2020 rms cement concrete producer user manual rms... · 2020-02-04 · the cement concrete producer...

29
1 2020 Cement Concrete Producer User Manual For the submission of Prequalification Documentation for MassDOT Approval MassDOT RMS 12/09/2019 The purpose of this document is to establish a procedure for the Cement Concrete Producer submission of Prequalification Documentation. The following is a step by step procedure Producers must follow to ensure all required Prequalification Documentation is submitted by the Producer and is received by MassDOT Research & Materials (RMS).

Upload: others

Post on 28-May-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 2020 RMS Cement Concrete Producer User Manual RMS... · 2020-02-04 · The Cement Concrete Producer requiring acce ss to the SharePoint site will receive an email notice to obtain

1

2020 Cement Concrete Producer User Manual

For the submission of Prequalification Documentation for MassDOT Approval

MassDOT RMS 12/09/2019

The purpose of this document is to establish a procedure for the Cement Concrete Producer submission of Prequalification Documentation. The following is a step by step procedure Producers must follow to ensure all required Prequalification Documentation is submitted by the Producer and is received by MassDOT Research & Materials (RMS).

Page 2: 2020 RMS Cement Concrete Producer User Manual RMS... · 2020-02-04 · The Cement Concrete Producer requiring acce ss to the SharePoint site will receive an email notice to obtain

2

Table of Contents 1  How to access the “MassDOT Cement Concrete Producer SharePoint Site” (Existing

SharePoint users) ................................................................................................................................ 4 

2  How to access the “MassDOT Cement Concrete Producer SharePoint Site” (New SharePoint user).................................................................................................................................. 4 

3  How to access your “2020 MassDOT Cement Concrete Producer SharePoint Site” “Library” ................................................................................................................................................. 5 

4  “Links”, “Annual Letter, Manuals, Templates”, and “MassDOT Contact Information” on the “Home” Page ......................................................................................................................... 6 

5  What Prequalification Documentation submissions to upload into your respective SharePoint Site Library ...................................................................................................................... 7 

6  How to access a blank “Cement Concrete Producer Persons of Contact.xlsm” template for new submission ......................................................................................................... 7 

7  How to save a completed “Cement Concrete Producer Persons of Contact.xlsm” template for new submission ......................................................................................................... 8 

8  How to “Edit Properties” and select “Document Type” from the drop-down menu . 10 

9  How to select “Persons of Contact (Excel)” from the drop-down menu ....................... 12 

10  How to save the selected “Document Type” and file .......................................................... 12 

11  How to exit the file.......................................................................................................................... 13 

12  How to access a blank “Cement Concrete Producer Standard Shop Drawing Checklist.xlsm” template for new submission (Precast/Prestress Concrete producers only) ..................................................................................................................................................... 14 

13  How to save a completed “Cement Concrete Producer Standard Shop Drawing Checklist.xlsm” template for new submission (Precast/Prestress Concrete producers only) ..................................................................................................................................................... 15 

14  How to “Edit Properties” and select “Document Type” from the drop-down menu (Precast/Prestress Concrete producers only) ......................................................................... 16 

15  How to select “Precast Shop Drawing Checklist (Excel)” from the drop-down menu (Precast/Prestress Concrete producers only) ......................................................................... 17 

16  How to save the selected “Document Type” and file (Precast/Prestress Concrete producers only) ................................................................................................................................ 19 

17  How to exit the file (Precast/Prestress Concrete producers only) ................................... 20 

18  How to access a blank “2020 RMS 043 Cement Concrete Mix Design Sheet.xlsm” template for new submission ...................................................................................................... 21 

19  How to save a completed “2020 RMS 043 Cement Concrete Mix Design Sheet.xlsm” template for new submission ...................................................................................................... 21 

20  How to “Edit Properties” and select “Document Type” from the drop-down menu . 23 

21  How to select “RMS 043 (Mix Design Sheet: Excel)” from the drop-down menu ..... 25 

22  How to save the selected “Document Type” and file .......................................................... 25 

Page 3: 2020 RMS Cement Concrete Producer User Manual RMS... · 2020-02-04 · The Cement Concrete Producer requiring acce ss to the SharePoint site will receive an email notice to obtain

3

23  How to exit the file.......................................................................................................................... 26 

24  How to locate your “2020” uploaded Prequalification Documentation in your SharePoint Site Library ................................................................................................................... 26 

25  How to open and edit documents ............................................................................................ 28 

Page 4: 2020 RMS Cement Concrete Producer User Manual RMS... · 2020-02-04 · The Cement Concrete Producer requiring acce ss to the SharePoint site will receive an email notice to obtain

4

1 HOW TO ACCESS THE “MASSDOT CEMENT CONCRETE PRODUCER SHAREPOINT SITE” (EXISTING SHAREPOINT USERS)

Cement Concrete Producers that have been granted access to the “MassDOT Cement Concrete Producer SharePoint Site” (including last year) are to access the “2020 MassDOT Cement Concrete Producer SharePoint Site” by clicking on the link provided below and entering their user name and password into the “Windows Security” dialog box (see Figure).

Website link to the “2020 MassDOT Cement Concrete Producer SharePoint Site”

https://projectcontrols2.massdot.state.ma.us/sites/Concrete20/_layouts/15/start.aspx#/ 

Please note that the producer is to enter pc\ before the username. Also, please notice the difference between “/” (forward slash) versus the required “\” (back slash) when entering pc\ before the user name. The “back slash” symbol can be found above the Enter key. Passwords are case sensitive.

Figure. Producer enters username, beginning with pc\ and enters password (case sensitive)

2 HOW TO ACCESS THE “MASSDOT CEMENT CONCRETE PRODUCER SHAREPOINT SITE” (NEW SHAREPOINT USER)

Cement Concrete Producers requiring access to the “MassDOT Cement Concrete Producer SharePoint Site” are to request access to Aidan Bates, via email ([email protected]), and provide the following contact information:

Plant Name First and Last Name Title Work Email Address Work Phone Number

The Cement Concrete Producer requiring access to the SharePoint site will receive an email notice to obtain access to their respective SharePoint location (see Figure). The email provides the Producer with the following:

Page 5: 2020 RMS Cement Concrete Producer User Manual RMS... · 2020-02-04 · The Cement Concrete Producer requiring acce ss to the SharePoint site will receive an email notice to obtain

5

Website link to the “2020 MassDOT Cement Concrete Producer SharePoint Site”

o https://projectcontrols2.massdot.state.ma.us/sites/Concrete20/_layouts/15/start.aspx#/ 

Producer User Name Producer User Name Password

Cement Concrete Producers not receiving this SharePoint access email notice are to contact [email protected].

Figure. Email notice to Cement Concrete Producer to access SharePoint site

Please note that your password will expire every 90 days. Producers are to manage and change their respective passwords every 90 days by accessing the following link: https://projectcontrolspw.massdot.state.ma.us/SitePages/Home.aspx

3 HOW TO ACCESS YOUR “2020 MASSDOT CEMENT CONCRETE PRODUCER SHAREPOINT SITE” “LIBRARY”

On the left side of the web site, under the heading “Mix Design Approval Submittals”, the Producer is to verify that their respective plant is listed. Cement Concrete

Page 6: 2020 RMS Cement Concrete Producer User Manual RMS... · 2020-02-04 · The Cement Concrete Producer requiring acce ss to the SharePoint site will receive an email notice to obtain

6

Producers who cannot locate their SharePoint library are to contact [email protected] for access.

Once verified, the Producer is to click on their respective plant to access their SharePoint site “Library” (see Figure).

Figure. Producer “2020” SharePoint site “Home” Page with Producer’s plant(s) listed on the left side

Please note that the Figure does not represent what the Cement Concrete Producer would be viewing as the screenshot was taken by an administrative user with special viewing capabilities. Producer SharePoint Libraries are only accessible and visible to their respective username. Producers will not be able to access or view other Producers’ SharePoint libraries.

4 “LINKS”, “ANNUAL LETTER, MANUALS, TEMPLATES”, AND “MASSDOT CONTACT INFORMATION” ON THE “HOME” PAGE

The Producer is able to access “Links”, “Annual Letter, Manuals, Templates”, and “MassDOT Contact Information” on the “Home” Page. There, the Producer is able to access the following information:

Links o Forms Library o MassDOT Standard and Supplemental Specifications o MassDOT Qualified Construction Materials List (QCML)

Page 7: 2020 RMS Cement Concrete Producer User Manual RMS... · 2020-02-04 · The Cement Concrete Producer requiring acce ss to the SharePoint site will receive an email notice to obtain

7

o MassDOT Qualified Construction Materials List (QCML) for Concrete Admixtures

o MassDOT Qualified Construction Materials List (QCML) for Alkali-silica Reactivity (ASR) Testing Laboratories

“Annual Letter, Manuals, Templates" o 2020 Cement Concrete Producer Annual Letter.pdf o 2020 Cement Concrete Producer User Manual.pdf o 2020 RMS 043 Cement Concrete Mix Design Sheet.xlsm o Cement Concrete Producer Persons of Contact Template.xlsm o Cement Concrete Producer Standard Shop Drawings Checklist.xlsm

MassDOT Contact Information o MassDOT Research & Materials Engineers o District Materials Engineers

5 WHAT PREQUALIFICATION DOCUMENTATION SUBMISSIONS TO UPLOAD INTO YOUR RESPECTIVE SHAREPOINT SITE LIBRARY

The Producer is to upload all of the required Prequalification Documentation into their respective Producer SharePoint Site Library. Such Prequalification Documentation may include the following:

RMS 043 (Mix Design Sheet: Excel) RMS 043 (Mix Design Sheet: Signed PDF) RMS 905 (ASR Test Card: Excel) RMS 905 (ASR Test Card: Signed PDF) RMS 909 (Rapid Chloride Ion Penetration Test Card: Excel) RMS 909 (Rapid Chloride Ion Penetration Test Card: Signed PDF) RMS 910 (Freeze / Thaw Test Card: Excel) RMS 910 (Freeze / Thaw Test Card: Signed PDF) ASR Petrographic Analysis (For new sources) Aggregate Testing (For new sources) Chloride Ion Penetration Testing (For new sources) Mill Certifications Persons of Contact (Excel) Precast Shop Drawing Checklist (Excel) Precast Shop Drawings Checklist (Signed PDF) Precast MassDOT Standard Shop Drawings (PDF) Other (Specify own value)

6 HOW TO ACCESS A BLANK “CEMENT CONCRETE PRODUCER PERSONS OF CONTACT.XLSM” TEMPLATE FOR NEW SUBMISSION

The Cement Concrete Producer is to open the “Cement Concrete Persons of Contact Template.xlsm” (found in “Forms Library”) and complete all entry fields. The Producer is responsible for entering in three (3) contacts (see Figure).

Page 8: 2020 RMS Cement Concrete Producer User Manual RMS... · 2020-02-04 · The Cement Concrete Producer requiring acce ss to the SharePoint site will receive an email notice to obtain

8

Figure. Cement Concrete Producer Persons of Contact Template.xlsm

If the Producer’s “PLANT NAME” is not found in the drop down menu, please contact [email protected] to have the “PLANT NAME” added.

7 HOW TO SAVE A COMPLETED “CEMENT CONCRETE PRODUCER PERSONS OF CONTACT.XLSM” TEMPLATE FOR NEW SUBMISSION

The Cement Concrete Producer is to save the “Cement Concrete Producer Persons of Contact Template.xlsm” by clicking the “PRODUCER SHAREPOINT SAVE BUTTON” (see Figure). This button automatically creates the required file naming convention. The Producer is to not modify the file name.

Page 9: 2020 RMS Cement Concrete Producer User Manual RMS... · 2020-02-04 · The Cement Concrete Producer requiring acce ss to the SharePoint site will receive an email notice to obtain

9

Figure. “PRODUCER SHAREPOINT SAVE BUTTON”

The Producer is to click “Yes” to initiate the “Save As” Dialog Box to Producer’s SharePoint location (see Figure).

Figure. Producer clicks “Yes” to initiate “Save As” Dialog Box to Producer’s SharePoint location

The Cement Concrete Producer is to click “Save” to save the file into the Producer’s SharePoint location (see Figure). The Producer is to not modify the file name that has been generated automatically.

Page 10: 2020 RMS Cement Concrete Producer User Manual RMS... · 2020-02-04 · The Cement Concrete Producer requiring acce ss to the SharePoint site will receive an email notice to obtain

10

Figure. “Save As” Dialog Box

8 HOW TO “EDIT PROPERTIES” AND SELECT “DOCUMENT TYPE” FROM THE DROP-DOWN MENU

The Cement Concrete Producer is required to enter in “Required Properties” in order to save the file into SharePoint (see Figure) by clicking on “Edit Properties”.

Figure. “Required Properties” warning message

Page 11: 2020 RMS Cement Concrete Producer User Manual RMS... · 2020-02-04 · The Cement Concrete Producer requiring acce ss to the SharePoint site will receive an email notice to obtain

11

The Cement Concrete Producer is to select the correct “Document Type” found in the drop-down menu. The “Document Type” is a required field and is denoted by the asterisk (*). The file cannot be saved until the Producer makes the selection. The drop-down menu contains various types of Prequalification Documentation:

RMS 043 (Mix Design Sheet: Excel) RMS 043 (Mix Design Sheet: Signed PDF) RMS 905 (ASR Test Card: Excel) RMS 905 (ASR Test Card: Signed PDF) RMS 909 (Rapid Chloride Ion Penetration Test Card: Excel) RMS 909 (Rapid Chloride Ion Penetration Test Card: Signed PDF) RMS 910 (Freeze / Thaw Test Card: Excel) RMS 910 (Freeze / Thaw Test Card: Signed PDF) MassDOT Approval Letter (Signed PDF) ASR Petrographic Analysis (For new sources) Aggregate Testing (For new sources) Chloride Ion Penetration Testing (For new sources) RMS 775 (Trial Batch Test Card) Mill Certifications Persons of Contact (Excel) Precast Shop Drawing Checklist (Excel) Precast Shop Drawing Checklist (Signed PDF) Precast MassDOT Standard Shop Drawings Other (Specify own value)

Figure. Select “Document Type”

Page 12: 2020 RMS Cement Concrete Producer User Manual RMS... · 2020-02-04 · The Cement Concrete Producer requiring acce ss to the SharePoint site will receive an email notice to obtain

12

9 HOW TO SELECT “PERSONS OF CONTACT (EXCEL)” FROM THE DROP-DOWN MENU

The Cement Concrete Producer is to select correct Document type (“Persons of Contact (Excel)”) from the drop-down menu.

Figure. Select “Persons of Contact (Excel)” from “Document Type” drop-down menu

10 HOW TO SAVE THE SELECTED “DOCUMENT TYPE” AND FILE

Once the “Document Type” is selected, the Cement Concrete Producer is to click “Retry Save” (see Figure).

Page 13: 2020 RMS Cement Concrete Producer User Manual RMS... · 2020-02-04 · The Cement Concrete Producer requiring acce ss to the SharePoint site will receive an email notice to obtain

13

Figure. Producer has selected “Persons of Contact (Excel)” and clicks “Retry Save”

11 HOW TO EXIT THE FILE

Once the “Required Properties” are entered in and the “Retry Save” is successful, the Producer may exit the file.

Figure. Producer exits the file

Page 14: 2020 RMS Cement Concrete Producer User Manual RMS... · 2020-02-04 · The Cement Concrete Producer requiring acce ss to the SharePoint site will receive an email notice to obtain

14

12 HOW TO ACCESS A BLANK “CEMENT CONCRETE PRODUCER STANDARD SHOP DRAWING CHECKLIST.XLSM” TEMPLATE FOR NEW SUBMISSION (PRECAST/PRESTRESS CONCRETE PRODUCERS ONLY)

The Cement Concrete Producer is to open the “Cement Concrete Producer Standard Shop Drawing Checklist.xlsm” (found on the “Home” Page, as described earlier) and complete all entry fields. The Producer is to enter “X” into the “Drawing on File” column, for all the “2017 MassDOT Construction Standard Drawings and Standard Drawings for Traffic Signals & Highway Lighting” the Producer has on file, listed in the “Drawing Description” column (see Figure).

Figure. Cement Concrete Producer Standard Shop Drawing Checklist.xlsm

If the Producer’s “PLANT NAME” is not found in the drop down menu, please contact [email protected] to have the “PLANT NAME” added.

Page 15: 2020 RMS Cement Concrete Producer User Manual RMS... · 2020-02-04 · The Cement Concrete Producer requiring acce ss to the SharePoint site will receive an email notice to obtain

15

13 HOW TO SAVE A COMPLETED “CEMENT CONCRETE PRODUCER STANDARD SHOP DRAWING CHECKLIST.XLSM” TEMPLATE FOR NEW SUBMISSION (PRECAST/PRESTRESS CONCRETE PRODUCERS ONLY)

The Cement Concrete Producer is to save the “Cement Concrete Producer Standard Shop Drawing Checklist.xlsm” by clicking the “PRODUCER SHAREPOINT SAVE BUTTON” (see Figure). This button automatically creates the required file naming convention. The Producer is to not modify the file name.

Figure. “PRODUCER SHAREPOINT SAVE BUTTON”

The Cement Concrete Producer is to click “Save” to save the file into the Producer’s SharePoint location (see Figure). The Producer is to not modify the file name that has been generated automatically.

Page 16: 2020 RMS Cement Concrete Producer User Manual RMS... · 2020-02-04 · The Cement Concrete Producer requiring acce ss to the SharePoint site will receive an email notice to obtain

16

Figure. “Save As” Dialog Box

14 HOW TO “EDIT PROPERTIES” AND SELECT “DOCUMENT TYPE” FROM THE DROP-DOWN MENU (PRECAST/PRESTRESS CONCRETE PRODUCERS ONLY)

The Cement Concrete Producer is required to enter in “Required Properties” in order to save the file into SharePoint (see Figure) by clicking on “Edit Properties”.

Figure. “Required Properties” warning message

Page 17: 2020 RMS Cement Concrete Producer User Manual RMS... · 2020-02-04 · The Cement Concrete Producer requiring acce ss to the SharePoint site will receive an email notice to obtain

17

15 HOW TO SELECT “PRECAST SHOP DRAWING CHECKLIST (EXCEL)” FROM THE DROP-DOWN MENU (PRECAST/PRESTRESS CONCRETE PRODUCERS ONLY)

The Cement Concrete Producer is to select the correct “Document Type” found in the drop-down menu. The “Document Type” is a required field and is denoted by the asterisk (*). The file cannot be saved until the Producer makes the selection. The drop-down menu contains various types of Prequalification Documentation:

RMS 043 (Mix Design Sheet: Excel) RMS 043 (Mix Design Sheet: Signed PDF) RMS 905 (ASR Test Card: Excel) RMS 905 (ASR Test Card: Signed PDF) RMS 909 (Rapid Chloride Ion Penetration Test Card: Excel) RMS 909 (Rapid Chloride Ion Penetration Test Card: Signed PDF) RMS 910 (Freeze / Thaw Test Card: Excel) RMS 910 (Freeze / Thaw Test Card: Signed PDF) MassDOT Approval Letter (Signed PDF) ASR Petrographic Analysis (For new sources) Aggregate Testing (For new sources) Chloride Ion Penetration Testing (For new sources) RMS 775 (Trial Batch Test Card) Mill Certifications Persons of Contact (Excel) Precast Shop Drawing Checklist (Excel) Precast Shop Drawing Checklist (Signed PDF) Precast MassDOT Standard Shop Drawings Other (Specify own value)

Page 18: 2020 RMS Cement Concrete Producer User Manual RMS... · 2020-02-04 · The Cement Concrete Producer requiring acce ss to the SharePoint site will receive an email notice to obtain

18

Figure. Select “Document Type”

The Cement Concrete Producer is to select correct Document type (“Precast Shop Drawing Checklist (Excel)”) from the drop-down menu.

Page 19: 2020 RMS Cement Concrete Producer User Manual RMS... · 2020-02-04 · The Cement Concrete Producer requiring acce ss to the SharePoint site will receive an email notice to obtain

19

Figure. Select “Precast Shop Drawing Checklist (Excel)” from “Document Type” drop-down menu

16 HOW TO SAVE THE SELECTED “DOCUMENT TYPE” AND FILE (PRECAST/PRESTRESS CONCRETE PRODUCERS ONLY)

Once the “Document Type” is selected, the Cement Concrete Producer is to click “Retry Save” (see Figure).

Page 20: 2020 RMS Cement Concrete Producer User Manual RMS... · 2020-02-04 · The Cement Concrete Producer requiring acce ss to the SharePoint site will receive an email notice to obtain

20

Figure. Producer has selected “Precast Shop Drawing Checklist (Excel)” and clicks “Retry Save”

17 HOW TO EXIT THE FILE (PRECAST/PRESTRESS CONCRETE PRODUCERS ONLY)

Once the “Required Properties” are entered in and the “Retry Save” is successful, the Producer may exit the file.

Figure. Producer exits the file

Page 21: 2020 RMS Cement Concrete Producer User Manual RMS... · 2020-02-04 · The Cement Concrete Producer requiring acce ss to the SharePoint site will receive an email notice to obtain

21

18 HOW TO ACCESS A BLANK “2020 RMS 043 CEMENT CONCRETE MIX DESIGN SHEET.XLSM” TEMPLATE FOR NEW SUBMISSION

The Cement Concrete Producer is to open the “2020 RMS 043 Cement Concrete Mix Design Sheet.xlsm” (found on the “Home” Page, as described earlier) and enters “Plant Information” into RMS 043 (see Figure).

Figure. 2020 RMS 043 Cement Concrete Mix Design Sheet.xlsm

If the Producer’s “PLANT NAME” is not found in the drop down menu, please contact [email protected] to have the “PLANT NAME” added.

19 HOW TO SAVE A COMPLETED “2020 RMS 043 CEMENT CONCRETE MIX DESIGN SHEET.XLSM” TEMPLATE FOR NEW SUBMISSION

The Cement Concrete Producer is to save the “2020 RMS 043 Cement Concrete Mix Design Sheet.xlsm” by clicking the “PRODUCER SHAREPOINT SAVE BUTTON” (see Figure). This button automatically creates the “Mailing Address” entry fields, “Identification No.” entry field and the required file naming convention. The Producer is to not modify the file name. Please verify that the “Mailing Address” entry fields are correct. If entry fields are not correct, please contact [email protected] to have the “Mailing Address” corrected.

Figure. “PRODUCER SHAREPOINT SAVE BUTTON”

2020

2020

Page 22: 2020 RMS Cement Concrete Producer User Manual RMS... · 2020-02-04 · The Cement Concrete Producer requiring acce ss to the SharePoint site will receive an email notice to obtain

22

The Producer is to click “Yes” to initiate the “Save As” Dialog Box to Producer’s SharePoint location (see Figure).

Figure. Producer clicks “Yes” to initiate “Save As” Dialog Box to Producer’s SharePoint location

The Cement Concrete Producer is to click “Save” to save the file into the Producer’s SharePoint location (see Figure). The Producer is to not modify the file name that has been generated automatically.

Page 23: 2020 RMS Cement Concrete Producer User Manual RMS... · 2020-02-04 · The Cement Concrete Producer requiring acce ss to the SharePoint site will receive an email notice to obtain

23

Figure. “Save As” Dialog Box

20 HOW TO “EDIT PROPERTIES” AND SELECT “DOCUMENT TYPE” FROM THE DROP-DOWN MENU

The Cement Concrete Producer is required to enter in “Required Properties” in order to save the file into SharePoint (see Figure) by clicking on “Edit Properties”.

Figure. “Required Properties” warning message

Page 24: 2020 RMS Cement Concrete Producer User Manual RMS... · 2020-02-04 · The Cement Concrete Producer requiring acce ss to the SharePoint site will receive an email notice to obtain

24

The Cement Concrete Producer is to select the correct “Document Type” found in the drop-down menu. The “Document Type” is a required field and is denoted by the asterisk (*). The file cannot be saved until the Producer makes the selection. The drop-down menu contains various types of Prequalification Documentation:

RMS 043 (Mix Design Sheet: Excel) RMS 043 (Mix Design Sheet: Signed PDF) RMS 905 (ASR Test Card: Excel) RMS 905 (ASR Test Card: Signed PDF) RMS 909 (Rapid Chloride Ion Penetration Test Card: Excel) RMS 909 (Rapid Chloride Ion Penetration Test Card: Signed PDF) RMS 910 (Freeze / Thaw Test Card: Excel) RMS 910 (Freeze / Thaw Test Card: Signed PDF) MassDOT Approval Letter (Signed PDF) ASR Petrographic Analysis (For new sources) Aggregate Testing (For new sources) Chloride Ion Penetration Testing (For new sources) RMS 775 (Trial Batch Test Card) Mill Certifications Persons of Contact (Excel) Precast Shop Drawing Checklist (Excel) Precast Shop Drawing Checklist (Signed PDF) Precast MassDOT Standard Shop Drawings Other (Specify own value)

Figure. Select “Document Type”

Page 25: 2020 RMS Cement Concrete Producer User Manual RMS... · 2020-02-04 · The Cement Concrete Producer requiring acce ss to the SharePoint site will receive an email notice to obtain

25

21 HOW TO SELECT “RMS 043 (MIX DESIGN SHEET: EXCEL)” FROM THE DROP-DOWN MENU

The Cement Concrete Producer is to select the correct Document type “(RMS 043 Mix Design Sheet: Excel)” from the drop-down menu.

Figure. Select “RMS 043 (Mix Design Sheet: Excel)” from “Document Type” drop-down menu

22 HOW TO SAVE THE SELECTED “DOCUMENT TYPE” AND FILE

Once the “Document Type” is selected, the Cement Concrete Producer is to click “Retry Save” (see Figure).

Page 26: 2020 RMS Cement Concrete Producer User Manual RMS... · 2020-02-04 · The Cement Concrete Producer requiring acce ss to the SharePoint site will receive an email notice to obtain

26

Figure. Producer has selected “RMS 043 (Mix Design Sheet: Excel)” and clicks “Retry Save”

23 HOW TO EXIT THE FILE

Once the “Required Properties” are entered in and the “Retry Save” is successful, the Producer may continue entering in data into the required entry fields or exit the file.

Figure. Producer exits the file

24 HOW TO LOCATE YOUR “2020” UPLOADED PREQUALIFICATION DOCUMENTATION IN YOUR SHAREPOINT SITE LIBRARY

The Producer is to access the SharePoint site and locate the document’s file location on SharePoint by clicking on the Producer’s “Library”. The Producer is to then click “Document Type” to unhide the “grouped” “Document Types” (see Figure).

Page 27: 2020 RMS Cement Concrete Producer User Manual RMS... · 2020-02-04 · The Cement Concrete Producer requiring acce ss to the SharePoint site will receive an email notice to obtain

27

Figure. “Document Type” groupings

SharePoint files are grouped by “Document Type”, which is required to be entered in by the Producer when saving documents to SharePoint. To access a grouping, click the “Document Type” and the grouping will reveal itself (see Figure).

Page 28: 2020 RMS Cement Concrete Producer User Manual RMS... · 2020-02-04 · The Cement Concrete Producer requiring acce ss to the SharePoint site will receive an email notice to obtain

28

Figure. “Document Type” groupings “ungrouped”

25 HOW TO OPEN AND EDIT DOCUMENTS

The Producer is to navigate to “Edit” by clicking on the “three dots”. The “three dots” is a place holder for navigating to certain file options (see Figure). Please note when accessing “.xlsm” files that this is the procedure that needs to be followed. Clicking on the file link will cause an error to be generated.

Page 29: 2020 RMS Cement Concrete Producer User Manual RMS... · 2020-02-04 · The Cement Concrete Producer requiring acce ss to the SharePoint site will receive an email notice to obtain

29

Figure. Navigate to “Edit” by clicking the “three dots”