3-5 March 20043-5 March 2004
ESA Columbus Ground ODF Validation ESA ODFCB, 3-5 March 2004 ESA ODFCB, 3-5 March 2004
Simon Challis, MSM-EO
3-5 March 20043-5 March 2004 22
ESA Columbus Ground ODF Validation• ESA ODF Management Plan currently does not cover the ESA
Columbus Ground ODF Validation Process in detail
• Recommend Validation Process Based on JSC-36054, Annex 3 - SODF Procedure Validation Plan
- Ground ODF Developers Determine Validation Requirement for Each Ground ODF- ESA ODF CB Approves these Recommendations to ensure that correct validation level for each procedure has been determined prior
to validation campaign
• Validation Requirements based on Validation Levels first defined in DLR Operations Validation Implementation Plan (Col-CC OP Delivery #3)
• In order to maximise efficiency of validation campaign a definitive list of Ground ODF should be finalised ASAP (Synthesis of EADS-ST, DLR, Payload Developer and FRCs inputs
3-5 March 20043-5 March 2004 33
ESA Ground ODF Validation LevelsESA Ground ODF Validation Levels(Corresponds to ISS ODF PV Requirements)(Corresponds to ISS ODF PV Requirements)
Desk Top Validation- Level-1: Validation by analysis/review
Simulation Facility Validation- Level-2: Validation using the Col-CC TQVS- Level-3: Validation during the Col-CC Simulation Campaign
- Level-3.1 Stand Alone Simulations (SAS) at Col-CC using TQVS- Level-3.2 Columbus Integrated Simulations (IS) using TQVS or Col-TRE- Level-3.3 Columbus Joint Multi-Segment (JMST) Simulations using SSTF/Col-
TRU
Flight Equipment Validation-Level-4: Validation during the System Validation Tests (SVTs) using FSF, PFM or SVF/SDIL (NASA ETE Testing)
3-5 March 20043-5 March 2004 44
PV Requirements Selection CriteriaPV Requirements Selection Criteria• Working Assumption: As a Minimum all Ground ODF should be
Validated up to Level 2• Propose ESA/DLR to Define PV Requirements Selection Criteria.
Examples:- Probability of Use during Flight 1E Mission- Response Delay (Immediate Actions/Response in Several Days)- Procedure Complexity (Commanding & Commanding Co-
ordination)- Criticality of ODF (Safety/Mission Critical)- Appropriate Validation Fidelity- Others
In addition• DLR to Propose Facility Configuration and Personnel Roles for Each
Validation Level ie Level 2 TQVS Validation• DLR to Propose Validation Criteria For Each Level
3-5 March 20043-5 March 2004 55
ESA Ground ODF Validation ProcessESA Ground ODF Validation Process
New Col-CCProcedure1
Ground ODF
Ready for Use
Submit PV requirements toESA ODF CB
Conduct OVRR
Conduct POVR
RevalidationRequired2
ESA ODF CB
approved PV reqmts
Facility Required
No Yes
No
No
No
DLROR
EADS Yes
EADS
Yes
Co-ordinate and schedule within
Col SVT Working Group4
Co-ordinate and schedule with TQV Team at
Col-CC
DLR
OVRR5 Required
POVR6 Required
ARs Required
Yes
Yes
Update PV/CM Records
Submit CRs (ARs) to ESA
ODF CB7
Yes
No
No
No
Yes
ODF Approved for use at Col-CC
Yes
No
Incorporate CRs
Update PV/CM Records
Conduct PV Session
Submit to ESA ODF
CB for
Approval8
No
Yes
Determine PV
Reqmts3
Yes
No
3-5 March 20043-5 March 2004 66
ESA Ground ODF Validation ProcessESA Ground ODF Validation ProcessNotes:1. New Procedure Constitutes one of the Following: - DLR Ground SODF Based on EADS-ST Flight ODF (Single or Multi-element) - DLR Ground SODF Based on EADS-ST Input - DLR Ground Multi-Element PODF Based on EADS-ST/FRC Input - Others?2. Revalidation is determined as part of PV Requirements and the ESA ODF CR Process?3. Assessment is made by Ground ODF Developer (ie Col-CC). Unless otherwise specified by
CR this assessment is only made once and the beginning of the validation process for each Ground ODF.
4. Post Columbus SVT 2 Activities5. OVRR - Operations Validation Readiness Review. Refer to OPS-PL-0-013-ESA, MSM GS
Operations Validation Plan6. POVR - Post Operations Validation Review. Refer to OPS-PL-0-013-ESA, MSM GS
Operations Validation Plan7. The I/F between the ESA ODF CB SPR System and Col-CC AR System is not defined in
current Col-CC Documentation. This I/F needs to be defined8. Do Ground ODF Have to form part of official release to ISS ODF? Release will coincide
with Ops Product Delivery Schedule
3-5 March 20043-5 March 2004 77
ESA Columbus Ground ODF Validation: ESA Columbus Ground ODF Validation: Additional IssuesAdditional Issues
There are a number of Issues that Impact the ODF Validation Process that need to be resolved/clarified:
• ESA ODF Validation Process - One System or Three? (Flight/Ground/Payload ODF)
• Agreed Working I/F between Flight ODF and Ground ODF Developer Teams
• Definitive List of Ground ODF• Agreed ESA ODF CR System between all ESA ODF Developers• Agreed Location(s) where ESA Columbus Ground ODF Validation
Process will be documented• Clear Flight ODF Validation Process outlined in EADS-ST
Documentation