25 years anniversary

28
PERI Asia Pte Ltd Special Edition | 2016 SG 25 th company anniversary Successful construction with PERI Foreword Page 5 PERI | Innovation and leadership in formwork and scaffolding technology Page 6 PERI Asia | Your local material and equipment supplier and engineering company Page 12 PERI Asia | Reference Projects Page 16

Upload: william-chui

Post on 13-Apr-2017

88 views

Category:

Real Estate


0 download

TRANSCRIPT

Page 1: 25 years anniversary

1

PERI Asia Pte LtdSpecial Edition | 2016 SG

25th company anniversary

Successful construction with PERI

ForewordPage 5

PERI | Innovation and leadership in formwork and scaffolding technologyPage 6

PERI Asia | Your local material and equipment supplier and engineering companyPage 12

PERI Asia | Reference Projects Page 16

Page 2: 25 years anniversary

Marina Bay Sands

Page 3: 25 years anniversary

Content

Foreword 5

PERI | Innovation and leadership 6in formwork and scaffolding technology

Milestones of constructiontechnology

Subsidiaries worldwide

Products and Systems

PERI Asia | Your local material and 12equipment supplier andengineering company

Milestones

Emerging Markets

More than just products

PERI Asia | Reference Projects 16

Civil Engineering

Commercial and Residential Buildings

Institutional Buildings

Industrial Buildings

PERI Cares 26

Page 4: 25 years anniversary

Openness and trust in dealing with each other, recognizing the value-add to our customers as the key for success, being bold and courageous in facing transformation and change – we at PERI live our guiding principles on a daily basis.

Page 5: 25 years anniversary

5

Dear valued partners andprospective customers,

It is a great pleasure for me to introduce our "25th company anniversary” edition to you.

PERI can look back on nearly 50 years of global experience.The great innovation strength and the early internationalisation are the pillars of the global success and steady growth. The high level of customer focus, of quality systems and of expertise create the confidence which has made the company a leading global brand.

After successfully venturing into the Singaporean market in 1982, PERI established its 12th subsidiary in Singapore on 14th May 1991. PERI Asia is today one of more than 60 subsidiaries worldwide.

This year we are celebrating our 25th company anniversary.

PERI Asia has been continuously growing – based on your confidence in our comprehensive services and our strong German foundation as a family owned company with a long-standing sense of values and a clear target: to provide the best performance and service to our customers. Thanks to your trust in our products and systems PERI Asia has been involved in numerous iconic projects across Singapore.

This special edition is dedicated to our long term partners in Singapore.

It showcases the history of PERI, the strong foundation of PERI Asia in Singapore and it displays a variety of your projects, utilising our products and systems, which have been shaping Singapores’ landscape.

On behalf of PERI, my predecessors and my team I would like to thank you for your support and partnership throughout these years.

Rest assured that we will continue working hard to achieve our goal: To be your most innovative and therefore preferred partner for construction and industry in Singapore.

I personally wish you great memories while reading.

We look forward to being of best service to you.

Marco RomahnManaging DirectorPERI Asia Pte Ltd

Page 6: 25 years anniversary

PERIMilestones of construction technology

1969 Founded by Arthur SchwoererPERI T70 - The first girder is produced.

1970 First major contractScharnebeck ship lift facility near Lüneburg, Germany. The world´s biggest twin vertical ship lift connects the Mittelland Canal and the River Elbe bridging a height difference of 38 m.

1974 The first subsidiaries, PERI expands in EuropeThe first subsidiaries are founded in Switzerland and France.

1984 Heading into a new eraPERI USA is the first subsidiary outside the European continent.

GT 24 wooden lattice girderAs a further development of the T-70 V with its 36 cm height, the new GT 24 wooden lattice girder provides more flexibility on the construction site through 12 cm less overall height but with the same dimensional stability.

1985 Atatürk Dam, TurkeyThe mobile SKS single-sided climbing formwork begins its international success story with the construction of the third largest dam in the world.

TRIO – Europe´s leading panel formwork is launchedThe universal wall formwork system is characterized by having few different

individual components resulting in faster forming operations. The patent for the TRIO panel formwork is used for 20 years; immediately after this, imitations start to appear on the market.

1989 A new milestone in self-climbing technologyPERI introduces the ACS self-climbing system. Climbing takes place with the hydraulic climbing mechanism without the use of a crane. Well-designed working platforms protect site personnel during all weathers.

1991 CAD software73 modern CAD work stations replace the drawing boards in Weissenhorn.

Page 7: 25 years anniversary

7

1995 Petronas Towers, Kuala Lumpur, MalaysiaFor construction of the 452 m high building, the use of the ACS self-climbing system ensures smooth and problem-free construction progress.

1998 PERI UP scaffold systemWith the development of the PERI UP scaffold system, PERI begins its activities in the scaffolding market. The PERI UP T 72 facade scaffolding with T-frame and guardrail in advance is safe and cost-effective.

2000 PERI with a new logoThe horizontal arrow symbolizes the increasing market presence and the growing number of satisfied customers.

The vertical arrow stands for the improvement in quality of all PERI services.

Production20,000 linear metres of girders are produced per day.

2003 Viaduc de Millau, FranceThe 2.5 km long cable-stayed bridge is constructed using special steel formwork, which rose steadily upwards cycle-by-cycle with the help of the ACS self-climbing system.

2005 Investment in the futurePERI expands the production area by 80% and doubles the size of the logistics and delivery facilities. Altogether, PERI invests approx.

80 million euros for securing the Weissenhorn plant.

2007 SustainabilityThe biomass power plant at the central production site in Weissenhorn is a symbol of combined economic and ecological sustainability at PERI.

2011 Re-development of the Panama canalThe new construction of the giant lock facilities on the Atlantic and Pacific coasts respectively is the largest single order in the company's history

2013 Implementation of the Market Unit organisationsTo focus on requirements of overseas markets

PERI in Weissenhorn. Headquarters, development and production site since 1969.

Page 8: 25 years anniversary

8

PERISubsidiaries worldwide

With over 60 subsidiaries, we are present on all continents with locally-based experts. From these international activities with widely differing requirements of our customers regarding construction methods, materials and equipment utilization as well as labour costs, we generate our performance leadership.

This profound knowledge in all areas and all markets is bundled together in product development processes which then benefit local users again – everywhere. With the aim: rationalization, simplification, quality, safety. Turning local insights into global knowledge.

1969 - 1979 1997 - 19991980 - 1990 2000 - 20021991 - 1992 2003 - 20051993 2006 - 20071994 - 1995 2008 - 20111996 2012 - 2015

Germany, 1969PERI GmbH

USA, 1982PERI FormworkSystems Inc.

Malaysia, 1991PERI FormworkMalaysia Sdn. Bhd.

Sweden, 1993PERIform Sverige AB

Korea, 1994PERI Korea Ltd.

Brazil, 1996PERI Formas eExcoramentos Ltda.

Australia, 1997PERI Australia Pty. Ltd.

Ukraine, 2000PERI Ukraina

Mexico, 2003PERI Cimbras y Andamios S.A. de C.V.

Russia, 2006OOO PERI Russia

Panama, 2008PERI Panamá Inc.

Colombia, 2012PERI S.A.S.

France, 1974PERI S.A.S.

Italy, 1983PERI S.p.A.

Singapore, 1991PERI ASIA Pte. Ltd.

Norway, 1993PERI Norge AS

Portugal, 1994PERIcofragens, Lda.

Argentina, 1996PERI S.A.

United Arab Emirates 1997PERI (L.L.C.)

Bulgaria, 2000PERI Bulgaria EOOD

Latvia, 2003PERI SIA

India, 2007PERI (India) Pvt. Ltd.

Peru, 2008PERI Peruana S.A.C.

Algeria, 2012SARL PERI

Switzerland, 1974PERI AG

United Kingdom, 1989PERI Ltd.

Austria, 1992PERI Ges. mbH

Poland, 1993PERI Polska Sp. z o.o.

Canada, 1995PERI FormworkSystems Inc.

Chile, 1996PERI Chile Ltda.

Israel, 1999PERI Formwork andEngineering Ltd.

Estonia, 2002PERI AS

Serbia-Montenegro,2003PERI Oplate d.o.o.

Kazakhstan, 2007TOO PERI Kazakhstan

Albania, 2010PERI Formwork andScaffolding Sh. p. k.

Saudi Arabia, 2013PERI Saudi ArabiaCompany Ltd.

Spain, 1975PERI S.A.U.

Turkey, 1990PERI Kalip ve IskeleleriSanayi ve Ticaret Ltd.

Czech Republic, 1992PERI spol. s r.o.

Denmark, 1993PERI Danmark A/S

Romania, 1996PERI Romãnia SRL

Greece, 1999PERI Hellas SolelyOwned Ltd.

Lithuania, 2002PERI UAB

Croatia, 2004PERI Oplate i skele d.o.o.

Qatar, 2007PERI Qatar LLC

South Africa, 2011PERI (Pty) Ltd.

Kuwait, 2013PERI KuwaitCompany Ltd.

Philippines, 2014PERI Asia Philippines Inc.

Hong Kong, 2015PERI (Hong Kong) Ltd.

Belgium, 1979PERI S.A.

Netherlands, 1979PERI Holding B.V.

Hungary, 1990PERI Kft.

Japan, 2005PERI Japan K.K.

Belorussia, 2007IOOO PERI Belarus

Finland, 1993PERI Suomi Ltd. Oy

Slovakia, 1996PERI spol. s r.o.

5001.0001.5002.0002.5003.0003.5004.0004.500

5.5005.000

6.0006.5007.0007.5008.000

1.350 1.500 1.650 1.7001.900

2.1502.500

2.9503.345 3.500 3.600

3.8504.200

4.700

5.400 5.385 5.5005.800

‘93 ‘94 ‘95 ‘96 ‘97 ‘98 ‘99 ‘00 ‘01 ‘02 ‘03 ‘04 ‘05 ‘06 ‘07 ‘08 ‘09 ‘10 ‘11 ‘12 ‘13 ‘14 ‘15

5.700

6.5006.700

7.000

7.700

100200300400500600700800900

1.1001.000

1.2001.3001.400

206246 252 252 276 299

353430

496 526 535615

760

920

1.110

873825

1.220

‘93 ‘94 ‘95 ‘96 ‘97 ‘98 ‘99 ‘00 ‘01 ‘02 ‘03 ‘04 ‘05 ‘06 ‘07 ‘08 ‘09 ‘10 ‘11 ‘12 ‘13 ‘14 ‘15

9771.052

1.0991.141

1.300Turnover in million €

Personal Development(International)

Page 9: 25 years anniversary

9

1969 - 1979 1997 - 19991980 - 1990 2000 - 20021991 - 1992 2003 - 20051993 2006 - 20071994 - 1995 2008 - 20111996 2012 - 2015

Germany, 1969PERI GmbH

USA, 1982PERI FormworkSystems Inc.

Malaysia, 1991PERI FormworkMalaysia Sdn. Bhd.

Sweden, 1993PERIform Sverige AB

Korea, 1994PERI Korea Ltd.

Brazil, 1996PERI Formas eExcoramentos Ltda.

Australia, 1997PERI Australia Pty. Ltd.

Ukraine, 2000PERI Ukraina

Mexico, 2003PERI Cimbras y Andamios S.A. de C.V.

Russia, 2006OOO PERI Russia

Panama, 2008PERI Panamá Inc.

Colombia, 2012PERI S.A.S.

France, 1974PERI S.A.S.

Italy, 1983PERI S.p.A.

Singapore, 1991PERI ASIA Pte. Ltd.

Norway, 1993PERI Norge AS

Portugal, 1994PERIcofragens, Lda.

Argentina, 1996PERI S.A.

United Arab Emirates 1997PERI (L.L.C.)

Bulgaria, 2000PERI Bulgaria EOOD

Latvia, 2003PERI SIA

India, 2007PERI (India) Pvt. Ltd.

Peru, 2008PERI Peruana S.A.C.

Algeria, 2012SARL PERI

Switzerland, 1974PERI AG

United Kingdom, 1989PERI Ltd.

Austria, 1992PERI Ges. mbH

Poland, 1993PERI Polska Sp. z o.o.

Canada, 1995PERI FormworkSystems Inc.

Chile, 1996PERI Chile Ltda.

Israel, 1999PERI Formwork andEngineering Ltd.

Estonia, 2002PERI AS

Serbia-Montenegro,2003PERI Oplate d.o.o.

Kazakhstan, 2007TOO PERI Kazakhstan

Albania, 2010PERI Formwork andScaffolding Sh. p. k.

Saudi Arabia, 2013PERI Saudi ArabiaCompany Ltd.

Spain, 1975PERI S.A.U.

Turkey, 1990PERI Kalip ve IskeleleriSanayi ve Ticaret Ltd.

Czech Republic, 1992PERI spol. s r.o.

Denmark, 1993PERI Danmark A/S

Romania, 1996PERI Romãnia SRL

Greece, 1999PERI Hellas SolelyOwned Ltd.

Lithuania, 2002PERI UAB

Croatia, 2004PERI Oplate i skele d.o.o.

Qatar, 2007PERI Qatar LLC

South Africa, 2011PERI (Pty) Ltd.

Kuwait, 2013PERI KuwaitCompany Ltd.

Philippines, 2014PERI Asia Philippines Inc.

Hong Kong, 2015PERI (Hong Kong) Ltd.

Belgium, 1979PERI S.A.

Netherlands, 1979PERI Holding B.V.

Hungary, 1990PERI Kft.

Japan, 2005PERI Japan K.K.

Belorussia, 2007IOOO PERI Belarus

Finland, 1993PERI Suomi Ltd. Oy

Slovakia, 1996PERI spol. s r.o.

Page 10: 25 years anniversary

NEW | DUO Wall, Column and Slab Formwork

Page 11: 25 years anniversary

11

T 70VWooden Lattice Girder

KG 240Climbing Scaffold

STERAPanel Formwork

GRV Articulated Walerfor Circular Structures

KGF 240 Climbing and Travelling Formwork

PD 8Shoring Tower

STERA PLUSPanel Formwork

VARIO GT 24Wall Formwork

AKF Tie-LessClimbing Formwork

MODUL Aluminium Slab Formwork

RAPID Aluminium Column Formwork

GT 24Wooden Lattice Girder

SKS Single-Sided Climbing Formwork

TRIOPanel Formwork

RUNDFLEXGirder Circular Formwork

CBClimbing Scaffold

ACSSelf-Climbing System

SKYDECK Aluminium Slab Formwork

MULTIPROPSystem

ELPOSPlanning Software

HD 200Heavy-Duty Props

DK / SKTie Technology

DOMINOPanel Formwork

TRIOHousing

VTTable Module

FB 180Folding Platform

PEPTubular Steel Slab Prop

TRIOShaft Element

VARIO QUATTROColumn Formwork

TRIOPlatform

SKYTABLESlab Table

PERI CADPlanning Software

PERI UP Frame and Modular Scaffolding

UNO Monolithic Housing Formwork

MAXIMO MXPPlatform

VARIODECKSlab Table

VARIOKITParapet Track

VARIOKIT Heavy-Duty Shoring Tower

PEP ErgoTubular Steel Slab Props

MAXIMO MXSEShaft Element

MPB 24Aluminium Beam

RUNDFLEXPlus

RCSClimbing System

MAXIMOPanel Formwork

VARIOKIT Engineering Construction Kit

GRIDFLEXSlab Formwork

PERI UP Rosett FlexIndustrial Scaffolding

DUOUniversal Formwork

MAXIMO MXHHeated Formwork

PERI UP Easy Facade Scaffolding

SKYMAXSlab Formwork

ACS Core 400Self-Climbing Formwork

ALPHAKIT EngineeringConstruction Kit

PEP Alpha andAlpha Tubular Steel Prop

MAXIMOBracket

MAXIMOMX 18 Tie Technology

SKYDECKHandrail Unit

PEP Ergo Slab PropFor use up to Load Class E

LPSScreen

SCS Single-SidedClimbing System

VARIOKIT Balance Cantilever Equipment

VARIOKITHeavy-Duty Truss Girder

Brackets for LGSWeather Protection Roof

ULS FlexLattice Girder

1969 - 1979 1995 - 20041980 - 1994 2013 - 20142005 - 2012 2015 - 2016

Our engineers take into consideration the total cost of materials and working hours in every product development - we call this the “performance price”. Result: the greatest possible reduction in effort and working time.

PERI products are characterized throughtheir innovative design, intelligent mechanical features and practical details – manufactured with high quality standards and thus ideally suited for dealing with the tough everyday use on the construction site. Easy handling, maximum flexibility and, at the same time, safe application prove convincingin the long-term.

PERIProducts and Systems

A clear indicator of this is that we havealways been able to set standards in theindustry with numerous innovations, and that the vast majority of PERI systems have firmly established themselves in the market.

Page 12: 25 years anniversary

12

PERI Asia Milestones

First Formwork system introduced and usedin Singapore ever

IBMTowers(renamedFujiXeroxTowers)

HawaiiTower

Downtown Line917 at SAV & KAP Station,918 TKK andCut and Cover Tunnel

Singapore ChineseCultural Centre (SCCC)

Sedona Hotel(Myanmar)

JTC ChemicalsHub at Tuas View

Ho Chi MinhMetro Line 1(Vietnam)

DUO MixedDevelopment

Sims UrbanOasis

School of the Arts (SOTA)

Kranji Tunnel Midview Cityat Bright Hill Drive

Asia SquareTower 1

HyfluxInnovationCentre

Anderson 18Condominium

AltezCondominium

Jacky Cheung½ CenturyConcertScaffolding

d’leedonCondominium

Parc EmilyCondominium

KallangPaya LebarExpresswayC423

1982

20152010

Expansionto Vietnam

Expansionto Hong Kong,Philippines

Expansionto Myanmar

2007

Renamingto PERI AsiaPte Ltd

IntroductionPERI Formwork

2013

Opening PERICustomer Centre

2016

25 YearsSuccessfulConstruction

HonoluluTower

Far EastPlaza

Golden LandmarkHotel renamed Village Hotel Bugis

The Azura(Vietnam)

Keppel Seghers TuasWaste to Energy Plant

Rolls-RoyceSeletar Campus& EngineTest Facility

Tampines TownHub at TampinesAve 4 & 5

JunctionCity (Myanmar)

EonShenton Way

Skysuitesat Anson

ResortWorldSentosa

InternationalCruise Terminal

Crystal Pavilionsat Marina Bay Sands

Marina OneMixed Development

Festive Mall(Philippines)

SingaporeSports Hub

FusionopolisPhase 2A Tower C

Various CircleLine MRT Stations

Marina BaySands

HotelCapella

GermanEuropeanSchoolSingapore

Springleaf MRTStation TEL T208

RobinsonTower

Opening RDCin Indonesia

1991

FormationPERI in Singapore

Page 13: 25 years anniversary

13

Continous growth. Considerable projects.

First Formwork system introduced and usedin Singapore ever

IBMTowers(renamedFujiXeroxTowers)

HawaiiTower

Downtown Line917 at SAV & KAP Station,918 TKK andCut and Cover Tunnel

Singapore ChineseCultural Centre (SCCC)

Sedona Hotel(Myanmar)

JTC ChemicalsHub at Tuas View

Ho Chi MinhMetro Line 1(Vietnam)

DUO MixedDevelopment

Sims UrbanOasis

School of the Arts (SOTA)

Kranji Tunnel Midview Cityat Bright Hill Drive

Asia SquareTower 1

HyfluxInnovationCentre

Anderson 18Condominium

AltezCondominium

Jacky Cheung½ CenturyConcertScaffolding

d’leedonCondominium

Parc EmilyCondominium

KallangPaya LebarExpresswayC423

1982

20152010

Expansionto Vietnam

Expansionto Hong Kong,Philippines

Expansionto Myanmar

2007

Renamingto PERI AsiaPte Ltd

IntroductionPERI Formwork

2013

Opening PERICustomer Centre

2016

25 YearsSuccessfulConstruction

HonoluluTower

Far EastPlaza

Golden LandmarkHotel renamed Village Hotel Bugis

The Azura(Vietnam)

Keppel Seghers TuasWaste to Energy Plant

Rolls-RoyceSeletar Campus& EngineTest Facility

Tampines TownHub at TampinesAve 4 & 5

JunctionCity (Myanmar)

EonShenton Way

Skysuitesat Anson

ResortWorldSentosa

InternationalCruise Terminal

Crystal Pavilionsat Marina Bay Sands

Marina OneMixed Development

Festive Mall(Philippines)

SingaporeSports Hub

FusionopolisPhase 2A Tower C

Various CircleLine MRT Stations

Marina BaySands

HotelCapella

GermanEuropeanSchoolSingapore

Springleaf MRTStation TEL T208

RobinsonTower

Opening RDCin Indonesia

1991

FormationPERI in Singapore

Page 14: 25 years anniversary

14

PERI AsiaEmerging Markets

PERI Hong Kong | Harbour Area Treatment Scheme The project, which is expected to serve about five million people, is primarily aimed at improving the water quality of Victoria Harbour in Hong Kong for marine life.

PERI Philippines | Amaia Esperanza Pasig This project will define an elevated expectation for safety standards coupled with formwork production and sets the standards for construction expectations in Manila.

PERI Myanmar | Sedona Hotel YangonThe phase 2 development of this 5 Star hotel, a 29 storey tall tower, accommodates 420 rooms. It is one of the tallest structures in Yangon.

PERI Vietnam | Ho Chi Minh Metro Line 1: Ben Thanh – Suoi Tien The line starts at the famous Ben Thanh Market in the central District 1 and ends at Suoi Tien Cultural Park with a length of 19.7km and 14 stations. The introduction of this metro line will see the central districts of HCMC linked directly with the eastern parts of the city.

Myanmar

Vietnam

Hong Kong

Philippines

Headed by the Market Unit Asia Pacific (MU APAC) and centrally located in Singapore, PERI evaluates opportunities abroad and provides the necessary support via PERI Asia to successfully enter into emerging markets.

To guarantee the best performance and services to our customers, skilled and well equipped PERI staff is relocated

We at PERI believe in the future of Asian markets

to designated locations in the region to directly cater to our customers needs.

In recent years subsidiaries have been established in Hong Kong and the Philippines.

PERI Asia currently carries out projects in Myanmar and Vietnam to expand our presence in the region.

Page 15: 25 years anniversary

15

PERI AsiaMore than just products

Due to our engineers’ in-depth understanding of the needs of our customers, they are able to develop the best project-related solutions for them. These services include, if requi-red, static calculations as well as assembly plans for special formwork. Although 90 % of the formwork project require-ments can be covered using standard equipment from the broad PERI product range, a special construction is, how-ever, sometimes more cost-effective and it is exactly here that the engineers apply their expertise with great effect.

Technical solutions

The broad range of PERI equipment and systems offer the perfect solution for every requirement. However, the PERI range of services goes far beyond production and system equipment sales and rental.

PERI has the world’s largest rental equipment pool that supplies its customers reliably, fast and with a high level of flexibility. “Just in time” deliveries and return deliveries – according to the particular construction schedule.

For very large material requirements, the local team works closely with other logistics locations thus ensuring an optimal delivery service to the construction sites.

Logistics

PERI formwork instructors provide an extensive profes-sional on-site briefing. This means that any improper handling can be avoided and the risk of accidents are greatly reduced. Using the systems even more efficiently accelerates the construction progress.

On-site support

Our training programme includes both seminars with specified content and individualised courses. In doing so, we support our customers by enabling them to find out about the latest formwork and scaffolding technologies for more efficiency, and to be able to pass on this knowledge.

Customer Training

Page 16: 25 years anniversary

16

PERI Asia | Reference Projects

Page 17: 25 years anniversary

17

18 Civil Engineering

20 Commercial and Residential Buildings

22 Institutional Buildings

24 Industrial Buildings

Page 18: 25 years anniversary

18

PERI AsiaCivil Engineering

2002 Kranji Tunnel

2003 Fort Canning Cut & Cover Tunnel

2004 Kallang Paya Lebar Expressway C423

2004 MacPherson, Tai Seng MRT Stations and Tunnel – CCL C822 Stage 2

2004 Sungei Pandan Pipejack Cable Tunnel

2005 Bartley MRT Station – CCL C851A Stage 3

2005 Open Outlet Drain at Tuas View Extension

2005 Ulu Pandan NEWater Factory

2008 Common Service Tunnel

2008 Dakota MRT Station – CCL C823

2008 Mountbattan MRT Station – CCL C823

2008 Bugis MRT Station – DTL C903 Stage 1

2008 Paya Lebar MRT Station – CCL C823

2009 Bukit Panjang MRT Station – DTL 912

2009 Slip Road Widening from SLE to BKE

2010 International Cruise Terminal, Singapore

2010 Sixth Avenue MRT Station – DTL 917

2013 MacPherson MRT Station – DTL C931 Stage 3

2015 Springleaf MRT Station TEL T208

2002 Kranji Tunnel

2009 Bukit Panjang MRT Station – DTL 912

2008 Bugis MRT Station – DTL C903 Stage 1

2009 Slip Road Widening from SLE to BKE

2004 Kallang Paya Lebar Expressway C423

2010 International Cruise Terminal, Singapore

Page 19: 25 years anniversary

19

2010 Sixth Avenue MRT Station – DTL 917 2013 MacPherson MRT Station - DTL C931 Stage 3

2004 Sungei Pandan Pipejack Cable Tunnel 2005 Open Outlet Drain at Tuas View Extension 2005 Bartley MRT Station – CCL C851A Stage 3

Page 20: 25 years anniversary

20

PERI AsiaCommercial and Residential Buildings

2007 Marina Bay Sands

2014 DUO Mixed Development

2010 Altez Condominium2010 Resort World Sentosa

2013 CapitaGreen Office Building 2013 Oasia Downtown

2007 Sky at Eleven Condominium

2010 Asia Square Tower 2

Page 21: 25 years anniversary

21

1982 Far East Plaza

1984 Honolulu Tower

1985 IBM Towers (renamed Fuji Xerox Tower)

1986 Golden Landmark Hotel (renamed Village Hotel Bugis)

2006 Crowne Plaza at Terminal 3

2006 Hotel Capella

2007 Marina Bay Financial Centre Tower 1

2007 Marina Bay Sands

2007 Sky at Eleven Condomonium

2009 Asia Square Tower 1

2009 Marina Bay Financial Centre Tower 2

2009 Ocean Financial Centre

2010 Altez Condominium

2010 Asia Square Tower 2

2010 Marina Bay Suites

2010 Resort World Sentosa

2011 d'Leedon Condominium

2011 Holiday Inn Express Hotel

2011 Le Nouvel Ardmore and Nouvel 18

2011 Parkroyal Hotel at Upper Pickering Street

2011 Skysuites at Anson

2013 CapitaGreen Office Building

2013 Oasia Downtown

2014 SBF Tower

2014 DUO Mixed Development

2014 Marina One Mixed Development

2009 Asia Square Tower 1

2014 Marina One Mixed Development

2011 Le Nouvel Ardmore2011 d'Leedon Condominium

2009 Marina Bay Financial Centre Tower 2

Page 22: 25 years anniversary

22

PERI AsiaInstitutional Buildings

2007 Duke-NUS Graduate Medical School

2007 Upgrading of Dunman High School

2008 Anglo Chinese School (Junior) Sports Hall

2008 Cedar’s Girls Secondary School Upgrading

2008 Marina Bay Sands Theatres

2008 School of the Arts (SOTA)

2008 Tampines Primary & Secondary School

2009 Assumption Pathway School Upgrading

2009 Crystal Pavilions at Marina Bay Sands

2009 NUS CREATE Campus

2009 United World College of South East Asia

2010 School of Science and Technology

2012 Singapore Sports Hub

2013 Changi Prison

2013 Stamford American International School

2014 JTC Aviation 2

2014 Tampines Town Hub at Tampines Ave 4 & 5

2014 Temasek Club House at Rifle Range Road

2015 Catholic Church at Punggol

2015 JTC Chemicals Hub at Tuas View

2015 Singapore Chinese Cultural Centre (SCCC)

2009 Crystal Pavilions at Marina Bay Sands

2008 Marina Bay Sands Theatres

2012 Singapore Sports Hub

2008 Tampines Primary & Secondary School

2009 United World College of South East Asia

Page 23: 25 years anniversary

23

2008 Cedar’s Girls Secondary School Upgrading

2009 Assumption Pathway School Upgrading 2010 School of Science and Technology 2010 NUS Staff House

2015 Singapore Chinese Cultural Centre (SCCC)

2008 Marina Bay Sands Theatres

2013 Stamford American International School

Page 24: 25 years anniversary

24

PERI AsiaIndustrial Buildings

2012 8 Storey Factory at Sunview Way

2010 Hyflux Innovation Centre

2014 PRIMAX at 22 New Industrial Road

2009 Sheng Siong Supermarket Warehouse & Office

2013 Ecotech at Sunview2012 Fusionopolis Phase 2A Tower C

2008 SingTel Data Centre

2012 NTUC Distribution Centre

Page 25: 25 years anniversary

25

2006 Hitachi Warehouse

2006 Samsung Siltronic Water Hub at Tampines

2008 SingTel Data Centre

2009 Midview City at Bright Hill Drive

2009 Sheng Siong Supermarket Warehouse and Office

2010 Hyflux Innovation Centre

2010 Rolls-Royce Engine Test Facility

2010 Rolls-Royce Seletar Campus

2011 Woodlands 11 Factory 2011 Yang Kee Logistics Warehouse

2012 6 Storey Warehouse at Banyan Avenue –Jurong Island

2012 8 Storey Factory at Sunview Way

2012 Fusionopolis Phase 2A Tower C

2012 Hafary Centre at Eunos Ave 3

2012 NTUC Distribution Centre

2012 Warehouse for LTH Logistics at Banyan Drive

2013 Bartley Biz Centre

2013 Ecotech at Sunview

2013 Factory at 970 and 998 Toa Payoh North

2014 Design & Build Factory at 42 Penjuru Road

2014 PRIMAX at 22 New Industrial Road

2014 Warehouse at Greenwich Drive

2014 Warehouse Greenwich Drive

2010 Rolls-Royce Engine Test Facility

2011 Woodlands 11 Factory

2010 Rolls-Royce Seletar Campus

2011 Warehouse for Yang Kee Logistics

Page 26: 25 years anniversary

26

PERI CaresSocial commitments

RDA

Children's Cancer Foundation

SCAL

The Singapore Contractors Association (SCAL) held its Annual Charity Golf Tournament on 30 July 2014 with the Minister for Manpower, Mr. Tan Chuan-Jin as this year’s sporting Guest-of-Honour.

This year the charity event supported the NKF (National Kidney Foundation), a public funded charitable organisation, which is the largest dialysis provider supporting more than 3,200 patients.

Every day, an average of four people will lose the use of their kidneys in

Singapore. On average an NKF patient must cope with an annual bill of $20k for their treament. NKF requires more than 70 million this year to subsidise their patients to pay either $50 SGD or less a month, or nothing at all.

PERI Asia took part in the RDA Charity Golf Day for the Riding for the Disabled Association (RDA) of Singapore. The event raised more than S$176,000. A total of 15 teams (golf flights) took part in the golf event and another 18 companies joined in for the dinner to wrap up the eventful day.

The Riding for the Disabled Association of Singapore (RDA Singapore) provides free horse riding therapy to children and adults with disabilities from all over Singapore.

Founded in 1992, Children’s Cancer Foundation (CCF) is a non-profit organisation with a mission to improve the quality of life for children with cancer and their families through enhancing their emotional, social and medical well-being. Over the years, CCF has helped more than 2700 children and their families at different stages of the illness.

CCF is solely funded by public and corporate donations. For every shirt sold, PERI donated 100% of the gross proceeds to CCF. The donations raised will facilitate the continued provision and improvement of various programmes and services for CCF's beneficiaries and their families.

Helping hands for Tacloban

On 7th November typhoon Haiyan hit the Philippines, killing at least 6069 people. Nearly all structures in the town of Tacloban suffered at least partial damage. Many people were left homeless. Almost 90 percent of the city was destroyed. Upon hearing about the typhoon our colleagues were very eager to help and donated clothes and dry food as well as the coordination of the donation to the Philippines.

Page 27: 25 years anniversary

assionngagementeliabilitynnovation

Page 28: 25 years anniversary

PERI Asia Pte LtdFormwork Scaffolding EngineeringNo.1 Sims Lane # 04-11Singapore 387355Phone +65 67 44 29 89Fax +65 67 44 36 [email protected]

www.linkedin.com/company/peri