2019 development charges study industry stakeholder consultation … · 2018. 11. 23. · 2019...

42
2019 Development Charges Study Technical Stakeholder Consultation Wednesday, November 21, 2018 Burnhamthorpe Community Centre

Upload: others

Post on 25-Jan-2021

5 views

Category:

Documents


0 download

TRANSCRIPT

  • 2019 Development Charges Study

    Technical Stakeholder Consultation

    Wednesday, November 21, 2018

    Burnhamthorpe Community Centre

  • Today we will discuss...• Introductions

    • City DC Survey Results

    • Overview of the Development Charges Act

    • Development Charges Study Process

    • Preliminary Development Forecast

    • Historical Inventories

    • 2019 DC Policies Review

    • Next Steps

    2

  • Introductions• City of Mississauga Staff:

    – Elizabeth McGee, Manager, Financial Strategies

    – Susan Cunningham, Manager Development Financing & Reserve Management, email: [email protected]

    – Rebecca Aza, Policy Analyst, email: [email protected]

    – Jahnavi Ramakrishnan, Policy Analyst, email: [email protected]

    • Hemson Consulting:

    – Craig Binning, Partner

    – Jackie Hall, Consultant

    3

  • DC Survey Results

    4

  • DC Survey Results

    5

  • DC Survey Results

    6

  • 7

    DC Survey Results

  • 8

    DC Survey Results

  • 9

    DC Survey Results

  • 10

    DC Survey Results

  • 11

    DC Survey Results

  • 12

    DC Survey Results

  • DC Survey Results

    13

  • 14

    DC Survey Results

  • 15

    DC Survey Results

  • DC Survey Results

    16

  • 17

    DC Survey Results

  • 18

    DC Survey Results

  • 19

    DC Survey Results

  • DC Survey Results – Summary

    • City staff has gained some valuable insight

    • Identified that the City needs to provide a greater understanding about DCs in the public forum– How DCs are spent in Mississauga?

    – The difference between Regional and City DCs

    • Strong viewpoints exist in certain areas related to DCs

    20

  • DC Survey Results – Summary (2)

    • Almost 60% of those that took the survey were developers• 50% of those taking the survey considered themselves

    knowledgeable about DCs• Developers are looking for a change in the City’s DC rate structure

    – Example, back-to-back and stacked townhouses category

    • The bulk of the residential development respondents develop units related to a high density built form

    • Greater number of non-residential developer respondents build commercial developments

    21

  • DC Survey Results – Summary (3)

    • City will continue to accept feedback throughout the DC process in developing its recommendations to Council, as part of the 2019 DC Background Study and By-law update

    22

  • Development Charges Recap

    23

  • What Are Development Charges?• Fees imposed on development to fund “growth-related” capital

    costs

    • DCs pay for new infrastructure and facilities to maintain service

    levels

    • Principle is “growth pays for growth” so that financial burden is not

    borne by existing tax payers

    24

  • Background

    • City Council passed DC By-law 0161-2014 in June 2014 that

    imposed DC rates for eligible City services

    – In June 2019, the 2014 DC By-law will expire

    • In order for the City to continue to collect DCs, a new DC

    Background Study must be completed and the City must hold at

    least one public meeting

    25

  • Overview of the Development Charges Act (DCA)

    • Service exclusions:– Cultural and entertainment facilities, including museums,

    theatres and art galleries

    – Tourism facilities including convention centre's

    – Parkland acquisition

    – Hospitals

    – Headquarters for general administration of municipalities and

    local boards

    26

  • Eligible Capital Costs

    • Costs to acquire and improve land

    • Building and structure costs

    • Rolling stock with a useful life of 7 years or more

    • Furniture and equipment, excluding computer equipment

    • Development-related studies

    • Engineering fees, contingencies

    • Past expenditures still to be funded through future DCs

    • Interest and financing costs27

  • Changes to the DCA as of Jan 1, 2016• Transit services are no longer subject to a 10% reduction and

    based on a “planned” level of service

    • Asset Management Plan (AMP) must demonstrate that assets are

    “financially sustainable” over their full lifecycle

    • Longer consultation period – DC Background Study must be made

    available 60 days prior to the passage of a DC By-law

    • Additional reporting requirements

    • DCs payable at first building permit (for multiple building permits)

    • DC Background Studies must consider Area Specific DCs

    28

  • Overview of Study Process

    Q1-Q3 2018

    Development Forecast

    Historical service levels

    Funding envelopes

    Capital programs

    DC Policy Review

    Preliminary DC rates

    Q4 2018Cost of Growth Analysis

    Draft DC Background

    Study

    Consult with Stakeholders

    Finalize Preliminary Draft Rates

    Q1 2019

    Finalize DC Study

    Continued consultation with

    Stakeholders

    Q2 2019

    Release DC Study to

    Public

    Passage of DC By-law

    29

  • Overview of Study Process

    Anticipated amount, type and location of development must be estimated

    Increase in the need for service attributable to the anticipated development must be estimated

    Increase in need may not exceed average level of service immediately preceding background study

    Allocation of eligible costs by type of development

    Reduce capital costs by legislated deductions

    Calculate 10-Year Historical Service Levels

    Grants/OtherContributions

    Required Service Discount

    Replacement/Benefit to Existing

    Available DC Reserves

    Post-Period Benefit

    Costs Eligible for DC Recovery

    Residential Sector(per unit)

    Non-Residential Sector(per m2 of GFA)

    Development Forecast

    Identify Growth-related Capital Needs

    Operating & Replacement Cost Analysis (Incl. AMP)

    30

  • Key Steps in Calculating DCsDEVELOPMENT FORECAST

    • Forecast amount, type and location of development

    • Establish area to which DCs apply

    • Establish planning periods

    • Types of development

    – Residential: population and dwelling units

    – Non-residential: non-residential floor space and employment

    31

  • Development Forecast: Key Assumptions• Population and employment forecasts based on 2017 Growth Plan

    (Amendment 2)

    • Region and City staff are currently working on new growth

    allocations, but nothing has been approved

    • Assumptions for 2019 DC Background Study

    – Based on Council-endorsed population and employment targets from the 2014

    DC Study

    – Considers growth in many areas including Ninth Line, strategic waterfront sites,

    the Hurontario Corridor and the Downtown

    32

  • Development Forecast• Planning Horizons

    – General services = 2019-2028

    – Engineered services = 2019-2041

    • Council-approved population and employment targets

    2031 2041

    Total Population 829,000 878,000

    Total Employment * 527,000 552,000

    * Includes place of work, no fixed and work at home employment

    33

  • Residential Growth Forecast

    * Census population excludes an undercoverage of 3.37%34

    General Services2019-2028

    Engineered Services2019-2041

    Residential TypeAt

    2018Growth

    2019-2028At

    2028Growth

    2019-2041At

    2041

    Total Occupied Dwellings

    - Ground-Related Units- Apartments

    243,462 21,398

    5,12016,278

    264,860 49,373

    11,47237,902

    292,835

    Total Census Population - Census Population*- Total Pop in New Private Dwellings

    731,693 50,64656,393

    782,339 117,707129,686

    849,400

  • Non-Residential Growth Forecast

    * Non-residential GFA is calculated based on employment in new space

    35

    General Services2019-2028

    Engineered Services2019-2041

    Non-Residential TypeAt

    2018Growth

    2019-2028At

    2028Growth

    2019-2041At

    2041

    Employment - Employment in New Space

    463,094 31,81434,920

    494,908 62,67970,925

    525,773

    Non-Residential GFA (m2)* 1,760,014 3,389,041

  • Historical Inventory Analysis

    General Service Level Methodology

    • 10-year historical average service level period (2009-2018)

    • Inventories data developed with City staff

    • Quantity and quality of service considered

    – Quantity = number of items

    – Quality = replacement cost of assets

    36

  • What is Included in the Inventories?

    • Historical inventories reflect– Demolitions of buildings

    – New buildings

    – Updated information for assets (e.g. building gross floor area)

    to reflect best available information

    – Historical inventory was reconciled with various data sources

    (e.g., TCA)

    37

  • Summary of Historical Inventory Analysis

    * The 2014 DC Study was based on a Fire Response Times approach. For the purposes of the 2019 DC Study response times are being used as input to the

    determination of services levels, servicing capacity and the development-related capital program38

    Service 2014 Methodology 2019 Methodology

    General Government Net Pop. + Emp Net Pop. + Emp

    Library Net Pop. + HHE Net Pop.

    Public Works Emp. + HHE Net Pop. + Emp

    Fire Services* Fire Response TimesNet Pop. + Emp and Fire Response Times

    Parks and Recreation Net Pop. + HHE Net Population

    Parking Net Pop. + Emp Net Pop. + Emp

    Development-Related Studies N/A Net Pop. + Emp

    TransitEmp + HHE and Transit Adjst.Factor

    Planned Level of Service

    Living Arts Centre N/A N/A

    Roads & Related Net Pop. + Emp Net Pop. + Emp

  • Rate Structure Comparison

    39

    Category 2014 DC Study Proposed for 2019 DC Study Comments

    Residential • Other Residential • Apartment (700 sf or

    greater)• Small Unit (

  • Exemptions

    • Statutory

    – City, Region, School Board-owned development

    – Creation of additional residential units (subject to the rules of the DCA and associated regulation)

    – 50% industrial expansion

    • Non-Statutory

    – Consistent with the 2014 DC Study, no new non-statutory exemptions will be provided

    – Grant in lieu of payment of DCs will be continued for places of religious assembly for a portion of the facility

    – Any relief from development charges will be at Council’s discretion 40

  • Next Steps• Inventories will be sent via email - Week of November 19th• Next Stakeholder Meeting - December 6, 2018 1:30pm –

    3:30pm, Committee Room “B”, Civic Centre(To be rescheduled)• Agenda items include:

    – Response to questions arising from inventories

    – Continued discussion of proposed policies

    – City’s growth capital program to be provided following meeting• Questions and/or feedback to be directed to:

    Susan CunninghamManager, Development Financing & Reserve ManagementEmail: [email protected]

    41

    jahnramCross-Out

  • Questions?

    Thank you for your participation

    Keep informed, visit City’s Website:

    www.mississauga.ca/developmentcharges

    42