3 rip thematic categories: 11th sept 2014, varna (bg) i.eco-voucher schemes to foster eco-...
TRANSCRIPT
3 RIP thematic categories:
11th Sept 2014, Varna (BG)
I. Eco-Voucher schemes
to foster eco-management
and eco-innovation
Speakers: PL, CZ
II. Cluster development
for eco-innovation & eco-
management
Speakers:UK, SI
III. Stakeholder platform
for eco-innovation & eco-
management
Speakers:EE, AT
Regional Implementation Plans
I. Eco-Voucher schemes to foster eco-management and eco-innovation
Improvement of existing voucher schemesby
Kujawsko-Pomorskie Region Rafał Modrzewski
(PL, PP 02)
11th Sept 2014, Varna (BG)
RIP themes
* The Polish RIP THEME visualised *
A picture says more than 1.000 words
311th Sept 2014, Varna (BG)
I. WHY
The need for:
co-operation
innovation
knowledge transfer
411th Sept 2014, Varna (BG)
II. OUR SOLUTION (= our RIP measure)
Promoting regional R&D potential
Open for external SMEs
Pro-ecological services and products
511th Sept 2014, Varna (BG)
III. Inspired by RECOMMEND
good practice from the South Moravian
Innovation Center
Study visits and meetings with experts
Thematic talks with regional stakeholders
611th Sept 2014, Varna (BG)
IV. STATUS QUO of our RIP implementation
final version accepted
key stakeholders engaged
possible financing from regional and national
programmes
711th Sept 2014, Varna (BG)
V. Next steps in implementing our RIP
ROP manual – more specific info
Elaboration of criteria
Contest for operator
811th Sept 2014, Varna (BG)
* The Polish RIP THEME visualised *
A picture says more than 1.000 words
911th Sept 2014, Varna (BG)
I. Eco-Voucher schemes to foster eco-management and eco-innovation
Business Voucher schemeby
EkoportJan Jareš
(CZ, PP 04)
11th Sept 2014, Varna (BG)
RIP themes
* The Czech RIP THEME visualised *
A picture says more than 1.000 words
1111th Sept 2014, Varna (BG)
I. WHY
lack of collaboration between R&D and
industry
no tool / incentive available
level of transferability / simplicity
allready existing in other CZ regions
1211th Sept 2014, Varna (BG)
II. OUR SOLUTION (= our RIP measure)
RIP describes current situation and future goals including concrete measures (voucher schemes) best practices examples from other CZ regions action plan and management „eco“ enhancements possibilities risk analysis sustainability
1311th Sept 2014, Varna (BG)
III. Inspired by RECOMMEND
by initial monitoring of available tools
(Greenovate!)
by other regions in CZ – workshop in Brno
1411th Sept 2014, Varna (BG)
IV. STATUS QUO of our RIP implementation
just finalised document (study) elaborated by external expert (Subsidia)Regional Authority and Council have approved
and allocated ca 50k eur for the first call (October 2014)
RECOMMEND helped to initiate, establish and launch pilot voucher scheme in South Bohemia (www.inovoucher.cz)
1511th Sept 2014, Varna (BG)
V. Next steps in implementing our RIP
evaluation of the first call (2014)
monitoring of project implementations (2014 /
2015)
preparation of the second call (2015)
eco-enhancement (2015)
1611th Sept 2014, Varna (BG)
* The Czech RIP THEME visualised *
A picture says more than 1.000 words
1711th Sept 2014, Varna (BG)
II. Eco-Cluster developmentfor eco-management & eco-innovation
Eco-management Cluster
byOpportunity Peterborough
Rod Gilchrist
(UK, PP 09)
11th Sept 2014, Varna (BG)
RIP themes
* The British RIP THEME visualised *
A picture says more than 1.000 words
1911th Sept 2014, Varna (BG)
I. WHY
Lack of SME advice and support
Need to stimulate eco innovation and
efficiency
Need to improve networking and share good
practice
2011th Sept 2014, Varna (BG)
II. OUR SOLUTION (= our RIP measure)
Improve SME networking via Future City Demonstrator project
Provide additional advice support to SMEs via 2014-20 LEADER or ESF/ERDF funding
Utilise domestic/EU funding streams to stimulate eco innovation and efficiency
2111th Sept 2014, Varna (BG)
III. Inspired by RECOMMEND
Advice, presentations and good practice shared by Lead partner
Partner visits during Working Summits
Field mission to Estonia showed what can be acheved through partnership
2211th Sept 2014, Varna (BG)
IV. STATUS QUO of our RIP implementation
Local Enterprise Partnership involved
Future City Demonstrator project to progress work
Recommend is informing LEADER bid
2311th Sept 2014, Varna (BG)
V. Next steps in implementing our RIP
Future City Demonstrator Project
LEADER Programme
Local Enterprise Partnership
2411th Sept 2014, Varna (BG)
* The British RIP THEME visualised *
A picture says more than 1.000 words
2511th Sept 2014, Varna (BG)
II. Eco-Cluster developmentfor eco-management & eco-innovation
Eco-Innovation Cluster (Bionics)
byLEA Spodnje Podravje
Uroš Majerič
(SI, PP 05)
11th Sept 2014, Varna (BG)
RIP themes
* The Slovenian RIP THEME visualised *
A picture says more than 1.000 words
2711th Sept 2014, Varna (BG)
I. WHY
Lack of activities in the eco innovation field
Insufficient support enviroment
Small number of eco innovative SME’s
Not appropriate funding for eco innovation
2811th Sept 2014, Varna (BG)
II. OUR SOLUTION (= our RIP measure)
Establishment of Bionics Cluster
Target groups:
- Educational institutions in the field of Bionics
- Local SME’s
2911th Sept 2014, Varna (BG)
III. Inspired by RECOMMEND
Discussed best practice examples regarding
establishment of Cluster networks in the UK
3011th Sept 2014, Varna (BG)
IV. STATUS QUO of our RIP implementation
Finalizing the RIP
Evaluating the final draft of the RIP with
corresponding stakeholders
3111th Sept 2014, Varna (BG)
V. Next steps in implementing our RIP
Establishment of the Bionics Cluster
Development of 5 year long term strategy for
the Cluster Joint development of eco innovation with
different members of the Cluster Providing funds for the realization of Cluster
activities
3211th Sept 2014, Varna (BG)
* The Slovenian RIP THEME visualised *
A picture says more than 1.000 words
3311th Sept 2014, Varna (BG)
III. Eco-Stakeholder platform for eco-management & eco-innovation
Contest “eco-friendly company of the year”
byTartu Regional Energy Agency
Martin Kikas
(EE, PP 06)
11th Sept 2014, Varna (BG)
RIP themes
* The Estonian RIP THEME visualised *
A picture says more than 1.000 words
3511th Sept 2014, Varna (BG)
I. WHY
Low awareness
Low initiative on environmental friendly measures
3611th Sept 2014, Varna (BG)
II. OUR SOLUTION (= our RIP measure)
Contest „Eco-friendly company of the year“
To motivate companies to deal with eco-innovation and environmentally friendly measures
Recognition of good examples
3711th Sept 2014, Varna (BG)
III. Inspired by RECOMMEND
Mapping of best practices
ÖkoManagement Lower Austria + recognition ceremony
Seminar about Ökomanagement Lower-Austria program in detail and implementation of energy management and environmental management systems in Austria
3811th Sept 2014, Varna (BG)
IV. STATUS QUO of our RIP implementation
Terms and conditions of the contest are worked out
The contest is announced together with City of Tartu
Recognition event will take place on 3rd of October
3911th Sept 2014, Varna (BG)
V. Next steps in implementing our RIP
Publication of good practices sent to the award contest
Encouragement to take part on the national „Environmental friendly company“ contest and „Europen Business Award for the Environment“
Together with City of Tartu we plan to make it a yearly contest
4011th Sept 2014, Varna (BG)
* The Estonian RIP THEME visualised *
A picture says more than 1.000 words
4111th Sept 2014, Varna (BG)
III. Eco-Stakeholder platform for eco-management & eco-innovation
My eco-expertby
Regional Government of Lower Austria(RECOMMEND Lead Partner)
Benjamin Kuscher
(AT, PP 01)
11th Sept 2014, Varna (BG)
RIP themes
* The Austrian RIP THEME visualised *
A picture says more than 1.000 words
4311th Sept 2014, Varna (BG)
I. WHY
defragmentation of eco-consultancy programmes
Lack of cooperation between the institutions supporting eco-management and eco-innovation
Lack of transparent selection criteria for
eco-consultants
4411th Sept 2014, Varna (BG)
II. OUR SOLUTION (= our RIP measure)
One single selection tool for all eco-consultants
More transparent information about all eco-consultants
Awareness raising to inform about the selection tool
4511th Sept 2014, Varna (BG)
III. Inspired by RECOMMEND
e-mobility
Crowdfunding for energy
Eco-procurement
4611th Sept 2014, Varna (BG)
IV. STATUS QUO of our RIP implementation
Online tool ready
Data entered
Graphic design ready
4711th Sept 2014, Varna (BG)
V. Next steps in implementing our RIP
Awareness raising
Ongoing hosting
Pool of experts for any eco-consultancy
4811th Sept 2014, Varna (BG)
* The Austrian RIP THEME visualised *
A picture says more than 1.000 words
4911th Sept 2014, Varna (BG)
On behalf of the Lead Partner we wish all RECOMMEND partners
a successful implementation of their RIPS!
Thank you for your work & commitment
11th Sept 2014, Varna (BG)
Regional Implementation Plans