25 kv electric traction on ser
TRANSCRIPT
25 KV Electric Traction on SER
1. 25 kV AC TRACTION on INDIAN RAILWAYS:
Chakradharpur Division of South Eastern Railway has got the distinction of introduction of
first 25 KV electric traction system in Indian Railways.
Commissioning of first Transformer and
Circuit Breaker at Kendposi
It was first introduced in Kendposi-Rajkharswan section of Chakradharpur division with the
technical assistance of SNCF (Societenationale des chemins de ferFrancais)
OHE was charged with 25 kV AC supply on 15th Dec‟1959.
The inaugural trial run took place in presence of AICCF officials and Sri. K S SambhaMurty,
then DEE/TRD/CKP on 15th Dec‟1959.
60th year was celebrated over SER in a big way. The function was concluded on
17.12.2019 in a simple but graceful manner.
Inauguration of 60 Glorious Years of 25KV AC Traction Mile stone by PCEE SER
2. GROWTH OF ELECTRIC LOCOMOTIVES OVER SER
SER is having highest holding of Electric locomotives (also 3 Phase locos) over Indian Railway.
3. Milestones of Electric Loco:
3.1 ELS/TATA:
It is the 2nd Electric Loco shed of Indian Railways. It was established in the year 1962
with 69 locomotives under the supervision of SNCF Railway.
Present holding (as on 01.07.2021): 201 (WAG9:174, WAP7:27)
Future Plan: 250.
It was established in the year 1964.
0
200
400
600
800
1000
1200
19
62
-63
19
63
-64
19
65
-66
19
68
-69
19
69
-70
19
75
-76
19
78
-79
19
81
-82
19
87
-88
19
90
-91
19
93
-94
19
96
-97
19
99
-00
20
00
-01
20
03
-04
20
06
-07
20
09
-10
20
12
-13
20
15
-16
20
18
-19
20
19
-20
20
20
-21
20
21
-22
up
to J
un
e
YEAR
TOTAL
3.2 ELS/BNDM:
Established: 07 January‟1983 with an initial holding of 6 WAM4 locomotives.
Present holding (as on 01.07.2021): 191 (WAG7: 89, WAG9: 86, WAP7: 15 & WAGC3:
1).
Silver Jubilee was celebrated on 25.10.2008.
Future Plan: 250 locos.
3.3 ELS/BKSC:
Established: 18th May 2012 with holding of 54 WAG5 locomotives(Inaugurated by ShriKulbhushan, Member Electrical on 18.05.2012)
Present holding (as on 01.07.2021): 150 (WAG7: 66, WAG9: 84)
Future Plan: 200 locos.
3.4 ELS/SRC:
Established: 26th January‟1999 with a holding of 6 WAP4 locomotives.
Present holding (as on 01.07.2021): Electric: 88 (WAP4: 35, WAP7: 53).
Diesel: 18 (WDS6: 10, WDM3A: 8).
Future Plan: 125
3.5 ELS/ROU:
Established:8th Jan 2019 with holding of 01(Inauguration byShriP.S.Mishra,G.M/S.E.Railway on 08.01.2019)
Present holding (as on 01.07.2021): WAG9: 121
Future Plan: 200
3.6 ELS/KGP (Earlier known as DLS/KGP):
Electric loco allotment of 5 WAG5 on 01.02.2018.
Complete evacuation: 01.09.2020.
Present holding (as on 01.07.2021):150 (WAG7:
125 & WAP4: 25).
Future Plan:200 locos.
3.7 ELS/IPTN (Earlier known as DLS/BKSC):
Electric loco allotment of 5 WAG5 on 01.02.2018.
Complete evacuation: 01.08.2020.
Present holding (as on 01.07.2021): 75 (WAG7).
Future Plan: 100 locos. 3.8 CTRC/TATA:
Established on 6th February 1976.
Wheel repair / manufacture of electric locomotives.
Capacity: 750 wheelset per year.
TM rewinding of conventional loco.
Capacity: 150 armatures per year.
3.9 CENTRE OF EXCELLENCE AT ELS/ROU:
Established: 31st July 2019(Inauguration by Smt. Manju Gupta, Addl. Member (Elect.) /
Railway Board on 31.07.2019)
OBJECTIVES:
To develop centralized support for Pneumatics and Electronics
Infrastructures:
Smart class capacity : 25
Auditorium capacity : 56
Conference hall capacity : 51
Pneumatics Lab
Power Electronics Lab
Electronics Lab
Computer Based Testing cum Training Lab
Mechanical Lab
4.0 Infrastructure of Electrical (OP):
4.1 Running Rooms:
There are 29 Running Rooms in SER. Out of which, 28 Running Rooms are air
conditioned.
Running Rooms in ADA Division are at Adra, Anara, Bokaro and Bhojudih.
Running Rooms in CKP Division are at Tatanagar, Chakradharpur, Bondamunda, Rourkela,
Dumitra, Karampada, Barsuan, Bimalgarh, Jharsuguda, Sardega, Dangoaposi, Noamundi,
Banspani, Joda Mines, Joruli.
Running Rooms in KGP Division are at Santragachi, Andul, Kharagpur, Nimpura, Tikiapara,
Mecheda, Panskura, Haldia.
Running Rooms in RNC Division are at Hatia, Muri.
Running Room HTE won MR Shield of Best Running Room of I.R for the year 2020-21.
4.2 CREW LOBBIES:
There are 21 Combined Crew and Guard Lobbies in SER. All the crew lobbies are air
conditioned and integrated with CMS:
Crew Lobbies in ADA Division at Adra, Anara, Bokaro and Bhojudih, Bankura.
Running Rooms in CKP Division at Tatanagar, Adityapur, Sini, Chakradharpur,
Manoharpur, Bondamunda, Rourkela, Jharsuguda, Dangoaposi, Joruli.
Running Rooms in KGP Division at Santragachi, Andul, Kharagpur, Nimpura.
Running Rooms in RNC Division at Hatia, Muri.
In addition, there are another 20 smaller crew booking points integrated with CMS functioning in
SER:
ADA Division: Mohuda
CKP Division: NOMD, BJMD, BBN, BYX, BSPX, DMF, BXF, GUA, KMPD.
KGP Division: BPO, HLZ, TPKR, HWH, MCA, PKU, MDN, HLZ (Freight), DGHA, AMTA.
4.3 TRIP SHEDS & POOLING POINTS:
There are five Trip Sheds with facility of Pit in SER to facilitate Trip inspection and other
attention of loco:
ADA Division: BKSC
CKP Division: TATA, DPS
KGP Division: SRC, KGP
RNC Division: HTE
In addition, there are another four Pooling Points (without Pit) in SER to facilitate road side
maintenance of loco:
ADA division: ADA, ANR
CKP Division: CKP, ROU.
4.4 ELTC/TATA:
Established in December 1964.
Provides initial, refresher and special trainings to crew (CLI/ LP/ALP).
Trainee capacity: 4440.
5.0 Achievements of SER during 2020-21:
5.1 During 2020-21, 132 (SRC - 2, TATA - 24, BNDM - 46, BKSC - 30 & ROU - 30) new
locomotives have been commissioned at SER. With this, total holding of electric loco in SER
has become 952 (534 - three-phase) which is highest on Indian Railway.
5.2 Diesel loco shed/Bokaro and Diesel loco shed/KGP have become fully operational 6th and 7th
Electric loco sheds of South Eastern Railway with present holding of 75 and 150 Electric
locomotives respectively. As these sheds no more hold any Diesel locomotives so their names
have been changed to Electric loco shed/Ispatnagar (ELIN) and Electric loco shed/KGP (ELKP)
respectively from 05.01.2021 with the approval of GM/SER.
Infrastructure of ELS/Ispatnagar for Maintaining Electric Locomotives:
MVMT Test Stand MVSL / MVSI Test Stand TM Test Machine
EPC Test Stand Pressure switch Test Stand Flasher Light Test Bench
SMGR Test Stand PHGR Test Stand Pantograph Test Stand
Traction Motor carbon brush holder pressure test stand
VCD test stand
MV drop test-stand for line contactors and drumcontactors
Major Infrastructure of ELS/KGP for Maintaining Electric Locomotives
Suction Arrangement for Dust Removal
EMC Test Bench Pure Air Brake System (IRAB-1) Test Stand
Auxiliary Motors Light Run Test Stand
Line Contactor Test Stand
PHGR Test Bench
Pantograph Test Stand Auxiliary compressor Test Stand
Fixture for handling of VCB
CPA Test Stand
MPH Test Stand
High Vacuum Type Transformer Oil Purification Plant
5.3 During 2020-21 ELS/ROU has become fully operational with inspection and lifting bays, stores
complex.
Major Infrastructure of ELS/ROU for Maintaining Electric Locomotives
EOT carne (65/10,35/6,15/6)T 65/10T EOT crane with Lifting tackle PIT WHEEL LATHE
BAKING OVEN VVVF drive Testing Machine Equipment handling stacker
DGA Machine Electronics Test equipment Hot & cold high pressure jet cleaner
Induction heater Pipe brazing machine Pipebending machine
TFP Oil filter Stacking arrangement inside store Stacking arrangement in heavy lifting bay
5.4 Centre of Excellence has been setup at ELS/ROU for giving maintenance support to various
Electric loco sheds of SER and imparting both training to running and maintenance staff. Total
5254 (SER – 594 & FR – 4660) trainees have been imparted training during 2020-21.
Major Infrastructure at “CENTRE OF EXCELLENCE “/ROU
CENTRE OF EXCELLENCE
Electronic Labwith Test Equipments
Conference
HallwithVIideoConferencing System
Smart Class Room
56 Seated Auditorium
Mechanical Model Room
Heavy Repairing Lab (GTO Valve Set Repairingsetup)
Computer based Testingand Training
PneumaticLabwith CCB and E70 Test Bench
5.5 ELS/TATA has become the first shed of SER to home 100% three-phase locomotives.
5.6 On Load Testing Facility for Hotel Load Converter developed by ELS/SRC & TATA:
ELS/Santragachi& TATA have developed an “On
load testing facility for Hotel Load Converter”
during 20-21. It helps in identifying defect, if any, in
the hotel load converter of the loco in shed itself. This
setup has been built up completely in-house by the
sheds using a released 60 KVA TFP of LHB coach.
5.7 Commissioning of High-end Electronics Testing Setup for M/S Medha& M/S BHEL make
Propulsion Systems at ELS/TATA:
Unique testing facilities have been commissioned at ELS/TATA for Medhamake (Version-II) &
M/S BHEL make Propulsion Systems of three-phase locos. These are the first of their type
on Indian Railways. The systems are capable of carrying out functional tests of various cards
of Propulsion Systems. It would be very useful in testing problematic / doubtful cards in
Electronics lab and will avoid troubleshooting by trial and error on locomotives.
Medha Make Test Rig (Version II) BHEL Make Test Rig
5.8 Conversion of WAG9 Bogie to Conventional Brake Rigging by KGP Workshop:
At KGP Workshop TBU/PBU to conventional brake rigging modification was carried out by
Bogie Repairs Shop & fitment of brake riggings, pneumatic pipelines, conventional handbrake
and footsteps by ERS-POH shop. Total 8 bogies were modified in 2020-21.
Unmodified bogie of WAG9 Modified bogie of WAG9
5.9 Modification of Pneumatic Pipe Line in FB Cubical:
A number of three phase locomotives have failed due to “Harmonic Filter Contactor” stuck up
“Harmonic Filter” isolated. It was found that in FB Panel ferrule of thermoplastic air tube get
dislocated due to improper griping.
To get rid of this problem, SER carried out an in-house modification by providing copper pipe
(10 mm dia) in place of thermoplastic type flexible pneumatic pipe. This said modification has
been carried out in 281 locos so far.
5.10 Modification in Pneumatic Circuit of VCB:
Ingress of moisture in VCB through its pneumatic circuit has been
a troublesome area. It hampered the functioning of VCB. SER has
carried out in-house modification in 46 Locos by providing an Air
Dryer in the pneumatic circuit of VCB so that moisture-free air may
be fed to VCB.
5.11 E70 Electronic Card Test Facility at ELS/TATA:
Brake system of three phase loco has pneumatics as well as electronics. So far sheds had test
setup for pneumatics only, so the electronic cards were being troubleshooted by trial and error.
ELS/TATA has developed a unique test set up for testing of various cards of E70 brake system
by in house efforts. The power supply cards are tested on load on this bench and
measurements are carried out at critical test points to ascertain health of the electronics.
Complete Setup of PSU Card
5.12 Consist Operation of WAP4 Locomotives by ELS/SRC:
ELS/SRC is entirely a coaching loco shed, maintaining 85 coaching electric locomotives (WAP4: 35 and WAP7: 50) and 18 Diesels locomotives. Due to COVID-19 pandemic situation; service of many Mail/Express and Passenger trains was suspended as a result some of the coaching locomotives had become idle.
ELS/SRC has made 4 CONSISTs (12 WAP4 locomotives) which are under trial usage over SER. Those are being used to haul fully loaded Goods traffic over graded sections of SER.
5.13 ELS/TATA converted condemned WAM4
loco no. 21393 to battery operated dual mode
shunting loco for shunting within shed at
restricted speed of 10 kmph only.
5.14 A e-help desk have been commissioned in
counselling rooms of important Lobbies of
CKP Division. This contains various items
including GyanKunj. Crew can test
themselves on both safety and technical
subjects. This is available in both online
and offline mode.
5.15 By better coordination and monitoring, Divisions controlled accrual of overtime of crew to
34,932 hours during 20-21 compared to 9,60,309 hours in 19-20. It would not be out of place
to mention that on an average 971.3 T.O.s per fortnight were served per day in 20-21
compared to 898.1 in 19-20 i.e NIL O.T despite higher T.O.
5.16 During 20-21, “Trip Schedule” of record 3532 (SER - 2480, FR - 1052) Coachingand 1925
(SER - 699, FR - 1226) Goods locos was carried out by SER.
PSU being
test
ed
PSU being
test
ed
PSU being
test
ed
PSU being
test
ed
Load
Resistor
Load
Resistor
Load
Resistor
Load
Resistor
Test Kit
Test Kit
Test Kit
Test Kit
5.17 ELTC/TATA:
4273 have been trained and released by ELTC in the Financial Year 2020-21 compared to
3842 in 2019-20.
5.18CTRC/TATA:
650 wheelsets were repaired by CTRC during Financial year 2020-21 compared to 633 in
19-20.
5.19 Following new M&P were commissioned during 2020-21 at various Electric Loco shed to increase outturn and improve reliability:
Induction Heater with demagnetising facility at ELS/BKSC, ELKP & ELIN.
Portable Pressure Sensor Tester at ELS/BKSC.
SMGR Test Bench at ELS/BKSC & ELKP.
Universal Test Bench for Master Controller of Conventional Locomotives at ELS/SRC.
Spheriblock Fitment / Removal Machine at ELS/BKSC.
Opening-Closing Time Checking Instrument for EM/EP Contactor at ELS/BKSC & TATA.
Provision of Additional Support in Compressor of 3-Phase Locomotives at ELS/BNDM.
Hydraulic Double Acting Jack for Mounting and Dismounting of Racer of WAG9 Locomotives at ELS/BKSC & TATA.
Commissioning of Universal Multipurpose Armature Machine (UMA) at ELS/BKSC. VVVF (Variable Voltage Variable Frequency) 3 Phase AC Drives for Light Load Run Test of
Traction Motors of WAG9 Locomotive at ELS/BKSC & ELS/ROU.
5.20 Energy Regeneration by 3 Phase Loco:
74161146 kWh energy has been regenerated by three phase electric loco on territorial
basis during 2020-21.
5.21 Right Powering of Freight Trains:
During 2020-21, SER has offered 296 MU loco (WAG7: 155.8 + WAG9: 140.2) per day to
ensure right powering of freight trains against a target of 280.3 (WAG7: 143+WAG9: 137.3)
which is about 16% more than the MU offered during 2019-20.
In addition, 22 pairs of RRC & Push Pull loco are also utilized per day during 2020-21 to
ensure right powering of freight trains.
5.22 Use of HOG to save Diesel:
Total 56 HOG equipped WAP-7 locos are being utilized to work 38 pairs (50 rakes) of
HOG trains to reduce consumption of diesel fuel during 2020-21.
5.23 Safety Drives, Seminars & Quiz:
132 numbers of safety drives have been conducted during 2020-21.
232 numbers of safety seminars have been conducted during 2020-21.
29 numbers of quiz have been conducted during 2020-21.
15 numbers of Text-To-Speech instructions on safety issues in mp3 version have been
circulated during 2020-21.
6. Achievements in 1st Quarter of 2021-22 (Apr'21 to Jun'21):
6.1 During 1st quarter of 2021-22, 26 (SRC: 3, TATA: 10, BNDM: 3, BKSC: 6 & ROU: 4)
new electric locomotives have been commissioned at SER. Total holding of electric
loco has become 978 (560 - three-phase) in SER, which is highest on Indian Railway.
6.2 During 1st quarter of 2021-22 a special cable checking drive has been undertaken by
Electric Sheds in which 535 electric Locos were checked and 232 locos were
corrected.
6.3 Test arrangement for cross travel checking of overhauled Pantograph and a test plant
for checking capacity of overhauled MPH have been made by ELS/IPTN with in-house
efforts. It will help in improving reliability of overhauled Pantograph and MPH.
6.4 ELS/TATA took a drive to check all electrical panel boxes
installed within ELS/TATA shed premises by Thermo
Vision Camera for any unusual heating of cables and
joints.
6.5 Sand Heating facility at ELS/ROU:
A sand heating facility has been fabricated with in-house
facilities at ELS/ROU. Proper testing of sanders is being
ensured by all the Sheds of SER using dry sand.
6.6 New Running Room has been commissioned at JMTC of CKP Division. It was
inaugurated by DRM/CKP on 10.04.2021.
6.7 e-Help Desk (Kiosk) have been installed at ROU, CKP, TATA, DPS,
JHS, RNC, KGP & ADA lobbies. It helps crew to enhance their
technical and SWR knowledge. It provides technical and safety
information that are accessible through a touch screen. It also has
facility for self test.
6.8 During Jun ‟21, “Trip Schedule” of 573 (SER – 365 & FR - 208) Coaching and 300
(SER -107, FR - 193) Goods locos were carried out by SER compared to 428 &92
respectively in corresponding period of 2020-21.The cumulative figure has become
1,679 Coaching and 955 Goods locomotives in 2021-22 compared to 891 &225
respectively in corresponding period of 2020-21.
6.9 By better coordination and monitoring, Divisions have controlled accrual of overtime of
crew to 3,441 hours during Jun ‟21 compared to 1,520 hours in Jun ‟20 (lockdown
period) and 89,337 hours in Jun ‟19. It would not be out of place to mention that on an
average 1101.5 T.O.s were served per day in Jun ‟21 compared to 852.5 in Jun ‟20
and 897.6 in Jun‟19. The cumulative figures (till Jun)of accrual of OT hours were
2,32,009, 1,550 (lockdown period) & 26,669 in 2019-20, 2020-21 & 2021-22
respectively.
6.10 ELTC/TATA:
456 staff (Refresher: 144, Promotional: 41, Diesel to Electric conversion training to
Loco maintenance staff / supervisor: 143 and others: 128) havebeen trained and
released by ELTC during Jun‟21 compared to 197 in Jun ‟20 and 264 in Jun‟19.
On a cumulative basis, 1,296 staff (Initial: 180, Refresher: 376, Promotional: 218,
Diesel to Electric conversion training to Loco Pilot: 28, Diesel to Electric conversion
training to Loco maintenance staff / supervisor: 340 and others: 154) have been
trained and released by ELTC during 2021-22 (till Jun ‟21) as compared to
393&833 staff trained during similar period of 2020-21 and 2019-20 respectively.
Model of actual motorized Bogie of three
phase loco has been kept on raised platform
near model room of ELTC/TATA for training
purpose. It helps in improving fault detection
skills of crew.
CCTV has been installed in Loco model room of conventional (relay type)
locomotive. Activities being carried out by trainee crew are visible to other trainees
waiting for their turn. Such facility was earlier available in MPCS type loco model
room only.
Due to condemnation of old hostel building, the microprocessor based model
benches had become nonfunctional. These trainers have been repaired and re -
commissioned in new model room developed in ELTC main training block.
CCTV camera with sound system for old WAG-5
Model car
MPCS based Trainer
A reading room has been commissioned near Library located at phase- I Hostel.
Online Yoga, Meditation, Soft Skill & CBWE (Central Board of Worker
Education) classes have been started by ELTC. During 1st quarter of 2021-22:
313, 255, 71& 72 trainees have made use of these classes respectively.
MPCS based Trainer No. 1 & 2 Shifting of Library from Academic Building to
Phase-I hostel.
Front view of Library and Reading Room Reading Room
6.11 CoE/ROU:
CBC online training, on three phase locomotives, has been imparted to 929 (SER:
53& FR: 876) during 1st quarter of 2021-22.
Investigation/testing of 17 electronic cards were carried out by CoE during 1st
quarter of 2021-22.
Repairing of 13 DC-DC Converter and one Flasher light unit were carried out by
CoE during 1st quarter of 2021-22.
CoE/ROU added 62 printed documents in its Library during 1st quarter of 2021-22.
Stator and Rotor Model of TM have been kept at Mechanical Lab for training.
6.12 CTRC/TATA:
12 & Nil Hitachi & TAO armatures were repaired by CTRC during Jun'21 compared
to 7 & 1 during Jun „20. Cumulative figure (till Jun) has become 23 & 7 in 2021-22
compared to 12 & 1 respectively in corresponding period of 2020-21.
68 wheelsets were repaired by CTRC during Jun'21compared to 61 during Jun‟20.
Cumulative figure (till Jun) has become 186 in 2021-22 compared to 99 in
corresponding period of 2020-21.
Surface wheel lathe has been
commissioned at CTRC. It will
enable CTRC to send wheel
after carrying out final
machining.
6.13 Revised gradient chart has been made by CKP. It was inaugurated by Sh. Vijay
Kumar Sahu DRM/CKP on 28.06.2021.
*****************