1 2 3 4 5 A C D 12710 B 4000 3330 North Refer To Site Plan For True North Direction 5060 2670 820 2220 01 102 02 102 3 m² LOBBY 1 4095 1035 1059 15 m² Study 11 26 m² FAMILY/TV AREA 7 21 m² DINING AREA 8 6000 2500 4250 6000 5380 5380 3 m² CUPD 12 4869 6 m² UTILITY 10 11 m² KITCHEN 6 1151 3125 5390 2100 5380 Ramp Step 1 m² CLKS 4 12 m² ENTRANCE HALL 2 32 m² LIVING ROOM 5 2 m² WC 29 1 2 3 4 5 A C D B 4250 1050 01 102 North Refer To Site Plan For True North Direction 2200 02 102 2803 2318 6 m² VOID 17 22 m² BEDROOM 1 18 4 m² DRESSING 19 19 m² BEDROOM 2 21 19 m² BEDROOM 3 24 4 m² DRESSING 25 6000 2500 4250 6000 5380 5380 18750 12710 7 m² EN-SUITE 2 22 1 m² HP 26 3 m² DRESSING 23 5390 3500 2000 2270 5 m² EN-SUITE 1 20 5380 3156 2654 4428 1800 1800 1764 1586 1452 1100 2015 3225 2037 12 m² LANDING 16 313 1000 3000 3025 900 1373 4655 20 m² BEDROOM 4 27 6 m² BATHROOM 28 1 : 100 Level 1-Ground Floor-Context 1 1 : 100 Level 3-First Floor 2 First Floor ISOMETRIC 3 Ground ISOMETRIC Rear 4 Area Schedule (Rentable) Level Area Count Name INTERNAL FLOOR AREA GRAND TOTAL Level 1-Ground Floor-Conte xt 147 m² 1 Area Level 3-First Floor 145 m² 1 Area Grand total: 2 Status Client Project Drg. Title THIS DOCUMENT IS THE PROPERTY OF DOHERTY FINEGAN KELLY CONSULTING ENGINEERS. THE DESIGN INFORMATION CONTAINED HEREIN IS STRICTLY CONFIDENTIAL. THIS DOCUMENT IS NOT TO BE USED, REPRODUCED, DISCLOSED OR CIRCULATED IN WHOLE OR IN PART WITHOUT THE PRIOR 'WRITTEN PERMISSION' IN EACH INSTANCE OF 'DOHERTY FINEGAN KELLY CONSULTING ENGINEERS' C 'DOHERTY FINEGAN KELLY CONSULTING ENGINEERS' Drawn By: Checked By: Drg. No.: Scale: Date: Rev: CONTRACTOR RESPONSIBLE FOR COMPLIANCE WITH CURRENT BUILDING REGULATIONS ALL WORKS TO COMPLY WITH CURRENT BUILDING REGULATIONS TO MITIGATE AGAINST FUTURE DEGRADATION OF BUILDING ELEMENTS AND PREVENT RISK TO HEALTH AND SAFETY, DETAILS OF SITE CONDITIONS AND HARDCORE MATERIAL MAY BE REQUESTED/CHECKED AS PART OF A BUILDING CONTROL INSPECTION, THEREFORE IT IS RECOMMENDED THAT: THE DEVELOPER SHALL SATISFY HIMSELF OF THE SUITABILITY OF THE GROUND CONDITIONS FOR THE PURPOSE OF SUPPORTING THE DEVELOPMENT, BY CARRYING OUT NECESSARY SITE INVESTIGATION INCLUDING CHEMICAL ANALYSIS OF SOILS TO ENSURE THAT THERE ARE NO HARMFUL CONTAMINANTS OR HAZARDS, WHICH WOULD CAUSES DETERIORATION OF ANY ELEMENT OF THE DEVELOPMENT HARDCORE MATERIALS USED IN BACKFILL, EXCAVATIONS, FLOORS, ROAD BASES ETC SHOULD BE CERTIFIED BY COMPETENT LABORATORY THAT THEY ARE OF A SUITABLE NATURE AND QUALITY IN RELATION TO THE PURPOSE AND CONDITIONS OF THEIR USE. THEY SHOULD BE CHEMICALLY ANALYZED TO CHECK IF SUCH MATERIALS CONTAIN ANY CHEMICALS, WHICH SHOULD ALSO INCLUDE THE PETROGRAOHIC INDICATOR OF SWELLING POTENTIAL NOTES FIGURED DIMENSIONS ONLY TO BE TAKEN FROM THIS DRAWING. DIMENSIONS TO BE CHECKED ON SITE. THIS DRAWING TO BE READ IN CONJUNCTION WITH ALL OTHER ARCHITECTURAL & ENGINEERING DRAWINGS AND ALL OTHER RELEVANT DRAWINGS & SPECIFICATIONS ALL LEVELS RELATE TO O.S. DATUM AT MALIN HEAD UNLESS NOTED OTHERWISE 1. 2. 3. A1 Tel: (01) 8301852 E - Mail [email protected] Fax: (01) 8602265 17171 - 1 : 100 PLANNING PROPOSED RESIDENTIAL DEVELOPMENT AT THE RATH, ROWLESTOWN HOUSE TYPE 1- FLOOR PLANS & 3D ISOMETRIC VIEWS MW EF 101 13.09.18 Oak Vision Ltd. Rev Date By Chk Description

Upload: others

Post on 14-Jul-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 3 First Floor ISOMETRIC 2 Level 3-First Floors3-eu-west-1.amazonaws.com/mediamaster-s3eu/b/3/b... · 2 First Floor ISOMETRIC 3 Ground ISOMETRIC Rear 4 Area Schedule (Rentable) Level

1 2 3 4 5

A

C

D

12710

B

4000

3330

North

Refer To Site Plan For True North

Direction 5060

2670

820

2220

01

102

02

102

3 m²LOBBY

1

4095

1035

1059

15 m²Study

11

26 m²FAMILY/TV AREA

7

21 m²DINING AREA

8

6000 2500 4250 6000

5380

5380

3 m²CUPD

12

4869

6 m²UTILITY

10

11 m²KITCHEN

6

1151

3125

5390

2100

5380

Ramp

Step

1 m²CLKS

4

12 m²ENTRANCE HALL

2

32 m²LIVING ROOM

5

2 m²WC29

1 2 3 4 5

A

C

D

B

4250

1050

01

102North

Refer To Site Plan For True North

Direction

2200

02

102

2803

2318

6 m²VOID

17

22 m²BEDROOM 1

18

4 m²DRESSING

19

19 m²BEDROOM 2

21

19 m²BEDROOM 3

24

4 m²DRESSING

25

6000 2500 4250 6000

5380

5380

18750

12710

7 m²EN-SUITE 2

221 m²HP26

3 m²DRESSING

23

5390

3500

2000 2270

5 m²EN-SUITE 1

20

5380

3156 2654

4428

1800

1800

1764

1586

1452

1100

2015

3225

2037

12 m²LANDING

16

313

1000

3000

3025 900 1373

4655

20 m²BEDROOM 4

27

6 m²BATHROOM

28

1 : 100

Level 1-Ground Floor-Context1

1 : 100

Level 3-First Floor2

First Floor ISOMETRIC3

Ground ISOMETRIC Rear4

Area Schedule (Rentable)

Level Area Count Name

INTERNALFLOORAREA

GRANDTOTAL

Level1-GroundFloor-Context

147 m² 1 Area

Level3-FirstFloor

145 m² 1 Area

Grand total: 2

Status

Client

Project

Drg. Title

THIS DOCUMENT IS THE PROPERTY OF DOHERTY FINEGAN KELLY CONSULTING ENGINEERS. THE DESIGN INFORMATION CONTAINED HEREIN IS STRICTLY CONFIDENTIAL. THIS DOCUMENT IS NOT TO BE USED, REPRODUCED, DISCLOSEDOR CIRCULATED IN WHOLE OR IN PART WITHOUT THE PRIOR 'WRITTEN PERMISSION' IN EACH INSTANCE OF 'DOHERTY FINEGAN KELLY CONSULTING ENGINEERS'

C 'DOHERTY FINEGAN KELLY CONSULTING ENGINEERS'

Drawn By:

Checked By:

Drg. No.:

Scale:

Date:

Rev:

CONTRACTOR RESPONSIBLE FOR

COMPLIANCE WITH CURRENT

BUILDING REGULATIONS

ALL WORKS TO COMPLY WITH

CURRENT BUILDING REGULATIONS

TO MITIGATE AGAINST FUTURE DEGRADATION OF BUILDING ELEMENTS AND PREVENT RISK TO HEALTH AND SAFETY, DETAILS OF SITE CONDITIONS AND HARDCORE MATERIAL MAY BE REQUESTED/CHECKED AS PART OF A BUILDING CONTROL INSPECTION, THEREFORE IT IS RECOMMENDED THAT:

THE DEVELOPER SHALL SATISFY HIMSELF OF THE SUITABILITY OF THE GROUND CONDITIONS FOR THE PURPOSE OF SUPPORTING THE DEVELOPMENT, BY CARRYING OUT NECESSARY SITE INVESTIGATION INCLUDING CHEMICAL ANALYSIS OF SOILS TO ENSURE THAT THERE ARE NO HARMFUL CONTAMINANTS OR HAZARDS, WHICH WOULD CAUSES DETERIORATION OF ANY ELEMENT OF THE DEVELOPMENT

HARDCORE MATERIALS USED IN BACKFILL, EXCAVATIONS, FLOORS, ROAD BASES ETC SHOULD BE CERTIFIED BY COMPETENT LABORATORY THAT THEY ARE OF A SUITABLE NATURE AND QUALITY IN RELATION TO THE PURPOSE AND CONDITIONS OF THEIR USE. THEY SHOULD BE CHEMICALLY ANALYZED TO CHECK IF SUCH MATERIALS CONTAIN ANY CHEMICALS, WHICH SHOULD ALSO INCLUDE THE PETROGRAOHIC INDICATOR OF SWELLING POTENTIAL

NOTES

FIGURED DIMENSIONS ONLY TO BE TAKEN FROM THIS DRAWING. DIMENSIONS TO BE CHECKED ON SITE.

THIS DRAWING TO BE READ IN CONJUNCTION WITH ALL OTHER ARCHITECTURAL & ENGINEERING DRAWINGS AND ALL OTHER RELEVANT DRAWINGS & SPECIFICATIONS

ALL LEVELS RELATE TO O.S. DATUM AT MALIN HEAD UNLESS NOTED OTHERWISE

1.

2.

3.

A1

Tel: (01) 8301852E-Mail [email protected] Fax: (01) 8602265

17171-

1 : 100

PLANNING

PROPOSEDRESIDENTIALDEVELOPMENT ATTHE RATH,ROWLESTOWN

HOUSE TYPE 1- FLOORPLANS & 3D ISOMETRICVIEWS

MW

EF

101

13.09.18

Oak Vision Ltd.

Rev Date By Chk Description