2665 s01-s04 ver 05

4
MEMBER SCHEDULE (for one site) MARK DESCRIPTION QTY REMARKS 1 [ &+6 1 C350 2 [ &+6 1 C250 3 13-16011-018 Steel Cap Assembly (PM6-A,PM8-A) 1 SET CLENERGY 4 13-16011-019 Adjustable Tube 100x50x576 (PM6-A, PM8-A) 1 CLENERGY 5 13-15011-019 Main Tube 100x100x1900 (PM6-A) 1 CLENERGY 6 13-15011-037 Landscape Tube 70x70x2600 (PM6-A,PM8-A) 3 CLENERGY 7 13-10015-072 Standard Rail 3150 4 CLENERGY 8 PV MODULE Size 1650x992 6 9 13-110011-004 End Clamp 40mm 8 CLENERGY 10 13-11010-004 Inter Clamp 40mm 12 CLENERGY 11 13-16011-027 Accessory Pacakage (PM6-A, PM8-A) 1 CLENERGY 1 2 3 5 6 7 8 %RUHG 3LHU Footing f'c=32 MPa With 150 kPa Min. End Bearing Pressure Date Amendment Issue Project: Rev. Date: A3 Scale: Drawn: Job No: Plot Date: APPROVED DRAWING No Designed: Sheet No. Client: C Copyright Title: 2665 S01-S04 Ver 05.dwg CHECKED By S01 CUSTOM DESIGNED POST MOUNTED SOLAR PANEL SUPPORTS. 4 LOCATIONS @ Mt KOSCIUSKO NATIONAL PARK REGAL ELECTRO SEPT'16 AS SHOWN K.Z S.P 1 OF 4 2665 C4 ELEVATION & MEMBER SCHEDULE M.A M.A 4 9 10 ELEVATION SCALE = 1:50 ALL STEEL WORKS EXPOSED TO THE WEATHER SHALL BE HOT DIP GALVANIZING $7 7+( 5$7( 2) .JPð 81/(66 OTHER WISE NOTED NOTE: IN WINTER THE PANEL ANGLE MUST BE $'-867(' 72 72 $92,' 612: /2$',1* ON PANELS & RAIL COMPONENTS.

Upload: zhichao-zhang

Post on 08-Jan-2017

5 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: 2665 S01-S04 Ver 05

MEMBER SCHEDULE (for one site)

MARK DESCRIPTION QTY REMARKS

1 Ø 273.1 x 9.3 CHS 1 C350

2 Ø 152.4 x 6.0 CHS 1 C250

3

13-16011-018 Steel Cap Assembly (PM6-A,PM8-A)

1 SET CLENERGY

4

13-16011-019 Adjustable Tube 100x50x576 (PM6-A, PM8-A)

1 CLENERGY

5

13-15011-019 Main Tube 100x100x1900 (PM6-A)

1 CLENERGY

6

13-15011-037 Landscape Tube 70x70x2600 (PM6-A,PM8-A)

3 CLENERGY

7 13-10015-072 Standard Rail 3150 4 CLENERGY

8 PV MODULE Size 1650x992 6

9

13-110011-004 End Clamp 40mm

8 CLENERGY

10

13-11010-004 Inter Clamp 40mm

12 CLENERGY

11

13-16011-027 Accessory Pacakage (PM6-A, PM8-A)

1 CLENERGY

1

2

3

5

6

7

8

Ø 750 Bored Pier

Footing f'c=32 MPa

With 150 kPa Min.

End Bearing Pressure

DateAmendmentIssue

Project:

Rev.

Date:

A3 Scale:

Drawn:

Job No:

Plot Date:

APPROVEDDRAWING No

Designed:

Sheet No.

Client:

CCopyright

Title:

2665 S01-S04 Ver 05.dwg

CHECKED

By

S01

CUSTOM DESIGNED POST MOUNTED

SOLAR PANEL SUPPORTS. 4 LOCATIONS

@ Mt KOSCIUSKO NATIONAL PARK

REGAL ELECTRO

SEPT'16

AS SHOWN

K.Z

S.P

1 OF 4

2665 C4

ELEVATION & MEMBER SCHEDULE

M.A M.A

49

10

ELEVATION

SCALE = 1:50

ALL STEEL WORKS EXPOSED TO THE

WEATHER SHALL BE HOT DIP GALVANIZING

AT THE RATE OF 0.6 - 0.7 Kg/m² UNLESS

OTHER WISE NOTED

NOTE:

IN WINTER THE PANEL ANGLE MUST BE

ADJUSTED TO 60° TO AVOID SNOW LOADING

ON PANELS & RAIL COMPONENTS.

Page 2: 2665 S01-S04 Ver 05

DateAmendmentIssue

Project:

Rev.

Date:

A3 Scale:

Drawn:

Job No:

Plot Date:

APPROVEDDRAWING No

Designed:

Sheet No.

Client:

CCopyright

Title:

2665 S01-S04 Ver 05.dwg

CHECKED

By

S02

CUSTOM DESIGNED POST MOUNTED

SOLAR PANEL SUPPORTS. 4 LOCATIONS

@ Mt KOSCIUSKO NATIONAL PARK

REGAL ELECTRO

SEPT'16

AS SHOWN

K.Z

S.P

2 OF 4

2665 C3

DETAIL ELEVATION & 3D VIEW

M.A M.A

D1

S03

D2

S03

1

2

3

5

6

7

8

4

9

10

11

2

5

8

7

6

3

3D VIEW

SCALE = 1:20

DETAIL ELEVATION

SCALE = 1:20

Page 3: 2665 S01-S04 Ver 05

DateAmendmentIssue

Project:

Rev.

Date:

A3 Scale:

Drawn:

Job No:

Plot Date:

APPROVEDDRAWING No

Designed:

Sheet No.

Client:

CCopyright

Title:

2665 S01-S04 Ver 05.dwg

CHECKED

By

S03

CUSTOM DESIGNED POST MOUNTED

SOLAR PANEL SUPPORTS. 4 LOCATIONS

@ Mt KOSCIUSKO NATIONAL PARK

REGAL ELECTRO

SEPT'16

AS SHOWN

K.Z

S.P

3 OF 4

2665 C4

SECTION DETAILS

M.A M.A

DETAIL

SCALE = 1:5

D1

S02

2

1

1

DETAIL

SCALE = 1:5

D2

S02

A A

B B

SECTION

SCALE = 1:5

AA

-

SECTION

SCALE = 1:5

BB

-

1

2

8

8

8

1

3

2

BASE PLATE

SCALE = 1:10

8

8

Page 4: 2665 S01-S04 Ver 05

DateAmendmentIssue

Project:

Rev.

Date:

A3 Scale:

Drawn:

Job No:

Plot Date:

APPROVEDDRAWING No

Designed:

Sheet No.

Client:

CCopyright

Title:

2665 S01-S04 Ver 05.dwg

CHECKED

By

S04

CUSTOM DESIGNED POST MOUNTED

SOLAR PANEL SUPPORTS. 4 LOCATIONS

@ Mt KOSCIUSKO NATIONAL PARK

REGAL ELECTRO

SEPT'16

AS SHOWN

K.Z

S.P

4 OF 4

2665 C2

M.A M.A

ELEVATION

SCALE = 1:50

ALL STEEL WORKS EXPOSED TO THE

WEATHER SHALL BE HOT DIP GALVANIZING

AT THE RATE OF 0.6 - 0.7 Kg/m² UNLESS

OTHER WISE NOTED

NOTE:

IN WINTER THE PANEL ANGLE MUST BE

ADJUSTED TO 60° TO AVOID SNOW LOADING

ON PANELS & RAIL COMPONENTS.

1

2

3

5

6

7

8

4

9

10

PLAN

SCALE = 1:50

SECTION

SCALE = 1:20

CC

-

CC

1