2608-sp-tss
TRANSCRIPT
-
8/14/2019 2608-SP-TSS
1/9
Job: Sharon Hills
Sheet No. 1 of 1
Calc by: SCS Date 10/23/2008Check by: Date
TSS Removal For : POND #1
TSS
Removal
Rate Starting TSS Load(1)
Amount
Removed
Remaining
Load
25% 100% 25% 75%
60% 75% 45% 30%
50% 30% 15% 15%
Total TSS Removal = 85%(1) Equals remaining load from previous BMP
Best Management Practice (BMP)
Deep Sump Catch Basins
Downstream Defender
Extended Detention Basin
-
8/14/2019 2608-SP-TSS
2/9
Job: Sharon Hills
Sheet No. 1 of 1
Calc by: SCS Date 10/23/2008Check by: Date
TSS Removal For : POND #5
TSS
Removal
Rate Starting TSS Load(1)
Amount
Removed
Remaining
Load
25% 100% 25% 75%
60% 75% 45% 30%
50% 30% 15% 15%
Total TSS Removal = 85%(1) Equals remaining load from previous BMP
Best Management Practice (BMP)
Deep Sump Catch Basins
Downstream Defender
Extended Detention Basin
-
8/14/2019 2608-SP-TSS
3/9
Job: Sharon Hills
Sheet No. 1 of 1
Calc by: SCS Date 10/23/2008Check by: Date
TSS Removal For : POND #6
TSS
Removal
Rate Starting TSS Load(1)
Amount
Removed
Remaining
Load
25% 100% 25% 75%
60% 75% 45% 30%
50% 30% 15% 15%
Total TSS Removal = 85%(1) Equals remaining load from previous BMP
Best Management Practice (BMP)
Deep Sump Catch Basins
Downstream Defender
Extended Detention Basin
-
8/14/2019 2608-SP-TSS
4/9
Job: Sharon Hills
Sheet No. 1 of 1
Calc by: SCS Date 10/23/2008Check by: Date
TSS Removal For : POND #7
TSS
Removal
Rate Starting TSS Load(1)
Amount
Removed
Remaining
Load
25% 100% 25% 75%
60% 75% 45% 30%
50% 30% 15% 15%
Total TSS Removal = 85%(1) Equals remaining load from previous BMP
Best Management Practice (BMP)
Deep Sump Catch Basins
Downstream Defender
Extended Detention Basin
-
8/14/2019 2608-SP-TSS
5/9
Job: Sharon Hills
Sheet No. 1 of 1
Calc by: SCS Date 10/23/2008Check by: Date
TSS Removal For : Recharge Area 1
TSS
Removal
Rate Starting TSS Load(1)
Amount
Removed
Remaining
Load
25% 100% 25% 75%
60% 75% 45% 30%
80% 30% 24% 6%
Total TSS Removal = 94%(1) Equals remaining load from previous BMP
Note: >40% removal prior to infiltration
Best Management Practice (BMP)
Deep Sump Catch Basins
Downstream Defender
Infiltration
-
8/14/2019 2608-SP-TSS
6/9
Job: Sharon Hills
Sheet No. 1 of 1
Calc by: SCS Date 10/23/2008Check by: Date
TSS Removal For : Recharge Area 2
TSS
Removal
Rate Starting TSS Load(1)
Amount
Removed
Remaining
Load
25% 100% 25% 75%
80% 75% 60% 15%
80% 15% 12% 3%
Total TSS Removal = 97%(1) Equals remaining load from previous BMP
Note: >40% removal prior to infiltration
Best Management Practice (BMP)
Deep Sump Catch Basins
Isolator Row
Infiltration
-
8/14/2019 2608-SP-TSS
7/9
Job: Sharon Hills
Sheet No. 1 of 1
Calc by: SCS Date 10/23/2008Check by: Date
TSS Removal For : Recharge Area 3
TSS
Removal
Rate Starting TSS Load(1)
Amount
Removed
Remaining
Load
25% 100% 25% 75%
80% 75% 60% 15%
80% 15% 12% 3%
Total TSS Removal = 97%(1) Equals remaining load from previous BMP
Note: >40% removal prior to infiltration
Best Management Practice (BMP)
Deep Sump Catch Basins
Isolator Row
Infiltration
-
8/14/2019 2608-SP-TSS
8/9
Job: Sharon Hills
Sheet No. 1 of 1
Calc by: SCS Date 10/23/2008Check by: Date
TSS Removal For : P33
TSS
Removal
Rate Starting TSS Load(1)
Amount
Removed
Remaining
Load
25% 100% 25% 75%
70% 75% 53% 23%Total TSS Removal = 78%
(1) Equals remaining load from previous BMP
Best Management Practice (BMP)
Deep Sump Catch Basins
Downstream Defender
-
8/14/2019 2608-SP-TSS
9/9
Job: Sharon Hills
Sheet No. 1 of 1
Calc by: SCS Date 10/23/2008
Check by: Date
TSS Removal For : AF1 (P22)
TSS
Removal
Rate Starting TSS Load(1)
Amount
Removed
Remaining
Load
25% 100% 25% 75%
80% 75% 60% 15%Total TSS Removal = 85%
(1) Equals remaining load from previous BMP
Best Management Practice (BMP)
Deep Sump Catch Basins
Aquafilter