Mochammad Imron Ocean engineering student, 15510017 http://www.ocean.itb.ac.id January 29, 2014 2D Pipeline Bottom Roughness Leave a comment Now, I’m starting to use english for words in my blog because I want to upgrade my english skill in writing.hehehehe ( I hope none of you will be confused with my word). Today,I want to share about on bottom roughness(OBR) analysis. What’s is bottom roughness?It’s an analysis to predict the location of span along subsea pipeline after installation or during operation. So, what’s the different between free span analysis?free span analysis is “only” determine the maximum allowable length of pipeline that unsupported when laid on seabed. The criteria of allowable span is divided into VIV(Vortex Induced Vibration) and ULS (Ultimate Limit State or Static Criteria). Why bottom roughness analysis is so important?Without bottom roughness analysis you don’t know how many support (sand bag, grout bag, etc) that you need to rectify of over span. However, it’s only prediction, so you need further inspection to ensure the location of over span. (http://dyurindatama.files.wordpress.com/2013/02/picture4.png) 2D OBR analysis is very simple, you can use any FEA softwere such as ABAQUS, ANSYS, etc..For this note, I used ABAQUS FEA as mny OBR simulator. The pipeline can be modelled using 1D element (PIPE31H) and the seabed can be modeled using anlaytical rigid of surface. The common step that used for Bottom Roughness is adopted fromSubsea Pipelines & Riser book (2005,Yong Bai & Qiang Bai)

Upload: lk-anhdung

Post on 14-Sep-2015

8 views

Category:

Documents


2 download

DESCRIPTION

13123

TRANSCRIPT

  • 6/21/2015 2DPipelineBottomRoughness|MochammadImron

    https://mochammadimron.wordpress.com/2014/01/29/2dpipelinebottomroughness/ 1/6

    MochammadImronOceanengineeringstudent,15510017http://www.ocean.itb.ac.id

    January29,2014

    2DPipelineBottomRoughness

    Leaveacomment

    Now,ImstartingtouseenglishforwordsinmyblogbecauseIwanttoupgrademyenglishskillinwriting.hehehehe(Ihopenoneofyouwillbeconfusedwithmyword).Today,Iwanttoshareaboutonbottomroughness(OBR)analysis.Whatsisbottomroughness?Itsananalysistopredictthelocationofspanalongsubseapipelineafterinstallationorduringoperation.So,whatsthedifferentbetweenfreespananalysis?freespananalysisisonlydeterminethemaximumallowablelengthofpipelinethatunsupportedwhenlaidonseabed.ThecriteriaofallowablespanisdividedintoVIV(VortexInducedVibration)andULS(UltimateLimitStateorStaticCriteria).Whybottomroughnessanalysisissoimportant?Withoutbottomroughnessanalysisyoudontknowhowmanysupport(sandbag,groutbag,etc)thatyouneedtorectifyofoverspan.However,itsonlyprediction,soyouneedfurtherinspectiontoensurethelocationofoverspan.

    (http://dyurindatama.files.wordpress.com/2013/02/picture4.png)

    2DOBRanalysisisverysimple,youcanuseanyFEAsoftweresuchasABAQUS,ANSYS,etc..Forthisnote,IusedABAQUSFEAasmnyOBRsimulator.Thepipelinecanbemodelledusing1Delement(PIPE31H)andtheseabedcanbemodeledusinganlayticalrigidofsurface.ThecommonstepthatusedforBottomRoughnessisadoptedfromSubseaPipelines&Riserbook(2005,YongBai&QiangBai)

  • 6/21/2015 2DPipelineBottomRoughness|MochammadImron

    https://mochammadimron.wordpress.com/2014/01/29/2dpipelinebottomroughness/ 2/6

    (http://dyurindatama.files.wordpress.com/2013/02/picture5.png)

    AfterODBfileisproducedfromyourABAQUSFEAmachine,forthenextstepyouneedtoextractCOORD1(coordinateofpipelineKP),COORD3(waterdepthofyourBottomofPipe[BOP]),andCPRESS(ContactpressureasindicatoronlytomakesureeachnodeofpipelineBOPistouchingseabedornot).YoucanusepythonfileorextractmanuallyusingAbaqusViewer.

    1. OpenyourODBfile(doubleclickyouODBfileoropenusingAbaqusViewer).Ontheleftsideyouwillseethetreeand2Xclickthestepyouwanttoextract.

    2. CreatePath.Onthemenubar,pleaseclickTools>Path>Createandyoutypeyourpathname,clickOKthenyouwillfaceEditNodeListPathandpleasefillNodeLabelsyouwanttoextractthevalue,forexample1:7399(itmeansnode1tonode7399).

    3. CreateXYData.ClickTools>XYData>Manager.Pleaseseepicturebelowforeasyexplanation.EachofyourXYdatashallbecopiedinMicrosoftExcel.Pleasecheckanybug/errorwithyouroutputresult.

  • 6/21/2015 2DPipelineBottomRoughness|MochammadImron

    https://mochammadimron.wordpress.com/2014/01/29/2dpipelinebottomroughness/ 3/6

    (http://dyurindatama.files.wordpress.com/2013/02/picture11.png)

    Beforeyoutryprocessfurtherwithyourexcelspreadsheet,youmustinterpolateyourwaterdepthofseabed(thathasbeeninputedinabaqus)againstyourCOORD1data(coordinateofpipelineKP),thenyouwillgetnewwaterdepthofseabedwithsameKPwithyourCOORD1data.DivideyourExcelspreadsheetinto2Sheets.

    Inthesheetno.1youneedtosetyoursheetasasamplebelow.Youwillseeanynumberspanstart&spanendalongthepipeline.Pleasemakesureduringpipelineembedded(negativevalueofspangap)thereareanyvalueofCPRESSandviceverse.Themaximumgapvaluealongpipelinemustbeinputtedintoallowablefreespananalysis(onset/screening/fatiguecriteriaasperDNVRPF105)

  • 6/21/2015 2DPipelineBottomRoughness|MochammadImron

    https://mochammadimron.wordpress.com/2014/01/29/2dpipelinebottomroughness/ 4/6

    (http://dyurindatama.files.wordpress.com/2013/02/picture1.png)

    Afterthat,youhavetosort&filtereachspanstart&spanend,thencopythisKPintosheetno.2asapicturebelow.Fromeachthisformulayouwillgettheoverspanresults.PleasenoticethatthisscreeningwillusedmaximumgapvaluealongKPstartandKPend.TheminimumspangapvaluethatinfluenceVIV,is30%OD(Ref:OTCNo.4455,1983,TheInfluenceofBoundaryLayerVelocityGradientsandBedProximityOnVortexSheddingfromFreeSpanningPipeline).Somepeopleused20%OD(Ref:SumerandFredsoe,1989,HydrodynamiccsaroundCylindricalStructures)asconservatismresult

  • 6/21/2015 2DPipelineBottomRoughness|MochammadImron

    https://mochammadimron.wordpress.com/2014/01/29/2dpipelinebottomroughness/ 5/6

    (http://dyurindatama.files.wordpress.com/2013/02/picture2.png)

    Theanalysishasnotoveryet.First,youneedtocheckwithcentrethirdofpipelinecriteria.Iftheaveragecenterthirdofpipelinebelowallowablegapvalue,youcanignoredthisoverspanifitiscausedbyVIVonly(notULS/Staticcriteria).Butif,youwantgettheconservatismresult,youcanconsiderthisspanisoverspan(Butitwillaffectyourspanrectificationcost).Second,youneedtochecktheupliftpossibility(orlooklikeupheaval)inyourABAQUSFEAmodel.Itshouldbenothappenedbecausetheweightofpipelineandwave/currentwillforcedthisupliftsectiontodroponseabedaslateralbuckling.So,ifyouroverspanisoccurinthisupliftsection,pleaseignoreitasaspan,butyoumustchecktheintegrityofthissection(UsingLoadcontrolledCheck&DisplacementControlCheckasperDNVF101).Third,youneedtoreassessedagaineachoverspansectionwitheachgapvalueandrecalculateagaininallowablefreespanassessment,soyouwillgetnewallowablespanthatlongerthanbefore.

    Your2DBottomRoughnessAnalysisisendfromhere.Butifyouwant,youcandoreanalysis(startformsheet1)withinteractivityphenomenon[duringVIV,yourspaniswillinducedvibrationwithitsneighborspan,somakethiseffectivelengthislongerthanisolatedspan].AsperDNVRPF105,youcandeterminedeachspanisakindofisolatedorinteractingspanasadiagrambelow.

  • 6/21/2015 2DPipelineBottomRoughness|MochammadImron

    https://mochammadimron.wordpress.com/2014/01/29/2dpipelinebottomroughness/ 6/6

    (http://dyurindatama.files.wordpress.com/2013/02/picture3.png)

    reference:

    http://dyurindatama.wordpress.com/2013/02/10/2dpipelinebottomroughness/(http://dyurindatama.wordpress.com/2013/02/10/2dpipelinebottomroughness/)

    PostedbymochammadimroninPersonal