275/132 kv substation, to the east, and a second 132kv line from para substation, to the south....
- Home
- Documents
- 275/132 kV substation, to the east, and a second 132kV line from Para substation, to the south. Playford 132 kV switchyard, to the north,
24
Upload: doancong
Post on 13-Apr-2018
272 views