ATF2 High Availability DC Magnet Power Supplies
By Paul Bellomo, Antonio de Lira, David MacNair and Briant Lam*
![Page 2: 21 March 2007ATF2 Power Supplies ATF2 High Availability DC Magnet Power Supplies By Paul Bellomo, Antonio de Lira, David MacNair and Briant Lam* *bri@slac.stanford.edu](https://reader036.vdocuments.site/reader036/viewer/2022082612/56649ec85503460f94bd5966/html5/thumbnails/2.jpg)
Topics
• Current Progress– Purchased Parts
• Pending Items
• Commissioning Schedule– With everything ready– Without magnets
![Page 3: 21 March 2007ATF2 Power Supplies ATF2 High Availability DC Magnet Power Supplies By Paul Bellomo, Antonio de Lira, David MacNair and Briant Lam* *bri@slac.stanford.edu](https://reader036.vdocuments.site/reader036/viewer/2022082612/56649ec85503460f94bd5966/html5/thumbnails/3.jpg)
Schedule
![Page 4: 21 March 2007ATF2 Power Supplies ATF2 High Availability DC Magnet Power Supplies By Paul Bellomo, Antonio de Lira, David MacNair and Briant Lam* *bri@slac.stanford.edu](https://reader036.vdocuments.site/reader036/viewer/2022082612/56649ec85503460f94bd5966/html5/thumbnails/4.jpg)
Purchased Parts• Power Supplies:
– OCEM HA Power Supplies - September 2007• Received schematics on 16 March 2007
• Bulk Power Supplies:– Lambda-EMI ESS 40V 250A - May 2007
• Ethernet Power Supply Controllers– SLAC - June 2007
• Racks– Out for bid (Build to print) - May 2007
• PLC– Allen Bradley ControlLogix - May 2007
![Page 5: 21 March 2007ATF2 Power Supplies ATF2 High Availability DC Magnet Power Supplies By Paul Bellomo, Antonio de Lira, David MacNair and Briant Lam* *bri@slac.stanford.edu](https://reader036.vdocuments.site/reader036/viewer/2022082612/56649ec85503460f94bd5966/html5/thumbnails/5.jpg)
Pending Purchase
• Cables– Intra-rack Control Cables– Intra-rack Power Cables
• Fans– Pending design– Suggestions from OCEM
![Page 6: 21 March 2007ATF2 Power Supplies ATF2 High Availability DC Magnet Power Supplies By Paul Bellomo, Antonio de Lira, David MacNair and Briant Lam* *bri@slac.stanford.edu](https://reader036.vdocuments.site/reader036/viewer/2022082612/56649ec85503460f94bd5966/html5/thumbnails/6.jpg)
Pending Items
• System Drawings– Rack Layout– Power Systems Wiring Diagram– PLC Chassis
• Assembly– Starts after Racks are received
• Test– Starts after Assembly
![Page 7: 21 March 2007ATF2 Power Supplies ATF2 High Availability DC Magnet Power Supplies By Paul Bellomo, Antonio de Lira, David MacNair and Briant Lam* *bri@slac.stanford.edu](https://reader036.vdocuments.site/reader036/viewer/2022082612/56649ec85503460f94bd5966/html5/thumbnails/7.jpg)
Commissioning Schedule
![Page 8: 21 March 2007ATF2 Power Supplies ATF2 High Availability DC Magnet Power Supplies By Paul Bellomo, Antonio de Lira, David MacNair and Briant Lam* *bri@slac.stanford.edu](https://reader036.vdocuments.site/reader036/viewer/2022082612/56649ec85503460f94bd5966/html5/thumbnails/8.jpg)
Commissioning Schedule (Two steps if magnets are not ready)