2019 development charges study industry stakeholder consultation … · 2018. 11. 23. · 2019...
TRANSCRIPT
-
2019 Development Charges Study
Technical Stakeholder Consultation
Wednesday, November 21, 2018
Burnhamthorpe Community Centre
-
Today we will discuss...• Introductions
• City DC Survey Results
• Overview of the Development Charges Act
• Development Charges Study Process
• Preliminary Development Forecast
• Historical Inventories
• 2019 DC Policies Review
• Next Steps
2
-
Introductions• City of Mississauga Staff:
– Elizabeth McGee, Manager, Financial Strategies
– Susan Cunningham, Manager Development Financing & Reserve Management, email: [email protected]
– Rebecca Aza, Policy Analyst, email: [email protected]
– Jahnavi Ramakrishnan, Policy Analyst, email: [email protected]
• Hemson Consulting:
– Craig Binning, Partner
– Jackie Hall, Consultant
3
-
DC Survey Results
4
-
DC Survey Results
5
-
DC Survey Results
6
-
7
DC Survey Results
-
8
DC Survey Results
-
9
DC Survey Results
-
10
DC Survey Results
-
11
DC Survey Results
-
12
DC Survey Results
-
DC Survey Results
13
-
14
DC Survey Results
-
15
DC Survey Results
-
DC Survey Results
16
-
17
DC Survey Results
-
18
DC Survey Results
-
19
DC Survey Results
-
DC Survey Results – Summary
• City staff has gained some valuable insight
• Identified that the City needs to provide a greater understanding about DCs in the public forum– How DCs are spent in Mississauga?
– The difference between Regional and City DCs
• Strong viewpoints exist in certain areas related to DCs
20
-
DC Survey Results – Summary (2)
• Almost 60% of those that took the survey were developers• 50% of those taking the survey considered themselves
knowledgeable about DCs• Developers are looking for a change in the City’s DC rate structure
– Example, back-to-back and stacked townhouses category
• The bulk of the residential development respondents develop units related to a high density built form
• Greater number of non-residential developer respondents build commercial developments
21
-
DC Survey Results – Summary (3)
• City will continue to accept feedback throughout the DC process in developing its recommendations to Council, as part of the 2019 DC Background Study and By-law update
22
-
Development Charges Recap
23
-
What Are Development Charges?• Fees imposed on development to fund “growth-related” capital
costs
• DCs pay for new infrastructure and facilities to maintain service
levels
• Principle is “growth pays for growth” so that financial burden is not
borne by existing tax payers
24
-
Background
• City Council passed DC By-law 0161-2014 in June 2014 that
imposed DC rates for eligible City services
– In June 2019, the 2014 DC By-law will expire
• In order for the City to continue to collect DCs, a new DC
Background Study must be completed and the City must hold at
least one public meeting
25
-
Overview of the Development Charges Act (DCA)
• Service exclusions:– Cultural and entertainment facilities, including museums,
theatres and art galleries
– Tourism facilities including convention centre's
– Parkland acquisition
– Hospitals
– Headquarters for general administration of municipalities and
local boards
26
-
Eligible Capital Costs
• Costs to acquire and improve land
• Building and structure costs
• Rolling stock with a useful life of 7 years or more
• Furniture and equipment, excluding computer equipment
• Development-related studies
• Engineering fees, contingencies
• Past expenditures still to be funded through future DCs
• Interest and financing costs27
-
Changes to the DCA as of Jan 1, 2016• Transit services are no longer subject to a 10% reduction and
based on a “planned” level of service
• Asset Management Plan (AMP) must demonstrate that assets are
“financially sustainable” over their full lifecycle
• Longer consultation period – DC Background Study must be made
available 60 days prior to the passage of a DC By-law
• Additional reporting requirements
• DCs payable at first building permit (for multiple building permits)
• DC Background Studies must consider Area Specific DCs
28
-
Overview of Study Process
Q1-Q3 2018
Development Forecast
Historical service levels
Funding envelopes
Capital programs
DC Policy Review
Preliminary DC rates
Q4 2018Cost of Growth Analysis
Draft DC Background
Study
Consult with Stakeholders
Finalize Preliminary Draft Rates
Q1 2019
Finalize DC Study
Continued consultation with
Stakeholders
Q2 2019
Release DC Study to
Public
Passage of DC By-law
29
-
Overview of Study Process
Anticipated amount, type and location of development must be estimated
Increase in the need for service attributable to the anticipated development must be estimated
Increase in need may not exceed average level of service immediately preceding background study
Allocation of eligible costs by type of development
Reduce capital costs by legislated deductions
Calculate 10-Year Historical Service Levels
Grants/OtherContributions
Required Service Discount
Replacement/Benefit to Existing
Available DC Reserves
Post-Period Benefit
Costs Eligible for DC Recovery
Residential Sector(per unit)
Non-Residential Sector(per m2 of GFA)
Development Forecast
Identify Growth-related Capital Needs
Operating & Replacement Cost Analysis (Incl. AMP)
30
-
Key Steps in Calculating DCsDEVELOPMENT FORECAST
• Forecast amount, type and location of development
• Establish area to which DCs apply
• Establish planning periods
• Types of development
– Residential: population and dwelling units
– Non-residential: non-residential floor space and employment
31
-
Development Forecast: Key Assumptions• Population and employment forecasts based on 2017 Growth Plan
(Amendment 2)
• Region and City staff are currently working on new growth
allocations, but nothing has been approved
• Assumptions for 2019 DC Background Study
– Based on Council-endorsed population and employment targets from the 2014
DC Study
– Considers growth in many areas including Ninth Line, strategic waterfront sites,
the Hurontario Corridor and the Downtown
32
-
Development Forecast• Planning Horizons
– General services = 2019-2028
– Engineered services = 2019-2041
• Council-approved population and employment targets
2031 2041
Total Population 829,000 878,000
Total Employment * 527,000 552,000
* Includes place of work, no fixed and work at home employment
33
-
Residential Growth Forecast
* Census population excludes an undercoverage of 3.37%34
General Services2019-2028
Engineered Services2019-2041
Residential TypeAt
2018Growth
2019-2028At
2028Growth
2019-2041At
2041
Total Occupied Dwellings
- Ground-Related Units- Apartments
243,462 21,398
5,12016,278
264,860 49,373
11,47237,902
292,835
Total Census Population - Census Population*- Total Pop in New Private Dwellings
731,693 50,64656,393
782,339 117,707129,686
849,400
-
Non-Residential Growth Forecast
* Non-residential GFA is calculated based on employment in new space
35
General Services2019-2028
Engineered Services2019-2041
Non-Residential TypeAt
2018Growth
2019-2028At
2028Growth
2019-2041At
2041
Employment - Employment in New Space
463,094 31,81434,920
494,908 62,67970,925
525,773
Non-Residential GFA (m2)* 1,760,014 3,389,041
-
Historical Inventory Analysis
General Service Level Methodology
• 10-year historical average service level period (2009-2018)
• Inventories data developed with City staff
• Quantity and quality of service considered
– Quantity = number of items
– Quality = replacement cost of assets
36
-
What is Included in the Inventories?
• Historical inventories reflect– Demolitions of buildings
– New buildings
– Updated information for assets (e.g. building gross floor area)
to reflect best available information
– Historical inventory was reconciled with various data sources
(e.g., TCA)
37
-
Summary of Historical Inventory Analysis
* The 2014 DC Study was based on a Fire Response Times approach. For the purposes of the 2019 DC Study response times are being used as input to the
determination of services levels, servicing capacity and the development-related capital program38
Service 2014 Methodology 2019 Methodology
General Government Net Pop. + Emp Net Pop. + Emp
Library Net Pop. + HHE Net Pop.
Public Works Emp. + HHE Net Pop. + Emp
Fire Services* Fire Response TimesNet Pop. + Emp and Fire Response Times
Parks and Recreation Net Pop. + HHE Net Population
Parking Net Pop. + Emp Net Pop. + Emp
Development-Related Studies N/A Net Pop. + Emp
TransitEmp + HHE and Transit Adjst.Factor
Planned Level of Service
Living Arts Centre N/A N/A
Roads & Related Net Pop. + Emp Net Pop. + Emp
-
Rate Structure Comparison
39
Category 2014 DC Study Proposed for 2019 DC Study Comments
Residential • Other Residential • Apartment (700 sf or
greater)• Small Unit (
-
Exemptions
• Statutory
– City, Region, School Board-owned development
– Creation of additional residential units (subject to the rules of the DCA and associated regulation)
– 50% industrial expansion
• Non-Statutory
– Consistent with the 2014 DC Study, no new non-statutory exemptions will be provided
– Grant in lieu of payment of DCs will be continued for places of religious assembly for a portion of the facility
– Any relief from development charges will be at Council’s discretion 40
-
Next Steps• Inventories will be sent via email - Week of November 19th• Next Stakeholder Meeting - December 6, 2018 1:30pm –
3:30pm, Committee Room “B”, Civic Centre(To be rescheduled)• Agenda items include:
– Response to questions arising from inventories
– Continued discussion of proposed policies
– City’s growth capital program to be provided following meeting• Questions and/or feedback to be directed to:
Susan CunninghamManager, Development Financing & Reserve ManagementEmail: [email protected]
41
jahnramCross-Out
-
Questions?
Thank you for your participation
Keep informed, visit City’s Website:
www.mississauga.ca/developmentcharges
42