2.create work center
DESCRIPTION
SAP PP Create Work CenterTRANSCRIPT
Business Process Procedures
SAP ECC 6.0 EhP3
March 2001August 2008EnglishEnglish
Create Work Center (155.21)
SAP AGDietmar-Hopp-Allee 1669190 WalldorfGermanyMaster Data Procedure
Copyright Copyright 2008 SAP AG. All rights reserved. No part of this publication may be reproduced or transmitted in any form or for any purpose without the express permission of SAP AG. The information contained herein may be changed without prior notice. Some software products marketed by SAP AG and its distributors contain proprietary software components of other software vendors. Microsoft, Windows, Excel, Outlook, and PowerPoint are registered trademarks of Microsoft Corporation. IBM, DB2, DB2 Universal Database, OS/2, Parallel Sysplex, MVS/ESA, AIX, S/390, AS/400, OS/390, OS/400, iSeries, pSeries, xSeries, zSeries, System i, System i5, System p, System p5, System x, System z, System z9, z/OS, AFP, Intelligent Miner, WebSphere, Netfinity, Tivoli, Informix, i5/OS, POWER, POWER5, POWER5+, OpenPower and PowerPC are trademarks or registered trademarks of IBM Corporation.
Adobe, the Adobe logo, Acrobat, PostScript, and Reader are either trademarks or registered trademarks of Adobe Systems Incorporated in the United States and/or other countries.
Oracle is a registered trademark of Oracle Corporation.
UNIX, X/Open, OSF/1, and Motif are registered trademarks of the Open Group. Citrix, ICA, Program Neighborhood, MetaFrame, WinFrame, VideoFrame, and MultiWin are trademarks or registered trademarks of Citrix Systems, Inc. HTML, XML, XHTML and W3C are trademarks or registered trademarks of W3C, World Wide Web Consortium, Massachusetts Institute of Technology. Java is a registered trademark of Sun Microsystems, Inc. JavaScript is a registered trademark of Sun Microsystems, Inc., used under license for technology invented and implemented by Netscape. SAP, R/3, xApps, xApp, SAP NetWeaver, Duet, PartnerEdge, ByDesign, SAP Business ByDesign, and other SAP products and services mentioned herein as well as their respective logos are trademarks or registered trademarks of SAP AG in Germany and in several other countries all over the world. All other product and service names mentioned are the trademarks of their respective companies. Data contained in this document serves informational purposes only. National product specifications may vary.
These materials are subject to change without notice. These materials are provided by SAP AG and its affiliated companies ("SAP Group") for informational purposes only, without representation or warranty of any kind, and SAP Group shall not be liable for errors or omissions with respect to the materials. The only warranties for SAP Group products and services are those that are set forth in the express warranty statements accompanying such products and services, if any. Nothing herein should be construed as constituting an additional warranty.Icons
IconMeaning
Caution
Example
Note
Recommendation
Syntax
External process
Business Process Alternative/Decision Choice
Typographic Conventions
Type StyleDescription
Example textWords or characters that appear on the screen. These include field names, screen titles, pushbuttons as well as menu names, paths and options.
Cross-references to other documentation.
Example textEmphasized words or phrases in body text, titles of graphics and tables.
EXAMPLE TEXTNames of elements in the system. These include report names, program names, transaction codes, table names, and individual key words of a programming language, when surrounded by body text, for example, SELECT and INCLUDE.
Example textScreen output. This includes file and directory names and their paths, messages, source code, names of variables and parameters as well as names of installation, upgrade and database tools.
EXAMPLE TEXTKeys on the keyboard, for example, function keys (such as F2) or the ENTER key.
Example textExact user entry. These are words or characters that you enter in the system exactly as they appear in the documentation.
Variable user entry. Pointed brackets indicate that you replace these words and characters with appropriate entries.
Contents
51Purpose
52Prerequisites
52.1Business Conditions
52.2Roles
63Process Steps
63.1Creating Work Center
93.2Work Centers for Services
124Follow-Up Processes
124.1Maintaining Work Center Hierarchy
124.2Creating Routings
135Appendix
135.1Reversal of Process Steps
Create Work Center 1 Purpose
In this document, a work center is created.
2 Prerequisites
2.1 Business ConditionsThe activities described in this document are part of a bigger chain of integrated business processes or scenarios. As a consequence, you must have fulfilled the following business conditions before you can start the activities described in this document:Business conditionScenario
Create Cost Center and Cost Center GroupCreate Cost Center and Cost Center Group (155.03)
Create Activity Type / Groups Create Activity Type / Groups (155.09)
2.2 Roles
UseThe following roles must have been installed to allow the relevant activities to be carried out in the SAP NetWeaver Business Client (NWBC). In addition, they must be assigned to the user or users who will perform the process steps described in this document. You do not need these roles if you are not using the NWBC interface, but the standard SAP GUI.
Prerequisites
The business roles have been assigned to the user(s) who will perform the process steps described in this document.Business roleTechnical nameProcess step
Engineering SpecialistSAP_BPR_ENG_SPECIALIST_EX-SCreate Work center
3 Process Steps3.1 Creating Work Center Use
A new work center / resource is needed.Procedure
1. Access the transaction choosing one of the following navigation options:
Option 1: SAP Graphical User Interface (SAP GUI):SAP ECC menuLogistics ( Production ( Master Data ( Work Centers ( Work Center ( Create (CR01)
Transaction codeCR01
Option 2: SAP NetWeaver Business Client (SAP NWBC) via business roleBusiness roleEngineering Specialist (SAP_BPR_ENG_SPECIALIST_EX-S)
Business role menuEngineering ( Work Centers ( Create Work Center
2. On the Create Work Center: Initial screen make following entriesField nameDescriptionUser action and valuesComment
Plant1000
Work centerenter work center
Work center catMachine
Production LinePlant maintenance0001 00070005Use for services
3. On the Create Work Center: Basic Data screen make following entries:Field nameDescriptionUser action and valuesComment
Descriptionenter work center description
Person responsibleselect from listUse for services
Usage009 All task list types004 Only maintenance task listsUse for services
Standard value keyfor normal productionNo standard valuesSAP1 SAP0Use for services
4. On the Default values Tab make following entries:Field nameDescriptionUser action and valuesComment
Control KeyPlant maintenance internalPM01 Use for services
5. On the Capacities Tab make following entries:Field nameDescriptionUser action and valuesComment
Capacity CategoryMachine
Person001
002 Use for services
Set Up formulafor production setup requirementsSAP005 Is not used for services
Processing formulafor production machine requirementsSAP006 Is not used for services
Other formulaProj:RqmtsNetwkMaintSAP008Use for services
6. Choose Enter. The Create Work Center Capacity: Header screen appears.Field nameDescriptionUser action and valuesComment
Capacity categoryEnter a description
Capacity planner grpSelect from listA / B / C Use A for services
Factory calendar IDFor GermanyIN
Active version1
Base unit of meas.Choose Unit of measureUse value H (hours) for services
Standard available capacity
Start08:00:00 for 8 amEnter a time for start
Finish17:00:00 for 5 pmEnter a time for finish
Length of breaks01:00:00 for 1 hourEnter a time for length of break
Operating TimeIs calculated and set automatically
Capacity UtilizationEnter the capacity utilization rate 100 for 100%100
No.of indiv.cap.Number of elements which make up a capacity group.10
Planning Details
Relevant for finite schedulingSelect checkboxX
Long term PlanningSelect checkboxX
Can be used by several operationsSelect checkboxXIs not selected for services.
If you are working with capacities you can reference to available capacities (for example, pool capacities). To do so choose Reference Available Capacity and enterField nameDescriptionUser action and valuesComment
Plant1000
Capacity enter capacity you have created before
Capcity categoryMachine
Person001
002
Repeat these steps if you want to assign a second capacity category. Choose Enter.7. Choose Scheduling tab page. Enter the following values:Field nameDescriptionUser action and valuesComment
Capacity categoryMachine
Person001
002 Use for services
CapacityEnter capacity created beforeOnly if you are working with referenced capacities Is not used for services
Setup formulafor production setup timeSAP001 Is not used for services
Processing formulafor production machine timeSAP002 Is not used for services
Other formulaProj:Netw/Maint.TimeSAP004
8. Choose Costing tab page. Enter the following values:Field nameDescriptionUser action and valuesComment
Cost centerChoose the cost center for services/consultingCost center for services, for example, 1321
ActTypeInt.Proc.Service Standard101Use for services
Formula KeyProj:RqmtsNetwkMaintSAP008Use for services
Activity type(Setup)3Is not used for services
Formula(Setup)SAP005Is not used for services
Activity type(Machine)1Is not used for services
Formula(Machine)SAP006Is not used for services
Activity type(Labor)11Is not used for services
Formula(Labor)SAP007Is not used for services
Activity Unit Choose UoM if required e.g. MINIs not used for services
9. Choose Save.Result
The work center is created.
To view the work center, run transaction code of CR60 or use the SAPGUI menu path Logistics ( Production ( Master Data ( Work Centers ( Reporting ( Work Center Information System.
You will need to resume this transaction to continue with the next.
3.2 Work Centers for Services
Use
A new work center (work center category 0005) is needed.
Procedure1. Access the transaction choosing one of the following navigation options:
Option 1: SAP Graphical User Interface (SAP GUI):
SAP ECC menuLogistics ( Customer Service ( Service Agreements ( Environment ( Work Centers ( Work Center ( Create
Transaction codeIR01
Option 2: SAP NetWeaver Business Client (SAP NWBC) via business role
Business roleMaintenance Employee (SAP_BPR_MAINTENANCE-S)
Business role menuProduct Maintenance ( Planning ( Create Work Center
2. On the Create Work Center: Initial Screen, enter the data and choose Enter.
Field nameDescriptionUser action and values
Plant1000
Work centerenter work center
Work center cat.0005
3. On the Basic Data screen make following entries:Field nameDescriptionUser action and valuesComment
Descriptionenter work center description
Person responsibleselect from list
Usage004 Only maintenance task lists
Standard value keyNo standard valuesSAP0
4. For additional languages go to Extras ( Short texts.5. Choose New entries and make the following entries:
Field NameDescription
Lang.Enter a language key
Object nameenter work center description
6. On the Default values tab make following entries:Field nameDescriptionUser action and valuesComment
Control KeyPlant maintenance internalPM01 Use for services
7. On the Capacities tab make following entries:Field nameDescriptionUser action and valuesComment
Capacity CategoryPerson002
Other formulaProj:RqmtsNetwkMaintSAP008
8. Choose Enter. The Create Work Center Capacity: Header screen appears. Make the following entries:
Field nameDescriptionUser action and valuesComment
Capacity category002
Capacity planner grpSelect from listA
Factory calendar IDFor Germany01
Active version1
Base unit of meas.Choose Unit of measureUse value H (hours) for services
Standard available capacity
StartEnter a time for start
FinishEnter a time for finish
Length of breaksEnter a time for length of break
Operating TimeIs calculated and set automatically
Capacity UtilizationEnter the capacity utilization rate100
No.of indiv.cap.Number of elements which make up a capacity group.10
Planning Details
Relevant for finite schedulingSelect checkboxX
Long term PlanningSelect checkboxX
Can be used by several operationsDo not select checkbox
9. Choose Back.10. Choose Scheduling tab page. Enter the following values:
Field nameDescriptionUser action and valuesComment
Capacity categoryPerson002
Other formulaOther formulaSAP004
11. Choose Costing tab page. Enter the following values:
Field nameDescriptionUser action and valuesComment
Start dateEnter start Date
End DateEnter End Date
Cost center(1321)Choose the cost center for services/consulting
ActType Int. Proc.101
Formula KeySAP008Enter the Formula key for costing in the second field
12. Choose Save.
Result
The system issues the message that the work center in plant 1000 was created.4 Follow-Up Processes
4.1 Maintaining Work Center Hierarchy
Use
This activity will maintain work center hierarchy.
Procedure
To execute this activity, run the Maintain Work Center Hierarchy (155.22) scenario.
4.2 Creating RoutingsUseThis activity will create routings.
Procedure
To execute this activity, run the Create Routings (155.39) scenario.
5 Appendix
5.1 Reversal of Process Steps
In the following section, you can find the most common reversal steps, which you can take to reverse some of the activities described in this document,
Creating a Request for Quotation
Transaction code ( SAP GUI)CR02
Reversal:Delete Work center
Transaction code ( SAP GUI)CR02
Business roleEngineering Specialist (SAP_BPR_ENG_SPECIALIST_EX-S)
Business role menuEngineering ( Work Centers ( Change Work Center
CommentIn transaction CR02 choose from the menu: Work center ( Delete
SAP AG
Page 13 of 13
_1118216528.bin