RAJASTHAN RAJYA VIDYUT PRASARAN NIGAM LIMITED [Corporate Identity Number (CIN) U40109RJ2000SGC016485j Regd. Office: Vidyurlthawan, .Ianpath, Jaipur 302005 Tete- Fax: +91-141.-2740455, email ID IWO_adlnll_store@J'vpn.co.in website www.rvpn.co.in NO.RVPN/AO(Admn-Store)/F. 10. lOS Jaipur, dated 08-0& - 16 ORDER Sub.:- Re-structuring of organisational structure and manpower norms of RVPN. Orders for re-structuring of organisational structure and manpower norms of RVPN were issued vide No. 338 and 339 dated 31.3.16. Many representations were receivedfrom the field officers as well as from labour unions. These all representations were put up to the re-structuring committee for examining and giving its recommendations. On the basis of the recommendations of the Committee. the Chairman & ManagingDirector, RVPN hasbeenpleasedto decidethat- 1. Total 267 posts are withdrawn from various GSSs/offices and reallocated to other offices [78 JENs (E&N) and 114 Tech workman(Commullication) withdrawn temporarilyfrom 220 kv GSS] ;:. Sanctionedstrength of RVPNwere 9915 as on 01.10.2015,which nas now been increasedto 10072, as on 1.7.2016 by sanction of posts on new!y commissioned ,220i132kvGSS after 01.10.2015.Detailsare as under :- =-=~'---.l91 H 157 10072 =.=_~_-23D 3. All Annexures attached with the Order No. 338 dated 31.3.16 have been revised and enclosed herewith and titled as under :- Sanctioned strengthas on 01.10.2015 --r-- .--- Posts sanctionedafter 01.10.2015 Total: Skeleton eosts sanctionedafter 01.10.2015 -.,...--- --- --_.- _(Anne~ure of Order No. 338 dated 31.3.16) Existin~ Revised Annexure titled Annexure No Annexure A-1 Annexure-A(CorporateOffice) Annexure A-2 (Rev-1) -- -- Annexure A-3 /--:-. Annexure A-4 Annexure A-6 Annexure A-7 Annexure 8-1 Annexure 8-1 (Rev-1) ---- Annexure 8-2 Annexure 8-2 (Rev-1) Annexure 8-3 Annexure 8-3 (Rev-1) f-:--. I Annexure 8-4 (R.ev-1) --- Annexure 8-4 I--:- ._--- Annexure 8-5 Annexure 8-5 (Rev-1) - Annexure A-5 Annexure 8-6 (Rev-1) Annexure 8-7 (Rev-1) Annexure-C Win /sectionwise sanction ~ew ·---1 i i - _'! U)

Upload: vuhuong

Post on 29-Mar-2018

215 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 23D10072 - Rajasthanenergy.rajasthan.gov.in/content/dam/raj/energy/corporate-one-lines... · increasedto 10072,ason1.7.2016 bysanctionofpostsonnew!y commissioned ... 11. The work

RAJASTHAN RAJYA VIDYUT PRASARAN NIGAM LIMITED[Corporate Identity Number (CIN) U40109RJ2000SGC016485j

Regd. Office: Vidyurlthawan, .Ianpath, Jaipur 302005Tete- Fax: +91-141.-2740455, email ID IWO_adlnll_store@J'vpn.co.in website www.rvpn.co.in

NO.RVPN/AO(Admn-Store)/F. 10. lOS Jaipur, dated 08-0& - 16ORDER

Sub.:- Re-structuring of organisational structure and manpower norms of RVPN.

Orders for re-structuring of organisational structure and manpower norms ofRVPN were issued vide No. 338 and 339 dated 31.3.16. Many representations werereceived from the field officers as well as from labour unions. These all representations

were put up to the re-structuring committee for examining and giving itsrecommendations.

On the basis of the recommendations of the Committee. the Chairman &ManagingDirector, RVPN has been pleasedto decide that-

1. Total 267 posts are withdrawn from various GSSs/offices and reallocated to otheroffices [78 JENs (E&N) and 114 Tech workman(Commullication) withdrawntemporarilyfrom 220 kv GSS]

;:. Sanctionedstrength of RVPNwere 9915 as on 01.10.2015,which nas now been

increasedto 10072, as on 1.7.2016 by sanction of posts on new!y commissioned,220i132kvGSS after 01.10.2015.Details are as under :-

=-=~'---.l91H157

10072=.=_~_-23D3. All Annexures attachedwith the Order No. 338 dated 31.3.16 have been revised

and enclosed herewith and titled as under :-

Sanctioned strengthas on 01.10.2015 --r--.---Posts sanctionedafter 01.10.2015

Total:Skeleton eosts sanctionedafter 01.10.2015

-.,...--- ---

--_.-_ (Anne~ure of Order No. 338 dated 31.3.16)

Existin~ Revised Annexure titledAnnexure No

Annexure A-1 Annexure-A(CorporateOffice)Annexure A-2 (Rev-1)-- --Annexure A-3/--:-.Annexure A-4Annexure A-6Annexure A-7Annexure 8-1 Annexure 8-1 (Rev-1)

----Annexure 8-2 Annexure 8-2 (Rev-1)Annexure 8-3 Annexure 8-3 (Rev-1)f-:--.

I Annexure 8-4 (R.ev-1)---Annexure 8-4

I--:- ._---Annexure 8-5 Annexure 8-5 (Rev-1)-Annexure A-5 Annexure 8-6 (Rev-1)

Annexure 8-7 (Rev-1)Annexure-C Win /sectionwise sanction~ew

·---1ii- _'!

U)

Page 2: 23D10072 - Rajasthanenergy.rajasthan.gov.in/content/dam/raj/energy/corporate-one-lines... · increasedto 10072,ason1.7.2016 bysanctionofpostsonnew!y commissioned ... 11. The work

Order No Joe dt.~.~.~~:-.l'4. Administrative control of the Technical workman (Communication) to be posted in

shift at GSS, shall remain with the concerned GSS In-Charge but the functionalControl of these technical workman (communication) will be with concernAEN(Communication).

5. The Junior Engineer (Communication),RVPNposted on 765/400kvGSS shall workon the instructionsof Assistant Engineer (Communication),RVPN concerned. TheSuperintendingEngineer (765 kv/T&C) will allow to the JEN for movement as perdirection of higher authorities of CommunicationWing.

6. The following Changes in Administrative Control and head quarter are made asunder

NameofGSS Present Controlling Circle revised controlling Circle andand Division Division

Circle Division Circle Division132 kv GSS, T&C, 220 kv GSS, T&C, 220 kv GSS,Toonga Bharatnur Dausa Jaipur-Rural Chaksu132 kv GSS, T&C, 220 KV GSS, T&C, Merta 220 kv GSS,Ladnu Ratanqarh Suianqarh Nagaur132 kv GSS, T&C, Merta 220 kv GSS, T&C, Merta 220 kv GSS,Sanju Nagaur Kuchera132 kv GSS, T&C, Merta 220 kv GSS, T&C, Merta 220 kv GSS,Mundawa Nagaur Kuchera132 kv GSS T&C Sikar 220 kv GSS, T&C Sikar 220 kv GSS,Khachariyawas Reengus Dantaramgarh132 kv GSS T&C Sikar 220 kv GSS, T&C SikarKhatusyamii Reengus132 kv ass, T&C Bikaner 220 kv ass, T&C Bikaner 220 kv ass, BikanerSharera BadnuXEN (PTCC) lCE(T&C) Jaipur Merger with SE (OC, I~& Monitoring)SE(Protection- CE/ACE(MPT&S) Jaipur Director(Tech)Engineering)Change in HQ

r--Name of office Present HQ Proposed HQ~-AEN{Clusterl Phalodi PS-5

AEN-II (T&C), Udaipur [earlier Udaipur Nirnbahera under T&C CircleAEN (C&M), Nimbahera] f Ch;ttrgarh ueto 31 3.17AEN (OTL) Bhilwara Bhilwara Beawar {under XEN(T&C) Ajmer}

i order issued vide No 83 dt 4.7.16XEN (MPT&S), Barmer Barmer Jaisalmer

7. All Annexuresattachedwith the Order No. 339 dated 31.3.16 have been revisedand enclosed herewith and titled as under :-

L E~isting Annexure No I Revised Annexure titl~_==:]

I (Annexureof OrderNo.339dat~31.3.16) ~Annexure-I Annexure-! (Rev-1) ~, Annexure-II Annexure-II (Rev-1)'--- _

(2'

Page 3: 23D10072 - Rajasthanenergy.rajasthan.gov.in/content/dam/raj/energy/corporate-one-lines... · increasedto 10072,ason1.7.2016 bysanctionofpostsonnew!y commissioned ... 11. The work

Order No 10 ~ dt.Q.a :-.~.-:!6Existing Annexure No I Revised Annexure titled

(Annexure of Order No. 339 dated 31.3.16)

Annexure-III ±Annexure-III (Rev-1)Annexure-IV (Rev-1)Annexure-IVAnnexure-V Annexure-V-A (Rev-1)

Annexure-V-8 (Rev-1)Annexure-VI Annexure- VI (Rev-1)Annexure-VII Annexure-VII (Rev-1)Annexure-VIII Annexure-VIII (Rev-1)Annexure-IX Annexure-IX (Rev-1)Annexure-X Annexure-X (Rev-1)Annexure-XI Annexure-XI (Rev-1)Annexure-XII Annexure- XII (Rev-1)Annexure-XII Annexure-XII (Rev-1)Annexure-XIII Annexure-XIII (Rev-1)annexure-XIV annexure-XIV (Rev-1)Annexure-XV Annexure-XV (Rev-1)Annexure-XVI Annexure-XVI (Rev-1)Annexure-XVII Annexure-XVII (Rev-1)Annexure-XVIII Annexure-XVIII (Rev-1)Annexure-XIX Annexure-XIX (Rev-1)Annexure-XX Annexure-XX (Rev-1)Annexure-XXI Annexure-XXI J.Rev-ll

8. After making the change the Nos. of office in each wing will be as under as on31.7.16:-

Level of Office Corporate T&C Civil MPT&S I Commu- LD Proc. Contract Totaloffice !-nication

Corporate office 1

=~=1

CE/ACE 3 3 1 1 1 1 13Circle 9 6 3 24Circle with 400 kv 15 ! 15GSS I.L,Division 24 24 PI 6 1 67Sub Division 48 39

---~-l-24 3~G! 3 153

r---- ~- -~---_-

RPM Sub Division 3 I 3-- ----j-------Oil testing lab 3 ____1_ 3TR work Shop 3 I 3I..-

2----T-

765 kv GSS ! 2.._-_.- ~---_----220 kv GSS 114 I 114i

",_',,- ,.~.-.--

132 kv GSS 377 I 377!Culste (6 GSS in 3

---1--------3i

each) _ L_______Meter Testing Lab 2! 2Civil de Division

-------l-.-------

3 i 3--_._-,--_ .... _

CivilQC Sub Div 3 i 3I

TOTAL 1 604 78jhgr-- - 34 4 5 1 786oJ I

Page 4: 23D10072 - Rajasthanenergy.rajasthan.gov.in/content/dam/raj/energy/corporate-one-lines... · increasedto 10072,ason1.7.2016 bysanctionofpostsonnew!y commissioned ... 11. The work

Order No log dt.O.e::c.8.:.1b9. The nomenclature of Secretary (Administration) was changed as Chief of

Administration & HRD which may be continue as Secretary (Administration) to

maintain parity in all power sector companies.

10.The Accounts Officer posted in T&C circle shall carry out all accounts related

works, which were carried out by the Accounts Officer before issue of Order No.

339 dated 31.3.16. The Accounts Officer will continue to pass and release the

payment of salary and other claims of entire circle and other offices as allocated

from time to time as usual. Administrative control of Accounts personnel shall be

with Sr Most Accounts officer posted in the office/section. As far as preparation of

salary and other claims of all the offices under the circle and to maintain service

record of the employee, are concerned, the same shall be done by the Personnel

Officer of the circle or by the TA to Superintending Engineer (T&C), RVPN, where

the post of Personnel Officer does not exist. Rest roles and functions of

Superintending Engineer (T&C), RVPN shall remain the same. The Circle SE will

provide 1/2 ministerial staff as per work load to PO/TA for establishment work.

11. The work related to regulatory affairs (CERC & APTEL) dealt by SE (NPP-RA) is

hereby assigned to the SE(ISP).

12.The salary of the officers/officials working against the dying cadre shall be charged

in the office where they are posted/working.

13.The function of corporate monitoring is placed under SE (QC& Inspection) and

accordingly its designation will now be SE (QC, Inspection and Monitoring). He will

continue to report to Director (Operation). Consequently the post of SE(TA to CMD

& Corporate Monitoring) is re-designated as SE-TA to CMD.

14.The work related to ISO which is look after by SE (NPP-RA), henceforth assigned

to the SE (QC-Inspection& Monitoring), RVPN, Jaipur.

15.0rganogrammes, showing detailed structure of RVPN are also enclosed at

Annexure-Ti" and "E".

Rest conditions of the Order No. 338 and 339 dated 31.03.2016 shall remain

unchanged.

Encl-Annexureas aboveBy order,

~ ..':,C\\6(Pukhl'aj Sen) --c.:\~_,__

SECRETARY[Adrnn] I

rt.'\\. \,/

Page 5: 23D10072 - Rajasthanenergy.rajasthan.gov.in/content/dam/raj/energy/corporate-one-lines... · increasedto 10072,ason1.7.2016 bysanctionofpostsonnew!y commissioned ... 11. The work

Copy to the following for information and necessary action please:-

1. The Joint Secretary (Energy), GoR, Jaipur2. The Chief Controller of Accounts, RVPN, Jaipur.3. The CE/ACEiZCE ( ), RVPN, Jaipur/Jodhpur IAjmer.4. The company Secretary, RVPN Jaipur5. The Superintending Engineer (T&C ), RVPN, .6. The Superintending Engineer ( ), RVPN, .7. The Joint Director Personnel, RVPN, Jaipur8. The Dy Director Personnel (HQ), RVPN, Jaipur9. The Sr. Accounts Officer (Ales), RVPN, Jaipur10. The Sr. Accounts Officer (EA-Cash), RVPN, Jaipur.11. The TA to CMDI Director (Tech/Op), RVPN, Jaipur.12. The Assistant Secretary (Estt-1I11/1111GAD), RVPN, Jaipur,13. The PS to CMD, RVPN, Jaipur14. The PA to Director(Finance), RVPN, Jaipur

(~C1\\J,Accounts Officer (Admn-Store)

(5)

Page 6: 23D10072 - Rajasthanenergy.rajasthan.gov.in/content/dam/raj/energy/corporate-one-lines... · increasedto 10072,ason1.7.2016 bysanctionofpostsonnew!y commissioned ... 11. The work
Page 7: 23D10072 - Rajasthanenergy.rajasthan.gov.in/content/dam/raj/energy/corporate-one-lines... · increasedto 10072,ason1.7.2016 bysanctionofpostsonnew!y commissioned ... 11. The work

NORMS AND SANCTIONED STRENGTH T&CWINGo.luelel\1 No. loa~· 08-08-1'

s,Name of officeNo.

A ZCE(T&C)

Annexure-Bl IRe.-l1 • •

------~l3~gN~o~rm~s~~*1~~--~1~--~1~~0~--~0~--_t--nt--~--~--_nr__nJ_~1H_--nr--i1t-,1~~3t--rrt-----t----t--ot--,2sr~ti5tt-~1~6t---~------+---. Strength 3 0 3 3 0 0 0 0 0 0 3 0 3 3 9 0 0 6 15 7 48RegionalCAO 3 Norms 1 1 0 1 1 1 2

3

OOP 3Strength 0 0 0 0 0 0 0 3 3 0 0 3 3 3 0 0 6

oNorms 1 2 o 21

StrengthOOO 000 30000 006 o o o 9XEN(RPM) 3 Norms 1 13

AEN(RPM)Strength003 000 00 00 003 o o 3 o 93 Norms 1 1

B AEN(RPM)Udaipur,Kota,BlkanerStrength 0 0 0 3 0 3 o o o

33 Norms 1 1

o o o o o 0 o o o o 9

1 SE (T&C·Rurall,Jaipur

Strength 0 0 0 3 0 3 o o 3 o o3

C T&CCirclewithout400 kvGSS

2 SE (T&Cl,Kota3 SE.tT&CI,Udaipur

a o o o o o 0 0 o o o 9

7 710 7

2 23

214 SE (T&C),SawaiMadhopur 9 7

2 26

215 SE (T&C),Bharatpur6 SE (T&C),Alwar7 SE (T&CI,Sikar8 SE{T&Cl.Sirohi

7 6

22

TOTAL 19

9 SE (T&C),Hanumangarh

o circlewith400kvGSS

7 6

22222

25

227 6

2218

22

2011 SE (T&C),Jaipur City 1 2 4 1 4 1 1 1 1 8 1 6 1 16 1 2 512 SE (T&C),Ajmer 1 2 3 1 4 1 1 1 1 7 1 6 1 14 1 2 473 SE (T&CI,Jodhpur 1 2 4 1 4 1 1 1 1 10 1 6 1 16 1 2 534 SE (T&C),Chittorgarh 1 2 3 4 1 1 1 1 7 1 5 1 14 1 2 455 SE (T&C),Babai 1 2 3 4 1 1 1 1 5 1 5 1 14 1 2 436 SE IT&CI,Merta 1 2 4 4 1 1 1 1 7 1 5 1 16 1 2 4!1

~~7~S~E~:~(T~&~C~I.B~h~I~lw~a-~-----------------_'-------------+--~r-----+--t--1~~2~--3~--+---~4r--71r---r---r--71t-~1t-~1+---+-~4+-~1+-_'--~5t-~1+---~14~--~~1+---72t---+---4-----~8 SE IT&CI.Kankanl 1 2 3 4 1 1 1 1 7 1 5 1 14 1 2 459 SE (T&C),Blkaner 1 2 3 1 4 1 1 1 1 7 1 5 1 14 1 2 4610 SE (T&CI,Hlndaun 1 2 3 4 1 1 1 1 4 1 5 1 14 1 2 4211 SE (T&C);Bhadala 1 2 3 4 1 1 1 2 1 1 5 1 14 1 2 4012 SE (T&CI,Barmar 1 2 3 4 1 1 1 1 4 1 0 5 1 14 1 2 4213 SE IT&C),Jalsalmar 1 1 5 4 1 1 1 2 1 1 5 1 16 1 2 4314 SE IT&CI.Ramaarh 1 1 4 4 1 1 2 1 1 5 1 14 1 2 3915SEIT&C);'Ratangarh 1 2 4 4 1 1 1 1 4 1 5 1 16 1 2 45

TOTAL 15 28 52 4 60 15 15 14 12 80 15 3 78 15 220 5 10 30 0 0 671E XENIT&C) 24 Norms 1 1 1 1 4

~ ·-.~·tS~t~~~n~gt~hi--O~r~°t-~2~4r-~~t-_O~~2~4~~0T-~0T-~0T- __ +-~0'_--~0'_~04---04- __ 04-~0~2~4~ __~0~__ ~0+-~O~~0~~2~4~.~0~ __ ~ 9~6

~~---------===-::~~.~-_~::::-_= _~~~~~--:~+r--_~:+-~~4~!~-~-~~~:~~.~~9~1;~~~~~~~~:~~~_~:+- __~_~:~ __~:t---+_~:~--:~__+--:~1~-4~:+---3~:~!+-__~ __:~ __~:~ __411+-~1:~ 5_::~~£;'::"=~.:-~=::.-=-=.:=:= :~:::. ::-~E~t;f~f~i~ :+-=~~t=-==6::-3il1~=-~oj=-=-=-j~j=-=-=-11---o"-:f--~'::oJ-------+t-----"'::~o+-=--=-~::'o%-------+f-----..:.~~t-=--=-~o~-=--=-~~-=-~~~-=--=--=-~~t-------..!.~}:J-:.------1i-=--=-~01-=--=--=-~~1-=--=--:=:1.;~~.j..~----::i}:1-=--=--=--=-45~~

~0kV- GSSCAT-A(Wi~hJ JEN) _ . _. --+----.---+---! 5 t'.;~-:~~;':;~;;:~;"th-'-,.+__:0t-....::2t--.c;~t--';1~T___::0+-~1~~+-~2+-~OT--0~---+ __~O+-_c04--__ .!:!.01-......!:2+-~01-----j~~2+-__:~4-__2~~~__~2+-~0+---~~-l---4~--1-9.!---~7~6

L I Strength 0 0 5 10 0 15 a 0 0 0 0 0 0 0 0 5 55 0 0 5 0 95220kVGSSCAT-A(With2_JE~N~.I~ L_i -L_7~8~_N~or~m~S--L--L--~~1L_~2~--L-~2~ __ ~ __ ~ __ ~ __ ~ __ ~ __ ~ __-L__-L__-L__l__j 1~ 1~1l___ JL__j_ __ 21l___ j_-21~8L____j

hi---K

7 67 6

95 69 6 9 9 9 66 9 57

I -r-1' ,

Page 8: 23D10072 - Rajasthanenergy.rajasthan.gov.in/content/dam/raj/energy/corporate-one-lines... · increasedto 10072,ason1.7.2016 bysanctionofpostsonnew!y commissioned ... 11. The work

o\JolP}ll No. lo_B_,·U.08.9 •. " Annexure-Bl(Rev-l)NORMSANDSANCTIONEDSTRENGTHT&CWING

T 1TlTrT I! ~--r1 ~ tc: " S c.. a.

~E " I! '2I I _I I I I -!! '"~'" e & c ..

~ ~ ~ 0 i ~ J1;; :;: ~

~c- Oo '" _ ~ E l( II ] E OJa. w _ :E ~ ;;; a.

~e c:

" - ~ III 011 E 0 ~ ~ ;;; " Jl c_ " E .. tII !!! 011 ~ ~ ~ 0 ~ c: 1;; .. :;: E .9 .:J .l.U

~;;;

~ ~ :s Di ..... l!S. E <C ~ Z

~ ! a. 0 0' 5l.. 1l~ 0 §' Z1== ~ ~ ~ ~ z 0 c:5 _!i It ~ :;: c 0 Ii ~No. Nameofoffice NameofSection Nos. ... 0 a. ... u a.Strength 0 0 78 156 0 156 0 0 0 0 0 0 0 0 0 78 858 0 0 78 0 1404- 31 Norms 1 2 2 1 9 1 16L 220 kV GSS CAT·8

Strength 0 0 31 62 0 62 0 0 0 0 0 0 0 0 0 31 279 0 0 31 0 496M 132 kv GSS CAT·A 31 Norms 1 4 9 14Strength 0 0 0 31 0 124 0 0 0 0 0 0 0 0 0 0 279 0 0 0 0 434-132 kV GSSCAT·B -

185 Norms 1 3 8 12N

Strength 0 0 0 185 0 555 0 0 0 0 0 0 0 0 0 0 1480 0 0 0 0 22200 132 kV GSS CAT·e 140 Norms 1 3 7 11Strength 0 0 0 140 0 420 0 0 0 0 0 0 0 0 0 0 980 0 0 0 0 1.540P 132 kv GSSCLUSTER (6 Nos.) OUTSOURCE 3 Norms 1 2 3 6Strength 0 0 0 3 0 6 0 0 0 0 0 0 0 0 0 0 9 0 0 0 0 181--1=,------. f----

3 26 185 714 10 1542 17 3 3 27 23 21 3 151 30 6 185 182 4568 7 10 203 82 8001TOTAL

Q 132 kV GSS CAT·C (Skeleton) sanctioned 21 Norms I 1 3 7 11after1.10.15Strength I 0 0 0 21 0 63 0 0 0 0 0 0 0 0 0 0 147 0 0 0 0 231

Note:1. Total number of SE (T&CI shall be 24 Nos. [9 existing SE (TCC) and 15 Nos. SE (400 kV GSSI]

2. Post of Tech. Workmen (Comm.) sanctioned at 220 KV GSS (Total 114)are temporarily shifted to Communication wing ( In the strength of Comm. Sub-Din. 102,P&Cwing 2,ITwing 2 and LDwing 8)

3.3 Posts of JEN (E&M) have been sanctioned at category "A " 220 KVGSS. 1 post of JEN (E&M) i.e: from 78 GSS except from 220KV GSSSakatpura,Bhilwara, Heerapura, Khetri and Debari has been withdran temporarily and provided as pernote N04

4. 3 JEN in procurement wing, 3 JEN in contract wing, 1 JEN in each T&C Div T&C Sub Division is provided temporarily from the strength of 220 Kv GSS (note.3)5. No fresh recrutment will be made agaist the skeleton posts6. To SE(T&q Jaisalmer and Ramgarh has pbeen provided AEN as TA Instead of XEN

(8)

Page 9: 23D10072 - Rajasthanenergy.rajasthan.gov.in/content/dam/raj/energy/corporate-one-lines... · increasedto 10072,ason1.7.2016 bysanctionofpostsonnew!y commissioned ... 11. The work

03uoi&t1 No.lo6·~· 08-08-1&

Annexure-B2 (Rev-l)

NORMS & SANCTIONED STRENGTHMPT&S WING

a:I-s:E "t:I ..c~ :t: :t: ~ CII...oil c toIII

~ ~ ~ "' "'0 ~ ... e 0oil ... VI III r.:Q. VI III ti CIIName of - e oil oil oil oil 'iii ~ z "' Q ...S. No. Nos. 0 e e e .... u c ....... e c > "' VIoffice/section CII u ... ~ ......z z z 0 III C '? ,E <I: .... .... .... ~ e '2 ~ 0 'iii 'iii"' ...... VI X <I: CII a: CII ....... ~ '0 ~z U Q. 0 Q.s: I-::ru....I-

1 CE/ACE (MPT&S) 3 Norms 1 1 1 1 1 1 6Sanction 3 0 0 3 0 3 3 0 3 3 18

2 SE(MPT&S} 6 Norms 1 1 1 1 2 6Sanction 0 6 0 6 0 6 6 (I 12 0 36-3 XEN (MPT&S) 12 Norms 1 1 0 1 1 4

f-- Sanction 0 0 12 12 0 0 12 0 12 0 48._~ AiN(MPT&~T'36- Norms 1 1" 1 5 8l I I Sanction I 0 0 0 36 36 0 36 180 0 0 288f=?¥-~JMTlf=- ·l--·-2-·lNorm.s 1 2 4 1 8I ___ iSanct,on 0 0 0 2 4 0 0 8 2 0 16L__ L_ TOTAL 3 6 12 59 40 9 57 188 29 3 406

~" ~\.secreta'tfiAanli~ C6"

(9)

Page 10: 23D10072 - Rajasthanenergy.rajasthan.gov.in/content/dam/raj/energy/corporate-one-lines... · increasedto 10072,ason1.7.2016 bysanctionofpostsonnew!y commissioned ... 11. The work

NORMS & SANCTIONED STRENGTHOF COMMUNICATION WINGAnnexure-B3(Rev-1)

o.)udeJl)Ne. J 0a o1AA. 06- 0g. I,- TW(comm.) "Cz - - - ~ ~ L- > cv::!: - z zz Z nJ nJ cv "'j e::!: ~ ::!: s .. .. > 0::!: III III .;: IIIs s III :e0 ::!: s "iU 0 nJ I C :; C nJ

S. No. Name of office u 0 0 0 e .;: .Q 0 III cv 0 c- 0 VI ::l .c cv nJU U U c .. III 'iii III ~ U ...... VILLI U - - 0 ,!!! eu - - L- .s: L- ::l ..!.Z Z III C .c 0« LLI z L- 0 0 "C cv nJLLI LLI LLI cv ::!: u.. "C u.. cv ........ VI X « -. a.. > e, 0LLI ....u1 ACE (COMMN) 1 1 1 1 1 1 62 SE (COMMN) Jaipur 1 1 1 1 43 XEN (COMMN) Heerapura 1 1 1 1 1 54 AEN-II (Cornrn.) Jaipur 1 1 8 4 145 AEN-I (Comm.jlaipur 1 1 8 4 146 AEN (Comrn.] Alwar 1 1 8 4 147 AEN (Comm.) Dha!pur 1 1 7 0 98 XEN ((OMMN) Kota 1 1 1 1 1 5

J 9 AEN [Comm.) Kota 1 1 8 8 18I

10 AEN(Comm.) Jhalawar 1 1 7 0 9~11 AEN(Comm.) Hindaun 1 1 8 4 14i 12 AHJ (Cornm.] Sawaimadhopur 1 1 7 0 9

13 SE (COMMN) Ajmer 1 1 1 1 414 XEN (COMMN) Ajmer 1 1 1 1 1 515 AEN [Comm.) Ajmer 1 1 7 4 1316 AEN (Cornrn.] Khetri Nagar 1 1 6 0 817 AEN (Cornm.] Sikar 1 1 6 0 818 AEN (Comrn.) Merta 1 1 5 0 719 XEN (COMMN) Udaipur 1 1 1 1 1 520 AEN (Cornm.) Bhilwara 1 1 7 0 921 AEN (Cornrn.)Chittargarh 1 1 7 0 922 AEN(Cornm.) Banswara 1 1 6 0 823 AEI'J(Cornrn.) Udaipur 1 1 7 4 13.J.

(10)

Page 11: 23D10072 - Rajasthanenergy.rajasthan.gov.in/content/dam/raj/energy/corporate-one-lines... · increasedto 10072,ason1.7.2016 bysanctionofpostsonnew!y commissioned ... 11. The work

NORMS & SANCTIONED STRENGTHOF COMMUNICATION WINGAnnexure-B3(Rev-l)

OJucle-V NO. /06 d;( o8-tJ8- "- TW(comm.) "Cz - - - ::: - ... > QJ:!: - z z -z Z ra ra QJ"'i" I:

:!: :!: :!: s .... .... > 0~ III III .i: IIIs :!: s III :;:;0 :!: ra 0 ni I I: ~ C ra uS. No. Name of office u 0 0 0 C .i: .c 0 III QJ U I:- 0 11'1 :::s .s::: QJ raU U U C .... ·iii .~ .......w U - - 0 .~ III III :;:; I: VIU - - ... :~ ... :::s ...!.Z Z III I: .s::: 0<{ LU Z ... 0 0 "C QJ QJ ra11'1 w W LU QJ s u. "C u. ........... x <{ .... Q. > Q. 0LUI-u

24 SE (COMMN) Jodhpur 1 1 1 1 425 XEN (COMMN) Jodhpur 1 1 1 1 1 526 AEN (Cornrn.) BALI 1 1 7 0 9

l 27 !AEN (Cornrn.) Barmer 1 1 5 0 728 AEN (comrn.) Jodhpur 1 1 7 4 1329 AEN (Cornm.] Jaisalmer 1 1 5 0 7---"---30 XEN (COMMN) Bikaner 1 1 1 1 1 5_.

AEN (Comm.) Bikaner31 1 1 5 0 732 AEN (Cornm.) Hanumangarh 1 1 5 0 733 AEN (Cornrn.) Ratangarh 1 1 5 0 734 AEN (Cornrn.] Suratgarh 1 1 7 4 13

Total 1 3 9 31 24 1 1 10 158 40 6 10 294

Note: 102 TW (Communication) is provided temporarily out of the strength of 220 kv GSS

secret~

Page 12: 23D10072 - Rajasthanenergy.rajasthan.gov.in/content/dam/raj/energy/corporate-one-lines... · increasedto 10072,ason1.7.2016 bysanctionofpostsonnew!y commissioned ... 11. The work

Annexure-B4 (Rev-1)

SANCTIONED STRENGTH lD WING

[J Ig :I:

Z I- ~.....~ z z z ti lI: lI: w z ~ toV>

~ ~ ~ .!! .!! :!: ~ w_0 ~ ~ :!: :!: :!: « '" :.::- .. :!: c: '" c:c.. .. '" ~j'NO.! ~ ~ :!: a1S :!: ~ :!: 0 6 ~ :5 iii iii cr:: :!: ... :.::E '"'0 ~ ~ 0 ~ 0 :!: ~ 0 « ~ .;:: o~ :::s cr:: E U ~w ~ ~ c: '".. u ~ ~ ... ~ ~ :I: 0 t;; ;=~ o 0 "i: 0z z z '" 6 E ;=~ iiiE « w w w Z ~ ~ ·c ::t: 010 ..... '" x z « w z ~ .. :E u E ::t: .. '0w w ~ "- .... 0.. I-Z U x « 0 uI- u ....~ I I-

Name of Office Sections/CellI

11 CE/ ACE (LD) 1 1 0 1 1 4 1 1 3 2 15SE(EA) 1 1 4 1 2 1 10

SE (SOLD)- Cell 1 3 4 2 1 2 1 14SE (SOLD)- LD CR 4 16 16 3 4 3 46SE (REM C)- Cell 1 1 1 1 1 5SE (REMC)- REMC CR 4 5 8 2 19SE (SSDA-SLDC)- Ceil 1 1 1 3 1 2 2 1 2 2 16I I SE (SSDA-SLDC)- SLDCCR 1 4 6 1 10 2 24

2 SUB-SLOe KOTA 1 3 8 123 SUB-SLDC BHILWARA 1 3 4 84 SUB-SLDC RATANGARH 1 3 4 8

TOTAL 1 4 13 2 34 8 1 28 17 1 1 4 1 4 10 3 1 30 14 177

Note: 8 TW (Communication) is provided ternporartlv out of the strength of 220 kv GSS

secret~~R1~

(12)

Page 13: 23D10072 - Rajasthanenergy.rajasthan.gov.in/content/dam/raj/energy/corporate-one-lines... · increasedto 10072,ason1.7.2016 bysanctionofpostsonnew!y commissioned ... 11. The work

I--~--------------------- ---'--1 --1

~ "C:t: CI.l

::i .. :t: ~ ~ ... ~C.... !II 0U CI.ls. s -e !II ... ~ t;; .-8Name of office ::i ::i - .... CI.l > <IIQ. ::i ... <II =~ ·c III::i s s s tID ... iV !II CNo s ~ S- o iV !II CI.l ·c > > c U IIIW s Q. Q. Q. "i" Q. C C tID 1;; Q.~ CI.l - IIIU W 0 "i" 0 !II !II U ..!.« Q. - 0 « ::i!: c ·c C !IIZ Z « 0 - III z 0- z z « ... III

~~....w w w w w w .; « « 0 CI.l 0 ... ::i!: ~ s CI.l 0U III X « .... .... I/) « Q. Q. I/) I/) c.. I-

1 CE(Civil) jaipur 1 1 1 1 1 1 3 3 122 SE(Civii QC), Jaipur 1 1 1 1 43 XEN (Civil-QC), Jaipur 1 2 1 1 1 1 74 AEN (Civil-QC), Kota 1 1 25 XEN (Civil-QC),Ajmer 1 2 1 1 1 1 76 AEN (Civil-QC), Udaipur 1 1 27 XEN (Civil-QC), Jodhpur 1 2 1 1 1 1 78 AEN (Civil-QC), Bikaner 1 1 29 ACE(Civil) Jaipur 1 1 1 1 1 1 4 1 2 13

10 SE (Civil), Jaipur 1 1 1 1 1 1 3 1 10111XEN (Civil), Jaipur City : 1 2 1 4t---12 A.EN (Civil), Jaipur city" 1 1 1 1 1 9 8** 2213 A_EN (Civil), BSB,Jaipur 1 2 1 S 914 XEN (Civil), Jaipur Rural 1 2 1 415 AEN-II (Civil), Jaipur Rural* 1 1 1 316 AEN-I (Civil), Jaipur Rural 1 2 1 2 617 XEN (Civil), Bharatpur 1 1 1 318 AEN(Civil) Bharatpur* 1 1 1 319 AEN (Civil), Dausa 1 1 1 1 420 XEN (Civil), Alwar 1 1 1 321 AEN-II (Civil) Alwar* 1 1 1 322 AEN (Civil), Aiwar 1

,1 ,

1 1 423 SE (Civil), Kota 1 1 1 1 1 1 3 1 1024 XEN (Civil), Kota j 1 1 1 32S AEN(Civi!} kota* I 1 1 1 3_.__

Sanction Strength of CIVILWINGAnnexure BS (Rev-I)

oJvoleJVNo. lo~ a,t- oB-oe-I'

(l :3)

Page 14: 23D10072 - Rajasthanenergy.rajasthan.gov.in/content/dam/raj/energy/corporate-one-lines... · increasedto 10072,ason1.7.2016 bysanctionofpostsonnew!y commissioned ... 11. The work

-.

~ 'C::: QI::r .... ::: ex: ~ > e.... - 10 ... 0s u QI "'iS. « 10 ,_

~ ~ ~::i .... .~ IIIName of office Q. ::i ::i III QI p-~ III Us s ~ ... 110 ... ii ... 10 eNo ::i s ~ S- o ii 10 QI .;: :; > 0 U 10loLl s Q. Q. Q. e, c: c: 110~~

QI I/)1..1 loLl 0 "'i "'i 0 10 10 1;; U ...... ..!.« Q. - 0 0 « III ~ e 'c c: 10...... Z Z Z z «~

...... ... 10~~

:c 0 ....loLl loLl loLl loLl loLl loLl ..; « 0 QI 0 ... ~ ~ s QI 01..1 I/) X « .... .... I/) « e, e, I/) I/) e, I-26 AEN (Civil), Jhalawar 1 2 1 1 527 AEN (Civil), Rawatbhata**'* 1 1 1 2 528 XEN(Civil), Sawai Madhopur 1 1 1 329 A.EN(Civil)Sawaimadhopur* 1 1 1 3

H¥ XEN(Civil), Hindaun 1 1 1 3, -- AEN(Civil) Hindaun* 1 1 1 332 AEN (Civil), Dholpur 1 1 1 1 433 SE(Civil), Ajmer 1 1 1 1 1 1 3 1 1034 XEN(Civil), Udaipur 1 1 1 335 AEN(Civil),Udaipur* 1 1 1 336 AEN(Civil), Dungurpur 1 1 1 1 437 XEN(Civil), Chittorgarh 1 1 1 338 AEN(civil), Chittorgarh* 1 1 1 3.I.39 AEN (Civil), Banswara 1 1 1 0 340 XEN (Civil), Bhilwara 1 1 1 1 441 AEN(Civil), Bhilwara 1 2 1 1 542 XEN(Civil), Ajmer 1 1 1 1 443 AEN(Civil), Ajmer 1 2 1 1 544 XEN (Civil), Mertacity 1 1 1 345 AEN(Civil)Mer.trl Citv"_____ ._____J___ 1 1 1 3~--~SIAEN(Civi!). Nagaur i 1 1 !

2I 1 5_.__ ,i 47 XEN(Civil), Babai I 1 1 1 1 448 AEN(Civil), Jhunjhunu 1 2 1 1 549 XEN(Civil), Sikar 1 1 1 1 450 AEN(Civil), Sikar 1 2 1 2 6

Sanction Strength of CIVILWINGAnnexure B5 [Rev-L)

O)V~e.!tJ No. loB cl:.t o8-c!l8-J~

([4-)

Page 15: 23D10072 - Rajasthanenergy.rajasthan.gov.in/content/dam/raj/energy/corporate-one-lines... · increasedto 10072,ason1.7.2016 bysanctionofpostsonnew!y commissioned ... 11. The work

anction trengt 0 O!hJdeN No. 10 dot· 0 -~ "tJ

::: Qj:::;- - ::: 0:: ~ ... > c:- ta 0s u ta - .... Qj "'j'S. :::;- ex: ... ... 0:: '" .2: III ..Name of office Q. :::;- :::;- ~ ... III Qj

So ... III U:::;- s s ..., 110 ... iV c ta CNo s ~ -::::- 0 i1i ta Qj '':: > > U taW s Q. Q. Q. "'j' Q. C C 110 .... p_ Qj Qj ....... '"v w 0 "'j' 0 ta ta III U ..!.ex: Q. - 0 0 ex: III ~ C 'c ~~C ta....... Z Z Z z ex: ex: ....... ... ta z 0 ....w w w w w w .: ex: ex: 0 Qj 0 ... ~ s I-~ s Qj 0v '" x ex: ..., ..., '" ex: Q. Q. '" '" Q. I-51 ACE(Civil)Jodhpur 1 1 1 1 1 3 1 1 10

52 SE(Civil), Jodhpur 1 1 1 1 1 1 3 1 1053 XEN (Civil), Jodhpur 1 1 1 354 AEN-II(Civil), Jodhpur" 1 1 1 1** 455 AEN-I (Civil), Jodhpur 1 1 1 1 456 XEN (Civil), Kankani 1 1 1 357 AEN(Civil) Kankani* 1 1 1 358 AEN (Civil), Pali 1 1 1 1 1** 559 XEN (Civil), Bhadala 1 1 1 1 460AEN (Civil), Phalodi 1 2 1 1 . 5-61 XEN (Civil), Jaisalmer 1 1 I 1 1 4

I 62 AEN (Civil), Jaisalmer 1 2 1 1 5f--rv;;::------------, r=- XFI" Ir,,/;f\ R"n-,r--rh I '11 1 I 1 1 4

'.)_·1 ... , '..... ,' "f \ c'·-!·ori ,! I j----.---- --------_-----_ .. - ...._--- -----~'----; [\": j/\Ef\i (C;\/i!), Rr"Pllf;nr-:l j , 1 2 1 1 I 5-_._---,--_ ..- ~....-=-- .__ ._ --_.._- --.~-{ ...--;,:: ':-':E;'~(Civil), Sir0hi ! 1 1 1 3..-, -,.-------------------------r--

~~2iAEN (Civil) Sirohi* -t- 1 1 1 1** 4I 67 AEN (Civil), Jaiore l 1 1 1 1 468 XEN (Civil), Barmer 1 1 1 1 469 AEN (Civil). Barmer 1 2 1 1 5, 70 SE(Civil)Bikaner 1 1 1 1 1 1 3 1 1071 XEN (Civil), Bikaner 1 1 1 372 AEN-II(Civil), Bikaner* 1 1 1 3** 673 AEN-I (Civil), Bikaner 1 1 1 1 474 XEN (Civil), Ratangarh 1 1 1 1 475 AEN (Civil), Ratangarh 1 2 1 1 5

s s h f CIVIL WINGAnnexure B5 (Rev-I)

g 8-08 ,~

(11{""'\

Page 16: 23D10072 - Rajasthanenergy.rajasthan.gov.in/content/dam/raj/energy/corporate-one-lines... · increasedto 10072,ason1.7.2016 bysanctionofpostsonnew!y commissioned ... 11. The work

Sanction Strengt 0 o.h>cleN tJo. lol& rb{ 0 -0 -II "C::t: :::: IIIz: +" :::: a:: £' > I:+" - RI .... 0u III "'js. s <t I'CI ... a:: +" > ..::i" +" VI '"Name of office U ::i" ::i" .... '" III - ~:s .;: '" us s 110 .... iii I'CI I:No ::i" s s .... iii ccIS '::::- 0 I'CI III .;: > > U I'CIW s Q. Q. Q. "'j 0.. I: I: 110 +" Q.III III ........ VIU w 0 "'j 0 I'CI I'CI '" .;;...c= U

,<t Q. - 0 0 <t '" s I: ·c I: iii........ z z z Z <t~

........ .... I'CI ~~ :c 0 +"W W W W W W ..; ~ 0 III 0 .... ~ ~ s III 0U VI x <C .... .... VI 0.. 0.. VI VI ~- 0.. I-76 XEN(Civil),Hanumangarh I I I 377 AEN(Civil) Hanumangarh I I I 378 AEN(Civil), Sri Ganganagar 1 1 1 1 1** 5

TOTAL 3 6 30 64 54 6 2 5 7 1 8 1 1 1 80 60 2 54 385

h f CIVILWINGAnnexure 85 (Rev-I)

e 8't:

* The AEN-TA to XEN(Civil) shall also work assu-divisional officer.* * the post of class-iv is provided to utilize asCCAat the rest houses***The AEN (Civil) will look after the civil works related to Generation Circle RVUN,Kota only either it may be in Chittorgarh,Bundi & Kota districts

~~s-l'~Secretary (Adrrtfn) .

( I b)

Page 17: 23D10072 - Rajasthanenergy.rajasthan.gov.in/content/dam/raj/energy/corporate-one-lines... · increasedto 10072,ason1.7.2016 bysanctionofpostsonnew!y commissioned ... 11. The work

SANCTIONED STRENGTH PROCUREMENTWING

oct

Annexure-B6 (Rev-I)

:::"'1;;iiicoeCIIc..

.-..EEo~

::::uct...S-O~

oVI

>~ cu '-v, C 0"' "' ...o U e_ ..... CIIC 0 a.g > 0c..

S.No. 1;;oc..

.s::.tocCII...t;;,iii..oI-

o5-o

I ·-----rSI: (Proc~rernen_t-I.!l 1 3 7 1 1 3 2 18I) ;XFt1iM&F) 1 2 1 1 5

h-I·· II '-', ~A=E~N~(M~&=F~-~i)--_---~--+-~--'_~r-~11r--+~22+--4__~ __r--r __+-~ __~~IIr-~11~00+---~--'_---+--~11~44

AEN(M&F-II)

3 -IACOSJ~J=ai~p~ur~_~~---- ---~-+--~~--r~11-_~~2~-+-~~-+-~1~~--r-,_~2+--~6~--r __~1~_~3,__~164 1.6.(05-, B-=e.::.aVl.:_:'.::.a:_r---+----------I---+--I---+-_-+----'1+-_+--'2-+-__-+-_+---I---'_;1-+-_+-_+---I_-=2-+-_ _;6-+-_-+_~1+_-~3=+_--=1.=.j65 IACOSJJOd_h~p~u_r__ ~--------------,__+-__~~--+-~1~-+--.::.2~~--r-,_~1~~--+--r~2+---=6+--~ 1~_~3~~1~6

I' TOTAL 1 2 8 1 19 1 13 1 2 2 9 1 4 1 20 38 1 13 10 147

NoteI.CAO (P&C)will handle the the work of both ACE/CEi.e. Procurement & Contracts.2.JENand 2 TW (Communicatiin) is provided temporarily out of the strength of 220 kv GSS

( 17)

~M~'-C.Secretary (Admn1

Page 18: 23D10072 - Rajasthanenergy.rajasthan.gov.in/content/dam/raj/energy/corporate-one-lines... · increasedto 10072,ason1.7.2016 bysanctionofpostsonnew!y commissioned ... 11. The work

OJv~e/I) NO. 108. ~ 08-08-1'

Annexure-B-7 (rev-a)

SANCTIONED STRENGTHCONTRACTSWING

IS. NO.'

I... ~ :t: :t: - > .r:- tIS ..II)

~ zr :::; t!S E -; til)0 :2! ..~ :2! s s :2! .. VI III s:::Q.VI E III CIlW ~ ~ ~ tIS- - ~ 2- 2- iii 0 tIS ...0 w w w 0 U ....w w - - - s::: VI .;:

~ VICIl U Z Z Z Z 0 ... ......... ,E c:s: w Z ~ II) ew w w w w ·2~

0 tIStIS ....... VI X X c:s: c:s: ..... CIl CIl ...w~ 0z U Q. Q. I-

Name of Office Name of section1 CE/ACE (Contracts) 1 1 1 1 1 1 3 1 3 13

SE(Contracts-I) 1 2 4 1 1 1 3 2 15SE(Contracts-H)

! 1 2 4 1 1 1 3 2 15TOTAL 1 2 5 1 8 2 3 3 1 9 1 7 43

Note:

1. CAO (P&C) will handle the the work of both ACE/CE i.e. Procurement & Contracts.

2. JEN is provided ternporarilv out of the strength of 220 kv G5S

~ ~Q-\'4.Secretary (Admrl) •

Page 19: 23D10072 - Rajasthanenergy.rajasthan.gov.in/content/dam/raj/energy/corporate-one-lines... · increasedto 10072,ason1.7.2016 bysanctionofpostsonnew!y commissioned ... 11. The work

ANNEXURE-C

T&C TOTAL-c cS ell - nI C cS.N. Designationof post I! E o .s= U) Z ...J .2 0.. nI .. :E c(oJ!l l!J!lo ell ::I .. .... ~ ..J- :EQ.u u r:: U) eIIU) s I- C II) CI> I/)alE 0.. 0 U) .s=U) Q, 0 0 o ca 0 .¥ 0(.)0 Q, 0 e ot!) :E o ..J (3 I-cnll. cnll.A ADMINISTRATION1 CMD 1 1 12 Dir.(Fin.) 1 1 13 Dir.(Tech.) 1 1 14 Dir.(Op.) 1 1 15 Secretary 1 1 16 LAO 1 1 1B ENGINEERINGI E&M7 CE/ACE 3 1 1 3 3 1 12 128 ACE 09 S.E.(E&M) 11 2 2 2 24 6 4 51 5110 XEN(E&M) 33 8 5 133 52 12 13 256 25611 AEN(E&M) 64 19 8 649 65 59 34 898 21 91912 JEN(E&M) 26 13 3 1410 132 40 28 6 1658 63 1721II CIVIL13 CE (Civil) 1 1 114 ACE(Civil) 2 2 215 SE (Civil) 6 6 616 XEN (Civil) 1 30 31 3117 AEN (Civil 2 64 66 6618 JEN (Civil) 54 54 54III COMMUNICATION19 ACE (Communication) 1 1 120 SE (Communication) 3 3 321 XEN (Communication) 1 9 2 12 1222 AEN (Communication) 3 1 31 8 43 4323 JEN (Communication) 2 17 24 17 60 60C ACCOUNTS/ FINANCE -24 CCOA 1 1 1----_ -~ .__.--25 CAO 3 1 3 7 726 Sr.AO 10 0 1 2 13 1327 AO 6 2 27 35 3528 MO-I '16 2 23 1 5 47 4729 MO-I!

91 9 2 149 4 7 262 262-30 Jr AccountantD PERSONNEL

_-_- ---31 CPO 1 1 1-_._-_._--32 J.D.P. '1 1 133 D.D.P. 1 3 4 4--_- f--34 P.O.

7 21 1 29 2935 APO-E LEGAL

36 JLR 1 1 1.- -37 Law Officer 1 1 1----38 HLA 1 1 2 2

WINGWise sanction strength

U~)

Page 20: 23D10072 - Rajasthanenergy.rajasthan.gov.in/content/dam/raj/energy/corporate-one-lines... · increasedto 10072,ason1.7.2016 bysanctionofpostsonnew!y commissioned ... 11. The work

O~~eIl)' "'0. '0 g ol:! 0S-D S-J b

T&C TOTAL....c:CII CII c: c cS.N. Designation of post.... E .... ca :Z ..J .2 0e o .c en.... ~ .iJ!lo CII ::::I ....

ad ::! <C'o'!!!Cou u .... ... ::! -lliE 0 c: cn CIIcn l- S; I- C (I) Q) (I).... 0 cn .ccn Il. 0 C o CQ 0 .:.::0(.) 0 Il. o (!) o(!) ::! o -l (3 I-ena. cna.

39 legal Assistant 1 3 4 4F MINISTRIAL40 Joint Secy. 1 1 141Dy. Secy. 2 2 2

~ A.S. 4 4 443 SO 5 1 1 6 1 1 15 1544 O.S.-I45 O.S.-II

144 20 9 2 18346 U.D.C. 57 10 10 80 515 51547 L.D.C.48 P.A49 Steno-I 40 4 3 30 9 1 4 8 99 9950 Steno-IIG IT51 Systen Analyst 1 1 152 ACP 1 1 153 Programmer 2 2 2H SECRETRIAL

----54 Co. Secretay 1 1 155 Secetrial.Officer 1 1 1K PRwing56 PRO 1 1 1I TECHNICAL E&M57 MTR-I58 MTR-II 112 112 11259 MTR-III,60 Eng, Supervisior 131 51 182 18261 ELECT-I62 ELECT-II I63 SSA-I 1 38

14190378 76 3 4686 147 4833

64 SSA-II i65 THI H-I/H-II i

i_L TECHNICAL COMMN. I

I- -t-r-:66 COMMN, SUPERVISOR tJ710

1 8 867 RM-I68 TW (Cornm.) 6 198 30 246 246I I

69 TH [COMMN.] ~_l __M RH MANAGER

·1-=170 Resident Officer-RH 1 1 171 Sf. Manager-RH 1 1 172 Manager-RH ±---t 1 1 1N TECHNICAL Civil __I73

I IMistry-I

LJ__74 Mistry-II60 60 6075 Mistry-Iii

76 TH [Civil.j/(SURVEYOR)

WING Wise sanction strength

r r, "')l.~_AIo:. I..> ..

Page 21: 23D10072 - Rajasthanenergy.rajasthan.gov.in/content/dam/raj/energy/corporate-one-lines... · increasedto 10072,ason1.7.2016 bysanctionofpostsonnew!y commissioned ... 11. The work

T&C TOTAL...c c.s QI ... I'll C cS.N. Designation of post E E u -C en z ..J .2 0... E - :E <C"OS ~So QI :::I ... "" ...JC.U U ...I- :E I- C (I).... - e c (/) QI(/) 5: Q) (I)c.:t: 0 (/) -C(/) C. 0 0 o I'll 0 ~ 0o 0 c. 0 e 0(.') :E 0 ...J (3 1-(1)11. (1)11.

0 IMIS~II A"IEOUS[ISOLATED ANDREQUIRED]

77 OSD (TELECOM] 1 1 178 FEEDER MANAGER 2 10 1 13 1379 CLASS-IVI CHOWKIDAR 97 13 7 116 87 29 10 14 54 427 42780 VEHICLE DRIVER

20 10 4 78 3 6 2 123 12381 CRANE OPERATORTOAl 619 147 43 6673 1328 406 294 177 385 10072 231 10303

WING Wise sanction strength

(21)

Page 22: 23D10072 - Rajasthanenergy.rajasthan.gov.in/content/dam/raj/energy/corporate-one-lines... · increasedto 10072,ason1.7.2016 bysanctionofpostsonnew!y commissioned ... 11. The work

OSD (Telecom)

JLR (Legal)

CompanySecretary

Secretary(Administration)

CPO/JDP

SE (HRD· Training)

LAO

JS/DS/AS (Estt.lGAD)

CORPORATE SET·UP OF RVPN

Chariman and MD

Director (Finance)

CCOA

(22)

CAO·lnternal Audit

Director (Technical)

PPD

ANNEXURE·I(Rev·1)

Director (Operation)

LD

CE/AC:E(Project, Planning CE/ACE(lD)&D~~~ .

T&CNPP&RA

CE/ACE(NPP&RA)

MPT&SCE/ACE(MPT&S),Jaipur/Ajmer/jodhpurSE (ProtectionEngineering)

IT

CE/ACE(IT)

Procurment

CE/ACE(Contracts)

QC & INSP. Montg.

SE (QC/lnspection & Monitoring)

CEiACE(T&C), Jaipur/Ajmer/Jodhpur

P&C

CE/ACE(Procurement)

CIVILCE(Civil)

COMMUNICATION

ACE(COMMUNICATION)

secre~~.u

Page 23: 23D10072 - Rajasthanenergy.rajasthan.gov.in/content/dam/raj/energy/corporate-one-lines... · increasedto 10072,ason1.7.2016 bysanctionofpostsonnew!y commissioned ... 11. The work

SECTIONS/CELL UNDER SECRETARY (ADMINISTRATION)

Secretary (Administration)

ANNEXURE-II (Rev-1)

o~d~1lJ No. 10 e .d;t (J8 ..e., ,

LAO SE (HRD & Trg) CPO (HRD) JSJDS (Estt.) JS (Pension)XEN (HRD) JDP (HRD) AS (Estt.-I)'PROXEN (Trg) DDP AS (Estt.-II)

AO (Admn-Store) JMC AS (Estt.-III)

Resident Officer,AS (APA)Delhi GH

ACP

(20)

Page 24: 23D10072 - Rajasthanenergy.rajasthan.gov.in/content/dam/raj/energy/corporate-one-lines... · increasedto 10072,ason1.7.2016 bysanctionofpostsonnew!y commissioned ... 11. The work

SECTIONS/CELL UNDER DIRECTOR (FINANCE)

CCOA

Sr AO (RE & HQ) CAO (P&F)

Dy COA (P&F)

Sr AO (Pension)

AO (E&C)

MO (F&R)

Director (Finance)

CAD (AlCs/ W&M)

Sr AO (CPC)

Sr AO (EA & Cash)

Sr AO (Accounts)

Sr. AO (B&R and W&M)

( 24)

ANNEXURE-III(Rev-1 )

CAO (IA)

Dy Director (IA)

~~~,~Secretary(Admn)

Page 25: 23D10072 - Rajasthanenergy.rajasthan.gov.in/content/dam/raj/energy/corporate-one-lines... · increasedto 10072,ason1.7.2016 bysanctionofpostsonnew!y commissioned ... 11. The work

o~eleItJ r-io. '0 B ~. 0 B.oS. \ G.AN NEXURE-IV(Rev-l)

Sections under CE/ACE (PP&D)

CELLUNDER COLUMNSECTION S. No. NO.1 HQ POST UNDER COLUMN NO.3

1 2 3 4 5CE/ACE (PP&D), 1 SE (Design), Jaipur Jaipur XEN-l (Design), XEN-2 (Design) , JaipurJaipur I Jaipur

2 SE (P&P), Jaipur Jaipur XEN-l (P&P), Jaipur XEN-2 (P&P), Jaipur

4 SE (Automation, N/M & Jaipur XEN-l (Automation, XEN-2 (Contracts),Special Projects),N/M & Special (Automation, N/M &JaipurProjects), Jaipur Special Projects), Jaipur

~~~~Secretary (Admn)

(25)

Page 26: 23D10072 - Rajasthanenergy.rajasthan.gov.in/content/dam/raj/energy/corporate-one-lines... · increasedto 10072,ason1.7.2016 bysanctionofpostsonnew!y commissioned ... 11. The work

ORGANiZATION STRUCTUREOF PROCURMENT

ANNEXURE-V-A(Rev-1)

C h./de.tLl tJ o . \ 0 e oIf. a 6.08· r b

I

SECTIONUNDEROFFICE S. No. COLUMN NO.1 HQ POSTCOLUMNNO.3 OFFICEUNDERCOLUMNNO.3

1 2 3 4 5CE/ACE 1 SE (Procurment-I), Jaipur XEN-l XEN-2 XEN-3(Procurement), Jaipur (Procurment), (Procurment), (Procurment),Jaipur Jaipur Jaipur Jaipur

2 XEN (M&F), Jaipur Jaipur AEN-I (M&F), AEN-II (M&F), ACOS,Jaipur ACOS,Beawar ACOS,JodhpurI i Jaipur JaipurI

3 SE (Procurment-II), Jaipur XEN-4 XEN-S XEN-6Jaipur (Procurment), (Procurment), (Procurment),Jaipur Jaipur Jaipur

4 CAO (P&C), Jaipur Jaipur SrAO (P&C), AO (P&C),JaipurJaipur

It Note: CAO (P&C) will handle the the work of both ACE/CEi.e. Procurement & Contracts.

~~l~Secretary (AdrRfn)

(2b)

Page 27: 23D10072 - Rajasthanenergy.rajasthan.gov.in/content/dam/raj/energy/corporate-one-lines... · increasedto 10072,ason1.7.2016 bysanctionofpostsonnew!y commissioned ... 11. The work

ANNEXURE-V-B(Rev-l)

ORGANIZATION STRUCTURE OF CONTRACTS

SECTIONS UNDERPOST & HQ S. No. COLUMN NO.1 HQ POSTSUNDER COLUMN NO.3

1 2 3 4 5CE/ACE 1 SE (Contracts-I), Jaipur Jaipur XEN-l XEN-2 (Contracts),(Contracts), Jaipur (Contracts), Jaipur Jaipur

I2 SE Contracts-II}, Jaipur Jaipur XEN-3 XEN-4 (Contracts),

(Contracts), Jaipur JaipurIL__

# Note: CAO (P&C) will handle the the work of both ACE/CEi.e. Procurement & Contracts.

~S1\-lSecretary (Admn)

(27)

Page 28: 23D10072 - Rajasthanenergy.rajasthan.gov.in/content/dam/raj/energy/corporate-one-lines... · increasedto 10072,ason1.7.2016 bysanctionofpostsonnew!y commissioned ... 11. The work

o h)dero NO. 108 cJJ· oS·oS·' '" ANNEXURE-VI (Rev-1)

SECTIONS/CElLS UNDER CE/ACE (NPP&RA)

;- --I CELLUNDERI

COLUMN NO.1 HQ POST UNDER OFFICENO.3SECTION S. No.1 2 3 4 5

CE/ACE (NPP&RA), 1 SE (NPP&RA), Jaipur XEN-l (NPP&RA), XEN-2 (NPP&RA), XEN-3 (NPP&RA),Jaipur Jaipur Jaipur Jaipur Jaipur

2 SE (ISP), Jaipur Jaipur XEN (ISP), Jaipur

~SMR1\{>Secretary (Adntn, .

(26)

Page 29: 23D10072 - Rajasthanenergy.rajasthan.gov.in/content/dam/raj/energy/corporate-one-lines... · increasedto 10072,ason1.7.2016 bysanctionofpostsonnew!y commissioned ... 11. The work

O.)uol.w rJ e . \0 ~ 0\'\. 0 8,.0 g. \ bANNEXURE-VII(Rev-1)

SECTIONSUNDERCE/ACE(IT)

~II

Cell UNDEROFFICEROF

Section S.No. COLUMN NO.1 HQ POSTUNDEROFFICERCOlUMN.3

1 2 3 4 5ACE/CE (IT), Jaipur 1 SE (MIS & IT), Jaipur XEN-l (MIS&IT), XEN-2(MIS&IT), XEN-3(MIS&IT),

Jaipur Jaipur Jaipur Jaipur

2 System Analyst, Jaipur ACPJaipur

~~~~Secretary (Admn,

(2 <j)

Page 30: 23D10072 - Rajasthanenergy.rajasthan.gov.in/content/dam/raj/energy/corporate-one-lines... · increasedto 10072,ason1.7.2016 bysanctionofpostsonnew!y commissioned ... 11. The work

ANNEXURE-VIII (Rev-I)ORGANIZATION SET-UP OF T&C

CIRCLE & OTHER OFFICES HQ OF OFFICEUNDER JURISDICTION OF AT COLUMN

DIVISION OFFICESDISTRICTS COVERED

(WITH HQ) UNDERZONE/CIRCLE

ZONE OFFICE &HQ

S.SUB-DIVISIONS (WITH HQ) UNDER OFFICESASMENTIONED IN COLUMN NO. 11

BY CIRCLENo. OFFICE AT CLOUMN NO.1 NO.3

2 3 4 5 11 12 131 14 151 SE(T&C),Jaipur CityCE/ ACE (T&C),

JaipurJaipur XEN(T&C),Heerapura AEN-I (T&C-city), AEN-II (T&C),

(Jaipur) Heerapura (Jaipur) Heerapura (Jaipur)Heerapura(Jaipur)

AEN(TR-Workshop), AEN(OTL),Heerapura (Jaipur) Heerapura

(Jaipur)

2 SE(T&C),Jaipur Rural Jaipur Jaipur XEN(T&C),JaipurRural

AEN(T&C-Rural), AEN(T&C),KotputliJaipur

AEN(T&C-Rural),Phagi (HQ765 kVPhagi) (Shifted fromBhadala Circle)

3 SE(T&C),Alwar IAlwar IALWAR XEN(T&C),Alwar AEN(T&C),Alwar AEN(T&C),Bhiwadi AEN(Cluster),i i Bansur~4---S~-E~(~T&~C)~,~B~ha-r-a~tP-u-r-----tB~h-a-ra~tP-u-r----tB~H~A~R~A~T~P~U~R------iX~E~N~(T~&~C7),~B7h-art~pu-r-tA~E~N~(=T=&=C~),-----tA~E~N-(=T=&=C~),-D-a-us-a---+~~---------+--'--------~

I----------+-DA-U-S-A-----------l Bhartpur

SE(T&C), Hindaun Hindaun5 DHOLPUR XEN(T&C),Hindaun AEN(T&C),1---------1KARAULI Hindaun

AEN(T&C),Dholpur

6 SE(T&C),Sawai Madhopur SawaiMadhopur

SAWAIMADHOPUR XEN(T&C),Sawai AEN(T&C),Sawai AEN(T&C),TonkMadhopur1----------------1 Madhopur

TONKBUNDI

SE(T&C), Kota7 Kota KOTA XEN-I(T&C},Kota~--------4-------------~

JHALAWARAEN(T&C),Kota AEN(T&C),Jhalawar AEN-II (T&C),Kota

(Shifted fromRamgarh Circle)BARAN

8 SE(765 kV GSS),Phagi Phagi9 SE(765 kVGSS),Anta

(Baran)Anta

10 AEN(RPM),Kota

T&C (30)

Page 31: 23D10072 - Rajasthanenergy.rajasthan.gov.in/content/dam/raj/energy/corporate-one-lines... · increasedto 10072,ason1.7.2016 bysanctionofpostsonnew!y commissioned ... 11. The work

ANNEXURE-VIII (Rev-l)ORGANIZATION SET-UP OF T&C

CIRCLE & OTHER OFFICES HQOF OFFICE DIVISION OFFICESZONE OFFICE & S. DISTRICTS COVERED

(WITH HQ) UNDER SUB-DIVISIONS (WITH HQ) UNDER OFFICES AS MENTIONED IN COLUMN NO. 11UNDER JURISDICTION OF AT COLUMNHQ No. BY CIRCLE

ZONE/CIRCLEOFFICE AT CLOUMN NO. 1 NO.3

1 2 3 4 5 11 12 13 14 15CE/ACE (T&C), 1 SE (T&e), Ajmer Ajmer AJMER XEN (T&C), Ajmer /l.EN (T&C), Ajmer AEN (T&C), Beawar AEN (OTL), BeawarAjmer Zone

2 SE (T&C), Bhilwara Bhilwara BHILWARA XEN (T&C), Bhilwara AEN-I (T&C), AEN (Cluster), AsindBhilwara

3 Sf (T&C), Merta City Merta NAGAUR XEN (T&C), Mertacity IAEN (T&C), Merta AEN (T&C), NagaurCity

I4 SE (T&C), Babai Babai JHUNJHUNU XEN (T&C), Babai AEN (T&C), Babai AEN (T&C), Jhunjhunu

,5 ISE (T&C), SikarI Sikar (TeC-III) SIKAR XEN (T&C), Sikar AEN(T&C), Sikar AEN(T&C) ReengusrSE (T&C), Udaipur.-

Udaiour UDAIPUR XEN (T&Cj, Udaipur AEN-I (T&C), AEN (T&C), KankroliiDUNGARGARH Debari (Udaipur)

RAJSAMAND7 SE (T&C), Chittorgarh Chitto rga rh eHITTORGARH XEN (T&C), AEN (T&C), AEN (T&C), Banswara AEN-II (T&C),

PRATAPGARH Chittorgarh Chittorgarh Nimbahera(Temporarily shifted from

BANSWARAudaipur Circle)I 8

AEN (RPM), DebariII L--'_. (Udaipur)

T&C

("31)

Page 32: 23D10072 - Rajasthanenergy.rajasthan.gov.in/content/dam/raj/energy/corporate-one-lines... · increasedto 10072,ason1.7.2016 bysanctionofpostsonnew!y commissioned ... 11. The work

ANNEXURE-VIII (Rev-I)ORGANIZATION SET-UP OF T&C

CIRCLE & OTHER OFFICES HQOF OFFICE DIVISION OFFICESZONE OFFICE & S. DISTRICTS COVERED

(WITH HQ) UNDER SUB-DIVISIONS (WITH HQ) UNDER OFFICESAS MENTIONED IN COLUMN NO. 11UNDER JURISDICTION OF AT COLUMNHQ No. BY CIRCLE

ZONE/CIRCLEOFFICE AT CLOUMN NO.1 NO.3

1 2 3 I 4 5 11 12 13 14 15ACE/CE (T&C), 1 SE (T&C), Bikaner Bikaner BIKMJER XEN (T&C), Bikaner AEN-I AEN-II (T&C),BikanerJodhpur (T&C),Bikaner

2 SE (T&C), Ratangarh Ratangarh CHURU XEN (T&C), Ratangarh ~AEN-I (T&C), AEN-II AEN TR-Ratangarh (T&C),Ratangarh Workshop),

Ratangarh3 SE (T&C), Hanumangarh Hanumangarh HANUMANGARH XEN (T&C), AEN (T&C), AEN (T&C),

I SRIGANGANAGARHanumangarh Hanumangarh Sriganganagar

4 SE (T&C), Sirohi Sirohi SIROHI XEN (T&C), Sirohi AEN (T&C), Sriohi AEN (T&C), Jalore

IBarmerJALORE

5 SE (T&C). Barmer BARMER XEN (T&C), Barmer AEN (T&C), Barmer AEN (T&Cj, BalotraII 6 SE (T&C),Jaisaimer Jaisalmer JAISAlMER XEN (T&C), Jaisalmer AEN-I (T&C), AEN-II (T&C),!

17-~(T8(C)' RamgarhJaisalmer JaisalmerI

! Ramgarh Ramgarh XEN (T&C). Ramgarh AEN (T&C),I ,

I ! 'Ramgarh

8 SE (T&C), Jodhpur Jodhpur JODHPUR (City) XEN (T&C), Jodhpur AEN-I (T&C), AEN (T&C), Dechu AEN TR-Workshop), AEN (OTL),Jodhpur Jodhpur Jodhpur

9 SE (T&C), Bhadala Bhadala Jodhpur (Rural) XEN (T&C), Bhadala AEN (T&C),AEN (Cluster), PS-

BhadalaS10 SE (T&C), Kankani Kankani Jodhour (Rural) XEN (T&C), Kankani "EN (T&C), AEN (T&C), Pali

PAll Kankani11

AEN (RPM), Bikaner.. . ..NOTE: * List of 220 kV EHV substation under each circle and 132 kV GSS under JUrisdiction and administrative control of various DIvIsions I.e. XEN (220 kV GSS) ISenclosed atAnnexure-XIII TO XV

~~91'~Secretary (Admii) I

T&C

Page 33: 23D10072 - Rajasthanenergy.rajasthan.gov.in/content/dam/raj/energy/corporate-one-lines... · increasedto 10072,ason1.7.2016 bysanctionofpostsonnew!y commissioned ... 11. The work

O'J'lJde'l) No. 1Q 8 ciA· 0 e,. 0 <6. I ~ANNEXURE-IX(Rev-1)

ORGANIZATIONSET-UPOFMPT&SWING

ZONE& HQ S. No. CIRCLEOFFICEUNDER HQ COTERMINOUSWITH THESE DIVISIONOFFICES SUB-DIVISIONSUNDERCOLUMNNO.6COLUMN NO.1 (T&C)/765 kV GSSCIRCLE UNDERCOLUMN

JURISDICTION NO.3

1 2 3 4 5 6 7

CEIACE 1 SE (MPT&S), Jaipur Jaipur Jaipur City, Jaipur Rural & Alwar, XEN (MPT&S), AEN-I (MPT&S), AEN-II (MPT&S), AEN-III(MPT&S),AEN(MTL),(MPT&S), Jaipur Bharalpur, 765 kV GSS Phagi Jaipur Jaipur Jaipur Jaipur Jaipur

XEN (MPT&S), AEN-I (MPT&S), AEN(MPT&S), AEN-II(MPT&S), AEN-IIIAlwar Alwar Bharatpur Alwar (MPT&S),

Bhiwadi2 SE (MPT&S), Kola Kola Kola, Sawai Madhopur, Hindaun, XEN (MPT&S), Kola AEN-I(MPT&S), AEN(MPT&S), AEN-II (MPT&S),

765 kV GSS Anta Kota Jhalawar Kota

XEN (MPT&S), AEN(MPT&S), AEN(MPT&S), AEN (MPT&S),Sawai Madhopur SawaiMadhopur Hindaun Tonk

--_. ICE/ACE 1 SE(MPT&S), Ajmer Ajmer Ajmer, Mertacity, Sikar, Babai XEN(MPT&S),Ajmer AEN-I(MPT&S), AEN-II (MPT&S), AEN(MPT&S),(MPT&S), Ajmer Ajmer Ajmer Merta city

XEN(MPT&S),Sikar AEN(MPT&S), AEN(MPT&S), AEN (MPT&S),Sikar Khetri Jhunjhunu "2 SE(MPT&S), Udaipur Udaipur Udaipur, Bhilwara, Chittorgarh XEN(MPT&S), AEN(MPT&S), AEN(MPT&S), AEN(MTL),

Udaipur Udaipur Kankroli UdaipurXEN(MPT&S), AEN(MPT&S), AEN(MPT&S), AEN (MPT&S),Bhilwara Bhilwara Chittorgarh Banswara

ACE/CE 1 SE(MPT&S),Jodhpur Jodhpur Jodhpur, Sirohi, Kankani,Bhadala, XEN(MPT&S), AEN-I(MPT&S), AEN-II (MPT&S), AEN(MPT&S), AEN(MPT&S), Jaisalmer, Ramgarh,Barmer Jodhpur Jodhpur Jodhpur Phalodi (MPT&S),JodhpurPali

XEN(MPT&S), AEN(MPT&S), AEN (MPT&S), AEN(MPT&S),Jaisalmer (Shifted Jaisalmer Barmer Sirohifrom Barmer)

I2 F(MPT&S), Bikaner Bikaner Bikaner, Hanumangarh, Ratangarh XEN(MPT&S), AEN-I (MPT&S), AEN(MPT&S), AEN-II(MPT&S),

I I Bikaner Bikaner Ratangarh Bikaner

II

-- t-.

IXEN(MPT&S), AEN(MPT&S), AEN(MPT&S),I I II I Hanumangarh Hanumangarh Suratgarh

(33)

Page 34: 23D10072 - Rajasthanenergy.rajasthan.gov.in/content/dam/raj/energy/corporate-one-lines... · increasedto 10072,ason1.7.2016 bysanctionofpostsonnew!y commissioned ... 11. The work

e""d~ t-lo. \0 8 cIA. 08·0<0· '.cANNEXURE-X(Rev-l)

ORGANIZATION SET-UPOF COMMUNICATION

COTERMINOUS WITH THE SE DIVISION OFFICESCIRCLEOFFICEUNDERHQ (T&C)/765 kV GSSCIRCLE UNDERCOLUMN NO. SUB-DIVISIONS OFFICESUNDERCOLUMN NO.6OFFICE S.No.

COLUMN NO.1JURISDICTION 3

1 2 3 4 5 6 7ACE (COMM), 1 SE (COMM), Jaipur Jaipur Jaipur City, Jaipur Rural & Alwar, XEN AEN-i (comm), AEN-II (Comm), Jalpur AEN-II (Comm), AEN (Comm),Jaipur Bharatpur, 765 kV GSS Phagi, (COMM),Heerapura Jaipur Alwar DholpurI [Kota, Sawai Madhopur, Hindaun,r-L Il..6..5....IsY_GSSAnta

XEN (COMM), Kota AEN (Comm), AEN (Comm), Jhalawar AEN (Comm), AEN (Comm),Kota Sawai Madhopur Hindaun0

Ajmer, Mertacity, Sikar, Babai, XEN (COMM),Ajmer AEN (Comm), AEN (Comm), Khetri AEN (Comm), AEN (Comm),Ajmer Sikar Merta city2 SE(COMM), Ajmer Ajmer Udaipur, Bhilwara, Chittorgarh

XEN (COMM), AEN (Comm), AEN (Comm), AEN (Comm),Udaipur Udaipur AEN (Comm),Bhilwara Banswara ChittorgarhSE(COMM), Jodhpur XEN AEN (Comm), AEN (Comm),Bali AEN (Comm), AEN (Comm),Jodhpur, Sirohi, Kankani, Bhadala, (COMM),Jodhpur Jodhpur Jaisalmer BarmerJaisalmer, Ramgarh, Barmer,

3 Jodhpur Bikaner, Hanumangarh, Ratangarh

XEN (COMM), AEN (Comm), AEN AEN (Comm), AEN(Comm),Bikaner Bikaner (Comm),Hanumangarh Ratangarh Suratgarh

~R-\&j J{,Secretary (Adrfin] .

C3'4)

Page 35: 23D10072 - Rajasthanenergy.rajasthan.gov.in/content/dam/raj/energy/corporate-one-lines... · increasedto 10072,ason1.7.2016 bysanctionofpostsonnew!y commissioned ... 11. The work

ANNEXURE-XI (Rev-l)

ORGANIZATION SET-UP OF LOAD DESPATCH (LD)

SECTION/CELL UNDER Office/ SECTION/CELL UNDERPOST & HQ S. No.

OFFICE AT COLUMN NO. 1 Control OFFICERAT COLUMN NO. SUB-DIVISIONS UNDER OFFICESAT COLUMN NO.5Room 3

1 2 3 4 5 6CE/ACE (LD), 1 SE (SOLD), Heerapura Office XEN-1 to 3

Jaipur (Jaipur) I(SOLD), HeeranuraControl XEN-4 TO 7 (SOLD),Room Heerapura

2 SE (REMC), Heerapura(Jaipur) Office

Control XEN 1to 4 (REMC),Room Heerapura

3 SE (SSDA-SLDC), Heerapura XEN-l to 2 (SSDA-SLDC),(Jaipur) Office Heerapura (Jaipur)

Control XEN 3 (SSDA-SLDC), AEN (Sub- AEN (Sub-SLDC), AEN (Sub-SLDC),Room Heerapura (Jaipur) SLDC), Kota Ratangarh Bhilwara,----- .

j 14 ISE.(Energy Accounting), Office XEN (EA), JaipurJaipur

t ~5)

Page 36: 23D10072 - Rajasthanenergy.rajasthan.gov.in/content/dam/raj/energy/corporate-one-lines... · increasedto 10072,ason1.7.2016 bysanctionofpostsonnew!y commissioned ... 11. The work

ANNEXURE-XII (Rev-1)- - ORGANIZATION SET-UP OF CIVIL WING- ..--"-~-

COTERMINOUSWITHCIRCLEOFFICES THESE(T&C)/ 765 kV DIVISION OFFICESUNDERCLOUMN SUB-DIVISIONOFFICESUNDERCOLUMN NO.7OFFICESUNDER

ZONE 8. HQ S. No. HQ UNDERCOLUMN GSSCIR!;LE NO.5COLUMN NO.1 NO.3 JURISDICTION

3 4 5 6 7 8 9 101 2

CE (Civil), 1 ACE (Civil) Jalpur SE (Civil), Jaipur Jaipur City, Jalpur XEN (Civil), Jaipur City AEN (Civil), BSB, Jaipur AEN (Civil-city), Jaipur

Jaipur Rural & Alwar, XEN (Civil), Jaipur Rural AEN-I (Civil), Jaipur Rural AEN (Civil-Rural), JaipurBharatpur, 765 kV

XEN (Civil), Bharatpur AEN (Civil), Dausa AEN (Civil), BhartpurGSS Phagi

XEN (Civil), Alwar AEN-I (Civil), Alwar AEN-II (Civil), Alwar

SE (Civil), Kota Kota,Sawai XEN (Civil), Kota AEN (Civil), Jhalawar AEN (Civil), Kota AEN(Civil), RawatbhataMadhopur, Hindaun,765 kV GSS Anta XEN (Civil), Sawai Madhopur AEN (Civil), Tonk shifted to AEN (Civil) sawimadhopur

Rawatbhata

IXEN (Civil), Hindaun AEN (Civil), Dholpur AEN (Civil) Hindaun

! SE (Civil), Ajmer Ajmer, Mertacity, XEN (Civil), Udaipur AEN (Civil), Dungurpur AEN (Civil) Udaipur

I Sikar, Babai, XEN (Civil), Chittorgarh AEN (Civil), Banswara AEN (Civil), ChittorgarhUdaipur, Bhilwara,

IChittorgarh XEN (Civil), Bhilwara AEN (Civil), Bhilwara

XEN (Civil), Ajmer AEN (Civil), Ajmer

I XEN (Civil), Mertacity AEN (Civil), Nagaur AEN (Civil), MertacityI

I XEN (Civil), Babai AEN (Civil), Jhunjhunu

! XEN (Civil), Sikar AEN (Civill Sikar2 ACE (Civil) Jodhpur SE (Civil), Jodhpur Jodhpur, Sirohi, XEN (Civil), Jodhpur AEN-I (Civil), Jodhpur AEN-II (Civil), Jodhpur

Kankani, Bhadala,XEN (Civil), Kankani AEN (Civil), Pali AEN (Civil), Kankani

Jaisalmer, Ramgarh,Barmer XEN (Civil), Bhadala AEN (Civil), Phalodi

XEN (Civil), Jaisalmer AEN (Civil), Jaisalmer

XEN (Civill, Ramaarh AEN(Civil) Rame:arhXEN (Civil), Sirohi AEN (Civil), Jalore AEN (CIVIL) Sirohi

XEN (Civil), Barmer AEN (Civil), BarmerSE (Civil), Bikaner Bikaner, XEN (Civil), Bikaner AEN (Civil), Bikaner AEN -II (Civil) Bikaner

IHanumangarh, XEN (Civil), Ratangarh AEN (Civil), Ratangarh. Ratangarh

I XEN (Civil), Hanumangarh AEN (Civil), Sri Ganganagar AEN (Civil) HanumangarhI

I 3 S!: (Qe-Design) Jaipur XEN (Civil-QC), Jaipur AEN (Civil-QC), Kota\

l XEN (Civil-QC),Ajmer AEN (Civil-QC), Udaipur

XEN (Civil-QC), Jodhpur AEN (Civil-QC), BikanerNOTE. AEN shown Incolumn No 9 will also work as TA to their XEN

Q.-21 C1 '---bSecretary (Admn)Civil

Page 37: 23D10072 - Rajasthanenergy.rajasthan.gov.in/content/dam/raj/energy/corporate-one-lines... · increasedto 10072,ason1.7.2016 bysanctionofpostsonnew!y commissioned ... 11. The work

S.No Circle S.No Division S.No Name ofGSS Name of GSS in cluster1 T&C- Jaipur City 400 kv GSS, Heerapura

1 220 kV GSS, Heerapura 1 132 kV GSS, Vaishali Nagar

2 132 kV GSS, Bhankrota2220 kV GSS, I,G Nagar 3 132 kV GSS, MNIT Jaipur

4 132 kV GSS, Purana ghat

5 132 kV GSS, Jawahar Nagar, Jaipur-3 220 kV GSS, Mansarovar 6 132 kV GSS, S.M.S. Stadium, Jaipur

7 132 kV GSS, Chambal, JaipurI : 4inn:.;v C<3:3.NPH 8 132 kV GSS, PWD Bangalow

1-' --5~20 kv GSS, Sitapura 9 132 kV GSS, Sitapura6 220 kv GSS, VKIA 10 132 kV GSS, VKAI, Jaipur

11 132 kV GSS, New Jhotwara12 132 kV GSS, Champapur, Kalwar Road13 132 kv GSS, RHCOSarana Dungar

2 T&C Jaipur rural 1 220 kv GSS, Bagaru 1 132 kv GSS, Bagru2 132 kv GSS, Dudu

I 2 220 kV GSS, Chomu 3 132 kv GSS, Rampura Dabri4 132 kv GSS, Markhi5 132 kv GSS, Govindgarh6 132 kv GSS, Jatawali

3 220 kV GSS, Kotputli 7 132 kv GSS, Paota8 132 kv GSS, Keshwana itA

4 220 kV GSS, Kukas 9 132 kv GSS, J. Ramgarh

I10 132 kv GSS, Andhir-

5 220 kV GSS, Manoharpur 11 132 kv GSS, Bilwadir-_L 12 132 kv GSS, Shahpura

6 220 kV GSS, Phulera 13 132 kv GSS, Jobner7 220 kV GSS, Renwal 14 132 kv GSS, Hingonia

15 132 kv GSS, Kaladera8 220 kv GSS, Sanganer 16 132 kv GSS, Balawala

I)

O.hJCl\ef\J,.Jo. loBd:l. 0«.0&·1'

Organizational & Administrative Set-up GSSUnderT&CZone JaipurAnnexure-XIII(Rev-l)

Page 38: 23D10072 - Rajasthanenergy.rajasthan.gov.in/content/dam/raj/energy/corporate-one-lines... · increasedto 10072,ason1.7.2016 bysanctionofpostsonnew!y commissioned ... 11. The work

S.No Circle S.No Division S.No Name ofGSS Name of GSS in cluster9 220 kv GSS, SEZ-1 17 132 kv GSS, Sirsi

10 220 kv GSS, Vatika 18 132 kV GSS, Phagi111220 kV GSS, Chaksu 19 132 kv GSS, Bassi (Jaipur)

20 132 kv GSS, Toonga12 220 kV GSS, K. K. Ohani13 220 kv GSS, Niwana

3 T&C, Alwar 1 132 kv GSS, Jhakarana2 132 kv GSS, Mandan3 132 kv GSS, Mundawar4 132 kv GSS, Pur Kotkasim5 132 kv GSS, Narianpur6 132 kv GSS, Bansur

1 220 kv GSS, Alwar 1 132 kv GSS, Pinana2 132 kv GSS, Rajgarh3 132 kv GSS, Thanagaji

2 220 kv GSS, Behror 4 132 kv GSS, Behror

I31220kv GSS, Bhiwadi 5 132 kv GSS, Bhiwadi

I 41220 kv GSS, Khushkera 6 132 kv GSS, Chopanki IAI I r--- 51220 kv GSS, Kishangarh bas 7 132 kv GSS, Tizarai :i G 220 kv:GSS, MiA Alwar 8 132 kv GSS, Malakhera

9 132 kv GSS, Ramgarh10 132 kv GSS, Govindgarh-Alwar11 132 kv GSS, Laxmangargh- Alwar12 132 kv GSS, Kherli

7 220 kV GSS, Neemrana 13 132 kv GSS, Shajahanpur8 Bansur

4 T&C, Bharatpur 1 220 kv GSS, Bharatpur 1 132 kv GSS, Roopwas2 132 kv GSS, Bharatpur3 132 kv GSS, Oeeg4 132 kv GSS, Kaman

Orooh)\J No . \ 0 B d.t· 03· oS· "Organizational & Administrative Set-up GSSUnderT&CZone Jaipur

Annexure-XIII(Rev-l)

Page 39: 23D10072 - Rajasthanenergy.rajasthan.gov.in/content/dam/raj/energy/corporate-one-lines... · increasedto 10072,ason1.7.2016 bysanctionofpostsonnew!y commissioned ... 11. The work

Annexure-XIII(Rev-l)

S. No DivisionOrganizational & Administ_rative Set-up GSSUnderT&CZone Jaipur

Name of GSS in cluster

2 220 kv GSS, Chhokarwara

3 220 kv GSS, Nadbai4 220 kv GSS, Dausa5 220 kv GSS, Lalsot

6 220 kv GSS, Mandawar

7 220 kv GSS, Sikrai

400 kv GSS, Hindaun1 220 kv GSS, Hindaun

2 220 kv GSS, Dholpur

~Ino kif CSS, C;~ngapLJrCity

S.No Name ofGSSS. No Circle

5 132 kv GSS, Kumaher6 132 kv GSS, Pahari7 132 kv GSS, Bayana8 132 kv GSS, Weir9 132 kv GSS, Bhusawar

10 132 kv GSS, Nagar

11 132 kv GSS, GSS Sagadi12 132 kv GSS, Nagai Pyariwas13 132 kv GSS, Daula kaun (Sada Khora)14 132 kv GSS, Dhigariya Shim15 132 kv GSS, Mahuwa

5 T&C Hindaun

2 132 kv GSS, Karauli

16 132 kv GSS, Sandikui17 132 kv GSS, Sikandara

1 132 kv GSS, Shri Mahaveerji

3 132 kv GSS, Todabheem4 132 kv GSS, Sapotra5 132 kv GSS, Kailadevi6 132 kv GSS, Nangal Sherpur7 132 kv GSS, Gudachandraji8 132 kv GSS, Rajakhera9 132 kv GSS, Baseri

10 132 kv GSS, Maniya11 132 kv GSS, Sarmathura (Dholpur)

6 T&C Sawaimadopur

r- 2i220 kv GSS, Sawaimadhopur

1 132 kv GSS, Gangapurcity2 132 kv GSS, Satoda3 132 kv GSS, Bareli (SWM)4 132 kv GSS, Khandar

Page 40: 23D10072 - Rajasthanenergy.rajasthan.gov.in/content/dam/raj/energy/corporate-one-lines... · increasedto 10072,ason1.7.2016 bysanctionofpostsonnew!y commissioned ... 11. The work

S.No Circle S.No Division S.No Name ofGSS Name of GSS in cluster5 132 kv GSS, Bhadoti

6 132 kv GSS, Uniara

7 132 kv GSS, Niwai

8 132 kv GSS, Lakheri.9 132 kv GSS, Nainwa

3 220 kv GSS, Duni 10 132 kv GSS, Malpura11 132 kv GSS, Todaraisingh12 132 kv GSS, Tonk13 132 kv GSS, Thadoli

I4 220 kv GSS, Bundi 14 132 kv GSS, BundiI 15 132 kv GSS, HindoliI II 16 132 kv GSS, Talera

17 132 kv GSS, Deoli(Tonk)7 T&C Kota 1 220 kV GSS, Dehara 1 132 kv GSS, Sultanpur

2 132 kv GSS, Itawa3 132 kv GSS, Anta

2 220 kv GSS, Sakatpura (Kota) 4 132 kv GSS, Industrial Area Kota5 132 kv GSS, Mahaveernagar6 132 kv GSS. Gopal Mill7 132 kv GSS, Deovl i(Manjhi)

3 220 kv GSS, Modak 8 132 kv GSS, Mandana Town9 132 kv GSS, Mayala (Ramganjmandi)

10 132 kv GSS, Bhawanimandi11 132 kv GSS, Dug12 132 kv GSS, Hemda

I 4 220 kv GSS. Jhalawar 13 132 kv GSS. IkleraI I 14 132 kv GSS, Bakani15 132 kv GSS, Kanwari16 132 kv GSS, Manohar Thana17 132 kv GSS, Rooparail

Oh.)~~ tJo. \ 0 ~ ob\: 06·08·1'Organizational & Administrative Set-up GSSUnderT&CZone Jaipur

Annexure-XIII(Rev-l)

(4-0)

Page 41: 23D10072 - Rajasthanenergy.rajasthan.gov.in/content/dam/raj/energy/corporate-one-lines... · increasedto 10072,ason1.7.2016 bysanctionofpostsonnew!y commissioned ... 11. The work

S.No Circle S.No Division S.No Name ofGSS Name of GSS in cluster5 220 kv GSS, Baran 18 132 kv GSS, Sangod

19 132 kv GSS, Baran!20 132 kv GSS, Bapawar21 132 kv GSS, Kelwara22 132 kv GSS, Kishanganj43 132 kv GSS, Mangrol

6 220 kv GSS, Kawai 23 132 kv GSS, Atru24 132 kv GSS, Kolukeri25 132 kv GSS, Chipabarod26 132 kv GSS, Khanpur

O:N~wtJo. )0 ScV\· 06 .t9B·"Organizational & Administrative Set-up GSSUnderT&CZone Jaipur

Annexure-XIII(Rev-l)

t41)

Page 42: 23D10072 - Rajasthanenergy.rajasthan.gov.in/content/dam/raj/energy/corporate-one-lines... · increasedto 10072,ason1.7.2016 bysanctionofpostsonnew!y commissioned ... 11. The work

S.No Circle S.No Division S.No Name ofGSS Name of GSS in cluster1 T&C, Ajmer 400 kv GSS, Ajmer

1 220 kv GSS, Ajmer 1 132 kv GSS, MDSU, Ajmer

2 132 kv GSS, Saradhana

3 132 kV Pushkar Road (kotada)

4 132 kv GSS. Pushkar~5 132 kv GSS. Subhash Nagar

2 220 kv GSS. Beawar 6 132 kv GSS. Kekri7 132 kv GSS. Nasirabad8 132 kv GSS. Sawar9 132 kv GSS. Masuda

3220 kv GSS. Kishangarh 10 132 kv GSS, Kishangarh11 132 kv GSS, Silora

I 12 132 kv GSS, Roopan garh

I 13 132 kv GSS, Arain---...,- fo--4 220 kv GSS, Jethana

i 2 T&C. 8hilwara AEN(Cluster)Asind 132 kv GSS. RaipurI132 kv GSS. Karera

I

132 kv GSS. Asind

I 132 kv GSS. Raila132 kv GSS, Danta (Bhilwara)132 kv GSS. Pratappura400 kv GSS, Bhilwara

1 220 kv GSS. Bhilwara 7 132 kv GSS, Gangapur8 132 kv GSS. RIICO Bhilwara

2 220 kv GSS, Guabpura 9 132 kv GSS. Shahpura( Bhilwara)10 132 kv GSS. Jahajpur

3 220 kv GSS, Hamirgarh 11 132 kv GSS. Mandalgarh12 132 kv GSS, Bigod13 132 kv GSS, Kachhola

II

I 14 132 kv GSS, BijoliaI

Ii 15 132 kv GSS. Suwana

ONdC!JU No. 'o~ ~ 0 e·08· J,Organizational & Administrative Set-up GSSunder T&CZone Ajmer

Annexure-XIV(Rev-l) •

(42)

Page 43: 23D10072 - Rajasthanenergy.rajasthan.gov.in/content/dam/raj/energy/corporate-one-lines... · increasedto 10072,ason1.7.2016 bysanctionofpostsonnew!y commissioned ... 11. The work

S.No Circle S.No Division S.No Name ofGSS Name of GSS in cluster3 T&C, Merta XEN (400 kv GSS), Merta 1 132 kv GSS, Lambajatan~

2 132 kv GSS, MertaCity3 132 kv GSS, Gotan4 132 kv GSS, Bherunda5 132 kv GSS, Merta Road6 132 kv GSS, Roon

1 220 kv GSS, Khinwsar 7 132 kv GSS, Narwa8 132 kv GSS, Heesaba

2 220 kv GSS, Kuchamancity 9 132 kv GSS, Molasar10 132 kv GSS, Chitawa

i 11 132 kv GSS, OayalpuraI I I 12 132 kv GSS, Oeedwanai I

t 31220 i<""c GSS, KucheraII 13 132 kv GSS, Kuchera

14 132 kv GSS, Sanjoo15 132 kv GSS, Mundawa

4 220 kv GSS, Makrana 16 132 kv GSS, NawaI

I 17 132 kv GSS, Bagot18 132 kv GSS, Bidiyad19 132 kv GSS, Parwatsar

5 220 kv GSS, Naqaur 20 132 kv GSS, Jayal21 132 kv GSS, Oeh

L 22 132 kv GSS, Ladnu4 T&C, Babai 400 kv GSS, Babaii 1 220 kv GSS, Khetrii 1 132 kv GSS, BabaiI

2 132 kv GSS, Gudagorji3 132 kv GSS, Mehada4 132 kv GSS, Buhana5 132 kv GSS, Navalgarh

2220 kv GSS, Chirawa6 132 kv GSS, Pilani7 132 kv GSS, Sultana8 132 kv GSS, Surajgarh

o:tude1Ut-lO.10'O ci{ o8.o8.1~Organizational & Administrative Set-up GSSunder T&CZone Ajmer

Annexure-XIV(Rev-l)..

(A.~)

Page 44: 23D10072 - Rajasthanenergy.rajasthan.gov.in/content/dam/raj/energy/corporate-one-lines... · increasedto 10072,ason1.7.2016 bysanctionofpostsonnew!y commissioned ... 11. The work

S.No Circle S.No Division S.No NameofGSS Name of GSS in cluster

9 132 kv GSS, Dulaniya

10 132 kv GSS, Mandrela

11 132 kv GSS, Nangali

12 132 kv GSS, Mahapalwas3 220 kv GSS, Jhunjhunu 13 132 kv GSS, Bissau

14 132 kv GSS, Kumawas

15 132 kv GSS, Mandawa

16 132 kv GSS, Bagger

17 132 kv GSS, Jhunjhunu

18 132 kv GSS, Bherunda Kalan

19 132 kv GSS, Malsisar

20 132 kv GSS, Udaipurwati5 T&C, Sikar 1 220 kv GSS, [)hod 1 132 kv GSS, khood

2 132 kv GSS, Losal

3 132 kv GSS, Kachawa

4 132 kv GSS, Patan2 220 kv GSS, Laxmangarh Sikar 5 132 kv GSS, Fatehpur

6 132 kv GSS, Antroli

I i 3 220 kv GSS, Reengus 7 132 kv GSS, Shri MadhopurI I 8 132 kv GSS, Ajeetgarh

I III

9 132 kv GSS, Khandela ModI iI I

I 10 132 kv GSS, RIICO ReengusI 11 132 kv GSS, Thoi12 132 kv GSS, Sanwalpura Tanwran

4 220 Kv GSS, Dnataramgarh 13 132 kv GSS, Khachariyawas. 14 132 kv GSS, Khatu Shyamji5 220 kv GSS, Sikar 15 132 kv GSS, Ranoli

16 132 kv GSS, Koodan17 132 kv GSS, Piprali18 132 kv GSS, Neemkathana

6 T&C, Udaipur 1 220 kv GSS, Debari 1 132 kv GSS, Pratapnagar

01vdw ""0. \08 eli{ o8.l18·',Organizational & Administrative Set-up GSSunder T&CZone Ajmer

Annexure-XIV(Rev-l) ..

(44)

Page 45: 23D10072 - Rajasthanenergy.rajasthan.gov.in/content/dam/raj/energy/corporate-one-lines... · increasedto 10072,ason1.7.2016 bysanctionofpostsonnew!y commissioned ... 11. The work

S.No Circle S.No Division S.No Name ofGSS Name of GSS in cluster2 132 kv GSS, Sukher

3 132 kv GSS, Bhatewar

4 132 kv GSS, Bhinder

5 132 kv GSS, Sanwad

6 132 kv GSS, Mavali

7 132 kv GSS, Oariba2 220 kv GSS, Madri 8 132 kv GSS, Zawar Mines

I 9 132 kv GSS, Oakan Kotra10 132 kv GSS, Rishabdeo

I 11 132 kv GSS, Salumbar

I 12 132 kv GSS, Kherwara13 132 kv GSS, GogundaI

I! ! 14 132 kv GSS, JhadolI,

I 15' 132 kv GSS, Seesaram, i'._----,-'- ----_._--_.

3(22C :'-1,' G~~,S.'\S;JIY 16 132 kv GSS, Oungarpur: i 17 132 kv GSS, Sagwarai,18 132 kv GSS, SeemalwaraI

i19 132 kv GSS, Bichhiwla

4 220 kv GSS, Barnan ka Tukada 20 132 kv GSS, Oeogarh21 132 kv GSS, Arnet22 132 kv GSS, Mokharnpura23 132 kv GSS, Bheem

5 220 kv GSS, kankroli 24 132 kv GSS, Kankroh25 132 kv GSS, Nathdawara26 132 kv GSS, Sapol

7 T&C, Chittrgarh 400 kv GSS, Chittorgarh,1 220 kv GSS, Chittorgarh 1 132 kv GSS, Bengu

2 132 kv GSS, RAPP3 132 kv GSS, Baroli (Rawatbhata)4 132 kv GSS, Ajoliya Ka kheraI 5 132 kv GSS, Rashmi

o)\}clw NO. 10 ~ d) 06·06·"Organizational & Administrative Set-up GSSunder T&CZone Ajmer

Annexure-XIV(Rev-l) •

r.A. ~)

Page 46: 23D10072 - Rajasthanenergy.rajasthan.gov.in/content/dam/raj/energy/corporate-one-lines... · increasedto 10072,ason1.7.2016 bysanctionofpostsonnew!y commissioned ... 11. The work

S.No Circle S.No Division S.No Name ofGSS Name of GSS in cluster6 132 kv GSS, Bassi (Chittorgarh)

7 132 kv GSS, Senthi2 220 kv GSS, Sawa.' 8 132 kv GSS, Kapasan

9 132 kv GSS, Bhadesar3 220 kv GSS, Nimbahera 10 132 kv GSS, Rasoolpura

11 132 kv GSS, 8adisadri

12 132 kv GSS, Mangalwar

13 132 kv GSS, Choti sadari14 132 kv GSS, Pratapgarh15 132 kv GSS, Dalot

16 132 kv GSS, Dhariawad4 220 kv GSS, Banswara 17 132 kv GSS, Bagidora

I 18 132 kv GSS, Paloda19 132 kv GSS, Partapur20 132 kv GSS, Kushalgarh21 132 kv GSS, Ghatol22 132 kv GSS, Peepalawa

O~olel\:! NO . 1(7e oI,,~e e .0«, ·1"Organizational & Administrative Set-up GSSunder T&CZone Ajmer

Annexure-XIV(Rev-l) •

(46)

Page 47: 23D10072 - Rajasthanenergy.rajasthan.gov.in/content/dam/raj/energy/corporate-one-lines... · increasedto 10072,ason1.7.2016 bysanctionofpostsonnew!y commissioned ... 11. The work

. No Division S.No Name ofGSS Name of GSS in cluster1 T&C Jodhpur 400 kv, GSS Jodhpur 1 132 kv GSS, Mandore

1 220 kv GSS, Aau 2 132 kv GSS, Aau2 220 kv GSS, Baithwasia 3 132 kv GSS, Hatundi

4 132 kv GSS, OsianI 5 132 kv GSS, MateraI, 3 \2:20 kv :_:;SS, Barli 6 132 kv GSS, Soorsagar

I 7 132 kv GSS, Narwa(PS-8)I iI-- -i 4 220 kv GSS, Boranada 8 132 kv GSS, CHB, Jodhpur

9 132 kv GSS, Pratapnagar (JD)5 220 kv GSS, Dechu 10 132 kv GSS, Dechu

11 132 kv GSS, Sanwreej12 132 kv GSS, Kalau

6 220 kv GSS, Jodhpur 13 132 kv GSS, Kuri Bhagtasani14 132 kv GSS, OPH, Jodhpur15 132 kv GSS, MBM Eng. Collage, JD16 132 kv GSS, Banar17 132 kv GSS, NPH, Jodhpur

7 220 kv GSS, Tinwari 18 132 kv GSS, Balesar19 132 kv GSS, Chamu20 132 kv GSS, Kiramsariya

2 T&C, Bhadala 1 132 kv GSS, BAP(PS-I)2 132 kv GSS, PS-2 of RGCL3 132 kv GSS, PS-3 of RGCL4 132 kv GSS, PS-4 of RGCL5 132 kv GSS, PS-V, Phalodi6 132 kv GSS, Khetusar

400 kv GSS, Bhadala1 220 kv GSS, Phalodi 7~32 kv GSS, Lohawat

8 132 kv GSS, Shaitansingh Nagar2 220 kv GSS, BAP

OJ1Je\eJIJ rJo. ,oe alA· oS·o 8- J,

Organizational & Administrative Set-up GSSUnder T&C Zone JodhpurAnnexure-XV(Rev-l) •

(41)

Page 48: 23D10072 - Rajasthanenergy.rajasthan.gov.in/content/dam/raj/energy/corporate-one-lines... · increasedto 10072,ason1.7.2016 bysanctionofpostsonnew!y commissioned ... 11. The work

Annexure-XV(Rev-l) •

. No Division S.No Name ofGSS Nameof GSSin cluster3 220 kv GSS, Bhadala4 220 kv GSS, Badisid

3 T&C, Kankani 400, kv Kankani1 220 kv GSS, Bilara 1 132 kv GSS, Borunda

. 2 132 kv GSS, Piparcity3 132 kv GSS, Pipliyakalan

2 220 kv GSS, Bhopalgarh 4 132 kv GSS, Bhopalgarh5 132 kv GSS, Soyala

3 220 kv GSS, Bhawad 6 132 kv GSS, Mathania7 132 kv GSS, Baori

4 220 kv GSS, Pali 8 132 kv GSS, Jaitaran9 132 kv GSS, Sojat

10 132 kv GSS, Pali11 132 kv GSS, Kharchi

I 12 132 kv GSS, Jojawar, i 13 132 kv GSS, Anadpur kalooI I

14 132 kv GSS, Tagore Nagar (Pali)i I

I5 1220 kv GSS, Bali 15 132 kv GSS, RaniI

16 132 kv GSS, Sumerpur17 132 kv GSS, Falana

4 T&C, Barmer 400 kv GSS, Barmer 1 132 kv GSS, Mahloo2 132 kv GSS, Barmer

. 3 132 kv GSS, Gardra Road4 132 kv GSS, Sheo

.. 5 132 kv GSS, Undoo1 220 kv GSS, Balotra 6 132 kv GSS, Samdari

7 132 kv GSS, Sindhari .8 132 kv GSS, Siwana..9 132 kv GSS, Padroo

10 132 kv GSS, Juna Mitha Khera

Organizational & Administrative Set-up GSSUnder T&C Zone Jodhpur

~-

Page 49: 23D10072 - Rajasthanenergy.rajasthan.gov.in/content/dam/raj/energy/corporate-one-lines... · increasedto 10072,ason1.7.2016 bysanctionofpostsonnew!y commissioned ... 11. The work

p. No Division S.No NameofGSS Nameof GSS in cluster2 220 kv GSS, Dhorimanna 11 132 kv GSS, Sawa12 132 kv GSS, Gudamalani13 132 kv GSS, Ranasar14 132 kv GSS, Sedwa15 132 kv GSS, Sata

5 T&C, Jaisalmer 400 kv GSS, Jaisalmer1 220 kv GSS, Amarsagar 1 132 kv GSS, Chandan

2 132 kv GSS, Jaisalmer3 132 kv GSS, Pokran4 132 kv GSS, Ajasar

I 5 ! T&C, RCinlqarh 400 kv GSS, Ramgarh

I 71 T&C, Sirohi

A 220 kv GSS, RamgarhI

1 220 kv GSS, Sirohi 1 132 kv GSS, Reodar2 132 kv GSS, Posaliya

2 220 kv GSS, Pindwara 3 132 kv GSS, Abu RoadI4 132 kv GSS, Riico Growth Centre Abu

3(20 kv GSS, Bhinmal 5 132 kv GSS, Raniwara6 132 kv GSS, Poonasa7 132 kv GSS, Sankad

I 8 132 kv GSS, Bhagora9 132 kv GSS, Ramseen

10 132 kv GSS, Badagoan4 220 kv GSS, Jalore 11 132 kv GSS, Jalore

12 132 kv GSS, 8agara13 132 kv GSS, Umaidpur,14 132 kv GSS, Mandawala

5 220 kv GSS, Sanchore 15 132 kv GSS, Galifa16 132 kv GSS, Sanchore17 132 kv GSS, Bhadroona18 132 kv GSS, Paladar

O}tJeltYI.".JO. \08 ol) oS·oS."Organizational & Administrative Set-up GSSUnder T&C Zone Jodhpur

Annexure-X\I(Rev-l)

r49'

Page 50: 23D10072 - Rajasthanenergy.rajasthan.gov.in/content/dam/raj/energy/corporate-one-lines... · increasedto 10072,ason1.7.2016 bysanctionofpostsonnew!y commissioned ... 11. The work

· No Division S.No NameofGSS Nameof GSSin cluster6 220 kv GSS, Sayala 19 132 kv GSS, Daspan

20 132 kv GSS, Sayala21 132 kv GSS, Jeewana

8 T&C, 1 220 kv GSS, Suratgarh 1 132 kv GSS, RajiyasarHanumangarh 2 132 kv GSS, Sri Vijaynagar (SNGN)

3 132 kv GSS, GarsanaI 4 132 kv GSS, Jhokasar

I 5 132 kv GSS, AnoopqarqI 2 no k'l GSS, Ucyog vihar 6 132 kv GSS, SriganganagarI

Sriganganagar 7 132 kv GSS, Sadulshahar3 220 kv GSS, Padampur 8 132 kv GSS, Srikaranpur

9 132 kv GSS, Raising Nagar10 132 kv GSS, Karninpura

4 220 kv GSS, Hanumagarh 11 132 kv GSS, Amarapur Thedi12 132 kv GSS, Hanumangarh13 132 kv GSS, Pilibanga14 132 kv GSS, Sangaria15 132 kv GSS, Rawatsar16 132 kv GSS, Goluwala

5 220 kv GSS, Bhadra 17 132 kv GSS, Bhadra "18 132 kv GSS, Nohar

9 T&C, Bikaner 400 kv GSS,Bikaner1 220 kv GSS, Bikaner 1 132 kv GSS, Napasar

2 132 kv GSS, Binasar3 132 kv GSS, Pugal Road, Bikaner4 132 kv GSS, Loonkaransar5 132 kv GSS, Khajuwala6 132 kv GSS, Sherera

2 220 kv GSS, Sridugargarh 7 132 kv GSS, Shri Dungargarh8 132 kv GSS, Momasar

o}tJdeI\J No. 108 M 08·08·"Organizational & Administrative Set-up GSSUnderT&CZone Jodhpur

Annexure-XV(Rev-l)

(lJo)

Page 51: 23D10072 - Rajasthanenergy.rajasthan.gov.in/content/dam/raj/energy/corporate-one-lines... · increasedto 10072,ason1.7.2016 bysanctionofpostsonnew!y commissioned ... 11. The work

FF-=--l I Division S.No NameofGSS Nameof GSS in cluster,9 132 kv GSS, Riri

10 132 kv GSS, Upani3 220 kv GSS, Nokha 11 132 kv GSS, Oeshnok

12 132 kv GSS, Jasarasar13 132 kv GSS, Panchu

4 220 kv GSS, Gajner 14 132 kv GSS, Nokha Oahiya,Gajner15 132 kv GSS, Bajju16 132 kv GSS, Kolayat

5 220 kv GSS, 8adnu 17 132 kv GSS, Lalamdesar18 132 kv GSS, Mundsar,19 132 kv GSS, Dulchasar

10 T&C, Ratangarh 400 kv GSS. Ratangarh1 220 "'V GSS, Ratangarh 1 132 kv GSS, Ratangarh

I 2 132 kv GSS, Churu3 132 kv GSS, Sardarshahar4 132 kv GSS, patllsar fanta5 132 kv GSS, Taranagar6 132 kv GSS, Chandghoti7 '132kv GSS, Sadulpur (Rajgarh)8 132 kv GSS, Bhanipura

2 220 kv GSS, Sujangarh 9 132 kv GSS, Sujangarh10 132 kv GSS, Salasar

3 220 kv GSS, Tehendesar 11 132 kv GSS, Bidasar12 132 kv GSS, Parewar13 132 kv GSS, Bhasina

O-'tleteN NO. 10 C6 Cl!A 06·0 S· I" Annexure-XV(Rev-l)Organizational & Administrative Set-up GSSUnderT&C Zone Jodhpur

(~I)

Page 52: 23D10072 - Rajasthanenergy.rajasthan.gov.in/content/dam/raj/energy/corporate-one-lines... · increasedto 10072,ason1.7.2016 bysanctionofpostsonnew!y commissioned ... 11. The work

"o~w No. )oG cU.. 06.08."ANNEXURE-XVI (Rev-i)

ABOLITION, CREATION RENAMING AND SHIFTING OF VARIOUS OFFICES•

S. Description of EXisting Designationl New Designationl RemarkNo. Organizational Offices Post Post1. Administration & Chief of Administration & Secretary RenameHuman Resource HRD (as per order 339 dt (Administration)• Development (Admn. & 31.3.16)

HRD)2. CPO New

3. SE (HRD & Trg.) New

4. XEN (R&T) XEN (Training) Rename5. XEN (HRD) New

6. AS (ACR) AS (APA) Rename7. Finance Regional CAO at New

JaipurlAjmer/Jodhpur

8. SR AO (RE & NewHQ)

9. Project Planning & CEI ACE (PPM) CEI ACE (PP&D) RenameDesign (PP&D)10. Design Circle SE (400 kV Design) SE (Design) Rename

11. I XEN (C&P) XEN-1 (Design) Rename

12. XEN (Str.) XEN-2 (Design) Rename

13. P&P Circle XEN (Projects) XEN-1 (P&P) Rename

14. XEN (PSS) XEN-2 (P&P) Rename

15. Automation, N/M & SE (Automation, . NewSpecial Projects Circle

I N/M & speCia+fProjects)-_j --.-

--16, I XEN (Tr.) XEN-1 . Rename

I(Automation, N/M I& Special IIn, J. Projects) i_------------i XEN (R&D) XEN-2' i Rename

i(Automation, N/MI

i & SpecialI Projects)leE/ACE (MM) CE/ACE

---_._----18. Procurement RenameI (Procurement)Ii - -.---_ - . -_._._._--_f-. --r

CE/ACE19. Contract NewI _{Contracts)Rename ----~

I-i---" -CAO (P&C)20. ! (.;\0 (MM)

I-+- .._-~--- . .__._-_21. Procurement-I Circle I SE (rLPC) SE (Procurement- Rename

I).)_.. -- _--_-_--- ._----22. I XEN (TL) XEN-1 RenameI (Procurement)_.l.__.__..._

~

-------- __ .

Page 53: 23D10072 - Rajasthanenergy.rajasthan.gov.in/content/dam/raj/energy/corporate-one-lines... · increasedto 10072,ason1.7.2016 bysanctionofpostsonnew!y commissioned ... 11. The work

23. XEN (Steel) XEN-2 Rename_{procurementl_24. XEN (TLM) XEN-3 RenamelProcuremen!l25. Procurement-II Circle SE (SSPC) SE (Procurement- Rename!II} New26. XEN (SWG) XEN-4 Rename_iProcuremen!2.27. XEN (TR) XEN-5 RenameJProcuremen!l_28. XEN (SS) XEN-6 Rename_{procuremen!l_29. Contracts-I Circle SE (400 kV Purchase) SE (Contracts-I) Rename!

New30. XEN (TK) of TLPC XEN-1 Rename!New_{Contractsl .31. XEN-2 NewlContract~32. Contracts-II Circle SE (765 kV Design) SE (Contracts-I) Rename!

New33. XEN (TK) of SSPC XEN-3 Rename!New_{Contract~34. XEN-4 New_{Contractsl35. New Power Projects & CE/ACE (NPP&R) CE/ACE RenameRegulatory Affairs (NPP&RA)(NPP&RA)

36. SE (NPP&R) SE (NPP&RA) Rename~37. Information Technology CE/ACE (IT & Trg.) CE!ACE (IT) RenameliT}

38. SE (MIS) SE (MIS & IT) Rename39. . SystemAnalyst New40. SE(TA to CMD) SE (TA to CMD & SE (TA to CMD) Rename

Corporate Montg.) (asi I per order No 339 dt

~.3.16)-41. QC & Inspection I SE (QC & Inspection) (as SE (QC & NewI per order 339 dt 31.3.16) Inspection,

Mon!9l42. Transmission t,ppended at Annexure-XVII

Construction43. Meters, --Protection, I Appended at Annexure-XVIII

Testing & Safety I_{MPT&Sl... ~_

44. Communication I Appended at Annexure-XIXI-_._----+ -

SE [Supervisory Rename45. Load Dispatch i SE (SLDC)I System & DatarI Acquisition (SSDA)-II SLOC]

46. --.---- ----------rXEN (SCAOA-I) XEN-1 (SSDA- Renamei SLOC)

47. -----pEN (SCADA-II) XEN-2 (SSOA- Rename______ ___L_ SLOCl

('53)

Page 54: 23D10072 - Rajasthanenergy.rajasthan.gov.in/content/dam/raj/energy/corporate-one-lines... · increasedto 10072,ason1.7.2016 bysanctionofpostsonnew!y commissioned ... 11. The work

,48. XEN (SCADA-III) I XEN-3 (SSDA- RenameI SLDCl

49. XEN (PC) XEN-1 (SOLD) Rename

50. I XEN (SA) XEN-2 (SOLD) Rename

51. XEN-3 (SOLD) New

52. XEN (LD) I XEN-4 to 7 (SOLD) Rename/Control Room

~.

SE (REMC) New

54. j XEN-1 to 4 (REMC) New/ ControlRoomr---ss.., Civil Appended at Annexure-XX

L-___j_

\?4)

Page 55: 23D10072 - Rajasthanenergy.rajasthan.gov.in/content/dam/raj/energy/corporate-one-lines... · increasedto 10072,ason1.7.2016 bysanctionofpostsonnew!y commissioned ... 11. The work

o )'Vel CIIJ "" 0 . \0 9 tU· CJ 6 ·0 S· I,

Annexure-XVII (Rev-1)CREATIONI RENAMINGI ABOLITION OF T&C OFFICES

S.No Present Nomenclature New nomenclature Remark1. SE (TCC-I), Jaipur SE (T&C-Rural), Jaipur Rural Rename2. SE(TCC-II), Jaipur SE (T&C), Sawai Madhopur Rename/Shifting3. SE (TCC-III), Ajmer SE (T&C), Sikar Rename/Shifting~-4. SE (TCC-IV), Jodhpur SE (T&C), Bharatpur Rename/Shifting5. SE (TCC(V), Kota SE (T&C), Kota Rename6. SE «TCC-VI), Alwar SE (T&C), Alwar Rename7. SE (TCC-VII), Udaipur SE (T&C), Udaipur Rename8. SE (TCC-VIII), Sirohi SE (T&C), Sirohi Rename9. SE (TCC-IX), Bikaner SE (T&C), Hanumangarh Rename/Shifting10. SE (400 kv GSS), Heerapura SE (T&C), Jaipur City Rename11. SE (400 kv GSS), Hindaun SE (T&C), Hindaun Rename12. SE (400 kvGSS), Ajmer SE (T&C), Ajmer Rename13. SE (400 kv GSS), Bhilwara SE (T&C), Bhilwara Rename14. SE (400 kv GSS), Chittorgarh SE (T&C), Chittorgarh Rename15. SE (400 kv GSS), Merta SE (T&C), Merta Rename16. SE (400 kv GSS), Babai SE (T&C), Babai Rename17. SE (400 kv GSS), Jodhpur SE (T&C), Jodhpur Rename18. SE (400 kv GSS),Kankani SE (T&C), Kankani Rename19. SE (400 kv GSS), Bhadala SE (T&C), Bhadala I Rename20. SE (400 kv GSS), Barmer SE (T&C), Barmer Rename21. SE (400 kv GSS), Jaisalmer SE (T&C), Jaisalmer Rename22. SE (400 kv GSS), Ramgarh SE (T&C), Ramgarh Rename23. SE (400 kv GSS), Bikaner SE (T&C), Bikaner Rename24. SE (400 kv GSS), Ratangarh SE (T&C), Ratangarh Rename25. XEN (C&M-400 KV GSS) XEN (T&C), RVPN, Jaipur City Rename

Heerapura26. XEN (C&M TCC-I) Jaipur XEN (T&C) ,RVPN Jaipur Rural Rename27. XEN (C&M TCC-VI) Alwar XEN (T&C), RVPN,Alwar Rename28. XEN (C&MTCC-VI) Bharatpur XEN (T&C), RVPN, Bharatpur Rename29. XEN (C&M TCC-II) Jaipur XEN (T&C), RVPN, Sawai Rename/Shifting

Madhopur30. XEN (C&M TCC-V) Kota XEN (T&C), RVPN, Kota Rename

--I- ---:--:---131. XEN (C&M TCC-III) Beawar 'XEN (T&C), RVPN,Ajmer Rename/Shifting32. XEN (C&M-400KV GSS) Merta XEN (T&C), RVPN, Merta Rename33. XEN (C&M- 400kv GSS) Khetri XEN (T&C), RVPN, Babai Rename/Shifting34. XEN (C&M TCC-VII) Udaipur XEN (T&C), RVPN, Udaipur Rename35. XEN (C&MTCC-IX) Bikaner XEN (T&C), RVPN, Bikaner Rename

L XEN (C&M-400KV GSS) XEN (T&C), RVPN Ratangarh RenameRatangarh

137. XEN (C&MTCC-VIII) Sirohi IXEN (T&C), RVPN, Sirohi Rename

~8. XEN (C&M-400 KV GSS) Barme1xEN (T&C), RVPN, Barmer Rename-

.59. RenameXEN (C&M400 kv GSS) XEN (T&C), RVPN, JaisalmerI Jaisalmer40. XEN (C&M-400KV GSS) Jodhpur XEN (T&C), RVPN, Jodhpur Rename41. XEN (C&MTCC-IV) Jodhpur XEN (T&C), RVPN, Kankani Rename/Shifting

(~,)-,--.'

Page 56: 23D10072 - Rajasthanenergy.rajasthan.gov.in/content/dam/raj/energy/corporate-one-lines... · increasedto 10072,ason1.7.2016 bysanctionofpostsonnew!y commissioned ... 11. The work

42. XEN (Capacitor), Jaipur XEN(RPM) Jaipur Rename43. XEN (T&C), RVPN, Hindaun New Creation44. XEN_(T&Cj,RVPN, Bhilwara New Creation45. XEN (T&C), RVPN, Sikar New Creation46. XEN (T&C), RVPN, Chittorgarh New Creation47. XEN (T&C), RVPN, New CreationHanumangarh

48. XEN (T&C), RVPN, Raf1!9_arh New Creation49. XEN (T&C), RVPN, Bhadala New Creation50. XEN(RPM), RVPN, Ajmer New Creation51. XEN (RPM), RVPN, Jodhpur New Creation52. AEN-II(C&M-TCC-VI), Alwar Abolish53. AEN-I (C&M-TCC-II), Jaipur Abolish54. AEN-II (C&M-TCC-II), Jaipur Abolish55. AEN-II (C&M-TCC-I) Jaipur AEN (T&C) Phagi HQ 765 kv Shifted atGSS Bhadala & kept

at Phagi tillfurther orders.56. AEN (C&M-400 kv GSS), AEN-II (T&C), RVPN, Shifted fromNimbahera (Shifted to Udaipur Nimbahera Udaipur tovide No 339 dt 31.3.16) Nimbahera upto31.3.17 andthereafter shiftedto Debari underT&C CircleUdaJpur.57. AEN-II(C&M-TCC-V), Kota AEN-II(T&C), Kota Shifted atRamgarh(Jaisalmer) butkeep continue atKota till furtherorders58. AEN (T&C), RVPN, Balotra New Creation

59. AEN-I(T&C), RVPN, Ramgarh New Creation'(Jaisalmer)

60. AEN-II (C&M-400KV GSS) AEN-I (T&C) Jaipur City RenameHeerapura61. AEN-III (C&M-400KV GSS), AEN-II (T&C) Jaipur City RenameHeerapura62. AEN-I (C&M-TCC-I) Jaipur AEN(T&C-Rural), Jaipur Rename63. AEN (C&M-TCC-II) Kotputali AEN (T&C) Kotputali Rename--64. AEN (C&M·TCC-II) Dausa AEN (T&C) Dausa Rename65. AEN (C&M-TCC-VI) Bharatpur AEN (T&C) Bharatpur Rename66. AEN-I(C&M-TCC-VI), Alwar AEN (T&C),Alwar Rename------67. AEN (C&M-TCC-VI), Bhiwadi AEN (T&C), Bhiwadi Rename68. AEN (C&M-400 kv GSS) Dholpur AEN (T&C) Dholpur Rename--~ ..---- ----69. AEN (C&M-TCC-I), Tonk AEN (T&C), Tonk Rename~. --70. AEN (C&M-TCC-I!) Sawai AEN (T&C) , Sawai Madhopur I Rename

IMadhopur-- ----- --I Rename71. AEN-I(C&M-TCC-V) Kota AEN-I (T&C) Kota

72. AEN (C&M-TCC-V) Jhalawar AEN (T&C) Jhalawar I Rename73. AEN-I (C&M-TCC-III) Beawar AEN (T&C) Beawar r Rename74. AEN-III (C&M-400 kv GSS) Ajmer AEN (T&C)Ajmer J Rename

o)"volwNo·lol3 cU·o8·o8.J6

(5()

Page 57: 23D10072 - Rajasthanenergy.rajasthan.gov.in/content/dam/raj/energy/corporate-one-lines... · increasedto 10072,ason1.7.2016 bysanctionofpostsonnew!y commissioned ... 11. The work

75. AEN (C&M-400 kv GSS) Bhilwara AEN-I(T&C) Bhilwara Rename76. AEN (C&M-400 KV GSS) Merta AEN (T&C) Merta Rename77. AEN (C&M-400 KV GSS) Nagaur AEN (T&C) Nagaur Rename78. AEN (C&M-400 kv GSS) AEN (T&C) Jhunjhunu Rename

Jhunjhunu79. AEN (C&M-TCC-III) Reengus AEN (T&C) Reengus Rename80. AEN (C&M- TCC-VII) Debari AEN-I (T&C), Udaipur HQ Debari Rename81. AEN (C&M-TCC-VII) Kankaroli AEN (T&C) Kankroli Rename82. AEN (C&M-400 kv GSS) AEN (T&C) Chittorgarh Rename

Chittorgarh83. AEN (C&M- TCC-VII) Banswara AEN(T&C) Banswara Rename84. AEN-I(C&M-TCC-IX) Bikaner AEN-I (T&C) Bikaner Rename85. AEN (C&M 400 kv GSS) Bikaner AEN-II (T&C) Bikaner Rename86. AEN (C&M-400 KV GSS) AEN-II (T&C) Ratangarh Rename

Ratangarh87. AEN (C&M- TCC-IX) AEN (T&C) Hanumangarh Rename

Hanumangarh88. AEN (C&M-TCC-VIII) Sirohi AEN (T&C) Sirohi Rename89. AEN (C&M-TCC-VIII) Jalore AEN (T&C) Jalore Rename90. AEN (C&M-400 kv GSS) Barmer AEN (T&C) Barmer Rename91. AEN-I (C&M-400 kv GSS) AEN-I (T&C) Jaisalmer Rename

Jaisalmer92. AEN-II (C&M-400 kv GSS) AEN-II (T&C) Jaisalmer Rename

Jaiselmer93. AEN (C&M-TCC-IV), Dechu AEN (T&C) Dechu Rename94. AEN (C&M-TCC-VIII) Pali 'AEN (T&C) Pali Rename --I

95. AEN-I(C&M-TCC-IV), Jodhpur AEN (T&C), Jodhpur Rename96. AEN (C&M-400 kv GSS) Hindaun AEN (T&C) Hindaun Rename97. AEN (C&M-TCC-III) Sikar AEN (T&C) Sikar Rename98. AEN (C&M-400 kv GSS) Bap AEN (T&C) Bhadala Rename/Shifted99. AEN-I (C&M-400 kv GSS) Khetri AEN (T&C) Babai Rename/Shifting100. AEN (C&M-400 KV GSS) AEN-I (T&C) Ratangarh Rename/Shifting

Sl!l.angarh101. AEN-II(C&M-TCC-IX) Bikaner AEN (T&C), Ganganagar Rename/Shifting102. AEN-II(C&M-400 kv GSS) AEN (T&C) Kankani Rename/Shifting

jodhpur103. AEhI-1(C&rv1400kv GSS) AEN (TRWork Shop), RVPN, Rename

Heerapura Jaipur104. AEN-I (C&M-400 KV GSS) AEN (TR Work Shop), RVPN, Rename

Jodhpur Jodhpur105. AEN-II (C&M-400 kV GSS), Khetri AEN (TRWork Shop), RVPN, Rename/ Shifting

Ratangarh106. AEN-II (C&M-TCC-III), Beawar AEN (OTL), RVPN, Beawar Rename107. AEN-II(C&M-TCC-IV), Jodhpur AEN (OTL), RVPN, Jodhpur Rename108. AEN(RPM), RVPN, Bikaner New Creation109. AEN(Capacitor), Sikar AEN(RPM),Ajmer Rename/shifting110. AEN (Capacitor) Heerapura AEN(RPM), Heerapura Rename111. AEN (Capacitor) Kota AEN(RPM) Kota Rename112. AEN(Capacitor), Jodhpur AEN(RPM), Jodhpur Rename113. AEN(Capacitor), Debari AEN (RPM),UdaipurHQ Debari Rename

V

ONde-o NO· lOS cU· 0 {5 .ofJ. \G

Page 58: 23D10072 - Rajasthanenergy.rajasthan.gov.in/content/dam/raj/energy/corporate-one-lines... · increasedto 10072,ason1.7.2016 bysanctionofpostsonnew!y commissioned ... 11. The work

OhJdero No. ID8.~. oS·o9·t'Annexure-XVIII (Rev-1)

CREATIONI RENAMINGI ABOLITION OF MPT&S OFFICES

1. XEN (Protection), Jaisalmer Abolition2. AEN (Protection) Ajmer AEN-I (MPT&S) Ajmer Rename3. AEN (Protection) Khetri AEN (MPT&S) Khetri Rename4. AEN (Protection) Banswara AEN (MPT&S) Banswara Rename5. AEN (Protection) Bikaner AEN-I (MPT&S) Bikaner Rename6. AEN (Protection) Jaisalmer AEN (MPT&S) Jaisalmer Rename7. AEN (Protection) Kota AEN-I (MPT&S) Kota Rename8. AEN (Protection) Merta AEN (MPT&S) Merta Rename9. AEN (Protection) Pali AEN (MPT&S) Pali Rename10. AEN (Protection) Ratangarh AEN (MPT&S) Ratangarh Rename11. AEN (Protection) Sirohi AEN (MPT&S) Sirohi Rename12. AEN (Protection) Suratgarh AEN (MPT&S) Suratgarh Rename13. AEN (Protectiont), Jhunjhunu AEN (MPT&S), Jhunjhunu Rename14. AEN (Protection), Phalodi AEN (MPT&S), Phalodi Rename15. AEN (Protection), Udaipur AEN (MPT&S), Udaipur Rename16. AEN (Protection), Chittorgarh AEN (MPT&S),Chittorgarh Rename17. AEN (Protection), Bhiwadi AEN (MPT&S) Bhiwadi Rename18. AEN (Testing Lab), Udaipur AEN (Testing Lab) Udaipur Rename19. AEN (Protection) Jhalawar AEN MPT&S) Jhalawar Rename20. AEN(Protection) Barmer AEN(MPT&S) Barmer Rename21. AEN(Protection) Bhilwara AEN(MPT&S) Bhilwara Rename22. AEN(Protection-l) SWM AEN(MPT&S) SWM Rename23. AEN(Protection), Alwar AEN-I(MPT&S), Alwar Rename24. AEN(Protection), Bharatpur AEN(MPT&S),Bharatpur Rename25. AEN(Testing Lab) Jaipur AEN(Testing Lab) Jaipur Rename26. AEN (Protection) sikar AEN, (MPT&S) Sikar Rename27. AEN(Protection-l) JAIPUR AEN-I(MPT&S) JAIPUR Rename28. AEN(Protection) Jodhpur AEN-i(MPT&S) Jodhpur Renamet29.

AEN(Protection-II) Jaipur AEN-II(MPT&S) Jaipur Rename30. AEN(Protection-III) JAIPUR AEN-1I1(MPT&S) JAIPUR Rename

~ 31. CE(M&P&S), RVPN, Jaipur 1',.CEICE(MPT&S), RVPN Jaipur Rename. 32. SE(Protection) Ajmer tSE(MPT&S) Ajmer Renamet 33. SE(Protection) Jaipur SE(MPT&S) Jaipur Rename ~-_I 34. SE(Protection) Jodhpur SE(MPT&S) Jodhpur RenameI

XH-J (MPT&S) Ajmer-_I 35. XEN (Protection) Ajmer Rename-36. XEn (Protection) Sirohi Shifted at XEn (MPT&S) Jaisalmer Rename/Shifting

Barmer vide No 339 dt 31.3.1637. XEN (Protection) Jodhpur XEN (MPT&S) Jodhpur Rename

i 38. XEN (Protection) Kota XEN (MPT&S) Kota RenameI 39. XEN (Protection) Udaipur XEN (MPT&S) Udaipur Rename

i 40. XEn (Protection) ALWAR XEN(MPT&S) ALWAR Rename41. XEN (Protection-I) Jaipur XEN(MPT&S) Jaipur RenameI

f---XEN(Protection) Sikar XEN(MPT&S) Sikar Rename~ 42.

I 43. XEN (Protection-II) Jaipur XEN(MPT&S), Sawaimadhopur Rename/Shifting44. XEN(Protection)Bikaner XEN(MPT&S), Bikaner Rename45. AEN-II (MPT&S), RVPN, Bikaner New Creation

V

Page 59: 23D10072 - Rajasthanenergy.rajasthan.gov.in/content/dam/raj/energy/corporate-one-lines... · increasedto 10072,ason1.7.2016 bysanctionofpostsonnew!y commissioned ... 11. The work

46. AEN-II (MPT&S), RVPN, , Ajmer New Creation47. AEN-II (MPT&S), RVPN, Kota New Creation48. AEN-II (MPT&S), RVPN, Alwar New Creation49. AEN (MPT&S), RVPN, Hindaun New Creation50. AEN (MPT&S), RVPN, Kankroli New Creation51. AEN (MPT&S), RVPN, Tonk New Creation52. AEN(MPT&S), Hanumangarh New Creation53. AEN-II (MPT&S), RVPN, , Jodhpur New Creation54. CE/ACE (MPT&S), RVPN, Jodhpur New Creation55. CE/ACE(MPT&S), RVPN, Ajmer New 'Creation56. S E (MPT&S), RVPN, Bikaner New Creation57. S E (MPT&S), RVPN, Kota New Creation58. S E (MPT&S), RVPN, Udaipur New Creation59. XEN (MPT&S), Hanumangarh New creation60. XEN (MPT&S), RVPN, Bhilwara New Creation

V

Page 60: 23D10072 - Rajasthanenergy.rajasthan.gov.in/content/dam/raj/energy/corporate-one-lines... · increasedto 10072,ason1.7.2016 bysanctionofpostsonnew!y commissioned ... 11. The work

o",eI~ ,.aD. 10~ tVt . (16·08·1 (,Annexure-XIX (Rev-1)

CREATIONI RENAMINGI ABOLITION OF COMMUNICATION OFFICES

1. AEN (PLCC) Bhinmal abolish2. AEN(PLCC 400 kv GSS) Bikaner abolish3. AEN(PLCC) Beawar abolish4. AEN(PLCC) Dausa abolish5. AEN(PLCC) Bhartpur abolish6. AEN(PLCC) Nagaur abolish7. AEN(PLCC400 kv GSS) Barmer abolish8. AEN(PLCC400 kv GSS) Bhilwara abolish9. AEN(PLCC400 kv GSS) HRP abolish10.AEN(PLCC400 kv GSS) Jaiselmer abolish11.AEN(PLCC400 kv GSS) Jodhpur abolish12.AEN(PLCC400 kv GSS) Merta abolish13.AEN(PLCC400 kv GSS) abolishRatangarh14.XEN(PLCC) Alwar abolish15.XEN(PL.CC)Bhilwara abolish16.XEN(PLCC) Ratangarh abolish17. AEN (Communication), New creation

Hanumangarh18.ACE (PLCC) Jaipur ACE (Communication) Jaipur Rename19.AEN(PLCC} Almer AEN(Communication) Almer Rename20.AEN(PLCC) Alwar AEN(Communication) Alwar Rename21.AEN(PLCC) Bali AEN(Communication} Bali Rename22.AEN(PLCC} Banswara AEN(Communication) Banswara Rename23.AEN(PLCC) Barmer AEN(Communication) Barmer Rename24.AEN(PLCC) Dholpur AEN(Communication) Dholpur Rename25.AEN(PLCC} Bhilwara AEN(Communication) Bhilwara Rename26.AEN(PLCC) Bikaner AEN(Communication) Bikaner Rename27.AEN(PLCC) Chambal AEN-I(Communication) Chambal Rename28.AEN(PLCC) Nimbahera AEN (Comrnunication)Chittorgarh Rename/shifted29.AEN(PLCC) Heerapura AEN-II(Communication) Heerapura Rename

AEN(PLCC400 kv GSS) Hindaun AEN(Communication) Hindaun Rename --3~.31.AEN(PLCC) Jaisalmer AEN(Communication) Jaisalmer Rename

1---32.AEN(PLCC) Jhalawar AEN(Communication) Jhalawar Rename i

33.AEN(PLCC) Jodhpur AEN(Cornmunication)Jodhpur Rename34.AEN(PLCC) Khetri AEN(Communication) Khetri Rename35.AEN(PLCC) Kota AEN(Communication) Kota Rename36.AEN(PLCC) Merta AEN(Communication) Merta Rename37.AEN(PLCC) Ratangarh AEN(Communication) Ratangarh Rename

AEN(PLCC) Sawaimadhopur AEN(Communication)Sawai Rename38. Madhopur39.AEN(PLCC) Sikar AEN(Communication)Sikar Rename40.AEN(PLCC) Suratgarh AEN(Communication)Suratgarh Rename41. AEN(Communication) Udaipur HQ Rename

AEN(PLCC) Debari Debari

(Co)

Page 61: 23D10072 - Rajasthanenergy.rajasthan.gov.in/content/dam/raj/energy/corporate-one-lines... · increasedto 10072,ason1.7.2016 bysanctionofpostsonnew!y commissioned ... 11. The work

42. SE (PLCC) Jodhpur SE (Communication) Jodhpur Rename43. SE(PLCC) Ajmer SE(Communication) Ajmer Rename44. SE(PLCC) Jaipur SE(Communication), Jaipur Rename45. XEN(PLCC) Ajmer XEN(Communication) Almer Rename46. XEN(PLCC) Bikaner XEN(Communication) Bikaner Rename47. XEN(PLCC) Heerapura XEN(Communication) Heerapura Rename48. XEN(PLCC) Jodhpur XEN(Communication) Jodhpur Rename49. XEN(PLCC) Kota XEN(Communication) Kota Rename

XEN(Communication) Udaipur HQ Rename50. XEN(PLCC) Debari Debari /'

V

(6))

Page 62: 23D10072 - Rajasthanenergy.rajasthan.gov.in/content/dam/raj/energy/corporate-one-lines... · increasedto 10072,ason1.7.2016 bysanctionofpostsonnew!y commissioned ... 11. The work

OhJdeN No. log lirL· 0 B· 0 e· ,6Annexure-XX(Rev-1 )

•CREATIONI RENAMINGI ABOLITION OF CIVIL OFFICES

1. AEN (CIVIL-TR-I) Kota Abolish2. AEN (CIVIL-TR-II) Kota Abolish3. AEN (CIVIL-TR) Rawatbhata Abolish4. AEN CIVIL-TR) Cittorgarh Abolish5. AEN (CIVIL-TR) Sirohi Abolish6. AEN (CIVIL-TR-II) Bikaner Abolish7. AEN (CIVIL-TR) Hanumangarh Abolish8. AEN (CIVIL-TR) Merta City Abolish9. AEN (CIVIL-TR-III) Jaipur AEN (Civil), Dausa Rename/Shifting10., AEN(Civil-QC-Lab) Jaipur AEN(Civil-QC-Lab) Jaipur Merger with11. AEN(Civil-QC}, Jaipur AEN(Civil-QC), Jaipur XEN(Civil-QC),

Jaipur12. AEN(Civil-QC), Kota AEN(Civil-QC), Kota No Change13. AEN(Cvil-QC-Lab) Jodhpur AEN(Cvil-QC-Lab) Jodhpur Merger with14. AEN(Civil-QC), Jodhpur AEN(Civil-QC), Jodhpur XEN(Civil-QC),

Jodhpur15. AEN(Civil-QC), Bikaner AEN(Civil-QC), Bikaner No Change16. AEN(C-QC-Lab), Bikaner AEN(C-QC-Lab), Bikaner Merger with17. AEN (Civil-QC), Ajmer AEN (Civil-QC), Ajmer XEN(Civil-QC),

Ajmer18. AEN(Civil-QC), Udaipur AEN(Civil-QC), Udaipur No Change19. AEN(C-QC),Barmer AEN (Civil), Ramgarh Rename/Shifting20. AEN (CIVIL-TR), S. Madhopur AEN (Civil), Rawatbhata Shifting

Shifted at Tonk vide No 339 dt31.3.16

21. AEN (CIVIL-TR) Bharatpur AEN(Civil), Dholpur Rename/Shifting22. AEN (CIVIL-TR) Bhilwara AEN (CIVIL) Bhilwara Rename23. AEN (CIVIL-TR) Ganganagar AEN (CIVIL) Ganganagar Rename24. AEN (CIVIL-TR) Jalore AEN (CIVIL) Jalore Rename25. AEN (CIVIL-TR) Jhalawar AEN (CIVIL) Jhalawar Rename26. AEN (CIVIL-TR) Jhunjhunu AEN (CIVIL) Jhunjhunu Rename27. AEN (CIVIL-TR-I) Jodhpur AEN (CIVIL) Jodhpur Rename28. AEN (CIVIL-TR) Pali AEN (CIVIL) Pali Rename29. AEN (CrVIL-TR) Ratangarh AEN (CIVIL) Ratangarh ,Rename30. AEN (CIVIL-TR), Jaisalrner AEN (Civil), Jaisalmer Rename31. AEN (CIVIL-TR), Nagaur AEN (CIVIL), Nagaur Rename32. AEN (CIVIL-TR-II)Jaipur AEN (CIVIL-BSB)Jaipur Rename33. AEN (CIVIL-TR-I) Bikaner AEN (CIVIL!) Bikaner Rename34. AEN (CIVIL-TR-I) Jaipur AEN (CIVIL-Rural) Jaipur Rename35. AEN CIVIL-TR) Banswara AEN CIVIL) Banswara Rename

-- -_.36. AEN (CIVIL-TR) Ajmer AEN(Civil) Ajmer Rename37. AEN (CIVIL-TR) Alwar AEN(Civil) Alwar rename38. AEN (CIVIL-TR) Sikar AEN(Civil) Sikar iRename39. AEN CIVIL-TR) Udaipur AEN (Civil), Dunoarpur [rename& shifted40. AEN (CIVIL-TR-II) Jodhpur AEN(Civil), Phalodi rename & shifted41. AEN (CIVIL-TR) Barmer AEN(Civil), Balotra rename & shifted42. SE (Civil-TR) Jaipur SE (Civil) Jaipur

JRename

V(cz:

Page 63: 23D10072 - Rajasthanenergy.rajasthan.gov.in/content/dam/raj/energy/corporate-one-lines... · increasedto 10072,ason1.7.2016 bysanctionofpostsonnew!y commissioned ... 11. The work

43. SE (CIVIL- TR) Kota SE (CIVIL) Kota Rename44. SE(CIVIL-TR) Bikaner SE(CIVIL) Bikaner Rename45. SE(Civil- TR) Jodhpur SE(Civil) Jodhpur Rename46. SE(Civil),RVPN Ajmer New creation47. XEN (CIVIL-TR) ALWAR XEN (CIVIL) ALWAR Rename48. XEN (CIVIL-TR) Hanumangarh XEN (CIVIL) Hanumangarh Rename49. XEN (Civil- Tr) Jodhpur XEN (Civil) Jodhpur Rename50. XEN (Civil- Tr) Sirohi XEN (Civil) Sirohi Rename51. XEN (Civil), Bhadala New creation52. XEN (Civil), Kankani New creation53. XEN _(Civil), Babai New creation54. XEN (Civil), Bhartpur New creation55. XENICivil), Bhilwara New creation56. XEN lCivi12, ChittoJ"garh New creation57. XEN _{_Civi!l,Hindaun New creation58. XEN lCivil), Jaisalmer New creation59. XEN (Civil- TR), Mertacity XEN (Civil), Mertacity Rename60. XEN lCivil), Ram_g_arh New creation61. XENlCivil), Rata~arh New creation62. XEN lCivil), Sikar New creation63. XEN (Civil), Sawai Madhopur New creation64. XEN lcivil-QC1, ~mer New creation65. XEN(Civil- TR) Ajmer XEN(Civil) Ajrner Rename66. XEN(Civil- Tr) Bikaner XEN(Civil) Bikaner Rename67. XEN(Civil- TR) Kota XEN(Civil) Kota Rename68. XEN(Civil- TR) Udaipur XEN(Civil) Udaipur Rename69. XEN(Civil-Tr), Barmer XEN(Civil), Barmer Rename70. XEN(Civil- TR-I) Jaipur XEN (Civil) Jaipur City Rename71. XEN(Civil-lI) Jaipur XEN(Civil) Jaipur Rural Rename72. ACE (Civil- TR) Jaipur ACE(Civil) Jaipur Rename73. ACE(CIVIL-TR) Jodhpur ACE(CIVIL) Jodhpur Rename74. AEN (Civil-city), Jaipur New Creation75. AEN (Civil-Rural), Jaipur INew Creation76. AEN (Civil), Bhartpur New Creation-77. AEN-II (Civil), Aiwar New Creation78. AEN (Civil), Kota New Creation79. AEN (Civil) sawimadhopur New Creation80. AEN (Civil) Hindaun New Creation81. AEN (Civil) Udaipur New Creation82. AEN (Civil), Chittorgarh New Creation83. AEN (Civil), Mertacity New Creation84. AEN-II (Civil), jodhpur New Creation85. AEN (Civil), Kankani New Creation86. AEN (CIVIL) Sirohi New Creation87. AEN -II (Civil) Bikaner New Creation88. AEN (Civil) Hanumangarh New Creation

(63)

Page 64: 23D10072 - Rajasthanenergy.rajasthan.gov.in/content/dam/raj/energy/corporate-one-lines... · increasedto 10072,ason1.7.2016 bysanctionofpostsonnew!y commissioned ... 11. The work

oJ17~1!f\l!'la. to e tl;t. o~. oe·,,,ANNEXURE- XXI (Rev-1)

BRIEF ROLES AND FUNCTIONS OF VARIOUS EXISTING AND NEWLY CREATEDOFFICES/SECTIONSRegional CAO Regional CAO at each Zonal Chief Engineer HO, shall have

supervisory control of accounting units of the zone and responsiblefor maintaining the accounts, expenditures, budgeting, salaries,pension pre-audit etc. with an objective to decentralize of works

f--::-:,=-:-:_. -+-=fr..:::_o:,,:_m_:_c_:_0::...:..Lrj:>orateoffices.XEN Role and responsibility of XEN (Capacitor) is redefined and re-(RPM)/AEN(RPM) designated as XEN (RPM) who, in co-ordination with the Load

despatch wing shall work for the overall reactive powermanagement of Nigam.

The work of preparation of salary and other claims of all theoffices under the circle and to maintain service record of theemployee, will be done by the Personnel Officer of the circle or bythe TA to Superintending Engineer (T&C),RVPN, where the post ofPersonnel Officer does not exist/operative.All the functional units such as accounts and personnel under thecircle offices and shall be a_f)art/sectionof his office.

SE(T&C) Each SE (T&C) shall be self contained units having all thefunctions reporting to the Circle Officer i.e. O&M, Construction andMaintenance, Finance! Accounts and Personnel.

As a circle officer SE (T&C) shall have administrative control ofO&M (GSSs) and Construction offices (T&C) as well as accountsand personnel units under him.

In order to equally distribute the workload to accounting units theaccounting units are also been made co-terminus with the circle.This shall ensure proper accounting and effective control onassets and budgeting. Under the T&C Circles, all the paymentsshall be made! passed by the Accounts Officer.

AEN (Cluster) AEN (Cluster) will be responsible for the supervision of thecontractor's works and carrying out the maintenance of the EHVLines associated with the substations of the cluster.

CE/ACE (Project Planning and Design)

CDeSign) Circle will be responsible for engineering and design studies/development for EHV substation, Lines and other technologiesand accordingly providing of required inputs to other wings.

------~-- ~---~(P&P) Circle will be responsible for the transmission system studies andI planning. Preparation and approval of various projects and project I

reports. ISE (Automation, NIw Circle will be responsible for the Automation, NetworklMgt & Special Management and Special and Innovative Projects for transmissionProjects):- system.New Power Project and regulatory affalrs:- _I SE (NPP& Circle will be responsible for ne·-w-~-o-w-e-r-~-ro-:-je-c-:-ts-u-n-:-de-r-.P~P:C----PNGFII Regulatory Affairs) modes. The circle shall also deal Withthe regulatory affairs (except

cases related to CERC & APTEL). such as filing! reply ofpetitions, ARR etc. in RERC. ,

f-S-E-('-S-P-)-----+-'=C7ir-c:-'e-w~i::-ll:- be responsible for Inter-State Projects and handling or!issues related to it. He wil! also deal with case of CerC &APTELsuch as filing! reply of petitions,ARR etc. ,(.---V------r----

Page 65: 23D10072 - Rajasthanenergy.rajasthan.gov.in/content/dam/raj/energy/corporate-one-lines... · increasedto 10072,ason1.7.2016 bysanctionofpostsonnew!y commissioned ... 11. The work

System Analyst

OJVclvo No. loBe« oB·09."Circle will be responsible for developing and maintaining all the ITinfrastructure, Software Packages and management informationsystem.

MIS-IT officesSE (MIS & IT)

This division level officer shall be responsible for maintaining anddoing the modifications in the software/ software packages in co­ordination with the SE (MIS)

Civil offices under his JUrisdictionACE (Civil) ACE (Civil) shall be responsible for all the civil related works of

transmission system and maintenance of existing building andinfrastructure of Nigam under his jurisdiction. Accounting functionunder him shall be handled by the Sr AO.SE (Civil) will be responsible for all the civil related works oftransmission system and maintenance of existing building andinfrastructure of Nigam under his jurisdiction.

SE (Civil)

SE (Civil-QC) The SE (Civil-QC) will supervise works for the quality in turnkey/partial turnkey/ labour contracts etc and the work assigned by theCE (Civil). The SE (Civil-QC) shall be directly under theadministrative control of CE (Civil) and will report their inspectionsand findings directly to him.

~--------------~----Offices under LDSE (System Circle will be responsible for Load Despatch, Open AccessOperation and Load Integration Approvals, and Operation of Load Despatch ControlDespatch-SOLD) RoomSE (SLDC System Circle will be responsible for maintaining and operating of SLDCand Data system, control Room and Real Time Data Acquisitions needs ofAcquisition- SSDA) the Transmission System.Energy Management Circle will be responsible for maintaining and operating ofCentre-REMC) Renewable Energy Management Centre being created.SE (Energy Circle will be responsible for complete Energy Accounting andAccounting-EA) billing of energy being received/ dispatched by various Generators,

Disc?ms, Private agencies and Other entities from/ to Nigam'sTransmission system.

CE/ACE CE/A(Procurement) and EHVoffices under hisjurisdiction

-CE/ACE (Contracts) CE/Aand offices under Turnkhis jurisdiction up toCAO (P&C) CAO

the pCE/Aexpelbills f

! P&CXEN(M&F): I XEN

contrI optim

~~

Procurement and Contract Offices~------~~~------~~~~--CE (Procurement) will be responsible for the procurement ofsubstation equipments/ items and Lines up to 765 kV Levels

CE (Contracts) will be responsible for the Labourl Partial­ev! Turnkey Projects/ contracts of EHV SUbstation and Lines765 kV Levels:

~~----~~~----.~~~--(P8..C) shall be responsible for according the concurrence tourcnase cases being dealt by CE/ACE (Procurement) andCE (Contracts) along-with the maintaining of the accounts oflditures of projects/ procurements, processing and passing ofor release of payments and other accounting functions underoffice .__ ---:-~--~:-:--:-----:---_:__----__:___:_.(M&F) who have fabrication shops and ACOS under his I

01 He will be responsible "or maintaining and reporting of Ium inventory levels and shall work under the administrative01 of CE/ACE (Procurement).

V

(6 'l/

Page 66: 23D10072 - Rajasthanenergy.rajasthan.gov.in/content/dam/raj/energy/corporate-one-lines... · increasedto 10072,ason1.7.2016 bysanctionofpostsonnew!y commissioned ... 11. The work

CE_(MPT&S) and Offices under his jurisdiction:SE (MPT&S) Circle will be responsible for development and maintaining the

protection system, metering system for the intra-state and inter­state! inter-utility for accurate energy measurement in thetransmission system along with the executing and maintaining theautomation interfacing with the substation equipments/ C&RPanels of the substations, Diagnostic and predictive testing ofcritical (i.e. Transformers, CB, CT etc.) transmission asset shallalso be done by him and also keep the log! analysis of thesetransmission elements under his jurisdiction.

Communication office

A t Off

SE (Communication) shall be responsible for operation andmaintenance the Communication Infrastructure for grid operation,visualization and monitoring of Transmission System of Nigamunder his jurisdiction which includes PLCC, Fiber Optic or anyother communication media along-with the supporting terminalequipments for tele-protection/data/voice requirements.

SE (Communication)and offices underhis jurisdiction

ccoun 5 Ices a co~ora e eveCAO (Accounts and Accounts, section shall be responsible for compiling andW&M): maintaining the accounts and expenditures. This section shall also

be responsible for Payments, fund management, Ways & Meansworks and budgetCirycontrol.

CAO (P&F- Control) This section will be responsible for the Provident Fund, Pensioncases, and handling of the F&R matters. All the work relatingpromotions, transfer! postings of AAO-II & Jr. Accountant, andrelated issues.

Sr. AO (RE & HQ) He shall handle the REC financing and will be responsible for the. checking! vetting of accounts related matters of various offices!wings at the Vidyut Bhawan (HOl.

Controller of Internal This office will be responsible for the Internal Audit function in theAudit organization. This shall directly report to Director (Finance) and

shall submit their inspection reports and observation to him.

t t I I

S f t t Iec Ions a corpora e eve:JLR:- He will be the head of legal cell of the organization. --

OSD(Telecom) The OSD (Telecom) shall develop and support in implementationoffice: of cost effective and feasible communication system for Power

Sector of Rajasthan as per requirements/ needs of the system.Superintending SE (QC & Inspection & Monitoring) shall develop the qualityEngineer (QC, control mechanism in RVPN for e!ectrical works under turnkey,Inspection partial turnkey and CLRC basis. The quality checks and inspectionMonitoring) of vendor! supplier premises!units for approval! quality checks as

per RVPN requirements. He will carry out surprise checks andinspection of works but also develop the mechanism for qualitychecks and RVPN hold points for checkingl inspectionof works.

---He shall also be responsible for rr.onitorinq the progress ofimplementation of various substations and Line works beingimplemented in the RVPN based on the Turnkey! Partial Turnkeyand Labour contract basis. Also monitoring and analysis of otherdata! information being received for tripping. System performance

(66)

Page 67: 23D10072 - Rajasthanenergy.rajasthan.gov.in/content/dam/raj/energy/corporate-one-lines... · increasedto 10072,ason1.7.2016 bysanctionofpostsonnew!y commissioned ... 11. The work

indices, Effectiveness of various action plans being implemented I

etc. He will develop the various templates for collecting andmonitoring the activitiesl performances of various officesl wings aswell as use the project management software tools for effectivemonitoring of the projects in the Nigam.

SE (Protection SE (Prot. Engg.) will work under Director (Technical) Jaipur. HeEngineering.) shall be responsible for the devising and standardizing of various

protection schemes for implementation in RVPN in line with theNational grid requirements..

OMol~ NO. '0 eJd 0 E3-o<6 ·16

Administration & HRD:CPO/JDP (HRD) All the work relating to HRD planning, promotions, transferl

postings of non gazetted technical (except JENs) & ministerialemployees (except MO-II & Jr Accountant), labour litigation, IRmatters, and labour welfare etc. matters shall be handled by him.He will also be responsible for enquiry cases and handle all typesof recruitment of all the cadres.

SE (HRD & Trg) This circlel section will be responsible for Capacity Building andTraining of the Employees, HRD Initiatives and the Enquires onTechnical Matters.

JS/DS/AS (Pension) All work related to pension's case of employees received forsanction

JS/DS/AS (GAD) JS/OS (GAD) will be the in-Chargeof pool vehicles. He will alsoact as estate manger of Vidyut Bhawan premises. He will also be.,responsible for allotment of telephones, quarter, guest house caseand general administration matters etc

,,_JSIDS (Estt.) JS/OS (Estt) shall be assisted by the three nos. of AS (Estt) forthe service matters of the Engineers and Of(icers and generalAdministration of the Nigam.

AS (APA) He will handle the APA related matters of the officersl officialslJENs. ;-j

LAO He shall be responsible for handling the land related issues of the I

Nigam and shall also be the estate officer for the RVPN. ,___ ~__jPRO He will be responsible for publicity, library, media management, ,

attending dignities, other works as assignment time to time. He will Ialso be responsible for publication of information of public interest ion various newspapers and websites. He will also be act as :

Iorganiser of national festivals etc. ilAO (Admn.) Maintain the GAB store, and deal with the case -'oT!

IL creation/abolition/up-gradation of post/offices and the work iassigned by the Secretary (Admn). i

I.._----

(67)

Page 68: 23D10072 - Rajasthanenergy.rajasthan.gov.in/content/dam/raj/energy/corporate-one-lines... · increasedto 10072,ason1.7.2016 bysanctionofpostsonnew!y commissioned ... 11. The work

... ..... ,l>

ORGANOGRAM OF R'JPN CORPORATE OFFICE

(&"B)

Page 69: 23D10072 - Rajasthanenergy.rajasthan.gov.in/content/dam/raj/energy/corporate-one-lines... · increasedto 10072,ason1.7.2016 bysanctionofpostsonnew!y commissioned ... 11. The work

-------------_ ~~.., /

1 !

(T&C)(MPT&S)

II!:\(PROCUREMENT:\ (CONTRACT],/ \ LOAD ,

-_,I' \". I \". " DESPATCH '-- - - -- "'-, /

3. The Organogram as on 31.07.2016

( 69)