210-05925_isi fas2220_fas2240-2_web
TRANSCRIPT
2 4 6 8
1 3 5 7
10 12 14 16
9 11 13 15
12
11
14
13
16
15
6
5
8
7
10
9
2
1
4
31000/100/10MLNK /
1000/100/10MLNK /
MANAGEMENT SUBNET
• Insert USB flash drive into USB port and install software.
Install System Setup software3
41 2 3 5
51 2 3 4
• “Getting Started” and training videos: https://communities.netapp.com/community/netapp_university/getting_started
• NetApp solutions: http://www.netapp.com/us/solutions/
• Technical reports: http://www.netapp.com/us/library/technical-reports.html
• General information: http://www.netapp.com/us/library/
LEARN MORE
• System Setup information: http://support.netapp.com/NOW/public/system_setup/
• Site Requirements Guide: https://library.netapp.com/ecm/ecm_get_file/ECMP1112530
• Controller and configuration examples: http://support.netapp.com/documentation/productlibrary/index.html?productID=61397
• OnCommand System Manager documentation set: http://support.netapp.com/documentation/productlibrary/index.html?productID=61372
• Data ONTAP 8 library: http://support.netapp.com/documentation/productlibrary/index.html?productID=30092
• Licenses: http://support.netapp.com/eservice/agree.do?moduleName=PROTOCOL
Site Requirements Guide
System Setup landing page
License site for your system
Configuration examples for FAS2220/2240-2 systems
Data ONTAP library • Storage Management Guide• Logical Storage Management Guide• File Access & Protocols Management Guide• Data Protection Guide
OnCommand System Manager documentation set
HELPFUL LINKSVisit the NetApp web site for more information.
HELPFUL LINKSVisit the NetApp web site for more information.
Complete System Setup4
Complete configuration5
• Create an account.• Register your system.• Get your license keys.
Register at support.netapp.com1
• When directed, power on your system (or repower).
• the system. Wait for discover to complete.
• Enter the values from the configuration worksheet into System Setup.*
Start System Setup software4
• Provision more storage.• Configure other protocols and data protection.• Set up Service Processor and Remote Support Agent.
Download OnCommand System Manager2
Cable Windows client2• Cable your Windows client to the
same network as your controllers.
Complete configuration worksheet • Editable worksheet is available on the USB flash drive.
1
1
2
e0b e0d
e0a e0cLNK LNK
0b 0a
! +
-
e0b e0d
e0a e0cLNK LNK
0b 0a
! +
-
A
B
1
2
Both power supplies MUST be powered on.
*If you cannot use System Setup, see the Data ONTAP Software Setup Guide.
WINDOWS CLIENT
VLAN1
2
AC AC
LNK LNK
0b 0a
! +
-
FAS2220/2240-2 SYSTEM
Prepare for installation14 51 2 3
You need to provide:2
Installation and Setup InstructionsFAS2220/FAS2240-2 System
ACCESSORY TRAYFind in the box:1
HELPFUL LINKS ON PAGE 4
USB flash driveContains software and configuration worksheet Starter network,
storage, and10 GbE cables
Power cablesConfiguration
worksheet
Serial cable not needed for this configuration
Microsoft Windows client
Runs the software to configure your storage system
ScrewdriverFor securing hardware
into your racks
Additional network cablesFor connecting your storage to your network
switch and Microsoft® Windows® client
Rack spaceThe FAS2220/2240-2 system
requires 2U of rack space as well as power and network connectivity
4 51 2 3
Single controller model(Dual path to external drives, single path to internal drives)
Double controller model(Multipath HA)
Single controller model Double controller model(Multipath HA)
Single controller model(Dual path to external drives, single path to internal drives)
Double controller model(Multipath HA)
Cabling FAS2220/2240-2 systems with NO external storage
Cabling FAS2220/2240-2 systems WITH external storageDS424x disk shelves
Cabling FAS2220/2240-2 systems WITH external storageDS2246 disk shelves
N
31
42
Disconnect allsupply power forcomplete isolation .
N
31
42
Disconnectallsupplypowerforcompleteisolation .
N
31
42
Disconnect allsupply power forcomplete isolation .
N
31
42
Disconnectallsupplypowerforcompleteisolation .
1
2
AC AC
N
31
42
Disconnect allsupply power forcomplete isolation .
N
31
42
Disconnectallsupplypowerforcompleteisolation .
N
31
42
Disconnect allsupply power forcomplete isolation .
N
31
42
Disconnectallsupplypowerforcompleteisolation .
LNK LNK
0a0b
e0a
e0b
e0c
e0d
IOM3
IOM3
LINK
LINK
IOM3
IOM3
LINK
LINK
IOM3
IOM3
LINK
LINK
IOM3
IOM3
LINK
LINK
N
31
42
Disconnect allsupply power forcomplete isolation .
N
31
42
Disconnectallsupplypowerforcompleteisolation .
N
31
42
Disconnect allsupply power forcomplete isolation .
N
31
42
Disconnectallsupplypowerforcompleteisolation .
1
2
AC AC
N
31
42
Disconnect allsupply power forcomplete isolation .
N
31
42
Disconnectallsupplypowerforcompleteisolation .
N
31
42
Disconnect allsupply power forcomplete isolation .
N
31
42
Disconnectallsupplypowerforcompleteisolation .
LNK LNK
0a0b
e0a
e0b
e0c
e0d
LNK LNK
0a0b
e0a
e0b
e0c
e0d
IOM3
IOM3
LINK
LINK
IOM3
IOM3
LINK
LINK
IOM3
IOM3
LINK
LINK
IOM3
IOM3
LINK
LINK
1
2
AC AC
LNK LNK
0a0b
e0a
e0b
e0c
e0d
1
2
AC AC
LNK LNK
0a0b
e0a
e0b
e0c
e0d
LNK LNK
0a0b
e0a
e0b
e0c
e0d
1
2
AC AC
LNK LNK
0a0b
e0a
e0b
e0c
e0d
1
2
AC AC
IOM3
IOM3
LINK
LINK IOM3
IOM3
LINK
LINK
1
2
AC AC
IOM3
IOM3
LINK
LINK IOM3
IOM3
LINK
LINK
1
2
AC AC
LNK LNK
0a0b
e0a
e0b
e0c
e0d
LNK LNK
0a0b
e0a
e0b
e0c
e0d
1
2
AC AC
IOM3
IOM3
LINK
LINK IOM3
IOM3
LINK
LINK
1
2
AC AC
IOM3
IOM3
LINK
LINK IOM3
IOM3
LINK
LINK
Cable SAS ports
Cable ACP ports
STOP HERE. If you have NO external storage, skip to .
No additional cabling required for single controller.
Cable storage (Choose option A, B, or C below) 3
A
B
C
HELPFUL LINKS ON PAGE 4 For additional configurations, see HELPFUL LINKS.
Network cables
Network cables
Network cables
Daisy chain SAS ports
Cable first SAS ports
Cable last SAS ports
Cable ACP connections
1
2
2
3
4
4
Daisy chain SAS ports
Cable first SAS ports
Cable last SAS ports
Cable ACP connections
1
2
3
Storage cables
Storage cables
Storage cables
2 4 6 8
1 3 5 7
10 12 14 16
9 11 13 15
12
11
14
13
16
15
6
5
8
7
10
9
2
1
4
31000/100/10MLNK /
1000/100/10MLNK /
NETWORK SWITCH
4 51 2 3
FAS2240-2FAS2240-2
PCM Attention LED
NVMEM LED
A
B
1
2
A
B
1
2ACP port(locked wrench icon)
Console port (Setting: 9600 N-8-1)
One or two controller modulesOptional 10 GbE cardSAS ports (2)
BACK VIEW OF SYSTEM
Power supply LEDs
A
B
1
2
Gigabit Ethernet ports (4)
Remote/Node Management port(wrench icon)
Shelf ID display
Bezel
Attention LED
Power LED
FRONT VIEW OF SYSTEM
Both power cords MUST be used for all units.
Install hardware2
LIFTING HAZARDCAUTION
25 kg (55 lbs.)
• Rack the system. - Rail kit: follow instructions in rail kit. - System cabinet: install in system cabinet.
• Place the bezel over the front of the system.
Install system1
Cable controller (7-Mode) (Choose option A or B below) 2
HELPFUL LINKS ON PAGE 4
1
2
AC AC
LNK LNK
0a0b
e0a
e0b
e0c
e0d
LNK LNK
0a0b
e0a
e0b
e0c
e0d
BACK VIEW OF FAS2220/2240-2 SYSTEM
DO NOT power on system at this point.
3 Connect both power cordsPower cords
4
1
1
2
LNK LNK
0b 0a
! +
-
Use retaining clipsUse retaining clips
10/100/1000
Network cables
See your network administrator for help connecting to your switch. See your network administrator for help connecting to your switch.
Attach cable management arms.
Cable port e0a to the network switch.NOTE: Port e0a is required; other ports are available if needed.
Cable the wrench port to the network switch.
Strap the cables to the cable management arms.
4
1
2
3
A
3
2
DATA SWITCH
5 6 7 81 2 3 4 13 14 15 169 10 11 12
12
LNK /SPD LNK /SPD
4
1
10 GbE
Network cables
Attach cable management arms.
Cable port e1a to data switch.
Cable the wrench port to the management switch.
Strap the cables to the cable management arms.
4
1
2
3
B
e1a e1bACTLNK
ACTLNK
1
2
AC
LNK LNK
0a0b
BACK VIEW OF FAS2220/2240-2 SYSTEM
2
2 4 6 8
1 3 5 7
10 12 14 16
9 11 13 15
12
11
14
13
16
15
6
5
8
7
10
9
2
1
4
31000/100/10MLNK /
1000/100/10MLNK /
MANAGEMENT SUBNET
3
10 GbE cables
e1a e1bACTLNK
ACTLNK
4 51 2 3
Single controller model(Dual path to external drives, single path to internal drives)
Double controller model(Multipath HA)
Single controller model Double controller model(Multipath HA)
Single controller model(Dual path to external drives, single path to internal drives)
Double controller model(Multipath HA)
Cabling FAS2220/2240-2 systems with NO external storage
Cabling FAS2220/2240-2 systems WITH external storageDS424x disk shelves
Cabling FAS2220/2240-2 systems WITH external storageDS2246 disk shelves
N
31
42
Disconnect allsupply power forcomplete isolation .
N
31
42
Disconnectallsupplypowerforcompleteisolation .
N
31
42
Disconnect allsupply power forcomplete isolation .
N
31
42
Disconnectallsupplypowerforcompleteisolation .
1
2
AC AC
N
31
42
Disconnect allsupply power forcomplete isolation .
N
31
42
Disconnectallsupplypowerforcompleteisolation .
N
31
42
Disconnect allsupply power forcomplete isolation .
N
31
42
Disconnectallsupplypowerforcompleteisolation .
LNK LNK
0a0b
e0a
e0b
e0c
e0d
IOM3
IOM3
LINK
LINK
IOM3
IOM3
LINK
LINK
IOM3
IOM3
LINK
LINK
IOM3
IOM3
LINK
LINK
N
31
42
Disconnect allsupply power forcomplete isolation .
N
31
42
Disconnectallsupplypowerforcompleteisolation .
N
31
42
Disconnect allsupply power forcomplete isolation .
N
31
42
Disconnectallsupplypowerforcompleteisolation .
1
2
AC AC
N
31
42
Disconnect allsupply power forcomplete isolation .
N
31
42
Disconnectallsupplypowerforcompleteisolation .
N
31
42
Disconnect allsupply power forcomplete isolation .
N
31
42
Disconnectallsupplypowerforcompleteisolation .
LNK LNK
0a0b
e0a
e0b
e0c
e0d
LNK LNK
0a0b
e0a
e0b
e0c
e0d
IOM3
IOM3
LINK
LINK
IOM3
IOM3
LINK
LINK
IOM3
IOM3
LINK
LINK
IOM3
IOM3
LINK
LINK
1
2
AC AC
LNK LNK
0a0b
e0a
e0b
e0c
e0d
1
2
AC AC
LNK LNK
0a0b
e0a
e0b
e0c
e0d
LNK LNK
0a0b
e0a
e0b
e0c
e0d
1
2
AC AC
LNK LNK
0a0b
e0a
e0b
e0c
e0d
1
2
AC AC
IOM3
IOM3
LINK
LINK IOM3
IOM3
LINK
LINK
1
2
AC AC
IOM3
IOM3
LINK
LINK IOM3
IOM3
LINK
LINK
1
2
AC AC
LNK LNK
0a0b
e0a
e0b
e0c
e0d
LNK LNK
0a0b
e0a
e0b
e0c
e0d
1
2
AC AC
IOM3
IOM3LIN
K
LINK IOM3
IOM3
LINK
LINK
1
2
AC AC
IOM3
IOM3
LINK
LINK IOM3
IOM3
LINK
LINK
Cable SAS ports
Cable ACP ports
STOP HERE. If you have NO external storage, skip to .
No additional cabling required for single controller.
Cable storage (Choose option A, B, or C below) 3
A
B
C
HELPFUL LINKS ON PAGE 4 For additional configurations, see HELPFUL LINKS.
Network cables
Network cables
Network cables
Daisy chain SAS ports
Cable first SAS ports
Cable last SAS ports
Cable ACP connections
1
2
2
3
4
4
Daisy chain SAS ports
Cable first SAS ports
Cable last SAS ports
Cable ACP connections
1
2
3
Storage cables
Storage cables
Storage cables
2 4 6 8
1 3 5 7
10 12 14 16
9 11 13 15
12
11
14
13
16
15
6
5
8
7
10
9
2
1
4
31000/100/10MLNK /
1000/100/10MLNK /
NETWORK SWITCH
4 51 2 3
FAS2240-2FAS2240-2
PCM Attention LED
NVMEM LED
A
B
1
2
A
B
1
2ACP port(locked wrench icon)
Console port (Setting: 9600 N-8-1)
One or two controller modulesOptional 10 GbE cardSAS ports (2)
BACK VIEW OF SYSTEM
Power supply LEDs
A
B
1
2
Gigabit Ethernet ports (4)
Remote/Node Management port(wrench icon)
Shelf ID display
Bezel
Attention LED
Power LED
FRONT VIEW OF SYSTEM
Both power cords MUST be used for all units.
Install hardware2
LIFTING HAZARDCAUTION
25 kg (55 lbs.)
• Rack the system. - Rail kit: follow instructions in rail kit. - System cabinet: install in system cabinet.
• Place the bezel over the front of the system.
Install system1
Cable controller (7-Mode) (Choose option A or B below) 2
HELPFUL LINKS ON PAGE 4
1
2
AC AC
LNK LNK
0a0b
e0a
e0b
e0c
e0d
LNK LNK
0a0b
e0a
e0b
e0c
e0d
BACK VIEW OF FAS2220/2240-2 SYSTEM
DO NOT power on system at this point.
3 Connect both power cordsPower cords
4
1
1
2
LNK LNK
0b 0a
! +
-
Use retaining clipsUse retaining clips
10/100/1000
Network cables
See your network administrator for help connecting to your switch. See your network administrator for help connecting to your switch.
Attach cable management arms.
Cable port e0a to the network switch.NOTE: Port e0a is required; other ports are available if needed.
Cable the wrench port to the network switch.
Strap the cables to the cable management arms.
4
1
2
3
A
3
2
DATA SWITCH
5 6 7 81 2 3 4 13 14 15 169 10 11 12
12
LNK /SPD LNK /SPD
4
1
10 GbE
Network cables
Attach cable management arms.
Cable port e1a to data switch.
Cable the wrench port to the management switch.
Strap the cables to the cable management arms.
4
1
2
3
B
e1a e1bACTLNK
ACTLNK
1
2
AC
LNK LNK
0a0b
BACK VIEW OF FAS2220/2240-2 SYSTEM
2
2 4 6 8
1 3 5 7
10 12 14 16
9 11 13 15
12
11
14
13
16
15
6
5
8
7
10
9
2
1
4
31000/100/10MLNK /
1000/100/10MLNK /
MANAGEMENT SUBNET
3
10 GbE cables
e1a e1bACTLNK
ACTLNK
2 4 6 8
1 3 5 7
10 12 14 16
9 11 13 15
12
11
14
13
16
15
6
5
8
7
10
9
2
1
4
31000/100/10MLNK /
1000/100/10MLNK /
MANAGEMENT SUBNET
• Insert USB flash drive into USB port and install software.
Install System Setup software3
41 2 3 5
51 2 3 4
• “Getting Started” and training videos: https://communities.netapp.com/community/netapp_university/getting_started
• NetApp solutions: http://www.netapp.com/us/solutions/
• Technical reports: http://www.netapp.com/us/library/technical-reports.html
• General information: http://www.netapp.com/us/library/
LEARN MORE
• System Setup information: http://support.netapp.com/NOW/public/system_setup/
• Site Requirements Guide: https://library.netapp.com/ecm/ecm_get_file/ECMP1112530
• Controller and configuration examples: http://support.netapp.com/documentation/productlibrary/index.html?productID=61397
• OnCommand System Manager documentation set: http://support.netapp.com/documentation/productlibrary/index.html?productID=61372
• Data ONTAP 8 library: http://support.netapp.com/documentation/productlibrary/index.html?productID=30092
• Licenses: http://support.netapp.com/eservice/agree.do?moduleName=PROTOCOL
Site Requirements Guide
System Setup landing page
License site for your system
Configuration examples for FAS2220/2240-2 systems
Data ONTAP library • Storage Management Guide• Logical Storage Management Guide• File Access & Protocols Management Guide• Data Protection Guide
OnCommand System Manager documentation set
HELPFUL LINKSVisit the NetApp web site for more information.
HELPFUL LINKSVisit the NetApp web site for more information.
Complete System Setup4
Complete configuration5
• Create an account.• Register your system.• Get your license keys.
Register at support.netapp.com1
• When directed, power on your system (or repower).
• the system. Wait for discover to complete.
• Enter the values from the configuration worksheet into System Setup.*
Start System Setup software4
• Provision more storage.• Configure other protocols and data protection.• Set up Service Processor and Remote Support Agent.
Download OnCommand System Manager2
Cable Windows client2• Cable your Windows client to the
same network as your controllers.
Complete configuration worksheet • Editable worksheet is available on the USB flash drive.
1
1
2
e0b e0d
e0a e0cLNK LNK
0b 0a
! +
-
e0b e0d
e0a e0cLNK LNK
0b 0a
! +
-
A
B
1
2
Both power supplies MUST be powered on.
*If you cannot use System Setup, see the Data ONTAP Software Setup Guide.
WINDOWS CLIENT
VLAN1
2
AC AC
LNK LNK
0b 0a
! +
-
FAS2220/2240-2 SYSTEM
Prepare for installation14 51 2 3
You need to provide:2
Installation and Setup InstructionsFAS2220/FAS2240-2 System
ACCESSORY TRAYFind in the box:1
HELPFUL LINKS ON PAGE 4
USB flash driveContains software and configuration worksheet Starter network,
storage, and10 GbE cables
Power cablesConfiguration
worksheet
Serial cable not needed for this configuration
Microsoft Windows client
Runs the software to configure your storage system
ScrewdriverFor securing hardware
into your racks
Additional network cablesFor connecting your storage to your network
switch and Microsoft® Windows® client
Rack spaceThe FAS2220/2240-2 system
requires 2U of rack space as well as power and network connectivity