2016 bikeway project concept simulations 2000 to 2013 - boulanger
TRANSCRIPT
![Page 1: 2016 Bikeway Project Concept Simulations 2000 to 2013 - Boulanger](https://reader031.vdocuments.site/reader031/viewer/2022030305/587484ec1a28abc62f8b4df1/html5/thumbnails/1.jpg)
By Todd Boulanger Supporting Materials for Resume / Linkedin
![Page 2: 2016 Bikeway Project Concept Simulations 2000 to 2013 - Boulanger](https://reader031.vdocuments.site/reader031/viewer/2022030305/587484ec1a28abc62f8b4df1/html5/thumbnails/2.jpg)
! Provide context for unconventional allocation of space or design practice among staff during concept planning;
! Allow lay audience members to visualize how public roadway or right of way space may be changed versus more traditional engineering strip maps or text descriptions; and
! Communicate ‘best practice’ design standards in a local context.
![Page 3: 2016 Bikeway Project Concept Simulations 2000 to 2013 - Boulanger](https://reader031.vdocuments.site/reader031/viewer/2022030305/587484ec1a28abc62f8b4df1/html5/thumbnails/3.jpg)
![Page 4: 2016 Bikeway Project Concept Simulations 2000 to 2013 - Boulanger](https://reader031.vdocuments.site/reader031/viewer/2022030305/587484ec1a28abc62f8b4df1/html5/thumbnails/4.jpg)
Task: Convert Main Street back into two way flow without reconstruction costs. [Status: Roadway converted to two way traffic but back-in parking not used here, though used elsewhere.]
![Page 5: 2016 Bikeway Project Concept Simulations 2000 to 2013 - Boulanger](https://reader031.vdocuments.site/reader031/viewer/2022030305/587484ec1a28abc62f8b4df1/html5/thumbnails/5.jpg)
![Page 6: 2016 Bikeway Project Concept Simulations 2000 to 2013 - Boulanger](https://reader031.vdocuments.site/reader031/viewer/2022030305/587484ec1a28abc62f8b4df1/html5/thumbnails/6.jpg)
![Page 7: 2016 Bikeway Project Concept Simulations 2000 to 2013 - Boulanger](https://reader031.vdocuments.site/reader031/viewer/2022030305/587484ec1a28abc62f8b4df1/html5/thumbnails/7.jpg)
Task: Development of an alternative drive through design that would not effect pedestrian space on a sidewalk in high capacity transit zone versus conventional Project Developer proposed drive through. [Status: walk up ATM built for bank and drive though not built.]
![Page 8: 2016 Bikeway Project Concept Simulations 2000 to 2013 - Boulanger](https://reader031.vdocuments.site/reader031/viewer/2022030305/587484ec1a28abc62f8b4df1/html5/thumbnails/8.jpg)
![Page 9: 2016 Bikeway Project Concept Simulations 2000 to 2013 - Boulanger](https://reader031.vdocuments.site/reader031/viewer/2022030305/587484ec1a28abc62f8b4df1/html5/thumbnails/9.jpg)
Task: Seeking developer and council support of an alternative intersection design, as the first modern roundabout for downtown. Client: Development Review and Public Works [End result: roundabout built]
![Page 10: 2016 Bikeway Project Concept Simulations 2000 to 2013 - Boulanger](https://reader031.vdocuments.site/reader031/viewer/2022030305/587484ec1a28abc62f8b4df1/html5/thumbnails/10.jpg)
![Page 11: 2016 Bikeway Project Concept Simulations 2000 to 2013 - Boulanger](https://reader031.vdocuments.site/reader031/viewer/2022030305/587484ec1a28abc62f8b4df1/html5/thumbnails/11.jpg)
Task: Development of an alternative roadway lane layout based on a queuing street to improve bike and pedestrian safety along heritage arterial streets with limited width. [2016 Status: street restriped “as-is”]
![Page 12: 2016 Bikeway Project Concept Simulations 2000 to 2013 - Boulanger](https://reader031.vdocuments.site/reader031/viewer/2022030305/587484ec1a28abc62f8b4df1/html5/thumbnails/12.jpg)
![Page 13: 2016 Bikeway Project Concept Simulations 2000 to 2013 - Boulanger](https://reader031.vdocuments.site/reader031/viewer/2022030305/587484ec1a28abc62f8b4df1/html5/thumbnails/13.jpg)
![Page 14: 2016 Bikeway Project Concept Simulations 2000 to 2013 - Boulanger](https://reader031.vdocuments.site/reader031/viewer/2022030305/587484ec1a28abc62f8b4df1/html5/thumbnails/14.jpg)
![Page 15: 2016 Bikeway Project Concept Simulations 2000 to 2013 - Boulanger](https://reader031.vdocuments.site/reader031/viewer/2022030305/587484ec1a28abc62f8b4df1/html5/thumbnails/15.jpg)
Task: Development of updated parking lot layout and circulation standards to improve pedestrian access and safety. [End result: Staff dialog generated and some pedestrian enhancements adopted.]
![Page 16: 2016 Bikeway Project Concept Simulations 2000 to 2013 - Boulanger](https://reader031.vdocuments.site/reader031/viewer/2022030305/587484ec1a28abc62f8b4df1/html5/thumbnails/16.jpg)
![Page 17: 2016 Bikeway Project Concept Simulations 2000 to 2013 - Boulanger](https://reader031.vdocuments.site/reader031/viewer/2022030305/587484ec1a28abc62f8b4df1/html5/thumbnails/17.jpg)
![Page 18: 2016 Bikeway Project Concept Simulations 2000 to 2013 - Boulanger](https://reader031.vdocuments.site/reader031/viewer/2022030305/587484ec1a28abc62f8b4df1/html5/thumbnails/18.jpg)
Task: Development of an alternative roadway lane layout to improve bike safety and property access. [End result: bike lane added.]
![Page 19: 2016 Bikeway Project Concept Simulations 2000 to 2013 - Boulanger](https://reader031.vdocuments.site/reader031/viewer/2022030305/587484ec1a28abc62f8b4df1/html5/thumbnails/19.jpg)
Task: Development of an alternative roadway lane layout to improve bike safety and property access. [Status: waiting for Walmart development to install refuge island.]
![Page 20: 2016 Bikeway Project Concept Simulations 2000 to 2013 - Boulanger](https://reader031.vdocuments.site/reader031/viewer/2022030305/587484ec1a28abc62f8b4df1/html5/thumbnails/20.jpg)
![Page 21: 2016 Bikeway Project Concept Simulations 2000 to 2013 - Boulanger](https://reader031.vdocuments.site/reader031/viewer/2022030305/587484ec1a28abc62f8b4df1/html5/thumbnails/21.jpg)
Task: Development of an alternative arterial bikeway link and use of new design treatments. [End result: conventional bike lane built but road converted to two way traffic flow.]
![Page 22: 2016 Bikeway Project Concept Simulations 2000 to 2013 - Boulanger](https://reader031.vdocuments.site/reader031/viewer/2022030305/587484ec1a28abc62f8b4df1/html5/thumbnails/22.jpg)
Task: Development of an alternative arterial bikeway link and use of new design treatments. [End result: blue conflict bike lane not used here.]
![Page 23: 2016 Bikeway Project Concept Simulations 2000 to 2013 - Boulanger](https://reader031.vdocuments.site/reader031/viewer/2022030305/587484ec1a28abc62f8b4df1/html5/thumbnails/23.jpg)
![Page 24: 2016 Bikeway Project Concept Simulations 2000 to 2013 - Boulanger](https://reader031.vdocuments.site/reader031/viewer/2022030305/587484ec1a28abc62f8b4df1/html5/thumbnails/24.jpg)
Task: Development of an alternative arterial lane layout to provide safer bike access and tourism for rural Oregon town. [Status: not yet built]