MILTON QUINCY MILTON QUINCY BOSTON MILTON LENGTH OF PROJECT = 1,062.00 FEET = 0.201 MILES PROJECT END STA. 12+50.00 N 2921657.0519 E 779544.4987 PROJECT LOCATION DEPARTMENT OF TRANSPORTATION FEDERAL HIGHWAY ADMINISTRATION APPROVED: DIVISION ADMINISTRATOR DATE DATE CHIEF ENGINEER DATE RECOMMENDED FOR APPROVAL APPROVED HIGHWAY ADMINISTRATOR DATE DESCRIPTION REV # DESIGN DESIGNATION ROADWAY GRANITE AVENUE SQUANTUM STREET DESIGN SPEED 30 MPH 30 MPH ADT (2015) 20,113 14,019 ADT (2025) 22,217 15,486 K 12% 8% D 76% NB 55% WB T (PEAK HOUR) 1.8% 1.9% T (AVERAGE DAY) 2.3% 2.0% DHV 2,661 1,269 DDHV 2,019 693 FUNCTIONAL CLASSIFICATION URBAN MINOR ARTERIAL URBAN MINOR ARTERIAL INDEX SHEET NO. DESCRIPTION 1 TITLE SHEET & INDEX 2 LEGEND & ABBREVIATIONS 3 KEY PLAN & BORING LOCATIONS 4-6 TYPICAL SECTIONS 7 CONSTRUCTION BASELINE TIES 8 CONSTRUCTION PLAN 9 PROFILE (GRANITE AVE) 10 PROFILES (SQUANTUM STREET) 11 CURB TIE PLAN 12 GRADING PLAN 13 DRAINAGE & UTILITY PLAN 14 TRAFFIC SIGN & PAVEMENT MARKINGS 15 TRAFFIC SIGN SUMMARY SHEET 16 TRAFFIC SIGNAL PLAN 17 TRAFFIC SIGNAL DATA PLAN 18-22 TEMPORARY TRAFFIC CONTROL PLANS 23-27 CONSTRUCTION PHASING PLANS 28-32 CONSTRUCTION DETAILS 33-36 CROSS SECTIONS (GRANITE AVENUE) 37-40 CROSS SECTIONS (SQUANTUM STREET) 25% SUBMITTAL N THE MASSACHUSETTS HIGHWAY DEPARTMENT STANDARD SPECIFICATIONS FOR HIGHWAYS AND BRIDGES DATED 1988, AS AMENDED, THE SUPPLEMENTAL SPECIFICATIONS DATED JULY 1, 2015, THE 2014 CONSTRUCTION STANDARD DETAILS, THE 2015 OVERHEAD SIGNAL STRUCTURE AND FOUNDATION STANDARD DRAWINGS, MASSDOT TRAFFIC MANAGEMENT PLANS AND DETAIL DRAWINGS, THE LATEST MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES FOR STREETS AND HIGHWAYS WITH MASSACHUSETTS AMENDMENTS, THE 1990 STANDARD DRAWINGS FOR SIGNS AND SUPPORTS, THE 1968 STANDARD DRAWINGS FOR TRAFFIC SIGNALS AND HIGHWAY LIGHTING, AND THE LATEST EDITION OF THE AMERICAN STANDARD FOR NURSERY STOCK, WILL GOVERN. 607754_HD (TITLE SHEET).DWG 21-Jun-2016 12:40 PM Plotted on FED. AID PROJ. NO. SHEET NO. TOTAL SHEETS MILTON GRANITE AVENUE AT SQUANTUM STREET 40 STATE MA PROJECT FILE NO. - 607754 1 TITLE SHEET & INDEX 1000 SCALE: 1" = 1000' 0 2000 3000 4000 PROJECT BEGIN STA. 102+20 N 2921162.6386 E 779506.4737 PROJECT END STA. 111+80.00 N 2921478.3256 E 779789.8834 PROJECT BEGIN STA. 5+60.00 N 2921005.6814 E 779772.1311 Civil Engineering GIS

Upload: duongthien

Post on 08-Jun-2018

213 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 25% SUBMITTAL - Milton MA | 779544.4987 PROJECT LOCATION DEPARTMENT OF TRANSPORTATION FEDERAL HIGHWAY ADMINISTRATION APPROVED: DIVISION ADMINISTRATOR DATE DATE CHIEF ENGINEER DATE

M

ILT

ON

QU

IN

CY

M

I

L

T

O

N

Q

U

I

N

C

Y

B

O

S

T

O

N

M

I

L

T

O

N

LENGTH OF PROJECT = 1,062.00 FEET = 0.201 MILES

PROJECT END

STA. 12+50.00

N 2921657.0519

E 779544.4987

PROJECT

LOCATION

DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

APPROVED:

DIVISION ADMINISTRATOR DATE DATE

CHIEF ENGINEER DATE

RECOMMENDED FOR APPROVAL

APPROVED

HIGHWAY ADMINISTRATOR

DATE

DESCRIPTION

REV #

DESIGN DESIGNATION

ROADWAY GRANITE AVENUE SQUANTUM STREET

DESIGN SPEED 30 MPH 30 MPH

ADT (2015)20,113 14,019

ADT (2025) 22,217 15,486

K 12% 8%

D 76% NB 55% WB

T (PEAK HOUR)

1.8% 1.9%

T (AVERAGE DAY)

2.3% 2.0%

DHV2,661 1,269

DDHV2,019

693

FUNCTIONAL CLASSIFICATION URBAN MINOR ARTERIAL URBAN MINOR ARTERIAL

INDEX

SHEET NO. DESCRIPTION

1 TITLE SHEET & INDEX

2 LEGEND & ABBREVIATIONS

3 KEY PLAN & BORING LOCATIONS

4-6 TYPICAL SECTIONS

7 CONSTRUCTION BASELINE TIES

8 CONSTRUCTION PLAN

9

PROFILE (GRANITE AVE)

10

PROFILES (SQUANTUM STREET)

11 CURB TIE PLAN

12 GRADING PLAN

13 DRAINAGE & UTILITY PLAN

14 TRAFFIC SIGN & PAVEMENT MARKINGS

15 TRAFFIC SIGN SUMMARY SHEET

16 TRAFFIC SIGNAL PLAN

17 TRAFFIC SIGNAL DATA PLAN

18-22 TEMPORARY TRAFFIC CONTROL PLANS

23-27 CONSTRUCTION PHASING PLANS

28-32 CONSTRUCTION DETAILS

33-36

CROSS SECTIONS (GRANITE AVENUE)

37-40

CROSS SECTIONS (SQUANTUM STREET)

25% SUBMITTAL

N

THE MASSACHUSETTS HIGHWAY DEPARTMENT STANDARD SPECIFICATIONS FOR HIGHWAYS AND

BRIDGES DATED 1988, AS AMENDED, THE SUPPLEMENTAL SPECIFICATIONS DATED JULY 1, 2015,

THE 2014 CONSTRUCTION STANDARD DETAILS, THE 2015 OVERHEAD SIGNAL STRUCTURE AND

FOUNDATION STANDARD DRAWINGS, MASSDOT TRAFFIC MANAGEMENT PLANS AND DETAIL

DRAWINGS, THE LATEST MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES FOR STREETS AND

HIGHWAYS WITH MASSACHUSETTS AMENDMENTS, THE 1990 STANDARD DRAWINGS FOR SIGNS

AND SUPPORTS, THE 1968 STANDARD DRAWINGS FOR TRAFFIC SIGNALS AND HIGHWAY LIGHTING,

AND THE LATEST EDITION OF THE AMERICAN STANDARD FOR NURSERY STOCK, WILL GOVERN.

60

77

54

_H

D (T

IT

LE

S

HE

ET

).D

WG

21

-Ju

n-2

01

6 1

2:4

0 P

MP

lo

tte

d o

n

FED. AID PROJ. NO.

SHEET

NO.

TOTAL

SHEETS

MILTON

GRANITE AVENUE AT SQUANTUM STREET

40

STATE

MA

PROJECT FILE NO.

-

607754

1

TITLE SHEET & INDEX

1000

SCALE: 1" = 1000'

0 2000 3000 4000

PROJECT BEGIN

STA. 102+20

N 2921162.6386

E 779506.4737

PROJECT END

STA. 111+80.00

N 2921478.3256

E 779789.8834

PROJECT BEGIN

STA. 5+60.00

N 2921005.6814

E 779772.1311

Civil Engineering

GIS

Page 2: 25% SUBMITTAL - Milton MA | 779544.4987 PROJECT LOCATION DEPARTMENT OF TRANSPORTATION FEDERAL HIGHWAY ADMINISTRATION APPROVED: DIVISION ADMINISTRATOR DATE DATE CHIEF ENGINEER DATE

GENERAL SYMBOLS

EXISTING PROPOSED DESCRIPTION

JERSEY BARRIER

CATCH BASIN

CATCH BASIN CURB INLET

FLAG POLE

GAS PUMP

MAIL BOX

POST SQUARE

POST CIRCULAR

WELL

ELECTRIC HANDHOLE

FENCE GATE POST

GAS GATE

BORING HOLE

MONITORING WELL

TEST PIT

HYDRANT

LIGHT POLE

COUNTY BOUND

GPS POINT

CABLE MANHOLE

DRAINAGE MANHOLE

ELECTRIC MANHOLE

GAS MANHOLE

MISC MANHOLE

SEWER MANHOLE

TELEPHONE MANHOLE

WATER MANHOLE

MASSACHUSETTS HIGHWAY BOUND

MONUMENT

STONE BOUND

TOWN OR CITY BOUND

TRAVERSE OR TRIANGULATION STATION

TROLLEY POLE OR GUY POLE

TRANSMISSION POLE

UTILITY POLE W/ FIREBOX

UTILITY POLE WITH DOUBLE LIGHT

UTILITY POLE W / 1 LIGHT

UTILITY POLE

BUSH

TREE

STUMP

SWAMP / MARSH

WATER GATE

PARKING METER

OVERHEAD CABLE/WIRE

CURBING

CONTOURS (ON-THE-GROUND SURVEY DATA)

CONTOURS (PHOTOGRAMMETRIC DATA)

UNDERGROUND DRAIN PIPE (DOUBLE LINE 24 INCH AND OVER)

UNDERGROUND ELECTRIC DUCT (DOUBLE LINE 24 INCH AND OVER)

UNDERGROUND GAS MAIN (DOUBLE LINE 24 INCH AND OVER)

UNDERGROUND SEWER MAIN (DOUBLE LINE 24 INCH AND OVER)

UNDERGROUND TELEPHONE DUCT (DOUBLE LINE 24 INCH AND OVER)

UNDERGROUND WATER MAIN (DOUBLE LINE 24 INCH AND OVER)

BALANCED STONE WALL

GUARD RAIL - STEEL POSTS

GUARD RAIL - WOOD POSTS

CHAIN LINK OR METAL FENCE

WOOD FENCE

HAY BALES/SILT FENCE

TREE LINE

SAWCUT LINE

TOP OR BOTTOM OF SLOPE OR LIMIT OF SLOPE (LOS)

LIMIT OF EDGE OF PAVEMENT OR COLD PLANE AND OVERLAY

BANK OF RIVER OR STREAM

BORDER OF WETLAND

100 FT WETLAND BUFFER

200 FT RIVERFRONT BUFFER

STATE HIGHWAY LAYOUT

TOWN OR CITY LAYOUT

COUNTY LAYOUT

RAILROAD SIDELINE

TOWN OR CITY BOUNDARY LINE

PROPERTY LINE OR APPROXIMATE PROPERTY LINE

TEMPORARY EASEMENT

TRAFFIC SYMBOLS

EXISTING PROPOSED DESCRIPTION

CONTROLLER PHASE ACTUATED

TRAFFIC SIGNAL HEAD (SIZE AS NOTED)

WIRE LOOP DETECTOR (6' x 6' TYP UNLESS OTHERWISE SPECIFIED)

VIDEO DETECTION CAMERA

MICROWAVE DETECTOR

PEDESTRIAN PUSH BUTTON, SIGN (DIRECTIONAL ARROW AS SHOWN) AND SADDLE

EMERGENCY PREEMPTION CONFIRMATION STROBE LIGHT

VEHICULAR SIGNAL HEAD

VEHICULAR SIGNAL HEAD, OPTICALLY PROGRAMMED

FLASHING BEACON

PEDESTRIAN SIGNAL HEAD, (TYPE AS NOTED OR AS SPECIFIED)

RAILROAD SIGNAL

SIGNAL POST AND BASE (ALPHA-NUMERIC DESIGNATION NOTED)

MAST ARM, SHAFT AND BASE (ARM LENGTH AS NOTED)

HIGH MAST POLE OR TOWER

SIGN AND POST

SIGN AND POST (2 POSTS)

MAST ARM WITH LUMINAIRE

OPTICAL PRE-EMPTION DETECTOR

CONTROL CABINET, GROUND MOUNTED

CONTROL CABINET, POLE MOUNTED

FLASHING BEACON CONTROL AND METER PEDESTAL

LOAD CENTER ASSEMBLY

PULL BOX 12"x12" (OR AS NOTED)

ELECTRIC HANDHOLE 12"x24" (OR AS NOTED)

TRAFFIC SIGNAL CONDUIT

PAVEMENT MARKINGS SYMBOLS

EXISTING PROPOSED DESCRIPTION

PAVEMENT ARROW - WHITE

LEGEND "ONLY" - WHITE

STOP LINE

CROSSWALK

SOLID WHITE LINE

SOLID YELLOW LINE

BROKEN WHITE LINE

BROKEN YELLOW LINE

DOTTED WHITE LINE

DOTTED YELLOW LINE

DOTTED WHITE LINE EXTENSION

DOTTED YELLOW LINE EXTENSION

DOUBLE WHITE LINE

DOUBLE YELLOW LINE

ABBREVIATIONS

GENERAL

AADT ANNUAL AVERAGE DAILY TRAFFIC

ABAN ABANDON

ADJ ADJUST

APPROX. APPROXIMATE

A.C. ASPHALT CONCRETE

ACCM PIPE ASPHALT COATED CORRUGATED METAL PIPE

BIT. BITUMINOUS

BC BOTTOM OF CURB

BD. BOUND

BL BASELINE

BLDG BUILDING

BM BENCHMARK

BO BY OTHERS

BOS BOTTOM OF SLOPE

BR. BRIDGE

CB CATCH BASIN

CBCI CATCH BASIN WITH CURB INLET

CC CEMENT CONCRETE

CCM CEMENT CONCRETE MASONRY

CEM CEMENT

CI CURB INLET

CIP CAST IRON PIPE

CLF CHAIN LINK FENCE

CL CENTERLINE

CMP CORRUGATED METAL PIPE

CSP CORRUGATED STEEL PIPE

CO. COUNTY

CONC CONCRETE

CONT CONTINUOUS

CONST CONSTRUCTION

CR GR CROWN GRADE

DHV DESIGN HOURLY VOLUME

DI DROP INLET

DIA DIAMETER

DIP DUCTILE IRON PIPE

DW STEADY DON'T WALK - PORTLAND ORANGE

DWY DRIVEWAY

ELEV (or EL.)

ELEVATION

EMB EMBANKMENT

EOP EDGE OF PAVEMENT

EXIST (or EX)

EXISTING

EXC EXCAVATION

F&C FRAME AND COVER

F&G FRAME AND GRATE

FD FULL DEPTH

FDN. FOUNDATION

FLDSTN FIELDSTONE

GAR GARAGE

GC GRANITE CURB

GD GROUND

GG GAS GATE

GI GUTTER INLET

GIP GALVANIZED IRON PIPE

GRAN GRANITE

GRAV GRAVEL

GRD GUARD

HDW HEADWALL

HMA HOT MIX ASPHALT

HOR HORIZONTAL

HYD HYDRANT

INV INVERT

JCT JUNCTION

L LENGTH OF CURVE

LB LEACH BASIN

LOS LIMIT OF SLOPE

LP LIGHT POLE

LT LEFT

MAX MAXIMUM

MB MAILBOX

MH MANHOLE

MHB MASSACHUSETTS HIGHWAY BOUND

MIN MINIMUM

NIC NOT IN CONTRACT

NO. NUMBER

PC POINT OF CURVATURE

PCC POINT OF COMPOUND CURVATURE

P.G.L. PROFILE GRADE LINE

PI POINT OF INTERSECTION

POC POINT ON CURVE

POT POINT ON TANGENT

PRC POINT OF REVERSE CURVATURE

PROJ PROJECT

PROP PROPOSED

PSB PLANTABLE SOIL BORROW

PT POINT OF TANGENCY

PVC POINT OF VERTICAL CURVATURE

PVI POINT OF VERTICAL INTERSECTION

ABBREVIATIONS (cont.)

GENERAL

PVT POINT OF VERTICAL TANGENCY

PVMT PAVEMENT

PWW PAVED WATER WAY

R RADIUS OF CURVATURE

R&D REMOVE AND DISPOSE

RCP REINFORCED CONCRETE PIPE

RD ROAD

RDWY ROADWAY

REM REMOVE

RET RETAIN

RET WALL RETAINING WALL

ROW RIGHT OF WAY

RR RAILROAD

R&R REMOVE AND RESET

R&S REMOVE AND STACK

RT RIGHT

SB STONE BOUND

SHLD SHOULDER

SMH SEWER MANHOLE

ST STREET

STA STATION

SSD STOPPING SIGHT DISTANCE

SHLO STATE HIGHWAY LAYOUT LINE

SW SIDEWALK

SDWK SIDEWALK

T TANGENT DISTANCE OF CURVE/TRUCK %

TAN TANGENT

TEMP TEMPORARY

TC TOP OF CURB

TOS TOP OF SLOPE

TYP TYPICAL

UP UTILITY POLE

VAR VARIES

VERT VERTICAL

VC VERTICAL CURVE

WCR WHEEL CHAIR RAMP

WG WATER GATE

WIP WROUGHT IRON PIPE

WM WATER METER/WATER MAIN

X-SECT CROSS SECTION

TRAFFIC SIGNAL

CAB. CABINET

CCVE CLOSED CIRCUIT VIDEO EQUIPMENT

DW STEADY DON'T WALK

FDW FLASHING DON'T WALK

FR FLASHING CIRCULAR RED

FRL FLASHING RED LEFT ARROW

FRR FLASHING RED RIGHT ARROW

FY FLASHING CIRCULAR AMBER

FYL FLASHING AMBER LEFT ARROW

FYR FLASHING AMBER RIGHT ARROW

G STEADY CIRCULAR GREEN

GL STEADY GREEN LEFT ARROW

GR STEADY GREEN RIGHT ARROW

GSL STEADY GREEN SLASH LEFT ARROW

GSR STEADY GREEN SLASH RIGHT ARROW

GV STEADY GREEN VERTICAL ARROW

OL OVERLAP

PED PEDESTRIAN

PTZPAN, TILE, ZOOM

R STEADY CIRCULAR RED

RL STEADY RED LEFT ARROW

RR STEADY RED RIGHT ARROW

TR SIG TRAFFIC SIGNAL

TSC TRAFFIC SIGNAL CONDUIT

W STEADY WALK

Y STEADY CIRCULAR AMBER

YL STEADY AMBER LEFT ARROW

20'

20'

1

M

*

RRSG

DBYL

DBWL

BWL

SWL

CW

SL

DYLEx

DWLEx

DYL

BYL

DWL

SYL

JB

CB

FP

GP

MB

WELL

EHH

GG

BHL #

MW #

TP #

MHB

TPL or GUY

UFB

UPDL

ULT

UPL

WG

PM

60

77

54

_H

D (L

EG

EN

D &

A

BB

RE

).D

WG

21

-Ju

n-2

01

6 1

2:4

1 P

MP

lo

tte

d o

n

FED. AID PROJ. NO.

SHEET

NO.

TOTAL

SHEETS

MILTON

GRANITE AVENUE AT SQUANTUM STREET

40

STATE

MA

PROJECT FILE NO.

-

607754

2

LEGEND & ABBREVIATIONS

Page 3: 25% SUBMITTAL - Milton MA | 779544.4987 PROJECT LOCATION DEPARTMENT OF TRANSPORTATION FEDERAL HIGHWAY ADMINISTRATION APPROVED: DIVISION ADMINISTRATOR DATE DATE CHIEF ENGINEER DATE

1

1

1

1

1

2

1

1

3

P

C

+

2

7

.

1

3

P

T

+

7

8

.

8

3

1

1

0

PC +84.19

P

T

+

0

4

.

7

5

1

0

1

1

0

2

1

0

3

1

0

4

+

3

9

.

0

0

+

6

6

.

0

0

5 6 7 8 9 10 11 12 13 14

1

2

1

122

PC

+

20.85

PT +03.02

120

+11.3

4

LIMIT OF MILLING

& RESURFACING

STA 103+25.79

N2921253.8358

E779560.0801

LIMIT OF MILLING

& RESURFACING

STA 7+15.97

N2921152.9171

E779720.6771

LIMIT OF MILLING

& RESURFACING

STA 120+91.18

N2921539.2106

E779492.9597

LIMIT OF MILLING

& RESURFACING

STA 111+77.30

N2921476.7472

E779787.6834

LIMIT OF SIDEWALK

RECONSTRUCTION

STA 7+15.97

LIMIT OF SIDEWALK

RECONSTRUCTION

STA 7+64.20

LIMIT OF SIDEWALK

RECONSTRUCTION

STA 103+25.79

LIMIT OF SIDEWALK

RECONSTRUCTION

STA 103+37.30

LIMIT OF MILLING

& RESURFACING

STA 11+87.29

N2921597.8503

E779565.1877

LIMIT OF SIDEWALK

RECONSTRUCTION

STA 11+87.29

LIMIT OF SIDEWALK

RECONSTRUCTION

STA 11+87.29

LIMIT OF SIDEWALK

RECONSTRUCTION

STA 120+91.18

LIMIT OF SIDEWALK

RECONSTRUCTION

STA 120+87.61

S

Q

U

A

N

T

U

M

S

T

R

E

E

T

S

Q

U

A

N

T

U

M

S

T

R

E

E

T

G

U

I

L

F

O

R

D

R

O

A

D

PROP TEMP

EASEMENT LINE

STREET LAYOUT LINE

STREET LAYOUT LINE

STREET LAYOUT LINE

STREET

LAYOUT LINE

STREET

LAYOUT LINE

STREET LAYOUT LINE

STREET LAYOUT LINE

STREET LAYOUT LINE

STREET LAYOUT LINE

STREET LAYOUT LINE

LIMIT OF SIDEWALK

RECONSTRUCTION

STA 110+96.51

LIMIT OF SIDEWALK

RECONSTRUCTION

STA 111+77.30

PROJECT BEGIN

STA 5+60

N2921005.5172

E779771.6611

PROJECT END

STA 12+50

N2921657.0519

E779544.4987

PROJECT BEGIN

STA 102+20

N2921162.6386

E779506.4737

PROJECT END

STA 111+80

N2921478.3256

E779789.8834

30

SCALE: 1" = 30'

0 60 100

60

77

54

_H

D (K

EY

P

LA

N &

B

OR

IN

G L

OC

AT

IO

N).D

WG

21

-Ju

n-2

01

6 1

2:3

7 P

MP

lo

tte

d o

n

FED. AID PROJ. NO.

SHEET

NO.

TOTAL

SHEETS

MILTON

GRANITE AVENUE AT SQUANTUM STREET

40

STATE

MA

PROJECT FILE NO.

-

607754

KEY PLAN & BORING LOCATION

3

LEGEND

- CONSTRUCTION PLANX

- CURB TIE PLAN

X

- SIGN & PAVEMENT MARKING PLAN

X

- TRAFFIC SIGNAL PLAN

X

8161211

- GRADING PLAN

X

- DRAINAGE & UTILITY PLAN

X

13

14

Page 4: 25% SUBMITTAL - Milton MA | 779544.4987 PROJECT LOCATION DEPARTMENT OF TRANSPORTATION FEDERAL HIGHWAY ADMINISTRATION APPROVED: DIVISION ADMINISTRATOR DATE DATE CHIEF ENGINEER DATE

GRANITE AVENUE

CONSTRUCTION

STA 7+15.977 TO STA 7+64.20±

NOT TO SCALE

VAR. 20.00' - 21.00' 11.00 11.00

5.00

TRAVEL LANETRAVEL LANETRAVEL LANE CEM. CONC.

SDWK

PROP PAVEMENT

MILLING & RESURFACING

VAR.

1' - 3.2'

VARIES

VARIES

MEET & MATCH

EXIST GRADE

SAWCUT

PROP GRAN CURB

TYPE VA4,

6" REVEAL (TYP.)

VARIES

2.6' TO 4.8'

5.00

SHLD/

BIKE LANE

5.00

SHLD/

BIKE LANE

RET EXIST CURB

3" MIN REVEAL (TYP.)

GRANITE AVENUE

CONSTRUCTION

STA 7+64.20± TO STA 8+62.62±

NOT TO SCALE

11.00 11.00

5.00

TRAVEL LANETRAVEL LANE CEM. CONC.

SDWK

PROP PAVEMENT

MILLING & RESURFACING

VAR.

1' - 3.2'

VARIES

VARIES

MEET & MATCH

EXIST GRADE

SAWCUT

PROP GRAN CURB

TYPE VA4,

6" REVEAL (TYP.)

VARIES

2.6' - 2.8'±

5.00

SHLD/

BIKE LANE

5.00

SHLD/

BIKE LANE

PROP 4" LOAM

BORROW & SEED

PROP 4" LOAM

BORROW & SEED

11.00

TRAVEL LANE

11.00

TRAVEL LANE

PROP GRAN CURB

TYPE VA4,

6" REVEAL (TYP.)

3.0'±

CEM. CONC.

SDWK

5.00

MEET & MATCH

EXIST GRADE

GRANITE AVENUE

CONSTRUCTION

STA 10+28.22± TO STA 10+40.38±

NOT TO SCALE

11.00 11.00

5.00

TRAVEL LANETRAVEL LANE CEM. CONC.

SDWK

PROP PAVEMENT

MILLING & RESURFACING

1' TYP.

VARIES

VARIES

MEET & MATCH

EXIST GRADE

SAWCUT

PROP GRAN CURB

TYPE VA4,

6" REVEAL (TYP.)

8.00

SHLD/

BIKE LANE

11.00

TRAVEL LANE

11.00

TURNING LANE

PROP GRAN CURB

TYPE VA4,

6" REVEAL (TYP.)

1.67

5.00

SHLD/

BIKE LANE

SAWCUT

VAR.

1' - 2'

CEM. CONC.

SDWK

6.00

LEVEL

3.60

PROP 4" LOAM

BORROW & SEED

PROP 4" LOAM

BORROW & SEED

SLOPE VARIES

SEE GRADING PLAN

1' TYP.

PROP HWY GUARD

1.50%*

1.50%*

1.50%*

1.50%*

1.50%*

*TOLERANCE FOR CONSTRUCTION ±0.5%

*TOLERANCE FOR CONSTRUCTION ±0.5%

*TOLERANCE FOR CONSTRUCTION ±0.5%

PROP MILLING MULCH

UNDER GUARD RAIL

60

77

54

_H

D (T

YP

IC

AL

S

EC

TIO

NS

).D

WG

21

-Ju

n-2

01

6 1

2:3

3 P

MP

lo

tte

d o

n

FED. AID PROJ. NO.

SHEET

NO.

TOTAL

SHEETS

MILTON

GRANITE AVENUE AT SQUANTUM STREET

40

STATE

MA

PROJECT FILE NO.

-

607754

TYPICAL SECTIONS

4

*8" GRAVEL BORROW, TYPE b

(AIR ENTRAINED 4000 PSI, 3/4", 610)

4" CEMENT CONCRETE SIDEWALK/WHEELCHAIR RAMP OVER

SUBBASE:

4" DENSE GRADED CRUSHED STONE OVER

***4" SUPERPAVE BASE COURSE - 37.5 (SBC-37.5) OVER

***1.75" SUPERPAVE INTERMEDIATE COURSE 12.5 (SIC-12.5) OVER

1.75" SUPERPAVE SURFACE COURSE - 12.5 (SSC-12.5) OVER

PROPOSED CEMENT CONCRETE SIDEWALK & WHEELCHAIR RAMP

SURFACE:

PROPOSED PAVEMENT MILLING & RESURFACING

*8" GRAVEL BORROW, TYPE b

SUBBASE:

SURFACE:

PROPOSED FULL DEPTH PAVEMENT

BASE:

PAVEMENT NOTES

INTERMEDIATE:

1.75" SUPERPAVE SURFACE COURSE - 12.5 (SSC-12.5) OVER SURFACE:

1.75" PAVEMENT MICRO MILLING

EXISTING PAVEMENT TREATED WITH ASPHALT

1.75" SUPERPAVE SURFACE COURSE - 9.5 (SSC-9.5) OVER

3.5" HOT MIX ASPHALT DRIVEWAY PLACED IN TWO LAYERS (ITEM 703.)

PROPOSED HOT MIX ASPHALT DRIVEWAY

SURFACE:

***1.75" SUPERPAVE INTERMEDIATE COURSE - 12.5 (SIC-12.5) OVER

*8" GRAVEL BORROW, TYPE bSUBBASE:

PROPOSED FULL DEPTH PAVEMENT (HES) LESS THAN 4 FT WIDE

SURFACE:

***6" HIGH EARLY STRENGTH (3000 PSI, 1 1/2", 470)BASE:

1.75" SUPERPAVE SURFACE COURSE - 12.5 (SSC 12.5) OVER

(ASPHALT EMULSION FOR TACK COAT 0.05 GAL/SY)

*8" GRAVEL BORROW, TYPE bSUBBASE:

(ASPHALT EMULSION FOR TACK COAT 0.05 GAL/SY)

*EXISTING GRAVEL DETERMINED TO BE SUITABLE SHALL REMAIN AS DIRECTED BY THE ENGINEER.

***1.75" SUPERPAVE INTERMEDIATE COURSE - 12.5 (SIC-12.5) OVERINTERMEDIATE:

PROPOSED PAVEMENT MILLING & RESURFACING (WITH LEVELING COURSE)

1.75" SUPERPAVE SURFACE COURSE - 12.5 (SSC-12.5) OVERSURFACE:

**1.75" SUPERPAVE LEVELING COURSE - 9.5 (SLC-9.5) OVER

1.75" PAVEMENT MICRO MILLING

**ADDITIONAL LIFTS OF SUPERPAVE LEVELING COURSE 9.5 (SSC 9.5) SHALL BE PAVED AT A MINIMUM OF 1" AND

MAXIMUM OF 1.75" AS REQUIRED.

***TACK COAT COVERAGE IS REQUIRED ON THE INTERMEDIATE COURSE, BASE COURSE, AND CEMENT CONCRETE

BASE COURSE.

CEMENT CONCRETE BASE COURSE OVER

EMULSION FOR TACK COAT 0.07 GAL/SY

EXISTING PAVEMENT TREATED WITH ASPHALT

EMULSION FOR TACK COAT 0.07 GAL/SY

*8" GRAVEL BORROW, TYPE b

(AIR ENTRAINED 4000 PSI, 3/4", 610)

6" CEMENT CONCRETE SIDEWALK/WHEELCHAIR RAMP OVER

SUBBASE:

PROPOSED CEMENT CONCRETE SIDEWALK AT DRIVEWAY

SURFACE:

Page 5: 25% SUBMITTAL - Milton MA | 779544.4987 PROJECT LOCATION DEPARTMENT OF TRANSPORTATION FEDERAL HIGHWAY ADMINISTRATION APPROVED: DIVISION ADMINISTRATOR DATE DATE CHIEF ENGINEER DATE

GRANITE AVENUE

CONSTRUCTION

STA 10+40.38± TO STA 11+12.18

NOT TO SCALE

11.00 11.00

5.00

TRAVEL LANETRAVEL LANE CEM. CONC.

SDWK

PROP PAVEMENT

MILLING & RESURFACING

VAR.

1' - 1.70'

VARIES

VARIES

MEET & MATCH

EXIST GRADE

SAWCUT

PROP GRAN CURB

TYPE VA4,

6" REVEAL (TYP.)

8.00

SHLD/

BIKE LANE

11.00

TRAVEL LANE

11.00

TURNING LANE

PROP GRAN CURB

TYPE VA4,

6" REVEAL (TYP.)

5.00

SHLD/

BIKE LANE

SAWCUT

VAR.

2' - 3.60'

CEM. CONC.

SDWK

6.00

LEVEL

3.60

PROP 4" LOAM

BORROW & SEED

PROP PAVEMENT

MILLING & RESURFACING

1' TYP.

VARIES

6" REVEAL (TYP.)

AT BACK OF SDWK

VARIES REVEAL

1.00%*

1.50%*

*TOLERANCE FOR CONSTRUCTION ±0.5%

PROP 6" WIDE CAST IN PLACE

CONCRETE RETAINING WALL

HEIGHT VARIES

QUANTUM STREET_WEST SIDE

CONSTRUCTION

STA 103+25.79± TO STA 103+37.30±

NOT TO SCALE

20.00

11.00 11.00 1'±

1'

6.00

TRAVEL LANETURNING LANE

TRAVEL LANE

CEM. CONC.

SDWK

PROP PAVEMENT

MILLING & RESURFACING

1'±

SHLD

SHLD

1.5'±

MEET & MATCH

EXIST GRADE

RET EXIST

HWY GUARD

SAWCUT

QUANTUM STREET_WEST SIDE

CONSTRUCTION

STA 103+37.30± TO STA 103+88.20±

NOT TO SCALE

20.0011.00 11.00

1'±1'

6.00

TRAVEL LANETURNING LANETRAVEL LANE CEM. CONC.

SDWK

PROP PAVEMENT

MILLING & RESURFACING

1'±

SHLDSHLD

MEET & MATCH

EXIST GRADE

PROP HWY GUARD

SAWCUT

PROP GRAN CURB

TYPE VA4,

6" REVEAL (TYP.)

SAWCUT

PROP PAVEMENT

MILLING & RESURFACING

VARIES

REMOVE EXIST ISLAND

PROP FULL DEPTH

PAVEMENT

PROP GRAN CURB

TYPE VA4,

6" REVEAL (TYP.)

6.00

CEM. CONC.

SDWK

PROP 4" LOAM

BORROW & SEED

TO EXIST BACK

OF SIDEWALK

SLO

PE

VA

R.

RET EXIST CURB

3" MIN. REVEAL (TYP.)

1.50%*

1.50%*

1.50%*

*TOLERANCE FOR CONSTRUCTION ±0.5%

*TOLERANCE FOR CONSTRUCTION ±0.5%

PROP MILLING MULCH

UNDER GUARD RAIL

60

77

54

_H

D (T

YP

IC

AL

S

EC

TIO

NS

).D

WG

21

-Ju

n-2

01

6 1

2:3

3 P

MP

lo

tte

d o

n

FED. AID PROJ. NO.

SHEET

NO.

TOTAL

SHEETS

MILTON

GRANITE AVENUE AT SQUANTUM STREET

40

STATE

MA

PROJECT FILE NO.

-

607754

TYPICAL SECTIONS

5

Page 6: 25% SUBMITTAL - Milton MA | 779544.4987 PROJECT LOCATION DEPARTMENT OF TRANSPORTATION FEDERAL HIGHWAY ADMINISTRATION APPROVED: DIVISION ADMINISTRATOR DATE DATE CHIEF ENGINEER DATE

SQUANTUM STREET_EAST SIDE

CONSTRUCTION

STA 110+47.73± TO STA 111+00.64±

NOT TO SCALE

11.00 VARIES 17.72' TO 21.54' 1'±1'

6.00

TRAVEL LANETRAVEL LANE CEM. CONC.

SDWK

PROP PAVEMENT

MILLING & RESURFACING

1'±

SHLDSHLD

MEET & MATCH

EXIST GRADE

SAWCUT

PROP GRAN CURB

TYPE VA4,

6" REVEAL (TYP.)

SAWCUT

PROP PAVEMENT

MILLING & RESURFACING

VARIES

REMOVE EXIST ISLAND

PROP FULL DEPTH

PAVEMENT

VAR. 8.00-16.00'±

CEM. CONC.

SDWK

PROP 4" LOAM

BORROW & SEED

TO EXIST BACK

OF SIDEWALK

VARIES

TURNING LANE

11.00

VARIES

PROP CEM. CONC.

SDWK END AT

STA 110+96.76±

SQUANTUM STREET_EAST SIDE

CONSTRUCTION

STA 111+00.64± TO STA 111+77.30±

NOT TO SCALE

VARIES 13.07' TO 17.72' 1'±1'

6.00±

TRAVEL LANETRAVEL LANE EXIST SDWK

PROP PAVEMENT

MILLING & RESURFACING

SHLDSHLD

RET EXIST CURB

SAWCUT

PROP PAVEMENT

MILLING & RESURFACING

VAR. 5.00± -8.00'±

CEM. CONC.

SDWK

PROP 4" LOAM

BORROW & SEED

TO EXIST BACK

OF SIDEWALK

VARIES

VARIES 19.28' TO 22.00'

VARIES

1.50%*

1.50%*

1.50%*

*TOLERANCE FOR CONSTRUCTION ±0.5%

*TOLERANCE FOR CONSTRUCTION ±0.5%

60

77

54

_H

D (T

YP

IC

AL

S

EC

TIO

NS

).D

WG

21

-Ju

n-2

01

6 1

2:3

4 P

MP

lo

tte

d o

n

FED. AID PROJ. NO.

SHEET

NO.

TOTAL

SHEETS

MILTON

GRANITE AVENUE AT SQUANTUM STREET

40

STATE

MA

PROJECT FILE NO.

-

607754

TYPICAL SECTIONS

6

Page 7: 25% SUBMITTAL - Milton MA | 779544.4987 PROJECT LOCATION DEPARTMENT OF TRANSPORTATION FEDERAL HIGHWAY ADMINISTRATION APPROVED: DIVISION ADMINISTRATOR DATE DATE CHIEF ENGINEER DATE

GUILFORD ROAD CONSTRUCTION BASELINE DATA

NUMBER

L6

C3

L7

STARTING

STATION

122+03.02

120+20.85

120+00.00

NORTHING

2921606.6916

2921543.016

2921549.8936

EASTING

779408.4524

779562.267

779581.9470

CURVE DATA

R=125.00' Δ 83°30'08"

L=182.17' T=111.57'

LINE DATA

N25°45'38"W

8.32'

S70°44'14"W

20.85'

ENDING

STATION

122+11.34

122+03.02

120+20.85

NORTHING

2921614.187

2921606.6916

2921543.016

EASTING

779404.835

779408.452

779562.267

GRANITE AVENUE CONSTRUCTION BASELINE DATA

NUMBER

L1

STARTING

STATION

0+00.00

NORTHING

2920477.0329

EASTING

779956.8763

CURVE DATA LINE DATA

N19°15'46"W

2446.72'

ENDING

STATION

24+46.72

NORTHING

2922786.776

EASTING

779149.698

SQUANTUM ST_WEST SIDE CONSTRUCTION BASELINE DATA

NUMBER

L2

C1

L3

STARTING

STATION

100+00.00

103+27.13

103+78.83

NORTHING

2920972.9776

2921254.996

2921297.0923

EASTING

779394.9896

779560.762

779590.6608

CURVE DATA

R=300.00' Δ 9°52'25"

L=51.70' T=25.91'

LINE DATA

N30°26'50"E

327.13'

N40°19'15"E

87.17'

ENDING

STATION

103+27.13

103+78.83

104+66.00

NORTHING

2921254.996

2921297.0923

2921363.554

EASTING

779560.762

779590.661

779647.066

SQUANTUM ST_EAST SIDE CONSTRUCTION BASELINE DATA

NUMBER

L4

C2

L5

STARTING

STATION

110+00.00

111+84.19

113+04.75

NORTHING

2921373.3962

2921480.768

2921568.5833

EASTING

779643.6270

779793.288

779874.6943

CURVE DATA

R=300.00' Δ 23°01'26"

L=120.55' T=61.10'

LINE DATA

N54°20'35"E

184.19'

N31°19'09"E

34.25'

ENDING

STATION

111+84.19

113+04.75

113+39.00

NORTHING

2921480.768

2921568.5833

2921597.846

EASTING

779793.288

779874.694

779892.500

1

1

1

1

1

2

P

C

+

2

7

.

1

3

P

T

+

7

8

.

8

3

1

1

0

PC +84.19

1

0

3

1

0

4

+

6

6

.

0

0

7 8 9 10 11 12

1

2

1

122

PC

+

20.85

PT +03.02

120

+11.3

4

LIMIT OF MILLING

& RESURFACING

STA 103+25.79

N2921253.8358

E779560.0801

LIMIT OF MILLING

& RESURFACING

STA 7+15.97

N2921152.9171

E779720.6771

LIMIT OF MILLING

& RESURFACING

STA 120+91.18

N2921539.2106

E779492.9597

LIMIT OF MILLING

& RESURFACING

STA 111+77.30

N2921476.7472

E779787.6834

CONST BL

LIMIT OF SIDEWALK

RECONSTRUCTION

STA 7+15.97

LIMIT OF SIDEWALK

RECONSTRUCTION

STA 7+64.20

LIMIT OF SIDEWALK

RECONSTRUCTION

STA 103+25.79

LIMIT OF SIDEWALK

RECONSTRUCTION

STA 103+37.30

LIMIT OF MILLING

& RESURFACING

STA 11+87.29

N2921597.8503

E779565.1877

LIMIT OF SIDEWALK

RECONSTRUCTION

STA 11+87.29

LIMIT OF SIDEWALK

RECONSTRUCTION

STA 11+87.29

LIMIT OF SIDEWALK

RECONSTRUCTION

STA 120+91.18

LIMIT OF SIDEWALK

RECONSTRUCTION

STA 120+87.61

STA 9+39.10 GRANITE AVENUE =STA 104+66.00 SQUANTUM ST_WEST SIDE

STA 9+49.52 GRANITE AVENUE =STA 110+00.00 SQUANTUM ST_EAST SIDE

STA 11+36.49 GRANITE AVENUE =STA 120+00.00 GUILFORD ROAD

L1

L

2

L

3

L

4

L6

L7

C

1

C

3

GRANITE AVENUE

GRANITE AVENUE

S

Q

U

A

N

T

U

M

S

T

R

E

E

T

S

Q

U

A

N

T

U

M

S

T

R

E

E

T

G

U

I

L

F

O

R

D

R

O

A

D

S

8

9

°

0

4

'0

8

"

E

4

9

.

8

0

'

CONST BL

C

O

N

S

T

B

L

C

O

N

S

T

B

L

C

O

N

S

T

B

L

N

7

6

°

4

5

'

3

5

"

W

3

8

.

2

6

'

S

5

1

°

4

9

'

3

4

"

E

5

2

.

8

4

'

SURVEY TRAVERSE LINE

SURVEY TRAVERSE LINE

PROP TEMP

EASEMENT LINE

STREET LAYOUT LINE

STREET LAYOUT LINE

STREET LAYOUT LINE

STREET

LAYOUT LINE

STREET

LAYOUT LINE

STREET LAYOUT LINE

STREET LAYOUT LINE

STREET LAYOUT LINE

STREET LAYOUT LINE

STREET LAYOUT LINE

LIMIT OF SIDEWALK

RECONSTRUCTION

STA 110+96.51

LIMIT OF SIDEWALK

RECONSTRUCTION

STA 111+77.30

LIMIT OF MILLING

& RESURFACING

STA 10+40.38

N2921445.5324

E779574.6289

20

SCALE: 1" = 20'

0 50 100

60

77

54

_H

D (C

ON

ST

B

AS

EL

IN

E T

IE

S).D

WG

21

-Ju

n-2

01

6 1

2:2

7 P

MP

lo

tte

d o

n

FED. AID PROJ. NO.

SHEET

NO.

TOTAL

SHEETS

MILTON

GRANITE AVENUE AT SQUANTUM STREET

40

STATE

MA

PROJECT FILE NO.

-

607754

CONSTRUCTION BASELINE TIES

7

LEGEND & ABBREVIATION

- SURVEY CONTROL POINT

MAG - MAG NAIL

DH - DRILL HOLE

Page 8: 25% SUBMITTAL - Milton MA | 779544.4987 PROJECT LOCATION DEPARTMENT OF TRANSPORTATION FEDERAL HIGHWAY ADMINISTRATION APPROVED: DIVISION ADMINISTRATOR DATE DATE CHIEF ENGINEER DATE

1

1

1

1

1

2

P

C

+

2

7

.

1

3

P

T

+

7

8

.

8

3

1

1

0

PC +84.19

1

0

3

1

0

4

+

6

6

.

0

0

7 8 9 10 11 12

1

2

1

122

PC

+

20.85

PT +03.02

120

+11.3

4

LIMIT OF MILLING

& RESURFACING

STA 103+25.79

N2921253.8358

E779560.0801

LIMIT OF MILLING

& RESURFACING

STA 120+91.18

N2921539.2106

E779492.9597

LIMIT OF MILLING

& RESURFACING

STA 111+77.30

N2921476.7472

E779787.6834

PROP MILLING &

RESURFACING

PROP CC SW

PROP GRAN CURB,

TYPE VA4 (TYP.)

REM TREE

LIMIT OF SIDEWALK

RECONSTRUCTION

STA 7+15.97

LIMIT OF SIDEWALK

RECONSTRUCTION

STA 7+64.20

LIMIT OF SIDEWALK

RECONSTRUCTION

STA 103+25.79

LIMIT OF SIDEWALK

RECONSTRUCTION

STA 103+37.30

WCR2

WCR1

WCR3

WCR4

WCR5

WCR6

WCR7

WCR8

REM ISLAND

PROP FD PVMT

REM ISLAND

PROP FD PVMT

LIMIT OF MILLING

& RESURFACING

STA 11+87.29

N2921597.8503

E779565.1877

LIMIT OF SIDEWALK

RECONSTRUCTION

STA 11+87.29

LIMIT OF SIDEWALK

RECONSTRUCTION

STA 11+87.29

LIMIT OF SIDEWALK

RECONSTRUCTION

STA 120+91.18

LIMIT OF SIDEWALK

RECONSTRUCTION

STA 120+87.61

DWY1

DWY2

GRANITE AVENUE

GRANITE AVENUE

S

Q

U

A

N

T

U

M

S

T

R

E

E

T

S

Q

U

A

N

T

U

M

S

T

R

E

E

T

G

U

I

L

F

O

R

D

R

O

A

D

SEE GRANITE AVE

5000 PROJECT

MASSDOT PROJECT

FILE NO. 608406

STA 9+39.10 GRANITE AVENUE =STA 104+66.00 QUANTUM ST_WEST SIDE

STA 9+49.52 GRANITE AVENUE =STA 110+00.00 QUANTUM ST_EAST SIDE

STA 11+36.49 GRANITE AVENUE =STA 120+00.00 GUILFORD ROAD

PROP MILLING &

RESURFACING

PROP MILLING &

RESURFACING

PROP MILLING &

RESURFACING

PROP MILLING &

RESURFACING

BEGIN PROP HWY GUARD

CONNECT TO EXIST

PROP HWY

GUARD (TYP.)

PROP HWY GUARD

TANGENT END TREATMENT

LIMIT OF SIDEWALK

RECONSTRUCTION

STA 110+96.51

LIMIT OF SIDEWALK

RECONSTRUCTION

STA 111+77.30

SAWCUT

SAWCUT

S

A

W

C

U

T

S

A

W

C

U

T

S

A

W

C

U

T

S

A

W

C

U

T

SAWCUT

SAWCUT

SAWCUT

SAWCUT

SAWCUT

S

A

W

C

U

T

S

A

W

C

U

T

SAWCUT

PROP LOAM

BORROW & SEED

PROP LOAM

BORROW & SEED

PROP CC SW

PROP CC SW

PROP CC SW

PROP CC SW

PROP CC SW

PROP CC SW

PROP LOAM

BORROW & SEED

PROP CC SW

PROP CC SW

PROP LOAM

BORROW & SEED

PROP LOAM

BORROW & SEED

PROP LOAM

BORROW & SEED

PROP CC SW

PROP CC SW

PROP COMPOST

FILTER TUBE (TYP)

PROP LOAM

BORROW & SEED

PROP CC SW

PROP LOAM

BORROW & SEED

PROP CC SW

PROP CC SW

PROP LOAM

BORROW & SEED

PROP CC SW

PROP CC SW

PROP DWY

MILLING &

RESURFACING

R&D EXIST

HWY GUARD

PROTECT TREE

PROTECT TREE

WCR9

WCR10

PROP DWY

FULL DEPTH PVMT

PROP FD PVMT

PROP MILLING &

RESURFACING

LIMIT OF MILLING

& RESURFACING

STA 120+32.40

N2921445.5324

E779574.6289

PROP DWY

MILLING &

RESURFACING

PROP LOAM

BORROW & SEED

PROP TEMP

EASEMENT LINE

STREET LAYOUT LINE

STREET LAYOUT LINE

STREET LAYOUT LINE

STREET LAYOUT LINE

STREET

LAYOUT LINE

STREET LAYOUT LINE

STREET LAYOUT LINE

STREET LAYOUT LINE

STREET LAYOUT LINE

STREET LAYOUT LINE

LIMIT OF MILLING

& RESURFACING

STA 7+15.97

N2921152.9171

E779720.6771

PROP LOS

PROP LOS

R&D EXIST GC

R&D

EXIST GC

R&D

EXIST GC

S

A

W

C

U

T

S

A

W

C

U

T

S

A

W

C

U

T

S

A

W

C

U

T

R&D

EXIST GC

R&D

EXIST GC

R&D

EXIST GC

PROP CAST

IN PLACE

CONC.

RETAINING

WALL

AT BACK

OF SW

PROP FD PVMT

20

SCALE: 1" = 20'

0 50 100

60

77

54

_H

D (C

ON

ST

P

LA

N).D

WG

21

-Ju

n-2

01

6 1

2:1

4 P

MP

lo

tte

d o

n

FED. AID PROJ. NO.

SHEET

NO.

TOTAL

SHEETS

MILTON

GRANITE AVENUE AT SQUANTUM STREET

40

STATE

MA

PROJECT FILE NO.

-

607754

CONSTRUCTION PLANS

HIGHWAY GUARD DETAILS

STA 103+37.30 LT CONNECT TO EXIST

STA 103+37.30 LT TO STA 104+00.63 LT - STEEL W BEAM HIGHWAY GUARD (SIGNAL FACED)

STA 104+00.63 LT TO STA 9+92.24 LT - STEEL W BEAM HIGHWAY GUARD - CURVED (SIGNAL FACED)

STA 9+92.24 LT TO STA 9+98.23 LT - STEEL W BEAM HIGHWAY GUARD (SIGNAL FACED)

STA 9+98.23 LT TO STA 10+35.73 LT - STEEL BEAM HIGHWAY GUARD TANGENT END TREATMENT

TRAFFIC SIGNAL CONDUIT

SEE SHEET 16

WATER SUPPLY ALTERATIONS

SEE SHEET 13

DRAINAGE DETAILS

8

NOTES:

1. FOR DRAINAGE AND UTILITY PLANS SEE SHEET 13.

SEE SHEET 13

Page 9: 25% SUBMITTAL - Milton MA | 779544.4987 PROJECT LOCATION DEPARTMENT OF TRANSPORTATION FEDERAL HIGHWAY ADMINISTRATION APPROVED: DIVISION ADMINISTRATOR DATE DATE CHIEF ENGINEER DATE

NAVD 88

BASE ELEV

20.00

30

40

50

60

20

30

40

50

60

7+00

36.02

35.70

8+00

35.15

34.60

9+00

34.16

34.28

10+00

35.01

36.24

11+00

37.60

12+007+00 8+00 9+00 10+00 11+00 12+00

-0.65%

-1.10%

2.55%

3

.1

6

%

GR

AD

E B

RE

AK

S

TA

=

7+

15.97

ELE

V =

36.24

GR

AD

E B

RE

AK

S

TA

=

8+

00.00

ELE

V =

35.70

GR

AD

E B

RE

AK

S

TA

=

11+

36.49

ELE

V =

37.17

GR

AD

E B

RE

AK

S

TA

=

11+

87.29

ELE

V =

38.77

LOW POINT ELEV = 34.14

LOW POINT STA = 9+65.13

PVI STA = 9+95.00

PVI ELEV = 33.56

A.D. = 3.65%

K = 41.12

150' VC

PV

C: 9+

20

ELE

V: 34.38

PV

T: 10+

70

ELE

V: 35.47

249.0' HSD

Granite Avenue

Station=9+23.76

elev = 34.34

Granite Avenue

Station=9+39.10

elev = 34.22

Granite Avenue

Station=9+57.74

elev = 34.14

Granite Avenue

Station=9+49.52

elev = 34.17

BEGIN MILING & RESURFACING

STA =7+15.97

MEET & MATCH EXIST

END MILING & RESURFACING

STA =11+87.29

MEET & MATCH EXIST

STA 9+39.10 GRANITE AVENUE =STA 104+66.00 SQUANTUM ST_WEST SIDE

STA 9+49.52 GRANITE AVENUE =STA 110+00.00 SQUANTUM ST_EAST SIDE

PROP GRADE

EXIST GRADE

STA 11+36.49 GRANITE AVENUE =STA 120+00.00 GUILFORD ROAD

SQUANTUM STREET

EXIST GRADE

PROP GRADE

Granite Avenue

Station=11+36.49

elev = 37.17

GRANITE AVENUE

GUILFOD ROAD

0

0

HOR. SCALE IN FEET

VER. SCALE IN FEET

20 40

4 4 8

0

0

20

60

77

54

_H

D (P

RO

FIL

E).D

WG

21

-Ju

n-2

01

6 1

1:5

9 A

MP

lo

tte

d o

n

FED. AID PROJ. NO.

SHEET

NO.

TOTAL

SHEETS

MILTON

GRANITE AVENUE AT SQUANTUM STREET

40

STATE

MA

PROJECT FILE NO.

-

607754

PROFILE

GRANITE AVENUE

9

FOR CONSTRUCTION PLAN:

SEE SHEET NO. 8

Page 10: 25% SUBMITTAL - Milton MA | 779544.4987 PROJECT LOCATION DEPARTMENT OF TRANSPORTATION FEDERAL HIGHWAY ADMINISTRATION APPROVED: DIVISION ADMINISTRATOR DATE DATE CHIEF ENGINEER DATE

NAVD 88

BASE ELEV

20.00

30

40

50

20

30

40

50

103+00

34.67

34.17

104+00

34.01

103+00 104+00

-0.99%

1.3

2%

GR

AD

E B

RE

AK

S

TA

=

103+

25.79

ELE

V =

34.90

GR

AD

E B

RE

AK

S

TA

=

104+

35.72

ELE

V =

33.82

GRADE BREAK STA = 104+66.00

ELEV = 34.22

GRANITE AVE

STA 9+39.10 GRANITE AVENUE =STA 104+66.00 SQUANTUM ST_WEST SIDE

EXIST GRADE

PROP GRADE

SQUANTUM ST_WEST SIDE

BEGIN MILING & RESURFACING

STA =103+25.79

MEET & MATCH EXIST

NAVD 88

BASE ELEV

20.00

30

40

50

20

30

40

50

33.81

34.30

111+00

34.83

112+00111+00 112+00

-1.9

2%

0.97%

1.06%

GRADE BREAK STA = 110+00.00

ELEV = 34.17

GR

AD

E B

RE

AK

S

TA

=

110+

29.12

ELE

V =

33.61

GR

AD

E B

RE

AK

S

TA

=

111+

00.00

ELE

V =

34.30

GR

AD

E B

RE

AK

S

TA

=

111+

77.30

ELE

V =

35.12

STA 9+49.52 GRANITE AVENUE =STA 110+00.00 SQUANTUM ST_EAST SIDE

EXIST GRADE

PROP GRADE

GRANITE AVE

SQUANTUM ST_EAST SIDE

END MILING & RESURFACING

STA =111+77.30

MEET & MATCH EXIST

0

0

HOR. SCALE IN FEET

VER. SCALE IN FEET

20 40

4 4 8

0

0

20

60

77

54

_H

D (P

RO

FIL

E).D

WG

21

-Ju

n-2

01

6 1

2:0

0 P

MP

lo

tte

d o

n

FED. AID PROJ. NO.

SHEET

NO.

TOTAL

SHEETS

MILTON

GRANITE AVENUE AT SQUANTUM STREET

40

STATE

MA

PROJECT FILE NO.

-

607754

PROFILES

SQUANTUM STREET

10

FOR CONSTRUCTION PLAN:

SEE SHEET NO. 8

Page 11: 25% SUBMITTAL - Milton MA | 779544.4987 PROJECT LOCATION DEPARTMENT OF TRANSPORTATION FEDERAL HIGHWAY ADMINISTRATION APPROVED: DIVISION ADMINISTRATOR DATE DATE CHIEF ENGINEER DATE

1

1

1

1

1

2

P

C

+

2

7

.

1

3

P

T

+

7

8

.

8

3

1

1

0

PC +84.19

1

0

3

1

0

4

+

6

6

.

0

0

7 8 9 10 11 12

1

2

1

122

PC

+

20.85

PT +03.02

120

+11.3

4

LIMIT OF MILLING

& RESURFACING

STA 103+25.79

N2921253.8358

E779560.0801

LIMIT OF MILLING

& RESURFACING

STA 7+15.97

N2921152.9171

E779720.6771

LIMIT OF MILLING

& RESURFACING

STA 120+91.18

N2921539.2106

E779492.9597

LIMIT OF MILLING

& RESURFACING

STA 111+77.30

N2921476.7472

E779787.6834

LIMIT OF SIDEWALK

RECONSTRUCTION

STA 7+15.97

LIMIT OF SIDEWALK

RECONSTRUCTION

STA 7+64.20

LIMIT OF SIDEWALK

RECONSTRUCTION

STA 103+25.79

LIMIT OF SIDEWALK

RECONSTRUCTION

STA 103+37.30

LIMIT OF MILLING

& RESURFACING

STA 11+87.29

N2921597.8503

E779565.1877

LIMIT OF SIDEWALK

RECONSTRUCTION

STA 11+87.29

LIMIT OF SIDEWALK

RECONSTRUCTION

STA 11+87.29

LIMIT OF SIDEWALK

RECONSTRUCTION

STA 120+91.18

LIMIT OF SIDEWALK

RECONSTRUCTION

STA 120+87.61

26.60'

28.35'

28.67'

25.33'

28.67'

25.33'

25.33'

2

3

.

0

0

'

2

2

.

9

4

'

2

2

.

7

9

'

2

1

.

9

6

' 2

1

.

4

6

'

2

1

.

0

9

'

2

0

.

0

0

'

27.00'

27.00'

27.00'

27.00'

27.00'

27.00'

17.00'

10.80'

2

4

.5

1

'

1

8

.7

2

'

1

4

.0

7

'

2

3

.0

0

'

1

7

.0

1

'

2

0

.8

0

'

2

2

.0

5

'

2

3

.0

0

'

C1

C2

C

3

C

4

C

5

C

6

C7

C8

C9

C10

C11

C12

C

1

3

C

1

4

C

1

5

PC

PT

PC

PT PC

P

T

P

C

P

T

P

C

PT

P

C

P

T

P

C

PT

PC

P

T

P

C

P

T

PC

PT

P

C

P

C

C

P

R

C

PT

P

C

P

C

C

PT

+26.79

+57.65

+69.10

+78.92

+06.92

+02.81

+62.62

+28.22

+92.24 +12.18

+40.88

+58.90+66.79

+70.53

+47.73

+81.69

+94.03

+06.15

+25.57

+38.39

+37.30

+50.92

+54.07

+72.47

+88.20

+00.63

8.0'

8.0'

6.5'

6.5'

8

.0

'

8

.0

'

5.0'

5.0'

5

.

0

'

5.0'

6

.0

'

5.0'

4.0'

5.0'

6

.

0

'

6

.

0

'

6

.

0

'

7.9'

6

.

0

'

6

.

0

'

6

.

0

'

6

.

0

'

6.0'

6.0'

4

'

4

'

4

'

10.0'

STA 9+39.10 GRANITE AVENUE =STA 104+66.00 SQUANTUM ST_WEST SIDE

STA 9+49.52 GRANITE AVENUE =STA 110+00.00 SQUANTUM ST_EAST SIDE

STA 11+36.49 GRANITE AVENUE =STA 120+00.00 GUILFORD ROAD

STA 10+50.17

OFF: 35.00'

STA 10+40.38

OFF: 33.50'

STA 10+40.38

OFF: 49.67'

STA 10+58.91

OFF: 43.50'

STA 10+98.00

OFF: 43.49'

STA 10+98.03

OFF: 33.50'

STA 11+03.03

OFF: 33.50'

STA 11+70.53

OFF: 26.00'

STA 120+43.36

OFF: 10.93'

STA 120+41.52

OFF: 12.58'

STA 111+20.70

OFF: 22.47'

STA 111+37.81

OFF: 29.07'

STA 111+54.26

OFF: 25.12'

STA 111+24.68

OFF: 31.72'

STA 110+95.30

OFF: 31.00'

STA 110+67.40

OFF: 49.96'

LIMIT OF SIDEWALK

RECONSTRUCTION

STA 111+77.30

LIMIT OF SIDEWALK

RECONSTRUCTION

STA 110+96.51

GRANITE AVENUE

CONSTRUCTION

SQUANTUM ST_WEST SIDE

CONSTRUCTION

SQUANTUM ST_EAST SIDE

CONSTRUCTION

GUILFORD ROAD

CONSTRUCTION

STA 120+76.85

OFF: 17.55'

SEE GRANITE AVE

5000 PROJECT

MASSDOT PROJECT

FILE NO. 608406

PROP TEMP

EASEMENT LINE

STREET LAYOUT LINE

STREET LAYOUT LINE

STREET LAYOUT LINE

STREET LAYOUT LINE

STREET LAYOUT LINE

STREET LAYOUT LINE

STREET LAYOUT LINE

STREET LAYOUT LINE

STREET LAYOUT LINE

STREET LAYOUT LINE

LIMIT OF MILLING

& RESURFACING

STA 10+40.38

N2921445.5324

E779574.6289

+38.75

+87.61

1

2

'

STA 120+41.30

OFF: 12.65'

STA 120+63.71

OFF: 11.56'

PROP LOS

PROP LOS

STA 7+15.97

OFF: 26.28'

STA 11+87.29

OFF: 26.58'

STA 11+87.29

OFF: 17.00'

STA 7+64.20

OFF: 25.33'

STA 120+91.18

OFF: 9.91'

CURVE TABLE

CURVE #

C1

C2

C3

C4

C5

C6

C7

C8

C9

C10

C11

C12

C13

C14

C15

RADIUS

200.00'

200.00'

20.00'

200.00'

100.00'

80.00'

40.00'

200.00'

35.00'

500.00'

20.00'

15.00'

140.00'

140.00'

116.00'

LENGTH

10.83'

11.33'

42.03'

19.91'

17.99'

83.19'

46.41'

19.46'

64.99'

20.50'

33.57'

21.79'

27.20'

26.21'

45.45'

TANGENT

5.42'

5.67'

34.93'

9.96'

9.02'

45.80'

26.21'

9.74'

46.78'

10.25'

22.28'

13.33'

13.64'

13.14'

23.02'

DELTA

3° 06' 08"

3° 14' 44"

120° 24' 59"

5° 42' 16"

10° 18' 18"

59° 35' 01"

66° 28' 35"

5° 34' 26"

106° 23' 39"

2° 20' 57"

96° 10' 14"

83° 14' 18"

11° 07' 53"

10° 43' 31"

22° 26' 53"

20

SCALE: 1" = 20'

0 50 100

60

77

54

_H

D (C

UR

B T

IE

P

LA

N).D

WG

21

-Ju

n-2

01

6 1

2:0

0 P

MP

lo

tte

d o

n

FED. AID PROJ. NO.

SHEET

NO.

TOTAL

SHEETS

MILTON

GRANITE AVENUE AT SQUANTUM STREET

40

STATE

MA

PROJECT FILE NO.

-

607754

CURB TIE PLAN

11

Page 12: 25% SUBMITTAL - Milton MA | 779544.4987 PROJECT LOCATION DEPARTMENT OF TRANSPORTATION FEDERAL HIGHWAY ADMINISTRATION APPROVED: DIVISION ADMINISTRATOR DATE DATE CHIEF ENGINEER DATE

1

1

1

1

1

2

P

C

+

2

7

.

1

3

P

T

+

7

8

.

8

3

1

1

0

PC +84.19

1

0

3

1

0

4

+

6

6

.

0

0

7 8 9 10 11 12

1

2

1

122

PC

+

20.85

PT +03.02

120

+11.3

4

LIMIT OF MILLING

& RESURFACING

STA 103+25.79

N2921253.8358

E779560.0801

LIMIT OF MILLING

& RESURFACING

STA 7+15.97

N2921152.9171

E779720.6771

LIMIT OF MILLING

& RESURFACING

STA 120+91.18

N2921539.2106

E779492.9597

LIMIT OF MILLING

& RESURFACING

STA 111+77.30

N2921476.7472

E779787.6834

LIMIT OF SIDEWALK

RECONSTRUCTION

STA 7+15.97

LIMIT OF SIDEWALK

RECONSTRUCTION

STA 7+64.20

LIMIT OF SIDEWALK

RECONSTRUCTION

STA 103+25.79

LIMIT OF SIDEWALK

RECONSTRUCTION

STA 103+37.30

LIMIT OF MILLING

& RESURFACING

STA 11+87.29

N2921597.8503

E779565.1877

LIMIT OF SIDEWALK

RECONSTRUCTION

STA 11+87.29

LIMIT OF SIDEWALK

RECONSTRUCTION

STA 11+87.29

LIMIT OF SIDEWALK

RECONSTRUCTION

STA 120+91.18

LIMIT OF SIDEWALK

RECONSTRUCTION

STA 120+87.61

STA 9+39.10 GRANITE AVENUE =STA 104+66.00 SQUANTUM ST_WEST SIDE

STA 9+49.52 GRANITE AVENUE =STA 110+00.00 SQUANTUM ST_EAST SIDE

STA 11+36.49 GRANITE AVENUE =STA 120+00.00 GUILFORD ROAD

GRANITE AVENUE

GRANITE AVENUE

S

Q

U

A

N

T

U

M

S

T

R

E

E

T

S

Q

U

A

N

T

U

M

S

T

R

E

E

T

G

U

I

L

F

O

R

D

R

O

A

D

SEE GRANITE AVE

5000 PROJECT

MASSDOT PROJECT

FILE NO. 608406

RIM 33.04

BC 34.13

TC 34.63

BC 34.10

TC 34.52

34.57

34.30

34.03

34.36

34.40

34.33

34.20

34.28

33.98

BC 33.92

TC 34.25

34.26

BC=RIM= 33.50

TC 33.83

33.88

33.91

33.76

33.81

34.04

33.99

34.10

34.05

34.06

3

6

3

5

34

BC 34.38

TC 34.88

34.98

34.29

34.23

34.52

34.58

34.46

34.52

BC 34.16

TC 34.66

34.70

TC 35.91

BC 34.51

34.41

35.01

34.72

34.63

34.62

34.70

34.65

34.18

34.11

34.38

34.45

TC 34.37

RIM=BC= 33.87

TC 34.67

BC 34.25

TC 34.62

BC 34.20

TC 34.35

BC 33.93

TC 35.97

BC 35.47

35.40

TW 36.53

BW 36.03

TC 33.91

BC 33.41

TC=33.74

BC=RIM 33.24

TC 34.27

BC 33.77

34.45

33.95

34.01

TC 33.93

BC 33.43

TC 34.18

BC 33.68

TW 35.76

BW 35.48

TC 35.74

BC 35.24

TW 36.26

BW 35.79

TW 36.26

BW 35.77

TC 35.74

BC 35.24

PROP TEMP

EASEMENT LINE

33.16

33.21

TC 33.60

BC 33.10

33.83

STREET LAYOUT LINE

STREET LAYOUT LINE

STREET LAYOUT LINE

STREET

LAYOUT LINE

STREET LAYOUT LINE

STREET LAYOUT LINE

STREET LAYOUT LINE

STREET LAYOUT LINE

STREET LAYOUT LINE

STREET LAYOUT LINE

PROP LOS

PROP LOS

33.78

33.71

33.82

33.76

TC 33.81

BC 33.31

33.84

34.42

34

36.50

TC 35.63

BC 35.13

TC 37.55

BC 37.05

36.66

3

5

3

5

LIMIT OF SIDEWALK

RECONSTRUCTION

STA 110+96.51

LIMIT OF SIDEWALK

RECONSTRUCTION

STA 111+77.30

LIMIT OF MILLING

& RESURFACING

STA 10+40.38

N2921445.5324

E779574.6289

20

SCALE: 1" = 20'

0 50 100

60

77

54

_H

D (G

RA

DIN

G P

LA

N).D

WG

21

-Ju

n-2

01

6 1

1:5

7 A

MP

lo

tte

d o

n

FED. AID PROJ. NO.

SHEET

NO.

TOTAL

SHEETS

MILTON

GRANITE AVENUE AT SQUANTUM STREET

40

STATE

MA

PROJECT FILE NO.

-

607754

GRADING PLAN

12

Page 13: 25% SUBMITTAL - Milton MA | 779544.4987 PROJECT LOCATION DEPARTMENT OF TRANSPORTATION FEDERAL HIGHWAY ADMINISTRATION APPROVED: DIVISION ADMINISTRATOR DATE DATE CHIEF ENGINEER DATE

1

1

1

1

1

2

P

C

+

2

7

.

1

3

P

T

+

7

8

.

8

3

1

1

0

PC +84.19

1

0

3

1

0

4

+

6

6

.

0

0

7 8 9 10 11 12

1

2

1

122

PC

+

20.85

PT +03.02

120

+11.3

4

LIMIT OF MILLING

& RESURFACING

STA 103+25.79

N2921253.8358

E779560.0801

LIMIT OF MILLING

& RESURFACING

STA 7+15.97

N2921152.9171

E779720.6771

LIMIT OF MILLING

& RESURFACING

STA 120+91.18

N2921539.2106

E779492.9597

LIMIT OF MILLING

& RESURFACING

STA 111+77.30

N2921476.7472

E779787.6834

LIMIT OF SIDEWALK

RECONSTRUCTION

STA 7+15.97

LIMIT OF SIDEWALK

RECONSTRUCTION

STA 7+64.20

LIMIT OF SIDEWALK

RECONSTRUCTION

STA 103+25.79

LIMIT OF SIDEWALK

RECONSTRUCTION

STA 103+37.30

ADJ

RET HYD

LIMIT OF MILLING

& RESURFACING

STA 11+87.29

N2921597.8503

E779565.1877

LIMIT OF SIDEWALK

RECONSTRUCTION

STA 11+87.29

LIMIT OF SIDEWALK

RECONSTRUCTION

STA 11+87.29

LIMIT OF SIDEWALK

RECONSTRUCTION

STA 120+91.18

LIMIT OF SIDEWALK

RECONSTRUCTION

STA 120+87.61

ADJ

RELOCATE UP

(BY OTHERS)

R

E

T

ADJ

ADJ

RET

ADJ

ADJ

RET

ADJ

ADJ

ADJ OHW

(BY OTHERS)

ADJ

RET

ADJ

ADJ

ADJ

ADJ

ADJ

ADJ

ADJ

TMH

ADJ

REM EXIST TRAFFIC

SIGNAL EQUIPMENT

(SEE TRAFFIC SIGNAL PLANS)

ADJ

RET

RET

RET

RET

ADJ

ADJ

ADJ

R

E

T

RE

T

RE

T

RE

T

AD

J

A

D

J

RE

T

R

E

T

RET

RET

RET

ADJ

RET

RET

ADJ

RET

ADJ GG

R

E

T

A

D

J

ADJ

ADJ

13'-12" CPP

ABAN PIPE

& PLUG

PROP CBCI

STA 110+84.69 LT

RIM= 33.50

INV= 28.93

PROP CBCI

STA 9+21.99 RT

RIM= 33.04

INV= 29.54

51'-12" CPP

RET EMH

STREET LIGHT

& CONDUIT (TYP)

R

E

T

ADJ

R

E

T

R

E

T

G

A

S

RET

RET

RET

RET

RET

A

D

J

R

E

T

RE

T

R

E

T

ADJ

ADJ

R&R HYD

15'-6" DICL

RELOCATE

U.P. #55A

(BY OTHERS)

RELOCATE OHW

(BY OTHERS)

RET

RET

GRANITE AVENUEGRANITE AVENUE

S

Q

U

A

N

T

U

M

S

T

R

E

E

T

S

Q

U

A

N

T

U

M

S

T

R

E

E

T

G

U

I

L

F

O

R

D

R

O

A

D

PROP CBCI

STA 9+62.39 LT

RIM= 33.24

INV= 29.74

ABAN PIPE

& PLUG

30'-12" CPP

ADJ

RIM= 33.22

R&S F&G

PROP F&G

ADJ

RIM= 33.87

R&S F&G

PROP F&G

ADJ

RIM= 34.75

R&S F&G

PROP F&G

RET

ABAN CB

R&S F&G

ABAN CB

R&S F&G

RET

RET

R

E

T

RETRET

ADJ

ADJ

ADJ

RE

T

RET

R

E

T

R

E

T

RET

PROP TEMP

EASEMENT LINE

STREET

LAYOUT LINE

STREET LAYOUT LINE

STREET LAYOUT LINE

STREET

LAYOUT LINE

STREET

LAYOUT LINE

STREET LAYOUT LINE

STREET LAYOUT LINE

STREET LAYOUT LINE

STREET LAYOUT LINE

STREET LAYOUT LINE

LIMIT OF SIDEWALK

RECONSTRUCTION

STA 110+96.40

LIMIT OF SIDEWALK

RECONSTRUCTION

STA 111+77.30

LIMIT OF MILLING

& RESURFACING

STA 10+40.38

N2921445.5324

E779574.6289

SEE GRANITE AVE

5000 PROJECT

MASSDOT PROJECT

FILE NO. 608406

RET

RET

RELOCATE OHW

(BY OTHERS)

RELOCATE OHW

(BY OTHERS)

20

SCALE: 1" = 20'

0 50 100

60

77

54

_H

D (D

RA

IN

AG

E &

U

TIL

IT

Y P

LA

N).D

WG

21

-Ju

n-2

01

6 1

1:4

1 A

MP

lo

tte

d o

n

FED. AID PROJ. NO.

SHEET

NO.

TOTAL

SHEETS

MILTON

GRANITE AVENUE AT SQUANTUM STREET

40

STATE

MA

PROJECT FILE NO.

-

607754

DRAINAGE & UTILITY PLAN

13

UTILITY NOTES

1. LOCATIONS OF EXISTING UNDERGROUND UTILITIES ARE SHOWN IN AN APPROXIMATE WAY ONLY AND HAVE

NOT BEEN INDEPENDENTLY VERIFIED BY THE OWNER OR ITS REPRESENTATIVE. THE CONTRACTOR SHALL

DETERMINE THE EXACT LOCATION OF ALL EXISTING UTILITIES BEFORE COMMENCING WORK, AND SHALL

BE FULLY RESPONSIBLE FOR ANY AND ALL DAMAGES WHICH MIGHT BE OCCASIONED BY THE

CONTRACTOR'S FAILURE TO EXACTLY LOCATE AND PRESERVE ANY AND ALL UNDERGROUND UTILITIES.

2. THE CONTRACTOR SHALL ALTER THE MASONRY OF THE TOP SECTION OF ALL DRAINAGE STRUCTURES AS

NECESSARY FOR CHANGES IN GRADE, AND RESET ALL WATER, SEWER, AND DRAINAGE FRAMES, GRATES,

AND BOXES TO THE PROPOSED FINISHED SURFACE GRADE. REQUIRED NEW MASONRY SHALL BE CLAY

BRICK CONFORMING TO M4.05.2.

3. THE CONTRACTOR SHALL MAKE ALL ARRANGEMENTS FOR THE ALTERATION AND ADJUSTMENT OF GAS,

ELECTRIC, TELEPHONE, AND ANY OTHER PRIVATE UTILITIES BY THE UTILITY COMPANIES.

4. ALL LATERAL DRAIN PIPES SHALL BE INSTALLED WITH A PITCH OF 0.01 FOOT PER FOOT (MINIMUM) UNLESS

OTHERWISE SHOWN ON THE DRAWINGS.

5. CONTRACTOR SHALL BE RESPONSIBLE FOR CONTACTING DIG SAFE BEFORE PERFORMING ANY

EXCAVATION TO DETERMINE THE LOCATIONS OF ANY UNDERGROUND UTILITIES.

6. ALL DRAINAGE CASTINGS SHALL BE INSTALLED FLUSH WITH THE PROPOSED FINISHED GRADE AND

BICYCLE SAFE DRAINAGE GRATES SHALL BE USED.

7. DRAINAGE ELEVATIONS ARE PROVIDED FOR DESIGN PURPOSES ONLY. THE CONTRACTOR SHALL VERIFY

BY TEST PIT, THE LOCATIONS OF EXISTING UTILITIES WHICH MAY CONFLICT WITH THE PROPOSED

DRAINAGE DESIGN. ANY FIELD ADJUSTMENTS REQUIRED WILL BE MADE AS APPROVED OR DIRECTED BY

THE ENGINEER. ONLY AFTER THE CONTRACTOR VERIFIES ELEVATIONS FOR THE CONSTRUCTABILITY OF

THE DRAINAGE SYSTEM SHALL ANY STRUCTURE BE ORDERED. ANY FIELD ADJUSTMENTS TO LINE & GRADE

UP TO A DEPTH OF 5' SHALL BE INCLUDED IN THE COST OF THE PIPE. PIPE EXCAVATION GREATER THAN 5'

WILL BE PAID UNDER CLASS B TRENCH EXCAVATION. .

8. ALL EXISTING DRAINAGE STRUCTURES AND LATERAL DRAIN PIPES TO BE RETAINED OR ALTERED WILL

REQUIRE SEDIMENT REMOVAL.THIS INCLUDES ALL DRAIN ELEMENTS WITHIN THE EXISTING DRAINAGE

SYSTEM THAT MAY FALL OUTSIDE OF THE LIMIT OF WORK..

LEGEND:

EXISTING PROPOSEDUTILITY

ELECTRIC

GAS-OIL-STEAM

COMMUNICATION / CATV

PORTABLE WATER

SEWER

DRAINAGE

ELECTRIC/COMM/CATV OHW

TRAFFIC CONDUIT

UTILITY MANHOLE

UTILITY POLE

Page 14: 25% SUBMITTAL - Milton MA | 779544.4987 PROJECT LOCATION DEPARTMENT OF TRANSPORTATION FEDERAL HIGHWAY ADMINISTRATION APPROVED: DIVISION ADMINISTRATOR DATE DATE CHIEF ENGINEER DATE

1

1

1

1

1

2

1

1

0

1

0

2

1

0

3

1

0

4

+

6

6

.

0

0

7 8 9 10 11 12 13

1

2

1

122

120

+11.3

4

BWL

DBYL

SWL

BWL

DBYL

SWL

SWL

SWL

SWL

SWL

DW

L

DW

L

BWL

DBYL

SWL

DWL

DWL

SWL

DBYL

SWL

SL

CW

TURN

RIGHT

MUST

RIGHT

LANE

R&S

GUILFORD RD

TURN

RIGHT

MUST

RIGHT

LANE

GRANITE AVE

SQUANTUM ST

5.0'

11.0'

11.0'

11.0'

11.0'

5.0'

R&S

R&S

DBYL

SWL

BW

L

SW

L

RET

R&S

R&S

R&S

R&S

R&S

R&S

PROP R3-8c

R10-22

PROP R3-8b

R10-22

PROP R3-8d

R10-22

PROP R3-8a

PROP R4-4

215

PROP MBTA-1PROP W4-2L

1

1

.

0

'

0

.

8

'

1

7

.

0

'

1

1

.

0

'

1

.

0

'

1

1

.

0

'

1

.

0

'

1

9

.

0

'

1

1

.

0

'

1

.

0

'

5.0'

11.0'

11.0'

11.0'

11.0'

5.0'

215

PROP MBTA-1

R&S

PROP R1-1

1

1

.0

'

1

1

.0

'

1

.8

'

1

.0

'

V

A

R

IE

S

PROP D3-1b

R10-11b

PROP D3-1b

R10-11b

PROP D3-1a

PROP R10-11b

PROP

R10-11b

8.9'

11.0'

11.0'

5.8'

VA

RIE

S

PROP

R3-8a

PROP R3-8d

PROP R3-8c

PROP

R3-8b

CW

CW

C

W

CW

S

W

L

D

B

Y

L

S

W

L

S

W

L

S

W

L

D

B

Y

L

S

W

L

S

W

L

L

I

M

I

T

O

F

S

I

G

N

A

N

D

P

A

V

E

M

E

N

T

M

A

R

K

I

N

G

S

M

E

E

T

A

N

D

M

A

T

C

H

E

X

I

S

T

S

T

A

1

0

2

+

2

0

±

L

I

M

I

T

O

F

S

I

G

N

A

N

D

P

A

V

E

M

E

N

T

M

A

R

K

I

N

G

S

M

E

E

T

A

N

D

M

A

T

C

H

E

X

I

S

T

S

T

A

1

2

0

+

9

1

±

L

IM

IT

O

F

S

IG

N

A

N

D

P

A

V

E

M

E

N

T

M

A

R

K

IN

G

S

M

E

E

T

A

N

D

M

A

T

C

H

E

X

IS

T

S

T

A

1

1

1

+

8

0

±

LIM

IT

O

F S

IG

N A

ND

PA

VE

ME

NT

M

AR

KIN

GS

ME

ET

A

ND

M

AT

CH

E

XIS

T

STA 12+50 ±

DWLEx

SEE GRANITE AVE

5000 PROJECT

MASSDOT PROJECT

FILE NO. 608406

S

Q

U

A

N

T

U

M

S

T

R

E

E

T

G

U

I

L

F

O

R

D

R

O

A

D

PROP R7-107bN

PROP

R7-107bN

PROP W4-2R

PROP TEMP

EASEMENT LINE

STREET LAYOUT LINE

STREET

LAYOUT LINE

STREET LAYOUT LINE

STREET LAYOUT LINE

STREET LAYOUT LINE

STREET LAYOUT LINE

STREET LAYOUT LINE

STREET

LAYOUT LINE

STREET LAYOUT LINE

STREET LAYOUT LINE

S

Q

U

A

N

T

U

M

S

T

R

E

E

T

PROP MAST ARM

POST FDN. (TYP.)

PROP SIGNAL

POST FDN. (TYP.)

PROP SIGNAL

CABINET (TYP.)

PROP D3-1C

PROP D3-1a

R&S

SL

SL

S

L

R&S

R&S

6

8.9'

11.0'

11.0'

5.8'

VA

RIE

S

PROP

R3-8a

LIM

IT

O

F S

IG

N A

ND

PA

VE

ME

NT

M

AR

KIN

GS

ME

ET

A

ND

M

AT

CH

E

XIS

T

STA 5+60 ±

STREET

LAYOUT LINE

STREET

LAYOUT LINE

TRAFFIC SIGN & PAVEMENT MARKINGS

20

SCALE: 1" = 20'

0 50 100

60

77

54

_T

R_

SH

EE

TS

.D

WG

21

-Ju

n-2

01

6 1

1:3

6 A

MP

lo

tte

d o

n

FED. AID PROJ. NO.

SHEET

NO.

TOTAL

SHEETS

MILTON

GRANITE AVENUE AT SQUANTUM STREET

40

STATE

MA

PROJECT FILE NO.

-

607754

14

CO

NT

IN

UE

D

BE

LO

W

CO

NT

IN

UE

D

AB

OV

E

TRAFFIC SIGN AND PAVEMENT MARKINGS NOTES

1. ALL EXISTING SIGNS AND SIGN POSTS WITHIN THE PROJECT

LIMITS SHALL REMAIN UNLESS OTHERWISE NOTED ON THE

PLANS.

2. ALL PROPOSED PAVEMENT MARKINGS WITHIN THE LIMIT OF

WORK SHALL BE THERMOPLASTIC. ALL EXISTING PAVEMENT

MARKINGS THAT CONFLICT WITH THE PROPOSED PAVEMENT

MARKINGS SHALL BE REMOVED.

3. ALL PROPOSED SIGN POSTS SHALL BE P-5 TYPE (TELESCOPIC

POST) UNLESS NOTED OTHERWISE.

4. PROPOSED PAVEMENT MARKINGS (LEGENDS & ARROWS) SHALL

BE INSTALLED IN ACCORDANCE WITH THE LATEST EDITION OF

MUTCD & MASSDOT STANDARD DRAWINGS.

5. ALL PROPOSED SIGNS SHALL BE IN ACCORDANCE WITH THE

LATEST EDITION OF MUTCD AND MASSDOT STANDARDS.

6. EXACT LOCATIONS OF PROPOSED SIGNS SHALL BE DETERMINED

BY THE ENGINEER IN THE FIELD.

7. ALL SIGN PANELS SHALL BE 90° TO THE CURB AND FACING THE

FLOW OF TRAFFIC EXCEPT PARKING REGULATIONS AND MBTA

SIGNS.

8. ALL SIGNS TO BE R&R SHALL BE MOUNTED ON NEW POSTS,

UNLESS OTHERWISE NOTED.

9. SIGNS TO BE MOUNTED NEAR THE CURB LINE SHALL BE SET

BACK 12" FROM THE EDGE OF THE SIGN PANEL TO THE CURB

LINE. NO SIGN SHALL OVERHANG THE CURB LINE.

10. ALL SIGNS SHALL BE MOUNTED TO PROVIDE A 7.0' MINIMUM

CLEARANCE BETWEEN THE BOTTOM OF THE SIGN AND FINISH

GRADE EXCEPT OBJECT MARKER SIGNS.

11. SEE SHEET 15 FOR PROPOSED SIGN LEGENDS.

12. SEE SHEET 2 FOR LEGENDS, ABBREVIATIONS, AND GENERAL

NOTES.

Page 15: 25% SUBMITTAL - Milton MA | 779544.4987 PROJECT LOCATION DEPARTMENT OF TRANSPORTATION FEDERAL HIGHWAY ADMINISTRATION APPROVED: DIVISION ADMINISTRATOR DATE DATE CHIEF ENGINEER DATE

TRAFFIC SIGN SUMMARY SHEET

TRAFFIC SIGN SUMMARY

60

77

54

_T

R_

SH

EE

TS

.D

WG

21

-Ju

n-2

01

6 1

1:3

6 A

MP

lo

tte

d o

n

FED. AID PROJ. NO.

SHEET

NO.

TOTAL

SHEETS

MILTON

GRANITE AVENUE AT SQUANTUM STREET

40

STATE

MA

PROJECT FILE NO.

-

607754

15

215

P

Page 16: 25% SUBMITTAL - Milton MA | 779544.4987 PROJECT LOCATION DEPARTMENT OF TRANSPORTATION FEDERAL HIGHWAY ADMINISTRATION APPROVED: DIVISION ADMINISTRATOR DATE DATE CHIEF ENGINEER DATE

1

1

1

1

1

2

1

1

0

1

0

3

1

0

4

+

6

6

.

0

0

7 8 9 10 11 12

1

2

1

122

120

+11.3

4

S

Q

U

A

N

T

U

M

S

T

R

E

E

T

S

Q

U

A

N

T

U

M

S

T

R

E

E

T

G

U

I

L

F

O

R

D

R

O

A

D

PROP 40' MAST ARM

POST, BASE, & FDN

W/ VEHICULAR HOUSINGS

W/ PED HOUSINGS

W/ APS PUSH BUTTON

SIGN & SADDLES

P1

PROP SERVICE CONNECTION

RISER TO EXIST UP

PROP 40' MAST ARM

POST, BASE, & FDN

W/ VEHICULAR HOUSINGS

PROP TS2-TYPE 1 CONTROLLER,

SIZE P CABINET, & FOUNDATION

PROP 3" CONDUIT (TYP)

PROP 12" x 12"

PULLBOX (TYP)

PROP PRE-EMPTION

CONFIRMATION

STROBE (WHITE)

PRE-EMPTION

RECEIVER (TYP)

P2

P3

P4

P5

P6

P7

P8

A

B

C

D

H

J

K

L

M

N

D1

D4

D3

D2

PROP 8' SIGNAL POST,

BASE, & FDN

W/ PED HOUSING

W/ APS PUSH BUTTON

SIGN & SADDLE (TYP)

PROP TYPE D-1 BICYCLE

LOOP DETECTOR (TYP)

PROP ROADWAY

LOOP DETECTOR (TYP)

SEE NOTES THIS SHEET

PROP TEMP

EASEMENT LINE

STREET LAYOUT LINE

STREET

LAYOUT LINE

STREET LAYOUT LINE

STREET LAYOUT LINE

STREET LAYOUT LINE

STREET LAYOUT LINE

STREET LAYOUT LINE

STREET

LAYOUT LINE

STREET LAYOUT LINE

STREET LAYOUT LINE

TRAFFIC SIGNAL PLAN

20

SCALE: 1" = 20'

0 50 100

60

77

54

_T

R_

SH

EE

TS

.D

WG

21

-Ju

n-2

01

6 1

1:3

6 A

MP

lo

tte

d o

n

FED. AID PROJ. NO.

SHEET

NO.

TOTAL

SHEETS

MILTON

GRANITE AVENUE AT SQUANTUM STREET

40

STATE

MA

PROJECT FILE NO.

-

607754

16

TRAFFIC SIGNAL NOTES:

1. REMOVE AND STACK ALL EXISTING SIGNAL EQUIPMENT AT THIS INTERSECTION UNLESS

OTHERWISE NOTED.

2. ABANDON ALL EXISTING SIGNAL CONDUITS IN PLACE UNLESS OTHERWISE NOTED.

3. REMOVE AND STACK ALL EXISTING SIGNAL POST, & MAST ARM FOUNDATIONS, AND TRAFFIC

PULL BOXES.

4. CONSTRUCTION OF THE TRAFFIC CONTROL SIGNAL SYSTEM SHALL CONFORM TO THE

MASSACHUSETTS DEPARTMENT OF TRANSPORTATION'S (MASSDOT) "STANDARD

SPECIFICATIONS FOR HIGHWAYS AND BRIDGES", 1988 ED. AS AMENDED, THE 2015 OVERHEAD

SIGNAL STRUCTURE AND FOUNDATION STANDARD DRAWINGS, THE 2009 FEDERAL HIGHWAY

ADMINISTRATION'S "MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES", (MUTCD) LATEST

EDITION AS AMENDED, AND THE 1968 STANDARD DRAWINGS FOR TRAFFIC SIGNALS AND

HIGHWAY LIGHTING.

5. ALL VEHICLE INDICATIONS MOUNTED ON MAST ARMS SHALL BE FIXED MOUNTED AND BE

EQUIPPED WITH 5" LOUVERED BACKPLATES.

6. POLE MOUNTED SIGNALS SHALL BE MOUNTED TO PROVIDE A 2 FOOT MINIMUM CLEARANCE

BETWEEN VERTICAL PROJECTION OF THE CURB LINE AND SIGNAL VISOR. PROVIDE SPECIAL

MOUNTING HARDWARE AS REQUIRED.

7. ALL SIGNAL CONDUITS CROSSING ROADWAY SHALL BE ENCASED IN CONCRETE.

8. SEE SHEET 14 FOR PROPOSED SIGN AND PAVEMENT MARKING.

NOTES:

1. ALL SIGNALS SHALL HAVE CAP VISORS.

2. ALL SIGNALS SHALL BE 12" LED WITH 5" LOUVERED BACKPLATES.

3. ALL BACKPLATES SHALL BE A 3" RETROREFLECTIVE BORDER.

4. ALL PED INDICATORS SHALL HAVE SUN CAP VISORS.

PROPOSED SIGNAL IDENTIFICATION

16" L.E.D

ONE SECTION DUAL

DISPLAY W/ COUNTDOWN

P1,P2,P3,P4

P5,P6,P7,P8

AL

L 1

2" L

EN

S

G

R

Y

A,B,C,D,

E,M,N

AL

L 1

2" L

EN

S

G

R

Y

A,C,E,

F,G,H

G

Y

R

B,D

AL

L 1

2" L

EN

S

G

Y

P5,P6,P8

EXISTING SIGNAL IDENTIFICATION

NOTES:

1. REMOVE AND STACK (R&S) EXISTING EQUIPMENT.

P1,P2,P3

P4,P7

G

Y

R

F,G

AL

L 1

2" L

EN

S

G

Y

J,K

AL

L 1

2" L

EN

S

G

R

G

Y

H,L

AL

L 1

2" L

EN

S

G

R

Y

Page 17: 25% SUBMITTAL - Milton MA | 779544.4987 PROJECT LOCATION DEPARTMENT OF TRANSPORTATION FEDERAL HIGHWAY ADMINISTRATION APPROVED: DIVISION ADMINISTRATOR DATE DATE CHIEF ENGINEER DATE

TRAFFIC SIGNAL DATA PLAN

60

77

54

_T

R_

SH

EE

TS

.D

WG

21

-Ju

n-2

01

6 1

1:3

6 A

MP

lo

tte

d o

n

FED. AID PROJ. NO.

SHEET

NO.

TOTAL

SHEETS

MILTON

GRANITE AVENUE AT SQUANTUM STREET

40

STATE

MA

PROJECT FILE NO.

-

607754

17

NEMA DUAL RING PHASING NOTES:

Ø 2

Ø 6

Ø 1

Ø 5

Ø 4Ø 3

Ø 8Ø 7

OPER.

FLASH

SEQUENCE AND TIMING FOR FULL ACTUATED CONTROL (ISOLATED)

PEDESTRIAN CLEARANCE

WALK (W)

RED CLEARANCE

YELLOW CLEARANCE

RECALL

MEMORY

MAXIMUM 2

MAXIMUM 1

PASSAGE TIME (VEHICLE)

MINIMUM GREEN (INITIAL)

STREET

HOUSINGSDIRECTION1 2

TIMING IN SECONDS

EM

ER

GE

NC

Y

43 5 6 7 8 9 1310 11 12 1514

ON

LY

19 20 21 25 26 27181716

DETECTOR

1b

2b

2

1

NUMBER

B=PRES.

A=PULSE

MODE

ØØNUM. OFLOOPCHANNELAMPLIFIER

21

2

2

2

1

NUMBER

1

NUMBER

1

SIZE CALLEDTURNS EXT.

LOOP DETECTOR DATA

EXT.DELAY

TIMETIME

3b

3

3

3

2

1

MAJOR ITEMS REQUIRED

CONTROLLER NEMA 8 PHASE TS2-TYPE 1, CAB., & FDN.

PEDESTRIAN PUSH BUTTON, SIGN & SADDLES (APS)

DUAL CHANNEL LOOP DETECTOR AMPLIFIER (CARD RACK)

16" PEDESTRIAN COUNTDOWN HOUSING, TYPE L.E.D. (INT'L SYMBOL)

8' SIGNAL POLE, BASE, & FDN.

ROADWAY LOOP DETECTOR (SEE LOOP DETECTOR DATA TABLE)

12" X 12" PULL BOX

SERVICE CONNECTION, TYPE OVERHEAD

QUANTITYITEM

EMERGENCY VEHICLE PRE-EMPTION PHASE SELECTOR MODULE-DUAL CHANNEL

PRE-EMPTION CARD RACK

EMERGENCY VEHICLE PRE-EMPTION CONFIRMATION STROBE (WHITE)

1

2

1

7

8

8

8

1

1

32

16

6

6

2

2

2

2

-

-

-

-

-

-

-

-

-

-

-

-

B3@6'X6'

B1@6'X6'

B3@6'X6'

B1@6'X12'

B3@6'X12'

B1@6'X12'

3

3

3

3

3

3

6

6

2

2

2

2

Ø 9

EMERGENCY VEHICLE PRE-EMPTION RECEIVER-SINGLE CHANNEL4

811.31

81

6.0

1

2322 24

(PED.)

(PED.)

PAY ITEM

EMERGENCY VEHICLE PREEMPTION SCHEDULE

APPROACH

WESTBOUND

EASTBOUND

NORTHBOUND

SOUTHBOUND

Ø4 & Ø7

PREEMPTION

PHASE

NEXT PHASE

CALLED

EMERGENCY VEHICLE PREEMPTION OPERATION:

1. EMERGENCY VEHICLE PREEMPTION SHALL BE ACTUATED BY AN

OPTICAL SIGNAL FROM AN OPTICAL EMITTER MOUNTED ON AN

EMERGENCY VEHICLE AND RECEIVED BY AN OPTICAL

DETECTOR LOCATED AT INTERSECTION. A SEPARATE

RECEIVING DETECTOR IS REQUIRED FOR EACH DETECTED

APPROACH.

2. PREEMPTION SIGNALS FROM MULTIPLE APPROACHES SHALL BE

SERVICED ON A FIRST DETECTED FIRST SERVED BASIS.

3. IN RESPONSE TO A PREEMPTION SIGNAL RECEIVED AT AN

INTERSECTION BY AN OPTICAL DETECTOR, THE CONTROLLER

SHALL TIME THE CLEARANCE INTERVALS OF THE ACTIVE PHASE

(IF DIFFERENT THAT TO BE SERVICED) AND ADVANCE TO

AND/OR HOLD IN EMERGENCY VEHICLE PREEMPTION PHASE

UNTIL PREEMPTION SIGNAL CEASES. THE CONTROLLER SHALL

THEN TIME CLEARANCES AND SIMILARLY SERVICE OTHER

EMERGENCY VEHICLE PREEMPTION SEQUENCES IN THE ORDER

RECEIVED (IF RECEIVED) OTHERWISE, RESUME NORMAL

PREFERENTIAL PHASE SEQUENCE.

4. PREEMPTION MINIMUM GREENS SHALL BE SIX SECONDS.

5. NORMAL CLEARANCES SHALL BE PROVIDED ON PHASES THAT

ARE TERMINATED BY PREEMPTION DEMAND.

6. ACTUAL TIMING FOR PREEMPTION SHALL BE DETERMINED IN

THE FIELD IN COORDINATION WITH THE FIRE DEPARTMENT AND

SHALL BE APPROVED BY MASSDOT PRIOR TO OPERATION.

1. PHASES ASSOCIATED BY A SOLID LINE SHALL NOT

OPERATE CONCURRENTLY.

2. PHASES ASSOCIATED BY A DASHED LINE MAY

OPERATE CONCURRENTLY.

3. THROUGH MOVEMENTS MAY INCLUDE RIGHT TURNS.

4. IF THE ASSIGNED RIGHT OF WAY FOR ANY TRAFFIC

MOVEMENT IS TO REMAIN IN EFFECT DURING THE

NEXT CALLED PHASE, THE SIGNAL INDICATIONS FOR

THAT TRAFFIC MOVEMENT SHALL NOT CHANGE

DURING THE CHANGE INTERVAL(S) UNLESS

OTHERWISE NOTED.

GRANITE AVENUE NB A,B,C

SB D,E

SB-RT F,G

EB-LT H

EB J,K

G

G Y R

FY

FY

FY

FRL

FR

PEDESTRIAN CROSSING

PEDESTRIAN CROSSING

PEDESTRIAN CROSSING

PEDESTRIAN CROSSING

NB-SB

EB-WB

NB-SB

EB-WB

P1,P2

P3,P4

P5,P6

P7,P8

DW DW DW

DW DW DW

DW DW DW

DW DW DW

DW DW DW

DW DW DW

DW DW DW

DW DW DW

DW DW DW

DW DW DW

DW DW DW

DW DW DW

W FDW DW

W FDW DW

W FDW DW

W FDW DW

OFF

OFF

OFF

OFF

10

3

22

31

5

1

10

3

17

22

4

1

10

3

22

31

5

1

-

-

-

-

-

3

7

20

NON-LOCKING NON-LOCKING NON-LOCKING LOCKING

4

4b

5

5b

7

7b

14

24

15

25

17

27

3@6'X6' 3

3

3

3

3

3

1@6'X6'

3@6'X6'

1@6'X6'

1@6'X6'

1@6'X6'

6

6 B

B

6

6

7

7 B

B7

7

3

3 B

B

3

3

--

--

--

--

--

--

Plus all necessary duct, cable, labor, miscellaneous material and

equipment to complete the installation.

R R R

MAX 2: 3:00 PM - 7:00 PM

MAX 1: ALL OTHER TIMES

* PEDESTRIAN PHASE PUSH BUTTON ACTUATED ONLY.

PREFERENTIAL PHASING SEQUENCE

Ø 4 & Ø 7 Ø 2 & Ø 6

5" 5-SECTION BACKPLATES (LOUVERED) WITH 3" RETROREFLECTIVE BORDER2

WB-LT L

Y R R R R R R RR R R R R R

R R R

R R R R R R G Y R R R R R R R

FRL

DW DW DW

DW DW DW

DW DW DW

DW DW DW

NON-LOCKING

D1

D2

D3

D4

PREEMPTION

RECEIVER

Ø3 & Ø8

4

3

17

22

4

1

(SEC)

R R R

WB M,NFR

40 FT TYPE II, GALV. STEEL MAST ARM ASSEMBLY , BASE & FDN. 2

2 WAY, 3 SECTION, SIGNAL HOUSING (12" L.E.D.)3

5" 3-SECTION BACKPLATES (LOUVERED) WITH 3" RETROREFLECTIVE BORDER9

6

16

33@6'X6' 4 B4

--

6b

26

31@6'X6' 4 B4

--

8

18

33@6'X6'

8

B

8 --

8b

28

31@6'X12'

8

B

8 --

OFFMAX OFF MAX

OFF

GRANITE AVENUE

S

Q

U

A

N

T

U

M

S

T

R

E

E

T

NOTES:

1. ALL SIGNALS SHALL HAVE CAP VISORS.

2. ALL SIGNALS SHALL BE 12" LED WITH 5" LOUVERED BACKPLATES.

3. ALL BACKPLATES SHALL BE A 3" RETROREFLECTIVE BORDER.

4. ALL PED INDICATORS SHALL HAVE SUN CAP VISORS.

PROPOSED SIGNAL IDENTIFICATION

16" L.E.D

ONE SECTION DUAL

DISPLAY W/ COUNTDOWN

P1,P2,P3,P4

P5,P6,P7,P8

AL

L 1

2" L

EN

S

G

R

Y

A,B,C,D,

E,M,N

H,L

AL

L 1

2" L

EN

S

G

Y

R

F,G

AL

L 1

2" L

EN

S

G

Y

J,K

AL

L 1

2" L

EN

S

G

R

G

Y

GRANITE AVENUE

GRANITE AVENUE

R R R

SQUANTUM STREET

SQUANTUM STREET

SQUANTUM STREET

SQUANTUM STREET

RL RL RL

RL RL RL

RL RL RL

RL RL RL

RL RL RL

RL RL RL

RL RL RL RL RL RL

RL RL RLRL RL RL

R R R

R R R

G/GL Y R

R R R

R R R

R R R

R R R R R R

R R RG Y R

Ø 9* Ø 3 & Ø 8

(PED.)

OL

TECHNICAL NOTES:

1. ANY PHASE NOT CALLED WILL BE SKIPPED. SIGNAL INDICATION WILL NOT CHANGE

IF THE ASSIGNED RIGHT-OF-WAY DOES NOT CHANGE DURING THE NEXT PHASE

CALLED.

2. FLASHING OPERATION PER MUTCD SECTION 4D.28 THROUGH SECTION 4D.31

Ø2 & Ø6

Ø2 & Ø6

Ø2 & Ø6Ø3 & Ø8

Ø2

Ø6

2 WAY, 3 SECTION & 4 SECTION, SIGNAL HOUSING (12" L.E.D.)2

1 WAY, 5 SECTION, SIGNAL HOUSING (12" L.E.D.)1

2 WAY, 3 SECTION & 5 SECTION, SIGNAL HOUSING (12" L.E.D.)1

5" 4-SECTION BACKPLATES (LOUVERED) WITH 3" RETROREFLECTIVE BORDER2

DW DW DW

DW DW DW

DW DW DW

DW DW DW

10

3

17

22

4

1

NON-LOCKING

R R R

R/GR R/YR R

R R R

OFF

OL

GL YL RL

RL RL RL

R R R

R R R

R R R

R R R

R R R

DW DW DW

DW DW DW

DW DW DW

DW DW DW

NON-LOCKING

4

3

17

22

4

1

OFF

RL RL RL

GL YL RL

R R R

R R R

G

R

Y

Page 18: 25% SUBMITTAL - Milton MA | 779544.4987 PROJECT LOCATION DEPARTMENT OF TRANSPORTATION FEDERAL HIGHWAY ADMINISTRATION APPROVED: DIVISION ADMINISTRATOR DATE DATE CHIEF ENGINEER DATE

1

1

1

1

1

2

1

1

3

1

1

0

1

0

1

1

0

2

1

0

3

1

0

4

+

3

9

.

0

0

1

0

0

+

6

6

.

0

0

34

56

78

910

1112

1314

1516

1718

1

2

1

122

120

+11.3

4

N

WORK ZONE

3

6

5

'

5

0

'

1

0

0

'

3

6

5

'

100'

250'1745'

5

0

'

(R2-10a)

(48"X36")

(W20-1)

(36"X36")

(R2-10a)

(48"X36")

(W20-1)

(36"X36")

(R2-10e)

(36"X48")

(W20-1)

(36"X36")

(R2-10e)

(36"X48")

(W20-1)

(36"X36")

(R2-10a)

(48"X36")

(R2-10e)

(36"X48")

(W20-1)

(36"X36")

(R2-10a)

(48"X36")

(R2-10e)

(36"X48")

GRANITE AVENUE

GRANITE AVENUE

S

Q

U

A

N

T

U

M

S

T

R

E

E

T

S

Q

U

A

N

T

U

M

S

T

R

E

E

T

G

U

I

L

F

O

R

D

R

O

A

D

50

SCALE: 1" = 50'

0 100 150 200

60

77

54

_T

R_

(T

TC

P).D

WG

21

-Ju

n-2

01

6 1

1:3

1 A

MP

lo

tte

d o

n

FED. AID PROJ. NO.

SHEET

NO.

TOTAL

SHEETS

MILTON

GRANITE AVENUE AT SQUANTUM STREET

40

STATE

MA

PROJECT FILE NO.

-

607754

18

TEMPORARY TRAFFIC CONTROL PLAN

LIMIT OF WORK

DIRECTION OF TRAVEL

SIGN

WORK ZONE

1. ALL TRAFFIC MANAGEMENT AND WORK ZONE TRAFFIC CONTROL MEASURES SHALL CONFORM TO THE REQUIREMENTS

OF THE 2009 MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES (M.U.T.C.D.), THE STANDARD SPECIFICATIONS, THE

PROJECT SPECIAL PROVISIONS AND THE FOLLOWING NOTES.

2. THE TRAFFIC MANAGEMENT PLANS CONTAINED HEREIN ARE GIVEN AS A GUIDE FOR TYPICAL WORK ZONE TRAFFIC

CONTROL APPLICATIONS FOR THE TYPES OF WORK ANTICIPATED FOR THIS PROJECT. THEY ARE NOT INTENDED TO

COVER ALL POSSIBLE CONSTRUCTION OPERATIONS WHICH THE CONTRACTOR MAY CHOOSE TO EMPLOY. WORK ZONE

TRAFFIC CONTROL FOR OTHER CONSTRUCTION OPERATIONS OR OTHER TRAFFIC SITUATIONS IF APPLICABLE SHALL

BE IN ACCORDANCE WITH THE 2009 M.U.T.C.D. AND AS APPROVED OR DIRECTED BY THE ENGINEER.

3. ABUTTER ACCESS SHALL NOT BE CLOSED EXCEPT FOR SHORT PERIODS AND ONLY WITH THE APPROVAL OF THE

ENGINEER.

4. GRADE DIFFERENCES IN EXCESS OF 2" DURING NON-WORKING HOURS WILL REQUIRE DELINEATION BY USE OF DRUMS.

5. GRADE DIFFERENCES IN EXCESS OF 4" DURING NON-WORKING HOURS SHALL BE PROTECTED BY BACKFILLING WITH A

TRANSITION OF GRAVEL OR OTHER MATERIAL TO BE COMPACTED AT A 4:1 SLOPE, AND DELINEATED BY DRUMS.

6. CONSTRUCTION SIGNS NOT APPLICABLE TO VARIOUS STAGES OF CONSTRUCTION SHALL BE REMOVED OR COVERED.

7. USE W20-7b SIGNS ONLY WHEN POLICE OFFICER IS DIRECTING TRAFFIC. THEY SHALL BE TAKEN DOWN OR COVERED

AT THE CLOSE OF EACH OPERATION.

8. MAINTAIN PEDESTRIAN ACCESS THROUGH THE WORK AREA AT ALL TIMES. THE POLICE DETAIL SHALL PROVIDE

CONTROL TO CROSS PEDESTRIANS ON ROADWAY TO SIDEWALK. PROVIDE TEMPORARY CROSSWALKS AND RAMPS AS

NEEDED AND AS DIRECTED BY THE ENGINEER.

9. ALL CONSTRUCTION SIGNING AND OTHER TRAFFIC MAINTENANCE DEVICES SHALL CONFORM WITH THE 2009 MUTCD

AS AMENDED, NCHRP 350, AND MASSDOT STANDARDS.

10. ADVANCE WARNING SIGNS NO LONGER APPLICABLE, WHICH MIGHT CREATE CONFUSION IN THE MINDS OF VEHICLE

OPERATORS, SHALL EITHER BE COVERED OR REMOVED AS SOON AS POSSIBLE. NO SIGN SHALL BE VISIBLE TO

TRAFFIC THAT MAY CONFLICT WITH ACTUAL ROADWAY CONDITIONS.

11. ALL DISTANCES MAY BE ADJUSTED TO FIT FIELD CONDITIONS AS DIRECTED BY THE ENGINEER.

12. THE CONTRACTOR SHALL USE TEMPORARY PATCHING OR BEVELED STEEL PLATES TO COVER PIPE TRENCHES AND

OTHER EXCAVATED HOLES NOT COMPLETED BY THE END OF EACH WORK DAY.

14. ALL DRUMS WITH FLASHERS, SIGNS AND SIGN SUPPORTS MUST PASS THE CRITERIA SET FORTH IN NCHRP 350 AND

MASH RECOMMENDED PROCEDURES FOR THE SAFETY EVALUATION OF HIGHWAY FEATURES.

15. MINIMUM LANE WIDTH IS TO BE 11 FEET UNLESS OTHERWISE SHOWN. MINIMUM LANE WIDTH WILL BE MEASURED FROM

THE EDGE OF DRUMS OR CONES.

16. THE CONTRACTOR SHALL MAKE EVERY EFFORT TO AVOID PLACING TEMPORARY TRAFFIC CONTROL DEVICES ON

PRIVATE PROPERTY. IF SUCH PLACEMENT ON PRIVATE PROPERTY IS UNAVOIDABLE, IT SHALL BE DONE WITH THE

APPROVAL OF THE ENGINEER.

17. ORANGE CONSTRUCTION FLAGS MAY BE USED ON ADVANCE WARNING SIGNS AS DIRECTED BY THE ENGINEER. FLAGS

SHALL BE A MINIMUM OF 16" X 16".

18. MAINTAIN EXISTING PAVEMENT MARKINGS WHERE APPLICABLE. WHEN LANES SHIFT, IF NECESSARY, EXISTING

MARKINGS SHALL BE REMOVED AND TEMPORARY PAVEMENT MARKING SHALL BE PROVIDED.

19. AT THE END OF EACH WORK DAY, NO TRAFFIC CONTROL DEVICES SHALL REMAIN IN THE ROADWAY AND ALL LANES

SHALL BE OPEN FOR TRAFFIC FLOW.

20. THE CONTRACTOR MAY PROPOSE TO USE A DIFFERENT SEQUENCE OF WORK AREAS THAN WHAT IS BEING PROPOSED

IN THESE DOCUMENTS. THE CONTRACTOR SHALL SUBMIT PHASING AND TRAFFIC MANAGEMENT PLANS FOR

APPROVAL BY THE ENGINEER.

21. MAXIMUM SPACING OF CHANNELIZING DEVICES IN A TAPER IS EQUAL IN FEET TO THE SPEED LIMIT IN MPH. (20'

SPACING TYPICAL ON TAPER, 35' SPACING TYPICAL ON TANGENTS.)

22. CHANNELIZATION WILL BE ACCOMPLISHED THROUGH THE USE OF REFLECTORIZED PLASTIC DRUMS OR CONES.

25. THE FIRST FIVE DRUMS OF A TAPER SHALL HAVE TYPE A LIGHTS.

26. POLICE DETAIL SHALL BE USED WHILE SETTING UP THE TEMPORARY TRAFFIC CONTROL DEVICES ON THE ROADWAY.

Page 19: 25% SUBMITTAL - Milton MA | 779544.4987 PROJECT LOCATION DEPARTMENT OF TRANSPORTATION FEDERAL HIGHWAY ADMINISTRATION APPROVED: DIVISION ADMINISTRATOR DATE DATE CHIEF ENGINEER DATE

60

77

54

_T

R_

(T

TC

P).D

WG

21

-Ju

n-2

01

6 1

1:2

5 A

MP

lo

tte

d o

n

FED. AID PROJ. NO.

SHEET

NO.

TOTAL

SHEETS

MILTON

GRANITE AVENUE AT SQUANTUM STREET

40

STATE

MA

PROJECT FILE NO.

-

607754

P/F

NUMBER OF LANES

NUMBER

OF

STUDIES

AVERAGE CAPACITY

MEASURED AVERAGE WORK ZONE CAPACITIES

LEGEND:

NOTES:

ROAD TYPE

DISTANCE BETWEEN SIGNS **

BA C

SUGGESTED WORK ZONE WARNING SIGN SPACING

STOPPING SIGHT DISTANCE AS A FUNCTION OF SPEED

SPEED*

(mph)

DISTANCE

(ft)

SPEED*

(km/h)

DISTANCE

(m)

TYPE OF TAPER TAPER LENGTH (L)*

TAPER LENGTH CRITERIA FOR TEMPORARY TRAFFIC CONTROL ZONES

SPEED LIMIT (S) TAPER LENGTH (L)

FEET

FORMULAS FOR DETERMINING TAPER LENGTHS

SPEED LIMIT (S) TAPER LENGTH (L)

Meters

24" (MIN.)

REFLECTORIZED

DRUM

LIMIT OF EXCAVATION

TEMPORARY BIT.

CONC. PAVEMENT

GRAVEL BORROW/SUBBASE

EXIST.

PAVEMENT

TRAVEL WAY

WORK AREA

DIRECTION OF TRAFFIC

W8-3

OR

W8-8

OR

W8-1

* - INCREASE SLOPE RATIO

FOR HIGHER SPEEDS

C

Depth≥4"

12*

1

1

4

19

TEMPORARY TRAFFIC CONTROL PLAN

Page 20: 25% SUBMITTAL - Milton MA | 779544.4987 PROJECT LOCATION DEPARTMENT OF TRANSPORTATION FEDERAL HIGHWAY ADMINISTRATION APPROVED: DIVISION ADMINISTRATOR DATE DATE CHIEF ENGINEER DATE

P

B

MUST

R3-7R

B

W20-7b

W4-7L

W4-2L

W20-7b

W20-7b

B

A

L

BUFFER

L/2

W20-5L

A

W20-7b

A

A

60

77

54

_T

R_

(T

TC

P).D

WG

21

-Ju

n-2

01

6 1

1:2

5 A

MP

lo

tte

d o

n

FED. AID PROJ. NO.

SHEET

NO.

TOTAL

SHEETS

MILTON

GRANITE AVENUE AT SQUANTUM STREET

40

STATE

MA

PROJECT FILE NO.

-

607754

BA

WORK

ZONE BUFFER A BL/2

DOWNSTREAM

TAPER

100 FT (30m) MAX

W5-1

W1-4R

W5-1

W1-4R

W1-4L

L/2

W1-4L

BUFFER

L/3

W5-1W30-8R

BA

4S

(0.8S)

BUFFERWORK ZONEBUFFERL/2

B A

4S

(0.8S)

R4-7

R4-7

50 FT

(15m)

L/2

W30-8R

W5-1

WORK

ZONE

100FT

(30m) MAX.

100FT

(30m) MAX.

BUFFER

100-150FT

(30-45m)

W20-7b

W20-4

W13-1p

XX

M.P.H.

W20-4

W13-1p

XX

W20-7b

P/F

OR

W20-7

OR

P/F

A B

AB

M.P.H.

W20-7

20

TEMPORARY TRAFFIC CONTROL PLAN

RIGHT

SHOULDER

CLOSED

Page 21: 25% SUBMITTAL - Milton MA | 779544.4987 PROJECT LOCATION DEPARTMENT OF TRANSPORTATION FEDERAL HIGHWAY ADMINISTRATION APPROVED: DIVISION ADMINISTRATOR DATE DATE CHIEF ENGINEER DATE

60

77

54

_T

R_

(T

TC

P).D

WG

21

-Ju

n-2

01

6 1

1:2

5 A

MP

lo

tte

d o

n

FED. AID PROJ. NO.

SHEET

NO.

TOTAL

SHEETS

MILTON

GRANITE AVENUE AT SQUANTUM STREET

40

STATE

MA

PROJECT FILE NO.

-

607754

21

TEMPORARY TRAFFIC CONTROL PLAN

Page 22: 25% SUBMITTAL - Milton MA | 779544.4987 PROJECT LOCATION DEPARTMENT OF TRANSPORTATION FEDERAL HIGHWAY ADMINISTRATION APPROVED: DIVISION ADMINISTRATOR DATE DATE CHIEF ENGINEER DATE

CONSTRUCTION SIGN SUMMARY

60

77

54

_T

R_

(T

TC

P).D

WG

21

-Ju

n-2

01

6 1

1:2

5 A

MP

lo

tte

d o

n

FED. AID PROJ. NO.

SHEET

NO.

TOTAL

SHEETS

MILTON

GRANITE AVENUE AT SQUANTUM STREET

40

STATE

MA

PROJECT FILE NO.

-

607754

22

TEMPORARY TRAFFIC CONTROL PLAN

HEIGHTWIDTH

SIZE OF SIGN

W1-4bL

W1-4bR

W13-1p

W8-8

W8-3

W4-2L

W20-5L

IDENTIFI-

CATION

NUMBER

#

REQ'D

UNIT

AREA

S.F.

AREA IN

SQUARE

FEET

SIGN

DIAGRAM

W30-8R

W5-1

36" 36" 2 9.00 18.00

36" 36" 2

36" 36" 2 9.00 18.00

24" 24" 2 4.00 8.00

36" 36" 2 9.00 18.00

36" 36" 2 9.00 18.00

36" 36" 2 9.00 18.00

36" 36" 2 9.00 18.00

36" 36" 2 9.00 18.00

ROUGH

ROAD

W20-1 36" 36" 6 9.00 54.00

ROAD

WORK

AHEAD

9.00 18.00

M.P.H.

XX

PAVEMENT

ENDS

HEIGHTWIDTH

SIZE OF SIGN

IDENTIFI-

CATION

NUMBER

#

REQ'D

UNIT

AREA

S.F.

AREA IN

SQUARE

FEET

SIGN

DIAGRAM

R4-7 24" 30" 2 5.00 10.00

R3-7R 30" 30" 2 6.25 12.50

W4-7L 36" 36" 1 9.00 9.00

R2-10a 48" 36" 4 12.00 48.00

R2-10e 36" 48" 5 12.00 60.00

W20-7b 36" 36" 4 9.00 36.00

POLICE

OFFICER

AHEAD

NO. OF SIGNS ARE ESTIMATED FOR BIDDING PURPOSES ONLY*

* *

R9-9 24" 12" 4 2.00 8.00

R9-11R 24" 18" 2 3.00 6.00

R9-11L 2 3.00 6.0024" 18"

RIGHT

SHOULDER

CLOSED

W21-5a 36" 36" 2 9.00 18.00

ONE LANE

ROAD

500 FT

W20-4 36" 36" 2 9.00 18.00

W1-4L

W1-4R

36" 36" 2 9.00 18.00

36" 36" 2 9.00 18.00

W20-7 36" 36" 2 9.00 18.00

W4-2R 36" 36" 2 9.00 18.00

W11-2 4 6.25 25.0030" 30"

W16-7PL 4 3.00 12.0024" 18"

W20-5R 36" 36" 2 9.00 18.00

RIGHT LANE

CLOSED

XX FT

Page 23: 25% SUBMITTAL - Milton MA | 779544.4987 PROJECT LOCATION DEPARTMENT OF TRANSPORTATION FEDERAL HIGHWAY ADMINISTRATION APPROVED: DIVISION ADMINISTRATOR DATE DATE CHIEF ENGINEER DATE

1

1

1

1

1

2

P

C

+

2

7

.

1

3

P

T

+

7

8

.

8

3

1

1

0

PC +84.19

1

0

3

1

0

4

+

6

6

.

0

0

7 8 9 10 11 12

1

2

1

122

PC

+

20.85

PT +03.02

120

+11.3

4

LIMIT OF MILLING

& RESURFACING

STA 103+25.79

N2921253.8358

E779560.0801

LIMIT OF MILLING

& RESURFACING

STA 7+15.97

N2921152.9171

E779720.6771

LIMIT OF MILLING

& RESURFACING

STA 120+91.18

N2921539.2106

E779492.9597

LIMIT OF MILLING

& RESURFACING

STA 111+77.30

N2921476.7472

E779787.6834

LIMIT OF MILLING

& RESURFACING

STA 11+87.29

N2921597.8503

E779565.1877

STAGE 1 WORK ZONE

STAGE 1 WORK ZONE

S

Q

U

A

N

T

U

M

S

T

R

E

E

T

S

Q

U

A

N

T

U

M

S

T

R

E

E

T

G

U

I

L

F

O

R

D

R

O

A

D

MAINTAIN SIGNALIZED INTERSECTION

22'

M

IN

1

1

'

M

I

N

1

1

'

M

I

N

ONE LANE CLOSURE

AS REQUIRED

20

SCALE: 1" = 20'

0 50 100

60

77

54

_H

D (C

ON

ST

S

TA

GIN

G).D

WG

21

-Ju

n-2

01

6 1

1:3

1 A

MP

lo

tte

d o

n

FED. AID PROJ. NO.

SHEET

NO.

TOTAL

SHEETS

MILTON

GRANITE AVENUE AT SQUANTUM STREET

40

STATE

MA

PROJECT FILE NO.

-

607754

CONSTRUCTION PHASING PLAN

23

1. REMOVE EXISTING CURB & MEDIAN ISLANDS ON SQUANTUM

STREET. INSTALL FULL DEPTH PAVEMENT.

1. THESE STAGING PLANS ARE SUGGESTED ONLY AND REFLECT TYPICAL WORK ZONE TRAFFIC MANAGEMENT. THEY ARE NOT

INTENDED TO COVER ALL CONSTRUCTION OPERATIONS WHICH THE CONTRACTOR MAY CHOOSE TO EMPLOY. TYPICAL TRAFFIC

MANAGEMENT PLANS TO ACHIEVE COMMON CLOSURES CAN BE FOUND ON SUBSEQUENT PLANS. WORK ZONE TRAFFIC CONTROL

PLANS SHALL BE IN ACCORDANCE WITH THE 2009 EDITION OF THE M.U.T.C.D. OR AS APPROVED BY MASSDOT OR RESIDENT

ENGINEER.

2. STAGING PLANS SHOW A GENERALIZED CONCEPT FOR PROJECT EXECUTION. ACTIVITIES ARE NOT NECESSARILY INTENDED TO BE

PERFORMED SEQUENTIALLY. VARIOUS STAGES AND ACTIVITIES MAY OVERLAP TO THE EXTENT THAT THE LIMITATIONS OF

OPERATIONS AND MAINTENANCE OF TRAFFIC ARE OBSERVED.

3. THE CONTRACTOR SHALL COORDINATE THE CONSTRUCTION EFFORT WITH OTHER PROJECTS IN THE VICINITY IN ORDER TO MINIMIZE

POTENTIAL TRAFFIC IMPACTS.

4. PROVIDE SUB-STAGES TO ALLOW ACCESS TO LOCAL BUSINESSES & TO MAINTAIN TRAFFIC FLOW. THE CONTRACTOR SHALL BE

RESPONSIBLE FOR PROVIDING TEMPORARY ADA COMPLIANT PEDESTRIAN ACCESS WHERE EXISTING ACCESS IS DISTURBED, AND

MAINTAINING TWO-WAY ABUTTER ACCESS AT ALL TIMES EXCEPT FOR SHORT PERIODS APPROVED BY MASSDOT.

5. THE CONTRACTOR SHALL MAINTAIN ACCESS TO ACTIVE FIRE HYDRANTS AND OTHER EMERGENCY FACILITIES WITHIN THE PROJECT

LIMITS AT ALL TIMES.

6. EXCAVATION FOR CONSTRUCTION ON BOTH SIDES OF THE PAVEMENT AT ANY ONE LOCATION AT THE SAME TIME WILL BE SUBJECT

TO THE APPROVAL OF THE RESIDENT ENGINEER.

7. THE CONTRACTOR SHALL SECURE WORK AREAS ACCORDING TO CURRENT STANDARDS TO INSURE PUBLIC SAFETY AND

CONVENIENCE. THIS SHALL INCLUDE INSURING THAT ALL EXCAVATIONS ARE PROTECTED AT ALL TIMES AND AT THE END OF EACH

WORK DAY.

8. PRIOR TO COMMENCEMENT OF CONSTRUCTION, THE CONTRACTOR SHALL CONTACT ALL UTILITIES TO COORDINATE WORK

SCHEDULES.

9. THE CONTRACTOR SHALL INSTALL REQUIRED SIGNING, TEMPORARY TRAFFIC CONTROLS, AND TEMPORARY PAVEMENT MARKINGS

PRIOR TO START OF WORK.

10. THE SIGNALIZED INTERSECTION WITHIN THE LIMIT OF WORK IS TO BE MAINTAINED THROUGHOUT THE DURATION OF THE PROJECT.

EXISTING TRAFFIC SIGNALS SHALL BE MAINTAINED UNTIL PROPOSED EQUIPMENT IS INSTALLED AND OPERATIONAL. EXISTING

TRAFFIC SIGNAL EQUIPMENT MAY NEED TO BE SUPPORTED OR RELOCATED TO TEMPORARY SUPPORTS. NO ADDITIONAL PAYMENT

WILL BE MADE FOR TEMP SUPPORT OR RELOCATION OF EXISTING TRAFFIC SIGNAL EQUIPMENT BUT ALL COSTS SHALL BE INCLUDED

IN THE VARIOUS TRAFFIC SIGNAL ITEMS FOR THIS PROJECT.

Page 24: 25% SUBMITTAL - Milton MA | 779544.4987 PROJECT LOCATION DEPARTMENT OF TRANSPORTATION FEDERAL HIGHWAY ADMINISTRATION APPROVED: DIVISION ADMINISTRATOR DATE DATE CHIEF ENGINEER DATE

1

1

1

1

1

2

P

C

+

2

7

.

1

3

P

T

+

7

8

.

8

3

1

1

0

PC +84.19

1

0

3

1

0

4

+

6

6

.

0

0

7 8 9 10 11 12

1

2

1

122

PC

+

20.85

PT +03.02

120

+11.3

4

LIMIT OF MILLING

& RESURFACING

STA 103+25.79

N2921253.8358

E779560.0801

LIMIT OF MILLING

& RESURFACING

STA 7+15.97

N2921152.9171

E779720.6771

LIMIT OF MILLING

& RESURFACING

STA 120+91.18

N2921539.2106

E779492.9597

LIMIT OF MILLING

& RESURFACING

STA 111+77.30

N2921476.7472

E779787.6834

LIMIT OF SIDEWALK

RECONSTRUCTION

STA 7+64.20±

LIMIT OF SIDEWALK

RECONSTRUCTION

STA 103+25.79±

LIMIT OF MILLING

& RESURFACING

STA 11+87.29

N2921597.8503

E779565.1877

STAGE 2 WORK ZONE

S

Q

U

A

N

T

U

M

S

T

R

E

E

T

S

Q

U

A

N

T

U

M

S

T

R

E

E

T

G

U

I

L

F

O

R

D

R

O

A

D

MAINTAIN SIGNALIZED

INTERSECTION

3

3

'

M

I

N

44' M

IN

MAINTAIN EXISTING LANE

CONFIGURATION

(SHIFT AS REQUIRED)

20

SCALE: 1" = 20'

0 50 100

60

77

54

_H

D (C

ON

ST

S

TA

GIN

G).D

WG

21

-Ju

n-2

01

6 1

1:3

1 A

MP

lo

tte

d o

n

FED. AID PROJ. NO.

SHEET

NO.

TOTAL

SHEETS

MILTON

GRANITE AVENUE AT SQUANTUM STREET

40

STATE

MA

PROJECT FILE NO.

-

607754

24

1. INSTALL PERMANENT DRAINAGE STRUCTURES, PIPE, GRANITE

CURB, SIDEWALK AND TRAFFIC SIGNAL EQUIPMENT WITHIN

WORKZONE.

2. EXCAVATE AND PLACE FULL DEPTH PAVEMENT WHERE

REQUIRED UP TO BINDER COURSE.

3. EXCAVATE AND CONSTRUCT DRIVEWAYS.

CONSTRUCTION PHASING PLAN

Page 25: 25% SUBMITTAL - Milton MA | 779544.4987 PROJECT LOCATION DEPARTMENT OF TRANSPORTATION FEDERAL HIGHWAY ADMINISTRATION APPROVED: DIVISION ADMINISTRATOR DATE DATE CHIEF ENGINEER DATE

1

1

1

1

1

2

P

C

+

2

7

.

1

3

P

T

+

7

8

.

8

3

1

1

0

PC +84.19

1

0

3

1

0

4

+

6

6

.

0

0

7 8 9 10 11 12

1

2

1

122

PC

+

20.85

PT +03.02

120

+11.3

4

LIMIT OF MILLING

& RESURFACING

STA 103+25.79

N2921253.8358

E779560.0801

LIMIT OF MILLING

& RESURFACING

STA 7+15.97

N2921152.9171

E779720.6771

LIMIT OF MILLING

& RESURFACING

STA 120+91.18

N2921539.2106

E779492.9597

LIMIT OF MILLING

& RESURFACING

STA 111+77.30

N2921476.7472

E779787.6834

LIMIT OF SIDEWALK

RECONSTRUCTION

STA 7+15.97±

LIMIT OF MILLING

& RESURFACING

STA 11+87.29

N2921597.8503

E779565.1877

S

Q

U

A

N

T

U

M

S

T

R

E

E

T

S

Q

U

A

N

T

U

M

S

T

R

E

E

T

G

U

I

L

F

O

R

D

R

O

A

D

STAGE 3 WORK ZONE

33' M

IN

ELIMINATE THREE

LANE APPROACH

3

3

' M

IN

2

2

'

M

I

N

MAINTAIN SIGNALIZED

INTERSECTION

P

C

+

2

7

.

1

3

1

0

3

LIMIT OF MILLING

& RESURFACING

STA 103+25.79

N2921253.8358

E779560.0801

S

Q

U

A

N

T

U

M

S

T

R

E

E

T

ELIMINATE THREE

LANE APPROACH

20

SCALE: 1" = 20'

0 50 100

60

77

54

_H

D (C

ON

ST

S

TA

GIN

G).D

WG

21

-Ju

n-2

01

6 1

1:3

1 A

MP

lo

tte

d o

n

FED. AID PROJ. NO.

SHEET

NO.

TOTAL

SHEETS

MILTON

GRANITE AVENUE AT SQUANTUM STREET

40

STATE

MA

PROJECT FILE NO.

-

607754

25

1. INSTALL PERMANENT DRAINAGE STRUCTURES, PIPE, GRANITE

CURB, SIDEWALK AND TRAFFIC SIGNAL EQUIPMENT WITHIN

WORKZONE.

2. EXCAVATE AND PLACE FULL DEPTH PAVEMENT WHERE

REQUIRED UP TO BINDER COURSE.

3. EXCAVATE AND CONSTRUCT DRIVEWAYS.

CONSTRUCTION PHASING PLAN

Page 26: 25% SUBMITTAL - Milton MA | 779544.4987 PROJECT LOCATION DEPARTMENT OF TRANSPORTATION FEDERAL HIGHWAY ADMINISTRATION APPROVED: DIVISION ADMINISTRATOR DATE DATE CHIEF ENGINEER DATE

1

1

1

1

1

2

P

C

+

2

7

.

1

3

P

T

+

7

8

.

8

3

1

1

0

PC +84.19

1

0

3

1

0

4

+

6

6

.

0

0

7 8 9 10 11 12

1

2

1

122

PC

+

20.85

PT +03.02

120

+11.3

4

LIMIT OF MILLING

& RESURFACING

STA 103+25.79

N2921253.8358

E779560.0801

LIMIT OF MILLING

& RESURFACING

STA 7+15.97

N2921152.9171

E779720.6771

LIMIT OF MILLING

& RESURFACING

STA 120+91.18

N2921539.2106

E779492.9597

LIMIT OF MILLING

& RESURFACING

STA 111+77.30

N2921476.7472

E779787.6834

LIMIT OF MILLING

& RESURFACING

STA 11+87.29

N2921597.8503

E779565.1877

LIMIT OF SIDEWALK

RECONSTRUCTION

STA 11+87.29±

STAGE 4 WORK ZONE

S

Q

U

A

N

T

U

M

S

T

R

E

E

T

S

Q

U

A

N

T

U

M

S

T

R

E

E

T

G

U

I

L

F

O

R

D

R

O

A

D

2

2

'

M

IN

.

3

3

'

M

IN

.

22'

MIN

.

22'

MIN

.

MAINTAIN SIGNALIZED

INTERSECTION

SEE GRANITE AVE

5000 PROJECT

MASSDOT PROJECT

FILE NO. 608406

P

C

+

2

7

.

1

3

P

T

+

7

8

.

8

3

LIMIT OF MILLING

& RESURFACING

STA 103+25.79

N2921253.8358

E779560.0801

S

Q

U

A

N

T

U

M

S

T

R

E

E

T

MAINTAIN SIGNALIZED

INTERSECTION

20

SCALE: 1" = 20'

0 50 100

60

77

54

_H

D (C

ON

ST

S

TA

GIN

G).D

WG

21

-Ju

n-2

01

6 1

1:3

2 A

MP

lo

tte

d o

n

FED. AID PROJ. NO.

SHEET

NO.

TOTAL

SHEETS

MILTON

GRANITE AVENUE AT SQUANTUM STREET

40

STATE

MA

PROJECT FILE NO.

-

607754

26

1. INSTALL PERMANENT DRAINAGE STRUCTURES, PIPE, GRANITE

CURB, SIDEWALK AND TRAFFIC SIGNAL EQUIPMENT WITHIN

WORKZONE.

2. EXCAVATE AND PLACE FULL DEPTH PAVEMENT WHERE

REQUIRED UP TO BINDER COURSE.

3. EXCAVATE AND CONSTRUCT DRIVEWAYS.

4. REMOVE EXISITING CURB & ISLAND AND INSTALL TEMP

PAVEMENT AT THE ISLAND BETWEEN STA 276+50 TO 277+25 RT

CONSTRUCTION PHASING PLAN

Page 27: 25% SUBMITTAL - Milton MA | 779544.4987 PROJECT LOCATION DEPARTMENT OF TRANSPORTATION FEDERAL HIGHWAY ADMINISTRATION APPROVED: DIVISION ADMINISTRATOR DATE DATE CHIEF ENGINEER DATE

1

1

1

1

1

2

P

C

+

2

7

.

1

3

P

T

+

7

8

.

8

3

1

1

0

PC +84.19

1

0

3

1

0

4

+

6

6

.

0

0

7 8 9 10 11 12

1

2

1

122

PC

+

20.85

PT +03.02

120

+11.3

4

LIMIT OF MILLING

& RESURFACING

STA 103+25.79

N2921253.8358

E779560.0801

LIMIT OF MILLING

& RESURFACING

STA 7+15.97

N2921152.9171

E779720.6771

LIMIT OF MILLING

& RESURFACING

STA 120+91.18

N2921539.2106

E779492.9597

LIMIT OF MILLING

& RESURFACING

STA 111+77.30

N2921476.7472

E779787.6834

LIMIT OF SIDEWALK

RECONSTRUCTION

STA 103+37.30±

LIMIT OF MILLING

& RESURFACING

STA 11+87.29

N2921597.8503

E779565.1877

LIMIT OF SIDEWALK

RECONSTRUCTION

STA 11+87.29±

LIMIT OF SIDEWALK

RECONSTRUCTION

STA 120+91.18±

LIMIT OF SIDEWALK

RECONSTRUCTION

STA 120+87.61±

STAGE 5 WORK ZONE

S

Q

U

A

N

T

U

M

S

T

R

E

E

T

S

Q

U

A

N

T

U

M

S

T

R

E

E

T

G

U

I

L

F

O

R

D

R

O

A

D

MAINTAIN SIGNALIZED

INTERSECTION

2

2

'

M

I

N

1

1

'

M

I

N

22'

MIN

.

22'

MIN

.

33'

MIN

.

STAGE 5 WORK ZONE

22' MIN.

SEE GRANITE AVE

5000 PROJECT

MASSDOT PROJECT

FILE NO. 608406

20

SCALE: 1" = 20'

0 50 100

60

77

54

_H

D (C

ON

ST

S

TA

GIN

G).D

WG

21

-Ju

n-2

01

6 1

1:3

2 A

MP

lo

tte

d o

n

FED. AID PROJ. NO.

SHEET

NO.

TOTAL

SHEETS

MILTON

GRANITE AVENUE AT SQUANTUM STREET

40

STATE

MA

PROJECT FILE NO.

-

607754

27

1. INSTALL PERMANENT DRAINAGE STRUCTURES, PIPE, GRANITE

CURB, SIDEWALK AND TRAFFIC SIGNAL EQUIPMENT WITHIN

WORKZONE.

2. EXCAVATE AND PLACE FULL DEPTH PAVEMENT WHERE

REQUIRED UP TO BINDER COURSE.

3. EXCAVATE AND CONSTRUCT DRIVEWAYS.

4. FINALIZE AND MAKE TRAFFIC SIGNAL OPERATIONAL.

5. MILL EXISTING PAVEMENT AND PLACE TOP COURSE

THROUGHOUT PROJECT.

6. PLACE REMAINING PAVEMENT MARKING AND SIGNAGE AND

COMPLETE CONSTRUCTION.

CONSTRUCTION PHASING PLAN

Page 28: 25% SUBMITTAL - Milton MA | 779544.4987 PROJECT LOCATION DEPARTMENT OF TRANSPORTATION FEDERAL HIGHWAY ADMINISTRATION APPROVED: DIVISION ADMINISTRATOR DATE DATE CHIEF ENGINEER DATE

60

77

54

_H

D_

(C

ON

ST

D

ET

AIL

S).D

WG

21

-Ju

n-2

01

6 1

1:0

8 A

MP

lo

tte

d o

n

FED. AID PROJ. NO.

SHEET

NO.

TOTAL

SHEETS

MILTON

GRANITE AVENUE AT SQUANTUM STREET

40

STATE

MA

PROJECT FILE NO.

-

607754

28

CONSTRUCTION DETAILS

NOT TO SCALE

1'-4

"

2'-6

"

1'-6"

CONDUIT

SAND BEDDING

1'-0"1'-0"

SAW-CUT AND TACK W/RS-1

ASPHALT EMULSION (TYP.)

EXCAVATABLE CONTROL

DENSITY FILL (SEE NOTE 2)

6"

6" DETECTABLE

METALLIC WARNING TAPE

(SEE NOTE 3)

NOTES:

1. SCHEDULE 80 ELECTRICAL CONDUIT TYPE NM-PLASTIC (UL),

WITH PULL ROPE, UNLESS OTHERWISE APPROVED BY MASSDOT.

2. CONTROL DENSITY FILL SHALL BE TYPE 2E AND MEET THE

REQUIREMENTS OF SUBSECTION M4.08.0

3. WARNING TAPE SHALL BE PER CURRENT APWA STANDARDS.

NOT TO SCALE

1'-4

"

2'-6

"

EXIST. GRASS SURFACE

1'-6"

CONDUIT

SAND BEDDING

1'-0"1'-0"

ORDINARY BORROW

(ALL STONES TO BE LESS THAN 3")

6"

NOTES:

1. SCHEDULE 80 ELECTRICAL CONDUIT TYPE NM-PLASTIC (UL),

WITH PULL ROPE, UNLESS OTHERWISE APPROVED BY MASSDOT.

2. WARNING TAPE SHALL BE PER CURRENT APWA STANDARDS.

REPLACE DISTURBED

AREA WITH

4" LOAM & SEED

NOT TO SCALE

1'-4"

2'-6"

EXIST. PAVEMENT SURFACE

1'-6"

CONDUIT

SAND BEDDING

COMPACTED GRAVEL

BORROW - M1.03.0 TYPE C (ALL

STONES TO BE LESS THAN 2")

6"

6" DETECTABLE

METALLIC WARNING

TAPE (SEE NOTE 2)

NOTES:

1. SCHEDULE 80 ELECTRICAL CONDUIT TYPE NM-PLASTIC (UL),

WITH PULL ROPE, UNLESS OTHERWISE APPROVED BY MASSDOT.

2. WARNING TAPE SHALL BE PER CURRENT APWA STANDARDS.

3'-0"

ADD MATERIAL TO MATCH

EXIST. SIDEWALK (HMA OR

CEM CONC.)

6" DETECTABLE

METALLIC WARNING

TAPE (SEE NOTE 2)

SAW-CUT

1.75" SUPERPAVE SURFACE COURSE (SSC 12.5)

OVER 1.75" SUPERPAVE INTERMEDIATE COURSE

(SIC 12.5) OVER 4" SUPERPAVE BASE COURSE (SBC 37.5)

TO MATCH EXISTING PAVEMENT

(PAID UNDER ITEM 451.)

12" GRAVEL BORROW

EXIST.

ROADWAY

SURFACE

NOT TO SCALE

12"(MIN.)

12"(MIN.)

STOP LINE

(AS REQUIRED)

CURB LINE

10' O.C.

ARROW SHALL BE POINTED RIGHT FOR RIGHT TURN ONLY.

6" - SWL

32'-0"

(MIN.)

NOT TO SCALE

8'-0"

6" - DBYL

8'-0"

*

(MIN.)

20'-0"

SL

NOT TO SCALE

GRANITE CURB IN EXISTING PAVEMENT

SURFACE

TREATMENT

VARIES

SAWCUT

GRAVEL BORROW

EXIST SURFACE

6"

6"

MIN

MIN

1'

(TYP)

* CEMENT CONCRETE

4' O.C.

12"

5'

SURFACE COURSE

* COST OF CEMENT CONCRETE INCLUDED IN CURBING

ROADS, ROAD SHOULDERS, PARKING

LEDGE

12"MIN.

AREAS, DRIVEWAYS, WALKWAYS

EARTH

12"MIN.

LOAM & SEED

LANDSCAPED AREAS

6"MIN.

GRAVEL BORROW TYPE C

COMPACT IN 6" LAYERS

DIAMETER+1.5'

SEE NOTES

FINISH GRADE

PROP PIPE

(SEE PLANS)

NOTES:

1. FOR PERMANENT PATCH IN ROADWAY

AREAS WITH MILL & OVERLAY USE FULL

DEPTH PAVEMENT MATERIALS SHOWN

ON TYPICAL SECTIONS (PAID FOR

UNDER ITEM 451)

2. FOR TEMPORARY PATCH IN ROADWAY

AREAS WITH FULL DEPTH PAVEMENT

USE 3 INCHES HMA BINDER MIX (PAID

FOR UNDER ITEM 472)

SUITABLE BACKFILL

COMPACT IN 12" LAYERS

NOT TO SCALE

*

Page 29: 25% SUBMITTAL - Milton MA | 779544.4987 PROJECT LOCATION DEPARTMENT OF TRANSPORTATION FEDERAL HIGHWAY ADMINISTRATION APPROVED: DIVISION ADMINISTRATOR DATE DATE CHIEF ENGINEER DATE

60

77

54

_H

D_

(C

ON

ST

D

ET

AIL

S).D

WG

21

-Ju

n-2

01

6 1

1:0

8 A

MP

lo

tte

d o

n

FED. AID PROJ. NO.

SHEET

NO.

TOTAL

SHEETS

MILTON

GRANITE AVENUE AT SQUANTUM STREET

40

STATE

MA

PROJECT FILE NO.

-

607754

29

CONSTRUCTION DETAILS

1. ALL EROSION AND SEDIMENT CONTROL MEASURES ARE TO BE

CONSTRUCTED AND MAINTAINED IN ACCORDANCE WITH PUBLISHED

EROSION CONTROL AND SEDIMENT GUIDELINES FOR MASSACHUSETTS

(SEE REFERENCE BELOW, NOTE #6).

2. ANY EROSION AND SEDIMENT CONTROL MEASURES FOR THE

STABILIZATION OF SLOPES ARE TEMPORARY FOR CONSTRUCTION PHASES

ONLY. SEE GRADING PLAN FOR FINAL STABILIZATION OF SLOPES.

3. SEDIMENT CONTROL MEASURES SHALL BE ADJUSTED TO MEET FIELD

CONDITIONS AT THE TIME OF AND DURING ALL PHASES OF CONSTRUCTION

AND BE CONSTRUCTED PRIOR TO AND IMMEDIATELY AFTER ANY GRADING

OR DISTURBANCE OF EXISTING SURFACE MATERIAL ON THE SITE.

4. PERIODIC INSPECTION AND MAINTENANCE OF ALL SEDIMENT CONTROL

STRUCTURES SHALL BE PROVIDED TO ENSURE THAT THE INTENDED

PURPOSE IS ACCOMPLISHED. THE CONTRACTOR SHALL BE RESPONSIBLE

FOR ALL SEDIMENT LEAVING THE LIMIT OF WORK. SEDIMENT CONTROL

MEASURES SHALL BE IN WORKING CONDITION AT THE END OF EACH

WORKING DAY.

5. ALL SEDIMENT WILL BE PREVENTED FROM ENTERING ANY STORM

DRAINAGE SYSTEM (I.E. THROUGH THE USE OF STRAW BALES, CATCH

BASIN SEDIMENT TRAPS, GRAVEL, BOARDS OR OTHER APPLICABLE

METHODS).

6. THE CONTRACTOR INSTALLING THE ABOVE SHALL OBTAIN AND FOLLOW

THE "MASSACHUSETTS EROSION AND SEDIMENT CONTROL GUIDELINES

FOR URBAN AND SUBURBAN AREAS" PREPARED BY DEPARTMENT OF

ENVIRONMENTAL PROTECTION, BUREAU OF RESOURCE PROTECTION,

DATED MAY 1997, REPRINTED MAY 2003 (OR LATEST EDITION) AND THE

2012 NPDES GENERAL PERMIT FOR STORMWATER DISCHARGES FROM

CONSTRUCTION ACTIVITIES, OR LATEST EDITION.

7. ALL DRAINAGE SWALES AND GROUND SURFACES WITHIN THE LIMIT OF

WORK SHALL BE PROTECTED.

8. AFTER ANY SIGNIFICANT RAINFALL (0.25" OR GREATER), SEDIMENT

CONTROL STRUCTURES SHALL BE INSPECTED FOR INTEGRITY. ANY

DAMAGED DEVICES SHALL BE CORRECTED IMMEDIATELY.

9. ALL STOCKPILES SHALL BE PROTECTED AND LOCATED A MINIMUM OF 100'

AWAY FROM EXISTING WATER BODIES OR WETLANDS & WITHIN THE LIMIT

OF WORK. SOIL STOCKPILES SHALL BE PROTECTED FROM CONTACT WITH

ONSITE STORMWATER RUNOFF USING TEMPORARY PERIMETER SEDIMENT

BARRIERS. A COVER (TARP) OR APPROPRIATE TEMPORARY STABILIZATION

WILL BE PROVIDED TO MINIMIZE SEDIMENT DISCHARGE.

10. STABILIZED PORTIONS OF A SITE SHALL BE INSPECTED AT LEAST ONCE

PER MONTH.

11. ANY SEDIMENT TRACKED ONTO PAVED AREAS SHALL BE SWEPT AT THE

END OF EACH WORKING DAY.

12. ALL DEBRIS GENERATED DURING SITE PREPARATION ACTIVITIES SHALL BE

LEGALLY DISPOSED OF OFF-SITE.

13. ALL TOPSOIL ENCOUNTERED WITHIN THE WORK AREA SHALL BE STRIPPED

TO ITS FULL DEPTH AND STOCKPILED FOR REUSE. TOPSOIL NOT NEEDED

AFTER COMPLETION OF ALL FINAL TOPSOIL SPREADING AND GRASSING

SHALL BE REMOVED FROM THE SITE AND LEGALLY RECYCLED OR

DISPOSED OF. TOPSOIL PILES SHALL REMAIN SEGREGATED FROM

EXCAVATED SUBSURFACE SOIL MATERIALS.

14. THE CONTRACTOR IS RESPONSIBLE FOR REMOVAL OF ALL EROSION AND

SEDIMENT CONTROLS AT THE COMPLETION OF SITE CONSTRUCTION.

EXISTING

TREE

EXISTING

TREE

6 FT MIN.

LIMIT OF

DRIPLINE

(VARIES)

PRUNE PER ISA

STANDARDS. REMOVE

DEAD & DAMAGED

BRANCHES. TIE BRANCHES

UP TO AVOID DAMAGE

FROM CONSTRUCTION

EQUIPMENT

EXISTING TREE(S)

INSTALL FENCING AT

EDGE OF DRIPLINE OR AS

FAR FROM TRUNK AS

POSSIBLE. MIN. DISTANCE

IS 6' FROM TRUNK. MAY

BE PLASTIC SNOW FENCE

OR CHAIN LINK, MIN. 4'

HIGH

ZONE OF

CONSTRUCTION

IMPACT

PRUNE DAMAGED OR

EXPOSED ROOTS

DAMAGED WITH A

SHARP SAW

LIMIT OF GRADING

(INDIVIDUAL TREE)

EXISTING GRADE

LIMIT OF FENCING

(MULTIPLE TREES)

WOODEN OR

METAL

POSTS (TYPICAL)

2X4 DIM. LUMBER

ATTACHED AT 2

LOCATIONS (MIN.).

CLADDING SHALL BE 8'

HIGH WITH 6" SPACING

OF BOARDS

W/BURLAP PRIOR TO

ARMORING.

LIMIT OF

CONSTRUCTION IMPACT

(REFER TO PLANS)

WOODEN OR METAL

POSTS (MAX. 8' SPACING)

LIMIT OF FENCING

(MULTIPLE TREES)

LIMIT OF

CANOPY

(VARIES)

AREA OF

UNDISTURBED

ROOT ZONE

LIMIT OF FENCE

(INDIVIDUAL

TREE)

PLAN VIEW

NOT TO SCALE

NOT TO SCALE

EXISTING CATCHBASIN

DUMP LOOPS

(REBAR NOT INCLUDED)

SILT SACK

OPTIONAL OVERFLOW

1" REBAR FOR BAG

REMOVAL FROM INLET

(REBAR NOT INCLUDED)

EXPANSION

RESTRAINT

FOAM

EXISTING CURB

OPENING

EXISTING GRATE TO

BE REUSED

D

I

R

E

C

T

I

O

N

O

F

F

L

O

W

COMPOST FILTER TUBE

MINIMUM 12 INCHES IN DIAMETER WITH AN EFFECTIVE HEIGHT OF 9.5 INCHES.

TUBES FOR COMPOST FILTERS SHALL BE JUTE MESH OR APPROVED

PHOTO-BIODEGRADABLE MATERIAL, HOWEVER PHOTO-BIODEGRADABE

FABRIC SHALL BE REMOVED AT END OF CONTRACT.

TAMP TUBES IN PLACE TO ENSURE GOOD CONTACT WITH SOIL SURFACE. IT IS

NOT NECESSARY TO TRENCH TUBES INTO EXISTING GRADE.

UNDISTURBED SOIL & VEGETATION.

TUBES SHALL BE PLACED AS CLOSE TO LIMITS OF SOIL

DISTURBANCE AS POSSIBLE.

DIRECTION OF FLOW

LIMIT OF WORK

COMPOST TUBES SHALL BE STAKED

OR LEANED AGAINST SUPPORTS (TREES, CINDER

BLOCKS) ON SLOPES 2:1 OR GREATER.

WHERE NECESSARY, STAKING SHALL BE MIN. 1 INCH X 1

INCH X 3 FEET UNTREATED HARDWOOD STAKES, UP TO 5

FT. APART OR AS REQUIRED TO SECURE TUBES IN

PLACE.

AR

EA

O

F

DIS

TU

RB

AN

CE

PR

OT

EC

TE

D A

RE

A

GENERAL NOTES:

1. PROVIDE A MINIMUM TUBE DIAMETER OF 12 INCHES FOR SLOPES UP TO 50 FEET IN LENGTH WITH A SLOPE RATIO OF 3H:1V OR STEEPER. LONGER

SLOPES OF 3H:1V MAY REQUIRE LARGER TUBE DIAMETER OR ADDITIONAL COURSING OF FILTER TUBES TO CREATE A FILTER BERM. REFER TO

MANUFACTURER'S RECOMMENDATIONS FOR SITUATIONS WITH LONGER OR STEEPER SLOPES.

2. INSTALL TUBES ALONG CONTOURS AND PERPENDICULAR TO SHEET OR CONCENTRATED FLOW.

3. TUBE LOCATION MAY BE SHIFTED TO ADJUST TO LANDSCAPE FEATURES, BUT SHALL PROTECT UNDISTURBED AREA AND VEGETATION TO MAXIMUM

EXTENT POSSIBLE. TUBES MAY BE PLACED DIRECTLY ON PAVED SURFACES WHEN NECESSARY.

4. DO NOT INSTALL IN PERENNIAL, EPHEMERAL OR INTERMITTENT STREAMS.

5. ADDITIONAL TUBES SHALL BE USED AT THE DIRECTION OF THE ENGINEER.

6. ADDITIONAL STAKING SHALL BE USED AT THE DIRECTION OF THE ENGINEER.

CURVE ENDS UPHILL TO

PREVENT DIVERSION

OF UNFILTERED

RUN-OFF.

TUBES MAY BE PLACED ON THE UPHILL SIDE OF

WELL- ANCHORED, STATIONARY FEATURES

SUCH AS EXISTING TREES IN LIEU OF STAKING.

STREAM

3.0 FT. MIN.

TUBES MAY BE

SLEEVED (ONE

INSERTED INTO

ANOTHER) OR PROVIDE

A 3 FT. MIN. OVERLAP

AT ENDS OF TUBES TO

JOIN IN A CONTINUOUS

BARRIER.

Page 30: 25% SUBMITTAL - Milton MA | 779544.4987 PROJECT LOCATION DEPARTMENT OF TRANSPORTATION FEDERAL HIGHWAY ADMINISTRATION APPROVED: DIVISION ADMINISTRATOR DATE DATE CHIEF ENGINEER DATE

60

77

54

_H

D_

(C

ON

ST

D

ET

AIL

S).D

WG

21

-Ju

n-2

01

6 1

1:0

9 A

MP

lo

tte

d o

n

FED. AID PROJ. NO.

SHEET

NO.

TOTAL

SHEETS

MILTON

GRANITE AVENUE AT SQUANTUM STREET

40

STATE

MA

PROJECT FILE NO.

-

607754

30

CONSTRUCTION DETAILS

VARIABLE DEPTH HMA SURFACE COURSE

1-1/2" MICROMILL

EXISTING

PAVEMENT

INTERMEDIATE COURSE

SURFACE COURSE

SAWCUT

20'

NOT TO SCALE

1-1/2"

GRANITE CURB

6" REVEAL

CUT STONE

TO FIT FLUSH

NOT TO SCALE

6'-0"

1'-0"

NOT TO SCALE

BA

CK

O

F W

AL

K

5'-0" M

IN

.

PROPOSED HYDRANT PROVIDED

BY TOWN OF MILTON

FINISH

GRADE

CRUSHED STONE 3' MIN, AT LEAST

6" ABOVE HYDRANT DRAIN RING

(ITEM 156.)

CONCRETE BLOCK SET

ON UNDISTURBED EARTH

CONCRETE THRUST BLOCK

FINISHED GRADE

EXISTING

WATER MAIN

REMOVE

EXISTING

PIPE

PROPOSED 6"

RESTRAINED M.J. DICL

RESTRAINED M.J.

CONNECTIONS (TYP)

MIN 6 CF OF CRUSHED

STONE AROUND BASE

OF HYDRANT (ITEM 156.)

FELT PAPER

SUITABLE COMPACTED BACKFILL

LOAM & SEED

4"

MAIN

PLACE CONCRETE THRUST BLOCK

AGAINST UNDISTURBED MATERIAL

(TYPICAL)

CONCRETE

TEE OR TAPPING

SLEEVE

45°

12"

CONCRETE

MAIN

PLACE 15 LB. ROOFING

FELT BETWEEN

BEND & CONC. (TYP)

BEND

1'-6" SQ.

45° MAX

(S.F.)(S.F.)(S.F.)(INCHES)

10 & 12

6.0

12.0

3.0

7.0

4.0

9.0

1. THRUST BLOCKS TO BE USED ON ALL PIPES AT HORIZONTAL AND VERTICAL BENDS

3. BEARING AREAS BASED ON HORIZONTAL PASSIVE SOIL PRESSURE OF 2000 PSF AND A MINIMUM

2. FOR FITTINGS WITH LESS THAN 45° DEFLECTION USE BEARING AREAS FOR 45° BEND.

BETWEEN THE PIPE AND THE ROCK FACE.

OR ABOVE THE CROWN OF THE PIPE. HOWEVER, CONCRETE BACKING SHALL BE PLACED

AREAS MAY BE DISREGARDED FOR TRENCHES IN ROCK WHERE THE TOP OF THE ROCK FACE IS AT

GREATER OR EQUAL TO 45°, TEES AND DEAD ENDS.

INTERNAL WATER PRESSURE OF 175 PSIG. JOINTS SHALL NOT BE ENCASED IN CONCRETE, BEARING

BEARING AREAS FOR 45° BEND.

AGAINST UNDISTURBED MATERIAL FOR FITTING. *

TABLE OF BEARING AREAS IN SQUARE FEET

SIZE OF MAIN 90° BEND 45° BEND

NOTES:

DEAD END

≤ 8

1621.0

12.0 16.0

Page 31: 25% SUBMITTAL - Milton MA | 779544.4987 PROJECT LOCATION DEPARTMENT OF TRANSPORTATION FEDERAL HIGHWAY ADMINISTRATION APPROVED: DIVISION ADMINISTRATOR DATE DATE CHIEF ENGINEER DATE

60

77

54

_H

D_

(C

ON

ST

D

ET

AIL

S).D

WG

21

-Ju

n-2

01

6 1

1:0

9 A

MP

lo

tte

d o

n

FED. AID PROJ. NO.

SHEET

NO.

TOTAL

SHEETS

MILTON

GRANITE AVENUE AT SQUANTUM STREET

40

STATE

MA

PROJECT FILE NO.

-

607754

31

CONSTRUCTION DETAILS

WHEELCHAIR RAMP DATA - TYPE A

WHEEL-

CHAIR

NUMBER

WCR

TYPE

STREET NAME STATION OFFSET

RAMP

WIDTH

SIDEWALK

WIDTH

ROADWAY

GUTTER

SLOPE

CURB TRANSITION

LENGTH

LEFT

SIDE

RIGHT

SIDE

4 A SQUANTUM WEST 104+27.60 24.7' RT - - - - -

5 A GRANITE AVE 10+20.32 27.0' LT - - - - -

WHEELCHAIR RAMP DATA - TYPE D

WHEEL-

CHAIR

NUMBER

WCR

TYPE

STREET NAME STATION OFFSET

RAMP

WIDTH

SIDEWALK

WIDTH

ROADWAY

GUTTER

SLOPE

CURB TRANSITION

LENGTH

LEFT

SIDE

RIGHT

SIDE

9 D GUILFORD ST 120+30.25 16.6' LT - - - - -

SIDEWALK

1

.

5

%

(

M

A

X

)

7

.

5

%

(

M

A

X

)

5

'

-

0

"

(

M

I

N

)

EDGE OF ACCESSIBLE ROUTE

7

.

5

%

(

M

A

X

)

7.5%

(MAX)

A

A

ROADWAY

DETECTABLE WARNING PANEL,

COLOR YELLOW (SEE MASSDOT

STD. DETAIL E 107.6.5R)

REFERENCE POINT

C RAMP OPENING

FLUSH WITH ROAD

1.5% (M

AX)7.5%

(M

A

X

)

C

U

R

B

WHEELCHAIR RAMP TYPE B

SECTION A-A

L

S

I

D

E

W

A

L

K

W

I

D

T

H

NOT TO SCALE

FLUSH WITH ROAD

C

U

R

B

T

R

A

N

S

IT

IO

N

L

E

N

G

T

H

(L

E

F

T

S

ID

E

)

G

U

T

T

E

R

S

L

O

P

E

(+

)

LANDING RAMP

4

'

M

I

N

SIDEWALK

SIDEWALK

7

.5

%

(M

A

X

)

5

'-0

" (M

IN

)

1

.

5

%

(

M

A

X

)

7

.

5

%

(

M

A

X

)

5

'

-

0

"

(

M

I

N

)

C

U

R

B

T

R

A

N

S

IT

IO

N

ROADWAY

1.5% (M

AX)

SECTION A-A

A

A

NOT TO SCALE

EDGE OF ACCESSIBLE ROUTE

CURB

DETECTABLE WARNING PANEL,

COLOR YELLOW (SEE MASSDOT

STD. DETAIL E 107.6.5R)

REFERENCE POINT

C RAMP OPENING

FLUSH

DETECTABLE WARNING

PANEL (SEE MASSDOT

STD. DETAIL E 107.6.5R)

SEE

TYPICAL

SECTIONS

L

L

E

V

E

L

L

A

N

D

IN

G

WHEELCHAIR RAMP TYPE A

S

I

D

E

W

A

L

K

W

I

D

T

H

L

E

N

G

T

H

(L

E

F

T

S

ID

E

)

G

U

T

T

E

R

S

L

O

P

E

(+

)

SEE

TYPICAL

SECTIONS

COMPACTED SUBGRADE

REMOVE UNSUITABLE MATERIAL

REPLACE WITH GRAVEL

COMPACTED SUBGRADE

REMOVE UNSUITABLE

MATERIAL REPLACE

WITH GRAVEL

SIDEWALK

*

*

*

*

*

*

*

*

*

*

VA

RIE

S

V

A

R

I

E

S

CENTER LINE RAMP

STATION LOCATION

REFERENCE POINT

T

R

A

N

S

I

T

I

O

N

L

E

N

G

T

H

DETECTABLE WARNING

PANEL INSTALLED

PERPENDICULAR TO RAMP

(SEE E 107.6.5R)

1.5%* LANDING

0" REVEAL

WHEELCHAIR RAMP TYPE D

NOT TO SCALE

C

L

S

I

D

E

W

A

L

K

W

I

D

T

H

R

A

M

P

W

I

D

T

H

G

U

T

T

E

R

3

'

-

0

"

M

I

N

S

L

O

P

E

(

+

)

WHEELCHAIR RAMP DATA - TYPE B

WHEEL-

CHAIR

NUMBER

WCR

TYPE

STREET NAME STATION OFFSET

RAMP

WIDTH

SIDEWALK

WIDTH

ROADWAY

GUTTER

SLOPE

CURB TRANSITION

LENGTH

LEFT

SIDE

RIGHT

SIDE

2 B GRANITE AVE 8+71.98 27.7' LT - - - - -

3 B SQUANTUM WEST 103+96.81 25.0' RT - - - - -

5'-0" MIN.

LOW SIDE TRANSITION

ROADWAY DOWNGRADE

A

A

HIGH SIDE TRANSITION

6" CURB REVEAL (TYP.)

6'-6"

EDGE OF ROADWAY

4

'

M

I

N

HSL

DETECTABLE WARNING PANEL,

COLOR YELLOW (SEE MASSDOT

STD. DETAIL E 107.6.5R)

LEVEL LANDING

LEVEL LANDING

1

.

5

%(

M

A

X

)

7

.

5

%(

M

A

X

)

*

*

ROADWAY

1.5% (M

AX)

7.5%

(M

A

X

)

LANDING RAMP

SEE

TYPICAL

SECTIONSCOMPACTED SUBGRADE

REMOVE UNSUITABLE

MATERIAL REPLACE

WITH GRAVEL

*

*

1.5%*

MAX

1.5%*

MAX

7.5%*

MAX

7.5%*

MAX

SECTION A-A

WHEELCHAIR RAMP TYPE C

NOT TO SCALE

ROADWAY

1.5% (M

AX)

SECTION A-A

DETECTABLE WARNING

PANEL (SEE MASSDOT

STD. DETAIL E 107.6.5R)

SEE

TYPICAL

SECTIONS

COMPACTED SUBGRADE

REMOVE UNSUITABLE MATERIAL

REPLACE WITH GRAVEL

*

7

.

5

%(

M

A

X

)

*

A

A

WHEELCHAIR RAMP DATA - TYPE C

WHEEL-

CHAIR

NUMBER

WCR

TYPE

STREET NAME STATION OFFSET

RAMP

WIDTH

SIDEWALK

WIDTH

ROADWAY

GUTTER

SLOPE

CURB TRANSITION

LENGTH

LEFT

SIDE

RIGHT

SIDE

1 C GRANITE AVE 8+78.90 28.7' RT - - - - -

6 C GRANITE AVE 10+18.15 28.5' RT - - - - -

7 C SQUANTUM EAST 110+55.10 35.2' LT - - - - -

8 C SQUANTUM EAST 110+36.60 27.6' RT - - - - -

10 C GUILFORD ST 120+31.15 15.0' RT - - - - -

- WHEELCHAIR RAMP DATA TABLE WILL BE FILLED OUT IN NEXT SUBMISSION

- WHEELCHAIR RAMP DATA TABLE WILL BE FILLED OUT IN NEXT SUBMISSION

- WHEELCHAIR RAMP DATA TABLE WILL BE FILLED OUT IN NEXT SUBMISSION

- WHEELCHAIR RAMP DATA TABLE WILL BE FILLED OUT IN NEXT SUBMISSION

* = TOLERANCE OF CONSTRUCTION ±0.5%

* = TOLERANCE OF CONSTRUCTION ±0.5%

* = TOLERANCE OF CONSTRUCTION ±0.5%

* = TOLERANCE OF CONSTRUCTION ±0.5%

Page 32: 25% SUBMITTAL - Milton MA | 779544.4987 PROJECT LOCATION DEPARTMENT OF TRANSPORTATION FEDERAL HIGHWAY ADMINISTRATION APPROVED: DIVISION ADMINISTRATOR DATE DATE CHIEF ENGINEER DATE

60

77

54

_H

D_

(C

ON

ST

D

ET

AIL

S).D

WG

21

-Ju

n-2

01

6 1

1:0

9 A

MP

lo

tte

d o

n

FED. AID PROJ. NO.

SHEET

NO.

TOTAL

SHEETS

MILTON

GRANITE AVENUE AT SQUANTUM STREET

40

STATE

MA

PROJECT FILE NO.

-

607754

32

CONSTRUCTION DETAILS

DRIVEWAY DATA - TYPE A

DRIVEWAY

NUMBER

DRIVEWAY

TYPE

STREET NAME STATION OFFSET

SIDEWALK

WIDTH

PATH OF

TRAVEL

(3.0' MIN.)

ROADWAY

GUTTER

SLOPE

CURB TRANSITION

LENGTH

LEFT

SIDE

RIGHT

SIDE

1 A GRANITE AVE 7+93 25.33' LT 8.00' 4.00' - - -

2 A SQUANTUM ST 111+30 29.50' LT 8.00' 6.00' - - -

3 A GRANITE AVE 11+50 27.00' RT 8.00' 5.00' - - -

7.5%

MAX

7.5%

MAX

1.5

%

MA

X

1.5

%

MA

X

GUTTER

SLOPE (+)

1.5

%

MA

X

A

A

PLAN

BACK OF SIDEWALK

1.5%

VA

R

IES

15%

M

AX

SECTION A-A

SIDEWALK

PATH OF TRAVEL

VARIES

TO MEET

& MATCH

EXISTING

DRIVEWAY

VARIES

DRIVEWAY SURFACE

MATCH DRIVEWAY WIDTH (10' MIN)

DRIVEWAY TYPE A

LEFT SIDE

TRANSITION

DRIVEWAY

BACK OF

SIDEWALK

RIGHT SIDE

TRANSITION

GRANITE CURB

(TYPE VB)

1" LIP

GUTTER

EXISTING DRIVEWAY

SAWCUT

DRIVEWAY SURFACE

RET EXIST GRAVEL BASE

15%

M

AX

PATH OF TRAVEL

VARIES

SIDEWALK WIDTH

NOT TO SCALE

ROADWAY

ROADWAY

SEE TYPICAL

SECTIONS

TYPE A

CURB CORNER

3" REVEAL (TYP.)

3" CURB

CORNER REVEAL

AREA OF CEMENT CONCRETE SIDEWALK AT DRIVEWAY (ITEM 701.1)

KEY:

L

REF POINT C

OF OPENING

TOLERANCE OF CONSTRUCTION ±0.5%*

*

*

*

**

*

- DRIVEWAY DATA TABLE WILL BE FILLED OUT IN NEXT SUBMISSION

Page 33: 25% SUBMITTAL - Milton MA | 779544.4987 PROJECT LOCATION DEPARTMENT OF TRANSPORTATION FEDERAL HIGHWAY ADMINISTRATION APPROVED: DIVISION ADMINISTRATOR DATE DATE CHIEF ENGINEER DATE

7+00

28

32

36

40

44

28

32

36

40

44

0 4 8 12 16 20 24 28 32 36 40 44 480-4-8-12-16-20-24-28-32-36-40-44-48

7+50

28

32

36

40

44

28

32

36

40

44

0 4 8 12 16 20 24 28 32 36 40 44 480-4-8-12-16-20-24-28-32-36-40-44-48

2.0%

3.1%

2.0%

1.5%

7+15.97

28

32

36

40

44

28

32

36

40

44

0 4 8 12 16 20 24 28 32 36 40 44 480-4-8-12-16-20-24-28-32-36-40-44-48

36.4

36.2

36

.2

4

36.1

36

.0

2

LA

YO

UT

LIN

E

LA

YO

UT

LIN

E

LA

YO

UT

LIN

E

LA

YO

UT

LIN

E

LA

YO

UT

LIN

E

LA

YO

UT

LIN

E

2.0%

2.4%

2.0%

1.5%

0

0

HOR. SCALE IN FEET

VER. SCALE IN FEET

20 40

4 4 8

0

0

20

60

77

54

_H

D (X

-S

EC

).D

WG

21

-Ju

n-2

01

6 1

1:0

0 A

MP

lo

tte

d o

n

FED. AID PROJ. NO.

SHEET

NO.

TOTAL

SHEETS

MILTON

GRANITE AVENUE AT SQUANTUM STREET

40

STATE

MA

PROJECT FILE NO.

-

607754

60

77

54

_H

D (X

-S

EC

).D

WG

21

-Ju

n-2

01

6 1

1:0

0 A

MP

lo

tte

d o

n

FED. AID PROJ. NO.

SHEET

NO.

TOTAL

SHEETS

MILTON

GRANITE AVENUE AT SQUANTUM STREET

40

STATE

MA

PROJECT FILE NO.

-

607754

CROSS SECTIONS

GRANITE AVENUE

33

Page 34: 25% SUBMITTAL - Milton MA | 779544.4987 PROJECT LOCATION DEPARTMENT OF TRANSPORTATION FEDERAL HIGHWAY ADMINISTRATION APPROVED: DIVISION ADMINISTRATOR DATE DATE CHIEF ENGINEER DATE

7+92.92

28

32

36

40

44

28

32

36

40

44

0 4 8 12 16 20 24 28 32 36 40 44 480-4-8-12-16-20-24-28-32-36-40-44-48

8+00

28

32

36

40

44

28

32

36

40

44

0 4 8 12 16 20 24 28 32 36 40 44 480-4-8-12-16-20-24-28-32-36-40-44-48

8+50

28

32

36

40

28

32

36

40

0 4 8 12 16 20 24 28 32 36 40 44 480-4-8-12-16-20-24-28-32-36-40-44-48

35.7

35

.7

5

35.6

35

.7

0

35.1

35

.1

5

LA

YO

UT

LIN

E

LA

YO

UT

LIN

ELA

YO

UT

LIN

E

LA

YO

UT

LIN

E

LA

YO

UT

LIN

E

LA

YO

UT

LIN

E

2.0%

2.0%

1.5%

2.0%

2.0%

1.5%

2.0%

2.0%

1.5%

1.3%

1.3%

15.0%

1.5%

2.0%

2.0%

1.5%

1.3%

1.3%

15.0%

1.5%

CROSS SECTIONS

GRANITE AVENUE

0

0

HOR. SCALE IN FEET

VER. SCALE IN FEET

20 40

4 4 8

0

0

20

60

77

54

_H

D (X

-S

EC

).D

WG

21

-Ju

n-2

01

6 1

1:0

0 A

MP

lo

tte

d o

n

FED. AID PROJ. NO.

SHEET

NO.

TOTAL

SHEETS

MILTON

GRANITE AVENUE AT SQUANTUM STREET

40

STATE

MA

PROJECT FILE NO.

-

607754

34

Page 35: 25% SUBMITTAL - Milton MA | 779544.4987 PROJECT LOCATION DEPARTMENT OF TRANSPORTATION FEDERAL HIGHWAY ADMINISTRATION APPROVED: DIVISION ADMINISTRATOR DATE DATE CHIEF ENGINEER DATE

10+50

24

28

32

36

40

24

28

32

36

40

0 4 8 12 16 20 24 28 32 36 40 44 480-4-8-12-16-20-24-28-32-36-40-44-48

10+80

28

32

36

40

44

28

32

36

40

44

0 4 8 12 16 20 24 28 32 36 40 44 480-4-8-12-16-20-24-28-32-36-40-44-48

11+00

28

32

36

40

44

28

32

36

40

44

0 4 8 12 16 20 24 28 32 36 40 44 480-4-8-12-16-20-24-28-32-36-40-44-48

35.1

35

.0

1

35.7

35

.7

3

36.2

36

.2

4

LA

YO

UT

LIN

E

LA

YO

UT

LIN

E

LA

YO

UT

LIN

E

LA

YO

UT

LIN

E

LA

YO

UT

LIN

E

LA

YO

UT

LIN

E

PROP 6" WIDE

RET. WALL (TYP.)

6" REVEAL AT BACK OF SIDEWALK

REVEAL VARIES AT DRIVEWAY SIDE

1.0%

1.0%

1.5%

4.0%

4.0%

1.0%4.0%

4.0%

4.0%

1.0%

1.0%

1.5%

4.0%

4.0%

1.0%

2.0%

2.0%

2.0%

2.0%

2.0%

1.5%

4.0%

4.0%

1.0%

3.0%

TE

MP

E

AS

EM

EN

T LIN

E (54.56' LT

)T

EM

P E

AS

EM

EN

T LIN

E (51.76' LT

)

0

0

HOR. SCALE IN FEET

VER. SCALE IN FEET

20 40

4 4 8

0

0

20

60

77

54

_H

D (X

-S

EC

).D

WG

21

-Ju

n-2

01

6 1

1:0

0 A

MP

lo

tte

d o

n

FED. AID PROJ. NO.

SHEET

NO.

TOTAL

SHEETS

MILTON

GRANITE AVENUE AT SQUANTUM STREET

40

STATE

MA

PROJECT FILE NO.

-

607754

CROSS SECTIONS

GRANITE AVENUE

35

Page 36: 25% SUBMITTAL - Milton MA | 779544.4987 PROJECT LOCATION DEPARTMENT OF TRANSPORTATION FEDERAL HIGHWAY ADMINISTRATION APPROVED: DIVISION ADMINISTRATOR DATE DATE CHIEF ENGINEER DATE

11+50

28

32

36

40

44

28

32

36

40

44

0 4 8 12 16 20 24 28 32 36 40 44 480-4-8-12-16-20-24-28-32-36-40-44-48

11+87.29

32

36

40

44

32

36

40

44

0 4 8 12 16 20 24 28 32 36 40 44 480-4-8-12-16-20-24-28-32-36-40-44-48

12+00

32

36

40

44

32

36

40

44

0 4 8 12 16 20 24 28 32 36 40 44 480-4-8-12-16-20-24-28-32-36-40-44-48

37.6

37

.6

0

38.8

38

.7

7

39.2

LA

YO

UT

LIN

E

LA

YO

UT

LIN

E

LA

YO

UT

LIN

ELA

YO

UT

LIN

E

LA

YO

UT

LIN

E

GUILFORD ROAD

1.0%

1.0%

15.0%

4.0%

1.5%

2.0%

2.0%

1.5%

4.0%

4.0%

1.0%

4

.1

:1

0

0

HOR. SCALE IN FEET

VER. SCALE IN FEET

20 40

4 4 8

0

0

20

60

77

54

_H

D (X

-S

EC

).D

WG

21

-Ju

n-2

01

6 1

1:0

1 A

MP

lo

tte

d o

n

FED. AID PROJ. NO.

SHEET

NO.

TOTAL

SHEETS

MILTON

GRANITE AVENUE AT SQUANTUM STREET

40

STATE

MA

PROJECT FILE NO.

-

607754

CROSS SECTIONS

GRANITE AVENUE

36

Page 37: 25% SUBMITTAL - Milton MA | 779544.4987 PROJECT LOCATION DEPARTMENT OF TRANSPORTATION FEDERAL HIGHWAY ADMINISTRATION APPROVED: DIVISION ADMINISTRATOR DATE DATE CHIEF ENGINEER DATE

103+00

24

28

32

36

40

24

28

32

36

40

0 4 8 12 16 20 24 28 32 36 40 44 480-4-8-12-16-20-24-28-32-36-40-44-48

103+25.79

24

28

32

36

40

24

28

32

36

40

0 4 8 12 16 20 24 28 32 36 40 44 480-4-8-12-16-20-24-28-32-36-40-44-48

103+50

24

28

32

36

40

24

28

32

36

40

0 4 8 12 16 20 24 28 32 36 40 44 480-4-8-12-16-20-24-28-32-36-40-44-48

35.2

34.9

34

.9

0

35.0

34

.6

6

LA

YO

UT

LIN

ELA

YO

UT

LIN

E

LA

YO

UT

LIN

E

PROP W BEAM

GUARD RAIL (TYP.)

2.0%

2.0%

1.5%

2.0%

2.0%2.0%

2.0%

2.0%

1.5%

2.0%

2.0%

1.5%

2

.

0

:

1

0

0

HOR. SCALE IN FEET

VER. SCALE IN FEET

20 40

4 4 8

0

0

20

60

77

54

_H

D (X

-S

EC

).D

WG

21

-Ju

n-2

01

6 1

1:0

1 A

MP

lo

tte

d o

n

FED. AID PROJ. NO.

SHEET

NO.

TOTAL

SHEETS

MILTON

GRANITE AVENUE AT SQUANTUM STREET

40

STATE

MA

PROJECT FILE NO.

-

607754

CROSS SECTIONS

SQUANTUM STREET

37

Page 38: 25% SUBMITTAL - Milton MA | 779544.4987 PROJECT LOCATION DEPARTMENT OF TRANSPORTATION FEDERAL HIGHWAY ADMINISTRATION APPROVED: DIVISION ADMINISTRATOR DATE DATE CHIEF ENGINEER DATE

104+00

28

32

36

40

28

32

36

40

0 4 8 12 16 20 24 28 32 36 40 44 480-4-8-12-16-20-24-28-32-36-40-44-48

34.1

34

.1

7

2.0%2.0%

2.0%

2.0%

1.5%

2.0%

2.0%

1.5%

18.3:1

0

0

HOR. SCALE IN FEET

VER. SCALE IN FEET

20 40

4 4 8

0

0

20

60

77

54

_H

D (X

-S

EC

).D

WG

21

-Ju

n-2

01

6 1

1:0

1 A

MP

lo

tte

d o

n

FED. AID PROJ. NO.

SHEET

NO.

TOTAL

SHEETS

MILTON

GRANITE AVENUE AT SQUANTUM STREET

40

STATE

MA

PROJECT FILE NO.

-

607754

38

CROSS SECTIONS

SQUANTUM STREET

Page 39: 25% SUBMITTAL - Milton MA | 779544.4987 PROJECT LOCATION DEPARTMENT OF TRANSPORTATION FEDERAL HIGHWAY ADMINISTRATION APPROVED: DIVISION ADMINISTRATOR DATE DATE CHIEF ENGINEER DATE

111+00

28

32

36

40

28

32

36

40

0 4 8 12 16 20 24 28 32 36 40 44 480-4-8-12-16-20-24-28-32-36-40-44-48

111+29.71

28

32

36

40

28

32

36

40

0 4 8 12 16 20 24 28 32 36 40 44 480-4-8-12-16-20-24-28-32-36-40-44-48

111+50

28

32

36

40

28

32

36

40

0 4 8 12 16 20 24 28 32 36 40 44 480-4-8-12-16-20-24-28-32-36-40-44-48

110+75

24

28

32

36

40

24

28

32

36

40

0 4 8 12 16 20 24 28 32 36 40 44 480-4-8-12-16-20-24-28-32-36-40-44-48

34.0

34

.0

6

34.1

34

.3

0

34.4

34

.6

1

34.7

34

.8

3

LA

YO

UT

LIN

E

LA

YO

UT

LIN

E

LA

YO

UT

LIN

E

LA

YO

UT

LIN

E

LA

YO

UT

LIN

E

LA

YO

UT

LIN

E

LA

YO

UT

LIN

E

3.0%

4.0%

4.0%

1.5%

3.0%

3.5%

3.5%2.0%

1.5%

4.0%

3.5%

3.5%

3.5%

1.5%

4.0%

4.0%

4.0%

1.5%

1.0%

1.0%

1.0%

1.5%

0

0

HOR. SCALE IN FEET

VER. SCALE IN FEET

20 40

4 4 8

0

0

20

60

77

54

_H

D (X

-S

EC

).D

WG

21

-Ju

n-2

01

6 1

1:0

1 A

MP

lo

tte

d o

n

FED. AID PROJ. NO.

SHEET

NO.

TOTAL

SHEETS

MILTON

GRANITE AVENUE AT SQUANTUM STREET

40

STATE

MA

PROJECT FILE NO.

-

607754

39

CROSS SECTIONS

SQUANTUM STREET

Page 40: 25% SUBMITTAL - Milton MA | 779544.4987 PROJECT LOCATION DEPARTMENT OF TRANSPORTATION FEDERAL HIGHWAY ADMINISTRATION APPROVED: DIVISION ADMINISTRATOR DATE DATE CHIEF ENGINEER DATE

111+77.30

28

32

36

40

28

32

36

40

0 4 8 12 16 20 24 28 32 36 40 44 480-4-8-12-16-20-24-28-32-36-40-44-48

112+00

28

32

36

40

28

32

36

40

0 4 8 12 16 20 24 28 32 36 40 44 480-4-8-12-16-20-24-28-32-36-40-44-48

35.1

35

.1

2

35.5

LA

YO

UT

LIN

E

LA

YO

UT

LIN

E

3.0%

4.0%

4.0%

1.5%

0

0

HOR. SCALE IN FEET

VER. SCALE IN FEET

20 40

4 4 8

0

0

20

60

77

54

_H

D (X

-S

EC

).D

WG

21

-Ju

n-2

01

6 1

1:0

1 A

MP

lo

tte

d o

n

FED. AID PROJ. NO.

SHEET

NO.

TOTAL

SHEETS

MILTON

GRANITE AVENUE AT SQUANTUM STREET

40

STATE

MA

PROJECT FILE NO.

-

607754

40

CROSS SECTIONS