![Page 1: 2018 ICRI Spring Convention Seismic Solutions...– ACI 318-11 Chapter 21 Section 21.3.3.2 – Stirrup Spacing reduced from 18” to 6” Typical Coker Structure:\爀䐀攀爀爀椀挀欀猀屲Drums](https://reader035.vdocuments.site/reader035/viewer/2022081411/60ae79003d6b68062b6503b4/html5/thumbnails/1.jpg)
2016 ICRI Kick-Off Party | February 1, 2016
2018 ICRI Spring ConventionSeismic Solutions
Industrial Structure Column RepairBy: Mark Guirguis P.E., ICRI, ACI I
Jakub Szewczyk, ICRI, CSRT, CWI
![Page 2: 2018 ICRI Spring Convention Seismic Solutions...– ACI 318-11 Chapter 21 Section 21.3.3.2 – Stirrup Spacing reduced from 18” to 6” Typical Coker Structure:\爀䐀攀爀爀椀挀欀猀屲Drums](https://reader035.vdocuments.site/reader035/viewer/2022081411/60ae79003d6b68062b6503b4/html5/thumbnails/2.jpg)
2016 ICRI Kick-Off Party | February 1, 2016
• Project Background• Deterioration Mechanism• Repair Strategy• Seismic Design Challenges• Constructability Challenges• Results
Presentation Outline
![Page 3: 2018 ICRI Spring Convention Seismic Solutions...– ACI 318-11 Chapter 21 Section 21.3.3.2 – Stirrup Spacing reduced from 18” to 6” Typical Coker Structure:\爀䐀攀爀爀椀挀欀猀屲Drums](https://reader035.vdocuments.site/reader035/viewer/2022081411/60ae79003d6b68062b6503b4/html5/thumbnails/3.jpg)
2016 ICRI Kick-Off Party | February 1, 2016
![Page 4: 2018 ICRI Spring Convention Seismic Solutions...– ACI 318-11 Chapter 21 Section 21.3.3.2 – Stirrup Spacing reduced from 18” to 6” Typical Coker Structure:\爀䐀攀爀爀椀挀欀猀屲Drums](https://reader035.vdocuments.site/reader035/viewer/2022081411/60ae79003d6b68062b6503b4/html5/thumbnails/4.jpg)
2016 ICRI Kick-Off Party | February 1, 2016
![Page 5: 2018 ICRI Spring Convention Seismic Solutions...– ACI 318-11 Chapter 21 Section 21.3.3.2 – Stirrup Spacing reduced from 18” to 6” Typical Coker Structure:\爀䐀攀爀爀椀挀欀猀屲Drums](https://reader035.vdocuments.site/reader035/viewer/2022081411/60ae79003d6b68062b6503b4/html5/thumbnails/5.jpg)
2016 ICRI Kick-Off Party | February 1, 2016
Coker Operation
Structural Loads:• Extremely heavy
Operating Loads (full drums, proof loads)
• Comparatively light Dead Loads
• Resulted in full perimeter column repairs (instead of phased approach)
![Page 6: 2018 ICRI Spring Convention Seismic Solutions...– ACI 318-11 Chapter 21 Section 21.3.3.2 – Stirrup Spacing reduced from 18” to 6” Typical Coker Structure:\爀䐀攀爀爀椀挀欀猀屲Drums](https://reader035.vdocuments.site/reader035/viewer/2022081411/60ae79003d6b68062b6503b4/html5/thumbnails/6.jpg)
2016 ICRI Kick-Off Party | February 1, 2016
Coker Unit at a Midwest Refinery• 3 Steel Derrick Structures• 6 Coke Drums (2 per Derrick)• 3 Concrete Decks• Concrete Chute• Coke Pit• Overhead Crane
![Page 7: 2018 ICRI Spring Convention Seismic Solutions...– ACI 318-11 Chapter 21 Section 21.3.3.2 – Stirrup Spacing reduced from 18” to 6” Typical Coker Structure:\爀䐀攀爀爀椀挀欀猀屲Drums](https://reader035.vdocuments.site/reader035/viewer/2022081411/60ae79003d6b68062b6503b4/html5/thumbnails/7.jpg)
2016 ICRI Kick-Off Party | February 1, 2016
Project Timeline:1. Repair accessible Columns
prior to unit outage (phased)2. Remove Top Derricks
(Max 700,000 lbs)3. Remove Old Drums
(Max 480,000 lbs)4. Repair Concrete Structure
(45’ tall)5. Install New Drums
(Max 550,000 lbs)6. Re-install Top Derricks7. 47 days
![Page 8: 2018 ICRI Spring Convention Seismic Solutions...– ACI 318-11 Chapter 21 Section 21.3.3.2 – Stirrup Spacing reduced from 18” to 6” Typical Coker Structure:\爀䐀攀爀爀椀挀欀猀屲Drums](https://reader035.vdocuments.site/reader035/viewer/2022081411/60ae79003d6b68062b6503b4/html5/thumbnails/8.jpg)
2016 ICRI Kick-Off Party | February 1, 2016
Design Parameters• Determine Extent of Concrete Damage• Design for Additional Loads of New Drums• Determine Loading During Construction• Seismic Considerations
– Category B– ACI 318-11 Chapter 21 Section 21.3.3.2– Stirrup Spacing reduced from 18” to 6”
![Page 9: 2018 ICRI Spring Convention Seismic Solutions...– ACI 318-11 Chapter 21 Section 21.3.3.2 – Stirrup Spacing reduced from 18” to 6” Typical Coker Structure:\爀䐀攀爀爀椀挀欀猀屲Drums](https://reader035.vdocuments.site/reader035/viewer/2022081411/60ae79003d6b68062b6503b4/html5/thumbnails/9.jpg)
2016 ICRI Kick-Off Party | February 1, 2016
• Project Background• Deterioration Mechanism• Repair Strategy• Seismic Design Challenges• Constructability Challenges• Results
Presentation Outline
![Page 10: 2018 ICRI Spring Convention Seismic Solutions...– ACI 318-11 Chapter 21 Section 21.3.3.2 – Stirrup Spacing reduced from 18” to 6” Typical Coker Structure:\爀䐀攀爀爀椀挀欀猀屲Drums](https://reader035.vdocuments.site/reader035/viewer/2022081411/60ae79003d6b68062b6503b4/html5/thumbnails/10.jpg)
2016 ICRI Kick-Off Party | February 1, 2016
Coke Drums
Overhead Crane
Hopper
Coke Pit
Bucket
Deterioration Mechanisms
• Mechanical and impact damage
• Water and moisture cycles
• Freeze / thaw cycle
• Temperature differences
• Vibrations from equipment
![Page 11: 2018 ICRI Spring Convention Seismic Solutions...– ACI 318-11 Chapter 21 Section 21.3.3.2 – Stirrup Spacing reduced from 18” to 6” Typical Coker Structure:\爀䐀攀爀爀椀挀欀猀屲Drums](https://reader035.vdocuments.site/reader035/viewer/2022081411/60ae79003d6b68062b6503b4/html5/thumbnails/11.jpg)
2016 ICRI Kick-Off Party | February 1, 2016
Deterioration- #3 Stirrup spacing at 18” (many were damaged)- Structure vulnerable to brittle column failure in seismic event- Code requires 6”- Heavy deterioration- No concrete cover in many spots
![Page 12: 2018 ICRI Spring Convention Seismic Solutions...– ACI 318-11 Chapter 21 Section 21.3.3.2 – Stirrup Spacing reduced from 18” to 6” Typical Coker Structure:\爀䐀攀爀爀椀挀欀猀屲Drums](https://reader035.vdocuments.site/reader035/viewer/2022081411/60ae79003d6b68062b6503b4/html5/thumbnails/12.jpg)
2016 ICRI Kick-Off Party | February 1, 2016
• Project Background• Deterioration Mechanism• Repair Strategy• Seismic Design Challenges• Constructability Challenges• Results
Presentation Outline
![Page 13: 2018 ICRI Spring Convention Seismic Solutions...– ACI 318-11 Chapter 21 Section 21.3.3.2 – Stirrup Spacing reduced from 18” to 6” Typical Coker Structure:\爀䐀攀爀爀椀挀欀猀屲Drums](https://reader035.vdocuments.site/reader035/viewer/2022081411/60ae79003d6b68062b6503b4/html5/thumbnails/13.jpg)
2016 ICRI Kick-Off Party | February 1, 2016
Repair strategy • Column Repairs phased based on
loading and accessibility. 3 different loading conditions:
• Fully loaded drums and derricks
• Empty drums
• Removed drums and derricks
• Installing new shear reinforcement
• Augmenting damaged reinforcement
![Page 14: 2018 ICRI Spring Convention Seismic Solutions...– ACI 318-11 Chapter 21 Section 21.3.3.2 – Stirrup Spacing reduced from 18” to 6” Typical Coker Structure:\爀䐀攀爀爀椀挀欀猀屲Drums](https://reader035.vdocuments.site/reader035/viewer/2022081411/60ae79003d6b68062b6503b4/html5/thumbnails/14.jpg)
2016 ICRI Kick-Off Party | February 1, 2016
![Page 15: 2018 ICRI Spring Convention Seismic Solutions...– ACI 318-11 Chapter 21 Section 21.3.3.2 – Stirrup Spacing reduced from 18” to 6” Typical Coker Structure:\爀䐀攀爀爀椀挀欀猀屲Drums](https://reader035.vdocuments.site/reader035/viewer/2022081411/60ae79003d6b68062b6503b4/html5/thumbnails/15.jpg)
2016 ICRI Kick-Off Party | February 1, 2016
Phasing
![Page 16: 2018 ICRI Spring Convention Seismic Solutions...– ACI 318-11 Chapter 21 Section 21.3.3.2 – Stirrup Spacing reduced from 18” to 6” Typical Coker Structure:\爀䐀攀爀爀椀挀欀猀屲Drums](https://reader035.vdocuments.site/reader035/viewer/2022081411/60ae79003d6b68062b6503b4/html5/thumbnails/16.jpg)
2016 ICRI Kick-Off Party | February 1, 2016
Repair strategy • Stirrup spacing reduced
from 18” to 6” to meet current seismic requirements and increase column ductility
• Vertical reinforcement augmented
• Cathodic protection installed
• Higher strength concrete
![Page 17: 2018 ICRI Spring Convention Seismic Solutions...– ACI 318-11 Chapter 21 Section 21.3.3.2 – Stirrup Spacing reduced from 18” to 6” Typical Coker Structure:\爀䐀攀爀爀椀挀欀猀屲Drums](https://reader035.vdocuments.site/reader035/viewer/2022081411/60ae79003d6b68062b6503b4/html5/thumbnails/17.jpg)
2016 ICRI Kick-Off Party | February 1, 2016
![Page 18: 2018 ICRI Spring Convention Seismic Solutions...– ACI 318-11 Chapter 21 Section 21.3.3.2 – Stirrup Spacing reduced from 18” to 6” Typical Coker Structure:\爀䐀攀爀爀椀挀欀猀屲Drums](https://reader035.vdocuments.site/reader035/viewer/2022081411/60ae79003d6b68062b6503b4/html5/thumbnails/18.jpg)
2016 ICRI Kick-Off Party | February 1, 2016
Repair strategy
![Page 19: 2018 ICRI Spring Convention Seismic Solutions...– ACI 318-11 Chapter 21 Section 21.3.3.2 – Stirrup Spacing reduced from 18” to 6” Typical Coker Structure:\爀䐀攀爀爀椀挀欀猀屲Drums](https://reader035.vdocuments.site/reader035/viewer/2022081411/60ae79003d6b68062b6503b4/html5/thumbnails/19.jpg)
2016 ICRI Kick-Off Party | February 1, 2016
Cathodic ProtectionAnodic Ring (Halo Effect)• Halo Effect phenomena is
associated with a repair area that is surrounded by “new” corrosion sites.
• Halo Effect is one of the primary reasons for shot-lived repairs.
![Page 20: 2018 ICRI Spring Convention Seismic Solutions...– ACI 318-11 Chapter 21 Section 21.3.3.2 – Stirrup Spacing reduced from 18” to 6” Typical Coker Structure:\爀䐀攀爀爀椀挀欀猀屲Drums](https://reader035.vdocuments.site/reader035/viewer/2022081411/60ae79003d6b68062b6503b4/html5/thumbnails/20.jpg)
2016 ICRI Kick-Off Party | February 1, 2016
![Page 21: 2018 ICRI Spring Convention Seismic Solutions...– ACI 318-11 Chapter 21 Section 21.3.3.2 – Stirrup Spacing reduced from 18” to 6” Typical Coker Structure:\爀䐀攀爀爀椀挀欀猀屲Drums](https://reader035.vdocuments.site/reader035/viewer/2022081411/60ae79003d6b68062b6503b4/html5/thumbnails/21.jpg)
2016 ICRI Kick-Off Party | February 1, 2016
![Page 22: 2018 ICRI Spring Convention Seismic Solutions...– ACI 318-11 Chapter 21 Section 21.3.3.2 – Stirrup Spacing reduced from 18” to 6” Typical Coker Structure:\爀䐀攀爀爀椀挀欀猀屲Drums](https://reader035.vdocuments.site/reader035/viewer/2022081411/60ae79003d6b68062b6503b4/html5/thumbnails/22.jpg)
2016 ICRI Kick-Off Party | February 1, 2016
• Project Background• Deterioration Mechanism• Repair Strategy• Seismic Design Challenges• Constructability Challenges• Results
Presentation Outline
![Page 23: 2018 ICRI Spring Convention Seismic Solutions...– ACI 318-11 Chapter 21 Section 21.3.3.2 – Stirrup Spacing reduced from 18” to 6” Typical Coker Structure:\爀䐀攀爀爀椀挀欀猀屲Drums](https://reader035.vdocuments.site/reader035/viewer/2022081411/60ae79003d6b68062b6503b4/html5/thumbnails/23.jpg)
2016 ICRI Kick-Off Party | February 1, 2016
![Page 24: 2018 ICRI Spring Convention Seismic Solutions...– ACI 318-11 Chapter 21 Section 21.3.3.2 – Stirrup Spacing reduced from 18” to 6” Typical Coker Structure:\爀䐀攀爀爀椀挀欀猀屲Drums](https://reader035.vdocuments.site/reader035/viewer/2022081411/60ae79003d6b68062b6503b4/html5/thumbnails/24.jpg)
2016 ICRI Kick-Off Party | February 1, 2016
Per IBC 2012 Section 1901 General:
• 1901.1 Scope. The provisions of this chapter shall govern the materials, quality control, design and construction of concrete used in structures.
• 1901.2 Plain and reinforced concrete. Structural concrete shall be designed and constructed in accordance with the requirements of this chapter.
Zone 1 is an outdated term to define seismic risk which has been replaced by the term “seismic design category” (SDC). The current SDC corresponding to Zone 1 is “B” per ACI 318-14, Table R5.2.2.
![Page 25: 2018 ICRI Spring Convention Seismic Solutions...– ACI 318-11 Chapter 21 Section 21.3.3.2 – Stirrup Spacing reduced from 18” to 6” Typical Coker Structure:\爀䐀攀爀爀椀挀欀猀屲Drums](https://reader035.vdocuments.site/reader035/viewer/2022081411/60ae79003d6b68062b6503b4/html5/thumbnails/25.jpg)
2016 ICRI Kick-Off Party | February 1, 2016
![Page 26: 2018 ICRI Spring Convention Seismic Solutions...– ACI 318-11 Chapter 21 Section 21.3.3.2 – Stirrup Spacing reduced from 18” to 6” Typical Coker Structure:\爀䐀攀爀爀椀挀欀猀屲Drums](https://reader035.vdocuments.site/reader035/viewer/2022081411/60ae79003d6b68062b6503b4/html5/thumbnails/26.jpg)
2016 ICRI Kick-Off Party | February 1, 2016
• Project Background• Deterioration Mechanism• Repair Strategy• Seismic Design Challenges• Constructability Challenges• Results
Presentation Outline
![Page 27: 2018 ICRI Spring Convention Seismic Solutions...– ACI 318-11 Chapter 21 Section 21.3.3.2 – Stirrup Spacing reduced from 18” to 6” Typical Coker Structure:\爀䐀攀爀爀椀挀欀猀屲Drums](https://reader035.vdocuments.site/reader035/viewer/2022081411/60ae79003d6b68062b6503b4/html5/thumbnails/27.jpg)
2016 ICRI Kick-Off Party | February 1, 2016
Mast Climbers
![Page 28: 2018 ICRI Spring Convention Seismic Solutions...– ACI 318-11 Chapter 21 Section 21.3.3.2 – Stirrup Spacing reduced from 18” to 6” Typical Coker Structure:\爀䐀攀爀爀椀挀欀猀屲Drums](https://reader035.vdocuments.site/reader035/viewer/2022081411/60ae79003d6b68062b6503b4/html5/thumbnails/28.jpg)
2016 ICRI Kick-Off Party | February 1, 2016
![Page 29: 2018 ICRI Spring Convention Seismic Solutions...– ACI 318-11 Chapter 21 Section 21.3.3.2 – Stirrup Spacing reduced from 18” to 6” Typical Coker Structure:\爀䐀攀爀爀椀挀欀猀屲Drums](https://reader035.vdocuments.site/reader035/viewer/2022081411/60ae79003d6b68062b6503b4/html5/thumbnails/29.jpg)
2016 ICRI Kick-Off Party | February 1, 2016
![Page 30: 2018 ICRI Spring Convention Seismic Solutions...– ACI 318-11 Chapter 21 Section 21.3.3.2 – Stirrup Spacing reduced from 18” to 6” Typical Coker Structure:\爀䐀攀爀爀椀挀欀猀屲Drums](https://reader035.vdocuments.site/reader035/viewer/2022081411/60ae79003d6b68062b6503b4/html5/thumbnails/30.jpg)
2016 ICRI Kick-Off Party | February 1, 2016
• Project Background• Deterioration Mechanism• Repair Strategy• Seismic Design Challenges• Constructability Challenges• Results
Presentation Outline
![Page 31: 2018 ICRI Spring Convention Seismic Solutions...– ACI 318-11 Chapter 21 Section 21.3.3.2 – Stirrup Spacing reduced from 18” to 6” Typical Coker Structure:\爀䐀攀爀爀椀挀欀猀屲Drums](https://reader035.vdocuments.site/reader035/viewer/2022081411/60ae79003d6b68062b6503b4/html5/thumbnails/31.jpg)
2016 ICRI Kick-Off Party | February 1, 2016
• System for Identifying Reinforcement Augmentation
• Engineering Field Support Beneficial• 30lb hammers for concrete surface and 15lb
hammers around reinforcement• Importance of considering constructability in
repair design and in meeting current seismic code provisions
Lessons Learned
![Page 32: 2018 ICRI Spring Convention Seismic Solutions...– ACI 318-11 Chapter 21 Section 21.3.3.2 – Stirrup Spacing reduced from 18” to 6” Typical Coker Structure:\爀䐀攀爀爀椀挀欀猀屲Drums](https://reader035.vdocuments.site/reader035/viewer/2022081411/60ae79003d6b68062b6503b4/html5/thumbnails/32.jpg)
2016 ICRI Kick-Off Party | February 1, 2016
![Page 33: 2018 ICRI Spring Convention Seismic Solutions...– ACI 318-11 Chapter 21 Section 21.3.3.2 – Stirrup Spacing reduced from 18” to 6” Typical Coker Structure:\爀䐀攀爀爀椀挀欀猀屲Drums](https://reader035.vdocuments.site/reader035/viewer/2022081411/60ae79003d6b68062b6503b4/html5/thumbnails/33.jpg)
2016 ICRI Kick-Off Party | February 1, 2016
Project Team:Mark GuirguisNick TriandafilouJakub SzewczykSlawomir DomagalaKathy Sitko