Project Driven Supply Chain (PDSC)

Hub and Spoke Solution

A joint Solution from Infosys and Oracle

Collaborate 2013

Page 2: 205210 project driven supply chain (pdsc)

Industry Challenges

2

Constant change of engineering

specifications affecting ability to deliver

products On time

High inventory cost to meet service levels

Lack of integration between manufacturing

and installation service

Lack of process alignment and system

design

• Change in engineering specs

• Change in BOM, Planning BOM

vs. Project BOM

• Keeping track of part numbers

• Keeping delivery in Sync with

project plan

• Inventory build up to meet high

degree of service levels

• High inventory build up cost to

meet service levels

• Reduced operational efficiency

due to high inventory

• Project plan and supply plan is out

of sync

• Change in plan not reflected in

other plan

• Project critical path not adequately

communicated to supply planning

• Process & systems are in silo’s

• Process & systems are sub optimal

• Lack of trust between functions

• Lack of visibility

Page 3: 205210 project driven supply chain (pdsc)

Industry ChallengesChange in engineering specs..

3

SEQ PART NUMBER

0 PBA166370-1

1 PBA166370-2

1.1 PBA166370-3

1.1.1 PBA166370-4

1.1.1.1 PBA166370-5

1.1.2 PBA166370-7

2 PBA166370-88

2.1 PBA166370-89

SEQ PART NUMBER

0 PBA166370-1

1 PBA166370-2

1.1 PBA166370-3

1.1.1 PBA166370-4

1.1.1.1 PBA166370-5

1.1.1.2 PBA166370-6

1.1.2 PBA166370-7

2 PBA166370-88

2.1 PBA166370-89O

rig

ina

l P

lan

Ch

an

ge

d P

lan

Original

Spec

Changed

Spec

Change in spec results in change in datesKeeping track of BOM change is

a major concern

New part number due

to change in specsDelay in shipment

due to change in

specs

Shipping date of

part number is

aligned with

project plan

Page 4: 205210 project driven supply chain (pdsc)

Project Management Supply Planning

Industry ChallengesHigh inventory cost to meet desired service levels..

4

Origin

al P

lan

“On time” delivery

Improved Service Levels

High Customer

Satisfaction

Increased

inventory cost

Hold high

inventory

Results in..

Page 5: 205210 project driven supply chain (pdsc)

Supply DisruptionKey Component Shortage

11

Supply Planner

Supply Planner identifies that

few Sales Orders would not

be completed on time due to

disruption in Supplies .

Supply Planner

Supply Planner receives

information that there would

be a disruption in the

Supplies for a particular

component from the Vendor.

PM Dashboard is reviewed and based

upon it the Supply Planner decides to

Delay non critical Projects (Sales Orders)

in Baseline Plan

Supply Planner / Project

Manager

RP

Supplier

Capacity

Dashboard

1. Supply

Disruption

2. Impact

Analysis

3. Send Information

to Project Manager (e-mail)

4. Decision

Project Manager

Update Baseline

Plan

ERP /

Legacy System

5. Update ERP/Legacy

Project Manager

Project Manager

Analysis the

impact of late

Penalty.

Project

Management

Dashboard

Dashboard displays

the Late Penalty

factor for the Projects

getting delayed.

Dashboard displays

the Supplier Capacity

impact on the Current

Sales Orders or

Projects.

Page 6: 205210 project driven supply chain (pdsc)

Supply Disruption – Use Case Execution

12

Creates Baseline

Supply plan with

data sync up from

Primavera

Supply Planner

1Review future

Projects & identify

Revenue Shortfall

Run simulation

plan after updating

the disrupted

supplier capacity

Supply Planner

2Displays the

Capacity Impact

Dashboard

Supply Planner

3Sends the dates to

Primavera for

Analysis

Supply Planner

4

Creates Reflection

Plan for What If

Analysis

Project Manager

5Triggers the

interface for

receiving dates

Project Manager

6Analyze the Late

Penalty

Dashboards

PM/Supply Planner

7

Supply Planner

8

Supply Planner

9

Sends the dates

back to Primavera

for Analysis

Supply Planner

10

Creates a new

reflection plan and

triggers interface

Analyze the

Optimized Late

Penalty Charges

11 12

Project Manager Project Manager

Run simulation

plan after updating

the supplier

capacity

Update the

simulation plan

with supplies from

additional supplier

Page 7: 205210 project driven supply chain (pdsc)

Supply Disruption – As Is State

13

SO numbers

aligned to the

Projects

Zero Variance

indicating

Projects are on

track

Portfolio of 5

Projects

Page 8: 205210 project driven supply chain (pdsc)

15

Executive

Review

Revenue

Forecast

Identify

Revenue

Shortfall

PMO

Analysis of

Revenue

Forecast

Identify

Projects

for

Revenue

Pull- In

CFO PMO Project Manager

What if

Analysis

Projects

Analyze

cost

Analyze

Revenue

Analyze

Headcount

Requireme

nt

Status

Meetings

Supply Planner

S&OP

Review

Meetings

What If

analysis for

Revenue Pull-

In

What if

analysis

Supply

Planner

Revenue Shaping

CFO

Dashboards

PMO

DashboardsPM

Dashboards

Runs &

Analyze

various

Simulation

Plans

Suggest best

possible

solution back

to Project

Manager

Supply

Planner

Dashboards

Page 9: 205210 project driven supply chain (pdsc)

Revenue Shaping

16

Executive reviews

revenue forecast

PMO analyses the

portfolio to identify

opportunities for

expediting project

deliveries

Identifies Projects

for What if

analysis

Identifies Revenue

Shortfall

Page 10: 205210 project driven supply chain (pdsc)

PM Analysis

17

Incremental

Revenue

Incremental

Headcount

Incremental Cost

due to Contract

Resources

Page 11: 205210 project driven supply chain (pdsc)

18

Revenue Shaping

Total Cost associated

with various Simulation

Plans

Charts show

parameters Revenue

and Gross Margin

associated with

Simulation Plans

Page 12: 205210 project driven supply chain (pdsc)

19

On time

metrics

Engg.

Submittals

Drill down

Engg.

Submittals

On Time

metrics

Shipments

Drill down

Shipments

Engineering

Manager

Procurement Manager Project Manager

Engineering

review

On time

metrics

delivery

milestones

Critical

Path

Analysis

Supply Planner

“On Time” Delivery

Procurement

Review

Project

Milestones

Review

Headcount

Analysis

Impact of

penaltiesEngg. Manager

Dashboards

Procurement

Manager Dashboard

PM

Dashboard

What if

analysis

Supply

Planner

Runs &

Analyze

various

Simulation

Plans

Suggest best

possible

solution back

to Project

Manager

Supply

Planner

Dashboards

Page 13: 205210 project driven supply chain (pdsc)

On Time Delivery – Engineering Submittals & Procurement

20

On Time delivery

Status -

Engineering

Submittals

On Time delivery

Status –

Procurement

• Engineering submittals grouped by

“On time” delivery metrics – Red,

Yellow, Green.

• Pie Chart projects the percentage

number of submittals in red, green

and yellow categories

• Drill down shows the details of

engineering submittals

• Shipments grouped by “On time”

delivery metrics – Red, Yellow, Green

• Pie Chart projects the percentage

number of shipments in red, green

and yellow categories

• Drill down shows the details of

shipments

Page 14: 205210 project driven supply chain (pdsc)

Late Penalty

21

• Projects categorized into Red,

Yellow and Green depending on

the late penalty charges

• Pie Chart shows the number of

projects in Red, Yellow and

Green Categories

• Drilldown provides information

on late penalty charges of

projects in the portfolio.

• Details on penalty charges

grouped by Business Unit

Projects on

time with no

late penalty

Drilldown to show

the late penalty

charges

Count of Projects

in different

categories

Page 15: 205210 project driven supply chain (pdsc)

On Time Delivery- Milestone Status

22

Number of

Milestones

Delayed

Impacted

Revenue Due to

Delayed Milestone

• Milestones are grouped by “On time”

delivery metrics - Red, Green and

Yellow

• Narrow down the search to specific

Quarters, Business Unit and

Customers

• Histogram to shows milestone count in

monthly time buckets.

• Pie chart projects the percentage

number of milestones in red, green

and yellow categories.

• Drill down provides

information on impacted

revenue due to the delay in

milestones

• Pie chart projects the

percentage of milestones in

red, green , yellow categories

for the particular month

Page 16: 205210 project driven supply chain (pdsc)

Increase in Project

Demand Percentage

shows more projects

gets complete on time

Increase in On

Time Delivery for

Individual

Customers

On Time Delivery

Project Demand %

increases

Page 17: 205210 project driven supply chain (pdsc)

THANK YOU

www.infosys.com

The contents of this document are proprietary and confidential to Infosys Limited and may not be disclosed in

whole or in part at any time, to any third party without the prior written consent of Infosys Limited.

© 2011 Infosys Limited. All rights reserved. Copyright in the whole and any part of this document belongs to

Infosys Limited. This work may not be used, sold, transferred, adapted, abridged, copied or reproduced in

whole or in part, in any manner or form, or in any media, without the prior written consent of Infosys Limited.