3 foreword a new centrally sponsored scheme “support to state irrigation reforms” is being...
TRANSCRIPT
PRADHANMANTRI KRISHI SINCHAYEE YOJANA
PMKSY
Farmer Welfare and Agriculture
Development
District-Jabalpur (M.P)
DISTRICT IRRIGATION PLAN
JABALPUR(M.P.)
2
DIP Compiled and prepared by-
LRM CONSULTANTS
C-1/444C SECTOR-G JANKIPURAM LUCKNOW-226021
Contact No- +91-9415409130,+91-8382839337 email- [email protected],
www.lrmconsultant.com
3
Foreword
A new centrally sponsored Scheme “Support to State irrigation Reforms” is being
implemented to improve land forms in the State. Government of India is committed to
accord high priority to water conservation and its management. To this effect
Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) has been formulated with the
vision of extending the coverage of irrigation, improving water use
efficiency on source creation, distribution, management, field application and
extension activities. The District Irrigation Plan is prepared in tune with
Agriculture need and situation. This is the basic document that spells out
Programme/Services to be accomplished during 2016-2021 through effective
utilization of resources.
PMKSY has been formulated through funding from Accelerated Irrigation
Benefit Programme (AIBP) of the Ministry of Water Resources, River
Development & Ganga Rejuvenation (MoWR, RD&GR), Integrated Watershed
Management Programme (IWMP) of Department of Land Resources (DoLR) and
the On Farm Water Management (OFWM) of Department of Agriculture and
Cooperation (DAC).
The DIP has been prepared in consultation with all District stake holder
Departments taking in to consideration of development needs in the District.
I am very grateful to thank the Engineers, departmental officials and participating
members in preparation of this DISTRICT IRRIGATION PLAN (DIP) document for the
District Jabalpur.
District Collector
Jabalpur,Madhya Pradesh
4
Table of Contents Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) ................................................................................. 7
I. Introduction ................................................................................................................................ 7
II. Program Component and responsible Ministries/ Departments ............................................... 8
District Irrigation Plans (DIPs) ............................................................................................................... 11
I. Introduction .............................................................................................................................. 11
(i) Background ........................................................................................................................... 12
(ii) Vision ................................................................................................................................. 14
(iii) Objective ........................................................................................................................... 14
(iv) Strategy & Focus Areas ..................................................................................................... 15
(v) Methodology ..................................................................................................................... 15
Chapter-1 .............................................................................................................................................. 18
General information District ................................................................................................................. 18
1.1 District Profile ....................................................................................................................... 18
1.2 Demography .......................................................................................................................... 22
1.3 Biomass and Livestock .......................................................................................................... 24
1.4 Agro Ecology, Climate, Hydrology and Topography ............................................................. 28
1.4.1 Slope .............................................................................................................................. 31
1.4.2 Geomorphology ............................................................................................................ 32
1.4.3 Hydro-Geomorphology ................................................................................................. 35
1.5 Soil ......................................................................................................................................... 36
1.5.1 Soil Depth ...................................................................................................................... 42
1.5.2 Soil Texture ................................................................................................................... 43
1.6 Soil Erosion ............................................................................................................................ 43
1.7 Drainage ................................................................................................................................ 44
1.8 Landuse ................................................................................................................................. 46
1.8.1 Landuse Classification ................................................................................................... 46
Chapter-2 .............................................................................................................................................. 54
District Water Profile ............................................................................................................................ 54
2.1 Irrigation Status ........................................................................................................................... 54
1.1.1 Importance of Irrigation ................................................................................................ 54
2.1.2 Types of Irrigation ......................................................................................................... 56
2.2 Production and Productivity of Major Crops ........................................................................ 60
Chapter-3 .............................................................................................................................................. 63
5
Water Availability .................................................................................................................................. 63
3.1 Status of Water Availability......................................................................................................... 63
Ground Water Resources ...................................................................................................................... 69
Ground Water Quality........................................................................................................................... 70
Quality of GroundWater for Drinking: ................................................................................................. 70
Quality of Water for Irrigation: ......................................................................................................... 70
Status ofGroundWaterDevelopment: ............................................................................................... 70
Ground Water Management Strategy .................................................................................................. 71
Recommendation .................................................................................................................................. 73
Chapter-4 .............................................................................................................................................. 74
Water Requirement/Demand ............................................................................................................... 74
4.1 Domestic Water Demand ............................................................................................................ 74
4.2 Crop Water Demand ................................................................................................................... 76
4.3 Livestock Water demand ............................................................................................................ 81
4.4 Industrial Water Demand............................................................................................................ 83
4.6 Water Demand of District for Various sectors ............................................................................ 85
4.7 Water Budget .............................................................................................................................. 86
Chapter-5 .............................................................................................................................................. 87
Strategic Action Plan ............................................................................................................................. 87
Methodology ..................................................................................................................................... 87
6
List of Tables
Table 1. 1 District Profile ...................................................................................................................... 20
Table 1. 2 Block Wise Population Details District – Jabalpur .............................................................. 22
Table 1. 3 Block Wise House Hold Details District - Jabalpur ............................................................ 23
Table 1. 4 Block-wise Small Animals Population ................................................................................ 25
Table 1. 5 Block-wise Large Animals Population ................................................................................ 26
Table 1. 6 Block-wise Wild Life Population ........................................................................................ 27
Table 1. 7 Block Wise Agro Ecological, Rainfall Data district - Jabalpur ........................................... 30
Table 1. 8 Temperature, PET and Elevetaion data pf district – Jabalpur .............................................. 30
Table 1. 9 Slope Category .................................................................................................................... 31
Table 1. 10 Slope Class In Jabalpur District ........................................................................................ 31
Table 1. 11 Soil Profile of the District .................................................................................................. 40
Table 1. 11 Land Use Pattern of District .............................................................................................. 50
Table 2. 1 Crop Irrigation Status of Jabalpur Block ............................................................................... 57
Table 2. 2 Crop Irrigation Status of PANAGAR Block ............................................................................ 57
Table 2. 3 Crop Irrigation Status of KUNDAM Block ............................................................................ 57
Table 2. 4 Crop Irrigation Status of Patan Block ................................................................................... 58
Table 2. 5 Crop Irrigation Status of Shahpur Block ............................................................................... 58
Table 2. 6 Crop Irrigation Status of MAJHOLI Block .............................................................................. 58
Table 2. 7 Crop Irrigation Status of SIHORA Block ................................................................................ 59
Table 2. 8 Production and Productivity Status of the Jabalpur District ................................................ 60
Table 2. 9 Block wise Irrigated and Rainfed Area ................................................................................. 62
Table 3- 1 Surface Water Availability .................................................................................................... 65
Table 3- 2 Ground Water Availability .................................................................................................... 65
Table 3- 3 Status of the canal commond .............................................................................................. 66
Table 3- 4 Ground Water Resources ..................................................................................................... 69
Table 4. 1 Average Domestic Water Requirement/Demand ............................................................... 75
Table 4. 2 Domestic Water demand ...................................................................................................... 75
Table 4. 3 Crop water Demand ........................................................................................................... 78
Table 4. 4 Livestock Water Demand .................................................................................................... 82
Table 4. 5 Water Consumption by Animals/Birds ................................................................................ 83
Table 4. 6 Industrial Water Demand .................................................................................................... 84
Table 4. 7Water Demand of the district for various sectors (Present) ................................................. 85
Table 4. 8Water Demand of the district for various sectors (Projected) .............................................. 85
Table 4. 9 Water Budget ...................................................................................................................... 86
Table 5. 1 Block wise Component wise Expenditure ............................................................................ 89
Table 5. 2 Block wise No. Of Activity and Expenditure ......................................................................... 90
Table 5. 3 Block wise Total Expenditure ............................................................................................... 90
Table 5. 4 Block wise Ministry wise Total Expenditure ......................................................................... 91
Table 5. 5 Component wise year wise Total Expenditure(Amount in Cr.) ............................................ 92
7
Pradhan Mantri Krishi Sinchayee Yojana (PMKSY)
I. Introduction
Government of India is committed to accord high priority to water
conservation and its management. To this effect Pradhan Mantri Krishi
Sinchayee Yojana (PMKSY) has been formulated with the vision of extending
the coverage of irrigation and improving water use efficiency in a focused
manner with end to end solution on source creation, distribution, management,
field application and extension activities. The major objective of PMKSY is to achieve
convergence of investments in irrigation at the field level, enhance the physical access of
water on the farm and expand cultivable area under assured irrigation (Har Khet ko Pani),
improve on-farm water use efficiency to reduce wastage of water, enhance the adoption of
precision-irrigation and other water saving technologies (Per drop More crop), enhance
recharge of aquifers and introduce sustainable water conservation practices by exploring the
feasibility of reusing treated municipal waste water for peri-urban agriculture and attract
greater private investment in precision irrigation system.The scheme also aims at bringing
concerned Ministries/Departments/Agencies/Research and Financial Institutions engaged in
creation/use/recycling/potential recycling of water, brought under a common platform, so that
a comprehensive and holistic view of the entire "water cycle" is taken into account and proper
water budgeting is done for all sectors namely, household, agriculture and industries.
The programme architecture of PMKSY aims at a 'decentralized State level planning
and execution' structure, in order to allow States to draw up a District Irrigation Plan (DIP)
and a State Irrigation Plan (SIP). DIP will have holistic developmental perspective of the
district outlining medium to long term developmental plans integrating three components
namely, water sources, distribution network and water use application of the district to be
prepared at two levels the block and the district. All structures created under the schemes will
be geo-tagged.
The programme will be supervised and monitored by an Inter-Ministerial
National Steering Committee (NSC) constituted under the Chairmanship of Prime
Minister with Union Ministers from concerned Ministries. A National Executive
8
Committee (NEC) will be constituted under the Chairmanship of Vice Chairman,
NITI Aayog to oversee programme implementation, allocation of resources, inter
ministerial coordination, monitoring & performance assessment, addressing
administrative issues etc.
PMKSY has been conceived amalgamating ongoing schemes viz.
Accelerated Irrigation Benefit Programme (AIBP) of the Ministry of Water
Resources, River Development & Ganga Rejuvenation (MoWR, RD&GR),
Integrated Watershed Management Programme (IWMP) of Department of Land
Resources (DoLR) and the On Farm Water Management (OFWM) of Department
of Agriculture and Cooperation (DAC). The scheme will be implemented by
Ministries of Agriculture, Water Resources and Rural Development. Ministry of
Rural Development is to mainly undertake rain water conservation, construction
of farm pond, water harvesting structures, small check dams and contour bunding
etc. MoWR, RD &GR, is to undertake various measures for creation of assured
irrigation source, construction of diversion canals, field channels, water
diversion/lift irrigation, including development of water distribution systems.
Ministry of Agriculture will promote efficient water conveyance and precision
water application devices like drips, sprinklers, pivots, rain -guns in the farm
“(Jal Sinchan)”, construction of micro -irrigation structures to supplement source
creation activities, extension activities for promotion of scientific moisture
conservation and agronomic measures.
II. Program Component and responsible Ministries/ Departments
1. AIBP(Accelerated Irrigation Benefit Programme)by MoWR, RD &GR To focus on
faster completion of ongoing Major and Medium Irrigation including National Projects.
2. PMKSY (Har Khet ko Pani) by MoWR,RD&GR Creation of new water sources through
Minor Irrigation (both surface and ground water)
Repair, restoration and renovation of water bodies; strengthening carryingcapacity of
traditional water sources, construction rain water harvestingstructures (Jal Sanchay);
Command area development, strengthening and creation of distributionnetwork from source
to the farm;
9
Ground water development in the areas where it is abundant, so that sinkis created to
store runoff/ flood water during peak rainy season;
Improvement in water management and distribution system for waterbodies to take
advantage of the available source which is not tapped to itsfullest capacity (deriving benefits
from low hanging fruits). At least 10% ofthe command area to be covered under
micro/precision irrigation;
Diversion of water from source of different location where it is plenty tonearby water
scarce areas, lift irrigation from water bodies/rivers at lowerelevation to supplement
requirements beyond IWMP and MGNREGSirrespective of irrigation command.
Creating and rejuvenating traditional water storage systems like Jal Mandir(Gujarat);
Khatri, Kuhl (H.P.); Zabo (Nagaland); Eri, Ooranis (T.N.); Dongs(Assam); Katas, Bandhas
(Odisha and M.P.) etc. at feasible locations.
3. PMKSY (Per Drop more Crop)by Dept. of Agriculture & Cooperation, MoA
Programme management, preparation of State/District Irrigation Plan, approval of
annual action plan, Monitoring etc.
Promoting efficient water conveyance and precision water applicationdevices like
drips, sprinklers, pivots, rain-guns in the farm (Jal Sinchan);
Topping up of input cost particularly under civil construction beyondpermissible limit
(40%), under MGNREGS for activities like lining inlet,outlet, silt traps, distribution system
etc.
Construction of micro irrigation structures to supplement source creationactivities including
tube wells and dug wells (in areas where ground wateris available and not under semi critical
/critical /over exploited category ofdevelopment) which are not supported under AIBP,
PMKSY (Har Khet koPani), PMKSY (Watershed) and MGNREGS as per block/district
irrigationplan
Secondary storage structures at tail end of canal system to store water when available
in abundance (rainy season) or from perennial sources like streams for use during dry periods
through effective on-farm watermanagement;
Water lifting devices like diesel/ electric/ solar pump sets including watercarriage
pipes, underground piping system;
10
Extension activities for promotion of scientific moisture conservation andagronomic
measures including cropping alignment to maximize use ofavailable water including rainfall
and minimize irrigation requirement (Jalsarankchan);
Capacity building, training and awareness campaign including low costpublications,
use of pico projectors and low cost films for encouragingpotential use water source through
technological, agronomic andmanagement practices including community irrigation.
The extension workers will be empowered to disseminate relevanttechnologies under
PMKSY only after requisite training is provided to themespecially in the area of promotion of
scientific moisture conservation andagronomic measures, improved/ innovative distribution
system like pipeand box outlet system, etc.
4. PMKSY (Watershed Development)by Dept. of Land Resources, MoRD Water
harvesting structures such as check dams, nala bund, farm ponds, tanks etc.
Capacity building, entry point activities, ridge area treatment, drainage line treatment,
soil and moisture conservation, nursery raising, afforestation, horticulture, pasture
development, livelihood activities for the asset-less persons and production system & micro
enterprises for small and marginal farmers etc.
Effective rainfall management like field bunding, contour bunding/trenching,
staggered trenching, land levelling, mulching etc.
11
District Irrigation Plans (DIPs)
I. Introduction
District Irrigation Plans (DIPs) is the important feature for planning and implementation
of PMKSY. It will present holistic irrigation development perspective of the district outlining
medium to long term development plans integrating three components viz. water sources,
distribution network and water use applications incorporating all usage of water like drinking
& domestic use, irrigation and industry. DIP will form the compilation package of all existing
and proposed water resource network system in the district.
DIP is compiled by identifying the gaps in irrigation infrastructure after taking into
consideration the District Agriculture Plans (DAPs) already prepared for Rashtriya Krishi
Vikas Yojana (RKVY) vis-à-vis irrigation infrastructure currently available and resources
that would be added during XII Plan from other ongoing schemes (both State and Central),
like Mahatma Gandhi National Rural Employment Guarantee Scheme(MGNREGS),
Rashtriya Krishi Vikash Yojana (RKVY), Rural Infrastructure Development Fund (RIDF),
Member of Parliament Local Area Development (MPLAD) Scheme, Member of Legislative
Assembly Local Area Development (MLALAD) Scheme, Local body funds etc. The gaps
indentified under Strategic Research & Extension Plan (SREGP) were used in preparation of
DIP.
The DIPs is prepared at two levels, the block and the district. Keeping in view the
convenience of map preparation and data collection, the work would be primarily done at
block level. Block wise irrigation plan is prepared depending on the available and potential
water resources and water requirement for agriculture sector prioritizing the activities based
on socio-economic and location specific requirement. Emphasize is also given to planning on
basin/subbasin level, the comprehensive irrigation plan covers more than one district. The
activities identified in the basin/sub-basin plan were segregated into district/block level action
plans. The satellite imagery, topo-sheets and available database is appropriately utilized for
developing irrigation plans at least on pilot basis to begin with and subsequently may be
extended to all projects.
12
The DIP plan includes information on all sources of available water, distribution
network, defunct water bodies, new potential water sources both surface and sub- surface
systems, application & conveyance provisions, crops and cropping system aligned to
available/designed quantity of water and suitable to local agro ecology. All activities
pertaining water harvesting, water augmentation from surface/subsurface sources, distribution
and application of water including repair renovation and restoration of water bodies, major
medium and minor irrigation works, command area development etc. are taken up within the
frame work of this plan.
Emphasis is given for deriving potential benefit from low hanging fruits like
extending the reach/coverage of water source through effective distribution and application
mechanism, reducing the gap between potential created and utilized through more focus on
command area development and precision irrigation. Proper integration of creation of source
like dams and water harvesting structures, distribution system like canals and command area
development works and precision farming is made for deriving best possible use of water
resources. Steps also taken for use of urban treated wastewater for irrigation purpose. For
respective cities a command area is identified for this purpose in and around the adjoining
agricultural land of urban habitation.
(i) Background
In the last one year, the Government of India has taken several farmer friendly
initiatives. These, amongst other things, include the following:
• A new scheme has been introduced to issue a Soil Health Card to every farmer. Soil
Health Management in the country is being promoted through setting up of soil and
fertilizer testing laboratories. 34 lakh soil samples has been collected and analysis is
continuing.
• A new scheme for promoting organic farming "Pramparagat Krishi Vikas Yojana" has
been launched to promote organic farming.
• A dedicated Kisan Channel has been started by Doordarshan to address various issues
concerning farmers.
• Government is also encouraging formation of Farmer Producer organizations.
13
• Assistance to farmers, as input subsidy, has been increased by 50 percent in case of
natural calamities.
• Norms have been relaxed to provide assistance from previous norm of crop loss of
more than 50 percent to 33 percent to farmers afflicted by natural calamities.
• Minimum Support Price (MSP) for various Kharif crops has been increased. Bonus of
Rs.200 per quintal has been announced for pulses. Area coverage under pulses has
increased over the last year.
Hon’ble President in his address to the joint Session of the Parliament of 16th Lok Sabha
indicated that “Each drop of water is precious”. Government is committed to giving high
priority to water security. It will complete the long pending irrigation projects on priority and
launch the ‘Pradhan Mantri Krishi Sinchayee Yojana’ with the motto of ‘Har Khet Ko Paani’.
There is a need for seriously considering all options including linking of rivers, where
feasible; for ensuring optimal use of our water resources to prevent the recurrence of floods
and drought. By harnessing rain water through ‘Jal Sanchay’ and ‘Jal Sinchan’, we will
nurture water conservation and ground water recharge. Micro irrigation will be to ensure ‘Per
drop-More crop’.
Out of about 141 m.Ha of net area sown in the country, about 65 million hectare (or 45%)
is presently covered under irrigation. Substantial dependency on rainfall makes cultivation in
unirrigated areas a high risk, less productive profession. Empirical evidences suggest that
assured or protective irrigation encourages farmers to invest more in farming technology and
inputs leading to productivity enhancement and increased farm income.
The Cabinet Committee on Economic Affairs chaired by Hon’ble Prime
Minister has accorded approval of Pradhan Mantri Krishi Sinchayee Yojana
(PMKSY) in its meeting held on 1st July, 2015. PMKSY has been approved for
implementation across the country with an outlay of Rs. 50,000 crore in five years.
For 2015-16, an outlay of Rs.5300 crore has been made which includes Rs. 1800
crore for DAC; Rs. 1500 crore for DoLR; Rs. 2000 crore for MoWR (Rs. 1000
crore for AIBP; Rs. 1000 crores for PMKSY).
14
(ii) Vision
To use the available water resources in the district to the maximum potential in an
efficient way catering to the basic needs of every living being and enhancing the livelihoods
of rural population to the maximum extent thus alleviating poverty in a sustainable way
without compromising the interests of future generations.
(iii) Objective
The broad objectives of PMKSY will be:-
a) Achieve convergence of investments in irrigation at the field level (preparation of
district level and, if required, sub district level water use plans).
b) Enhance the physical access of water on the farm and expand cultivable area under
assured irrigation (Har Khet ko pani),
c) Integration of water source, distribution and its efficient use, to make best use of
water through appropriate technologies and practices.
d) Improve on-farm water use efficiency to reduce wastage and increase availability
both in duration and extent,
e) Enhance the adoption of precision-irrigation and other water saving technologies
(More crop per drop).
f) Enhance recharge of aquifers and introduce sustainable water conservation
practices
g) Ensure the integrated development of rainfed areas using the watershed approach
towards soil and water conservation, regeneration of ground water, arresting runoff,
providing livelihood options and other NRM activities.
h) Promote extension activities relating to water harvesting, water management and
crop alignment for farmers and grass root level field functionaries.
i) Explore the feasibility of reusing treated municipal waste water for peri-urban
agriculture,
j) Attract greater private investments in irrigation.
15
This will in turn increase agricultural production and productivity and enhance farm
income.
(iv) Strategy & Focus Areas
To achieve these objectives,PMKSY will strategize by focusing on end-toend solution
in irrigation supply chain, viz. water sources, distribution network,efficient farm level
applications, extension services on new technologies &information etc. Broadly, PMKSY
will focus on:-
a) Creation of new water sources; repair, restoration and renovation of defunct water
sources; construction of water harvesting structures, secondary & micro storage,
groundwater development, enhancing potentials of traditional water bodies at village
level like Jal Mandir (Gujarat); Khatri, Kuhl (H.P.); Zabo (Nagaland); Eri, Ooranis
(T.N.); Dongs (Assam); Katas, Bandhas (Odisha and M.P.) etc.
b) Developing/augmenting distribution network where irrigation sources (both assured
and protective) are available or created;
c) Promotion of scientific moisture conservation and run off control measures to
improve ground water recharge so as to create opportunities for farmer to access
recharged water through shallow tube/dug wells;
d) Promoting efficient water conveyance and field application devices within the farm
viz, underground piping system, Drip & Sprinklers, pivots, rain-guns and other
application devices etc.;
e) Encouraging community irrigation through registered user groups/farmer producers’
organizations/NGOs;
f) Farmer oriented activities like capacity building, training and exposure visits,
demonstrations, farm schools, skill development in efficient water and crop
management practices (crop alignment) including large scale awareness on more crop
per drop of water through mass media campaign, exhibitions, field days, and
extension activities through short animation films etc.
(v) Methodology
The preparation of District Irrigation plan is an integration of geospatial technology,
Space application technologies and spatial and non-spatial data.
16
1. Transformation of available thematic information on to the village level on
Bhuvan portal and extract geo-referenced village map data.
2. Integration of thematic layers with socio-economic data for classification of
area into specific composite land units on village level.
3. Preparation of appropriate action plan based on potential of composite land units
and developmental needs of study area in on the basis of available data.
4. Field visit to validate the recommended measures with respect to the ground
situation and requirement of the local people.
5. Finalization of development plans based on field observation.
Available thematic information for preparation for water resource and land resource
development plan.
Landuse / land cover map
Groundwater potential map
Soil map - depth, texture, erosion and land capability
Slope map.
High resolution Satellite mage through Bhuvan portal.
Lithology.
Hydro geomorphology.
Area for development of water resources structure geospatial technology has been
used in this process first identify the area of crop land based on high resolution satellite data
and then identify the irrigated area by different source of irrigation methods. To identify the
unirrigated area an overlay method is used. District irrigation plan covers the fallowing
planning component of the district in sustainable development approach:
Increase in vegetation/biomass in the district.
More number of surface water bodies in district.
Shift from annual crop to perennial.
Increase in the extent of crop area.
Improvement in the soil moisture availability
Reclamation of waste lands.
Convergence of investments in irrigation at the field level.
17
Enhance the physical access of water on the farm and expand cultivable area under
assured irrigation (Har Khet ko pani)
Best use of water through appropriate technologies and practices.
Improve on-farm water use efficiency.
Enhance the adoption of precision-irrigation and other water saving technologies
(More crop per drop).
Enhance recharge of aquifers and introduce sustainable water conservation practices.
Ensure the integrated development of rainfed areas.
Promote extension activities relating to water harvesting, water management and crop
alignment for farmers and grass root level field functionaries.
Explore the feasibility of reusing treated municipal waste water for peri-urban
agriculture,
Attract greater private investments in irrigation.
18
Chapter-1
General information District
1.1 District Profile
Jabalpur district is located almost in the central part of Madhya Pradesh. Jabalpur
District is located in the Mahakoshal region of Madhya Pradesh, on the divide between the
watersheds of Narmada and the Son, but mostly within the valley of the Narmada, which here
runs through the famous gorge known as the Marble rocks, and falls 30 ft. over a rocky ledge.
The district extends from 22º49' to 23º07' north latitudes and 79º21' to 80º35' east longitude.
The total area of the district is 519757 Ha. It has an average elevation of 411 metres
(1348 ft).
Jabalpur district is bounded by Mandla district of Madhya Pradesh to south east,
Dindori district to the east, Seoni distrct to south and Narsinghput to south west and Damoh
district to west. District has been divided in to Six Tehsils and seven development blocks.
There are 1458 villages, 542 village Panchayats 07 Janpad Panchayats. Jabalpur district
primarily speaks Hindi and some are fluent with english too. People do speak multiple
languages, including: Bagheli, which has a lexical similarity of 72-91% with Hindi and is
spoken by about 7800 000 people in Bagelkhand and Bharia, a Dravidian language spoken by
at least 200000 members of the Bharia tribe and written in the Devanagari script.
Jabalpur City is known and considered as Sanskardhani, a “Cultural Center Place”.
Jabalpur is evolving as a multi-culture and multi-religious city, gradually growing in to a
cosmopolitan area. The roots of the city yet are with its farming native people. Series of
lakes, which, shaded by fine trees and bordered by fantastic crags add much beauty to the
suburbs. Jabalpur city is located in the Mahakoshal region situated at the center of India in
the state of Madhya-Pradesh. Jabalpur is the administrative headquarters of Jabalpur district
and Jabalpur division.
Jabalpur should be called the TIGER CORRIDOR as it is the nearest Road, Train and
Air gateway to world famous Kanha, Bandhavgad, Pench and Satpuda Tiger National parks.
It consists of a long narrow plain running north-east and south-west, and shut in on all
sides by highlands. This plain, which forms an offshoot from the great valley of the Narmada,
is covered in its western and southern portions by a rich alluvial deposit of black cotton-soil.
19
At Jabalpur city the soil is black cotton soil, and water plentiful near the surface. The north
and east belong to basin of the Son River, a tributary of the Ganges and Yamuna, the south
and west to the Narmada basin.
Jabalpur consists of seven developmental blocks: Jabalpur, Kundam, Panagar, Patan,
Shahpura, Sihora and Majholi. Tehsil in the district is Six i.e. Jabalpur, Kundam, Panagar,
Patan, Shahpura, Sihora. There are 1458 villages out of which 1424 are inhabited villages and
34 uninhabited villages in the district. The district has a total population of 2460714 out of
which 1023255 is rural population and 1437459 is urban population. According to census
2011 of the total population, there are 1278448 males and 1182266 females, Sex ratio - 925.
Total geographical area of the district is 519757 Ha., out of which 158694 Ha is
agricultural Area. Average annual rainfall of district is 1298 mm. District Location Map is
given is below.
20
Table 1. 1 District Profile
S. No. District Profile
1 District Code 451
2 Geographical Area 519757 ha.
3 Latitude and Longitude
N 22049’ and 23007’
4 E 79021’ and 80035’
5 Area under Forest 52230 ha.
6 Net sown Area 272399 ha.
7 Grossed Cropped Area 431093 ha.
8 Net Irrigated Area 205103 ha.
9 Net Rainfed 59099 ha.
10 Total No. of Blocks 7
11 ST blocks 1, Kundam
12 Total No. of Panchayat 516
13 Total No. of Villages (inhabitated) 1424
14 Total Population 2460714
15 Urban Population 1437459
16 Rural Population 1023255
17 Male 1278448
18 Female 1182266
19 No. of House holds 236971
20 Population Density 472
21 Sex ratio 925
22 Population Growth 14.4
23 Total Male 527031
24 Total Female 496244
25 Poultry 3389851
21
Figure 1- 1 Location Map of Jabalpur District
22
1.2 Demography
As per 2011 Census, the total population of the district is 2460714 out of which
41.58% belong to rural areas. Sex ratio is 925 in Jabalpur and 931 in Madhya Pradesh. This
shows that sex ratio is lower than that of Madhya Pradesh. Total rural population of Jabalpur
is 1023255. Details of ST, SC and House Holds are given in Table.
Table 1. 2 Block Wise Population Details District – Jabalpur
S.N. NAME OF
BLOCK
NO. OF GRAM
PANCHYAT
NO. OF VILLAGES COVERED
MALE FEMALE SC ST GEN/OBC TOTAL
POPULATION
1 JABALPUR 86 192 85152 78370 18838 51010 93674 163522
2 KUNDAM 68 198 58924 59663 9144 86564 22879 118587
3 PANAGAR 78 208 73403 67873 19482 30580 91214 141276
4 PATAN 76 222 67624 62450 22129 20161 87784 130074
5 SHAHPURA 84 227 92097 86012 25482 45512 107115 178109
6 SIHORA 57 155 69526 66073 19856 27450 88293 135599
7 MAJHOLI 83 222 80305 75783 23947 33510 98631 156088
8 URBAN
751417 686042 243649 181982 1011827 1437459
TOTAL 532 1424 1278448 1182266 382527 476769 1601417 2460714
Source: Census of India 2011
Graph 1- 1 Block Wise Population Details District - Jabalpur
0
20000
40000
60000
80000
100000
120000
MALE
FEMALE
SC
ST
GEN/OBC
Table 1. 3 Block Wise House Hold Details District - Jabalpur
Sr No Block Name House Hold Total Population Male Female
1 JABALPUR 36325 163522 85152 78370
2 KUNDAM 27522 118587 58924 59663
3 PANAGAR 32145 141276 73403 67873
4 PATAN 30889 130074 67624 62450
5 SHAHPURA 39040 178109 92097 86012
6 SIHORA 33011 135599 69526 66073
7 MAJHOLI 38039 156088 80305 75783
8 URBAN 278058 1437459 751417 686042
TOTAL 515029 2460714 1278448 1182266
Graph 1- 2 Block Household Details District - Jabalpur
0
5000
10000
15000
20000
25000
30000
35000
40000
JABALPUR KUNDAM PANAGAR PATAN SHAHPURA SIHORA MAJHOLI
1.3 Biomass and Livestock
Water plays an important role in livestock productivity. Livestock productivity in
pastoral areas depends greatly on the availability of water. There are several factors, which
determine water balance, water turnover and functions of the animal. Assessment of livestock
and water requirement is helpful in modelling water and livestock relationships.
The demand for meat, dairy products and eggs rises faster than the demand for crops;
thus both scenarios call for livestock production to increase relatively more rapidly than
crops. The world livestock system is broadly divided into pastoral grazing, mixed farming
and industrial systems (Sere and Stienfeld 1996). Estimate of the current demand of 1.7
billion tons of cereals and 206 million tons of meat in developing countries could rise by
2020 to 2.5 to 2.8 billion tons of cereals and to 310 millions of tons of meat (IFPRI 2000).
Water is used by the herbivore as a medium for physical and chemical energy transfer,
namely for evaporative cooling and intermediary metabolism (Konandre as and Anderson;
King 1983; Kirda and Riechardt 1986). Livestock and poultry water consumption depend on
a number of physiological and environmental conditions such as:
• Type and size of animal or bird
• Physiological state (lactating, pregnant or growing)
• Activity level
• Type of diet-dry hay, silage or lush pasture
• Temperature-hot summer days above 25 0C can sometimes double the water
consumption of animals.
• Water quality - palatability and salt content
25
Table 1. 4 Block-wise Small Animals Population
S.No. BLOCK
SMALL ANIMALS Total Small
animals POULTRY
(No.) DUCKS (No.) PIGS (No.) GOATS (No.) SHEEPS (No.)
1 JABALPUR 137702 136 1681 20144 360 160023
2 KUNDAM 144292 12 306 11716 152 156478
3 PANAGAR 176498 90 595 9563 0 186746
4 PATAN 14064 3 318 15190 3 29578
5 SHAHPURA 53100 8 379 15759 336 69582
6 SIHORA 2838593 0 576 7928 228 2847325
7 MAJHOLI 24458 895 977 23979 91 50400
TOTAL 3388707 1144 4832 104279 1170 3500132
Source: Livestock Census of India 2011
Graph 1- 3 Small Animals in Jabalpur District
From the above Graph it is clear that in Jabalpur District Sihora Block Having
highest no of Small Animals i.e. 2847325 out of this 2838593 Poultry, 576 Pigs, 7928 Goats.
And in Patan have Lowest no of small animals that are 29578 out of this 14064 Poultry, 3
Ducks, 318 Pigs, 15190 Goats and 3 Sheep’s.
0
200
400
600
800
1000
1200
1400
1600
1800
JABALPUR KUNDAM PANAGAR PATAN SHAHPURA SIHORA MAJHOLI
DUCKS (No.) PIGS (No.) SHEEPS (No.)
26
Table 1. 5 Block-wise Large Animals Population
S.N. BLOCK
LARGE ANIMALS
Total Large
Animals INDIGENOUS
COW (No.)
HYBRID COW
(No.)
IN
DESCRIPTIVE
BUFFALO (No.)
1 JABALPUR 58768 4737 18059 81564
2 KUNDAM 62223 505 7046 69774
3 PANAGAR 31703 4357 21472 57532
4 PATAN 37613 8617 13604 59834
5 SHAHPURA 57199 6950 15021 79170
6 SIHORA 33710 710 7577 41997
7 MAJHOLI 56260 2046 12545 70851
TOTAL 337476 27922 95324 460722
Graph 1- 4 Large Animals in Jabalpur District
From the above Graph it is clear that in Jabalpur District Jabalpur Block Having
highest no of Large Animals i.e 81564 out of this 58768 Indigenous Cow, 4737 Hybrid Cow,
18059 In-Descriptive Buffalo. And in Sohora have Lowest no of Large Animals i.e 41997 out
of this 33710 Indigenous Cow, 710 Hybrid Cow, 7577 In Descriptive Buffalo.
0
10000
20000
30000
40000
50000
60000
70000
JABALPUR KUNDAM PANAGAR PATAN SHAHPURA SIHORA MAJHOLI
INDIGENOUS COW (No.) HYBRID COW (No.) IN DESCRIPTIVE BUFFALO (No.)
27
Table 1. 6 Block-wise Wild Life Population
S.N. Block Total number of Wild Life (1 % of Total Livestock)
1 JABALPUR 2416
2 KUNDAM 2263
3 PANAGAR 2443
4 PATAN 894
5 SHAHPURA 1488
6 SIHORA 2889
7 MAJHOLI 1213
TOTAL 13605
Graph 1- 5 Wild Animals in Jabalpur District
0
500
1000
1500
2000
2500
3000
JABALPUR KUNDAM PANAGAR PATAN SHAHPURA SIHORA MAJHOLI
28
1.4 Agro Ecology, Climate, Hydrology and Topography
Agro-ecology is the study of ecological processes that operate in agricultural production
systems. The prefix agro- refers to agriculture. Bringing ecological principles to bear in agro-
ecosystems can suggest novel management approaches that would not otherwise be considered.
Agro-ecology is a whole system approach to agriculture and food systems development based on
traditional knowledge, alternative agriculture and local food system experiences.
Agro-ecological research considers interactions of all important biophysical, technical and
socioeconomic components of farming systems and regards these systems as the fundamental
units of study, where mineral cycles, energy transformations, biological processes and
socioeconomic relationships are analyzed as a whole in an interdisciplinary fashion. Agro-
ecology is concerned with the maintenance of a productive agriculture that sustains yields and
optimizes the use of local resources while minimizing the negative environmental and socio-
economic impacts of modern technologies.
Agro-ecology is the application of ecological concepts and methodological design for long-term
enhancement and management of soil fertility and agriculture productivity. It provides a strategy
to increase diversified agro-ecosystem. So it is benefiting the effect of the incorporation of plant
and animal biodiversity, nutrient recycling; biomass creation and growth through the use of
natural resource systems based on legumes, trees, and incorporation of livestock. These all make
the basis of a sustainable agriculture and aim to improve the food system and societal
sustainability. The agro-ecology supports production of both a huge quantity and diversity of
good quality of food, thread and medicinal crops, together with family utilization and the market
for economic and nutritionally at risk populations. Sustainable agricultural practices have to
tackle the conservation of biodiversity, enhanced ecological functions, social tolerance, self-
reliance, fairness, improved quality of life and economic productivity of crops and live- stock.
Sustainability of agriculture is viewed critically from the point of food and ecological security at
the regional scale.
29
Figure 1- 2 Agro-Climatic Zonea of Madhya Pradseh
30
Table 1. 7 Block Wise Agro Ecological, Rainfall Data district - Jabalpur
Name of Block
Agro
Ecolo
gical
Zone
Type
Type of
Terrain
Block Area
(Lacs Ha.)
Normal
Annual
Rainfall
(mm)mal
Annual
Rainfall(m
m)
Average
Monthaly
Rainfall (mm)
No. of Rainydays
Maximum Rainfall
Intensity(mm)
Up to
15 Min
Beyond
15 ut up to 30
Min
Beyond
30 but upto
60 Min
Jabalpur
Kymore & Satpura
Plane & Hilly
1.17 1298.3 108.1917 54
_ _ 67
Panagar 0.47 1298.3 108.1917 54 _ _ 65
Kundam 1.04 1178.6 98.21667 54 _ _ 66
Patan 0.6 1178.6 98.21667 54 _ _ 65
Shahpura 0.82 1178.6 98.21667 54 _ _ 66
Sihora 0.49 1178.6 98.21667 54 _ _ 64
Majholi 0.6 1178.6 98.21667 54 _ _ 65
Table 1. 8 Temperature, PET and Elevetaion data pf district – Jabalpur
Name of Block
Average Weekly Temperature (°C) Potential Evapo-Transpiration
(PET) Elevation
Period Period
Cumul
ative Total
Min. Max. Mean.
Summer
(April-May) Winter (Oct.-Mar.) Rainy (June-Sept)
Summer Winter Rainy
Season Min. Max. Mean. Min. Max. Mean. Min. Max. Mean.
Jabalpur 21.4 42 31.7 9.7 34.5 22.1 23.3 38 30.65 267 105 167 539 280 540 412
Panagar 21.4 42 31.7 9.7 34.5 22.1 23.3 38 30.65 265 109 170 544 280 540 412
Kundam 21.4 42 31.7 9.7 34.5 22.1 23.3 38 30.65 262 112 165 539 280 540 412
Patan 21.4 42 31.7 9.7 34.5 22.1 23.3 38 30.65 268 111 164 543 280 540 412
Shahpura 21.4 42 31.7 9.7 34.5 22.1 23.3 38 30.65 262 115 171 548 280 540 412
Sihora 21.4 42 31.7 9.7 34.5 22.1 23.3 38 30.65 261 122 169 552 280 540 412
Majholi 21.4 42 31.7 9.7 34.5 22.1 23.3 38 30.65 259 119 168 546 280 540 412
31
1.4.1 Slope
Slope is a measure of change in elevation. It is a crucial parameter in several well-known
predictive models used for environmental management, including the Universal Soil Loss
Equation and agricultural non-point source pollution models.The effect of slope on agriculture
may be both direct and indirect. The most obvious direct influence of slope is in the form of the
restrained on cultivation and accessibility. The indirect effect of slope manifests itself in
pedagogical and climatic modification including the position of water table, development of
soils, air drainage, and relative freedom from frost. This classification gives information
regarding slope percent classes in the study area
Table 1. 9 Slope Category
Table 1. 10 Slope Class In Jabalpur District
SOIL CLASSES MAJOR
SOIL CLASSES AREA IN HA
LAND SLOPE PERCENTAGE
0 TO 3 03 TO 8 8 TO 25 ABOVE 25
DEEP SOILS 261000 46980 96570 86130 31320
MEDIUN DEEP SOILS 89000 16020 32930 29370 10680
SHALLOW SOILS 169757 30556.26 62810.09 56019.81 20370.84
TOTAL 519757 93556.26 192310.09 171519.81 62370.84
Slope Category Slope class
Nearly level 0-1 %
Very gently sloping 1-3 %
Gently sloping 3-8 %
Strongly sloping 8-15 %
Mod. steep to steep 15-35 %
Steep sloping 35-45 %
Very Steep sloping >45 %
32
Land Slope characteristics helps in understanding the soil genesis, land use, relation with
Lithology and land form, etc. Climate plays an important role in Slope evolution and it is
generally found that slope in humid climate are relatively gentle with deep soil and thick
vegetation. Land area which falls under very gently sloping (1-3%) accounting 49% TGA,
followed by gently sloping class (3-8%) accounting 25% TGA which is good for agricultural
practices, moderate sloping (8-15%) accounting 12% TGA, moderately steep sloping (15-30%)
accounting 14% area and steeply sloping (30-50%) accounting 17% TGA of the district. Higher
sloping area is associated with severe to very severe soil erosion, rendering the land less
productive
1.4.2 Geomorphology
Geomorphology is defined as the science of landforms with an emphasis on their origin,
evolution, form, and distribution across the physical landscape. An understanding of
geomorphology and its processes is therefore essential to the understanding of physical
geography.
Geomorphology is one of the critical theme information for all the application projects.
Hence, the geomorphic maps proposed to be prepared would cater to the different resource
information needs of the country like geo-environment, geo-engineering, geohazards, mineral
and ground water exploration and also interdisciplinary themes like soil, land use / land cover
and forest, etc. Geomorphology plays an important role in various fields of planning. One of the
major themes is the irrigation development wherein the geomorphological guides are used as one
of the indicator zone for site selection. The understanding of subsurface geology is a primary
requirement for planning exploration and exploitation strategies. The basement structure highs
manifest itself on the surface as geomorphic anomaly like annular drainage pattern, radial
pattern, sudden change in the river course etc.
The geology of Jabalpur is granitic, sandstone (Archaean) and their alluvium drained
by the river system. Wainganga, Bagh and their tributaries. there are thirteen landform with 38
soil series ( identified, correlated and mappaed 51 soils series) as Hills (3 soil series), Upper
plateau (4), Lower lateau (2), Upper pediments (2), Lower pediments (2), Ridges (2), Gorge (2),
33
Upper piedlnont (5), Lower piedmout (4), Valley bottom (2), Intervening basin (2), Flood plain
(6) and Isolated hillocks (2). The soil series association of hills with escarpment 4, Upper plateau
6, lower plateau 2, upper pediment 2, lower pediment 3, ridges 2, gorge 2, upper piedimont 7,
lower piedimont 5, valley Bottom 2, intervening basing 2 and flood plain 12. the soil of the
district mappedas soil series association (2-3 soil series in 9 unit). These soil has been
categorized for land capability, irrigability potentials, ad brief account of interpretation area also
indicated in soils description. The soils have been classified at family level. There are four soil
order (Entisols, Inceptisols Alfisols, Vertisols), five sub-orders, five great-groups, seven sub-
groups and 38 soil series.
The soil erosion, soil degradation and agro-ecological units are also depixted for
poverty evevation programme and overall developmental activites in the district. The brief
account of soils occurring in the district has been indicated as below.
34
Figure 1- 3 Landuse Map of Jabalpur District
35
1.4.3 Hydro-Geomorphology
Hydro geomorphology has been defined as “an interdisciplinary science that focuses on the
interaction and linkage of hydrologic processes with landforms or earth materials and the
interaction of geomorphic processes with surface and subsurface water in temporal and spatial
dimensions.”
Hydro geomorphology is an emerging scientific domain, mainly based on the concepts of
other scientific areas related to geosciences (e.g., geomorphology, geology, remote sensing,
hydrogeology, applied geophysics, soil and rock geo-techniques, hydrology, topography,
climatology and natural hazards. It operates in an interdisciplinary field focused on the linkage
between hydrologic processes with landforms or earth materials, the interaction of geomorphic
processes relating surface water and groundwater regimen.
District Jabalpur is a home of geology since formations ranging form lower proterozoic to
Pleistocene age are exposed in the area different types of aquifers are formed by these rocks in
the area main geological units of the area are Archaens, Gondwana, Lameta, Deccan Trap and
Narmada alluvium. Occurrence & movement of ground water in hard rocks is mainly controlled
by secondary porosity through Joints & fractures. Primary porosity in Gondwana sand stone &
vesicular basalts in Deccan Traps play are important role in ground water movement. Lameta are
also forming potential aquaifers made up of relatively loose & friable shale & sand stone.
Ground water in general occurs under unconfined; Semi confined & confined conditions. The
occurrence & movement of ground water in different geological formations in described below.
Makoshal Group:
These formations consisting of quartzite’s, shale, state and marble are hard, compact,
recrystallized and have no primary porosity. There form poor aquifers. However, limestone’s at
places have solution cavities, which give rise to very high secondary porosity & permeability.
The limestone formation is encountered at Patan at depth of 55mbgl yielded 41 lps of water for
5.36 meters of draw down.
Granites:
Granites and granitic gneisses exposed mostly in and around Jabalpur town. These formations
are quite hard and generally devoid of primary porosity. However, due to weathering of the top
mantle, secondary porosity and permeability has developed which supports dug-wells. The joints
and fractures close down after a depth of 40 to 50 meters. Ground water occurs under water table
36
conditions and the tube wells in this formation, though very few, can sustain a maximum
discharge of about three lps for appreciable draw downs. The yield of open wells ranges between
20 to 100m3/day.
Vindhyans:
These are mostly sandstones belonging to the lower vindhyans and are devoid of any primary
Porosity. However, due to weathering, fracturing and jointing, the top portion of the formation
behaves as a phreatic aquifer due to development of secondary porosity. These formations can
thus support very low yielding open wells.
Gondwanas:
These are sedimentary formations and are rich in granular zones forming moderately potential
aquifers. Gondwana sandstones support both tube wells and dug-wells capable of yielding up to
ten LPS of water for moderate drawdowns. The exploratory well at Bijna Magarmuha tapping
alluvium and Gondwana sandstone yielded 8.5 LPS of water for a drawdown of 6.5 meters.
Verma (1998) has reported that there is a cluster of dug-cum-bore-wells near village Rithari
(23014’:80003’) and that each well has a command area of 8 to 16 hectares. The depth of these
wells is upto 35 meters. The discharge of wells near pariyat tank is about 150 m3/day.
1.5 Soil
Soil is the mixture of minerals, organic matter, gases, liquids, and the countless
organisms that together support life on Earth. Soil is a natural body known as the pedosphere and
which performs four important functions: it is a medium for plant growth; it is a means of water
storage, supply and purification; it is a modifier of Earth's atmosphere; it is a habitat for
organisms; all of which, in turn, modify the soil. Soil is the result of the process of the gradual
breakdown of rock - the solid geology that makes up the earth. As rock becomes broken down
through a variety of processes, such as weathering and erosion, the particles become ground
smaller and smaller. As a whole, soil is made up from four constituents: mineral material,
organic material, air and water. There are considered to be three main mineral parts to soil;
‘sand’, ‘silt’ and ‘clay’. These parts give the soil its 'mineral texture'. In addition, as leaves and
37
other organic material fall to the ground and decompose - there also forms an ‘organic’ layer.
Soil scientists (or pedologists) use a series of sieves to separate out the constituent parts in order
to characterise soil by texture class.
Many natural bodies, such as plants and animals, are discrete entities which can be
classified and guidelines for their identification followed. Soils are much more difficult to
identify and classify than these discrete bodies for two main reasons: (i) soil is more or less a
continuum covering the land surface of the earth, not a set of discrete entities; and (ii) most of
the soil is below ground and therefore not readily visible. Soils grade into one another across the
landscape usually without sharp boundaries between one type of soil and another. Soil surveyors
who make maps of soils have to use their skills in reading changes in the landscape coupled with
auger borings in the soil to identify the nature of the soil.
There are several ways of classifying a soil, from the simple to the complex. A soil type
may be as simple as ‘a sandy soil’ or ‘a clayey soil’ and this is often the perception of many land
users, such as farmers or civil engineers, who see it as material they have to deal with to achieve
an end result, such as the growing of a crop of wheat, or the building a road. Simple
classifications tend to be of local and restricted relevance only. At the other end of the spectrum
is the soil scientist who needs to understand how soils have formed, which types occur where,
and for what the different types of soil can be used. The soil scientist seeks a much broader
understanding, with the aim of underpinning the use and preservation of this important natural
resource, and this has manifested itself in a number of detailed soil classification systems
worldwide.
Six Different Types of Soils Found in India are as follows:
Alluvial Soils:
These are formed by the deposition of sediments by rivers. They are rich in humus and very
fertile. These soils are renewed every year.
38
Black Soils:
These soils are made up of volcanic rocks and lava-flow. It consists of Lime, Iron, Magnesium
and also Potash but l acks in Phosphorus, Nitrogen and Organic matter.
Red Soils:
These are derived from weathering of ancient metamorphic rocks of Deccan Plateau. Its redness
is due to iron composition. When iron content is lower it is yellow or brown.
Laterite Soils:
These soils are formed due to intense leaching and are well developed on the summits of hills
and uplands.
Mountain Soils:
These soils are formed as a result of the accumulation of organic matter derived from forest
growth.
Desert Soils:
In the desert regions of Rajasthan, soils are not well developed. As evaporation is in excess of
rainfall, the soil has a high salt content and saline layer forms a hard crust. These soils are gen-
erally sandy and deficient in organic matter
Soils have many important functions. Perhaps the best appreciated is the function to
support the growth of agricultural and horticultural crops. Soil is the mainstay of agriculture and
horticulture, forming as it does the medium in which growth and ultimately the yield of food
producing crops occurs. Farmers and gardeners have worked with their soils over many centuries
to produce increasing amounts of food to keep pace with the needs of a burgeoning world
population. The soil's natural cycles go a long way in ensuring that the soil can provide an
adequate physical, chemical and biological medium for crop growth. The farmer and
horticulturalist have also become skilled in managing soils so that these natural cycles can be
added to as necessary to facilitate adequate soil support and increasing yield to enhance
production.
39
District has got rich black soil which is most fertile and heavy and useful for farming.
Black Domat soil, smooth soil, rocky soil, and sandy soils are there in which wheat, grams and
all type of pulses has been mainly produced. Kalmetahar area of the district is one of the most
fertile land of Asia. Here wheat and gulabi grams are the major crops which is produced in large
quantity. Gadarwara is very famous for tuwar (Arhar) pulses mainly. At district level agricultural
farms, soil testing laboratory is there. where farmers get pesticides, best quality seeds, fertilizers
and most important technical guidence.
The Jabalpur district contains mainly three types of soil namely heavy soil, medium black soil
and light soil. Heavy soil: covers 45% of the area, blocks that cover this type of soil are Jabalpur,
Patan, Shahpura, Panagar. This soil is highin organic content and retails quite amount of water.
Medium Black soil: covers 25% of the area, includes Majholi, Sihora,Shahpura. This soil is
moderate in water retention and organic content. Light Soil: covers 30 % of. the area; include
Kundam, some parts of Jabalpur, Sihora. This soil is low inorganic content and is gravel and
sandy type of soil.
Slope of land is also one of the important physiographic aspects influencing theLand use of an
area. The effect of slope on agriculture may be both direct and indirect. The most obvious direct
influence of slope is in the form of the restrained on cultivation and accessibility. The indirect
effect of slope manifests itself in pedological and climatic modification including the position of
water table, development of soils, air drainage, and relative freedom from frost. This
classification gives information regarding slope percent classes in block wise area.
As per the soil testing laboratory of Jabalpur, Jabalpur district received 5000 to10000 soil
sample every year. These samples were tested and the status of nutrients in various parts of the
district is collated. As per these studies from 2011 to 2013 Jabalpur district needs additional
supplements of Potassium, Zinc, Sulphur and Boron.
40
Table 1. 11 Soil Profile of the District
S.N. NAME OF BLOCK
TOTAL
GEOGRAPHICAL
AREA
HEAVY SOIL MEDIUM BLACK SOIL LIGHT SOIL
1 JABALPUR 117022 52659.9 29255.5 35106.6
2 KUNDAM 104243 46909.35 26060.75 31272.9
3 PANAGAR 46458 20906.1 11614.5 13937.4
4 PATAN 60733 27329.85 15183.25 18219.9
5 SHAHPURA 81549 36697.05 20387.25 24464.7
6 SIHORA 49268 22170.6 12317 14780.4
7 MAJHOLI 60484 27217.8 15121 18145.2
TOTAL 519757 233890.65 129939.25 155927.1
41
42
1.5.1 Soil Depth
The effective depth of a soil for plant growth is the vertical distance into the soil from the
surface to a layer that essentially stops the downward growth of plant roots. The barrier layer
may rock, sand, gravel, heavy clay or a cemented layer (e.g. claiche).The mean depth of the soil
layer within the sampling area is assessed by studying conditions in the terrain, both on the test
area and in its immediate vicinity. The soil depth on the test area (humus layer + mineral soil) is
specified as one of the following four classes:
Deep soil Mean soil depth greater than 70 cm. Bedrock outcrop lacking in both the test area
and its immediate vicinity with similar topography.
Fairly
shallow soil
Mean soil depth 20-70 cm. Occasional visible bedrock outcrop present. If there is
only one bedrock outcrop it must lie wholly or partly within the test area.
Very
shallow soil
Mean soil depth less than 20 cm. Frequent occurrence of bedrock outcrop. At
least one bedrock outcrop within the test area. The soil may be deep within small
fissures in the bedrock.
Varying soil
depth
Wide variation in soil depth within the test area due to broad crevasses in the
bedrock, which occasionally emerges as outcrop at the surface.
43
1.5.2 Soil Texture
Soil texture has an important role in nutrient management because it influences nutrient
retention. For instance, finer textured soils tend to have greater ability to store soil nutrients. oil
particles within this fraction are further divided into the 3 separate size classes, which includes
sand, silt, and clay. The size of sand particles range between 2.0 and 0.05 mm; silt, 0.05 mm and
0.002 mm; and clay, less than 0.002 mm. Notice that clay particles may be over one thousand
times smaller than sand particles. This difference in size is largely due to the type of parent
material and the degree of weathering. Sand particles are generally primary minerals that have
not undergone much weathering. On the other hand, clay particles are secondary minerals that
are the products of the weathering of primary minerals. As weathering continues, the soil
particles break down and become smaller and smaller.
Soil texture is the relative proportions of sand, silt, or clay in a soil. The soil textural
class is a grouping of soils based upon these relative proportions. Soils with the finest texture are
called clay soils, while soils with the coarsest texture are called sands. However, a soil that has a
relatively even mixture of sand, silt, and clay and exhibits the properties from each separate is
called a loam. There are different types of loams, based upon which soil separate is most
abundantly present. If the percentages of clay, silt, and sand in a soil are known (primarily
through laboratory analysis), you may use the textural triangle to determine the texture class of
your soil.
1.6 Soil Erosion
Soil erosion is a surface feature which signifies the loss of soil from the particular area.
Estimation of the soul loss is important to understand the degree of soil degradation, which
restricts the land for potential agricultural use. The soil erosion affects adversely to fertility status
and land use. In Jabalpur district, the major part of area 45% falls under severe to very severe
erosion and 55% area fall slight to moderate soil erosion, expected soil loss is (5-15
tonnes/ha/year). In severe erosion area which needs attention for crop production, contour
44
bunding, contour farming, gully plugging, water harvesting and provision of outlets for proper
disposal of water are suggested, in order to arrest the precious loss of soils.
Soil Erosion is one form of soil degradation. Soil erosion is a naturally occurring process on
all land. The agents of soil erosion are water and wind, each contributing a significant amount of
soil loss each year. Soil erosion may be a slow process that continues relatively unnoticed, or it
may occur at an alarming rate causing serious loss of topsoil. The loss of soil from farmland may
be reflected in reduced crop production potential, lower surface water quality and damaged
drainage networks.
Erosion, whether it is by water, wind or tillage, involves three distinct actions – soil
detachment, movement and deposition. Topsoil, which is high in organic matter, fertility and
soil life, is relocated elsewhere "on-site" where it builds up over time or is carried "off-site"
where it fills in drainage channels. Soil erosion reduces cropland productivity and contributes
to the pollution of adjacent watercourses, wetlands and lakes.
Soil erosion can be a slow process that continues relatively unnoticed or can occur at an
alarming rate, causing serious loss of topsoil. Soil compaction, low organic matter, loss of soil
structure, poor internal drainage, salinisation and soil acidity problems are other serious soil
degradation conditions that can accelerate the soil erosion process.
1.7 Drainage
In geomorphology, a drainage system is the pattern formed by the streams, rivers,
and lakes in a particular drainage basin. They are governed by the topography of the land,
whether a particular region is dominated by hard or soft rocks, and the gradient of the land.
Geomorphologists and hydrologists often view streams as being part of drainage basins. A
drainage basin is the topographic region from which a stream receives runoff, through flow, and
groundwater flow. Drainage basins are divided from each other by topographic barriers called
a watershed. A watershed represents all of the stream tributaries that flow to some location along
the stream channel. The number, size, and shape of the drainage basins found in an area varies
and the larger the topographic map.
45
The drainage length statistics based on Strahler method of drainage ordering as shown in
figure below:
International Standard system of Stream ordering
Jabalpur District lies at the junction of vindhyan and Satpura range and forms part of the
great central watershed of India. The Narmada and its tributaries, the Hiran, Gaur drain the
district. Chotimahanadi drains a very small area in the east, which is tributary of son river falling
in the Ganga basin. The general slope of the Narmada valley is towards west & of Hiran towards
south west. The drainage in the district is generally of dendrite type except in the valley of
Narmada, along the right banks of Hiran below Katangi where it is of the straight trunk & trellis
pattern. The total length of the Narmada river in the district is about 110 km.
Geology and the Geomorphologic set up of the study area The geomorphic set-up as revealed in
the study seems to suggest structural controls on this valley development. The area forms the
southern edge of the Damoh plateau of the Great Vindhyan synclise and directly faces to the
south the Narmada valley into which some area drains via Hiran river. Thus the whole setup in
term of geomorphology belongs to a high up setting of Vidhyan rocks overlooking the Hiran
Narmada plain in Jabalpur area. The Vindhyan rocks form a prominent plateau with linear border
marked by Narmada North Fault. Down the south facing slopes, the Hiran flows in a path closely
determined by the major fault named, as mentioned, Narmada North Fault at the base of the
scarp slope system. The rocks on the plateau show a domal-structure-form of open type. This
domal form of the plateau has been target of petroleum exploration. Lineaments of two or three
categories are recognizable; Nearly parallel to the border line of the plateau, the Narmada-North-
46
Fault and linear valley, 2. The other set with NNE-SSW trend, and 3. The third set having NS or
NNW-SSE trends. The District lies on the south –eastern part of the great Vindhyan plateau
which stretches north of and parallel to the Narmada. The plateau rises abruptly from the
Narmada Valley in the line of steeply scarped hills, at the summit of which it reaches its greats
elevation and from where there is a gradual slope, generally towards the north-east. The plateau
is broken and crossed by the sonar valley in this district and by a series of valley between chains
of hills further to the north east.
1.8 Landuse
Land-use denotes how humans use the biophysical or ecological properties of land. Land-
uses include the modification and/or management of land for agriculture, settlements, forestry
and other uses including those that exclude humans from land, as in the designation of nature
reserves for conservation.
1.8.1 Landuse Classification
The conservation and development of land resource in the area needs special focus. It
needs well thought and rational planning, which in turn depends upon minute observation of land
use pattern. The aim of this study is clear visualization of local land environment. The intense
and focused study of land-use puts us in a position to conserve the important elements of the
nature, which otherwise lead in a direction of destruction and consequently threaten the soil
strata. The present study focuses mainly on dimension, which is very important from the
sustainability point of view that is distribution of different groups of land use, i.e. their ratios in
the region. Therefore, it becomes very complex and diversified to study all the groups available
at micro-level, homogenous groups are generalized to reduce the number of groups, and these
simplified groups of land use are called generalized land use classification.
World Land Use Classification mainly recognizes nine categories. These are Settlement
and AssociatedNonAgriculturalLand, Horticulture, Tree and Permanent Crops, CropLand,
Improved Permanent Pasture, ImprovedGrazingLand, WoodLand, Swamps and Marshes,
UnproductiveLand.
47
National Atlas and The land use classification presented by All India Soil and Land Use
Survey 1970 are as follows:
1. Forest Land (F) F1 without Canopy F2 Sparse Forest F3 GeneralForest F4 Fully
Stocked Top Canopy
2. Cultivated land (CC) C1 Single Cropped C2 Double Cropped C3 Triple Cropped
3. Terraced Land (T) T1 Poorly Bounded Land T2 Poor Terracing Measures T3 Bench
Terraces
4. WasteLand (W) W1 Fit for Cultivation W2 Unfit for Cultivation
5. PastureLand (P) P Pasture and Grazing Land H HayLand When the Grass Periodically
Cut P1 With Young Shrubs P2 With Well Grows Shrubs T Thorny Lands and Heavy Canopy
Shrubs.
Land use classification by Statistical Department of Government of India.
I. Geographical Area - Area calculated by Survey Department.
II. Reported Area (Statistical area related to land use)
1. Forest
2. Land not Available for Cultivation
a) Land Put to Non- Agricultural Use,
b) Barren and Uncultivable Land,
3. Other Uncultivable and excluding FallowLand
a) Permanent Pastures and Other Grazing Land,
b) Miscellaneous Tree Crops and Gardens,
c) Culturable Waste Land.
4. FallowLand a) Fallow Other than Current Fallow b) Current Fallow
48
5. Cultivated Land a) Net Sown Area, b) Area Sown More Than Once.
I. Total Irrigated Area.
In the analysis of land use pattern study has been adopted at block level: Forest Cover,
Barren and cultivable waste land, Current Fallow land, Other Fallow land, Barren & uncultivable
Land, Land put to non-agricultural Use, Pastures and Grazing Land, Area under bush, forest &
garden, Net area sown.
1.Forest: Includes all land classes as forests under any legal enactment dealing with forests or
administered as forests.
2. Area under Non-agricultural Uses: Includes all lands occupied by buildings, roads and
railways or under water, e.g. river, and canals and other lands used for non-agriculture purpose.
3. Barren and un-cultivable land: Includes all barren and un-cultivable land like mountains,
desert etc.
4. Permanent pastures and other grazing lands: Includes all grazing lands where they are
permanent pastures and meadows or not. Village common grazing land is included under this
head.
5. Land under miscellaneous tree crops and groves etc: This includes all cultivable land,
which is not included in ‘Net Area Sown’ but is put to some agricultural uses. Lands under
Casuarina trees, thatching grasses, bamboo bushes, and other groves for fuel, etc which are not
included under ‘Orchards’ are classified under this category.
6. Culturable Wasteland: This includes lands available for cultivation. Such lands may be
either fallow or covered with shrubs or jungles, which are not put to any use. Land once
cultivated but not cultivated for five years in succession should be include in this category at the
end of the five years.
49
7. Fallow lands other than current fallows: This includes all lands, which were taken up for
cultivation but are temporarily out of cultivation for a period of not less than one year and not
more than five years.
8. Current Fallows: This represents cropped area, which are kept fallow during the current year.
For example, if any seeding area is not cropped in the same year again, it may be treated as
current fallows.
9. Net Area Sown: This represents the total area sown with crops and orchards. Area sown more
than once in the same year is counted only once.
Table 1. 12 Land Use Pattern of District
S.NO. NAME OF Block TOTAL
GEOGRAPHICAL AREA
GROSS
CROPPED
AREA(1)
NET SOWN
AREA -2
AREA SOWN
MORE THAN
ONCE
CROPPING
INTENSITY
PERCENT
AREA UNDER
FOREST
AREA
UNDER
WASTE
LAND
AREA
UNDER
OTHER
USES
1 JABALPUR 117022 43023 32927 10096 146 29100 5360 49635
2 KUNDAM 104243 49083 35068 14015 132 17652 15734 35789
3 PANAGAR 46458 45139 28297 16842 142 0 2718 15443
4 PATAN 60733 88863 49722 39141 152 1633 397 8981
5 SHAHPURA 81549 88227 55906 32321 150 428 1861 23354
6 SIHORA 49268 44486 28158 16328 144 2801 1178 17131
7 MAJHOLI 60484 72272 42321 29951 145 616 592 16955
TOTAL 519757 431093 272399 158694
52230 27840 167288
Source: DAP, PPR, Land Use Plan
Graph 1- 6 Land use Pattern of Jabalpur District
0
10000
20000
30000
40000
50000
60000
70000
80000
90000
JABALPUR KUNDAM PANAGAR PATAN SHAHPURA SIHORA MAJHOLI
GROSS CROPPED AREA
NET SOWN AREA
AREA UNDER FOREST
AREA UNDER WASTE LAND
AREA UNDER OTHER USES
51
Figure 1- 4 Landuse Map of Jabalpur District
52
Figure 1- 5 Topography Map of Jabalpur District
53
Jabalpur district comprises of 7 development blocks, 532 panchayats and 11424 villages.
Total geographical area of the district is 519757 Hectare, of which the gross cropped area is
431093 Hectare, of which the net sown area is 272399 Hectare and more than once crop area is
158694 Hectare. Average crop intensity of whole district is 145% of the whole geographical
area.
The Jabalpur region comes under dry deciduous task forests. The other species found
here are Bamboo, Harra, Saalbeej, and Tendu Patta, which covers 52230 hac. Area of the district.
54
Chapter-2
District Water Profile
2.1 Irrigation Status
Irrigation and Water Resources Development provides the basic infrastructure for the
growth of economy of the country and large investment has been made for the purpose in our
country. Irrigation is an artificial application of water to the soil for crop production by
constructing head works (weir) across a river in case of flow irrigation system. In lift irrigation
system water required for irrigation purpose has been lifted from the river as the situation
commands by diesel operated or electricity power operated barge mounted pump. In third case
where these two systems are not feasible required water are extracted from the water bearing
aquifer beneath the ground level by means of deep tube well assembly. Besides these popular
system of irrigation there are sprinkler system and drip irrigation system. In a world of explosive
population growth, particularly in developing nations, it is the need of the time to enhance the
growth of food grain production keeping in conformity with the increase in population. The
increase in agricultural production in general and food grain production in particular has not kept
pace with the growth of the population by ushering the traditional cultivation system.
1.1.1 Importance of Irrigation
1. Control of Drought and Famines Insufficient, uncertain and irregular rain causes uncertainty in
agriculture. The period of rain is restricted to only four months in a year, June to September,
when monsoon arrives. The remaining eight months are dry. There is some rainfall during the
months of December and January in some parts of the country. Even during monsoon, the
rainfall is scanty and undependable in many parts of the country.
Sometimes the monsoon delayed considerably while sometimes they cease prematurely. This
pushes large areas of the country into drought conditions. With the help of irrigation, droughts
and famines can be effectively controlled.
2. Higher productivity on irrigated land:
Productivity on irrigated land is considerably more than the productivity on un-irrigated land.
55
3. Multiple cropping possible:
Since India has a tropical and sub-tropical climate, it has potentialities to grow crops on a year
round basis. However, since 80% of the annual rainfall is received in less than four months,
multiple cropping is generally not possible. Provision of irrigation facilities can make possible
the growing of two or three crops in a year in most areas of the country. This will considerably
enhance agriculture production and productivity.
4. Role in new agricultural strategy:
The successful implementation of the High Yielding Programme enhances agricultural
production in a great intent.
5. Bringing more land under cultivation:
Total reporting area for land utilization statistics was 306.05 million hectares in 1999-2000. of
this 19.44 million hectares was current fallow land. Current fallowed include lands which are
lying fallow for less than one year other than current fallows includes land lying un-ploughed for
one to five years.
Cultivable waste land comprises another 13.83 million hectares. Cultivation on all such lands is
impossible in some cases while in others it requires substantial capital investment to make land
fit for cultivation. Provision of irrigation facilities can make some portion of this land cultivable.
6. Reduces instability in output levels:
Irrigation helps in stabilizing the output and yield levels. It also plays a protective role during
drought years. Since, both income and employment are positively and closely related to output,
prevention of fall in output during drought is an important instrument for achieving stability of
income and employment in the countryside. Irrigation has enabled many states to acquire ‘partial
immunity’ from drought.
7. Indirect benefits of irrigation:
Irrigation confers indirect benefits through increased agricultural production. Employment
potential of irrigated lands, increase production, helps in developing allied activities means of
water transport etc. are improve income of government from agriculture. Availability of regular
56
water supply will increase the income of farmers imparting a sense of security and stability in
agriculture.
2.1.2 Types of Irrigation
Depending upon the availability of surface or ground water, topography, soil and rivers, various
types of irrigation practiced in India are as follows:
Tanks:
It is prevalent in the uneven and relatively rocky plateau of Peninsular India. Most of the tanks
are small in size and built by individuals or group of farmers by raising bunds across seasonal
streams. But there are some drawbacks: Tanks cover large areas of cultivable land. Evaporation
of water is rapid due to large expanse of shallow water of tanks, do not ensure perennial supply
of water.
Well:
It is more widespread in plains, coasts and some regions of peninsular India. It is less costly and
more flexible as water can be drawn whenever needed and ‘evaporation loss’ is minimised and
no fear of “over irrigation”. Uttar Pradesh leads in well irrigation and is followed by Punjab,
Haryana, Bihar, Gujarat and Andhra Pradesh.
Wells are of two types:
Open wells and tube-wells. Open wells are shallow and irrigate a small area because water
available is limited. Tube wells are deep and have the capacity to draw a large volume of water.
It has increased in recent years.
Canals:
Canals are the main source of irrigation in India. Canals are big water channels taken out from
rivers to carry water to places far away from the river.
It is of two types: Canals taken out from rivers without any regulating system like weirs etc. at
their head are called inundation canals and canals taking off from perennial rivers with a weir
system to regulate flow of water are called perennial canals
57
Table 2. 1 Crop Irrigation Status of Jabalpur Block
CROP TYPE &
NAME OF BLOCK
KHARIF RABI SUMMER TOTAL
Irrigated Rainfed Total Irrigated Rainfed Total Irrigated Rainfed Total Irrigated Rainfed Total
JABALPUR
A- CEREALS 7630 0 7630 14107 2295 16402 0 0 0 21737 2295 24032
B- COARSE
CERALS 0 491 491 0 0 0 0 0 0 0 491 491
C- PULSES 300 1347 1647 3431 6912 10343 0 0 0 3731 8259 11990
D- OILSEEDS 600 656 1256 19 146 165 0 0 0 619 802 1421
E- FIBRE 0 0 0 0 0 0 0 0 0 0 0 0
F- ANY OTHER
CROP 287 3000 3287 1660 142 1802 0 0 0 1947 3142 5089
TOTAL 8817 5494 14311 19217 9495 28712 0 0 0 28034 14989 43023
Source: Department of Agriculture, Agriculture Statistic of State, Agristat
Table 2. 2 Crop Irrigation Status of PANAGAR Block
CROP TYPE & NAME
OF BLOCK
KHARIF RABI SUMMER TOTAL
Irrigate
d Rainfed Total
Irrigate
d Rainfed Total Irrigated Rainfed Total Irrigated Rainfed Total
PANAGAR
A- CEREALS 16636 0 16636 18787 1226 20013 0 0 0 35423 1226 36649
B- COARSE CERALS 0 55 55 0 0 0 0 0 0 0 55 55
C- PULSES 110 220 330 3520 2406 5926 0 0 0 3630 2626 6256
D- OILSEEDS 0 140 140 0 36 36 0 0 0 0 176 176
E- FIBRE 0 0 0 0 0 0 0 0 0 0 0 0
F- ANY OTHER
CROP 106 600 706 1225 72 1297 0 0 0 1331 672 2003
TOTAL 16852 1015 17867 23532 3740 27272 0 0 0 40384 4755 45139
Source: Department of Agriculture, Agriculture Statistic of State, Agristat
Table 2. 3 Crop Irrigation Status of KUNDAM Block
CROP TYPE & NAME
OF BLOCK KHARIF RABI SUMMER TOTAL
Irrigated Rainfed Total Irrigated Rainfed Total Irrigated Rainfed Total Irrigated Rainfed Total
KUNDAM
A- CEREALS 8910 0 8910 6227 2565 8792 0 0 0 15137 2565 17702
B- COARSE CERALS 0 8632 8632 0 0 0 0 0 0 0 8632 8632
C- PULSES 200 484 684 3600 4225 7825 0 0 0 3800 4709 8509
D- OILSEEDS 0 418 418 0 3973 3973 0 0 0 0 4391 4391
E- FIBRE 0 0 0 0 0 0 0 0 0 0 0 0
F- ANY OTHER CROP 2000 7244 9244 594 11 605 0 0 0 2594 7255 9849
TOTAL 11110 16778 27888 10421 10774 21195 0 0 0 21531 27552 49083
Source: Department of Agriculture, Agriculture Statistic of State, Agristat
58
Table 2. 4 Crop Irrigation Status of Patan Block
CROP TYPE & NAME
OF BLOCK
KHARIF RABI SUMMER TOTAL
Irrigated Rainfed Total Irrigated Rainfed Total Irrigated Rainfed Total Irrigated Rainfed Total
PATAN
A- CEREALS 19339 0 19339 28934 1155 30089 0 0 0 48273 1155 49428
B- COARSE CERALS 0 11 11 0 0 0 0 0 0 0 11 11
C- PULSES 0 7734 7734 14805 5758 20563 0 0 0 14805 13492 28297
D- OILSEEDS 486 3000 3486 0 21 21 0 0 0 486 3021 3507
E- FIBRE 0 0 0 0 0 0 0 0 0 0 0 0
F- ANY OTHER CROP 400 1501 1901 5704 15 5719 0 0 0 6104 1516 7620
TOTAL 20225 12246 32471 49443 6949 56392 0 0 0 69668 19195 88863
Source: Department of Agriculture, Agriculture Statistic of State, Agristat
Table 2. 5 Crop Irrigation Status of Shahpur Block
CROP TYPE & NAME
OF BLOCK
KHARIF RABI SUMMER TOTAL
Irrigated Rainfed Total Irrigated Rainfed Total Irrigated Rainfed Total Irrigated Rainfed Total
SHAHPURA
A- CEREALS 7303 0 7303 30223 478 30701 0 0 0 37526 478 38004
B- COARSE CERALS 0 367 367 0 0 0 0 0 0 0 367 367
C- PULSES 2000 7047 9047 15690 6987 22677 0 0 0 17690 14034 31724
D- OILSEEDS 639 8000 8639 10 12 22 0 0 0 649 8012 8661
E- FIBRE 0 0 0 0 0 0 0 0 0 0 0 0
F- ANY OTHER CROP 2000 2474 4474 4997 0 4997 0 0 0 6997 2474 9471
TOTAL 11942 17888 29830 50920 7477 58397 0 0 0 62862 25365 88227
Source: Department of Agriculture, Agriculture Statistic of State, Agristat
Table 2. 6 Crop Irrigation Status of MAJHOLI Block
CROP TYPE & NAME OF
BLOCK
KHARIF RABI SUMMER TOTAL
Irrigated Rainfed Total Irrigated Rainfed Total Irrigated Rainfed Total Irrigated Rainfed Total
MAJHOLI
0 0 0
A- CEREALS 18860 0 18860 16810 1575 18385 0 0 0 35670 1575 37245
B- COARSE CERALS 0 0 0 0 0 0 0 0 0 0 0 0
C- PULSES 291 7000 7291 11771 10972 22743 0 0 0 12062 17972 30034
D- OILSEEDS 0 2721 2721 0 123 123 0 0 0 0 2844 2844
E- FIBRE 0 0 0 0 0 0 0 0 0 0 0 0
F- ANY OTHER CROP 136 700 836 1075 238 1313 0 0 0 1211 938 2149
TOTAL 19287 10421 29708 29656 12908 42564 0 0 0 48943 23329 72272
Source: Department of Agriculture, Agriculture Statistic of State, Agristat
59
Table 2. 7 Crop Irrigation Status of SIHORA Block
CROP TYPE & NAME OF
BLOCK
KHARIF RABI SUMMER TOTAL
Irrigated Rainfed Total Irrigated Rainfed Total Irrigated Rainfed Total Irrigated Rainfed Total
SIHORA
A- CEREALS 13200 0 13200 16004 941 16945 0 0 0 29204 941 30145
B- COARSE CERALS 0 97 97 0 0 0 0 0 0 0 97 97
C- PULSES 139 700 839 4665 6481 11146 0 0 0 4804 7181 11985
D- OILSEEDS 0 142 142 0 56 56 0 0 0 0 198 198
E- FIBRE 0 0 0 0 0 0 0 0 0 0 0 0
F- ANY OTHER CROP 0 538 538 1245 278 1523 0 0 0 1245 816 2061
TOTAL 13339 1477 14816 21914 7756 29670 0 0 0 35253 9233 44486
Source: Department of Agriculture, Agriculture Statistic of State, Agristat
60
2.2 Production and Productivity of Major Crops
Table 2. 8 Production and Productivity Status of the Jabalpur District
Block SEASON
CROP SOWN RAINFED IRRIGATED TOTAL
CERE
ALS
COAR
SE
CERE
ALS
PULS
ES
OIL
SEEDS
ANY
OTH
ER
CRO
P
ARE
A
PRODNQT
N/YR
PRODUCTI
VITY
KGS/HA
COST OF
CULTIVA
TION
PRODUCT
ION
QUINTAL/
YR
PRODUCTIVITYO
R YEILD
KGS/HA
COST OF
CULTIVA
TION
PRODUCT
ION
QUINTAL/
YR
PRODUCTI
VITY
OR YEILD
KGS/HA
COST OF
CULTIVA
TION
JABALP
UR
A.KHARIF 7630 491 1647 1256 3287 1431
1 329153 2300 25000 0 0 0 329153 2300 25000
B. RABI 16402 0 10343 165 1802 2871
2 0 0 0 717800 2500 30000 717800 2500 30000
SUMMEER 0 0 0 0 0 0 0 0 0 0 2500 30000 0 2500 30000
HORTICUL
TURE 0 0 0 0 0 0 0 0 0 0 2500 32000 0 2500 32000
&
PLANTATI
ON
TOTAL
24032 491 11990 1421 5089 4302
3 329153 2300 25000 717800 7500 92000 1046953
PANAG
AR
A.KHARIF 16636 55 330 140 706 1786
7 410941 2300 25000 0 0 0 410941 2300 25000
B. RABI 20013 0 5926 36 1297 2727
2 0 0 0 681800 2500 30000 681800 2500 30000
SUMMEER 0 0 0 0 0 0 0 0 0 0 2500 30000 0 2500 30000
HORTICUL
TURE 0 0 0 0 0 0 0 0 0 0 2500 32000 0 2500 32000
&
PLANTATI
ON
TOTAL
36649 55 6256 176 2003 4513
9 410941 2300 25000 681800 7500 92000 1092741 9800 117000
KUNDA
M
A.KHARIF 8910 8632 684 418 9244 2788
8 641424 2300 25000 0 0 0 641424 2300 25000
B. RABI 8792 0 7825 3973 605 2119
5 0 0 0 529875 2500 30000 529875 2500 30000
SUMMEER 0 0 0 0 0 0 0 0 0 0 2500 30000 0 2500 30000
HORTICUL
TURE 0 0 0 0 0 0 0 0 0 0 2500 32000 0 2500 32000
&
PLANTATI
ON
TOTAL
17702 8632 8509 4391 9849 4908
3 641424 2300 25000 529875 7500 92000 1171299 9800 117000
PATAN A.KHARIF 19339 11 7734 3486 1901
3247
1 746833 2300 25000 0 0 0 746833 2300 25000
61
Block SEASON
CROP SOWN RAINFED IRRIGATED TOTAL
CERE
ALS
COAR
SE
CERE
ALS
PULS
ES
OIL
SEEDS
ANY
OTH
ER
CRO
P
ARE
A
PRODNQT
N/YR
PRODUCTI
VITY
KGS/HA
COST OF
CULTIVA
TION
PRODUCT
ION
QUINTAL/
YR
PRODUCTIVITYO
R YEILD
KGS/HA
COST OF
CULTIVA
TION
PRODUCT
ION
QUINTAL/
YR
PRODUCTI
VITY
OR YEILD
KGS/HA
COST OF
CULTIVA
TION
B. RABI 30089 0 20563 21 5719 5639
2 0 0 0 1409800 2500 30000 1409800 2500 30000
SUMMEER 0 0 0 0 0 0 0 0 0 0 2500 30000 0 2500 30000
HORTICUL
TURE 0 0 0 0 0 0 0 0 0 0 2500 32000 0 2500 32000
&
PLANTATI
ON
TOTAL
49428 11 28297 3507 7620 8886
3 746833 2300 25000 1409800 7500 92000 2156633 9800 117000
SHAHP
URA
A.KHARIF 7303 367 9047 8639 4474 2983
0 686090 2300 25000 0 0 0 686090 2300 25000
B. RABI 30701 0 22677 22 4997 5839
7 0 0 0 1459925 2500 30000 1459925 2500 30000
SUMMEER 0 0 0 0 0 0 0 0 0 0 2500 30000 0 2500 30000
HORTICUL
TURE 0 0 0 0 0 0 0 0 0 0 2500 32000 0 2500 32000
&
PLANTATI
ON
TOTAL
38004 367 31724 8661 9471 8822
7 686090 2300 25000 1459925 7500 92000 2146015 9800 117000
MAJHO
LI
A.KHARIF 18860 0 7291 2721 836 2970
8 683284 2300 25000 0 0 0 683284 2300 25000
B. RABI 18385 0 22743 123 1313 4256
4 0 0 0 1064100 2500 30000 1064100 2500 30000
SUMMEER 0 0 0 0 0 0 0 0 0 0 2500 30000 0 2500 30000
HORTICUL
TURE 0 0 0 0 0 0 0 0 0 0 2500 32000 0 2500 32000
&
PLANTATI
ON
TOTAL
37245 0 30034 2844 2149 7227
2 683284 2300 25000 1064100 7500 92000 1747384 9800 117000
SIHORA
A.KHARIF 13200 97 839 142 538 1481
6 340768 2300 25000 0 0 0 340768 2300 25000
B. RABI 16945 0 11146 56 1523 2967
0 0 0 0 741750 2500 30000 741750 2500 30000
SUMMEER 0 0 0 0 0 0 0 0 0 0 2500 30000 0 2500 30000
HORTICUL
TURE 0 0 0 0 0 0 0 0 0 0 2500 32000 0 2500 32000
&
PLANTATI
ON
TOTAL
30145 97 11985 198 2061 4448
6 340768 2300 25000
District
Total
DISTRICT
A.KHARIF 91878 9653 27572 16802 20986 1668
91 3838493 2300 25000 0 0 0 3838493 2300 25000
62
Block SEASON
CROP SOWN RAINFED IRRIGATED TOTAL
CERE
ALS
COAR
SE
CERE
ALS
PULS
ES
OIL
SEEDS
ANY
OTH
ER
CRO
P
ARE
A
PRODNQT
N/YR
PRODUCTI
VITY
KGS/HA
COST OF
CULTIVA
TION
PRODUCT
ION
QUINTAL/
YR
PRODUCTIVITYO
R YEILD
KGS/HA
COST OF
CULTIVA
TION
PRODUCT
ION
QUINTAL/
YR
PRODUCTI
VITY
OR YEILD
KGS/HA
COST OF
CULTIVA
TION
B. RABI 141327 0 10122
3 4396 17256
2642
02 0 0 0 6605050 2500 30000 6605050 2500 30000
SUMMEER 0 0 0 0 0 0 0 0 0 0 2500 30000 0 2500 30000
HORTICUL
TURE 0 0 0 0 0 0 0 0 0 0 2500 32000 0 2500 32000
&
PLANTATI
ON
TOTAL 233205 9653 12879
5 21198 38242
4310
93 3838493 2300 25000 6605050 7500 92000 10443543 9800 117000
Table 2. 9 Block wise Irrigated and Rainfed Area
NAME OF BLOCK GROSS CROPPED AREA
IRRIGATED AREA
GROSS
IRRIGATED
AREA
UNIRRIGATED OR
TOTALLY RAINFED NET IRRIGATED AREA
PARTIALLY
IRRIGATE/PROTECTIVE
IRRIGATION
JABALPUR 43023 28034 5494 33528 9495
PANAGAR 45139 40384 1015 41399 3740
KUNDAM 49083 21531 16778 38309 10774
PATAN 88863 69668 12246 81914 6949
SHAHPURA 88227 62862 17888 80750 7477
SIHORA 72272 48943 10421 59364 12908
MAJHOLI 44486 35253 1477 36730 7756
Total 431093 306675 65319 371994 59099
63
Chapter-3
Water Availability
3.1 Status of Water Availability
In each irrigation area there is a demand for water and a supply of water. The demand for
water varies over time and depends on the types of crops, crop growth stages and on the climate.
While transporting irrigation water from the water source and applying it to the plant roots, a
portion of the water is lost through evaporation, leakage from the canals and percolation below
the roots of the crop. The scheme's gross irrigation needs these water losses. To express the
percentage of irrigation water that is used efficiently and what percentage is lost, the
term irrigation efficiency is used.
When the supply of water exceeds the demand, plants may receive too much water which
has a negative effect on their growth. Or, on the other hand, costly water may be spilled and
disappear into the drainage system. When the supply is less than the demand, the irrigation area
may suffer from drought and plant production will decrease.
Problems may arise when an irrigation area is extended, or when new crops are
introduced. The technician therefore needs to have an understanding of water shortage problems
together with knowledge of the correct approach, albeit simplified, to matching the supply with
the demand for water.
The water needed to supply an irrigation scheme is taken from a water source. The most
common sources of water for irrigation include rivers, reservoirs and lakes, and groundwater.
The possibility of supplying as much water to the irrigation area as is needed during each period
of the irrigation season depends primarily on the availability of the water at its source.
Availability may vary a lot over the year, or even between one year and another. Secondly, the
supply depends on the capacity of the facility installed to withdraw the water from the water
source. Further, technicians should be aware that water must be available during each week or
month of the growing season.
64
It is thus important to know how much water one can tap from a given water source over the
course of a season or a year, when:
- developing a new irrigation scheme,
- extending an existing scheme,
- changing the cropping season,
- adding a second or third irrigation season,
- switching from a low water demand crop to a crop such as rice with high water requirements.
The scheme irrigation water supply depends on two factors:
- Whether the water source itself has a limited flow or a limited volume,
- Whether the facilities that control the tapping (gate, well, pump) and conveyance (canal, pipe)
have a limited capacity.
There may also exist water regulations which prohibit an unlimited withdrawal of water from the
source.
Estimation of Ground Water Resources has been carried out based on the methodology
recommended by the Groundwater Estimation Committee (GEC’97). A ground water resource of
the entire state has been computed by CGWB (CGWB, NCCR, 2011) for the year 2008-2009.
Salient features of the estimation of ground water resources are described below. The present
computations pertain to the ground water year 2008-09. The resources have been computed
block wise. Areas having slope more than 20% were excluded from recharge computations.
Ground water recharge and draft were computed separately for command and non-command
areas. The present Ground Water Development in the district has been calculated for command
area and non-command area separately for each block. All the blocks in the study area have been
categorized as safe from ground water abstraction point of view.
Jabalpur district is underlain by Alluvium. Archaean granite, Basaltic lava flows of Deccan trap
Bijawar and Vindhyan sandstone. Dynamic ground water resources of the district have been
estimated for base year- 2010-11 on block wise basis. Out of 519727 geographical area, 443868
ha ( 85%) is ground water recharge worthy area and 78225 Ha(15%) is hilly area. There are
seven number of assessment units (blocks) in the distric which fall under non command ( 86%
65
Kundam and Majholi) and commond (14%) subunits. All the blocks except, Shahpura is
categorized as safe. Non command area of Shahpura block of the district is categorized as
semicritical ( Safe in 2009-09) The highest stage of ground water development is computed as
72% in Shahpur block.
The net ground water availability in the district is 59126 ham, and ground water draft for all uses
is 29130 ham. Making stage of ground water development 51% (51% in 2008-09) as a whole for
district, After making allocation, for future irrigation would be 27939 ham.
Table 3- 1 Surface Water Availability
S.N. SOURCE KHRIF RABI SUMMER TOTAL
1 SURFACE IRRIGATION
(í) Canal ( Major and Medium irrigation) 0.371612 0.112854 0 0.484466
(íí) Minor irrigation Tank 0.045613 0.039634 0 0.085247
(ííí) Lift Irrigation /Diversion 0 0 0 0
(ív) Various Water Bodies 0.018756 0.016456 0 0.035212
including Rain Water Harvesting
(v) Treated Effluent Received from STP 0 0 0 0
(ví) Untreated Effluent 0.004325 0.003523 0 0.007848
(víí) Perennial Sources of Water 0.5317606 0.045832 0 0.5775926
2 Ground Water
0 0
(í) Open Well 0 0.004062 0 0.004062
(íí) Deep Tube Well 0 0.018683 0 0.018683
(ííí) Medium Tube Well 0 0.035535 0 0.035535
(ív) Shallow Tube Wells 0 0.012421 0 0.012421
TOTAL 0.9720666 0.289 0 1.2610666
Table 3- 2 Ground Water Availability
BLOCK
STATUS AS PER CGWB NOTIFICATION
CRITICA
L
SEMI
CRITICAL SAFE
DRAFT
(BCM)
RECHARGE(BC
M)
GAP(BCM
)
JABALPU
R _ _ SAFE 0.03 0.0509 0.0209
PANAGAR _ _ SAFE 0.0605 0.15 0.0895
KUNDAM _ _ SAFE 0.0083 0.0711 0.0628
PATAN _ _ SAFE 0.0648 0.14 0.0752
SHAHPUR
A
SAFE IN
COMMAND 0.0567 0.1085 0.0518
SEMI CRITICAL
IN NON
COMMAND MAJHOLI _ _ SAFE 0.039 0.072 0.033
SIHORA _ _ SAFE 0.0302 0.0593 0.0291
Total
_ SAFE 0.2895 0.6518 0.3623
66
Table 3- 3 Status of the canal commond
S.
N.
Name Of
Village
Information of Canal Commond Information on Other Services
Commond Total Area
TOTAL
AREA
Developed
Area
Undevelope
d Area
Total
Area
Developed
Area
Undevelope
d Area
Developed
Commond
Undeveloped
Commond
1 2 3 4 5 6 7 8 4+7 5+8
1 JABALPU
R 4074
WORK IN
PROGRESS
DATA NOT
AVAILABLE
117022 3640 113382 3640 113382
2 KUNDAM 0
WORK IN
PROGRES
S
DATA NOT
AVAILABL
E
104243 0 104243 0 104243
3 PANAGA
R 14171
WORK IN
PROGRES
S
DATA NOT
AVAILABL
E
46458 3452 43006 3452 43006
4 PATAN 0
WORK IN
PROGRES
S
DATA NOT
AVAILABL
E
60733 29902 30831 29902 30831
5 SHAHPUR
A 0
WORK IN PROGRES
S
DATA NOT AVAILABL
E
81549 17834 63715 17834 63715
6 SIHORA 10371 WORK IN PROGRES
S
DATA NOT AVAILABL
E
49268 5264 44004 5264 44004
7 MAJHOLI 24305
WORK IN
PROGRESS
DATA NOT
AVAILABLE
60484 0 60484 0 60484
TOTAL 52921 1385 51541 519757 60092 459665 60092 459665
67
Water Level
In general depth to water level in the district, ranges between 0.37m-14.20mbgl
68
In general depth to water level in the district, ranges between 2.30m-16.80mbgl
69
Ground Water Resources
Jabalpur district is underlain by Alluvium, Archaean granite, Basaltic lava flows of Deccan
trap Bijawar and Vindhyan sandstone. Dynamic ground water resources of the district have been
estimated for base year -2008/09 on block-wise basis. Out of 5,26,693 ha of geographical area,
4, 43,866 ha ( 84 %) is ground water recharge worthy area and 82,827 ha (16%) is hilly area.
There are seven number of assessment units (block) in the district which fall under non-
command (86 %- Kundam and Majholi) and command (14.%) sub units. All the blocks except,
Patan is categorized as safe. Non command area of Patan block of the district is categorized as
semi critical (safe in 2003/04). The highest stage of ground water development is computed as
64% in Shahpur block. The net ground water availability in the district is 55,679 ham and ground
water draft for all uses is 28,184 ham, making stage of ground water development 51 % (42 % in
2003/04) as a whole for district. After making allocation for future domestic and industrial
supply for next 25 years, balance available ground water for future irrigation would be 25,645
ham.
Table 3- 4 Ground Water Resources
S
.
N
o.
District
/Assess
mentU
nit
Sub-
unitCom
mand/No
n-
Comman
d/
Net
AnnualG
roundwa
terAvaila
bility(ha
m)
ExistingGrossGr
oundwaterDraftf
orIrrigation(ha
m)
ExistingGross
Groundwater
DraftforDome
stic
&Industrialwa
terSupply(ha
m)
ExistingGrossG
roundwaterDraf
tforAlluses(11+1
2)
Provisionfordomest
ic,andindustrialreq
uirementsupplytone
xt 25 year-2033
Net
Groundwater
Availabilityfo
rfutureirrigati
on
ddevelopment
(ham)
StageofGr
oundwater
Developme
nt
{(13/10)*1
00}(%)
1 Bargi
Command 362 80 32 112 67 215 31
Non-
Command 4225 2236 430 2666 891 1097 63
BlockTot
al 4587 2316 462 2778 958 1313 61
2 Kunda
m
Command
Non-
Command 4871 569 356 925 456 3846 19
BlockTot
al 4871 569 356 925 456 3846 19
3 Majholi
Command
Non-
Command 6866 3212 427 3640 708 2945 53
BlockTot
al 6866 3212 427 3640 708 2945 53
4 Panagar
Command 930 161 135 297 140 629 32
Non-
Command 11431 5123 430 5553 629 5679 49
BlockTot
al 12362 5284 565 5850 769 6308 47
70
S
.
N
o.
District
/Assess
mentU
nit
Sub-
unitCom
mand/No
n-
Comman
d/
Net
AnnualG
roundwa
terAvaila
bility(ha
m)
ExistingGrossGr
oundwaterDraftf
orIrrigation(ha
m)
ExistingGross
Groundwater
DraftforDome
stic
&Industrialwa
terSupply(ha
m)
ExistingGrossG
roundwaterDraf
tforAlluses(11+1
2)
Provisionfordomest
ic,andindustrialreq
uirementsupplytone
xt 25 year-2033
Net
Groundwater
Availabilityfo
rfutureirrigati
on
ddevelopment
(ham)
StageofGr
oundwater
Developme
nt
{(13/10)*1
00}(%)
5 Patan
Command 6546 2053 113 2166 185 4308 33
Non-
Command 6136 3823 262 4084 430 1883 67
BlockTot
al 12681 5875 375 6250 615 6191 49
6 Shahpur
Command 3333 1453 162 1615 273 1607 48
Non-
Command 6181 4187 302 4489 507 1487 73
BlockTot
al 9513 5641 464 6104 780 3093 64
7 Sihora
Command 1066 122 46 169 65 879 16
Non-
Command 3733 2119 349 2468 543 1071 66
BlockTot
al 4799 2241 395 2637 608 1950 55
DistrictT
otal 55679 25140 3045 28184 4894 25645 51
Source: CGWB Jabalpur
Ground Water Quality
Quality of GroundWater for Drinking:
The EC value ranges from 505-1603, NO 3value ranges from 8-81,Fluoride value ranges from
0.02-2.35. The total hardness of the ground water in the district is undersafelimit as perBIS
standards.
Quality of Water for Irrigation:
High SAR is not good for irrigation as it leads to sodium hazard.Water samples in the district
generally fallin C1S1and C3S1classes of USSalinity diagram.How ever ground water in the
district general is safe for irrigation but proper drainage system is required where EC is more
than 1500 uscm.
Status ofGroundWaterDevelopment:
Ground water is main source for drinking and Irrigation in the Jabalpur district. About 37.44%
of irrigation in the district is from ground water sources. The level of irrigation in the district is
40% with the net sown area. There are 8832 tube wells and 8010 dug wells for irrigation in the
71
district. Depth of dug wells in the district ranges from 5 to 20m. Yield of bore wells vary from
19.3 to 76.4 cu m/hour depending upon the hydrogological situations in the area. High yielding
tube wells have been encountered which were drilled in the alluvium, Lameta & Gondwana sand
stone and their highest discharge was observed 33.30 lpm at Udna (alluvium) 528 lpm at Bijna.
Apart from private sources, hand pumps are main source of rural water supply in the district.
Ground Water Management Strategy Resource Estimation
As per Ground water resource estimation of Jabalpur district for the year 2008/09, the available
ground water resources & gross ground water drafts are 556.79 MCM & 251.40 MCM
respectively, making stage of ground water development 51% as a whole for the district. Thus
there is arable scope for future development of ground water resources in the district. All the
seven blocks namely, Bargi, Kundam, Sihora, Panagar, Majholi, Shahpur & Patan are falling
under safe categories. Decadal water level trend analysis reveals mixed of water level during pre
& post monsoon reasons.
After making allocation for future domestic & Industrial supply up to next 25 years, balance
available ground water is 48.94 MCM. If 70% of balance available ground water & 30% through
tube wells, then at suitable hy radiological locations tentatively 12775 new dug wells & 2737
new tube wells for irrigation can be constructed in the district, considering unit draft of dug wells
& tube Wells 1.5 & 3.0 ham respectively.
Area recommended for future development is given in fig 6. Dug wells are feasible structures
for granites & basaltic area, where as the shallow tube wells are recommended in
weathered/Jointed Achaeans & basaltic formations.
Deep tube wells with proper well assembly are suitable in Gondwana & alluvial formations in
the district. In the basalts, overlying lamata beds drilling may be talcum up with DTH Rigs, but
further down drilling in Lameta formations becomes difficult, due to its loose & friable nature, if
these rocks are occurring below a depth of 100m, drilling technology is to be developed to
negotiate the formations at proper level.
Water Conservation & Artificial Recharge:
72
Considering hydrogeology situation of the area, there is tremendous scope for artificial Recharge
work, especially, in ground water depleting areas of Shahpura, Patan Shihora, Majholi & Bargi
blocks. At present stage of ground water development in the district is only 32% in command
area and 55.71 in non-command area.
The declining trend of water levels is also observed in small Catcher. However, with ever
increasing demand for ground water, it is important to not mly safeguard it also.
Hydrogeologically, the district has been broadly grounded in to hard rock area & falling mostly
in panager, Jabalpur, Kundan, Sihora & Majholi blocks & the alluvial areas falling in Patan &
Shahpura blocks. In hilly & hard rock areas plan may be adopted using hill to valley approach in
awatershed at origin of streams structure like gully plugs & contour trenches may be constructed
to arrest surface water runoff.
Gabion structures may be constricted at down streams of these structures, across the stream
using local boulders & wire mesh to check the velocity of flowing water & to store water in up
stream side of there strictures. Percolation tanks are most important structures from ground water
rechargepoint of view.
Percolation tanks are recommended in second & third order streams on porous & permeable
formations. Foundation of these structures should not rest on hard & compact or on impermeable
formations & water should be allowed to seep below stream bed to recharge ground water body
at subsurface.
It is quite possible that in due course of time infiltration of water from percolation tank is
reduced due to silt deposition in side the structures to over-come this problem, recharge shaft
may be constricted inside percolation tanks to allow continuous Seepage of water from the
structure to ground water system of the area.
Recharge shafts can be constructed using Hume pipes of the diameter from 1 to 3 m structures.
Recharge shafts can also be contracted in those places where impervious formations are
occurring of surface & at shallow. Depths porous & permeable rocks are found. Properly
designed tube wells also act as recharge shorts to recharge deeper aquifers.
Sub-surface dykes are water conservation structures constructed at suitable hydrogological
locations across the river beds at end of water shed to check sub-surface flow of water along
stream beds.
Dug wells recharge is also applicable in rural areas. In this system water from fields is diverted
73
in to recharge well passing through de-salutation chamber & filter media. In alluvial areas,
recharge shafts are appropriate. Other structures like contour trenches, gabion structures & nalla
bunds etc can be constructed in the entire area.
Recommendation
The stage of ground water development of Jabalpur district as a whole is 51% which reveals
adequate scope for future development of ground water for irrigation. After making allocation
for future domestic & industrial water supply notice next 25 year in the district, balance available
ground water is 256.45 MCM. If 70% of balance available ground water is to be developed
through dug wells & 30% through tube wells/bore wells, then iteratively 12775 new dug wells &
2737 new tube wells can be constructed for irrigation.
Depletion of ground water levels in observed in small patches. With the ever increasing
demand for ground water, it in important to not only safe ground & conserve the ground
water but to augment it also.
Drilling problems in Kundam & Shahpura block may be encountered due to caving
nature of inter trappean clays & below these basaltic formations Lameta beds of
sedimentary origin may occur which may be loose & friable in nature & forming
potential aquifers is the area. Drilling in Lameta after crossing basalts at depths becomes
difficult. A proper drilling techniques is to be adopted to handle the caving nature of
inter-trappean clay & and in first hand compact basalts then after in loose & friable
Lameta formation at deeper levels.
74
Chapter-4
Water Requirement/Demand
4.1 Domestic Water Demand
As world population is constantly growing, the demand of water increases each and
every day. The luxuries of domestic uses of water have become a necessity to people in their
homes and backyards. Domestic water is normally characterized by its use inside and outside
the home: washing the dishes, cooking a meal, laundry, bathing, watering the lawn or garden,
and other household activities.
Water generally gets to our homes in one of two ways. Either it is delivered by a
city/county water department (or maybe from a private company), or people supply their own
water, normally from a well. Water delivered to homes is called "public-supplied deliveries" and
water that people supply themselves is called "self-supplied", and is almost always from
groundwater.
A number of factors like climate, culture, food habits, work and working conditions, level and
type of development, and physiology determine the requirement of water. As per the Bureau of
Indian Standards, IS:1172-1993, a minimum water supply of 200 litres per capita per day (lpcd)
should be provided for domestic consumption in cities with full flushing systems. IS:1172-1993
also mentions that the amount of water supply may be reduced to 135 lpcd for the LIG and the
economically weaker sections (EWS) of the society and in small towns [Modi 1998].
Graph 4. 1 Avg. Domestic Water Demand
0
10
20
30
40
50
60
Drinking Cooking Bathing(includingabloution)
WashingCloths
Washing ofUtentials
Cleaning ofHouses
Flushing ofLaterines
Lite
r P
er
Pe
rso
n P
er
day
Use of Water
75
Table 4. 1 Average Domestic Water Requirement/Demand
Average Domestic Water consumption Calculated
Sr. No. Use Consumption in Liter per
person per day
1 Drinking 5
2 Cooking 5
3 Bathing (including
abloution) 55
4 Washing Cloths 20
5 Washing of Utentials 10
6 Cleaning of Houses 10
7 Flushing of Laterines 30
Total 135
Source: Central Public Health and Environmental engineering organisation(CPHEEO India
Water Portal)
Table 4. 2 Domestic Water demand
BLOCKS Population
in 2011
Decade
Growth
Rate
Projected
population in
2015
Present
Water
Requirement
Projected
Population
in 2020
Gross Water
Demand in
2020
Water
Gap in
2020
JABALPUR 163522 14.4 175296 0.00863771 186287 0.00917929 0.00054158
KUNDAM 118587 14.4 127126 0.00626413 135097 0.0066569 0.00039277
PANAGAR 141276 14.4 151448 0.0074626 160943 0.00793047 0.00046787
PATAN 130074 14.4 139439 0.00687086 148182 0.00730167 0.00043081
SHAHPURA 178109 14.4 190933 0.00940822 202904 0.00999809 0.00058987
SIHORA 135599 14.4 145362 0.00716271 154476 0.0076118 0.00044909
MAJHOLI 156088 14.4 167326 0.00824499 177817 0.00876193 0.00051694
URBAN POPULATION 1437459 14.4 1540956 0.07593061 1637574 0.08069146 0.00476085
TOTAL 2460714 14.4 2637886 0.12998183 2803280 0.13813161 0.00814978
76
Graph 4. 2 Present Domestic Water Demand
Total Population for District Jabalpur in 2015 was 2637886, and projected population in
2020 is 2803280.
Average Per capita Domestic water requirement is 135 liters per day. Based on this
information Gross water Demand for Whole District in current year is 0.1299 BCM per annum.
The projected gross water demand in 2020 is 0.13813 BCM for per annum. Thus water gap is
0.00814 BCM for district Jabalpur per annum.
4.2 Crop Water Demand
Crop water requirement is the water required by the plants for its survival, growth,
development and to produce economic parts. This requirement is applied either naturally by
precipitation or artificially by irrigation. Hence the crop water requirement includes all losses
like:
a) Transpiration loss through leaves (T)
b) Evaporation loss through soil surface in cropped area (E)
c) Amount of weather used by plants (WP) for its metabolic activities which is estimated as less
than 1% of the total water absorption. These three components cannot be separated so easily.
Hence the ET loss is taken as crop water use or crop water consumptive use.
0
0.001
0.002
0.003
0.004
0.005
0.006
0.007
0.008
0.009
0.01
JABALPUR KUNDAM PANAGAR PATAN SHAHPURA SIHORA MAJHOLI
Present Water Requirement Future Water Requirement
77
d) Other application losses are conveyance loss, percolation loss, runoff loss, etc., (WL).
e) The water required for special purposes (WSP) like paddling operation, plugging operation,
land preparation, leaching, requirement, for the purpose of weeding, for dissolving fertilizer and
chemical, etc.
Hence the water requirement is symbolically represented as:
WR = T + E + WP + WL + WSP
(The other application losses and special purposes are mostly indented for wet land cultivation.)
Naturally different crops may have different water requirements at different places of the
same country, depending upon the climate, type of soil, and method of cultivation, effective rain
etc.The total water required for crop growth is not uniformly distributed over its entire life span
which is also called crop period. Actually, the watering stops same time before harvest and the
time duration from the first irrigation during sowing up to the last before harvest is called base
period. Though crop period is slightly more than the base period, they do not differ from
practical purposes.
The total depth of water required to raise a crop over a unit area of land is usually called
delta. Some typical values of delta for common crops in some regions of India are as follows:
Rice
•1000mm to 1500mm for heavy soils or high water table
•1500mm to 2000mm for medium soils
•2000 to 2500 for light soils or deep water table
•1600mm for upland conditions
Wheat
•250mm to 400mm in northern India
•500mm to 600mm in Central India
78
Barley: 450mm
Maize
•100mm during rainy season
•500mm during winter season
•900mm during summer season
•Cotton: 400 – 500mm
Sugarcane
•1400mm to 1500mm in Bihar
•1600mm to 1700mm in Andhra Pradesh
•1700mm to 1800mm in Punjab
•2200mm to 2400mm in Madhya Pradesh
•2800mm to 3000mm in Maharashtra
This information is based on Handbook of Agriculture (fifth edition, 2000) published by
the Indian Council of Agricultural Research.
Table 4. 3 Crop water Demand
S.N,
CROPS
AREA
SOWN
¼HA½
IRRIGATED
AREA
¼HA½
CROP WATER
DEMAND
¼MM½
WATER
POTENTIAL
REQIRED
¼BCM½
EXISTING
WATER
¼BCM½
WATER
POTENTIAL
TO BE CREATED
¼BCM½
1 A- CEREALS
a_ Rice 91878 91878 1200 1.102536 0.36383688 0.73869912
b_ Wheat 141327 131092 500 0.706635 0.23318955 0.47344545
2 B- COARSE CERALS 9653 0 650 0.0627445 0.020705685 0.042038815
3 C- PULSES 128795 60522 400 0.51518 0.1700094 0.3451706
4 D- OILSEEDS 21198 1754 400 0.084792 0.02798136 0.05681064
5 E- FIBRE 0 0 0 0 0 0
6 F- ANY OTHER CROP 38242 21429 1200 0.458904 0.15143832 0.30746568
TOTAL 431093 306675 2.9307915 0.967161195 1.963630305
79
BLOCK
NAME
CROPS
AREA
SOW
N
¼HA
½
IRRIGATE
D
AREA
¼HA½
CROP
WATER
DEMAND
¼MM½
WATER
POTENTIA
L
REQIRED
¼BCM½
EXISTING
L
WATER
POTENTIA
L
¼BCM½
WARER
POTENTIAL
TO BE
REQIRED
¼BCM½
JABALPU
R
A- CEREALS
a_ Rice 7630 7630 1200 0.09156 0.0302148 0.0613452
b_ Wheat 16402 14107 500 0.08201 0.0270633 0.0549467
24032 21737
B- COARSE
CERALS 491 0 650 0.0031915 0.001053195 0.002138305
C- PULSES 11990 3731 400 0.04796 0.0158268 0.0321332
D- OILSEEDS 1421 619 400 0.005684 0.00187572 0.00380828
E- FIBRE 0 0 0 0 0 0
F- ANY OTHER
CROP 5089 1947 1200 0.061068 0.02015244 0.04091556
TOTAL 43023 28034 0.2914735 0.096186255 0.195287245
PANAGAR
A- CEREALS
a_ Rice 16636 16636 1200 0.199632 0.06587856 0.13375344
b_ Wheat 20013 18787 500 0.100065 0.03302145 0.06704355
36649 35423
B- COARSE
CERALS 55 0 650 0.0003575 0.000117975 0.000239525
C- PULSES 6256 3630 400 0.025024 0.00825792 0.01676608
D- OILSEEDS 176 0 400 0.000704 0.00023232 0.00047168
E- FIBRE 0 0 0 0 0 0
F- ANY OTHER
CROP 2003 1331 1200 0.024036 0.00793188 0.01610412
TOTAL 45139 40384 0.3498185 0.115440105 0.234378395
KUNDAM
A- CEREALS
a_ Rice 8910 8910 1200 0.10692 0.0352836 0.0716364
b_ Wheat 8792 6227 500 0.04396 0.0145068 0.0294532
17702 15137
B- COARSE
CERALS 8632 0 650 0.056108 0.01851564 0.03759236
C- PULSES 8509 3800 400 0.034036 0.01123188 0.02280412
D- OILSEEDS 4391 0 400 0.017564 0.00579612 0.01176788
E- FIBRE 0 0 0 0 0 0
F- ANY OTHER
CROP 9849 2594 1200 0.118188 0.03900204 0.07918596
TOTAL 49083 21531 0.376776 0.12433608 0.25243992
PATAN
A- CEREALS
a_ Rice 19339 19339 1200 0.232068 0.07658244 0.15548556
b_ Wheat 30089 28934 500 0.150445 0.04964685 0.10079815
49428 48273
B- COARSE
CERALS 11 0 650 0.0000715 0.000023595 0.000047905
C- PULSES 28297 14805 400 0.113188 0.03735204 0.07583596
D- OILSEEDS 3507 486 400 0.014028 0.00462924 0.00939876
E- FIBRE 0 0 0 0 0 0
F- ANY OTHER
CROP 7620 6104 1200 0.09144 0.0301752 0.0612648
TOTAL 88863 69668 0.6012405 0.198409365 0.402831135
SHAHPUR A- CEREALS
80
BLOCK
NAME
CROPS
AREA
SOW
N
¼HA
½
IRRIGATE
D
AREA
¼HA½
CROP
WATER
DEMAND
¼MM½
WATER
POTENTIA
L
REQIRED
¼BCM½
EXISTING
L
WATER
POTENTIA
L
¼BCM½
WARER
POTENTIAL
TO BE
REQIRED
¼BCM½
A a_ Rice 7303 7303 1200 0.087636 0.02891988 0.05871612
b_ Wheat 30701 30223 500 0.153505 0.05065665 0.10284835
38004 37526
B- COARSE
CERALS 367 0 650 0.0023855 0.000787215 0.001598285
C- PULSES 31724 17690 400 0.126896 0.04187568 0.08502032
D- OILSEEDS 8661 649 400 0.034644 0.01143252 0.02321148
E- FIBRE 0 0 0 0 0 0
F- ANY OTHER
CROP 9471 6997 1200 0.113652 0.03750516 0.07614684
TOTAL 88227 62862 0.5187185 0.171177105 0.347541395
MAJHOLI
A- CEREALS
a_ Rice 18860 18860 1200 0.22632 0.0746856 0.1516344
b_ Wheat 18385 16810 500 0.091925 0.03033525 0.06158975
37245 35670
B- COARSE
CERALS 0 0 650 0 0 0
C- PULSES 30034 12062 400 0.120136 0.03964488 0.08049112
D- OILSEEDS 2844 0 400 0.011376 0.00375408 0.00762192
E- FIBRE 0 0 0 0 0 0
F- ANY OTHER
CROP 2149 1211 1200 0.025788 0.00851004 0.01727796
TOTAL 72272 48943 0.475545 0.15692985 0.31861515
SIHORA
A- CEREALS
a_ Rice 13200 13200 1200 0.1584 0.052272 0.106128
b_ Wheat 16945 16004 500 0.084725 0.02795925 0.05676575
30145 29204
B- COARSE
CERALS 97 0 650 0.0006305 0.000208065 0.000422435
C- PULSES 11985 4804 400 0.04794 0.0158202 0.0321198
D- OILSEEDS 198 0 400 0.000792 0.00026136 0.00053064
E- FIBRE 0 0 0 0 0 0
F- ANY OTHER
CROP 2061 1245 1200 0.024732 0.00816156 0.01657044
TOTAL 44486 35253 0.3172195 0.104682435 0.212537065
81
4.3 Livestock Water demand
Water is an important, but often overlooked, nutrient. Livestock water requirements are
affected by many factors including, size, productivity, diet and environmental conditions. Good
water quality and cleanliness can increase water intake and improve livestock production.
Limited access or reduced water consumption can result in dehydration, which can be fatal to
livestock.
In livestock, water constitutes approximately 98% of all molecules in the body and
between 50 and 81% of an animal’s total body weight at maturity. Water is needed to regulate
body temperature, as well as for growth, reproduction and lactation, digestion, metabolism,
excretion and hydrolysis of protein, fat and carbohydrates, regulation of mineral homoeostasis,
lubricating joints, cushioning the nervous system, transporting sound and eyesight.
Global trend in animal production indicates a rapid and massive increase in the
consumption of livestock products. It is predicted that meat and milk consumption will grow at
2.8 and 3.3% per annum, respectively, in developing countries like India where the whole system
of rural economy has revolved around livestock production. Providing enough quality water is
essential for good livestock husbandry.
The daily water requirement of livestock varies significantly among animal species. The
animal's size and growth stage will have a strong influence on daily water intake. Consumption
rates can be affected by environmental and management factors. Air temperature, relative
humidity and the level of animal exertion or production level are examples of these factors. The
quality of the water, which includes temperature, salinity and impurities affecting taste and
odour, will also have an effect. The water content of the animal's diet will influence its drinking
habits. Feed with relatively high moisture content decreases the quantity of drinking water
required.
Given that drinking water needs are species-, farm- and management-specific, many
producers today are opting to install water-metering equipment to obtain accurate measurements
of water use. If medication is ever provided through the livestock's watering system, the meter
can be used to ensure proper dose rates.
82
Table 4.4 gives block water demand for livestock for current year and for 2020. Number
of livestock as per 2011 census is 3960854. Estimation is done based on livestock water demand
which is different for types of animals. There is no additional water requirement as stored water
is more than water requirement. 25% of water is reserved for this purpose in all current and
future structures.
Table 4. 4 Livestock Water Demand
BLOCKS
TOTAL
NO. OF
LIVESTOCK
WATER
DEMAND
CURRENT YR
CUMT
WATER
DEMAND
CURRENT YR
BCM
WATER
DEMAND
IN 2020
BCM
EXISTING
WATER
POTENTIAL
¼BCM½
WATER
POTENTIAL
TO BE CREATED
¼BCM½
JABALPUR
A. POULTRY 137702 10052.246
B.SMALL ANIMALS 22321 134428.2225
C. LARGE ANIMALS 81564 1458772.14
TOTAL 241587 1603252.609 0.001603253 0.003206505 0.004809758 -0.001603253
KUNDAM
A. POULTRY 144292 10533.316
B.SMALL ANIMALS 12186 73390.185
C. LARGE ANIMALS 69774 1247907.99
TOTAL 226252 1331831.491 0.001331831 0.002663663 0.003995494 -0.001331831
PANAGAR
A. POULTRY 176498 12884.354
B.SMALL ANIMALS 10248 61718.58
C. LARGE ANIMALS 57532 1028959.82
TOTAL 244278 1103562.754 0.001103563 0.002207126 0.003310688 -0.001103563
PATAN
A. POULTRY 14064 1026.672
B.SMALL ANIMALS 15514 93433.065
C. LARGE ANIMALS 59834 1070131.09
TOTAL 89412 1164590.827 0.001164591 0.002329182 0.003493772 -0.001164591
SHAHPURA
A. POULTRY 53100 3876.3
B.SMALL ANIMALS 16482 99262.845
C. LARGE ANIMALS 79170 1415955.45
TOTAL 148752 1519094.595 0.001519095 0.003038189 0.004557284 -0.001519095
SIHORA
A. POULTRY 2838593 207217.289
B.SMALL ANIMALS 8732 52588.47
C. LARGE ANIMALS 41997 751116.345
TOTAL 2889322 1010922.104 0.001010922 0.002021844 0.003032766 -0.001010922
MAJHOLI
A. POULTRY 24458 1785.434
B.SMALL ANIMALS 25942 156235.695
C. LARGE ANIMALS 70851 1267170.135
121251 1425191.264 0.001425191 0.002850383 0.004275574 -0.001425191
TOTAL 3960854 9158445.644 0.009158446 0.018316891 0.027475337 -0.009158446
83
Graph 4. 3 Livestock Water Demand
Table 4. 5 Water Consumption by Animals/Birds
Water Consumptions by Animals / Birds
S. N. Livestock Category Water requirement Range Average Water Use L/ Day
1 Poultry 0.16-0.24 0.2
2 Small Animals 13-20 16.5
3 Large Animals 39-59 49
Source: Adapted from Nutrient requirements of poultry, Sheep, Cattles. 9th edition. Washington, D.C.:
National Research Council, 1994,
4.4 Industrial Water Demand In India, industry is the second highest consumer of water. Water is used in the
production process (e.g. for cooling purposes, for cleaning/washing as well as for employees’
use) and is either provided by a public supplier or self-supplied.The main sources of water for
the industrial sector are groundwater and surface water. Groundwater has emerged as an
important source to meet the water requirements of industries. Choice of source of water depends
on the availability of sufficient and regular supply of water and the cost of water from the source.
While the running cost of surface water is mainly the price paid to the supplier—the municipal
bodies; the cost of groundwater is the extraction cost energy used (electricity/diesel). Since the
prices of all the inputs, water, electricity, and diesel are administered or regulated by the
0
0.0005
0.001
0.0015
0.002
0.0025
0.003
0.0035
JABALPUR KUNDAM PANAGAR PATAN SHAHPURA SIHORA MAJHOLI
Water Demand in 2015 Water Demand in 2020
84
government, the inefficient use of water remains a normal practice. Since the surface water
supply from municipal sources is not sufficiently guaranteed, industrial units tend to depend on
groundwater
Table 4. 6 Industrial Water Demand
BLOCKS NAME OF INDUSTRY
WATER DEMAND
FOR DOMESTIC
& INDUSTRIAL
¼BCM½
HA MT
INCREASE
150 PERCENT
DEMAND IN
2020
¼HA½
EXISTING
WATER
POTENTIAL
¼BCM½
WATER
POTENTIAL
TO BE CREATED
¼BCM½
JABALPUR
RICE MILLS & OTHERS
0.00494 0.00741 0.00494 0.00247
KUNDAM 0.00366 0.00549 0.00366 0.00183
PANAGAR 0.00505 0.007575 0.00505 0.002525
PATAN 0.00404 0.00606 0.00404 0.00202
SHAHPURA 0.00497 0.007455 0.00497 0.002485
SIHORA 0.00411 0.006165 0.00411 0.002055
MAJHOLI 0.00464 0.00696 0.00464 0.00232
TOTAL 0.03141 0.047115 0.03141 0.015705
Graph 4. 4 Industrial Water Demand
4.5 Power Generation Water Demand
There is no water requirement for power generation in the District
0
0.001
0.002
0.003
0.004
0.005
0.006
0.007
0.008
JABALPUR KUNDAM PANAGAR PATAN SHAHPURA SIHORA MAJHOLI
Present water Requirement Projected water Requirement
85
4.6 Water Demand of District for Various sectors
Table 4. 7Water Demand of the district for various sectors (Present)
S.
No. Name of the Block
Components Total,
BCM Domestic Crop Livestock Industrial Power
generation
1 JABALPUR 0.00863771 0.291474 0.0016033 0.00741 0 0.30912446
2 PANAGAR 0.0074626 0.349819 0.0011036 0.00549 0 0.36387466
3 KUNDAM 0.00626413 0.376776 0.0013318 0.007575 0 0.39194696
4 PATAN 0.00687086 0.601241 0.0011646 0.00606 0 0.61533595
5 SHAHPURA 0.00940822 0.518719 0.0015191 0.007455 0 0.53710081
6 SIHORA 0.00716271 0.475545 0.0010109 0.006165 0 0.48988363
7 MAJHOLI 0.00824499 0.31722 0.0014252 0.00696 0 0.33384968
8 URBAN POPULATION 0.07593061 0 0 0 0 0.07593061
Total Demand 0.12998183 2.930792 0.009158 0.047115 0 3.1170468
Table 4. 8Water Demand of the district for various sectors (Projected)
S.
No. Name of the Block
Components Total,
BCM Domestic Crop Livestock Industrial Power
generation
1 JABALPUR 0.00917929 0.320621 0.0032065 0.00494 0 0.33794665
2 PANAGAR 0.00793047 0.3848 0.0022071 0.00366 0 0.39859795
3 KUNDAM 0.0066569 0.414454 0.0026637 0.00505 0 0.42882416
4 PATAN 0.00730167 0.661365 0.0023292 0.00404 0 0.6750354
5 SHAHPURA 0.00999809 0.57059 0.0030382 0.00497 0 0.58859663
6 SIHORA 0.0076118 0.5231 0.0020218 0.00411 0 0.53684314
7 MAJHOLI 0.00876193 0.348941 0.0028504 0.00464 0 0.36519376
8 URBAN POPULATION 0.08069146 0 0 0 0 0.08069146
Total Demand 0.13813161 3.223871 0.018317 0.03141 0 3.4117292
86
4.7 Water Budget
A water budget reflects the relationship between input and output
of water through a region. Thus we have a direct comparison of supply of water and the natural
demand for water. The following data provides current water gap and projected water gap for the
year 2020.
Table 4. 9 Water Budget
Block Water Demand
2015 Water Demand
2020 Gap
JABALPUR 0.309124 0.337947 0.028822
PANAGAR 0.363875 0.398598 0.034723
KUNDAM 0.391947 0.428824 0.036877
PATAN 0.615336 0.675035 0.059699
SHAHPURA 0.537101 0.588597 0.051496
SIHORA 0.489884 0.536843 0.04696
MAJHOLI 0.33385 0.365194 0.031344
URBAN POPULATION 0.075931 0.080691 0.004761
Total 3.117047 3.411729 0.294682
Graph 4. 5 Water Gap in the District
0
0.01
0.02
0.03
0.04
0.05
0.06
87
Chapter-5
Strategic Action Plan
Net Geographical Area of the Jabalpur District is 519757 Ha. Terrains, topography,
forest area clearances, availability of skilled man power, approachability of sites, presence of left
wing extremism, land slope, availability quality power, land acquisition issues, site availability
are some of the various factors which are determining the irrigation strategy for specific areas.
In this regard, it may be mentioned that the water sector has very strong linkages with all
other developmental activities. In view of fast changing development scenario, it is emphasized
that the key priorities and identified strategies cannot be considered as static and firm. These
need to be reviewed and improved upon from time to time. In this regard a comprehensive
“Strategic Plan for District Irrigation” has been prepared through geospatial approach.
Methodology
Diverse research methodologies using RS and GIS have been applied by different authors to
identify potential rainwater harvestings in remote and data scarce areas; in most of these
methods, thematic maps are derived from remote sensing data and integrated in GIS to evaluate
suitable sites for rainwater harvesting. Remote sensing is of immense use for natural resources
mapping and generating necessary spatial database required as an input for GIS analysis. GIS is a
tool for collecting, storing and analyzing spatial and non - spatial data, and developing a model
based on local factors can be used to evaluate appropriate natural resources development and
management action plans. Both these techniques can complement each other to be used as an
effective tool for selecting suitable sites for water harvesting structures.
In assessment of proposed rainwater harvesting structures potential using GIS and RS, outlines
six key factors that require to be integrated into a GIS framework in order. To successfully
develop a suitable model for RWH. This include; rainfall, hydrology (rainfall-runoff
relationships), slope, land cover, soils (texture, structure, depth) and socio-economics of the area
under consideration.
88
The following criteria have been followed for making decision on selecting suitable site
for various water harvesting structures as per Integrated Mission for Sustainable Development
(IMSD) guidelines.
Check dams
The slope should be less than 15 percent.
The land use may be barren, shrub land and riverbed.
The infiltration rate of the soil should be less.
The type of soil should be sandy clay loam.
Percolation tanks and nala bunds
The slope should be less than 10 percent.
The infiltration rate of the soil should be moderately high.
The land use / cover may be barren or scrub land.
The type of soil should be silt loam.
The suitability of WHS sites can be confirmed as the site is located on second and third
order drainage and satisfies the conditions of land use, soil type and slope as per IMSD
guidelines. Water harvesting structures are extremely important to conserve precious natural
resources like, soil and water, which is depleting day by day at alarming rate. The following
table provide strategic action plan for irrigation for each block as well as for whole district and
estimated costs and period of implementation.
89
Table 5. 1 Block wise Component wise Expenditure
Name of the Districts /
Blocks
Concerned Ministry/
Department Component Total
Jabalpur
DOLR-MORD Convergence
MGNREGS 3299
PMKSY Watershed 296.91
MOA&FW Har Khet Ko Pani 448.8685
Per Drop More Crop 70.2
MoWR AIBP 10.2
Har Khet Ko Pani 1942.05
Jabalpur Total
6067.23
Kundam
DOLR-MORD Convergence
MGNREGS 3793.97
PMKSY Watershed 341.4573
MOA&FW Har Khet Ko Pani 1786.645
Per Drop More Crop 132.4
MoWR AIBP 68913.54
Har Khet Ko Pani 490.99
Kundam Total
75459
Majholi
DOLR-MORD Convergence
MGNREGS 165
PMKSY Watershed 14.85
MOA&FW Har Khet Ko Pani 11294.67
Per Drop More Crop 985.2
MoWR Har Khet Ko Pani 736
Majholi Total
13195.7
Majoli MoWR AIBP 3585
Har Khet Ko Pani 8101
Majoli Total
11686
Panagar
MOA&FW Har Khet Ko Pani 3767.243
Per Drop More Crop 516.2
MoWR AIBP 370
Har Khet Ko Pani 5928.62
Panagar Total
10582.1
Patan MOA&FW Har Khet Ko Pani 629.0865
Per Drop More Crop 240.8
Patan Total
869.887
Shahpura
DOLR-MORD Convergence
MGNREGS 281
PMKSY Watershed 25.29
MOA&FW Har Khet Ko Pani 1192.703
Per Drop More Crop 282
Shahpura Total
1780.99
90
Name of the Districts /
Blocks
Concerned Ministry/
Department Component Total
Sihora
DOLR-MORD Convergence
MGNREGS 1177
PMKSY Watershed 105.93
MOA&FW Har Khet Ko Pani 2939.71
Per Drop More Crop 715.4
MoWR AIBP 2321.3
Har Khet Ko Pani 6340
Sihora Total
13599.3
Grand Total
133240.22
Table 5. 2 Block wise No. Of Activity and Expenditure
Name of the Districts / Blocks No of Activity Estimated cost (in Lakhs Rs.)
Jabalpur 667 6067.2285
Kundam 950 75459.0018
Majholi 878 13195.716
Majoli 2 11686
Panagar 911 10582.063
Patan 233 869.8865
Shahpura 939 1780.9925
Sihora 564 13599.3395
Grand Total 5144 133240.2278
Table 5. 3 Block wise Total Expenditure
Name of the Blocks Total
Jabalpur 6067.2285
Kundam 75459.0018
Majholi 13195.716
Majoli 11686
Panagar 10582.063
Patan 869.8865
Shahpura 1780.9925
Sihora 13599.3395
Grand Total 133240.2278
91
Table 5. 4 Block wise Ministry wise Total Expenditure
Ministry Estimated cost (in Lakhs
Rs.)
DOLR-MORD 9500.4073
MOA&FW 25001.1205
MoWR 98738.7
Grand Total 133240.2278
0
10000
20000
30000
40000
50000
60000
70000
80000
90000
100000
DOLR-MORD MOA&FW MoWR
9500.4073
25001.1205
98738.7
92
Table 5. 5 Component wise year wise Total Expenditure(Amount in Cr.)
Component 2016-17 2017-18 2018-19 2019-20 2020-21 Total
AIBP 26953.42 17230.94 13784.75 10338.56 6892.37 75200.04
Convergence MGNREGS 2614.79 2178.99 1743.19 1307.40 871.60 8715.97
Har Khet Ko Pani 13679.27 11399.40 9119.52 6839.64 4559.76 45597.58
Per Drop More Crop 882.66 735.55 588.44 441.33 294.22 2942.20
PMKSY Watershed 235.33 196.11 156.89 117.67 78.44 784.44
Grand Total 44365.48 31740.98 25392.79 19044.59 12696.39 133240.23
93
Village wise action plan is given in below table
Concerned
Ministry/
Department
Name of
the
Districts
/ Blocks
Component Activity Total
Number
Command
Area/Irrig
ation
Potential
(Ha)
Period of
Implement
ation 5/ 7
Estimated
cost
(in Lakhs
Rs.)
Longitude Lattitude Remark / Village Name
DOLR-MORD Jabalpur PMKSY Watershed Capacity Building 4948 5 98.97 79°57'6.219"E 23°8'59.857"N All
DOLR-MORD Jabalpur PMKSY Watershed Livelihood 1319 5 197.94 79°57'6.219"E 23°8'59.857"N All
DOLR-MORD Jabalpur Convergence MGNREGS Construction of
Stopdem 85714 17 5 30.00 79°55'25.041"E 22°56'9.778"N Atha kheda
DOLR-MORD Jabalpur Convergence MGNREGS Extention of Tank
(Renovation) 78125 16 5 25.00 79°53'55.104"E 23°8'20.509"N Bairagi
DOLR-MORD Jabalpur Convergence MGNREGS StopDam/CheckDam 2 22.00 5 16.00 79°51'14.954"E 22°53'48.416"N BAMHANI
DOLR-MORD Jabalpur Convergence MGNREGS Construction of
Rapta Cum Stopdem
in Tamar Nadi
275000 55 5 110.00 79°51'14.954"E 22°53'48.416"N Bamhni
DOLR-MORD Jabalpur Convergence MGNREGS
Construction of
Stopdem in Temar
nadi
225000 45 5 90.00 79°51'14.954"E 22°53'48.416"N Bamhni
DOLR-MORD Jabalpur Convergence MGNREGS Construction of
Rapta Cum Stopdem 200000 40 5 80.00 79°59'21.123"E 23°9'44.825"N Bamhni Barela
DOLR-MORD Jabalpur Convergence MGNREGS Construction of
Stopdem Rapta 57143 11 5 20.00 79°59'21.123"E 23°9'44.825"N Bamhni Barela
DOLR-MORD Jabalpur Convergence MGNREGS Construction of
Rapta Cum Stopdem 125000 25 5 50.00 79°59'21.123"E 23°9'44.825"N Bamhni Dhawai
DOLR-MORD Jabalpur Convergence MGNREGS construction of New
Tank 85714 17.14285714 5 30.00 79°55'0.986"E 22°58'22.12"N Bandar Kola
DOLR-MORD Jabalpur Convergence MGNREGS construction of New
Tank 57143 11.42857143 5 20.00 79°55'0.986"E 22°58'22.12"N Bandar Kola
DOLR-MORD Jabalpur Convergence MGNREGS StopDam/CheckDam 2 20.00 5 18.00 79°57'49.482"E 22°58'5.681"N Barbati
DOLR-MORD Jabalpur Convergence MGNREGS
Construction of
Stopdem in Ranway
Nadi
150000 30 5 60.00 79°55'30.662"E 23°11'3.519"N Barela Padwar
DOLR-MORD Jabalpur Convergence MGNREGS Construction of
Stopdem 85714 17.14285714 5 30.00 79°55'30.662"E 23°11'3.519"N Bargi
DOLR-MORD Jabalpur Convergence MGNREGS construction of New
Tank 57143 11.42857143 5 20.00 79°55'30.662"E 23°11'3.519"N Bargi
DOLR-MORD Jabalpur Convergence MGNREGS Construction of Stopdem in Nala
71429 14.28571429 5 25.00 79°55'30.662"E 23°11'3.519"N Barha
DOLR-MORD Jabalpur Convergence MGNREGS StopDam/CheckDam 1 7.00 5 12.00 79°55'30.662"E 23°11'3.519"N Basaniya
94
Concerned
Ministry/
Department
Name of
the
Districts
/ Blocks
Component Activity Total
Number
Command
Area/Irrig
ation
Potential
(Ha)
Period of
Implement
ation 5/ 7
Estimated
cost
(in Lakhs
Rs.)
Longitude Lattitude Remark / Village Name
DOLR-MORD Jabalpur Convergence MGNREGS StopDam/CheckDam 1 12.00 5 12.00 79°51'12.754"E 22°52'39.448"N Basanpani
DOLR-MORD Jabalpur Convergence MGNREGS StopDam/CheckDam 1 10.00 5 10.00 79°57'6.219"E 23°8'59.857"N Beenjha
DOLR-MORD Jabalpur Convergence MGNREGS StopDam/CheckDam 2 20.00 5 18.00 79°52'19.547"E 23°6'56.194"N BHAMNODA
DOLR-MORD Jabalpur Convergence MGNREGS Construction of
Stopdem 85714 17.14285714 5 30.00 79°52'19.547"E 23°6'56.194"N Bijapuri
DOLR-MORD Jabalpur Convergence MGNREGS
Construction of
Stopdem Cum Culvert
71429 14.28571429 5 25.00 79°52'19.547"E 23°6'56.194"N Bilhari
DOLR-MORD Jabalpur Convergence MGNREGS Extention of Tank
(Renovation) 138889 27.77777778 5 50.00 79°52'19.547"E 23°6'56.194"N Chahchahi Tola
DOLR-MORD Jabalpur Convergence MGNREGS
Construction of
Stopdem in jamuniya Tank
100000 20 5 35.00 79°55'47.525"E 22°55'41.673"N Charagaon
DOLR-MORD Jabalpur Convergence MGNREGS StopDam/CheckDam 1 8.00 5 10.00 79°55'47.525"E 22°55'41.673"N CHARGHAT
DOLR-MORD Jabalpur Convergence MGNREGS StopDam/CheckDam 1 9.00 5 10.00 79°55'47.525"E 22°55'41.673"N CHHAPRA
DOLR-MORD Jabalpur Convergence MGNREGS construction of New
Tank 85714 17.14285714 5 30.00 79°55'47.525"E 22°55'41.673"N Chhapra
DOLR-MORD Jabalpur Convergence MGNREGS Construction of
Rapta Cum Stopdem 114286 22.85714286 5 40.00 79°55'47.525"E 22°55'41.673"N Chhapra Tikhari
DOLR-MORD Jabalpur Convergence MGNREGS
Construction of
Cause-way Cum
Stopdem
85714 17.14285714 5 30.00 79°56'32.493"E 22°54'51.083"N Dagdaga
DOLR-MORD Jabalpur Convergence MGNREGS StopDam/CheckDam 2 16.00 5 16.00 79°46'44.769"E 22°55'49.327"N Devdeor
DOLR-MORD Jabalpur Convergence MGNREGS construction of New
Tank 85714 17.14285714 5 30.00 79°46'44.769"E 22°55'49.327"N Devdwar
DOLR-MORD Jabalpur Convergence MGNREGS StopDam/CheckDam 2 16.00 5 20.00 79°52'47.652"E 23°10'35.414"N DHABAI
DOLR-MORD Jabalpur Convergence MGNREGS Construction of
Stopdem 51429 10.28571429 5 18.00 79°52'47.652"E 23°10'35.414"N diya kheda
DOLR-MORD Jabalpur Convergence MGNREGS StopDam/CheckDam 1 11.00 5 12.00 79°52'47.652"E 23°10'35.414"N DIYAKHEDA
DOLR-MORD Jabalpur Convergence MGNREGS construction of New
Tank 125000 25 5 50.00 79°52'47.652"E 23°10'35.414"N Doondi
DOLR-MORD Jabalpur Convergence MGNREGS StopDam/CheckDam 1 10.00 5 10.00 79°55'53.117"E 22°59'5.113"N DUNGARIYA
DOLR-MORD Jabalpur Convergence MGNREGS StopDam/CheckDam 2 18.00 5 16.00 79°55'25.041"E 22°55'41.673"N ETAHKHEDA
DOLR-MORD Jabalpur Convergence MGNREGS
Construction of
Stopdem in Tedhiya
nadi
175000 35 5 70.00 79°55'25.041"E 22°55'41.673"N Gadh Jamuniya
95
Concerned
Ministry/
Department
Name of
the
Districts
/ Blocks
Component Activity Total
Number
Command
Area/Irrig
ation
Potential
(Ha)
Period of
Implement
ation 5/ 7
Estimated
cost
(in Lakhs
Rs.)
Longitude Lattitude Remark / Village Name
DOLR-MORD Jabalpur Convergence MGNREGS StopDam/CheckDam 2 16.00 5 16.00 79°50'22.927"E 22°59'8.632"N Gajna
DOLR-MORD Jabalpur Convergence MGNREGS StopDam/CheckDam 2 26.00 5 20.00 79°52'58.894"E 23°8'20.509"N GHANA
DOLR-MORD Jabalpur Convergence MGNREGS StopDam/CheckDam 2 18.00 5 28.00 79°52'58.894"E 23°8'20.509"N GHANA
DOLR-MORD Jabalpur Convergence MGNREGS construction of New
Tank 85714 17.14285714 5 30.00 79°55'19.42"E 22°54'51.083"N Ghat Pipariya
DOLR-MORD Jabalpur Convergence MGNREGS StopDam/CheckDam 2 20.00 5 16.00 79°55'19.42"E 22°54'51.083"N GHUNSOR
DOLR-MORD Jabalpur Convergence MGNREGS Construction of
Rapta Cum Stopdem 150000 30 5 60.00 79°51'54.5"E 23°1'47.538"N Harrai Charagwaon
DOLR-MORD Jabalpur Convergence MGNREGS StopDam/CheckDam 1 10.00 5 10.00 79°50'8.507"E 22°57'28.811"N Hinota
DOLR-MORD Jabalpur Convergence MGNREGS Construction of
Stopdem 100000 20 5 35.00 80°2'57.055"E 23°6'28.989"N Hinoutiya
DOLR-MORD Jabalpur Convergence MGNREGS StopDam/CheckDam 2 16.00 5 20.00 79°48'13.648"E 22°53'25.235"N HULKI
DOLR-MORD Jabalpur Convergence MGNREGS Construction of
Stopdem 100000 20 5 35.00 79°48'13.648"E 22°53'25.235"N Hulki
DOLR-MORD Jabalpur Convergence MGNREGS StopDam/CheckDam 2 20.00 5 20.00 79°48'40.287"E 23°3'8.085"N JHIRI
DOLR-MORD Jabalpur Convergence MGNREGS construction of New
Tank 45714 9.142857143 5 16.00 79°48'40.287"E 23°3'8.085"N Jhirri
DOLR-MORD Jabalpur Convergence MGNREGS StopDam/CheckDam 2 20.00 5 24.00 79°55'25.041"E 22°55'47.294"N JODHPUR
DOLR-MORD Jabalpur Convergence MGNREGS Construction of
Stopdem 85714 17.14285714 5 30.00 79°59'26.744"E 23°8'20.509"N Junwani
DOLR-MORD Jabalpur Convergence MGNREGS StopDam/CheckDam 1 8.00 5 13.00 79°59'26.744"E 23°8'20.509"N KAILWAS
DOLR-MORD Jabalpur Convergence MGNREGS Construction of
Stopdem in Narai
Nala
85714 17.14285714 5 30.00 79°59'26.744"E 23°8'20.509"N Kailwash
DOLR-MORD Jabalpur Convergence MGNREGS Construction of
Stopdem 57143 11.42857143 5 20.00 79°59'26.744"E 23°8'20.509"N Kaladehi
DOLR-MORD Jabalpur Convergence MGNREGS Extention of Tank
(Renovation) 62500 12.5 5 20.00 80°5'17.107"E 23°7'59.215"N Khairi
DOLR-MORD Jabalpur Convergence MGNREGS Construction of
Stopdem 85714 17.14285714 5 30.00 79°56'32.493"E 22°54'51.083"N Khurshi
DOLR-MORD Jabalpur Convergence MGNREGS Construction of
Stopdem Kutali 85714 17.14285714 5 30.00 79°56'32.493"E 22°54'51.083"N Kuteli
DOLR-MORD Jabalpur Convergence MGNREGS Extention of Tank
(Renovation) 62500 12.5 5 20.00 79°56'32.493"E 22°54'51.083"N Lanhgi
DOLR-MORD Jabalpur Convergence MGNREGS StopDam/CheckDam 1 12.00 5 10.00 79°48'21.728"E 22°57'59.953"N Lodhi
96
Concerned
Ministry/
Department
Name of
the
Districts
/ Blocks
Component Activity Total
Number
Command
Area/Irrig
ation
Potential
(Ha)
Period of
Implement
ation 5/ 7
Estimated
cost
(in Lakhs
Rs.)
Longitude Lattitude Remark / Village Name
DOLR-MORD Jabalpur Convergence MGNREGS Extention of Tank
(Renovation) 93750 18.75 5 30.00 79°48'21.728"E 22°57'59.953"N Lodhi
DOLR-MORD Jabalpur Convergence MGNREGS Construction of
Rapta Cum Stopdem 125000 25 5 50.00 79°51'57.063"E 23°6'56.194"N Mahagwaon Doonga
DOLR-MORD Jabalpur Convergence MGNREGS Construction of
Stopdem Padra Tola 85714 17.14285714 5 30.00 79°51'57.063"E 23°6'56.194"N Mahagwaon Doonga
DOLR-MORD Jabalpur Convergence MGNREGS StopDam/CheckDam 2 20.00 5 24.00 79°51'57.063"E 23°6'56.194"N MANEGAON
DOLR-MORD Jabalpur Convergence MGNREGS StopDam/CheckDam 2 22.00 5 18.00 79°51'57.063"E 23°6'56.194"N MANGELA
DOLR-MORD Jabalpur Convergence MGNREGS StopDam/CheckDam 1 8.00 5 10.00 79°51'57.063"E 23°6'56.194"N MANGELI
DOLR-MORD Jabalpur Convergence MGNREGS Construction of
Rapta Cum Stopdem 125000 25 5 50.00 79°51'57.063"E 23°6'56.194"N Mohash
DOLR-MORD Jabalpur Convergence MGNREGS Construction of
Stopdem 71429 14.28571429 5 25.00 79°51'57.063"E 23°6'56.194"N Mohash
DOLR-MORD Jabalpur Convergence MGNREGS StopDam/CheckDam 1 10.00 5 10.00 79°51'57.063"E 23°6'56.194"N MOTHAR
DOLR-MORD Jabalpur Convergence MGNREGS Construction of
Rapta Cum Stopdem 114286 22.85714286 5 40.00 79°51'57.063"E 23°6'56.194"N Nanha kheda
DOLR-MORD Jabalpur Convergence MGNREGS StopDam/CheckDam 2 20.00 5 26.00 79°51'57.063"E 23°6'56.194"N NARAYANPUR
DOLR-MORD Jabalpur Convergence MGNREGS StopDam/CheckDam 1 10.00 5 10.00 79°51'57.063"E 23°6'56.194"N NARRAI
DOLR-MORD Jabalpur Convergence MGNREGS StopDam/CheckDam 2 16.00 5 18.00 79°48'54.048"E 23°2'13.124"N NAYAGAON
DOLR-MORD Jabalpur Convergence MGNREGS Construction of
Rapta Cum Stopdem 125000 25 5 50.00 79°51'57.063"E 23°6'56.194"N Nigri
DOLR-MORD Jabalpur Convergence MGNREGS Construction of
Cause-way Cum
Stopdem
100000 20 5 35.00 79°51'57.063"E 23°6'56.194"N Nigri
DOLR-MORD Jabalpur Convergence MGNREGS StopDam/CheckDam 1 9.00 5 15.00 79°57'56.751"E 23°3'9.684"N PADARIYA
DOLR-MORD Jabalpur Convergence MGNREGS StopDam/CheckDam 2 24.00 5 24.00 79°55'53.146"E 23°9'22.341"N Parasiya
DOLR-MORD Jabalpur Convergence MGNREGS StopDam/CheckDam 1 11.00 5 8.00 79°55'53.146"E 23°9'22.341"N PARASIYA
DOLR-MORD Jabalpur Convergence MGNREGS StopDam/CheckDam 1 10.00 5 8.00 79°55'53.146"E 23°9'22.341"N PARASIYA
DOLR-MORD Jabalpur Convergence MGNREGS Extention of Tank
(Renovation) 78125 15.625 5 25.00 80°6'45.987"E 23°7'37.668"N Partala
DOLR-MORD Jabalpur Convergence MGNREGS StopDam/CheckDam 2 14.00 5 24.00 79°50'31.638"E 23°8'26.99"N PINDRAI
DOLR-MORD Jabalpur Convergence MGNREGS Construction of
Stopdem 57143 11.42857143 5 20.00 79°50'31.638"E 23°8'26.99"N Pindrai
97
Concerned
Ministry/
Department
Name of
the
Districts
/ Blocks
Component Activity Total
Number
Command
Area/Irrig
ation
Potential
(Ha)
Period of
Implement
ation 5/ 7
Estimated
cost
(in Lakhs
Rs.)
Longitude Lattitude Remark / Village Name
DOLR-MORD Jabalpur Convergence MGNREGS construction of New
Tank 125000 25 5 50.00 79°50'31.638"E 23°8'26.99"N Pindrai
DOLR-MORD Jabalpur Convergence MGNREGS StopDam/CheckDam 1 10.00 5 10.00 79°48'55.395"E 22°57'20.9"N Pipariya
DOLR-MORD Jabalpur Convergence MGNREGS Construction of
Stopdem 57143 11.42857143 5 20.00 79°48'55.395"E 22°57'20.9"N Pipariya
DOLR-MORD Jabalpur Convergence MGNREGS StopDam/CheckDam 2 20.00 5 24.00 79°58'25.03"E 23°5'9.536"N PIPARIYA KALA
DOLR-MORD Jabalpur Convergence MGNREGS StopDam/CheckDam 2 18.00 5 20.00 79°49'19.634"E 22°56'27.033"N Raipura
DOLR-MORD Jabalpur Convergence MGNREGS Construction of
Stopdem 150000 30 5 60.00 79°50'2.727"E 23°4'3.55"N Ramanpur
DOLR-MORD Jabalpur Convergence MGNREGS StopDam/CheckDam 2 16.00 5 20.00 79°50'2.727"E 23°4'3.55"N RAMPUR NAKATIA
DOLR-MORD Jabalpur Convergence MGNREGS StopDam/CheckDam 1 12.00 5 10.00 79°51'34.3"E 22°56'18.953"N REWA
DOLR-MORD Jabalpur Convergence MGNREGS Construction of
Stopdem 85714 17.14285714 5 30.00 80°2'28.775"E 23°4'10.283"N Richhai
DOLR-MORD Jabalpur Convergence MGNREGS StopDam/CheckDam 1 10.00 5 13.00 79°55'53.146"E 23°9'22.341"N ROUNSARA
DOLR-MORD Jabalpur Convergence MGNREGS StopDam/CheckDam 2 16.00 5 22.00 79°55'53.146"E 23°9'22.341"N SAGADA JHAPNI
DOLR-MORD Jabalpur Convergence MGNREGS StopDam/CheckDam 2 16.00 5 18.00 79°46'36.689"E 22°56'55.313"N Saliwada
DOLR-MORD Jabalpur Convergence MGNREGS Construction of
Stopdem 114286 22.85714286 5 40.00 79°46'36.689"E 22°56'55.313"N Saliwada
DOLR-MORD Jabalpur Convergence MGNREGS Construction of
Stopdem 85714 17.14285714 5 30.00 79°46'36.689"E 22°56'55.313"N Saliwada
DOLR-MORD Jabalpur Convergence MGNREGS construction of New
Tank 85714 17.14285714 5 30.00 79°46'36.689"E 22°56'55.313"N Saliwada
DOLR-MORD Jabalpur Convergence MGNREGS StopDam/CheckDam 2 16.00 5 26.00 79°55'41.904"E 23°8'54.236"N Samnapur
DOLR-MORD Jabalpur Convergence MGNREGS construction of New
Tank 71429 14.28571429 5 25.00 79°55'41.904"E 23°8'54.236"N Samnapur
DOLR-MORD Jabalpur Convergence MGNREGS Construction of
Stopdem in Ranway
Nadi
150000 30 5 60.00 79°55'41.904"E 23°8'54.236"N Saroura
DOLR-MORD Jabalpur Convergence MGNREGS StopDam/CheckDam 3 30.00 5 24.00 79°55'41.904"E 23°8'54.236"N SARRAI
DOLR-MORD Jabalpur Convergence MGNREGS
Construction of
Stopdem Purana pani
85714 17.14285714 5 30.00 79°48'27.115"E 23°0'55.018"N Sihora
DOLR-MORD Jabalpur Convergence MGNREGS Extention of Tank
(Renovation) 62500 12.5 5 20.00 79°48'27.115"E 23°0'55.018"N Sihora
DOLR-MORD Jabalpur Convergence MGNREGS StopDam/CheckDam 2 16.00 5 24.00 79°56'21.251"E 22°55'47.294"N SILUA
98
Concerned
Ministry/
Department
Name of
the
Districts
/ Blocks
Component Activity Total
Number
Command
Area/Irrig
ation
Potential
(Ha)
Period of
Implement
ation 5/ 7
Estimated
cost
(in Lakhs
Rs.)
Longitude Lattitude Remark / Village Name
DOLR-MORD Jabalpur Convergence MGNREGS
construction of
Rapta cum stopdem
Silua Sukri in Temar Nadi
450000 90 5 180.00 79°56'21.251"E 22°55'47.294"N Silua
DOLR-MORD Jabalpur Convergence MGNREGS Extention of Tank
(Renovation) 62500 12.5 5 20.00 79°56'21.251"E 22°55'47.294"N Silua
DOLR-MORD Jabalpur Convergence MGNREGS Construction of
Rapta Cum Stopdem 137500 27.5 5 55.00 79°56'21.251"E 22°55'47.294"N Silua Padariya
DOLR-MORD Jabalpur Convergence MGNREGS StopDam/CheckDam 3 27.00 5 27.00 79°56'21.251"E 22°55'47.294"N SIVANI
DOLR-MORD Jabalpur Convergence MGNREGS StopDam/CheckDam 1 13.00 5 10.00 79°56'21.251"E 22°55'47.294"N SOHAD
DOLR-MORD Jabalpur Convergence MGNREGS Construction of
Stopdem 85714 17.14285714 5 30.00 79°56'21.251"E 22°55'47.294"N Sohad
DOLR-MORD Jabalpur Convergence MGNREGS StopDam/CheckDam 2 20.00 5 24.00 79°56'21.251"E 22°55'47.294"N SUKRI
DOLR-MORD Jabalpur Convergence MGNREGS StopDam/CheckDam 2 16.00 5 16.00 79°56'21.251"E 22°55'47.294"N TEMER
DOLR-MORD Jabalpur Convergence MGNREGS StopDam/CheckDam 2 22.00 5 22.00 79°56'21.251"E 22°55'47.294"N Thana
DOLR-MORD Jabalpur Convergence MGNREGS StopDam/CheckDam 1 9.00 5 10.00 79°56'21.251"E 22°55'47.294"N TIKARIYA
DOLR-MORD Jabalpur Convergence MGNREGS StopDam/CheckDam 2 16.00 5 20.00 79°49'22.328"E 22°58'40.352"N Tinsa
DOLR-MORD Jabalpur Convergence MGNREGS StopDam/CheckDam 2 22.00 5 18.00 79°50'55.247"E 22°58'16.113"N Tinsi
DOLR-MORD Kundam PMKSY Watershed Capacity Building 5691 5 114 80°21'22.061"E 23°14'9.012"N All
DOLR-MORD Kundam PMKSY Watershed Livelihood 1518 5 228 80°21'22.061"E 23°14'9.012"N All
DOLR-MORD Kundam Convergence MGNREGS StopDam/CheckDam 1 9.00 5 12.00 80°24'31.985"E 23°16'52.424"N Amera
DOLR-MORD Kundam Convergence MGNREGS StopDam/CheckDam 1 9.00 5 8.00 80°17'4.184"E 23°15'29.934"N Andhar
DOLR-MORD Kundam Convergence MGNREGS StopDam/CheckDam 2 20.00 5 20.00 80°11'51.901"E 23°11'1.843"N BahanaPani
DOLR-MORD Kundam Convergence MGNREGS StopDam/CheckDam 1 9.00 5 14.00 80°26'39.305"E 23°9'54.509"N Bamhani
DOLR-MORD kundam Convergence MGNREGS construction of
stopdem Baragwaon 200000 40 5 80.00 80°11'10.656"E 23°10'17.652"N Baragwaon
DOLR-MORD Kundam Convergence MGNREGS StopDam/CheckDam 2 24.00 5 16.00 80°11'10.656"E 23°10'17.652"N Bargawn
DOLR-MORD kundam Convergence MGNREGS
construction of
stopdem Motoghat Doondi
225000 45 5 90.00 80°17'13.022"E 23°15'53.503"N Barkheda
DOLR-MORD kundam Convergence MGNREGS
construction of
Rapta cum stopdem Devghadh
280000 56 5 112.00 80°17'13.022"E 23°15'53.503"N Barkheda
DOLR-MORD Kundam Convergence MGNREGS StopDam/CheckDam 3 30.00 5 33.00 80°11'1.818"E 23°13'11.47"N Bheswahi
99
Concerned
Ministry/
Department
Name of
the
Districts
/ Blocks
Component Activity Total
Number
Command
Area/Irrig
ation
Potential
(Ha)
Period of
Implement
ation 5/ 7
Estimated
cost
(in Lakhs
Rs.)
Longitude Lattitude Remark / Village Name
DOLR-MORD Kundam Convergence MGNREGS StopDam/CheckDam 1 10.00 5 10.00 80°11'1.818"E 23°13'11.47"N Bhokadeori
DOLR-MORD kundam Convergence MGNREGS construction of New
stopdem Patpara
Nala
125000 25 5 50.00 80°8'10.975"E 23°11'35.182"N Bichhuya
DOLR-MORD kundam Convergence MGNREGS
construction of New
stopdem Mohdha
Nala
114286 22.85714286 5 40.00 80°12'15.47"E 23°11'19.519"N Bijapuri
DOLR-MORD Kundam Convergence MGNREGS StopDam/CheckDam 2 18.00 5 26.00 80°12'15.47"E 23°11'19.519"N Bilgawan
DOLR-MORD Kundam Convergence MGNREGS StopDam/CheckDam 2 16.00 5 24.00 80°23'21.28"E 23°14'28.067"N Biltukari
DOLR-MORD Kundam Convergence MGNREGS StopDam/CheckDam 3 27.00 5 27.00 80°12'41.984"E 23°12'53.793"N Bishanpura
DOLR-MORD Kundam Convergence MGNREGS StopDam/CheckDam 1 12.00 5 12.00 80°17'0.438"E 23°7'27.229"N Budbudi
DOLR-MORD Kundam Convergence MGNREGS StopDam/CheckDam 1 11.00 5 10.00 80°19'15.6"E 23°12'6.875"N Chhapara
DOLR-MORD Kundam Convergence MGNREGS StopDam/CheckDam 2 20.00 5 20.00 80°8'58.083"E 23°11'34.249"N Chiraipani
DOLR-MORD Kundam Convergence MGNREGS StopDam/CheckDam 1 11.00 5 13.00 80°8'58.083"E 23°11'34.249"N Chitakhudri
DOLR-MORD Kundam Convergence MGNREGS StopDam/CheckDam 1 12.00 5 15.00 80°8'58.083"E 23°11'34.249"N Chourikala
DOLR-MORD Kundam Convergence MGNREGS StopDam/CheckDam 1 11.00 5 9.00 80°8'58.083"E 23°11'34.249"N Chourikhurd
DOLR-MORD kundam Convergence MGNREGS
construction of Rapta cum stopdem
Sodi Nadi Baghraji
road
187500 37.5 5 75.00 80°8'58.083"E 23°11'34.249"N Dabara Kala
DOLR-MORD Kundam Convergence MGNREGS construction of New
Tank 206500 41.3 5 82.60 80°8'58.083"E 23°11'34.249"N Dabra kala
DOLR-MORD Kundam Convergence MGNREGS construction of
Samudayak Tank 62857 12.57142857 5 22.00 80°8'58.083"E 23°11'34.249"N Dabra Kala
DOLR-MORD Kundam Convergence MGNREGS StopDam/CheckDam 1 11.00 5 9.00 80°12'15.47"E 23°13'14.416"N Dargarh
DOLR-MORD Kundam Convergence MGNREGS Extention of Tank
(Renovation) 93750 18.75 5 30.00 80°10'42.916"E 23°12'32.975"N Dehri Kala
DOLR-MORD kundam Convergence MGNREGS
construction of New
stopdem Sookha
Nala
114286 22.85714286 5 40.00 80°10'41.052"E 23°13'18.651"N Dehri khurd
DOLR-MORD kundam Convergence MGNREGS
construction of New
stopdem Sookha Nala
128571 25.71428571 5 45.00 80°10'41.052"E 23°13'18.651"N Dehri khurd
DOLR-MORD Kundam Convergence MGNREGS StopDam/CheckDam 2 20.00 5 30.00 80°13'52.143"E 23°9'49.848"N Deori Kalan
DOLR-MORD Kundam Convergence MGNREGS StopDam/CheckDam 2 16.00 5 20.00 80°21'22.061"E 23°14'9.012"N Deorigarh
100
Concerned
Ministry/
Department
Name of
the
Districts
/ Blocks
Component Activity Total
Number
Command
Area/Irrig
ation
Potential
(Ha)
Period of
Implement
ation 5/ 7
Estimated
cost
(in Lakhs
Rs.)
Longitude Lattitude Remark / Village Name
DOLR-MORD Kundam Convergence MGNREGS StopDam/CheckDam 2 16.00 5 20.00 80°21'22.061"E 23°14'9.012"N Devhara
DOLR-MORD Kundam Convergence MGNREGS construction of New
Tank 232700 46.54 5 93.08 80°13'34.432"E 23°16'9.235"N Dhanwahi
DOLR-MORD Kundam Convergence MGNREGS StopDam/CheckDam 2 26.00 5 16.00 80°14'14.515"E 23°10'26.202"N Doli
DOLR-MORD Kundam Convergence MGNREGS StopDam/CheckDam 1 7.00 5 14.00 80°21'22.061"E 23°14'9.012"N Dunda (Duda)
DOLR-MORD kundam Convergence MGNREGS construction of New
stopdem Talin Nala 57143 11.42857143 5 20.00 80°16'55.777"E 23°20'33.034"N Garyari
DOLR-MORD kundam Convergence MGNREGS construction of New
stopdem Medho Nali 125000 25 5 50.00 80°9'51.379"E 23°10'8.714"N Hansapur
DOLR-MORD Kundam Convergence MGNREGS StopDam/CheckDam 1 9.00 5 9.00 80°28'29.258"E 23°19'51.894"N Hardulikala
DOLR-MORD Kundam Convergence MGNREGS StopDam/CheckDam 1 8.00 5 10.00 80°28'29.258"E 23°19'51.894"N Harratikur
DOLR-MORD Kundam Convergence MGNREGS StopDam/CheckDam 2 18.00 5 20.00 80°28'29.258"E 23°19'51.894"N Jaitpuri
DOLR-MORD Kundam Convergence MGNREGS StopDam/CheckDam 1 11.00 5 12.00 80°28'29.258"E 23°19'51.894"N Jaitpuri
DOLR-MORD Kundam Convergence MGNREGS StopDam/CheckDam 2 20.00 5 20.00 80°16'51.116"E 23°9'2.309"N Jamgaon
DOLR-MORD kundam Convergence MGNREGS construction of
Rapta cum stopdem
Gour Nadi
225000 45 5 90.00 80°16'51.116"E 23°9'2.309"N Jamgaon
DOLR-MORD Kundam Convergence MGNREGS StopDam/CheckDam 2 18.00 5 22.00 80°13'46.55"E 23°8'59.512"N Jamodi
DOLR-MORD Kundam Convergence MGNREGS StopDam/CheckDam 2 20.00 5 24.00 80°21'22.061"E 23°14'9.012"N Jhiria
DOLR-MORD Kundam Convergence MGNREGS StopDam/CheckDam 2 10.00 5 24.00 80°34'3.942"E 23°17'50.839"N Jhirna
DOLR-MORD Kundam Convergence MGNREGS StopDam/CheckDam 2 18.00 5 24.00 80°28'29.258"E 23°19'51.894"N Kalyanpur
DOLR-MORD Kundam Convergence MGNREGS StopDam/CheckDam 1 11.00 5 9.00 80°28'29.258"E 23°19'51.894"N Kalyanpur
DOLR-MORD Kundam Convergence MGNREGS StopDam/CheckDam 1 7.00 5 9.00 80°21'22.061"E 23°14'9.012"N Kanhwara
DOLR-MORD Kundam Convergence MGNREGS StopDam/CheckDam 2 18.00 5 24.00 80°30'46.325"E 23°17'27.535"N Karaghat
DOLR-MORD kundam Convergence MGNREGS
construction of Rapta cum stopdem
Hiran Nadi Baghraji
road
337500 67.5 5 135.00 80°21'16.44"E 23°15'44.569"N Karan pura
DOLR-MORD Kundam Convergence MGNREGS StopDam/CheckDam 2 20.00 5 22.00 80°21'16.44"E 23°15'44.569"N Karanpura
DOLR-MORD Kundam Convergence MGNREGS StopDam/CheckDam 2 20.00 5 26.00 80°21'16.44"E 23°15'44.569"N Karondi
DOLR-MORD Kundam Convergence MGNREGS StopDam/CheckDam 1 8.00 5 12.00 80°18'22.467"E 23°7'18.84"N Kastara
DOLR-MORD Kundam Convergence MGNREGS StopDam/CheckDam 2 20.00 5 20.00 80°21'16.44"E 23°15'44.569"N Khamarwani
DOLR-MORD Kundam Convergence MGNREGS StopDam/CheckDam 2 20.00 5 20.00 80°21'16.44"E 23°15'44.569"N Kheri
101
Concerned
Ministry/
Department
Name of
the
Districts
/ Blocks
Component Activity Total
Number
Command
Area/Irrig
ation
Potential
(Ha)
Period of
Implement
ation 5/ 7
Estimated
cost
(in Lakhs
Rs.)
Longitude Lattitude Remark / Village Name
DOLR-MORD Kundam Convergence MGNREGS StopDam/CheckDam 2 20.00 5 24.00 80°31'53.44"E 23°22'23.96"N Khirwa
DOLR-MORD kundam Convergence MGNREGS construction of New
stopdem Lutna Nala 128571 25.71428571 5 45.00 80°14'42.969"E 23°11'26.003"N Khitoula
DOLR-MORD kundam Convergence MGNREGS construction of New stopdem Lutna Nala
114286 22.85714286 5 40.00 80°14'42.969"E 23°11'26.003"N Khitoula
DOLR-MORD Kundam Convergence MGNREGS StopDam/CheckDam 2 22.00 5 20.00 80°14'42.969"E 23°11'26.003"N Khukkham (Khukhan)
DOLR-MORD Kundam Convergence MGNREGS StopDam/CheckDam 2 18.00 5 16.00 80°14'42.969"E 23°11'26.003"N Knehri
DOLR-MORD Kundam Convergence MGNREGS StopDam/CheckDam 1 8.00 5 10.00 80°14'42.969"E 23°11'26.003"N Knharpura
DOLR-MORD kundam Convergence MGNREGS construction of New
stopdem Kur Nala 62857 12.57142857 5 22.00 80°14'42.969"E 23°11'26.003"N Kude Harduli
DOLR-MORD Kundam Convergence MGNREGS StopDam/CheckDam 2 22.00 5 20.00 80°14'42.969"E 23°11'26.003"N Kudeharduli
DOLR-MORD Kundam Convergence MGNREGS StopDam/CheckDam 2 18.00 5 26.00 80°14'42.969"E 23°11'26.003"N Kuhka
DOLR-MORD Kundam Convergence MGNREGS StopDam/CheckDam 1 8.00 5 10.00 80°27'38.031"E 23°13'34.497"N Kuppi
DOLR-MORD Kundam Convergence MGNREGS construction of New
Tank 366150 73.23 5 146.46 80°14'42.968"E 23°11'26.002"N Kuragwaon
DOLR-MORD Kundam Convergence MGNREGS StopDam/CheckDam 2 16.00 5 24.00 80°14'42.968"E 23°11'26.002"N Kurgawan
DOLR-MORD kundam Convergence MGNREGS
construction of
Rapta cum stopdem
Bandar Nala Kunwarhat
300000 60 5 120.00 80°14'42.968"E 23°11'26.002"N Kuwarhat
DOLR-MORD Kundam Convergence MGNREGS construction of
Samudayak Tank 62857 12.57142857 5 22.00 80°14'42.968"E 23°11'26.002"N lahsar
DOLR-MORD kundam Convergence MGNREGS
construction of
Rapta cum stopdem Hiran Nadi Lahshar
to Karopani road
252500 50.5 5 101.00 80°14'42.968"E 23°11'26.002"N Lahshar
DOLR-MORD Kundam Convergence MGNREGS StopDam/CheckDam 2 22.00 5 16.00 80°14'42.968"E 23°11'26.002"N Lakhanwara
DOLR-MORD Kundam Convergence MGNREGS StopDam/CheckDam 2 18.00 5 16.00 80°14'42.968"E 23°11'26.002"N Lehsar
DOLR-MORD Kundam Convergence MGNREGS Extention of Tank
(Renovation) 70313 14.0625 5 22.50 80°14'42.968"E 23°11'26.002"N Lohkari
DOLR-MORD Kundam Convergence MGNREGS construction of New
Tank 232700 46.54 5 93.08 80°31'10.561"E 23°19'25.919"N madai Kala
DOLR-MORD Kundam Convergence MGNREGS construction of New
Tank 205625 41.125 5 82.25 80°31'10.561"E 23°19'25.919"N madai Kala
102
Concerned
Ministry/
Department
Name of
the
Districts
/ Blocks
Component Activity Total
Number
Command
Area/Irrig
ation
Potential
(Ha)
Period of
Implement
ation 5/ 7
Estimated
cost
(in Lakhs
Rs.)
Longitude Lattitude Remark / Village Name
DOLR-MORD Kundam Convergence MGNREGS StopDam/CheckDam 2 20.00 5 26.00 80°31'10.561"E 23°19'25.919"N Madaikala
DOLR-MORD kundam Convergence MGNREGS construction of New
stopdem Sarangpur 62857 12.57142857 5 22.00 80°24'16.313"E 23°15'33.327"N Mahagwa
DOLR-MORD kundam Convergence MGNREGS
construction of New
stopdem Kumhar
Nala
62857 12.57142857 5 22.00 80°24'16.313"E 23°15'33.327"N Mahagwa
DOLR-MORD Kundam Convergence MGNREGS construction of New
Tank 71429 14.28571429 5 25.00 80°24'16.313"E 23°15'33.327"N mahagwaon
DOLR-MORD Kundam Convergence MGNREGS StopDam/CheckDam 2 16.00 5 16.00 80°24'16.313"E 23°15'33.327"N Maheshpuri
DOLR-MORD kundam Convergence MGNREGS construction of
Rapta cum stopdem 300000 60 5 120.00 80°32'13.948"E 23°20'58.202"N Makharar
DOLR-MORD Kundam Convergence MGNREGS StopDam/CheckDam 2 16.00 5 20.00 80°32'13.948"E 23°20'58.202"N Makhrar
DOLR-MORD Kundam Convergence MGNREGS construction of
Samudayak Tank 62857 12.57142857 5 22.00 80°24'16.313"E 23°15'33.327"N Manera
DOLR-MORD Kundam Convergence MGNREGS StopDam/CheckDam 2 26.00 5 22.00 80°24'16.313"E 23°15'33.327"N Mehgawa
DOLR-MORD Kundam Convergence MGNREGS StopDam/CheckDam 2 22.00 5 30.00 80°24'16.313"E 23°15'33.327"N Menpathari
DOLR-MORD Kundam Convergence MGNREGS StopDam/CheckDam 1 10.00 5 10.00 80°32'43.777"E 23°16'52.114"N Mohani
DOLR-MORD Kundam Convergence MGNREGS StopDam/CheckDam 2 20.00 5 20.00 80°32'43.777"E 23°16'52.114"N Mohini
DOLR-MORD Kundam Convergence MGNREGS StopDam/CheckDam 1 11.00 5 10.00 80°31'44.119"E 23°16'27.878"N Padariya
DOLR-MORD Kundam Convergence MGNREGS StopDam/CheckDam 2 18.00 5 20.00 80°31'44.119"E 23°16'27.878"N Padariya
DOLR-MORD Kundam Convergence MGNREGS Extention of Tank
(Renovation) 62500 12.5 5 20.00 80°31'44.119"E 23°16'27.878"N Padariya
DOLR-MORD Kundam Convergence MGNREGS StopDam/CheckDam 2 18.00 5 26.00 80°17'48.463"E 23°14'9.012"N Padharpur
DOLR-MORD Kundam Convergence MGNREGS StopDam/CheckDam 1 8.00 5 10.00 80°17'48.463"E 23°14'9.012"N Patanakala
DOLR-MORD kundam Convergence MGNREGS
construction of
Rapta cum stopdem
Patna khurd to Goura road
280000 56 5 112.00 80°17'48.463"E 23°14'9.012"N Patna khurd
DOLR-MORD kundam Convergence MGNREGS
construction of New
stopdem Jamunah
Nala
62857 12.57142857 5 22.00 80°12'31.046"E 23°14'42.544"N Pipariya
DOLR-MORD Kundam Convergence MGNREGS StopDam/CheckDam 2 20.00 5 20.00 80°17'48.463"E 23°14'9.012"N Ramhepur
DOLR-MORD kundam Convergence MGNREGS construction of
Rapta cum stopdem
Turka
225000 45 5 90.00 80°19'24.922"E 23°8'15.701"N Rampuri Kala
103
Concerned
Ministry/
Department
Name of
the
Districts
/ Blocks
Component Activity Total
Number
Command
Area/Irrig
ation
Potential
(Ha)
Period of
Implement
ation 5/ 7
Estimated
cost
(in Lakhs
Rs.)
Longitude Lattitude Remark / Village Name
DOLR-MORD Kundam Convergence MGNREGS StopDam/CheckDam 1 12.00 5 8.00 80°19'24.922"E 23°8'15.701"N Rampuri Kalan
DOLR-MORD Kundam Convergence MGNREGS StopDam/CheckDam 2 18.00 5 20.00 80°18'5.689"E 23°11'7.217"N Rampuri Khurd
DOLR-MORD Kundam Convergence MGNREGS StopDam/CheckDam 1 8.00 5 12.00 80°12'31.046"E 23°8'18.497"N Ranipur
DOLR-MORD Kundam Convergence MGNREGS StopDam/CheckDam 1 12.00 5 10.00 80°10'35.645"E 23°13'40.907"N Rungiri
DOLR-MORD Kundam Convergence MGNREGS StopDam/CheckDam 2 22.00 5 24.00 80°10'35.645"E 23°13'40.907"N Sadaphal
DOLR-MORD Kundam Convergence MGNREGS StopDam/CheckDam 2 16.00 5 16.00 80°10'35.645"E 23°13'40.907"N Sahadara
DOLR-MORD Kundam Convergence MGNREGS StopDam/CheckDam 1 10.00 5 12.00 80°28'50.738"E 23°17'12.621"N Sakri
DOLR-MORD Kundam Convergence MGNREGS StopDam/CheckDam 2 22.00 5 22.00 80°28'50.738"E 23°17'12.621"N sakri
DOLR-MORD Kundam Convergence MGNREGS StopDam/CheckDam 1 8.00 5 8.00 80°30'9.971"E 23°16'14.827"N Salhepani
DOLR-MORD Kundam Convergence MGNREGS StopDam/CheckDam 1 10.00 5 10.00 80°10'35.645"E 23°13'40.907"N Sandabeli
DOLR-MORD Kundam Convergence MGNREGS StopDam/CheckDam 2 20.00 5 28.00 80°10'35.645"E 23°13'40.907"N Sandhi
DOLR-MORD kundam Convergence MGNREGS construction of New
stopdem School
ward no 5
62857 12.57142857 5 22.00 80°10'35.645"E 23°13'40.907"N Sandhi
DOLR-MORD Kundam Convergence MGNREGS StopDam/CheckDam 1 10.00 5 9.00 80°10'35.645"E 23°13'40.907"N Sankuhi
DOLR-MORD kundam Convergence MGNREGS construction of New
stopdem Doolhi
Nala
62857 12.57142857 5 22.00 80°10'35.645"E 23°13'40.907"N Santabeli
DOLR-MORD kundam Convergence MGNREGS
construction of New
stopdem Kachara Har
62857 12.57142857 5 22.00 80°10'35.645"E 23°13'40.907"N Santabeli
DOLR-MORD Kundam Convergence MGNREGS StopDam/CheckDam 2 16.00 5 18.00 80°10'35.645"E 23°13'40.907"N Sarouli
DOLR-MORD Kundam Convergence MGNREGS StopDam/CheckDam 2 16.00 5 20.00 80°10'35.645"E 23°13'40.907"N Sarsawan
DOLR-MORD Kundam Convergence MGNREGS StopDam/CheckDam 2 20.00 5 20.00 80°10'35.645"E 23°13'40.907"N Satanjhir
DOLR-MORD Kundam Convergence MGNREGS StopDam/CheckDam 2 16.00 5 26.00 80°10'35.645"E 23°13'40.907"N Sataveli
DOLR-MORD kundam Convergence MGNREGS construction of New stopdem Mohal Pani
54286 10.85714286 5 19.00 80°10'35.645"E 23°13'40.907"N Satnajhare
DOLR-MORD kundam Convergence MGNREGS construction of New
stopdem Jhunni Nala 128571 25.71428571 5 45.00 80°9'32.073"E 23°12'59.075"N Sukri
DOLR-MORD kundam Convergence MGNREGS construction of New
stopdem Sikhuri
Kachara Nala
102857 20.57142857 5 36.00 80°13'9.264"E 23°12'50.686"N Tilsani
DOLR-MORD Kundam Convergence MGNREGS StopDam/CheckDam 2 24.00 5 20.00 80°29'3.789"E 23°8'49.258"N Touri
104
Concerned
Ministry/
Department
Name of
the
Districts
/ Blocks
Component Activity Total
Number
Command
Area/Irrig
ation
Potential
(Ha)
Period of
Implement
ation 5/ 7
Estimated
cost
(in Lakhs
Rs.)
Longitude Lattitude Remark / Village Name
DOLR-MORD kundam Convergence MGNREGS construction of New
stopdem jawari Nala 62857 12.57142857 5 22.00 80°29'3.789"E 23°8'49.258"N Touri
DOLR-MORD Kundam Convergence MGNREGS StopDam/CheckDam 1 11.00 5 12.00 80°10'35.645"E 23°13'40.907"N Turka
DOLR-MORD Kundam Convergence MGNREGS StopDam/CheckDam 1 11.00 5 10.00 80°21'41.016"E 23°9'15.359"N Urdgawan
DOLR-MORD Majholi PMKSY Watershed Capacity Building 248 5 4.95 79°56'15.63"E 23°28'17.785"N All
DOLR-MORD Majholi PMKSY Watershed Livelihood 66 5 9.9 79°56'15.63"E 23°28'17.785"N All
DOLR-MORD Majholi Convergence MGNREGS pond 1 11.00 5 13.00 79°58'58.639"E 23°29'42.101"N Baiharkala
DOLR-MORD Majholi Convergence MGNREGS pond 1 8.00 5 10.00 79°58'58.639"E 23°29'42.101"N Chappra
DOLR-MORD Majholi Convergence MGNREGS StopDam/CheckDam 2 18.00 5 26.00 79°58'58.639"E 23°29'42.101"N Dinari Khamariya
DOLR-MORD Majholi Convergence MGNREGS StopDam/CheckDam 1 10.00 5 10.00 79°58'58.639"E 23°29'42.101"N Ghutehi
DOLR-MORD Majholi Convergence MGNREGS StopDam/CheckDam 1 8.00 5 8.00 79°58'58.639"E 23°29'42.101"N Gourha Bhitoni
DOLR-MORD Majholi Convergence MGNREGS pond 2 20.00 5 24.00 79°58'58.639"E 23°29'42.101"N Gurji
DOLR-MORD Majholi Convergence MGNREGS pond 1 10.00 5 10.00 79°58'58.639"E 23°29'42.101"N Hardua Khurd
DOLR-MORD Majholi Convergence MGNREGS StopDam/CheckDam 2 20.00 5 20.00 79°58'58.639"E 23°29'42.101"N Khalri
DOLR-MORD Majholi Convergence MGNREGS StopDam/CheckDam 2 20.00 5 24.00 79°58'58.639"E 23°29'42.101"N Madai
DOLR-MORD Majholi Convergence MGNREGS pond 2 18.00 5 20.00 79°58'58.639"E 23°29'42.101"N Rehta Khamariya
DOLR-MORD Shahpura PMKSY Watershed Capacity Building 422 5 8.43 79°42'12.478"E 23°6'39.331"N All
DOLR-MORD Shahpura PMKSY Watershed Livelihood 112 5 16.86 79°42'12.478"E 23°6'39.331"N All
DOLR-MORD Shahpura Convergence MGNREGS StopDam/CheckDam 2 22.00 5 24.00 79°43'42.414"E 23°7'7.436"N Andiya
DOLR-MORD Shahpura Convergence MGNREGS StopDam/CheckDam 2 22.00 5 22.00 79°43'42.414"E 23°7'7.436"N Bharatpur
DOLR-MORD Shahpura Convergence MGNREGS StopDam/CheckDam 2 22.00 5 20.00 79°43'42.414"E 23°7'7.436"N Chirapondi
DOLR-MORD Shahpura Convergence MGNREGS StopDam/CheckDam 1 10.00 5 10.00 79°43'42.414"E 23°7'7.436"N Dabkiya
DOLR-MORD Shahpura Convergence MGNREGS StopDam/CheckDam 1 8.00 5 8.00 79°43'42.414"E 23°7'7.436"N Devri
DOLR-MORD Shahpura Convergence MGNREGS StopDam/CheckDam 2 20.00 5 22.00 79°43'42.414"E 23°7'7.436"N DUNGARIYA
DOLR-MORD Shahpura Convergence MGNREGS StopDam/CheckDam 2 18.00 5 20.00 79°40'24.492"E 23°2'22.031"N GHUGHARI
DOLR-MORD Shahpura Convergence MGNREGS StopDam/CheckDam 2 24.00 5 24.00 79°41'10.808"E 23°0'44.155"N Kulha
DOLR-MORD Shahpura Convergence MGNREGS StopDam/CheckDam 2 18.00 5 18.00 79°43'42.414"E 23°7'7.436"N Nayanagar
DOLR-MORD Shahpura Convergence MGNREGS StopDam/CheckDam 1 8.00 5 12.00 79°42'4.046"E 22°58'37.329"N Patichargawan
DOLR-MORD Shahpura Convergence MGNREGS StopDam/CheckDam 2 16.00 5 20.00 79°33'19.197"E 23°12'37.543"N Pipariya
DOLR-MORD Shahpura Convergence MGNREGS StopDam/CheckDam 2 24.00 5 16.00 79°40'1.06"E 22°58'23.944"N Simariya
105
Concerned
Ministry/
Department
Name of
the
Districts
/ Blocks
Component Activity Total
Number
Command
Area/Irrig
ation
Potential
(Ha)
Period of
Implement
ation 5/ 7
Estimated
cost
(in Lakhs
Rs.)
Longitude Lattitude Remark / Village Name
DOLR-MORD Shahpura Convergence MGNREGS StopDam/CheckDam 1 8.00 5 10.00 79°40'12.75"E 23°12'23.618"N Singori
DOLR-MORD Shahpura Convergence MGNREGS StopDam/CheckDam 2 16.00 5 18.00 79°43'42.414"E 23°7'7.436"N Sukha
DOLR-MORD Shahpura Convergence MGNREGS StopDam/CheckDam 2 20.00 5 24.00 79°43'42.414"E 23°7'7.436"N Tinheta
DOLR-MORD Shahpura Convergence MGNREGS StopDam/CheckDam 1 11.00 5 13.00 79°41'50.134"E 22°59'45.604"N Urram
DOLR-MORD Sihora Convergence MGNREGS construction of
stopdem Barne Nadi 175000 35 5 70.00 80°7'35.772"E 23°24'44.187"N Agariya
DOLR-MORD Sihora PMKSY Watershed Capacity Building 1766 5 35.31 80°8'48.846"E 23°24'49.808"N All
DOLR-MORD Sihora PMKSY Watershed Livelihood 471 5 70.62 80°8'48.846"E 23°24'49.808"N All
DOLR-MORD Sihora Convergence MGNREGS
construction of New
stopdem Sodhi Dhamdhama Nala
212500 42.5 5 85.00 80°7'35.772"E 23°24'44.187"N Badha Banjar
DOLR-MORD Sihora Convergence MGNREGS construction of
stopdem 51429 10.28571429 5 18.00 80°4'33.785"E 23°27'18.789"N Banjar
DOLR-MORD Sihora Convergence MGNREGS
construction of
Rapta cum stopdem
Jhiriya Ghat
275000 55 5 110.00 80°7'35.772"E 23°24'44.187"N Bhandra
DOLR-MORD Sihora Convergence MGNREGS
construction of
Rapta cum stopdem
Gada
262500 52.5 5 105.00 80°7'35.772"E 23°24'44.187"N Bhandra
DOLR-MORD Sihora Convergence MGNREGS
construction of
stopdem Silpara
Nadi Deori Kanhai
200000 40 5 80.00 80°7'35.772"E 23°24'44.187"N Chhanagwaon
DOLR-MORD Sihora Convergence MGNREGS construction of
stopdem 57143 11.42857143 5 20.00 80°7'35.772"E 23°24'44.187"N Deori
DOLR-MORD Sihora Convergence MGNREGS construction of
stopdem 51429 10.28571429 5 18.00 80°7'35.772"E 23°24'44.187"N Deori Kanhai
DOLR-MORD Sihora Convergence MGNREGS construction of New
Tank 57143 11.42857143 5 20.00 80°2'17.458"E 23°21'53.701"N Dhangaown
DOLR-MORD Sihora Convergence MGNREGS StopDam/CheckDam 1 8.00 5 10.00 80°6'38.461"E 23°24'19.35"N Ghugra
DOLR-MORD Sihora Convergence MGNREGS StopDam/CheckDam 1 7.00 5 12.00 80°7'35.772"E 23°24'44.187"N Hargad
DOLR-MORD Sihora Convergence MGNREGS construction of
stopdem Belkundi
Nadi
225000 45 5 90.00 80°7'35.772"E 23°24'44.187"N Kewlari
DOLR-MORD Sihora Convergence MGNREGS StopDam/CheckDam 1 9.00 5 9.00 80°9'48.581"E 23°27'13.352"N Kurro
DOLR-MORD Sihora Convergence MGNREGS construction of
stopdem 51429 10.28571429 5 18.00 80°7'35.772"E 23°24'44.187"N Madha
106
Concerned
Ministry/
Department
Name of
the
Districts
/ Blocks
Component Activity Total
Number
Command
Area/Irrig
ation
Potential
(Ha)
Period of
Implement
ation 5/ 7
Estimated
cost
(in Lakhs
Rs.)
Longitude Lattitude Remark / Village Name
DOLR-MORD Sihora Convergence MGNREGS construction of
stopdem Hiran Nadi 262500 52.5 5 105.00 80°7'35.772"E 23°24'44.187"N Madha Paraswara
DOLR-MORD Sihora Convergence MGNREGS construction of
stopdem 51429 10.28571429 5 18.00 80°14'28.033"E 23°28'10.058"N Mahagwaon
DOLR-MORD Sihora Convergence MGNREGS construction of New
Tank 57143 11.42857143 5 20.00 80°7'35.772"E 23°24'44.187"N matiya Tola
DOLR-MORD Sihora Convergence MGNREGS construction of
stopdem 85714 17.14285714 5 30.00 80°4'43.107"E 23°24'47.314"N Nangai
DOLR-MORD Sihora Convergence MGNREGS StopDam/CheckDam 2 22.00 5 16.00 80°15'14.835"E 23°20'43.401"N Pipariya
DOLR-MORD Sihora Convergence MGNREGS
construction of
stopdem Barna Nadi Piparsara
337500 67.5 5 135.00 80°4'56.248"E 23°21'48.652"N Pondi khurd
DOLR-MORD Sihora Convergence MGNREGS construction of
stopdem 91429 18.28571429 5 32.00 80°4'56.248"E 23°21'48.652"N Pondi khurd
DOLR-MORD Sihora Convergence MGNREGS construction of
stopdem 85714 17.14285714 5 30.00 80°4'56.248"E 23°21'48.652"N Pondi khurd
DOLR-MORD Sihora Convergence MGNREGS
construction of
Rapta cum stopdem Matgawaon
275000 55 5 110.00 80°7'35.772"E 23°24'44.187"N Ram khiriya
DOLR-MORD Sihora Convergence MGNREGS StopDam/CheckDam 2 18.00 5 16.00 80°7'35.772"E 23°24'44.187"N Sarda
MOA&FW Jabalpur Har Khet Ko Pani Capacity Building 756 5 15.12 79°55'58.767"E 23°5'54.363"N All
MOA&FW Jabalpur Har Khet Ko Pani Diesel / Electric /
SolarPump 1 1 5 0.25 79°49'16.448"E 23°9'48.803"N Amahinota
MOA&FW Jabalpur Har Khet Ko Pani Tube well 1 1 5 2.00 79°49'16.448"E 23°9'48.803"N Amahinota
MOA&FW Jabalpur Per Drop More Crop Sprinkler 2 2 5 0.40 79°49'16.448"E 23°9'48.803"N Amahinota
MOA&FW Jabalpur Har Khet Ko Pani Diesel / Electric /
SolarPump 1 1 5 0.25 79°55'25.041"E 22°56'9.778"N Atha Kheda
MOA&FW Jabalpur Har Khet Ko Pani Tube well 1 1 5 2.00 79°55'25.041"E 22°56'9.778"N Atha Kheda
MOA&FW Jabalpur Per Drop More Crop Sprinkler 2 2 5 0.40 79°55'25.041"E 22°56'9.778"N Atha Kheda
MOA&FW Jabalpur Har Khet Ko Pani Diesel / Electric /
SolarPump 2 2 5 0.50 79°54'19.889"E 23°3'22.126"N Badhaiya Kheda
MOA&FW Jabalpur Per Drop More Crop Sprinkler 3 3 5 0.60 79°54'19.889"E 23°3'22.126"N Badhaiya Kheda
MOA&FW Jabalpur Per Drop More Crop Sprinkler 1 1 5 0.20 79°54'19.889"E 23°3'22.126"N Badhaiya Kheda
MOA&FW Jabalpur Per Drop More Crop Sprinkler 1 1 5 0.20 79°50'26.336"E 23°9'32.892"N Bahdan
MOA&FW Jabalpur Har Khet Ko Pani Diesel / Electric /
SolarPump 2 2 5 0.50 79°53'55.104"E 23°8'20.509"N Bahoripar
107
Concerned
Ministry/
Department
Name of
the
Districts
/ Blocks
Component Activity Total
Number
Command
Area/Irrig
ation
Potential
(Ha)
Period of
Implement
ation 5/ 7
Estimated
cost
(in Lakhs
Rs.)
Longitude Lattitude Remark / Village Name
MOA&FW Jabalpur Har Khet Ko Pani Tube well 1 1 5 2.00 79°53'55.104"E 23°8'20.509"N Bahoripar
MOA&FW Jabalpur Per Drop More Crop Sprinkler 4 4 5 0.80 79°53'55.104"E 23°8'20.509"N Bahoripar
MOA&FW Jabalpur Per Drop More Crop Drip system 1 1 5 1.00 79°53'55.104"E 23°8'20.509"N Bahoripar
MOA&FW Jabalpur Har Khet Ko Pani Diesel / Electric /
SolarPump 3 3 5 0.75 79°53'55.104"E 23°8'20.509"N Balhwara
MOA&FW Jabalpur Har Khet Ko Pani Tube well 1 1 5 2.00 79°53'55.104"E 23°8'20.509"N Balhwara
MOA&FW Jabalpur Per Drop More Crop Sprinkler 7 7 5 1.40 79°53'55.104"E 23°8'20.509"N Balhwara
MOA&FW Jabalpur Har Khet Ko Pani Diesel / Electric /
SolarPump 2 2 5 0.50 79°51'14.954"E 22°53'48.416"N Bamhani
MOA&FW Jabalpur Har Khet Ko Pani Tube well 1 1 5 2.00 79°51'14.954"E 22°53'48.416"N Bamhani
MOA&FW Jabalpur Har Khet Ko Pani Diesel / Electric /
SolarPump 2 2 5 0.50 79°51'14.954"E 22°53'48.416"N Bamhani
MOA&FW Jabalpur Har Khet Ko Pani Tube well 1 1 5 2.00 79°51'14.954"E 22°53'48.416"N Bamhani
MOA&FW Jabalpur Per Drop More Crop Sprinkler 2 2 5 0.40 79°51'14.954"E 22°53'48.416"N Bamhani
MOA&FW Jabalpur Per Drop More Crop Sprinkler 2 2 5 0.40 79°51'14.954"E 22°53'48.416"N Bamhani
MOA&FW Jabalpur Har Khet Ko Pani Diesel / Electric /
SolarPump 1 1 5 0.25 79°59'21.123"E 23°9'44.825"N Bamhnoda
MOA&FW Jabalpur Per Drop More Crop Sprinkler 1 1 5 0.20 79°59'21.123"E 23°9'44.825"N Bamhnoda
MOA&FW Jabalpur Har Khet Ko Pani Diesel / Electric /
SolarPump 2 2 5 0.50 79°59'21.123"E 23°9'44.825"N Bamuraha Hinota
MOA&FW Jabalpur Har Khet Ko Pani Tube well 1 1 5 2.00 79°59'21.123"E 23°9'44.825"N Bamuraha Hinota
MOA&FW Jabalpur Per Drop More Crop Sprinkler 4 4 5 0.80 79°59'21.123"E 23°9'44.825"N Bamuraha Hinota
MOA&FW Jabalpur Har Khet Ko Pani Diesel / Electric /
SolarPump 2 2 5 0.50 79°55'0.986"E 22°58'22.12"N Bandar Kola
MOA&FW Jabalpur Har Khet Ko Pani Tube well 1 1 5 2.00 79°55'0.986"E 22°58'22.12"N Bandar Kola
MOA&FW Jabalpur Per Drop More Crop Sprinkler 3 3 5 0.60 79°55'0.986"E 22°58'22.12"N Bandar Kola
MOA&FW Jabalpur Har Khet Ko Pani Diesel / Electric /
SolarPump 2 2 5 0.50 79°57'49.482"E 22°58'5.681"N Barbati
MOA&FW Jabalpur Har Khet Ko Pani Tube well 1 1 5 2.00 79°57'49.482"E 22°58'5.681"N Barbati
MOA&FW Jabalpur Per Drop More Crop Sprinkler 3 3 5 0.60 79°57'49.482"E 22°58'5.681"N Barbati
MOA&FW Jabalpur Har Khet Ko Pani Diesel / Electric /
SolarPump 2 2 5 0.50 79°55'30.662"E 23°11'3.519"N Bareli Pathar
108
Concerned
Ministry/
Department
Name of
the
Districts
/ Blocks
Component Activity Total
Number
Command
Area/Irrig
ation
Potential
(Ha)
Period of
Implement
ation 5/ 7
Estimated
cost
(in Lakhs
Rs.)
Longitude Lattitude Remark / Village Name
MOA&FW Jabalpur Har Khet Ko Pani Tube well 1 1 5 2.00 79°55'30.662"E 23°11'3.519"N Bareli Pathar
MOA&FW Jabalpur Per Drop More Crop Sprinkler 2 2 5 0.40 79°55'30.662"E 23°11'3.519"N Bareli Pathar
MOA&FW Jabalpur Har Khet Ko Pani Diesel / Electric /
SolarPump 2 2 5 0.50 79°55'30.662"E 23°11'3.519"N Barha
MOA&FW Jabalpur Har Khet Ko Pani Tube well 2 2 5 4.00 79°55'30.662"E 23°11'3.519"N Barha
MOA&FW Jabalpur Per Drop More Crop Sprinkler 4 4 5 0.80 79°55'30.662"E 23°11'3.519"N Barha
MOA&FW Jabalpur Har Khet Ko Pani Diesel / Electric /
SolarPump 2 2 5 0.50 79°55'30.662"E 23°11'3.519"N Basaniya
MOA&FW Jabalpur Har Khet Ko Pani Tube well 1 1 5 2.00 79°55'30.662"E 23°11'3.519"N Basaniya
MOA&FW Jabalpur Per Drop More Crop Sprinkler 2 2 5 0.40 79°55'30.662"E 23°11'3.519"N Basaniya
MOA&FW Jabalpur Har Khet Ko Pani Diesel / Electric /
SolarPump 1 1 5 0.25 79°51'12.754"E 22°52'39.448"N Basanpani
MOA&FW Jabalpur Har Khet Ko Pani Tube well 1 1 5 2.00 79°51'12.754"E 22°52'39.448"N Basanpani
MOA&FW Jabalpur Per Drop More Crop Sprinkler 2 2 5 0.40 79°51'12.754"E 22°52'39.448"N Basanpani
MOA&FW Jabalpur Har Khet Ko Pani Diesel / Electric /
SolarPump 1 1 5 0.25 79°54'26.672"E 23°0'3.845"N Basha
MOA&FW Jabalpur Har Khet Ko Pani Tube well 1 1 5 2.00 79°54'26.672"E 23°0'3.845"N Basha
MOA&FW Jabalpur Per Drop More Crop Sprinkler 1 1 5 0.20 79°54'26.672"E 23°0'3.845"N Basha
MOA&FW Jabalpur Har Khet Ko Pani Diesel / Electric /
SolarPump 1 1 5 0.25 80°5'0.948"E 23°8'39.615"N Beragi
MOA&FW Jabalpur Har Khet Ko Pani Tube well 1 1 5 2.00 80°5'0.948"E 23°8'39.615"N Beragi
MOA&FW Jabalpur Per Drop More Crop Sprinkler 2 2 5 0.40 80°5'0.948"E 23°8'39.615"N Beragi
MOA&FW Jabalpur Har Khet Ko Pani Diesel / Electric /
SolarPump 1 1 5 0.25 79°52'19.547"E 23°6'56.194"N Bijapuri
MOA&FW Jabalpur Har Khet Ko Pani Tube well 1 1 5 2.00 79°52'19.547"E 23°6'56.194"N Bijapuri
MOA&FW Jabalpur Per Drop More Crop Sprinkler 1 1 5 0.20 79°52'19.547"E 23°6'56.194"N Bijapuri
MOA&FW Jabalpur Har Khet Ko Pani Tube well 1 1 5 2.00 79°52'19.547"E 23°6'56.194"N Bijora
MOA&FW Jabalpur Per Drop More Crop Sprinkler 1 1 5 0.20 79°52'19.547"E 23°6'56.194"N Bijora
MOA&FW Jabalpur Har Khet Ko Pani Diesel / Electric /
SolarPump 1 1 5 0.25 80°9'23.546"E 23°7'21.508"N Bilgada
MOA&FW Jabalpur Har Khet Ko Pani Tube well 1 1 5 2.00 80°9'23.546"E 23°7'21.508"N Bilgada
MOA&FW Jabalpur Per Drop More Crop Sprinkler 1 1 5 0.20 80°9'23.546"E 23°7'21.508"N Bilgada
109
Concerned
Ministry/
Department
Name of
the
Districts
/ Blocks
Component Activity Total
Number
Command
Area/Irrig
ation
Potential
(Ha)
Period of
Implement
ation 5/ 7
Estimated
cost
(in Lakhs
Rs.)
Longitude Lattitude Remark / Village Name
MOA&FW Jabalpur Har Khet Ko Pani Diesel / Electric /
SolarPump 1 1 5 0.25 79°52'19.547"E 23°6'56.194"N Binjha
MOA&FW Jabalpur Har Khet Ko Pani Tube well 1 1 5 2.00 79°52'19.547"E 23°6'56.194"N Binjha
MOA&FW Jabalpur Per Drop More Crop Sprinkler 1 1 5 0.20 79°52'19.547"E 23°6'56.194"N Binjha
MOA&FW Jabalpur Har Khet Ko Pani Diesel / Electric /
SolarPump 2 2 5 0.50 79°52'19.547"E 23°6'56.194"N Chandeli
MOA&FW Jabalpur Har Khet Ko Pani Tube well 2 2 5 4.00 79°52'19.547"E 23°6'56.194"N Chandeli
MOA&FW Jabalpur Per Drop More Crop Sprinkler 1 1 5 0.20 79°52'19.547"E 23°6'56.194"N Chandeli
MOA&FW Jabalpur Har Khet Ko Pani Diesel / Electric /
SolarPump 1 1 5 0.25 79°47'56.142"E 23°1'50.231"N Chanderi
MOA&FW Jabalpur Per Drop More Crop Sprinkler 1 1 5 0.20 79°47'56.142"E 23°1'50.231"N Chanderi
MOA&FW Jabalpur Har Khet Ko Pani Diesel / Electric /
SolarPump 1 1 5 0.25 79°55'47.525"E 22°55'41.673"N Chargawan
MOA&FW Jabalpur Har Khet Ko Pani Tube well 1 1 5 2.00 79°55'47.525"E 22°55'41.673"N Chargawan
MOA&FW Jabalpur Per Drop More Crop Sprinkler 1 1 5 0.20 79°55'47.525"E 22°55'41.673"N Chargawan
MOA&FW Jabalpur Har Khet Ko Pani Diesel / Electric /
SolarPump 1 1 5 0.25 79°55'47.525"E 22°55'41.673"N Charghat
MOA&FW Jabalpur Har Khet Ko Pani Tube well 8 8 5 16.00 79°55'47.525"E 22°55'41.673"N Charghat
MOA&FW Jabalpur Per Drop More Crop Sprinkler 2 2 5 0.40 79°55'47.525"E 22°55'41.673"N Charghat
MOA&FW Jabalpur Har Khet Ko Pani Diesel / Electric /
SolarPump 2 2 5 0.50 79°55'47.525"E 22°55'41.673"N Charguwan
MOA&FW Jabalpur Har Khet Ko Pani Tube well 2 2 5 4.00 79°55'47.525"E 22°55'41.673"N Charguwan
MOA&FW Jabalpur Per Drop More Crop Sprinkler 2 2 5 0.40 79°55'47.525"E 22°55'41.673"N Charguwan
MOA&FW Jabalpur Har Khet Ko Pani Diesel / Electric /
SolarPump 1 1 5 0.25 79°55'47.525"E 22°55'41.673"N Chaukhada
MOA&FW Jabalpur Har Khet Ko Pani Tube well 1 1 5 2.00 79°55'47.525"E 22°55'41.673"N Chaukhada
MOA&FW Jabalpur Per Drop More Crop Sprinkler 1 1 5 0.20 79°55'47.525"E 22°55'41.673"N Chaukhada
MOA&FW Jabalpur Har Khet Ko Pani Diesel / Electric /
SolarPump 1 1 5 0.25 79°55'47.525"E 22°55'41.673"N Chhapara
MOA&FW Jabalpur Per Drop More Crop Sprinkler 1 1 5 0.20 79°55'47.525"E 22°55'41.673"N Chhapara
MOA&FW Jabalpur Har Khet Ko Pani Diesel / Electric /
SolarPump 1 1 5 0.25 79°56'42.685"E 23°2'46.791"N Chhattarpur
110
Concerned
Ministry/
Department
Name of
the
Districts
/ Blocks
Component Activity Total
Number
Command
Area/Irrig
ation
Potential
(Ha)
Period of
Implement
ation 5/ 7
Estimated
cost
(in Lakhs
Rs.)
Longitude Lattitude Remark / Village Name
MOA&FW Jabalpur Har Khet Ko Pani Tube well 1 1 5 2.00 79°56'42.685"E 23°2'46.791"N Chhattarpur
MOA&FW Jabalpur Per Drop More Crop Sprinkler 1 1 5 0.20 79°56'42.685"E 23°2'46.791"N Chhattarpur
MOA&FW Jabalpur Har Khet Ko Pani Farm Pond 1 2 5 2.00 79°52'47.652"E 23°10'35.414"N Chhitapar
MOA&FW Jabalpur Har Khet Ko Pani Diesel / Electric /
SolarPump 2 2 5 0.50 79°52'47.652"E 23°10'35.414"N Chhitapar
MOA&FW Jabalpur Per Drop More Crop Sprinkler 2 2 5 0.40 79°52'47.652"E 23°10'35.414"N Chhitapar
MOA&FW Jabalpur Har Khet Ko Pani Diesel / Electric /
SolarPump 1 1 5 0.25 79°52'47.652"E 23°10'35.414"N Chourai
MOA&FW Jabalpur Har Khet Ko Pani Tube well 1 1 5 2.00 79°52'47.652"E 23°10'35.414"N Chourai
MOA&FW Jabalpur Per Drop More Crop Sprinkler 2 2 5 0.40 79°52'47.652"E 23°10'35.414"N Chourai
MOA&FW Jabalpur Har Khet Ko Pani Tube well 1 1 5 2.00 79°52'0.16"E 23°0'43.493"N Churiya
MOA&FW Jabalpur Per Drop More Crop Sprinkler 1 1 5 0.20 79°52'0.16"E 23°0'43.493"N Churiya
MOA&FW Jabalpur Har Khet Ko Pani Farm Pond 1 2 5 2.00 79°48'38.401"E 23°4'47.504"N Dagdagouwa
MOA&FW Jabalpur Har Khet Ko Pani Diesel / Electric /
SolarPump 1 1 5 0.25 79°48'38.401"E 23°4'47.504"N Dagdagouwa
MOA&FW Jabalpur Har Khet Ko Pani Tube well 1 1 5 2.00 79°48'38.401"E 23°4'47.504"N Dagdagouwa
MOA&FW Jabalpur Per Drop More Crop Sprinkler 1 1 5 0.20 79°48'38.401"E 23°4'47.504"N Dagdagouwa
MOA&FW Jabalpur Har Khet Ko Pani Diesel / Electric /
SolarPump 1 1 5 0.25 79°46'38.193"E 22°56'0.439"N Deodwar
MOA&FW Jabalpur Har Khet Ko Pani Tube well 1 1 5 2.00 79°46'38.193"E 22°56'0.439"N Deodwar
MOA&FW Jabalpur Per Drop More Crop Sprinkler 1 1 5 0.20 79°46'38.193"E 22°56'0.439"N Deodwar
MOA&FW Jabalpur Har Khet Ko Pani Diesel / Electric /
SolarPump 1 1 5 0.25 79°55'17.845"E 23°2'42.751"N Deori
MOA&FW Jabalpur Har Khet Ko Pani Tube well 1 1 5 2.00 79°55'17.845"E 23°2'42.751"N Deori
MOA&FW Jabalpur Har Khet Ko Pani Diesel / Electric /
SolarPump 1 1 5 0.25 79°55'17.845"E 23°2'42.751"N Deori
MOA&FW Jabalpur Har Khet Ko Pani Tube well 1 1 5 2.00 79°55'17.845"E 23°2'42.751"N Deori
MOA&FW Jabalpur Har Khet Ko Pani Diesel / Electric /
SolarPump 1 1 5 0.25 79°55'17.845"E 23°2'42.751"N Deori
MOA&FW Jabalpur Har Khet Ko Pani Diesel / Electric /
SolarPump 1 1 5 0.25 79°55'17.845"E 23°2'42.751"N Deori
MOA&FW Jabalpur Per Drop More Crop Sprinkler 2 2 5 0.40 79°55'17.845"E 23°2'42.751"N Deori
111
Concerned
Ministry/
Department
Name of
the
Districts
/ Blocks
Component Activity Total
Number
Command
Area/Irrig
ation
Potential
(Ha)
Period of
Implement
ation 5/ 7
Estimated
cost
(in Lakhs
Rs.)
Longitude Lattitude Remark / Village Name
MOA&FW Jabalpur Per Drop More Crop Sprinkler 1 1 5 0.20 79°55'17.845"E 23°2'42.751"N Deori
MOA&FW Jabalpur Per Drop More Crop Sprinkler 1 1 5 0.20 79°55'17.845"E 23°2'42.751"N Deori
MOA&FW Jabalpur Per Drop More Crop Sprinkler 1 1 5 0.20 79°55'17.845"E 23°2'42.751"N Deori
MOA&FW Jabalpur Har Khet Ko Pani Diesel / Electric /
SolarPump 1 1 5 0.25 79°52'47.652"E 23°10'35.414"N Dhabai
MOA&FW Jabalpur Har Khet Ko Pani Tube well 1 1 5 2.00 79°52'47.652"E 23°10'35.414"N Dhabai
MOA&FW Jabalpur Per Drop More Crop Sprinkler 1 1 5 0.20 79°52'47.652"E 23°10'35.414"N Dhabai
MOA&FW Jabalpur Har Khet Ko Pani Diesel / Electric /
SolarPump 2 2 5 0.50 79°52'47.652"E 23°10'35.414"N Dhanpuri
MOA&FW Jabalpur Har Khet Ko Pani Tube well 1 1 5 2.00 79°52'47.652"E 23°10'35.414"N Dhanpuri
MOA&FW Jabalpur Per Drop More Crop Sprinkler 2 2 5 0.40 79°52'47.652"E 23°10'35.414"N Dhanpuri
MOA&FW Jabalpur Har Khet Ko Pani Diesel / Electric /
SolarPump 1 1 5 0.25 79°52'47.652"E 23°10'35.414"N Dhoda
MOA&FW Jabalpur Har Khet Ko Pani Tube well 2 2 5 4.00 79°52'47.652"E 23°10'35.414"N Dhoda
MOA&FW Jabalpur Per Drop More Crop Sprinkler 1 1 5 0.20 79°52'47.652"E 23°10'35.414"N Dhoda
MOA&FW Jabalpur Har Khet Ko Pani Diesel / Electric /
SolarPump 1 1 5 0.25 79°52'47.652"E 23°10'35.414"N Diya Kheda
MOA&FW Jabalpur Har Khet Ko Pani Tube well 1 1 5 2.00 79°52'47.652"E 23°10'35.414"N Diya Kheda
MOA&FW Jabalpur Per Drop More Crop Sprinkler 1 1 5 0.20 79°52'47.652"E 23°10'35.414"N Diya Kheda
MOA&FW Jabalpur Har Khet Ko Pani Diesel / Electric /
SolarPump 2 2 5 0.50 79°47'17.342"E 23°2'51.628"N Dugariya
MOA&FW Jabalpur Har Khet Ko Pani Tube well 1 1 5 2.00 79°47'17.342"E 23°2'51.628"N Dugariya
MOA&FW Jabalpur Per Drop More Crop Sprinkler 2 2 5 0.40 79°47'17.342"E 23°2'51.628"N Dugariya
MOA&FW Jabalpur Har Khet Ko Pani Diesel / Electric /
SolarPump 1 1 5 0.25 79°52'47.652"E 23°10'35.414"N Dundai
MOA&FW Jabalpur Per Drop More Crop Sprinkler 1 1 5 0.20 79°52'47.652"E 23°10'35.414"N Dundai
MOA&FW Jabalpur Har Khet Ko Pani Diesel / Electric /
SolarPump 1 1 5 0.25 79°55'53.117"E 22°59'5.113"N Dungariya
MOA&FW Jabalpur Har Khet Ko Pani Tube well 1 1 5 2.00 79°55'53.117"E 22°59'5.113"N Dungariya
MOA&FW Jabalpur Per Drop More Crop Sprinkler 1 1 5 0.20 79°55'53.117"E 22°59'5.113"N Dungariya
MOA&FW Jabalpur Har Khet Ko Pani Tube well 1 1 5 2.00 79°55'25.041"E 22°55'41.673"N Gadarkheda
MOA&FW Jabalpur Per Drop More Crop Sprinkler 1 1 5 0.20 79°55'25.041"E 22°55'41.673"N Gadarkheda
112
Concerned
Ministry/
Department
Name of
the
Districts
/ Blocks
Component Activity Total
Number
Command
Area/Irrig
ation
Potential
(Ha)
Period of
Implement
ation 5/ 7
Estimated
cost
(in Lakhs
Rs.)
Longitude Lattitude Remark / Village Name
MOA&FW Jabalpur Har Khet Ko Pani Farm Pond 1 2 5 2.00 79°55'25.041"E 22°55'41.673"N Gagha Gorakhpur
MOA&FW Jabalpur Har Khet Ko Pani Diesel / Electric /
SolarPump 1 1 5 0.25 79°55'25.041"E 22°55'41.673"N Gagha Gorakhpur
MOA&FW Jabalpur Har Khet Ko Pani Tube well 1 1 5 2.00 79°55'25.041"E 22°55'41.673"N Gagha Gorakhpur
MOA&FW Jabalpur Per Drop More Crop Sprinkler 2 2 5 0.40 79°55'25.041"E 22°55'41.673"N Gagha Gorakhpur
MOA&FW Jabalpur Har Khet Ko Pani Diesel / Electric /
SolarPump 1 1 5 0.25 79°50'22.927"E 22°59'8.632"N Gajna
MOA&FW Jabalpur Har Khet Ko Pani Tube well 1 1 5 2.00 79°50'22.927"E 22°59'8.632"N Gajna
MOA&FW Jabalpur Per Drop More Crop Sprinkler 1 1 5 0.20 79°50'22.927"E 22°59'8.632"N Gajna
MOA&FW Jabalpur Har Khet Ko Pani Tube well 1 1 5 2.00 79°57'6.219"E 23°8'59.857"N Gangdha
MOA&FW Jabalpur Per Drop More Crop Sprinkler 1 1 5 0.20 79°57'6.219"E 23°8'59.857"N Gangdha
MOA&FW Jabalpur Har Khet Ko Pani Diesel / Electric /
SolarPump 1 1 5 0.25 79°51'30.26"E 23°2'46.791"N Ghaghra
MOA&FW Jabalpur Har Khet Ko Pani Tube well 1 1 5 2.00 79°51'30.26"E 23°2'46.791"N Ghaghra
MOA&FW Jabalpur Per Drop More Crop Sprinkler 1 1 5 0.20 79°51'30.26"E 23°2'46.791"N Ghaghra
MOA&FW Jabalpur Har Khet Ko Pani Farm Pond 1 2 5 2.00 79°52'58.894"E 23°8'20.509"N Ghana
MOA&FW Jabalpur Har Khet Ko Pani Diesel / Electric /
SolarPump 1 1 5 0.25 79°52'58.894"E 23°8'20.509"N Ghana
MOA&FW Jabalpur Har Khet Ko Pani Tube well 1 1 5 2.00 79°52'58.894"E 23°8'20.509"N Ghana
MOA&FW Jabalpur Har Khet Ko Pani Diesel / Electric /
SolarPump 1 1 5 0.25 79°52'58.894"E 23°8'20.509"N Ghana
MOA&FW Jabalpur Har Khet Ko Pani Tube well 1 1 5 2.00 79°52'58.894"E 23°8'20.509"N Ghana
MOA&FW Jabalpur Per Drop More Crop Sprinkler 2 2 5 0.40 79°52'58.894"E 23°8'20.509"N Ghana
MOA&FW Jabalpur Per Drop More Crop Drip system 1 1 5 1.00 79°52'58.894"E 23°8'20.509"N Ghana
MOA&FW Jabalpur Per Drop More Crop Sprinkler 2 2 5 0.40 79°52'58.894"E 23°8'20.509"N Ghana
MOA&FW Jabalpur Har Khet Ko Pani Diesel / Electric /
SolarPump 2 2 5 0.50 79°55'19.42"E 22°54'51.083"N Ghat Pipariya
MOA&FW Jabalpur Har Khet Ko Pani Tube well 2 2 5 4.00 79°55'19.42"E 22°54'51.083"N Ghat Pipariya
MOA&FW Jabalpur Per Drop More Crop Sprinkler 3 3 5 0.60 79°55'19.42"E 22°54'51.083"N Ghat Pipariya
MOA&FW Jabalpur Har Khet Ko Pani Diesel / Electric /
SolarPump 2 2 5 0.50 79°55'19.42"E 22°54'51.083"N Ghunsor
MOA&FW Jabalpur Har Khet Ko Pani Tube well 1 1 5 2.00 79°55'19.42"E 22°54'51.083"N Ghunsor
113
Concerned
Ministry/
Department
Name of
the
Districts
/ Blocks
Component Activity Total
Number
Command
Area/Irrig
ation
Potential
(Ha)
Period of
Implement
ation 5/ 7
Estimated
cost
(in Lakhs
Rs.)
Longitude Lattitude Remark / Village Name
MOA&FW Jabalpur Per Drop More Crop Sprinkler 2 2 5 0.40 79°55'19.42"E 22°54'51.083"N Ghunsor
MOA&FW Jabalpur Har Khet Ko Pani Tube well 1 1 5 2.00 79°55'19.42"E 22°54'51.083"N Ghutiya
MOA&FW Jabalpur Per Drop More Crop Sprinkler 1 1 5 0.20 79°55'19.42"E 22°54'51.083"N Ghutiya
MOA&FW Jabalpur Har Khet Ko Pani Diesel / Electric /
SolarPump 1 1 5 0.25 79°55'19.42"E 22°54'51.083"N Gokalpur
MOA&FW Jabalpur Har Khet Ko Pani Tube well 1 1 5 2.00 79°55'19.42"E 22°54'51.083"N Gokalpur
MOA&FW Jabalpur Per Drop More Crop Sprinkler 1 1 5 0.20 79°55'19.42"E 22°54'51.083"N Gokalpur
MOA&FW Jabalpur Har Khet Ko Pani Farm Pond 1 2 5 2.00 79°51'54.5"E 23°1'47.538"N Harrai
MOA&FW Jabalpur Har Khet Ko Pani Diesel / Electric /
SolarPump 2 2 5 0.50 79°51'54.5"E 23°1'47.538"N Harrai
MOA&FW Jabalpur Har Khet Ko Pani Tube well 1 1 5 2.00 79°51'54.5"E 23°1'47.538"N Harrai
MOA&FW Jabalpur Per Drop More Crop Sprinkler 3 3 5 0.60 79°51'54.5"E 23°1'47.538"N Harrai
MOA&FW Jabalpur Har Khet Ko Pani Diesel / Electric /
SolarPump 1 1 5 0.25 79°50'8.507"E 22°57'28.811"N Hinota
MOA&FW Jabalpur Har Khet Ko Pani Diesel / Electric /
SolarPump 1 1 5 0.25 79°50'8.507"E 22°57'28.811"N Hinota
MOA&FW Jabalpur Har Khet Ko Pani Tube well 1 1 5 2.00 79°50'8.507"E 22°57'28.811"N Hinota
MOA&FW Jabalpur Per Drop More Crop Sprinkler 1 1 5 0.20 79°50'8.507"E 22°57'28.811"N Hinota
MOA&FW Jabalpur Per Drop More Crop Sprinkler 1 1 5 0.20 79°50'8.507"E 22°57'28.811"N Hinota
MOA&FW Jabalpur Har Khet Ko Pani Diesel / Electric /
SolarPump 2 2 5 0.50 80°2'57.055"E 23°6'28.989"N Hinotiya
MOA&FW Jabalpur Har Khet Ko Pani Tube well 1 1 5 2.00 80°2'57.055"E 23°6'28.989"N Hinotiya
MOA&FW Jabalpur Har Khet Ko Pani Diesel / Electric /
SolarPump 1 1 5 0.25 80°2'57.055"E 23°6'28.989"N Hinotiya
MOA&FW Jabalpur Har Khet Ko Pani Tube well 1 1 5 2.00 80°2'57.055"E 23°6'28.989"N Hinotiya
MOA&FW Jabalpur Per Drop More Crop Sprinkler 2 2 5 0.40 80°2'57.055"E 23°6'28.989"N Hinotiya
MOA&FW Jabalpur Per Drop More Crop Sprinkler 2 2 5 0.40 80°2'57.055"E 23°6'28.989"N Hinotiya
MOA&FW Jabalpur Har Khet Ko Pani Diesel / Electric /
SolarPump 1 1 5 0.25 79°48'13.648"E 22°53'25.235"N Hulki
MOA&FW Jabalpur Har Khet Ko Pani Tube well 1 1 5 2.00 79°48'13.648"E 22°53'25.235"N Hulki
MOA&FW Jabalpur Per Drop More Crop Sprinkler 1 1 5 0.20 79°48'13.648"E 22°53'25.235"N Hulki
114
Concerned
Ministry/
Department
Name of
the
Districts
/ Blocks
Component Activity Total
Number
Command
Area/Irrig
ation
Potential
(Ha)
Period of
Implement
ation 5/ 7
Estimated
cost
(in Lakhs
Rs.)
Longitude Lattitude Remark / Village Name
MOA&FW Jabalpur Har Khet Ko Pani Diesel / Electric /
SolarPump 1 1 5 0.25 80°6'58.107"E 23°8'54.428"N Indra
MOA&FW Jabalpur Har Khet Ko Pani Tube well 1 1 5 2.00 80°6'58.107"E 23°8'54.428"N Indra
MOA&FW Jabalpur Per Drop More Crop Sprinkler 2 2 5 0.40 80°6'58.107"E 23°8'54.428"N Indra
MOA&FW Jabalpur Har Khet Ko Pani Diesel / Electric /
SolarPump 1 1 5 0.25 79°55'50.165"E 23°4'25.096"N Jamtara
MOA&FW Jabalpur Per Drop More Crop Sprinkler 1 1 5 0.20 79°55'50.165"E 23°4'25.096"N Jamtara
MOA&FW Jabalpur Har Khet Ko Pani Diesel / Electric /
SolarPump 1 1 5 0.25 79°54'51.314"E 23°8'54.236"N Jamuniya
MOA&FW Jabalpur Har Khet Ko Pani Tube well 1 1 5 2.00 79°54'51.314"E 23°8'54.236"N Jamuniya
MOA&FW Jabalpur Har Khet Ko Pani Diesel / Electric /
SolarPump 1 1 5 0.25 79°54'51.314"E 23°8'54.236"N Jamuniya
MOA&FW Jabalpur Har Khet Ko Pani Tube well 1 1 5 2.00 79°54'51.314"E 23°8'54.236"N Jamuniya
MOA&FW Jabalpur Har Khet Ko Pani Diesel / Electric /
SolarPump 1 1 5 0.25 79°54'51.314"E 23°8'54.236"N Jamuniya
MOA&FW Jabalpur Har Khet Ko Pani Tube well 1 1 5 2.00 79°54'51.314"E 23°8'54.236"N Jamuniya
MOA&FW Jabalpur Per Drop More Crop Sprinkler 1 1 5 0.20 79°54'51.314"E 23°8'54.236"N Jamuniya
MOA&FW Jabalpur Per Drop More Crop Sprinkler 1 1 5 0.20 79°54'51.314"E 23°8'54.236"N Jamuniya
MOA&FW Jabalpur Per Drop More Crop Sprinkler 1 1 5 0.20 79°54'51.314"E 23°8'54.236"N Jamuniya
MOA&FW Jabalpur Har Khet Ko Pani Diesel / Electric /
SolarPump 1 1 5 0.25 79°48'40.287"E 23°3'8.085"N Jhiri
MOA&FW Jabalpur Har Khet Ko Pani Tube well 1 1 5 2.00 79°48'40.287"E 23°3'8.085"N Jhiri
MOA&FW Jabalpur Per Drop More Crop Sprinkler 1 1 5 0.20 79°48'40.287"E 23°3'8.085"N Jhiri
MOA&FW Jabalpur Har Khet Ko Pani Diesel / Electric /
SolarPump 2 2 5 0.50 79°55'25.041"E 22°55'47.294"N Jogidhana
MOA&FW Jabalpur Har Khet Ko Pani Tube well 1 1 5 2.00 79°55'25.041"E 22°55'47.294"N Jogidhana
MOA&FW Jabalpur Per Drop More Crop Sprinkler 3 3 5 0.60 79°55'25.041"E 22°55'47.294"N Jogidhana
MOA&FW Jabalpur Har Khet Ko Pani Diesel / Electric /
SolarPump 1 1 5 0.25 79°51'8.714"E 23°5'2.803"N Jotpur
MOA&FW Jabalpur Har Khet Ko Pani Tube well 1 1 5 2.00 79°51'8.714"E 23°5'2.803"N Jotpur
MOA&FW Jabalpur Per Drop More Crop Sprinkler 1 1 5 0.20 79°51'8.714"E 23°5'2.803"N Jotpur
115
Concerned
Ministry/
Department
Name of
the
Districts
/ Blocks
Component Activity Total
Number
Command
Area/Irrig
ation
Potential
(Ha)
Period of
Implement
ation 5/ 7
Estimated
cost
(in Lakhs
Rs.)
Longitude Lattitude Remark / Village Name
MOA&FW Jabalpur Har Khet Ko Pani Diesel / Electric /
SolarPump 1 1 5 0.25 79°59'26.744"E 23°8'20.509"N Junwani
MOA&FW Jabalpur Har Khet Ko Pani Tube well 1 1 5 2.00 79°59'26.744"E 23°8'20.509"N Junwani
MOA&FW Jabalpur Per Drop More Crop Sprinkler 1 1 5 0.20 79°59'26.744"E 23°8'20.509"N Junwani
MOA&FW Jabalpur Har Khet Ko Pani Diesel / Electric /
SolarPump 2 2 5 0.50 79°59'26.744"E 23°8'20.509"N Kailwas
MOA&FW Jabalpur Har Khet Ko Pani Tube well 1 1 5 2.00 79°59'26.744"E 23°8'20.509"N Kailwas
MOA&FW Jabalpur Per Drop More Crop Sprinkler 3 3 5 0.60 79°59'26.744"E 23°8'20.509"N Kailwas
MOA&FW Jabalpur Har Khet Ko Pani Diesel / Electric /
SolarPump 2 2 5 0.50 79°59'26.744"E 23°8'20.509"N Kaladehi
MOA&FW Jabalpur Har Khet Ko Pani Tube well 1 1 5 2.00 79°59'26.744"E 23°8'20.509"N Kaladehi
MOA&FW Jabalpur Per Drop More Crop Sprinkler 3 3 5 0.60 79°59'26.744"E 23°8'20.509"N Kaladehi
MOA&FW Jabalpur Har Khet Ko Pani Diesel / Electric /
SolarPump 1 1 5 0.25 80°1'10.669"E 23°3'37.963"N Kalgodi
MOA&FW Jabalpur Har Khet Ko Pani Tube well 3 3 5 6.00 80°1'10.669"E 23°3'37.963"N Kalgodi
MOA&FW Jabalpur Per Drop More Crop Sprinkler 2 2 5 0.40 80°1'10.669"E 23°3'37.963"N Kalgodi
MOA&FW Jabalpur Har Khet Ko Pani Diesel / Electric /
SolarPump 1 1 5 0.25 79°54'45.693"E 22°54'28.599"N Kareli
MOA&FW Jabalpur Har Khet Ko Pani Tube well 1 1 5 2.00 79°54'45.693"E 22°54'28.599"N Kareli
MOA&FW Jabalpur Per Drop More Crop Sprinkler 1 1 5 0.20 79°54'56.935"E 23°7'58.025"N Kareli
MOA&FW Jabalpur Har Khet Ko Pani Diesel / Electric /
SolarPump 1 1 5 0.25 79°54'45.693"E 22°54'28.599"N Kathotiya
MOA&FW Jabalpur Har Khet Ko Pani Tube well 1 1 5 2.00 79°54'45.693"E 22°54'28.599"N Kathotiya
MOA&FW Jabalpur Per Drop More Crop Sprinkler 1 1 5 0.20 79°54'56.935"E 23°7'58.025"N Kathotiya
MOA&FW Jabalpur Har Khet Ko Pani Diesel / Electric /
SolarPump 1 1 5 0.25 79°54'45.693"E 22°54'28.599"N Khamhariya
MOA&FW Jabalpur Har Khet Ko Pani Diesel / Electric /
SolarPump 1 1 5 0.25 79°54'45.693"E 22°54'28.599"N Khamhariya
MOA&FW Jabalpur Per Drop More Crop Sprinkler 1 1 5 0.20 79°54'56.935"E 23°7'58.025"N Khamhariya
MOA&FW Jabalpur Per Drop More Crop Sprinkler 1 1 5 0.20 79°54'56.935"E 23°7'58.025"N Khamhariya
MOA&FW Jabalpur Har Khet Ko Pani Diesel / Electric /
SolarPump 2 2 5 0.50 79°54'45.693"E 22°54'28.599"N Khapa
116
Concerned
Ministry/
Department
Name of
the
Districts
/ Blocks
Component Activity Total
Number
Command
Area/Irrig
ation
Potential
(Ha)
Period of
Implement
ation 5/ 7
Estimated
cost
(in Lakhs
Rs.)
Longitude Lattitude Remark / Village Name
MOA&FW Jabalpur Har Khet Ko Pani Tube well 1 1 5 2.00 79°54'45.693"E 22°54'28.599"N Khapa
MOA&FW Jabalpur Per Drop More Crop Sprinkler 2 2 5 0.40 79°54'56.935"E 23°7'58.025"N Khapa
MOA&FW Jabalpur Har Khet Ko Pani Diesel / Electric /
SolarPump 2 2 5 0.50 79°54'45.693"E 22°54'28.599"N Khapa Gwari
MOA&FW Jabalpur Har Khet Ko Pani Tube well 1 1 5 2.00 79°54'45.693"E 22°54'28.599"N Khapa Gwari
MOA&FW Jabalpur Per Drop More Crop Sprinkler 4 4 5 0.80 79°54'56.935"E 23°7'58.025"N Khapa Gwari
MOA&FW Jabalpur Har Khet Ko Pani Diesel / Electric /
SolarPump 1 1 5 0.25 79°54'45.693"E 22°54'28.599"N Khapa Kheda
MOA&FW Jabalpur Har Khet Ko Pani Tube well 1 1 5 2.00 79°54'45.693"E 22°54'28.599"N Khapa Kheda
MOA&FW Jabalpur Per Drop More Crop Sprinkler 1 1 5 0.20 79°54'56.935"E 23°7'58.025"N Khapa Kheda
MOA&FW Jabalpur Har Khet Ko Pani Diesel / Electric /
SolarPump 1 1 5 0.25 79°54'45.693"E 22°54'28.599"N Khari
MOA&FW Jabalpur Per Drop More Crop Sprinkler 1 1 5 0.20 79°54'56.935"E 23°7'58.025"N Khari
MOA&FW Jabalpur Har Khet Ko Pani Diesel / Electric /
SolarPump 1 1 5 0.25 79°54'45.693"E 22°54'28.599"N Khirhani
MOA&FW Jabalpur Per Drop More Crop Sprinkler 1 1 5 0.20 79°54'56.935"E 23°7'58.025"N Khirhani
MOA&FW Jabalpur Per Drop More Crop Sprinkler 1 1 5 0.20 79°54'56.935"E 23°7'58.025"N Khmariya
MOA&FW Jabalpur Har Khet Ko Pani Diesel / Electric /
SolarPump 1 1 5 0.25 79°54'45.693"E 22°54'28.599"N Khursi
MOA&FW Jabalpur Har Khet Ko Pani Tube well 2 2 5 4.00 79°54'45.693"E 22°54'28.599"N Khursi
MOA&FW Jabalpur Har Khet Ko Pani Diesel / Electric /
SolarPump 1 1 5 0.25 79°54'45.693"E 22°54'28.599"N Khursi
MOA&FW Jabalpur Har Khet Ko Pani Tube well 1 1 5 2.00 79°54'45.693"E 22°54'28.599"N Khursi
MOA&FW Jabalpur Per Drop More Crop Sprinkler 1 1 5 0.20 79°54'56.935"E 23°7'58.025"N Khursi
MOA&FW Jabalpur Per Drop More Crop Sprinkler 2 2 5 0.40 79°54'56.935"E 23°7'58.025"N Khursi
MOA&FW Jabalpur Har Khet Ko Pani Diesel / Electric /
SolarPump 1 1 5 0.25 79°54'45.693"E 22°54'28.599"N Kohani
MOA&FW Jabalpur Har Khet Ko Pani Tube well 1 1 5 2.00 79°54'45.693"E 22°54'28.599"N Kohani
MOA&FW Jabalpur Per Drop More Crop Sprinkler 2 2 5 0.40 79°54'56.935"E 23°7'58.025"N Kohani
MOA&FW Jabalpur Har Khet Ko Pani Diesel / Electric /
SolarPump 1 1 5 0.25 79°59'26.977"E 23°6'12.829"N Kosamghat
MOA&FW Jabalpur Har Khet Ko Pani Tube well 1 1 5 2.00 79°59'26.977"E 23°6'12.829"N Kosamghat
117
Concerned
Ministry/
Department
Name of
the
Districts
/ Blocks
Component Activity Total
Number
Command
Area/Irrig
ation
Potential
(Ha)
Period of
Implement
ation 5/ 7
Estimated
cost
(in Lakhs
Rs.)
Longitude Lattitude Remark / Village Name
MOA&FW Jabalpur Per Drop More Crop Sprinkler 2 2 5 0.40 79°59'26.977"E 23°6'12.829"N Kosamghat
MOA&FW Jabalpur Har Khet Ko Pani Diesel / Electric /
SolarPump 1 1 5 0.25 79°54'45.693"E 22°54'28.599"N Kuda
MOA&FW Jabalpur Har Khet Ko Pani Tube well 1 1 5 2.00 79°54'45.693"E 22°54'28.599"N Kuda
MOA&FW Jabalpur Per Drop More Crop Sprinkler 1 1 5 0.20 79°54'56.935"E 23°7'58.025"N Kuda
MOA&FW Jabalpur Har Khet Ko Pani Diesel / Electric /
SolarPump 1 1 5 0.25 79°54'45.693"E 22°54'28.599"N Kudari
MOA&FW Jabalpur Har Khet Ko Pani Tube well 1 1 5 2.00 79°54'45.693"E 22°54'28.599"N Kudari
MOA&FW Jabalpur Per Drop More Crop Sprinkler 2 2 5 0.40 79°54'56.935"E 23°7'58.025"N Kudari
MOA&FW Jabalpur Har Khet Ko Pani Diesel / Electric /
SolarPump 2 2 5 0.50 79°54'45.693"E 22°54'28.599"N Kukuri Kheda
MOA&FW Jabalpur Har Khet Ko Pani Tube well 1 1 5 2.00 79°54'45.693"E 22°54'28.599"N Kukuri Kheda
MOA&FW Jabalpur Per Drop More Crop Sprinkler 4 4 5 0.80 79°54'56.935"E 23°7'58.025"N Kukuri Kheda
MOA&FW Jabalpur Har Khet Ko Pani Diesel / Electric /
SolarPump 1 1 5 0.25 79°54'45.693"E 22°54'28.599"N Kumhi
MOA&FW Jabalpur Har Khet Ko Pani Tube well 1 1 5 2.00 79°54'45.693"E 22°54'28.599"N Kumhi
MOA&FW Jabalpur Per Drop More Crop Sprinkler 2 2 5 0.40 79°54'56.935"E 23°7'58.025"N Kumhi
MOA&FW Jabalpur Har Khet Ko Pani Diesel / Electric /
SolarPump 1 1 5 0.25 79°54'45.693"E 22°54'28.599"N Lahagi
MOA&FW Jabalpur Per Drop More Crop Sprinkler 2 2 5 0.40 79°54'56.935"E 23°7'58.025"N Lahagi
MOA&FW Jabalpur Har Khet Ko Pani Diesel / Electric /
SolarPump 1 1 5 0.25 79°54'45.693"E 22°54'28.599"N Lamheti
MOA&FW Jabalpur Har Khet Ko Pani Tube well 1 1 5 2.00 79°54'45.693"E 22°54'28.599"N Lamheti
MOA&FW Jabalpur Per Drop More Crop Sprinkler 2 2 5 0.40 79°54'56.935"E 23°7'58.025"N Lamheti
MOA&FW Jabalpur Har Khet Ko Pani Diesel / Electric /
SolarPump 1 1 5 0.25 79°48'21.728"E 22°57'59.953"N Lodhi
MOA&FW Jabalpur Har Khet Ko Pani Tube well 2 2 5 4.00 79°48'21.728"E 22°57'59.953"N Lodhi
MOA&FW Jabalpur Per Drop More Crop Sprinkler 1 1 5 0.20 79°48'21.728"E 22°57'59.953"N Lodhi
MOA&FW Jabalpur Har Khet Ko Pani Diesel / Electric /
SolarPump 1 1 5 0.25 79°54'45.693"E 22°54'28.599"N Magardha
MOA&FW Jabalpur Har Khet Ko Pani Tube well 1 1 5 2.00 79°54'45.693"E 22°54'28.599"N Magardha
MOA&FW Jabalpur Per Drop More Crop Sprinkler 2 2 5 0.40 79°54'56.935"E 23°7'58.025"N Magardha
118
Concerned
Ministry/
Department
Name of
the
Districts
/ Blocks
Component Activity Total
Number
Command
Area/Irrig
ation
Potential
(Ha)
Period of
Implement
ation 5/ 7
Estimated
cost
(in Lakhs
Rs.)
Longitude Lattitude Remark / Village Name
MOA&FW Jabalpur Har Khet Ko Pani Diesel / Electric /
SolarPump 1 1 5 0.25 79°54'45.693"E 22°54'28.599"N Mahgaon
MOA&FW Jabalpur Har Khet Ko Pani Tube well 1 1 5 2.00 79°54'45.693"E 22°54'28.599"N Mahgaon
MOA&FW Jabalpur Per Drop More Crop Sprinkler 1 1 5 0.20 79°54'56.935"E 23°7'58.025"N Mahgaon
MOA&FW Jabalpur Har Khet Ko Pani Diesel / Electric /
SolarPump 1 1 5 0.25 79°59'17.55"E 23°3'51.43"N Mahgawan
MOA&FW Jabalpur Har Khet Ko Pani Tube well 1 1 5 2.00 79°59'17.55"E 23°3'51.43"N Mahgawan
MOA&FW Jabalpur Har Khet Ko Pani Diesel / Electric /
SolarPump 1 1 5 0.25 79°59'17.55"E 23°3'51.43"N Mahgawan
MOA&FW Jabalpur Har Khet Ko Pani Tube well 1 1 5 2.00 79°59'17.55"E 23°3'51.43"N Mahgawan
MOA&FW Jabalpur Per Drop More Crop Sprinkler 3 3 5 0.60 79°59'17.55"E 23°3'51.43"N Mahgawan
MOA&FW Jabalpur Per Drop More Crop Sprinkler 1 1 5 0.20 79°59'17.55"E 23°3'51.43"N Mahgawan
MOA&FW Jabalpur Har Khet Ko Pani Diesel / Electric /
SolarPump 2 2 5 0.50 79°54'45.693"E 22°54'28.599"N Malara
MOA&FW Jabalpur Har Khet Ko Pani Tube well 1 1 5 2.00 79°54'45.693"E 22°54'28.599"N Malara
MOA&FW Jabalpur Per Drop More Crop Sprinkler 2 2 5 0.40 79°54'56.935"E 23°7'58.025"N Malara
MOA&FW Jabalpur Har Khet Ko Pani Diesel / Electric /
SolarPump 1 1 5 0.25 79°53'0.486"E 23°3'46.043"N Manegaon
MOA&FW Jabalpur Har Khet Ko Pani Tube well 1 1 5 2.00 79°53'0.486"E 23°3'46.043"N Manegaon
MOA&FW Jabalpur Per Drop More Crop Sprinkler 2 2 5 0.40 79°53'0.486"E 23°3'46.043"N Manegaon
MOA&FW Jabalpur Har Khet Ko Pani Farm Pond 1 2 5 2.00 79°53'32.62"E 23°8'48.614"N Mangela
MOA&FW Jabalpur Har Khet Ko Pani Diesel / Electric /
SolarPump 1 1 5 0.25 79°53'32.62"E 23°8'48.614"N Mangela
MOA&FW Jabalpur Har Khet Ko Pani Tube well 1 1 5 2.00 79°53'32.62"E 23°8'48.614"N Mangela
MOA&FW Jabalpur Per Drop More Crop Sprinkler 2 2 5 0.40 79°54'56.935"E 23°7'58.025"N Mangela
MOA&FW Jabalpur Har Khet Ko Pani Diesel / Electric /
SolarPump 1 1 5 0.25 79°53'32.62"E 23°8'48.614"N Mangeli
MOA&FW Jabalpur Har Khet Ko Pani Tube well 1 1 5 2.00 79°53'32.62"E 23°8'48.614"N Mangeli
MOA&FW Jabalpur Per Drop More Crop Sprinkler 2 2 5 0.40 79°54'56.935"E 23°7'58.025"N Mangeli
MOA&FW Jabalpur Per Drop More Crop Sprinkler 1 1 5 0.20 79°54'56.935"E 23°7'58.025"N Mankedi
MOA&FW Jabalpur Har Khet Ko Pani Diesel / Electric /
SolarPump 1 1 5 0.25 79°53'32.62"E 23°8'48.614"N Marha Patha
119
Concerned
Ministry/
Department
Name of
the
Districts
/ Blocks
Component Activity Total
Number
Command
Area/Irrig
ation
Potential
(Ha)
Period of
Implement
ation 5/ 7
Estimated
cost
(in Lakhs
Rs.)
Longitude Lattitude Remark / Village Name
MOA&FW Jabalpur Har Khet Ko Pani Tube well 2 2 5 4.00 79°53'32.62"E 23°8'48.614"N Marha Patha
MOA&FW Jabalpur Per Drop More Crop Sprinkler 1 1 5 0.20 79°54'56.935"E 23°7'58.025"N Marha Patha
MOA&FW Jabalpur Per Drop More Crop Sprinkler 1 1 5 0.20 79°54'56.935"E 23°7'58.025"N Medki
MOA&FW Jabalpur Har Khet Ko Pani Diesel / Electric /
SolarPump 1 1 5 0.25 79°53'32.62"E 23°8'48.614"N Mohaniya
MOA&FW Jabalpur Per Drop More Crop Sprinkler 1 1 5 0.20 79°54'56.935"E 23°7'58.025"N Mohaniya
MOA&FW Jabalpur Har Khet Ko Pani Diesel / Electric /
SolarPump 1 1 5 0.25 79°53'32.62"E 23°8'48.614"N Mohas
MOA&FW Jabalpur Har Khet Ko Pani Tube well 1 1 5 2.00 79°53'32.62"E 23°8'48.614"N Mohas
MOA&FW Jabalpur Per Drop More Crop Sprinkler 2 2 5 0.40 79°54'56.935"E 23°7'58.025"N Mohas
MOA&FW Jabalpur Har Khet Ko Pani Diesel / Electric /
SolarPump 1 1 5 0.25 79°53'32.62"E 23°8'48.614"N Mothar
MOA&FW Jabalpur Har Khet Ko Pani Tube well 1 1 5 2.00 79°53'32.62"E 23°8'48.614"N Mothar
MOA&FW Jabalpur Per Drop More Crop Sprinkler 1 1 5 0.20 79°54'56.935"E 23°7'58.025"N Mothar
MOA&FW Jabalpur Har Khet Ko Pani Diesel / Electric /
SolarPump 1 1 5 0.25 79°53'32.62"E 23°8'48.614"N Mukanwara
MOA&FW Jabalpur Har Khet Ko Pani Tube well 1 1 5 2.00 79°53'32.62"E 23°8'48.614"N Mukanwara
MOA&FW Jabalpur Per Drop More Crop Sprinkler 2 2 5 0.40 79°54'56.935"E 23°7'58.025"N Mukanwara
MOA&FW Jabalpur Har Khet Ko Pani Diesel / Electric /
SolarPump 1 1 5 0.25 79°53'32.62"E 23°8'48.614"N Nanhakheda
MOA&FW Jabalpur Har Khet Ko Pani Tube well 1 1 5 2.00 79°53'32.62"E 23°8'48.614"N Nanhakheda
MOA&FW Jabalpur Per Drop More Crop Sprinkler 1 1 5 0.20 79°54'56.935"E 23°7'58.025"N Nanhakheda
MOA&FW Jabalpur Har Khet Ko Pani Diesel / Electric /
SolarPump 1 1 5 0.25 79°53'32.62"E 23°8'48.614"N Narayanpur
MOA&FW Jabalpur Har Khet Ko Pani Tube well 1 1 5 2.00 79°53'32.62"E 23°8'48.614"N Narayanpur
MOA&FW Jabalpur Per Drop More Crop Sprinkler 1 1 5 0.20 79°54'56.935"E 23°7'58.025"N Narayanpur
MOA&FW Jabalpur Har Khet Ko Pani Diesel / Electric /
SolarPump 1 1 5 0.25 79°53'32.62"E 23°8'48.614"N Narrai
MOA&FW Jabalpur Har Khet Ko Pani Tube well 1 1 5 2.00 79°53'32.62"E 23°8'48.614"N Narrai
MOA&FW Jabalpur Per Drop More Crop Sprinkler 2 2 5 0.40 79°54'56.935"E 23°7'58.025"N Narrai
MOA&FW Jabalpur Har Khet Ko Pani Diesel / Electric /
SolarPump 1 1 5 0.25 79°48'54.048"E 23°2'13.124"N Nayagaon
120
Concerned
Ministry/
Department
Name of
the
Districts
/ Blocks
Component Activity Total
Number
Command
Area/Irrig
ation
Potential
(Ha)
Period of
Implement
ation 5/ 7
Estimated
cost
(in Lakhs
Rs.)
Longitude Lattitude Remark / Village Name
MOA&FW Jabalpur Har Khet Ko Pani Tube well 2 2 5 4.00 79°48'54.048"E 23°2'13.124"N Nayagaon
MOA&FW Jabalpur Har Khet Ko Pani Diesel / Electric /
SolarPump 1 1 5 0.25 79°48'54.048"E 23°2'13.124"N Nayagaon
MOA&FW Jabalpur Har Khet Ko Pani Tube well 1 1 5 2.00 79°48'54.048"E 23°2'13.124"N Nayagaon
MOA&FW Jabalpur Per Drop More Crop Sprinkler 2 2 5 0.40 79°48'54.048"E 23°2'13.124"N Nayagaon
MOA&FW Jabalpur Per Drop More Crop Sprinkler 2 2 5 0.40 79°48'54.048"E 23°2'13.124"N Nayagaon
MOA&FW Jabalpur Har Khet Ko Pani Diesel / Electric /
SolarPump 1 1 5 0.25 79°57'15.004"E 23°5'5.496"N Neem Kheda
MOA&FW Jabalpur Har Khet Ko Pani Tube well 1 1 5 2.00 79°57'15.004"E 23°5'5.496"N Neem Kheda
MOA&FW Jabalpur Har Khet Ko Pani Diesel / Electric /
SolarPump 1 1 5 0.25 79°57'15.004"E 23°5'5.496"N Neem Kheda
MOA&FW Jabalpur Per Drop More Crop Sprinkler 1 1 5 0.20 79°57'15.004"E 23°5'5.496"N Neem Kheda
MOA&FW Jabalpur Per Drop More Crop Sprinkler 1 1 5 0.20 79°57'15.004"E 23°5'5.496"N Neem Kheda
MOA&FW Jabalpur Per Drop More Crop Sprinkler 2 2 5 0.40 79°54'56.935"E 23°7'58.025"N Nigri
MOA&FW Jabalpur Har Khet Ko Pani Diesel / Electric /
SolarPump 2 2 5 0.50 79°57'6.219"E 23°8'59.857"N Nigri
MOA&FW Jabalpur Har Khet Ko Pani Tube well 1 1 5 2.00 79°57'6.219"E 23°8'59.857"N Nigri
MOA&FW Jabalpur Har Khet Ko Pani Diesel / Electric /
SolarPump 2 2 5 0.50 79°57'56.751"E 23°3'9.684"N Padariya
MOA&FW Jabalpur Har Khet Ko Pani Tube well 1 1 5 2.00 79°57'56.751"E 23°3'9.684"N Padariya
MOA&FW Jabalpur Har Khet Ko Pani Diesel / Electric /
SolarPump 2 2 5 0.50 79°57'56.751"E 23°3'9.684"N Padariya
MOA&FW Jabalpur Har Khet Ko Pani Tube well 1 1 5 2.00 79°57'56.751"E 23°3'9.684"N Padariya
MOA&FW Jabalpur Per Drop More Crop Sprinkler 2 2 5 0.40 79°57'56.751"E 23°3'9.684"N Padariya
MOA&FW Jabalpur Per Drop More Crop Sprinkler 3 3 5 0.60 79°57'56.751"E 23°3'9.684"N Padariya
MOA&FW Jabalpur Har Khet Ko Pani Diesel / Electric /
SolarPump 2 2 5 0.50 79°53'32.62"E 23°8'48.614"N Paduwa
MOA&FW Jabalpur Har Khet Ko Pani Tube well 1 1 5 2.00 79°53'32.62"E 23°8'48.614"N Paduwa
MOA&FW Jabalpur Per Drop More Crop Sprinkler 2 2 5 0.40 79°54'56.935"E 23°7'58.025"N Paduwa
MOA&FW Jabalpur Har Khet Ko Pani Diesel / Electric /
SolarPump 2 2 5 0.50 79°53'32.62"E 23°8'48.614"N Padwar
MOA&FW Jabalpur Har Khet Ko Pani Tube well 1 1 5 2.00 79°53'32.62"E 23°8'48.614"N Padwar
121
Concerned
Ministry/
Department
Name of
the
Districts
/ Blocks
Component Activity Total
Number
Command
Area/Irrig
ation
Potential
(Ha)
Period of
Implement
ation 5/ 7
Estimated
cost
(in Lakhs
Rs.)
Longitude Lattitude Remark / Village Name
MOA&FW Jabalpur Per Drop More Crop Sprinkler 3 3 5 0.60 79°54'56.935"E 23°7'58.025"N Padwar
MOA&FW Jabalpur Har Khet Ko Pani Diesel / Electric /
SolarPump 1 1 5 0.25 80°10'41.652"E 23°5'52.629"N Pahadi Kheda
MOA&FW Jabalpur Har Khet Ko Pani Tube well 1 1 5 2.00 80°10'41.652"E 23°5'52.629"N Pahadi Kheda
MOA&FW Jabalpur Per Drop More Crop Sprinkler 1 1 5 0.20 80°10'41.652"E 23°5'52.629"N Pahadi Kheda
MOA&FW Jabalpur Har Khet Ko Pani Diesel / Electric /
SolarPump 1 1 5 0.25 79°53'8.566"E 22°57'41.099"N Para
MOA&FW Jabalpur Har Khet Ko Pani Tube well 1 1 5 2.00 79°53'8.566"E 22°57'41.099"N Para
MOA&FW Jabalpur Per Drop More Crop Sprinkler 2 2 5 0.40 79°53'8.566"E 22°57'41.099"N Para
MOA&FW Jabalpur Har Khet Ko Pani Diesel / Electric /
SolarPump 3 3 5 0.75 79°53'32.62"E 23°8'48.614"N Parasiya
MOA&FW Jabalpur Har Khet Ko Pani Tube well 2 2 5 4.00 79°53'32.62"E 23°8'48.614"N Parasiya
MOA&FW Jabalpur Har Khet Ko Pani Farm Pond 1 2 5 2.00 79°53'32.62"E 23°8'48.614"N Parasiya
MOA&FW Jabalpur Har Khet Ko Pani Diesel / Electric /
SolarPump 1 1 5 0.25 79°53'32.62"E 23°8'48.614"N Parasiya
MOA&FW Jabalpur Har Khet Ko Pani Tube well 1 1 5 2.00 79°53'32.62"E 23°8'48.614"N Parasiya
MOA&FW Jabalpur Har Khet Ko Pani Diesel / Electric /
SolarPump 1 1 5 0.25 79°53'32.62"E 23°8'48.614"N Parasiya
MOA&FW Jabalpur Har Khet Ko Pani Tube well 1 1 5 2.00 79°53'32.62"E 23°8'48.614"N Parasiya
MOA&FW Jabalpur Per Drop More Crop Sprinkler 2 2 5 0.40 79°54'56.935"E 23°7'58.025"N Parasiya
MOA&FW Jabalpur Per Drop More Crop Sprinkler 2 2 5 0.40 79°54'56.935"E 23°7'58.025"N Parasiya
MOA&FW Jabalpur Per Drop More Crop Sprinkler 1 1 5 0.20 79°54'56.935"E 23°7'58.025"N Parasiya
MOA&FW Jabalpur Har Khet Ko Pani Diesel / Electric /
SolarPump 1 1 5 0.25 79°55'25.925"E 23°5'27.043"N Paraswara
MOA&FW Jabalpur Har Khet Ko Pani Tube well 1 1 5 2.00 79°55'25.925"E 23°5'27.043"N Paraswara
MOA&FW Jabalpur Har Khet Ko Pani Diesel / Electric /
SolarPump 1 1 5 0.25 79°55'25.925"E 23°5'27.043"N Paraswara
MOA&FW Jabalpur Per Drop More Crop Sprinkler 2 2 5 0.40 79°55'25.925"E 23°5'27.043"N Paraswara
MOA&FW Jabalpur Per Drop More Crop Sprinkler 1 1 5 0.20 79°55'25.925"E 23°5'27.043"N Paraswara
MOA&FW Jabalpur Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°6'45.987"E 23°7'37.668"N Partala
MOA&FW Jabalpur Har Khet Ko Pani Diesel / Electric /
SolarPump 2 2 5 0.50 80°6'45.987"E 23°7'37.668"N Partala
122
Concerned
Ministry/
Department
Name of
the
Districts
/ Blocks
Component Activity Total
Number
Command
Area/Irrig
ation
Potential
(Ha)
Period of
Implement
ation 5/ 7
Estimated
cost
(in Lakhs
Rs.)
Longitude Lattitude Remark / Village Name
MOA&FW Jabalpur Har Khet Ko Pani Tube well 2 2 5 4.00 80°6'45.987"E 23°7'37.668"N Partala
MOA&FW Jabalpur Per Drop More Crop Sprinkler 2 2 5 0.40 80°6'45.987"E 23°7'37.668"N Partala
MOA&FW Jabalpur Per Drop More Crop Sprinkler 1 1 5 0.20 79°54'56.935"E 23°7'58.025"N Patpara
MOA&FW Jabalpur Har Khet Ko Pani Diesel / Electric /
SolarPump 1 1 5 0.25 79°50'31.638"E 23°8'26.99"N Pidrai
MOA&FW Jabalpur Per Drop More Crop Sprinkler 2 2 5 0.40 79°50'31.638"E 23°8'26.99"N Pidrai
MOA&FW Jabalpur Per Drop More Crop Drip system 2 2 5 2.00 79°50'31.638"E 23°8'26.99"N Pidrai
MOA&FW Jabalpur Per Drop More Crop Sprinkler 1 1 5 0.20 79°50'31.638"E 23°8'26.99"N Pidrai
MOA&FW Jabalpur Har Khet Ko Pani Diesel / Electric /
SolarPump 1 1 5 0.25 79°50'31.638"E 23°8'26.99"N Pindrai
MOA&FW Jabalpur Har Khet Ko Pani Tube well 1 1 5 2.00 79°50'31.638"E 23°8'26.99"N Pindrai
MOA&FW Jabalpur Per Drop More Crop Sprinkler 2 2 5 0.40 79°50'31.638"E 23°8'26.99"N Pindrai
MOA&FW Jabalpur Har Khet Ko Pani Diesel / Electric /
SolarPump 1 1 5 0.25 79°48'55.395"E 22°57'20.9"N Pipariya
MOA&FW Jabalpur Har Khet Ko Pani Tube well 1 1 5 2.00 79°48'55.395"E 22°57'20.9"N Pipariya
MOA&FW Jabalpur Har Khet Ko Pani Diesel / Electric /
SolarPump 1 1 5 0.25 79°48'55.395"E 22°57'20.9"N Pipariya
MOA&FW Jabalpur Har Khet Ko Pani Tube well 1 1 5 2.00 79°48'55.395"E 22°57'20.9"N Pipariya
MOA&FW Jabalpur Per Drop More Crop Sprinkler 2 2 5 0.40 79°48'55.395"E 22°57'20.9"N Pipariya
MOA&FW Jabalpur Per Drop More Crop Sprinkler 2 2 5 0.40 79°48'55.395"E 22°57'20.9"N Pipariya
MOA&FW Jabalpur Har Khet Ko Pani Diesel / Electric /
SolarPump 1 1 5 0.25 79°58'25.03"E 23°5'9.536"N Pipariya Kalan
MOA&FW Jabalpur Har Khet Ko Pani Tube well 1 1 5 2.00 79°58'25.03"E 23°5'9.536"N Pipariya Kalan
MOA&FW Jabalpur Har Khet Ko Pani Diesel / Electric /
SolarPump 2 2 5 0.50 79°58'25.03"E 23°5'9.536"N Pipariya Kalan
MOA&FW Jabalpur Har Khet Ko Pani Tube well 1 1 5 2.00 79°58'25.03"E 23°5'9.536"N Pipariya Kalan
MOA&FW Jabalpur Per Drop More Crop Sprinkler 1 1 5 0.20 79°58'25.03"E 23°5'9.536"N Pipariya Kalan
MOA&FW Jabalpur Per Drop More Crop Sprinkler 2 2 5 0.40 79°58'25.03"E 23°5'9.536"N Pipariya Kalan
MOA&FW Jabalpur Har Khet Ko Pani Diesel / Electric /
SolarPump 2 2 5 0.50 79°58'45.23"E 23°4'27.79"N Pipariya Khurd
MOA&FW Jabalpur Har Khet Ko Pani Tube well 1 1 5 2.00 79°58'45.23"E 23°4'27.79"N Pipariya Khurd
123
Concerned
Ministry/
Department
Name of
the
Districts
/ Blocks
Component Activity Total
Number
Command
Area/Irrig
ation
Potential
(Ha)
Period of
Implement
ation 5/ 7
Estimated
cost
(in Lakhs
Rs.)
Longitude Lattitude Remark / Village Name
MOA&FW Jabalpur Har Khet Ko Pani Diesel / Electric /
SolarPump 1 1 5 0.25 79°58'45.23"E 23°4'27.79"N Pipariya Khurd
MOA&FW Jabalpur Har Khet Ko Pani Tube well 1 1 5 2.00 79°58'45.23"E 23°4'27.79"N Pipariya Khurd
MOA&FW Jabalpur Per Drop More Crop Sprinkler 2 2 5 0.40 79°58'45.23"E 23°4'27.79"N Pipariya Khurd
MOA&FW Jabalpur Per Drop More Crop Sprinkler 2 2 5 0.40 79°58'45.23"E 23°4'27.79"N Pipariya Khurd
MOA&FW Jabalpur Har Khet Ko Pani Diesel / Electric /
SolarPump 1 1 5 0.25 80°4'23.241"E 23°4'47.99"N Purwa
MOA&FW Jabalpur Har Khet Ko Pani Diesel / Electric /
SolarPump 1 1 5 0.25 80°4'23.241"E 23°4'47.99"N Purwa
MOA&FW Jabalpur Har Khet Ko Pani Tube well 1 1 5 2.00 80°4'23.241"E 23°4'47.99"N Purwa
MOA&FW Jabalpur Per Drop More Crop Sprinkler 1 1 5 0.20 80°4'23.241"E 23°4'47.99"N Purwa
MOA&FW Jabalpur Per Drop More Crop Sprinkler 1 1 5 0.20 80°4'23.241"E 23°4'47.99"N Purwa
MOA&FW Jabalpur Har Khet Ko Pani Diesel / Electric /
SolarPump 1 1 5 0.25 79°49'19.634"E 22°56'27.033"N Raipura
MOA&FW Jabalpur Har Khet Ko Pani Tube well 2 2 5 4.00 79°49'19.634"E 22°56'27.033"N Raipura
MOA&FW Jabalpur Per Drop More Crop Sprinkler 2 2 5 0.40 79°49'19.634"E 22°56'27.033"N Raipura
MOA&FW Jabalpur Har Khet Ko Pani Diesel / Electric /
SolarPump 1 1 5 0.25 79°50'2.727"E 23°4'3.55"N Rampur Naktiya
MOA&FW Jabalpur Har Khet Ko Pani Tube well 2 2 5 4.00 79°50'2.727"E 23°4'3.55"N Rampur Naktiya
MOA&FW Jabalpur Per Drop More Crop Sprinkler 1 1 5 0.20 79°50'2.727"E 23°4'3.55"N Rampur Naktiya
MOA&FW Jabalpur Har Khet Ko Pani Diesel / Electric /
SolarPump 2 2 5 0.50 79°48'27.115"E 22°59'42.299"N Rengajhori
MOA&FW Jabalpur Har Khet Ko Pani Tube well 3 3 5 6.00 79°48'27.115"E 22°59'42.299"N Rengajhori
MOA&FW Jabalpur Per Drop More Crop Sprinkler 2 2 5 0.40 79°48'27.115"E 22°59'42.299"N Rengajhori
MOA&FW Jabalpur Har Khet Ko Pani Diesel / Electric /
SolarPump 2 2 5 0.50 79°51'34.3"E 22°56'18.953"N Rewa
MOA&FW Jabalpur Har Khet Ko Pani Tube well 1 1 5 2.00 79°51'34.3"E 22°56'18.953"N Rewa
MOA&FW Jabalpur Per Drop More Crop Sprinkler 2 2 5 0.40 79°51'34.3"E 22°56'18.953"N Rewa
MOA&FW Jabalpur Per Drop More Crop Sprinkler 1 1 5 0.20 80°2'28.775"E 23°4'10.283"N Richhai
MOA&FW Jabalpur Har Khet Ko Pani Diesel / Electric /
SolarPump 1 1 5 0.25 79°53'32.62"E 23°8'48.614"N Ronsra
MOA&FW Jabalpur Har Khet Ko Pani Tube well 1 1 5 2.00 79°53'32.62"E 23°8'48.614"N Ronsra
124
Concerned
Ministry/
Department
Name of
the
Districts
/ Blocks
Component Activity Total
Number
Command
Area/Irrig
ation
Potential
(Ha)
Period of
Implement
ation 5/ 7
Estimated
cost
(in Lakhs
Rs.)
Longitude Lattitude Remark / Village Name
MOA&FW Jabalpur Per Drop More Crop Sprinkler 1 1 5 0.20 79°54'56.935"E 23°7'58.025"N Ronsra
MOA&FW Jabalpur Har Khet Ko Pani Diesel / Electric /
SolarPump 1 1 5 0.25 79°53'32.62"E 23°8'48.614"N Sagda Jhapani
MOA&FW Jabalpur Har Khet Ko Pani Tube well 1 1 5 2.00 79°53'32.62"E 23°8'48.614"N Sagda Jhapani
MOA&FW Jabalpur Per Drop More Crop Sprinkler 1 1 5 0.20 79°54'56.935"E 23°7'58.025"N Sagda Jhapani
MOA&FW Jabalpur Har Khet Ko Pani Diesel / Electric /
SolarPump 1 1 5 0.25 79°53'32.62"E 23°8'48.614"N Salaiya
MOA&FW Jabalpur Har Khet Ko Pani Tube well 1 1 5 2.00 79°53'32.62"E 23°8'48.614"N Salaiya
MOA&FW Jabalpur Per Drop More Crop Sprinkler 1 1 5 0.20 79°54'56.935"E 23°7'58.025"N Salaiya
MOA&FW Jabalpur Har Khet Ko Pani Diesel / Electric /
SolarPump 2 2 5 0.50 79°46'36.689"E 22°56'55.313"N Saliwada
MOA&FW Jabalpur Har Khet Ko Pani Tube well 3 3 5 6.00 79°46'36.689"E 22°56'55.313"N Saliwada
MOA&FW Jabalpur Har Khet Ko Pani Diesel / Electric /
SolarPump 1 1 5 0.25 79°46'36.689"E 22°56'55.313"N Saliwada
MOA&FW Jabalpur Har Khet Ko Pani Tube well 1 1 5 2.00 79°46'36.689"E 22°56'55.313"N Saliwada
MOA&FW Jabalpur Har Khet Ko Pani Diesel / Electric /
SolarPump 2 2 5 0.50 79°46'36.689"E 22°56'55.313"N Saliwada
MOA&FW Jabalpur Har Khet Ko Pani Tube well 1 1 5 2.00 79°46'36.689"E 22°56'55.313"N Saliwada
MOA&FW Jabalpur Per Drop More Crop Sprinkler 2 2 5 0.40 79°46'36.689"E 22°56'55.313"N Saliwada
MOA&FW Jabalpur Per Drop More Crop Sprinkler 2 2 5 0.40 79°46'36.689"E 22°56'55.313"N Saliwada
MOA&FW Jabalpur Per Drop More Crop Sprinkler 2 2 5 0.40 79°46'36.689"E 22°56'55.313"N Saliwada
MOA&FW Jabalpur Har Khet Ko Pani Diesel / Electric /
SolarPump 1 1 5 0.25 79°53'8.566"E 22°59'55.765"N Saliwara
MOA&FW Jabalpur Har Khet Ko Pani Tube well 1 1 5 2.00 79°53'8.566"E 22°59'55.765"N Saliwara
MOA&FW Jabalpur Per Drop More Crop Sprinkler 1 1 5 0.20 79°53'8.566"E 22°59'55.765"N Saliwara
MOA&FW Jabalpur Har Khet Ko Pani Diesel / Electric /
SolarPump 1 1 5 0.25 79°53'32.62"E 23°8'48.614"N Samad Pipariya
MOA&FW Jabalpur Per Drop More Crop Sprinkler 2 2 5 0.40 79°54'56.935"E 23°7'58.025"N Samad Pipariya
MOA&FW Jabalpur Har Khet Ko Pani Diesel / Electric /
SolarPump 1 1 5 0.25 79°53'32.62"E 23°8'48.614"N Samnapur
MOA&FW Jabalpur Har Khet Ko Pani Tube well 1 1 5 2.00 79°53'32.62"E 23°8'48.614"N Samnapur
MOA&FW Jabalpur Per Drop More Crop Sprinkler 1 1 5 0.20 79°54'56.935"E 23°7'58.025"N Samnapur
125
Concerned
Ministry/
Department
Name of
the
Districts
/ Blocks
Component Activity Total
Number
Command
Area/Irrig
ation
Potential
(Ha)
Period of
Implement
ation 5/ 7
Estimated
cost
(in Lakhs
Rs.)
Longitude Lattitude Remark / Village Name
MOA&FW Jabalpur Har Khet Ko Pani Diesel / Electric /
SolarPump 1 1 5 0.25 79°53'32.62"E 23°8'48.614"N Sarora
MOA&FW Jabalpur Har Khet Ko Pani Tube well 1 1 5 2.00 79°53'32.62"E 23°8'48.614"N Sarora
MOA&FW Jabalpur Per Drop More Crop Sprinkler 2 2 5 0.40 79°54'56.935"E 23°7'58.025"N Sarora
MOA&FW Jabalpur Har Khet Ko Pani Diesel / Electric /
SolarPump 1 1 5 0.25 79°53'32.62"E 23°8'48.614"N Sarrai
MOA&FW Jabalpur Har Khet Ko Pani Tube well 1 1 5 2.00 79°53'32.62"E 23°8'48.614"N Sarrai
MOA&FW Jabalpur Per Drop More Crop Sprinkler 2 2 5 0.40 79°54'56.935"E 23°7'58.025"N Sarrai
MOA&FW Jabalpur Per Drop More Crop Drip system 1 1 5 1.00 79°54'56.935"E 23°7'58.025"N Sarrai
MOA&FW Jabalpur Har Khet Ko Pani Diesel / Electric /
SolarPump 1 1 5 0.25 79°53'32.62"E 23°8'48.614"N Sehora
MOA&FW Jabalpur Per Drop More Crop Sprinkler 1 1 5 0.20 79°54'56.935"E 23°7'58.025"N Sehora
MOA&FW Jabalpur Har Khet Ko Pani Diesel / Electric /
SolarPump 2 2 5 0.50 79°49'30.408"E 23°5'1.456"N Seoni
MOA&FW Jabalpur Har Khet Ko Pani Tube well 1 1 5 2.00 79°49'30.408"E 23°5'1.456"N Seoni
MOA&FW Jabalpur Per Drop More Crop Sprinkler 2 2 5 0.40 79°49'30.408"E 23°5'1.456"N Seoni
MOA&FW Jabalpur Har Khet Ko Pani Diesel / Electric /
SolarPump 2 2 5 0.50 79°53'32.62"E 23°8'48.614"N Shahajpuri
MOA&FW Jabalpur Har Khet Ko Pani Tube well 1 1 5 2.00 79°53'32.62"E 23°8'48.614"N Shahajpuri
MOA&FW Jabalpur Per Drop More Crop Sprinkler 2 2 5 0.40 79°54'56.935"E 23°7'58.025"N Shahajpuri
MOA&FW Jabalpur Har Khet Ko Pani Diesel / Electric /
SolarPump 1 1 5 0.25 79°48'27.115"E 23°0'55.018"N Sihora
MOA&FW Jabalpur Har Khet Ko Pani Tube well 1 1 5 2.00 79°48'27.115"E 23°0'55.018"N Sihora
MOA&FW Jabalpur Per Drop More Crop Sprinkler 1 1 5 0.20 79°48'27.115"E 23°0'55.018"N Sihora
MOA&FW Jabalpur Per Drop More Crop Sprinkler 2 2 5 0.40 79°54'56.935"E 23°7'58.025"N Silgaur
MOA&FW Jabalpur Har Khet Ko Pani Diesel / Electric /
SolarPump 1 1 5 0.25 79°58'36.155"E 23°9'44.825"N Silgaur
MOA&FW Jabalpur Har Khet Ko Pani Tube well 1 1 5 2.00 79°58'36.155"E 23°9'44.825"N Silgaur
MOA&FW Jabalpur Per Drop More Crop Sprinkler 1 1 5 0.20 79°54'56.935"E 23°7'58.025"N Silpuri
MOA&FW Jabalpur Har Khet Ko Pani Diesel / Electric /
SolarPump 1 1 5 0.25 79°58'36.155"E 23°9'44.825"N Silpuri
MOA&FW Jabalpur Per Drop More Crop Sprinkler 4 4 5 0.80 79°54'56.935"E 23°7'58.025"N Siluwa
126
Concerned
Ministry/
Department
Name of
the
Districts
/ Blocks
Component Activity Total
Number
Command
Area/Irrig
ation
Potential
(Ha)
Period of
Implement
ation 5/ 7
Estimated
cost
(in Lakhs
Rs.)
Longitude Lattitude Remark / Village Name
MOA&FW Jabalpur Per Drop More Crop Sprinkler 2 2 5 0.40 79°54'56.935"E 23°7'58.025"N Siluwa
MOA&FW Jabalpur Per Drop More Crop Sprinkler 2 2 5 0.40 79°54'56.935"E 23°7'58.025"N Siluwa
MOA&FW Jabalpur Per Drop More Crop Sprinkler 1 1 5 0.20 79°54'56.935"E 23°7'58.025"N Siluwa
MOA&FW Jabalpur Har Khet Ko Pani Diesel / Electric /
SolarPump 2 2 5 0.50 79°58'36.155"E 23°9'44.825"N Siluwa
MOA&FW Jabalpur Har Khet Ko Pani Tube well 1 1 5 2.00 79°58'36.155"E 23°9'44.825"N Siluwa
MOA&FW Jabalpur Har Khet Ko Pani Diesel / Electric /
SolarPump 1 1 5 0.25 79°58'36.155"E 23°9'44.825"N Siluwa
MOA&FW Jabalpur Har Khet Ko Pani Tube well 2 2 5 4.00 79°58'36.155"E 23°9'44.825"N Siluwa
MOA&FW Jabalpur Har Khet Ko Pani Diesel / Electric /
SolarPump 1 1 5 0.25 79°58'36.155"E 23°9'44.825"N Siluwa
MOA&FW Jabalpur Har Khet Ko Pani Tube well 1 1 5 2.00 79°58'36.155"E 23°9'44.825"N Siluwa
MOA&FW Jabalpur Har Khet Ko Pani Diesel / Electric /
SolarPump 1 1 5 0.25 79°58'36.155"E 23°9'44.825"N Siluwa
MOA&FW Jabalpur Har Khet Ko Pani Tube well 1 1 5 2.00 79°58'36.155"E 23°9'44.825"N Siluwa
MOA&FW Jabalpur Per Drop More Crop Sprinkler 2 2 5 0.40 79°54'56.935"E 23°7'58.025"N Sohad
MOA&FW Jabalpur Har Khet Ko Pani Diesel / Electric /
SolarPump 1 1 5 0.25 79°58'36.155"E 23°9'44.825"N Sohad
MOA&FW Jabalpur Har Khet Ko Pani Tube well 1 1 5 2.00 79°58'36.155"E 23°9'44.825"N Sohad
MOA&FW Jabalpur Per Drop More Crop Sprinkler 2 2 5 0.40 79°54'56.935"E 23°7'58.025"N Sukari
MOA&FW Jabalpur Har Khet Ko Pani Farm Pond 1 2 5 2.00 79°58'36.155"E 23°9'44.825"N Sukari
MOA&FW Jabalpur Har Khet Ko Pani Diesel / Electric /
SolarPump 2 2 5 0.50 79°58'36.155"E 23°9'44.825"N Sukari
MOA&FW Jabalpur Har Khet Ko Pani Tube well 1 1 5 2.00 79°58'36.155"E 23°9'44.825"N Sukari
MOA&FW Jabalpur Per Drop More Crop Sprinkler 1 1 5 0.20 79°54'56.935"E 23°7'58.025"N Sukhalalpur
MOA&FW Jabalpur Har Khet Ko Pani Tube well 1 1 5 2.00 79°58'36.155"E 23°9'44.825"N Sukhalalpur
MOA&FW Jabalpur Per Drop More Crop Sprinkler 2 2 5 0.40 79°54'56.935"E 23°7'58.025"N Temar
MOA&FW Jabalpur Har Khet Ko Pani Diesel / Electric /
SolarPump 1 1 5 0.25 79°58'36.155"E 23°9'44.825"N Temar
MOA&FW Jabalpur Har Khet Ko Pani Tube well 1 1 5 2.00 79°58'36.155"E 23°9'44.825"N Temar
MOA&FW Jabalpur Har Khet Ko Pani Diesel / Electric /
SolarPump 3 3 5 0.75 79°49'26.494"E 23°8'1.235"N Tewar
127
Concerned
Ministry/
Department
Name of
the
Districts
/ Blocks
Component Activity Total
Number
Command
Area/Irrig
ation
Potential
(Ha)
Period of
Implement
ation 5/ 7
Estimated
cost
(in Lakhs
Rs.)
Longitude Lattitude Remark / Village Name
MOA&FW Jabalpur Har Khet Ko Pani Tube well 1 1 5 2.00 79°49'26.494"E 23°8'1.235"N Tewar
MOA&FW Jabalpur Per Drop More Crop Sprinkler 10 10 5 2.00 79°49'26.494"E 23°8'1.235"N Tewar
MOA&FW Jabalpur Per Drop More Crop Drip system 1 1 5 1.00 79°49'26.494"E 23°8'1.235"N Tewar
MOA&FW Jabalpur Per Drop More Crop Sprinkler 1 1 5 0.20 79°54'56.935"E 23°7'58.025"N Thana
MOA&FW Jabalpur Har Khet Ko Pani Diesel / Electric /
SolarPump 1 1 5 0.25 79°58'36.155"E 23°9'44.825"N Thana
MOA&FW Jabalpur Har Khet Ko Pani Tube well 1 1 5 2.00 79°58'36.155"E 23°9'44.825"N Thana
MOA&FW Jabalpur Per Drop More Crop Sprinkler 2 2 5 0.40 79°54'56.935"E 23°7'58.025"N Tigan
MOA&FW Jabalpur Har Khet Ko Pani Diesel / Electric /
SolarPump 2 2 5 0.50 79°58'36.155"E 23°9'44.825"N Tigan
MOA&FW Jabalpur Har Khet Ko Pani Tube well 1 1 5 2.00 79°58'36.155"E 23°9'44.825"N Tigan
MOA&FW Jabalpur Per Drop More Crop Sprinkler 1 1 5 0.20 79°54'56.935"E 23°7'58.025"N Tighra
MOA&FW Jabalpur Har Khet Ko Pani Diesel / Electric /
SolarPump 1 1 5 0.25 79°58'36.155"E 23°9'44.825"N Tighra
MOA&FW Jabalpur Per Drop More Crop Sprinkler 1 1 5 0.20 79°54'56.935"E 23°7'58.025"N Tikariya
MOA&FW Jabalpur Har Khet Ko Pani Diesel / Electric /
SolarPump 1 1 5 0.25 79°58'36.155"E 23°9'44.825"N Tikariya
MOA&FW Jabalpur Har Khet Ko Pani Diesel / Electric /
SolarPump 1 1 5 0.25 79°51'18.14"E 23°3'50.083"N Tikhari
MOA&FW Jabalpur Per Drop More Crop Sprinkler 1 1 5 0.20 79°51'18.14"E 23°3'50.083"N Tikhari
MOA&FW Jabalpur Per Drop More Crop Sprinkler 1 1 5 0.20 79°54'56.935"E 23°7'58.025"N Tilhari
MOA&FW Jabalpur Har Khet Ko Pani Diesel / Electric /
SolarPump 1 1 5 0.25 79°55'58.767"E 23°5'54.363"N Tilhari
MOA&FW Jabalpur Har Khet Ko Pani Tube well 1 1 5 2.00 79°55'58.767"E 23°5'54.363"N Tilhari
MOA&FW Jabalpur Har Khet Ko Pani Diesel / Electric /
SolarPump 1 1 5 0.25 79°49'22.328"E 22°58'40.352"N Tinsa
MOA&FW Jabalpur Har Khet Ko Pani Tube well 1 1 5 2.00 79°49'22.328"E 22°58'40.352"N Tinsa
MOA&FW Jabalpur Per Drop More Crop Sprinkler 2 2 5 0.40 79°49'22.328"E 22°58'40.352"N Tinsa
MOA&FW Jabalpur Har Khet Ko Pani Diesel / Electric /
SolarPump 1 1 5 0.25 79°50'55.247"E 22°58'16.113"N Tinsi
MOA&FW Jabalpur Har Khet Ko Pani Tube well 1 1 5 2.00 79°50'55.247"E 22°58'16.113"N Tinsi
MOA&FW Jabalpur Per Drop More Crop Sprinkler 2 2 5 0.40 79°50'55.247"E 22°58'16.113"N Tinsi
128
Concerned
Ministry/
Department
Name of
the
Districts
/ Blocks
Component Activity Total
Number
Command
Area/Irrig
ation
Potential
(Ha)
Period of
Implement
ation 5/ 7
Estimated
cost
(in Lakhs
Rs.)
Longitude Lattitude Remark / Village Name
MOA&FW Jabalpur Per Drop More Crop Sprinkler 2 2 5 0.40 79°54'56.935"E 23°7'58.025"N Tuniya
MOA&FW Jabalpur Har Khet Ko Pani Diesel / Electric /
SolarPump 2 2 5 0.50 79°55'58.767"E 23°5'54.363"N Tuniya
MOA&FW Jabalpur Har Khet Ko Pani Tube well 1 1 5 2.00 79°55'58.767"E 23°5'54.363"N Tuniya
MOA&FW Jabalpur Har Khet Ko Pani Tube well 1 1 5 2.00 80°9'16.812"E 23°5'44.549"N Umariya
MOA&FW Jabalpur Har Khet Ko Pani Diesel / Electric /
SolarPump 1 1 5 0.25 80°9'16.812"E 23°5'44.549"N Umariya
MOA&FW Jabalpur Har Khet Ko Pani Tube well 1 1 5 2.00 80°9'16.812"E 23°5'44.549"N Umariya
MOA&FW Jabalpur Per Drop More Crop Sprinkler 1 1 5 0.20 80°9'16.812"E 23°5'44.549"N Umariya
MOA&FW Jabalpur Per Drop More Crop Sprinkler 1 1 5 0.20 80°9'16.812"E 23°5'44.549"N Umariya
MOA&FW Jabalpur Per Drop More Crop Sprinkler 1 1 5 0.20 79°54'56.935"E 23°7'58.025"N Vikrampur
MOA&FW Jabalpur Har Khet Ko Pani Diesel / Electric /
SolarPump 1 1 5 0.25 79°55'58.767"E 23°5'54.363"N Vikrampur
MOA&FW Jabalpur Per Drop More Crop Sprinkler 2 2 5 0.40 79°54'56.935"E 23°7'58.025"N Villhari
MOA&FW Jabalpur Har Khet Ko Pani Diesel / Electric /
SolarPump 1 1 5 0.25 79°55'58.767"E 23°5'54.363"N Villhari
MOA&FW Jabalpur Har Khet Ko Pani Tube well 1 1 5 2.00 79°55'58.767"E 23°5'54.363"N Villhari
MOA&FW Kundam Har Khet Ko Pani Capacity Building 2795 5 55.89 80°21'22.061"E 23°14'9.012"N All
MOA&FW Kundam Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°27'0.744"E 23°17'55.5"N Amatitaha
MOA&FW Kundam Har Khet Ko Pani Diesel / Electric /
SolarPump 2 2 5 0.50 80°27'0.744"E 23°17'55.5"N Amatitaha
MOA&FW Kundam Har Khet Ko Pani Tube well 2 2 5 4.00 80°27'0.744"E 23°17'55.5"N Amatitaha
MOA&FW Kundam Per Drop More Crop Sprinkler 3 3 5 0.60 80°27'0.744"E 23°17'55.5"N Amatitaha
MOA&FW Kundam Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°24'31.985"E 23°16'52.424"N Amera
MOA&FW Kundam Har Khet Ko Pani Diesel / Electric /
SolarPump 2 2 5 0.50 80°24'31.985"E 23°16'52.424"N Amera
MOA&FW Kundam Har Khet Ko Pani Tube well 1 1 5 2.00 80°24'31.985"E 23°16'52.424"N Amera
MOA&FW Kundam Per Drop More Crop Sprinkler 1 1 5 0.20 80°24'31.985"E 23°16'52.424"N Amera
MOA&FW Kundam Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°20'45.139"E 23°13'40.93"N Amheta
MOA&FW Kundam Har Khet Ko Pani Diesel / Electric /
SolarPump 6 6 5 1.50 80°20'45.139"E 23°13'40.93"N Amheta
MOA&FW Kundam Har Khet Ko Pani Tube well 4 4 5 8.00 80°20'45.139"E 23°13'40.93"N Amheta
129
Concerned
Ministry/
Department
Name of
the
Districts
/ Blocks
Component Activity Total
Number
Command
Area/Irrig
ation
Potential
(Ha)
Period of
Implement
ation 5/ 7
Estimated
cost
(in Lakhs
Rs.)
Longitude Lattitude Remark / Village Name
MOA&FW Kundam Per Drop More Crop Sprinkler 5 5 5 1.00 80°20'45.139"E 23°13'40.93"N Amheta
MOA&FW Kundam Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°11'16.548"E 23°12'27.279"N Amjhar
MOA&FW Kundam Har Khet Ko Pani Diesel / Electric /
SolarPump 3 3 5 0.75 80°11'16.548"E 23°12'27.279"N Amjhar
MOA&FW Kundam Har Khet Ko Pani Tube well 3 3 5 6.00 80°11'16.548"E 23°12'27.279"N Amjhar
MOA&FW Kundam Per Drop More Crop Sprinkler 2 2 5 0.40 80°11'16.548"E 23°12'27.279"N Amjhar
MOA&FW Kundam Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°17'4.184"E 23°15'29.934"N Andhar
MOA&FW Kundam Har Khet Ko Pani Diesel / Electric /
SolarPump 2 2 5 0.50 80°17'4.184"E 23°15'29.934"N Andhar
MOA&FW Kundam Har Khet Ko Pani Tube well 5 5 5 10.00 80°17'4.184"E 23°15'29.934"N Andhar
MOA&FW Kundam Per Drop More Crop Sprinkler 5 5 5 1.00 80°17'4.184"E 23°15'29.934"N Andhar
MOA&FW Kundam Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°24'40.921"E 23°15'47.795"N Babaiya
MOA&FW Kundam Har Khet Ko Pani Diesel / Electric /
SolarPump 2 2 5 0.50 80°24'40.921"E 23°15'47.795"N Babaiya
MOA&FW Kundam Har Khet Ko Pani Tube well 2 2 5 4.00 80°24'40.921"E 23°15'47.795"N Babaiya
MOA&FW Kundam Per Drop More Crop Sprinkler 3 3 5 0.60 80°24'40.921"E 23°15'47.795"N Babaiya
MOA&FW Kundam Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°23'18.334"E 23°17'36.615"N Badkhera
MOA&FW Kundam Har Khet Ko Pani Diesel / Electric /
SolarPump 2 2 5 0.50 80°23'18.334"E 23°17'36.615"N Badkhera
MOA&FW Kundam Har Khet Ko Pani Tube well 1 1 5 2.00 80°23'18.334"E 23°17'36.615"N Badkhera
MOA&FW Kundam Per Drop More Crop Sprinkler 2 2 5 0.40 80°23'18.334"E 23°17'36.615"N Badkhera
MOA&FW Kundam Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°18'50.242"E 23°10'5.868"N Badkur
MOA&FW Kundam Har Khet Ko Pani Diesel / Electric /
SolarPump 2 2 5 0.50 80°18'50.242"E 23°10'5.868"N Badkur
MOA&FW Kundam Har Khet Ko Pani Tube well 2 2 5 4.00 80°18'50.242"E 23°10'5.868"N Badkur
MOA&FW Kundam Per Drop More Crop Sprinkler 3 3 5 0.60 80°18'50.242"E 23°10'5.868"N Badkur
MOA&FW Kundam Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°12'36.092"E 23°9'51.137"N Badua
MOA&FW Kundam Har Khet Ko Pani Diesel / Electric /
SolarPump 1 1 5 0.25 80°12'36.092"E 23°9'51.137"N Badua
MOA&FW Kundam Har Khet Ko Pani Tube well 2 2 5 4.00 80°12'36.092"E 23°9'51.137"N Badua
MOA&FW Kundam Per Drop More Crop Sprinkler 2 2 5 0.40 80°12'36.092"E 23°9'51.137"N Badua
MOA&FW Kundam Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°11'51.901"E 23°11'1.843"N Baghraji
130
Concerned
Ministry/
Department
Name of
the
Districts
/ Blocks
Component Activity Total
Number
Command
Area/Irrig
ation
Potential
(Ha)
Period of
Implement
ation 5/ 7
Estimated
cost
(in Lakhs
Rs.)
Longitude Lattitude Remark / Village Name
MOA&FW Kundam Har Khet Ko Pani Diesel / Electric /
SolarPump 8 8 5 2.00 80°11'51.901"E 23°11'1.843"N Baghraji
MOA&FW Kundam Per Drop More Crop Sprinkler 35 35 5 7.00 80°11'51.901"E 23°11'1.843"N Baghraji
MOA&FW Kundam Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°11'51.901"E 23°11'1.843"N Bahnapani(Bihnapani)
MOA&FW Kundam Har Khet Ko Pani Diesel / Electric /
SolarPump 1 1 5 0.25 80°17'27.752"E 23°14'10.391"N Bahnapani(Bihnapani)
MOA&FW Kundam Har Khet Ko Pani Tube well 1 1 5 2.00 80°17'27.752"E 23°14'10.391"N Bahnapani(Bihnapani)
MOA&FW Kundam Per Drop More Crop Sprinkler 2 2 5 0.40 80°17'27.752"E 23°14'10.391"N Bahnapani(Bihnapani)
MOA&FW Kundam Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°16'28.831"E 23°12'47.901"N Bairagi
MOA&FW Kundam Har Khet Ko Pani Diesel / Electric /
SolarPump 3 3 5 0.75 80°16'28.831"E 23°12'47.901"N Bairagi
MOA&FW Kundam Har Khet Ko Pani Tube well 2 2 5 4.00 80°16'28.831"E 23°12'47.901"N Bairagi
MOA&FW Kundam Per Drop More Crop Sprinkler 3 3 5 0.60 80°16'28.831"E 23°12'47.901"N Bairagi
MOA&FW Kundam Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°26'39.305"E 23°9'54.509"N Bamhani
MOA&FW Kundam Har Khet Ko Pani Diesel / Electric /
SolarPump 1 1 5 0.25 80°26'39.305"E 23°9'54.509"N Bamhani
MOA&FW Kundam Har Khet Ko Pani Tube well 2 2 5 4.00 80°26'39.305"E 23°9'54.509"N Bamhani
MOA&FW Kundam Per Drop More Crop Sprinkler 1 1 5 0.20 80°26'39.305"E 23°9'54.509"N Bamhani
MOA&FW Kundam Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°28'1.156"E 23°19'4.997"N Bandariya
MOA&FW Kundam Har Khet Ko Pani Diesel / Electric /
SolarPump 6 6 5 1.50 80°28'1.156"E 23°19'4.997"N Bandariya
MOA&FW Kundam Har Khet Ko Pani Tube well 12 12 5 24.00 80°28'1.156"E 23°19'4.997"N Bandariya
MOA&FW Kundam Per Drop More Crop Sprinkler 7 7 5 1.40 80°28'1.156"E 23°19'4.997"N Bandariya
MOA&FW Kundam Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°15'12.233"E 23°11'46.034"N Bar
MOA&FW Kundam Har Khet Ko Pani Diesel / Electric /
SolarPump 2 2 5 0.50 80°15'12.233"E 23°11'46.034"N Bar
MOA&FW Kundam Har Khet Ko Pani Tube well 1 1 5 2.00 80°15'12.233"E 23°11'46.034"N Bar
MOA&FW Kundam Per Drop More Crop Sprinkler 1 1 5 0.20 80°15'12.233"E 23°11'46.034"N Bar
MOA&FW Kundam Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°11'10.656"E 23°10'17.652"N Bargawan
MOA&FW Kundam Har Khet Ko Pani Diesel / Electric /
SolarPump 2 2 5 0.50 80°11'10.656"E 23°10'17.652"N Bargawan
MOA&FW Kundam Har Khet Ko Pani Tube well 5 5 5 10.00 80°11'10.656"E 23°10'17.652"N Bargawan
131
Concerned
Ministry/
Department
Name of
the
Districts
/ Blocks
Component Activity Total
Number
Command
Area/Irrig
ation
Potential
(Ha)
Period of
Implement
ation 5/ 7
Estimated
cost
(in Lakhs
Rs.)
Longitude Lattitude Remark / Village Name
MOA&FW Kundam Per Drop More Crop Sprinkler 5 5 5 1.00 80°11'10.656"E 23°10'17.652"N Bargawan
MOA&FW Kundam Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°17'13.022"E 23°15'53.503"N Batai
MOA&FW Kundam Har Khet Ko Pani Diesel / Electric /
SolarPump 2 2 5 0.50 80°17'13.022"E 23°15'53.503"N Batai
MOA&FW Kundam Har Khet Ko Pani Tube well 2 2 5 4.00 80°17'13.022"E 23°15'53.503"N Batai
MOA&FW Kundam Per Drop More Crop Sprinkler 5 5 5 1.00 80°17'13.022"E 23°15'53.503"N Batai
MOA&FW Kundam Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°9'45.22"E 23°11'37.195"N Bhadri
MOA&FW Kundam Har Khet Ko Pani Diesel / Electric /
SolarPump 1 1 5 0.25 80°9'45.22"E 23°11'37.195"N Bhadri
MOA&FW Kundam Har Khet Ko Pani Tube well 2 2 5 4.00 80°9'45.22"E 23°11'37.195"N Bhadri
MOA&FW Kundam Per Drop More Crop Sprinkler 2 2 5 0.40 80°9'45.22"E 23°11'37.195"N Bhadri
MOA&FW Kundam Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°12'36.092"E 23°18'41.429"N Bhaiswahi
MOA&FW Kundam Har Khet Ko Pani Diesel / Electric /
SolarPump 1 1 5 0.25 80°12'36.092"E 23°18'41.429"N Bhaiswahi
MOA&FW Kundam Har Khet Ko Pani Tube well 2 2 5 4.00 80°12'36.092"E 23°18'41.429"N Bhaiswahi
MOA&FW Kundam Per Drop More Crop Sprinkler 2 2 5 0.40 80°12'36.092"E 23°18'41.429"N Bhaiswahi
MOA&FW Kundam Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°17'27.752"E 23°11'57.818"N Bhajiya
MOA&FW Kundam Har Khet Ko Pani Diesel / Electric /
SolarPump 5 5 5 1.25 80°17'27.752"E 23°11'57.818"N Bhajiya
MOA&FW Kundam Har Khet Ko Pani Tube well 4 4 5 8.00 80°17'27.752"E 23°11'57.818"N Bhajiya
MOA&FW Kundam Per Drop More Crop Sprinkler 4 4 5 0.80 80°17'27.752"E 23°11'57.818"N Bhajiya
MOA&FW Kundam Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°11'1.818"E 23°13'11.47"N Bhanpura
MOA&FW Kundam Har Khet Ko Pani Diesel / Electric /
SolarPump 2 2 5 0.50 80°11'1.818"E 23°13'11.47"N Bhanpura
MOA&FW Kundam Har Khet Ko Pani Tube well 1 1 5 2.00 80°11'1.818"E 23°13'11.47"N Bhanpura
MOA&FW Kundam Per Drop More Crop Sprinkler 1 1 5 0.20 80°11'1.818"E 23°13'11.47"N Bhanpura
MOA&FW Kundam Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°11'1.818"E 23°13'11.47"N Bhimpar
MOA&FW Kundam Har Khet Ko Pani Diesel / Electric /
SolarPump 2 2 5 0.50 80°11'1.818"E 23°13'11.47"N Bhimpar
MOA&FW Kundam Har Khet Ko Pani Tube well 2 2 5 4.00 80°11'1.818"E 23°13'11.47"N Bhimpar
MOA&FW Kundam Per Drop More Crop Sprinkler 2 2 5 0.40 80°11'1.818"E 23°13'11.47"N Bhimpar
MOA&FW Kundam Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°11'1.818"E 23°13'11.47"N Bhoka Deori
132
Concerned
Ministry/
Department
Name of
the
Districts
/ Blocks
Component Activity Total
Number
Command
Area/Irrig
ation
Potential
(Ha)
Period of
Implement
ation 5/ 7
Estimated
cost
(in Lakhs
Rs.)
Longitude Lattitude Remark / Village Name
MOA&FW Kundam Har Khet Ko Pani Diesel / Electric /
SolarPump 2 2 5 0.50 80°11'1.818"E 23°13'11.47"N Bhoka Deori
MOA&FW Kundam Har Khet Ko Pani Tube well 2 2 5 4.00 80°11'1.818"E 23°13'11.47"N Bhoka Deori
MOA&FW Kundam Per Drop More Crop Sprinkler 1 1 5 0.20 80°11'1.818"E 23°13'11.47"N Bhoka Deori
MOA&FW Kundam Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°8'10.975"E 23°11'35.182"N Bichua
MOA&FW Kundam Har Khet Ko Pani Diesel / Electric /
SolarPump 3 3 5 0.75 80°8'10.975"E 23°11'35.182"N Bichua
MOA&FW Kundam Har Khet Ko Pani Tube well 2 2 5 4.00 80°8'10.975"E 23°11'35.182"N Bichua
MOA&FW Kundam Per Drop More Crop Sprinkler 2 2 5 0.40 80°8'10.975"E 23°11'35.182"N Bichua
MOA&FW Kundam Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°12'15.47"E 23°11'19.519"N Bijapuri
MOA&FW Kundam Har Khet Ko Pani Diesel / Electric /
SolarPump 3 3 5 0.75 80°12'15.47"E 23°11'19.519"N Bijapuri
MOA&FW Kundam Har Khet Ko Pani Tube well 2 2 5 4.00 80°12'15.47"E 23°11'19.519"N Bijapuri
MOA&FW Kundam Per Drop More Crop Sprinkler 2 2 5 0.40 80°12'15.47"E 23°11'19.519"N Bijapuri
MOA&FW Kundam Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°12'15.47"E 23°11'19.519"N Bilgawan
MOA&FW Kundam Har Khet Ko Pani Diesel / Electric /
SolarPump 2 2 5 0.50 80°12'15.47"E 23°11'19.519"N Bilgawan
MOA&FW Kundam Har Khet Ko Pani Tube well 2 2 5 4.00 80°12'15.47"E 23°11'19.519"N Bilgawan
MOA&FW Kundam Per Drop More Crop Sprinkler 3 3 5 0.60 80°12'15.47"E 23°11'19.519"N Bilgawan
MOA&FW Kundam Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°23'21.28"E 23°14'28.067"N Bilsara
MOA&FW Kundam Har Khet Ko Pani Diesel / Electric /
SolarPump 2 2 5 0.50 80°23'21.28"E 23°14'28.067"N Bilsara
MOA&FW Kundam Har Khet Ko Pani Tube well 1 1 5 2.00 80°23'21.28"E 23°14'28.067"N Bilsara
MOA&FW Kundam Per Drop More Crop Sprinkler 2 2 5 0.40 80°23'21.28"E 23°14'28.067"N Bilsara
MOA&FW Kundam Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°23'21.28"E 23°14'28.067"N Biltukri (Biltikuri)
MOA&FW Kundam Har Khet Ko Pani Diesel / Electric /
SolarPump 2 2 5 0.50 80°23'21.28"E 23°14'28.067"N Biltukri (Biltikuri)
MOA&FW Kundam Har Khet Ko Pani Tube well 2 2 5 4.00 80°23'21.28"E 23°14'28.067"N Biltukri (Biltikuri)
MOA&FW Kundam Per Drop More Crop Sprinkler 2 2 5 0.40 80°23'21.28"E 23°14'28.067"N Biltukri (Biltikuri)
MOA&FW Kundam Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°12'41.984"E 23°12'53.793"N Bisanpura
MOA&FW Kundam Har Khet Ko Pani Diesel / Electric /
SolarPump 2 2 5 0.50 80°12'41.984"E 23°12'53.793"N Bisanpura
133
Concerned
Ministry/
Department
Name of
the
Districts
/ Blocks
Component Activity Total
Number
Command
Area/Irrig
ation
Potential
(Ha)
Period of
Implement
ation 5/ 7
Estimated
cost
(in Lakhs
Rs.)
Longitude Lattitude Remark / Village Name
MOA&FW Kundam Har Khet Ko Pani Tube well 2 2 5 4.00 80°12'41.984"E 23°12'53.793"N Bisanpura
MOA&FW Kundam Per Drop More Crop Sprinkler 2 2 5 0.40 80°12'41.984"E 23°12'53.793"N Bisanpura
MOA&FW Kundam Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°12'41.984"E 23°12'53.793"N Bishanpura
MOA&FW Kundam Har Khet Ko Pani Diesel / Electric /
SolarPump 5 5 5 1.25 80°12'41.984"E 23°12'53.793"N Bishanpura
MOA&FW Kundam Har Khet Ko Pani Tube well 2 2 5 4.00 80°12'41.984"E 23°12'53.793"N Bishanpura
MOA&FW Kundam Per Drop More Crop Sprinkler 3 3 5 0.60 80°12'41.984"E 23°12'53.793"N Bishanpura
MOA&FW Kundam Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°17'0.438"E 23°7'27.229"N Budbudi
MOA&FW Kundam Har Khet Ko Pani Diesel / Electric /
SolarPump 2 2 5 0.50 80°17'0.438"E 23°7'27.229"N Budbudi
MOA&FW Kundam Har Khet Ko Pani Tube well 5 5 5 10.00 80°17'0.438"E 23°7'27.229"N Budbudi
MOA&FW Kundam Per Drop More Crop Sprinkler 2 2 5 0.40 80°17'0.438"E 23°7'27.229"N Budbudi
MOA&FW Kundam Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°26'38.666"E 23°17'48.399"N Chaurai Kalan
MOA&FW Kundam Har Khet Ko Pani Diesel / Electric /
SolarPump 3 3 5 0.75 80°26'38.666"E 23°17'48.399"N Chaurai Kalan
MOA&FW Kundam Har Khet Ko Pani Tube well 6 6 5 12.00 80°26'38.666"E 23°17'48.399"N Chaurai Kalan
MOA&FW Kundam Per Drop More Crop Sprinkler 4 4 5 0.80 80°26'38.666"E 23°17'48.399"N Chaurai Kalan
MOA&FW Kundam Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°26'38.666"E 23°17'48.399"N Chaurai Khurd
MOA&FW Kundam Har Khet Ko Pani Diesel / Electric /
SolarPump 1 1 5 0.25 80°26'38.666"E 23°17'48.399"N Chaurai Khurd
MOA&FW Kundam Har Khet Ko Pani Tube well 2 2 5 4.00 80°26'38.666"E 23°17'48.399"N Chaurai Khurd
MOA&FW Kundam Per Drop More Crop Sprinkler 1 1 5 0.20 80°26'38.666"E 23°17'48.399"N Chaurai Khurd
MOA&FW Kundam Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°19'15.6"E 23°12'6.875"N Chhapara
MOA&FW Kundam Har Khet Ko Pani Diesel / Electric /
SolarPump 1 1 5 0.25 80°19'15.6"E 23°12'6.875"N Chhapara
MOA&FW Kundam Har Khet Ko Pani Tube well 1 1 5 2.00 80°19'15.6"E 23°12'6.875"N Chhapara
MOA&FW Kundam Per Drop More Crop Sprinkler 2 2 5 0.40 80°19'15.6"E 23°12'6.875"N Chhapara
MOA&FW Kundam Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°19'15.6"E 23°12'6.875"N Chhapra
MOA&FW Kundam Har Khet Ko Pani Diesel / Electric /
SolarPump 1 1 5 0.25 80°19'15.6"E 23°12'6.875"N Chhapra
MOA&FW Kundam Har Khet Ko Pani Tube well 2 2 5 4.00 80°19'15.6"E 23°12'6.875"N Chhapra
MOA&FW Kundam Per Drop More Crop Sprinkler 2 2 5 0.40 80°19'15.6"E 23°12'6.875"N Chhapra
134
Concerned
Ministry/
Department
Name of
the
Districts
/ Blocks
Component Activity Total
Number
Command
Area/Irrig
ation
Potential
(Ha)
Period of
Implement
ation 5/ 7
Estimated
cost
(in Lakhs
Rs.)
Longitude Lattitude Remark / Village Name
MOA&FW Kundam Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°28'21.842"E 23°15'44.066"N Chhirpani
MOA&FW Kundam Har Khet Ko Pani Diesel / Electric /
SolarPump 1 1 5 0.25 80°28'21.842"E 23°15'44.066"N Chhirpani
MOA&FW Kundam Har Khet Ko Pani Tube well 1 1 5 2.00 80°28'21.842"E 23°15'44.066"N Chhirpani
MOA&FW Kundam Per Drop More Crop Sprinkler 2 2 5 0.40 80°28'21.842"E 23°15'44.066"N Chhirpani
MOA&FW Kundam Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°19'16.757"E 23°11'1.843"N Chhita Khudri
MOA&FW Kundam Har Khet Ko Pani Diesel / Electric /
SolarPump 2 2 5 0.50 80°19'16.757"E 23°11'1.843"N Chhita Khudri
MOA&FW Kundam Har Khet Ko Pani Tube well 2 2 5 4.00 80°19'16.757"E 23°11'1.843"N Chhita Khudri
MOA&FW Kundam Per Drop More Crop Sprinkler 2 2 5 0.40 80°19'16.757"E 23°11'1.843"N Chhita Khudri
MOA&FW Kundam Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°19'16.757"E 23°11'1.843"N Chikhli
MOA&FW Kundam Har Khet Ko Pani Diesel / Electric /
SolarPump 1 1 5 0.25 80°19'16.757"E 23°11'1.843"N Chikhli
MOA&FW Kundam Har Khet Ko Pani Tube well 1 1 5 2.00 80°19'16.757"E 23°11'1.843"N Chikhli
MOA&FW Kundam Per Drop More Crop Sprinkler 1 1 5 0.20 80°19'16.757"E 23°11'1.843"N Chikhli
MOA&FW Kundam Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°19'16.757"E 23°11'1.843"N Chiraipani
MOA&FW Kundam Har Khet Ko Pani Diesel / Electric /
SolarPump 2 2 5 0.50 80°19'16.757"E 23°11'1.843"N Chiraipani
MOA&FW Kundam Har Khet Ko Pani Tube well 2 2 5 4.00 80°19'16.757"E 23°11'1.843"N Chiraipani
MOA&FW Kundam Per Drop More Crop Sprinkler 2 2 5 0.40 80°19'16.757"E 23°11'1.843"N Chiraipani
MOA&FW Kundam Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°8'58.083"E 23°11'34.249"N Dabra Kalan
MOA&FW Kundam Har Khet Ko Pani Diesel / Electric /
SolarPump 8 8 5 2.00 80°8'58.083"E 23°11'34.249"N Dabra Kalan
MOA&FW Kundam Har Khet Ko Pani Tube well 12 12 5 24.00 80°8'58.083"E 23°11'34.249"N Dabra Kalan
MOA&FW Kundam Per Drop More Crop Sprinkler 15 15 5 3.00 80°8'58.083"E 23°11'34.249"N Dabra Kalan
MOA&FW Kundam Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°13'10.196"E 23°10'42.049"N Dadargawan
MOA&FW Kundam Har Khet Ko Pani Diesel / Electric /
SolarPump 2 2 5 0.50 80°13'10.196"E 23°10'42.049"N Dadargawan
MOA&FW Kundam Har Khet Ko Pani Tube well 4 4 5 8.00 80°13'10.196"E 23°10'42.049"N Dadargawan
MOA&FW Kundam Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°13'10.196"E 23°10'42.049"N Dadargawan
MOA&FW Kundam Har Khet Ko Pani Diesel / Electric /
SolarPump 2 2 5 0.50 80°13'10.196"E 23°10'42.049"N Dadargawan
135
Concerned
Ministry/
Department
Name of
the
Districts
/ Blocks
Component Activity Total
Number
Command
Area/Irrig
ation
Potential
(Ha)
Period of
Implement
ation 5/ 7
Estimated
cost
(in Lakhs
Rs.)
Longitude Lattitude Remark / Village Name
MOA&FW Kundam Har Khet Ko Pani Tube well 3 3 5 6.00 80°13'10.196"E 23°10'42.049"N Dadargawan
MOA&FW Kundam Per Drop More Crop Sprinkler 3 3 5 0.60 80°13'10.196"E 23°10'42.049"N Dadargawan
MOA&FW Kundam Per Drop More Crop Sprinkler 3 3 5 0.60 80°13'10.196"E 23°10'42.049"N Dadargawan
MOA&FW Kundam Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°12'15.47"E 23°13'14.416"N Dargarh
MOA&FW Kundam Har Khet Ko Pani Diesel / Electric /
SolarPump 2 2 5 0.50 80°12'15.47"E 23°13'14.416"N Dargarh
MOA&FW Kundam Har Khet Ko Pani Tube well 2 2 5 4.00 80°12'15.47"E 23°13'14.416"N Dargarh
MOA&FW Kundam Per Drop More Crop Sprinkler 2 2 5 0.40 80°12'15.47"E 23°13'14.416"N Dargarh
MOA&FW Kundam Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°12'17.996"E 23°11'59.418"N Dashrathpur
MOA&FW Kundam Har Khet Ko Pani Diesel / Electric /
SolarPump 2 2 5 0.50 80°12'17.996"E 23°11'59.418"N Dashrathpur
MOA&FW Kundam Har Khet Ko Pani Tube well 3 3 5 6.00 80°12'17.996"E 23°11'59.418"N Dashrathpur
MOA&FW Kundam Per Drop More Crop Sprinkler 2 2 5 0.40 80°12'17.996"E 23°11'59.418"N Dashrathpur
MOA&FW Kundam Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°10'42.916"E 23°12'32.975"N Dehari Kalan
MOA&FW Kundam Har Khet Ko Pani Diesel / Electric /
SolarPump 2 2 5 0.50 80°10'42.916"E 23°12'32.975"N Dehari Kalan
MOA&FW Kundam Har Khet Ko Pani Tube well 2 2 5 4.00 80°10'42.916"E 23°12'32.975"N Dehari Kalan
MOA&FW Kundam Per Drop More Crop Sprinkler 4 4 5 0.80 80°10'42.916"E 23°12'32.975"N Dehari Kalan
MOA&FW Kundam Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°10'41.052"E 23°13'18.651"N Dehari Khurd
MOA&FW Kundam Har Khet Ko Pani Diesel / Electric /
SolarPump 2 2 5 0.50 80°10'41.052"E 23°13'18.651"N Dehari Khurd
MOA&FW Kundam Har Khet Ko Pani Tube well 4 4 5 8.00 80°10'41.052"E 23°13'18.651"N Dehari Khurd
MOA&FW Kundam Per Drop More Crop Sprinkler 3 3 5 0.60 80°10'41.052"E 23°13'18.651"N Dehari Khurd
MOA&FW Kundam Per Drop More Crop Sprinkler 3 3 5 0.60 80°17'59.705"E 23°15'27.706"N Deohara
MOA&FW Kundam Per Drop More Crop Sprinkler 3 3 5 0.60 80°17'59.705"E 23°15'27.706"N Deohara
MOA&FW Kundam Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°18'33.431"E 23°15'22.085"N Deohara
MOA&FW Kundam Har Khet Ko Pani Diesel / Electric /
SolarPump 2 2 5 0.50 80°18'33.431"E 23°15'22.085"N Deohara
MOA&FW Kundam Har Khet Ko Pani Tube well 3 3 5 6.00 80°18'33.431"E 23°15'22.085"N Deohara
MOA&FW Kundam Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°18'33.431"E 23°15'22.085"N Deohara
MOA&FW Kundam Har Khet Ko Pani Diesel / Electric /
SolarPump 2 2 5 0.50 80°18'33.431"E 23°15'22.085"N Deohara
136
Concerned
Ministry/
Department
Name of
the
Districts
/ Blocks
Component Activity Total
Number
Command
Area/Irrig
ation
Potential
(Ha)
Period of
Implement
ation 5/ 7
Estimated
cost
(in Lakhs
Rs.)
Longitude Lattitude Remark / Village Name
MOA&FW Kundam Har Khet Ko Pani Tube well 3 3 5 6.00 80°18'33.431"E 23°15'22.085"N Deohara
MOA&FW Kundam Per Drop More Crop Sprinkler 12 12 5 2.40 80°17'59.705"E 23°15'27.706"N Deori
MOA&FW Kundam Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°18'33.431"E 23°15'22.085"N Deori
MOA&FW Kundam Har Khet Ko Pani Diesel / Electric /
SolarPump 8 8 5 2.00 80°18'33.431"E 23°15'22.085"N Deori
MOA&FW Kundam Har Khet Ko Pani Tube well 15 15 5 30.00 80°18'33.431"E 23°15'22.085"N Deori
MOA&FW Kundam Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°13'52.143"E 23°9'49.848"N Deori Kalan
MOA&FW Kundam Har Khet Ko Pani Diesel / Electric /
SolarPump 2 2 5 0.50 80°13'52.143"E 23°9'49.848"N Deori Kalan
MOA&FW Kundam Har Khet Ko Pani Tube well 2 2 5 4.00 80°13'52.143"E 23°9'49.848"N Deori Kalan
MOA&FW Kundam Per Drop More Crop Sprinkler 3 3 5 0.60 80°13'52.143"E 23°9'49.848"N Deori Kalan
MOA&FW Kundam Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°15'4.851"E 23°12'29.246"N Deori Khurd
MOA&FW Kundam Har Khet Ko Pani Diesel / Electric /
SolarPump 3 3 5 0.75 80°15'4.851"E 23°12'29.246"N Deori Khurd
MOA&FW Kundam Har Khet Ko Pani Tube well 4 4 5 8.00 80°15'4.851"E 23°12'29.246"N Deori Khurd
MOA&FW Kundam Per Drop More Crop Sprinkler 2 2 5 0.40 80°15'4.851"E 23°12'29.246"N Deori Khurd
MOA&FW Kundam Per Drop More Crop Sprinkler 1 1 5 0.20 80°17'59.705"E 23°15'27.706"N Deorigarh (Diwarigarh)
MOA&FW Kundam Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°18'33.431"E 23°15'22.085"N Deorigarh (Diwarigarh)
MOA&FW Kundam Har Khet Ko Pani Diesel / Electric /
SolarPump 1 1 5 0.25 80°18'33.431"E 23°15'22.085"N Deorigarh (Diwarigarh)
MOA&FW Kundam Har Khet Ko Pani Tube well 1 1 5 2.00 80°18'33.431"E 23°15'22.085"N Deorigarh (Diwarigarh)
MOA&FW Kundam Har Khet Ko Pani Farm Pond 2 4 5 4.00 80°13'34.432"E 23°16'9.235"N Dhanwahi
MOA&FW Kundam Har Khet Ko Pani Diesel / Electric /
SolarPump 14 14 5 3.50 80°13'34.432"E 23°16'9.235"N Dhanwahi
MOA&FW Kundam Har Khet Ko Pani Tube well 15 15 5 30.00 80°13'34.432"E 23°16'9.235"N Dhanwahi
MOA&FW Kundam Per Drop More Crop Sprinkler 12 12 5 2.40 80°13'34.432"E 23°16'9.235"N Dhanwahi
MOA&FW Kundam Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°14'14.515"E 23°10'26.202"N Doli
MOA&FW Kundam Har Khet Ko Pani Diesel / Electric /
SolarPump 2 2 5 0.50 80°14'14.515"E 23°10'26.202"N Doli
MOA&FW Kundam Har Khet Ko Pani Tube well 1 1 5 2.00 80°14'14.515"E 23°10'26.202"N Doli
MOA&FW Kundam Per Drop More Crop Sprinkler 1 1 5 0.20 80°14'14.515"E 23°10'26.202"N Doli
MOA&FW Kundam Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°11'47.235"E 23°10'8.491"N Dugargawan
137
Concerned
Ministry/
Department
Name of
the
Districts
/ Blocks
Component Activity Total
Number
Command
Area/Irrig
ation
Potential
(Ha)
Period of
Implement
ation 5/ 7
Estimated
cost
(in Lakhs
Rs.)
Longitude Lattitude Remark / Village Name
MOA&FW Kundam Har Khet Ko Pani Diesel / Electric /
SolarPump 2 2 5 0.50 80°11'47.235"E 23°10'8.491"N Dugargawan
MOA&FW Kundam Har Khet Ko Pani Tube well 3 3 5 6.00 80°11'47.235"E 23°10'8.491"N Dugargawan
MOA&FW Kundam Per Drop More Crop Sprinkler 3 3 5 0.60 80°11'47.235"E 23°10'8.491"N Dugargawan
MOA&FW Kundam Per Drop More Crop Sprinkler 1 1 5 0.20 80°17'59.705"E 23°15'27.706"N Dunda (Duda)
MOA&FW Kundam Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°18'33.431"E 23°15'22.085"N Dunda (Duda)
MOA&FW Kundam Har Khet Ko Pani Diesel / Electric /
SolarPump 1 1 5 0.25 80°18'33.431"E 23°15'22.085"N Dunda (Duda)
MOA&FW Kundam Har Khet Ko Pani Tube well 1 1 5 2.00 80°18'33.431"E 23°15'22.085"N Dunda (Duda)
MOA&FW Kundam Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°10'7.494"E 23°11'38.91"N Gangai
MOA&FW Kundam Har Khet Ko Pani Diesel / Electric /
SolarPump 2 2 5 0.50 80°10'7.494"E 23°11'38.91"N Gangai
MOA&FW Kundam Har Khet Ko Pani Tube well 1 1 5 2.00 80°10'7.494"E 23°11'38.91"N Gangai
MOA&FW Kundam Per Drop More Crop Sprinkler 2 2 5 0.40 80°10'7.494"E 23°11'38.91"N Gangai
MOA&FW Kundam Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°16'55.777"E 23°20'33.034"N Garyari
MOA&FW Kundam Har Khet Ko Pani Diesel / Electric /
SolarPump 2 2 5 0.50 80°16'55.777"E 23°20'33.034"N Garyari
MOA&FW Kundam Har Khet Ko Pani Tube well 1 1 5 2.00 80°16'55.777"E 23°20'33.034"N Garyari
MOA&FW Kundam Per Drop More Crop Sprinkler 2 2 5 0.40 80°16'55.777"E 23°20'33.034"N Garyari
MOA&FW Kundam Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°20'15.312"E 23°18'13.526"N Gauri
MOA&FW Kundam Har Khet Ko Pani Diesel / Electric /
SolarPump 1 1 5 0.25 80°20'15.312"E 23°18'13.526"N Gauri
MOA&FW Kundam Har Khet Ko Pani Tube well 1 1 5 2.00 80°20'15.312"E 23°18'13.526"N Gauri
MOA&FW Kundam Per Drop More Crop Sprinkler 2 2 5 0.40 80°20'15.312"E 23°18'13.526"N Gauri
MOA&FW Kundam Per Drop More Crop Sprinkler 2 2 5 0.40 80°17'59.705"E 23°15'27.706"N Ghodatakan
MOA&FW Kundam Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°18'33.431"E 23°15'22.085"N Ghodatakan
MOA&FW Kundam Har Khet Ko Pani Diesel / Electric /
SolarPump 1 1 5 0.25 80°18'33.431"E 23°15'22.085"N Ghodatakan
MOA&FW Kundam Har Khet Ko Pani Tube well 1 1 5 2.00 80°18'33.431"E 23°15'22.085"N Ghodatakan
MOA&FW Kundam Per Drop More Crop Sprinkler 2 2 5 0.40 80°17'59.705"E 23°15'27.706"N Ghughara
MOA&FW Kundam Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°18'33.431"E 23°15'22.085"N Ghughara
138
Concerned
Ministry/
Department
Name of
the
Districts
/ Blocks
Component Activity Total
Number
Command
Area/Irrig
ation
Potential
(Ha)
Period of
Implement
ation 5/ 7
Estimated
cost
(in Lakhs
Rs.)
Longitude Lattitude Remark / Village Name
MOA&FW Kundam Har Khet Ko Pani Diesel / Electric /
SolarPump 2 2 5 0.50 80°18'33.431"E 23°15'22.085"N Ghughara
MOA&FW Kundam Har Khet Ko Pani Tube well 2 2 5 4.00 80°18'33.431"E 23°15'22.085"N Ghughara
MOA&FW Kundam Per Drop More Crop Sprinkler 2 2 5 0.40 80°17'59.705"E 23°15'27.706"N Ghughari
MOA&FW Kundam Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°18'33.431"E 23°15'22.085"N Ghughari
MOA&FW Kundam Har Khet Ko Pani Diesel / Electric /
SolarPump 2 2 5 0.50 80°18'33.431"E 23°15'22.085"N Ghughari
MOA&FW Kundam Har Khet Ko Pani Tube well 2 2 5 4.00 80°18'33.431"E 23°15'22.085"N Ghughari
MOA&FW Kundam Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°14'16.972"E 23°15'24.896"N Guraiya
MOA&FW Kundam Har Khet Ko Pani Diesel / Electric /
SolarPump 14 14 5 3.50 80°14'16.972"E 23°15'24.896"N Guraiya
MOA&FW Kundam Har Khet Ko Pani Tube well 15 15 5 30.00 80°14'16.972"E 23°15'24.896"N Guraiya
MOA&FW Kundam Per Drop More Crop Sprinkler 12 12 5 2.40 80°14'16.972"E 23°15'24.896"N Guraiya
MOA&FW Kundam Per Drop More Crop Sprinkler 2 2 5 0.40 80°17'59.705"E 23°15'27.706"N Hadipani
MOA&FW Kundam Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°18'33.431"E 23°15'22.085"N Hadipani
MOA&FW Kundam Har Khet Ko Pani Diesel / Electric /
SolarPump 2 2 5 0.50 80°18'33.431"E 23°15'22.085"N Hadipani
MOA&FW Kundam Har Khet Ko Pani Tube well 2 2 5 4.00 80°18'33.431"E 23°15'22.085"N Hadipani
MOA&FW Kundam Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°9'51.379"E 23°10'8.714"N Hansapur
MOA&FW Kundam Har Khet Ko Pani Diesel / Electric /
SolarPump 2 2 5 0.50 80°9'51.379"E 23°10'8.714"N Hansapur
MOA&FW Kundam Har Khet Ko Pani Tube well 2 2 5 4.00 80°9'51.379"E 23°10'8.714"N Hansapur
MOA&FW Kundam Per Drop More Crop Sprinkler 4 4 5 0.80 80°9'51.379"E 23°10'8.714"N Hansapur
MOA&FW Kundam Per Drop More Crop Sprinkler 2 2 5 0.40 80°17'59.705"E 23°15'27.706"N Harduli Kalan
MOA&FW Kundam Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°18'33.431"E 23°15'22.085"N Harduli Kalan
MOA&FW Kundam Har Khet Ko Pani Diesel / Electric /
SolarPump 2 2 5 0.50 80°18'33.431"E 23°15'22.085"N Harduli Kalan
MOA&FW Kundam Har Khet Ko Pani Tube well 2 2 5 4.00 80°18'33.431"E 23°15'22.085"N Harduli Kalan
MOA&FW Kundam Per Drop More Crop Sprinkler 1 1 5 0.20 80°17'59.705"E 23°15'27.706"N Harra Tikur
MOA&FW Kundam Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°18'33.431"E 23°15'22.085"N Harra Tikur
MOA&FW Kundam Har Khet Ko Pani Diesel / Electric /
SolarPump 2 2 5 0.50 80°18'33.431"E 23°15'22.085"N Harra Tikur
139
Concerned
Ministry/
Department
Name of
the
Districts
/ Blocks
Component Activity Total
Number
Command
Area/Irrig
ation
Potential
(Ha)
Period of
Implement
ation 5/ 7
Estimated
cost
(in Lakhs
Rs.)
Longitude Lattitude Remark / Village Name
MOA&FW Kundam Har Khet Ko Pani Tube well 1 1 5 2.00 80°18'33.431"E 23°15'22.085"N Harra Tikur
MOA&FW Kundam Per Drop More Crop Sprinkler 4 4 5 0.80 80°17'59.705"E 23°15'27.706"N Hinauta
MOA&FW Kundam Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°18'33.431"E 23°15'22.085"N Hinauta
MOA&FW Kundam Har Khet Ko Pani Diesel / Electric /
SolarPump 2 2 5 0.50 80°18'33.431"E 23°15'22.085"N Hinauta
MOA&FW Kundam Har Khet Ko Pani Tube well 1 1 5 2.00 80°18'33.431"E 23°15'22.085"N Hinauta
MOA&FW Kundam Per Drop More Crop Sprinkler 4 4 5 0.80 80°17'59.705"E 23°15'27.706"N Imalai
MOA&FW Kundam Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°18'33.431"E 23°15'22.085"N Imalai
MOA&FW Kundam Har Khet Ko Pani Diesel / Electric /
SolarPump 2 2 5 0.50 80°18'33.431"E 23°15'22.085"N Imalai
MOA&FW Kundam Har Khet Ko Pani Tube well 5 5 5 10.00 80°18'33.431"E 23°15'22.085"N Imalai
MOA&FW Kundam Per Drop More Crop Sprinkler 2 2 5 0.40 80°17'59.705"E 23°15'27.706"N Jaitpuri
MOA&FW Kundam Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°18'33.431"E 23°15'22.085"N Jaitpuri
MOA&FW Kundam Har Khet Ko Pani Diesel / Electric /
SolarPump 1 1 5 0.25 80°18'33.431"E 23°15'22.085"N Jaitpuri
MOA&FW Kundam Har Khet Ko Pani Tube well 2 2 5 4.00 80°18'33.431"E 23°15'22.085"N Jaitpuri
MOA&FW Kundam Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°16'51.116"E 23°9'2.309"N Jamgaon
MOA&FW Kundam Har Khet Ko Pani Diesel / Electric /
SolarPump 1 1 5 0.25 80°16'51.116"E 23°9'2.309"N Jamgaon
MOA&FW Kundam Har Khet Ko Pani Tube well 1 1 5 2.00 80°16'51.116"E 23°9'2.309"N Jamgaon
MOA&FW Kundam Per Drop More Crop Sprinkler 2 2 5 0.40 80°16'51.116"E 23°9'2.309"N Jamgaon
MOA&FW Kundam Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°13'46.55"E 23°8'59.512"N Jamodi
MOA&FW Kundam Har Khet Ko Pani Diesel / Electric /
SolarPump 2 2 5 0.50 80°13'46.55"E 23°8'59.512"N Jamodi
MOA&FW Kundam Har Khet Ko Pani Tube well 2 2 5 4.00 80°13'46.55"E 23°8'59.512"N Jamodi
MOA&FW Kundam Per Drop More Crop Sprinkler 3 3 5 0.60 80°13'46.55"E 23°8'59.512"N Jamodi
MOA&FW Kundam Per Drop More Crop Sprinkler 13 13 5 2.60 80°17'59.705"E 23°15'27.706"N Jamuniya
MOA&FW Kundam Per Drop More Crop Sprinkler 8 8 5 1.60 80°17'59.705"E 23°15'27.706"N Jamuniya
MOA&FW Kundam Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°18'33.431"E 23°15'22.085"N Jamuniya
MOA&FW Kundam Har Khet Ko Pani Diesel / Electric /
SolarPump 7 7 5 1.75 80°18'33.431"E 23°15'22.085"N Jamuniya
MOA&FW Kundam Har Khet Ko Pani Tube well 11 11 5 22.00 80°18'33.431"E 23°15'22.085"N Jamuniya
140
Concerned
Ministry/
Department
Name of
the
Districts
/ Blocks
Component Activity Total
Number
Command
Area/Irrig
ation
Potential
(Ha)
Period of
Implement
ation 5/ 7
Estimated
cost
(in Lakhs
Rs.)
Longitude Lattitude Remark / Village Name
MOA&FW Kundam Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°18'33.431"E 23°15'22.085"N Jamuniya
MOA&FW Kundam Har Khet Ko Pani Diesel / Electric /
SolarPump 6 6 5 1.50 80°18'33.431"E 23°15'22.085"N Jamuniya
MOA&FW Kundam Har Khet Ko Pani Tube well 8 8 5 16.00 80°18'33.431"E 23°15'22.085"N Jamuniya
MOA&FW Kundam Per Drop More Crop Sprinkler 5 5 5 1.00 80°17'59.705"E 23°15'27.706"N Jaruwa Dabra
MOA&FW Kundam Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°18'33.431"E 23°15'22.085"N Jaruwa Dabra
MOA&FW Kundam Har Khet Ko Pani Diesel / Electric /
SolarPump 12 12 5 3.00 80°18'33.431"E 23°15'22.085"N Jaruwa Dabra
MOA&FW Kundam Har Khet Ko Pani Tube well 18 18 5 36.00 80°18'33.431"E 23°15'22.085"N Jaruwa Dabra
MOA&FW Kundam Per Drop More Crop Sprinkler 3 3 5 0.60 80°17'59.705"E 23°15'27.706"N Jhiriya
MOA&FW Kundam Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°18'33.431"E 23°15'22.085"N Jhiriya
MOA&FW Kundam Har Khet Ko Pani Diesel / Electric /
SolarPump 2 2 5 0.50 80°18'33.431"E 23°15'22.085"N Jhiriya
MOA&FW Kundam Har Khet Ko Pani Tube well 3 3 5 6.00 80°18'33.431"E 23°15'22.085"N Jhiriya
MOA&FW Kundam Per Drop More Crop Sprinkler 4 4 5 0.80 80°17'59.705"E 23°15'27.706"N Jhirmila
MOA&FW Kundam Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°18'33.431"E 23°15'22.085"N Jhirmila
MOA&FW Kundam Har Khet Ko Pani Diesel / Electric /
SolarPump 5 5 5 1.25 80°18'33.431"E 23°15'22.085"N Jhirmila
MOA&FW Kundam Har Khet Ko Pani Tube well 5 5 5 10.00 80°18'33.431"E 23°15'22.085"N Jhirmila
MOA&FW Kundam Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°34'3.942"E 23°17'50.839"N Jhirna
MOA&FW Kundam Har Khet Ko Pani Diesel / Electric /
SolarPump 2 2 5 0.50 80°34'3.942"E 23°17'50.839"N Jhirna
MOA&FW Kundam Har Khet Ko Pani Tube well 2 2 5 4.00 80°34'3.942"E 23°17'50.839"N Jhirna
MOA&FW Kundam Per Drop More Crop Sprinkler 2 2 5 0.40 80°34'3.942"E 23°17'50.839"N Jhirna
MOA&FW Kundam Per Drop More Crop Sprinkler 2 2 5 0.40 80°17'59.705"E 23°15'27.706"N Jhirni
MOA&FW Kundam Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°18'33.431"E 23°15'22.085"N Jhirni
MOA&FW Kundam Har Khet Ko Pani Diesel / Electric /
SolarPump 1 1 5 0.25 80°18'33.431"E 23°15'22.085"N Jhirni
MOA&FW Kundam Har Khet Ko Pani Tube well 1 1 5 2.00 80°18'33.431"E 23°15'22.085"N Jhirni
MOA&FW Kundam Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°29'7.517"E 23°21'16.845"N Jhonjh
MOA&FW Kundam Har Khet Ko Pani Diesel / Electric /
SolarPump 6 6 5 1.50 80°29'7.517"E 23°21'16.845"N Jhonjh
141
Concerned
Ministry/
Department
Name of
the
Districts
/ Blocks
Component Activity Total
Number
Command
Area/Irrig
ation
Potential
(Ha)
Period of
Implement
ation 5/ 7
Estimated
cost
(in Lakhs
Rs.)
Longitude Lattitude Remark / Village Name
MOA&FW Kundam Har Khet Ko Pani Tube well 8 8 5 16.00 80°29'7.517"E 23°21'16.845"N Jhonjh
MOA&FW Kundam Per Drop More Crop Sprinkler 8 8 5 1.60 80°29'7.517"E 23°21'16.845"N Jhonjh
MOA&FW Kundam Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°29'7.517"E 23°21'16.845"N Jhunjh
MOA&FW Kundam Har Khet Ko Pani Diesel / Electric /
SolarPump 1 1 5 0.25 80°29'7.517"E 23°21'16.845"N Jhunjh
MOA&FW Kundam Har Khet Ko Pani Tube well 1 1 5 2.00 80°29'7.517"E 23°21'16.845"N Jhunjh
MOA&FW Kundam Per Drop More Crop Sprinkler 2 2 5 0.40 80°29'7.517"E 23°21'16.845"N Jhunjh
MOA&FW Kundam Per Drop More Crop Sprinkler 3 3 5 0.60 80°17'59.705"E 23°15'27.706"N Jujhari
MOA&FW Kundam Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°18'33.431"E 23°15'22.085"N Jujhari
MOA&FW Kundam Har Khet Ko Pani Diesel / Electric /
SolarPump 4 4 5 1.00 80°18'33.431"E 23°15'22.085"N Jujhari
MOA&FW Kundam Har Khet Ko Pani Tube well 5 5 5 10.00 80°18'33.431"E 23°15'22.085"N Jujhari
MOA&FW Kundam Per Drop More Crop Sprinkler 3 3 5 0.60 80°17'59.705"E 23°15'27.706"N Kalyanpur
MOA&FW Kundam Per Drop More Crop Sprinkler 2 2 5 0.40 80°17'59.705"E 23°15'27.706"N Kalyanpur
MOA&FW Kundam Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°18'33.431"E 23°15'22.085"N Kalyanpur
MOA&FW Kundam Har Khet Ko Pani Diesel / Electric /
SolarPump 2 2 5 0.50 80°18'33.431"E 23°15'22.085"N Kalyanpur
MOA&FW Kundam Har Khet Ko Pani Tube well 2 2 5 4.00 80°18'33.431"E 23°15'22.085"N Kalyanpur
MOA&FW Kundam Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°18'33.431"E 23°15'22.085"N Kalyanpur
MOA&FW Kundam Har Khet Ko Pani Diesel / Electric /
SolarPump 2 2 5 0.50 80°18'33.431"E 23°15'22.085"N Kalyanpur
MOA&FW Kundam Har Khet Ko Pani Tube well 2 2 5 4.00 80°18'33.431"E 23°15'22.085"N Kalyanpur
MOA&FW Kundam Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°32'57.759"E 23°19'52.951"N Kanhari
MOA&FW Kundam Har Khet Ko Pani Diesel / Electric /
SolarPump 2 2 5 0.50 80°32'57.759"E 23°19'52.951"N Kanhari
MOA&FW Kundam Har Khet Ko Pani Tube well 1 1 5 2.00 80°32'57.759"E 23°19'52.951"N Kanhari
MOA&FW Kundam Per Drop More Crop Sprinkler 1 1 5 0.20 80°32'57.759"E 23°19'52.951"N Kanhari
MOA&FW Kundam Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°30'30.543"E 23°20'45.086"N Kanharpura
MOA&FW Kundam Har Khet Ko Pani Diesel / Electric /
SolarPump 2 2 5 0.50 80°30'30.543"E 23°20'45.086"N Kanharpura
MOA&FW Kundam Har Khet Ko Pani Tube well 1 1 5 2.00 80°30'30.543"E 23°20'45.086"N Kanharpura
MOA&FW Kundam Per Drop More Crop Sprinkler 2 2 5 0.40 80°30'30.543"E 23°20'45.086"N Kanharpura
142
Concerned
Ministry/
Department
Name of
the
Districts
/ Blocks
Component Activity Total
Number
Command
Area/Irrig
ation
Potential
(Ha)
Period of
Implement
ation 5/ 7
Estimated
cost
(in Lakhs
Rs.)
Longitude Lattitude Remark / Village Name
MOA&FW Kundam Per Drop More Crop Sprinkler 3 3 5 0.60 80°17'59.705"E 23°15'27.706"N Kanhwara
MOA&FW Kundam Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°18'33.431"E 23°15'22.085"N Kanhwara
MOA&FW Kundam Har Khet Ko Pani Diesel / Electric /
SolarPump 2 2 5 0.50 80°18'33.431"E 23°15'22.085"N Kanhwara
MOA&FW Kundam Har Khet Ko Pani Tube well 3 3 5 6.00 80°18'33.431"E 23°15'22.085"N Kanhwara
MOA&FW Kundam Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°30'46.325"E 23°17'27.535"N Karaghat
MOA&FW Kundam Har Khet Ko Pani Diesel / Electric /
SolarPump 2 2 5 0.50 80°30'46.325"E 23°17'27.535"N Karaghat
MOA&FW Kundam Har Khet Ko Pani Tube well 1 1 5 2.00 80°30'46.325"E 23°17'27.535"N Karaghat
MOA&FW Kundam Per Drop More Crop Sprinkler 1 1 5 0.20 80°30'46.325"E 23°17'27.535"N Karaghat
MOA&FW Kundam Per Drop More Crop Sprinkler 1 1 5 0.20 80°17'59.705"E 23°15'27.706"N Karanpura
MOA&FW Kundam Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°21'27.682"E 23°10'35.414"N Karanpura
MOA&FW Kundam Har Khet Ko Pani Diesel / Electric /
SolarPump 1 1 5 0.25 80°21'27.682"E 23°10'35.414"N Karanpura
MOA&FW Kundam Har Khet Ko Pani Tube well 2 2 5 4.00 80°21'27.682"E 23°10'35.414"N Karanpura
MOA&FW Kundam Per Drop More Crop Sprinkler 3 3 5 0.60 80°17'59.705"E 23°15'27.706"N Kardara
MOA&FW Kundam Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°21'27.682"E 23°10'35.414"N Kardara
MOA&FW Kundam Har Khet Ko Pani Diesel / Electric /
SolarPump 2 2 5 0.50 80°21'27.682"E 23°10'35.414"N Kardara
MOA&FW Kundam Har Khet Ko Pani Tube well 2 2 5 4.00 80°21'27.682"E 23°10'35.414"N Kardara
MOA&FW Kundam Per Drop More Crop Sprinkler 3 3 5 0.60 80°17'59.705"E 23°15'27.706"N Karondi
MOA&FW Kundam Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°21'27.682"E 23°10'35.414"N Karondi
MOA&FW Kundam Har Khet Ko Pani Diesel / Electric /
SolarPump 2 2 5 0.50 80°21'27.682"E 23°10'35.414"N Karondi
MOA&FW Kundam Har Khet Ko Pani Tube well 1 1 5 2.00 80°21'27.682"E 23°10'35.414"N Karondi
MOA&FW Kundam Har Khet Ko Pani Farm Pond 2 4 5 4.00 80°18'22.467"E 23°7'18.84"N Kastara
MOA&FW Kundam Har Khet Ko Pani Diesel / Electric /
SolarPump 2 2 5 0.50 80°18'22.467"E 23°7'18.84"N Kastara
MOA&FW Kundam Har Khet Ko Pani Tube well 5 5 5 10.00 80°18'22.467"E 23°7'18.84"N Kastara
MOA&FW Kundam Per Drop More Crop Sprinkler 4 4 5 0.80 80°18'22.467"E 23°7'18.84"N Kastara
MOA&FW Kundam Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°32'51.234"E 23°18'15.075"N Khairi
143
Concerned
Ministry/
Department
Name of
the
Districts
/ Blocks
Component Activity Total
Number
Command
Area/Irrig
ation
Potential
(Ha)
Period of
Implement
ation 5/ 7
Estimated
cost
(in Lakhs
Rs.)
Longitude Lattitude Remark / Village Name
MOA&FW Kundam Har Khet Ko Pani Diesel / Electric /
SolarPump 2 2 5 0.50 80°32'51.234"E 23°18'15.075"N Khairi
MOA&FW Kundam Har Khet Ko Pani Tube well 1 1 5 2.00 80°32'51.234"E 23°18'15.075"N Khairi
MOA&FW Kundam Per Drop More Crop Sprinkler 1 1 5 0.20 80°32'51.234"E 23°18'15.075"N Khairi
MOA&FW Kundam Per Drop More Crop Sprinkler 2 2 5 0.40 80°17'59.705"E 23°15'27.706"N Khamha
MOA&FW Kundam Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°21'27.682"E 23°10'35.414"N Khamha
MOA&FW Kundam Har Khet Ko Pani Diesel / Electric /
SolarPump 2 2 5 0.50 80°21'27.682"E 23°10'35.414"N Khamha
MOA&FW Kundam Har Khet Ko Pani Tube well 2 2 5 4.00 80°21'27.682"E 23°10'35.414"N Khamha
MOA&FW Kundam Per Drop More Crop Sprinkler 5 5 5 1.00 80°17'59.705"E 23°15'27.706"N Khamhariya
MOA&FW Kundam Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°21'27.682"E 23°10'35.414"N Khamhariya
MOA&FW Kundam Har Khet Ko Pani Diesel / Electric /
SolarPump 4 4 5 1.00 80°21'27.682"E 23°10'35.414"N Khamhariya
MOA&FW Kundam Har Khet Ko Pani Tube well 2 2 5 4.00 80°21'27.682"E 23°10'35.414"N Khamhariya
MOA&FW Kundam Per Drop More Crop Sprinkler 2 2 5 0.40 80°17'59.705"E 23°15'27.706"N Khamharwani
MOA&FW Kundam Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°21'27.682"E 23°10'35.414"N Khamharwani
MOA&FW Kundam Har Khet Ko Pani Diesel / Electric /
SolarPump 1 1 5 0.25 80°21'27.682"E 23°10'35.414"N Khamharwani
MOA&FW Kundam Har Khet Ko Pani Tube well 1 1 5 2.00 80°21'27.682"E 23°10'35.414"N Khamharwani
MOA&FW Kundam Per Drop More Crop Sprinkler 2 2 5 0.40 80°17'59.705"E 23°15'27.706"N Khinha
MOA&FW Kundam Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°21'27.682"E 23°10'35.414"N Khinha
MOA&FW Kundam Har Khet Ko Pani Diesel / Electric /
SolarPump 1 1 5 0.25 80°21'27.682"E 23°10'35.414"N Khinha
MOA&FW Kundam Har Khet Ko Pani Tube well 1 1 5 2.00 80°21'27.682"E 23°10'35.414"N Khinha
MOA&FW Kundam Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°31'53.44"E 23°22'23.96"N Khirwa
MOA&FW Kundam Har Khet Ko Pani Diesel / Electric /
SolarPump 1 1 5 0.25 80°31'53.44"E 23°22'23.96"N Khirwa
MOA&FW Kundam Har Khet Ko Pani Tube well 1 1 5 2.00 80°31'53.44"E 23°22'23.96"N Khirwa
MOA&FW Kundam Per Drop More Crop Sprinkler 2 2 5 0.40 80°31'53.44"E 23°22'23.96"N Khirwa
MOA&FW Kundam Per Drop More Crop Sprinkler 1 1 5 0.20 80°17'59.705"E 23°15'27.706"N Khitola
MOA&FW Kundam Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°21'27.682"E 23°10'35.414"N Khitola
144
Concerned
Ministry/
Department
Name of
the
Districts
/ Blocks
Component Activity Total
Number
Command
Area/Irrig
ation
Potential
(Ha)
Period of
Implement
ation 5/ 7
Estimated
cost
(in Lakhs
Rs.)
Longitude Lattitude Remark / Village Name
MOA&FW Kundam Har Khet Ko Pani Diesel / Electric /
SolarPump 2 2 5 0.50 80°21'27.682"E 23°10'35.414"N Khitola
MOA&FW Kundam Har Khet Ko Pani Tube well 1 1 5 2.00 80°21'27.682"E 23°10'35.414"N Khitola
MOA&FW Kundam Per Drop More Crop Sprinkler 3 3 5 0.60 80°17'59.705"E 23°15'27.706"N Khudargawan
MOA&FW Kundam Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°21'27.682"E 23°10'35.414"N Khudargawan
MOA&FW Kundam Har Khet Ko Pani Diesel / Electric /
SolarPump 2 2 5 0.50 80°21'27.682"E 23°10'35.414"N Khudargawan
MOA&FW Kundam Har Khet Ko Pani Tube well 2 2 5 4.00 80°21'27.682"E 23°10'35.414"N Khudargawan
MOA&FW Kundam Per Drop More Crop Sprinkler 3 3 5 0.60 80°17'59.705"E 23°15'27.706"N Khukkham (Khukhan)
MOA&FW Kundam Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°21'27.682"E 23°10'35.414"N Khukkham (Khukhan)
MOA&FW Kundam Har Khet Ko Pani Diesel / Electric /
SolarPump 2 2 5 0.50 80°21'27.682"E 23°10'35.414"N Khukkham (Khukhan)
MOA&FW Kundam Har Khet Ko Pani Tube well 4 4 5 8.00 80°21'27.682"E 23°10'35.414"N Khukkham (Khukhan)
MOA&FW Kundam Per Drop More Crop Sprinkler 2 2 5 0.40 80°17'59.705"E 23°15'27.706"N Kiwlari
MOA&FW Kundam Per Drop More Crop Sprinkler 2 2 5 0.40 80°17'59.705"E 23°15'27.706"N Kiwlari
MOA&FW Kundam Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°21'27.682"E 23°10'35.414"N Kiwlari
MOA&FW Kundam Har Khet Ko Pani Diesel / Electric /
SolarPump 2 2 5 0.50 80°21'27.682"E 23°10'35.414"N Kiwlari
MOA&FW Kundam Har Khet Ko Pani Tube well 1 1 5 2.00 80°21'27.682"E 23°10'35.414"N Kiwlari
MOA&FW Kundam Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°21'27.682"E 23°10'35.414"N Kiwlari
MOA&FW Kundam Har Khet Ko Pani Diesel / Electric /
SolarPump 2 2 5 0.50 80°21'27.682"E 23°10'35.414"N Kiwlari
MOA&FW Kundam Har Khet Ko Pani Tube well 2 2 5 4.00 80°21'27.682"E 23°10'35.414"N Kiwlari
MOA&FW Kundam Per Drop More Crop Sprinkler 2 2 5 0.40 80°17'59.705"E 23°15'27.706"N Kolmuhi
MOA&FW Kundam Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°21'27.682"E 23°10'35.414"N Kolmuhi
MOA&FW Kundam Har Khet Ko Pani Diesel / Electric /
SolarPump 2 2 5 0.50 80°21'27.682"E 23°10'35.414"N Kolmuhi
MOA&FW Kundam Har Khet Ko Pani Tube well 3 3 5 6.00 80°21'27.682"E 23°10'35.414"N Kolmuhi
MOA&FW Kundam Per Drop More Crop Sprinkler 3 3 5 0.60 80°17'59.705"E 23°15'27.706"N Kosam Dongri
MOA&FW Kundam Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°21'27.682"E 23°10'35.414"N Kosam Dongri
MOA&FW Kundam Har Khet Ko Pani Diesel / Electric /
SolarPump 2 2 5 0.50 80°21'27.682"E 23°10'35.414"N Kosam Dongri
145
Concerned
Ministry/
Department
Name of
the
Districts
/ Blocks
Component Activity Total
Number
Command
Area/Irrig
ation
Potential
(Ha)
Period of
Implement
ation 5/ 7
Estimated
cost
(in Lakhs
Rs.)
Longitude Lattitude Remark / Village Name
MOA&FW Kundam Har Khet Ko Pani Tube well 2 2 5 4.00 80°21'27.682"E 23°10'35.414"N Kosam Dongri
MOA&FW Kundam Per Drop More Crop Sprinkler 3 3 5 0.60 80°17'59.705"E 23°15'27.706"N Kude Harduli (Kudo)
MOA&FW Kundam Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°21'27.682"E 23°10'35.414"N Kude Harduli (Kudo)
MOA&FW Kundam Har Khet Ko Pani Diesel / Electric /
SolarPump 2 2 5 0.50 80°21'27.682"E 23°10'35.414"N Kude Harduli (Kudo)
MOA&FW Kundam Har Khet Ko Pani Tube well 2 2 5 4.00 80°21'27.682"E 23°10'35.414"N Kude Harduli (Kudo)
MOA&FW Kundam Per Drop More Crop Sprinkler 2 2 5 0.40 80°17'59.705"E 23°15'27.706"N Kuhka
MOA&FW Kundam Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°21'27.682"E 23°10'35.414"N Kuhka
MOA&FW Kundam Har Khet Ko Pani Diesel / Electric /
SolarPump 2 2 5 0.50 80°21'27.682"E 23°10'35.414"N Kuhka
MOA&FW Kundam Har Khet Ko Pani Tube well 2 2 5 4.00 80°21'27.682"E 23°10'35.414"N Kuhka
MOA&FW Kundam Per Drop More Crop Sprinkler 2 2 5 0.40 80°17'59.705"E 23°15'27.706"N Kundwara
MOA&FW Kundam Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°21'27.682"E 23°10'35.414"N Kundwara
MOA&FW Kundam Har Khet Ko Pani Diesel / Electric /
SolarPump 2 2 5 0.50 80°21'27.682"E 23°10'35.414"N Kundwara
MOA&FW Kundam Har Khet Ko Pani Tube well 4 4 5 8.00 80°21'27.682"E 23°10'35.414"N Kundwara
MOA&FW Kundam Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°27'38.031"E 23°13'34.497"N Kuppi
MOA&FW Kundam Har Khet Ko Pani Diesel / Electric /
SolarPump 1 1 5 0.25 80°27'38.031"E 23°13'34.497"N Kuppi
MOA&FW Kundam Har Khet Ko Pani Tube well 1 1 5 2.00 80°27'38.031"E 23°13'34.497"N Kuppi
MOA&FW Kundam Per Drop More Crop Sprinkler 2 2 5 0.40 80°27'38.031"E 23°13'34.497"N Kuppi
MOA&FW Kundam Per Drop More Crop Sprinkler 5 5 5 1.00 80°17'59.705"E 23°15'27.706"N Kurgawan
MOA&FW Kundam Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°21'27.682"E 23°10'35.414"N Kurgawan
MOA&FW Kundam Har Khet Ko Pani Diesel / Electric /
SolarPump 2 2 5 0.50 80°21'27.682"E 23°10'35.414"N Kurgawan
MOA&FW Kundam Har Khet Ko Pani Tube well 6 6 5 12.00 80°21'27.682"E 23°10'35.414"N Kurgawan
MOA&FW Kundam Per Drop More Crop Sprinkler 2 2 5 0.40 80°17'59.705"E 23°15'27.706"N Kusuwa Dabra
MOA&FW Kundam Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°21'27.682"E 23°10'35.414"N Kusuwa Dabra
MOA&FW Kundam Har Khet Ko Pani Diesel / Electric /
SolarPump 1 1 5 0.25 80°21'27.682"E 23°10'35.414"N Kusuwa Dabra
MOA&FW Kundam Har Khet Ko Pani Tube well 1 1 5 2.00 80°21'27.682"E 23°10'35.414"N Kusuwa Dabra
MOA&FW Kundam Per Drop More Crop Sprinkler 2 2 5 0.40 80°17'59.705"E 23°15'27.706"N Kutra Ghondi
146
Concerned
Ministry/
Department
Name of
the
Districts
/ Blocks
Component Activity Total
Number
Command
Area/Irrig
ation
Potential
(Ha)
Period of
Implement
ation 5/ 7
Estimated
cost
(in Lakhs
Rs.)
Longitude Lattitude Remark / Village Name
MOA&FW Kundam Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°21'27.682"E 23°10'35.414"N Kutra Ghondi
MOA&FW Kundam Har Khet Ko Pani Diesel / Electric /
SolarPump 1 1 5 0.25 80°21'27.682"E 23°10'35.414"N Kutra Ghondi
MOA&FW Kundam Har Khet Ko Pani Tube well 1 1 5 2.00 80°21'27.682"E 23°10'35.414"N Kutra Ghondi
MOA&FW Kundam Per Drop More Crop Sprinkler 2 2 5 0.40 80°17'59.705"E 23°15'27.706"N Kuwarhat
MOA&FW Kundam Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°21'27.682"E 23°10'35.414"N Kuwarhat
MOA&FW Kundam Har Khet Ko Pani Diesel / Electric /
SolarPump 1 1 5 0.25 80°21'27.682"E 23°10'35.414"N Kuwarhat
MOA&FW Kundam Har Khet Ko Pani Tube well 2 2 5 4.00 80°21'27.682"E 23°10'35.414"N Kuwarhat
MOA&FW Kundam Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°25'14.479"E 23°20'3.205"N Ladwar
MOA&FW Kundam Har Khet Ko Pani Diesel / Electric /
SolarPump 1 1 5 0.25 80°25'14.479"E 23°20'3.205"N Ladwar
MOA&FW Kundam Har Khet Ko Pani Tube well 1 1 5 2.00 80°25'14.479"E 23°20'3.205"N Ladwar
MOA&FW Kundam Per Drop More Crop Sprinkler 2 2 5 0.40 80°25'14.479"E 23°20'3.205"N Ladwar
MOA&FW Kundam Per Drop More Crop Sprinkler 3 3 5 0.60 80°17'59.705"E 23°15'27.706"N Lahsar
MOA&FW Kundam Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°21'27.682"E 23°10'35.414"N Lahsar
MOA&FW Kundam Har Khet Ko Pani Diesel / Electric /
SolarPump 2 2 5 0.50 80°21'27.682"E 23°10'35.414"N Lahsar
MOA&FW Kundam Har Khet Ko Pani Tube well 4 4 5 8.00 80°21'27.682"E 23°10'35.414"N Lahsar
MOA&FW Kundam Per Drop More Crop Sprinkler 3 3 5 0.60 80°17'59.705"E 23°15'27.706"N Lakhanwara
MOA&FW Kundam Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°21'27.682"E 23°10'35.414"N Lakhanwara
MOA&FW Kundam Har Khet Ko Pani Diesel / Electric /
SolarPump 2 2 5 0.50 80°21'27.682"E 23°10'35.414"N Lakhanwara
MOA&FW Kundam Har Khet Ko Pani Tube well 2 2 5 4.00 80°21'27.682"E 23°10'35.414"N Lakhanwara
MOA&FW Kundam Per Drop More Crop Sprinkler 5 5 5 1.00 80°17'59.705"E 23°15'27.706"N Luhkari
MOA&FW Kundam Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°21'27.682"E 23°10'35.414"N Luhkari
MOA&FW Kundam Har Khet Ko Pani Diesel / Electric /
SolarPump 2 2 5 0.50 80°21'27.682"E 23°10'35.414"N Luhkari
MOA&FW Kundam Har Khet Ko Pani Tube well 1 1 5 2.00 80°21'27.682"E 23°10'35.414"N Luhkari
MOA&FW Kundam Per Drop More Crop Sprinkler 2 2 5 0.40 80°17'59.705"E 23°15'27.706"N Madai
MOA&FW Kundam Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°21'27.682"E 23°10'35.414"N Madai
147
Concerned
Ministry/
Department
Name of
the
Districts
/ Blocks
Component Activity Total
Number
Command
Area/Irrig
ation
Potential
(Ha)
Period of
Implement
ation 5/ 7
Estimated
cost
(in Lakhs
Rs.)
Longitude Lattitude Remark / Village Name
MOA&FW Kundam Har Khet Ko Pani Diesel / Electric /
SolarPump 2 2 5 0.50 80°21'27.682"E 23°10'35.414"N Madai
MOA&FW Kundam Har Khet Ko Pani Tube well 1 1 5 2.00 80°21'27.682"E 23°10'35.414"N Madai
MOA&FW Kundam Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°31'10.561"E 23°19'25.919"N Madai Kalan
MOA&FW Kundam Har Khet Ko Pani Diesel / Electric /
SolarPump 2 2 5 0.50 80°31'10.561"E 23°19'25.919"N Madai Kalan
MOA&FW Kundam Har Khet Ko Pani Tube well 2 2 5 4.00 80°31'10.561"E 23°19'25.919"N Madai Kalan
MOA&FW Kundam Per Drop More Crop Sprinkler 2 2 5 0.40 80°31'10.561"E 23°19'25.919"N Madai Kalan
MOA&FW Kundam Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°31'18.951"E 23°18'24.397"N Madai Khurd
MOA&FW Kundam Har Khet Ko Pani Diesel / Electric /
SolarPump 2 2 5 0.50 80°31'18.951"E 23°18'24.397"N Madai Khurd
MOA&FW Kundam Har Khet Ko Pani Tube well 2 2 5 4.00 80°31'18.951"E 23°18'24.397"N Madai Khurd
MOA&FW Kundam Per Drop More Crop Sprinkler 1 1 5 0.20 80°31'18.951"E 23°18'24.397"N Madai Khurd
MOA&FW Kundam Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°31'49.712"E 23°9'5.105"N Mahgawan
MOA&FW Kundam Har Khet Ko Pani Diesel / Electric /
SolarPump 8 8 5 2.00 80°31'49.712"E 23°9'5.105"N Mahgawan
MOA&FW Kundam Har Khet Ko Pani Tube well 10 10 5 20.00 80°31'49.712"E 23°9'5.105"N Mahgawan
MOA&FW Kundam Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°31'49.712"E 23°9'5.105"N Mahgawan
MOA&FW Kundam Har Khet Ko Pani Diesel / Electric /
SolarPump 2 2 5 0.50 80°31'49.712"E 23°9'5.105"N Mahgawan
MOA&FW Kundam Har Khet Ko Pani Tube well 1 1 5 2.00 80°31'49.712"E 23°9'5.105"N Mahgawan
MOA&FW Kundam Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°31'49.712"E 23°9'5.105"N Mahgawan
MOA&FW Kundam Har Khet Ko Pani Diesel / Electric /
SolarPump 2 2 5 0.50 80°31'49.712"E 23°9'5.105"N Mahgawan
MOA&FW Kundam Har Khet Ko Pani Tube well 2 2 5 4.00 80°31'49.712"E 23°9'5.105"N Mahgawan
MOA&FW Kundam Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°31'49.712"E 23°9'5.105"N Mahgawan
MOA&FW Kundam Har Khet Ko Pani Diesel / Electric /
SolarPump 1 1 5 0.25 80°31'49.712"E 23°9'5.105"N Mahgawan
MOA&FW Kundam Har Khet Ko Pani Tube well 1 1 5 2.00 80°31'49.712"E 23°9'5.105"N Mahgawan
MOA&FW Kundam Per Drop More Crop Sprinkler 10 10 5 2.00 80°31'49.712"E 23°9'5.105"N Mahgawan
MOA&FW Kundam Per Drop More Crop Sprinkler 2 2 5 0.40 80°31'49.712"E 23°9'5.105"N Mahgawan
MOA&FW Kundam Per Drop More Crop Sprinkler 4 4 5 0.80 80°31'49.712"E 23°9'5.105"N Mahgawan
148
Concerned
Ministry/
Department
Name of
the
Districts
/ Blocks
Component Activity Total
Number
Command
Area/Irrig
ation
Potential
(Ha)
Period of
Implement
ation 5/ 7
Estimated
cost
(in Lakhs
Rs.)
Longitude Lattitude Remark / Village Name
MOA&FW Kundam Per Drop More Crop Sprinkler 2 2 5 0.40 80°31'49.712"E 23°9'5.105"N Mahgawan
MOA&FW Kundam Per Drop More Crop Sprinkler 2 2 5 0.40 80°17'59.705"E 23°15'27.706"N Majhgawan
MOA&FW Kundam Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°21'27.682"E 23°10'35.414"N Majhgawan
MOA&FW Kundam Har Khet Ko Pani Diesel / Electric /
SolarPump 1 1 5 0.25 80°21'27.682"E 23°10'35.414"N Majhgawan
MOA&FW Kundam Har Khet Ko Pani Tube well 1 1 5 2.00 80°21'27.682"E 23°10'35.414"N Majhgawan
MOA&FW Kundam Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°32'13.948"E 23°20'58.202"N Makhrar
MOA&FW Kundam Har Khet Ko Pani Diesel / Electric /
SolarPump 5 5 5 1.25 80°32'13.948"E 23°20'58.202"N Makhrar
MOA&FW Kundam Har Khet Ko Pani Tube well 5 5 5 10.00 80°32'13.948"E 23°20'58.202"N Makhrar
MOA&FW Kundam Per Drop More Crop Sprinkler 3 3 5 0.60 80°32'13.948"E 23°20'58.202"N Makhrar
MOA&FW Kundam Per Drop More Crop Sprinkler 14 14 5 2.80 80°17'59.705"E 23°15'27.706"N Manera
MOA&FW Kundam Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°21'27.682"E 23°10'35.414"N Manera
MOA&FW Kundam Har Khet Ko Pani Diesel / Electric /
SolarPump 7 7 5 1.75 80°21'27.682"E 23°10'35.414"N Manera
MOA&FW Kundam Har Khet Ko Pani Tube well 11 11 5 22.00 80°21'27.682"E 23°10'35.414"N Manera
MOA&FW Kundam Per Drop More Crop Sprinkler 2 2 5 0.40 80°17'59.705"E 23°15'27.706"N Masuri(Masri)Kachhar
MOA&FW Kundam Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°21'27.682"E 23°10'35.414"N Masuri(Masri)Kachhar
MOA&FW Kundam Har Khet Ko Pani Diesel / Electric /
SolarPump 2 2 5 0.50 80°21'27.682"E 23°10'35.414"N Masuri(Masri)Kachhar
MOA&FW Kundam Har Khet Ko Pani Tube well 3 3 5 6.00 80°21'27.682"E 23°10'35.414"N Masuri(Masri)Kachhar
MOA&FW Kundam Per Drop More Crop Sprinkler 2 2 5 0.40 80°17'59.705"E 23°15'27.706"N Mehdar (Mahdar)
MOA&FW Kundam Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°21'27.682"E 23°10'35.414"N Mehdar (Mahdar)
MOA&FW Kundam Har Khet Ko Pani Diesel / Electric /
SolarPump 2 2 5 0.50 80°21'27.682"E 23°10'35.414"N Mehdar (Mahdar)
MOA&FW Kundam Har Khet Ko Pani Tube well 3 3 5 6.00 80°21'27.682"E 23°10'35.414"N Mehdar (Mahdar)
MOA&FW Kundam Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°32'43.777"E 23°16'52.114"N Mohani
MOA&FW Kundam Har Khet Ko Pani Diesel / Electric /
SolarPump 2 2 5 0.50 80°32'43.777"E 23°16'52.114"N Mohani
MOA&FW Kundam Har Khet Ko Pani Tube well 2 2 5 4.00 80°32'43.777"E 23°16'52.114"N Mohani
MOA&FW Kundam Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°32'43.777"E 23°16'52.114"N Mohani
149
Concerned
Ministry/
Department
Name of
the
Districts
/ Blocks
Component Activity Total
Number
Command
Area/Irrig
ation
Potential
(Ha)
Period of
Implement
ation 5/ 7
Estimated
cost
(in Lakhs
Rs.)
Longitude Lattitude Remark / Village Name
MOA&FW Kundam Har Khet Ko Pani Diesel / Electric /
SolarPump 1 1 5 0.25 80°32'43.777"E 23°16'52.114"N Mohani
MOA&FW Kundam Har Khet Ko Pani Tube well 2 2 5 4.00 80°32'43.777"E 23°16'52.114"N Mohani
MOA&FW Kundam Per Drop More Crop Sprinkler 1 1 5 0.20 80°32'43.777"E 23°16'52.114"N Mohani
MOA&FW Kundam Per Drop More Crop Sprinkler 1 1 5 0.20 80°32'43.777"E 23°16'52.114"N Mohani
MOA&FW Kundam Per Drop More Crop Sprinkler 8 8 5 1.60 80°17'59.705"E 23°15'27.706"N Murjhaur
MOA&FW Kundam Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°21'27.682"E 23°10'35.414"N Murjhaur
MOA&FW Kundam Har Khet Ko Pani Diesel / Electric /
SolarPump 7 7 5 1.75 80°21'27.682"E 23°10'35.414"N Murjhaur
MOA&FW Kundam Har Khet Ko Pani Tube well 10 10 5 20.00 80°21'27.682"E 23°10'35.414"N Murjhaur
MOA&FW Kundam Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°16'12.898"E 23°17'40.585"N Narayanpur
MOA&FW Kundam Har Khet Ko Pani Diesel / Electric /
SolarPump 2 2 5 0.50 80°16'12.898"E 23°17'40.585"N Narayanpur
MOA&FW Kundam Har Khet Ko Pani Tube well 4 4 5 8.00 80°16'12.898"E 23°17'40.585"N Narayanpur
MOA&FW Kundam Per Drop More Crop Sprinkler 3 3 5 0.60 80°16'12.898"E 23°17'40.585"N Narayanpur
MOA&FW Kundam Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°12'11.471"E 23°11'4.421"N Nawargawan
MOA&FW Kundam Har Khet Ko Pani Diesel / Electric /
SolarPump 2 2 5 0.50 80°12'11.471"E 23°11'4.421"N Nawargawan
MOA&FW Kundam Har Khet Ko Pani Tube well 2 2 5 4.00 80°12'11.471"E 23°11'4.421"N Nawargawan
MOA&FW Kundam Per Drop More Crop Sprinkler 3 3 5 0.60 80°12'11.471"E 23°11'4.421"N Nawargawan
MOA&FW Kundam Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°20'39.246"E 23°13'11.47"N Negai
MOA&FW Kundam Har Khet Ko Pani Diesel / Electric /
SolarPump 2 2 5 0.50 80°20'39.246"E 23°13'11.47"N Negai
MOA&FW Kundam Har Khet Ko Pani Tube well 1 1 5 2.00 80°20'39.246"E 23°13'11.47"N Negai
MOA&FW Kundam Per Drop More Crop Sprinkler 7 7 5 1.40 80°20'39.246"E 23°13'11.47"N Negai
MOA&FW Kundam Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°31'44.119"E 23°16'27.878"N Padariya
MOA&FW Kundam Har Khet Ko Pani Diesel / Electric /
SolarPump 2 2 5 0.50 80°31'44.119"E 23°16'27.878"N Padariya
MOA&FW Kundam Har Khet Ko Pani Tube well 2 2 5 4.00 80°31'44.119"E 23°16'27.878"N Padariya
MOA&FW Kundam Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°31'44.119"E 23°16'27.878"N Padariya
MOA&FW Kundam Har Khet Ko Pani Diesel / Electric /
SolarPump 2 2 5 0.50 80°31'44.119"E 23°16'27.878"N Padariya
150
Concerned
Ministry/
Department
Name of
the
Districts
/ Blocks
Component Activity Total
Number
Command
Area/Irrig
ation
Potential
(Ha)
Period of
Implement
ation 5/ 7
Estimated
cost
(in Lakhs
Rs.)
Longitude Lattitude Remark / Village Name
MOA&FW Kundam Har Khet Ko Pani Tube well 1 1 5 2.00 80°31'44.119"E 23°16'27.878"N Padariya
MOA&FW Kundam Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°31'44.119"E 23°16'27.878"N Padariya
MOA&FW Kundam Har Khet Ko Pani Diesel / Electric /
SolarPump 1 1 5 0.25 80°31'44.119"E 23°16'27.878"N Padariya
MOA&FW Kundam Har Khet Ko Pani Tube well 1 1 5 2.00 80°31'44.119"E 23°16'27.878"N Padariya
MOA&FW Kundam Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°31'44.119"E 23°16'27.878"N Padariya
MOA&FW Kundam Har Khet Ko Pani Diesel / Electric /
SolarPump 1 1 5 0.25 80°31'44.119"E 23°16'27.878"N Padariya
MOA&FW Kundam Har Khet Ko Pani Tube well 1 1 5 2.00 80°31'44.119"E 23°16'27.878"N Padariya
MOA&FW Kundam Per Drop More Crop Sprinkler 3 3 5 0.60 80°31'44.119"E 23°16'27.878"N Padariya
MOA&FW Kundam Per Drop More Crop Sprinkler 6 6 5 1.20 80°31'44.119"E 23°16'27.878"N Padariya
MOA&FW Kundam Per Drop More Crop Sprinkler 1 1 5 0.20 80°31'44.119"E 23°16'27.878"N Padariya
MOA&FW Kundam Per Drop More Crop Sprinkler 2 2 5 0.40 80°31'44.119"E 23°16'27.878"N Padariya
MOA&FW Kundam Per Drop More Crop Sprinkler 1 1 5 0.20 80°17'59.705"E 23°15'27.706"N Padharpur
MOA&FW Kundam Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°21'27.682"E 23°10'35.414"N Padharpur
MOA&FW Kundam Har Khet Ko Pani Diesel / Electric /
SolarPump 2 2 5 0.50 80°21'27.682"E 23°10'35.414"N Padharpur
MOA&FW Kundam Har Khet Ko Pani Tube well 1 1 5 2.00 80°21'27.682"E 23°10'35.414"N Padharpur
MOA&FW Kundam Per Drop More Crop Sprinkler 4 4 5 0.80 80°17'59.705"E 23°15'27.706"N Pahpatpur
MOA&FW Kundam Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°21'27.682"E 23°10'35.414"N Pahpatpur
MOA&FW Kundam Har Khet Ko Pani Diesel / Electric /
SolarPump 6 6 5 1.50 80°21'27.682"E 23°10'35.414"N Pahpatpur
MOA&FW Kundam Har Khet Ko Pani Tube well 6 6 5 12.00 80°21'27.682"E 23°10'35.414"N Pahpatpur
MOA&FW Kundam Per Drop More Crop Sprinkler 2 2 5 0.40 80°17'59.705"E 23°15'27.706"N Parwa
MOA&FW Kundam Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°21'27.682"E 23°10'35.414"N Parwa
MOA&FW Kundam Har Khet Ko Pani Diesel / Electric /
SolarPump 2 2 5 0.50 80°21'27.682"E 23°10'35.414"N Parwa
MOA&FW Kundam Har Khet Ko Pani Tube well 1 1 5 2.00 80°21'27.682"E 23°10'35.414"N Parwa
MOA&FW Kundam Per Drop More Crop Sprinkler 2 2 5 0.40 80°17'59.705"E 23°15'27.706"N Patna Kalan
MOA&FW Kundam Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°21'27.682"E 23°10'35.414"N Patna Kalan
MOA&FW Kundam Har Khet Ko Pani Diesel / Electric /
SolarPump 2 2 5 0.50 80°21'27.682"E 23°10'35.414"N Patna Kalan
151
Concerned
Ministry/
Department
Name of
the
Districts
/ Blocks
Component Activity Total
Number
Command
Area/Irrig
ation
Potential
(Ha)
Period of
Implement
ation 5/ 7
Estimated
cost
(in Lakhs
Rs.)
Longitude Lattitude Remark / Village Name
MOA&FW Kundam Har Khet Ko Pani Tube well 4 4 5 8.00 80°21'27.682"E 23°10'35.414"N Patna Kalan
MOA&FW Kundam Per Drop More Crop Sprinkler 2 2 5 0.40 80°17'59.705"E 23°15'27.706"N Patna Khurd
MOA&FW Kundam Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°21'27.682"E 23°10'35.414"N Patna Khurd
MOA&FW Kundam Har Khet Ko Pani Diesel / Electric /
SolarPump 3 3 5 0.75 80°21'27.682"E 23°10'35.414"N Patna Khurd
MOA&FW Kundam Har Khet Ko Pani Tube well 4 4 5 8.00 80°21'27.682"E 23°10'35.414"N Patna Khurd
MOA&FW Kundam Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°13'25.635"E 23°13'43.702"N Phiphari
MOA&FW Kundam Har Khet Ko Pani Diesel / Electric /
SolarPump 5 5 5 1.25 80°13'25.635"E 23°13'43.702"N Phiphari
MOA&FW Kundam Har Khet Ko Pani Tube well 3 3 5 6.00 80°13'25.635"E 23°13'43.702"N Phiphari
MOA&FW Kundam Per Drop More Crop Sprinkler 5 5 5 1.00 80°13'25.635"E 23°13'43.702"N Phiphari
MOA&FW Kundam Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°12'31.046"E 23°14'42.544"N Pipariya
MOA&FW Kundam Har Khet Ko Pani Diesel / Electric /
SolarPump 9 9 5 2.25 80°12'31.046"E 23°14'42.544"N Pipariya
MOA&FW Kundam Har Khet Ko Pani Tube well 12 12 5 24.00 80°12'31.046"E 23°14'42.544"N Pipariya
MOA&FW Kundam Har Khet Ko Pani Farm Pond 2 4 5 4.00 80°12'31.046"E 23°14'42.544"N Pipariya
MOA&FW Kundam Har Khet Ko Pani Diesel / Electric /
SolarPump 7 7 5 1.75 80°12'31.046"E 23°14'42.544"N Pipariya
MOA&FW Kundam Har Khet Ko Pani Tube well 12 12 5 24.00 80°12'31.046"E 23°14'42.544"N Pipariya
MOA&FW Kundam Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°12'31.046"E 23°14'42.544"N Pipariya
MOA&FW Kundam Har Khet Ko Pani Diesel / Electric /
SolarPump 2 2 5 0.50 80°12'31.046"E 23°14'42.544"N Pipariya
MOA&FW Kundam Har Khet Ko Pani Tube well 2 2 5 4.00 80°12'31.046"E 23°14'42.544"N Pipariya
MOA&FW Kundam Per Drop More Crop Sprinkler 15 15 5 3.00 80°12'31.046"E 23°14'42.544"N Pipariya
MOA&FW Kundam Per Drop More Crop Sprinkler 12 12 5 2.40 80°12'31.046"E 23°14'42.544"N Pipariya
MOA&FW Kundam Per Drop More Crop Sprinkler 2 2 5 0.40 80°12'31.046"E 23°14'42.544"N Pipariya
MOA&FW Kundam Per Drop More Crop Sprinkler 8 8 5 1.60 80°17'59.705"E 23°15'27.706"N Pitkuhi Kalan
MOA&FW Kundam Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°23'31.345"E 23°14'42.738"N Pitkuhi Kalan
MOA&FW Kundam Har Khet Ko Pani Diesel / Electric /
SolarPump 7 7 5 1.75 80°23'31.345"E 23°14'42.738"N Pitkuhi Kalan
MOA&FW Kundam Har Khet Ko Pani Tube well 11 11 5 22.00 80°23'31.345"E 23°14'42.738"N Pitkuhi Kalan
MOA&FW Kundam Per Drop More Crop Sprinkler 8 8 5 1.60 80°17'59.705"E 23°15'27.706"N Pitkuhi Khurd
152
Concerned
Ministry/
Department
Name of
the
Districts
/ Blocks
Component Activity Total
Number
Command
Area/Irrig
ation
Potential
(Ha)
Period of
Implement
ation 5/ 7
Estimated
cost
(in Lakhs
Rs.)
Longitude Lattitude Remark / Village Name
MOA&FW Kundam Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°23'31.345"E 23°14'42.738"N Pitkuhi Khurd
MOA&FW Kundam Har Khet Ko Pani Diesel / Electric /
SolarPump 10 10 5 2.50 80°23'31.345"E 23°14'42.738"N Pitkuhi Khurd
MOA&FW Kundam Har Khet Ko Pani Tube well 12 12 5 24.00 80°23'31.345"E 23°14'42.738"N Pitkuhi Khurd
MOA&FW Kundam Per Drop More Crop Sprinkler 10 10 5 2.00 80°17'59.705"E 23°15'27.706"N Rahata
MOA&FW Kundam Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°23'31.345"E 23°14'42.738"N Rahata
MOA&FW Kundam Har Khet Ko Pani Diesel / Electric /
SolarPump 9 9 5 2.25 80°23'31.345"E 23°14'42.738"N Rahata
MOA&FW Kundam Har Khet Ko Pani Tube well 11 11 5 22.00 80°23'31.345"E 23°14'42.738"N Rahata
MOA&FW Kundam Per Drop More Crop Sprinkler 1 1 5 0.20 80°17'59.705"E 23°15'27.706"N Ramhepur
MOA&FW Kundam Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°23'31.345"E 23°14'42.738"N Ramhepur
MOA&FW Kundam Har Khet Ko Pani Diesel / Electric /
SolarPump 2 2 5 0.50 80°23'31.345"E 23°14'42.738"N Ramhepur
MOA&FW Kundam Har Khet Ko Pani Tube well 1 1 5 2.00 80°23'31.345"E 23°14'42.738"N Ramhepur
MOA&FW Kundam Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°19'24.922"E 23°8'15.701"N Rampuri Kalan
MOA&FW Kundam Har Khet Ko Pani Diesel / Electric /
SolarPump 2 2 5 0.50 80°19'24.922"E 23°8'15.701"N Rampuri Kalan
MOA&FW Kundam Har Khet Ko Pani Tube well 2 2 5 4.00 80°19'24.922"E 23°8'15.701"N Rampuri Kalan
MOA&FW Kundam Per Drop More Crop Sprinkler 2 2 5 0.40 80°19'24.922"E 23°8'15.701"N Rampuri Kalan
MOA&FW Kundam Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°18'5.689"E 23°11'7.217"N Rampuri Khurd
MOA&FW Kundam Har Khet Ko Pani Diesel / Electric /
SolarPump 2 2 5 0.50 80°18'5.689"E 23°11'7.217"N Rampuri Khurd
MOA&FW Kundam Har Khet Ko Pani Tube well 1 1 5 2.00 80°18'5.689"E 23°11'7.217"N Rampuri Khurd
MOA&FW Kundam Per Drop More Crop Sprinkler 2 2 5 0.40 80°18'5.689"E 23°11'7.217"N Rampuri Khurd
MOA&FW Kundam Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°29'14.042"E 23°14'19.24"N Rangiri
MOA&FW Kundam Har Khet Ko Pani Diesel / Electric /
SolarPump 1 1 5 0.25 80°29'14.042"E 23°14'19.24"N Rangiri
MOA&FW Kundam Har Khet Ko Pani Tube well 1 1 5 2.00 80°29'14.042"E 23°14'19.24"N Rangiri
MOA&FW Kundam Per Drop More Crop Sprinkler 2 2 5 0.40 80°29'14.042"E 23°14'19.24"N Rangiri
MOA&FW Kundam Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°12'31.046"E 23°8'18.497"N Ranipur
MOA&FW Kundam Har Khet Ko Pani Diesel / Electric /
SolarPump 2 2 5 0.50 80°12'31.046"E 23°8'18.497"N Ranipur
153
Concerned
Ministry/
Department
Name of
the
Districts
/ Blocks
Component Activity Total
Number
Command
Area/Irrig
ation
Potential
(Ha)
Period of
Implement
ation 5/ 7
Estimated
cost
(in Lakhs
Rs.)
Longitude Lattitude Remark / Village Name
MOA&FW Kundam Har Khet Ko Pani Tube well 1 1 5 2.00 80°12'31.046"E 23°8'18.497"N Ranipur
MOA&FW Kundam Per Drop More Crop Sprinkler 2 2 5 0.40 80°12'31.046"E 23°8'18.497"N Ranipur
MOA&FW Kundam Per Drop More Crop Sprinkler 2 2 5 0.40 80°17'59.705"E 23°15'27.706"N Roriya
MOA&FW Kundam Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°23'31.345"E 23°14'42.738"N Roriya
MOA&FW Kundam Har Khet Ko Pani Diesel / Electric /
SolarPump 2 2 5 0.50 80°23'31.345"E 23°14'42.738"N Roriya
MOA&FW Kundam Har Khet Ko Pani Tube well 2 2 5 4.00 80°23'31.345"E 23°14'42.738"N Roriya
MOA&FW Kundam Per Drop More Crop Sprinkler 2 2 5 0.40 80°17'59.705"E 23°15'27.706"N Sadafal
MOA&FW Kundam Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°23'31.345"E 23°14'42.738"N Sadafal
MOA&FW Kundam Har Khet Ko Pani Diesel / Electric /
SolarPump 1 1 5 0.25 80°23'31.345"E 23°14'42.738"N Sadafal
MOA&FW Kundam Har Khet Ko Pani Tube well 2 2 5 4.00 80°23'31.345"E 23°14'42.738"N Sadafal
MOA&FW Kundam Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°17'20.945"E 23°19'11.004"N Sahajpuri
MOA&FW Kundam Har Khet Ko Pani Diesel / Electric /
SolarPump 8 8 5 2.00 80°17'20.945"E 23°19'11.004"N Sahajpuri
MOA&FW Kundam Har Khet Ko Pani Tube well 10 10 5 20.00 80°17'20.945"E 23°19'11.004"N Sahajpuri
MOA&FW Kundam Per Drop More Crop Sprinkler 15 15 5 3.00 80°17'20.945"E 23°19'11.004"N Sahajpuri
MOA&FW Kundam Per Drop More Crop Sprinkler 2 2 5 0.40 80°17'59.705"E 23°15'27.706"N Sahdara
MOA&FW Kundam Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°23'31.345"E 23°14'42.738"N Sahdara
MOA&FW Kundam Har Khet Ko Pani Diesel / Electric /
SolarPump 1 1 5 0.25 80°23'31.345"E 23°14'42.738"N Sahdara
MOA&FW Kundam Har Khet Ko Pani Tube well 2 2 5 4.00 80°23'31.345"E 23°14'42.738"N Sahdara
MOA&FW Kundam Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°28'50.738"E 23°17'12.621"N Sakari
MOA&FW Kundam Har Khet Ko Pani Diesel / Electric /
SolarPump 2 2 5 0.50 80°28'50.738"E 23°17'12.621"N Sakari
MOA&FW Kundam Har Khet Ko Pani Tube well 3 3 5 6.00 80°28'50.738"E 23°17'12.621"N Sakari
MOA&FW Kundam Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°28'50.738"E 23°17'12.621"N Sakari
MOA&FW Kundam Har Khet Ko Pani Diesel / Electric /
SolarPump 1 1 5 0.25 80°28'50.738"E 23°17'12.621"N Sakari
MOA&FW Kundam Har Khet Ko Pani Tube well 2 2 5 4.00 80°28'50.738"E 23°17'12.621"N Sakari
MOA&FW Kundam Per Drop More Crop Sprinkler 2 2 5 0.40 80°28'50.738"E 23°17'12.621"N Sakari
MOA&FW Kundam Per Drop More Crop Sprinkler 2 2 5 0.40 80°28'50.738"E 23°17'12.621"N Sakari
154
Concerned
Ministry/
Department
Name of
the
Districts
/ Blocks
Component Activity Total
Number
Command
Area/Irrig
ation
Potential
(Ha)
Period of
Implement
ation 5/ 7
Estimated
cost
(in Lakhs
Rs.)
Longitude Lattitude Remark / Village Name
MOA&FW Kundam Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°8'18.432"E 23°10'31.795"N Salaiya
MOA&FW Kundam Har Khet Ko Pani Diesel / Electric /
SolarPump 1 1 5 0.25 80°8'18.432"E 23°10'31.795"N Salaiya
MOA&FW Kundam Har Khet Ko Pani Tube well 1 1 5 2.00 80°8'18.432"E 23°10'31.795"N Salaiya
MOA&FW Kundam Per Drop More Crop Sprinkler 2 2 5 0.40 80°8'18.432"E 23°10'31.795"N Salaiya
MOA&FW Kundam Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°30'9.971"E 23°16'14.827"N Salhepani
MOA&FW Kundam Har Khet Ko Pani Diesel / Electric /
SolarPump 1 1 5 0.25 80°30'9.971"E 23°16'14.827"N Salhepani
MOA&FW Kundam Har Khet Ko Pani Tube well 2 2 5 4.00 80°30'9.971"E 23°16'14.827"N Salhepani
MOA&FW Kundam Per Drop More Crop Sprinkler 2 2 5 0.40 80°30'9.971"E 23°16'14.827"N Salhepani
MOA&FW Kundam Per Drop More Crop Sprinkler 2 2 5 0.40 80°17'59.705"E 23°15'27.706"N Samnapur
MOA&FW Kundam Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°23'31.345"E 23°14'42.738"N Samnapur
MOA&FW Kundam Har Khet Ko Pani Diesel / Electric /
SolarPump 2 2 5 0.50 80°23'31.345"E 23°14'42.738"N Samnapur
MOA&FW Kundam Har Khet Ko Pani Tube well 2 2 5 4.00 80°23'31.345"E 23°14'42.738"N Samnapur
MOA&FW Kundam Per Drop More Crop Sprinkler 10 10 5 2.00 80°17'59.705"E 23°15'27.706"N Sandaweli
MOA&FW Kundam Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°23'31.345"E 23°14'42.738"N Sandaweli
MOA&FW Kundam Har Khet Ko Pani Diesel / Electric /
SolarPump 2 2 5 0.50 80°23'31.345"E 23°14'42.738"N Sandaweli
MOA&FW Kundam Har Khet Ko Pani Tube well 5 5 5 10.00 80°23'31.345"E 23°14'42.738"N Sandaweli
MOA&FW Kundam Per Drop More Crop Sprinkler 2 2 5 0.40 80°17'59.705"E 23°15'27.706"N Sandhi (Sadhi)
MOA&FW Kundam Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°23'31.345"E 23°14'42.738"N Sandhi (Sadhi)
MOA&FW Kundam Har Khet Ko Pani Diesel / Electric /
SolarPump 1 1 5 0.25 80°23'31.345"E 23°14'42.738"N Sandhi (Sadhi)
MOA&FW Kundam Har Khet Ko Pani Tube well 2 2 5 4.00 80°23'31.345"E 23°14'42.738"N Sandhi (Sadhi)
MOA&FW Kundam Per Drop More Crop Sprinkler 2 2 5 0.40 80°17'59.705"E 23°15'27.706"N Sangrampur
MOA&FW Kundam Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°23'31.345"E 23°14'42.738"N Sangrampur
MOA&FW Kundam Har Khet Ko Pani Diesel / Electric /
SolarPump 1 1 5 0.25 80°23'31.345"E 23°14'42.738"N Sangrampur
MOA&FW Kundam Har Khet Ko Pani Tube well 2 2 5 4.00 80°23'31.345"E 23°14'42.738"N Sangrampur
MOA&FW Kundam Per Drop More Crop Sprinkler 2 2 5 0.40 80°17'59.705"E 23°15'27.706"N Sanjari
MOA&FW Kundam Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°23'31.345"E 23°14'42.738"N Sanjari
155
Concerned
Ministry/
Department
Name of
the
Districts
/ Blocks
Component Activity Total
Number
Command
Area/Irrig
ation
Potential
(Ha)
Period of
Implement
ation 5/ 7
Estimated
cost
(in Lakhs
Rs.)
Longitude Lattitude Remark / Village Name
MOA&FW Kundam Har Khet Ko Pani Diesel / Electric /
SolarPump 2 2 5 0.50 80°23'31.345"E 23°14'42.738"N Sanjari
MOA&FW Kundam Har Khet Ko Pani Tube well 1 1 5 2.00 80°23'31.345"E 23°14'42.738"N Sanjari
MOA&FW Kundam Per Drop More Crop Sprinkler 2 2 5 0.40 80°17'59.705"E 23°15'27.706"N Sankuhi
MOA&FW Kundam Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°23'31.345"E 23°14'42.738"N Sankuhi
MOA&FW Kundam Har Khet Ko Pani Diesel / Electric /
SolarPump 2 2 5 0.50 80°23'31.345"E 23°14'42.738"N Sankuhi
MOA&FW Kundam Har Khet Ko Pani Tube well 1 1 5 2.00 80°23'31.345"E 23°14'42.738"N Sankuhi
MOA&FW Kundam Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°25'36.851"E 23°12'6.875"N Sarangpur
MOA&FW Kundam Har Khet Ko Pani Diesel / Electric /
SolarPump 2 2 5 0.50 80°25'36.851"E 23°12'6.875"N Sarangpur
MOA&FW Kundam Har Khet Ko Pani Tube well 2 2 5 4.00 80°25'36.851"E 23°12'6.875"N Sarangpur
MOA&FW Kundam Per Drop More Crop Sprinkler 2 2 5 0.40 80°25'36.851"E 23°12'6.875"N Sarangpur
MOA&FW Kundam Per Drop More Crop Sprinkler 2 2 5 0.40 80°17'59.705"E 23°15'27.706"N Sarauli
MOA&FW Kundam Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°23'31.345"E 23°14'42.738"N Sarauli
MOA&FW Kundam Har Khet Ko Pani Diesel / Electric /
SolarPump 1 1 5 0.25 80°23'31.345"E 23°14'42.738"N Sarauli
MOA&FW Kundam Har Khet Ko Pani Tube well 1 1 5 2.00 80°23'31.345"E 23°14'42.738"N Sarauli
MOA&FW Kundam Per Drop More Crop Sprinkler 2 2 5 0.40 80°17'59.705"E 23°15'27.706"N Sarsawan
MOA&FW Kundam Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°23'31.345"E 23°14'42.738"N Sarsawan
MOA&FW Kundam Har Khet Ko Pani Diesel / Electric /
SolarPump 3 3 5 0.75 80°23'31.345"E 23°14'42.738"N Sarsawan
MOA&FW Kundam Har Khet Ko Pani Tube well 2 2 5 4.00 80°23'31.345"E 23°14'42.738"N Sarsawan
MOA&FW Kundam Per Drop More Crop Sprinkler 2 2 5 0.40 80°17'59.705"E 23°15'27.706"N Satabeli
MOA&FW Kundam Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°23'31.345"E 23°14'42.738"N Satabeli
MOA&FW Kundam Har Khet Ko Pani Diesel / Electric /
SolarPump 2 2 5 0.50 80°23'31.345"E 23°14'42.738"N Satabeli
MOA&FW Kundam Har Khet Ko Pani Tube well 1 1 5 2.00 80°23'31.345"E 23°14'42.738"N Satabeli
MOA&FW Kundam Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°10'35.459"E 23°14'0.597"N Silpura
MOA&FW Kundam Har Khet Ko Pani Diesel / Electric /
SolarPump 2 2 5 0.50 80°10'35.459"E 23°14'0.597"N Silpura
MOA&FW Kundam Har Khet Ko Pani Tube well 3 3 5 6.00 80°10'35.459"E 23°14'0.597"N Silpura
156
Concerned
Ministry/
Department
Name of
the
Districts
/ Blocks
Component Activity Total
Number
Command
Area/Irrig
ation
Potential
(Ha)
Period of
Implement
ation 5/ 7
Estimated
cost
(in Lakhs
Rs.)
Longitude Lattitude Remark / Village Name
MOA&FW Kundam Per Drop More Crop Sprinkler 2 2 5 0.40 80°10'35.459"E 23°14'0.597"N Silpura
MOA&FW Kundam Per Drop More Crop Sprinkler 3 3 5 0.60 80°17'59.705"E 23°15'27.706"N Simariya
MOA&FW Kundam Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°23'31.345"E 23°14'42.738"N Simariya
MOA&FW Kundam Har Khet Ko Pani Diesel / Electric /
SolarPump 2 2 5 0.50 80°23'31.345"E 23°14'42.738"N Simariya
MOA&FW Kundam Har Khet Ko Pani Tube well 2 2 5 4.00 80°23'31.345"E 23°14'42.738"N Simariya
MOA&FW Kundam Per Drop More Crop Sprinkler 2 2 5 0.40 80°17'59.705"E 23°15'27.706"N Sonthi
MOA&FW Kundam Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°23'31.345"E 23°14'42.738"N Sonthi
MOA&FW Kundam Har Khet Ko Pani Diesel / Electric /
SolarPump 2 2 5 0.50 80°23'31.345"E 23°14'42.738"N Sonthi
MOA&FW Kundam Har Khet Ko Pani Tube well 2 2 5 4.00 80°23'31.345"E 23°14'42.738"N Sonthi
MOA&FW Kundam Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°25'4.225"E 23°13'56.869"N Soopawara
MOA&FW Kundam Har Khet Ko Pani Diesel / Electric /
SolarPump 6 6 5 1.50 80°25'4.225"E 23°13'56.869"N Soopawara
MOA&FW Kundam Har Khet Ko Pani Tube well 4 4 5 8.00 80°25'4.225"E 23°13'56.869"N Soopawara
MOA&FW Kundam Per Drop More Crop Sprinkler 5 5 5 1.00 80°25'4.225"E 23°13'56.869"N Soopawara
MOA&FW Kundam Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°17'12.556"E 23°17'41.518"N Sujanpur
MOA&FW Kundam Har Khet Ko Pani Diesel / Electric /
SolarPump 2 2 5 0.50 80°17'12.556"E 23°17'41.518"N Sujanpur
MOA&FW Kundam Har Khet Ko Pani Tube well 2 2 5 4.00 80°17'12.556"E 23°17'41.518"N Sujanpur
MOA&FW Kundam Per Drop More Crop Sprinkler 2 2 5 0.40 80°17'12.556"E 23°17'41.518"N Sujanpur
MOA&FW Kundam Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°9'32.073"E 23°12'59.075"N Sukari
MOA&FW Kundam Har Khet Ko Pani Diesel / Electric /
SolarPump 3 3 5 0.75 80°9'32.073"E 23°12'59.075"N Sukari
MOA&FW Kundam Har Khet Ko Pani Tube well 2 2 5 4.00 80°9'32.073"E 23°12'59.075"N Sukari
MOA&FW Kundam Per Drop More Crop Sprinkler 2 2 5 0.40 80°9'32.073"E 23°12'59.075"N Sukari
MOA&FW Kundam Per Drop More Crop Sprinkler 8 8 5 1.60 80°17'59.705"E 23°15'27.706"N Sunawal
MOA&FW Kundam Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°23'31.345"E 23°14'42.738"N Sunawal
MOA&FW Kundam Har Khet Ko Pani Diesel / Electric /
SolarPump 7 7 5 1.75 80°23'31.345"E 23°14'42.738"N Sunawal
MOA&FW Kundam Har Khet Ko Pani Tube well 10 10 5 20.00 80°23'31.345"E 23°14'42.738"N Sunawal
MOA&FW Kundam Per Drop More Crop Sprinkler 2 2 5 0.40 80°17'59.705"E 23°15'27.706"N Tauri
157
Concerned
Ministry/
Department
Name of
the
Districts
/ Blocks
Component Activity Total
Number
Command
Area/Irrig
ation
Potential
(Ha)
Period of
Implement
ation 5/ 7
Estimated
cost
(in Lakhs
Rs.)
Longitude Lattitude Remark / Village Name
MOA&FW Kundam Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°23'31.345"E 23°14'42.738"N Tauri
MOA&FW Kundam Har Khet Ko Pani Diesel / Electric /
SolarPump 1 1 5 0.25 80°23'31.345"E 23°14'42.738"N Tauri
MOA&FW Kundam Har Khet Ko Pani Tube well 1 1 5 2.00 80°23'31.345"E 23°14'42.738"N Tauri
MOA&FW Kundam Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°17'22.81"E 23°18'18.804"N Tikariya
MOA&FW Kundam Har Khet Ko Pani Diesel / Electric /
SolarPump 6 6 5 1.50 80°17'22.81"E 23°18'18.804"N Tikariya
MOA&FW Kundam Har Khet Ko Pani Tube well 8 8 5 16.00 80°17'22.81"E 23°18'18.804"N Tikariya
MOA&FW Kundam Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°17'22.81"E 23°18'18.804"N Tikariya
MOA&FW Kundam Har Khet Ko Pani Diesel / Electric /
SolarPump 2 2 5 0.50 80°17'22.81"E 23°18'18.804"N Tikariya
MOA&FW Kundam Har Khet Ko Pani Tube well 6 6 5 12.00 80°17'22.81"E 23°18'18.804"N Tikariya
MOA&FW Kundam Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°17'22.81"E 23°18'18.804"N Tikariya
MOA&FW Kundam Har Khet Ko Pani Diesel / Electric /
SolarPump 2 2 5 0.50 80°17'22.81"E 23°18'18.804"N Tikariya
MOA&FW Kundam Har Khet Ko Pani Tube well 3 3 5 6.00 80°17'22.81"E 23°18'18.804"N Tikariya
MOA&FW Kundam Per Drop More Crop Sprinkler 5 5 5 1.00 80°17'22.81"E 23°18'18.804"N Tikariya
MOA&FW Kundam Per Drop More Crop Sprinkler 3 3 5 0.60 80°17'22.81"E 23°18'18.804"N Tikariya
MOA&FW Kundam Per Drop More Crop Sprinkler 2 2 5 0.40 80°17'22.81"E 23°18'18.804"N Tikariya
MOA&FW Kundam Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°13'9.264"E 23°12'50.686"N Tilsani
MOA&FW Kundam Har Khet Ko Pani Diesel / Electric /
SolarPump 4 4 5 1.00 80°13'9.264"E 23°12'50.686"N Tilsani
MOA&FW Kundam Har Khet Ko Pani Tube well 6 6 5 12.00 80°13'9.264"E 23°12'50.686"N Tilsani
MOA&FW Kundam Per Drop More Crop Sprinkler 5 5 5 1.00 80°13'9.264"E 23°12'50.686"N Tilsani
MOA&FW Kundam Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°28'53.535"E 23°18'49.565"N Titahakalan
MOA&FW Kundam Har Khet Ko Pani Diesel / Electric /
SolarPump 1 1 5 0.25 80°28'53.535"E 23°18'49.565"N Titahakalan
MOA&FW Kundam Har Khet Ko Pani Tube well 2 2 5 4.00 80°28'53.535"E 23°18'49.565"N Titahakalan
MOA&FW Kundam Per Drop More Crop Sprinkler 2 2 5 0.40 80°28'53.535"E 23°18'49.565"N Titahakalan
MOA&FW Kundam Per Drop More Crop Sprinkler 4 4 5 0.80 80°17'59.705"E 23°15'27.706"N Toormadar
MOA&FW Kundam Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°23'31.345"E 23°14'42.738"N Toormadar
158
Concerned
Ministry/
Department
Name of
the
Districts
/ Blocks
Component Activity Total
Number
Command
Area/Irrig
ation
Potential
(Ha)
Period of
Implement
ation 5/ 7
Estimated
cost
(in Lakhs
Rs.)
Longitude Lattitude Remark / Village Name
MOA&FW Kundam Har Khet Ko Pani Diesel / Electric /
SolarPump 5 5 5 1.25 80°23'31.345"E 23°14'42.738"N Toormadar
MOA&FW Kundam Har Khet Ko Pani Tube well 3 3 5 6.00 80°23'31.345"E 23°14'42.738"N Toormadar
MOA&FW Kundam Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°29'3.789"E 23°8'49.258"N Tori
MOA&FW Kundam Har Khet Ko Pani Diesel / Electric /
SolarPump 8 8 5 2.00 80°29'3.789"E 23°8'49.258"N Tori
MOA&FW Kundam Har Khet Ko Pani Tube well 2 2 5 4.00 80°29'3.789"E 23°8'49.258"N Tori
MOA&FW Kundam Per Drop More Crop Sprinkler 2 2 5 0.40 80°29'3.789"E 23°8'49.258"N Tori
MOA&FW Kundam Per Drop More Crop Sprinkler 2 2 5 0.40 80°17'59.705"E 23°15'27.706"N Turka
MOA&FW Kundam Har Khet Ko Pani Diesel / Electric /
SolarPump 1 1 5 0.25 80°23'31.345"E 23°14'42.738"N Turka
MOA&FW Kundam Har Khet Ko Pani Tube well 2 2 5 4.00 80°23'31.345"E 23°14'42.738"N Turka
MOA&FW Kundam Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°21'22.061"E 23°14'9.012"N Turka
MOA&FW Kundam Per Drop More Crop Sprinkler 1 1 5 0.20 80°17'59.705"E 23°15'27.706"N Uchaihara(Uchara)
MOA&FW Kundam Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°23'31.345"E 23°14'42.738"N Uchaihara(Uchara)
MOA&FW Kundam Har Khet Ko Pani Diesel / Electric /
SolarPump 2 2 5 0.50 80°23'31.345"E 23°14'42.738"N Uchaihara(Uchara)
MOA&FW Kundam Har Khet Ko Pani Tube well 1 1 5 2.00 80°23'31.345"E 23°14'42.738"N Uchaihara(Uchara)
MOA&FW Kundam Per Drop More Crop Sprinkler 2 2 5 0.40 80°17'59.705"E 23°15'27.706"N Umarjhar (Umarjhir)
MOA&FW Kundam Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°23'31.345"E 23°14'42.738"N Umarjhar (Umarjhir)
MOA&FW Kundam Har Khet Ko Pani Diesel / Electric /
SolarPump 1 1 5 0.25 80°23'31.345"E 23°14'42.738"N Umarjhar (Umarjhir)
MOA&FW Kundam Har Khet Ko Pani Tube well 2 2 5 4.00 80°23'31.345"E 23°14'42.738"N Umarjhar (Umarjhir)
MOA&FW Kundam Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°21'41.016"E 23°9'15.359"N Urdgawan
MOA&FW Kundam Har Khet Ko Pani Diesel / Electric /
SolarPump 1 1 5 0.25 80°21'41.016"E 23°9'15.359"N Urdgawan
MOA&FW Kundam Har Khet Ko Pani Tube well 1 1 5 2.00 80°21'41.016"E 23°9'15.359"N Urdgawan
MOA&FW Kundam Per Drop More Crop Sprinkler 2 2 5 0.40 80°21'41.016"E 23°9'15.359"N Urdgawan
MOA&FW Majholi Har Khet Ko Pani Diesel / Electric /
SolarPump 15 15 5 3.75 79°57'18.884"E 23°32'42.164"N Abhana
MOA&FW Majholi Har Khet Ko Pani Tube well 10 10 5 20.00 79°57'18.884"E 23°32'42.164"N Abhana
159
Concerned
Ministry/
Department
Name of
the
Districts
/ Blocks
Component Activity Total
Number
Command
Area/Irrig
ation
Potential
(Ha)
Period of
Implement
ation 5/ 7
Estimated
cost
(in Lakhs
Rs.)
Longitude Lattitude Remark / Village Name
MOA&FW Majholi Har Khet Ko Pani Diesel / Electric /
SolarPump 8 8 5 2.00 79°57'18.884"E 23°32'42.164"N Abhana
MOA&FW Majholi Har Khet Ko Pani Tube well 16 16 5 32.00 79°57'18.884"E 23°32'42.164"N Abhana
MOA&FW Majholi Per Drop More Crop Sprinkler 10 10 5 2.00 79°57'18.884"E 23°32'42.164"N Abhana
MOA&FW Majholi Per Drop More Crop Sprinkler 15 15 5 3.00 79°57'18.884"E 23°32'42.164"N Abhana
MOA&FW Majholi Har Khet Ko Pani Diesel / Electric /
SolarPump 9 9 5 2.25 79°55'25.041"E 23°28'12.164"N Alasur
MOA&FW Majholi Har Khet Ko Pani Tube well 25 25 5 50.00 79°55'25.041"E 23°28'12.164"N Alasur
MOA&FW Majholi Har Khet Ko Pani Diesel / Electric /
SolarPump 15 15 5 3.75 79°55'25.041"E 23°28'12.164"N Alasur
MOA&FW Majholi Per Drop More Crop Sprinkler 11 11 5 2.20 80°0'51.059"E 23°32'13.868"N Alasur
MOA&FW Majholi Per Drop More Crop Sprinkler 26 26 5 5.20 80°0'51.059"E 23°32'13.868"N Alasur
MOA&FW Majholi Har Khet Ko Pani Capacity Building 17883 5 357.67 80°0'51.059"E 23°31'0.795"N All
MOA&FW Majholi Har Khet Ko Pani Tube well 21 21 5 42.00 79°55'25.041"E 23°28'12.164"N Amauda
MOA&FW Majholi Har Khet Ko Pani Diesel / Electric /
SolarPump 11 11 5 2.75 79°55'25.041"E 23°28'12.164"N Amauda
MOA&FW Majholi Per Drop More Crop Sprinkler 25 25 5 5.00 80°0'51.059"E 23°32'13.868"N Amauda
MOA&FW Majholi Har Khet Ko Pani Tube well 18 18 5 36.00 79°55'25.041"E 23°28'12.164"N Amee
MOA&FW Majholi Har Khet Ko Pani Diesel / Electric /
SolarPump 11 11 5 2.75 79°55'25.041"E 23°28'12.164"N Amee
MOA&FW Majholi Per Drop More Crop Sprinkler 28 28 5 5.60 80°0'51.059"E 23°32'13.868"N Amee
MOA&FW Majholi Har Khet Ko Pani Tube well 19 19 5 38.00 79°57'4.591"E 23°32'2.286"N Amgawan
MOA&FW Majholi Har Khet Ko Pani Farm Pond 1 2 5 2.00 79°57'4.591"E 23°32'2.286"N Amgawan
MOA&FW Majholi Per Drop More Crop Sprinkler 24 24 5 4.80 79°57'4.591"E 23°32'2.286"N Amgawan
MOA&FW Majholi Har Khet Ko Pani Diesel / Electric /
SolarPump 11 11 5 2.75 79°55'36.283"E 23°27'55.301"N Amna
MOA&FW Majholi Har Khet Ko Pani Tube well 25 25 5 50.00 79°55'36.283"E 23°27'55.301"N Amna
MOA&FW Majholi Per Drop More Crop Sprinkler 12 12 5 2.40 80°0'51.059"E 23°32'13.868"N Amna
MOA&FW Majholi Har Khet Ko Pani Diesel / Electric /
SolarPump 15 15 5 3.75 79°55'36.283"E 23°27'55.301"N Anghora
MOA&FW Majholi Har Khet Ko Pani Tube well 24 24 5 48.00 79°55'36.283"E 23°27'55.301"N Anghora
160
Concerned
Ministry/
Department
Name of
the
Districts
/ Blocks
Component Activity Total
Number
Command
Area/Irrig
ation
Potential
(Ha)
Period of
Implement
ation 5/ 7
Estimated
cost
(in Lakhs
Rs.)
Longitude Lattitude Remark / Village Name
MOA&FW Majholi Har Khet Ko Pani Diesel / Electric /
SolarPump 16 16 5 4.00 79°55'36.283"E 23°27'55.301"N Anghora
MOA&FW Majholi Har Khet Ko Pani Tube well 25 25 5 50.00 79°55'36.283"E 23°27'55.301"N Anghora
MOA&FW Majholi Per Drop More Crop Sprinkler 25 25 5 5.00 80°0'51.059"E 23°32'13.868"N Anghora
MOA&FW Majholi Har Khet Ko Pani Diesel / Electric /
SolarPump 25 25 5 6.25 79°55'36.283"E 23°27'55.301"N Babaiya
MOA&FW Majholi Har Khet Ko Pani Tube well 21 21 5 42.00 79°55'36.283"E 23°27'55.301"N Babaiya
MOA&FW Majholi Har Khet Ko Pani Farm Pond 1 2 5 2.00 79°55'36.283"E 23°27'55.301"N Babaiya
MOA&FW Majholi Per Drop More Crop Sprinkler 20 20 5 4.00 80°0'51.059"E 23°32'13.868"N Babaiya
MOA&FW Majholi Har Khet Ko Pani Diesel / Electric /
SolarPump 12 12 5 3.00 79°55'36.283"E 23°27'55.301"N Badkhera
MOA&FW Majholi Har Khet Ko Pani Tube well 17 17 5 34.00 79°55'36.283"E 23°27'55.301"N Badkhera
MOA&FW Majholi Per Drop More Crop Sprinkler 23 23 5 4.60 80°0'51.059"E 23°32'13.868"N Badkhera
MOA&FW Majholi Har Khet Ko Pani Diesel / Electric /
SolarPump 10 10 5 2.50 79°55'36.283"E 23°27'55.301"N Bagaswahi
MOA&FW Majholi Har Khet Ko Pani Tube well 24 24 5 48.00 79°55'36.283"E 23°27'55.301"N Bagaswahi
MOA&FW Majholi Har Khet Ko Pani Diesel / Electric /
SolarPump 14 14 5 3.50 79°55'36.283"E 23°27'55.301"N Bagaswahi
MOA&FW Majholi Per Drop More Crop Sprinkler 24 24 5 4.80 80°0'51.059"E 23°32'13.868"N Bagaswahi
MOA&FW Majholi Per Drop More Crop Sprinkler 14 14 5 2.80 80°0'51.059"E 23°32'13.868"N Bagaswahi
MOA&FW Majholi Har Khet Ko Pani Tube well 20 20 5 40.00 79°55'36.283"E 23°27'55.301"N Bagdhari
MOA&FW Majholi Har Khet Ko Pani Diesel / Electric /
SolarPump 25 25 5 6.25 79°55'36.283"E 23°27'55.301"N Bagdhari
MOA&FW Majholi Har Khet Ko Pani Tube well 21 21 5 42.00 79°55'36.283"E 23°27'55.301"N Bagdhari
MOA&FW Majholi Per Drop More Crop Sprinkler 25 25 5 5.00 80°0'51.059"E 23°32'13.868"N Bagdhari
MOA&FW Majholi Per Drop More Crop Drip system 2 2 5 2.00 80°0'51.059"E 23°32'13.868"N Bagdhari
MOA&FW Majholi Har Khet Ko Pani Diesel / Electric /
SolarPump 16 16 5 4.00 79°55'36.283"E 23°27'55.301"N Bagheli
MOA&FW Majholi Har Khet Ko Pani Tube well 21 21 5 42.00 79°55'36.283"E 23°27'55.301"N Bagheli
MOA&FW Majholi Per Drop More Crop Sprinkler 13 13 5 2.60 80°0'51.059"E 23°32'13.868"N Bagheli
MOA&FW Majholi Per Drop More Crop Sprinkler 15 15 5 3.00 80°0'51.059"E 23°32'13.868"N Bagheli
161
Concerned
Ministry/
Department
Name of
the
Districts
/ Blocks
Component Activity Total
Number
Command
Area/Irrig
ation
Potential
(Ha)
Period of
Implement
ation 5/ 7
Estimated
cost
(in Lakhs
Rs.)
Longitude Lattitude Remark / Village Name
MOA&FW Majholi Har Khet Ko Pani Diesel / Electric /
SolarPump 9 9 5 2.25 79°55'36.283"E 23°27'55.301"N Baihar Kalan
MOA&FW Majholi Har Khet Ko Pani Tube well 15 15 5 30.00 79°55'36.283"E 23°27'55.301"N Baihar Kalan
MOA&FW Majholi Har Khet Ko Pani Diesel / Electric /
SolarPump 16 16 5 4.00 79°55'36.283"E 23°27'55.301"N Baihar Kalan
MOA&FW Majholi Har Khet Ko Pani Tube well 20 20 5 40.00 79°55'36.283"E 23°27'55.301"N Baihar Kalan
MOA&FW Majholi Per Drop More Crop Sprinkler 15 15 5 3.00 80°0'51.059"E 23°32'13.868"N Baihar Kalan
MOA&FW Majholi Har Khet Ko Pani Diesel / Electric /
SolarPump 10 10 5 2.50 79°55'36.283"E 23°27'55.301"N Baihar Khurd
MOA&FW Majholi Har Khet Ko Pani Tube well 24 24 5 48.00 79°55'36.283"E 23°27'55.301"N Baihar Khurd
MOA&FW Majholi Har Khet Ko Pani Farm Pond 1 2 5 2.00 79°55'36.283"E 23°27'55.301"N Baihar Khurd
MOA&FW Majholi Per Drop More Crop Sprinkler 18 18 5 3.60 80°0'51.059"E 23°32'13.868"N Baihar Khurd
MOA&FW Majholi Har Khet Ko Pani Diesel / Electric /
SolarPump 16 16 5 4.00 79°55'36.283"E 23°27'55.301"N Bakla
MOA&FW Majholi Har Khet Ko Pani Tube well 25 25 5 50.00 79°55'36.283"E 23°27'55.301"N Bakla
MOA&FW Majholi Per Drop More Crop Sprinkler 16 16 5 3.20 80°0'51.059"E 23°32'13.868"N Bakla
MOA&FW Majholi Per Drop More Crop Sprinkler 16 16 5 3.20 80°0'51.059"E 23°32'13.868"N Bakla
MOA&FW Majholi Har Khet Ko Pani Diesel / Electric /
SolarPump 9 9 5 2.25 79°55'36.283"E 23°27'55.301"N Bamhauri
MOA&FW Majholi Har Khet Ko Pani Tube well 15 15 5 30.00 79°55'36.283"E 23°27'55.301"N Bamhauri
MOA&FW Majholi Per Drop More Crop Sprinkler 16 16 5 3.20 80°0'51.059"E 23°32'13.868"N Bamhauri
MOA&FW Majholi Har Khet Ko Pani Diesel / Electric /
SolarPump 15 15 5 3.75 79°55'36.283"E 23°27'55.301"N Bamhori
MOA&FW Majholi Har Khet Ko Pani Tube well 24 24 5 48.00 79°55'36.283"E 23°27'55.301"N Bamhori
MOA&FW Majholi Har Khet Ko Pani Diesel / Electric /
SolarPump 22 22 5 5.50 79°55'36.283"E 23°27'55.301"N Bamhori
MOA&FW Majholi Har Khet Ko Pani Tube well 19 19 5 38.00 79°55'36.283"E 23°27'55.301"N Bamhori
MOA&FW Majholi Per Drop More Crop Drip system 2 2 5 2.00 80°0'51.059"E 23°32'13.868"N Bamhori
MOA&FW Majholi Per Drop More Crop Sprinkler 10 10 5 2.00 80°0'51.059"E 23°32'13.868"N Bamhori
MOA&FW Majholi Per Drop More Crop Drip system 1 1 5 1.00 80°0'51.059"E 23°32'13.868"N Bamhori
MOA&FW Majholi Har Khet Ko Pani Diesel / Electric /
SolarPump 20 20 5 5.00 79°55'36.283"E 23°27'55.301"N Bandha
162
Concerned
Ministry/
Department
Name of
the
Districts
/ Blocks
Component Activity Total
Number
Command
Area/Irrig
ation
Potential
(Ha)
Period of
Implement
ation 5/ 7
Estimated
cost
(in Lakhs
Rs.)
Longitude Lattitude Remark / Village Name
MOA&FW Majholi Har Khet Ko Pani Tube well 24 24 5 48.00 79°55'36.283"E 23°27'55.301"N Bandha
MOA&FW Majholi Har Khet Ko Pani Diesel / Electric /
SolarPump 24 24 5 6.00 79°55'36.283"E 23°27'55.301"N Bandha
MOA&FW Majholi Per Drop More Crop Sprinkler 13 13 5 2.60 80°0'51.059"E 23°32'13.868"N Bandha
MOA&FW Majholi Per Drop More Crop Sprinkler 15 15 5 3.00 80°0'51.059"E 23°32'13.868"N Bandha
MOA&FW Majholi Har Khet Ko Pani Tube well 21 21 5 42.00 79°55'36.283"E 23°27'55.301"N Bankhedi
MOA&FW Majholi Har Khet Ko Pani Diesel / Electric /
SolarPump 24 24 5 6.00 79°55'36.283"E 23°27'55.301"N Bankhedi
MOA&FW Majholi Per Drop More Crop Sprinkler 19 19 5 3.80 80°0'51.059"E 23°32'13.868"N Bankhedi
MOA&FW Majholi Har Khet Ko Pani Tube well 24 24 5 48.00 79°55'36.283"E 23°27'55.301"N Barauda
MOA&FW Majholi Har Khet Ko Pani Diesel / Electric /
SolarPump 24 24 5 6.00 79°55'36.283"E 23°27'55.301"N Barauda
MOA&FW Majholi Per Drop More Crop Sprinkler 19 19 5 3.80 80°0'51.059"E 23°32'13.868"N Barauda
MOA&FW Majholi Har Khet Ko Pani Tube well 19 19 5 38.00 79°55'36.283"E 23°27'55.301"N Bardahri
MOA&FW Majholi Har Khet Ko Pani Diesel / Electric /
SolarPump 25 25 5 6.25 79°55'36.283"E 23°27'55.301"N Bardahri
MOA&FW Majholi Per Drop More Crop Sprinkler 14 14 5 2.80 80°0'51.059"E 23°32'13.868"N Bardahri
MOA&FW Majholi Har Khet Ko Pani Tube well 24 24 5 48.00 79°55'36.283"E 23°27'55.301"N Bargawan
MOA&FW Majholi Har Khet Ko Pani Diesel / Electric /
SolarPump 15 15 5 3.75 79°55'36.283"E 23°27'55.301"N Bargawan
MOA&FW Majholi Har Khet Ko Pani Tube well 19 19 5 38.00 79°55'36.283"E 23°27'55.301"N Bargawan
MOA&FW Majholi Per Drop More Crop Sprinkler 18 18 5 3.60 80°0'51.059"E 23°32'13.868"N Bargawan
MOA&FW Majholi Per Drop More Crop Sprinkler 21 21 5 4.20 80°0'51.059"E 23°32'13.868"N Bargawan
MOA&FW Majholi Har Khet Ko Pani Diesel / Electric /
SolarPump 11 11 5 2.75 79°55'36.283"E 23°27'55.301"N Bargawan Darachi
MOA&FW Majholi Har Khet Ko Pani Tube well 15 15 5 30.00 79°55'36.283"E 23°27'55.301"N Bargawan Darachi
MOA&FW Majholi Har Khet Ko Pani Diesel / Electric /
SolarPump 15 15 5 3.75 79°55'36.283"E 23°27'55.301"N Bargawan Darachi
MOA&FW Majholi Har Khet Ko Pani Tube well 21 21 5 42.00 79°55'36.283"E 23°27'55.301"N Bargawan Darachi
MOA&FW Majholi Per Drop More Crop Sprinkler 15 15 5 3.00 80°0'51.059"E 23°32'13.868"N Bargawan Darachi
MOA&FW Majholi Har Khet Ko Pani Diesel / Electric /
SolarPump 15 15 5 3.75 80°9'46.681"E 23°32'17.981"N Bargi
163
Concerned
Ministry/
Department
Name of
the
Districts
/ Blocks
Component Activity Total
Number
Command
Area/Irrig
ation
Potential
(Ha)
Period of
Implement
ation 5/ 7
Estimated
cost
(in Lakhs
Rs.)
Longitude Lattitude Remark / Village Name
MOA&FW Majholi Har Khet Ko Pani Tube well 23 23 5 46.00 80°9'46.681"E 23°32'17.981"N Bargi
MOA&FW Majholi Per Drop More Crop Sprinkler 18 18 5 3.60 80°9'46.681"E 23°32'17.981"N Bargi
MOA&FW Majholi Per Drop More Crop Drip system 1 1 5 1.00 80°9'46.681"E 23°32'17.981"N Bargi
MOA&FW Majholi Per Drop More Crop Sprinkler 20 20 5 4.00 80°9'46.681"E 23°32'17.981"N Bargi
MOA&FW Majholi Har Khet Ko Pani Diesel / Electric /
SolarPump 14 14 5 3.50 79°55'36.283"E 23°27'55.301"N Batrangi
MOA&FW Majholi Har Khet Ko Pani Tube well 21 21 5 42.00 79°55'36.283"E 23°27'55.301"N Batrangi
MOA&FW Majholi Per Drop More Crop Sprinkler 16 16 5 3.20 80°0'51.059"E 23°32'13.868"N Batrangi
MOA&FW Majholi Har Khet Ko Pani Diesel / Electric /
SolarPump 16 16 5 4.00 79°52'45.229"E 23°29'34.043"N Bhadkura
MOA&FW Majholi Har Khet Ko Pani Tube well 18 18 5 36.00 79°52'45.229"E 23°29'34.043"N Bhadkura
MOA&FW Majholi Per Drop More Crop Drip system 1 1 5 1.00 79°52'45.229"E 23°29'34.043"N Bhadkura
MOA&FW Majholi Har Khet Ko Pani Diesel / Electric /
SolarPump 14 14 5 3.50 79°53'10.136"E 23°29'36.479"N Bhatgawan
MOA&FW Majholi Har Khet Ko Pani Tube well 21 21 5 42.00 79°53'10.136"E 23°29'36.479"N Bhatgawan
MOA&FW Majholi Har Khet Ko Pani Diesel / Electric /
SolarPump 19 19 5 4.75 79°53'10.136"E 23°29'36.479"N Bhatgawan
MOA&FW Majholi Har Khet Ko Pani Tube well 17 17 5 34.00 79°53'10.136"E 23°29'36.479"N Bhatgawan
MOA&FW Majholi Per Drop More Crop Sprinkler 16 16 5 3.20 80°0'51.059"E 23°32'13.868"N Bhatgawan
MOA&FW Majholi Per Drop More Crop Drip system 1 1 5 1.00 80°0'51.059"E 23°32'13.868"N Bhatgawan
MOA&FW Majholi Per Drop More Crop Sprinkler 16 16 5 3.20 80°0'51.059"E 23°32'13.868"N Bhatgawan
MOA&FW Majholi Har Khet Ko Pani Diesel / Electric /
SolarPump 22 22 5 5.50 79°53'10.136"E 23°29'36.479"N Bhita Kalan
MOA&FW Majholi Har Khet Ko Pani Tube well 18 18 5 36.00 79°53'10.136"E 23°29'36.479"N Bhita Kalan
MOA&FW Majholi Har Khet Ko Pani Farm Pond 1 2 5 2.00 79°53'10.136"E 23°29'36.479"N Bhita Kalan
MOA&FW Majholi Per Drop More Crop Sprinkler 18 18 5 3.60 80°0'51.059"E 23°32'13.868"N Bhita Kalan
MOA&FW Majholi Per Drop More Crop Drip system 2 2 5 2.00 80°0'51.059"E 23°32'13.868"N Bhita Kalan
MOA&FW Majholi Har Khet Ko Pani Diesel / Electric /
SolarPump 19 19 5 4.75 79°53'10.136"E 23°29'36.479"N Bhita Khurd
MOA&FW Majholi Per Drop More Crop Sprinkler 20 20 5 4.00 80°0'51.059"E 23°32'13.868"N Bhita Khurd
MOA&FW Majholi Per Drop More Crop Drip system 1 1 5 1.00 80°0'51.059"E 23°32'13.868"N Bhita Khurd
MOA&FW Majholi Har Khet Ko Pani Tube well 29 29 5 58.00 79°53'10.136"E 23°29'36.479"N Bhutehi (Ghutehi)
164
Concerned
Ministry/
Department
Name of
the
Districts
/ Blocks
Component Activity Total
Number
Command
Area/Irrig
ation
Potential
(Ha)
Period of
Implement
ation 5/ 7
Estimated
cost
(in Lakhs
Rs.)
Longitude Lattitude Remark / Village Name
MOA&FW Majholi Har Khet Ko Pani Diesel / Electric /
SolarPump 14 14 5 3.50 79°53'10.136"E 23°29'36.479"N Bhutehi (Ghutehi)
MOA&FW Majholi Per Drop More Crop Sprinkler 21 21 5 4.20 80°0'51.059"E 23°32'13.868"N Bhutehi (Ghutehi)
MOA&FW Majholi Per Drop More Crop Drip system 1 1 5 1.00 80°0'51.059"E 23°32'13.868"N Bhutehi (Ghutehi)
MOA&FW Majholi Har Khet Ko Pani Tube well 19 19 5 38.00 79°53'10.136"E 23°29'36.479"N Bichhiya
MOA&FW Majholi Per Drop More Crop Sprinkler 25 25 5 5.00 80°0'51.059"E 23°32'13.868"N Bichhiya
MOA&FW Majholi Per Drop More Crop Drip system 1 1 5 1.00 80°0'51.059"E 23°32'13.868"N Bichhiya
MOA&FW Majholi Har Khet Ko Pani Diesel / Electric /
SolarPump 17 17 5 4.25 79°53'10.136"E 23°29'36.479"N Bihara
MOA&FW Majholi Har Khet Ko Pani Tube well 23 23 5 46.00 79°53'10.136"E 23°29'36.479"N Bihara
MOA&FW Majholi Per Drop More Crop Sprinkler 17 17 5 3.40 80°0'51.059"E 23°32'13.868"N Bihara
MOA&FW Majholi Har Khet Ko Pani Diesel / Electric /
SolarPump 18 18 5 4.50 79°53'10.136"E 23°29'36.479"N Bilgawan
MOA&FW Majholi Har Khet Ko Pani Tube well 24 24 5 48.00 79°53'10.136"E 23°29'36.479"N Bilgawan
MOA&FW Majholi Per Drop More Crop Drip system 1 1 5 1.00 80°0'51.059"E 23°32'13.868"N Bilgawan
MOA&FW Majholi Har Khet Ko Pani Diesel / Electric /
SolarPump 16 16 5 4.00 79°53'10.136"E 23°29'36.479"N Binduli
MOA&FW Majholi Har Khet Ko Pani Tube well 24 24 5 48.00 79°53'10.136"E 23°29'36.479"N Binduli
MOA&FW Majholi Per Drop More Crop Sprinkler 17 17 5 3.40 80°0'51.059"E 23°32'13.868"N Binduli
MOA&FW Majholi Per Drop More Crop Drip system 1 1 5 1.00 80°0'51.059"E 23°32'13.868"N Binduli
MOA&FW Majholi Per Drop More Crop Sprinkler 16 16 5 3.20 80°0'51.059"E 23°32'13.868"N Binduli
MOA&FW Majholi Har Khet Ko Pani Diesel / Electric /
SolarPump 19 19 5 4.75 79°53'10.136"E 23°29'36.479"N Biriya
MOA&FW Majholi Har Khet Ko Pani Tube well 24 24 5 48.00 79°53'10.136"E 23°29'36.479"N Biriya
MOA&FW Majholi Har Khet Ko Pani Farm Pond 1 2 5 2.00 79°53'10.136"E 23°29'36.479"N Biriya
MOA&FW Majholi Per Drop More Crop Drip system 1 1 5 1.00 80°0'51.059"E 23°32'13.868"N Biriya
MOA&FW Majholi Har Khet Ko Pani Diesel / Electric /
SolarPump 16 16 5 4.00 79°53'10.136"E 23°29'36.479"N Bisi
MOA&FW Majholi Per Drop More Crop Sprinkler 19 19 5 3.80 79°55'30.662"E 23°27'49.68"N Bisi
MOA&FW Majholi Per Drop More Crop Drip system 1 1 5 1.00 79°55'30.662"E 23°27'49.68"N Bisi
MOA&FW Majholi Har Khet Ko Pani Tube well 21 21 5 42.00 79°53'10.136"E 23°29'36.479"N Bodi
165
Concerned
Ministry/
Department
Name of
the
Districts
/ Blocks
Component Activity Total
Number
Command
Area/Irrig
ation
Potential
(Ha)
Period of
Implement
ation 5/ 7
Estimated
cost
(in Lakhs
Rs.)
Longitude Lattitude Remark / Village Name
MOA&FW Majholi Har Khet Ko Pani Diesel / Electric /
SolarPump 19 19 5 4.75 79°53'10.136"E 23°29'36.479"N Bodi
MOA&FW Majholi Per Drop More Crop Sprinkler 17 17 5 3.40 79°55'30.662"E 23°27'49.68"N Bodi
MOA&FW Majholi Per Drop More Crop Drip system 1 1 5 1.00 79°55'30.662"E 23°27'49.68"N Bodi
MOA&FW Majholi Har Khet Ko Pani Tube well 23 23 5 46.00 79°53'10.136"E 23°29'36.479"N Budeli
MOA&FW Majholi Per Drop More Crop Sprinkler 14 14 5 2.80 79°55'30.662"E 23°27'49.68"N Budeli
MOA&FW Majholi Per Drop More Crop Drip system 1 1 5 1.00 79°55'30.662"E 23°27'49.68"N Budeli
MOA&FW Majholi Har Khet Ko Pani Diesel / Electric /
SolarPump 19 19 5 4.75 79°53'10.136"E 23°29'36.479"N Budhi
MOA&FW Majholi Har Khet Ko Pani Tube well 21 21 5 42.00 79°53'10.136"E 23°29'36.479"N Budhi
MOA&FW Majholi Per Drop More Crop Sprinkler 19 19 5 3.80 79°55'30.662"E 23°27'49.68"N Budhi
MOA&FW Majholi Per Drop More Crop Drip system 2 2 5 2.00 79°55'30.662"E 23°27'49.68"N Budhi
MOA&FW Majholi Har Khet Ko Pani Diesel / Electric /
SolarPump 19 19 5 4.75 79°53'10.136"E 23°29'36.479"N Budrai
MOA&FW Majholi Har Khet Ko Pani Tube well 20 20 5 40.00 79°53'10.136"E 23°29'36.479"N Budrai
MOA&FW Majholi Per Drop More Crop Sprinkler 24 24 5 4.80 79°55'30.662"E 23°27'49.68"N Budrai
MOA&FW Majholi Har Khet Ko Pani Diesel / Electric /
SolarPump 19 19 5 4.75 79°53'10.136"E 23°29'36.479"N Changawan
MOA&FW Majholi Har Khet Ko Pani Tube well 21 21 5 42.00 79°53'10.136"E 23°29'36.479"N Changawan
MOA&FW Majholi Per Drop More Crop Drip system 1 1 5 1.00 79°55'30.662"E 23°27'49.68"N Changawan
MOA&FW Majholi Per Drop More Crop Sprinkler 19 19 5 3.80 79°55'30.662"E 23°27'49.68"N Changawan
MOA&FW Majholi Per Drop More Crop Drip system 1 1 5 1.00 79°55'30.662"E 23°27'49.68"N Changawan
MOA&FW Majholi Har Khet Ko Pani Diesel / Electric /
SolarPump 18 18 5 4.50 79°53'10.136"E 23°29'36.479"N Channota
MOA&FW Majholi Har Khet Ko Pani Tube well 21 21 5 42.00 79°53'10.136"E 23°29'36.479"N Channota
MOA&FW Majholi Per Drop More Crop Sprinkler 16 16 5 3.20 79°55'30.662"E 23°27'49.68"N Channota
MOA&FW Majholi Har Khet Ko Pani Diesel / Electric /
SolarPump 19 19 5 4.75 79°53'10.136"E 23°29'36.479"N Chargawan
MOA&FW Majholi Har Khet Ko Pani Tube well 21 21 5 42.00 79°53'10.136"E 23°29'36.479"N Chargawan
MOA&FW Majholi Per Drop More Crop Drip system 1 1 5 1.00 79°55'30.662"E 23°27'49.68"N Chargawan
MOA&FW Majholi Har Khet Ko Pani Diesel / Electric /
SolarPump 14 14 5 3.50 79°53'10.136"E 23°29'36.479"N Chhapra
166
Concerned
Ministry/
Department
Name of
the
Districts
/ Blocks
Component Activity Total
Number
Command
Area/Irrig
ation
Potential
(Ha)
Period of
Implement
ation 5/ 7
Estimated
cost
(in Lakhs
Rs.)
Longitude Lattitude Remark / Village Name
MOA&FW Majholi Har Khet Ko Pani Tube well 23 23 5 46.00 79°53'10.136"E 23°29'36.479"N Chhapra
MOA&FW Majholi Per Drop More Crop Sprinkler 14 14 5 2.80 79°55'30.662"E 23°27'49.68"N Chhapra
MOA&FW Majholi Per Drop More Crop Drip system 1 1 5 1.00 79°55'30.662"E 23°27'49.68"N Chhapra
MOA&FW Majholi Per Drop More Crop Sprinkler 16 16 5 3.20 79°55'30.662"E 23°27'49.68"N Chhapra
MOA&FW Majholi Har Khet Ko Pani Diesel / Electric /
SolarPump 16 16 5 4.00 79°53'10.136"E 23°29'36.479"N Chhitapal
MOA&FW Majholi Har Khet Ko Pani Tube well 23 23 5 46.00 79°53'10.136"E 23°29'36.479"N Chhitapal
MOA&FW Majholi Har Khet Ko Pani Diesel / Electric /
SolarPump 17 17 5 4.25 79°53'10.136"E 23°29'36.479"N Chhitapal
MOA&FW Majholi Har Khet Ko Pani Tube well 24 24 5 48.00 79°53'10.136"E 23°29'36.479"N Chhitapal
MOA&FW Majholi Per Drop More Crop Drip system 1 1 5 1.00 79°55'30.662"E 23°27'49.68"N Chhitapal
MOA&FW Majholi Per Drop More Crop Sprinkler 16 16 5 3.20 79°55'30.662"E 23°27'49.68"N Chhitapal
MOA&FW Majholi Per Drop More Crop Drip system 1 1 5 1.00 79°55'30.662"E 23°27'49.68"N Chhitapal
MOA&FW Majholi Per Drop More Crop Sprinkler 19 19 5 3.80 79°55'30.662"E 23°27'49.68"N Chhitapal
MOA&FW Majholi Har Khet Ko Pani Diesel / Electric /
SolarPump 16 16 5 4.00 80°3'48.179"E 23°29'52.793"N Darshani
MOA&FW Majholi Har Khet Ko Pani Tube well 23 23 5 46.00 80°3'48.179"E 23°29'52.793"N Darshani
MOA&FW Majholi Per Drop More Crop Drip system 1 1 5 1.00 80°3'48.179"E 23°29'52.793"N Darshani
MOA&FW Majholi Per Drop More Crop Sprinkler 17 17 5 3.40 80°3'48.179"E 23°29'52.793"N Darshani
MOA&FW Majholi Per Drop More Crop Drip system 1 1 5 1.00 80°3'48.179"E 23°29'52.793"N Darshani
MOA&FW Majholi Har Khet Ko Pani Diesel / Electric /
SolarPump 14 14 5 3.50 79°53'10.136"E 23°29'36.479"N Dauni (Doni)
MOA&FW Majholi Har Khet Ko Pani Tube well 24 24 5 48.00 79°53'10.136"E 23°29'36.479"N Dauni (Doni)
MOA&FW Majholi Per Drop More Crop Sprinkler 25 25 5 5.00 79°55'30.662"E 23°27'49.68"N Dauni (Doni)
MOA&FW Majholi Per Drop More Crop Drip system 2 2 5 2.00 79°55'30.662"E 23°27'49.68"N Dauni (Doni)
MOA&FW Majholi Har Khet Ko Pani Diesel / Electric /
SolarPump 14 14 5 3.50 79°53'10.136"E 23°29'36.479"N Deori (Diwari)
MOA&FW Majholi Har Khet Ko Pani Tube well 18 18 5 36.00 79°53'10.136"E 23°29'36.479"N Deori (Diwari)
MOA&FW Majholi Per Drop More Crop Sprinkler 17 17 5 3.40 79°55'30.662"E 23°27'49.68"N Deori (Diwari)
MOA&FW Majholi Per Drop More Crop Drip system 3 3 5 3.00 79°55'30.662"E 23°27'49.68"N Deori (Diwari)
MOA&FW Majholi Har Khet Ko Pani Diesel / Electric /
SolarPump 19 19 5 4.75 79°53'10.136"E 23°29'36.479"N Dhana Khurd
167
Concerned
Ministry/
Department
Name of
the
Districts
/ Blocks
Component Activity Total
Number
Command
Area/Irrig
ation
Potential
(Ha)
Period of
Implement
ation 5/ 7
Estimated
cost
(in Lakhs
Rs.)
Longitude Lattitude Remark / Village Name
MOA&FW Majholi Har Khet Ko Pani Tube well 21 21 5 42.00 79°53'10.136"E 23°29'36.479"N Dhana Khurd
MOA&FW Majholi Har Khet Ko Pani Farm Pond 1 2 5 2.00 79°53'10.136"E 23°29'36.479"N Dhana Khurd
MOA&FW Majholi Har Khet Ko Pani Diesel / Electric /
SolarPump 21 21 5 5.25 79°53'10.136"E 23°29'36.479"N Dhanadi
MOA&FW Majholi Per Drop More Crop Sprinkler 20 20 5 4.00 79°55'30.662"E 23°27'49.68"N Dhanadi
MOA&FW Majholi Per Drop More Crop Drip system 1 1 5 1.00 79°55'30.662"E 23°27'49.68"N Dhanadi
MOA&FW Majholi Har Khet Ko Pani Tube well 23 23 5 46.00 79°53'10.136"E 23°29'36.479"N Dhangawan
MOA&FW Majholi Har Khet Ko Pani Diesel / Electric /
SolarPump 17 17 5 4.25 79°53'10.136"E 23°29'36.479"N Dhangawan
MOA&FW Majholi Har Khet Ko Pani Tube well 20 20 5 40.00 79°53'10.136"E 23°29'36.479"N Dhangawan
MOA&FW Majholi Har Khet Ko Pani Diesel / Electric /
SolarPump 17 17 5 4.25 79°53'10.136"E 23°29'36.479"N Dhangawan
MOA&FW Majholi Har Khet Ko Pani Tube well 23 23 5 46.00 79°53'10.136"E 23°29'36.479"N Dhangawan
MOA&FW Majholi Har Khet Ko Pani Diesel / Electric /
SolarPump 16 16 5 4.00 79°53'10.136"E 23°29'36.479"N Dhangawan
MOA&FW Majholi Per Drop More Crop Sprinkler 16 16 5 3.20 79°55'30.662"E 23°27'49.68"N Dhangawan
MOA&FW Majholi Per Drop More Crop Drip system 1 1 5 1.00 79°55'30.662"E 23°27'49.68"N Dhangawan
MOA&FW Majholi Per Drop More Crop Sprinkler 18 18 5 3.60 79°55'30.662"E 23°27'49.68"N Dhangawan
MOA&FW Majholi Per Drop More Crop Drip system 1 1 5 1.00 79°55'30.662"E 23°27'49.68"N Dhangawan
MOA&FW Majholi Per Drop More Crop Sprinkler 16 16 5 3.20 79°55'30.662"E 23°27'49.68"N Dhangawan
MOA&FW Majholi Per Drop More Crop Drip system 1 1 5 1.00 79°55'30.662"E 23°27'49.68"N Dhangawan
MOA&FW Majholi Har Khet Ko Pani Tube well 22 22 5 44.00 79°53'10.136"E 23°29'36.479"N Dhanwahi
MOA&FW Majholi Har Khet Ko Pani Diesel / Electric /
SolarPump 16 16 5 4.00 79°53'10.136"E 23°29'36.479"N Dhanwahi
MOA&FW Majholi Per Drop More Crop Sprinkler 16 16 5 3.20 79°55'30.662"E 23°27'49.68"N Dhanwahi
MOA&FW Majholi Har Khet Ko Pani Tube well 20 20 5 40.00 79°53'10.136"E 23°29'36.479"N Dharampura
MOA&FW Majholi Per Drop More Crop Sprinkler 15 15 5 3.00 79°55'30.662"E 23°27'49.68"N Dharampura
MOA&FW Majholi Per Drop More Crop Drip system 1 1 5 1.00 79°55'30.662"E 23°27'49.68"N Dharampura
MOA&FW Majholi Har Khet Ko Pani Diesel / Electric /
SolarPump 16 16 5 4.00 79°53'10.136"E 23°29'36.479"N Dhoda (Dhodha)
MOA&FW Majholi Har Khet Ko Pani Tube well 25 25 5 50.00 79°53'10.136"E 23°29'36.479"N Dhoda (Dhodha)
MOA&FW Majholi Per Drop More Crop Sprinkler 16 16 5 3.20 79°55'30.662"E 23°27'49.68"N Dhoda (Dhodha)
168
Concerned
Ministry/
Department
Name of
the
Districts
/ Blocks
Component Activity Total
Number
Command
Area/Irrig
ation
Potential
(Ha)
Period of
Implement
ation 5/ 7
Estimated
cost
(in Lakhs
Rs.)
Longitude Lattitude Remark / Village Name
MOA&FW Majholi Har Khet Ko Pani Diesel / Electric /
SolarPump 19 19 5 4.75 79°53'10.136"E 23°29'36.479"N Dhondi
MOA&FW Majholi Har Khet Ko Pani Tube well 24 24 5 48.00 79°53'10.136"E 23°29'36.479"N Dhondi
MOA&FW Majholi Per Drop More Crop Drip system 1 1 5 1.00 79°55'30.662"E 23°27'49.68"N Dhondi
MOA&FW Majholi Per Drop More Crop Sprinkler 17 17 5 3.40 79°55'30.662"E 23°27'49.68"N Dhondi
MOA&FW Majholi Per Drop More Crop Drip system 3 3 5 3.00 79°55'30.662"E 23°27'49.68"N Dhondi
MOA&FW Majholi Har Khet Ko Pani Diesel / Electric /
SolarPump 19 19 5 4.75 79°53'10.136"E 23°29'36.479"N Dinari Khamhariya
MOA&FW Majholi Har Khet Ko Pani Tube well 21 21 5 42.00 79°53'10.136"E 23°29'36.479"N Dinari Khamhariya
MOA&FW Majholi Har Khet Ko Pani Farm Pond 1 2 5 2.00 79°53'10.136"E 23°29'36.479"N Dinari Khamhariya
MOA&FW Majholi Har Khet Ko Pani Diesel / Electric /
SolarPump 16 16 5 4.00 79°53'10.136"E 23°29'36.479"N Diwari
MOA&FW Majholi Har Khet Ko Pani Tube well 24 24 5 48.00 79°53'10.136"E 23°29'36.479"N Diwari
MOA&FW Majholi Har Khet Ko Pani Diesel / Electric /
SolarPump 17 17 5 4.25 79°53'10.136"E 23°29'36.479"N Diwari
MOA&FW Majholi Har Khet Ko Pani Tube well 26 26 5 52.00 79°53'10.136"E 23°29'36.479"N Diwari
MOA&FW Majholi Per Drop More Crop Sprinkler 17 17 5 3.40 79°55'30.662"E 23°27'49.68"N Diwari
MOA&FW Majholi Per Drop More Crop Drip system 2 2 5 2.00 79°55'30.662"E 23°27'49.68"N Diwari
MOA&FW Majholi Per Drop More Crop Sprinkler 19 19 5 3.80 79°55'30.662"E 23°27'49.68"N Diwari
MOA&FW Majholi Har Khet Ko Pani Farm Pond 1 2 5 2.00 79°53'10.136"E 23°29'36.479"N Duhatra
MOA&FW Majholi Per Drop More Crop Sprinkler 21 21 5 4.20 79°55'30.662"E 23°27'49.68"N Duhatra
MOA&FW Majholi Per Drop More Crop Drip system 1 1 5 1.00 79°55'30.662"E 23°27'49.68"N Duhatra
MOA&FW Majholi Har Khet Ko Pani Diesel / Electric /
SolarPump 19 19 5 4.75 79°53'10.136"E 23°29'36.479"N Dundi
MOA&FW Majholi Har Khet Ko Pani Tube well 24 24 5 48.00 79°53'10.136"E 23°29'36.479"N Dundi
MOA&FW Majholi Har Khet Ko Pani Farm Pond 1 2 5 2.00 79°53'10.136"E 23°29'36.479"N Dundi
MOA&FW Majholi Har Khet Ko Pani Diesel / Electric /
SolarPump 19 19 5 4.75 79°53'10.136"E 23°29'36.479"N Dungariya
MOA&FW Majholi Har Khet Ko Pani Tube well 27 27 5 54.00 79°53'10.136"E 23°29'36.479"N Dungariya
MOA&FW Majholi Per Drop More Crop Sprinkler 17 17 5 3.40 79°55'30.662"E 23°27'49.68"N Dungariya
MOA&FW Majholi Per Drop More Crop Drip system 1 1 5 1.00 79°55'30.662"E 23°27'49.68"N Dungariya
MOA&FW Majholi Per Drop More Crop Sprinkler 16 16 5 3.20 79°55'30.662"E 23°27'49.68"N Dungariya
169
Concerned
Ministry/
Department
Name of
the
Districts
/ Blocks
Component Activity Total
Number
Command
Area/Irrig
ation
Potential
(Ha)
Period of
Implement
ation 5/ 7
Estimated
cost
(in Lakhs
Rs.)
Longitude Lattitude Remark / Village Name
MOA&FW Majholi Har Khet Ko Pani Diesel / Electric /
SolarPump 16 16 5 4.00 79°53'10.136"E 23°29'36.479"N Gada
MOA&FW Majholi Har Khet Ko Pani Tube well 30 30 5 60.00 79°53'10.136"E 23°29'36.479"N Gada
MOA&FW Majholi Har Khet Ko Pani Diesel / Electric /
SolarPump 16 16 5 4.00 79°53'10.136"E 23°29'36.479"N Gada
MOA&FW Majholi Har Khet Ko Pani Tube well 20 20 5 40.00 79°53'10.136"E 23°29'36.479"N Gada
MOA&FW Majholi Per Drop More Crop Sprinkler 16 16 5 3.20 79°55'30.662"E 23°27'49.68"N Gada
MOA&FW Majholi Har Khet Ko Pani Farm Pond 2 4 5 4.00 79°53'10.136"E 23°29'36.479"N Gandhiganj
MOA&FW Majholi Per Drop More Crop Sprinkler 20 20 5 4.00 79°55'30.662"E 23°27'49.68"N Gandhiganj
MOA&FW Majholi Per Drop More Crop Drip system 1 1 5 1.00 79°55'30.662"E 23°27'49.68"N Gandhiganj
MOA&FW Majholi Har Khet Ko Pani Diesel / Electric /
SolarPump 25 25 5 6.25 79°53'10.136"E 23°29'36.479"N Gathaura
MOA&FW Majholi Har Khet Ko Pani Tube well 22 22 5 44.00 79°53'10.136"E 23°29'36.479"N Gathaura
MOA&FW Majholi Har Khet Ko Pani Diesel / Electric /
SolarPump 19 19 5 4.75 79°53'10.136"E 23°29'36.479"N Gathaura
MOA&FW Majholi Per Drop More Crop Sprinkler 17 17 5 3.40 79°55'30.662"E 23°27'49.68"N Gathaura
MOA&FW Majholi Per Drop More Crop Drip system 3 3 5 3.00 79°55'30.662"E 23°27'49.68"N Gathaura
MOA&FW Majholi Har Khet Ko Pani Tube well 21 21 5 42.00 79°53'10.136"E 23°29'36.479"N Gaura
MOA&FW Majholi Har Khet Ko Pani Diesel / Electric /
SolarPump 21 21 5 5.25 79°53'10.136"E 23°29'36.479"N Gaura
MOA&FW Majholi Har Khet Ko Pani Tube well 23 23 5 46.00 79°53'10.136"E 23°29'36.479"N Gaura
MOA&FW Majholi Per Drop More Crop Sprinkler 18 18 5 3.60 79°55'30.662"E 23°27'49.68"N Gaura
MOA&FW Majholi Per Drop More Crop Sprinkler 19 19 5 3.80 79°55'30.662"E 23°27'49.68"N Gaura
MOA&FW Majholi Har Khet Ko Pani Diesel / Electric /
SolarPump 17 17 5 4.25 80°7'18.647"E 23°32'53.577"N Gauraha Bhitauni
MOA&FW Majholi Har Khet Ko Pani Tube well 26 26 5 52.00 80°7'18.647"E 23°32'53.577"N Gauraha Bhitauni
MOA&FW Majholi Per Drop More Crop Sprinkler 18 18 5 3.60 80°7'18.647"E 23°32'53.577"N Gauraha Bhitauni
MOA&FW Majholi Per Drop More Crop Drip system 1 1 5 1.00 80°7'18.647"E 23°32'53.577"N Gauraha Bhitauni
MOA&FW Majholi Har Khet Ko Pani Diesel / Electric /
SolarPump 17 17 5 4.25 79°53'10.136"E 23°29'36.479"N Ghana Kalan
MOA&FW Majholi Har Khet Ko Pani Tube well 23 23 5 46.00 79°53'10.136"E 23°29'36.479"N Ghana Kalan
170
Concerned
Ministry/
Department
Name of
the
Districts
/ Blocks
Component Activity Total
Number
Command
Area/Irrig
ation
Potential
(Ha)
Period of
Implement
ation 5/ 7
Estimated
cost
(in Lakhs
Rs.)
Longitude Lattitude Remark / Village Name
MOA&FW Majholi Har Khet Ko Pani Diesel / Electric /
SolarPump 16 16 5 4.00 79°53'10.136"E 23°29'36.479"N Ghana Kalan
MOA&FW Majholi Per Drop More Crop Sprinkler 24 24 5 4.80 79°55'30.662"E 23°27'49.68"N Ghana Kalan
MOA&FW Majholi Har Khet Ko Pani Tube well 24 24 5 48.00 79°53'10.136"E 23°29'36.479"N Ghat Khamhariya
MOA&FW Majholi Har Khet Ko Pani Farm Pond 2 4 5 4.00 79°53'10.136"E 23°29'36.479"N Ghat Khamhariya
MOA&FW Majholi Per Drop More Crop Sprinkler 20 20 5 4.00 79°55'30.662"E 23°27'49.68"N Ghat Khamhariya
MOA&FW Majholi Per Drop More Crop Drip system 1 1 5 1.00 79°55'30.662"E 23°27'49.68"N Ghat Khamhariya
MOA&FW Majholi Har Khet Ko Pani Diesel / Electric /
SolarPump 25 25 5 6.25 79°53'10.136"E 23°29'36.479"N Ghughra
MOA&FW Majholi Har Khet Ko Pani Tube well 22 22 5 44.00 79°53'10.136"E 23°29'36.479"N Ghughra
MOA&FW Majholi Har Khet Ko Pani Diesel / Electric /
SolarPump 21 21 5 5.25 79°53'10.136"E 23°29'36.479"N Ghughra
MOA&FW Majholi Har Khet Ko Pani Tube well 23 23 5 46.00 79°53'10.136"E 23°29'36.479"N Ghughra
MOA&FW Majholi Per Drop More Crop Sprinkler 18 18 5 3.60 79°55'30.662"E 23°27'49.68"N Ghughra
MOA&FW Majholi Har Khet Ko Pani Farm Pond 1 2 5 2.00 79°53'10.136"E 23°29'36.479"N Gurda
MOA&FW Majholi Har Khet Ko Pani Diesel / Electric /
SolarPump 18 18 5 4.50 79°53'10.136"E 23°29'36.479"N Gurda
MOA&FW Majholi Per Drop More Crop Sprinkler 21 21 5 4.20 79°55'30.662"E 23°27'49.68"N Gurda
MOA&FW Majholi Per Drop More Crop Drip system 1 1 5 1.00 79°55'30.662"E 23°27'49.68"N Gurda
MOA&FW Majholi Har Khet Ko Pani Tube well 23 23 5 46.00 80°5'15.233"E 23°30'35.651"N Gurji
MOA&FW Majholi Har Khet Ko Pani Diesel / Electric /
SolarPump 17 17 5 4.25 80°5'15.233"E 23°30'35.651"N Gurji
MOA&FW Majholi Har Khet Ko Pani Tube well 23 23 5 46.00 80°5'15.233"E 23°30'35.651"N Gurji
MOA&FW Majholi Per Drop More Crop Sprinkler 18 18 5 3.60 80°5'15.233"E 23°30'35.651"N Gurji
MOA&FW Majholi Per Drop More Crop Drip system 1 1 5 1.00 80°5'15.233"E 23°30'35.651"N Gurji
MOA&FW Majholi Per Drop More Crop Sprinkler 19 19 5 3.80 79°55'30.662"E 23°27'49.68"N Gwari
MOA&FW Majholi Har Khet Ko Pani Diesel / Electric /
SolarPump 17 17 5 4.25 80°1'2.301"E 23°29'42.101"N Gwari
MOA&FW Majholi Har Khet Ko Pani Tube well 26 26 5 52.00 80°1'2.301"E 23°29'42.101"N Gwari
MOA&FW Majholi Per Drop More Crop Sprinkler 16 16 5 3.20 79°55'30.662"E 23°27'49.68"N Harduwa
MOA&FW Majholi Per Drop More Crop Sprinkler 24 24 5 4.80 79°55'30.662"E 23°27'49.68"N Harduwa
171
Concerned
Ministry/
Department
Name of
the
Districts
/ Blocks
Component Activity Total
Number
Command
Area/Irrig
ation
Potential
(Ha)
Period of
Implement
ation 5/ 7
Estimated
cost
(in Lakhs
Rs.)
Longitude Lattitude Remark / Village Name
MOA&FW Majholi Har Khet Ko Pani Diesel / Electric /
SolarPump 16 16 5 4.00 80°1'2.301"E 23°29'42.101"N Harduwa
MOA&FW Majholi Har Khet Ko Pani Tube well 20 20 5 40.00 80°1'2.301"E 23°29'42.101"N Harduwa
MOA&FW Majholi Har Khet Ko Pani Diesel / Electric /
SolarPump 16 16 5 4.00 80°1'2.301"E 23°29'42.101"N Harduwa
MOA&FW Majholi Har Khet Ko Pani Tube well 24 24 5 48.00 80°1'2.301"E 23°29'42.101"N Harduwa
MOA&FW Majholi Per Drop More Crop Sprinkler 20 20 5 4.00 79°55'30.662"E 23°27'49.68"N Harduwa Kalan
MOA&FW Majholi Per Drop More Crop Drip system 1 1 5 1.00 79°55'30.662"E 23°27'49.68"N Harduwa Kalan
MOA&FW Majholi Har Khet Ko Pani Farm Pond 2 4 5 4.00 80°1'2.301"E 23°29'42.101"N Harduwa Kalan
MOA&FW Majholi Har Khet Ko Pani Diesel / Electric /
SolarPump 25 25 5 6.25 80°1'2.301"E 23°29'42.101"N Harduwa Kalan
MOA&FW Majholi Har Khet Ko Pani Tube well 22 22 5 44.00 80°1'2.301"E 23°29'42.101"N Harduwa Kalan
MOA&FW Majholi Per Drop More Crop Sprinkler 18 18 5 3.60 79°55'30.662"E 23°27'49.68"N Harduwa Khurd
MOA&FW Majholi Per Drop More Crop Sprinkler 20 20 5 4.00 79°55'30.662"E 23°27'49.68"N Harduwa Khurd
MOA&FW Majholi Har Khet Ko Pani Diesel / Electric /
SolarPump 21 21 5 5.25 80°1'2.301"E 23°29'42.101"N Harduwa Khurd
MOA&FW Majholi Har Khet Ko Pani Tube well 23 23 5 46.00 80°1'2.301"E 23°29'42.101"N Harduwa Khurd
MOA&FW Majholi Har Khet Ko Pani Farm Pond 2 4 5 4.00 80°1'2.301"E 23°29'42.101"N Harduwa Khurd
MOA&FW Majholi Per Drop More Crop Drip system 1 1 5 1.00 79°55'30.662"E 23°27'49.68"N Harsingi
MOA&FW Majholi Har Khet Ko Pani Diesel / Electric /
SolarPump 25 25 5 6.25 80°1'2.301"E 23°29'42.101"N Harsingi
MOA&FW Majholi Har Khet Ko Pani Tube well 22 22 5 44.00 80°1'2.301"E 23°29'42.101"N Harsingi
MOA&FW Majholi Per Drop More Crop Sprinkler 17 17 5 3.40 79°55'30.662"E 23°27'49.68"N Hatauli
MOA&FW Majholi Per Drop More Crop Drip system 3 3 5 3.00 79°55'30.662"E 23°27'49.68"N Hatauli
MOA&FW Majholi Har Khet Ko Pani Diesel / Electric /
SolarPump 19 19 5 4.75 80°1'2.301"E 23°29'42.101"N Hatauli
MOA&FW Majholi Per Drop More Crop Sprinkler 16 16 5 3.20 79°55'30.662"E 23°27'49.68"N Hathlewa
MOA&FW Majholi Per Drop More Crop Sprinkler 24 24 5 4.80 79°55'30.662"E 23°27'49.68"N Hathlewa
MOA&FW Majholi Har Khet Ko Pani Tube well 21 21 5 42.00 80°1'2.301"E 23°29'42.101"N Hathlewa
MOA&FW Majholi Har Khet Ko Pani Diesel / Electric /
SolarPump 16 16 5 4.00 80°1'2.301"E 23°29'42.101"N Hathlewa
MOA&FW Majholi Har Khet Ko Pani Tube well 20 20 5 40.00 80°1'2.301"E 23°29'42.101"N Hathlewa
172
Concerned
Ministry/
Department
Name of
the
Districts
/ Blocks
Component Activity Total
Number
Command
Area/Irrig
ation
Potential
(Ha)
Period of
Implement
ation 5/ 7
Estimated
cost
(in Lakhs
Rs.)
Longitude Lattitude Remark / Village Name
MOA&FW Majholi Per Drop More Crop Sprinkler 20 20 5 4.00 79°55'30.662"E 23°27'49.68"N Hathwai
MOA&FW Majholi Per Drop More Crop Drip system 1 1 5 1.00 79°55'30.662"E 23°27'49.68"N Hathwai
MOA&FW Majholi Har Khet Ko Pani Diesel / Electric /
SolarPump 16 16 5 4.00 80°1'2.301"E 23°29'42.101"N Hathwai
MOA&FW Majholi Har Khet Ko Pani Tube well 24 24 5 48.00 80°1'2.301"E 23°29'42.101"N Hathwai
MOA&FW Majholi Har Khet Ko Pani Farm Pond 2 4 5 4.00 80°1'2.301"E 23°29'42.101"N Hathwai
MOA&FW Majholi Har Khet Ko Pani Diesel / Electric /
SolarPump 25 25 5 6.25 79°51'28.889"E 23°25'58.417"N Hinauta
MOA&FW Majholi Har Khet Ko Pani Tube well 22 22 5 44.00 79°51'28.889"E 23°25'58.417"N Hinauta
MOA&FW Majholi Har Khet Ko Pani Diesel / Electric /
SolarPump 21 21 5 5.25 79°51'28.889"E 23°25'58.417"N Hinauta
MOA&FW Majholi Har Khet Ko Pani Tube well 23 23 5 46.00 79°51'28.889"E 23°25'58.417"N Hinauta
MOA&FW Majholi Per Drop More Crop Sprinkler 18 18 5 3.60 79°51'28.889"E 23°25'58.417"N Hinauta
MOA&FW Majholi Per Drop More Crop Sprinkler 20 20 5 4.00 79°55'30.662"E 23°27'49.68"N Indrana
MOA&FW Majholi Per Drop More Crop Drip system 1 1 5 1.00 79°55'30.662"E 23°27'49.68"N Indrana
MOA&FW Majholi Har Khet Ko Pani Farm Pond 2 4 5 4.00 80°1'2.301"E 23°29'42.101"N Indrana
MOA&FW Majholi Per Drop More Crop Sprinkler 18 18 5 3.60 79°55'30.662"E 23°27'49.68"N Itawa
MOA&FW Majholi Per Drop More Crop Drip system 1 1 5 1.00 79°55'30.662"E 23°27'49.68"N Itawa
MOA&FW Majholi Har Khet Ko Pani Diesel / Electric /
SolarPump 25 25 5 6.25 80°1'2.301"E 23°29'42.101"N Itawa
MOA&FW Majholi Har Khet Ko Pani Tube well 22 22 5 44.00 80°1'2.301"E 23°29'42.101"N Itawa
MOA&FW Majholi Har Khet Ko Pani Diesel / Electric /
SolarPump 17 17 5 4.25 80°1'2.301"E 23°29'42.101"N Itawa
MOA&FW Majholi Har Khet Ko Pani Tube well 23 23 5 46.00 79°50'19.246"E 23°29'42.079"N Jamuniya
MOA&FW Majholi Per Drop More Crop Sprinkler 16 16 5 3.20 79°50'19.246"E 23°29'42.079"N Jamuniya
MOA&FW Majholi Har Khet Ko Pani Diesel / Electric /
SolarPump 16 16 5 4.00 80°1'2.301"E 23°29'42.101"N Jamuniya
MOA&FW Majholi Per Drop More Crop Sprinkler 21 21 5 4.20 79°55'30.662"E 23°27'49.68"N Jauli
MOA&FW Majholi Per Drop More Crop Drip system 1 1 5 1.00 79°55'30.662"E 23°27'49.68"N Jauli
MOA&FW Majholi Har Khet Ko Pani Tube well 20 20 5 40.00 80°1'2.301"E 23°29'42.101"N Jauli
MOA&FW Majholi Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°1'2.301"E 23°29'42.101"N Jauli
MOA&FW Majholi Per Drop More Crop Sprinkler 18 18 5 3.60 79°55'30.662"E 23°27'49.68"N Jhingrai
173
Concerned
Ministry/
Department
Name of
the
Districts
/ Blocks
Component Activity Total
Number
Command
Area/Irrig
ation
Potential
(Ha)
Period of
Implement
ation 5/ 7
Estimated
cost
(in Lakhs
Rs.)
Longitude Lattitude Remark / Village Name
MOA&FW Majholi Har Khet Ko Pani Diesel / Electric /
SolarPump 18 18 5 4.50 80°1'2.301"E 23°29'42.101"N Jhingrai
MOA&FW Majholi Har Khet Ko Pani Tube well 23 23 5 46.00 80°1'2.301"E 23°29'42.101"N Jhingrai
MOA&FW Majholi Per Drop More Crop Sprinkler 19 19 5 3.80 79°55'30.662"E 23°27'49.68"N Jujhari
MOA&FW Majholi Har Khet Ko Pani Diesel / Electric /
SolarPump 21 21 5 5.25 80°1'2.301"E 23°29'42.101"N Jujhari
MOA&FW Majholi Har Khet Ko Pani Tube well 23 23 5 46.00 80°1'2.301"E 23°29'42.101"N Jujhari
MOA&FW Majholi Har Khet Ko Pani Diesel / Electric /
SolarPump 17 17 5 4.25 80°1'2.301"E 23°29'42.101"N Jujhari
MOA&FW Majholi Per Drop More Crop Sprinkler 17 17 5 3.40 79°55'30.662"E 23°27'49.68"N Junwani Khurd
MOA&FW Majholi Per Drop More Crop Drip system 1 1 5 1.00 79°55'30.662"E 23°27'49.68"N Junwani Khurd
MOA&FW Majholi Har Khet Ko Pani Tube well 26 26 5 52.00 80°1'2.301"E 23°29'42.101"N Junwani Khurd
MOA&FW Majholi Per Drop More Crop Sprinkler 17 17 5 3.40 79°55'30.662"E 23°27'49.68"N Kailwas
MOA&FW Majholi Per Drop More Crop Drip system 3 3 5 3.00 79°55'30.662"E 23°27'49.68"N Kailwas
MOA&FW Majholi Har Khet Ko Pani Diesel / Electric /
SolarPump 16 16 5 4.00 80°1'2.301"E 23°29'42.101"N Kailwas
MOA&FW Majholi Har Khet Ko Pani Tube well 22 22 5 44.00 80°1'2.301"E 23°29'42.101"N Kailwas
MOA&FW Majholi Per Drop More Crop Sprinkler 24 24 5 4.80 79°55'30.662"E 23°27'49.68"N Kaithra
MOA&FW Majholi Har Khet Ko Pani Diesel / Electric /
SolarPump 19 19 5 4.75 80°1'2.301"E 23°29'42.101"N Kaithra
MOA&FW Majholi Har Khet Ko Pani Tube well 21 21 5 42.00 80°1'2.301"E 23°29'42.101"N Kaithra
MOA&FW Majholi Per Drop More Crop Sprinkler 16 16 5 3.20 79°55'30.662"E 23°27'49.68"N Kanjai
MOA&FW Majholi Har Khet Ko Pani Diesel / Electric /
SolarPump 16 16 5 4.00 80°1'2.301"E 23°29'42.101"N Kanjai
MOA&FW Majholi Har Khet Ko Pani Tube well 24 24 5 48.00 80°1'2.301"E 23°29'42.101"N Kanjai
MOA&FW Majholi Har Khet Ko Pani Diesel / Electric /
SolarPump 16 16 5 4.00 80°1'2.301"E 23°29'42.101"N Kanjai
MOA&FW Majholi Har Khet Ko Pani Tube well 20 20 5 40.00 80°1'2.301"E 23°29'42.101"N Kanjai
MOA&FW Majholi Har Khet Ko Pani Farm Pond 1 2 5 2.00 79°56'58.355"E 23°29'16.632"N Kankardehi
MOA&FW Majholi Har Khet Ko Pani Diesel / Electric /
SolarPump 18 18 5 4.50 79°56'58.355"E 23°29'16.632"N Kankardehi
MOA&FW Majholi Per Drop More Crop Sprinkler 21 21 5 4.20 79°56'58.355"E 23°29'16.632"N Kankardehi
174
Concerned
Ministry/
Department
Name of
the
Districts
/ Blocks
Component Activity Total
Number
Command
Area/Irrig
ation
Potential
(Ha)
Period of
Implement
ation 5/ 7
Estimated
cost
(in Lakhs
Rs.)
Longitude Lattitude Remark / Village Name
MOA&FW Majholi Per Drop More Crop Drip system 1 1 5 1.00 79°56'58.355"E 23°29'16.632"N Kankardehi
MOA&FW Majholi Per Drop More Crop Sprinkler 18 18 5 3.60 79°55'30.662"E 23°27'49.68"N Kapa
MOA&FW Majholi Per Drop More Crop Sprinkler 24 24 5 4.80 79°55'30.662"E 23°27'49.68"N Kapa
MOA&FW Majholi Har Khet Ko Pani Tube well 23 23 5 46.00 80°1'2.301"E 23°29'42.101"N Kapa
MOA&FW Majholi Har Khet Ko Pani Diesel / Electric /
SolarPump 21 21 5 5.25 80°1'2.301"E 23°29'42.101"N Kapa
MOA&FW Majholi Har Khet Ko Pani Tube well 23 23 5 46.00 80°1'2.301"E 23°29'42.101"N Kapa
MOA&FW Majholi Per Drop More Crop Sprinkler 16 16 5 3.20 79°55'30.662"E 23°27'49.68"N Katra
MOA&FW Majholi Har Khet Ko Pani Diesel / Electric /
SolarPump 16 16 5 4.00 80°1'2.301"E 23°29'42.101"N Katra
MOA&FW Majholi Har Khet Ko Pani Tube well 24 24 5 48.00 80°1'2.301"E 23°29'42.101"N Katra
MOA&FW Majholi Har Khet Ko Pani Diesel / Electric /
SolarPump 16 16 5 4.00 80°1'2.301"E 23°29'42.101"N Katra
MOA&FW Majholi Per Drop More Crop Sprinkler 20 20 5 4.00 79°55'30.662"E 23°27'49.68"N Khairi
MOA&FW Majholi Har Khet Ko Pani Tube well 20 20 5 40.00 80°1'2.301"E 23°29'42.101"N Khairi
MOA&FW Majholi Har Khet Ko Pani Farm Pond 2 4 5 4.00 80°1'2.301"E 23°29'42.101"N Khairi
MOA&FW Majholi Per Drop More Crop Drip system 1 1 5 1.00 79°55'30.662"E 23°27'49.68"N Khakhara
MOA&FW Majholi Har Khet Ko Pani Diesel / Electric /
SolarPump 25 25 5 6.25 80°1'2.301"E 23°29'42.101"N Khakhara
MOA&FW Majholi Har Khet Ko Pani Tube well 22 22 5 44.00 80°1'2.301"E 23°29'42.101"N Khakhara
MOA&FW Majholi Per Drop More Crop Sprinkler 17 17 5 3.40 79°55'30.662"E 23°27'49.68"N Khalari
MOA&FW Majholi Per Drop More Crop Drip system 1 1 5 1.00 79°55'30.662"E 23°27'49.68"N Khalari
MOA&FW Majholi Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°1'2.301"E 23°29'42.101"N Khalari
MOA&FW Majholi Har Khet Ko Pani Diesel / Electric /
SolarPump 25 25 5 6.25 80°1'2.301"E 23°29'42.101"N Khalari
MOA&FW Majholi Har Khet Ko Pani Tube well 30 30 5 60.00 80°0'38.052"E 23°30'49.839"N Khamhariya
MOA&FW Majholi Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°0'38.052"E 23°30'49.839"N Khamhariya
MOA&FW Majholi Har Khet Ko Pani Diesel / Electric /
SolarPump 18 18 5 4.50 80°0'38.052"E 23°30'49.839"N Khamhariya
MOA&FW Majholi Har Khet Ko Pani Tube well 23 23 5 46.00 80°0'38.052"E 23°30'49.839"N Khamhariya
MOA&FW Majholi Har Khet Ko Pani Diesel / Electric /
SolarPump 17 17 5 4.25 80°0'38.052"E 23°30'49.839"N Khamhariya
175
Concerned
Ministry/
Department
Name of
the
Districts
/ Blocks
Component Activity Total
Number
Command
Area/Irrig
ation
Potential
(Ha)
Period of
Implement
ation 5/ 7
Estimated
cost
(in Lakhs
Rs.)
Longitude Lattitude Remark / Village Name
MOA&FW Majholi Har Khet Ko Pani Tube well 26 26 5 52.00 80°0'38.052"E 23°30'49.839"N Khamhariya
MOA&FW Majholi Har Khet Ko Pani Diesel / Electric /
SolarPump 16 16 5 4.00 80°0'38.052"E 23°30'49.839"N Khamhariya
MOA&FW Majholi Per Drop More Crop Sprinkler 21 21 5 4.20 80°0'38.052"E 23°30'49.839"N Khamhariya
MOA&FW Majholi Per Drop More Crop Drip system 1 1 5 1.00 80°0'38.052"E 23°30'49.839"N Khamhariya
MOA&FW Majholi Per Drop More Crop Sprinkler 19 19 5 3.80 80°0'38.052"E 23°30'49.839"N Khamhariya
MOA&FW Majholi Per Drop More Crop Sprinkler 24 24 5 4.80 80°0'38.052"E 23°30'49.839"N Khamhariya
MOA&FW Majholi Per Drop More Crop Sprinkler 17 17 5 3.40 79°55'30.662"E 23°27'49.68"N Khamra
MOA&FW Majholi Per Drop More Crop Drip system 3 3 5 3.00 79°55'30.662"E 23°27'49.68"N Khamra
MOA&FW Majholi Har Khet Ko Pani Tube well 24 24 5 48.00 80°1'2.301"E 23°29'42.101"N Khamra
MOA&FW Majholi Har Khet Ko Pani Diesel / Electric /
SolarPump 19 19 5 4.75 80°1'2.301"E 23°29'42.101"N Khamra
MOA&FW Majholi Har Khet Ko Pani Tube well 21 21 5 42.00 80°1'2.301"E 23°29'42.101"N Khamra
MOA&FW Majholi Har Khet Ko Pani Diesel / Electric /
SolarPump 16 16 5 4.00 79°55'1.925"E 23°34'21.154"N Khand
MOA&FW Majholi Har Khet Ko Pani Tube well 23 23 5 46.00 79°55'1.925"E 23°34'21.154"N Khand
MOA&FW Majholi Per Drop More Crop Sprinkler 15 15 5 3.00 79°55'1.925"E 23°34'21.154"N Khand
MOA&FW Majholi Per Drop More Crop Sprinkler 16 16 5 3.20 79°55'1.925"E 23°34'21.154"N Khand
MOA&FW Majholi Har Khet Ko Pani Diesel / Electric /
SolarPump 16 16 5 4.00 80°1'2.301"E 23°29'42.101"N Khango
MOA&FW Majholi Har Khet Ko Pani Tube well 20 20 5 40.00 80°1'2.301"E 23°29'42.101"N Khango
MOA&FW Majholi Har Khet Ko Pani Farm Pond 2 4 5 4.00 80°1'2.301"E 23°29'42.101"N Khango
MOA&FW Majholi Per Drop More Crop Sprinkler 20 20 5 4.00 79°55'30.662"E 23°27'49.68"N Khinni
MOA&FW Majholi Per Drop More Crop Drip system 1 1 5 1.00 79°55'30.662"E 23°27'49.68"N Khinni
MOA&FW Majholi Per Drop More Crop Sprinkler 18 18 5 3.60 79°55'30.662"E 23°27'49.68"N Khinni
MOA&FW Majholi Har Khet Ko Pani Diesel / Electric /
SolarPump 25 25 5 6.25 80°1'2.301"E 23°29'42.101"N Khinni
MOA&FW Majholi Har Khet Ko Pani Tube well 22 22 5 44.00 80°1'2.301"E 23°29'42.101"N Khinni
MOA&FW Majholi Har Khet Ko Pani Diesel / Electric /
SolarPump 21 21 5 5.25 79°58'25.448"E 23°33'3.134"N Khitaula
MOA&FW Majholi Har Khet Ko Pani Tube well 23 23 5 46.00 79°58'25.448"E 23°33'3.134"N Khitaula
MOA&FW Majholi Per Drop More Crop Sprinkler 17 17 5 3.40 79°58'25.448"E 23°33'3.134"N Khitaula
176
Concerned
Ministry/
Department
Name of
the
Districts
/ Blocks
Component Activity Total
Number
Command
Area/Irrig
ation
Potential
(Ha)
Period of
Implement
ation 5/ 7
Estimated
cost
(in Lakhs
Rs.)
Longitude Lattitude Remark / Village Name
MOA&FW Majholi Per Drop More Crop Drip system 3 3 5 3.00 79°58'25.448"E 23°33'3.134"N Khitaula
MOA&FW Majholi Per Drop More Crop Sprinkler 18 18 5 3.60 79°55'30.662"E 23°27'49.68"N Khudawal
MOA&FW Majholi Per Drop More Crop Drip system 1 1 5 1.00 79°55'30.662"E 23°27'49.68"N Khudawal
MOA&FW Majholi Per Drop More Crop Sprinkler 20 20 5 4.00 79°55'30.662"E 23°27'49.68"N Khudawal
MOA&FW Majholi Har Khet Ko Pani Diesel / Electric /
SolarPump 19 19 5 4.75 80°1'2.301"E 23°29'42.101"N Khudawal
MOA&FW Majholi Har Khet Ko Pani Tube well 21 21 5 42.00 80°1'2.301"E 23°29'42.101"N Khudawal
MOA&FW Majholi Har Khet Ko Pani Diesel / Electric /
SolarPump 17 17 5 4.25 80°1'2.301"E 23°29'42.101"N Khudawal
MOA&FW Majholi Har Khet Ko Pani Tube well 23 23 5 46.00 80°1'2.301"E 23°29'42.101"N Khudawal
MOA&FW Majholi Har Khet Ko Pani Farm Pond 2 4 5 4.00 80°1'2.301"E 23°29'42.101"N Khudawal
MOA&FW Majholi Per Drop More Crop Drip system 1 1 5 1.00 79°55'30.662"E 23°27'49.68"N Kingi
MOA&FW Majholi Per Drop More Crop Sprinkler 17 17 5 3.40 79°55'30.662"E 23°27'49.68"N Kingi
MOA&FW Majholi Har Khet Ko Pani Diesel / Electric /
SolarPump 25 25 5 6.25 80°1'2.301"E 23°29'42.101"N Kingi
MOA&FW Majholi Har Khet Ko Pani Tube well 22 22 5 44.00 80°1'2.301"E 23°29'42.101"N Kingi
MOA&FW Majholi Har Khet Ko Pani Diesel / Electric /
SolarPump 19 19 5 4.75 79°54'27.894"E 23°24'5.414"N Koni Kalan
MOA&FW Majholi Har Khet Ko Pani Tube well 21 21 5 42.00 79°54'27.894"E 23°24'5.414"N Koni Kalan
MOA&FW Majholi Per Drop More Crop Drip system 3 3 5 3.00 79°54'27.894"E 23°24'5.414"N Koni Kalan
MOA&FW Majholi Har Khet Ko Pani Diesel / Electric /
SolarPump 16 16 5 4.00 79°54'26.387"E 23°23'36.787"N Koni Khurd
MOA&FW Majholi Har Khet Ko Pani Tube well 23 23 5 46.00 79°54'26.387"E 23°23'36.787"N Koni Khurd
MOA&FW Majholi Per Drop More Crop Sprinkler 15 15 5 3.00 79°54'26.387"E 23°23'36.787"N Koni Khurd
MOA&FW Majholi Per Drop More Crop Sprinkler 18 18 5 3.60 79°55'30.662"E 23°27'49.68"N Kuda
MOA&FW Majholi Per Drop More Crop Drip system 1 1 5 1.00 79°55'30.662"E 23°27'49.68"N Kuda
MOA&FW Majholi Har Khet Ko Pani Diesel / Electric /
SolarPump 17 17 5 4.25 80°1'2.301"E 23°25'23.534"N Kuda
MOA&FW Majholi Per Drop More Crop Sprinkler 18 18 5 3.60 79°55'30.662"E 23°27'49.68"N Kukrai
MOA&FW Majholi Per Drop More Crop Sprinkler 16 16 5 3.20 79°55'30.662"E 23°27'49.68"N Kukrai
MOA&FW Majholi Har Khet Ko Pani Tube well 23 23 5 46.00 80°1'2.301"E 23°25'23.534"N Kukrai
177
Concerned
Ministry/
Department
Name of
the
Districts
/ Blocks
Component Activity Total
Number
Command
Area/Irrig
ation
Potential
(Ha)
Period of
Implement
ation 5/ 7
Estimated
cost
(in Lakhs
Rs.)
Longitude Lattitude Remark / Village Name
MOA&FW Majholi Har Khet Ko Pani Diesel / Electric /
SolarPump 21 21 5 5.25 80°1'2.301"E 23°25'23.534"N Kukrai
MOA&FW Majholi Har Khet Ko Pani Tube well 23 23 5 46.00 80°1'2.301"E 23°25'23.534"N Kukrai
MOA&FW Majholi Har Khet Ko Pani Diesel / Electric /
SolarPump 16 16 5 4.00 79°48'37.459"E 23°28'8.328"N Kulhuwa
MOA&FW Majholi Har Khet Ko Pani Tube well 20 20 5 40.00 79°48'37.459"E 23°28'8.328"N Kulhuwa
MOA&FW Majholi Har Khet Ko Pani Farm Pond 2 4 5 4.00 79°48'37.459"E 23°28'8.328"N Kulhuwa
MOA&FW Majholi Per Drop More Crop Sprinkler 20 20 5 4.00 79°48'37.459"E 23°28'8.328"N Kulhuwa
MOA&FW Majholi Per Drop More Crop Drip system 1 1 5 1.00 79°48'37.459"E 23°28'8.328"N Kulhuwa
MOA&FW Majholi Per Drop More Crop Sprinkler 18 18 5 3.60 79°55'30.662"E 23°27'49.68"N Kumharwara
MOA&FW Majholi Per Drop More Crop Drip system 1 1 5 1.00 79°55'30.662"E 23°27'49.68"N Kumharwara
MOA&FW Majholi Har Khet Ko Pani Diesel / Electric /
SolarPump 25 25 5 6.25 80°1'2.301"E 23°25'23.534"N Kumharwara
MOA&FW Majholi Har Khet Ko Pani Tube well 22 22 5 44.00 80°1'2.301"E 23°25'23.534"N Kumharwara
MOA&FW Majholi Per Drop More Crop Sprinkler 19 19 5 3.80 79°55'30.662"E 23°27'49.68"N Kusmi
MOA&FW Majholi Har Khet Ko Pani Diesel / Electric /
SolarPump 17 17 5 4.25 80°1'2.301"E 23°25'23.534"N Kusmi
MOA&FW Majholi Har Khet Ko Pani Tube well 23 23 5 46.00 80°1'2.301"E 23°25'23.534"N Kusmi
MOA&FW Majholi Har Khet Ko Pani Diesel / Electric /
SolarPump 17 17 5 4.25 80°1'2.301"E 23°25'23.534"N Kusmi
MOA&FW Majholi Har Khet Ko Pani Tube well 26 26 5 52.00 79°55'31.301"E 23°27'45.56"N Ladoi
MOA&FW Majholi Har Khet Ko Pani Diesel / Electric /
SolarPump 21 21 5 5.25 79°55'31.301"E 23°27'45.56"N Ladoi
MOA&FW Majholi Har Khet Ko Pani Tube well 23 23 5 46.00 79°55'31.301"E 23°27'45.56"N Ladoi
MOA&FW Majholi Per Drop More Crop Sprinkler 18 18 5 3.60 79°55'31.301"E 23°27'45.56"N Ladoi
MOA&FW Majholi Per Drop More Crop Sprinkler 16 16 5 3.20 79°55'31.301"E 23°27'45.56"N Ladoi
MOA&FW Majholi Per Drop More Crop Sprinkler 20 20 5 4.00 79°55'30.662"E 23°27'49.68"N Lahaud
MOA&FW Majholi Per Drop More Crop Drip system 1 1 5 1.00 79°55'30.662"E 23°27'49.68"N Lahaud
MOA&FW Majholi Har Khet Ko Pani Diesel / Electric /
SolarPump 16 16 5 4.00 80°1'2.301"E 23°25'23.534"N Lahaud
MOA&FW Majholi Har Khet Ko Pani Tube well 20 20 5 40.00 80°1'2.301"E 23°25'23.534"N Lahaud
MOA&FW Majholi Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°1'2.301"E 23°25'23.534"N Lahaud
178
Concerned
Ministry/
Department
Name of
the
Districts
/ Blocks
Component Activity Total
Number
Command
Area/Irrig
ation
Potential
(Ha)
Period of
Implement
ation 5/ 7
Estimated
cost
(in Lakhs
Rs.)
Longitude Lattitude Remark / Village Name
MOA&FW Majholi Per Drop More Crop Sprinkler 18 18 5 3.60 79°55'30.662"E 23°27'49.68"N Lakhanpur
MOA&FW Majholi Har Khet Ko Pani Diesel / Electric /
SolarPump 25 25 5 6.25 80°1'2.301"E 23°25'23.534"N Lakhanpur
MOA&FW Majholi Har Khet Ko Pani Tube well 22 22 5 44.00 80°1'2.301"E 23°25'23.534"N Lakhanpur
MOA&FW Majholi Per Drop More Crop Drip system 1 1 5 1.00 79°55'30.662"E 23°27'49.68"N Lamkana
MOA&FW Majholi Har Khet Ko Pani Diesel / Electric /
SolarPump 17 17 5 4.25 80°1'2.301"E 23°25'23.534"N Lamkana
MOA&FW Majholi Har Khet Ko Pani Tube well 23 23 5 46.00 80°1'2.301"E 23°25'23.534"N Lamkana
MOA&FW Majholi Har Khet Ko Pani Diesel / Electric /
SolarPump 19 19 5 4.75 79°55'26.785"E 23°33'29.625"N Lamti
MOA&FW Majholi Per Drop More Crop Sprinkler 17 17 5 3.40 79°55'26.785"E 23°33'29.625"N Lamti
MOA&FW Majholi Per Drop More Crop Drip system 3 3 5 3.00 79°55'26.785"E 23°33'29.625"N Lamti
MOA&FW Majholi Per Drop More Crop Sprinkler 20 20 5 4.00 79°55'30.662"E 23°27'49.68"N Latuwa
MOA&FW Majholi Har Khet Ko Pani Tube well 21 21 5 42.00 80°1'2.301"E 23°25'23.534"N Latuwa
MOA&FW Majholi Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°1'2.301"E 23°25'23.534"N Latuwa
MOA&FW Majholi Har Khet Ko Pani Diesel / Electric /
SolarPump 25 25 5 6.25 79°54'17.64"E 23°27'41.543"N Luhari
MOA&FW Majholi Har Khet Ko Pani Tube well 22 22 5 44.00 79°54'17.64"E 23°27'41.543"N Luhari
MOA&FW Majholi Har Khet Ko Pani Diesel / Electric /
SolarPump 16 16 5 4.00 79°54'17.64"E 23°27'41.543"N Luhari
MOA&FW Majholi Har Khet Ko Pani Tube well 24 24 5 48.00 79°54'17.64"E 23°27'41.543"N Luhari
MOA&FW Majholi Per Drop More Crop Drip system 1 1 5 1.00 79°54'17.64"E 23°27'41.543"N Luhari
MOA&FW Majholi Per Drop More Crop Sprinkler 24 24 5 4.80 79°54'17.64"E 23°27'41.543"N Luhari
MOA&FW Majholi Per Drop More Crop Sprinkler 18 18 5 3.60 79°54'17.64"E 23°27'41.543"N Luhari
MOA&FW Majholi Per Drop More Crop Drip system 1 1 5 1.00 79°54'17.64"E 23°27'41.543"N Luhari
MOA&FW Majholi Per Drop More Crop Sprinkler 21 21 5 4.20 79°55'30.662"E 23°27'49.68"N Madai
MOA&FW Majholi Per Drop More Crop Drip system 1 1 5 1.00 79°55'30.662"E 23°27'49.68"N Madai
MOA&FW Majholi Har Khet Ko Pani Diesel / Electric /
SolarPump 17 17 5 4.25 80°1'2.301"E 23°25'23.534"N Madai
MOA&FW Majholi Har Khet Ko Pani Tube well 23 23 5 46.00 80°1'2.301"E 23°25'23.534"N Madai
MOA&FW Majholi Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°1'2.301"E 23°25'23.534"N Madai
179
Concerned
Ministry/
Department
Name of
the
Districts
/ Blocks
Component Activity Total
Number
Command
Area/Irrig
ation
Potential
(Ha)
Period of
Implement
ation 5/ 7
Estimated
cost
(in Lakhs
Rs.)
Longitude Lattitude Remark / Village Name
MOA&FW Majholi Har Khet Ko Pani Diesel / Electric /
SolarPump 18 18 5 4.50 79°59'40.535"E 23°24'21.234"N Magarkata
MOA&FW Majholi Har Khet Ko Pani Tube well 23 23 5 46.00 79°59'40.535"E 23°24'21.234"N Magarkata
MOA&FW Majholi Har Khet Ko Pani Diesel / Electric /
SolarPump 16 16 5 4.00 79°59'40.535"E 23°24'21.234"N Magarkata
MOA&FW Majholi Har Khet Ko Pani Tube well 20 20 5 40.00 79°59'40.535"E 23°24'21.234"N Magarkata
MOA&FW Majholi Per Drop More Crop Sprinkler 16 16 5 3.20 79°59'40.535"E 23°24'21.234"N Magarkata
MOA&FW Majholi Har Khet Ko Pani Farm Pond 1 2 5 2.00 79°56'31.423"E 23°35'6.356"N Mahagawan
MOA&FW Majholi Har Khet Ko Pani Diesel / Electric /
SolarPump 25 25 5 6.25 79°56'31.423"E 23°35'6.356"N Mahagawan
MOA&FW Majholi Per Drop More Crop Sprinkler 20 20 5 4.00 79°56'31.423"E 23°35'6.356"N Mahagawan
MOA&FW Majholi Per Drop More Crop Drip system 1 1 5 1.00 79°56'31.423"E 23°35'6.356"N Mahagawan
MOA&FW Majholi Har Khet Ko Pani Tube well 22 22 5 44.00 79°56'31.423"E 23°35'6.356"N Mahgawan
MOA&FW Majholi Har Khet Ko Pani Diesel / Electric /
SolarPump 21 21 5 5.25 79°56'31.423"E 23°35'6.356"N Mahgawan
MOA&FW Majholi Har Khet Ko Pani Tube well 23 23 5 46.00 79°56'31.423"E 23°35'6.356"N Mahgawan
MOA&FW Majholi Har Khet Ko Pani Farm Pond 1 2 5 2.00 79°56'31.423"E 23°35'6.356"N Mahgawan
MOA&FW Majholi Per Drop More Crop Sprinkler 18 18 5 3.60 79°56'31.423"E 23°35'6.356"N Mahgawan
MOA&FW Majholi Per Drop More Crop Sprinkler 21 21 5 4.20 79°56'31.423"E 23°35'6.356"N Mahgawan
MOA&FW Majholi Per Drop More Crop Drip system 1 1 5 1.00 79°55'30.662"E 23°27'49.68"N Majauli
MOA&FW Majholi Per Drop More Crop Sprinkler 15 15 5 3.00 79°55'30.662"E 23°27'49.68"N Majauli
MOA&FW Majholi Har Khet Ko Pani Diesel / Electric /
SolarPump 18 18 5 4.50 80°1'2.301"E 23°25'23.534"N Majauli
MOA&FW Majholi Har Khet Ko Pani Tube well 23 23 5 46.00 80°1'2.301"E 23°25'23.534"N Majauli
MOA&FW Majholi Per Drop More Crop Sprinkler 18 18 5 3.60 79°55'30.662"E 23°27'49.68"N Majhgawan
MOA&FW Majholi Per Drop More Crop Drip system 1 1 5 1.00 79°55'30.662"E 23°27'49.68"N Majhgawan
MOA&FW Majholi Per Drop More Crop Sprinkler 19 19 5 3.80 79°55'30.662"E 23°27'49.68"N Majhgawan
MOA&FW Majholi Har Khet Ko Pani Diesel / Electric /
SolarPump 16 16 5 4.00 80°1'2.301"E 23°25'23.534"N Majhgawan
MOA&FW Majholi Har Khet Ko Pani Tube well 23 23 5 46.00 80°1'2.301"E 23°25'23.534"N Majhgawan
MOA&FW Majholi Har Khet Ko Pani Diesel / Electric /
SolarPump 17 17 5 4.25 80°1'2.301"E 23°25'23.534"N Majhgawan
180
Concerned
Ministry/
Department
Name of
the
Districts
/ Blocks
Component Activity Total
Number
Command
Area/Irrig
ation
Potential
(Ha)
Period of
Implement
ation 5/ 7
Estimated
cost
(in Lakhs
Rs.)
Longitude Lattitude Remark / Village Name
MOA&FW Majholi Har Khet Ko Pani Tube well 23 23 5 46.00 80°1'2.301"E 23°25'23.534"N Majhgawan
MOA&FW Majholi Per Drop More Crop Sprinkler 24 24 5 4.80 79°55'30.662"E 23°27'49.68"N Malhana
MOA&FW Majholi Har Khet Ko Pani Diesel / Electric /
SolarPump 17 17 5 4.25 80°1'2.301"E 23°25'23.534"N Malhana
MOA&FW Majholi Har Khet Ko Pani Tube well 26 26 5 52.00 80°1'2.301"E 23°25'23.534"N Malhana
MOA&FW Majholi Har Khet Ko Pani Diesel / Electric /
SolarPump 16 16 5 4.00 79°53'13.354"E 23°30'46.365"N Mandhara
MOA&FW Majholi Har Khet Ko Pani Tube well 24 24 5 48.00 79°53'13.354"E 23°30'46.365"N Mandhara
MOA&FW Majholi Per Drop More Crop Sprinkler 18 18 5 3.60 79°53'13.354"E 23°30'46.365"N Mandhara
MOA&FW Majholi Per Drop More Crop Sprinkler 16 16 5 3.20 79°55'30.662"E 23°27'49.68"N Mandla
MOA&FW Majholi Har Khet Ko Pani Diesel / Electric /
SolarPump 21 21 5 5.25 80°1'2.301"E 23°25'23.534"N Mandla
MOA&FW Majholi Har Khet Ko Pani Tube well 23 23 5 46.00 80°1'2.301"E 23°25'23.534"N Mandla
MOA&FW Majholi Har Khet Ko Pani Diesel / Electric /
SolarPump 16 16 5 4.00 80°1'2.301"E 23°25'23.534"N Mandla
MOA&FW Majholi Har Khet Ko Pani Tube well 20 20 5 40.00 80°1'2.301"E 23°25'23.534"N Mandla
MOA&FW Majholi Per Drop More Crop Sprinkler 15 15 5 3.00 79°55'30.662"E 23°27'49.68"N Mangawan
MOA&FW Majholi Per Drop More Crop Drip system 1 1 5 1.00 79°55'30.662"E 23°27'49.68"N Mangawan
MOA&FW Majholi Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°1'2.301"E 23°25'23.534"N Mangawan
MOA&FW Majholi Per Drop More Crop Sprinkler 19 19 5 3.80 79°55'30.662"E 23°27'49.68"N Mansakra
MOA&FW Majholi Har Khet Ko Pani Diesel / Electric /
SolarPump 16 16 5 4.00 80°1'2.301"E 23°25'23.534"N Mansakra
MOA&FW Majholi Har Khet Ko Pani Tube well 23 23 5 46.00 80°1'2.301"E 23°25'23.534"N Mansakra
MOA&FW Majholi Har Khet Ko Pani Diesel / Electric /
SolarPump 17 17 5 4.25 80°1'2.301"E 23°25'23.534"N Mansakra
MOA&FW Majholi Per Drop More Crop Sprinkler 24 24 5 4.80 79°55'30.662"E 23°27'49.68"N Marhati
MOA&FW Majholi Har Khet Ko Pani Tube well 26 26 5 52.00 80°1'2.301"E 23°25'23.534"N Marhati
MOA&FW Majholi Har Khet Ko Pani Diesel / Electric /
SolarPump 16 16 5 4.00 80°1'2.301"E 23°25'23.534"N Marhati
MOA&FW Majholi Har Khet Ko Pani Tube well 24 24 5 48.00 80°1'2.301"E 23°25'23.534"N Marhati
MOA&FW Majholi Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°1'2.301"E 23°25'23.534"N Marhati
181
Concerned
Ministry/
Department
Name of
the
Districts
/ Blocks
Component Activity Total
Number
Command
Area/Irrig
ation
Potential
(Ha)
Period of
Implement
ation 5/ 7
Estimated
cost
(in Lakhs
Rs.)
Longitude Lattitude Remark / Village Name
MOA&FW Majholi Har Khet Ko Pani Diesel / Electric /
SolarPump 25 25 5 6.25 80°10'22.277"E 23°33'6.572"N Mohla
MOA&FW Majholi Har Khet Ko Pani Tube well 22 22 5 44.00 80°10'22.277"E 23°33'6.572"N Mohla
MOA&FW Majholi Per Drop More Crop Sprinkler 20 20 5 4.00 80°10'22.277"E 23°33'6.572"N Mohla
MOA&FW Majholi Per Drop More Crop Drip system 1 1 5 1.00 80°10'22.277"E 23°33'6.572"N Mohla
MOA&FW Majholi Per Drop More Crop Sprinkler 19 19 5 3.80 80°10'22.277"E 23°33'6.572"N Mohla
MOA&FW Majholi Per Drop More Crop Sprinkler 21 21 5 4.20 79°55'30.662"E 23°27'49.68"N Mudari
MOA&FW Majholi Har Khet Ko Pani Diesel / Electric /
SolarPump 17 17 5 4.25 80°1'2.301"E 23°25'23.534"N Mudari
MOA&FW Majholi Har Khet Ko Pani Tube well 26 26 5 52.00 80°1'2.301"E 23°25'23.534"N Mudari
MOA&FW Majholi Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°1'2.301"E 23°25'23.534"N Mudari
MOA&FW Majholi Per Drop More Crop Drip system 1 1 5 1.00 79°55'30.662"E 23°27'49.68"N Mudiya Madaud
MOA&FW Majholi Har Khet Ko Pani Diesel / Electric /
SolarPump 18 18 5 4.50 80°1'2.301"E 23°25'23.534"N Mudiya Madaud
MOA&FW Majholi Har Khet Ko Pani Tube well 23 23 5 46.00 80°1'2.301"E 23°25'23.534"N Mudiya Madaud
MOA&FW Majholi Per Drop More Crop Sprinkler 18 18 5 3.60 79°55'30.662"E 23°27'49.68"N Mudkuru
MOA&FW Majholi Per Drop More Crop Drip system 1 1 5 1.00 79°55'30.662"E 23°27'49.68"N Mudkuru
MOA&FW Majholi Har Khet Ko Pani Diesel / Electric /
SolarPump 17 17 5 4.25 80°1'2.301"E 23°25'23.534"N Mudkuru
MOA&FW Majholi Per Drop More Crop Sprinkler 17 17 5 3.40 79°55'30.662"E 23°27'49.68"N Muhaniya
MOA&FW Majholi Per Drop More Crop Drip system 3 3 5 3.00 79°55'30.662"E 23°27'49.68"N Muhaniya
MOA&FW Majholi Har Khet Ko Pani Tube well 23 23 5 46.00 80°1'2.301"E 23°25'23.534"N Muhaniya
MOA&FW Majholi Har Khet Ko Pani Diesel / Electric /
SolarPump 19 19 5 4.75 79°58'40.267"E 23°24'47.602"N Muraith
MOA&FW Majholi Har Khet Ko Pani Tube well 21 21 5 42.00 79°58'40.267"E 23°24'47.602"N Muraith
MOA&FW Majholi Har Khet Ko Pani Farm Pond 1 2 5 2.00 79°58'40.267"E 23°24'47.602"N Muraith
MOA&FW Majholi Per Drop More Crop Sprinkler 20 20 5 4.00 79°58'40.267"E 23°24'47.602"N Muraith
MOA&FW Majholi Per Drop More Crop Drip system 1 1 5 1.00 79°58'40.267"E 23°24'47.602"N Muraith
MOA&FW Majholi Per Drop More Crop Sprinkler 21 21 5 4.20 79°55'30.662"E 23°27'49.68"N Naigai
MOA&FW Majholi Har Khet Ko Pani Diesel / Electric /
SolarPump 25 25 5 6.25 80°1'2.301"E 23°25'23.534"N Naigai
MOA&FW Majholi Har Khet Ko Pani Tube well 22 22 5 44.00 80°1'2.301"E 23°25'23.534"N Naigai
182
Concerned
Ministry/
Department
Name of
the
Districts
/ Blocks
Component Activity Total
Number
Command
Area/Irrig
ation
Potential
(Ha)
Period of
Implement
ation 5/ 7
Estimated
cost
(in Lakhs
Rs.)
Longitude Lattitude Remark / Village Name
MOA&FW Majholi Har Khet Ko Pani Diesel / Electric /
SolarPump 16 16 5 4.00 80°8'8.368"E 23°31'34.475"N Naigawan
MOA&FW Majholi Har Khet Ko Pani Tube well 27 27 5 54.00 80°8'8.368"E 23°31'34.475"N Naigawan
MOA&FW Majholi Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°8'8.368"E 23°31'34.475"N Naigawan
MOA&FW Majholi Har Khet Ko Pani Diesel / Electric /
SolarPump 18 18 5 4.50 80°8'8.368"E 23°31'34.475"N Naigawan
MOA&FW Majholi Har Khet Ko Pani Tube well 23 23 5 46.00 80°8'8.368"E 23°31'34.475"N Naigawan
MOA&FW Majholi Per Drop More Crop Sprinkler 21 21 5 4.20 80°8'8.368"E 23°31'34.475"N Naigawan
MOA&FW Majholi Per Drop More Crop Drip system 1 1 5 1.00 80°8'8.368"E 23°31'34.475"N Naigawan
MOA&FW Majholi Per Drop More Crop Sprinkler 5 5 5 1.00 80°8'8.368"E 23°31'34.475"N Naigawan
MOA&FW Majholi Per Drop More Crop Sprinkler 24 24 5 4.80 79°55'30.662"E 23°27'49.68"N Nandghat
MOA&FW Majholi Har Khet Ko Pani Diesel / Electric /
SolarPump 7 7 5 1.75 80°1'2.301"E 23°25'23.534"N Nandghat
MOA&FW Majholi Har Khet Ko Pani Tube well 11 11 5 22.00 80°1'2.301"E 23°25'23.534"N Nandghat
MOA&FW Majholi Har Khet Ko Pani Diesel / Electric /
SolarPump 16 16 5 4.00 80°1'2.301"E 23°25'23.534"N Nandghat
MOA&FW Majholi Per Drop More Crop Sprinkler 19 19 5 3.80 79°55'30.662"E 23°27'49.68"N Nandgram
MOA&FW Majholi Per Drop More Crop Sprinkler 10 10 5 2.00 79°55'30.662"E 23°27'49.68"N Nandgram
MOA&FW Majholi Har Khet Ko Pani Tube well 24 24 5 48.00 80°1'2.301"E 23°25'23.534"N Nandgram
MOA&FW Majholi Har Khet Ko Pani Diesel / Electric /
SolarPump 17 17 5 4.25 80°1'2.301"E 23°25'23.534"N Nandgram
MOA&FW Majholi Har Khet Ko Pani Tube well 26 26 5 52.00 80°1'2.301"E 23°25'23.534"N Nandgram
MOA&FW Majholi Per Drop More Crop Drip system 1 1 5 1.00 79°55'30.662"E 23°27'49.68"N Narila
MOA&FW Majholi Per Drop More Crop Sprinkler 17 17 5 3.40 79°55'30.662"E 23°27'49.68"N Narila
MOA&FW Majholi Per Drop More Crop Drip system 3 3 5 3.00 79°55'30.662"E 23°27'49.68"N Narila
MOA&FW Majholi Har Khet Ko Pani Diesel / Electric /
SolarPump 14 14 5 3.50 80°1'2.301"E 23°25'23.534"N Narila
MOA&FW Majholi Har Khet Ko Pani Tube well 10 10 5 20.00 80°1'2.301"E 23°25'23.534"N Narila
MOA&FW Majholi Per Drop More Crop Sprinkler 21 21 5 4.20 79°55'30.662"E 23°27'49.68"N Nayagaon
MOA&FW Majholi Har Khet Ko Pani Diesel / Electric /
SolarPump 19 19 5 4.75 80°1'2.301"E 23°25'23.534"N Nayagaon
MOA&FW Majholi Har Khet Ko Pani Tube well 21 21 5 42.00 80°1'2.301"E 23°25'23.534"N Nayagaon
183
Concerned
Ministry/
Department
Name of
the
Districts
/ Blocks
Component Activity Total
Number
Command
Area/Irrig
ation
Potential
(Ha)
Period of
Implement
ation 5/ 7
Estimated
cost
(in Lakhs
Rs.)
Longitude Lattitude Remark / Village Name
MOA&FW Majholi Per Drop More Crop Sprinkler 21 21 5 4.20 79°55'30.662"E 23°27'49.68"N Nigwani
MOA&FW Majholi Har Khet Ko Pani Diesel / Electric /
SolarPump 16 16 5 4.00 80°1'2.301"E 23°25'23.534"N Nigwani
MOA&FW Majholi Har Khet Ko Pani Tube well 27 27 5 54.00 80°1'2.301"E 23°25'23.534"N Nigwani
MOA&FW Majholi Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°1'2.301"E 23°25'23.534"N Nigwani
MOA&FW Majholi Har Khet Ko Pani Diesel / Electric /
SolarPump 18 18 5 4.50 79°49'55.138"E 23°27'52.257"N Padariya
MOA&FW Majholi Har Khet Ko Pani Tube well 23 23 5 46.00 79°49'55.138"E 23°27'52.257"N Padariya
MOA&FW Majholi Har Khet Ko Pani Diesel / Electric /
SolarPump 16 16 5 4.00 79°49'55.138"E 23°27'52.257"N Padariya
MOA&FW Majholi Har Khet Ko Pani Tube well 20 20 5 40.00 79°49'55.138"E 23°27'52.257"N Padariya
MOA&FW Majholi Per Drop More Crop Drip system 1 1 5 1.00 79°49'55.138"E 23°27'52.257"N Padariya
MOA&FW Majholi Per Drop More Crop Sprinkler 16 16 5 3.20 79°49'55.138"E 23°27'52.257"N Padariya
MOA&FW Majholi Har Khet Ko Pani Diesel / Electric /
SolarPump 16 16 5 4.00 79°53'12.559"E 23°32'46.734"N Paduwa
MOA&FW Majholi Har Khet Ko Pani Tube well 24 24 5 48.00 79°53'12.559"E 23°32'46.734"N Paduwa
MOA&FW Majholi Per Drop More Crop Sprinkler 24 24 5 4.80 79°53'12.559"E 23°32'46.734"N Paduwa
MOA&FW Majholi Per Drop More Crop Sprinkler 21 21 5 4.20 79°55'30.662"E 23°27'49.68"N Padwar
MOA&FW Majholi Har Khet Ko Pani Diesel / Electric /
SolarPump 16 16 5 4.00 80°1'2.301"E 23°25'23.534"N Padwar
MOA&FW Majholi Har Khet Ko Pani Tube well 27 27 5 54.00 80°1'2.301"E 23°25'23.534"N Padwar
MOA&FW Majholi Per Drop More Crop Sprinkler 19 19 5 3.80 79°55'30.662"E 23°27'49.68"N Paharuwa
MOA&FW Majholi Per Drop More Crop Sprinkler 21 21 5 4.20 79°55'30.662"E 23°27'49.68"N Paharuwa
MOA&FW Majholi Har Khet Ko Pani Diesel / Electric /
SolarPump 17 17 5 4.25 80°1'2.301"E 23°25'23.534"N Paharuwa
MOA&FW Majholi Har Khet Ko Pani Tube well 26 26 5 52.00 80°1'2.301"E 23°25'23.534"N Paharuwa
MOA&FW Majholi Har Khet Ko Pani Diesel / Electric /
SolarPump 16 16 5 4.00 79°58'56.971"E 23°31'5.433"N Pali
MOA&FW Majholi Har Khet Ko Pani Tube well 27 27 5 54.00 79°58'56.971"E 23°31'5.433"N Pali
MOA&FW Majholi Har Khet Ko Pani Farm Pond 1 2 5 2.00 79°58'56.971"E 23°31'5.433"N Pali
MOA&FW Majholi Per Drop More Crop Sprinkler 21 21 5 4.20 79°58'56.971"E 23°31'5.433"N Pali
MOA&FW Majholi Per Drop More Crop Drip system 1 1 5 1.00 79°55'30.662"E 23°27'49.68"N Pathra
184
Concerned
Ministry/
Department
Name of
the
Districts
/ Blocks
Component Activity Total
Number
Command
Area/Irrig
ation
Potential
(Ha)
Period of
Implement
ation 5/ 7
Estimated
cost
(in Lakhs
Rs.)
Longitude Lattitude Remark / Village Name
MOA&FW Majholi Har Khet Ko Pani Diesel / Electric /
SolarPump 18 18 5 4.50 80°1'2.301"E 23°25'23.534"N Pathra
MOA&FW Majholi Har Khet Ko Pani Tube well 23 23 5 46.00 80°1'2.301"E 23°25'23.534"N Pathra
MOA&FW Majholi Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°1'2.301"E 23°25'23.534"N Pathra
MOA&FW Majholi Per Drop More Crop Sprinkler 20 20 5 4.00 79°55'30.662"E 23°27'49.68"N Pati
MOA&FW Majholi Per Drop More Crop Drip system 1 1 5 1.00 79°55'30.662"E 23°27'49.68"N Pati
MOA&FW Majholi Har Khet Ko Pani Diesel / Electric /
SolarPump 25 25 5 6.25 80°1'2.301"E 23°25'23.534"N Pati
MOA&FW Majholi Per Drop More Crop Sprinkler 14 14 5 2.80 79°55'30.662"E 23°27'49.68"N Patori
MOA&FW Majholi Har Khet Ko Pani Tube well 22 22 5 44.00 80°1'2.301"E 23°25'23.534"N Patori
MOA&FW Majholi Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°1'2.301"E 23°25'23.534"N Patori
MOA&FW Majholi Per Drop More Crop Drip system 1 1 5 1.00 79°55'30.662"E 23°27'49.68"N Pauniya
MOA&FW Majholi Per Drop More Crop Sprinkler 24 24 5 4.80 79°55'30.662"E 23°27'49.68"N Pauniya
MOA&FW Majholi Har Khet Ko Pani Diesel / Electric /
SolarPump 17 17 5 4.25 80°1'2.301"E 23°25'23.534"N Pauniya
MOA&FW Majholi Har Khet Ko Pani Tube well 21 21 5 42.00 80°1'2.301"E 23°25'23.534"N Pauniya
MOA&FW Majholi Per Drop More Crop Sprinkler 17 17 5 3.40 79°55'30.662"E 23°27'49.68"N Paura
MOA&FW Majholi Har Khet Ko Pani Diesel / Electric /
SolarPump 16 16 5 4.00 80°1'2.301"E 23°25'23.534"N Paura
MOA&FW Majholi Har Khet Ko Pani Tube well 24 24 5 48.00 80°1'2.301"E 23°25'23.534"N Paura
MOA&FW Majholi Har Khet Ko Pani Diesel / Electric /
SolarPump 19 19 5 4.75 79°50'54.067"E 23°27'36.185"N Persila
MOA&FW Majholi Har Khet Ko Pani Tube well 21 21 5 42.00 79°50'54.067"E 23°27'36.185"N Persila
MOA&FW Majholi Har Khet Ko Pani Farm Pond 1 2 5 2.00 79°50'54.067"E 23°27'36.185"N Persila
MOA&FW Majholi Per Drop More Crop Drip system 3 3 5 3.00 79°50'54.067"E 23°27'36.185"N Persila
MOA&FW Majholi Per Drop More Crop Sprinkler 21 21 5 4.20 79°55'30.662"E 23°27'49.68"N Pipariya
MOA&FW Majholi Per Drop More Crop Drip system 1 1 5 1.00 79°55'30.662"E 23°27'49.68"N Pipariya
MOA&FW Majholi Per Drop More Crop Sprinkler 19 19 5 3.80 79°55'30.662"E 23°27'49.68"N Pipariya
MOA&FW Majholi Per Drop More Crop Sprinkler 21 21 5 4.20 79°55'30.662"E 23°27'49.68"N Pipariya
MOA&FW Majholi Per Drop More Crop Sprinkler 18 18 5 3.60 79°55'30.662"E 23°27'49.68"N Pipariya
MOA&FW Majholi Per Drop More Crop Drip system 1 1 5 1.00 79°55'30.662"E 23°27'49.68"N Pipariya
185
Concerned
Ministry/
Department
Name of
the
Districts
/ Blocks
Component Activity Total
Number
Command
Area/Irrig
ation
Potential
(Ha)
Period of
Implement
ation 5/ 7
Estimated
cost
(in Lakhs
Rs.)
Longitude Lattitude Remark / Village Name
MOA&FW Majholi Per Drop More Crop Sprinkler 6 6 5 1.20 79°55'30.662"E 23°27'49.68"N Pipariya
MOA&FW Majholi Har Khet Ko Pani Diesel / Electric /
SolarPump 18 18 5 4.50 80°1'2.301"E 23°25'23.534"N Pipariya
MOA&FW Majholi Har Khet Ko Pani Tube well 23 23 5 46.00 80°1'2.301"E 23°25'23.534"N Pipariya
MOA&FW Majholi Har Khet Ko Pani Diesel / Electric /
SolarPump 17 17 5 4.25 80°1'2.301"E 23°25'23.534"N Pipariya
MOA&FW Majholi Har Khet Ko Pani Tube well 26 26 5 52.00 80°1'2.301"E 23°25'23.534"N Pipariya
MOA&FW Majholi Har Khet Ko Pani Diesel / Electric /
SolarPump 16 16 5 4.00 80°1'2.301"E 23°25'23.534"N Pipariya
MOA&FW Majholi Har Khet Ko Pani Tube well 27 27 5 54.00 80°1'2.301"E 23°25'23.534"N Pipariya
MOA&FW Majholi Har Khet Ko Pani Diesel / Electric /
SolarPump 17 17 5 4.25 80°1'2.301"E 23°25'23.534"N Pipariya
MOA&FW Majholi Har Khet Ko Pani Tube well 23 23 5 46.00 80°1'2.301"E 23°25'23.534"N Pipariya
MOA&FW Majholi Har Khet Ko Pani Diesel / Electric /
SolarPump 9 9 5 2.25 80°1'2.301"E 23°25'23.534"N Pipariya
MOA&FW Majholi Per Drop More Crop Sprinkler 17 17 5 3.40 79°55'30.662"E 23°27'49.68"N Pipariya (Suleman)
MOA&FW Majholi Per Drop More Crop Drip system 3 3 5 3.00 79°55'30.662"E 23°27'49.68"N Pipariya (Suleman)
MOA&FW Majholi Har Khet Ko Pani Tube well 11 11 5 22.00 80°1'2.301"E 23°25'23.534"N Pipariya (Suleman)
MOA&FW Majholi Har Khet Ko Pani Diesel / Electric /
SolarPump 19 19 5 4.75 80°1'2.301"E 23°25'23.534"N Pipariya (Suleman)
MOA&FW Majholi Per Drop More Crop Sprinkler 21 21 5 4.20 79°55'30.662"E 23°27'49.68"N Pipariya(Tagar)
MOA&FW Majholi Har Khet Ko Pani Tube well 21 21 5 42.00 80°1'2.301"E 23°25'23.534"N Pipariya(Tagar)
MOA&FW Majholi Har Khet Ko Pani Diesel / Electric /
SolarPump 16 16 5 4.00 80°1'2.301"E 23°25'23.534"N Pipariya(Tagar)
MOA&FW Majholi Har Khet Ko Pani Tube well 27 27 5 54.00 79°51'38.264"E 23°27'41.543"N Pola
MOA&FW Majholi Har Khet Ko Pani Farm Pond 1 2 5 2.00 79°51'38.264"E 23°27'41.543"N Pola
MOA&FW Majholi Per Drop More Crop Sprinkler 15 15 5 3.00 79°51'38.264"E 23°27'41.543"N Pola
MOA&FW Majholi Har Khet Ko Pani Diesel / Electric /
SolarPump 12 12 5 3.00 80°2'37.197"E 23°30'10.204"N Ponda
MOA&FW Majholi Har Khet Ko Pani Tube well 17 17 5 34.00 80°2'37.197"E 23°30'10.204"N Ponda
MOA&FW Majholi Per Drop More Crop Drip system 1 1 5 1.00 80°2'37.197"E 23°30'10.204"N Ponda
MOA&FW Majholi Per Drop More Crop Sprinkler 20 20 5 4.00 79°55'30.662"E 23°27'49.68"N Pondi Kalan
186
Concerned
Ministry/
Department
Name of
the
Districts
/ Blocks
Component Activity Total
Number
Command
Area/Irrig
ation
Potential
(Ha)
Period of
Implement
ation 5/ 7
Estimated
cost
(in Lakhs
Rs.)
Longitude Lattitude Remark / Village Name
MOA&FW Majholi Per Drop More Crop Drip system 1 1 5 1.00 79°55'30.662"E 23°27'49.68"N Pondi Kalan
MOA&FW Majholi Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°1'2.301"E 23°25'23.534"N Pondi Kalan
MOA&FW Majholi Har Khet Ko Pani Diesel / Electric /
SolarPump 25 25 5 6.25 80°1'2.301"E 23°25'23.534"N Pondi Kalan
MOA&FW Majholi Har Khet Ko Pani Tube well 22 22 5 44.00 80°1'2.301"E 23°25'23.534"N Pondi Kalan
MOA&FW Majholi Per Drop More Crop Sprinkler 19 19 5 3.80 79°55'30.662"E 23°27'49.68"N Pondi Khurd
MOA&FW Majholi Har Khet Ko Pani Diesel / Electric /
SolarPump 17 17 5 4.25 80°1'2.301"E 23°25'23.534"N Pondi Khurd
MOA&FW Majholi Har Khet Ko Pani Tube well 26 26 5 52.00 80°1'2.301"E 23°25'23.534"N Pondi Khurd
MOA&FW Majholi Har Khet Ko Pani Farm Pond 2 4 5 4.00 80°1'2.301"E 23°25'23.534"N Pondi Khurd
MOA&FW Majholi Har Khet Ko Pani Diesel / Electric /
SolarPump 18 18 5 4.50 80°2'11.75"E 23°29'13.954"N Puraina
MOA&FW Majholi Har Khet Ko Pani Tube well 25 25 5 50.00 80°2'11.75"E 23°29'13.954"N Puraina
MOA&FW Majholi Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°2'11.75"E 23°29'13.954"N Puraina
MOA&FW Majholi Per Drop More Crop Sprinkler 14 14 5 2.80 80°2'11.75"E 23°29'13.954"N Puraina
MOA&FW Majholi Per Drop More Crop Drip system 1 1 5 1.00 80°2'11.75"E 23°29'13.954"N Puraina
MOA&FW Majholi Per Drop More Crop Sprinkler 21 21 5 4.20 79°55'30.662"E 23°27'49.68"N Puranhai
MOA&FW Majholi Per Drop More Crop Drip system 1 1 5 1.00 79°55'30.662"E 23°27'49.68"N Puranhai
MOA&FW Majholi Per Drop More Crop Sprinkler 19 19 5 3.80 79°55'30.662"E 23°27'49.68"N Puranhai
MOA&FW Majholi Har Khet Ko Pani Diesel / Electric /
SolarPump 18 18 5 4.50 80°1'2.301"E 23°25'23.534"N Puranhai
MOA&FW Majholi Har Khet Ko Pani Tube well 23 23 5 46.00 80°1'2.301"E 23°25'23.534"N Puranhai
MOA&FW Majholi Per Drop More Crop Sprinkler 24 24 5 4.80 79°55'30.662"E 23°27'49.68"N Rahta Khamhariya
MOA&FW Majholi Per Drop More Crop Drip system 2 2 5 2.00 79°55'30.662"E 23°27'49.68"N Rahta Khamhariya
MOA&FW Majholi Har Khet Ko Pani Diesel / Electric /
SolarPump 17 17 5 4.25 80°1'2.301"E 23°25'23.534"N Rahta Khamhariya
MOA&FW Majholi Har Khet Ko Pani Tube well 26 26 5 52.00 80°1'2.301"E 23°25'23.534"N Rahta Khamhariya
MOA&FW Majholi Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°1'2.301"E 23°25'23.534"N Rahta Khamhariya
MOA&FW Majholi Per Drop More Crop Sprinkler 20 20 5 4.00 79°55'30.662"E 23°27'49.68"N Rajtala
MOA&FW Majholi Har Khet Ko Pani Diesel / Electric /
SolarPump 16 16 5 4.00 80°1'2.301"E 23°25'23.534"N Rajtala
MOA&FW Majholi Har Khet Ko Pani Tube well 24 24 5 48.00 80°1'2.301"E 23°25'23.534"N Rajtala
187
Concerned
Ministry/
Department
Name of
the
Districts
/ Blocks
Component Activity Total
Number
Command
Area/Irrig
ation
Potential
(Ha)
Period of
Implement
ation 5/ 7
Estimated
cost
(in Lakhs
Rs.)
Longitude Lattitude Remark / Village Name
MOA&FW Majholi Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°1'2.301"E 23°25'23.534"N Rajtala
MOA&FW Majholi Per Drop More Crop Drip system 1 1 5 1.00 79°55'30.662"E 23°27'49.68"N Rajwai
MOA&FW Majholi Per Drop More Crop Sprinkler 16 16 5 3.20 79°55'30.662"E 23°27'49.68"N Rajwai
MOA&FW Majholi Har Khet Ko Pani Diesel / Electric /
SolarPump 25 25 5 6.25 80°1'2.301"E 23°25'23.534"N Rajwai
MOA&FW Majholi Har Khet Ko Pani Tube well 22 22 5 44.00 80°1'2.301"E 23°25'23.534"N Rajwai
MOA&FW Majholi Per Drop More Crop Sprinkler 21 21 5 4.20 79°55'30.662"E 23°27'49.68"N Ranital
MOA&FW Majholi Har Khet Ko Pani Diesel / Electric /
SolarPump 16 16 5 4.00 80°1'2.301"E 23°25'23.534"N Ranital
MOA&FW Majholi Har Khet Ko Pani Tube well 20 20 5 40.00 80°1'2.301"E 23°25'23.534"N Ranital
MOA&FW Majholi Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°1'2.301"E 23°25'23.534"N Ranital
MOA&FW Majholi Per Drop More Crop Drip system 1 1 5 1.00 79°55'30.662"E 23°27'49.68"N Richhi
MOA&FW Majholi Har Khet Ko Pani Diesel / Electric /
SolarPump 18 18 5 4.50 80°1'2.301"E 23°25'23.534"N Richhi
MOA&FW Majholi Har Khet Ko Pani Tube well 23 23 5 46.00 80°1'2.301"E 23°25'23.534"N Richhi
MOA&FW Majholi Per Drop More Crop Sprinkler 13 13 5 2.60 79°55'30.662"E 23°27'49.68"N Richhi Khurd
MOA&FW Majholi Per Drop More Crop Drip system 1 1 5 1.00 79°55'30.662"E 23°27'49.68"N Richhi Khurd
MOA&FW Majholi Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°1'2.301"E 23°25'23.534"N Richhi Khurd
MOA&FW Majholi Per Drop More Crop Sprinkler 21 21 5 4.20 79°55'30.662"E 23°27'49.68"N Richhi Pindrai
MOA&FW Majholi Har Khet Ko Pani Diesel / Electric /
SolarPump 11 11 5 2.75 80°1'2.301"E 23°25'23.534"N Richhi Pindrai
MOA&FW Majholi Har Khet Ko Pani Tube well 14 14 5 28.00 80°1'2.301"E 23°25'23.534"N Richhi Pindrai
MOA&FW Majholi Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°1'2.301"E 23°25'23.534"N Richhi Pindrai
MOA&FW Majholi Per Drop More Crop Drip system 2 2 5 2.00 79°55'30.662"E 23°27'49.68"N Rinwajha
MOA&FW Majholi Har Khet Ko Pani Diesel / Electric /
SolarPump 18 18 5 4.50 80°1'2.301"E 23°25'23.534"N Rinwajha
MOA&FW Majholi Har Khet Ko Pani Tube well 25 25 5 50.00 80°1'2.301"E 23°25'23.534"N Rinwajha
MOA&FW Majholi Per Drop More Crop Sprinkler 20 20 5 4.00 79°55'30.662"E 23°27'49.68"N Ronsara
MOA&FW Majholi Per Drop More Crop Drip system 3 3 5 3.00 79°55'30.662"E 23°27'49.68"N Ronsara
MOA&FW Majholi Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°1'2.301"E 23°25'23.534"N Ronsara
MOA&FW Majholi Per Drop More Crop Sprinkler 10 10 5 2.00 79°55'30.662"E 23°27'49.68"N Sagda
188
Concerned
Ministry/
Department
Name of
the
Districts
/ Blocks
Component Activity Total
Number
Command
Area/Irrig
ation
Potential
(Ha)
Period of
Implement
ation 5/ 7
Estimated
cost
(in Lakhs
Rs.)
Longitude Lattitude Remark / Village Name
MOA&FW Majholi Har Khet Ko Pani Diesel / Electric /
SolarPump 25 25 5 6.25 80°1'2.301"E 23°25'23.534"N Sagda
MOA&FW Majholi Har Khet Ko Pani Tube well 22 22 5 44.00 80°1'2.301"E 23°25'23.534"N Sagda
MOA&FW Majholi Per Drop More Crop Sprinkler 19 19 5 3.80 79°55'30.662"E 23°27'49.68"N Sagodi
MOA&FW Majholi Har Khet Ko Pani Diesel / Electric /
SolarPump 11 11 5 2.75 80°1'2.301"E 23°25'23.534"N Sagodi
MOA&FW Majholi Har Khet Ko Pani Tube well 16 16 5 32.00 80°1'2.301"E 23°25'23.534"N Sagodi
MOA&FW Majholi Per Drop More Crop Drip system 1 1 5 1.00 79°55'30.662"E 23°27'49.68"N Sagona
MOA&FW Majholi Har Khet Ko Pani Diesel / Electric /
SolarPump 14 14 5 3.50 80°1'2.301"E 23°25'23.534"N Sagona
MOA&FW Majholi Har Khet Ko Pani Tube well 11 11 5 22.00 80°1'2.301"E 23°25'23.534"N Sagona
MOA&FW Majholi Har Khet Ko Pani Farm Pond 2 4 5 4.00 80°1'2.301"E 23°25'23.534"N Sagona
MOA&FW Majholi Per Drop More Crop Sprinkler 24 24 5 4.80 79°55'30.662"E 23°27'49.68"N Sahajpura
MOA&FW Majholi Per Drop More Crop Drip system 1 1 5 1.00 79°55'30.662"E 23°27'49.68"N Sahajpura
MOA&FW Majholi Har Khet Ko Pani Diesel / Electric /
SolarPump 16 16 5 4.00 80°1'2.301"E 23°25'23.534"N Sahajpura
MOA&FW Majholi Per Drop More Crop Sprinkler 14 14 5 2.80 79°55'30.662"E 23°27'49.68"N Sakarpila
MOA&FW Majholi Har Khet Ko Pani Tube well 23 23 5 46.00 80°1'2.301"E 23°25'23.534"N Sakarpila
MOA&FW Majholi Har Khet Ko Pani Diesel / Electric /
SolarPump 16 16 5 4.00 80°1'2.301"E 23°25'23.534"N Sakarpila
MOA&FW Majholi Har Khet Ko Pani Tube well 21 21 5 42.00 80°1'2.301"E 23°25'23.534"N Sakarpila
MOA&FW Majholi Per Drop More Crop Sprinkler 18 18 5 3.60 79°55'30.662"E 23°27'49.68"N Salaiya
MOA&FW Majholi Per Drop More Crop Drip system 1 1 5 1.00 79°55'30.662"E 23°27'49.68"N Salaiya
MOA&FW Majholi Har Khet Ko Pani Farm Pond 2 4 5 4.00 80°1'2.301"E 23°25'23.534"N Salaiya
MOA&FW Majholi Har Khet Ko Pani Diesel / Electric /
SolarPump 14 14 5 3.50 80°1'2.301"E 23°25'23.534"N Salaiya
MOA&FW Majholi Har Khet Ko Pani Tube well 24 24 5 48.00 79°57'0.95"E 23°27'11.743"N Samdhar
MOA&FW Majholi Har Khet Ko Pani Farm Pond 1 2 5 2.00 79°57'0.95"E 23°27'11.743"N Samdhar
MOA&FW Majholi Per Drop More Crop Sprinkler 20 20 5 4.00 79°57'0.95"E 23°27'11.743"N Samdhar
MOA&FW Majholi Per Drop More Crop Drip system 3 3 5 3.00 79°57'0.95"E 23°27'11.743"N Samdhar
MOA&FW Majholi Har Khet Ko Pani Diesel / Electric /
SolarPump 25 25 5 6.25 79°57'13.632"E 23°25'33.556"N Sarauda
189
Concerned
Ministry/
Department
Name of
the
Districts
/ Blocks
Component Activity Total
Number
Command
Area/Irrig
ation
Potential
(Ha)
Period of
Implement
ation 5/ 7
Estimated
cost
(in Lakhs
Rs.)
Longitude Lattitude Remark / Village Name
MOA&FW Majholi Har Khet Ko Pani Tube well 22 22 5 44.00 79°57'13.632"E 23°25'33.556"N Sarauda
MOA&FW Majholi Per Drop More Crop Sprinkler 17 17 5 3.40 79°57'13.632"E 23°25'33.556"N Sarauda
MOA&FW Majholi Per Drop More Crop Drip system 3 3 5 3.00 79°57'13.632"E 23°25'33.556"N Sarauda
MOA&FW Majholi Per Drop More Crop Sprinkler 14 14 5 2.80 79°55'30.662"E 23°27'49.68"N Shyampura
MOA&FW Majholi Har Khet Ko Pani Diesel / Electric /
SolarPump 19 19 5 4.75 80°1'2.301"E 23°25'23.534"N Shyampura
MOA&FW Majholi Har Khet Ko Pani Tube well 21 21 5 42.00 80°1'2.301"E 23°25'23.534"N Shyampura
MOA&FW Majholi Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°1'2.301"E 23°25'23.534"N Shyampura
MOA&FW Majholi Har Khet Ko Pani Diesel / Electric /
SolarPump 13 13 5 3.25 80°1'2.301"E 23°25'23.534"N Sihoda
MOA&FW Majholi Har Khet Ko Pani Tube well 18 18 5 36.00 80°1'2.301"E 23°25'23.534"N Sihoda
MOA&FW Majholi Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°1'2.301"E 23°25'23.534"N Sihoda
MOA&FW Majholi Per Drop More Crop Sprinkler 20 20 5 4.00 79°55'30.662"E 23°27'49.68"N Silhati
MOA&FW Majholi Per Drop More Crop Drip system 3 3 5 3.00 79°55'30.662"E 23°27'49.68"N Silhati
MOA&FW Majholi Har Khet Ko Pani Diesel / Electric /
SolarPump 25 25 5 6.25 80°1'2.301"E 23°25'23.534"N Silhati
MOA&FW Majholi Har Khet Ko Pani Tube well 22 22 5 44.00 80°1'2.301"E 23°25'23.534"N Silhati
MOA&FW Majholi Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°1'2.301"E 23°25'23.534"N Silhati
MOA&FW Majholi Har Khet Ko Pani Diesel / Electric /
SolarPump 10 10 5 2.50 79°57'15.766"E 23°30'4.847"N Simariya
MOA&FW Majholi Har Khet Ko Pani Tube well 16 16 5 32.00 79°57'15.766"E 23°30'4.847"N Simariya
MOA&FW Majholi Har Khet Ko Pani Diesel / Electric /
SolarPump 17 17 5 4.25 79°57'15.766"E 23°30'4.847"N Simariya
MOA&FW Majholi Har Khet Ko Pani Tube well 26 26 5 52.00 79°57'15.766"E 23°30'4.847"N Simariya
MOA&FW Majholi Har Khet Ko Pani Diesel / Electric /
SolarPump 19 19 5 4.75 79°57'15.766"E 23°30'4.847"N Simariya
MOA&FW Majholi Har Khet Ko Pani Tube well 21 21 5 42.00 79°57'15.766"E 23°30'4.847"N Simariya
MOA&FW Majholi Har Khet Ko Pani Diesel / Electric /
SolarPump 10 10 5 2.50 79°57'15.766"E 23°30'4.847"N Simariya
MOA&FW Majholi Har Khet Ko Pani Tube well 14 14 5 28.00 79°57'15.766"E 23°30'4.847"N Simariya
MOA&FW Majholi Har Khet Ko Pani Farm Pond 1 2 5 2.00 79°57'15.766"E 23°30'4.847"N Simariya
MOA&FW Majholi Per Drop More Crop Sprinkler 14 14 5 2.80 79°57'15.766"E 23°30'4.847"N Simariya
190
Concerned
Ministry/
Department
Name of
the
Districts
/ Blocks
Component Activity Total
Number
Command
Area/Irrig
ation
Potential
(Ha)
Period of
Implement
ation 5/ 7
Estimated
cost
(in Lakhs
Rs.)
Longitude Lattitude Remark / Village Name
MOA&FW Majholi Per Drop More Crop Sprinkler 19 19 5 3.80 79°57'15.766"E 23°30'4.847"N Simariya
MOA&FW Majholi Per Drop More Crop Sprinkler 17 17 5 3.40 79°57'15.766"E 23°30'4.847"N Simariya
MOA&FW Majholi Per Drop More Crop Drip system 3 3 5 3.00 79°57'15.766"E 23°30'4.847"N Simariya
MOA&FW Majholi Per Drop More Crop Sprinkler 18 18 5 3.60 79°57'15.766"E 23°30'4.847"N Simariya
MOA&FW Majholi Per Drop More Crop Sprinkler 20 20 5 4.00 79°55'30.662"E 23°27'49.68"N Singhpur
MOA&FW Majholi Per Drop More Crop Drip system 3 3 5 3.00 79°55'30.662"E 23°27'49.68"N Singhpur
MOA&FW Majholi Har Khet Ko Pani Diesel / Electric /
SolarPump 25 25 5 6.25 80°1'2.301"E 23°25'23.534"N Singhpur
MOA&FW Majholi Har Khet Ko Pani Tube well 22 22 5 44.00 80°1'2.301"E 23°25'23.534"N Singhpur
MOA&FW Majholi Har Khet Ko Pani Diesel / Electric /
SolarPump 10 10 5 2.50 80°1'5.172"E 23°33'30.868"N Soma Khurd
MOA&FW Majholi Per Drop More Crop Sprinkler 12 12 5 2.40 80°1'5.172"E 23°33'30.868"N Soma Khurd
MOA&FW Majholi Per Drop More Crop Drip system 1 1 5 1.00 80°1'5.172"E 23°33'30.868"N Soma Khurd
MOA&FW Majholi Har Khet Ko Pani Tube well 15 15 5 30.00 79°52'49.247"E 23°27'14.757"N Suhajani
MOA&FW Majholi Har Khet Ko Pani Diesel / Electric /
SolarPump 16 16 5 4.00 79°52'49.247"E 23°27'14.757"N Suhajani
MOA&FW Majholi Per Drop More Crop Sprinkler 14 14 5 2.80 79°52'49.247"E 23°27'14.757"N Suhajani
MOA&FW Majholi Har Khet Ko Pani Tube well 21 21 5 42.00 79°53'39.63"E 23°31'52.508"N Suhas Khurd
MOA&FW Majholi Har Khet Ko Pani Farm Pond 1 2 5 2.00 79°53'39.63"E 23°31'52.508"N Suhas Khurd
MOA&FW Majholi Per Drop More Crop Sprinkler 18 18 5 3.60 79°53'39.63"E 23°31'52.508"N Suhas Khurd
MOA&FW Majholi Per Drop More Crop Drip system 1 1 5 1.00 79°53'39.63"E 23°31'52.508"N Suhas Khurd
MOA&FW Majholi Har Khet Ko Pani Diesel / Electric /
SolarPump 17 17 5 4.25 79°52'49.247"E 23°27'14.757"N Suhjani
MOA&FW Majholi Har Khet Ko Pani Tube well 20 20 5 40.00 79°52'49.247"E 23°27'14.757"N Suhjani
MOA&FW Majholi Har Khet Ko Pani Farm Pond 1 2 5 2.00 79°52'49.247"E 23°27'14.757"N Suhjani
MOA&FW Majholi Per Drop More Crop Sprinkler 20 20 5 4.00 79°55'30.662"E 23°27'49.68"N Sungawan
MOA&FW Majholi Per Drop More Crop Drip system 3 3 5 3.00 79°55'30.662"E 23°27'49.68"N Sungawan
MOA&FW Majholi Har Khet Ko Pani Diesel / Electric /
SolarPump 25 25 5 6.25 80°0'51.059"E 23°31'0.795"N Sungawan
MOA&FW Majholi Har Khet Ko Pani Tube well 22 22 5 44.00 80°0'51.059"E 23°31'0.795"N Sungawan
MOA&FW Majholi Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°0'51.059"E 23°31'0.795"N Sungawan
191
Concerned
Ministry/
Department
Name of
the
Districts
/ Blocks
Component Activity Total
Number
Command
Area/Irrig
ation
Potential
(Ha)
Period of
Implement
ation 5/ 7
Estimated
cost
(in Lakhs
Rs.)
Longitude Lattitude Remark / Village Name
MOA&FW Majholi Per Drop More Crop Sprinkler 17 17 5 3.40 79°55'30.662"E 23°27'49.68"N Sunwani
MOA&FW Majholi Har Khet Ko Pani Diesel / Electric /
SolarPump 17 17 5 4.25 80°0'51.059"E 23°31'0.795"N Sunwani
MOA&FW Majholi Har Khet Ko Pani Tube well 24 24 5 48.00 80°0'51.059"E 23°31'0.795"N Sunwani
MOA&FW Majholi Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°0'51.059"E 23°31'0.795"N Sunwani
MOA&FW Majholi Per Drop More Crop Sprinkler 14 14 5 2.80 79°55'30.662"E 23°27'49.68"N Surekha
MOA&FW Majholi Per Drop More Crop Drip system 1 1 5 1.00 79°55'30.662"E 23°27'49.68"N Surekha
MOA&FW Majholi Har Khet Ko Pani Diesel / Electric /
SolarPump 16 16 5 4.00 80°0'51.059"E 23°31'0.795"N Surekha
MOA&FW Majholi Per Drop More Crop Sprinkler 20 20 5 4.00 79°55'30.662"E 23°27'49.68"N Tagbihar
MOA&FW Majholi Har Khet Ko Pani Tube well 19 19 5 38.00 80°0'51.059"E 23°31'0.795"N Tagbihar
MOA&FW Majholi Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°0'51.059"E 23°31'0.795"N Tagbihar
MOA&FW Majholi Har Khet Ko Pani Diesel / Electric /
SolarPump 25 25 5 6.25 79°58'56.06"E 23°22'6.339"N Tala
MOA&FW Majholi Har Khet Ko Pani Tube well 22 22 5 44.00 79°58'56.06"E 23°22'6.339"N Tala
MOA&FW Majholi Per Drop More Crop Drip system 3 3 5 3.00 79°58'56.06"E 23°22'6.339"N Tala
MOA&FW Majholi Per Drop More Crop Sprinkler 14 14 5 2.80 79°58'56.06"E 23°22'6.339"N Tala
MOA&FW Majholi Har Khet Ko Pani Diesel / Electric /
SolarPump 16 16 5 4.00 80°0'51.059"E 23°31'0.795"N Talad
MOA&FW Majholi Har Khet Ko Pani Tube well 21 21 5 42.00 80°0'51.059"E 23°31'0.795"N Talad
MOA&FW Majholi Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°0'51.059"E 23°31'0.795"N Talad
MOA&FW Majholi Per Drop More Crop Sprinkler 15 15 5 3.00 79°55'30.662"E 23°27'49.68"N Talwa
MOA&FW Majholi Per Drop More Crop Sprinkler 17 17 5 3.40 79°55'30.662"E 23°27'49.68"N Talwa
MOA&FW Majholi Har Khet Ko Pani Diesel / Electric /
SolarPump 15 15 5 3.75 80°0'51.059"E 23°31'0.795"N Talwa
MOA&FW Majholi Har Khet Ko Pani Tube well 17 17 5 34.00 80°0'51.059"E 23°31'0.795"N Talwa
MOA&FW Majholi Per Drop More Crop Sprinkler 14 14 5 2.80 79°55'30.662"E 23°27'49.68"N Tapa
MOA&FW Majholi Har Khet Ko Pani Diesel / Electric /
SolarPump 12 12 5 3.00 80°0'51.059"E 23°31'0.795"N Tapa
MOA&FW Majholi Har Khet Ko Pani Tube well 19 19 5 38.00 80°0'51.059"E 23°31'0.795"N Tapa
MOA&FW Majholi Per Drop More Crop Drip system 1 1 5 1.00 79°55'30.662"E 23°27'49.68"N Tikuri
192
Concerned
Ministry/
Department
Name of
the
Districts
/ Blocks
Component Activity Total
Number
Command
Area/Irrig
ation
Potential
(Ha)
Period of
Implement
ation 5/ 7
Estimated
cost
(in Lakhs
Rs.)
Longitude Lattitude Remark / Village Name
MOA&FW Majholi Har Khet Ko Pani Diesel / Electric /
SolarPump 8 8 5 2.00 80°0'51.059"E 23°31'0.795"N Tikuri
MOA&FW Majholi Har Khet Ko Pani Tube well 14 14 5 28.00 80°0'51.059"E 23°31'0.795"N Tikuri
MOA&FW Majholi Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°0'51.059"E 23°31'0.795"N Tikuri
MOA&FW Majholi Per Drop More Crop Sprinkler 20 20 5 4.00 79°55'30.662"E 23°27'49.68"N Umardha
MOA&FW Majholi Per Drop More Crop Drip system 3 3 5 3.00 79°55'30.662"E 23°27'49.68"N Umardha
MOA&FW Majholi Har Khet Ko Pani Diesel / Electric /
SolarPump 25 25 5 6.25 80°0'51.059"E 23°31'0.795"N Umardha
MOA&FW Majholi Har Khet Ko Pani Tube well 22 22 5 44.00 80°0'51.059"E 23°31'0.795"N Umardha
MOA&FW Majholi Har Khet Ko Pani Diesel / Electric /
SolarPump 16 16 5 4.00 79°56'32.951"E 23°25'1.162"N Umariya
MOA&FW Majholi Har Khet Ko Pani Tube well 21 21 5 42.00 79°56'32.951"E 23°25'1.162"N Umariya
MOA&FW Majholi Har Khet Ko Pani Farm Pond 1 2 5 2.00 79°56'32.951"E 23°25'1.162"N Umariya
MOA&FW Majholi Har Khet Ko Pani Diesel / Electric /
SolarPump 21 21 5 5.25 79°56'32.951"E 23°25'1.162"N Umariya
MOA&FW Majholi Har Khet Ko Pani Tube well 30 30 5 60.00 79°56'32.951"E 23°25'1.162"N Umariya
MOA&FW Majholi Har Khet Ko Pani Diesel / Electric /
SolarPump 19 19 5 4.75 79°56'32.951"E 23°25'1.162"N Umariya
MOA&FW Majholi Har Khet Ko Pani Tube well 21 21 5 42.00 79°56'32.951"E 23°25'1.162"N Umariya
MOA&FW Majholi Har Khet Ko Pani Farm Pond 1 2 5 2.00 79°56'32.951"E 23°25'1.162"N Umariya
MOA&FW Majholi Har Khet Ko Pani Diesel / Electric /
SolarPump 14 14 5 3.50 79°56'32.951"E 23°25'1.162"N Umariya
MOA&FW Majholi Har Khet Ko Pani Tube well 21 21 5 42.00 79°56'32.951"E 23°25'1.162"N Umariya
MOA&FW Majholi Per Drop More Crop Sprinkler 14 14 5 2.80 79°56'32.951"E 23°25'1.162"N Umariya
MOA&FW Majholi Per Drop More Crop Sprinkler 23 23 5 4.60 79°56'32.951"E 23°25'1.162"N Umariya
MOA&FW Majholi Per Drop More Crop Drip system 1 1 5 1.00 79°56'32.951"E 23°25'1.162"N Umariya
MOA&FW Majholi Per Drop More Crop Sprinkler 17 17 5 3.40 79°56'32.951"E 23°25'1.162"N Umariya
MOA&FW Majholi Per Drop More Crop Drip system 3 3 5 3.00 79°56'32.951"E 23°25'1.162"N Umariya
MOA&FW Majholi Per Drop More Crop Sprinkler 16 16 5 3.20 79°56'32.951"E 23°25'1.162"N Umariya
MOA&FW Majholi Per Drop More Crop Drip system 1 1 5 1.00 79°56'32.951"E 23°25'1.162"N Umariya
MOA&FW Panagar Har Khet Ko Pani Farm Pond 2 4 5 4.00 79°56'43.735"E 23°16'40.78"N Akola
193
Concerned
Ministry/
Department
Name of
the
Districts
/ Blocks
Component Activity Total
Number
Command
Area/Irrig
ation
Potential
(Ha)
Period of
Implement
ation 5/ 7
Estimated
cost
(in Lakhs
Rs.)
Longitude Lattitude Remark / Village Name
MOA&FW Panagar Har Khet Ko Pani Diesel / Electric /
SolarPump 5 5 5 1.25 79°56'43.735"E 23°16'40.78"N Akola
MOA&FW Panagar Har Khet Ko Pani Tube well 5 5 5 10.00 79°56'43.735"E 23°16'40.78"N Akola
MOA&FW Panagar Per Drop More Crop Sprinkler 12 12 5 2.40 80°7'2.046"E 23°17'25.748"N Akola
MOA&FW Panagar Har Khet Ko Pani Capacity Building 6275 5 125.49 79°59'9.881"E 23°16'57.643"N All
MOA&FW Panagar Har Khet Ko Pani Farm Pond 2 4 5 4.00 79°56'43.735"E 23°16'40.78"N Amakhoh
MOA&FW Panagar Har Khet Ko Pani Diesel / Electric /
SolarPump 8 8 5 2.00 79°56'43.735"E 23°16'40.78"N Amakhoh
MOA&FW Panagar Har Khet Ko Pani Tube well 4 4 5 8.00 79°56'43.735"E 23°16'40.78"N Amakhoh
MOA&FW Panagar Per Drop More Crop Sprinkler 8 8 5 1.60 80°7'2.046"E 23°17'25.748"N Amakhoh
MOA&FW Panagar Per Drop More Crop Drip system 1 1 5 1.00 80°7'2.046"E 23°17'25.748"N Amakhoh
MOA&FW Panagar Har Khet Ko Pani Farm Pond 4 8 5 8.00 79°56'43.735"E 23°16'40.78"N Amanala
MOA&FW Panagar Har Khet Ko Pani Diesel / Electric /
SolarPump 12 12 5 3.00 79°56'43.735"E 23°16'40.78"N Amanala
MOA&FW Panagar Har Khet Ko Pani Tube well 8 8 5 16.00 79°56'43.735"E 23°16'40.78"N Amanala
MOA&FW Panagar Per Drop More Crop Sprinkler 10 10 5 2.00 80°7'2.046"E 23°17'25.748"N Amanala
MOA&FW Panagar Per Drop More Crop Drip system 2 2 5 2.00 80°7'2.046"E 23°17'25.748"N Amanala
MOA&FW Panagar Har Khet Ko Pani Farm Pond 2 4 5 4.00 79°56'43.735"E 23°16'40.78"N Andhuwa
MOA&FW Panagar Har Khet Ko Pani Diesel / Electric /
SolarPump 10 10 5 2.50 79°56'43.735"E 23°16'40.78"N Andhuwa
MOA&FW Panagar Har Khet Ko Pani Tube well 6 6 5 12.00 79°56'43.735"E 23°16'40.78"N Andhuwa
MOA&FW Panagar Per Drop More Crop Sprinkler 10 10 5 2.00 80°7'2.046"E 23°17'25.748"N Andhuwa
MOA&FW Panagar Per Drop More Crop Drip system 1 1 5 1.00 80°7'2.046"E 23°17'25.748"N Andhuwa
MOA&FW Panagar Har Khet Ko Pani Farm Pond 2 4 5 4.00 79°56'43.735"E 23°16'40.78"N Badera Kalan
MOA&FW Panagar Har Khet Ko Pani Diesel / Electric /
SolarPump 10 10 5 2.50 79°56'43.735"E 23°16'40.78"N Badera Kalan
MOA&FW Panagar Har Khet Ko Pani Tube well 8 8 5 16.00 79°56'43.735"E 23°16'40.78"N Badera Kalan
MOA&FW Panagar Per Drop More Crop Sprinkler 5 5 5 1.00 80°7'2.046"E 23°17'25.748"N Badera Kalan
MOA&FW Panagar Har Khet Ko Pani Farm Pond 2 4 5 4.00 79°56'43.735"E 23°16'40.78"N Badhaiya Kheda
MOA&FW Panagar Har Khet Ko Pani Diesel / Electric /
SolarPump 10 10 5 2.50 79°56'43.735"E 23°16'40.78"N Badhaiya Kheda
MOA&FW Panagar Har Khet Ko Pani Tube well 6 6 5 12.00 79°56'43.735"E 23°16'40.78"N Badhaiya Kheda
194
Concerned
Ministry/
Department
Name of
the
Districts
/ Blocks
Component Activity Total
Number
Command
Area/Irrig
ation
Potential
(Ha)
Period of
Implement
ation 5/ 7
Estimated
cost
(in Lakhs
Rs.)
Longitude Lattitude Remark / Village Name
MOA&FW Panagar Per Drop More Crop Sprinkler 5 5 5 1.00 80°7'2.046"E 23°17'25.748"N Badhaiya Kheda
MOA&FW Panagar Har Khet Ko Pani Diesel / Electric /
SolarPump 10 10 5 2.50 80°2'27.177"E 23°18'31.359"N Badkhera
MOA&FW Panagar Har Khet Ko Pani Tube well 1 1 5 2.00 80°2'27.177"E 23°18'31.359"N Badkhera
MOA&FW Panagar Per Drop More Crop Sprinkler 10 10 5 2.00 80°2'27.177"E 23°18'31.359"N Badkhera
MOA&FW Panagar Per Drop More Crop Drip system 1 1 5 1.00 80°2'27.177"E 23°18'31.359"N Badkhera
MOA&FW Panagar Har Khet Ko Pani Diesel / Electric /
SolarPump 10 10 5 2.50 80°3'58.284"E 23°19'17.712"N Badkheri
MOA&FW Panagar Har Khet Ko Pani Tube well 8 8 5 16.00 80°3'58.284"E 23°19'17.712"N Badkheri
MOA&FW Panagar Per Drop More Crop Sprinkler 8 8 5 1.60 80°3'58.284"E 23°19'17.712"N Badkheri
MOA&FW Panagar Har Khet Ko Pani Diesel / Electric /
SolarPump 8 8 5 2.00 79°56'43.735"E 23°16'40.78"N Bagheli
MOA&FW Panagar Har Khet Ko Pani Tube well 5 5 5 10.00 79°56'43.735"E 23°16'40.78"N Bagheli
MOA&FW Panagar Per Drop More Crop Sprinkler 8 8 5 1.60 80°7'2.046"E 23°17'25.748"N Bagheli
MOA&FW Panagar Per Drop More Crop Drip system 1 1 5 1.00 80°7'2.046"E 23°17'25.748"N Bagheli
MOA&FW Panagar Har Khet Ko Pani Farm Pond 2 4 5 4.00 79°56'43.735"E 23°16'40.78"N Baghoda
MOA&FW Panagar Har Khet Ko Pani Diesel / Electric /
SolarPump 10 10 5 2.50 79°56'43.735"E 23°16'40.78"N Baghoda
MOA&FW Panagar Har Khet Ko Pani Tube well 6 6 5 12.00 79°56'43.735"E 23°16'40.78"N Baghoda
MOA&FW Panagar Per Drop More Crop Sprinkler 12 12 5 2.40 80°7'2.046"E 23°17'25.748"N Baghoda
MOA&FW Panagar Per Drop More Crop Drip system 2 2 5 2.00 80°7'2.046"E 23°17'25.748"N Baghoda
MOA&FW Panagar Har Khet Ko Pani Farm Pond 2 4 5 4.00 79°56'43.735"E 23°16'40.78"N Baghodi
MOA&FW Panagar Har Khet Ko Pani Diesel / Electric /
SolarPump 8 8 5 2.00 79°56'43.735"E 23°16'40.78"N Baghodi
MOA&FW Panagar Har Khet Ko Pani Tube well 5 5 5 10.00 79°56'43.735"E 23°16'40.78"N Baghodi
MOA&FW Panagar Per Drop More Crop Sprinkler 8 8 5 1.60 80°7'2.046"E 23°17'25.748"N Baghodi
MOA&FW Panagar Per Drop More Crop Drip system 2 2 5 2.00 80°7'2.046"E 23°17'25.748"N Baghodi
MOA&FW Panagar Har Khet Ko Pani Farm Pond 1 2 5 2.00 79°56'43.735"E 23°16'40.78"N Bamhnoda
MOA&FW Panagar Har Khet Ko Pani Diesel / Electric /
SolarPump 10 10 5 2.50 79°56'43.735"E 23°16'40.78"N Bamhnoda
MOA&FW Panagar Har Khet Ko Pani Tube well 5 5 5 10.00 79°56'43.735"E 23°16'40.78"N Bamhnoda
MOA&FW Panagar Har Khet Ko Pani Tube well 7 7 5 14.00 79°56'43.735"E 23°16'40.78"N Bamhnoda
195
Concerned
Ministry/
Department
Name of
the
Districts
/ Blocks
Component Activity Total
Number
Command
Area/Irrig
ation
Potential
(Ha)
Period of
Implement
ation 5/ 7
Estimated
cost
(in Lakhs
Rs.)
Longitude Lattitude Remark / Village Name
MOA&FW Panagar Har Khet Ko Pani Farm Pond 2 4 5 4.00 79°56'43.735"E 23°16'40.78"N Bamhnoda
MOA&FW Panagar Har Khet Ko Pani Diesel / Electric /
SolarPump 1 1 5 0.25 79°56'43.735"E 23°16'40.78"N Bamhnoda
MOA&FW Panagar Har Khet Ko Pani Tube well 6 6 5 12.00 79°56'43.735"E 23°16'40.78"N Bamhnoda
MOA&FW Panagar Har Khet Ko Pani Diesel / Electric /
SolarPump 4 4 5 1.00 79°56'43.735"E 23°16'40.78"N Bamhnoda
MOA&FW Panagar Har Khet Ko Pani Tube well 3 3 5 6.00 79°56'43.735"E 23°16'40.78"N Bamhnoda
MOA&FW Panagar Per Drop More Crop Sprinkler 7 7 5 1.40 80°7'2.046"E 23°17'25.748"N Bamhnoda
MOA&FW Panagar Per Drop More Crop Sprinkler 5 5 5 1.00 80°7'2.046"E 23°17'25.748"N Bamhnoda
MOA&FW Panagar Per Drop More Crop Sprinkler 8 8 5 1.60 80°7'2.046"E 23°17'25.748"N Bamhnoda
MOA&FW Panagar Har Khet Ko Pani Farm Pond 2 4 5 4.00 79°56'43.735"E 23°16'40.78"N Bamhnodi
MOA&FW Panagar Har Khet Ko Pani Diesel / Electric /
SolarPump 9 9 5 2.25 79°56'43.735"E 23°16'40.78"N Bamhnodi
MOA&FW Panagar Har Khet Ko Pani Tube well 7 7 5 14.00 79°56'43.735"E 23°16'40.78"N Bamhnodi
MOA&FW Panagar Har Khet Ko Pani Diesel / Electric /
SolarPump 8 8 5 2.00 79°56'43.735"E 23°16'40.78"N Bamhnodi
MOA&FW Panagar Har Khet Ko Pani Tube well 5 5 5 10.00 79°56'43.735"E 23°16'40.78"N Bamhnodi
MOA&FW Panagar Per Drop More Crop Sprinkler 7 7 5 1.40 80°7'2.046"E 23°17'25.748"N Bamhnodi
MOA&FW Panagar Per Drop More Crop Sprinkler 8 8 5 1.60 80°7'2.046"E 23°17'25.748"N Bamhnodi
MOA&FW Panagar Har Khet Ko Pani Diesel / Electric /
SolarPump 8 8 5 2.00 79°56'43.735"E 23°16'40.78"N Bamhori
MOA&FW Panagar Har Khet Ko Pani Tube well 8 8 5 16.00 79°56'43.735"E 23°16'40.78"N Bamhori
MOA&FW Panagar Per Drop More Crop Sprinkler 8 8 5 1.60 80°7'2.046"E 23°17'25.748"N Bamhori
MOA&FW Panagar Per Drop More Crop Drip system 1 1 5 1.00 80°7'2.046"E 23°17'25.748"N Bamhori
MOA&FW Panagar Har Khet Ko Pani Farm Pond 4 8 5 8.00 79°56'43.735"E 23°16'40.78"N Bandhi
MOA&FW Panagar Har Khet Ko Pani Diesel / Electric /
SolarPump 8 8 5 2.00 79°56'43.735"E 23°16'40.78"N Bandhi
MOA&FW Panagar Har Khet Ko Pani Tube well 5 5 5 10.00 79°56'43.735"E 23°16'40.78"N Bandhi
MOA&FW Panagar Per Drop More Crop Sprinkler 6 6 5 1.20 80°7'2.046"E 23°17'25.748"N Bandhi
MOA&FW Panagar Per Drop More Crop Drip system 1 1 5 1.00 80°7'2.046"E 23°17'25.748"N Bandhi
MOA&FW Panagar Har Khet Ko Pani Diesel / Electric /
SolarPump 10 10 5 2.50 79°56'43.735"E 23°16'40.78"N Barauda
196
Concerned
Ministry/
Department
Name of
the
Districts
/ Blocks
Component Activity Total
Number
Command
Area/Irrig
ation
Potential
(Ha)
Period of
Implement
ation 5/ 7
Estimated
cost
(in Lakhs
Rs.)
Longitude Lattitude Remark / Village Name
MOA&FW Panagar Har Khet Ko Pani Tube well 6 6 5 12.00 79°56'43.735"E 23°16'40.78"N Barauda
MOA&FW Panagar Per Drop More Crop Sprinkler 10 10 5 2.00 80°7'2.046"E 23°17'25.748"N Barauda
MOA&FW Panagar Per Drop More Crop Drip system 2 2 5 2.00 80°7'2.046"E 23°17'25.748"N Barauda
MOA&FW Panagar Har Khet Ko Pani Diesel / Electric /
SolarPump 5 5 5 1.25 79°56'43.735"E 23°16'40.78"N Basha
MOA&FW Panagar Har Khet Ko Pani Tube well 3 3 5 6.00 79°56'43.735"E 23°16'40.78"N Basha
MOA&FW Panagar Per Drop More Crop Sprinkler 4 4 5 0.80 80°7'2.046"E 23°17'25.748"N Basha
MOA&FW Panagar Per Drop More Crop Drip system 1 1 5 1.00 80°7'2.046"E 23°17'25.748"N Basha
MOA&FW Panagar Har Khet Ko Pani Diesel / Electric /
SolarPump 10 10 5 2.50 79°56'43.735"E 23°16'40.78"N Beerner
MOA&FW Panagar Har Khet Ko Pani Tube well 8 8 5 16.00 79°56'43.735"E 23°16'40.78"N Beerner
MOA&FW Panagar Per Drop More Crop Sprinkler 10 10 5 2.00 80°7'2.046"E 23°17'25.748"N Beerner
MOA&FW Panagar Per Drop More Crop Drip system 1 1 5 1.00 80°7'2.046"E 23°17'25.748"N Beerner
MOA&FW Panagar Har Khet Ko Pani Diesel / Electric /
SolarPump 12 12 5 3.00 79°56'43.735"E 23°16'40.78"N Belkhadu
MOA&FW Panagar Har Khet Ko Pani Tube well 6 6 5 12.00 79°56'43.735"E 23°16'40.78"N Belkhadu
MOA&FW Panagar Per Drop More Crop Sprinkler 10 10 5 2.00 80°7'2.046"E 23°17'25.748"N Belkhadu
MOA&FW Panagar Per Drop More Crop Drip system 2 2 5 2.00 80°7'2.046"E 23°17'25.748"N Belkhadu
MOA&FW Panagar Har Khet Ko Pani Farm Pond 2 4 5 4.00 79°56'43.735"E 23°16'40.78"N Bhaisa
MOA&FW Panagar Har Khet Ko Pani Diesel / Electric /
SolarPump 12 12 5 3.00 79°56'43.735"E 23°16'40.78"N Bhaisa
MOA&FW Panagar Har Khet Ko Pani Tube well 6 6 5 12.00 79°56'43.735"E 23°16'40.78"N Bhaisa
MOA&FW Panagar Per Drop More Crop Sprinkler 8 8 5 1.60 80°7'2.046"E 23°17'25.748"N Bhaisa
MOA&FW Panagar Har Khet Ko Pani Diesel / Electric /
SolarPump 8 8 5 2.00 79°56'43.735"E 23°16'40.78"N Bhaisdehi
MOA&FW Panagar Per Drop More Crop Sprinkler 6 6 5 1.20 80°7'2.046"E 23°17'25.748"N Bhaisdehi
MOA&FW Panagar Per Drop More Crop Drip system 1 1 5 1.00 80°7'2.046"E 23°17'25.748"N Bhaisdehi
MOA&FW Panagar Har Khet Ko Pani Diesel / Electric /
SolarPump 10 10 5 2.50 79°56'43.735"E 23°16'40.78"N Bharda
MOA&FW Panagar Har Khet Ko Pani Tube well 8 8 5 16.00 79°56'43.735"E 23°16'40.78"N Bharda
MOA&FW Panagar Per Drop More Crop Sprinkler 8 8 5 1.60 80°7'2.046"E 23°17'25.748"N Bharda
MOA&FW Panagar Per Drop More Crop Drip system 1 1 5 1.00 80°7'2.046"E 23°17'25.748"N Bharda
197
Concerned
Ministry/
Department
Name of
the
Districts
/ Blocks
Component Activity Total
Number
Command
Area/Irrig
ation
Potential
(Ha)
Period of
Implement
ation 5/ 7
Estimated
cost
(in Lakhs
Rs.)
Longitude Lattitude Remark / Village Name
MOA&FW Panagar Har Khet Ko Pani Diesel / Electric /
SolarPump 6 6 5 1.50 79°56'43.735"E 23°16'40.78"N Bharra Dhimra
MOA&FW Panagar Har Khet Ko Pani Tube well 4 4 5 8.00 79°56'43.735"E 23°16'40.78"N Bharra Dhimra
MOA&FW Panagar Per Drop More Crop Sprinkler 5 5 5 1.00 80°7'2.046"E 23°17'25.748"N Bharra Dhimra
MOA&FW Panagar Har Khet Ko Pani Farm Pond 2 4 5 4.00 79°56'43.735"E 23°16'40.78"N Bhidari Kalan
MOA&FW Panagar Har Khet Ko Pani Diesel / Electric /
SolarPump 9 9 5 2.25 79°56'43.735"E 23°16'40.78"N Bhidari Kalan
MOA&FW Panagar Har Khet Ko Pani Tube well 4 4 5 8.00 79°56'43.735"E 23°16'40.78"N Bhidari Kalan
MOA&FW Panagar Per Drop More Crop Sprinkler 8 8 5 1.60 80°7'2.046"E 23°17'25.748"N Bhidari Kalan
MOA&FW Panagar Per Drop More Crop Drip system 2 2 5 2.00 80°7'2.046"E 23°17'25.748"N Bhidari Kalan
MOA&FW Panagar Har Khet Ko Pani Farm Pond 2 4 5 4.00 79°56'43.735"E 23°16'40.78"N Bhidari Khurd
MOA&FW Panagar Har Khet Ko Pani Diesel / Electric /
SolarPump 12 12 5 3.00 79°56'43.735"E 23°16'40.78"N Bhidari Khurd
MOA&FW Panagar Har Khet Ko Pani Tube well 8 8 5 16.00 79°56'43.735"E 23°16'40.78"N Bhidari Khurd
MOA&FW Panagar Per Drop More Crop Sprinkler 10 10 5 2.00 80°7'2.046"E 23°17'25.748"N Bhidari Khurd
MOA&FW Panagar Per Drop More Crop Drip system 2 2 5 2.00 80°7'2.046"E 23°17'25.748"N Bhidari Khurd
MOA&FW Panagar Har Khet Ko Pani Farm Pond 2 4 5 4.00 79°56'43.735"E 23°16'40.78"N Bhita
MOA&FW Panagar Har Khet Ko Pani Diesel / Electric /
SolarPump 9 9 5 2.25 79°56'43.735"E 23°16'40.78"N Bhita
MOA&FW Panagar Har Khet Ko Pani Tube well 12 12 5 24.00 79°56'43.735"E 23°16'40.78"N Bhita
MOA&FW Panagar Per Drop More Crop Sprinkler 8 8 5 1.60 80°7'2.046"E 23°17'25.748"N Bhita
MOA&FW Panagar Per Drop More Crop Drip system 1 1 5 1.00 80°7'2.046"E 23°17'25.748"N Bhita
MOA&FW Panagar Har Khet Ko Pani Farm Pond 4 8 5 8.00 79°56'43.735"E 23°16'40.78"N Bhorha
MOA&FW Panagar Har Khet Ko Pani Diesel / Electric /
SolarPump 8 8 5 2.00 79°56'43.735"E 23°16'40.78"N Bhorha
MOA&FW Panagar Har Khet Ko Pani Tube well 6 6 5 12.00 79°56'43.735"E 23°16'40.78"N Bhorha
MOA&FW Panagar Per Drop More Crop Sprinkler 6 6 5 1.20 80°7'2.046"E 23°17'25.748"N Bhorha
MOA&FW Panagar Per Drop More Crop Drip system 2 2 5 2.00 80°7'2.046"E 23°17'25.748"N Bhorha
MOA&FW Panagar Har Khet Ko Pani Diesel / Electric /
SolarPump 8 8 5 2.00 79°56'27.545"E 23°15'12.363"N Bihar
MOA&FW Panagar Har Khet Ko Pani Tube well 9 9 5 18.00 79°56'27.545"E 23°15'12.363"N Bihar
MOA&FW Panagar Per Drop More Crop Sprinkler 6 6 5 1.20 79°56'27.545"E 23°15'12.363"N Bihar
198
Concerned
Ministry/
Department
Name of
the
Districts
/ Blocks
Component Activity Total
Number
Command
Area/Irrig
ation
Potential
(Ha)
Period of
Implement
ation 5/ 7
Estimated
cost
(in Lakhs
Rs.)
Longitude Lattitude Remark / Village Name
MOA&FW Panagar Per Drop More Crop Drip system 1 1 5 1.00 79°56'27.545"E 23°15'12.363"N Bihar
MOA&FW Panagar Har Khet Ko Pani Farm Pond 2 4 5 4.00 80°7'13.288"E 23°17'8.885"N Bihariya
MOA&FW Panagar Har Khet Ko Pani Diesel / Electric /
SolarPump 8 8 5 2.00 80°7'13.288"E 23°17'8.885"N Bihariya
MOA&FW Panagar Har Khet Ko Pani Tube well 6 6 5 12.00 80°7'13.288"E 23°17'8.885"N Bihariya
MOA&FW Panagar Per Drop More Crop Sprinkler 6 6 5 1.20 80°7'2.046"E 23°17'25.748"N Bihariya
MOA&FW Panagar Per Drop More Crop Drip system 1 1 5 1.00 80°7'2.046"E 23°17'25.748"N Bihariya
MOA&FW Panagar Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°7'13.288"E 23°17'8.885"N Bijaura
MOA&FW Panagar Har Khet Ko Pani Diesel / Electric /
SolarPump 6 6 5 1.50 80°7'13.288"E 23°17'8.885"N Bijaura
MOA&FW Panagar Har Khet Ko Pani Tube well 6 6 5 12.00 80°7'13.288"E 23°17'8.885"N Bijaura
MOA&FW Panagar Per Drop More Crop Sprinkler 6 6 5 1.20 80°7'2.046"E 23°17'25.748"N Bijaura
MOA&FW Panagar Per Drop More Crop Drip system 1 1 5 1.00 80°7'2.046"E 23°17'25.748"N Bijaura
MOA&FW Panagar Har Khet Ko Pani Diesel / Electric /
SolarPump 8 8 5 2.00 79°56'37.135"E 23°15'47.527"N Bijauri
MOA&FW Panagar Har Khet Ko Pani Tube well 12 12 5 24.00 79°56'37.135"E 23°15'47.527"N Bijauri
MOA&FW Panagar Per Drop More Crop Sprinkler 12 12 5 2.40 79°56'37.135"E 23°15'47.527"N Bijauri
MOA&FW Panagar Har Khet Ko Pani Farm Pond 2 4 5 4.00 80°7'13.288"E 23°17'8.885"N Bijhna
MOA&FW Panagar Har Khet Ko Pani Diesel / Electric /
SolarPump 11 11 5 2.75 80°7'13.288"E 23°17'8.885"N Bijhna
MOA&FW Panagar Har Khet Ko Pani Tube well 6 6 5 12.00 80°7'13.288"E 23°17'8.885"N Bijhna
MOA&FW Panagar Per Drop More Crop Sprinkler 8 8 5 1.60 80°7'2.046"E 23°17'25.748"N Bijhna
MOA&FW Panagar Per Drop More Crop Drip system 2 2 5 2.00 80°7'2.046"E 23°17'25.748"N Bijhna
MOA&FW Panagar Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°7'13.288"E 23°17'8.885"N Bijhuwa
MOA&FW Panagar Har Khet Ko Pani Diesel / Electric /
SolarPump 10 10 5 2.50 80°7'13.288"E 23°17'8.885"N Bijhuwa
MOA&FW Panagar Har Khet Ko Pani Tube well 6 6 5 12.00 80°7'13.288"E 23°17'8.885"N Bijhuwa
MOA&FW Panagar Per Drop More Crop Sprinkler 8 8 5 1.60 80°7'2.046"E 23°17'25.748"N Bijhuwa
MOA&FW Panagar Har Khet Ko Pani Diesel / Electric /
SolarPump 12 12 5 3.00 79°59'9.779"E 23°19'8.921"N Bilgawan
MOA&FW Panagar Har Khet Ko Pani Tube well 8 8 5 16.00 79°59'9.779"E 23°19'8.921"N Bilgawan
MOA&FW Panagar Per Drop More Crop Sprinkler 6 6 5 1.20 79°59'9.779"E 23°19'8.921"N Bilgawan
199
Concerned
Ministry/
Department
Name of
the
Districts
/ Blocks
Component Activity Total
Number
Command
Area/Irrig
ation
Potential
(Ha)
Period of
Implement
ation 5/ 7
Estimated
cost
(in Lakhs
Rs.)
Longitude Lattitude Remark / Village Name
MOA&FW Panagar Har Khet Ko Pani Diesel / Electric /
SolarPump 4 4 5 1.00 80°7'13.288"E 23°17'8.885"N Bilkharwa
MOA&FW Panagar Har Khet Ko Pani Tube well 2 2 5 4.00 80°7'13.288"E 23°17'8.885"N Bilkharwa
MOA&FW Panagar Per Drop More Crop Sprinkler 4 4 5 0.80 80°7'2.046"E 23°17'25.748"N Bilkharwa
MOA&FW Panagar Har Khet Ko Pani Diesel / Electric /
SolarPump 9 9 5 2.25 80°7'13.288"E 23°17'8.885"N Byadhkheda
MOA&FW Panagar Har Khet Ko Pani Tube well 6 6 5 12.00 80°7'13.288"E 23°17'8.885"N Byadhkheda
MOA&FW Panagar Per Drop More Crop Sprinkler 10 10 5 2.00 80°7'2.046"E 23°17'25.748"N Byadhkheda
MOA&FW Panagar Per Drop More Crop Drip system 1 1 5 1.00 80°7'2.046"E 23°17'25.748"N Byadhkheda
MOA&FW Panagar Har Khet Ko Pani Farm Pond 5 10 5 10.00 80°7'13.288"E 23°17'8.885"N Chakdehi
MOA&FW Panagar Har Khet Ko Pani Diesel / Electric /
SolarPump 5 5 5 1.25 80°7'13.288"E 23°17'8.885"N Chakdehi
MOA&FW Panagar Har Khet Ko Pani Tube well 4 4 5 8.00 80°7'13.288"E 23°17'8.885"N Chakdehi
MOA&FW Panagar Per Drop More Crop Sprinkler 5 5 5 1.00 80°7'2.046"E 23°17'25.748"N Chakdehi
MOA&FW Panagar Per Drop More Crop Drip system 1 1 5 1.00 80°7'2.046"E 23°17'25.748"N Chakdehi
MOA&FW Panagar Har Khet Ko Pani Farm Pond 2 4 5 4.00 80°7'13.288"E 23°17'8.885"N Chanti
MOA&FW Panagar Har Khet Ko Pani Diesel / Electric /
SolarPump 6 6 5 1.50 80°7'13.288"E 23°17'8.885"N Chanti
MOA&FW Panagar Har Khet Ko Pani Tube well 4 4 5 8.00 80°7'13.288"E 23°17'8.885"N Chanti
MOA&FW Panagar Per Drop More Crop Sprinkler 4 4 5 0.80 80°7'2.046"E 23°17'25.748"N Chanti
MOA&FW Panagar Har Khet Ko Pani Farm Pond 2 4 5 4.00 80°7'13.288"E 23°17'8.885"N Charkhi
MOA&FW Panagar Har Khet Ko Pani Diesel / Electric /
SolarPump 6 6 5 1.50 80°7'13.288"E 23°17'8.885"N Charkhi
MOA&FW Panagar Har Khet Ko Pani Tube well 4 4 5 8.00 80°7'13.288"E 23°17'8.885"N Charkhi
MOA&FW Panagar Per Drop More Crop Sprinkler 5 5 5 1.00 80°7'2.046"E 23°17'25.748"N Charkhi
MOA&FW Panagar Har Khet Ko Pani Diesel / Electric /
SolarPump 10 10 5 2.50 80°7'13.288"E 23°17'8.885"N Chhattarpur
MOA&FW Panagar Har Khet Ko Pani Tube well 8 8 5 16.00 80°7'13.288"E 23°17'8.885"N Chhattarpur
MOA&FW Panagar Per Drop More Crop Sprinkler 8 8 5 1.60 80°7'2.046"E 23°17'25.748"N Chhattarpur
MOA&FW Panagar Per Drop More Crop Drip system 1 1 5 1.00 80°7'2.046"E 23°17'25.748"N Chhattarpur
MOA&FW Panagar Har Khet Ko Pani Farm Pond 3 6 5 6.00 80°7'13.288"E 23°17'8.885"N Chhina Mani
200
Concerned
Ministry/
Department
Name of
the
Districts
/ Blocks
Component Activity Total
Number
Command
Area/Irrig
ation
Potential
(Ha)
Period of
Implement
ation 5/ 7
Estimated
cost
(in Lakhs
Rs.)
Longitude Lattitude Remark / Village Name
MOA&FW Panagar Har Khet Ko Pani Diesel / Electric /
SolarPump 9 9 5 2.25 80°7'13.288"E 23°17'8.885"N Chhina Mani
MOA&FW Panagar Har Khet Ko Pani Tube well 8 8 5 16.00 80°7'13.288"E 23°17'8.885"N Chhina Mani
MOA&FW Panagar Per Drop More Crop Sprinkler 8 8 5 1.60 80°7'2.046"E 23°17'25.748"N Chhina Mani
MOA&FW Panagar Per Drop More Crop Drip system 2 2 5 2.00 80°7'2.046"E 23°17'25.748"N Chhina Mani
MOA&FW Panagar Har Khet Ko Pani Farm Pond 2 4 5 4.00 80°7'13.288"E 23°17'8.885"N Chhitrikhurd
MOA&FW Panagar Har Khet Ko Pani Diesel / Electric /
SolarPump 5 5 5 1.25 80°7'13.288"E 23°17'8.885"N Chhitrikhurd
MOA&FW Panagar Har Khet Ko Pani Tube well 4 4 5 8.00 80°7'13.288"E 23°17'8.885"N Chhitrikhurd
MOA&FW Panagar Per Drop More Crop Sprinkler 6 6 5 1.20 80°7'2.046"E 23°17'25.748"N Chhitrikhurd
MOA&FW Panagar Har Khet Ko Pani Diesel / Electric /
SolarPump 10 10 5 2.50 80°7'13.288"E 23°17'8.885"N Chilhiya
MOA&FW Panagar Har Khet Ko Pani Tube well 6 6 5 12.00 80°7'13.288"E 23°17'8.885"N Chilhiya
MOA&FW Panagar Per Drop More Crop Sprinkler 6 6 5 1.20 80°7'2.046"E 23°17'25.748"N Chilhiya
MOA&FW Panagar Per Drop More Crop Drip system 1 1 5 1.00 80°7'2.046"E 23°17'25.748"N Chilhiya
MOA&FW Panagar Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°7'13.288"E 23°17'8.885"N Deeha (Diha)
MOA&FW Panagar Har Khet Ko Pani Diesel / Electric /
SolarPump 5 5 5 1.25 80°7'13.288"E 23°17'8.885"N Deeha (Diha)
MOA&FW Panagar Har Khet Ko Pani Tube well 3 3 5 6.00 80°7'13.288"E 23°17'8.885"N Deeha (Diha)
MOA&FW Panagar Per Drop More Crop Sprinkler 4 4 5 0.80 80°7'2.046"E 23°17'25.748"N Deeha (Diha)
MOA&FW Panagar Per Drop More Crop Drip system 1 1 5 1.00 80°7'2.046"E 23°17'25.748"N Deeha (Diha)
MOA&FW Panagar Har Khet Ko Pani Diesel / Electric /
SolarPump 9 9 5 2.25 80°7'13.288"E 23°17'8.885"N Deogana
MOA&FW Panagar Har Khet Ko Pani Tube well 5 5 5 10.00 80°7'13.288"E 23°17'8.885"N Deogana
MOA&FW Panagar Per Drop More Crop Sprinkler 10 10 5 2.00 80°7'2.046"E 23°17'25.748"N Deogana
MOA&FW Panagar Har Khet Ko Pani Farm Pond 8 16 5 16.00 80°7'13.288"E 23°17'8.885"N Dharhar
MOA&FW Panagar Har Khet Ko Pani Diesel / Electric /
SolarPump 12 12 5 3.00 80°7'13.288"E 23°17'8.885"N Dharhar
MOA&FW Panagar Har Khet Ko Pani Tube well 8 8 5 16.00 80°7'13.288"E 23°17'8.885"N Dharhar
MOA&FW Panagar Per Drop More Crop Sprinkler 10 10 5 2.00 80°7'2.046"E 23°17'25.748"N Dharhar
MOA&FW Panagar Per Drop More Crop Drip system 2 2 5 2.00 80°7'2.046"E 23°17'25.748"N Dharhar
201
Concerned
Ministry/
Department
Name of
the
Districts
/ Blocks
Component Activity Total
Number
Command
Area/Irrig
ation
Potential
(Ha)
Period of
Implement
ation 5/ 7
Estimated
cost
(in Lakhs
Rs.)
Longitude Lattitude Remark / Village Name
MOA&FW Panagar Har Khet Ko Pani Diesel / Electric /
SolarPump 8 8 5 2.00 80°7'13.288"E 23°17'8.885"N Dhubaha
MOA&FW Panagar Har Khet Ko Pani Tube well 4 4 5 8.00 80°7'13.288"E 23°17'8.885"N Dhubaha
MOA&FW Panagar Per Drop More Crop Sprinkler 6 6 5 1.20 80°7'2.046"E 23°17'25.748"N Dhubaha
MOA&FW Panagar Per Drop More Crop Drip system 1 1 5 1.00 80°7'2.046"E 23°17'25.748"N Dhubaha
MOA&FW Panagar Har Khet Ko Pani Farm Pond 2 4 5 4.00 80°7'13.288"E 23°17'8.885"N Dhurauwa (Ghurauwa)
MOA&FW Panagar Har Khet Ko Pani Diesel / Electric /
SolarPump 5 5 5 1.25 80°7'13.288"E 23°17'8.885"N Dhurauwa (Ghurauwa)
MOA&FW Panagar Har Khet Ko Pani Tube well 4 4 5 8.00 80°7'13.288"E 23°17'8.885"N Dhurauwa (Ghurauwa)
MOA&FW Panagar Per Drop More Crop Sprinkler 6 6 5 1.20 80°7'2.046"E 23°17'25.748"N Dhurauwa (Ghurauwa)
MOA&FW Panagar Per Drop More Crop Drip system 1 1 5 1.00 80°7'2.046"E 23°17'25.748"N Dhurauwa (Ghurauwa)
MOA&FW Panagar Har Khet Ko Pani Diesel / Electric /
SolarPump 12 12 5 3.00 80°7'13.288"E 23°17'8.885"N Dojiya
MOA&FW Panagar Har Khet Ko Pani Tube well 5 5 5 10.00 80°7'13.288"E 23°17'8.885"N Dojiya
MOA&FW Panagar Per Drop More Crop Sprinkler 8 8 5 1.60 80°7'2.046"E 23°17'25.748"N Dojiya
MOA&FW Panagar Har Khet Ko Pani Farm Pond 2 4 5 4.00 80°7'13.288"E 23°17'8.885"N Dongar Badera
MOA&FW Panagar Har Khet Ko Pani Diesel / Electric /
SolarPump 10 10 5 2.50 80°7'13.288"E 23°17'8.885"N Dongar Badera
MOA&FW Panagar Har Khet Ko Pani Tube well 5 5 5 10.00 80°7'13.288"E 23°17'8.885"N Dongar Badera
MOA&FW Panagar Per Drop More Crop Sprinkler 10 10 5 2.00 80°7'2.046"E 23°17'25.748"N Dongar Badera
MOA&FW Panagar Per Drop More Crop Drip system 1 1 5 1.00 80°7'2.046"E 23°17'25.748"N Dongar Badera
MOA&FW Panagar Har Khet Ko Pani Diesel / Electric /
SolarPump 12 12 5 3.00 80°7'13.288"E 23°17'8.885"N Dudki
MOA&FW Panagar Har Khet Ko Pani Tube well 5 5 5 10.00 80°7'13.288"E 23°17'8.885"N Dudki
MOA&FW Panagar Per Drop More Crop Sprinkler 10 10 5 2.00 80°7'2.046"E 23°17'25.748"N Dudki
MOA&FW Panagar Per Drop More Crop Drip system 1 1 5 1.00 80°7'2.046"E 23°17'25.748"N Dudki
MOA&FW Panagar Har Khet Ko Pani Farm Pond 5 10 5 10.00 80°7'13.288"E 23°17'8.885"N Dumna
MOA&FW Panagar Har Khet Ko Pani Diesel / Electric /
SolarPump 5 5 5 1.25 80°7'13.288"E 23°17'8.885"N Dumna
MOA&FW Panagar Har Khet Ko Pani Tube well 4 4 5 8.00 80°7'13.288"E 23°17'8.885"N Dumna
MOA&FW Panagar Per Drop More Crop Sprinkler 5 5 5 1.00 80°7'2.046"E 23°17'25.748"N Dumna
MOA&FW Panagar Per Drop More Crop Drip system 1 1 5 1.00 80°7'2.046"E 23°17'25.748"N Dumna
202
Concerned
Ministry/
Department
Name of
the
Districts
/ Blocks
Component Activity Total
Number
Command
Area/Irrig
ation
Potential
(Ha)
Period of
Implement
ation 5/ 7
Estimated
cost
(in Lakhs
Rs.)
Longitude Lattitude Remark / Village Name
MOA&FW Panagar Har Khet Ko Pani Farm Pond 2 4 5 4.00 80°7'13.288"E 23°17'8.885"N Dundi
MOA&FW Panagar Har Khet Ko Pani Diesel / Electric /
SolarPump 12 12 5 3.00 80°7'13.288"E 23°17'8.885"N Dundi
MOA&FW Panagar Har Khet Ko Pani Tube well 8 8 5 16.00 80°7'13.288"E 23°17'8.885"N Dundi
MOA&FW Panagar Per Drop More Crop Sprinkler 10 10 5 2.00 80°7'2.046"E 23°17'25.748"N Dundi
MOA&FW Panagar Har Khet Ko Pani Farm Pond 2 4 5 4.00 80°7'13.288"E 23°17'8.885"N Dundi Pipariya
MOA&FW Panagar Har Khet Ko Pani Diesel / Electric /
SolarPump 8 8 5 2.00 80°7'13.288"E 23°17'8.885"N Dundi Pipariya
MOA&FW Panagar Har Khet Ko Pani Tube well 6 6 5 12.00 80°7'13.288"E 23°17'8.885"N Dundi Pipariya
MOA&FW Panagar Per Drop More Crop Sprinkler 8 8 5 1.60 80°7'2.046"E 23°17'25.748"N Dundi Pipariya
MOA&FW Panagar Per Drop More Crop Drip system 1 1 5 1.00 80°7'2.046"E 23°17'25.748"N Dundi Pipariya
MOA&FW Panagar Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°7'13.288"E 23°17'8.885"N Dungariya
MOA&FW Panagar Har Khet Ko Pani Diesel / Electric /
SolarPump 8 8 5 2.00 80°7'13.288"E 23°17'8.885"N Dungariya
MOA&FW Panagar Har Khet Ko Pani Tube well 6 6 5 12.00 80°7'13.288"E 23°17'8.885"N Dungariya
MOA&FW Panagar Per Drop More Crop Sprinkler 5 5 5 1.00 80°7'2.046"E 23°17'25.748"N Dungariya
MOA&FW Panagar Har Khet Ko Pani Farm Pond 2 4 5 4.00 80°6'39.562"E 23°17'36.99"N Gadheri
MOA&FW Panagar Har Khet Ko Pani Diesel / Electric /
SolarPump 6 6 5 1.50 80°6'39.562"E 23°17'36.99"N Gadheri
MOA&FW Panagar Har Khet Ko Pani Tube well 2 2 5 4.00 80°6'39.562"E 23°17'36.99"N Gadheri
MOA&FW Panagar Per Drop More Crop Sprinkler 5 5 5 1.00 80°7'2.046"E 23°17'25.748"N Gadheri
MOA&FW Panagar Har Khet Ko Pani Farm Pond 4 8 5 8.00 80°6'39.562"E 23°17'36.99"N Gangajali
MOA&FW Panagar Har Khet Ko Pani Diesel / Electric /
SolarPump 5 5 5 1.25 80°6'39.562"E 23°17'36.99"N Gangajali
MOA&FW Panagar Har Khet Ko Pani Tube well 5 5 5 10.00 80°6'39.562"E 23°17'36.99"N Gangajali
MOA&FW Panagar Per Drop More Crop Sprinkler 4 4 5 0.80 80°7'2.046"E 23°17'25.748"N Gangajali
MOA&FW Panagar Har Khet Ko Pani Farm Pond 2 4 5 4.00 80°6'39.562"E 23°17'36.99"N Ganjar
MOA&FW Panagar Har Khet Ko Pani Diesel / Electric /
SolarPump 8 8 5 2.00 80°6'39.562"E 23°17'36.99"N Ganjar
MOA&FW Panagar Har Khet Ko Pani Tube well 6 6 5 12.00 80°6'39.562"E 23°17'36.99"N Ganjar
MOA&FW Panagar Per Drop More Crop Sprinkler 8 8 5 1.60 80°7'2.046"E 23°17'25.748"N Ganjar
MOA&FW Panagar Per Drop More Crop Drip system 1 1 5 1.00 80°7'2.046"E 23°17'25.748"N Ganjar
203
Concerned
Ministry/
Department
Name of
the
Districts
/ Blocks
Component Activity Total
Number
Command
Area/Irrig
ation
Potential
(Ha)
Period of
Implement
ation 5/ 7
Estimated
cost
(in Lakhs
Rs.)
Longitude Lattitude Remark / Village Name
MOA&FW Panagar Har Khet Ko Pani Farm Pond 2 4 5 4.00 80°6'39.562"E 23°17'36.99"N Garda
MOA&FW Panagar Har Khet Ko Pani Diesel / Electric /
SolarPump 12 12 5 3.00 80°6'39.562"E 23°17'36.99"N Garda
MOA&FW Panagar Har Khet Ko Pani Tube well 5 5 5 10.00 80°6'39.562"E 23°17'36.99"N Garda
MOA&FW Panagar Per Drop More Crop Sprinkler 8 8 5 1.60 80°7'2.046"E 23°17'25.748"N Garda
MOA&FW Panagar Har Khet Ko Pani Farm Pond 4 8 5 8.00 80°6'39.562"E 23°17'36.99"N Ghana
MOA&FW Panagar Har Khet Ko Pani Diesel / Electric /
SolarPump 12 12 5 3.00 80°6'39.562"E 23°17'36.99"N Ghana
MOA&FW Panagar Har Khet Ko Pani Tube well 12 12 5 24.00 80°6'39.562"E 23°17'36.99"N Ghana
MOA&FW Panagar Per Drop More Crop Sprinkler 12 12 5 2.40 80°7'2.046"E 23°17'25.748"N Ghana
MOA&FW Panagar Per Drop More Crop Drip system 2 2 5 2.00 80°7'2.046"E 23°17'25.748"N Ghana
MOA&FW Panagar Har Khet Ko Pani Farm Pond 4 8 5 8.00 80°6'39.562"E 23°17'36.99"N Ghughu Tola
MOA&FW Panagar Har Khet Ko Pani Diesel / Electric /
SolarPump 5 5 5 1.25 80°6'39.562"E 23°17'36.99"N Ghughu Tola
MOA&FW Panagar Har Khet Ko Pani Tube well 4 4 5 8.00 80°6'39.562"E 23°17'36.99"N Ghughu Tola
MOA&FW Panagar Per Drop More Crop Sprinkler 4 4 5 0.80 80°7'2.046"E 23°17'25.748"N Ghughu Tola
MOA&FW Panagar Per Drop More Crop Drip system 1 1 5 1.00 80°7'2.046"E 23°17'25.748"N Ghughu Tola
MOA&FW Panagar Har Khet Ko Pani Farm Pond 2 4 5 4.00 79°58'20.23"E 23°19'30.499"N Gora
MOA&FW Panagar Har Khet Ko Pani Diesel / Electric /
SolarPump 10 10 5 2.50 79°58'20.23"E 23°19'30.499"N Gora
MOA&FW Panagar Har Khet Ko Pani Tube well 6 6 5 12.00 79°58'20.23"E 23°19'30.499"N Gora
MOA&FW Panagar Per Drop More Crop Sprinkler 6 6 5 1.20 79°58'20.23"E 23°19'30.499"N Gora
MOA&FW Panagar Per Drop More Crop Drip system 2 2 5 2.00 79°58'20.23"E 23°19'30.499"N Gora
MOA&FW Panagar Har Khet Ko Pani Farm Pond 2 4 5 4.00 80°6'39.562"E 23°17'36.99"N Gudgawan
MOA&FW Panagar Har Khet Ko Pani Diesel / Electric /
SolarPump 12 12 5 3.00 80°6'39.562"E 23°17'36.99"N Gudgawan
MOA&FW Panagar Har Khet Ko Pani Tube well 8 8 5 16.00 80°6'39.562"E 23°17'36.99"N Gudgawan
MOA&FW Panagar Per Drop More Crop Sprinkler 10 10 5 2.00 80°7'2.046"E 23°17'25.748"N Gudgawan
MOA&FW Panagar Per Drop More Crop Drip system 2 2 5 2.00 80°7'2.046"E 23°17'25.748"N Gudgawan
MOA&FW Panagar Har Khet Ko Pani Diesel / Electric /
SolarPump 8 8 5 2.00 79°56'40.11"E 23°21'38.545"N Guleda
MOA&FW Panagar Har Khet Ko Pani Tube well 5 5 5 10.00 79°56'40.11"E 23°21'38.545"N Guleda
204
Concerned
Ministry/
Department
Name of
the
Districts
/ Blocks
Component Activity Total
Number
Command
Area/Irrig
ation
Potential
(Ha)
Period of
Implement
ation 5/ 7
Estimated
cost
(in Lakhs
Rs.)
Longitude Lattitude Remark / Village Name
MOA&FW Panagar Per Drop More Crop Sprinkler 5 5 5 1.00 79°56'40.11"E 23°21'38.545"N Guleda
MOA&FW Panagar Har Khet Ko Pani Farm Pond 1 2 5 2.00 79°54'24.843"E 23°12'57.542"N Gurda
MOA&FW Panagar Har Khet Ko Pani Diesel / Electric /
SolarPump 5 5 5 1.25 79°54'24.843"E 23°12'57.542"N Gurda
MOA&FW Panagar Har Khet Ko Pani Tube well 5 5 5 10.00 79°54'24.843"E 23°12'57.542"N Gurda
MOA&FW Panagar Per Drop More Crop Sprinkler 5 5 5 1.00 79°54'24.843"E 23°12'57.542"N Gurda
MOA&FW Panagar Per Drop More Crop Drip system 1 1 5 1.00 79°54'24.843"E 23°12'57.542"N Gurda
MOA&FW Panagar Har Khet Ko Pani Diesel / Electric /
SolarPump 5 5 5 1.25 80°6'39.562"E 23°17'36.99"N Harduwa
MOA&FW Panagar Har Khet Ko Pani Tube well 3 3 5 6.00 80°6'39.562"E 23°17'36.99"N Harduwa
MOA&FW Panagar Per Drop More Crop Sprinkler 5 5 5 1.00 80°7'2.046"E 23°17'25.748"N Harduwa
MOA&FW Panagar Per Drop More Crop Drip system 1 1 5 1.00 80°7'2.046"E 23°17'25.748"N Harduwa
MOA&FW Panagar Har Khet Ko Pani Farm Pond 2 4 5 4.00 80°6'39.562"E 23°17'36.99"N Hathi Dol
MOA&FW Panagar Har Khet Ko Pani Diesel / Electric /
SolarPump 6 6 5 1.50 80°6'39.562"E 23°17'36.99"N Hathi Dol
MOA&FW Panagar Har Khet Ko Pani Tube well 5 5 5 10.00 80°6'39.562"E 23°17'36.99"N Hathi Dol
MOA&FW Panagar Per Drop More Crop Sprinkler 5 5 5 1.00 80°7'2.046"E 23°17'25.748"N Hathi Dol
MOA&FW Panagar Har Khet Ko Pani Farm Pond 2 4 5 4.00 80°6'39.562"E 23°17'36.99"N Hathna
MOA&FW Panagar Har Khet Ko Pani Diesel / Electric /
SolarPump 6 6 5 1.50 80°6'39.562"E 23°17'36.99"N Hathna
MOA&FW Panagar Har Khet Ko Pani Tube well 4 4 5 8.00 80°6'39.562"E 23°17'36.99"N Hathna
MOA&FW Panagar Per Drop More Crop Sprinkler 4 4 5 0.80 80°7'2.046"E 23°17'25.748"N Hathna
MOA&FW Panagar Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°6'39.562"E 23°17'36.99"N Hinota
MOA&FW Panagar Har Khet Ko Pani Diesel / Electric /
SolarPump 9 9 5 2.25 80°6'39.562"E 23°17'36.99"N Hinota
MOA&FW Panagar Har Khet Ko Pani Tube well 6 6 5 12.00 80°6'39.562"E 23°17'36.99"N Hinota
MOA&FW Panagar Per Drop More Crop Sprinkler 6 6 5 1.20 80°7'2.046"E 23°17'25.748"N Hinota
MOA&FW Panagar Har Khet Ko Pani Farm Pond 2 4 5 4.00 80°6'39.562"E 23°17'36.99"N Imaliya
MOA&FW Panagar Har Khet Ko Pani Diesel / Electric /
SolarPump 8 8 5 2.00 80°6'39.562"E 23°17'36.99"N Imaliya
MOA&FW Panagar Har Khet Ko Pani Tube well 5 5 5 10.00 80°6'39.562"E 23°17'36.99"N Imaliya
205
Concerned
Ministry/
Department
Name of
the
Districts
/ Blocks
Component Activity Total
Number
Command
Area/Irrig
ation
Potential
(Ha)
Period of
Implement
ation 5/ 7
Estimated
cost
(in Lakhs
Rs.)
Longitude Lattitude Remark / Village Name
MOA&FW Panagar Har Khet Ko Pani Diesel / Electric /
SolarPump 10 10 5 2.50 80°6'39.562"E 23°17'36.99"N Imaliya
MOA&FW Panagar Har Khet Ko Pani Tube well 6 6 5 12.00 80°6'39.562"E 23°17'36.99"N Imaliya
MOA&FW Panagar Per Drop More Crop Sprinkler 5 5 5 1.00 80°7'2.046"E 23°17'25.748"N Imaliya
MOA&FW Panagar Per Drop More Crop Sprinkler 8 8 5 1.60 80°7'2.046"E 23°17'25.748"N Imaliya
MOA&FW Panagar Per Drop More Crop Drip system 2 2 5 2.00 80°7'2.046"E 23°17'25.748"N Imaliya
MOA&FW Panagar Har Khet Ko Pani Farm Pond 2 4 5 4.00 80°1'40.425"E 23°16'32.015"N Imlai
MOA&FW Panagar Har Khet Ko Pani Diesel / Electric /
SolarPump 8 8 5 2.00 80°1'40.425"E 23°16'32.015"N Imlai
MOA&FW Panagar Har Khet Ko Pani Tube well 6 6 5 12.00 80°1'40.425"E 23°16'32.015"N Imlai
MOA&FW Panagar Per Drop More Crop Sprinkler 8 8 5 1.60 80°1'40.425"E 23°16'32.015"N Imlai
MOA&FW Panagar Per Drop More Crop Drip system 1 1 5 1.00 80°1'40.425"E 23°16'32.015"N Imlai
MOA&FW Panagar Har Khet Ko Pani Diesel / Electric /
SolarPump 9 9 5 2.25 79°56'48.203"E 23°20'47.312"N Jaitna
MOA&FW Panagar Har Khet Ko Pani Tube well 5 5 5 10.00 79°56'48.203"E 23°20'47.312"N Jaitna
MOA&FW Panagar Per Drop More Crop Sprinkler 10 10 5 2.00 79°56'48.203"E 23°20'47.312"N Jaitna
MOA&FW Panagar Per Drop More Crop Drip system 1 1 5 1.00 79°56'48.203"E 23°20'47.312"N Jaitna
MOA&FW Panagar Har Khet Ko Pani Farm Pond 2 4 5 4.00 80°6'39.562"E 23°17'36.99"N Jaitpuri
MOA&FW Panagar Har Khet Ko Pani Diesel / Electric /
SolarPump 6 6 5 1.50 80°6'39.562"E 23°17'36.99"N Jaitpuri
MOA&FW Panagar Har Khet Ko Pani Tube well 2 2 5 4.00 80°6'39.562"E 23°17'36.99"N Jaitpuri
MOA&FW Panagar Per Drop More Crop Sprinkler 5 5 5 1.00 80°7'2.046"E 23°17'25.748"N Jaitpuri
MOA&FW Panagar Har Khet Ko Pani Farm Pond 2 4 5 4.00 80°6'39.562"E 23°17'36.99"N Jatwan
MOA&FW Panagar Har Khet Ko Pani Diesel / Electric /
SolarPump 12 12 5 3.00 80°6'39.562"E 23°17'36.99"N Jatwan
MOA&FW Panagar Har Khet Ko Pani Tube well 8 8 5 16.00 80°6'39.562"E 23°17'36.99"N Jatwan
MOA&FW Panagar Per Drop More Crop Sprinkler 10 10 5 2.00 80°7'2.046"E 23°17'25.748"N Jatwan
MOA&FW Panagar Per Drop More Crop Drip system 1 1 5 1.00 80°7'2.046"E 23°17'25.748"N Jatwan
MOA&FW Panagar Har Khet Ko Pani Farm Pond 2 4 5 4.00 80°6'39.562"E 23°17'36.99"N Jhagra
MOA&FW Panagar Har Khet Ko Pani Diesel / Electric /
SolarPump 10 10 5 2.50 80°6'39.562"E 23°17'36.99"N Jhagra
MOA&FW Panagar Har Khet Ko Pani Tube well 6 6 5 12.00 80°6'39.562"E 23°17'36.99"N Jhagra
206
Concerned
Ministry/
Department
Name of
the
Districts
/ Blocks
Component Activity Total
Number
Command
Area/Irrig
ation
Potential
(Ha)
Period of
Implement
ation 5/ 7
Estimated
cost
(in Lakhs
Rs.)
Longitude Lattitude Remark / Village Name
MOA&FW Panagar Per Drop More Crop Sprinkler 10 10 5 2.00 80°7'2.046"E 23°17'25.748"N Jhagra
MOA&FW Panagar Per Drop More Crop Drip system 1 1 5 1.00 80°7'2.046"E 23°17'25.748"N Jhagra
MOA&FW Panagar Har Khet Ko Pani Diesel / Electric /
SolarPump 6 6 5 1.50 80°6'39.562"E 23°17'36.99"N Jhagri
MOA&FW Panagar Har Khet Ko Pani Tube well 4 4 5 8.00 80°6'39.562"E 23°17'36.99"N Jhagri
MOA&FW Panagar Per Drop More Crop Sprinkler 5 5 5 1.00 80°7'2.046"E 23°17'25.748"N Jhagri
MOA&FW Panagar Har Khet Ko Pani Farm Pond 2 4 5 4.00 80°6'39.562"E 23°17'36.99"N Jhigra Kheda
MOA&FW Panagar Har Khet Ko Pani Diesel / Electric /
SolarPump 5 5 5 1.25 80°6'39.562"E 23°17'36.99"N Jhigra Kheda
MOA&FW Panagar Har Khet Ko Pani Tube well 4 4 5 8.00 80°6'39.562"E 23°17'36.99"N Jhigra Kheda
MOA&FW Panagar Per Drop More Crop Sprinkler 6 6 5 1.20 80°7'2.046"E 23°17'25.748"N Jhigra Kheda
MOA&FW Panagar Per Drop More Crop Drip system 1 1 5 1.00 80°7'2.046"E 23°17'25.748"N Jhigra Kheda
MOA&FW Panagar Har Khet Ko Pani Diesel / Electric /
SolarPump 8 8 5 2.00 80°6'39.562"E 23°17'36.99"N Jhilmili
MOA&FW Panagar Har Khet Ko Pani Tube well 8 8 5 16.00 80°6'39.562"E 23°17'36.99"N Jhilmili
MOA&FW Panagar Per Drop More Crop Sprinkler 5 5 5 1.00 80°7'2.046"E 23°17'25.748"N Jhilmili
MOA&FW Panagar Per Drop More Crop Drip system 1 1 5 1.00 80°7'2.046"E 23°17'25.748"N Jhilmili
MOA&FW Panagar Har Khet Ko Pani Farm Pond 4 8 5 8.00 80°6'39.562"E 23°17'36.99"N Jhurjhuru
MOA&FW Panagar Har Khet Ko Pani Diesel / Electric /
SolarPump 8 8 5 2.00 80°6'39.562"E 23°17'36.99"N Jhurjhuru
MOA&FW Panagar Har Khet Ko Pani Tube well 6 6 5 12.00 80°6'39.562"E 23°17'36.99"N Jhurjhuru
MOA&FW Panagar Per Drop More Crop Sprinkler 6 6 5 1.20 80°7'2.046"E 23°17'25.748"N Jhurjhuru
MOA&FW Panagar Per Drop More Crop Drip system 1 1 5 1.00 80°7'2.046"E 23°17'25.748"N Jhurjhuru
MOA&FW Panagar Har Khet Ko Pani Farm Pond 2 4 5 4.00 79°53'49.44"E 23°15'55.785"N Junwani
MOA&FW Panagar Har Khet Ko Pani Diesel / Electric /
SolarPump 12 12 5 3.00 79°53'49.44"E 23°15'55.785"N Junwani
MOA&FW Panagar Har Khet Ko Pani Tube well 8 8 5 16.00 79°53'49.44"E 23°15'55.785"N Junwani
MOA&FW Panagar Per Drop More Crop Sprinkler 10 10 5 2.00 79°53'49.44"E 23°15'55.785"N Junwani
MOA&FW Panagar Per Drop More Crop Drip system 2 2 5 2.00 79°53'49.44"E 23°15'55.785"N Junwani
MOA&FW Panagar Per Drop More Crop Sprinkler 4 4 5 0.80 80°7'2.046"E 23°17'25.748"N Kachnari
MOA&FW Panagar Per Drop More Crop Drip system 1 1 5 1.00 80°7'2.046"E 23°17'25.748"N Kachnari
207
Concerned
Ministry/
Department
Name of
the
Districts
/ Blocks
Component Activity Total
Number
Command
Area/Irrig
ation
Potential
(Ha)
Period of
Implement
ation 5/ 7
Estimated
cost
(in Lakhs
Rs.)
Longitude Lattitude Remark / Village Name
MOA&FW Panagar Har Khet Ko Pani Diesel / Electric /
SolarPump 5 5 5 1.25 79°59'9.881"E 23°16'57.643"N Kachnari
MOA&FW Panagar Har Khet Ko Pani Tube well 3 3 5 6.00 79°59'9.881"E 23°16'57.643"N Kachnari
MOA&FW Panagar Har Khet Ko Pani Farm Pond 2 4 5 4.00 80°4'55.159"E 23°15'35.392"N Kakarhai
MOA&FW Panagar Har Khet Ko Pani Diesel / Electric /
SolarPump 6 6 5 1.50 80°4'55.159"E 23°15'35.392"N Kakarhai
MOA&FW Panagar Har Khet Ko Pani Tube well 6 6 5 12.00 80°4'55.159"E 23°15'35.392"N Kakarhai
MOA&FW Panagar Per Drop More Crop Sprinkler 5 5 5 1.00 80°4'55.159"E 23°15'35.392"N Kakarhai
MOA&FW Panagar Per Drop More Crop Drip system 1 1 5 1.00 80°4'55.159"E 23°15'35.392"N Kakarhai
MOA&FW Panagar Har Khet Ko Pani Farm Pond 4 8 5 8.00 80°3'37.247"E 23°9'53.043"N Kakartala
MOA&FW Panagar Har Khet Ko Pani Diesel / Electric /
SolarPump 8 8 5 2.00 80°3'37.247"E 23°9'53.043"N Kakartala
MOA&FW Panagar Har Khet Ko Pani Tube well 6 6 5 12.00 80°3'37.247"E 23°9'53.043"N Kakartala
MOA&FW Panagar Per Drop More Crop Sprinkler 6 6 5 1.20 80°3'37.247"E 23°9'53.043"N Kakartala
MOA&FW Panagar Per Drop More Crop Drip system 1 1 5 1.00 80°3'37.247"E 23°9'53.043"N Kakartala
MOA&FW Panagar Har Khet Ko Pani Farm Pond 2 4 5 4.00 80°6'39.562"E 23°17'36.99"N Kaladumar
MOA&FW Panagar Har Khet Ko Pani Diesel / Electric /
SolarPump 10 10 5 2.50 80°6'39.562"E 23°17'36.99"N Kaladumar
MOA&FW Panagar Har Khet Ko Pani Tube well 6 6 5 12.00 80°6'39.562"E 23°17'36.99"N Kaladumar
MOA&FW Panagar Per Drop More Crop Sprinkler 10 10 5 2.00 80°7'2.046"E 23°17'25.748"N Kaladumar
MOA&FW Panagar Per Drop More Crop Drip system 2 2 5 2.00 80°7'2.046"E 23°17'25.748"N Kaladumar
MOA&FW Panagar Har Khet Ko Pani Farm Pond 2 4 5 4.00 80°6'39.562"E 23°17'36.99"N Kandra Kheda
MOA&FW Panagar Har Khet Ko Pani Diesel / Electric /
SolarPump 8 8 5 2.00 80°6'39.562"E 23°17'36.99"N Kandra Kheda
MOA&FW Panagar Har Khet Ko Pani Tube well 6 6 5 12.00 80°6'39.562"E 23°17'36.99"N Kandra Kheda
MOA&FW Panagar Per Drop More Crop Sprinkler 8 8 5 1.60 80°7'2.046"E 23°17'25.748"N Kandra Kheda
MOA&FW Panagar Per Drop More Crop Drip system 1 1 5 1.00 80°7'2.046"E 23°17'25.748"N Kandra Kheda
MOA&FW Panagar Har Khet Ko Pani Farm Pond 4 8 5 8.00 80°6'39.562"E 23°17'36.99"N Kanjaniya
MOA&FW Panagar Har Khet Ko Pani Diesel / Electric /
SolarPump 12 12 5 3.00 80°6'39.562"E 23°17'36.99"N Kanjaniya
MOA&FW Panagar Har Khet Ko Pani Tube well 8 8 5 16.00 80°6'39.562"E 23°17'36.99"N Kanjaniya
MOA&FW Panagar Per Drop More Crop Sprinkler 12 12 5 2.40 80°7'2.046"E 23°17'25.748"N Kanjaniya
208
Concerned
Ministry/
Department
Name of
the
Districts
/ Blocks
Component Activity Total
Number
Command
Area/Irrig
ation
Potential
(Ha)
Period of
Implement
ation 5/ 7
Estimated
cost
(in Lakhs
Rs.)
Longitude Lattitude Remark / Village Name
MOA&FW Panagar Per Drop More Crop Drip system 1 1 5 1.00 80°7'2.046"E 23°17'25.748"N Kanjaniya
MOA&FW Panagar Har Khet Ko Pani Diesel / Electric /
SolarPump 10 10 5 2.50 80°6'39.562"E 23°17'36.99"N Kariwah
MOA&FW Panagar Har Khet Ko Pani Tube well 8 8 5 16.00 80°6'39.562"E 23°17'36.99"N Kariwah
MOA&FW Panagar Per Drop More Crop Sprinkler 9 9 5 1.80 80°7'2.046"E 23°17'25.748"N Kariwah
MOA&FW Panagar Per Drop More Crop Drip system 1 1 5 1.00 80°7'2.046"E 23°17'25.748"N Kariwah
MOA&FW Panagar Har Khet Ko Pani Farm Pond 4 8 5 8.00 80°0'49.635"E 23°14'3.37"N Kashi
MOA&FW Panagar Har Khet Ko Pani Diesel / Electric /
SolarPump 8 8 5 2.00 80°0'49.635"E 23°14'3.37"N Kashi
MOA&FW Panagar Har Khet Ko Pani Tube well 6 6 5 12.00 80°0'49.635"E 23°14'3.37"N Kashi
MOA&FW Panagar Per Drop More Crop Sprinkler 6 6 5 1.20 80°0'49.635"E 23°14'3.37"N Kashi
MOA&FW Panagar Per Drop More Crop Drip system 1 1 5 1.00 80°0'49.635"E 23°14'3.37"N Kashi
MOA&FW Panagar Har Khet Ko Pani Diesel / Electric /
SolarPump 6 6 5 1.50 80°5'2.16"E 23°18'46.248"N Kataiya
MOA&FW Panagar Har Khet Ko Pani Tube well 6 6 5 12.00 80°5'2.16"E 23°18'46.248"N Kataiya
MOA&FW Panagar Per Drop More Crop Sprinkler 6 6 5 1.20 80°5'2.16"E 23°18'46.248"N Kataiya
MOA&FW Panagar Har Khet Ko Pani Diesel / Electric /
SolarPump 5 5 5 1.25 79°53'59.43"E 23°13'3.454"N Kathoda
MOA&FW Panagar Har Khet Ko Pani Tube well 3 3 5 6.00 79°53'59.43"E 23°13'3.454"N Kathoda
MOA&FW Panagar Per Drop More Crop Sprinkler 5 5 5 1.00 79°53'59.43"E 23°13'3.454"N Kathoda
MOA&FW Panagar Per Drop More Crop Drip system 1 1 5 1.00 79°53'59.43"E 23°13'3.454"N Kathoda
MOA&FW Panagar Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°1'28.837"E 23°17'29.822"N Keolari
MOA&FW Panagar Har Khet Ko Pani Diesel / Electric /
SolarPump 12 12 5 3.00 80°1'28.837"E 23°17'29.822"N Keolari
MOA&FW Panagar Har Khet Ko Pani Tube well 8 8 5 16.00 80°1'28.837"E 23°17'29.822"N Keolari
MOA&FW Panagar Har Khet Ko Pani Farm Pond 2 4 5 4.00 80°1'28.837"E 23°17'29.822"N Keolari
MOA&FW Panagar Har Khet Ko Pani Diesel / Electric /
SolarPump 8 8 5 2.00 80°1'28.837"E 23°17'29.822"N Keolari
MOA&FW Panagar Har Khet Ko Pani Tube well 6 6 5 12.00 80°1'28.837"E 23°17'29.822"N Keolari
MOA&FW Panagar Per Drop More Crop Sprinkler 8 8 5 1.60 80°1'28.837"E 23°17'29.822"N Keolari
MOA&FW Panagar Per Drop More Crop Drip system 1 1 5 1.00 80°1'28.837"E 23°17'29.822"N Keolari
MOA&FW Panagar Per Drop More Crop Sprinkler 8 8 5 1.60 80°1'28.837"E 23°17'29.822"N Keolari
209
Concerned
Ministry/
Department
Name of
the
Districts
/ Blocks
Component Activity Total
Number
Command
Area/Irrig
ation
Potential
(Ha)
Period of
Implement
ation 5/ 7
Estimated
cost
(in Lakhs
Rs.)
Longitude Lattitude Remark / Village Name
MOA&FW Panagar Per Drop More Crop Drip system 1 1 5 1.00 80°1'28.837"E 23°17'29.822"N Keolari
MOA&FW Panagar Har Khet Ko Pani Farm Pond 4 8 5 8.00 80°6'39.562"E 23°17'36.99"N Ker
MOA&FW Panagar Har Khet Ko Pani Diesel / Electric /
SolarPump 8 8 5 2.00 80°6'39.562"E 23°17'36.99"N Ker
MOA&FW Panagar Har Khet Ko Pani Tube well 6 6 5 12.00 80°6'39.562"E 23°17'36.99"N Ker
MOA&FW Panagar Per Drop More Crop Sprinkler 6 6 5 1.20 80°7'2.046"E 23°17'25.748"N Ker
MOA&FW Panagar Per Drop More Crop Drip system 2 2 5 2.00 80°7'2.046"E 23°17'25.748"N Ker
MOA&FW Panagar Har Khet Ko Pani Diesel / Electric /
SolarPump 8 8 5 2.00 80°6'39.562"E 23°17'36.99"N Khajri
MOA&FW Panagar Har Khet Ko Pani Tube well 5 5 5 10.00 80°6'39.562"E 23°17'36.99"N Khajri
MOA&FW Panagar Per Drop More Crop Sprinkler 8 8 5 1.60 80°7'2.046"E 23°17'25.748"N Khajri
MOA&FW Panagar Per Drop More Crop Drip system 1 1 5 1.00 80°7'2.046"E 23°17'25.748"N Khajri
MOA&FW Panagar Har Khet Ko Pani Farm Pond 2 4 5 4.00 80°6'39.562"E 23°17'36.99"N Khamhariya
MOA&FW Panagar Har Khet Ko Pani Diesel / Electric /
SolarPump 18 18 5 4.50 80°6'39.562"E 23°17'36.99"N Khamhariya
MOA&FW Panagar Har Khet Ko Pani Tube well 12 12 5 24.00 80°6'39.562"E 23°17'36.99"N Khamhariya
MOA&FW Panagar Har Khet Ko Pani Farm Pond 2 4 5 4.00 80°6'39.562"E 23°17'36.99"N Khamhariya
MOA&FW Panagar Har Khet Ko Pani Diesel / Electric /
SolarPump 8 8 5 2.00 80°6'39.562"E 23°17'36.99"N Khamhariya
MOA&FW Panagar Har Khet Ko Pani Tube well 6 6 5 12.00 80°6'39.562"E 23°17'36.99"N Khamhariya
MOA&FW Panagar Per Drop More Crop Sprinkler 12 12 5 2.40 80°7'2.046"E 23°17'25.748"N Khamhariya
MOA&FW Panagar Per Drop More Crop Drip system 1 1 5 1.00 80°7'2.046"E 23°17'25.748"N Khamhariya
MOA&FW Panagar Per Drop More Crop Sprinkler 6 6 5 1.20 80°7'2.046"E 23°17'25.748"N Khamhariya
MOA&FW Panagar Per Drop More Crop Drip system 1 1 5 1.00 80°7'2.046"E 23°17'25.748"N Khamhariya
MOA&FW Panagar Har Khet Ko Pani Diesel / Electric /
SolarPump 10 10 5 2.50 80°0'24.902"E 23°15'21.154"N Kharond
MOA&FW Panagar Har Khet Ko Pani Tube well 6 6 5 12.00 80°0'24.902"E 23°15'21.154"N Kharond
MOA&FW Panagar Per Drop More Crop Sprinkler 8 8 5 1.60 80°0'24.902"E 23°15'21.154"N Kharond
MOA&FW Panagar Per Drop More Crop Drip system 2 2 5 2.00 80°0'24.902"E 23°15'21.154"N Kharond
MOA&FW Panagar Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°6'39.562"E 23°17'36.99"N Kheri
MOA&FW Panagar Har Khet Ko Pani Diesel / Electric /
SolarPump 5 5 5 1.25 80°6'39.562"E 23°17'36.99"N Kheri
210
Concerned
Ministry/
Department
Name of
the
Districts
/ Blocks
Component Activity Total
Number
Command
Area/Irrig
ation
Potential
(Ha)
Period of
Implement
ation 5/ 7
Estimated
cost
(in Lakhs
Rs.)
Longitude Lattitude Remark / Village Name
MOA&FW Panagar Har Khet Ko Pani Tube well 3 3 5 6.00 80°6'39.562"E 23°17'36.99"N Kheri
MOA&FW Panagar Per Drop More Crop Sprinkler 6 6 5 1.20 80°7'2.046"E 23°17'25.748"N Kheri
MOA&FW Panagar Har Khet Ko Pani Farm Pond 2 4 5 4.00 80°6'39.562"E 23°17'36.99"N Khirahni
MOA&FW Panagar Har Khet Ko Pani Diesel / Electric /
SolarPump 12 12 5 3.00 80°6'39.562"E 23°17'36.99"N Khirahni
MOA&FW Panagar Har Khet Ko Pani Tube well 8 8 5 16.00 80°6'39.562"E 23°17'36.99"N Khirahni
MOA&FW Panagar Per Drop More Crop Sprinkler 7 7 5 1.40 80°7'2.046"E 23°17'25.748"N Khirahni
MOA&FW Panagar Per Drop More Crop Drip system 1 1 5 1.00 80°7'2.046"E 23°17'25.748"N Khirahni
MOA&FW Panagar Har Khet Ko Pani Diesel / Electric /
SolarPump 15 15 5 3.75 79°53'38.917"E 23°16'39.474"N Khiriya
MOA&FW Panagar Har Khet Ko Pani Tube well 8 8 5 16.00 79°53'38.917"E 23°16'39.474"N Khiriya
MOA&FW Panagar Har Khet Ko Pani Farm Pond 2 4 5 4.00 79°53'38.917"E 23°16'39.474"N Khiriya
MOA&FW Panagar Har Khet Ko Pani Diesel / Electric /
SolarPump 5 5 5 1.25 79°53'38.917"E 23°16'39.474"N Khiriya
MOA&FW Panagar Har Khet Ko Pani Tube well 4 4 5 8.00 79°53'38.917"E 23°16'39.474"N Khiriya
MOA&FW Panagar Per Drop More Crop Sprinkler 10 10 5 2.00 79°53'38.917"E 23°16'39.474"N Khiriya
MOA&FW Panagar Per Drop More Crop Drip system 1 1 5 1.00 79°53'38.917"E 23°16'39.474"N Khiriya
MOA&FW Panagar Per Drop More Crop Sprinkler 6 6 5 1.20 79°53'38.917"E 23°16'39.474"N Khiriya
MOA&FW Panagar Per Drop More Crop Drip system 1 1 5 1.00 79°53'38.917"E 23°16'39.474"N Khiriya
MOA&FW Panagar Har Khet Ko Pani Diesel / Electric /
SolarPump 5 5 5 1.25 80°6'39.562"E 23°17'36.99"N Khiriya Kalan
MOA&FW Panagar Har Khet Ko Pani Tube well 3 3 5 6.00 80°6'39.562"E 23°17'36.99"N Khiriya Kalan
MOA&FW Panagar Per Drop More Crop Sprinkler 5 5 5 1.00 80°7'2.046"E 23°17'25.748"N Khiriya Kalan
MOA&FW Panagar Per Drop More Crop Drip system 1 1 5 1.00 80°7'2.046"E 23°17'25.748"N Khiriya Kalan
MOA&FW Panagar Har Khet Ko Pani Diesel / Electric /
SolarPump 5 5 5 1.25 80°6'39.562"E 23°17'36.99"N Khirkiya Khurd
MOA&FW Panagar Har Khet Ko Pani Tube well 3 3 5 6.00 80°6'39.562"E 23°17'36.99"N Khirkiya Khurd
MOA&FW Panagar Per Drop More Crop Sprinkler 4 4 5 0.80 80°7'2.046"E 23°17'25.748"N Khirkiya Khurd
MOA&FW Panagar Per Drop More Crop Drip system 1 1 5 1.00 80°7'2.046"E 23°17'25.748"N Khirkiya Khurd
MOA&FW Panagar Har Khet Ko Pani Farm Pond 1 2 5 2.00 79°55'44.389"E 23°17'57.793"N Kohani
MOA&FW Panagar Har Khet Ko Pani Diesel / Electric /
SolarPump 10 10 5 2.50 79°55'44.389"E 23°17'57.793"N Kohani
211
Concerned
Ministry/
Department
Name of
the
Districts
/ Blocks
Component Activity Total
Number
Command
Area/Irrig
ation
Potential
(Ha)
Period of
Implement
ation 5/ 7
Estimated
cost
(in Lakhs
Rs.)
Longitude Lattitude Remark / Village Name
MOA&FW Panagar Har Khet Ko Pani Tube well 5 5 5 10.00 79°55'44.389"E 23°17'57.793"N Kohani
MOA&FW Panagar Per Drop More Crop Sprinkler 5 5 5 1.00 79°55'44.389"E 23°17'57.793"N Kohani
MOA&FW Panagar Har Khet Ko Pani Diesel / Electric /
SolarPump 8 8 5 2.00 80°6'39.562"E 23°17'36.99"N Kohna
MOA&FW Panagar Har Khet Ko Pani Tube well 5 5 5 10.00 80°6'39.562"E 23°17'36.99"N Kohna
MOA&FW Panagar Per Drop More Crop Sprinkler 7 7 5 1.40 80°7'2.046"E 23°17'25.748"N Kohna
MOA&FW Panagar Per Drop More Crop Drip system 1 1 5 1.00 80°7'2.046"E 23°17'25.748"N Kohna
MOA&FW Panagar Har Khet Ko Pani Diesel / Electric /
SolarPump 5 5 5 1.25 80°6'39.562"E 23°17'36.99"N Kudwari
MOA&FW Panagar Har Khet Ko Pani Tube well 3 3 5 6.00 80°6'39.562"E 23°17'36.99"N Kudwari
MOA&FW Panagar Per Drop More Crop Sprinkler 4 4 5 0.80 80°7'2.046"E 23°17'25.748"N Kudwari
MOA&FW Panagar Per Drop More Crop Drip system 1 1 5 1.00 80°7'2.046"E 23°17'25.748"N Kudwari
MOA&FW Panagar Har Khet Ko Pani Diesel / Electric /
SolarPump 12 12 5 3.00 80°1'13.652"E 23°18'0.99"N Kusner
MOA&FW Panagar Har Khet Ko Pani Tube well 10 10 5 20.00 80°1'13.652"E 23°18'0.99"N Kusner
MOA&FW Panagar Per Drop More Crop Sprinkler 12 12 5 2.40 80°1'13.652"E 23°18'0.99"N Kusner
MOA&FW Panagar Har Khet Ko Pani Farm Pond 2 4 5 4.00 80°6'39.562"E 23°17'36.99"N Kutgar
MOA&FW Panagar Har Khet Ko Pani Diesel / Electric /
SolarPump 8 8 5 2.00 80°6'39.562"E 23°17'36.99"N Kutgar
MOA&FW Panagar Har Khet Ko Pani Tube well 6 6 5 12.00 80°6'39.562"E 23°17'36.99"N Kutgar
MOA&FW Panagar Per Drop More Crop Sprinkler 6 6 5 1.20 80°7'2.046"E 23°17'25.748"N Kutgar
MOA&FW Panagar Per Drop More Crop Drip system 1 1 5 1.00 80°7'2.046"E 23°17'25.748"N Kutgar
MOA&FW Panagar Har Khet Ko Pani Farm Pond 4 8 5 8.00 80°6'39.562"E 23°17'36.99"N Lakhan Wara
MOA&FW Panagar Har Khet Ko Pani Diesel / Electric /
SolarPump 12 12 5 3.00 80°6'39.562"E 23°17'36.99"N Lakhan Wara
MOA&FW Panagar Har Khet Ko Pani Tube well 8 8 5 16.00 80°6'39.562"E 23°17'36.99"N Lakhan Wara
MOA&FW Panagar Per Drop More Crop Sprinkler 10 10 5 2.00 80°7'2.046"E 23°17'25.748"N Lakhan Wara
MOA&FW Panagar Per Drop More Crop Drip system 2 2 5 2.00 80°7'2.046"E 23°17'25.748"N Lakhan Wara
MOA&FW Panagar Har Khet Ko Pani Diesel / Electric /
SolarPump 8 8 5 2.00 80°6'39.562"E 23°17'36.99"N Lakhna
MOA&FW Panagar Har Khet Ko Pani Tube well 5 5 5 10.00 80°6'39.562"E 23°17'36.99"N Lakhna
MOA&FW Panagar Per Drop More Crop Sprinkler 8 8 5 1.60 80°7'2.046"E 23°17'25.748"N Lakhna
212
Concerned
Ministry/
Department
Name of
the
Districts
/ Blocks
Component Activity Total
Number
Command
Area/Irrig
ation
Potential
(Ha)
Period of
Implement
ation 5/ 7
Estimated
cost
(in Lakhs
Rs.)
Longitude Lattitude Remark / Village Name
MOA&FW Panagar Per Drop More Crop Drip system 1 1 5 1.00 80°7'2.046"E 23°17'25.748"N Lakhna
MOA&FW Panagar Har Khet Ko Pani Farm Pond 4 8 5 8.00 80°6'39.562"E 23°17'36.99"N Lilkheda
MOA&FW Panagar Har Khet Ko Pani Diesel / Electric /
SolarPump 8 8 5 2.00 80°6'39.562"E 23°17'36.99"N Lilkheda
MOA&FW Panagar Har Khet Ko Pani Tube well 6 6 5 12.00 80°6'39.562"E 23°17'36.99"N Lilkheda
MOA&FW Panagar Per Drop More Crop Sprinkler 6 6 5 1.20 80°7'2.046"E 23°17'25.748"N Lilkheda
MOA&FW Panagar Per Drop More Crop Drip system 1 1 5 1.00 80°7'2.046"E 23°17'25.748"N Lilkheda
MOA&FW Panagar Har Khet Ko Pani Diesel / Electric /
SolarPump 10 10 5 2.50 79°58'35.015"E 23°17'9.31"N Liti
MOA&FW Panagar Har Khet Ko Pani Tube well 6 6 5 12.00 79°58'35.015"E 23°17'9.31"N Liti
MOA&FW Panagar Per Drop More Crop Sprinkler 6 6 5 1.20 79°58'35.015"E 23°17'9.31"N Liti
MOA&FW Panagar Har Khet Ko Pani Farm Pond 1 2 5 2.00 79°52'50.966"E 23°16'17.896"N Machala
MOA&FW Panagar Har Khet Ko Pani Diesel / Electric /
SolarPump 10 10 5 2.50 79°52'50.966"E 23°16'17.896"N Machala
MOA&FW Panagar Har Khet Ko Pani Tube well 6 6 5 12.00 79°52'50.966"E 23°16'17.896"N Machala
MOA&FW Panagar Per Drop More Crop Sprinkler 10 10 5 2.00 79°52'50.966"E 23°16'17.896"N Machala
MOA&FW Panagar Per Drop More Crop Drip system 1 1 5 1.00 79°52'50.966"E 23°16'17.896"N Machala
MOA&FW Panagar Har Khet Ko Pani Farm Pond 2 4 5 4.00 79°53'0.557"E 23°20'12.855"N Madna
MOA&FW Panagar Har Khet Ko Pani Diesel / Electric /
SolarPump 9 9 5 2.25 79°53'0.557"E 23°20'12.855"N Madna
MOA&FW Panagar Har Khet Ko Pani Tube well 10 10 5 20.00 79°53'0.557"E 23°20'12.855"N Madna
MOA&FW Panagar Per Drop More Crop Sprinkler 5 5 5 1.00 79°53'0.557"E 23°20'12.855"N Madna
MOA&FW Panagar Per Drop More Crop Drip system 1 1 5 1.00 79°53'0.557"E 23°20'12.855"N Madna
MOA&FW Panagar Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°6'39.562"E 23°17'36.99"N Mahgaon
MOA&FW Panagar Har Khet Ko Pani Diesel / Electric /
SolarPump 5 5 5 1.25 80°6'39.562"E 23°17'36.99"N Mahgaon
MOA&FW Panagar Har Khet Ko Pani Tube well 5 5 5 10.00 80°6'39.562"E 23°17'36.99"N Mahgaon
MOA&FW Panagar Per Drop More Crop Sprinkler 5 5 5 1.00 80°7'2.046"E 23°17'25.748"N Mahgaon
MOA&FW Panagar Per Drop More Crop Drip system 1 1 5 1.00 80°7'2.046"E 23°17'25.748"N Mahgaon
MOA&FW Panagar Har Khet Ko Pani Diesel / Electric /
SolarPump 9 9 5 2.25 80°3'14.329"E 23°17'15.437"N Mahgawan
MOA&FW Panagar Har Khet Ko Pani Tube well 5 5 5 10.00 80°3'14.329"E 23°17'15.437"N Mahgawan
213
Concerned
Ministry/
Department
Name of
the
Districts
/ Blocks
Component Activity Total
Number
Command
Area/Irrig
ation
Potential
(Ha)
Period of
Implement
ation 5/ 7
Estimated
cost
(in Lakhs
Rs.)
Longitude Lattitude Remark / Village Name
MOA&FW Panagar Har Khet Ko Pani Farm Pond 2 4 5 4.00 80°3'14.329"E 23°17'15.437"N Mahgawan
MOA&FW Panagar Har Khet Ko Pani Diesel / Electric /
SolarPump 12 12 5 3.00 80°3'14.329"E 23°17'15.437"N Mahgawan
MOA&FW Panagar Har Khet Ko Pani Tube well 8 8 5 16.00 80°3'14.329"E 23°17'15.437"N Mahgawan
MOA&FW Panagar Har Khet Ko Pani Diesel / Electric /
SolarPump 12 12 5 3.00 80°3'14.329"E 23°17'15.437"N Mahgawan
MOA&FW Panagar Har Khet Ko Pani Tube well 6 6 5 12.00 80°3'14.329"E 23°17'15.437"N Mahgawan
MOA&FW Panagar Har Khet Ko Pani Farm Pond 2 4 5 4.00 80°3'14.329"E 23°17'15.437"N Mahgawan
MOA&FW Panagar Har Khet Ko Pani Diesel / Electric /
SolarPump 5 5 5 1.25 80°3'14.329"E 23°17'15.437"N Mahgawan
MOA&FW Panagar Har Khet Ko Pani Tube well 4 4 5 8.00 80°3'14.329"E 23°17'15.437"N Mahgawan
MOA&FW Panagar Per Drop More Crop Sprinkler 10 10 5 2.00 80°3'14.329"E 23°17'15.437"N Mahgawan
MOA&FW Panagar Per Drop More Crop Drip system 1 1 5 1.00 80°3'14.329"E 23°17'15.437"N Mahgawan
MOA&FW Panagar Per Drop More Crop Sprinkler 10 10 5 2.00 80°3'14.329"E 23°17'15.437"N Mahgawan
MOA&FW Panagar Per Drop More Crop Drip system 2 2 5 2.00 80°3'14.329"E 23°17'15.437"N Mahgawan
MOA&FW Panagar Per Drop More Crop Sprinkler 10 10 5 2.00 80°3'14.329"E 23°17'15.437"N Mahgawan
MOA&FW Panagar Per Drop More Crop Drip system 1 1 5 1.00 80°3'14.329"E 23°17'15.437"N Mahgawan
MOA&FW Panagar Per Drop More Crop Sprinkler 6 6 5 1.20 80°3'14.329"E 23°17'15.437"N Mahgawan
MOA&FW Panagar Per Drop More Crop Drip system 1 1 5 1.00 80°3'14.329"E 23°17'15.437"N Mahgawan
MOA&FW Panagar Har Khet Ko Pani Farm Pond 4 8 5 8.00 80°3'14.329"E 23°17'15.437"N Majhgawan
MOA&FW Panagar Har Khet Ko Pani Diesel / Electric /
SolarPump 12 12 5 3.00 80°3'14.329"E 23°17'15.437"N Majhgawan
MOA&FW Panagar Har Khet Ko Pani Tube well 8 8 5 16.00 80°3'14.329"E 23°17'15.437"N Majhgawan
MOA&FW Panagar Per Drop More Crop Sprinkler 10 10 5 2.00 80°3'14.329"E 23°17'15.437"N Majhgawan
MOA&FW Panagar Per Drop More Crop Drip system 2 2 5 2.00 80°3'14.329"E 23°17'15.437"N Majhgawan
MOA&FW Panagar Har Khet Ko Pani Farm Pond 2 4 5 4.00 79°51'19.06"E 23°14'7.629"N Mangela
MOA&FW Panagar Har Khet Ko Pani Diesel / Electric /
SolarPump 10 10 5 2.50 79°51'19.06"E 23°14'7.629"N Mangela
MOA&FW Panagar Har Khet Ko Pani Tube well 6 6 5 12.00 79°51'19.06"E 23°14'7.629"N Mangela
MOA&FW Panagar Per Drop More Crop Sprinkler 10 10 5 2.00 79°51'19.06"E 23°14'7.629"N Mangela
MOA&FW Panagar Per Drop More Crop Drip system 1 1 5 1.00 79°51'19.06"E 23°14'7.629"N Mangela
214
Concerned
Ministry/
Department
Name of
the
Districts
/ Blocks
Component Activity Total
Number
Command
Area/Irrig
ation
Potential
(Ha)
Period of
Implement
ation 5/ 7
Estimated
cost
(in Lakhs
Rs.)
Longitude Lattitude Remark / Village Name
MOA&FW Panagar Har Khet Ko Pani Diesel / Electric /
SolarPump 8 8 5 2.00 79°55'17.217"E 23°14'34.801"N Maniyari Kalan
MOA&FW Panagar Har Khet Ko Pani Tube well 4 4 5 8.00 79°55'17.217"E 23°14'34.801"N Maniyari Kalan
MOA&FW Panagar Per Drop More Crop Sprinkler 6 6 5 1.20 79°55'17.217"E 23°14'34.801"N Maniyari Kalan
MOA&FW Panagar Per Drop More Crop Drip system 1 1 5 1.00 79°55'17.217"E 23°14'34.801"N Maniyari Kalan
MOA&FW Panagar Har Khet Ko Pani Diesel / Electric /
SolarPump 8 8 5 2.00 79°55'1.233"E 23°15'45.129"N Maniyari Khurd
MOA&FW Panagar Har Khet Ko Pani Tube well 4 4 5 8.00 79°55'1.233"E 23°15'45.129"N Maniyari Khurd
MOA&FW Panagar Per Drop More Crop Sprinkler 6 6 5 1.20 79°55'1.233"E 23°15'45.129"N Maniyari Khurd
MOA&FW Panagar Per Drop More Crop Drip system 1 1 5 1.00 79°55'1.233"E 23°15'45.129"N Maniyari Khurd
MOA&FW Panagar Har Khet Ko Pani Diesel / Electric /
SolarPump 9 9 5 2.25 80°6'39.562"E 23°17'36.99"N Mankuara
MOA&FW Panagar Har Khet Ko Pani Tube well 5 5 5 10.00 80°6'39.562"E 23°17'36.99"N Mankuara
MOA&FW Panagar Per Drop More Crop Sprinkler 5 5 5 1.00 80°7'2.046"E 23°17'25.748"N Mankuara
MOA&FW Panagar Per Drop More Crop Drip system 1 1 5 1.00 80°7'2.046"E 23°17'25.748"N Mankuara
MOA&FW Panagar Har Khet Ko Pani Farm Pond 4 8 5 8.00 80°6'39.562"E 23°17'36.99"N Matamar
MOA&FW Panagar Har Khet Ko Pani Diesel / Electric /
SolarPump 12 12 5 3.00 80°6'39.562"E 23°17'36.99"N Matamar
MOA&FW Panagar Har Khet Ko Pani Tube well 88 88 5 176.00 80°6'39.562"E 23°17'36.99"N Matamar
MOA&FW Panagar Per Drop More Crop Sprinkler 10 10 5 2.00 80°7'2.046"E 23°17'25.748"N Matamar
MOA&FW Panagar Per Drop More Crop Drip system 2 2 5 2.00 80°7'2.046"E 23°17'25.748"N Matamar
MOA&FW Panagar Har Khet Ko Pani Farm Pond 2 4 5 4.00 80°6'39.562"E 23°17'36.99"N Matiyakui
MOA&FW Panagar Har Khet Ko Pani Diesel / Electric /
SolarPump 10 10 5 2.50 80°6'39.562"E 23°17'36.99"N Matiyakui
MOA&FW Panagar Har Khet Ko Pani Tube well 7 7 5 14.00 80°6'39.562"E 23°17'36.99"N Matiyakui
MOA&FW Panagar Per Drop More Crop Sprinkler 10 10 5 2.00 80°7'2.046"E 23°17'25.748"N Matiyakui
MOA&FW Panagar Har Khet Ko Pani Farm Pond 2 4 5 4.00 80°6'39.562"E 23°17'36.99"N Mohaniya
MOA&FW Panagar Har Khet Ko Pani Diesel / Electric /
SolarPump 12 12 5 3.00 80°6'39.562"E 23°17'36.99"N Mohaniya
MOA&FW Panagar Har Khet Ko Pani Tube well 9 9 5 18.00 80°6'39.562"E 23°17'36.99"N Mohaniya
MOA&FW Panagar Per Drop More Crop Sprinkler 9 9 5 1.80 80°7'2.046"E 23°17'25.748"N Mohaniya
MOA&FW Panagar Per Drop More Crop Drip system 1 1 5 1.00 80°7'2.046"E 23°17'25.748"N Mohaniya
215
Concerned
Ministry/
Department
Name of
the
Districts
/ Blocks
Component Activity Total
Number
Command
Area/Irrig
ation
Potential
(Ha)
Period of
Implement
ation 5/ 7
Estimated
cost
(in Lakhs
Rs.)
Longitude Lattitude Remark / Village Name
MOA&FW Panagar Har Khet Ko Pani Farm Pond 2 4 5 4.00 80°6'39.562"E 23°17'36.99"N Mohari
MOA&FW Panagar Har Khet Ko Pani Diesel / Electric /
SolarPump 8 8 5 2.00 80°6'39.562"E 23°17'36.99"N Mohari
MOA&FW Panagar Har Khet Ko Pani Tube well 6 6 5 12.00 80°6'39.562"E 23°17'36.99"N Mohari
MOA&FW Panagar Per Drop More Crop Sprinkler 8 8 5 1.60 80°7'2.046"E 23°17'25.748"N Mohari
MOA&FW Panagar Per Drop More Crop Drip system 1 1 5 1.00 80°7'2.046"E 23°17'25.748"N Mohari
MOA&FW Panagar Har Khet Ko Pani Farm Pond 2 4 5 4.00 80°6'39.562"E 23°17'36.99"N Mohas
MOA&FW Panagar Har Khet Ko Pani Diesel / Electric /
SolarPump 10 10 5 2.50 80°6'39.562"E 23°17'36.99"N Mohas
MOA&FW Panagar Har Khet Ko Pani Tube well 6 6 5 12.00 80°6'39.562"E 23°17'36.99"N Mohas
MOA&FW Panagar Per Drop More Crop Sprinkler 10 10 5 2.00 80°7'2.046"E 23°17'25.748"N Mohas
MOA&FW Panagar Per Drop More Crop Drip system 1 1 5 1.00 80°7'2.046"E 23°17'25.748"N Mohas
MOA&FW Panagar Har Khet Ko Pani Diesel / Electric /
SolarPump 10 10 5 2.50 80°6'39.562"E 23°17'36.99"N Mohlajhir
MOA&FW Panagar Har Khet Ko Pani Tube well 9 9 5 18.00 80°6'39.562"E 23°17'36.99"N Mohlajhir
MOA&FW Panagar Per Drop More Crop Sprinkler 8 8 5 1.60 80°7'2.046"E 23°17'25.748"N Mohlajhir
MOA&FW Panagar Per Drop More Crop Drip system 1 1 5 1.00 80°7'2.046"E 23°17'25.748"N Mohlajhir
MOA&FW Panagar Har Khet Ko Pani Farm Pond 4 8 5 8.00 80°6'39.562"E 23°17'36.99"N Monegaon
MOA&FW Panagar Har Khet Ko Pani Diesel / Electric /
SolarPump 12 12 5 3.00 80°6'39.562"E 23°17'36.99"N Monegaon
MOA&FW Panagar Har Khet Ko Pani Tube well 8 8 5 16.00 80°6'39.562"E 23°17'36.99"N Monegaon
MOA&FW Panagar Per Drop More Crop Sprinkler 12 12 5 2.40 80°7'2.046"E 23°17'25.748"N Monegaon
MOA&FW Panagar Per Drop More Crop Drip system 1 1 5 1.00 80°7'2.046"E 23°17'25.748"N Monegaon
MOA&FW Panagar Har Khet Ko Pani Diesel / Electric /
SolarPump 12 12 5 3.00 80°6'39.562"E 23°17'36.99"N Mudari
MOA&FW Panagar Har Khet Ko Pani Tube well 8 8 5 16.00 80°6'39.562"E 23°17'36.99"N Mudari
MOA&FW Panagar Per Drop More Crop Sprinkler 8 8 5 1.60 80°7'2.046"E 23°17'25.748"N Mudari
MOA&FW Panagar Har Khet Ko Pani Farm Pond 2 4 5 4.00 79°53'42.114"E 23°19'19.31"N Mudiya
MOA&FW Panagar Har Khet Ko Pani Diesel / Electric /
SolarPump 8 8 5 2.00 79°53'42.114"E 23°19'19.31"N Mudiya
MOA&FW Panagar Har Khet Ko Pani Tube well 5 5 5 10.00 79°53'42.114"E 23°19'19.31"N Mudiya
MOA&FW Panagar Har Khet Ko Pani Farm Pond 2 4 5 4.00 79°53'42.114"E 23°19'19.31"N Mudiya
216
Concerned
Ministry/
Department
Name of
the
Districts
/ Blocks
Component Activity Total
Number
Command
Area/Irrig
ation
Potential
(Ha)
Period of
Implement
ation 5/ 7
Estimated
cost
(in Lakhs
Rs.)
Longitude Lattitude Remark / Village Name
MOA&FW Panagar Har Khet Ko Pani Diesel / Electric /
SolarPump 10 10 5 2.50 79°53'42.114"E 23°19'19.31"N Mudiya
MOA&FW Panagar Har Khet Ko Pani Tube well 5 5 5 10.00 79°53'42.114"E 23°19'19.31"N Mudiya
MOA&FW Panagar Per Drop More Crop Sprinkler 9 9 5 1.80 79°53'42.114"E 23°19'19.31"N Mudiya
MOA&FW Panagar Per Drop More Crop Drip system 1 1 5 1.00 79°53'42.114"E 23°19'19.31"N Mudiya
MOA&FW Panagar Per Drop More Crop Sprinkler 5 5 5 1.00 79°53'42.114"E 23°19'19.31"N Mudiya
MOA&FW Panagar Per Drop More Crop Drip system 2 2 5 2.00 79°53'42.114"E 23°19'19.31"N Mudiya
MOA&FW Panagar Har Khet Ko Pani Farm Pond 2 4 5 4.00 80°6'39.562"E 23°17'36.99"N Nagna
MOA&FW Panagar Har Khet Ko Pani Diesel / Electric /
SolarPump 10 10 5 2.50 80°6'39.562"E 23°17'36.99"N Nagna
MOA&FW Panagar Har Khet Ko Pani Tube well 6 6 5 12.00 80°6'39.562"E 23°17'36.99"N Nagna
MOA&FW Panagar Per Drop More Crop Sprinkler 10 10 5 2.00 80°7'2.046"E 23°17'25.748"N Nagna
MOA&FW Panagar Per Drop More Crop Drip system 1 1 5 1.00 80°7'2.046"E 23°17'25.748"N Nagna
MOA&FW Panagar Har Khet Ko Pani Diesel / Electric /
SolarPump 5 5 5 1.25 80°6'39.562"E 23°17'36.99"N Nandani
MOA&FW Panagar Har Khet Ko Pani Tube well 3 3 5 6.00 80°6'39.562"E 23°17'36.99"N Nandani
MOA&FW Panagar Per Drop More Crop Sprinkler 4 4 5 0.80 80°7'2.046"E 23°17'25.748"N Nandani
MOA&FW Panagar Per Drop More Crop Drip system 1 1 5 1.00 80°7'2.046"E 23°17'25.748"N Nandani
MOA&FW Panagar Har Khet Ko Pani Diesel / Electric /
SolarPump 5 5 5 1.25 80°6'39.562"E 23°17'36.99"N Nandni Ronsara
MOA&FW Panagar Har Khet Ko Pani Tube well 3 3 5 6.00 80°6'39.562"E 23°17'36.99"N Nandni Ronsara
MOA&FW Panagar Per Drop More Crop Sprinkler 4 4 5 0.80 80°7'2.046"E 23°17'25.748"N Nandni Ronsara
MOA&FW Panagar Per Drop More Crop Drip system 1 1 5 1.00 80°7'2.046"E 23°17'25.748"N Nandni Ronsara
MOA&FW Panagar Har Khet Ko Pani Diesel / Electric /
SolarPump 10 10 5 2.50 80°6'39.562"E 23°17'36.99"N Nargawan
MOA&FW Panagar Har Khet Ko Pani Tube well 6 6 5 12.00 80°6'39.562"E 23°17'36.99"N Nargawan
MOA&FW Panagar Per Drop More Crop Sprinkler 10 10 5 2.00 80°7'2.046"E 23°17'25.748"N Nargawan
MOA&FW Panagar Per Drop More Crop Drip system 2 2 5 2.00 80°7'2.046"E 23°17'25.748"N Nargawan
MOA&FW Panagar Har Khet Ko Pani Diesel / Electric /
SolarPump 9 9 5 2.25 80°6'39.562"E 23°17'36.99"N Nibhora
MOA&FW Panagar Har Khet Ko Pani Tube well 6 6 5 12.00 80°6'39.562"E 23°17'36.99"N Nibhora
MOA&FW Panagar Per Drop More Crop Sprinkler 10 10 5 2.00 80°7'2.046"E 23°17'25.748"N Nibhora
217
Concerned
Ministry/
Department
Name of
the
Districts
/ Blocks
Component Activity Total
Number
Command
Area/Irrig
ation
Potential
(Ha)
Period of
Implement
ation 5/ 7
Estimated
cost
(in Lakhs
Rs.)
Longitude Lattitude Remark / Village Name
MOA&FW Panagar Per Drop More Crop Drip system 2 2 5 2.00 80°7'2.046"E 23°17'25.748"N Nibhora
MOA&FW Panagar Har Khet Ko Pani Diesel / Electric /
SolarPump 9 9 5 2.25 80°6'39.562"E 23°17'36.99"N Nimduwa
MOA&FW Panagar Har Khet Ko Pani Tube well 6 6 5 12.00 80°6'39.562"E 23°17'36.99"N Nimduwa
MOA&FW Panagar Per Drop More Crop Sprinkler 6 6 5 1.20 80°7'2.046"E 23°17'25.748"N Nimduwa
MOA&FW Panagar Per Drop More Crop Drip system 1 1 5 1.00 80°7'2.046"E 23°17'25.748"N Nimduwa
MOA&FW Panagar Har Khet Ko Pani Farm Pond 2 4 5 4.00 80°6'39.562"E 23°17'36.99"N Nipaniya
MOA&FW Panagar Har Khet Ko Pani Diesel / Electric /
SolarPump 8 8 5 2.00 80°6'39.562"E 23°17'36.99"N Nipaniya
MOA&FW Panagar Har Khet Ko Pani Tube well 6 6 5 12.00 80°6'39.562"E 23°17'36.99"N Nipaniya
MOA&FW Panagar Per Drop More Crop Sprinkler 6 6 5 1.20 80°7'2.046"E 23°17'25.748"N Nipaniya
MOA&FW Panagar Per Drop More Crop Drip system 1 1 5 1.00 80°7'2.046"E 23°17'25.748"N Nipaniya
MOA&FW Panagar Har Khet Ko Pani Farm Pond 2 4 5 4.00 80°6'39.562"E 23°17'36.99"N Niradpur
MOA&FW Panagar Har Khet Ko Pani Diesel / Electric /
SolarPump 11 11 5 2.75 80°6'39.562"E 23°17'36.99"N Niradpur
MOA&FW Panagar Har Khet Ko Pani Tube well 5 5 5 10.00 80°6'39.562"E 23°17'36.99"N Niradpur
MOA&FW Panagar Per Drop More Crop Sprinkler 8 8 5 1.60 80°7'2.046"E 23°17'25.748"N Niradpur
MOA&FW Panagar Per Drop More Crop Drip system 2 2 5 2.00 80°7'2.046"E 23°17'25.748"N Niradpur
MOA&FW Panagar Har Khet Ko Pani Farm Pond 2 4 5 4.00 79°56'26.08"E 23°17'35.949"N Nuniya Kalan
MOA&FW Panagar Har Khet Ko Pani Diesel / Electric /
SolarPump 9 9 5 2.25 79°56'26.08"E 23°17'35.949"N Nuniya Kalan
MOA&FW Panagar Har Khet Ko Pani Tube well 5 5 5 10.00 79°56'26.08"E 23°17'35.949"N Nuniya Kalan
MOA&FW Panagar Per Drop More Crop Sprinkler 8 8 5 1.60 79°56'26.08"E 23°17'35.949"N Nuniya Kalan
MOA&FW Panagar Per Drop More Crop Drip system 1 1 5 1.00 79°56'26.08"E 23°17'35.949"N Nuniya Kalan
MOA&FW Panagar Har Khet Ko Pani Diesel / Electric /
SolarPump 10 10 5 2.50 79°57'50.26"E 23°17'37.015"N Nuniya Khurd
MOA&FW Panagar Har Khet Ko Pani Tube well 6 6 5 12.00 79°57'50.26"E 23°17'37.015"N Nuniya Khurd
MOA&FW Panagar Per Drop More Crop Sprinkler 6 6 5 1.20 79°57'50.26"E 23°17'37.015"N Nuniya Khurd
MOA&FW Panagar Har Khet Ko Pani Diesel / Electric /
SolarPump 5 5 5 1.25 79°52'12.473"E 23°12'36.522"N Onriya
MOA&FW Panagar Har Khet Ko Pani Tube well 3 3 5 6.00 79°52'12.473"E 23°12'36.522"N Onriya
MOA&FW Panagar Per Drop More Crop Sprinkler 5 5 5 1.00 79°52'12.473"E 23°12'36.522"N Onriya
218
Concerned
Ministry/
Department
Name of
the
Districts
/ Blocks
Component Activity Total
Number
Command
Area/Irrig
ation
Potential
(Ha)
Period of
Implement
ation 5/ 7
Estimated
cost
(in Lakhs
Rs.)
Longitude Lattitude Remark / Village Name
MOA&FW Panagar Per Drop More Crop Drip system 1 1 5 1.00 79°52'12.473"E 23°12'36.522"N Onriya
MOA&FW Panagar Har Khet Ko Pani Diesel / Electric /
SolarPump 10 10 5 2.50 80°6'39.562"E 23°17'36.99"N Padariya
MOA&FW Panagar Har Khet Ko Pani Tube well 8 8 5 16.00 80°6'39.562"E 23°17'36.99"N Padariya
MOA&FW Panagar Per Drop More Crop Sprinkler 8 8 5 1.60 80°7'2.046"E 23°17'25.748"N Padariya
MOA&FW Panagar Per Drop More Crop Drip system 1 1 5 1.00 80°7'2.046"E 23°17'25.748"N Padariya
MOA&FW Panagar Har Khet Ko Pani Farm Pond 2 4 5 4.00 80°6'39.562"E 23°17'36.99"N Padhar Kheda
MOA&FW Panagar Har Khet Ko Pani Diesel / Electric /
SolarPump 5 5 5 1.25 80°6'39.562"E 23°17'36.99"N Padhar Kheda
MOA&FW Panagar Har Khet Ko Pani Tube well 4 4 5 8.00 80°6'39.562"E 23°17'36.99"N Padhar Kheda
MOA&FW Panagar Per Drop More Crop Sprinkler 6 6 5 1.20 80°7'2.046"E 23°17'25.748"N Padhar Kheda
MOA&FW Panagar Per Drop More Crop Drip system 1 1 5 1.00 80°7'2.046"E 23°17'25.748"N Padhar Kheda
MOA&FW Panagar Har Khet Ko Pani Farm Pond 2 4 5 4.00 80°6'39.562"E 23°17'36.99"N Padora
MOA&FW Panagar Har Khet Ko Pani Diesel / Electric /
SolarPump 12 12 5 3.00 80°6'39.562"E 23°17'36.99"N Padora
MOA&FW Panagar Har Khet Ko Pani Tube well 6 6 5 12.00 80°6'39.562"E 23°17'36.99"N Padora
MOA&FW Panagar Per Drop More Crop Sprinkler 6 6 5 1.20 80°7'2.046"E 23°17'25.748"N Padora
MOA&FW Panagar Har Khet Ko Pani Farm Pond 4 8 5 8.00 80°6'39.562"E 23°17'36.99"N Padri
MOA&FW Panagar Har Khet Ko Pani Diesel / Electric /
SolarPump 10 10 5 2.50 80°6'39.562"E 23°17'36.99"N Padri
MOA&FW Panagar Har Khet Ko Pani Tube well 6 6 5 12.00 80°6'39.562"E 23°17'36.99"N Padri
MOA&FW Panagar Per Drop More Crop Sprinkler 5 5 5 1.00 80°7'2.046"E 23°17'25.748"N Padri
MOA&FW Panagar Per Drop More Crop Drip system 2 2 5 2.00 80°7'2.046"E 23°17'25.748"N Padri
MOA&FW Panagar Har Khet Ko Pani Diesel / Electric /
SolarPump 5 5 5 1.25 80°6'39.562"E 23°17'36.99"N Padwar Kalan
MOA&FW Panagar Har Khet Ko Pani Tube well 3 3 5 6.00 80°6'39.562"E 23°17'36.99"N Padwar Kalan
MOA&FW Panagar Per Drop More Crop Sprinkler 5 5 5 1.00 80°7'2.046"E 23°17'25.748"N Padwar Kalan
MOA&FW Panagar Per Drop More Crop Drip system 1 1 5 1.00 80°7'2.046"E 23°17'25.748"N Padwar Kalan
MOA&FW Panagar Har Khet Ko Pani Diesel / Electric /
SolarPump 4 4 5 1.00 80°6'39.562"E 23°17'36.99"N Padwar Khurd
MOA&FW Panagar Har Khet Ko Pani Tube well 2 2 5 4.00 80°6'39.562"E 23°17'36.99"N Padwar Khurd
MOA&FW Panagar Per Drop More Crop Sprinkler 4 4 5 0.80 80°7'2.046"E 23°17'25.748"N Padwar Khurd
219
Concerned
Ministry/
Department
Name of
the
Districts
/ Blocks
Component Activity Total
Number
Command
Area/Irrig
ation
Potential
(Ha)
Period of
Implement
ation 5/ 7
Estimated
cost
(in Lakhs
Rs.)
Longitude Lattitude Remark / Village Name
MOA&FW Panagar Har Khet Ko Pani Farm Pond 4 8 5 8.00 80°6'39.562"E 23°17'36.99"N Paraspani
MOA&FW Panagar Har Khet Ko Pani Diesel / Electric /
SolarPump 5 5 5 1.25 80°6'39.562"E 23°17'36.99"N Paraspani
MOA&FW Panagar Har Khet Ko Pani Tube well 4 4 5 8.00 80°6'39.562"E 23°17'36.99"N Paraspani
MOA&FW Panagar Per Drop More Crop Sprinkler 4 4 5 0.80 80°7'2.046"E 23°17'25.748"N Paraspani
MOA&FW Panagar Per Drop More Crop Drip system 1 1 5 1.00 80°7'2.046"E 23°17'25.748"N Paraspani
MOA&FW Panagar Har Khet Ko Pani Diesel / Electric /
SolarPump 8 8 5 2.00 79°52'13.405"E 23°18'17.773"N Patera
MOA&FW Panagar Har Khet Ko Pani Tube well 8 8 5 16.00 79°52'13.405"E 23°18'17.773"N Patera
MOA&FW Panagar Per Drop More Crop Sprinkler 10 10 5 2.00 79°52'13.405"E 23°18'17.773"N Patera
MOA&FW Panagar Har Khet Ko Pani Diesel / Electric /
SolarPump 14 14 5 3.50 80°6'39.562"E 23°17'36.99"N Pathra
MOA&FW Panagar Har Khet Ko Pani Tube well 8 8 5 16.00 80°6'39.562"E 23°17'36.99"N Pathra
MOA&FW Panagar Har Khet Ko Pani Farm Pond 2 4 5 4.00 80°6'39.562"E 23°17'36.99"N Pathra
MOA&FW Panagar Har Khet Ko Pani Diesel / Electric /
SolarPump 12 12 5 3.00 80°6'39.562"E 23°17'36.99"N Pathra
MOA&FW Panagar Har Khet Ko Pani Tube well 8 8 5 16.00 80°6'39.562"E 23°17'36.99"N Pathra
MOA&FW Panagar Per Drop More Crop Sprinkler 10 10 5 2.00 80°7'2.046"E 23°17'25.748"N Pathra
MOA&FW Panagar Per Drop More Crop Drip system 1 1 5 1.00 80°7'2.046"E 23°17'25.748"N Pathra
MOA&FW Panagar Per Drop More Crop Sprinkler 10 10 5 2.00 80°7'2.046"E 23°17'25.748"N Pathra
MOA&FW Panagar Per Drop More Crop Drip system 2 2 5 2.00 80°7'2.046"E 23°17'25.748"N Pathra
MOA&FW Panagar Har Khet Ko Pani Farm Pond 4 8 5 8.00 80°6'39.562"E 23°17'36.99"N Pathrora
MOA&FW Panagar Har Khet Ko Pani Diesel / Electric /
SolarPump 12 12 5 3.00 80°6'39.562"E 23°17'36.99"N Pathrora
MOA&FW Panagar Har Khet Ko Pani Tube well 8 8 5 16.00 80°6'39.562"E 23°17'36.99"N Pathrora
MOA&FW Panagar Per Drop More Crop Sprinkler 12 12 5 2.40 80°7'2.046"E 23°17'25.748"N Pathrora
MOA&FW Panagar Per Drop More Crop Drip system 1 1 5 1.00 80°7'2.046"E 23°17'25.748"N Pathrora
MOA&FW Panagar Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°6'39.562"E 23°17'36.99"N Patna
MOA&FW Panagar Har Khet Ko Pani Diesel / Electric /
SolarPump 5 5 5 1.25 80°6'39.562"E 23°17'36.99"N Patna
MOA&FW Panagar Har Khet Ko Pani Tube well 3 3 5 6.00 80°6'39.562"E 23°17'36.99"N Patna
MOA&FW Panagar Per Drop More Crop Sprinkler 4 4 5 0.80 80°7'2.046"E 23°17'25.748"N Patna
220
Concerned
Ministry/
Department
Name of
the
Districts
/ Blocks
Component Activity Total
Number
Command
Area/Irrig
ation
Potential
(Ha)
Period of
Implement
ation 5/ 7
Estimated
cost
(in Lakhs
Rs.)
Longitude Lattitude Remark / Village Name
MOA&FW Panagar Per Drop More Crop Drip system 1 1 5 1.00 80°7'2.046"E 23°17'25.748"N Patna
MOA&FW Panagar Har Khet Ko Pani Diesel / Electric /
SolarPump 8 8 5 2.00 80°6'39.562"E 23°17'36.99"N Pauruwa
MOA&FW Panagar Har Khet Ko Pani Tube well 5 5 5 10.00 80°6'39.562"E 23°17'36.99"N Pauruwa
MOA&FW Panagar Per Drop More Crop Sprinkler 5 5 5 1.00 80°7'2.046"E 23°17'25.748"N Pauruwa
MOA&FW Panagar Har Khet Ko Pani Farm Pond 2 4 5 4.00 80°6'39.562"E 23°17'36.99"N Phoota Tal
MOA&FW Panagar Har Khet Ko Pani Diesel / Electric /
SolarPump 9 9 5 2.25 80°6'39.562"E 23°17'36.99"N Phoota Tal
MOA&FW Panagar Har Khet Ko Pani Tube well 7 7 5 14.00 80°6'39.562"E 23°17'36.99"N Phoota Tal
MOA&FW Panagar Per Drop More Crop Sprinkler 8 8 5 1.60 80°7'2.046"E 23°17'25.748"N Phoota Tal
MOA&FW Panagar Per Drop More Crop Drip system 2 2 5 2.00 80°7'2.046"E 23°17'25.748"N Phoota Tal
MOA&FW Panagar Har Khet Ko Pani Farm Pond 2 4 5 4.00 80°1'29.636"E 23°18'56.134"N Pipariya
MOA&FW Panagar Har Khet Ko Pani Diesel / Electric /
SolarPump 10 10 5 2.50 80°1'29.636"E 23°18'56.134"N Pipariya
MOA&FW Panagar Har Khet Ko Pani Tube well 8 8 5 16.00 80°1'29.636"E 23°18'56.134"N Pipariya
MOA&FW Panagar Har Khet Ko Pani Diesel / Electric /
SolarPump 10 10 5 2.50 80°1'29.636"E 23°18'56.134"N Pipariya
MOA&FW Panagar Har Khet Ko Pani Tube well 6 6 5 12.00 80°1'29.636"E 23°18'56.134"N Pipariya
MOA&FW Panagar Har Khet Ko Pani Diesel / Electric /
SolarPump 10 10 5 2.50 80°1'29.636"E 23°18'56.134"N Pipariya
MOA&FW Panagar Har Khet Ko Pani Tube well 6 6 5 12.00 80°1'29.636"E 23°18'56.134"N Pipariya
MOA&FW Panagar Har Khet Ko Pani Farm Pond 2 4 5 4.00 80°1'29.636"E 23°18'56.134"N Pipariya
MOA&FW Panagar Har Khet Ko Pani Diesel / Electric /
SolarPump 5 5 5 1.25 80°1'29.636"E 23°18'56.134"N Pipariya
MOA&FW Panagar Har Khet Ko Pani Tube well 4 4 5 8.00 80°1'29.636"E 23°18'56.134"N Pipariya
MOA&FW Panagar Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°1'29.636"E 23°18'56.134"N Pipariya
MOA&FW Panagar Har Khet Ko Pani Diesel / Electric /
SolarPump 5 5 5 1.25 80°1'29.636"E 23°18'56.134"N Pipariya
MOA&FW Panagar Har Khet Ko Pani Tube well 3 3 5 6.00 80°1'29.636"E 23°18'56.134"N Pipariya
MOA&FW Panagar Per Drop More Crop Sprinkler 8 8 5 1.60 80°1'29.636"E 23°18'56.134"N Pipariya
MOA&FW Panagar Per Drop More Crop Drip system 1 1 5 1.00 80°1'29.636"E 23°18'56.134"N Pipariya
MOA&FW Panagar Per Drop More Crop Sprinkler 8 8 5 1.60 80°1'29.636"E 23°18'56.134"N Pipariya
221
Concerned
Ministry/
Department
Name of
the
Districts
/ Blocks
Component Activity Total
Number
Command
Area/Irrig
ation
Potential
(Ha)
Period of
Implement
ation 5/ 7
Estimated
cost
(in Lakhs
Rs.)
Longitude Lattitude Remark / Village Name
MOA&FW Panagar Per Drop More Crop Drip system 2 2 5 2.00 80°1'29.636"E 23°18'56.134"N Pipariya
MOA&FW Panagar Per Drop More Crop Sprinkler 8 8 5 1.60 80°1'29.636"E 23°18'56.134"N Pipariya
MOA&FW Panagar Per Drop More Crop Drip system 2 2 5 2.00 80°1'29.636"E 23°18'56.134"N Pipariya
MOA&FW Panagar Per Drop More Crop Sprinkler 6 6 5 1.20 80°1'29.636"E 23°18'56.134"N Pipariya
MOA&FW Panagar Per Drop More Crop Drip system 1 1 5 1.00 80°1'29.636"E 23°18'56.134"N Pipariya
MOA&FW Panagar Per Drop More Crop Sprinkler 4 4 5 0.80 80°1'29.636"E 23°18'56.134"N Pipariya
MOA&FW Panagar Per Drop More Crop Drip system 1 1 5 1.00 80°1'29.636"E 23°18'56.134"N Pipariya
MOA&FW Panagar Har Khet Ko Pani Diesel / Electric /
SolarPump 5 5 5 1.25 80°6'39.562"E 23°17'36.99"N Pipariya Baniya Kheda
MOA&FW Panagar Har Khet Ko Pani Tube well 3 3 5 6.00 80°6'39.562"E 23°17'36.99"N Pipariya Baniya Kheda
MOA&FW Panagar Per Drop More Crop Sprinkler 4 4 5 0.80 80°7'2.046"E 23°17'25.748"N Pipariya Baniya Kheda
MOA&FW Panagar Per Drop More Crop Drip system 1 1 5 1.00 80°7'2.046"E 23°17'25.748"N Pipariya Baniya Kheda
MOA&FW Panagar Har Khet Ko Pani Farm Pond 8 16 5 16.00 80°6'39.562"E 23°17'36.99"N Pondi
MOA&FW Panagar Har Khet Ko Pani Diesel / Electric /
SolarPump 12 12 5 3.00 80°6'39.562"E 23°17'36.99"N Pondi
MOA&FW Panagar Har Khet Ko Pani Tube well 8 8 5 16.00 80°6'39.562"E 23°17'36.99"N Pondi
MOA&FW Panagar Har Khet Ko Pani Diesel / Electric /
SolarPump 6 6 5 1.50 80°6'39.562"E 23°17'36.99"N Pondi
MOA&FW Panagar Har Khet Ko Pani Tube well 4 4 5 8.00 80°6'39.562"E 23°17'36.99"N Pondi
MOA&FW Panagar Per Drop More Crop Sprinkler 10 10 5 2.00 80°7'2.046"E 23°17'25.748"N Pondi
MOA&FW Panagar Per Drop More Crop Drip system 2 2 5 2.00 80°7'2.046"E 23°17'25.748"N Pondi
MOA&FW Panagar Per Drop More Crop Sprinkler 5 5 5 1.00 80°7'2.046"E 23°17'25.748"N Pondi
MOA&FW Panagar Har Khet Ko Pani Farm Pond 4 8 5 8.00 80°6'39.562"E 23°17'36.99"N Poniya
MOA&FW Panagar Har Khet Ko Pani Diesel / Electric /
SolarPump 10 10 5 2.50 80°6'39.562"E 23°17'36.99"N Poniya
MOA&FW Panagar Har Khet Ko Pani Tube well 6 6 5 12.00 80°6'39.562"E 23°17'36.99"N Poniya
MOA&FW Panagar Per Drop More Crop Sprinkler 5 5 5 1.00 80°7'2.046"E 23°17'25.748"N Poniya
MOA&FW Panagar Per Drop More Crop Drip system 2 2 5 2.00 80°7'2.046"E 23°17'25.748"N Poniya
MOA&FW Panagar Har Khet Ko Pani Diesel / Electric /
SolarPump 11 11 5 2.75 80°6'39.562"E 23°17'36.99"N Purena
MOA&FW Panagar Har Khet Ko Pani Tube well 5 5 5 10.00 80°6'39.562"E 23°17'36.99"N Purena
222
Concerned
Ministry/
Department
Name of
the
Districts
/ Blocks
Component Activity Total
Number
Command
Area/Irrig
ation
Potential
(Ha)
Period of
Implement
ation 5/ 7
Estimated
cost
(in Lakhs
Rs.)
Longitude Lattitude Remark / Village Name
MOA&FW Panagar Per Drop More Crop Sprinkler 8 8 5 1.60 80°7'2.046"E 23°17'25.748"N Purena
MOA&FW Panagar Har Khet Ko Pani Diesel / Electric /
SolarPump 4 4 5 1.00 80°6'39.562"E 23°17'36.99"N Raiya Kheda
MOA&FW Panagar Har Khet Ko Pani Tube well 2 2 5 4.00 80°6'39.562"E 23°17'36.99"N Raiya Kheda
MOA&FW Panagar Per Drop More Crop Sprinkler 4 4 5 0.80 80°7'2.046"E 23°17'25.748"N Raiya Kheda
MOA&FW Panagar Har Khet Ko Pani Diesel / Electric /
SolarPump 5 5 5 1.25 80°6'39.562"E 23°17'36.99"N Raksha
MOA&FW Panagar Har Khet Ko Pani Tube well 3 3 5 6.00 80°6'39.562"E 23°17'36.99"N Raksha
MOA&FW Panagar Per Drop More Crop Sprinkler 4 4 5 0.80 80°7'2.046"E 23°17'25.748"N Raksha
MOA&FW Panagar Per Drop More Crop Drip system 1 1 5 1.00 80°7'2.046"E 23°17'25.748"N Raksha
MOA&FW Panagar Har Khet Ko Pani Farm Pond 4 8 5 8.00 80°6'39.562"E 23°17'36.99"N Rithauri
MOA&FW Panagar Har Khet Ko Pani Diesel / Electric /
SolarPump 8 8 5 2.00 80°6'39.562"E 23°17'36.99"N Rithauri
MOA&FW Panagar Har Khet Ko Pani Tube well 5 5 5 10.00 80°6'39.562"E 23°17'36.99"N Rithauri
MOA&FW Panagar Per Drop More Crop Sprinkler 6 6 5 1.20 80°7'2.046"E 23°17'25.748"N Rithauri
MOA&FW Panagar Per Drop More Crop Drip system 1 1 5 1.00 80°7'2.046"E 23°17'25.748"N Rithauri
MOA&FW Panagar Har Khet Ko Pani Farm Pond 2 4 5 4.00 80°6'39.562"E 23°17'36.99"N Rivjha
MOA&FW Panagar Har Khet Ko Pani Diesel / Electric /
SolarPump 8 8 5 2.00 80°6'39.562"E 23°17'36.99"N Rivjha
MOA&FW Panagar Har Khet Ko Pani Tube well 5 5 5 10.00 80°6'39.562"E 23°17'36.99"N Rivjha
MOA&FW Panagar Per Drop More Crop Sprinkler 6 6 5 1.20 80°7'2.046"E 23°17'25.748"N Rivjha
MOA&FW Panagar Per Drop More Crop Drip system 2 2 5 2.00 80°7'2.046"E 23°17'25.748"N Rivjha
MOA&FW Panagar Har Khet Ko Pani Farm Pond 2 4 5 4.00 80°6'39.562"E 23°17'36.99"N Sakri
MOA&FW Panagar Har Khet Ko Pani Diesel / Electric /
SolarPump 10 10 5 2.50 80°6'39.562"E 23°17'36.99"N Sakri
MOA&FW Panagar Har Khet Ko Pani Tube well 6 6 5 12.00 80°6'39.562"E 23°17'36.99"N Sakri
MOA&FW Panagar Har Khet Ko Pani Farm Pond 8 16 5 16.00 80°6'39.562"E 23°17'36.99"N Sakri
MOA&FW Panagar Har Khet Ko Pani Diesel / Electric /
SolarPump 6 6 5 1.50 80°6'39.562"E 23°17'36.99"N Sakri
MOA&FW Panagar Har Khet Ko Pani Tube well 8 8 5 16.00 80°6'39.562"E 23°17'36.99"N Sakri
MOA&FW Panagar Per Drop More Crop Sprinkler 8 8 5 1.60 80°7'2.046"E 23°17'25.748"N Sakri
MOA&FW Panagar Per Drop More Crop Sprinkler 1 1 5 0.20 80°7'2.046"E 23°17'25.748"N Sakri
223
Concerned
Ministry/
Department
Name of
the
Districts
/ Blocks
Component Activity Total
Number
Command
Area/Irrig
ation
Potential
(Ha)
Period of
Implement
ation 5/ 7
Estimated
cost
(in Lakhs
Rs.)
Longitude Lattitude Remark / Village Name
MOA&FW Panagar Per Drop More Crop Drip system 8 8 5 8.00 80°7'2.046"E 23°17'25.748"N Sakri
MOA&FW Panagar Har Khet Ko Pani Farm Pond 2 4 5 4.00 79°54'38.856"E 23°17'19.433"N Salaiya
MOA&FW Panagar Har Khet Ko Pani Diesel / Electric /
SolarPump 9 9 5 2.25 79°54'38.856"E 23°17'19.433"N Salaiya
MOA&FW Panagar Har Khet Ko Pani Tube well 10 10 5 20.00 79°54'38.856"E 23°17'19.433"N Salaiya
MOA&FW Panagar Per Drop More Crop Sprinkler 6 6 5 1.20 79°54'38.856"E 23°17'19.433"N Salaiya
MOA&FW Panagar Per Drop More Crop Drip system 1 1 5 1.00 79°54'38.856"E 23°17'19.433"N Salaiya
MOA&FW Panagar Har Khet Ko Pani Diesel / Electric /
SolarPump 10 10 5 2.50 80°6'39.562"E 23°17'36.99"N Saraswahi
MOA&FW Panagar Har Khet Ko Pani Tube well 8 8 5 16.00 80°6'39.562"E 23°17'36.99"N Saraswahi
MOA&FW Panagar Per Drop More Crop Sprinkler 10 10 5 2.00 80°7'2.046"E 23°17'25.748"N Saraswahi
MOA&FW Panagar Per Drop More Crop Drip system 1 1 5 1.00 80°7'2.046"E 23°17'25.748"N Saraswahi
MOA&FW Panagar Har Khet Ko Pani Diesel / Electric /
SolarPump 6 6 5 1.50 80°6'39.562"E 23°17'36.99"N Sarkhedi
MOA&FW Panagar Har Khet Ko Pani Tube well 4 4 5 8.00 80°6'39.562"E 23°17'36.99"N Sarkhedi
MOA&FW Panagar Per Drop More Crop Sprinkler 5 5 5 1.00 80°7'2.046"E 23°17'25.748"N Sarkhedi
MOA&FW Panagar Har Khet Ko Pani Farm Pond 2 4 5 4.00 80°6'39.562"E 23°17'36.99"N Sarsawa (Sarsuwan)
MOA&FW Panagar Har Khet Ko Pani Diesel / Electric /
SolarPump 12 12 5 3.00 80°6'39.562"E 23°17'36.99"N Sarsawa (Sarsuwan)
MOA&FW Panagar Har Khet Ko Pani Tube well 8 8 5 16.00 80°6'39.562"E 23°17'36.99"N Sarsawa (Sarsuwan)
MOA&FW Panagar Per Drop More Crop Sprinkler 10 10 5 2.00 80°7'2.046"E 23°17'25.748"N Sarsawa (Sarsuwan)
MOA&FW Panagar Per Drop More Crop Drip system 1 1 5 1.00 80°7'2.046"E 23°17'25.748"N Sarsawa (Sarsuwan)
MOA&FW Panagar Har Khet Ko Pani Diesel / Electric /
SolarPump 5 5 5 1.25 80°6'39.562"E 23°17'36.99"N Sarupa
MOA&FW Panagar Har Khet Ko Pani Tube well 3 3 5 6.00 80°6'39.562"E 23°17'36.99"N Sarupa
MOA&FW Panagar Per Drop More Crop Sprinkler 4 4 5 0.80 80°7'2.046"E 23°17'25.748"N Sarupa
MOA&FW Panagar Per Drop More Crop Drip system 1 1 5 1.00 80°7'2.046"E 23°17'25.748"N Sarupa
MOA&FW Panagar Har Khet Ko Pani Farm Pond 2 4 5 4.00 79°52'39.032"E 23°19'39.439"N Simariya
MOA&FW Panagar Har Khet Ko Pani Diesel / Electric /
SolarPump 10 10 5 2.50 79°52'39.032"E 23°19'39.439"N Simariya
MOA&FW Panagar Har Khet Ko Pani Tube well 5 5 5 10.00 79°52'39.032"E 23°19'39.439"N Simariya
224
Concerned
Ministry/
Department
Name of
the
Districts
/ Blocks
Component Activity Total
Number
Command
Area/Irrig
ation
Potential
(Ha)
Period of
Implement
ation 5/ 7
Estimated
cost
(in Lakhs
Rs.)
Longitude Lattitude Remark / Village Name
MOA&FW Panagar Har Khet Ko Pani Diesel / Electric /
SolarPump 5 5 5 1.25 79°52'39.032"E 23°19'39.439"N Simariya
MOA&FW Panagar Har Khet Ko Pani Tube well 3 3 5 6.00 79°52'39.032"E 23°19'39.439"N Simariya
MOA&FW Panagar Per Drop More Crop Sprinkler 8 8 5 1.60 79°52'39.032"E 23°19'39.439"N Simariya
MOA&FW Panagar Per Drop More Crop Drip system 1 1 5 1.00 79°52'39.032"E 23°19'39.439"N Simariya
MOA&FW Panagar Per Drop More Crop Sprinkler 4 4 5 0.80 79°52'39.032"E 23°19'39.439"N Simariya
MOA&FW Panagar Per Drop More Crop Drip system 1 1 5 1.00 79°52'39.032"E 23°19'39.439"N Simariya
MOA&FW Panagar Har Khet Ko Pani Farm Pond 2 4 5 4.00 80°6'39.562"E 23°17'36.99"N Simra
MOA&FW Panagar Har Khet Ko Pani Diesel / Electric /
SolarPump 5 5 5 1.25 80°6'39.562"E 23°17'36.99"N Simra
MOA&FW Panagar Per Drop More Crop Sprinkler 6 6 5 1.20 80°7'2.046"E 23°17'25.748"N Simra
MOA&FW Panagar Per Drop More Crop Drip system 1 1 5 1.00 80°7'2.046"E 23°17'25.748"N Simra
MOA&FW Panagar Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°6'39.562"E 23°17'36.99"N Singaldeep 1
MOA&FW Panagar Har Khet Ko Pani Diesel / Electric /
SolarPump 12 12 5 3.00 80°6'39.562"E 23°17'36.99"N Singaldeep 1
MOA&FW Panagar Har Khet Ko Pani Tube well 5 5 5 10.00 80°6'39.562"E 23°17'36.99"N Singaldeep 1
MOA&FW Panagar Per Drop More Crop Sprinkler 6 6 5 1.20 80°7'2.046"E 23°17'25.748"N Singaldeep 1
MOA&FW Panagar Per Drop More Crop Drip system 1 1 5 1.00 80°7'2.046"E 23°17'25.748"N Singaldeep 1
MOA&FW Panagar Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°6'39.562"E 23°17'36.99"N Singaldeep 2
MOA&FW Panagar Har Khet Ko Pani Diesel / Electric /
SolarPump 10 10 5 2.50 80°6'39.562"E 23°17'36.99"N Singaldeep 2
MOA&FW Panagar Har Khet Ko Pani Tube well 7 7 5 14.00 80°6'39.562"E 23°17'36.99"N Singaldeep 2
MOA&FW Panagar Per Drop More Crop Sprinkler 6 6 5 1.20 80°7'2.046"E 23°17'25.748"N Singaldeep 2
MOA&FW Panagar Per Drop More Crop Drip system 13 13 5 13.00 80°7'2.046"E 23°17'25.748"N Singaldeep 2
MOA&FW Panagar Har Khet Ko Pani Farm Pond 2 4 5 4.00 79°57'56.254"E 23°18'27.363"N Singod
MOA&FW Panagar Har Khet Ko Pani Diesel / Electric /
SolarPump 12 12 5 3.00 79°57'56.254"E 23°18'27.363"N Singod
MOA&FW Panagar Har Khet Ko Pani Tube well 6 6 5 12.00 79°57'56.254"E 23°18'27.363"N Singod
MOA&FW Panagar Per Drop More Crop Sprinkler 10 10 5 2.00 79°57'56.254"E 23°18'27.363"N Singod
MOA&FW Panagar Per Drop More Crop Drip system 2 2 5 2.00 79°57'56.254"E 23°18'27.363"N Singod
MOA&FW Panagar Har Khet Ko Pani Farm Pond 4 8 5 8.00 80°6'39.562"E 23°17'36.99"N Sonapur
225
Concerned
Ministry/
Department
Name of
the
Districts
/ Blocks
Component Activity Total
Number
Command
Area/Irrig
ation
Potential
(Ha)
Period of
Implement
ation 5/ 7
Estimated
cost
(in Lakhs
Rs.)
Longitude Lattitude Remark / Village Name
MOA&FW Panagar Har Khet Ko Pani Diesel / Electric /
SolarPump 12 12 5 3.00 80°6'39.562"E 23°17'36.99"N Sonapur
MOA&FW Panagar Har Khet Ko Pani Tube well 12 12 5 24.00 80°6'39.562"E 23°17'36.99"N Sonapur
MOA&FW Panagar Per Drop More Crop Sprinkler 12 12 5 2.40 80°7'2.046"E 23°17'25.748"N Sonapur
MOA&FW Panagar Per Drop More Crop Drip system 2 2 5 2.00 80°7'2.046"E 23°17'25.748"N Sonapur
MOA&FW Panagar Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°6'39.562"E 23°17'36.99"N Suhajna
MOA&FW Panagar Har Khet Ko Pani Diesel / Electric /
SolarPump 10 10 5 2.50 80°6'39.562"E 23°17'36.99"N Suhajna
MOA&FW Panagar Har Khet Ko Pani Tube well 4 4 5 8.00 80°6'39.562"E 23°17'36.99"N Suhajna
MOA&FW Panagar Per Drop More Crop Sprinkler 10 10 5 2.00 80°7'2.046"E 23°17'25.748"N Suhajna
MOA&FW Panagar Har Khet Ko Pani Diesel / Electric /
SolarPump 5 5 5 1.25 80°6'39.562"E 23°17'36.99"N Sukha
MOA&FW Panagar Har Khet Ko Pani Tube well 3 3 5 6.00 80°6'39.562"E 23°17'36.99"N Sukha
MOA&FW Panagar Per Drop More Crop Sprinkler 4 4 5 0.80 80°7'2.046"E 23°17'25.748"N Sukha
MOA&FW Panagar Per Drop More Crop Drip system 1 1 5 1.00 80°7'2.046"E 23°17'25.748"N Sukha
MOA&FW Panagar Har Khet Ko Pani Farm Pond 4 8 5 8.00 80°6'39.562"E 23°17'36.99"N Sunderpur
MOA&FW Panagar Har Khet Ko Pani Diesel / Electric /
SolarPump 12 12 5 3.00 80°6'39.562"E 23°17'36.99"N Sunderpur
MOA&FW Panagar Har Khet Ko Pani Tube well 8 8 5 16.00 80°6'39.562"E 23°17'36.99"N Sunderpur
MOA&FW Panagar Per Drop More Crop Sprinkler 10 10 5 2.00 80°7'2.046"E 23°17'25.748"N Sunderpur
MOA&FW Panagar Per Drop More Crop Drip system 2 2 5 2.00 80°7'2.046"E 23°17'25.748"N Sunderpur
MOA&FW Panagar Har Khet Ko Pani Farm Pond 2 4 5 4.00 80°6'39.562"E 23°17'36.99"N Surtalai
MOA&FW Panagar Har Khet Ko Pani Diesel / Electric /
SolarPump 8 8 5 2.00 80°6'39.562"E 23°17'36.99"N Surtalai
MOA&FW Panagar Har Khet Ko Pani Tube well 6 6 5 12.00 80°6'39.562"E 23°17'36.99"N Surtalai
MOA&FW Panagar Per Drop More Crop Sprinkler 6 6 5 1.20 80°7'2.046"E 23°17'25.748"N Surtalai
MOA&FW Panagar Per Drop More Crop Drip system 1 1 5 1.00 80°7'2.046"E 23°17'25.748"N Surtalai
MOA&FW Panagar Har Khet Ko Pani Diesel / Electric /
SolarPump 10 10 5 2.50 79°54'10.086"E 23°19'48.88"N Tikari
MOA&FW Panagar Har Khet Ko Pani Tube well 5 5 5 10.00 79°54'10.086"E 23°19'48.88"N Tikari
MOA&FW Panagar Per Drop More Crop Sprinkler 6 6 5 1.20 79°54'10.086"E 23°19'48.88"N Tikari
MOA&FW Panagar Har Khet Ko Pani Farm Pond 2 4 5 4.00 80°6'39.562"E 23°17'36.99"N Tilgawan
226
Concerned
Ministry/
Department
Name of
the
Districts
/ Blocks
Component Activity Total
Number
Command
Area/Irrig
ation
Potential
(Ha)
Period of
Implement
ation 5/ 7
Estimated
cost
(in Lakhs
Rs.)
Longitude Lattitude Remark / Village Name
MOA&FW Panagar Har Khet Ko Pani Diesel / Electric /
SolarPump 8 8 5 2.00 80°6'39.562"E 23°17'36.99"N Tilgawan
MOA&FW Panagar Har Khet Ko Pani Tube well 6 6 5 12.00 80°6'39.562"E 23°17'36.99"N Tilgawan
MOA&FW Panagar Per Drop More Crop Sprinkler 8 8 5 1.60 80°7'2.046"E 23°17'25.748"N Tilgawan
MOA&FW Panagar Per Drop More Crop Drip system 1 1 5 1.00 80°7'2.046"E 23°17'25.748"N Tilgawan
MOA&FW Panagar Har Khet Ko Pani Farm Pond 2 4 5 4.00 80°1'7.392"E 23°14'49.719"N Tindni
MOA&FW Panagar Har Khet Ko Pani Diesel / Electric /
SolarPump 8 8 5 2.00 80°1'7.392"E 23°14'49.719"N Tindni
MOA&FW Panagar Har Khet Ko Pani Tube well 6 6 5 12.00 80°1'7.392"E 23°14'49.719"N Tindni
MOA&FW Panagar Per Drop More Crop Sprinkler 6 6 5 1.20 80°1'7.392"E 23°14'49.719"N Tindni
MOA&FW Panagar Per Drop More Crop Drip system 1 1 5 1.00 80°1'7.392"E 23°14'49.719"N Tindni
MOA&FW Panagar Har Khet Ko Pani Diesel / Electric /
SolarPump 18 18 5 4.50 80°6'39.562"E 23°17'36.99"N Tiwari Kheda
MOA&FW Panagar Har Khet Ko Pani Tube well 16 16 5 32.00 80°6'39.562"E 23°17'36.99"N Tiwari Kheda
MOA&FW Panagar Per Drop More Crop Sprinkler 4 4 5 0.80 80°7'2.046"E 23°17'25.748"N Tiwari Kheda
MOA&FW Panagar Per Drop More Crop Drip system 1 1 5 1.00 80°7'2.046"E 23°17'25.748"N Tiwari Kheda
MOA&FW Panagar Har Khet Ko Pani Diesel / Electric /
SolarPump 6 6 5 1.50 80°6'39.562"E 23°17'36.99"N Tunku Mohaniya
MOA&FW Panagar Har Khet Ko Pani Tube well 4 4 5 8.00 80°6'39.562"E 23°17'36.99"N Tunku Mohaniya
MOA&FW Panagar Per Drop More Crop Sprinkler 6 6 5 1.20 80°7'2.046"E 23°17'25.748"N Tunku Mohaniya
MOA&FW Panagar Per Drop More Crop Drip system 1 1 5 1.00 80°7'2.046"E 23°17'25.748"N Tunku Mohaniya
MOA&FW Panagar Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°3'37.505"E 23°17'48.203"N Umariya
MOA&FW Panagar Har Khet Ko Pani Diesel / Electric /
SolarPump 12 12 5 3.00 80°3'37.505"E 23°17'48.203"N Umariya
MOA&FW Panagar Har Khet Ko Pani Tube well 8 8 5 16.00 80°3'37.505"E 23°17'48.203"N Umariya
MOA&FW Panagar Har Khet Ko Pani Farm Pond 2 4 5 4.00 80°3'37.505"E 23°17'48.203"N Umariya
MOA&FW Panagar Har Khet Ko Pani Diesel / Electric /
SolarPump 8 8 5 2.00 80°3'37.505"E 23°17'48.203"N Umariya
MOA&FW Panagar Har Khet Ko Pani Tube well 6 6 5 12.00 80°3'37.505"E 23°17'48.203"N Umariya
MOA&FW Panagar Har Khet Ko Pani Farm Pond 2 4 5 4.00 80°3'37.505"E 23°17'48.203"N Umariya
MOA&FW Panagar Har Khet Ko Pani Diesel / Electric /
SolarPump 10 10 5 2.50 80°3'37.505"E 23°17'48.203"N Umariya
227
Concerned
Ministry/
Department
Name of
the
Districts
/ Blocks
Component Activity Total
Number
Command
Area/Irrig
ation
Potential
(Ha)
Period of
Implement
ation 5/ 7
Estimated
cost
(in Lakhs
Rs.)
Longitude Lattitude Remark / Village Name
MOA&FW Panagar Har Khet Ko Pani Tube well 8 8 5 16.00 80°3'37.505"E 23°17'48.203"N Umariya
MOA&FW Panagar Per Drop More Crop Sprinkler 6 6 5 1.20 80°3'37.505"E 23°17'48.203"N Umariya
MOA&FW Panagar Per Drop More Crop Sprinkler 5 5 5 1.00 80°3'37.505"E 23°17'48.203"N Umariya
MOA&FW Panagar Per Drop More Crop Sprinkler 10 10 5 2.00 80°3'37.505"E 23°17'48.203"N Umariya
MOA&FW Panagar Per Drop More Crop Drip system 1 1 5 1.00 80°3'37.505"E 23°17'48.203"N Umariya
MOA&FW Panagar Har Khet Ko Pani Farm Pond 2 4 5 4.00 80°6'39.562"E 23°17'36.99"N Umariya Choube
MOA&FW Panagar Har Khet Ko Pani Diesel / Electric /
SolarPump 6 6 5 1.50 80°6'39.562"E 23°17'36.99"N Umariya Choube
MOA&FW Panagar Har Khet Ko Pani Tube well 4 4 5 8.00 80°6'39.562"E 23°17'36.99"N Umariya Choube
MOA&FW Panagar Per Drop More Crop Sprinkler 5 5 5 1.00 80°7'2.046"E 23°17'25.748"N Umariya Choube
MOA&FW Panagar Per Drop More Crop Drip system 2 2 5 2.00 80°7'2.046"E 23°17'25.748"N Umariya Choube
MOA&FW Panagar Har Khet Ko Pani Diesel / Electric /
SolarPump 8 8 5 2.00 80°6'39.562"E 23°17'36.99"N Urduwa Kalan
MOA&FW Panagar Per Drop More Crop Sprinkler 9 9 5 1.80 80°7'2.046"E 23°17'25.748"N Urduwa Kalan
MOA&FW Panagar Per Drop More Crop Drip system 1 1 5 1.00 80°7'2.046"E 23°17'25.748"N Urduwa Kalan
MOA&FW Panagar Har Khet Ko Pani Diesel / Electric /
SolarPump 10 10 5 2.50 80°6'39.562"E 23°17'36.99"N Urduwa Khurd
MOA&FW Panagar Har Khet Ko Pani Tube well 6 6 5 12.00 80°6'39.562"E 23°17'36.99"N Urduwa Khurd
MOA&FW Panagar Per Drop More Crop Sprinkler 10 10 5 2.00 80°7'2.046"E 23°17'25.748"N Urduwa Khurd
MOA&FW Panagar Per Drop More Crop Drip system 1 1 5 1.00 80°7'2.046"E 23°17'25.748"N Urduwa Khurd
MOA&FW Panagar Har Khet Ko Pani Farm Pond 8 16 5 16.00 80°6'39.562"E 23°17'36.99"N Veerner
MOA&FW Panagar Har Khet Ko Pani Diesel / Electric /
SolarPump 6 6 5 1.50 80°6'39.562"E 23°17'36.99"N Veerner
MOA&FW Panagar Har Khet Ko Pani Tube well 8 8 5 16.00 80°6'39.562"E 23°17'36.99"N Veerner
MOA&FW Panagar Per Drop More Crop Sprinkler 1 1 5 0.20 80°7'2.046"E 23°17'25.748"N Veerner
MOA&FW Panagar Per Drop More Crop Drip system 8 8 5 8.00 80°7'2.046"E 23°17'25.748"N Veerner
MOA&FW Panagar Har Khet Ko Pani Tube well 4 4 5 8.00 80°6'39.562"E 23°17'36.99"N
MOA&FW Patan Per Drop More Crop Sprinkler 8 8 5 1.60 79°41'38.752"E 23°17'25.748"N Abhana
MOA&FW Patan Har Khet Ko Pani Diesel / Electric /
SolarPump 8 8 5 2.00 79°46'36.665"E 23°21'16.209"N Abhana
MOA&FW Patan Per Drop More Crop Sprinkler 15 15 5 3.00 79°41'38.752"E 23°17'25.748"N Achalauni
228
Concerned
Ministry/
Department
Name of
the
Districts
/ Blocks
Component Activity Total
Number
Command
Area/Irrig
ation
Potential
(Ha)
Period of
Implement
ation 5/ 7
Estimated
cost
(in Lakhs
Rs.)
Longitude Lattitude Remark / Village Name
MOA&FW Patan Per Drop More Crop Drip system 1 1 5 1.00 79°41'38.752"E 23°17'25.748"N Achalauni
MOA&FW Patan Har Khet Ko Pani Diesel / Electric /
SolarPump 8 8 5 2.00 79°46'36.665"E 23°21'16.209"N Achalauni
MOA&FW Patan Har Khet Ko Pani Tube well 2 2 5 4.00 79°46'36.665"E 23°21'16.209"N Achalauni
MOA&FW Patan Per Drop More Crop Sprinkler 2 2 5 0.40 79°41'38.752"E 23°17'25.748"N Akauna
MOA&FW Patan Har Khet Ko Pani Diesel / Electric /
SolarPump 1 1 5 0.25 79°46'36.665"E 23°21'16.209"N Akauna
MOA&FW Patan Har Khet Ko Pani Capacity Building 1267 5 25.34 79°43'48.035"E 23°18'55.684"N All
MOA&FW Patan Har Khet Ko Pani Diesel / Electric /
SolarPump 10 10 5 2.50 79°41'18.673"E 23°3'28.447"N Badhaiya Kheda
MOA&FW Patan Har Khet Ko Pani Tube well 10 10 5 20.00 79°41'18.673"E 23°3'28.447"N Badhaiya Kheda
MOA&FW Patan Per Drop More Crop Sprinkler 15 15 5 3.00 79°41'18.673"E 23°3'28.447"N Badhaiya Kheda
MOA&FW Patan Per Drop More Crop Sprinkler 12 12 5 2.40 79°41'38.752"E 23°17'25.748"N Bamhori
MOA&FW Patan Har Khet Ko Pani Diesel / Electric /
SolarPump 10 10 5 2.50 79°43'48.035"E 23°18'55.684"N Bamhori
MOA&FW Patan Har Khet Ko Pani Tube well 10 10 5 20.00 79°43'48.035"E 23°18'55.684"N Bamhori
MOA&FW Patan Har Khet Ko Pani Diesel / Electric /
SolarPump 15 15 5 3.75 79°42'47.427"E 23°11'58.773"N Barbata
MOA&FW Patan Har Khet Ko Pani Tube well 5 5 5 10.00 79°42'47.427"E 23°11'58.773"N Barbata
MOA&FW Patan Per Drop More Crop Sprinkler 10 10 5 2.00 79°42'47.427"E 23°11'58.773"N Barbata
MOA&FW Patan Per Drop More Crop Sprinkler 15 15 5 3.00 79°41'38.752"E 23°17'25.748"N Barhi
MOA&FW Patan Har Khet Ko Pani Diesel / Electric /
SolarPump 8 8 5 2.00 79°43'48.035"E 23°18'55.684"N Barhi
MOA&FW Patan Har Khet Ko Pani Tube well 10 10 5 20.00 79°43'48.035"E 23°18'55.684"N Barhi
MOA&FW Patan Per Drop More Crop Sprinkler 10 10 5 2.00 79°41'38.752"E 23°17'25.748"N Baroda Hada
MOA&FW Patan Per Drop More Crop Drip system 2 2 5 2.00 79°41'38.752"E 23°17'25.748"N Baroda Hada
MOA&FW Patan Har Khet Ko Pani Diesel / Electric /
SolarPump 12 12 5 3.00 79°43'48.035"E 23°18'55.684"N Baroda Hada
MOA&FW Patan Per Drop More Crop Sprinkler 5 5 5 1.00 79°41'38.752"E 23°17'25.748"N Basiya
MOA&FW Patan Har Khet Ko Pani Diesel / Electric /
SolarPump 5 5 5 1.25 79°43'48.035"E 23°18'55.684"N Basiya
MOA&FW Patan Per Drop More Crop Sprinkler 8 8 5 1.60 79°41'38.752"E 23°17'25.748"N Beeja
229
Concerned
Ministry/
Department
Name of
the
Districts
/ Blocks
Component Activity Total
Number
Command
Area/Irrig
ation
Potential
(Ha)
Period of
Implement
ation 5/ 7
Estimated
cost
(in Lakhs
Rs.)
Longitude Lattitude Remark / Village Name
MOA&FW Patan Per Drop More Crop Drip system 2 2 5 2.00 79°41'38.752"E 23°17'25.748"N Beeja
MOA&FW Patan Har Khet Ko Pani Diesel / Electric /
SolarPump 6 6 5 1.50 79°43'48.035"E 23°18'55.684"N Beeja
MOA&FW Patan Per Drop More Crop Sprinkler 12 12 5 2.40 79°41'38.752"E 23°17'25.748"N Belkhedi Chapod
MOA&FW Patan Har Khet Ko Pani Diesel / Electric /
SolarPump 10 10 5 2.50 79°43'48.035"E 23°18'55.684"N Belkhedi Chapod
MOA&FW Patan Per Drop More Crop Sprinkler 20 20 5 4.00 79°41'38.752"E 23°17'25.748"N Benikheda
MOA&FW Patan Per Drop More Crop Drip system 5 5 5 5.00 79°41'38.752"E 23°17'25.748"N Benikheda
MOA&FW Patan Har Khet Ko Pani Diesel / Electric /
SolarPump 5 5 5 1.25 79°43'48.035"E 23°18'55.684"N Benikheda
MOA&FW Patan Har Khet Ko Pani Tube well 2 2 5 4.00 79°43'48.035"E 23°18'55.684"N Benikheda
MOA&FW Patan Per Drop More Crop Sprinkler 10 10 5 2.00 79°41'38.752"E 23°17'25.748"N Bhakaliya
MOA&FW Patan Har Khet Ko Pani Tube well 12 12 5 24.00 79°43'48.035"E 23°18'55.684"N Bhakaliya
MOA&FW Patan Per Drop More Crop Sprinkler 10 10 5 2.00 79°41'38.752"E 23°17'25.748"N Bhita (Karondi)
MOA&FW Patan Per Drop More Crop Drip system 2 2 5 2.00 79°41'38.752"E 23°17'25.748"N Bhita (Karondi)
MOA&FW Patan Har Khet Ko Pani Diesel / Electric /
SolarPump 10 10 5 2.50 79°43'48.035"E 23°18'55.684"N Bhita (Karondi)
MOA&FW Patan Har Khet Ko Pani Tube well 2 2 5 4.00 79°43'48.035"E 23°18'55.684"N Bhita (Karondi)
MOA&FW Patan Per Drop More Crop Sprinkler 15 15 5 3.00 79°41'38.752"E 23°17'25.748"N Bilkharwa
MOA&FW Patan Per Drop More Crop Drip system 4 4 5 4.00 79°41'38.752"E 23°17'25.748"N Bilkharwa
MOA&FW Patan Har Khet Ko Pani Diesel / Electric /
SolarPump 15 15 5 3.75 79°43'48.035"E 23°18'55.684"N Bilkharwa
MOA&FW Patan Har Khet Ko Pani Tube well 8 8 5 16.00 79°43'48.035"E 23°18'55.684"N Bilkharwa
MOA&FW Patan Per Drop More Crop Sprinkler 25 25 5 5.00 79°41'38.752"E 23°17'25.748"N Binaiki
MOA&FW Patan Per Drop More Crop Drip system 10 10 5 10.00 79°41'38.752"E 23°17'25.748"N Binaiki
MOA&FW Patan Har Khet Ko Pani Farm Pond 1 2 5 2.00 79°43'48.035"E 23°18'55.684"N Binaiki
MOA&FW Patan Har Khet Ko Pani Diesel / Electric /
SolarPump 5 5 5 1.25 79°43'48.035"E 23°18'55.684"N Binaiki
MOA&FW Patan Har Khet Ko Pani Tube well 2 2 5 4.00 79°43'48.035"E 23°18'55.684"N Binaiki
MOA&FW Patan Per Drop More Crop Sprinkler 10 10 5 2.00 79°41'38.752"E 23°17'25.748"N Boriya
MOA&FW Patan Har Khet Ko Pani Diesel / Electric /
SolarPump 10 10 5 2.50 79°43'48.035"E 23°18'55.684"N Boriya
230
Concerned
Ministry/
Department
Name of
the
Districts
/ Blocks
Component Activity Total
Number
Command
Area/Irrig
ation
Potential
(Ha)
Period of
Implement
ation 5/ 7
Estimated
cost
(in Lakhs
Rs.)
Longitude Lattitude Remark / Village Name
MOA&FW Patan Har Khet Ko Pani Tube well 1 1 5 2.00 79°43'48.035"E 23°18'55.684"N Boriya
MOA&FW Patan Per Drop More Crop Sprinkler 10 10 5 2.00 79°41'38.752"E 23°17'25.748"N Chandwa
MOA&FW Patan Har Khet Ko Pani Diesel / Electric /
SolarPump 10 10 5 2.50 79°43'48.035"E 23°18'55.684"N Chandwa
MOA&FW Patan Har Khet Ko Pani Tube well 7 7 5 14.00 79°43'48.035"E 23°18'55.684"N Chandwa
MOA&FW Patan Per Drop More Crop Sprinkler 2 2 5 0.40 79°41'38.752"E 23°17'25.748"N Chapod
MOA&FW Patan Har Khet Ko Pani Diesel / Electric /
SolarPump 5 5 5 1.25 79°43'48.035"E 23°18'55.684"N Chapod
MOA&FW Patan Per Drop More Crop Sprinkler 5 5 5 1.00 79°41'38.752"E 23°17'25.748"N Charguwan (Akauna)
MOA&FW Patan Har Khet Ko Pani Diesel / Electric /
SolarPump 8 8 5 2.00 79°43'48.035"E 23°18'55.684"N Charguwan (Akauna)
MOA&FW Patan Per Drop More Crop Sprinkler 15 15 5 3.00 79°41'38.752"E 23°17'25.748"N Chhapari
MOA&FW Patan Per Drop More Crop Drip system 1 1 5 1.00 79°41'38.752"E 23°17'25.748"N Chhapari
MOA&FW Patan Har Khet Ko Pani Diesel / Electric /
SolarPump 10 10 5 2.50 79°43'48.035"E 23°18'55.684"N Chhapari
MOA&FW Patan Har Khet Ko Pani Tube well 2 2 5 4.00 79°43'48.035"E 23°18'55.684"N Chhapari
MOA&FW Patan Per Drop More Crop Sprinkler 5 5 5 1.00 79°41'38.752"E 23°17'25.748"N Chhatarpur
MOA&FW Patan Har Khet Ko Pani Diesel / Electric /
SolarPump 10 10 5 2.50 79°43'48.035"E 23°18'55.684"N Chhatarpur
MOA&FW Patan Per Drop More Crop Sprinkler 10 10 5 2.00 79°41'38.752"E 23°17'25.748"N Chhituraha
MOA&FW Patan Har Khet Ko Pani Diesel / Electric /
SolarPump 8 8 5 2.00 79°43'48.035"E 23°18'55.684"N Chhituraha
MOA&FW Patan Har Khet Ko Pani Diesel / Electric /
SolarPump 5 5 5 1.25 79°47'25.75"E 23°19'51.388"N Chikhli
MOA&FW Patan Per Drop More Crop Sprinkler 3 3 5 0.60 79°47'25.75"E 23°19'51.388"N Chikhli
MOA&FW Patan Per Drop More Crop Sprinkler 1 1 5 0.20 79°41'38.752"E 23°17'25.748"N Deori
MOA&FW Patan Har Khet Ko Pani Diesel / Electric /
SolarPump 2 2 5 0.50 79°43'48.035"E 23°18'55.684"N Deori
MOA&FW Patan Per Drop More Crop Sprinkler 10 10 5 2.00 79°41'38.752"E 23°17'25.748"N Dhaneta
MOA&FW Patan Per Drop More Crop Drip system 4 4 5 4.00 79°41'38.752"E 23°17'25.748"N Dhaneta
MOA&FW Patan Har Khet Ko Pani Diesel / Electric /
SolarPump 15 15 5 3.75 79°43'48.035"E 23°18'55.684"N Dhaneta
231
Concerned
Ministry/
Department
Name of
the
Districts
/ Blocks
Component Activity Total
Number
Command
Area/Irrig
ation
Potential
(Ha)
Period of
Implement
ation 5/ 7
Estimated
cost
(in Lakhs
Rs.)
Longitude Lattitude Remark / Village Name
MOA&FW Patan Har Khet Ko Pani Tube well 10 10 5 20.00 79°43'48.035"E 23°18'55.684"N Dhaneta
MOA&FW Patan Per Drop More Crop Sprinkler 15 15 5 3.00 79°41'38.752"E 23°17'25.748"N Dhirkheda
MOA&FW Patan Har Khet Ko Pani Diesel / Electric /
SolarPump 10 10 5 2.50 79°43'48.035"E 23°18'55.684"N Dhirkheda
MOA&FW Patan Per Drop More Crop Sprinkler 2 2 5 0.40 79°41'38.752"E 23°17'25.748"N Didhaura (Basiya)
MOA&FW Patan Har Khet Ko Pani Diesel / Electric /
SolarPump 5 5 5 1.25 79°43'48.035"E 23°18'55.684"N Didhaura (Basiya)
MOA&FW Patan Har Khet Ko Pani Tube well 3 3 5 6.00 79°43'48.035"E 23°18'55.684"N Didhaura (Basiya)
MOA&FW Patan Per Drop More Crop Sprinkler 2 2 5 0.40 79°41'38.752"E 23°17'25.748"N Dohra
MOA&FW Patan Har Khet Ko Pani Diesel / Electric /
SolarPump 5 5 5 1.25 79°43'48.035"E 23°18'55.684"N Dohra
MOA&FW Patan Per Drop More Crop Sprinkler 5 5 5 1.00 79°41'38.752"E 23°17'25.748"N Doni
MOA&FW Patan Per Drop More Crop Drip system 1 1 5 1.00 79°41'38.752"E 23°17'25.748"N Doni
MOA&FW Patan Har Khet Ko Pani Diesel / Electric /
SolarPump 8 8 5 2.00 79°43'48.035"E 23°18'55.684"N Doni
MOA&FW Patan Per Drop More Crop Sprinkler 10 10 5 2.00 79°41'38.752"E 23°17'25.748"N Dundi
MOA&FW Patan Har Khet Ko Pani Diesel / Electric /
SolarPump 8 8 5 2.00 79°43'48.035"E 23°18'55.684"N Dundi
MOA&FW Patan Per Drop More Crop Sprinkler 5 5 5 1.00 79°41'38.752"E 23°17'25.748"N Gadaghat
MOA&FW Patan Har Khet Ko Pani Diesel / Electric /
SolarPump 15 15 5 3.75 79°43'48.035"E 23°18'55.684"N Gadaghat
MOA&FW Patan Har Khet Ko Pani Diesel / Electric /
SolarPump 10 10 5 2.50 79°51'49.51"E 23°20'50.563"N Ganyari
MOA&FW Patan Har Khet Ko Pani Tube well 3 3 5 6.00 79°51'49.51"E 23°20'50.563"N Ganyari
MOA&FW Patan Per Drop More Crop Sprinkler 10 10 5 2.00 79°41'38.752"E 23°17'25.748"N Ganyari
MOA&FW Patan Per Drop More Crop Sprinkler 4 4 5 0.80 79°41'38.752"E 23°17'25.748"N Gudiya
MOA&FW Patan Har Khet Ko Pani Diesel / Electric /
SolarPump 4 4 5 1.00 79°43'48.035"E 23°18'55.684"N Gudiya
MOA&FW Patan Har Khet Ko Pani Tube well 2 2 5 4.00 79°43'48.035"E 23°18'55.684"N Gudiya
MOA&FW Patan Per Drop More Crop Sprinkler 20 20 5 4.00 79°41'38.752"E 23°17'25.748"N Gwari
MOA&FW Patan Har Khet Ko Pani Diesel / Electric /
SolarPump 10 10 5 2.50 79°43'48.035"E 23°18'55.684"N Gwari
232
Concerned
Ministry/
Department
Name of
the
Districts
/ Blocks
Component Activity Total
Number
Command
Area/Irrig
ation
Potential
(Ha)
Period of
Implement
ation 5/ 7
Estimated
cost
(in Lakhs
Rs.)
Longitude Lattitude Remark / Village Name
MOA&FW Patan Har Khet Ko Pani Tube well 12 12 5 24.00 79°43'48.035"E 23°18'55.684"N Gwari
MOA&FW Patan Per Drop More Crop Sprinkler 10 10 5 2.00 79°41'38.752"E 23°17'25.748"N Handa
MOA&FW Patan Har Khet Ko Pani Diesel / Electric /
SolarPump 10 10 5 2.50 79°43'48.035"E 23°18'55.684"N Handa
MOA&FW Patan Per Drop More Crop Sprinkler 10 10 5 2.00 79°41'38.752"E 23°17'25.748"N Harduwa
MOA&FW Patan Per Drop More Crop Sprinkler 12 12 5 2.40 79°41'38.752"E 23°17'25.748"N Harduwa
MOA&FW Patan Har Khet Ko Pani Diesel / Electric /
SolarPump 8 8 5 2.00 79°43'48.035"E 23°18'55.684"N Harduwa
MOA&FW Patan Har Khet Ko Pani Tube well 2 2 5 4.00 79°43'48.035"E 23°18'55.684"N Harduwa
MOA&FW Patan Har Khet Ko Pani Diesel / Electric /
SolarPump 10 10 5 2.50 79°43'48.035"E 23°18'55.684"N Harduwa
MOA&FW Patan Har Khet Ko Pani Tube well 10 10 5 20.00 79°43'48.035"E 23°18'55.684"N Harduwa
MOA&FW Patan Har Khet Ko Pani Diesel / Electric /
SolarPump 6 6 5 1.50 79°31'45.399"E 23°12'57.351"N Hinauta (Baroda)
MOA&FW Patan Per Drop More Crop Sprinkler 10 10 5 2.00 79°31'45.399"E 23°12'57.351"N Hinauta (Baroda)
MOA&FW Patan Per Drop More Crop Sprinkler 10 10 5 2.00 79°41'38.752"E 23°17'25.748"N Juri Kalan
MOA&FW Patan Har Khet Ko Pani Diesel / Electric /
SolarPump 8 8 5 2.00 79°43'48.035"E 23°18'55.684"N Juri Kalan
MOA&FW Patan Per Drop More Crop Sprinkler 10 10 5 2.00 79°41'38.752"E 23°17'25.748"N Juri Khurd
MOA&FW Patan Har Khet Ko Pani Diesel / Electric /
SolarPump 10 10 5 2.50 79°43'48.035"E 23°18'55.684"N Juri Khurd
MOA&FW Patan Har Khet Ko Pani Diesel / Electric /
SolarPump 10 10 5 2.50 79°51'8.406"E 23°22'38.065"N Kanti
MOA&FW Patan Har Khet Ko Pani Tube well 1 1 5 2.00 79°51'8.406"E 23°22'38.065"N Kanti
MOA&FW Patan Per Drop More Crop Sprinkler 10 10 5 2.00 79°51'8.406"E 23°22'38.065"N Kanti
MOA&FW Patan Per Drop More Crop Drip system 2 2 5 2.00 79°51'8.406"E 23°22'38.065"N Kanti
MOA&FW Patan Per Drop More Crop Sprinkler 10 10 5 2.00 79°41'38.752"E 23°17'25.748"N Kantora
MOA&FW Patan Per Drop More Crop Drip system 3 3 5 3.00 79°41'38.752"E 23°17'25.748"N Kantora
MOA&FW Patan Har Khet Ko Pani Diesel / Electric /
SolarPump 8 8 5 2.00 79°43'48.035"E 23°18'55.684"N Kantora
MOA&FW Patan Per Drop More Crop Sprinkler 10 10 5 2.00 79°41'38.752"E 23°17'25.748"N Karari Mankuwara
MOA&FW Patan Per Drop More Crop Drip system 4 4 5 4.00 79°41'38.752"E 23°17'25.748"N Karari Mankuwara
233
Concerned
Ministry/
Department
Name of
the
Districts
/ Blocks
Component Activity Total
Number
Command
Area/Irrig
ation
Potential
(Ha)
Period of
Implement
ation 5/ 7
Estimated
cost
(in Lakhs
Rs.)
Longitude Lattitude Remark / Village Name
MOA&FW Patan Har Khet Ko Pani Diesel / Electric /
SolarPump 15 15 5 3.75 79°43'48.035"E 23°18'55.684"N Karari Mankuwara
MOA&FW Patan Per Drop More Crop Sprinkler 6 6 5 1.20 79°41'38.752"E 23°17'25.748"N Katiya Luhari
MOA&FW Patan Har Khet Ko Pani Diesel / Electric /
SolarPump 7 7 5 1.75 79°43'48.035"E 23°18'55.684"N Katiya Luhari
MOA&FW Patan Per Drop More Crop Sprinkler 15 15 5 3.00 79°41'38.752"E 23°17'25.748"N Khaira (Amarpur)
MOA&FW Patan Har Khet Ko Pani Diesel / Electric /
SolarPump 12 12 5 3.00 79°43'48.035"E 23°18'55.684"N Khaira (Amarpur)
MOA&FW Patan Har Khet Ko Pani Tube well 8 8 5 16.00 79°43'48.035"E 23°18'55.684"N Khaira (Amarpur)
MOA&FW Patan Per Drop More Crop Sprinkler 9 9 5 1.80 79°41'38.752"E 23°17'25.748"N Khairi
MOA&FW Patan Har Khet Ko Pani Diesel / Electric /
SolarPump 8 8 5 2.00 79°43'48.035"E 23°18'55.684"N Khairi
MOA&FW Patan Har Khet Ko Pani Tube well 9 9 5 18.00 79°43'48.035"E 23°18'55.684"N Khairi
MOA&FW Patan Per Drop More Crop Sprinkler 4 4 5 0.80 79°41'38.752"E 23°17'25.748"N Kuda
MOA&FW Patan Har Khet Ko Pani Diesel / Electric /
SolarPump 8 8 5 2.00 79°43'48.035"E 23°18'55.684"N Kuda
MOA&FW Patan Har Khet Ko Pani Diesel / Electric /
SolarPump 5 5 5 1.25 79°31'41.03"E 23°11'56.179"N Kukurbhuka
MOA&FW Patan Har Khet Ko Pani Tube well 2 2 5 4.00 79°31'41.03"E 23°11'56.179"N Kukurbhuka
MOA&FW Patan Per Drop More Crop Sprinkler 3 3 5 0.60 79°31'41.03"E 23°11'56.179"N Kukurbhuka
MOA&FW Patan Per Drop More Crop Drip system 2 2 5 2.00 79°31'41.03"E 23°11'56.179"N Kukurbhuka
MOA&FW Patan Per Drop More Crop Sprinkler 30 30 5 6.00 79°41'38.752"E 23°17'25.748"N Luhari
MOA&FW Patan Per Drop More Crop Drip system 5 5 5 5.00 79°41'38.752"E 23°17'25.748"N Luhari
MOA&FW Patan Har Khet Ko Pani Diesel / Electric /
SolarPump 10 10 5 2.50 79°43'48.035"E 23°18'55.684"N Luhari
MOA&FW Patan Har Khet Ko Pani Tube well 2 2 5 4.00 79°43'48.035"E 23°18'55.684"N Luhari
MOA&FW Patan Per Drop More Crop Sprinkler 10 10 5 2.00 79°41'38.752"E 23°17'25.748"N Luhari Kanti
MOA&FW Patan Har Khet Ko Pani Diesel / Electric /
SolarPump 10 10 5 2.50 79°43'48.035"E 23°18'55.684"N Luhari Kanti
MOA&FW Patan Per Drop More Crop Sprinkler 10 10 5 2.00 79°41'38.752"E 23°17'25.748"N Mad Pipariya
MOA&FW Patan Har Khet Ko Pani Diesel / Electric /
SolarPump 8 8 5 2.00 79°43'48.035"E 23°18'55.684"N Mad Pipariya
234
Concerned
Ministry/
Department
Name of
the
Districts
/ Blocks
Component Activity Total
Number
Command
Area/Irrig
ation
Potential
(Ha)
Period of
Implement
ation 5/ 7
Estimated
cost
(in Lakhs
Rs.)
Longitude Lattitude Remark / Village Name
MOA&FW Patan Per Drop More Crop Sprinkler 12 12 5 2.40 79°41'38.752"E 23°17'25.748"N Mado
MOA&FW Patan Har Khet Ko Pani Diesel / Electric /
SolarPump 10 10 5 2.50 79°43'48.035"E 23°18'55.684"N Mado
MOA&FW Patan Har Khet Ko Pani Tube well 2 2 5 4.00 79°43'48.035"E 23°18'55.684"N Mado
MOA&FW Patan Per Drop More Crop Sprinkler 10 10 5 2.00 79°41'38.752"E 23°17'25.748"N Madwa
MOA&FW Patan Har Khet Ko Pani Diesel / Electric /
SolarPump 8 8 5 2.00 79°43'48.035"E 23°18'55.684"N Madwa
MOA&FW Patan Har Khet Ko Pani Diesel / Electric /
SolarPump 8 8 5 2.00 79°47'51.529"E 23°25'21.392"N Mahguwan
MOA&FW Patan Har Khet Ko Pani Tube well 10 10 5 20.00 79°47'51.529"E 23°25'21.392"N Mahguwan
MOA&FW Patan Per Drop More Crop Sprinkler 10 10 5 2.00 79°47'51.529"E 23°25'21.392"N Mahguwan
MOA&FW Patan Per Drop More Crop Sprinkler 6 6 5 1.20 79°41'38.752"E 23°17'25.748"N Majhgawan
MOA&FW Patan Har Khet Ko Pani Diesel / Electric /
SolarPump 5 5 5 1.25 79°43'48.035"E 23°18'55.684"N Majhgawan
MOA&FW Patan Per Drop More Crop Sprinkler 10 10 5 2.00 79°41'38.752"E 23°17'25.748"N Muhla
MOA&FW Patan Har Khet Ko Pani Diesel / Electric /
SolarPump 10 10 5 2.50 79°43'48.035"E 23°18'55.684"N Muhla
MOA&FW Patan Per Drop More Crop Sprinkler 6 6 5 1.20 79°41'38.752"E 23°17'25.748"N Murgawan
MOA&FW Patan Har Khet Ko Pani Diesel / Electric /
SolarPump 10 10 5 2.50 79°43'48.035"E 23°18'55.684"N Murgawan
MOA&FW Patan Per Drop More Crop Sprinkler 5 5 5 1.00 79°41'38.752"E 23°17'25.748"N Muswa
MOA&FW Patan Har Khet Ko Pani Diesel / Electric /
SolarPump 8 8 5 2.00 79°43'48.035"E 23°18'55.684"N Muswa
MOA&FW Patan Har Khet Ko Pani Diesel / Electric /
SolarPump 8 8 5 2.00 79°41'36.644"E 23°12'44.697"N Nanhwara
MOA&FW Patan Har Khet Ko Pani Tube well 10 10 5 20.00 79°41'36.644"E 23°12'44.697"N Nanhwara
MOA&FW Patan Per Drop More Crop Sprinkler 20 20 5 4.00 79°41'36.644"E 23°12'44.697"N Nanhwara
MOA&FW Patan Per Drop More Crop Sprinkler 8 8 5 1.60 79°41'38.752"E 23°17'25.748"N Noukheda
MOA&FW Patan Per Drop More Crop Drip system 2 2 5 2.00 79°41'38.752"E 23°17'25.748"N Noukheda
MOA&FW Patan Har Khet Ko Pani Diesel / Electric /
SolarPump 10 10 5 2.50 79°43'48.035"E 23°18'55.684"N Noukheda
MOA&FW Patan Har Khet Ko Pani Tube well 3 3 5 6.00 79°43'48.035"E 23°18'55.684"N Noukheda
235
Concerned
Ministry/
Department
Name of
the
Districts
/ Blocks
Component Activity Total
Number
Command
Area/Irrig
ation
Potential
(Ha)
Period of
Implement
ation 5/ 7
Estimated
cost
(in Lakhs
Rs.)
Longitude Lattitude Remark / Village Name
MOA&FW Patan Per Drop More Crop Sprinkler 10 10 5 2.00 79°41'38.752"E 23°17'25.748"N Nunsar
MOA&FW Patan Per Drop More Crop Drip system 5 5 5 5.00 79°41'38.752"E 23°17'25.748"N Nunsar
MOA&FW Patan Har Khet Ko Pani Diesel / Electric /
SolarPump 20 20 5 5.00 79°43'48.035"E 23°18'55.684"N Nunsar
MOA&FW Patan Har Khet Ko Pani Diesel / Electric /
SolarPump 10 10 5 2.50 79°39'42.818"E 23°13'26.855"N Padariya (Bilkharwa)
MOA&FW Patan Har Khet Ko Pani Tube well 5 5 5 10.00 79°39'42.818"E 23°13'26.855"N Padariya (Bilkharwa)
MOA&FW Patan Per Drop More Crop Sprinkler 7 7 5 1.40 79°39'42.818"E 23°13'26.855"N Padariya (Bilkharwa)
MOA&FW Patan Per Drop More Crop Drip system 2 2 5 2.00 79°39'42.818"E 23°13'26.855"N Padariya (Bilkharwa)
MOA&FW Patan Har Khet Ko Pani Diesel / Electric /
SolarPump 5 5 5 1.25 79°43'48.035"E 23°18'55.684"N Paimakheda
MOA&FW Patan Har Khet Ko Pani Tube well 2 2 5 4.00 79°43'48.035"E 23°18'55.684"N Paimakheda
MOA&FW Patan Per Drop More Crop Sprinkler 4 4 5 0.80 79°43'48.035"E 23°18'55.684"N Paimakheda
MOA&FW Patan Har Khet Ko Pani Diesel / Electric /
SolarPump 10 10 5 2.50 79°50'44.693"E 23°18'59.9"N Pauniya
MOA&FW Patan Har Khet Ko Pani Tube well 2 2 5 4.00 79°50'44.693"E 23°18'59.9"N Pauniya
MOA&FW Patan Per Drop More Crop Sprinkler 10 10 5 2.00 79°50'44.693"E 23°18'59.9"N Pauniya
MOA&FW Patan Per Drop More Crop Drip system 1 1 5 1.00 79°50'44.693"E 23°18'59.9"N Pauniya
MOA&FW Patan Har Khet Ko Pani Diesel / Electric /
SolarPump 8 8 5 2.00 79°49'16.162"E 23°24'45.592"N Pipariya
MOA&FW Patan Per Drop More Crop Sprinkler 5 5 5 1.00 79°49'16.162"E 23°24'45.592"N Pipariya
MOA&FW Patan Har Khet Ko Pani Diesel / Electric /
SolarPump 8 8 5 2.00 79°36'37.325"E 23°13'9.992"N Pondi
MOA&FW Patan Har Khet Ko Pani Tube well 4 4 5 8.00 79°36'37.325"E 23°13'9.992"N Pondi
MOA&FW Patan Per Drop More Crop Sprinkler 10 10 5 2.00 79°36'37.325"E 23°13'9.992"N Pondi
MOA&FW Patan Per Drop More Crop Drip system 2 2 5 2.00 79°36'37.325"E 23°13'9.992"N Pondi
MOA&FW Patan Har Khet Ko Pani Diesel / Electric /
SolarPump 10 10 5 2.50 79°36'37.325"E 23°13'9.992"N Pondi (Udana)
MOA&FW Patan Per Drop More Crop Sprinkler 2 2 5 0.40 79°36'37.325"E 23°13'9.992"N Pondi (Udana)
MOA&FW Patan Har Khet Ko Pani Diesel / Electric /
SolarPump 8 8 5 2.00 79°35'21.441"E 23°13'18.423"N Pondi Rajghat
MOA&FW Patan Per Drop More Crop Sprinkler 6 6 5 1.20 79°35'21.441"E 23°13'18.423"N Pondi Rajghat
236
Concerned
Ministry/
Department
Name of
the
Districts
/ Blocks
Component Activity Total
Number
Command
Area/Irrig
ation
Potential
(Ha)
Period of
Implement
ation 5/ 7
Estimated
cost
(in Lakhs
Rs.)
Longitude Lattitude Remark / Village Name
MOA&FW Patan Per Drop More Crop Sprinkler 5 5 5 1.00 79°41'38.752"E 23°17'25.748"N Raithra
MOA&FW Patan Har Khet Ko Pani Diesel / Electric /
SolarPump 10 10 5 2.50 79°43'48.035"E 23°18'55.684"N Raithra
MOA&FW Patan Har Khet Ko Pani Tube well 1 1 5 2.00 79°43'48.035"E 23°18'55.684"N Raithra
MOA&FW Patan Per Drop More Crop Sprinkler 10 10 5 2.00 79°41'38.752"E 23°17'25.748"N Rakhi
MOA&FW Patan Har Khet Ko Pani Diesel / Electric /
SolarPump 10 10 5 2.50 79°43'48.035"E 23°18'55.684"N Rakhi
MOA&FW Patan Har Khet Ko Pani Tube well 7 7 5 14.00 79°43'48.035"E 23°18'55.684"N Rakhi
MOA&FW Patan Per Drop More Crop Sprinkler 20 20 5 4.00 79°41'38.752"E 23°17'25.748"N Rimjha
MOA&FW Patan Har Khet Ko Pani Diesel / Electric /
SolarPump 8 8 5 2.00 79°43'48.035"E 23°18'55.684"N Rimjha
MOA&FW Patan Per Drop More Crop Sprinkler 11 11 5 2.20 79°41'38.752"E 23°17'25.748"N Riyana
MOA&FW Patan Har Khet Ko Pani Diesel / Electric /
SolarPump 10 10 5 2.50 79°43'48.035"E 23°18'55.684"N Riyana
MOA&FW Patan Har Khet Ko Pani Farm Pond 1 2 5 2.00 79°43'48.035"E 23°18'55.684"N Sarond
MOA&FW Patan Per Drop More Crop Sprinkler 5 5 5 1.00 79°41'38.752"E 23°17'25.748"N Simariya
MOA&FW Patan Per Drop More Crop Drip system 1 1 5 1.00 79°41'38.752"E 23°17'25.748"N Simariya
MOA&FW Patan Har Khet Ko Pani Diesel / Electric /
SolarPump 8 8 5 2.00 79°43'48.035"E 23°18'55.684"N Simariya
MOA&FW Patan Har Khet Ko Pani Diesel / Electric /
SolarPump 15 15 5 3.75 79°40'37.623"E 23°14'21.66"N Simariya (Karari)
MOA&FW Patan Har Khet Ko Pani Tube well 5 5 5 10.00 79°40'37.623"E 23°14'21.66"N Simariya (Karari)
MOA&FW Patan Per Drop More Crop Sprinkler 10 10 5 2.00 79°40'37.623"E 23°14'21.66"N Simariya (Karari)
MOA&FW Patan Per Drop More Crop Drip system 2 2 5 2.00 79°40'37.623"E 23°14'21.66"N Simariya (Karari)
MOA&FW Patan Har Khet Ko Pani Diesel / Electric /
SolarPump 8 8 5 2.00 79°40'37.623"E 23°14'21.66"N Simariya (Patan)
MOA&FW Patan Har Khet Ko Pani Tube well 10 10 5 20.00 79°40'37.623"E 23°14'21.66"N Simariya (Patan)
MOA&FW Patan Per Drop More Crop Sprinkler 20 20 5 4.00 79°40'37.623"E 23°14'21.66"N Simariya (Patan)
MOA&FW Patan Har Khet Ko Pani Diesel / Electric /
SolarPump 10 10 5 2.50 79°39'21.739"E 23°16'32.348"N Singori
MOA&FW Patan Per Drop More Crop Sprinkler 10 10 5 2.00 79°39'21.739"E 23°16'32.348"N Singori
MOA&FW Patan Per Drop More Crop Drip system 10 10 5 10.00 79°39'21.739"E 23°16'32.348"N Singori
237
Concerned
Ministry/
Department
Name of
the
Districts
/ Blocks
Component Activity Total
Number
Command
Area/Irrig
ation
Potential
(Ha)
Period of
Implement
ation 5/ 7
Estimated
cost
(in Lakhs
Rs.)
Longitude Lattitude Remark / Village Name
MOA&FW Patan Har Khet Ko Pani Diesel / Electric /
SolarPump 8 8 5 2.00 79°48'38.22"E 23°12'44.697"N Sontalai
MOA&FW Patan Per Drop More Crop Sprinkler 5 5 5 1.00 79°48'38.22"E 23°12'44.697"N Sontalai
MOA&FW Patan Har Khet Ko Pani Diesel / Electric /
SolarPump 8 8 5 2.00 79°51'47.929"E 23°19'25.194"N Suraiya
MOA&FW Patan Per Drop More Crop Sprinkler 4 4 5 0.80 79°51'47.929"E 23°19'25.194"N Suraiya
MOA&FW Patan Har Khet Ko Pani Diesel / Electric /
SolarPump 8 8 5 2.00 79°51'47.929"E 23°19'25.194"N Surhiya (Patan)
MOA&FW Patan Har Khet Ko Pani Tube well 8 8 5 16.00 79°51'47.929"E 23°19'25.194"N Surhiya (Patan)
MOA&FW Patan Per Drop More Crop Sprinkler 20 20 5 4.00 79°51'47.929"E 23°19'25.194"N Surhiya (Patan)
MOA&FW Patan Har Khet Ko Pani Diesel / Electric /
SolarPump 12 12 5 3.00 79°42'44.096"E 23°18'38.821"N Thana
MOA&FW Patan Per Drop More Crop Sprinkler 8 8 5 1.60 79°42'44.096"E 23°18'38.821"N Thana
MOA&FW Patan Per Drop More Crop Drip system 2 2 5 2.00 79°42'44.096"E 23°18'38.821"N Thana
MOA&FW Patan Per Drop More Crop Sprinkler 15 15 5 3.00 79°41'38.752"E 23°17'25.748"N Timri
MOA&FW Patan Per Drop More Crop Drip system 2 2 5 2.00 79°41'38.752"E 23°17'25.748"N Timri
MOA&FW Patan Har Khet Ko Pani Diesel / Electric /
SolarPump 10 10 5 2.50 79°43'48.035"E 23°18'55.684"N Timri
MOA&FW Patan Har Khet Ko Pani Tube well 2 2 5 4.00 79°43'48.035"E 23°18'55.684"N Timri
MOA&FW Patan Har Khet Ko Pani Diesel / Electric /
SolarPump 15 15 5 3.75 79°38'39.582"E 23°13'39.502"N Udana (Sadak)
MOA&FW Patan Per Drop More Crop Sprinkler 15 15 5 3.00 79°38'39.582"E 23°13'39.502"N Udana (Sadak)
MOA&FW Patan Per Drop More Crop Drip system 1 1 5 1.00 79°38'39.582"E 23°13'39.502"N Udana (Sadak)
MOA&FW Shahpura Har Khet Ko Pani Farm Pond 1 2 5 2.00 79°42'57.446"E 23°7'29.92"N Ahmadpur
MOA&FW Shahpura Har Khet Ko Pani Farm Pond 1 2 5 2.00 79°42'57.446"E 23°7'29.92"N Ahrora
MOA&FW Shahpura Har Khet Ko Pani Capacity Building 2148 5 42.95 79°42'12.478"E 23°6'39.331"N All
MOA&FW Shahpura Per Drop More Crop Sprinkler 2 2 5 0.40 79°38'38.879"E 23°7'18.678"N Amakhoh
MOA&FW Shahpura Har Khet Ko Pani Farm Pond 1 2 5 2.00 79°42'57.446"E 23°7'29.92"N Amakhoh
MOA&FW Shahpura Har Khet Ko Pani Farm Pond 1 2 5 2.00 79°42'57.446"E 23°7'29.92"N Andiya
MOA&FW Shahpura Har Khet Ko Pani Farm Pond 1 2 5 2.00 79°42'57.446"E 23°7'29.92"N Badkheda
MOA&FW Shahpura Har Khet Ko Pani Farm Pond 1 2 5 2.00 79°42'57.446"E 23°7'29.92"N Bagrai
MOA&FW Shahpura Per Drop More Crop Sprinkler 1 1 5 0.20 79°38'38.879"E 23°7'18.678"N Bamhori
238
Concerned
Ministry/
Department
Name of
the
Districts
/ Blocks
Component Activity Total
Number
Command
Area/Irrig
ation
Potential
(Ha)
Period of
Implement
ation 5/ 7
Estimated
cost
(in Lakhs
Rs.)
Longitude Lattitude Remark / Village Name
MOA&FW Shahpura Har Khet Ko Pani Farm Pond 1 2 5 2.00 79°42'57.446"E 23°7'29.92"N Bamhori
MOA&FW Shahpura Har Khet Ko Pani Farm Pond 1 2 5 2.00 79°42'57.446"E 23°7'29.92"N Barbati
MOA&FW Shahpura Har Khet Ko Pani Farm Pond 1 2 5 2.00 79°42'57.446"E 23°7'29.92"N Bargi
MOA&FW Shahpura Har Khet Ko Pani Farm Pond 1 2 5 2.00 79°26'51.334"E 23°10'29.793"N Barkahar
MOA&FW Shahpura Har Khet Ko Pani Diesel / Electric /
SolarPump 1 1 5 0.25 79°26'51.334"E 23°10'29.793"N Barkahar
MOA&FW Shahpura Har Khet Ko Pani Tube well 2 2 5 4.00 79°26'51.334"E 23°10'29.793"N Barkahar
MOA&FW Shahpura Per Drop More Crop Sprinkler 5 5 5 1.00 79°26'51.334"E 23°10'29.793"N Barkahar
MOA&FW Shahpura Per Drop More Crop Drip system 1 1 5 1.00 79°26'51.334"E 23°10'29.793"N Barkahar
MOA&FW Shahpura Per Drop More Crop Sprinkler 1 1 5 0.20 79°38'38.879"E 23°7'18.678"N Barmhan
MOA&FW Shahpura Har Khet Ko Pani Farm Pond 1 2 5 2.00 79°42'57.446"E 23°7'29.92"N Barmhan
MOA&FW Shahpura Har Khet Ko Pani Diesel / Electric /
SolarPump 1 1 5 0.25 79°42'57.446"E 23°7'29.92"N Barmhan
MOA&FW Shahpura Har Khet Ko Pani Farm Pond 1 2 5 2.00 79°42'57.446"E 23°7'29.92"N Basendi
MOA&FW Shahpura Har Khet Ko Pani Farm Pond 1 2 5 2.00 79°42'57.446"E 23°7'29.92"N Belkheda
MOA&FW Shahpura Har Khet Ko Pani Farm Pond 1 2 5 2.00 79°42'57.446"E 23°7'29.92"N Belkhedi
MOA&FW Shahpura Har Khet Ko Pani Farm Pond 1 2 5 2.00 79°42'57.446"E 23°7'29.92"N Bhadarwara
MOA&FW Shahpura Har Khet Ko Pani Farm Pond 1 2 5 2.00 79°42'57.446"E 23°7'29.92"N Bhadpura
MOA&FW Shahpura Per Drop More Crop Sprinkler 2 2 5 0.40 79°38'38.879"E 23°7'18.678"N Bhairoghat
MOA&FW Shahpura Har Khet Ko Pani Diesel / Electric /
SolarPump 2 2 5 0.50 79°42'57.446"E 23°7'29.92"N Bhairoghat
MOA&FW Shahpura Har Khet Ko Pani Tube well 1 1 5 2.00 79°42'57.446"E 23°7'29.92"N Bhairoghat
MOA&FW Shahpura Har Khet Ko Pani Farm Pond 1 2 5 2.00 79°42'57.446"E 23°7'29.92"N Bhamka
MOA&FW Shahpura Har Khet Ko Pani Farm Pond 1 2 5 2.00 79°42'57.446"E 23°7'29.92"N Bhamki
MOA&FW Shahpura Har Khet Ko Pani Farm Pond 1 2 5 2.00 79°42'57.446"E 23°7'29.92"N Bharatpur
MOA&FW Shahpura Har Khet Ko Pani Farm Pond 1 2 5 2.00 79°42'57.446"E 23°7'29.92"N Bhidki
MOA&FW Shahpura Har Khet Ko Pani Farm Pond 1 2 5 2.00 79°42'57.446"E 23°7'29.92"N Bhikampur
MOA&FW Shahpura Har Khet Ko Pani Farm Pond 1 2 5 2.00 79°42'57.446"E 23°7'29.92"N Bhita
MOA&FW Shahpura Har Khet Ko Pani Farm Pond 1 2 5 2.00 79°42'57.446"E 23°7'29.92"N Bhita
MOA&FW Shahpura Har Khet Ko Pani Farm Pond 1 2 5 2.00 79°42'57.446"E 23°7'29.92"N Bhotiya
MOA&FW Shahpura Har Khet Ko Pani Farm Pond 1 2 5 2.00 79°42'57.446"E 23°7'29.92"N Bichuwa
239
Concerned
Ministry/
Department
Name of
the
Districts
/ Blocks
Component Activity Total
Number
Command
Area/Irrig
ation
Potential
(Ha)
Period of
Implement
ation 5/ 7
Estimated
cost
(in Lakhs
Rs.)
Longitude Lattitude Remark / Village Name
MOA&FW Shahpura Har Khet Ko Pani Farm Pond 1 2 5 2.00 79°42'57.446"E 23°7'29.92"N Biharipura
MOA&FW Shahpura Per Drop More Crop Sprinkler 2 2 5 0.40 79°38'38.879"E 23°7'18.678"N Bijaura
MOA&FW Shahpura Har Khet Ko Pani Diesel / Electric /
SolarPump 2 2 5 0.50 79°42'57.446"E 23°7'29.92"N Bijaura
MOA&FW Shahpura Har Khet Ko Pani Tube well 1 1 5 2.00 79°42'57.446"E 23°7'29.92"N Bijaura
MOA&FW Shahpura Har Khet Ko Pani Farm Pond 1 2 5 2.00 79°42'57.446"E 23°7'29.92"N Bijna
MOA&FW Shahpura Har Khet Ko Pani Farm Pond 1 2 5 2.00 79°42'57.446"E 23°7'29.92"N Bijori (Gangai)
MOA&FW Shahpura Per Drop More Crop Sprinkler 2 2 5 0.40 79°38'38.879"E 23°7'18.678"N Biruhala
MOA&FW Shahpura Har Khet Ko Pani Farm Pond 1 2 5 2.00 79°42'57.446"E 23°7'29.92"N Biruhala
MOA&FW Shahpura Har Khet Ko Pani Diesel / Electric /
SolarPump 1 1 5 0.25 79°42'57.446"E 23°7'29.92"N Biruhala
MOA&FW Shahpura Har Khet Ko Pani Tube well 2 2 5 4.00 79°42'57.446"E 23°7'29.92"N Biruhala
MOA&FW Shahpura Har Khet Ko Pani Farm Pond 1 2 5 2.00 79°42'57.446"E 23°7'29.92"N Chirapondi
MOA&FW Shahpura Har Khet Ko Pani Farm Pond 1 2 5 2.00 79°42'57.446"E 23°7'29.92"N Dabhola
MOA&FW Shahpura Har Khet Ko Pani Farm Pond 1 2 5 2.00 79°42'57.446"E 23°7'29.92"N Dabkiya
MOA&FW Shahpura Har Khet Ko Pani Farm Pond 1 2 5 2.00 79°42'57.446"E 23°7'29.92"N Daman Khamariya
MOA&FW Shahpura Har Khet Ko Pani Farm Pond 1 2 5 2.00 79°42'57.446"E 23°7'29.92"N Deori
MOA&FW Shahpura Har Khet Ko Pani Farm Pond 1 2 5 2.00 79°42'57.446"E 23°7'29.92"N Deori (Bhorgarh)
MOA&FW Shahpura Har Khet Ko Pani Diesel / Electric /
SolarPump 2 2 5 0.50 79°46'48.61"E 23°3'2.922"N Dhangawan
MOA&FW Shahpura Har Khet Ko Pani Tube well 1 1 5 2.00 79°46'48.61"E 23°3'2.922"N Dhangawan
MOA&FW Shahpura Per Drop More Crop Sprinkler 5 5 5 1.00 79°46'48.61"E 23°3'2.922"N Dhangawan
MOA&FW Shahpura Per Drop More Crop Drip system 2 2 5 2.00 79°46'48.61"E 23°3'2.922"N Dhangawan
MOA&FW Shahpura Har Khet Ko Pani Farm Pond 1 2 5 2.00 79°42'57.446"E 23°7'29.92"N Dharampura
MOA&FW Shahpura Har Khet Ko Pani Farm Pond 1 2 5 2.00 79°42'57.446"E 23°7'29.92"N Dharampura
MOA&FW Shahpura Har Khet Ko Pani Farm Pond 1 2 5 2.00 79°42'57.446"E 23°7'29.92"N Dharti Kachhar
MOA&FW Shahpura Har Khet Ko Pani Farm Pond 1 2 5 2.00 79°42'57.446"E 23°7'29.92"N Dhimarjhojhi
MOA&FW Shahpura Har Khet Ko Pani Farm Pond 1 2 5 2.00 79°42'57.446"E 23°7'29.92"N Didhora
MOA&FW Shahpura Har Khet Ko Pani Farm Pond 1 2 5 2.00 79°42'57.446"E 23°7'29.92"N Dighauri
MOA&FW Shahpura Har Khet Ko Pani Farm Pond 1 2 5 2.00 79°42'57.446"E 23°7'29.92"N Divri
MOA&FW Shahpura Har Khet Ko Pani Farm Pond 1 2 5 2.00 79°42'57.446"E 23°7'29.92"N Dongar Jhansi
240
Concerned
Ministry/
Department
Name of
the
Districts
/ Blocks
Component Activity Total
Number
Command
Area/Irrig
ation
Potential
(Ha)
Period of
Implement
ation 5/ 7
Estimated
cost
(in Lakhs
Rs.)
Longitude Lattitude Remark / Village Name
MOA&FW Shahpura Har Khet Ko Pani Farm Pond 1 2 5 2.00 79°42'57.446"E 23°7'29.92"N Dugariya
MOA&FW Shahpura Har Khet Ko Pani Farm Pond 1 2 5 2.00 79°42'57.446"E 23°7'29.92"N Dulha Kheda
MOA&FW Shahpura Har Khet Ko Pani Farm Pond 1 2 5 2.00 79°42'57.446"E 23°7'29.92"N Gadar Pipariya
MOA&FW Shahpura Har Khet Ko Pani Farm Pond 1 2 5 2.00 79°42'57.446"E 23°7'29.92"N Gangai
MOA&FW Shahpura Har Khet Ko Pani Farm Pond 1 2 5 2.00 79°42'57.446"E 23°7'29.92"N Ganj Katanga
MOA&FW Shahpura Har Khet Ko Pani Farm Pond 1 2 5 2.00 79°42'57.446"E 23°7'29.92"N Ghughara
MOA&FW Shahpura Har Khet Ko Pani Farm Pond 1 2 5 2.00 79°42'57.446"E 23°7'29.92"N Ghughari
MOA&FW Shahpura Har Khet Ko Pani Farm Pond 1 2 5 2.00 79°42'57.446"E 23°7'29.92"N Ghughari
MOA&FW Shahpura Har Khet Ko Pani Farm Pond 1 2 5 2.00 79°42'57.446"E 23°7'29.92"N Gokala
MOA&FW Shahpura Har Khet Ko Pani Farm Pond 1 2 5 2.00 79°28'22.5"E 23°12'14.133"N Gubarakhurd
MOA&FW Shahpura Per Drop More Crop Sprinkler 2 2 5 0.40 79°28'22.5"E 23°12'14.133"N Gubarakhurd
MOA&FW Shahpura Har Khet Ko Pani Farm Pond 1 2 5 2.00 79°29'16.251"E 23°12'10.971"N Gubra Kalan
MOA&FW Shahpura Har Khet Ko Pani Diesel / Electric /
SolarPump 2 2 5 0.50 79°29'16.251"E 23°12'10.971"N Gubra Kalan
MOA&FW Shahpura Har Khet Ko Pani Tube well 1 1 5 2.00 79°29'16.251"E 23°12'10.971"N Gubra Kalan
MOA&FW Shahpura Per Drop More Crop Sprinkler 2 2 5 0.40 79°29'16.251"E 23°12'10.971"N Gubra Kalan
MOA&FW Shahpura Per Drop More Crop Sprinkler 5 5 5 1.00 79°38'38.879"E 23°7'18.678"N Gundrai
MOA&FW Shahpura Per Drop More Crop Drip system 2 2 5 2.00 79°38'38.879"E 23°7'18.678"N Gundrai
MOA&FW Shahpura Har Khet Ko Pani Diesel / Electric /
SolarPump 2 2 5 0.50 79°42'57.446"E 23°7'29.92"N Gundrai
MOA&FW Shahpura Har Khet Ko Pani Tube well 1 1 5 2.00 79°42'57.446"E 23°7'29.92"N Gundrai
MOA&FW Shahpura Har Khet Ko Pani Farm Pond 1 2 5 2.00 79°42'57.446"E 23°7'29.92"N Gwari
MOA&FW Shahpura Har Khet Ko Pani Farm Pond 1 2 5 2.00 79°42'57.446"E 23°7'29.92"N Harduli
MOA&FW Shahpura Har Khet Ko Pani Farm Pond 1 2 5 2.00 79°42'57.446"E 23°7'29.92"N Hathi Khandar
MOA&FW Shahpura Har Khet Ko Pani Farm Pond 1 2 5 2.00 79°31'39.926"E 23°12'56.595"N Hinotiya
MOA&FW Shahpura Har Khet Ko Pani Diesel / Electric /
SolarPump 1 1 5 0.25 79°31'39.926"E 23°12'56.595"N Hinotiya
MOA&FW Shahpura Har Khet Ko Pani Tube well 2 2 5 4.00 79°31'39.926"E 23°12'56.595"N Hinotiya
MOA&FW Shahpura Per Drop More Crop Sprinkler 5 5 5 1.00 79°31'39.926"E 23°12'56.595"N Hinotiya
MOA&FW Shahpura Per Drop More Crop Drip system 1 1 5 1.00 79°31'39.926"E 23°12'56.595"N Hinotiya
MOA&FW Shahpura Har Khet Ko Pani Farm Pond 1 2 5 2.00 79°42'57.446"E 23°7'29.92"N Hirapur
241
Concerned
Ministry/
Department
Name of
the
Districts
/ Blocks
Component Activity Total
Number
Command
Area/Irrig
ation
Potential
(Ha)
Period of
Implement
ation 5/ 7
Estimated
cost
(in Lakhs
Rs.)
Longitude Lattitude Remark / Village Name
MOA&FW Shahpura Har Khet Ko Pani Farm Pond 1 2 5 2.00 79°42'57.446"E 23°7'29.92"N Hirapur Banda
MOA&FW Shahpura Har Khet Ko Pani Farm Pond 1 2 5 2.00 79°33'37.258"E 23°9'44.221"N Imaliya
MOA&FW Shahpura Har Khet Ko Pani Farm Pond 1 2 5 2.00 79°33'37.258"E 23°9'44.221"N Imliya
MOA&FW Shahpura Har Khet Ko Pani Diesel / Electric /
SolarPump 2 2 5 0.50 79°33'37.258"E 23°9'44.221"N Imliya
MOA&FW Shahpura Har Khet Ko Pani Tube well 2 2 5 4.00 79°33'37.258"E 23°9'44.221"N Imliya
MOA&FW Shahpura Har Khet Ko Pani Farm Pond 1 2 5 2.00 79°33'37.258"E 23°9'44.221"N Imliya
MOA&FW Shahpura Per Drop More Crop Sprinkler 10 10 5 2.00 79°33'37.258"E 23°9'44.221"N Imliya
MOA&FW Shahpura Per Drop More Crop Drip system 2 2 5 2.00 79°33'37.258"E 23°9'44.221"N Imliya
MOA&FW Shahpura Har Khet Ko Pani Farm Pond 1 2 5 2.00 79°42'57.446"E 23°7'29.92"N Ishwar Kheda
MOA&FW Shahpura Har Khet Ko Pani Farm Pond 1 2 5 2.00 79°42'57.446"E 23°7'29.92"N Jaita Kheda
MOA&FW Shahpura Har Khet Ko Pani Farm Pond 1 2 5 2.00 79°42'57.446"E 23°7'29.92"N Jamkhar
MOA&FW Shahpura Har Khet Ko Pani Diesel / Electric /
SolarPump 2 2 5 0.50 79°29'40.011"E 23°10'50.684"N Jamuniya
MOA&FW Shahpura Har Khet Ko Pani Tube well 2 2 5 4.00 79°29'40.011"E 23°10'50.684"N Jamuniya
MOA&FW Shahpura Har Khet Ko Pani Farm Pond 1 2 5 2.00 79°29'40.011"E 23°10'50.684"N Jamuniya
MOA&FW Shahpura Per Drop More Crop Sprinkler 5 5 5 1.00 79°29'40.011"E 23°10'50.684"N Jamuniya
MOA&FW Shahpura Per Drop More Crop Drip system 2 2 5 2.00 79°29'40.011"E 23°10'50.684"N Jamuniya
MOA&FW Shahpura Har Khet Ko Pani Farm Pond 1 2 5 2.00 79°42'57.446"E 23°7'29.92"N Jamuniya (Jwab)
MOA&FW Shahpura Har Khet Ko Pani Farm Pond 1 2 5 2.00 79°42'57.446"E 23°7'29.92"N Jhansi
MOA&FW Shahpura Har Khet Ko Pani Farm Pond 1 2 5 2.00 79°42'57.446"E 23°7'29.92"N Jhinna
MOA&FW Shahpura Har Khet Ko Pani Farm Pond 1 2 5 2.00 79°39'25.534"E 23°8'3.927"N Jhojhi
MOA&FW Shahpura Har Khet Ko Pani Farm Pond 1 2 5 2.00 79°42'57.446"E 23°7'29.92"N Jhurai Pipariya
MOA&FW Shahpura Har Khet Ko Pani Farm Pond 1 2 5 2.00 79°42'57.446"E 23°7'29.92"N Jugpura
MOA&FW Shahpura Har Khet Ko Pani Farm Pond 1 2 5 2.00 79°42'57.446"E 23°7'29.92"N Kainthra
MOA&FW Shahpura Har Khet Ko Pani Farm Pond 1 2 5 2.00 79°42'57.446"E 23°7'29.92"N Kalapatha
MOA&FW Shahpura Har Khet Ko Pani Farm Pond 1 2 5 2.00 79°42'57.446"E 23°7'29.92"N Kamtiya
MOA&FW Shahpura Har Khet Ko Pani Farm Pond 1 2 5 2.00 79°38'23.021"E 23°0'54.641"N Kanchanpuri
MOA&FW Shahpura Har Khet Ko Pani Farm Pond 1 2 5 2.00 79°42'57.446"E 23°7'29.92"N Katangi
MOA&FW Shahpura Har Khet Ko Pani Farm Pond 1 2 5 2.00 79°42'57.446"E 23°7'29.92"N Katori
MOA&FW Shahpura Har Khet Ko Pani Farm Pond 1 2 5 2.00 79°42'57.446"E 23°7'29.92"N Kedarpur
242
Concerned
Ministry/
Department
Name of
the
Districts
/ Blocks
Component Activity Total
Number
Command
Area/Irrig
ation
Potential
(Ha)
Period of
Implement
ation 5/ 7
Estimated
cost
(in Lakhs
Rs.)
Longitude Lattitude Remark / Village Name
MOA&FW Shahpura Har Khet Ko Pani Farm Pond 1 2 5 2.00 79°42'57.446"E 23°7'29.92"N Khairi
MOA&FW Shahpura Har Khet Ko Pani Farm Pond 1 2 5 2.00 79°42'57.446"E 23°7'29.92"N Khairi
MOA&FW Shahpura Har Khet Ko Pani Farm Pond 1 2 5 2.00 79°30'32.661"E 23°13'47.933"N Khairi (Bhairoghat)
MOA&FW Shahpura Har Khet Ko Pani Diesel / Electric /
SolarPump 1 1 5 0.25 79°30'32.661"E 23°13'47.933"N Khairi (Bhairoghat)
MOA&FW Shahpura Per Drop More Crop Sprinkler 1 1 5 0.20 79°30'32.661"E 23°13'47.933"N Khairi (Bhairoghat)
MOA&FW Shahpura Har Khet Ko Pani Farm Pond 1 2 5 2.00 79°42'57.446"E 23°7'29.92"N Khamhariya
MOA&FW Shahpura Har Khet Ko Pani Farm Pond 1 2 5 2.00 79°42'57.446"E 23°7'29.92"N Khapra
MOA&FW Shahpura Har Khet Ko Pani Farm Pond 1 2 5 2.00 79°42'57.446"E 23°7'29.92"N Khokha
MOA&FW Shahpura Har Khet Ko Pani Farm Pond 1 2 5 2.00 79°42'57.446"E 23°7'29.92"N Khulri
MOA&FW Shahpura Har Khet Ko Pani Farm Pond 1 2 5 2.00 79°42'57.446"E 23°7'29.92"N Kislai
MOA&FW Shahpura Har Khet Ko Pani Farm Pond 1 2 5 2.00 79°42'57.446"E 23°7'29.92"N Kisrod
MOA&FW Shahpura Har Khet Ko Pani Farm Pond 1 2 5 2.00 79°42'57.446"E 23°7'29.92"N Kiwlari
MOA&FW Shahpura Har Khet Ko Pani Farm Pond 1 2 5 2.00 79°42'57.446"E 23°7'29.92"N Kohli
MOA&FW Shahpura Har Khet Ko Pani Farm Pond 1 2 5 2.00 79°42'57.446"E 23°7'29.92"N Kuda Kalan
MOA&FW Shahpura Har Khet Ko Pani Farm Pond 1 2 5 2.00 79°42'57.446"E 23°7'29.92"N Kudan
MOA&FW Shahpura Har Khet Ko Pani Farm Pond 1 2 5 2.00 79°41'10.808"E 23°0'44.155"N Kulha
MOA&FW Shahpura Har Khet Ko Pani Farm Pond 1 2 5 2.00 79°39'24.193"E 23°1'14.741"N Kulon
MOA&FW Shahpura Har Khet Ko Pani Farm Pond 1 2 5 2.00 79°42'57.446"E 23°7'29.92"N Kunda
MOA&FW Shahpura Har Khet Ko Pani Farm Pond 1 2 5 2.00 79°42'57.446"E 23°7'29.92"N Kunda
MOA&FW Shahpura Har Khet Ko Pani Farm Pond 1 2 5 2.00 79°42'57.446"E 23°7'29.92"N Kushli (Mankendi)
MOA&FW Shahpura Har Khet Ko Pani Farm Pond 1 2 5 2.00 79°42'57.446"E 23°7'29.92"N Kusmi
MOA&FW Shahpura Har Khet Ko Pani Farm Pond 1 2 5 2.00 79°42'57.446"E 23°7'29.92"N Kuwakheda
MOA&FW Shahpura Har Khet Ko Pani Farm Pond 1 2 5 2.00 79°42'57.446"E 23°7'29.92"N Lamheta
MOA&FW Shahpura Har Khet Ko Pani Farm Pond 1 2 5 2.00 79°42'57.446"E 23°7'29.92"N Lami
MOA&FW Shahpura Har Khet Ko Pani Farm Pond 1 2 5 2.00 79°30'15.798"E 23°12'47.227"N Maili
MOA&FW Shahpura Har Khet Ko Pani Diesel / Electric /
SolarPump 1 1 5 0.25 79°30'15.798"E 23°12'47.227"N Maili
MOA&FW Shahpura Har Khet Ko Pani Tube well 2 2 5 4.00 79°30'15.798"E 23°12'47.227"N Maili
MOA&FW Shahpura Per Drop More Crop Sprinkler 2 2 5 0.40 79°30'15.798"E 23°12'47.227"N Maili
MOA&FW Shahpura Per Drop More Crop Drip system 2 2 5 2.00 79°30'15.798"E 23°12'47.227"N Maili
243
Concerned
Ministry/
Department
Name of
the
Districts
/ Blocks
Component Activity Total
Number
Command
Area/Irrig
ation
Potential
(Ha)
Period of
Implement
ation 5/ 7
Estimated
cost
(in Lakhs
Rs.)
Longitude Lattitude Remark / Village Name
MOA&FW Shahpura Har Khet Ko Pani Farm Pond 1 2 5 2.00 79°42'57.446"E 23°7'29.92"N Majitha
MOA&FW Shahpura Har Khet Ko Pani Farm Pond 1 2 5 2.00 79°42'57.446"E 23°7'29.92"N Malkachhar
MOA&FW Shahpura Har Khet Ko Pani Farm Pond 1 2 5 2.00 79°42'57.446"E 23°7'29.92"N Manegaon
MOA&FW Shahpura Har Khet Ko Pani Farm Pond 1 2 5 2.00 79°42'57.446"E 23°7'29.92"N Mankendi
MOA&FW Shahpura Har Khet Ko Pani Farm Pond 1 2 5 2.00 79°42'57.446"E 23°7'29.92"N Matanpur
MOA&FW Shahpura Har Khet Ko Pani Farm Pond 1 2 5 2.00 79°42'57.446"E 23°7'29.92"N Matapur
MOA&FW Shahpura Har Khet Ko Pani Farm Pond 1 2 5 2.00 79°42'57.446"E 23°7'29.92"N Matwara
MOA&FW Shahpura Har Khet Ko Pani Farm Pond 1 2 5 2.00 79°42'57.446"E 23°7'29.92"N Meregaon
MOA&FW Shahpura Har Khet Ko Pani Farm Pond 1 2 5 2.00 79°42'57.446"E 23°7'29.92"N Mihagawan (Chargawan)
MOA&FW Shahpura Har Khet Ko Pani Farm Pond 1 2 5 2.00 79°42'57.446"E 23°7'29.92"N Mihgaon
MOA&FW Shahpura Har Khet Ko Pani Farm Pond 1 2 5 2.00 79°42'57.446"E 23°7'29.92"N Mihguwan
MOA&FW Shahpura Har Khet Ko Pani Farm Pond 1 2 5 2.00 79°42'57.446"E 23°7'29.92"N Nachan Kheda
MOA&FW Shahpura Har Khet Ko Pani Farm Pond 1 2 5 2.00 79°42'57.446"E 23°7'29.92"N Naktiya
MOA&FW Shahpura Har Khet Ko Pani Farm Pond 1 2 5 2.00 79°42'57.446"E 23°7'29.92"N Natwara
MOA&FW Shahpura Har Khet Ko Pani Farm Pond 1 2 5 2.00 79°42'57.446"E 23°7'29.92"N Nayanagar
MOA&FW Shahpura Har Khet Ko Pani Farm Pond 1 2 5 2.00 79°42'57.446"E 23°7'29.92"N Neechi
MOA&FW Shahpura Har Khet Ko Pani Farm Pond 1 2 5 2.00 79°42'57.446"E 23°7'29.92"N Neemkheda
MOA&FW Shahpura Har Khet Ko Pani Farm Pond 1 2 5 2.00 79°42'57.446"E 23°7'29.92"N Neemkheda
MOA&FW Shahpura Har Khet Ko Pani Farm Pond 1 2 5 2.00 79°42'57.446"E 23°7'29.92"N Noni
MOA&FW Shahpura Har Khet Ko Pani Farm Pond 1 2 5 2.00 79°42'57.446"E 23°7'29.92"N Nunpur
MOA&FW Shahpura Har Khet Ko Pani Farm Pond 1 2 5 2.00 79°39'54.051"E 23°3'48.546"N Oriya
MOA&FW Shahpura Har Khet Ko Pani Farm Pond 1 2 5 2.00 79°42'57.446"E 23°7'29.92"N Pahadi Kheda
MOA&FW Shahpura Har Khet Ko Pani Farm Pond 1 2 5 2.00 79°42'57.446"E 23°7'29.92"N Parsiya
MOA&FW Shahpura Har Khet Ko Pani Diesel / Electric /
SolarPump 2 2 5 0.50 79°32'50.938"E 23°15'32.484"N Pathariya
MOA&FW Shahpura Har Khet Ko Pani Tube well 2 2 5 4.00 79°32'50.938"E 23°15'32.484"N Pathariya
MOA&FW Shahpura Per Drop More Crop Sprinkler 5 5 5 1.00 79°32'50.938"E 23°15'32.484"N Pathariya
MOA&FW Shahpura Per Drop More Crop Drip system 2 2 5 2.00 79°32'50.938"E 23°15'32.484"N Pathariya
MOA&FW Shahpura Har Khet Ko Pani Farm Pond 1 2 5 2.00 79°42'57.446"E 23°7'29.92"N Patharphodi
MOA&FW Shahpura Har Khet Ko Pani Farm Pond 1 2 5 2.00 79°42'4.046"E 22°58'37.329"N Pati Chargawan
244
Concerned
Ministry/
Department
Name of
the
Districts
/ Blocks
Component Activity Total
Number
Command
Area/Irrig
ation
Potential
(Ha)
Period of
Implement
ation 5/ 7
Estimated
cost
(in Lakhs
Rs.)
Longitude Lattitude Remark / Village Name
MOA&FW Shahpura Har Khet Ko Pani Farm Pond 1 2 5 2.00 79°42'57.446"E 23°7'29.92"N Pawla
MOA&FW Shahpura Har Khet Ko Pani Farm Pond 1 2 5 2.00 79°42'57.446"E 23°7'29.92"N Phular
MOA&FW Shahpura Har Khet Ko Pani Diesel / Electric /
SolarPump 1 1 5 0.25 79°30'25.916"E 23°11'36.402"N Pindrai
MOA&FW Shahpura Har Khet Ko Pani Tube well 1 1 5 2.00 79°30'25.916"E 23°11'36.402"N Pindrai
MOA&FW Shahpura Per Drop More Crop Sprinkler 2 2 5 0.40 79°30'25.916"E 23°11'36.402"N Pindrai
MOA&FW Shahpura Har Khet Ko Pani Farm Pond 1 2 5 2.00 79°33'19.197"E 23°12'37.543"N Pipariya
MOA&FW Shahpura Har Khet Ko Pani Farm Pond 1 2 5 2.00 79°33'19.197"E 23°12'37.543"N Pipariya
MOA&FW Shahpura Har Khet Ko Pani Farm Pond 1 2 5 2.00 79°39'48.954"E 23°10'49.18"N Pipariya (Kanwas)
MOA&FW Shahpura Har Khet Ko Pani Farm Pond 1 2 5 2.00 79°33'19.197"E 23°12'37.543"N Pipariya Kalan
MOA&FW Shahpura Har Khet Ko Pani Diesel / Electric /
SolarPump 2 2 5 0.50 79°33'19.197"E 23°12'37.543"N Pipariya Kalan
MOA&FW Shahpura Per Drop More Crop Sprinkler 10 10 5 2.00 79°33'19.197"E 23°12'37.543"N Pipariya Kalan
MOA&FW Shahpura Per Drop More Crop Drip system 2 2 5 2.00 79°33'19.197"E 23°12'37.543"N Pipariya Kalan
MOA&FW Shahpura Har Khet Ko Pani Tube well 2 2 5 4.00 79°42'57.446"E 23°7'29.92"N Pipariya Kalan
MOA&FW Shahpura Har Khet Ko Pani Farm Pond 1 2 5 2.00 79°42'57.446"E 23°7'29.92"N Pipariya Ramghat
MOA&FW Shahpura Har Khet Ko Pani Farm Pond 1 2 5 2.00 79°40'47.97"E 23°8'27.461"N Pondi (Phatak)
MOA&FW Shahpura Har Khet Ko Pani Farm Pond 1 2 5 2.00 79°40'47.97"E 23°8'27.461"N Pondi (Sahajpur)
MOA&FW Shahpura Har Khet Ko Pani Farm Pond 1 2 5 2.00 79°40'47.97"E 23°8'27.461"N Raiya Kheda
MOA&FW Shahpura Har Khet Ko Pani Farm Pond 1 2 5 2.00 79°40'47.97"E 23°8'27.461"N Ramkhiriya
MOA&FW Shahpura Har Khet Ko Pani Farm Pond 1 2 5 2.00 79°42'57.446"E 23°7'29.92"N Sagda
MOA&FW Shahpura Har Khet Ko Pani Farm Pond 1 2 5 2.00 79°42'57.446"E 23°7'29.92"N Sakri
MOA&FW Shahpura Har Khet Ko Pani Farm Pond 1 2 5 2.00 79°44'1.649"E 23°1'12.519"N Saliwada
MOA&FW Shahpura Per Drop More Crop Sprinkler 2 2 5 0.40 79°44'1.649"E 23°1'12.519"N Saliwada
MOA&FW Shahpura Har Khet Ko Pani Diesel / Electric /
SolarPump 1 1 5 0.25 79°29'11.913"E 23°11'21.485"N Saliwada
MOA&FW Shahpura Har Khet Ko Pani Tube well 1 1 5 2.00 79°29'11.913"E 23°11'21.485"N Saliwada
MOA&FW Shahpura Har Khet Ko Pani Farm Pond 1 2 5 2.00 79°29'11.913"E 23°11'21.485"N Saliwada
MOA&FW Shahpura Har Khet Ko Pani Farm Pond 1 2 5 2.00 79°29'59.34"E 23°14'34.989"N Samadpura
MOA&FW Shahpura Har Khet Ko Pani Diesel / Electric /
SolarPump 2 2 5 0.50 79°29'59.34"E 23°14'34.989"N Samadpura
245
Concerned
Ministry/
Department
Name of
the
Districts
/ Blocks
Component Activity Total
Number
Command
Area/Irrig
ation
Potential
(Ha)
Period of
Implement
ation 5/ 7
Estimated
cost
(in Lakhs
Rs.)
Longitude Lattitude Remark / Village Name
MOA&FW Shahpura Har Khet Ko Pani Tube well 1 1 5 2.00 79°29'59.34"E 23°14'34.989"N Samadpura
MOA&FW Shahpura Per Drop More Crop Sprinkler 2 2 5 0.40 79°29'59.34"E 23°14'34.989"N Samadpura
MOA&FW Shahpura Har Khet Ko Pani Farm Pond 1 2 5 2.00 79°42'57.446"E 23°7'29.92"N Sarra
MOA&FW Shahpura Har Khet Ko Pani Farm Pond 1 2 5 2.00 79°42'57.446"E 23°7'29.92"N Semra
MOA&FW Shahpura Har Khet Ko Pani Farm Pond 1 2 5 2.00 79°42'57.446"E 23°7'29.92"N Semra
MOA&FW Shahpura Har Khet Ko Pani Farm Pond 1 2 5 2.00 79°42'57.446"E 23°7'29.92"N Sheetalpur
MOA&FW Shahpura Har Khet Ko Pani Farm Pond 1 2 5 2.00 79°42'57.446"E 23°7'29.92"N Sihoda
MOA&FW Shahpura Har Khet Ko Pani Farm Pond 1 2 5 2.00 79°40'1.06"E 22°58'23.944"N Simariya
MOA&FW Shahpura Har Khet Ko Pani Farm Pond 1 2 5 2.00 79°40'12.75"E 23°12'23.618"N Singori
MOA&FW Shahpura Har Khet Ko Pani Farm Pond 1 2 5 2.00 79°42'57.446"E 23°7'29.92"N Singpur
MOA&FW Shahpura Har Khet Ko Pani Farm Pond 1 2 5 2.00 79°42'57.446"E 23°7'29.92"N Suhajani
MOA&FW Shahpura Har Khet Ko Pani Farm Pond 1 2 5 2.00 79°42'57.446"E 23°7'29.92"N Sunachar
MOA&FW Shahpura Per Drop More Crop Sprinkler 1 1 5 0.20 79°38'38.879"E 23°7'18.678"N Sunpura
MOA&FW Shahpura Har Khet Ko Pani Farm Pond 1 2 5 2.00 79°42'57.446"E 23°7'29.92"N Sunpura
MOA&FW Shahpura Har Khet Ko Pani Farm Pond 1 2 5 2.00 79°42'57.446"E 23°7'29.92"N Sunwara
MOA&FW Shahpura Har Khet Ko Pani Farm Pond 1 2 5 2.00 79°42'57.446"E 23°7'29.92"N Surai
MOA&FW Shahpura Har Khet Ko Pani Farm Pond 1 2 5 2.00 79°42'57.446"E 23°7'29.92"N Thana
MOA&FW Shahpura Har Khet Ko Pani Farm Pond 1 2 5 2.00 79°42'57.446"E 23°7'29.92"N Tikri
MOA&FW Shahpura Har Khet Ko Pani Farm Pond 1 2 5 2.00 79°42'57.446"E 23°7'29.92"N Tinheta
MOA&FW Shahpura Har Khet Ko Pani Farm Pond 1 2 5 2.00 79°42'57.446"E 23°7'29.92"N Tipra
MOA&FW Shahpura Har Khet Ko Pani Farm Pond 1 2 5 2.00 79°42'57.446"E 23°7'29.92"N Tonta
MOA&FW Shahpura Har Khet Ko Pani Farm Pond 1 2 5 2.00 79°39'21.572"E 23°2'21.157"N Umariya
MOA&FW Shahpura Har Khet Ko Pani Farm Pond 1 2 5 2.00 79°39'21.572"E 23°2'21.157"N Umariya
MOA&FW Shahpura Har Khet Ko Pani Farm Pond 1 2 5 2.00 79°39'21.572"E 23°2'21.157"N Umariya
246
Concerned
Ministry/
Department
Name of the
Districts /
Blocks
Component Activity Total Number
Command
Area/Irrig
ation
Potential
(Ha)
Period of
Implement
ation 5/ 7
Estimated
cost
(in Lakhs
Rs.)
Longitude Lattitude Remark / Village
Name
MOA&FW Sihora Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°7'41.393"E 23°24'38.566"N Agariya
MOA&FW Sihora Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°7'41.393"E 23°24'38.566"N Algoda
MOA&FW Sihora Har Khet Ko Pani Capacity
Building 5323 5 106.46 80°8'48.846"E 23°24'49.808"N All
MOA&FW Sihora Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°7'41.393"E 23°24'38.566"N Amgawan
MOA&FW Sihora Har Khet Ko Pani Farm Pond 4 8 5 8.00 80°4'33.785"E 23°27'18.789"N Bandarkola
MOA&FW Sihora Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°4'33.785"E 23°27'18.789"N Bandha
MOA&FW Sihora Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°4'33.785"E 23°27'18.789"N Banjar Bughari
MOA&FW Sihora Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°7'41.393"E 23°24'38.566"N Bhadam Khurd
MOA&FW Sihora Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°7'41.393"E 23°24'38.566"N Bhandra
MOA&FW Sihora Har Khet Ko Pani Farm Pond 4 8 5 8.00 80°7'41.393"E 23°24'38.566"N Bijaiya
MOA&FW Sihora Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°7'41.393"E 23°24'38.566"N Budhari
MOA&FW Sihora Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°7'41.393"E 23°24'38.566"N Budhuwa
MOA&FW Sihora Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°7'41.393"E 23°24'38.566"N Deonagar
MOA&FW Sihora Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°7'58.859"E 23°22'10.014"N Gadchapa
MOA&FW Sihora Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°11'11.115"E 23°24'6.533"N Gandhigram
MOA&FW Sihora Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°6'38.461"E 23°24'19.35"N Ghutna
MOA&FW Sihora Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°6'38.461"E 23°24'19.35"N Gidurha
MOA&FW Sihora Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°7'41.393"E 23°24'38.566"N Gosalpur
MOA&FW Sihora Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°7'41.393"E 23°24'38.566"N Gunahru
MOA&FW Sihora Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°7'41.393"E 23°24'38.566"N Hargrah
MOA&FW Sihora Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°7'41.393"E 23°24'38.566"N Jujhari
MOA&FW Sihora Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°7'41.393"E 23°24'38.566"N Junwani Kalan
MOA&FW Sihora Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°7'41.393"E 23°24'38.566"N Kachnari
MOA&FW Sihora Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°7'41.393"E 23°24'38.566"N Khabhra
MOA&FW Sihora Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°7'41.393"E 23°24'38.566"N Khajuri
MOA&FW Sihora Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°7'41.393"E 23°24'38.566"N Khamhariya
MOA&FW Sihora Per Drop More Crop Sprinkler 32 32 5 6.40 80°8'48.846"E 23°24'49.808"N Khirhani Kalan
MOA&FW Sihora Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°7'41.393"E 23°24'38.566"N Khitaula
MOA&FW Sihora Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°7'41.393"E 23°24'38.566"N Kumhi
MOA&FW Sihora Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°12'36.174"E 23°24'50.81"N Majhgawan
247
Concerned
Ministry/
Department
Name of the
Districts /
Blocks
Component Activity Total Number
Command
Area/Irrig
ation
Potential
(Ha)
Period of
Implement
ation 5/ 7
Estimated
cost
(in Lakhs
Rs.)
Longitude Lattitude Remark / Village
Name
MOA&FW Sihora Har Khet Ko Pani Farm Pond 3 6 5 6.00 80°7'41.393"E 23°24'38.566"N Mandha
MOA&FW Sihora Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°7'41.393"E 23°24'38.566"N Muhatara
MOA&FW Sihora Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°4'43.107"E 23°24'47.314"N Murta
MOA&FW Sihora Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°15'14.835"E 23°20'43.401"N Pipariya
MOA&FW Sihora Har Khet Ko Pani Farm Pond 4 8 5 8.00 80°15'14.835"E 23°20'43.401"N Pipariya
MOA&FW Sihora Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°5'50.105"E 23°20'58.937"N Pondi Kalan
MOA&FW Sihora Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°4'56.248"E 23°21'48.652"N Pondi Khurd
MOA&FW Sihora Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°7'41.393"E 23°24'38.566"N Pratappur
MOA&FW Sihora Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°7'41.393"E 23°24'38.566"N Raipura Muhsam
MOA&FW Sihora Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°7'41.393"E 23°24'38.566"N Rajgawan
MOA&FW Sihora Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°7'41.393"E 23°24'38.566"N Ramkhiriya
MOA&FW Sihora Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°7'41.393"E 23°24'38.566"N Ranital
MOA&FW Sihora Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°9'7.605"E 23°22'14.674"N Siluwa
MOA&FW Sihora Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°7'41.393"E 23°24'38.566"N Tikariya
Concerned
Ministry/
Department
Name of the
Districts /
Blocks
Component Activity Total Number
Command
Area/Irrig
ation
Potential
(Ha)
Period of
Implement
ation 5/ 7
Estimated
cost
(in Lakhs
Rs.)
Longitude Lattitude
MOA&FW Shahpura Har Khet Ko Pani
Diesel /
Electric / SolarPump
1 1 5 0.25 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani Tube well 2 2 5 4.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani
Diesel /
Electric /
SolarPump
1 1 5 0.25 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani Tube well 2 2 5 4.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani
Diesel /
Electric / SolarPump
1 1 5 0.25 79°42'12.478"E 23°6'39.331"N
248
Concerned
Ministry/
Department
Name of the
Districts /
Blocks
Component Activity Total Number
Command
Area/Irrig
ation
Potential
(Ha)
Period of
Implement
ation 5/ 7
Estimated
cost
(in Lakhs
Rs.)
Longitude Lattitude
MOA&FW Shahpura Har Khet Ko Pani Tube well 1 1 5 2.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani Diesel /
Electric /
SolarPump
1 1 5 0.25 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani Tube well 1 1 5 2.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani
Diesel /
Electric /
SolarPump
2 2 5 0.50 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani Tube well 2 2 5 4.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani
Diesel /
Electric / SolarPump
5 5 5 1.25 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani Tube well 2 2 5 4.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani
Diesel /
Electric /
SolarPump
1 1 5 0.25 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani Tube well 1 1 5 2.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani
Diesel /
Electric /
SolarPump
2 2 5 0.50 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani Tube well 1 1 5 2.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani Diesel /
Electric /
SolarPump
1 1 5 0.25 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani Diesel /
Electric /
SolarPump
2 2 5 0.50 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani Tube well 1 1 5 2.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani
Diesel /
Electric /
SolarPump
2 2 5 0.50 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani Tube well 2 2 5 4.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani
Diesel /
Electric / SolarPump
1 1 5 0.25 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani Tube well 2 2 5 4.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani
Diesel /
Electric /
SolarPump
1 1 5 0.25 79°42'12.478"E 23°6'39.331"N
249
Concerned
Ministry/
Department
Name of the
Districts /
Blocks
Component Activity Total Number
Command
Area/Irrig
ation
Potential
(Ha)
Period of
Implement
ation 5/ 7
Estimated
cost
(in Lakhs
Rs.)
Longitude Lattitude
MOA&FW Shahpura Har Khet Ko Pani Tube well 2 2 5 4.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani Diesel /
Electric /
SolarPump
1 1 5 0.25 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani Tube well 2 2 5 4.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani
Diesel /
Electric /
SolarPump
1 1 5 0.25 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani Tube well 1 1 5 2.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani
Diesel /
Electric / SolarPump
1 1 5 0.25 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani Tube well 1 1 5 2.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani
Diesel /
Electric /
SolarPump
2 2 5 0.50 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani Tube well 2 2 5 4.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani
Diesel /
Electric /
SolarPump
5 5 5 1.25 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani Tube well 2 2 5 4.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani Diesel /
Electric /
SolarPump
1 1 5 0.25 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani Tube well 1 1 5 2.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani
Diesel /
Electric / SolarPump
2 2 5 0.50 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani Tube well 1 1 5 2.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani Diesel /
Electric /
SolarPump
5 5 5 1.25 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani Tube well 5 5 5 10.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani
Diesel /
Electric /
SolarPump
2 2 5 0.50 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani Tube well 2 2 5 4.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani Tube well 1 1 5 2.00 79°42'12.478"E 23°6'39.331"N
250
Concerned
Ministry/
Department
Name of the
Districts /
Blocks
Component Activity Total Number
Command
Area/Irrig
ation
Potential
(Ha)
Period of
Implement
ation 5/ 7
Estimated
cost
(in Lakhs
Rs.)
Longitude Lattitude
MOA&FW Shahpura Har Khet Ko Pani
Diesel /
Electric /
SolarPump
1 1 5 0.25 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani Tube well 2 2 5 4.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani
Diesel /
Electric /
SolarPump
2 2 5 0.50 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani Tube well 2 2 5 4.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani
Diesel /
Electric /
SolarPump
1 1 5 0.25 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani Tube well 1 1 5 2.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani
Diesel /
Electric / SolarPump
1 1 5 0.25 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani Tube well 1 1 5 2.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani Diesel /
Electric /
SolarPump
2 2 5 0.50 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani Tube well 2 2 5 4.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani
Diesel /
Electric / SolarPump
5 5 5 1.25 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani Tube well 2 2 5 4.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani Diesel /
Electric /
SolarPump
1 1 5 0.25 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani Tube well 1 1 5 2.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani
Diesel /
Electric /
SolarPump
2 2 5 0.50 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani Tube well 1 1 5 2.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani
Diesel /
Electric / SolarPump
5 5 5 1.25 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani Tube well 5 5 5 10.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani
Diesel /
Electric /
SolarPump
2 2 5 0.50 79°42'12.478"E 23°6'39.331"N
251
Concerned
Ministry/
Department
Name of the
Districts /
Blocks
Component Activity Total Number
Command
Area/Irrig
ation
Potential
(Ha)
Period of
Implement
ation 5/ 7
Estimated
cost
(in Lakhs
Rs.)
Longitude Lattitude
MOA&FW Shahpura Har Khet Ko Pani Tube well 2 2 5 4.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani Tube well 1 1 5 2.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani
Diesel /
Electric / SolarPump
1 1 5 0.25 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani Tube well 2 2 5 4.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani Diesel /
Electric /
SolarPump
2 2 5 0.50 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani Tube well 2 2 5 4.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani
Diesel /
Electric /
SolarPump
2 2 5 0.50 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani Tube well 2 2 5 4.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani
Diesel /
Electric / SolarPump
2 2 5 0.50 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani Tube well 1 1 5 2.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani
Diesel /
Electric /
SolarPump
1 1 5 0.25 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani Tube well 2 2 5 4.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani
Diesel /
Electric / SolarPump
2 2 5 0.50 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani Tube well 1 1 5 2.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani Diesel /
Electric /
SolarPump
1 1 5 0.25 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani Tube well 2 2 5 4.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani
Diesel /
Electric / SolarPump
2 2 5 0.50 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani Tube well 1 1 5 2.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani Diesel /
Electric /
SolarPump
2 2 5 0.50 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani Tube well 2 2 5 4.00 79°42'12.478"E 23°6'39.331"N
252
Concerned
Ministry/
Department
Name of the
Districts /
Blocks
Component Activity Total Number
Command
Area/Irrig
ation
Potential
(Ha)
Period of
Implement
ation 5/ 7
Estimated
cost
(in Lakhs
Rs.)
Longitude Lattitude
MOA&FW Shahpura Har Khet Ko Pani
Diesel /
Electric /
SolarPump
2 2 5 0.50 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani Tube well 1 1 5 2.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani
Diesel /
Electric /
SolarPump
2 2 5 0.50 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani Tube well 1 1 5 2.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani
Diesel /
Electric /
SolarPump
1 1 5 0.25 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani Diesel /
Electric /
SolarPump
2 2 5 0.50 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani Tube well 1 1 5 2.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani
Diesel /
Electric / SolarPump
2 2 5 0.50 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani Tube well 2 2 5 4.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani Diesel /
Electric /
SolarPump
1 1 5 0.25 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani Tube well 2 2 5 4.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani
Diesel /
Electric /
SolarPump
1 1 5 0.25 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani Tube well 2 2 5 4.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani
Diesel /
Electric / SolarPump
1 1 5 0.25 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani Tube well 2 2 5 4.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani
Diesel /
Electric /
SolarPump
1 1 5 0.25 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani Tube well 1 1 5 2.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani
Diesel /
Electric / SolarPump
1 1 5 0.25 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani Tube well 1 1 5 2.00 79°42'12.478"E 23°6'39.331"N
253
Concerned
Ministry/
Department
Name of the
Districts /
Blocks
Component Activity Total Number
Command
Area/Irrig
ation
Potential
(Ha)
Period of
Implement
ation 5/ 7
Estimated
cost
(in Lakhs
Rs.)
Longitude Lattitude
MOA&FW Shahpura Har Khet Ko Pani
Diesel /
Electric /
SolarPump
2 2 5 0.50 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani Tube well 2 2 5 4.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani
Diesel /
Electric /
SolarPump
2 2 5 0.50 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani Tube well 1 1 5 2.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani
Diesel /
Electric /
SolarPump
2 2 5 0.50 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani Tube well 1 1 5 2.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani
Diesel /
Electric / SolarPump
1 1 5 0.25 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani
Diesel /
Electric / SolarPump
2 2 5 0.50 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani Tube well 1 1 5 2.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani Diesel /
Electric /
SolarPump
2 2 5 0.50 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani Tube well 2 2 5 4.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani
Diesel /
Electric /
SolarPump
1 1 5 0.25 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani Tube well 2 2 5 4.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani
Diesel /
Electric / SolarPump
1 1 5 0.25 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani Tube well 2 2 5 4.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani
Diesel /
Electric /
SolarPump
1 1 5 0.25 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani Tube well 2 2 5 4.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani
Diesel /
Electric / SolarPump
1 1 5 0.25 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani Tube well 1 1 5 2.00 79°42'12.478"E 23°6'39.331"N
254
Concerned
Ministry/
Department
Name of the
Districts /
Blocks
Component Activity Total Number
Command
Area/Irrig
ation
Potential
(Ha)
Period of
Implement
ation 5/ 7
Estimated
cost
(in Lakhs
Rs.)
Longitude Lattitude
MOA&FW Shahpura Har Khet Ko Pani
Diesel /
Electric /
SolarPump
1 1 5 0.25 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani Tube well 1 1 5 2.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani
Diesel /
Electric /
SolarPump
2 2 5 0.50 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani Tube well 2 2 5 4.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani
Diesel /
Electric /
SolarPump
5 5 5 1.25 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani Tube well 2 2 5 4.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani
Diesel /
Electric / SolarPump
1 1 5 0.25 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani Tube well 1 1 5 2.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani Diesel /
Electric /
SolarPump
2 2 5 0.50 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani Tube well 1 1 5 2.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani
Diesel /
Electric / SolarPump
1 1 5 0.25 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani
Diesel /
Electric /
SolarPump
2 2 5 0.50 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani Tube well 1 1 5 2.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani
Diesel /
Electric / SolarPump
2 2 5 0.50 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani Tube well 2 2 5 4.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani
Diesel /
Electric /
SolarPump
1 1 5 0.25 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani Tube well 2 2 5 4.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani
Diesel /
Electric / SolarPump
1 1 5 0.25 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani Tube well 2 2 5 4.00 79°42'12.478"E 23°6'39.331"N
255
Concerned
Ministry/
Department
Name of the
Districts /
Blocks
Component Activity Total Number
Command
Area/Irrig
ation
Potential
(Ha)
Period of
Implement
ation 5/ 7
Estimated
cost
(in Lakhs
Rs.)
Longitude Lattitude
MOA&FW Shahpura Har Khet Ko Pani
Diesel /
Electric /
SolarPump
1 1 5 0.25 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani Tube well 2 2 5 4.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani
Diesel /
Electric /
SolarPump
1 1 5 0.25 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani Tube well 1 1 5 2.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani
Diesel /
Electric /
SolarPump
1 1 5 0.25 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani Tube well 1 1 5 2.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani
Diesel /
Electric / SolarPump
2 2 5 0.50 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani Tube well 2 2 5 4.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani Diesel /
Electric /
SolarPump
5 5 5 1.25 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani Tube well 2 2 5 4.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani
Diesel /
Electric / SolarPump
1 1 5 0.25 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani Tube well 1 1 5 2.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani Diesel /
Electric /
SolarPump
2 2 5 0.50 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani Tube well 1 1 5 2.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani
Diesel /
Electric /
SolarPump
5 5 5 1.25 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani Tube well 5 5 5 10.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani
Diesel /
Electric / SolarPump
2 2 5 0.50 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani Tube well 2 2 5 4.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani Tube well 1 1 5 2.00 79°42'12.478"E 23°6'39.331"N
256
Concerned
Ministry/
Department
Name of the
Districts /
Blocks
Component Activity Total Number
Command
Area/Irrig
ation
Potential
(Ha)
Period of
Implement
ation 5/ 7
Estimated
cost
(in Lakhs
Rs.)
Longitude Lattitude
MOA&FW Shahpura Har Khet Ko Pani
Diesel /
Electric /
SolarPump
1 1 5 0.25 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani Tube well 2 2 5 4.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani
Diesel /
Electric /
SolarPump
2 2 5 0.50 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani Tube well 2 2 5 4.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani
Diesel /
Electric /
SolarPump
1 1 5 0.25 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani Tube well 1 1 5 2.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani
Diesel /
Electric / SolarPump
1 1 5 0.25 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani Tube well 1 1 5 2.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani Diesel /
Electric /
SolarPump
2 2 5 0.50 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani Tube well 2 2 5 4.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani
Diesel /
Electric / SolarPump
5 5 5 1.25 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani Tube well 2 2 5 4.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani Diesel /
Electric /
SolarPump
1 1 5 0.25 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani Tube well 1 1 5 2.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani
Diesel /
Electric /
SolarPump
2 2 5 0.50 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani Tube well 1 1 5 2.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani
Diesel /
Electric / SolarPump
5 5 5 1.25 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani Tube well 5 5 5 10.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani
Diesel /
Electric /
SolarPump
2 2 5 0.50 79°42'12.478"E 23°6'39.331"N
257
Concerned
Ministry/
Department
Name of the
Districts /
Blocks
Component Activity Total Number
Command
Area/Irrig
ation
Potential
(Ha)
Period of
Implement
ation 5/ 7
Estimated
cost
(in Lakhs
Rs.)
Longitude Lattitude
MOA&FW Shahpura Har Khet Ko Pani Tube well 2 2 5 4.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani Tube well 1 1 5 2.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani
Diesel /
Electric / SolarPump
1 1 5 0.25 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani Tube well 2 2 5 4.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani Diesel /
Electric /
SolarPump
2 2 5 0.50 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani Tube well 2 2 5 4.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani
Diesel /
Electric /
SolarPump
2 2 5 0.50 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani Tube well 2 2 5 4.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani
Diesel /
Electric / SolarPump
2 2 5 0.50 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani Tube well 2 2 5 4.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani
Diesel /
Electric /
SolarPump
5 5 5 1.25 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani Tube well 2 2 5 4.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani
Diesel /
Electric / SolarPump
1 1 5 0.25 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani Tube well 1 1 5 2.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani Diesel /
Electric /
SolarPump
2 2 5 0.50 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani Tube well 1 1 5 2.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani
Diesel /
Electric / SolarPump
5 5 5 1.25 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani Tube well 5 5 5 10.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani Diesel /
Electric /
SolarPump
2 2 5 0.50 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani Tube well 2 2 5 4.00 79°42'12.478"E 23°6'39.331"N
258
Concerned
Ministry/
Department
Name of the
Districts /
Blocks
Component Activity Total Number
Command
Area/Irrig
ation
Potential
(Ha)
Period of
Implement
ation 5/ 7
Estimated
cost
(in Lakhs
Rs.)
Longitude Lattitude
MOA&FW Shahpura Har Khet Ko Pani Tube well 1 1 5 2.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani Diesel /
Electric /
SolarPump
1 1 5 0.25 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani Tube well 2 2 5 4.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani
Diesel /
Electric /
SolarPump
2 2 5 0.50 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani Tube well 2 2 5 4.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani
Diesel /
Electric / SolarPump
2 2 5 0.50 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani Tube well 2 2 5 4.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani
Diesel /
Electric /
SolarPump
2 2 5 0.50 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani Tube well 2 2 5 4.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani
Diesel /
Electric /
SolarPump
1 1 5 0.25 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani Tube well 2 2 5 4.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani Diesel /
Electric /
SolarPump
2 2 5 0.50 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani Tube well 2 2 5 4.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani Tube well 1 1 5 2.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani Diesel /
Electric /
SolarPump
1 1 5 0.25 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani Tube well 2 2 5 4.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani
Diesel /
Electric / SolarPump
2 2 5 0.50 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani Tube well 2 2 5 4.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani Diesel /
Electric /
SolarPump
2 2 5 0.50 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani Tube well 2 2 5 4.00 79°42'12.478"E 23°6'39.331"N
259
Concerned
Ministry/
Department
Name of the
Districts /
Blocks
Component Activity Total Number
Command
Area/Irrig
ation
Potential
(Ha)
Period of
Implement
ation 5/ 7
Estimated
cost
(in Lakhs
Rs.)
Longitude Lattitude
MOA&FW Shahpura Har Khet Ko Pani
Diesel /
Electric /
SolarPump
2 2 5 0.50 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani Tube well 2 2 5 4.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani
Diesel /
Electric /
SolarPump
1 1 5 0.25 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani Tube well 2 2 5 4.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani
Diesel /
Electric /
SolarPump
2 2 5 0.50 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani Tube well 2 2 5 4.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani
Diesel /
Electric / SolarPump
1 1 5 0.25 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani Tube well 2 2 5 4.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani Diesel /
Electric /
SolarPump
1 1 5 0.25 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani Tube well 2 2 5 4.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani
Diesel /
Electric / SolarPump
2 2 5 0.50 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani Tube well 2 2 5 4.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani Diesel /
Electric /
SolarPump
1 1 5 0.25 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani Tube well 2 2 5 4.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani
Diesel /
Electric /
SolarPump
1 1 5 0.25 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani Tube well 2 2 5 4.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani
Diesel /
Electric / SolarPump
1 1 5 0.25 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani Tube well 2 2 5 4.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani
Diesel /
Electric /
SolarPump
2 2 5 0.50 79°42'12.478"E 23°6'39.331"N
260
Concerned
Ministry/
Department
Name of the
Districts /
Blocks
Component Activity Total Number
Command
Area/Irrig
ation
Potential
(Ha)
Period of
Implement
ation 5/ 7
Estimated
cost
(in Lakhs
Rs.)
Longitude Lattitude
MOA&FW Shahpura Har Khet Ko Pani Tube well 2 2 5 4.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani Diesel /
Electric /
SolarPump
1 1 5 0.25 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani Tube well 2 2 5 4.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani
Diesel /
Electric /
SolarPump
1 1 5 0.25 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani Tube well 2 2 5 4.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani
Diesel /
Electric / SolarPump
2 2 5 0.50 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani Tube well 2 2 5 4.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani
Diesel /
Electric /
SolarPump
1 1 5 0.25 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani Tube well 2 2 5 4.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani
Diesel /
Electric /
SolarPump
1 1 5 0.25 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani Tube well 2 2 5 4.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani Diesel /
Electric /
SolarPump
1 1 5 0.25 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani Tube well 2 2 5 4.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani Tube well 1 1 5 2.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani Diesel /
Electric /
SolarPump
1 1 5 0.25 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani Tube well 1 1 5 2.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani
Diesel /
Electric / SolarPump
1 1 5 0.25 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani Tube well 2 2 5 4.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani Diesel /
Electric /
SolarPump
2 2 5 0.50 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani Tube well 2 2 5 4.00 79°42'12.478"E 23°6'39.331"N
261
Concerned
Ministry/
Department
Name of the
Districts /
Blocks
Component Activity Total Number
Command
Area/Irrig
ation
Potential
(Ha)
Period of
Implement
ation 5/ 7
Estimated
cost
(in Lakhs
Rs.)
Longitude Lattitude
MOA&FW Shahpura Har Khet Ko Pani
Diesel /
Electric /
SolarPump
1 1 5 0.25 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani Tube well 2 2 5 4.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani
Diesel /
Electric /
SolarPump
1 1 5 0.25 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani Tube well 2 2 5 4.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani
Diesel /
Electric /
SolarPump
2 2 5 0.50 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani Tube well 2 2 5 4.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani
Diesel /
Electric / SolarPump
1 1 5 0.25 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani Tube well 2 2 5 4.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani Diesel /
Electric /
SolarPump
1 1 5 0.25 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani Tube well 2 2 5 4.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani
Diesel /
Electric / SolarPump
2 2 5 0.50 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani Tube well 2 2 5 4.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani Tube well 1 1 5 2.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani
Diesel /
Electric / SolarPump
1 1 5 0.25 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani Tube well 2 2 5 4.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani Diesel /
Electric /
SolarPump
2 2 5 0.50 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani Tube well 2 2 5 4.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani
Diesel /
Electric /
SolarPump
2 2 5 0.50 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani Tube well 2 2 5 4.00 79°42'12.478"E 23°6'39.331"N
262
Concerned
Ministry/
Department
Name of the
Districts /
Blocks
Component Activity Total Number
Command
Area/Irrig
ation
Potential
(Ha)
Period of
Implement
ation 5/ 7
Estimated
cost
(in Lakhs
Rs.)
Longitude Lattitude
MOA&FW Shahpura Har Khet Ko Pani
Diesel /
Electric /
SolarPump
2 2 5 0.50 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani Tube well 2 2 5 4.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani
Diesel /
Electric /
SolarPump
1 1 5 0.25 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani Tube well 2 2 5 4.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani
Diesel /
Electric /
SolarPump
2 2 5 0.50 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani Tube well 2 2 5 4.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani
Diesel /
Electric / SolarPump
1 1 5 0.25 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani Tube well 2 2 5 4.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani Diesel /
Electric /
SolarPump
1 1 5 0.25 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani Tube well 2 2 5 4.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani
Diesel /
Electric / SolarPump
2 2 5 0.50 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani Tube well 2 2 5 4.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani Diesel /
Electric /
SolarPump
1 1 5 0.25 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani Tube well 2 2 5 4.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani
Diesel /
Electric /
SolarPump
1 1 5 0.25 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani Tube well 2 2 5 4.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani
Diesel /
Electric / SolarPump
1 1 5 0.25 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani Tube well 2 2 5 4.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani
Diesel /
Electric /
SolarPump
2 2 5 0.50 79°42'12.478"E 23°6'39.331"N
263
Concerned
Ministry/
Department
Name of the
Districts /
Blocks
Component Activity Total Number
Command
Area/Irrig
ation
Potential
(Ha)
Period of
Implement
ation 5/ 7
Estimated
cost
(in Lakhs
Rs.)
Longitude Lattitude
MOA&FW Shahpura Har Khet Ko Pani Tube well 2 2 5 4.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani Diesel /
Electric /
SolarPump
1 1 5 0.25 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani Tube well 2 2 5 4.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani
Diesel /
Electric /
SolarPump
1 1 5 0.25 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani Tube well 2 2 5 4.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani
Diesel /
Electric / SolarPump
2 2 5 0.50 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani Tube well 2 2 5 4.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani
Diesel /
Electric /
SolarPump
1 1 5 0.25 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani Tube well 2 2 5 4.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani
Diesel /
Electric /
SolarPump
1 1 5 0.25 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani Tube well 2 2 5 4.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani Diesel /
Electric /
SolarPump
1 1 5 0.25 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani Tube well 2 2 5 4.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani Tube well 1 1 5 2.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani Diesel /
Electric /
SolarPump
1 1 5 0.25 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani Tube well 1 1 5 2.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani
Diesel /
Electric / SolarPump
1 1 5 0.25 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani Tube well 2 2 5 4.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani Diesel /
Electric /
SolarPump
2 2 5 0.50 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani Tube well 2 2 5 4.00 79°42'12.478"E 23°6'39.331"N
264
Concerned
Ministry/
Department
Name of the
Districts /
Blocks
Component Activity Total Number
Command
Area/Irrig
ation
Potential
(Ha)
Period of
Implement
ation 5/ 7
Estimated
cost
(in Lakhs
Rs.)
Longitude Lattitude
MOA&FW Shahpura Har Khet Ko Pani
Diesel /
Electric /
SolarPump
1 1 5 0.25 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani Tube well 2 2 5 4.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani
Diesel /
Electric /
SolarPump
1 1 5 0.25 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani Tube well 2 2 5 4.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani
Diesel /
Electric /
SolarPump
2 2 5 0.50 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani Tube well 2 2 5 4.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani
Diesel /
Electric / SolarPump
1 1 5 0.25 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani Tube well 2 2 5 4.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani Diesel /
Electric /
SolarPump
1 1 5 0.25 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani Tube well 2 2 5 4.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani Tube well 1 1 5 2.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani Diesel /
Electric /
SolarPump
1 1 5 0.25 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani Tube well 1 1 5 2.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani
Diesel /
Electric / SolarPump
1 1 5 0.25 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani Tube well 2 2 5 4.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani Diesel /
Electric /
SolarPump
1 1 5 0.25 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani Tube well 1 1 5 2.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani
Diesel /
Electric /
SolarPump
1 1 5 0.25 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani Tube well 1 1 5 2.00 79°42'12.478"E 23°6'39.331"N
265
Concerned
Ministry/
Department
Name of the
Districts /
Blocks
Component Activity Total Number
Command
Area/Irrig
ation
Potential
(Ha)
Period of
Implement
ation 5/ 7
Estimated
cost
(in Lakhs
Rs.)
Longitude Lattitude
MOA&FW Shahpura Har Khet Ko Pani
Diesel /
Electric /
SolarPump
1 1 5 0.25 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani Tube well 1 1 5 2.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani
Diesel /
Electric /
SolarPump
1 1 5 0.25 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani Tube well 1 1 5 2.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani
Diesel /
Electric /
SolarPump
1 1 5 0.25 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani Tube well 1 1 5 2.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani
Diesel /
Electric / SolarPump
1 1 5 0.25 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani Tube well 1 1 5 2.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani Diesel /
Electric /
SolarPump
1 1 5 0.25 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani Tube well 1 1 5 2.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani
Diesel /
Electric / SolarPump
2 2 5 0.50 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani Tube well 2 2 5 4.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani Diesel /
Electric /
SolarPump
2 2 5 0.50 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani Tube well 2 2 5 4.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani
Diesel /
Electric /
SolarPump
1 1 5 0.25 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani Tube well 2 2 5 4.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani
Diesel /
Electric / SolarPump
2 2 5 0.50 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani Tube well 2 2 5 4.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani
Diesel /
Electric /
SolarPump
1 1 5 0.25 79°42'12.478"E 23°6'39.331"N
266
Concerned
Ministry/
Department
Name of the
Districts /
Blocks
Component Activity Total Number
Command
Area/Irrig
ation
Potential
(Ha)
Period of
Implement
ation 5/ 7
Estimated
cost
(in Lakhs
Rs.)
Longitude Lattitude
MOA&FW Shahpura Har Khet Ko Pani Tube well 2 2 5 4.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani Diesel /
Electric /
SolarPump
1 1 5 0.25 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani Tube well 2 2 5 4.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani
Diesel /
Electric /
SolarPump
2 2 5 0.50 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani Tube well 2 2 5 4.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani
Diesel /
Electric / SolarPump
1 1 5 0.25 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani Tube well 2 2 5 4.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani
Diesel /
Electric /
SolarPump
1 1 5 0.25 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani Tube well 2 2 5 4.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani
Diesel /
Electric /
SolarPump
1 1 5 0.25 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani Tube well 2 2 5 4.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani Diesel /
Electric /
SolarPump
2 2 5 0.50 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani Tube well 2 2 5 4.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani
Diesel /
Electric / SolarPump
1 1 5 0.25 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani Tube well 2 2 5 4.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani Diesel /
Electric /
SolarPump
1 1 5 0.25 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani Tube well 2 2 5 4.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani
Diesel /
Electric /
SolarPump
2 2 5 0.50 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani Tube well 2 2 5 4.00 79°42'12.478"E 23°6'39.331"N
267
Concerned
Ministry/
Department
Name of the
Districts /
Blocks
Component Activity Total Number
Command
Area/Irrig
ation
Potential
(Ha)
Period of
Implement
ation 5/ 7
Estimated
cost
(in Lakhs
Rs.)
Longitude Lattitude
MOA&FW Shahpura Har Khet Ko Pani
Diesel /
Electric /
SolarPump
1 1 5 0.25 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani Tube well 2 2 5 4.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani
Diesel /
Electric /
SolarPump
1 1 5 0.25 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani Tube well 2 2 5 4.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani
Diesel /
Electric /
SolarPump
1 1 5 0.25 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani Tube well 2 2 5 4.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani Tube well 1 1 5 2.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani
Diesel /
Electric /
SolarPump
1 1 5 0.25 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani Tube well 1 1 5 2.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani
Diesel /
Electric /
SolarPump
1 1 5 0.25 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Har Khet Ko Pani Tube well 2 2 5 4.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Sprinkler 2 2 5 0.40 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Drip system 2 2 5 2.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Sprinkler 2 2 5 0.40 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Sprinkler 2 2 5 0.40 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Sprinkler 2 2 5 0.40 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Sprinkler 2 2 5 0.40 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Drip system 1 1 5 1.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Sprinkler 10 10 5 2.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Drip system 1 1 5 1.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Sprinkler 2 2 5 0.40 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Sprinkler 2 2 5 0.40 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Drip system 1 1 5 1.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Sprinkler 1 1 5 0.20 79°42'12.478"E 23°6'39.331"N
268
Concerned
Ministry/
Department
Name of the
Districts /
Blocks
Component Activity Total Number
Command
Area/Irrig
ation
Potential
(Ha)
Period of
Implement
ation 5/ 7
Estimated
cost
(in Lakhs
Rs.)
Longitude Lattitude
MOA&FW Shahpura Per Drop More Crop Sprinkler 1 1 5 0.20 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Sprinkler 2 2 5 0.40 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Sprinkler 10 10 5 2.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Drip system 2 2 5 2.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Sprinkler 5 5 5 1.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Drip system 1 1 5 1.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Sprinkler 2 2 5 0.40 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Drip system 2 2 5 2.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Sprinkler 2 2 5 0.40 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Sprinkler 2 2 5 0.40 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Sprinkler 2 2 5 0.40 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Sprinkler 2 2 5 0.40 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Drip system 1 1 5 1.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Sprinkler 10 10 5 2.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Drip system 1 1 5 1.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Sprinkler 2 2 5 0.40 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Sprinkler 2 2 5 0.40 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Drip system 1 1 5 1.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Sprinkler 10 10 5 2.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Drip system 2 2 5 2.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Sprinkler 2 2 5 0.40 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Drip system 1 1 5 1.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Sprinkler 1 1 5 0.20 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Sprinkler 2 2 5 0.40 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Drip system 1 1 5 1.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Sprinkler 5 5 5 1.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Drip system 2 2 5 2.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Sprinkler 2 2 5 0.40 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Sprinkler 2 2 5 0.40 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Sprinkler 2 2 5 0.40 79°42'12.478"E 23°6'39.331"N
269
Concerned
Ministry/
Department
Name of the
Districts /
Blocks
Component Activity Total Number
Command
Area/Irrig
ation
Potential
(Ha)
Period of
Implement
ation 5/ 7
Estimated
cost
(in Lakhs
Rs.)
Longitude Lattitude
MOA&FW Shahpura Per Drop More Crop Drip system 1 1 5 1.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Sprinkler 10 10 5 2.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Drip system 1 1 5 1.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Sprinkler 2 2 5 0.40 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Sprinkler 2 2 5 0.40 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Drip system 1 1 5 1.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Sprinkler 10 10 5 2.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Drip system 2 2 5 2.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Sprinkler 2 2 5 0.40 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Drip system 1 1 5 1.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Sprinkler 1 1 5 0.20 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Sprinkler 2 2 5 0.40 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Drip system 1 1 5 1.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Sprinkler 5 5 5 1.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Drip system 2 2 5 2.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Sprinkler 2 2 5 0.40 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Drip system 1 1 5 1.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Sprinkler 2 2 5 0.40 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Drip system 1 1 5 1.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Sprinkler 2 2 5 0.40 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Drip system 1 1 5 1.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Sprinkler 2 2 5 0.40 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Drip system 1 1 5 1.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Sprinkler 2 2 5 0.40 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Sprinkler 2 2 5 0.40 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Sprinkler 5 5 5 1.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Drip system 2 2 5 2.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Sprinkler 5 5 5 1.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Drip system 2 2 5 2.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Sprinkler 2 2 5 0.40 79°42'12.478"E 23°6'39.331"N
270
Concerned
Ministry/
Department
Name of the
Districts /
Blocks
Component Activity Total Number
Command
Area/Irrig
ation
Potential
(Ha)
Period of
Implement
ation 5/ 7
Estimated
cost
(in Lakhs
Rs.)
Longitude Lattitude
MOA&FW Shahpura Per Drop More Crop Sprinkler 2 2 5 0.40 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Sprinkler 1 1 5 0.20 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Sprinkler 1 1 5 0.20 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Sprinkler 2 2 5 0.40 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Sprinkler 10 10 5 2.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Drip system 2 2 5 2.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Sprinkler 5 5 5 1.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Drip system 1 1 5 1.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Sprinkler 2 2 5 0.40 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Drip system 2 2 5 2.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Sprinkler 2 2 5 0.40 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Sprinkler 2 2 5 0.40 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Sprinkler 2 2 5 0.40 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Sprinkler 5 5 5 1.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Drip system 2 2 5 2.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Sprinkler 5 5 5 1.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Drip system 2 2 5 2.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Sprinkler 2 2 5 0.40 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Sprinkler 2 2 5 0.40 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Sprinkler 1 1 5 0.20 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Sprinkler 1 1 5 0.20 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Sprinkler 2 2 5 0.40 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Sprinkler 10 10 5 2.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Drip system 2 2 5 2.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Sprinkler 5 5 5 1.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Drip system 1 1 5 1.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Sprinkler 2 2 5 0.40 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Drip system 2 2 5 2.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Sprinkler 2 2 5 0.40 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Sprinkler 2 2 5 0.40 79°42'12.478"E 23°6'39.331"N
271
Concerned
Ministry/
Department
Name of the
Districts /
Blocks
Component Activity Total Number
Command
Area/Irrig
ation
Potential
(Ha)
Period of
Implement
ation 5/ 7
Estimated
cost
(in Lakhs
Rs.)
Longitude Lattitude
MOA&FW Shahpura Per Drop More Crop Sprinkler 2 2 5 0.40 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Sprinkler 2 2 5 0.40 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Drip system 1 1 5 1.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Sprinkler 10 10 5 2.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Drip system 1 1 5 1.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Sprinkler 2 2 5 0.40 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Sprinkler 2 2 5 0.40 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Drip system 1 1 5 1.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Sprinkler 1 1 5 0.20 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Sprinkler 1 1 5 0.20 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Sprinkler 2 2 5 0.40 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Sprinkler 10 10 5 2.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Drip system 2 2 5 2.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Sprinkler 5 5 5 1.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Drip system 1 1 5 1.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Sprinkler 2 2 5 0.40 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Drip system 2 2 5 2.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Sprinkler 2 2 5 0.40 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Sprinkler 2 2 5 0.40 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Sprinkler 2 2 5 0.40 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Sprinkler 2 2 5 0.40 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Drip system 1 1 5 1.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Sprinkler 10 10 5 2.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Drip system 1 1 5 1.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Sprinkler 2 2 5 0.40 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Sprinkler 2 2 5 0.40 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Drip system 1 1 5 1.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Sprinkler 10 10 5 2.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Drip system 2 2 5 2.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Sprinkler 2 2 5 0.40 79°42'12.478"E 23°6'39.331"N
272
Concerned
Ministry/
Department
Name of the
Districts /
Blocks
Component Activity Total Number
Command
Area/Irrig
ation
Potential
(Ha)
Period of
Implement
ation 5/ 7
Estimated
cost
(in Lakhs
Rs.)
Longitude Lattitude
MOA&FW Shahpura Per Drop More Crop Drip system 1 1 5 1.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Sprinkler 1 1 5 0.20 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Sprinkler 2 2 5 0.40 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Drip system 1 1 5 1.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Sprinkler 5 5 5 1.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Drip system 2 2 5 2.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Sprinkler 2 2 5 0.40 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Sprinkler 2 2 5 0.40 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Sprinkler 2 2 5 0.40 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Drip system 1 1 5 1.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Sprinkler 10 10 5 2.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Drip system 1 1 5 1.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Sprinkler 2 2 5 0.40 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Sprinkler 2 2 5 0.40 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Drip system 1 1 5 1.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Sprinkler 10 10 5 2.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Drip system 2 2 5 2.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Sprinkler 2 2 5 0.40 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Drip system 1 1 5 1.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Sprinkler 1 1 5 0.20 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Sprinkler 2 2 5 0.40 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Drip system 1 1 5 1.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Sprinkler 5 5 5 1.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Drip system 2 2 5 2.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Sprinkler 2 2 5 0.40 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Drip system 1 1 5 1.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Sprinkler 2 2 5 0.40 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Drip system 1 1 5 1.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Sprinkler 10 10 5 2.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Drip system 1 1 5 1.00 79°42'12.478"E 23°6'39.331"N
273
Concerned
Ministry/
Department
Name of the
Districts /
Blocks
Component Activity Total Number
Command
Area/Irrig
ation
Potential
(Ha)
Period of
Implement
ation 5/ 7
Estimated
cost
(in Lakhs
Rs.)
Longitude Lattitude
MOA&FW Shahpura Per Drop More Crop Sprinkler 2 2 5 0.40 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Sprinkler 2 2 5 0.40 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Drip system 1 1 5 1.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Sprinkler 10 10 5 2.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Drip system 2 2 5 2.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Sprinkler 2 2 5 0.40 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Drip system 1 1 5 1.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Sprinkler 1 1 5 0.20 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Sprinkler 2 2 5 0.40 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Drip system 1 1 5 1.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Sprinkler 5 5 5 1.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Drip system 2 2 5 2.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Sprinkler 2 2 5 0.40 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Drip system 1 1 5 1.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Sprinkler 2 2 5 0.40 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Drip system 1 1 5 1.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Sprinkler 2 2 5 0.40 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Sprinkler 2 2 5 0.40 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Drip system 1 1 5 1.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Sprinkler 1 1 5 0.20 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Sprinkler 2 2 5 0.40 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Drip system 1 1 5 1.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Sprinkler 5 5 5 1.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Drip system 2 2 5 2.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Sprinkler 2 2 5 0.40 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Drip system 1 1 5 1.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Sprinkler 2 2 5 0.40 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Drip system 1 1 5 1.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Sprinkler 2 2 5 0.40 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Sprinkler 3 3 5 0.60 79°42'12.478"E 23°6'39.331"N
274
Concerned
Ministry/
Department
Name of the
Districts /
Blocks
Component Activity Total Number
Command
Area/Irrig
ation
Potential
(Ha)
Period of
Implement
ation 5/ 7
Estimated
cost
(in Lakhs
Rs.)
Longitude Lattitude
MOA&FW Shahpura Per Drop More Crop Drip system 1 1 5 1.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Sprinkler 3 3 5 0.60 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Drip system 1 1 5 1.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Sprinkler 2 2 5 0.40 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Sprinkler 5 5 5 1.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Drip system 2 2 5 2.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Sprinkler 1 1 5 0.20 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Sprinkler 1 1 5 0.20 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Sprinkler 2 2 5 0.40 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Sprinkler 3 3 5 0.60 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Drip system 1 1 5 1.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Sprinkler 3 3 5 0.60 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Drip system 1 1 5 1.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Sprinkler 2 2 5 0.40 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Sprinkler 5 5 5 1.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Drip system 2 2 5 2.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Sprinkler 1 1 5 0.20 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Sprinkler 1 1 5 0.20 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Sprinkler 2 2 5 0.40 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Sprinkler 1 1 5 0.20 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Sprinkler 1 1 5 0.20 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Sprinkler 2 2 5 0.40 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Sprinkler 3 3 5 0.60 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Drip system 1 1 5 1.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Sprinkler 3 3 5 0.60 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Drip system 1 1 5 1.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Sprinkler 2 2 5 0.40 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Sprinkler 5 5 5 1.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Drip system 2 2 5 2.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Sprinkler 1 1 5 0.20 79°42'12.478"E 23°6'39.331"N
275
Concerned
Ministry/
Department
Name of the
Districts /
Blocks
Component Activity Total Number
Command
Area/Irrig
ation
Potential
(Ha)
Period of
Implement
ation 5/ 7
Estimated
cost
(in Lakhs
Rs.)
Longitude Lattitude
MOA&FW Shahpura Per Drop More Crop Sprinkler 1 1 5 0.20 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Sprinkler 2 2 5 0.40 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Drip system 1 1 5 1.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Sprinkler 1 1 5 0.20 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Sprinkler 2 2 5 0.40 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Drip system 1 1 5 1.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Sprinkler 5 5 5 1.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Drip system 2 2 5 2.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Sprinkler 2 2 5 0.40 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Drip system 1 1 5 1.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Sprinkler 2 2 5 0.40 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Drip system 1 1 5 1.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Sprinkler 2 2 5 0.40 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Sprinkler 3 3 5 0.60 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Drip system 1 1 5 1.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Sprinkler 3 3 5 0.60 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Drip system 1 1 5 1.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Sprinkler 2 2 5 0.40 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Sprinkler 5 5 5 1.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Drip system 2 2 5 2.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Sprinkler 1 1 5 0.20 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Sprinkler 1 1 5 0.20 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Sprinkler 2 2 5 0.40 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Sprinkler 3 3 5 0.60 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Drip system 1 1 5 1.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Sprinkler 3 3 5 0.60 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Drip system 1 1 5 1.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Sprinkler 2 2 5 0.40 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Sprinkler 5 5 5 1.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Drip system 2 2 5 2.00 79°42'12.478"E 23°6'39.331"N
276
Concerned
Ministry/
Department
Name of the
Districts /
Blocks
Component Activity Total Number
Command
Area/Irrig
ation
Potential
(Ha)
Period of
Implement
ation 5/ 7
Estimated
cost
(in Lakhs
Rs.)
Longitude Lattitude
MOA&FW Shahpura Per Drop More Crop Sprinkler 1 1 5 0.20 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Sprinkler 1 1 5 0.20 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Sprinkler 2 2 5 0.40 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Sprinkler 1 1 5 0.20 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Sprinkler 1 1 5 0.20 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Sprinkler 2 2 5 0.40 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Sprinkler 3 3 5 0.60 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Drip system 1 1 5 1.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Sprinkler 3 3 5 0.60 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Drip system 1 1 5 1.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Sprinkler 2 2 5 0.40 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Sprinkler 5 5 5 1.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Drip system 2 2 5 2.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Sprinkler 1 1 5 0.20 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Sprinkler 1 1 5 0.20 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Sprinkler 1 1 5 0.20 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Sprinkler 1 1 5 0.20 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Sprinkler 2 2 5 0.40 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Sprinkler 1 1 5 0.20 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Sprinkler 1 1 5 0.20 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Sprinkler 1 1 5 0.20 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Sprinkler 1 1 5 0.20 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Sprinkler 1 1 5 0.20 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Sprinkler 5 5 5 1.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Drip system 1 1 5 1.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Sprinkler 1 1 5 0.20 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Sprinkler 2 2 5 0.40 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Drip system 1 1 5 1.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Sprinkler 2 2 5 0.40 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Drip system 1 1 5 1.00 79°42'12.478"E 23°6'39.331"N
277
Concerned
Ministry/
Department
Name of the
Districts /
Blocks
Component Activity Total Number
Command
Area/Irrig
ation
Potential
(Ha)
Period of
Implement
ation 5/ 7
Estimated
cost
(in Lakhs
Rs.)
Longitude Lattitude
MOA&FW Shahpura Per Drop More Crop Sprinkler 2 2 5 0.40 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Sprinkler 3 3 5 0.60 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Drip system 1 1 5 1.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Sprinkler 3 3 5 0.60 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Drip system 1 1 5 1.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Sprinkler 2 2 5 0.40 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Sprinkler 5 5 5 1.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Drip system 2 2 5 2.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Sprinkler 1 1 5 0.20 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Sprinkler 1 1 5 0.20 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Sprinkler 2 2 5 0.40 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Sprinkler 3 3 5 0.60 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Drip system 1 1 5 1.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Sprinkler 3 3 5 0.60 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Drip system 1 1 5 1.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Sprinkler 2 2 5 0.40 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Sprinkler 5 5 5 1.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Drip system 2 2 5 2.00 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Sprinkler 1 1 5 0.20 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Sprinkler 1 1 5 0.20 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Sprinkler 2 2 5 0.40 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Sprinkler 1 1 5 0.20 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Sprinkler 1 1 5 0.20 79°42'12.478"E 23°6'39.331"N
MOA&FW Shahpura Per Drop More Crop Sprinkler 2 2 5 0.40 79°42'12.478"E 23°6'39.331"N
MOA&FW Sihora Har Khet Ko Pani
Diesel /
Electric /
SolarPump
18 18 5 4.50 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani Tube well 10 10 5 20.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani
Diesel /
Electric / SolarPump
30 30 5 7.50 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani Tube well 8 8 5 16.00 80°8'48.846"E 23°24'49.808"N
278
Concerned
Ministry/
Department
Name of the
Districts /
Blocks
Component Activity Total Number
Command
Area/Irrig
ation
Potential
(Ha)
Period of
Implement
ation 5/ 7
Estimated
cost
(in Lakhs
Rs.)
Longitude Lattitude
MOA&FW Sihora Har Khet Ko Pani
Diesel /
Electric /
SolarPump
18 18 5 4.50 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani Tube well 12 12 5 24.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani
Diesel /
Electric /
SolarPump
38 38 5 9.50 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani Tube well 8 8 5 16.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani Tube well 6 6 5 12.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani
Diesel /
Electric / SolarPump
25 25 5 6.25 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani Tube well 8 8 5 16.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani
Diesel /
Electric /
SolarPump
31 31 5 7.75 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani Tube well 8 8 5 16.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani Tube well 6 6 5 12.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani
Diesel /
Electric /
SolarPump
25 25 5 6.25 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani Tube well 6 6 5 12.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani
Diesel /
Electric / SolarPump
26 26 5 6.50 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani Tube well 8 8 5 16.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani Diesel /
Electric /
SolarPump
20 20 5 5.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani Tube well 5 5 5 10.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani
Diesel /
Electric / SolarPump
18 18 5 4.50 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani Tube well 5 5 5 10.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani Tube well 5 5 5 10.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani
Diesel /
Electric / SolarPump
32 32 5 8.00 80°8'48.846"E 23°24'49.808"N
279
Concerned
Ministry/
Department
Name of the
Districts /
Blocks
Component Activity Total Number
Command
Area/Irrig
ation
Potential
(Ha)
Period of
Implement
ation 5/ 7
Estimated
cost
(in Lakhs
Rs.)
Longitude Lattitude
MOA&FW Sihora Har Khet Ko Pani Tube well 10 10 5 20.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani Diesel /
Electric /
SolarPump
18 18 5 4.50 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani Tube well 5 5 5 10.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani Tube well 4 4 5 8.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani Diesel /
Electric /
SolarPump
40 40 5 10.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani Tube well 15 15 5 30.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani
Diesel /
Electric /
SolarPump
21 21 5 5.25 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani Tube well 6 6 5 12.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani
Diesel /
Electric / SolarPump
35 35 5 8.75 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani Tube well 8 8 5 16.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani
Diesel /
Electric /
SolarPump
36 36 5 9.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani Tube well 7 7 5 14.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani
Diesel /
Electric / SolarPump
36 36 5 9.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani Tube well 5 5 5 10.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani Diesel /
Electric /
SolarPump
32 32 5 8.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani Tube well 4 4 5 8.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani
Diesel /
Electric / SolarPump
32 32 5 8.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani Tube well 8 8 5 16.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani Tube well 12 12 5 24.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani
Diesel /
Electric / SolarPump
20 20 5 5.00 80°8'48.846"E 23°24'49.808"N
280
Concerned
Ministry/
Department
Name of the
Districts /
Blocks
Component Activity Total Number
Command
Area/Irrig
ation
Potential
(Ha)
Period of
Implement
ation 5/ 7
Estimated
cost
(in Lakhs
Rs.)
Longitude Lattitude
MOA&FW Sihora Har Khet Ko Pani Tube well 8 8 5 16.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani Diesel /
Electric /
SolarPump
18 18 5 4.50 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani Tube well 4 4 5 8.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani
Diesel /
Electric /
SolarPump
28 28 5 7.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani Tube well 12 12 5 24.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani
Diesel /
Electric / SolarPump
34 34 5 8.50 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani Tube well 8 8 5 16.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani
Diesel /
Electric /
SolarPump
18 18 5 4.50 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani Tube well 5 5 5 10.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani
Diesel /
Electric /
SolarPump
32 32 5 8.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani Tube well 12 12 5 24.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani Tube well 2 2 5 4.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani Tube well 1 1 5 2.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani Tube well 4 4 5 8.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani Diesel /
Electric /
SolarPump
20 20 5 5.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani Tube well 6 6 5 12.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani
Diesel /
Electric /
SolarPump
28 28 5 7.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani Tube well 8 8 5 16.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani
Diesel /
Electric / SolarPump
18 18 5 4.50 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani Tube well 4 4 5 8.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani Diesel /
Electric / 25 25 5 6.25 80°8'48.846"E 23°24'49.808"N
281
Concerned
Ministry/
Department
Name of the
Districts /
Blocks
Component Activity Total Number
Command
Area/Irrig
ation
Potential
(Ha)
Period of
Implement
ation 5/ 7
Estimated
cost
(in Lakhs
Rs.)
Longitude Lattitude
SolarPump
MOA&FW Sihora Har Khet Ko Pani Tube well 6 6 5 12.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani Tube well 6 6 5 12.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani Tube well 10 10 5 20.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani Tube well 6 6 5 12.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani
Diesel /
Electric /
SolarPump
18 18 5 4.50 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani Tube well 5 5 5 10.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani
Diesel /
Electric / SolarPump
20 20 5 5.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani Tube well 5 5 5 10.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani Tube well 4 4 5 8.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani Tube well 4 4 5 8.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani
Diesel /
Electric /
SolarPump
18 18 5 4.50 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani Tube well 4 4 5 8.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani
Diesel /
Electric / SolarPump
25 25 5 6.25 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani Tube well 8 8 5 16.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani Diesel /
Electric /
SolarPump
28 28 5 7.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani Tube well 12 12 5 24.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani
Diesel /
Electric / SolarPump
32 32 5 8.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani Tube well 8 8 5 16.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani Diesel /
Electric /
SolarPump
22 22 5 5.50 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani Tube well 8 8 5 16.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani Tube well 4 4 5 8.00 80°8'48.846"E 23°24'49.808"N
282
Concerned
Ministry/
Department
Name of the
Districts /
Blocks
Component Activity Total Number
Command
Area/Irrig
ation
Potential
(Ha)
Period of
Implement
ation 5/ 7
Estimated
cost
(in Lakhs
Rs.)
Longitude Lattitude
MOA&FW Sihora Har Khet Ko Pani
Diesel /
Electric /
SolarPump
28 28 5 7.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani Tube well 6 6 5 12.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani
Diesel /
Electric /
SolarPump
18 18 5 4.50 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani Tube well 4 4 5 8.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani Tube well 4 4 5 8.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani
Diesel /
Electric / SolarPump
18 18 5 4.50 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani Tube well 5 5 5 10.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani Tube well 4 4 5 8.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani
Diesel /
Electric / SolarPump
28 28 5 7.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani Tube well 10 10 5 20.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani
Diesel /
Electric /
SolarPump
25 25 5 6.25 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani Tube well 8 8 5 16.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani Tube well 4 4 5 8.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani
Diesel /
Electric /
SolarPump
28 28 5 7.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani Tube well 8 8 5 16.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani
Diesel /
Electric / SolarPump
28 28 5 7.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani Tube well 8 8 5 16.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani Diesel /
Electric /
SolarPump
18 18 5 4.50 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani Tube well 6 6 5 12.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani
Diesel /
Electric / SolarPump
28 28 5 7.00 80°8'48.846"E 23°24'49.808"N
283
Concerned
Ministry/
Department
Name of the
Districts /
Blocks
Component Activity Total Number
Command
Area/Irrig
ation
Potential
(Ha)
Period of
Implement
ation 5/ 7
Estimated
cost
(in Lakhs
Rs.)
Longitude Lattitude
MOA&FW Sihora Har Khet Ko Pani Tube well 7 7 5 14.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani Diesel /
Electric /
SolarPump
40 40 5 10.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani Tube well 12 12 5 24.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani Tube well 4 4 5 8.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani Tube well 2 2 5 4.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani
Diesel /
Electric / SolarPump
28 28 5 7.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani Tube well 8 8 5 16.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani Diesel /
Electric /
SolarPump
36 36 5 9.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani Tube well 7 7 5 14.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani
Diesel /
Electric /
SolarPump
18 18 5 4.50 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani Tube well 4 4 5 8.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani Diesel /
Electric /
SolarPump
28 28 5 7.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani Tube well 7 7 5 14.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani
Diesel /
Electric /
SolarPump
28 28 5 7.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani Tube well 8 8 5 16.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani
Diesel /
Electric / SolarPump
24 24 5 6.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani Tube well 5 5 5 10.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani Tube well 5 5 5 10.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani Tube well 4 4 5 8.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani
Diesel /
Electric /
SolarPump
22 22 5 5.50 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani Tube well 5 5 5 10.00 80°8'48.846"E 23°24'49.808"N
284
Concerned
Ministry/
Department
Name of the
Districts /
Blocks
Component Activity Total Number
Command
Area/Irrig
ation
Potential
(Ha)
Period of
Implement
ation 5/ 7
Estimated
cost
(in Lakhs
Rs.)
Longitude Lattitude
MOA&FW Sihora Har Khet Ko Pani Tube well 4 4 5 8.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani Tube well 4 4 5 8.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani Tube well 8 8 5 16.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani Diesel /
Electric /
SolarPump
18 18 5 4.50 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani Tube well 4 4 5 8.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani
Diesel /
Electric / SolarPump
18 18 5 4.50 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani Tube well 4 4 5 8.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani Tube well 2 2 5 4.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani
Diesel /
Electric / SolarPump
18 18 5 4.50 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani Tube well 4 4 5 8.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani Tube well 4 4 5 8.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani Tube well 12 12 5 24.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani Tube well 12 12 5 24.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani
Diesel /
Electric / SolarPump
25 25 5 6.25 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani Tube well 15 15 5 30.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani Tube well 8 8 5 16.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani Tube well 8 8 5 16.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani
Diesel /
Electric /
SolarPump
22 22 5 5.50 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani Tube well 6 6 5 12.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani Tube well 12 12 5 24.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani
Diesel /
Electric /
SolarPump
18 18 5 4.50 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani Tube well 8 8 5 16.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani Diesel /
Electric / 18 18 5 4.50 80°8'48.846"E 23°24'49.808"N
285
Concerned
Ministry/
Department
Name of the
Districts /
Blocks
Component Activity Total Number
Command
Area/Irrig
ation
Potential
(Ha)
Period of
Implement
ation 5/ 7
Estimated
cost
(in Lakhs
Rs.)
Longitude Lattitude
SolarPump
MOA&FW Sihora Har Khet Ko Pani Tube well 6 6 5 12.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani
Diesel /
Electric / SolarPump
28 28 5 7.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani Tube well 8 8 5 16.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani Tube well 4 4 5 8.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani
Diesel /
Electric / SolarPump
28 28 5 7.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani Tube well 8 8 5 16.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani Tube well 4 4 5 8.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani
Diesel /
Electric / SolarPump
25 25 5 6.25 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani Tube well 7 7 5 14.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani Diesel /
Electric /
SolarPump
18 18 5 4.50 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani Tube well 6 6 5 12.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani
Diesel /
Electric /
SolarPump
18 18 5 4.50 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani Tube well 5 5 5 10.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani Diesel /
Electric /
SolarPump
18 18 5 4.50 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani Tube well 8 8 5 16.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani
Diesel /
Electric /
SolarPump
21 21 5 5.25 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani Tube well 5 5 5 10.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani Tube well 4 4 5 8.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani
Diesel /
Electric /
SolarPump
18 18 5 4.50 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani Tube well 12 12 5 24.00 80°8'48.846"E 23°24'49.808"N
286
Concerned
Ministry/
Department
Name of the
Districts /
Blocks
Component Activity Total Number
Command
Area/Irrig
ation
Potential
(Ha)
Period of
Implement
ation 5/ 7
Estimated
cost
(in Lakhs
Rs.)
Longitude Lattitude
MOA&FW Sihora Har Khet Ko Pani Tube well 4 4 5 8.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani Diesel /
Electric /
SolarPump
18 18 5 4.50 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani Tube well 5 5 5 10.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani
Diesel /
Electric /
SolarPump
22 22 5 5.50 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani Tube well 4 4 5 8.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani Farm Pond 1 2 5 2.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani
Diesel /
Electric /
SolarPump
28 28 5 7.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani Tube well 8 8 5 16.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani Tube well 2 2 5 4.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani
Diesel /
Electric /
SolarPump
18 18 5 4.50 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani Tube well 4 4 5 8.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani Diesel /
Electric /
SolarPump
18 18 5 4.50 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani Tube well 4 4 5 8.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani
Diesel /
Electric /
SolarPump
18 18 5 4.50 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani Tube well 6 6 5 12.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani Tube well 4 4 5 8.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani
Diesel /
Electric /
SolarPump
18 18 5 4.50 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani Tube well 4 4 5 8.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani
Diesel /
Electric / SolarPump
18 18 5 4.50 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani Tube well 4 4 5 8.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani Tube well 4 4 5 8.00 80°8'48.846"E 23°24'49.808"N
287
Concerned
Ministry/
Department
Name of the
Districts /
Blocks
Component Activity Total Number
Command
Area/Irrig
ation
Potential
(Ha)
Period of
Implement
ation 5/ 7
Estimated
cost
(in Lakhs
Rs.)
Longitude Lattitude
MOA&FW Sihora Har Khet Ko Pani Tube well 4 4 5 8.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani Diesel /
Electric /
SolarPump
18 18 5 4.50 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani Tube well 5 5 5 10.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani
Diesel /
Electric /
SolarPump
45 45 5 11.25 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani Tube well 12 12 5 24.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani
Diesel /
Electric / SolarPump
18 18 5 4.50 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani Tube well 8 8 5 16.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani
Diesel /
Electric /
SolarPump
28 28 5 7.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani Tube well 8 8 5 16.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani
Diesel /
Electric /
SolarPump
22 22 5 5.50 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani Tube well 4 4 5 8.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani Diesel /
Electric /
SolarPump
20 20 5 5.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani Tube well 5 5 5 10.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani
Diesel /
Electric / SolarPump
18 18 5 4.50 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani Tube well 6 6 5 12.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani Diesel /
Electric /
SolarPump
32 32 5 8.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani Tube well 8 8 5 16.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani
Diesel /
Electric /
SolarPump
18 18 5 4.50 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani Tube well 4 4 5 8.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani Diesel / 29 29 5 7.25 80°8'48.846"E 23°24'49.808"N
288
Concerned
Ministry/
Department
Name of the
Districts /
Blocks
Component Activity Total Number
Command
Area/Irrig
ation
Potential
(Ha)
Period of
Implement
ation 5/ 7
Estimated
cost
(in Lakhs
Rs.)
Longitude Lattitude
Electric /
SolarPump
MOA&FW Sihora Har Khet Ko Pani Tube well 6 6 5 12.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani Tube well 4 4 5 8.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani Tube well 4 4 5 8.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani
Diesel /
Electric / SolarPump
28 28 5 7.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani Tube well 5 5 5 10.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani Tube well 5 5 5 10.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani
Diesel /
Electric / SolarPump
36 36 5 9.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani Tube well 8 8 5 16.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani Tube well 4 4 5 8.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani
Diesel /
Electric / SolarPump
22 22 5 5.50 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani Tube well 6 6 5 12.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani Diesel /
Electric /
SolarPump
28 28 5 7.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani Tube well 6 6 5 12.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani
Diesel /
Electric / SolarPump
21 21 5 5.25 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani Tube well 5 5 5 10.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani Diesel /
Electric /
SolarPump
18 18 5 4.50 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani Tube well 4 4 5 8.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani
Diesel /
Electric /
SolarPump
18 18 5 4.50 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani Tube well 4 4 5 8.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani
Diesel /
Electric / SolarPump
24 24 5 6.00 80°8'48.846"E 23°24'49.808"N
289
Concerned
Ministry/
Department
Name of the
Districts /
Blocks
Component Activity Total Number
Command
Area/Irrig
ation
Potential
(Ha)
Period of
Implement
ation 5/ 7
Estimated
cost
(in Lakhs
Rs.)
Longitude Lattitude
MOA&FW Sihora Har Khet Ko Pani Tube well 6 6 5 12.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani Tube well 4 4 5 8.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani
Diesel /
Electric / SolarPump
22 22 5 5.50 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani Tube well 6 6 5 12.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani Diesel /
Electric /
SolarPump
22 22 5 5.50 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani Tube well 5 5 5 10.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani
Diesel /
Electric /
SolarPump
30 30 5 7.50 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani Tube well 7 7 5 14.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani Tube well 4 4 5 8.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani
Diesel /
Electric /
SolarPump
18 18 5 4.50 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani Tube well 4 4 5 8.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani Diesel /
Electric /
SolarPump
26 26 5 6.50 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani Tube well 7 7 5 14.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani
Diesel /
Electric /
SolarPump
28 28 5 7.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani Tube well 5 5 5 10.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani
Diesel /
Electric / SolarPump
18 18 5 4.50 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani Tube well 6 6 5 12.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani Diesel /
Electric /
SolarPump
28 28 5 7.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani Tube well 8 8 5 16.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani
Diesel /
Electric / SolarPump
18 18 5 4.50 80°8'48.846"E 23°24'49.808"N
290
Concerned
Ministry/
Department
Name of the
Districts /
Blocks
Component Activity Total Number
Command
Area/Irrig
ation
Potential
(Ha)
Period of
Implement
ation 5/ 7
Estimated
cost
(in Lakhs
Rs.)
Longitude Lattitude
MOA&FW Sihora Har Khet Ko Pani Tube well 4 4 5 8.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani Diesel /
Electric /
SolarPump
22 22 5 5.50 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani Tube well 7 7 5 14.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani
Diesel /
Electric /
SolarPump
12 12 5 3.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani Tube well 4 4 5 8.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani
Diesel /
Electric / SolarPump
12 12 5 3.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani Tube well 3 3 5 6.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani
Diesel /
Electric /
SolarPump
18 18 5 4.50 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani Tube well 4 4 5 8.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani
Diesel /
Electric /
SolarPump
16 16 5 4.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani Tube well 5 5 5 10.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani Diesel /
Electric /
SolarPump
28 28 5 7.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani Tube well 8 8 5 16.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani
Diesel /
Electric / SolarPump
18 18 5 4.50 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani Tube well 4 4 5 8.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani Diesel /
Electric /
SolarPump
28 28 5 7.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Har Khet Ko Pani Tube well 5 5 5 10.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Per Drop More Crop Sprinkler 15 15 5 3.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Per Drop More Crop Sprinkler 25 25 5 5.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Per Drop More Crop Sprinkler 35 35 5 7.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Per Drop More Crop Drip system 1 1 5 1.00 80°8'48.846"E 23°24'49.808"N
291
Concerned
Ministry/
Department
Name of the
Districts /
Blocks
Component Activity Total Number
Command
Area/Irrig
ation
Potential
(Ha)
Period of
Implement
ation 5/ 7
Estimated
cost
(in Lakhs
Rs.)
Longitude Lattitude
MOA&FW Sihora Per Drop More Crop Sprinkler 35 35 5 7.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Per Drop More Crop Sprinkler 15 15 5 3.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Per Drop More Crop Sprinkler 28 28 5 5.60 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Per Drop More Crop Sprinkler 36 36 5 7.20 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Per Drop More Crop Drip system 1 1 5 1.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Per Drop More Crop Sprinkler 18 18 5 3.60 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Per Drop More Crop Sprinkler 18 18 5 3.60 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Per Drop More Crop Sprinkler 38 38 5 7.60 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Per Drop More Crop Drip system 2 2 5 2.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Per Drop More Crop Sprinkler 15 15 5 3.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Per Drop More Crop Sprinkler 12 12 5 2.40 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Per Drop More Crop Sprinkler 15 15 5 3.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Per Drop More Crop Sprinkler 35 35 5 7.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Per Drop More Crop Sprinkler 15 15 5 3.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Per Drop More Crop Sprinkler 18 18 5 3.60 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Per Drop More Crop Sprinkler 35 35 5 7.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Per Drop More Crop Drip system 1 1 5 1.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Per Drop More Crop Sprinkler 16 16 5 3.20 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Per Drop More Crop Sprinkler 38 38 5 7.60 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Per Drop More Crop Drip system 1 1 5 1.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Per Drop More Crop Sprinkler 35 35 5 7.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Per Drop More Crop Sprinkler 32 32 5 6.40 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Per Drop More Crop Sprinkler 30 30 5 6.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Per Drop More Crop Sprinkler 32 32 5 6.40 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Per Drop More Crop Sprinkler 45 45 5 9.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Per Drop More Crop Drip system 1 1 5 1.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Per Drop More Crop Sprinkler 25 25 5 5.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Per Drop More Crop Sprinkler 22 22 5 4.40 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Per Drop More Crop Sprinkler 32 32 5 6.40 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Per Drop More Crop Drip system 1 1 5 1.00 80°8'48.846"E 23°24'49.808"N
292
Concerned
Ministry/
Department
Name of the
Districts /
Blocks
Component Activity Total Number
Command
Area/Irrig
ation
Potential
(Ha)
Period of
Implement
ation 5/ 7
Estimated
cost
(in Lakhs
Rs.)
Longitude Lattitude
MOA&FW Sihora Per Drop More Crop Sprinkler 38 38 5 7.60 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Per Drop More Crop Drip system 1 1 5 1.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Per Drop More Crop Sprinkler 15 15 5 3.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Per Drop More Crop Sprinkler 38 38 5 7.60 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Per Drop More Crop Drip system 1 1 5 1.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Per Drop More Crop Sprinkler 12 12 5 2.40 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Per Drop More Crop Drip system 1 1 5 1.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Per Drop More Crop Sprinkler 8 8 5 1.60 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Per Drop More Crop Sprinkler 8 8 5 1.60 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Per Drop More Crop Sprinkler 18 18 5 3.60 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Per Drop More Crop Sprinkler 36 36 5 7.20 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Per Drop More Crop Sprinkler 12 12 5 2.40 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Per Drop More Crop Sprinkler 32 32 5 6.40 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Per Drop More Crop Drip system 1 1 5 1.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Per Drop More Crop Sprinkler 15 15 5 3.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Per Drop More Crop Sprinkler 18 18 5 3.60 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Per Drop More Crop Sprinkler 15 15 5 3.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Per Drop More Crop Sprinkler 18 18 5 3.60 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Per Drop More Crop Sprinkler 12 12 5 2.40 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Per Drop More Crop Sprinkler 20 20 5 4.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Per Drop More Crop Sprinkler 20 20 5 4.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Per Drop More Crop Sprinkler 32 32 5 6.40 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Per Drop More Crop Sprinkler 38 38 5 7.60 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Per Drop More Crop Drip system 1 1 5 1.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Per Drop More Crop Sprinkler 38 38 5 7.60 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Per Drop More Crop Drip system 1 1 5 1.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Per Drop More Crop Sprinkler 32 32 5 6.40 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Per Drop More Crop Drip system 1 1 5 1.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Per Drop More Crop Sprinkler 12 12 5 2.40 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Per Drop More Crop Sprinkler 25 25 5 5.00 80°8'48.846"E 23°24'49.808"N
293
Concerned
Ministry/
Department
Name of the
Districts /
Blocks
Component Activity Total Number
Command
Area/Irrig
ation
Potential
(Ha)
Period of
Implement
ation 5/ 7
Estimated
cost
(in Lakhs
Rs.)
Longitude Lattitude
MOA&FW Sihora Per Drop More Crop Sprinkler 20 20 5 4.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Per Drop More Crop Sprinkler 10 10 5 2.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Per Drop More Crop Sprinkler 22 22 5 4.40 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Per Drop More Crop Sprinkler 12 12 5 2.40 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Per Drop More Crop Sprinkler 32 32 5 6.40 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Per Drop More Crop Drip system 1 1 5 1.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Per Drop More Crop Sprinkler 22 22 5 4.40 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Per Drop More Crop Drip system 1 1 5 1.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Per Drop More Crop Sprinkler 12 12 5 2.40 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Per Drop More Crop Sprinkler 25 25 5 5.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Per Drop More Crop Sprinkler 32 32 5 6.40 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Per Drop More Crop Sprinkler 22 22 5 4.40 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Per Drop More Crop Sprinkler 25 25 5 5.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Per Drop More Crop Sprinkler 38 38 5 7.60 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Per Drop More Crop Drip system 1 1 5 1.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Per Drop More Crop Sprinkler 12 12 5 2.40 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Per Drop More Crop Sprinkler 14 14 5 2.80 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Per Drop More Crop Sprinkler 25 25 5 5.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Per Drop More Crop Sprinkler 31 31 5 6.20 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Per Drop More Crop Sprinkler 15 15 5 3.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Per Drop More Crop Sprinkler 25 25 5 5.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Per Drop More Crop Drip system 1 1 5 1.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Per Drop More Crop Sprinkler 32 32 5 6.40 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Per Drop More Crop Drip system 1 1 5 1.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Per Drop More Crop Sprinkler 32 32 5 6.40 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Per Drop More Crop Sprinkler 29 29 5 5.80 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Per Drop More Crop Sprinkler 12 12 5 2.40 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Per Drop More Crop Sprinkler 30 30 5 6.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Per Drop More Crop Sprinkler 12 12 5 2.40 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Per Drop More Crop Sprinkler 10 10 5 2.00 80°8'48.846"E 23°24'49.808"N
294
Concerned
Ministry/
Department
Name of the
Districts /
Blocks
Component Activity Total Number
Command
Area/Irrig
ation
Potential
(Ha)
Period of
Implement
ation 5/ 7
Estimated
cost
(in Lakhs
Rs.)
Longitude Lattitude
MOA&FW Sihora Per Drop More Crop Sprinkler 25 25 5 5.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Per Drop More Crop Sprinkler 15 15 5 3.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Per Drop More Crop Sprinkler 15 15 5 3.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Per Drop More Crop Sprinkler 12 12 5 2.40 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Per Drop More Crop Sprinkler 15 15 5 3.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Per Drop More Crop Sprinkler 12 12 5 2.40 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Per Drop More Crop Sprinkler 15 15 5 3.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Per Drop More Crop Sprinkler 18 18 5 3.60 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Per Drop More Crop Sprinkler 18 18 5 3.60 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Per Drop More Crop Sprinkler 12 12 5 2.40 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Per Drop More Crop Sprinkler 25 25 5 5.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Per Drop More Crop Sprinkler 28 28 5 5.60 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Per Drop More Crop Sprinkler 28 28 5 5.60 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Per Drop More Crop Sprinkler 15 15 5 3.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Per Drop More Crop Sprinkler 22 22 5 4.40 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Per Drop More Crop Sprinkler 32 32 5 6.40 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Per Drop More Crop Sprinkler 15 15 5 3.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Per Drop More Crop Sprinkler 30 30 5 6.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Per Drop More Crop Sprinkler 12 12 5 2.40 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Per Drop More Crop Sprinkler 28 28 5 5.60 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Per Drop More Crop Drip system 1 1 5 1.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Per Drop More Crop Sprinkler 28 28 5 5.60 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Per Drop More Crop Sprinkler 25 25 5 5.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Per Drop More Crop Drip system 1 1 5 1.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Per Drop More Crop Sprinkler 22 22 5 4.40 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Per Drop More Crop Sprinkler 18 18 5 3.60 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Per Drop More Crop Sprinkler 18 18 5 3.60 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Per Drop More Crop Sprinkler 22 22 5 4.40 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Per Drop More Crop Sprinkler 12 12 5 2.40 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Per Drop More Crop Sprinkler 15 15 5 3.00 80°8'48.846"E 23°24'49.808"N
295
Concerned
Ministry/
Department
Name of the
Districts /
Blocks
Component Activity Total Number
Command
Area/Irrig
ation
Potential
(Ha)
Period of
Implement
ation 5/ 7
Estimated
cost
(in Lakhs
Rs.)
Longitude Lattitude
MOA&FW Sihora Per Drop More Crop Sprinkler 18 18 5 3.60 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Per Drop More Crop Drip system 1 1 5 1.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Per Drop More Crop Drip system 1 1 5 1.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Per Drop More Crop Sprinkler 12 12 5 2.40 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Per Drop More Crop Sprinkler 16 16 5 3.20 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Per Drop More Crop Sprinkler 16 16 5 3.20 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Per Drop More Crop Sprinkler 14 14 5 2.80 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Per Drop More Crop Sprinkler 12 12 5 2.40 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Per Drop More Crop Sprinkler 12 12 5 2.40 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Per Drop More Crop Sprinkler 15 15 5 3.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Per Drop More Crop Sprinkler 26 26 5 5.20 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Per Drop More Crop Sprinkler 12 12 5 2.40 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Per Drop More Crop Sprinkler 28 28 5 5.60 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Per Drop More Crop Sprinkler 45 45 5 9.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Per Drop More Crop Drip system 1 1 5 1.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Per Drop More Crop Sprinkler 22 22 5 4.40 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Per Drop More Crop Sprinkler 30 30 5 6.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Per Drop More Crop Sprinkler 20 20 5 4.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Per Drop More Crop Sprinkler 18 18 5 3.60 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Per Drop More Crop Sprinkler 22 22 5 4.40 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Per Drop More Crop Sprinkler 28 28 5 5.60 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Per Drop More Crop Sprinkler 22 22 5 4.40 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Per Drop More Crop Sprinkler 25 25 5 5.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Per Drop More Crop Sprinkler 12 12 5 2.40 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Per Drop More Crop Sprinkler 18 18 5 3.60 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Per Drop More Crop Sprinkler 26 26 5 5.20 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Per Drop More Crop Sprinkler 14 14 5 2.80 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Per Drop More Crop Sprinkler 34 34 5 6.80 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Per Drop More Crop Drip system 1 1 5 1.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Per Drop More Crop Sprinkler 16 16 5 3.20 80°8'48.846"E 23°24'49.808"N
296
Concerned
Ministry/
Department
Name of the
Districts /
Blocks
Component Activity Total Number
Command
Area/Irrig
ation
Potential
(Ha)
Period of
Implement
ation 5/ 7
Estimated
cost
(in Lakhs
Rs.)
Longitude Lattitude
MOA&FW Sihora Per Drop More Crop Sprinkler 28 28 5 5.60 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Per Drop More Crop Sprinkler 25 25 5 5.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Per Drop More Crop Sprinkler 18 18 5 3.60 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Per Drop More Crop Sprinkler 16 16 5 3.20 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Per Drop More Crop Sprinkler 15 15 5 3.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Per Drop More Crop Sprinkler 30 30 5 6.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Per Drop More Crop Sprinkler 12 12 5 2.40 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Per Drop More Crop Sprinkler 20 20 5 4.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Per Drop More Crop Sprinkler 25 25 5 5.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Per Drop More Crop Sprinkler 28 28 5 5.60 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Per Drop More Crop Sprinkler 10 10 5 2.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Per Drop More Crop Sprinkler 16 16 5 3.20 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Per Drop More Crop Sprinkler 24 24 5 4.80 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Per Drop More Crop Sprinkler 31 31 5 6.20 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Per Drop More Crop Sprinkler 22 22 5 4.40 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Per Drop More Crop Sprinkler 35 35 5 7.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Per Drop More Crop Drip system 1 1 5 1.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Per Drop More Crop Sprinkler 22 22 5 4.40 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Per Drop More Crop Sprinkler 31 31 5 6.20 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Per Drop More Crop Drip system 1 1 5 1.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Per Drop More Crop Sprinkler 10 10 5 2.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Per Drop More Crop Sprinkler 15 15 5 3.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Per Drop More Crop Sprinkler 22 22 5 4.40 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Per Drop More Crop Sprinkler 18 18 5 3.60 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Per Drop More Crop Sprinkler 25 25 5 5.00 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Per Drop More Crop Sprinkler 22 22 5 4.40 80°8'48.846"E 23°24'49.808"N
MOA&FW Sihora Per Drop More Crop Sprinkler 22 22 5 4.40 80°8'48.846"E 23°24'49.808"N
297
Concerned
Ministry/
Department
Name of
the
Districts /
Blocks
Component Activity Total
Number
Command
Area/Irrig
ation
Potential
(Ha)
Period of
Implement
ation 5/ 7
Estimated
cost
(in Lakhs
Rs.)
Longitude Lattitude Remark / Village
Name
MOA&FW Sihora Har Khet Ko Pani
Diesel /
Electric /
SolarPump
15 15 5 3.75 80°8'48.846"E 23°24'49.808"N Amadogri
MOA&FW Sihora Har Khet Ko Pani
Diesel /
Electric /
SolarPump
12 12 5 3.00 80°8'48.846"E 23°24'49.808"N Bharda
MOA&FW Sihora Har Khet Ko Pani
Diesel /
Electric /
SolarPump
14 14 5 3.50 80°8'48.846"E 23°24'49.808"N Khagamau
MOA&FW Sihora Har Khet Ko Pani Diesel /
Electric /
SolarPump
15 15 5 3.75 80°8'48.846"E 23°24'49.808"N Bandarkola
MOA&FW Sihora Har Khet Ko Pani
Diesel /
Electric / SolarPump
1 1 5 0.25 80°8'48.846"E 23°24'49.808"N Ghatsemirya
MOA&FW Sihora Har Khet Ko Pani
Diesel /
Electric / SolarPump
14 14 5 3.50 80°8'48.846"E 23°24'49.808"N Muskura
MOA&FW Sihora Har Khet Ko Pani
Diesel /
Electric /
SolarPump
8 8 5 2.00 80°8'48.846"E 23°24'49.808"N Muskuri
MOA&FW Sihora Har Khet Ko Pani
Diesel /
Electric /
SolarPump
15 15 5 3.75 80°8'48.846"E 23°24'49.808"N Bhanpura
MOA&FW Sihora Har Khet Ko Pani
Diesel /
Electric /
SolarPump
16 16 5 4.00 80°8'48.846"E 23°24'49.808"N Diwari
MOA&FW Sihora Har Khet Ko Pani Diesel /
Electric /
SolarPump
17 17 5 4.25 80°8'48.846"E 23°24'49.808"N Hinautiya
MOA&FW Sihora Har Khet Ko Pani Diesel /
Electric /
SolarPump
15 15 5 3.75 80°8'48.846"E 23°24'49.808"N Bichhiya
MOA&FW Sihora Har Khet Ko Pani
Diesel /
Electric /
SolarPump
15 15 5 3.75 80°8'48.846"E 23°24'49.808"N Bijaiya
MOA&FW Sihora Har Khet Ko Pani
Diesel /
Electric / SolarPump
10 10 5 2.50 80°8'48.846"E 23°24'49.808"N Banjar Bughari
MOA&FW Sihora Har Khet Ko Pani
Diesel /
Electric /
SolarPump
12 12 5 3.00 80°8'48.846"E 23°24'49.808"N Chikhali
298
Concerned
Ministry/
Department
Name of
the
Districts /
Blocks
Component Activity Total
Number
Command
Area/Irrig
ation
Potential
(Ha)
Period of
Implement
ation 5/ 7
Estimated
cost
(in Lakhs
Rs.)
Longitude Lattitude Remark / Village
Name
MOA&FW Sihora Har Khet Ko Pani Diesel /
Electric /
SolarPump
13 13 5 3.25 80°8'48.846"E 23°24'49.808"N Pathrai
MOA&FW Sihora Har Khet Ko Pani Diesel /
Electric /
SolarPump
15 15 5 3.75 80°8'48.846"E 23°24'49.808"N Bilha
MOA&FW Sihora Har Khet Ko Pani
Diesel /
Electric /
SolarPump
15 15 5 3.75 80°8'48.846"E 23°24'49.808"N Budhari
MOA&FW Sihora Har Khet Ko Pani
Diesel /
Electric / SolarPump
10 10 5 2.50 80°8'48.846"E 23°24'49.808"N Binaika
MOA&FW Sihora Har Khet Ko Pani
Diesel /
Electric /
SolarPump
1 1 5 0.25 80°8'48.846"E 23°24'49.808"N Ranital
MOA&FW Sihora Har Khet Ko Pani
Diesel /
Electric /
SolarPump
15 15 5 3.75 80°8'48.846"E 23°24'49.808"N Damdama
MOA&FW Sihora Har Khet Ko Pani Diesel /
Electric /
SolarPump
15 15 5 3.75 80°8'48.846"E 23°24'49.808"N Dhamdha
MOA&FW Sihora Har Khet Ko Pani
Diesel /
Electric /
SolarPump
12 12 5 3.00 80°8'48.846"E 23°24'49.808"N Darauli Khurd
MOA&FW Sihora Har Khet Ko Pani Diesel /
Electric /
SolarPump
15 15 5 3.75 80°8'48.846"E 23°24'49.808"N Dhamki
MOA&FW Sihora Har Khet Ko Pani
Diesel /
Electric / SolarPump
10 10 5 2.50 80°8'48.846"E 23°24'49.808"N Khirhani Khurd
MOA&FW Sihora Har Khet Ko Pani
Diesel /
Electric / SolarPump
15 15 5 3.75 80°8'48.846"E 23°24'49.808"N Dhangawan
MOA&FW Sihora Har Khet Ko Pani
Diesel /
Electric /
SolarPump
15 15 5 3.75 80°8'48.846"E 23°24'49.808"N Diwari
MOA&FW Sihora Har Khet Ko Pani
Diesel /
Electric /
SolarPump
15 15 5 3.75 80°8'48.846"E 23°24'49.808"N Khamhariya
MOA&FW Sihora Har Khet Ko Pani Diesel /
Electric /
SolarPump
10 10 5 2.50 80°8'48.846"E 23°24'49.808"N Kodampur
MOA&FW Sihora Har Khet Ko Pani Diesel /
Electric / 15 15 5 3.75 80°8'48.846"E 23°24'49.808"N Mahgawan
299
Concerned
Ministry/
Department
Name of
the
Districts /
Blocks
Component Activity Total
Number
Command
Area/Irrig
ation
Potential
(Ha)
Period of
Implement
ation 5/ 7
Estimated
cost
(in Lakhs
Rs.)
Longitude Lattitude Remark / Village
Name
SolarPump
MOA&FW Sihora Har Khet Ko Pani
Diesel /
Electric /
SolarPump
13 13 5 3.25 80°8'48.846"E 23°24'49.808"N Rajgawan
MOA&FW Sihora Har Khet Ko Pani
Diesel /
Electric /
SolarPump
12 12 5 3.00 80°8'48.846"E 23°24'49.808"N Ghorakoni
MOA&FW Sihora Har Khet Ko Pani Diesel /
Electric /
SolarPump
15 15 5 3.75 80°8'48.846"E 23°24'49.808"N Mandod
MOA&FW Sihora Har Khet Ko Pani Diesel /
Electric /
SolarPump
16 16 5 4.00 80°8'48.846"E 23°24'49.808"N Gada
MOA&FW Sihora Har Khet Ko Pani
Diesel /
Electric / SolarPump
15 15 5 3.75 80°8'48.846"E 23°24'49.808"N Negai
MOA&FW Sihora Har Khet Ko Pani
Diesel /
Electric / SolarPump
10 10 5 2.50 80°8'48.846"E 23°24'49.808"N Mangaon
MOA&FW Sihora Har Khet Ko Pani
Diesel /
Electric /
SolarPump
15 15 5 3.75 80°8'48.846"E 23°24'49.808"N Nindora
MOA&FW Sihora Har Khet Ko Pani
Diesel /
Electric /
SolarPump
16 16 5 4.00 80°8'48.846"E 23°24'49.808"N Kumhi
MOA&FW Sihora Har Khet Ko Pani
Diesel /
Electric /
SolarPump
15 15 5 3.75 80°8'48.846"E 23°24'49.808"N Nipaniya
MOA&FW Sihora Har Khet Ko Pani Diesel /
Electric /
SolarPump
15 15 5 3.75 80°8'48.846"E 23°24'49.808"N Pondi Khurd
MOA&FW Sihora Har Khet Ko Pani Diesel /
Electric /
SolarPump
15 15 5 3.75 80°8'48.846"E 23°24'49.808"N Sindursi
MOA&FW Sihora Har Khet Ko Pani
Diesel /
Electric / SolarPump
16 16 5 4.00 80°8'48.846"E 23°24'49.808"N Madha
MOA&FW Sihora Har Khet Ko Pani
Diesel /
Electric / SolarPump
15 15 5 3.75 80°8'48.846"E 23°24'49.808"N Tangwa (Tagawan)
MOA&FW Sihora Har Khet Ko Pani
Diesel /
Electric /
SolarPump
13 13 5 3.25 80°8'48.846"E 23°24'49.808"N Riwjhi
300
Concerned
Ministry/
Department
Name of
the
Districts /
Blocks
Component Activity Total
Number
Command
Area/Irrig
ation
Potential
(Ha)
Period of
Implement
ation 5/ 7
Estimated
cost
(in Lakhs
Rs.)
Longitude Lattitude Remark / Village
Name
MOA&FW Sihora Har Khet Ko Pani Diesel /
Electric /
SolarPump
12 12 5 3.00 80°8'48.846"E 23°24'49.808"N Ghughara
MoWR Jabalpur Har Khet Ko Pani
Repair of Stop Dam &
providing
gate & removal of
deposition at
basin.
1 5 1.45 79°53'55.104"E 23°8'20.509"N Bahoripar
MoWR Jabalpur Har Khet Ko Pani
Repair of Stop Dam &
providing
gate & removal of
deposition at
basin.
1 5 1.8 79°51'14.954"E 22°53'48.416"N Bamhni
MoWR Jabalpur Har Khet Ko Pani
Bargi
Diversation
Project 1750.00 79°55'13.799"E 22°55'7.947"N CADA Work
MoWR Jabalpur Har Khet Ko Pani
Repair of Stop Dam &
providing
gate &
removal of
deposition at basin.
1 5 1.65 79°52'47.652"E 23°10'35.414"N Chunwani
MoWR Jabalpur Har Khet Ko Pani
Repair work
of dam &
canal along with structure
& C.C. lining
of Canal at Churiya
Tank.
1 / 900 50.41 5 24 79°52'0.16"E 23°0'43.493"N Churiya
MoWR Jabalpur Har Khet Ko Pani
Repair of Stop Dam &
providing
gate & removal of
deposition at
basin.
1 5 1.3 79°52'0.16"E 23°0'43.493"N Churiya
301
Concerned
Ministry/
Department
Name of
the
Districts /
Blocks
Component Activity Total
Number
Command
Area/Irrig
ation
Potential
(Ha)
Period of
Implement
ation 5/ 7
Estimated
cost
(in Lakhs
Rs.)
Longitude Lattitude Remark / Village
Name
MoWR Jabalpur Har Khet Ko Pani
Repair of Stop Dam &
providing
gate & removal of
deposition at
basin.
1 5 1.2 79°52'47.652"E 23°10'35.414"N Dhanpuri
MoWR Jabalpur Har Khet Ko Pani
Repair of
Stop Dam &
providing gate &
removal of
deposition at basin.
1 5 1.6 79°48'13.648"E 22°53'25.235"N Hulki
MoWR Jabalpur Har Khet Ko Pani
Repair work
of dam &
canal along with structure
& C.C. lining
of Canal at Indradaman
Tank.
1 / 2100 40.00 5 62 79°55'19.42"E 22°54'51.083"N Indradaman
MoWR Jabalpur Har Khet Ko Pani
Repair of
Stop Dam &
providing
gate & removal of
deposition at
basin.
1 5 1.4 79°55'25.041"E 22°55'47.294"N Jogidhana
MoWR Jabalpur Har Khet Ko Pani
Repair work
of dam &
canal along with structure
& C.C. lining
of Canal at Lodhi Tank.
1 / 1140 70.30 5 28 79°48'21.728"E 22°57'59.953"N Lodhi
MoWR Jabalpur Har Khet Ko Pani
Repair work
of dam of
Marhapatha Tank.
1 35.00 5 20.8 79°53'32.62"E 23°8'48.614"N Marhapatha
MoWR Jabalpur Har Khet Ko Pani
Repair of
Stop Dam & providing
gate &
removal of
1 5 4 79°53'32.62"E 23°8'48.614"N Mehgaon
302
Concerned
Ministry/
Department
Name of
the
Districts /
Blocks
Component Activity Total
Number
Command
Area/Irrig
ation
Potential
(Ha)
Period of
Implement
ation 5/ 7
Estimated
cost
(in Lakhs
Rs.)
Longitude Lattitude Remark / Village
Name
deposition at basin.
MoWR Jabalpur Har Khet Ko Pani
Repair of
Stop Dam & providing
gate &
removal of
deposition at
basin.
1 5 1.65 79°48'54.048"E 23°2'13.124"N Nayagaon
MoWR Jabalpur Har Khet Ko Pani
Repair work of dam &
canal along
with structure & C.C. lining
of Canal at
Pipariya Tank.
1 / 1800 90.45 5 29.8 79°48'55.395"E 22°57'20.9"N Pipariya
MoWR Jabalpur AIBP
C.C. Lining
work of
Canal at Purwatola
Tank.
800 40.00 5 10.20 80°4'23.241"E 23°4'47.99"N Purwa
MoWR Jabalpur Har Khet Ko Pani
Repair of Stop Dam &
providing
gate & removal of
deposition at
basin.
1 5 1.6 79°51'34.3"E 22°56'18.953"N Rewa
MoWR Jabalpur Har Khet Ko Pani Repair work
of dam of
Siluwa Tank.
1 36.00 5 5 79°58'36.155"E 23°9'44.825"N Siluwa
MoWR Jabalpur Har Khet Ko Pani
Repair of Stop Dam &
providing
gate & removal of
deposition at
basin.
1 5 1.2 79°58'36.155"E 23°9'44.825"N Siluwa
MoWR Jabalpur Har Khet Ko Pani
Repair of
Stop Dam &
providing gate &
1 5 1.8 79°58'36.155"E 23°9'44.825"N Sundarpur
303
Concerned
Ministry/
Department
Name of
the
Districts /
Blocks
Component Activity Total
Number
Command
Area/Irrig
ation
Potential
(Ha)
Period of
Implement
ation 5/ 7
Estimated
cost
(in Lakhs
Rs.)
Longitude Lattitude Remark / Village
Name
removal of deposition at
basin.
MoWR Jabalpur Har Khet Ko Pani
Repair of
Stop Dam & providing
gate &
removal of
deposition at
basin.
1 5 1.8 79°55'58.767"E 23°5'54.363"N Tilheri
MoWR Kundam AIBP
Construction of Hiran
Medium Irr.
Tank.
- 9000.00 5 23400 80°23'18.334"E 23°17'36.615"N Badhua
MoWR Kundam AIBP
Construction of Baghraji
Medium Irr.
Tank.
- 2600.00 5 7789 80°23'18.334"E 23°17'36.615"N Badhua
MoWR Kundam Har Khet Ko Pani
Repair work
of dam &
canal along with structure
& C.C. lining
of Canal at Bairagi Tank.
1500 59.00 5 61 80°16'28.831"E 23°12'47.901"N Bairagi
MoWR Kundam Har Khet Ko Pani
Repair of
Stop Dam &
providing gate &
removal of
deposition at basin.
1 5 1.25 80°17'13.022"E 23°15'53.503"N Barkheda
MoWR Kundam AIBP
C.C. Lining
work of Canal at
Dungargawan
Tank.
1320 140.59 5 18.85 80°17'13.022"E 23°15'53.503"N Batai
MoWR Kundam Har Khet Ko Pani
Repair of
Stop Dam &
providing gate &
removal of
deposition at basin.
1 5 2.3 80°17'27.752"E 23°11'57.818"N Bhajia
304
Concerned
Ministry/
Department
Name of
the
Districts /
Blocks
Component Activity Total
Number
Command
Area/Irrig
ation
Potential
(Ha)
Period of
Implement
ation 5/ 7
Estimated
cost
(in Lakhs
Rs.)
Longitude Lattitude Remark / Village
Name
MoWR Kundam Har Khet Ko Pani
Repair of Stop Dam &
providing
gate & removal of
deposition at
basin.
1 5 1.3 80°11'1.818"E 23°13'11.47"N Bhimwar
MoWR Kundam Har Khet Ko Pani
Repair of
Stop Dam &
providing gate &
removal of
deposition at basin.
1 5 1.7 80°12'15.47"E 23°11'19.519"N Bilhari
MoWR Kundam Har Khet Ko Pani
Repair of
Stop Dam &
providing gate &
removal of
deposition at basin.
1 5 1.6 80°23'21.28"E 23°14'28.067"N Bisanpur
MoWR Kundam AIBP
C.C. lining
work of
Canal at
Imlai Tank.
1000 15.55 5 7 80°12'41.984"E 23°12'53.793"N Bisanpura
MoWR Kundam Har Khet Ko Pani
Repair of Stop Dam &
providing
gate & removal of
deposition at
basin.
1 5 1.6 80°26'38.666"E 23°17'48.399"N Cherapondi
MoWR Kundam AIBP
Construction of
Chhitakhudri
Medium Irr. Tank.
- 9600.00 5 31000 80°19'16.757"E 23°11'1.843"N Chhitakhudri
MoWR Kundam Har Khet Ko Pani
Repair of
Canal Structures &
C.C. Lining
of Canal at Chiraipani
Tank
840 88.00 5 17.97 80°8'58.083"E 23°11'34.249"N Chiraipani
305
Concerned
Ministry/
Department
Name of
the
Districts /
Blocks
Component Activity Total
Number
Command
Area/Irrig
ation
Potential
(Ha)
Period of
Implement
ation 5/ 7
Estimated
cost
(in Lakhs
Rs.)
Longitude Lattitude Remark / Village
Name
MoWR Kundam AIBP
Construction of Dargarh
Minor Irr.
Tank.
- 1950.00 5 6594 80°12'15.47"E 23°13'14.416"N Dargarh
MoWR Kundam Har Khet Ko Pani
Repair work
of dam &
canal along with structure
& C.C. lining
of Canal at Dehrikala
Tank.
1 / 2040 50.20 5 35 80°10'42.916"E 23°12'32.975"N Dehrikala
MoWR Kundam Har Khet Ko Pani
Repair of
Stop Dam & providing
gate &
removal of deposition at
basin.
1 5 3.5 80°18'33.431"E 23°15'22.085"N Deohara
MoWR Kundam Har Khet Ko Pani
Repair work of canal
along with
structure &
C.C. lining of
Canal at Doli
Tank.
2220 204.00 5 35 80°18'33.431"E 23°15'22.085"N Deori
MoWR Kundam Har Khet Ko Pani
Repair of
Stop Dam &
providing gate &
removal of
deposition at basin.
1 5 1.8 80°18'33.431"E 23°15'22.085"N Deori
MoWR Kundam Har Khet Ko Pani
Repair of
Stop Dam &
providing gate &
removal of
deposition at basin.
1 5 1.2 80°18'33.431"E 23°15'22.085"N Dungargawan
MoWR Kundam AIBP
C.C. Lining
work of Canal at
Dungargawan
Tank.
1320 49.00 5 12.8 80°18'55.915"E 23°14'20.254"N Dungargawan
306
Concerned
Ministry/
Department
Name of
the
Districts /
Blocks
Component Activity Total
Number
Command
Area/Irrig
ation
Potential
(Ha)
Period of
Implement
ation 5/ 7
Estimated
cost
(in Lakhs
Rs.)
Longitude Lattitude Remark / Village
Name
MoWR Kundam Har Khet Ko Pani
Repair of Stop Dam &
providing
gate & removal of
deposition at
basin.
1 5 1.6 80°10'7.494"E 23°11'38.91"N Gangai
MoWR Kundam Har Khet Ko Pani
Repair work
of canal
along with structure &
C.C. lining of
Canal at Harduli Tank.
1158 33.00 5 66 80°18'33.431"E 23°15'22.085"N Harduli
MoWR Kundam Har Khet Ko Pani
Repair of
Canal
structures and C.C. lining of
canal at
Saroli Tank.
1360 45.00 5 16.21 80°18'33.431"E 23°15'22.085"N Harratikur
MoWR Kundam Har Khet Ko Pani
Repair of
Stop Dam &
providing
gate &
removal of
deposition at basin.
1 5 1.9 80°18'33.431"E 23°15'22.085"N Harratikur
MoWR Kundam AIBP
C.C. lining
work of Canal at
Imlai Tank.
1000 38.66 5 10 80°18'55.915"E 23°14'20.254"N Imlai
MoWR Kundam Har Khet Ko Pani
Repair work
of dam & canal along
with structure
& C.C. lining of Canal at
Doli Tank.
1 / 2000 119.00 5 45 80°13'46.55"E 23°8'59.512"N Jamodi
MoWR Kundam Har Khet Ko Pani
Repair work of dam &
canal along
with structure & C.C. lining
of Canal at
Jhiriya Tank.
1 / 1000 22.00 5 48 80°18'33.431"E 23°15'22.085"N Jhiriya
307
Concerned
Ministry/
Department
Name of
the
Districts /
Blocks
Component Activity Total
Number
Command
Area/Irrig
ation
Potential
(Ha)
Period of
Implement
ation 5/ 7
Estimated
cost
(in Lakhs
Rs.)
Longitude Lattitude Remark / Village
Name
MoWR Kundam Har Khet Ko Pani
Repair of Stop Dam &
providing
gate & removal of
deposition at
basin.
1 5 1.4 80°18'33.431"E 23°15'22.085"N Jhiriya
MoWR Kundam Har Khet Ko Pani
Repair of
Stop Dam &
providing gate &
removal of
deposition at basin.
1 5 1.6 80°18'33.431"E 23°15'22.085"N Kanakpura
MoWR Kundam Har Khet Ko Pani
Repair of
Stop Dam &
providing gate &
removal of
deposition at basin.
1 5 1.85 80°21'27.682"E 23°10'35.414"N Kohka
MoWR Kundam Har Khet Ko Pani
Repair of
Canal
Structures &
C.C. Lining
of Canal at Koyalmuhi
Tank
1200 60.00 5 17.98 80°21'27.682"E 23°10'35.414"N Koyalmuhi
MoWR Kundam Har Khet Ko Pani
Repair of Stop Dam &
providing
gate & removal of
deposition at
basin.
1 5 2.1 80°21'27.682"E 23°10'35.414"N Kuthra Godhi
MoWR Kundam AIBP
C.C. Lininig work &
repairing of
canal along with structure
& dam
pitching of Mehgaon
Tank.
2226 100.00 5 14.06 80°18'55.915"E 23°14'20.254"N Lohkari
308
Concerned
Ministry/
Department
Name of
the
Districts /
Blocks
Component Activity Total
Number
Command
Area/Irrig
ation
Potential
(Ha)
Period of
Implement
ation 5/ 7
Estimated
cost
(in Lakhs
Rs.)
Longitude Lattitude Remark / Village
Name
MoWR Kundam Har Khet Ko Pani
Repair of Stop Dam &
providing
gate & removal of
deposition at
basin.
1 5 1.5 80°21'27.682"E 23°10'35.414"N Lohkari
MoWR Kundam Har Khet Ko Pani
Repair work
of canal
along with structure &
C.C. lining of
Canal at Jhiriya Tank.
1250 24.00 5 15.8 80°21'27.682"E 23°10'35.414"N Maheshpuri
MoWR Kundam Har Khet Ko Pani
Repair of
Stop Dam &
providing gate &
removal of
deposition at basin.
1 5 1.45 80°21'27.682"E 23°10'35.414"N Mansapur
MoWR Kundam Har Khet Ko Pani
Repair of
Stop Dam &
providing
gate &
removal of deposition at
basin.
1 5 1.8 80°21'27.682"E 23°10'35.414"N Mansuri
MoWR Kundam Har Khet Ko Pani
Repair of Stop Dam &
providing
gate & removal of
deposition at
basin.
1 5 1.46 80°21'27.682"E 23°10'35.414"N Mehgaon
MoWR Kundam AIBP
C.C. lining work &
repairing of
canal along with structure
& Dam
pitching of Mehgaon
Tank.
1 / 1000 140.00 5 20.06 80°18'55.915"E 23°14'20.254"N Mehgawan
309
Concerned
Ministry/
Department
Name of
the
Districts /
Blocks
Component Activity Total
Number
Command
Area/Irrig
ation
Potential
(Ha)
Period of
Implement
ation 5/ 7
Estimated
cost
(in Lakhs
Rs.)
Longitude Lattitude Remark / Village
Name
MoWR Kundam Har Khet Ko Pani
Repair of Stop Dam &
providing
gate & removal of
deposition at
basin.
1 10.45 5 4 80°21'27.682"E 23°10'35.414"N Murjhour &
Baghraji
MoWR Kundam Har Khet Ko Pani
Repair of
Stop Dam &
providing gate &
removal of
deposition at basin.
1 5 1.56 80°20'39.246"E 23°13'11.47"N Negai
MoWR Kundam Har Khet Ko Pani
Repair of
Stop Dam &
providing gate &
removal of
deposition at basin.
1 5 1.8 80°13'25.635"E 23°13'43.702"N Phipree
MoWR Kundam AIBP
Canal lining
work of
Saroli Tank
1000 22.00 5 11.88 80°12'31.046"E 23°14'42.544"N Pipariya
MoWR Kundam Har Khet Ko Pani
Repairing of
Canal along with
structures &
Canal lining of Pitkuhi
Tank.
860 16.00 5 15.72 80°12'31.046"E 23°14'42.544"N Pipariya
MoWR Kundam Har Khet Ko Pani
Repair of
Sluice, canal along with
structures &
canal lining of Pitkuhi
Tank.
1 / 1000 12.00 5 28.54 80°23'31.345"E 23°14'42.738"N Pitkuhi Khurd
MoWR Kundam Har Khet Ko Pani
Repair of Canal
Structures &
C.C. Lining of Canal at
Chiraipani
Tank
600 12.00 5 9.35 80°19'24.922"E 23°8'15.701"N Rampuri Kala
310
Concerned
Ministry/
Department
Name of
the
Districts /
Blocks
Component Activity Total
Number
Command
Area/Irrig
ation
Potential
(Ha)
Period of
Implement
ation 5/ 7
Estimated
cost
(in Lakhs
Rs.)
Longitude Lattitude Remark / Village
Name
MoWR Kundam Har Khet Ko Pani
Repair of Stop Dam &
providing
gate & removal of
deposition at
basin.
1 5 1.6 80°23'31.345"E 23°14'42.738"N Sakul
MoWR Kundam Har Khet Ko Pani
Repair of
Stop Dam &
providing gate &
removal of
deposition at basin.
1 5 1.75 80°23'31.345"E 23°14'42.738"N Sangrampur
MoWR Kundam Har Khet Ko Pani
Repair work
of canal
along with structure &
C.C. lining of
Canal at Doli Tank.
2220 45.00 5 31 80°23'31.345"E 23°14'42.738"N Sankuhi
MoWR Kundam AIBP
C.C. lining of
canal work of
Saroli Tank
1000 26.00 5 11.89 80°21'22.061"E 23°14'9.012"N Santaveli
MoWR Kundam Har Khet Ko Pani
Repair of
Stop Dam & providing
gate &
removal of deposition at
basin.
1 5 1.6 80°23'31.345"E 23°14'42.738"N Saraswa
MoWR Kundam Har Khet Ko Pani
Repair of
Stop Dam & providing
gate &
removal of deposition at
basin.
1 5 2.1 80°23'31.345"E 23°14'42.738"N Saroli
MoWR Kundam Har Khet Ko Pani
Repair of Stop Dam &
providing
gate & removal of
deposition at
basin.
1 5 1.1 80°10'35.459"E 23°14'0.597"N Silpura
311
Concerned
Ministry/
Department
Name of
the
Districts /
Blocks
Component Activity Total
Number
Command
Area/Irrig
ation
Potential
(Ha)
Period of
Implement
ation 5/ 7
Estimated
cost
(in Lakhs
Rs.)
Longitude Lattitude Remark / Village
Name
MoWR Kundam AIBP
Repair work of dam &
canal along
with structure & C.C. lining
of Canal at
Tilsani Tank.
1 / 930 31.45 5 24 80°13'9.264"E 23°12'50.686"N Tilsani
MoWR Majholi Har Khet Ko Pani
Repair of
regulator &
canal along with structure
& lining of
Bargi Reg.
1 / 7000 142.00 5 43 79°55'36.283"E 23°27'55.301"N Bargi
MoWR Majholi Har Khet Ko Pani
Repair of regulator &
canal along
with structure & lining of
Barkheda
Reg.
1 / 3900 40.00 5 16 79°55'36.283"E 23°27'55.301"N Barkheda
MoWR Majholi Har Khet Ko Pani
Repair work
of canal
along with
structure &
C.C. lining of
Canal at Ghutehi
Tank.
2500 60.00 5 50 79°55'36.283"E 23°27'55.301"N Barkhedi
MoWR Majholi Har Khet Ko Pani
Repair work of canal
along with
structure & C.C. lining of
Canal at
Ghutehi Tank.
3230 120.00 5 76 79°53'10.136"E 23°29'36.479"N Dinari
Khamariya
MoWR Majholi Har Khet Ko Pani
Repair of
regulator &
canal along with structure
& lining of
Dinari Khamariya
Reg.
1 / 3000 61.00 5 30 79°53'10.136"E 23°29'36.479"N Dinari
Khamariya
312
Concerned
Ministry/
Department
Name of
the
Districts /
Blocks
Component Activity Total
Number
Command
Area/Irrig
ation
Potential
(Ha)
Period of
Implement
ation 5/ 7
Estimated
cost
(in Lakhs
Rs.)
Longitude Lattitude Remark / Village
Name
MoWR Majholi Har Khet Ko Pani
Repair work of dam &
canal along
with structure & C.C. lining
of Canal at
Ghutehi Tank.
1 180.00 5 220 79°53'10.136"E 23°29'36.479"N Ghutehi
MoWR Majholi Har Khet Ko Pani
Repair of
regulator & canal along
with structure
& lining of Ghuthehi
Reg.
1 / 2300 48.00 5 26 79°53'10.136"E 23°29'36.479"N Ghutehi
MoWR Majholi Har Khet Ko Pani
Repair work
of dam & canal along
with structure
& C.C. lining of Canal at
Hatoli Tank.
1 / 1000 117.00 5 76 80°1'2.301"E 23°29'42.101"N Hatoli
MoWR Majholi Har Khet Ko Pani
Repair work
of canal
along with
structure & C.C. lining of
Canal at
Narela Tank.
9020 26.00 5 15 80°1'2.301"E 23°29'42.101"N Khawra
MoWR Majholi Har Khet Ko Pani
Repair work
of canal
along with structure &
C.C. lining of
Canal at Ghutehi
Tank.
200 15.00 5 4 80°1'2.301"E 23°25'23.534"N Majholi
MoWR Majholi Har Khet Ko Pani
Repair work
of dam & canal along
with structure
& C.C. lining of Canal at
Narela Tank.
1 / 100 35.00 5 120 80°1'2.301"E 23°25'23.534"N Narela
313
Concerned
Ministry/
Department
Name of
the
Districts /
Blocks
Component Activity Total
Number
Command
Area/Irrig
ation
Potential
(Ha)
Period of
Implement
ation 5/ 7
Estimated
cost
(in Lakhs
Rs.)
Longitude Lattitude Remark / Village
Name
MoWR Majholi Har Khet Ko Pani
Repair work of canal
along with
structure & C.C. lining of
Canal at
Ghutehi Tank.
1500 95.00 5 60 79°56'32.951"E 23°25'1.162"N Umariya
MoWR Majoli Har Khet Ko Pani
Bargi
Diversation Project
8101.00 79°56'4.388"E 23°26'42.228"N CADA Work
MoWR Majoli AIBP
Construction
of Canal and
distribution system 63 to
104 km Bargi
diversation Project
3585.00 79°57'11.84"E 23°29'30.858"N CADA Work
MoWR Panagar Har Khet Ko Pani
Repair work
of dam & canal along
with structure
& C.C. lining
of Canal at
Bandhi Tank.
1 / 1000 73.62 5 38.62 79°56'43.735"E 23°16'40.78"N Bandhi
MoWR Panagar Har Khet Ko Pani
Repair work of canal
along with
structure & C.C. lining of
Canal at
Panagar Tank.
2000 74.52 5 29 79°56'43.735"E 23°16'40.78"N Bharda
MoWR Panagar AIBP
Construction
of Canal and
distribution system 16 to
63 km Bargi
diversation Project
370.00 79°56'49.356"E 23°16'57.643"N CADA Work
MoWR Panagar Har Khet Ko Pani
Bargi
Diversation Project
5687.00 80°7'24.53"E 23°17'3.264"N CADA Work
314
Concerned
Ministry/
Department
Name of
the
Districts /
Blocks
Component Activity Total
Number
Command
Area/Irrig
ation
Potential
(Ha)
Period of
Implement
ation 5/ 7
Estimated
cost
(in Lakhs
Rs.)
Longitude Lattitude Remark / Village
Name
MoWR Panagar Har Khet Ko Pani
Repair & Maintenance
of dam and
canal of chhatarpur
tank.
1 / 1110 78.03 5 22 80°7'13.288"E 23°17'8.885"N Chhatarpur
MoWR Panagar Har Khet Ko Pani
Repair work of dam &
canal along
with structure & C.C. lining
of Canal at
Kakarhai Tank.
1 / 1000 33.15 5 16.67 80°4'55.159"E 23°15'35.392"N Kakarhai
MoWR Panagar Har Khet Ko Pani
Repair work
of canal
along with structure &
C.C. lining of
Canal at Panagar
Tank.
1340 133.82 5 23.6 80°6'39.562"E 23°17'36.99"N Padariya
MoWR Panagar Har Khet Ko Pani
Repair work
of canal
along with
structure & C.C. lining of
Canal at
Kakarhai Tank.
3960 96.62 5 48 80°6'39.562"E 23°17'36.99"N Padri
MoWR Panagar Har Khet Ko Pani
Repair work
of dam & canal along
with structure
& C.C. lining of Canal at
Bandhi Tank.
3000 30.83 5 20.98 80°6'39.562"E 23°17'36.99"N Rithori
MoWR Panagar Har Khet Ko Pani
Repair work
of dam & canal along
with structure
& C.C. lining of Canal at
Panagar
Tank.
1 / 500 29.25 5 42.75 80°1'7.392"E 23°14'49.719"N Tindini
315
Concerned
Ministry/
Department
Name of
the
Districts /
Blocks
Component Activity Total
Number
Command
Area/Irrig
ation
Potential
(Ha)
Period of
Implement
ation 5/ 7
Estimated
cost
(in Lakhs
Rs.)
Longitude Lattitude Remark / Village
Name
MoWR Sihora Har Khet Ko Pani Bargi
Diversation
Project 6340.00 80°9'11.33"E 23°24'27.324"N CADA Work
MoWR Sihora AIBP
Construction of Canal and
distribution
system 63 to 104 km Bargi
diversation
Project
2321.30 80°9'39.435"E 23°27'38.438"N CADA Work
316
District Level Irrigation Committee
(DIP Approval Committee)
Executive Engineer
Executive Engineer
Public Health Engineering
Rural Engineering Services
District - Jabalpur (M.P.)
District - Jabalpur (M.P.)
Executive Engineer
Project Director ATMA
Water Resource Department
Farmer Welfare & Agriculture
District - Jabalpur (M.P.)
Development
District - Jabalpur (M.P.)
Supretendent Engineer
Deputy Director Agriculture
Upper Narmada Zone
Farmer Welfare & Agriculture
District - Jabalpur (M.P.)
Development
District - Jabalpur (M.P.)
Chief Executive Officer
Collector
Zila Panchayat
District - Jabalpur (M.P.)
District - Jabalpur (M.P.)
Approved By
ZILA YOJNA SAMITI
Prabhari Mantri District- Jabalpur (M.P.)