Construction A to Z
1
2Q 2020 Opportunity Day11 Aug 2020
DISCLAIMER
The contents of the presentation provide by CAZ (Thailand) Public Company Limited (the“Company”) is provided as information for discussion purpose only.
Some of the information in this presentation may contain projections or other forwardlooking statements regarding future events such as plans, business strategies, futuremarket or industrial situations. Thus, actual situations may differ from what is projectedin this presentation due to the unexpected environment which might be better or worsethat anticipated. The reader must make his/her own assessment of the relevance,accuracy and adequacy of the information contained in this presentation. Including, mayconsider necessary or appropriate for the purpose of such assessment.
Also, the information included in this forward-looking statement may be change by theCompany without notice and then the Company dose not take any duty to update anyrelevant information.
Introduction
Agenda
Financial Performance
Scope of Services
2Q 2020 Overviews
3
Outlook
Introduction
Agenda
Financial Performance
Scope of Services
2Q 2020 Overviews
4
Outlook
Introduction
Business and Vision
VisionA most competitive construction contractor who
creates sustainable prosperity in Thailand.
Mission- Excellent construction capability, competitive
fabricator.
- Set engineering capability, entered into oversea
market.
- Strong EPC player in Asia Pacific Region.
CAZ‘s major business range is Construction Total
Service & Management System (Procurement,
Construction, and Shop Fabrication)
To provide clients with the best possible service
in all phases of project from A to Z such as Civil
& Architectural, Structural, Tank & Vessel, and
Heaters Fabrication work, Piping & Mechanical
erection, etc.
5
ManpowerStaff 513 people, Worker 3,620 peopleProjects 1552
As of 30 Jun 2020
Finished On-going Backlog
2,231
2014
Established in
February•Integrated
Production Control
System program to
improve project cost
management
2015
Strong
Partnership• Partnering with
TAKUNI
• Our first EPC project,
PTT ASAHI SAR
• Integrated Welding
Control System & Spool
Tracking Management
System to improve our
quality
2016
New office and
Workshop • Acquired 51% of JKEC
Co., Ltd as subsidiary
• Purchase 108 Rai of
Land and Factory
• Thailand’s biggest
Spherical Tank project,
PTT Tank’s Propylene
tank, 332 MB as EPC 2018
Solid Growth • PTT LNG Cold Water
Project, 643 MB as
EPC project
• Certified ASME
Stamp for Pressure
Vessel, Tank
Fabrication
2017
Sustainability • Additionally acquired
JKEC to be 73% of total
shares
• Highest Backlog of
2,472 MB
• Awarded PTT GC ORP
SMP Project 1,570 MB
and PTT GC PO Civil
Project 451 MB
6
2019
IPO &
First Trading• Offered 80
ordinary million
shares as the
Initial Public
Offering, Trading in
mai on 22 Jan'19
742 MB 651 MB
1,019 MB1,387 MB
2,035 MB
Revenue : 272 MB
Thai Oil LAB PTT ASHAI SAR PTT Tank’s Propylene tank PTTLNG CWG PTTGC OPR SMP 1st Trading day New shop expansion
New shop
Expansion• Expand Factory
#2 to increase
revenue by
Fabrication sales
increase
2Q 2020
Introduction
Milestone
1,175 MB
• Awarded
- TOP Piping Spool379 MB
- HMC STR Fab118 MB
- PTTLNG NF SM 401 MB
7
ISO 9001:2015 CertificateASME Certificate of Authorization
CAZ has developed Quality Management
System to control Total Quality which is
included Quality Assurance, Quality Control
and Quality Audit
Renewed Certificate of ISO 9001:2015on 14.
Sep. 2018
Under Implementation of ISO 14001:2015 &
45001:2018 schedule to achieve within 4Q
2020 (based on Covid-19 pandemic)
Introduction
Quality Standards and Certificates
8
CAZ has been awarded as Outstanding Partner from Samsung Engineering which shows that
we are the best partner to complete projects successfully. This award is giving to the best
company oversea.
PTTLNG Outstanding Service PTT LNG Cold Water Generation
SAMSUNG ENGINEERING Outstanding Service PTT Wangnoi Compressor Station
SAMSUNG ENGINEERING Outstanding Partner Among all partners
Introduction
Award of Appreciation from Client
Introduction
Agenda
Financial Performance
Scope of Services
2Q 2020 Overviews
9
Outlook
10
EPC
Engineering
Procurement
Construction
SMP & E&I Civil Others
Steel Structure
Mechanical
Piping
Electrical & Instrument
Civil and Building Shop Fabrication
Tank Fabrication
Pressure Vessel
Fabrication
Bangchak Enclosed
Ground Flare (EGF) Ground Flare Installation
Contract Amount : 272 MB
April 2018– June 2020
PTT GC Olefins
ReconfigurationStructure & Equipment Erection &
Piping Work
Contract Amount : 1,367 MB
May 18 ~ July 20
THAIOIL Clean fuel Civil Work & Equip. Foundation
Contract Amount : 921 MB
December 2019 – May 2022
PTT Tank Terminal4,000 tons Spherical Tank, Transfer
Pump, Ground Flare & Etc.
Contract Amount : 345 MB
December 2016 – October 2018
Scope of Services
Business Units
11
MaptaphutSattahip
Laem Chabang
Piping Shop (Alloy)
Blasting Shop
Piping Shop (CS SAW Welding)
Painting Shop
Pipe support
Piping Shop (CS)
Labor Camp
Admin Building
Engineering Building
Piping Shop (CS)
Painting Shop
Painting Auto Blasting M/CPiping Shop (SUS)
Piping Factory #1 : 258,000 m2 (108 Rai),Shop Area :30,000 m2, Laydown :86,000 m2
Factory #2
CAZ
10 KM
Location
Pipe Cutting & Beveling
Scope of Services
Head Office & Piping Fabrication Shop
12
Scope of Services
Structure Fabrication Shop
* CAZ will increase capacity 50% more with new shop
Steel Fabrication Shop
40 m x 180 m
Machine Shop
Misc. FabShop
Misc. FabShop
Painting & Blasting Shop
STR Factory #2 (Pluak Dang Work Shop) : 127,000 m2 (79 Rai),Shop Area : 10,200 m2,Laydown Area : 116,800 m2
13
Scope of Services
Ongoing Projects Status
Introduction
Agenda
Financial Performance
Scope of Services
2Q 2020 Overviews
14
Outlook
15
Open New STR Factory #2
Renovate Piping Shop
STR shop has been move New location, CAZ will increase capacity 50% more with new shop
All existing shops have been renovated to work for piping work.
2Q2020 Overviews
Key Highlight 2Q 2020
Renovate gantry crane column
and wall openOffice Building (2 Floor)& Main Shop
Miscellaneous Shop
16
Award New Projects
PTTLNG Nong Fab LNG Receiving Terminal Project (STR / Mech)
Scope of work : Steel STR Fab & Erection 2,800 Ton / Mechanical erection work
Contract period : Jul 2020 -Aug 2021
Contract amount : 401 Million Baht
Location : Rayong province
PTTLNG Nong Fab LNG Receiving Terminal Project (Jetty Piping)
Scope of work : Jetty Top Side Piping work (140,000 DB), Painting & Insulation Work
Contract period : Jul 2020 -Aug 2021
Contract amount : 863 Million Baht
Location : Rayong province
2Q2020 Overviews
Key Highlight 2Q 2020
17
Social DistancingSafeguarding the health of employees
Social Distance Screening
Hand Sanitizer Gel
Work Site Control
2Q 2020 Overviews
Priority of Responses to COVID-19
Check the body temperature to all employees
Provide alcohol gel for hand cleaning at all company area.
Social distancing for employees at least 1 meter
Introduction
Agenda
Financial Performance
Scope of Services
2Q 2020 Overviews
18
Outlook
19
Financial Performance
Ongoing Projects Status
Project
GroupContract Amount Portion
Acc. Sales
(From Start to 2Q 20)Progress Backlog
EPC 530* 8% 494 97% 36
SMP / E&I 3,094* 47% 1,331 60% 1,763
Civil 2,283 34% 1,080 47% 1,203
Fab & Others 709 11% 597 84% 112
Total 6,616 100% 3,502 61% 3,114
Mil THB
Announcement on 13 July 2020
PTTLNG Nong Fab LNG Receiving Terminal Project (Jetty Piping) : 863 M THB
PTTLNG Heater : 20.3 M
20
272
742651
1,019
2017201620152014 2018
1,387
Revenue(Million Baht)
2015 2016 2017
Profitability(Percentage)
2018
11.18.3
53.022.9
2015 2016 2017 2018
10.111.6
10.0 10.59.0
7.9
1.1 1.7 2.23.8 3.7
2.9
Gross Profit Net Profit
Net Profit (Million Baht)
2019
2,034
2019
2019
75.5
670 942 2,472 2,287Backlog 230
1,175
2020 (2Q20)
2,231
33.5
2020 (2Q20)
2020 (2Q20)
Financial Performance
Overall Highlight
Revenue 3 Months (Million Baht)
540.3
563.7
2Q2019 2Q2020
Revenue6 Months (Million Baht)
4.3%Increased
3 Months
Revenue increased of 23.4 MB due to recognized revenue from backlog carried forward of Y2019. Main projects were from SMP and Civil segment.
Including, recognized revenue from new projects award during period.
Financial Performance
2Q 2020 Performance summary (Y-o-Y)
954.7
1,175.5
2Q2019 2Q2020
23.1%Increased
6 Months
Revenue increased of 220.8 MB due to recognized revenue from backlog carried forward of Y2019. Main projects were from SMP and Civil segment.
Including, recognized revenue from new projects award during period.
As of 30 June 2020, has backlog of 2,231.3 Million Baht.
Moreover, announcement of new projects on 13 July 2020 of 883.3 Million Baht. Lead the Company has backlog of 3,114.6 Million Baht.
Gross Profit 3 Months (Million Baht)
48.3
42.6
2Q2019 2Q2020
11.9%Decreased
3 Months
Gross profit decreased of 5.7 MB. 2Q 2020 gross profit margin was 7.6% compared
with 2Q2019 which was 8.9%. A few dropped, due to improved budget cost control for projects in order to update all cost to be close with current costs (Impact from COVID-19 pandemic cause the Company has to adjust labor & other costs).
Financial Performance
2Q 2020 Performance summary (Y-o-Y)
94.4
92.9
2Q2019 2Q2020
Gross Profit 6 Months (Million Baht)
1.6%Decreased
6 Months
Gross profit decreased of 1.5 MB. Gross profit margin of 6 months was 7.9%
compared with same period of 2019 which was 8.9%. A few dropped, due to improved budget cost control for projects in order to update all cost to be close with current costs (Impact from COVID-19 pandemic cause the Company has to adjust labor & other costs).
Net Profit 3 Months (Million Baht)
21.6
13.5
2Q2019 2Q2020
Financial Performance
2Q 2020 Performance summary (Y-o-Y)
40.8
33.5
2Q2019 2Q2020
Net Profit 6 Months (Million Baht)
37.6%Decreased
3 Months
Net profit decreased of 8.1 Million Baht. Net profit margin was 2.4% compared with 2Q2019
which was 4.0%. Main reasons which net profit dropped, due to
- Improved budget cost control for projects.- Including of finance cost increased by short term
loan which occurred on mid of 2019 for projects’ working capital. Also for increasing liquidities for projects during of COVID-19 pandemic.
17.9%Decreased
6 Months
Net profit decreased of 7.3 Million Baht. Net profit margin was 2.9% compared with 2019
which was 4.3%. Main reasons which net profit dropped, due to
- Improved budget cost control for projects.- Including of finance cost increased by short term
loan which occurred on mid of 2019 for projects’ working capital. Also for increasing liquidities for projects during of COVID-19 pandemic.
31 8
186 225
565 518
10 20
539 575
156188
327 340
217 227
385 376
64 93
494499
Cash Account Receivable Unbilled receivable
Inventory PPE Others
Accout Payable Advance received Bank Loan
Other liabilities Equity
1,488 Million Baht
Assets
31 Dec 2019
1,554 Million Baht
L/A &
Equity
30 Jun 2020
Assets
Increased Account receivable increased from last year
around 21%. Due to increasing of transfer right of controlling asset and billing invoice to customers for construction contracts on.
PPE and intangible assets increased 14% or increased of Baht 36 Million due to renovate & improve of the new shop at Pluangdang district. Including, invested into construction tool and equipment for support new projects.
Liabilities &
Equities
Increased
Account payable increased due to material purchasing and subcontractors for projects.
Contract liabilities comprised of advance received from customers of Baht 176 Million, and income received in advance of Baht 51 Million. Both increased resulted from revenue recognized and advance received from projects.
Equities increased by 1% due to operating results for 6-month period. Including, interim dividend payment on May 2020, of 30 Million Baht (0.1071 per share).
Significant changed
Financial Performance
2Q 2020 Statement of financial position
Leverage Ratio (times)
1.79
0.57
2.10
0.85
-
1.00
2.00
3.00
Debt to Equity Interest Bearing Debt
2Q2019 2Q2020
Efficiency Ratio (%)
21.8
8.2
13.6
6.6
0.0
5.0
10.0
15.0
20.0
25.0
Return on Equity Return on Asset
2Q2019 2Q2020
25
Financial Performance
Financial Ratio
Introduction
Agenda
Financial Performance
Scope of Services
2Q 2020 Overviews
26
Outlook
* As PTT Group (PTT LNG, Thai Oil, PTT GC, IRPC) invested
for MEGA Project, Down Stream project also shall be
continuously invested (HMC PP, BST, Dow Chemical & etc)
PTTGC / HMC – Award 2,139 M. Baht from 62,600 M.
Baht (3.4%)
2018 Propylene Oxide Project (11,200 M.Baht)
2018 Polyols Project (20,000 M.Baht)
2018 Olefins Reconfiguration Project (22,400 M.Baht)
2019 HMC Polymer Expansion Project (9,000 M.Baht)
2019 Kuraray Project (21,000 M. Baht)
2020 Aromatic Reconfiguration Project (10,000 M.Baht)
2021 Olefins Modification Project (4,700 M.Baht)
IRPC
2019 Paraxylene Plant Project (30,000 M.Baht)
2020 Olefins Expansion Project (20,000 M.Baht)
2021 Diesel Hydro Treating (7,000 M.Baht)
2021 DHDS (12,500 M.Baht)
Business Outlook
Customer Investment
27
2018 Terminal 27.5 MTPA (30,000 M.Baht)
2020 EGAT 5 MTPA
2026 Terminal 35 MTPA
2031 Terminal 45 MTPA
LNG Terminal
Thai Oil
2019 Clean Fuel Project (140,000 M.Baht)
2019 Improvement (4,000 M.Baht)
*Annual Maintenance (1,320 M.Baht)BCP – Award 314 M. Baht from 8,400 M. Baht
(3.7%)
2018 Continuous Catalyst Regeneration Unit (8,400 M.Baht)
2020 DHDS (10,000 M.Baht)
: On going Project : CAZ On going Project
- Award 1,992 M. Baht from 30,000 M.
Baht (6.6%)
- Award 1,300M. Baht from 140,000 M. Baht
(0.9%)
** EURO V Project investment of Baht 50 Billion for 6 Oil Refinery companies (Thai Oil, PTTGC,ESSO, IRPC and Star Petroleum Refining Plc. (SPRC) and BCP).
Business Outlook
Potential project bidding of 2H 2020
28
No.
Industries Business unitPeriod duration
(Months)Project value(Million Baht)
Status
1. GAS Piping Jul 20 ~ May 21 860 changed to 863 Awarded on July
2. GAS STR / Mech Jul 20 ~ May 21 401 Awarded on July
3. Refinery SMP Sep 20 ~ Apr 22 1,500
4. Refinery* E&I Work Dec 20 150 Changed to 350
5. Petrochemical* General Contractor Dec 20 1,400
6. Petrochemical* General Contractor Dec 20 ~ Oct 22 1,500
Total 6,014
Note ; * Alternative project bidding
Q & A
29