Information under Section 4(1)(a) of the Act CONTRACT SECTION Sl.No. File No. Description 2017-18 1 PHC/CNT/KPL/TND/01/2017-18/ Construction of Compound Wall, Pavilion & Flag Post for Parade Ground at IRB Munirabad in Koppal district under DC works. 2 PHC/CNT/KPL/TND/02/2017-18/WI-542 Providing Painting & Minor Repair Works For Existing 144 PC And 20 SI Quarters at IRB Munirabad in Koppal District Under DC Works 3 PHC/CNT/BGM/TND/03/2017-18/WI-543 Construction of Store Room, Store Keepers Room, Conference Hall, Deputy Controllers Room in First Floor of Existing DTC and Vehicle Parking Shelter for Home Guards 4 PHC/CNT/DVG/TND/04/2017-18/WI-544 Construction of Academic Science Building (First Floor) for Davanagere University at Shivagangotri, Davanagere Under D C Works 5 PHC/CNT/DVG/TND/05/2017-18/WI-545 Construction of Academic Social Building (First Floor) for Davanagere University at Shivagangotri, Davanagere Under D C Works 6 PHC/CNT/DVG/TND/06/2017-18/WI-547 Supplying and Installation 2 Nos. of 10 Passenger Lifts and Laying of LT UG Cable For Arranging Power Supply to Knowledge Plaza at Shivagangotri University Davanagere 7 PHC/CNT/KLB/TND/07/2017-18/WI-546 Construction of Administrative Block for IRB at Arakeri Village in Vijayapura District Under Budget Scheme 8 PHC/CNT/DVG/TND/08/2017-18/WI-550 Providing and Fixing UPVC Windows & Ventilators for Knowledge Plaza Block at Shivagangotri, Davanagere University Tholahunase Under D C Works 9 PHC/CNT/PG2020/PKG-16/09/2017-18/WI- 562 Construction Of 178 Nos (168 PC + 10 SI) Police Quarters in Raichur, Yadgir & Kalaburgi Districts Under Police Gruha 2020 Scheme (PG 2020 / PH-3 / Package No. 16 / 2017-18) 10 PHC/CNT/PG2020/PKG-23/10/2017-18/WI- 574 Construction of 32 Nos. of SI quarters (Stilt+8 Floors) at Coles road, Frazer town in Bangalore city under Police Gruha 2020 scheme (PG 2020 / Ph-3 / Package No. 23 / 2017-18) 11 PHC/CNT/PG2020/PKG-03/11/2017-18/WI- 558 Construction Of 192 Nos (192 PC) Police Quarters in Tumkur District Under Police Gruha 2020 Scheme (PG 2020 / PH-3 / Package No. 03 / 2017-18) On Lump Sum Turnkey Basis, 12 PHC/CNT/PG2020/PKG-02/12/2017-18/WI- 554 Construction of 126 Nos. (120 PC + 6 SI) Police Quarters in Tumkur City under Police Gruha 2020 Scheme (PG 2020 / PH-3 / Package No. 02 / 2017-18) on lump sum turnkey 13 PHC/CNT/Contracts/TND/12/2017-18 Lacratee Dvrakam (Infra) Pvt. Ltd. (La Greens) Constructions Chemicals (Water Providing) 14 PHC/CNT/PG2020/PKG-06/14/2017-18/WI- 563 Construction Of 144 Nos (132 PC + 12 SI) Police Quarters in Mandya & Chamarajanagara Districts Under Police Gruha 2020 Scheme (PG 2020 / PH-3 / Package No. 06 / 2017- 15 PHC/CNT/PG2020/PKG-07/15/2017-18/WI- 555 Construction of 156 Nos (156 PC) Police Quarters in Mysore District under Police Gruha 2020 Scheme (PG 2020 / PH-3 / Package No. 07 / 2017-18) on lump sum turnkey basis, 16 PHC/CNT/PG2020/PKG-13/16/2017-18/WI- 559 Construction of 116 Nos. (108 PC + 8 SI) Police Quarters in Uttara Kannada & Haveri Districts under Police Gruha 2020 Scheme (PG 2020 / PH-3 / Package No. 13 / 2017-18) on

Upload: others

Post on 30-Dec-2021

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 2017-18 Construction of Compound Wall, Pavilion & Flag Post

Information under Section 4(1)(a) of the Act

CONTRACT SECTION

Sl.No.

File No.

Description

2017-18

1

PHC/CNT/KPL/TND/01/2017-18/

Construction of Compound Wall, Pavilion & Flag Post

for Parade Ground at IRB Munirabad in Koppal district

under DC works.

2

PHC/CNT/KPL/TND/02/2017-18/WI-542

Providing Painting & Minor Repair Works For Existing

144 PC And 20 SI Quarters at IRB Munirabad in

Koppal District Under DC Works

3

PHC/CNT/BGM/TND/03/2017-18/WI-543

Construction of Store Room, Store Keepers Room,

Conference Hall, Deputy Controllers Room in First

Floor of Existing DTC and Vehicle Parking Shelter for

Home Guards

4

PHC/CNT/DVG/TND/04/2017-18/WI-544

Construction of Academic Science Building (First Floor)

for Davanagere University at Shivagangotri, Davanagere

Under D C Works

5

PHC/CNT/DVG/TND/05/2017-18/WI-545

Construction of Academic Social Building (First Floor)

for Davanagere University at Shivagangotri, Davanagere

Under D C Works

6

PHC/CNT/DVG/TND/06/2017-18/WI-547

Supplying and Installation 2 Nos. of 10 Passenger Lifts

and Laying of LT UG Cable For Arranging Power

Supply to Knowledge Plaza at Shivagangotri

University Davanagere

7

PHC/CNT/KLB/TND/07/2017-18/WI-546

Construction of Administrative Block for IRB at Arakeri

Village in Vijayapura District Under Budget Scheme

8

PHC/CNT/DVG/TND/08/2017-18/WI-550

Providing and Fixing UPVC Windows &

Ventilators for Knowledge Plaza Block at

Shivagangotri, Davanagere University

Tholahunase Under D C Works

9

PHC/CNT/PG2020/PKG-16/09/2017-18/WI- 562

Construction Of 178 Nos (168 PC + 10 SI) Police

Quarters in Raichur, Yadgir & Kalaburgi Districts Under

Police Gruha 2020 Scheme (PG 2020 / PH-3 / Package

No. 16 / 2017-18)

10

PHC/CNT/PG2020/PKG-23/10/2017-18/WI- 574

Construction of 32 Nos. of SI quarters (Stilt+8 Floors) at

Coles road, Frazer town in Bangalore city under Police

Gruha 2020 scheme (PG – 2020 / Ph-3 / Package No. 23

/ 2017-18)

11

PHC/CNT/PG2020/PKG-03/11/2017-18/WI- 558

Construction Of 192 Nos (192 PC) Police Quarters in

Tumkur District Under Police Gruha 2020 Scheme (PG –

2020 / PH-3

/ Package No. 03 / 2017-18) On Lump Sum Turnkey

Basis,

12

PHC/CNT/PG2020/PKG-02/12/2017-18/WI- 554

Construction of 126 Nos. (120 PC + 6 SI) Police

Quarters in Tumkur City under Police Gruha 2020

Scheme (PG – 2020 / PH-3 / Package No. 02 / 2017-18)

on lump sum turnkey

13

PHC/CNT/Contracts/TND/12/2017-18

Lacratee Dvrakam (Infra) Pvt. Ltd. (La Greens)

Constructions Chemicals (Water Providing)

14

PHC/CNT/PG2020/PKG-06/14/2017-18/WI- 563

Construction Of 144 Nos (132 PC + 12 SI) Police

Quarters in Mandya & Chamarajanagara Districts Under

Police Gruha 2020 Scheme (PG – 2020 / PH-3 /

Package No. 06 / 2017-

15

PHC/CNT/PG2020/PKG-07/15/2017-18/WI- 555

Construction of 156 Nos (156 PC) Police Quarters in

Mysore District under Police Gruha 2020 Scheme (PG –

2020 / PH-3

/ Package No. 07 / 2017-18) on lump sum turnkey basis,

16

PHC/CNT/PG2020/PKG-13/16/2017-18/WI- 559

Construction of 116 Nos. (108 PC + 8 SI) Police

Quarters in Uttara Kannada & Haveri Districts under

Police Gruha 2020 Scheme (PG – 2020 / PH-3 /

Package No. 13 / 2017-18) on

Page 2: 2017-18 Construction of Compound Wall, Pavilion & Flag Post

17

PHC/CNT/PG2020/PKG-14/17/2017-18/WI- 577

Construction of 246 Nos. (228 PC + 18 SI) Police

Quarters in Belagavi District under Police Gruha 2020

Scheme (PG – 2020 / PH-3 / Package No. 14 / 2017-18)

on lump sum

18

PHC/CNT/PG2020/PKG-11/18/2017-18/WI- 566

Construction of 148 Nos. (144 PC + 4 SI) Police

Quarters in Shivamogga District under Police Gruha

2020 Scheme (PG – 2020 / PH-3 / Package No. 11 /

2017-18) on lump sum

19

PHC/CNT/PG2020/PKG-26/19/2017-18/WI- 564

Construction of 102 Nos. (96 PC + 6 SI) Police

Quarters in Shivamogga under Police Gruha 2020

Scheme (PG – 2020 / PH-3 / Package No. 26 / 2017-18)

on lump sum turnkey

20

PHC/CNT/PG2020/PKG-32/20/2017-18/WI- 569

Construction of 90 Nos. (72 PC + 18 SI) Police Quarters

in Chitradurga District under Police Gruha 2020 Scheme

(PG – 2020 / PH-3 / Package No. 32 / 2017-18) on lump

sum

21

PHC/CNT/PG2020/PKG-28/28/2017-18/WI 568

Construction of 126 Nos (120 PC + 6 SI) Police

quarters at Karwar in Uttar Kannada District under

Police Gruha 2020 Scheme (PG – 2020 / PH-3 /

Package No. 28 / 2017-18) on

22

PHC/CNT/PG2020/PKG-03/11/2017-18/WI- 552

Construction of 72 nos (72 pc ) Police quarters in

Bangalore Rural District under police gruha 2020

scheme (PG – 2020 / ph-3 / package no. 24 / 2017-18)

on lump sum turnkey basis,

23

PHC/CNT/PG2020/PKG-01/23/2017-18/WI- 549

Construction of 80 Nos (72 PC + 8 SI) quarters in

Bangalore Rural District under Police Gruha 2020

Scheme (PG – 2020 / PH-3 / Package No. 01 / 2017-18)

on lump sum turnkey

24

PHC/CNT/PG2020/PKG-04/24/2017-18/WI- 560

Construction Of 238 Nos (216 PC + 22 SI) Police

Qurters In Chikkballapur & Kolar Districts Under Police

Gruha 2020 Scheme (PG – 2020 / PH-3 / Package No.

04 / 2017-18) On

25

PHC/CNT/PG2020/PKG-05/25/2017-18/WI- 551

Construction of 192 nos (180 PC + 12 SI) police qurters

in kolar city under police gruha 2020 scheme (PG – 2020

/ ph-3

/ package no. 05 / 2017-18) on lump sum turnkey basis, using

26

PHC/CNT/PG2020/PKG-10/83/2017-18/WI- 623

Construction of 198 Nos. (192 PC + 6 SI) Police Quarters

in Hassan District Under Police Gruha 2020 Scheme

(PG – 2020 / Ph-3 / Package No. 10 / 2017-18) On Lump

Sum

27

PHC/CNT/PG2020/PKG-08/84/2017-18/WI- 621

Construction of 60 nos (60 PC) Police quarters in

Chikkamagalur District under Police Gruha 2020 scheme

(PG

– 2020 / Ph-3 / Package No. 08 / 2017-18) on Lump Sum

28

PHC/CNT/PG2020/PKG-28/28/2017-18/WI- 568

Construction of 126 Nos (120 PC + 6 SI) Police

quarters at Karwar in Uttar Kannada District under

Police Gruha 2020 Scheme (PG – 2020 / PH-3 /

Package No. 28 / 2017-18) on

29

PHC/CNT/BNG(R)/TND/29/2017-18/WI-565

Providing & Supplying Furniture for DPO

Building Chikkaballapura District Under

Budget Scheme

30

PHC/CNT/PG2020/PKG-29/30/2017-18/WI- 567

Construction of 44 Nos (36 PC + 8 SI) Quarters in

Dakshina Kannada District under Police Gruha 2020

Scheme (PG – 2020 / PH-3 / Package No. 29 /2017-18)

on lump

31

PHC/CNT/PG2020/PKG-15/31/2017-18/WI- 571

Vijayapura & Bagalkote Districts under Police Gruha

2020 Scheme (PG – 2020 / PH-3 / Package No. 15 /

2017-18) on lump sum turnkey basis, using

Conventional method of Construction

32

PHC/CNT/PG2020/PKG-31/32/2017-18/WI- 570

Udupi District under Police Gruha 2020 Scheme (PG –

2020 / PH-3 / Package No. 31 / 2017-18) on lump sum

turnkey basis, using Conventional method of

Construction (Framed Structure)

33

PHC/CNT/PG2020/PKG-30/33/2017-18/WI- 573

Badagabettu in Udupi under Police Gruha 2020 Scheme (PG– 2020 / PH-3 / Package No. 30 / 2017-18) on lump sum turnkey basis, using Conventional method of Construction

Page 3: 2017-18 Construction of Compound Wall, Pavilion & Flag Post

34

PHC/CNT/PG2020/PKG-09/34/2017-18/WI- 572

Shanthigrama for 11th Btn, in Hassan District under

Police Gruha 2020 Scheme (PG – 2020 / PH-3 /

PackageNo. 09 / 2017-18) on lump sum turnkey basis,

using Alternate Technology i.e. Monolithic Construction

35

PHC/CNT/PG2020/PKG-19/35A/2017-18/WI- 581

(Stilt +8 Floors) (Block A, B, C & D) at Sirsi Circle,

Mysore road, Bangalore under Police Gruha 2020

Scheme (PG – 2020 / PH-3 / Package No. 19 / 2017-18)

on lump sum

36

PHC/CNT/PG2020/PKG-18/36/2017-18/WI- 576

(Stilt+8 floors) at K.R. Puram in Bangalore under Police

Gruha 2020 Scheme (PG 2020 / PH-3 / Package No. 18

/ 2017-18) on lump sum turnkey basis based on tenderers

own design

37

PHC/CNT/PG2020/PKG-17/37/2017-18/WI- 575

(stilt+ 8 floors) at Adugodi in Bengaluru under Police

Gruha 2020 Scheme (PG – 2020 / PH-3 / Package No.

17 / 2017-18) on lump sum turnkey basis, using

Conventional method of Construction

38

PHC/CNT/3RDPARTY/MYS/TND/38/2017-18

Entrustment of 3rd party quality assurance and

monitoring of works of KSPH & IDCL Mysore Division

39

PHC/CNT/PG2020/PKG-27/39/2017-18/WI- 578

Construction of 76 Nos (64 PC + 12 SI ) Police quarters

at DAR Davangere Under Police Gruha 2020 Scheme (PG

2020

/ PH-3 / Package No. 27 / 2017-18) on lump sum turnkey

40

PHC/CNT/PG2020/PKG-20/40/2017-18/WI- 580

Construction of 64 PC quarters (Block C) at Binny Mill &

64 PC quarters at Hulimavu (Stilt + 8 Floors) In Bangalore

Under Police Gruha 2020 Scheme (PG 2020 / Ph-3 /

Package No.

41

PHC/CNT/PG2020/PKG-21/41/2017-18/WI- 582

Construction of 128 PC Quarters (Block A & B) (Stilt + 8

Floors) at Nagarabhavi (Jnanabharathi) in Bangalore

under Police Gruha 2020 Scheme (PG – 2020 / PH-3 /

Package No.21

42

PHC/CNT/PG2020/PKG-22/42/2017-18/WI- 583

Floors) at Nagarabhavi (Jnanabharathi) in Bangalore

under Police Gruha 2020 Scheme (PG – 2020 / PH-3 /

Package No. 22 / 2017-18) on lump sum turnkey basis,

based on tenderers

43

PHC/CNT/RTI/TND/43/2017-18

Ramakrishna B N Yeshwanthapura Bangalore

Information Regarding through RTI

44

PHC/CNT/BNG(R)/TND/44/2017-18/WI-584

Formation of Roads for DPO & DAR

Complex at Chikkaballapura

45

PH & IDCL/DVG/TND/45/2017-18/

Providing House Keeping of Davanagere Divion and

Sub Division Regarding.

46

PHC/CNT/MNG/TND/46/2017-18/WI-586

Repairs to KSRP 7th Battalion Block F1 & F2

Quarters at Asaigoli, Mangalore in D. K. District

Under DC Works

47

PHC/CNT/MNG/TND/47/2017-18/WI-585

Construction of Division and Sub Division Office of

KSPH & IDCL at Nanthur, Padavu in Mangalore Under

MISC Expenditure of Head Office

48

PHC/CNT/BNG(R)/TND/48/2017-18/WI-587

Construction of Dining / Kitchen Building for KSISF

at Maligenahally in Bangalore Rural District Under

Non Plan Scheme

49

PH & IDCL/TND/49/2017-18/

RTI 2005 Information Regarding

50

PHC/CNT/BNG(U1)/TND/50/2017-18/WI-588

Supplying And Installing of Gym Equipments and

Other Furnishing items to Police Welfare Centre at

KSRP 3rd Battalion, Koramangala, Bangalore

Under DC Works

51

PHC/CNT/BNG.H.O/TND/51/2017-18

2010-11 year special development scheme under

Fire Station, Fire Qtrs Building construction and

Vehicle and equipments purchasing Regd.

52

PHC/CNT/BGM-VEH/TND/52/2017-18

Supply of Non A./c cars to KSPH&IDC Sub dn at

Belgavi & Hubballi.

53

PHC/CNT/KLB/TND/53/2017-18/WI-589

Construction of Police Station (Grade - 5) at Chowk in

Kalaburagi District under 2017-18 DC Modernization

scheme

Page 4: 2017-18 Construction of Compound Wall, Pavilion & Flag Post

54

. PHC/CNT/KLB/TND/54/2017-18/WI-590

Construction of Police Station (Grade - 5) at Manhalli in

Bidar district under 2017-18 DC Modernization scheme

55

PHC/CNT/KLB/TND/55/2017-18/WI-591 Construction of Police Station (Grade - 4) at Mehakar in

Bidar district under 2017-18 DC Modernization Scheme

56

PHC/CNT/BNG(R)/TND/56/2017-18/WI-593

Repair Works like Plastering, Painting, Fixing of UPVC

windows and Flush Doors for Existing Senior Police

Officers Mess Building at Primrose Road Bangalore

Under DC Works

57

PHC/CNT/KLB/TND/57/2017-18/WI-594

Construction of DYSP Office Building at

Lingsuguru in Raichur district under 2017-18

Modernization scheme

58

PHC/CNT/KLB/TND/58/2017-18/WI-595

Construction of Police Station (Grade - 4) at Hutti in

Raichur District Under 2017-18 Modernization Scheme

59

PHC/CNT/KLB/TND/59/2017-18/WI-596

Construction of Police Station (Grade - 5) at

Sindhanuru in Raichur District Under 2017-18

Modernization Scheme

60

PHC/CNT/BNG(U1)/TND/60/2017-18/WI-598

Construction of Grade-VI Traffic Police Station at

Adugodi, Bangalore under 2017-18 MOPF Scheme

61

PHC/CNT/MNG/TND/61/2017-18/WI-600

Construction of Police station building at Uppinangadi in

D.K. District under 2017-18 Modernization scheme

62

PHC/CNT/MNG/TND/62/2017-18/WI-599

Construction of Police Circle Inspector Office at

Byndoor in Udupi District under 2017-18

Modernization scheme

63

PHC/CNT/MYS/TND/63/2017-18/WI-597

Construction Of Barracks For PTS DAR in 2nd

floor, Jyothinagara at Mysore under Modernization

Scheme

64

PHC/CNT/KPL/TND/64/2017-18/WI-601

Construction of Police Station (Grade-5) & Circle

Office at Kotturu in Bellary District under 2017-18

Modernization scheme

65

PHC/CNT/DVG/TND/65/2017-18/WI-602

Construction of 3 Bay Fire Station at

Harapanahalli in Davanagere District Under 2015-

16 K-SAFE Scheme

66

PHC/CNT/DVG/TND/66/2017-18/WI-603

Construction of Police Station (Grade-5) at Harihara in

Davanagere District under 2017-18 Modernization

Scheme

67

PHC/CNT/DVG/TND/67/2017-18/WI-607

Construction of Police Station (Grade-5) at Hiriyuru in

Chitradurga District Under 2017-18 Modernization

Scheme

68

PHC/CNT/DVG/TND/68/2017-18/WI-608/CALL-

2

Construction of Police Station (Grade-5) at Jayanagara in

Shimoga City Under 2017-18 DC Modernization Scheme

(Call- 2)

69

PHC/CNT/DVG/TND/69/2017-18/WI-609

Construction of class rooms at 1st Floor of Administrative

Block, Barracks at 1st floor and Toilet Block near Parade

Ground at PTS Aimangala in Chitradurga District under

2017-

70

PHC/CNT/MNG/TND/70/2017-18/WI-610

Construction of Grade-3 Police Station at Kota in

Udupi District Under 2017-18 Modernization

Scheme (Call-2)

71

PHC/CNT/BNG(R)/TND/71/2017-18/WI-

612/CALL-2

Construction of Police Station (Grade-4) at Kortagere in

Tumkur District under 2017-18 Modernization Scheme

(Call- 2)

72

PHC/CNT/BNG(R)/TND/72/2017-18/WI-611

Construction of 3 Bay Fire Station at Turuvekere in

Tumkur District under 2015-16 SDP K-Safe Scheme

(Call-2)

Page 5: 2017-18 Construction of Compound Wall, Pavilion & Flag Post

73

. PHC/CNT/BGM/TND/73/2017-18/WI-615

Construction of Toilet Block near Parade Ground for

PTS at Hubballi-Dharwad under 2017-18

Modernization Scheme

74

PHC/CNT/AR/2017-18

Action Plan for preparing and Printing of Annual Report

2016- 17

75

PHC/CNT/HSN/TND/75/2017-18/WI-613/CALL- 3

Construction of Toilet Block at Parade Ground for

PTS at Hassan Under 2017-18 Modernization

Scheme (Call-3)

76

PHC/CNT/MYS/TND/76/2017-18/WI-614

Construction of Grade-3 Police Station at Begur in

Chamarajanagara District under 2017-18

Modernization scheme

77

PHC/CNT/MNG/TND/77/2017-18/WI-616

Providing Civil and Electrical Repairs to ANF Camp at

Agumbe in Shimoga District Under 2016-17 Repairs

Head

78

PHC/CNT/MNG/TND/78/2017-18/WI-617

Repairs to Bath Room, Toilets And Vehicle Shed of

ANF Camp at Kigga in Chikkamagalur District

Under 2016-17 Repairs Head

79

PHC/CNT/MNG/TND/79/2017-18/WI-

618/CALL-2

Repairs To Kitchen And Dining Hall Of ANF Camp at

Shankaranarayana, Kundapura in Udupi District Under

2016- 17 Repairs Head (Call-2).

80

PHC/CNT/MYS/TND/80/2017-18/WI-619

Construction of Grade-3 Police Station at Nanjangudu in

Mysore District under 2017-18 Modernisation Scheme

81

PHC/CNT/PG2020/PKG-33/81/2017-18/WI-

620

Chikkamagalur District Under Police Gruha 2020

Scheme (PG– 2020 / PH-3 / Package No. 33 / 2017-

18) On Lump Sum Turnkey Basis, Using Using

Alternate Technology /

82

PHC/CNT/PG2020/PKG-34/82/2017-18/WI-

622

Hassan District Under Police Gruha 2020 Scheme

(PG – 2020 / PH-3 / Package No. 34 / 2017-18) On

Lump Sum Turnkey Basis, Using Alternate

Technology / Conventional

83

PHC/CNT/PG2020/PKG-10/83/2017-18/WI-

623

Hassan District Under Police Gruha 2020 Scheme

(PG – 2020 / Ph-3 / Package No. 10 / 2017-18) on

Lump Sum Turnkey Basis, Using Conventional /

Alternate Technology

84

PHC/CNT/PG2020/PKG-08/84/2017-18/WI-

621

Chikkamagalur District under Police Gruha 2020 scheme (PG

– 2020 / Ph-3 / Package No. 08 / 2017-18) on Lump

Sum Turnkey Basis, using Alternate Technology /

Conventional

85

PHC/CNT/HSNTND/85/2017-18/WI-624/CALL- 2 UTILITY BUILDING, ADDITIONAL CLASS ROOMS

AND TOILETS FOR WOMEN STAFF FOR PTS

KADUR IN CHIKKAMAGALUR DISTRICT UNDER

2017-18

86

PHC/CNT/BGM/TND/86/2017-18/WI-625/CALL- 2 Infrastructure Facilities for KSRP 2nd Battalion at

APMC Kangrali in Belagavi District Under 2017-18

State Budget Scheme

87

PHC/CNT/BNG(U2)/TND/87/2017-18/WI-

626/CALL-2

Construction of Karnataka State Forensic Science &

Technology Centre at Madiwala, Bangalore Under

2017-18 Budget Scheme (Call-2).

88

PHC/CNT/BNG(R)/TND/88/2017-18/WI-627

MTO & MT Sheds and Parade Ground at CAR Ullala,

Yeshwantpura Hobli, Bangalore North Taluk Under

2016-17 State Budget Scheme

90

PHC/CNT/MNG/TND/90/2017-18/WI-629

Repair works at ANF head quarters at

Ramasamudra, Karkala in Udupi District under

2016-17 Repairs Head

91

PHC/CNT/DVG/TND/91/2017-18

Approval to Short Term NIT foe Constructiion of Toilet i

Police Station

92

PHC/CNT/BGM/TND/92/2017-18/WI-657

Improvement and Repair Works to Police Training

School at Khanapura in Belagavi District Under Dc

Works

Page 6: 2017-18 Construction of Compound Wall, Pavilion & Flag Post

93

PHC/CNT/BNG(U2)/TND/93/2017-18/WI-658

Construction of 6 Bay Fire Station and Fire &

Emergency Management Centre at Mayohall,

Residency Road, Bangalore

94

PHC/CNT/KLB/TND/94/2017-18/WI-661

Construction of sports infrastructure facilities at Nehru

stadium in Bidar under 2017-18 HKRDB Macro

Development Project Scheme

95

No. PHC/CNT/BNG(R)/TND/95/2017-18/WI-

679

Repair Works like Internal Water Supply, Electrical

Work, Drain Work, Tiles W ork for Existing Senior Police

Officers Mess Building at Primrose Road Bengaluru

Under DC Works

96

PHC/CNT/KPL/TND/96/2017-18

Construction of Toilet for Women Staff to existing

police station in Bellary Dist.

97

PHC/CNT/3rd Party/DVG/TND/97/2017-18

Entrustment of 3rd Party Quality Assurance and

Monitoring of Works Pertaining to KSPH and IDCL

Davanagere Division (2 Works)

98

PHC/CNT/BGM/TND/98/2017-18

Construction of Toilet for Women Staff police station in

Gadag Dist.

99

PHC/CNT/KLB/TND/99/2017-18/WI-732/C

Construction of Back Side Compound Wall & C C Road

for DPO Building at Yadgir Under Budgeted Scheme

(Reserved for SC) (CALL-2)all-2

100

PHC/CNT/KLB/TND/100/2017-18/WI-

684/CALL-2

Providing Interior Furniture for DPO Building at Yadgir

Under Budgeted Scheme (Reserved for SC) (CALL-2)

101

No. PHC/CNT/BGM/TND/101/2017-18/WI-733

Repairs to Existing Old Building (Proposed to be

Converted as Library) for PTS at Hubballi-Dharwad

Under DC Works (Reserved For ST) (Call 2)

102

PHC/CNT/BNG(R)/TND/102/2017-18/WI-730

Construction of Guard Room, Sentry Room and Vehicle

Shed for DPO Building at Chikkaballapura Under 2016-

17 DC Works

103

PHC/CNT/DVG/TND/103/2017-18/WI-729/

Providing Stainless Steel Gates for Openings at

Knowledge Plaza Block, Davanagere University at

Shivagangotri, Davanagere Under 2016-17 DC Works

(Call-3).

104

PHC/CNT/DVG/TND/104/2017-18

Supply of Non A./c cars to Davangere Division

105

PHC/CNT/HSN/TND/105/2017-18

Stations at various location in Hassan district (8

locations) Chikkamagalur District (29 Locations) and

Madikeri Rural Police Station at Kodagu

106

PHC/CNT/KLB/TND/106/2017-18

Construction of Toilet to Women Staff in the Existing

Police Stations in kalaburagi district at variouslocation

(Total 17 locations) general category

107

PHC/CNT/KLB/TND/107/2017-18

Construction of Toilet to Women Staff in the existing

Police Stations in Vijayapura district at various location

(Total 12 locations) general category

108

PHC/CNT/KLB/TND/108/2017-18

Construction of Toilet to Women Staff in the Existing

Police Stations in Bidar district at various location (Total

4 locations) general category

109

PHC/CNT/KLB/TND/109/2017-18

Construction of Toilet to Women Staff in the Existing

Police Stations in Yadgir district at various location

(Total 4 locations) general category

110

PHC/CNT/KLB/TND/110/2017-18

Construction of Toilet to Women Staff in the Existing

Police Stations in Raichur district at various location

(Total 5 locations) general category

111

PHC/CNT/KPL/TND/111/2017-18

Construction of Toilet for Women Staff in

Gajendragada Police Stations in Gadag district

112

PHC/CNT/MNG/TND/112/2017-18

Construction of Toilet to Women Staff in the Existing

Police Stations at Hebri in Udupi district Under state

budget scheme for year 2017-18

113

PHC/CNT/BNG-U1/TND/113/2017-18

External Electrical works to technical support

centre at Adugodi, Bangalore under DC works

Page 7: 2017-18 Construction of Compound Wall, Pavilion & Flag Post

114

PHC/CNT/DVG/TND/114/2017-18

Construction of Women Toilet at jagalur circle office in

Jagalur Taluk

115

PHC/CNT/DVG/TND/115/2017-18

Construction of Women Toilet at Arsikeri Police Station

in Harapanahalli Taluk

116

PHC/CNT/DVG/TND/116/2017-18

Construction of Women Toilet at Karnool Police Station

and sagara Police Station in Sagara Taluk

117

PHC/CNT/DVG/TND/117/2017-18

Construction of Women Toilet at Badravathi Police

Station in Badravathi Taluk

118

PHC/CNT/DVG/TND/118/2017-18

Construction of Women Toilet at Basavapatana Police

Station in Badravathi Taluk

119

PHC/CNT/MYS/TND/119/2017-18

Construction of Toilet for Women Staff in all Existing

Police Stations at 18 locations in mysore rural dist under

precast method of construction.

120

PHC/CNT/MYS/TND/120/2017-18

Construction of Toilet for Women Staff in all Existing

Police Stations at 16 locations in mysore city under

convntional precast method of construction.

121

PHC/CNT/MYS/TND/121/2017-18

Construction of Toilet for Women Staff in all Existing

Police Stations at 2 locations in Chamarajanagara

District using convntional method of construction.

122

PHC/CNT/MYS/TND/122/2017-18

Construction of Toilet for Women Staff in all Existing

Police Stations at 19 locations in Mandya District using

precast method of construction.

123

PHC/CNT/H.O/TND/123/2017-18

Sri. K L A Padmanabasa Joint M D Khoday

Group of Industries Bangalore Request Regd.,

124

PHC/CNT/DVG/TND/124/2017-18/WI-757

Construction of Police Public School, Boys Hostel &

Girls Hostel at Kondajji in Davanagere District Under

2017-18 Budgeted Scheme

125

PHC/CNT/HSN/TND/116/2016/WI-445

Water Proofing and Painting Work To Armoury and

Repairs to Existing External Sewage System at KSRP

8th Battalion at Machenahally in Shivamogga District

Under DC Works

126

PHC/CNT/DVG/TND/126/2017-18/WI-746

Construction of Women Barrack for Home Guard

Training School at Devarabelekere in Davanagere

District Under DC Works

127

PHC/CNT/BNG(R)/TND/127/2017-18/WI-749

Repairs to DG & IGP Residence, Nrupatunga

Road Bangalore

128

PHC/CNT/BNG(R)/TND/128/2017-18

Police Stations in KGF (Andersonpet, Championpeet,

Marikuppam Masti, Mulbagal, Nangli) Package No.

01/2017- 18(Reserved for SC)

129

PHC/CNT/BNG(R)/TND/129/2017-18

Construction of Toilet for Women Staff in

Honnavalli, Nonavinakere, Huliyaru, Madhugiri,

Turuvekere & Dandinavhivara Police Stations in

Tumkur Dist.

130

PHC/CNT/BNG(R)/TND/130/2017-18

Construction of Toilets to Women Staff in the Existing

03 Police Stations in Kolar District (Traffic PS Kolar,

RPS Kolar, Vemagal) Package No. 06/2017-18

131

PHC/CNT/BNG(R)/TND/131/2017-18

Police Stations in Bangalore Rural District (Attibele,

Sarjapura, Banneraghatta, Thirumalshetti Halli) Package

No. 04/2017-18.

132

PHC/CNT/TND/Contracts/Circular/2017-18

Selection of contractors in case of single bid

tenders in tendering process

Page 8: 2017-18 Construction of Compound Wall, Pavilion & Flag Post

133

PHC/CNT/BGM/TND/133/2017-18/

Renovation and Repairs to 6 SI Qtrs for KSRP 2nd Btn .

At machhe in Belagavi Dist. Under DC Work.

134

PHC/CNT/HSN/TND/134/2017-18/

Supply of Hired vehiclas to Chikkamagalur Dn reg.

135

PHC/CNT/BNG-R/TND/135/2017-18

Construction of Compound wall for KSRP Batalion at

Koratagere in Tumkur Dist.

136

PHC/CNT/BNG-R/TND/136/2017-18

Construction of Toilets for Women staff in existing Police

Station at (Rajanukunte, chikkajala, Doddabelavangala,

Hoshalli)

137

PHC/CNT/BNG-U1/TND/137/2017-18

Dismantling of old Exisiting 1 SI Qutrs 1 DYSP Qtrs & 1

Nos of---- small shed & disposing of old --- from site at

coles road Bangalore under PG 2020

138

PHC/CNT/PMC-Madiwala/TND/138/2017-18

Consultancy services for Project Management

Consultancy Services including Supervision, Quality

Assurance, Progress Monitoring / Reporting,

Measurement, Billing And

139

PHC/CNT/PMC-Mayohall/TND/139/2017-18

Consultancy services for Project Management

Consultancy Services including Supervision, Quality

Assurance, Progress Monitoring / Reporting,

Measurement, Billing And

140

PHC/CNT/DVG- VEH/TND/140/2017-18

Supply of Vehicals to Shivamogga Sub Division on

haired basis.

141

PHC/CNT/MYS/TND/141/2017-18/

Construction of Pavilion Building and Swmimming Pool

to District Stadium at Chamarajnagar.

142

PHC/CNT/KPL/TND/142/2017-18/

Construction of Toilet for Women Staff in

Gajendragada Police Stations in Gadag Dist.

(Reserved for ST Category)

143

PHC/CNT/KPL/TND/143/2017-18/

Construction of Toilet for women staff in Gadag Shahar,

Gada Road and women police stan in Gadag Dist.

144

PHC/CNT/BGM/TND/144/2017-18/

Construction of Toilet to police constables in at Hubballi,

145

PHC/CNT/BGM/TND/145/2017-18/

Construction of Toilet for woman police Constable in

south traffice police Station in Hubballi, Dharwad under

budgeted scheme .

146

PHC/CNT/BGM/TND/146/2017-18/

Construction of women Police constable toiet at DYSP

Dharwad, under budgeted Scheme for 2017for 2017-18

(shifted them cPI Rural Dharwad).

147

PHC/CNT/BGM/TND/147/2017-18/

Construction of women Police constable toiet Gokul

Road Police Station in Hubballi Dharwad under

budgeted Scheme for 2017for 2017-18

148

PHC/CNT/BGM/TND/148/2017-18/

Construction of toiets women Police constable in

Hosabhavi Police Station in Haveri Dist. under

budgeted Scheme for 2017for 2017-18

149

PHC/CNT/HSN/TND/149/2017-18/

Construction of Retaining wall for 72 PC & 6SI Qts

Madikeri in Kodagu Dist. Under Police Gruha 2020

150

PHC/CNT/HSN/TND/150/2017-18/

Construction of Toilets for Women Staff in 8 existing

Police Stations in Hassan District using conventional

method of construction

151

PHC/CNT/HSN/TND/151/2017-18/

Construction of Toilets for Women staff in existing

Rural Police Station at Madikeri in Kodagu District

using Conventional Method of Construction

Page 9: 2017-18 Construction of Compound Wall, Pavilion & Flag Post

152

PHC/CNT/DVG/TND/152/2017-18/

Construction of womens Toilets of Rural Police

Station Kote police station in Chitradurga town (

reserved for SC)

153

PHC/CNT/DVG/TND/153/2017-18/

Construction of Womens Toilets at Talaku police

station in Challakere Taluk.

154

PHC/CNT/DVG/TND/154/2017-18/

Construction of Womens Toilets at Chikkajajuru

Police Station & Chitrahalli Police Station

155

PHC/CNT/DVG/TND/155/2017-18/

Construction of Womens Toilets at Badavane,

Womens Police Station & Traffic Police Station

156

PHC/CNT/Mys/TND/156/2017-18/

Repairs to Existing Quarters at KSRP, 5th Battalion,

Mysuru (6 Block of 54 Houses)

157

PHC/CNT/BNG-U1/TND/157/2017-18

Electrification work to Renovation to Auditorium at

4th Btn KSRP Koramanagala.

158

PHC/CNT/BNG-R/HO/High Court/158/2017-18

High Court of Karnataka at Bangalore with petition

Nos 5654- 56155/2017( GM-RES)( Administrtative

Block Ullal , Yeshwanthpur)

159

PHC/CNT/KPL/VEH/159/2017-18/

Supply of Hired vehiclas to Hospet Dn and Hospet

sub dn reg.

160

PHC/CNT/DVG/TND/160/2017-18/

Construction of Womens Toilets at Jagaluru Circle

Office in Jagalure talukin Chitradurga Dist.

161

PHC/CNT/DVG/TND/161/2017-18/

Construction of Toilet for Women Staff in

Basavapatna & Santhebennur Police Stations in

Channagiri Taluk.

162

PHC/CNT/DVG/TND/162/2017-18/

Construction of Toilet for Women Staff in Kargal &

Sagara Police Stations in Sagara Taluk.

2018-19

163 No.PHC/CNT/BNG(U1)/TND/27/2018-19/WI-821 Repair and Renovation of Auditorium at KSRP 4th Battalion Premises, Koramangala, Bangalore

164 No. PHC/CNT/BGM/TND/147/2017-18/WI-766 Construction of Toilet for Women Staff in North Traffic Police Station in Hubballi-Dharwad Under 2017-18 State Budget Scheme

165 No. PHC/CNT/BGM/TND/148/2017-18/WI-767 Construction of Toilet for Women Staff in Hamsabhavi Police Station in Haveri District Under 2017-18 State

Budget Scheme

166 No. PHC/CNT/BGM/TND/147/2017-18/WI-766/CALL-2

Construction of Toilet for Women Staff in Gokul Road Police Station in Hubballi-Dharwad Under 2017-18 State Budget Scheme

167 No.PHC/CNT/DVG/TND/180/2017-18/WI-782 Providing Furniture to Chigateri Police station (Grade-4) at Harapanahalli Taluk in Davanagere District

168 No. PHC/CNT/MNG/TND/165/2017-18/WI-777 Renovation and Repairs to A1 and A2 Block, SI Quarters at 7thBattalion KSRP Mangalore

169 No. PHC/CNT/DVG/TND/175/2017-18/WI-780 Repairs to Block No. 4 of SI Quarters, Block No. 13 of PC Quarters, Block No. 20 to 24 of PC Quarters at KSRP 8th Battalion Machenahalli in Shimoga District Under the Savings of DC Works

170 No. PHC/CNT/BNG(R)/TND/167/2017-18/WI-778 Construction of Administrative Block, Barrack, MTO, Motor Transport Shed and Parade Ground for 12thBattalion KSRP at Koratagere in Tumkur District Under 2017-18 Budgeted Scheme

Page 10: 2017-18 Construction of Compound Wall, Pavilion & Flag Post

171 No. PHC/CNT/BNG(U2)/TND/194/2017-18/WI-792 Balance works of Construction of CCT Academic Block (Operational Block) at Agara Village (near Tataguni Estate), Kanakapura Road Bangalore

172 No.PHC/CNT/MYS/TND/189/2017-18/WI-785/CALL-2 Road Surface and Preparation (Cutting & Filling), Road Surface Finishing (Grade 2, 3 and Bituminous Finish), RCC Drain, Surface Trench, Footpath Pavement, RWH & Bus Bay with Asphalt Finishing for Police Public School, Mysore (Call-2)

173 No. PHC/CNT/MYS/TND/186/2017-18/WI-784/Call-2 Providing and Construction of Two Wheeler Parking, Foot Path, Asphalt Road, Covered Parking, Landscaping, Compound W all, Cafeteria, RCC Culvert and Electrical Works to the Office of Commissioner of Police Office at Mysore

174 No. PHC/CNT/BNG(U1)/TND/113/2017-18/WI-745/CALL-2

External Electrical works to Technical Support Centre at Adugodi, Bangalore (CALL-2)

175 No.PHC/CNT/BNG(U1)/TND/10/2018-19/WI-801 Repairs to Senior Police Officers Quarters A2, A3, B3, B4 & B5 at Shoolay Circle, Bangalore

176 No. PHC/CNT/DVG/TND/168/2017-18/WI-779 Repairs to Kitchen Block at PTS Aimangala in Chitradurga District Under DC Works

177 No.PHC/CNT/BNG(R)/TND/24/2018-19/WI-816 Providing, Supplying & Fixing of Kitchen equipments to Kitchen & Dining Block at KSISF Maligenahalli in Bangalore Rural District

178 No.PHC/CNT/BNG(U2)/TND/07/2018-19/WI-800 Repairs to existing Junior Police Officers Mess, 24 Rooms and 8 Rooms building at Magrath Road, Ashoknagar at Bangalore

179 No. PHC/CNT/BNG(U2)/TND/195/2017-18/WI-791/CALL-2

Providing Interiors, Furnishing to GF, FF & SF, Kitchen and Dining Facility at Stilt Floor of Newly Constructed Trainees Block at CCT Agara, Kankpura Road Bangalore

180 No. PHC/CNT/KLB/TND/19/2018-19/WI-809 Repairs to District Training Centre for Home Guards at Kalaburgi

181 No.PHC/CNT/BNG(U1)/TND/27/2018-19/WI-821 Repairs to Ground Floor of Sports Barrack at KSRP 4th Battalion, Koramangala, Bangalore

182 No. PHC/CNT/BGM/TND/21/2018-19/WI-812 Construction of Armoury Building at PTS Dharwad under MPF Scheme

183 No. PHC/CNT/BGM/TND/22/2018-19/WI-813 Construction of MT Shed for KSRP 2nd Battalion at Machhe in Belagavi District under DC works

184 No. PHC/CNT/BNG(U1)/TND/12/2018-19/WI-803 Extension of Ground Floor & Construction of First Floor for Wireless Training School at Audugodi, Bangalore

185 No. PHC/CNT/BNG(U1)/TND/23/2018-19/WI-818 No. PHC/CNT/BNG(U1)/TND/28/2018-19/WI-820

Repairs & Renovations to Dog Kennel and Toilet Block attached to Dog Kennel Barrack at CAR (South) premises, Adugodi, Bangalore. (Glazed tiles dadoo, ceramic tiles flooring, replacing doors, windows, inside & outside painting, sanitary line) External Electrification in ISD office premises at KSRP 1st Battalion, Richmond Road, Bangalore

186 No. PHC/CNT/KLB/TND/17/2018-19/WI-811 Repairs & Colouring to Group-C type-C2 quarters,

Group-D type block-F quarters and providing & laying/ Repairs to drainage & Manholes at PTC Naganahalli in Kalaburgi District

Page 11: 2017-18 Construction of Compound Wall, Pavilion & Flag Post

187 Renovation Works like Sanitary Fittings in Bathroom, Veneer Paneling, Gypsum False Ceiling and Plumbing Work at DG & IGP Residence, NT Road, Bangalore

188 No.PHC/CNT/BNG(R)/TND/25/2018-19/WI-817 Providing and Supplying Furniture for Rural Police Station at Chintamani in Chikkaballapura District

189 No. PHC/CNT/BNG(U2)/TND/15/2018-19/WI-806 Repairs & Improvement Works to Existing Alert Base Central Building in Mayo Hall at Bangalore

190 No. PHC/CNT/BNG(U1)/TND/28/2018-19/WI-820 Repair and servicing of 250 KVA TC, DG set at FSL Madiwala, Bangalore

191 No. PHC/CNT/DVG/TND/14/2018-19/WI-804 Construction of Balance Portion of Hostel & Infrastructure Facilities at PTS Aimangala in Chitradurga District Under MOPF Scheme

192 No. PHC/CNT/MYS/TND/191/2018-19/WI-786/CALL-3

Providing Campus Lighting, CCTV, Paging System and Diesel Generator with Acoustic Enclosure to Police Public School Phase-2 Works, Mysore

193 No.PHC/CNT/BNG(R)/TND/31/2018-19/WI-822/CALL-2

Repairs to 6 PC Quarters (1 Block) for Wireless at Hebbal & Repairs to DYSP Chambers Wireless Radio Grid office at M.G.Road Bangalore (Reserved for ST)

194 No. PHC/CNT/MNG/TND/30/2018-19/WI-823 Construction of Retaining W all, Compound Wall, Drain & Pitching to the newly Constructed Police Quarters under Police Gruha 2020 Phase-III Scheme at Sampiya and Samathadka, Puttur Taluk in D.K. District

195 No. PHC/CNT/BNG(U1)/TND/13/2018-19/WI-805 Construction of Armoury Building for Police Training School at Thanisandra, Bangalore

196 No. PHC/CNT/BNG(U1)/TND/33/2018-19/WI-825 Construction of Alround Compound at Newly Constructed PC Qtrs (A to F, G & H blocks) of Police Department at K.R.Puram, Bangalore

197 No PHC/CNT/MYS/TND/192/2017-18/WI-788/CALL-3 Landscaping, Botanical Garden, RCC Sump (2 Lakhs Ltrs. Capacity), Water Supply Mains and Gate Valve, Swimming Pool (22.5 KL Capacity) Filtration Plant

Change Room and Pavilion, Play Ground Formation with Track, Entrance Gate, Security Shed with Toilet, Visitors Waiting Shelter with Toilet, Staff Parking Shelter with Paver Flooring, Amphitheatre, Play Ground Pavilion (40 M) with Dressing Room, Toilets and Games Equipments for Police Public School, Mysore (Call-3).-

198 No. PHC/CNT/MYS/TND/190/2017-18/WI-787/Call-3 No.PHC/CNT/KPL/TND/40/2018-19/WI-830

Supplying and Installation of Sewage Treatment Plant of 100 KLD Capacity (MBBR Process Based) on Tenderer’s own Design and drawing including 15 KVA Standby Diesel Generator and Allied Under Ground Drainage W orks to Police Public School Phase-2 Works, Mysore Construction of Two Wheeler Shed, Motor Vehicle Shed, Cattle Trap, RCC Drain, Granite Name Boards,

Wicket Gate for Home Guards at Bellary under DC works

199 No. PHC/CNT/BNG(R)/TND/41/2018-19/WI-831 Repair works like Water Proofing, Electrical fittings, Granite Flooring, Wooden W ard robe & Kitchen equipments for existing Senior Police Officers Mess building at Primrose Road, Bangalore under DC works

200 No.PHC/CNT/BNG(U1)/TND/48/2018-19/WI-834 Construction of Kindergarten & Administrative Block (Ground Floor) at Existing Police Public School Premises (Phase-1) Koramangala, Bangalore

Page 12: 2017-18 Construction of Compound Wall, Pavilion & Flag Post

201 No. PHC/CNT/BGM/TND/58/2018-19/WI-842 Providing 500 LPH RO Commercial Plant and Solar Water Heater System for 36 PC / SI Quarters at PTS Khanapura in Belagavi District

202 No.PHC/CNT/KLB/TND/57/2017-18/WI-594 Construction of DYSP Office Building at Lingsuguru in Raichur District under 2017-18 Modernization Scheme

203 No. PHC/CNT/BNG(U2)/TND/16/2018-19/WI-807 Construction of Commando Barrack in First Floor of Administrative building of CCT in Kudlu, Bangalore

204 No. PHC/CNT/MYS/TND/76/2017-18/WI-614 Construction of Grade-3 Police Station at Begur in Chamarajanagara District under 2017-18 Modernization Scheme

205 No.PHC/CNT/MNG/TND/70/2017-18/WI-610/CALL-2 Construction of Grade-3 Police Station at Kota in Udupi District Under 2017-18 Modernization Scheme (Call-2)

206 No. PHC/CNT/BNG(U1)/TND/57/2018-19/WI-835 Construction of Compound Wall for Police Quarters A & B Block at Kengeri, Bangalore Under Police Gruha-2020 Scheme

207 No. PHC/CNT/BNG(R)/TND/62/2018-19/WI-846 Repair and Renovation of Wireless HQ for State Emergency Response Centre (SERC), ERSS at M.G. Road, Bangalore

208 PHC/CNT/BNG(U1)/TND/49/2018-19/WI-833/Call-2 Supplying and Installation of Sewage Treatment Plant (MBBR Process Based) On Tenderer’s Own Design and Drawing for Newly Constructed Guest House in Premises of Police Staff Quarters at Anandrao Circle, Sheshadripuram Road Bangalore (CALL-2)

209 No.PHC/CNT/BNG(R)/TND/63/2018-19/WI-852 Construction of Additional Toilet & Bathrooms for

KSPTS Channapatna in Ramanagara Dist Under 2014-15 Modernization Scheme

210 No. PHC/CNT/MYS/TND/64/2018-19/WI-853 Providing Furnitures, Interiors & False Ceiling, Fire fighting appliances, AC Inverter, Campus Lighting and High mast light works to the Newly Constructed COP Office building at Mysore

211 No. PHC/CNT/DVG/TND/67/2017-18/WI-607/CALL-2 Construction of Police Station (Grade-5) at Hiriyuru in

Chitradurga District Under 2017-18 Modernization Scheme (CALL-2)

212 No.PHC/CNT/KLB/TND/65/2018-19/WI-865 Repairs to Old IGP Office (Police Commissionarate Office) at Kalaburgi under DC Repair works

213 No.PHC/CNT/KLB/TND/59/2018-19/WI-596/CALL Construction of Police Station (Grade-5) at Sindhanuru in Raichur District Under 2017-18 Modernization

Scheme (CALL-2

214 No. PHC/CNT/MYS/TND/44/2018-19/WI-832 Construction of Toilets and Bath Rooms in 1st Floor for PTS at Mysore

215 No. PHC/CNT/KLP/TND/76/2018-19/WI-871 Construction of Commandant's Residence, 03 Nos. Deputy Commandant's Residence & 07 Nos. Assistant Commandant's Residence for IRB at Munirabad in

Koppal District

216 No. PHC/CNT/BNG(R)/TND/72/2017-18/WI-611/CALL-2

Construction of 3 Bay Fire Station at Turuvekere in Tumkur District under 2015-16 SDP K-Safe Scheme (Call-2)

217 No. PHC/CNT/KLB/TND/53/2018-19/WI-589/CALL-2 Construction of Police Station (Grade - 5) at Chowk in Kalaburagi District under 2017-18 DC Modernization

Scheme (CALL-2)

218 No. PHC/CNT/BGM/TND/72/2018-19/WI-864 Repairs & Renovation W orks to Audience Gallery for Parade Ground & Flag Post in front of Police Bhavan in Belagavi under DC works

Page 13: 2017-18 Construction of Compound Wall, Pavilion & Flag Post

2019-20

219 No. PHC/CNT/DVG/TND/66/2017-18/WI-603 Construction of Police Station (Grade-5) at Harihara in Davanagere District under 2017-18 Modernization Scheme

220 No. PHC/CNT/BNG(U1)/TND/114/2018-19/WI-905 Balance work and Improving Aesthetics of Police Community Hall (Police Bhavan) for KSRP at 3rd Batallion Premises, Koramangala, Bangalore

221 No. PHC/CNT/MYS/TND/94/2018-19/WI-896 Construction of District Home Guard Training Centre

Building in Mandya

222 No. PHC/CNT/BNG(R)/TND/85/2018-19/WI-870 Construction of Dormitory, Store Room & Retaining Wall With Compound for District Training Centre at Kolar, in Kolar District

223 No.PHC/CNT/HSN/TND/82/2018-19/WI-879/CALL-2 Providing Furnitures and Electronic Items for Police Office Complex, N.R. Circle, Hassan (Call-2)

224 No. PHC/CNT/MYS/TND/94 A/2018-19/WI-897 Supply & Installation of Furnitures, Kitchen equipments and Dining Tables to Hostel Block at Police Public School, Mysore

225 No. PHC/CNT/DVG/TND/87/2018-19/WI-882 Renovation & Repair Works To Shifting The Admin Office of Commandant, 2nd Battalion KSISF to Old Shivamogga District Jail & Painting & Minor Repair

Works to Existing 1 Nos of Officers Quarters, 1 Block Of 12 Pc Quarters & 5 Blocks Of 2 PC Quarters at old Shivamogga District Jail Premises In Shivamogga District

226 No. PHC/CNT/KLB/TND/93/2018-19/WI-868/CALL-2 Construction of Armoury building, 1 No. Assistant Commandant Residence, 2 Nos. Deputy Commandant Quarters, 6 Nos Assistant Commandants quarters, Entrance Arch with 2 Nos Guard Room at IRB in Vijayapura under Budget Scheme (Call-2)

227 No. PHC/CNT/BNG-U1/ TND/106/2018-19/WI-909 Construction of Class Rooms with Infrastructure facilities to APTS, Yelahanka, Bangalore

228 No. PHC/CNT /KLB/TND/111/2018-19/WI-917 Construction of 120 PSI Capacity Barracks (03 blocks) PTS at Naganahalli in Kalaburagi Under Budgeted Scheme

229 No. PHC/CNT/BNGU-1/TND/107/2018-19/WI-920 Construction of Additional Class Room at First Floor of existing Administrative and Teaching Block of Police Training School, Thanisandra, Bangalore