    Job: Sharon Hills

    Sheet No. 1 of 1

    Calc by: SCS Date 10/23/2008Check by: Date

    TSS Removal For : POND #1

    TSS

    Removal

    Rate Starting TSS Load(1)

    Amount

    Removed

    Remaining

    Load

    25% 100% 25% 75%

    60% 75% 45% 30%

    50% 30% 15% 15%

    Total TSS Removal = 85%(1) Equals remaining load from previous BMP

    Best Management Practice (BMP)

    Deep Sump Catch Basins

    Downstream Defender

    Extended Detention Basin

  • 8/14/2019 2608-SP-TSS

    2/9

    Job: Sharon Hills

    Sheet No. 1 of 1

    Calc by: SCS Date 10/23/2008Check by: Date

    TSS Removal For : POND #5

    TSS

    Removal

    Rate Starting TSS Load(1)

    Amount

    Removed

    Remaining

    Load

    25% 100% 25% 75%

    60% 75% 45% 30%

    50% 30% 15% 15%

    Total TSS Removal = 85%(1) Equals remaining load from previous BMP

    Best Management Practice (BMP)

    Deep Sump Catch Basins

    Downstream Defender

    Extended Detention Basin

  • 8/14/2019 2608-SP-TSS

    3/9

    Job: Sharon Hills

    Sheet No. 1 of 1

    Calc by: SCS Date 10/23/2008Check by: Date

    TSS Removal For : POND #6

    TSS

    Removal

    Rate Starting TSS Load(1)

    Amount

    Removed

    Remaining

    Load

    25% 100% 25% 75%

    60% 75% 45% 30%

    50% 30% 15% 15%

    Total TSS Removal = 85%(1) Equals remaining load from previous BMP

    Best Management Practice (BMP)

    Deep Sump Catch Basins

    Downstream Defender

    Extended Detention Basin

  • 8/14/2019 2608-SP-TSS

    4/9

    Job: Sharon Hills

    Sheet No. 1 of 1

    Calc by: SCS Date 10/23/2008Check by: Date

    TSS Removal For : POND #7

    TSS

    Removal

    Rate Starting TSS Load(1)

    Amount

    Removed

    Remaining

    Load

    25% 100% 25% 75%

    60% 75% 45% 30%

    50% 30% 15% 15%

    Total TSS Removal = 85%(1) Equals remaining load from previous BMP

    Best Management Practice (BMP)

    Deep Sump Catch Basins

    Downstream Defender

    Extended Detention Basin

  • 8/14/2019 2608-SP-TSS

    5/9

    Job: Sharon Hills

    Sheet No. 1 of 1

    Calc by: SCS Date 10/23/2008Check by: Date

    TSS Removal For : Recharge Area 1

    TSS

    Removal

    Rate Starting TSS Load(1)

    Amount

    Removed

    Remaining

    Load

    25% 100% 25% 75%

    60% 75% 45% 30%

    80% 30% 24% 6%

    Total TSS Removal = 94%(1) Equals remaining load from previous BMP

    Note: >40% removal prior to infiltration

    Best Management Practice (BMP)

    Deep Sump Catch Basins

    Downstream Defender

    Infiltration

  • 8/14/2019 2608-SP-TSS

    6/9

    Job: Sharon Hills

    Sheet No. 1 of 1

    Calc by: SCS Date 10/23/2008Check by: Date

    TSS Removal For : Recharge Area 2

    TSS

    Removal

    Rate Starting TSS Load(1)

    Amount

    Removed

    Remaining

    Load

    25% 100% 25% 75%

    80% 75% 60% 15%

    80% 15% 12% 3%

    Total TSS Removal = 97%(1) Equals remaining load from previous BMP

    Note: >40% removal prior to infiltration

    Best Management Practice (BMP)

    Deep Sump Catch Basins

    Isolator Row

    Infiltration

  • 8/14/2019 2608-SP-TSS

    7/9

    Job: Sharon Hills

    Sheet No. 1 of 1

    Calc by: SCS Date 10/23/2008Check by: Date

    TSS Removal For : Recharge Area 3

    TSS

    Removal

    Rate Starting TSS Load(1)

    Amount

    Removed

    Remaining

    Load

    25% 100% 25% 75%

    80% 75% 60% 15%

    80% 15% 12% 3%

    Total TSS Removal = 97%(1) Equals remaining load from previous BMP

    Note: >40% removal prior to infiltration

    Best Management Practice (BMP)

    Deep Sump Catch Basins

    Isolator Row

    Infiltration

  • 8/14/2019 2608-SP-TSS

    8/9

    Job: Sharon Hills

    Sheet No. 1 of 1

    Calc by: SCS Date 10/23/2008Check by: Date

    TSS Removal For : P33

    TSS

    Removal

    Rate Starting TSS Load(1)

    Amount

    Removed

    Remaining

    Load

    25% 100% 25% 75%

    70% 75% 53% 23%Total TSS Removal = 78%

    (1) Equals remaining load from previous BMP

    Best Management Practice (BMP)

    Deep Sump Catch Basins

    Downstream Defender

  • 8/14/2019 2608-SP-TSS

    9/9

    Job: Sharon Hills

    Sheet No. 1 of 1

    Calc by: SCS Date 10/23/2008

    Check by: Date

    TSS Removal For : AF1 (P22)

    TSS

    Removal

    Rate Starting TSS Load(1)

    Amount

    Removed

    Remaining

    Load

    25% 100% 25% 75%

    80% 75% 60% 15%Total TSS Removal = 85%

    (1) Equals remaining load from previous BMP

    Best Management Practice (BMP)

    Deep Sump Catch Basins

    Aquafilter