1 WELCOME U.S. 17-92 (Orlando Avenue) Improvements from south of Nottingham Street to south of Monroe Avenue Orange County Financial Project ID (FPID) Number: 408429-2 Federal Aid Project (FAP) Number: D 518 071 B The public hearing will begin promptly at 6 p.m. 5:30 p.m. Open House 6 p.m. Formal Presentation Public Comment Period FPID 408429-2 | PUBLIC HEARING | APRIL 29, 2021

Upload: others

Post on 13-Jan-2022

1 views

Category:

Documents


0 download

TRANSCRIPT

1

WELCOMEU.S. 17-92 (Orlando Avenue) Improvements from south of Nottingham Street to south of Monroe AvenueOrange CountyFinancial Project ID (FPID) Number: 408429-2Federal Aid Project (FAP) Number: D 518 071 B

The public hearing will begin promptly at 6 p.m.

5:30 p.m. Open House

6 p.m. Formal Presentation

Public Comment Period

FPID 408429-2 | PUBLIC HEARING | APRIL 29, 2021

Eliode Joseph, P.E.

FDOT Project Manager

Lynn Hogan, AICPHearing Moderator

Rhet Schmidt, P.E.Project Consultant

Welcome

2FPID 408429-2 | PUBLIC HEARING | APRIL 29, 2021

Dial-in attendees are “listen only”.

A copy of the presentation is available atwww.cflroads.com/project/408429-2

In-Person

Virtual Dial-In

Hybrid Hearing

About the Public Hearing

This public hearing is being conducted in a hybrid format. Participants can attend:

• In-Person• Virtual• Dial-In

.

3FPID 408429-2 | PUBLIC HEARING | APRIL 29, 2021

Desktop

Mobile

GoToWebinar Control Panel

FPID 408429-2 | PUBLIC HEARING | APRIL 29, 2021 4

Send an email to Kristina King

[email protected]

Type a message

in the Questions box on

GoToWebinarControl panel

?

Call 941-228-2789

To report a technical issue…

FPID 408429-2 | PUBLIC HEARING | APRIL 29, 2021 5

Please submit your comments and questions by

May 13, 2021.

A recording of this presentation will be posted following the

hearing.

About Your Comments and Questions

All comments and questions are part of the Public Record.

FPID 408429-2 | PUBLIC HEARING | APRIL 29, 2021 6

In-person at the microphone

Please complete a speaker request card and return to project staff.

Online using GoToWebinar

Please unmute yourself when called upon.

By phone

Call the FDOT Project Managerafter the public hearing

Verbal Comments and Questions

Multiple ways to submit:

Eliode Joseph 386-943-5388

FPID 408429-2 | PUBLIC HEARING | APRIL 29, 2021 7

PROJECT MANAGER

• In-person using comment form

• Online using GoToWebinar

Type your comment/ question in the Questions box

• Online at the project website

• By email toFDOT Project Manager

• By U.S. mail toFDOT Project Manager

Eliode Joseph, P.E.Florida Department of Transportation

719 South Woodland Boulevard, MS 542DeLand, Florida 32720

[email protected]

Written Comments and Questions

cflroads.com/project/408429-2

PROJECT WEBSITE

FPID 408429-2 | PUBLIC HEARING | APRIL 29, 2021 8

Title VI Compliance

All inquiries or concerns will be handled according to FDOT procedure and in a prompt and courteous manner.

Jacqueline ParamoreState Title VI Coordinator

605 Suwannee Street, Mail Station 65Tallahassee, Florida [email protected]

Jennifer Smith District Five Title VI Coordinator

719 South Woodland Boulevard DeLand, Florida [email protected]

Public participation is solicited without regard to

race, color, national origin, age, sex, religion,

disability, or family status. Persons wishing to

express concerns relative to FDOT compliance

with Title VI may do so by contacting:

Title VI of the Civil Rights Act of 1964

FPID 408429-2 | PUBLIC HEARING | APRIL 29, 2021 9

Public Notice

Department/project webpage

Email to project contacts list

Property owner/tenant letters

Social mediaNewspapers

Florida Administrative Register

FPID 408429-2 | PUBLIC HEARING | APRIL 29, 2021 10

PUBLIC HEARINGU.S. 17-92 (Orlando Avenue) Improvements from south of Nottingham Street to south of Monroe AvenueOrange County, FloridaFinancial Project ID (FPID) Number: 408429-2Federal Aid Project (FAP) Number: D 518 071 B

Agenda

5:30 p.m. Open House

6 p.m. Formal Presentation

Public Comment Period

FPID 408429-2 | PUBLIC HEARING | APRIL 29, 2021 11

Monroe Ave

Fairbanks Ave

Morse Blvd

Winter Park

Project Overview

FPID 408429-2 | PUBLIC HEARING | APRIL 29, 2021

Orla

ndo A

veO

rlan

do A

ve

End

Begin

12

Project Schedule

• PD&E Study in 2004

• Corridor Assessment in 2016

• Design began in 2018, and a public meeting was held in early 2019

• Design estimated to be complete in spring 2022

• Right of way acquisition and construction are currently not funded

FPID 408429-2 | PUBLIC HEARING | APRIL 29, 2021 13

2018 2019Year2020 2021 2022

Public Involvement

Design Plans

Public Meeting Public Hearing

Improvements Overview

• Roadway improvements

• Safety and aesthetic enhancements

• Pedestrian improvements

• Intersection improvements

• Median modifications

14FPID 408429-2 | PUBLIC HEARING | APRIL 29, 2021

Roadway Improvements

15FPID 408429-2 | PUBLIC HEARING | APRIL 29, 2021

• From south of Nottingham Street to OrangeAvenue, the roadway footprint will remain thesame. The concrete pavement will be repaired.

• From Orange Avenue to Gay Road, the travellanes will be 11 feet wide, and the center left turnlane will be 12 feet wide. The bike lanes will beremoved, and the concrete pavement will berepaired.

• From Lee Road to south of Monroe Avenue, therewill be two 12-foot-wide northbound travel lanesand three 12-foot-wide southbound travel lanes.The concrete on the northbound lanes will berepaired, and the southbound lanes, which areasphalt, will be repaved.

U.S. 17-92 from south of Nottingham Street to Orange Avenue

U.S. 17-92 from Orange Avenue to Gay Road

U.S. 17-92 from Lee Road to south of Monroe Avenue

The typical sections shown here are graphic representations of the proposed U.S. 17-92 roadway improvements.

The proposed U.S. 17-92 typical section, from Orange Avenue to Gay Road, does not

feature dedicated bicycle lanes.

Monro

e A

ve

Fa

irba

nks A

ve

Morse

Blvd

Denning Drive

Webste

r Ave

Min

ne

sota

Ave

Ha

rmo

n A

ve

Proposed New Bicycle Route

END PROJECT

Proposed U.S. 17-92 (from Orange Avenue to Gay Road)

BEGIN PROJECT

From the south end of the project on northbound U.S. 17-92 or eastbound Orange Avenue, bicyclists could take Harmon Avenue east to the Denning Drive multi-use trail.

Gay R

oad

FPID 408429-2 | PUBLIC HEARING | APRIL 29, 2021

If traveling on southbound U.S. 17-92 from north of the project, bicyclists can safely cross U.S. 17-92 at the Lee Road signalized intersection, take the Lee Road extension

east to Webster Avenue, and on to the Denning Drive multi-use trail

From Denning Drive, bicyclists can access U.S. 17-92 via side streets between Orange Avenue and Lee Road.

16

Corridor Safety and Aesthetic Enhancements

Add landscaping slide…

FPID 408429-2 | PUBLIC HEARING | APRIL 29, 2021 17

• FDOT is partnering with the City of Winter Park toenhance safety and aesthetics through:

• Decorative street lighting

• Enhanced crosswalks

• Decorative streetscape,hardscape, and landscaping

• Additional coordination is ongoing, includingthe cost of aesthetic enhancements.

Pedestrian Improvements

FPID 408429-2 | PUBLIC HEARING | APRIL 29, 2021 18

• Upgraded pedestrian signals andcrosswalks

• Reconstructed sidewalk curb rampsto meet Americans with DisabilitiesAct (ADA) standards

• Enhanced lighting, landscaping, andstreetscape improvements

• Repairs to existing sidewalks, andnew, wider sidewalks, alongU.S. 17-92 from Orange Avenue toWebster Avenue

Intersection Improvements Intersection Reconstruction

Fairbanks Avenue

Morse Boulevard

Webster Avenue

Three U.S. 17-92 intersections will be completely reconstructed to provide pedestrian and traffic improvements:

• Webster Avenue

• Morse Boulevard

• Fairbanks Avenue

FPID 408429-2 | PUBLIC HEARING | APRIL 29, 2021 19

Intersection Improvements

10

• Traffic signal poles upgraded to mast arm signal poles at:

• Webster Avenue

• Morse Boulevard

• Fairbanks Avenue

• Orange Avenue

• Minnesota Avenue

• Existing mast arm signal poles at Gay Road and Lee Road will beupgraded to meet current design standards.

Orange Avenue Minnesota Avenue

FPID 408429-2 | PUBLIC HEARING | APRIL 29, 2021

Lee RoadGay Road

20

Intersection ImprovementsNew Eastbound Left Turn Lanes

To address traffic delays for westbound traffic on Orange Avenue and Fairbanks Avenue at U.S. 17-92, new eastbound left turn lanes will be

constructed to reduce backups on these cross streets.

FPID 408429-2 | PUBLIC HEARING | APRIL 29, 2021 21

North

North

Additional

Left Turn Lane

Additional

Left Turn Lane

Median Modifications

.

.

Existing U.S. 17-92 Raised Median

FPID 408429-2 | PUBLIC HEARING | APRIL 29, 2021 22

• Raised medians, either paved or landscaped, separate vehiculartraffic and improve safety by reducing conflict points between turningvehicles.

• In addition to safety benefits, medians can improve the overallaesthetics of an area.

New Raised Medians Garden Drive and Vivian Avenue

FPID 408429-2 | PUBLIC HEARING | APRIL 29, 2021 23

Raised Median

Raised Median

GA

RD

EN

DR

ORLANDO AVE LE

ITH

AV

E

CA

ME

LIA

DR

• New raised medians are proposed north and south of the SunRail crossing atGarden Drive and Vivian Avenue to improve safety at this location

• Pedestrian rail crossing gates will also be installed. When activated by anapproaching train, the automatic gates are used to help prevent pedestrians fromcrossing the tracks.

• Roadway pavement, sidewalks, and sidewalk curb ramps will be repaired

New Raised Median north of Aragon Avenue

Northbound vehicles on U.S. 17-92 routinely use the center two-way left turn lane as a travel lane to bypass traffic and turn left at Fairbanks Avenue, creating conflicts with:

ORLANDO AVE

FAIR

BA

NK

S A

VERaised Median

FPID 408429-2 | PUBLIC HEARING | APRIL 29, 2021 24

KE

NT

UC

KY

AV

E

AR

AG

ON

AV

E

GE

NE

ST

• Vehicles in the center two-way left turn lane

• Northbound vehicles entering the left turn lane closer to Fairbanks Avenue

• Pedestrians crossing U.S. 17-92 at this location

GL

EN

DO

N P

KY

Median Modifications north of Lee Road

Medians will also be modified at the following locations:

ORLANDO AVE

FR

IEN

DS

AV

E

DIX

ON

AV

E

LE

E R

OA

D

MO

NR

OE

AV

E

EL

VIN

AV

E

FPID 408429-2 | PUBLIC HEARING | APRIL 29, 2021 25

KIN

DE

L A

VE

• Friends Avenue – Directional (existing)

• Glendon Parkway – Full Opening

• Solana Avenue – Closed

• Elvin Avenue – Directional

• Monroe Avenue – Closed

Access Management Information

FPID 408429-2 | PUBLIC HEARING | APRIL 29, 2021 26

• Many of the project enhancementspresented today are accessmanagement improvements.

• You can learn more aboutaccess management in theDepartment's Access Managementbrochure, which is available onlineat www.fdot.gov, or by contactingthe FDOT project manager.

Right of Way Requirements

FPID 408429-2 | PUBLIC HEARING | APRIL 29, 2021 27

• No business or residential relocations are required for this project.

• Additional right of way is needed for the new left turn lanes atOrange Avenue and Fairbanks Avenue.

• Small sections of land at intersection corners for Americans withDisabilities Act (ADA) and signal improvements.

• Easements for sidewalk and driveway construction andmaintenance

• If right of way or an easement on your property is needed for thisproject, you will be contacted by the Department by mail and willhave the opportunity to ask questions and provide your comments.

Minimizing Temporary Construction Impacts

FPID 408429-2 | PUBLIC HEARING | APRIL 29, 2021 28

• Early and ongoing stakeholdercoordination

• Maintain pedestrian, driveway, andproperty access

• Maintain traffic on U.S. 17-92

• Nighttime lane closures needed forroadway pavement rehabilitation

• Short-term detours may be needed forintersection reconstruction

Responses will be provided in writing following the hearing.

OnlineIn-person By phone

Public Comment Period

Please complete a Speaker Request Card in advance.

FPID 408429-2 | PUBLIC HEARING | APRIL 29, 2021 29

Public Comment PeriodVerbal comments and questions

• In-person at the microphone

• Fill out a Speaker Request Card

• Online using the GoToWebinar

Control Panel

• If you have not already, type

your name and request to

speak in the GoToWebinar

question box.

• Call after the public hearing

See GoToWebinar

Control Panel

Call Project Manager at: 386-943-5388

FPID 408429-2 | PUBLIC HEARING | APRIL 29, 2021 30

• Fill out a speaker request card

• Come to the microphone whencalled upon

• State your name and address

• Provide your comments/questionswithin a 3-minute time frame.

Public Comment Period In-Person Participants

FPID 408429-2 | PUBLIC HEARING | APRIL 29, 2021 31

• Fill out a speaker request card

• Come to the microphone whencalled upon

• State your name and address

• Provide your comments/questionswithin a 3-minute time frame.

Public Comment Period In-Person Participants

FPID 408429-2 | PUBLIC HEARING | APRIL 29, 2021 32

When your name is called to speak, please:

• Unmute yourself

• State your name and address

• Provide your comments/questionswithin a 3-minute time frame.

Unmute

/Mute

button

See GoToWebinar

Control Panel

For technical assistance, please notify staff using the questions box in the control panel.

Public Comment Period Online Participants

FPID 408429-2 | PUBLIC HEARING | APRIL 29, 2021 33

When your name is called to speak, please:

• Unmute yourself

• State your name and address

• Provide your comments/questionswithin a 3-minute time frame.

Unmute

/Mute

button

See GoToWebinar

Control Panel

For technical assistance, please notify staff using the questions box in the control panel.

Public Comment Period Online Participants

FPID 408429-2 | PUBLIC HEARING | APRIL 29, 2021 34

386-943-5388

Please submit comments and questions by May 13, 2021

Florida Department of Transportation

719 S. Woodland Boulevard, MS 542DeLand, Florida 32720

[email protected]

www.cflroads.com/project/408429-2

Thank You For Participating.

FPID 408429-2 | PUBLIC HEARING | APRIL 29, 2021 35