2016-12-15 ced1 agendaced1.org/wp-content/uploads/2010/03/2016-12-15-ced1-website-pac… ·...
TRANSCRIPT
AGENDA FOR CIRCUIT ENGINEERING DISTRICT #1
REGULAR BOARD MEETING
2016-12-15 CED1 Agenda Page 1 of 1
DATE: December 15, 2016 TIME: 10:00 am PLACE: Ottawa Courthouse Annex, 123 E. Central, Miami, Oklahoma
AGENDA 1. Call to order by President
2. Determine that Notice of Meeting and Agenda for this meeting was properly posted in
accordance with the Oklahoma Open Meeting Act
3. Flag salute and opening prayer 4. Roll call by Secretary 5. Introduction of attendees 6. Presentation by Welch State Bank and GUY Engineering 7. Reading of the minutes and approval or modification thereof. (Attachment 7) 8. Acknowledge receipt of incoming correspondence.
9. Discussion and acceptance of the Treasurer’s Report. (Attachment 9) 10. Reports from the following with discussion:
a. Congressional Representatives b. Tribal Representatives c. COG Representatives d. ODOT
- Local Government - Division 8
e. OCCEDB f. ACCO / SIG-SIF / Legislative g. County Advisory Board (CAB)
11. Discussion and possible action to approve projects and funding on the following programs:
a. Emergency Transportation Revolving (ETR) Fund (Attachment 11a) b. Surface Transportation Program (STP) (Attachment 11b) c. Material Request Program (MRP) (Attachment 11c) d. Used Beam Program (Attachment 11d) e. Combined STP(BR) and CIRB Plan (Attachment 11e) f. 2017 STP(BR) Project Status (Attachment 11f)
12. Discussion and possible action on filling the CED#1 Secretary/Treasurer Position.
13. Discussion and possible action on making the counties in CED#1 and the Grand Gateway
RTPO mirror each other.
14. Review calendar of events. (Attachment 14) 15. New Business 16. Adjourn
MEETING MINUTS FOR CIRCUIT ENGINEERING DISTRICT #1
(AMENDED) REGULAR BOARD MEETING
2016-11-17 CED1 Meeting Minutes Page 1 of 4
DATE: November 17, 2016 TIME: 10:00 am PLACE: Craig County Fairgrounds, 915 Apperson Rd, Vinita, OK
MEETING MINUTES 1. Call to order by President
2. Determine that Notice of Meeting and Agenda for this meeting was properly posted in
accordance with the Oklahoma Open Meeting Act -Megan Douglas with CED #1 confirmed that the meeting was posted in accordance with the Oklahoma Open Meeting Act.
3. Flag salute and opening prayer -Mitch Antle led the Flag Salute, and Lowell Walker led the opening prayer.
4. Roll call by Secretary COUNTY APPOINTED REP. PRESENT ABSENT
CRAIG Lowell Walker X
CREEK Newt Stephens (Rick Stewart)
X
DELAWARE Tom Sanders X MAYES Kevin Whiteside X NOWATA Doug Sonenberg X
OSAGE Scott Hilton (Sec./Treasurer)
X
OTTAWA Russell Earls (President) X PAWNEE Charles Brown X
ROGERS Dan DeLozier (Vice-President)
X
TULSA Tom Rains X WASHINGTON Mitch Antle X
5. Introduction of attendees 6. Presentation by Welch State Bank and Kellogg Engineering
-Sherri Mounds from Welch State Bank thanked everyone for attending and for their business. Brian Kellogg with Kellogg Engineering also thanked everyone for attending.
7. Reading of the minutes and approval or modification thereof.
-Mitch Antle made a motion to approve the minutes as presented; Dan DeLozier seconded. Roll call vote:
COUNTY APPOINTED REP YES NO CRAIG Lowell Walker X CREEK Rick Stewart X DELAWARE Tom Sanders X MAYES Kevin Whiteside X NOWATA Doug Sonenberg X OSAGE Scott Hilton X OTTAWA Russell Earls X PAWNEE Charles Brown X ROGERS Dan DeLozier X
MEETING MINUTS FOR CIRCUIT ENGINEERING DISTRICT #1
(AMENDED) REGULAR BOARD MEETING
2016-11-17 CED1 Meeting Minutes Page 2 of 4
-Motion carried.
8. Acknowledge receipt of incoming correspondence.
-Ms. Douglas announced that a handout was included in everyone’s packet for a free upcoming Snow and Ice Control Techniques training.
9. Discussion and acceptance of the Treasurer’s Report. -Scott Hilton reported that no funds have been received yet this month. The previous balance was $124,433.30 and the current balance is $114,458.30, so there is not enough money available to fund a materials request. -Payments since last meeting:
11/4/2016 Ck 10288 Guy Engineering – Program Management $9,975.00 - Rick Stewart made a motion to approve the Treasurer’s Report as presented; Tom Sanders seconded. Roll call vote:
-Motion carried. 10. Reports from the following with discussion:
a. Congressional Representatives -Debbie Dooley from Congressman Mullin’s office congratulated everyone who won their races. Curtis Barnes asked Ms. Dooley to please thank Congressman Mullin for speaking at the ACCO Conference.
b. Tribal Representatives -None were present.
c. COG Representatives -Debbie McGlasson with Grand Gateway RPTO mentioned that they hope to start applying for FASTLANE federal funding opportunities, which offer 10% of the $850 million total for rural projects. Also, ODOT has been given 12 months to work on a statewide freight plan, so if anyone knows of any bottleneck issues, Ms. McGlasson asked that counties send that information to her. -Rick Stewart asked if more work could be done to make the boundaries of the Grand Gateway RPTO mirror CED #1. Russell Earls asked that the topic be added to the December meeting agenda.
d. ODOT
TULSA Tom Rains X WASHINGTON Mitch Antle X
COUNTY APPOINTED REP YES NO CRAIG Lowell Walker X CREEK Rick Stewart X DELAWARE Tom Sanders X MAYES Kevin Whiteside X NOWATA Doug Sonenberg X OSAGE Scott Hilton X OTTAWA Russell Earls X PAWNEE Charles Brown X ROGERS Dan DeLozier X TULSA Tom Rains X WASHINGTON Mitch Antle X
MEETING MINUTS FOR CIRCUIT ENGINEERING DISTRICT #1
(AMENDED) REGULAR BOARD MEETING
2016-11-17 CED1 Meeting Minutes Page 3 of 4
- Local Government -No issues were presented.
- Division 8 -No issues were presented.
e. OCCEDB -No representatives were present.
f. ACCO / SIG-SIF / Legislative -No information was discussed.
g. County Advisory Board (CAB) -Ryan Ball reported that Betty Freeman is working on compiling the CAB purchases. He also reminded everyone that the funds have a one-time 3% interest, and then no more interest is due. Delaware County was approved in the first round of buys to purchase a vibrating roller. It was noted that at the ACCO District #1 meeting Ryan Ball was elected to be the District #1 representative for the CAB.
11. Discussion and possible action to approve projects and funding on the following
programs: a. Emergency Transportation Revolving (ETR) Fund
-Delaware County District #3 requested a $150,000 ETR to help pay for funds acquisition of right-of-way JP#29896 and JP#29897. Ms. Douglas reported that Tulsa County is anticipating paying back $85,000 soon, so CED #1 will then have enough funds to pay for the Delaware request. Ms. Douglas also mentioned that the ETR has not been approved by the Delaware County Board of County Commissioners yet. Tom Sanders made a motion to approve the Delaware County District #3 request for $150,000 pending approval of the Delaware County Board of County Commissioners; Rick Stewart seconded. Roll call vote:
-Motion carried. b. Surface Transportation Program (STP)
-Ms. Douglas reported that there were no changes to the STP program. c. Material Request Program (MRP)
-Ms. Douglas reported that there is not enough money available to pay a Materials Request at this time.
d. Used Beam Program -Ms. Douglas reported that there have been no new used beam requests. There are currently 244 beams available plus Tulsa County is expecting several more soon.
e. Combined STP(BR) and CIRB Plan -Ms. Douglas reported that the projects that were not eligible for federal funds
COUNTY APPOINTED REP YES NO CRAIG Lowell Walker X CREEK Rick Stewart X DELAWARE Tom Sanders X MAYES Kevin Whiteside X NOWATA Doug Sonenberg X OSAGE Scott Hilton X OTTAWA Russell Earls X PAWNEE Charles Brown X ROGERS Dan DeLozier X TULSA Tom Rains X WASHINGTON Mitch Antle X
MEETING MINUTS FOR CIRCUIT ENGINEERING DISTRICT #1
(AMENDED) REGULAR BOARD MEETING
2016-11-17 CED1 Meeting Minutes Page 4 of 4
were taken off the list of projects. Updates were also provided for projects on the list.
f. 2017 STP(BR) Project Status -Ms. Douglas reported that the Transportation Commission approved the CIRB 5 year plan during the November meeting. The final information has not been received by CED #1 so the information can be updated. That should be completed in the next two weeks, and then each county should receive their updated 8 year plan for approval at their Board of County Commissioners meeting.
12. Discussion on nomination for CED #1 Secretary/Treasurer Position.
-Rick Stewart nominated Mitch Antle to fill the position of Secretary/Treasurer. Ms. Douglas explained that according to the by-laws the position does not have to be filled until one month following the vacancy. She also reminded everyone that the position must be filled by a board member. Ms. Douglas also mentioned that the board has the option of taking nominations between the November and December meeting, or waiting until the January meeting to accept nominations. After discussion, the board decided they wanted to accept nominations between the November and December meeting and to possibly vote on the position at the December meeting. Anyone with a nomination is asked to send that information to Scott Hilton or Megan Douglas.
13. Review calendar of events. -The December 15th meeting will be held at the Ottawa County Courthouse Annex. The October 2017 proposed meeting date was moved due to a conflict with the ACCO Fall Conference.
14. New Business -Ms. Douglas reported that the Flashpoint discussion from the ACCO Conference is now
available on-line for anyone who might have missed it.
15. Adjourn -Dan Delozier made a motion to adjourn the meeting; Lowell Walker seconded. Roll call vote:
-Motion carried.
COUNTY APPOINTED REP YES NO CRAIG Lowell Walker X CREEK Rick Stewart X DELAWARE Tom Sanders X MAYES Kevin Whiteside X NOWATA Doug Sonenberg X OSAGE Scott Hilton X OTTAWA Russell Earls X PAWNEE Charles Brown X ROGERS Dan DeLozier X TULSA Tom Rains X WASHINGTON Mitch Antle X
Date Check # Payee Debit Credit
BudgetLine
Item #Description
CED#1 Checkbook Register
9/5/2016 1084 Guy Engineering Services Used Beam Program 100.50 24
9/5/2016 1084 Guy Engineering Services Project Management 9,975.00 3
9/5/2016 1084 Guy Engineering Services Project Scoping- Hourly 130.72 27
9/26/2016 Statewide Circuit CED Revolv. Disbursement 28,798.61 0
9/29/2016 10285 Delaware County, D2 Materials Request Grant 50,000.00 15
9/29/2016 10286 Washington County, D2 Materials Request Grant 50,000.00 15
10/6/2016 10287 Guy Engineering Services Program Mangement 9,975.00 3
10/27/2016 Statewide Circuit CED Revolv. Disbursement 27,802.67 0
11/15/2016 10288 Guy Engineering Services Project Management 9,975.00 3
12/7/2016 Statewide Circuit CED Revolv. Disbursement 28,081.33 0
12/7/2016 OCCEDB Auction McAlester Auction 4,035.88 0
12/13/2016 Guy Engineering Services Project Management 9,975.00 3
136,600.51
Tuesday, December 13, 2016 Page 11 of 11
CIR
CU
IT E
NG
INE
ER
ING
DIS
TR
ICT
#1
EM
ER
GE
NC
Y A
ND
TR
AN
SP
OR
TA
TIO
N (
ET
R)
RE
VO
LV
ING
FU
ND
PR
OG
RA
M
Proj
.ID
Coun
tyDi
st.
Proj
ect
Nam
e
Brid
geor
Road
way
ETR
#JP
#Fo
rce
Acco
unt
Agre
emen
t
Est
imat
edCo
st
Fun
dsRe
ques
ted
Reim
burs
- em
ent
Sour
ce
Appr
oved
by C
EDXm
td to
OCCE
DB
Antic
ipat
edRe
imbu
rsem
ent
Date
Cum
ulat
iveBa
lance
1Ma
yes
242
8 Rd
NBI 2
7204
ETRC
B1-4
9-2(
01)0
950
0,000
$
50
0,000
$
BR &
CBR
I1/2
9/200
91/2
9/200
9n/a
5/26/2
009
500,0
00$
3,571
,428
$
2Os
age
1Ol
d Hwy
99Ro
adET
RCR1
-57-
1(02
)09
2698
7(04
)36
9,950
$
36
9,950
$
1/29/2
009
1/29/2
009
n/a5/1
8/201
036
9,950
$
3,5
71,42
8$
3Os
age
210
3rd S
t NRo
adET
RCR1
-57-
2(03
)09
2585
4(04
)23
5,000
$
23
5,000
$
CBRI
1/29/2
009
1/29/2
009
n/a5/1
8/201
023
5,000
$
3,5
71,42
8$
4Os
age
3Pr
ue R
oad
Road
ETRC
R1-5
7-3(
01)0
926
986(
04)
275,0
00$
275,0
00$
CB
RI1/2
9/200
91/2
9/200
9n/a
5/18/2
010
275,0
00$
3,571
,428
$
6De
lawar
e1
660 R
dRo
adET
RCB1
-21-
1(01
)09
100,0
00$
100,0
00$
CB
RI5/1
4/200
95/1
4/200
9n/a
2/25/2
010
100,0
00$
3,571
,428
$
7Pa
wnee
2NS
339 E
W43
-44
Road
ETRC
B1-5
9-2(
01)0
950
,000
$
50,00
0$
CBRI
5/14/2
009
5/14/2
009
n/a3/2
3/201
050
,000
$
3,5
71,42
8$
8CE
D#2
ETRC
R-2-
11-1
(01)
09ET
RCR-
2-11
-1(0
2)09
ETRC
R-2-
11-2
(03)
0956
,232
$
56,23
2$
--5/1
4/200
9RR
?n/a
6/2/20
0956
,232
$
3,5
71,42
8$
9Pa
wnee
2Ol
d NBI
0526
3Ro
ad
NS 35
300
ETRC
B1-5
9-2(
02)1
0N/
A11
6,000
$
11
6,000
$
FEMA
8/19/2
009
8/19/2
009
6-30
-201
1se
nt11
6,000
$
3,5
71,42
8$
10Os
age
3W
Tina
Tra
il(W
hispe
ring H
ills)
Road
ETRC
R1-5
7-2(
04)1
027
240
YES
180,0
00$
180,0
00$
CB
RI8/1
9/200
98/1
9/200
911
-200
9__
180,0
00$
3,571
,428
$
12a
Roge
rs2
BR #9
8 Elm
Crk
Bridg
eET
RCB1
-66-
2(02
)10
N/A
200,0
00$
200,0
00$
Lo
cal
10/21
/2009
10/21
/2009
6-30
-201
22/2
3/201
220
0,000
$
3,5
71,42
8$
12b
Roge
rs2
BR #5
6 Rab
b Crk
Bridg
eET
RCB1
-66-
2(03
)10
N/A
200,0
00$
200,0
00$
Lo
cal
10/21
/2009
10/21
/2009
6-30
-201
22/2
3/201
220
0,000
$
3,5
71,42
8$
13Ro
gers
2Ke
etonv
ille R
d Ove
rlay
Road
ETRC
R1-6
6-2(
04)1
0N/
A20
0,000
$
20
0,000
$
Loca
l10
/21/20
0910
/21/20
096-
30-2
012
2/23/2
012
200,0
00$
3,571
,428
$
14No
wata
3BR
#28 C
reek
Bridg
eET
RCB1
-53-
3(01
)10
YES
870,0
00$
-$
CB
RI11
/3/20
0911
/4/20
09Ap
ril 20
11N/
A3,5
71,42
8$
15Os
age
2CR
1405
(Roa
d to P
rue)
(Pea
ch O
rchar
d)Ro
adET
RCR1
-57-
2(05
)10
2744
4YE
S28
5,000
$
28
5,000
$
CBRI
11/3/
2009
11/4/
2009
11-2
010
12/6/
2010
285,0
00$
3,571
,428
$
17No
wata
2BR
#29 C
alifor
nia C
reek
Bridg
eET
RCB1
-53-
2(02
)10
N/A
N/A
175,0
00$
BR
6/24/2
010
6/24/2
010
withi
n 12 m
os of
co
mplet
ion10
/22/20
1117
5,000
$
3,5
71,42
8$
20De
lawar
e2
South
510 R
d. (A
mphit
heate
r Rd)
Road
ETRC
R1-2
1-2(
02)1
2N/
AN/
A13
5,760
$
13
5,760
$
CBRI
6/23/2
011
7/20/2
011
9-20
1212
/15/20
1113
5,760
$
3,5
71,42
8$
18Pa
wnee
2CR
#6Br
idge
ETRC
B1-5
9-2(
05)1
1N/
AN/
A11
0,000
$
CBRI
6/24/2
010
6/24/2
010
9-15
-201
24/2
/2012
110,0
00$
3,571
,428
$
25Ot
tawa
1Qu
apaw
to P
eoria
Road
ETRC
R1-5
8-1(
01)1
2N/
AN/
A1,0
00,00
0$
35
0,000
$
Sales
Tax
&
CBRI
9/29/2
011
9/29/2
011
6-30
-201
311
/30/20
1235
0,000
$
3,5
71,42
8$
26W
ashin
gton
3Ke
eler C
reek
Bridg
eET
RCB1
-74-
3(02
)12
2694
8(04
)N/
A61
0,000
$
50
,000
$
CB
RI1/2
6/201
21/2
7/201
26-
30-2
013
11/30
/2012
50,00
0$
3,571
,428
$
27De
lawar
e3
Old H
wy 33
Road
ETRC
R1-2
1-3(
03)1
228
320(
04)
N/A
520,0
00$
100,0
00$
CB
RI/C
DBG
REAP
1/26/2
012
1/27/2
012
6-30
-201
3Fe
b-13
100,0
00$
3,571
,428
$
19Os
age
1BR
#109
Clea
r Cre
ekBr
idge
ETRC
B1-5
7-1(
06)1
1N/
AN/
A68
6,000
$
50
0,000
$
BR &
CBR
I1/2
7/201
01/3
1/201
16-
30-2
013
2/19/2
013
500,0
00$
3,571
,428
$
22Os
age
3Ho
lland
ia Av
e Ro
adET
RCR1
-57-
3(07
)12
N/A
N/A
80,00
0$
80
,000
$
CB
RI9/2
9/201
19/2
9/201
16-
30-2
013
13-M
ay80
,000
$
3,5
71,42
8$
16a
Pawn
ee1
NBI 0
4727
Br
idges
ETRC
B1-5
9-1(
03)1
0N/
AN/
A30
,000
$
Co
unty
Fund
s4/2
9/201
05/1
/2010
6-30
-201
313
-May
30,00
0$
3,571
,428
$
16b
Pawn
ee1
NBI 0
6811
Bridg
esET
RCB1
-59-
1(04
)10
N/A
N/A
25,00
0$
Coun
ty Fu
nds
4/29/2
010
5/1/20
106-
30-2
013
13-M
ay25
,000
$
3,5
71,42
8$
21Ma
yes
2Mu
rphy
Roa
d to S
pring
Cr
k Roa
dRo
adET
RCR1
-49-
2(02
)12
N/A
N/A
143,8
16$
143,8
16$
Tr
ibal
8/25/2
011
8/29/2
011
6-30
-201
3Ma
y-13
143,8
16$
3,571
,428
$
23Os
age
317
7th W
. Ave
. Ro
adET
RCR1
-57-
3(08
)12
N/A
N/A
110,0
00$
110,0
00$
CB
RI9/2
9/201
19/2
9/201
16-
30-2
014
13-D
ec11
0,000
$
3,5
71,42
8$
31Al
falfa
CED8
Lamb
ert
Road
N/A
2483
2(08
)N/
A35
0,000
$
35
0,000
$
CIRB
12/12
/2013
12/12
/2013
6-30
-201
414
-Feb
350,0
00$
3,571
,428
$
32W
oodw
ard
CED8
Quinl
anRo
adN/
A27
106(
04)
N/A
350,0
00$
350,0
00$
CI
RB12
/12/20
1312
/12/20
136-
30-2
014
14-F
eb35
0,000
$
3,5
71,42
8$
Fund
sRe
paid
Emer
genc
y Tra
nspo
rtatio
n Re
volvi
ng F
und
- COM
PLET
ED P
ROJE
CTS
G:\0
6-38
8 C
ircui
t Eng
inee
ring
Dis
tric
t 1\E
TR
\CE
D#1
ET
R T
rack
ing
Spr
eads
heet
12/1
3/20
16
CIR
CU
IT E
NG
INE
ER
ING
DIS
TR
ICT
#1
EM
ER
GE
NC
Y A
ND
TR
AN
SP
OR
TA
TIO
N (
ET
R)
RE
VO
LV
ING
FU
ND
PR
OG
RA
M
Proj
.ID
Coun
tyDi
st.
Proj
ect
Nam
e
Brid
geor
Road
way
ETR
#JP
#Fo
rce
Acco
unt
Agre
emen
t
Est
imat
edCo
st
Fun
dsRe
ques
ted
Reim
burs
- em
ent
Sour
ce
Appr
oved
by C
EDXm
td to
OCCE
DB
Antic
ipat
edRe
imbu
rsem
ent
Date
Cum
ulat
iveBa
lance
Fund
sRe
paid
24Os
age
3Ch
ickas
aw R
oad
Road
ETRC
R1-5
7-3(
09)1
2N/
AN/
A11
0,000
$
11
0,000
$
CBRI
9/29/2
011
9/29/2
011
6-30
-201
411
0,000
$
3,5
71,42
8$
29De
lawar
e2
Br 37
Rep
airBr
idge
ETRC
B1-2
1-2(
04)1
4N/
AN/
A10
0,000
$
10
0,000
$
CBRI
7/25/2
013
7/30/2
013
12/20
1414
-Jun
100,0
00$
3,571
,428
$
2,200
,002
$
5W
ashin
gton
2W
1800
Rd
Road
ETRC
R1-7
4-2(
01)0
934
2,000
$
20
0,000
$
Cher
okee
s/C
ounty
3/24/2
009
3/24/2
009
6-30
-201
16/2
2/201
07/1
0/201
011
/22/20
1020
0,000
$
2,2
00,00
2$
11Ro
gers
3Gr
egor
y Sch
ool R
d Ov
erlay
Road
ETRC
R1-6
6-3(
01)1
0N/
AN/
A55
0,000
$
55
0,000
$
Loca
l10
/21/20
0910
/21/20
096-
30-2
014
7-Se
p55
0,000
$
2,2
00,00
2$
35De
lawar
e3
New
Life R
anch
Roa
dRo
adET
RCR1
-21-
3(06
)14
2934
4N/
A80
,000
$
80,00
0$
Triba
l3/2
0/201
43/2
6/201
18-
1-20
1414
-Jul
80,00
0$
2,200
,002
$
41CE
D#8
CED#
8 Ro
ad10
0,000
$
E
TR
Repa
ymen
t 9/2
5/201
4
30Ma
yes
2So
uth 43
7 & O
ld 33
Hwy
Road
ETRC
R1-4
9-2(
03)1
4 N/
AN/
A63
0,000
$
63
0,000
$
Triba
l7/2
5/201
37/3
0/201
38/2
014
Oct-1
463
0,000
$
2,2
00,00
2$
28Os
age
236
th St
. N. E
xt.Ro
adET
RCR1
-57-
2(10
)12
N/A
N/A
199,4
20$
200,0
00$
CB
RI3/2
1/201
23/2
3/201
26-
30-2
015
Jan-
1520
0,000
$
2,2
00,00
2$
42CE
DAB
B70
0,000
$
70
0,000
$
CBRI
/CIR
B2,2
00,00
2$
33De
lawar
e3
NBI 0
9401
Bridg
eET
RCB1
-21-
3(05
)14
N/A
N/A
90,00
0$
90
,000
$
Tr
ibal
1/23/2
014
1/23/2
014
July
2016
Jul-1
590
,000
$
2,2
00,00
2$
34De
lawar
e3
NBI 0
3179
Bridg
eET
RCB1
-21-
3(05
)14
N/A
N/A
20,00
0$
20
,000
$
CB
RI1/2
3/201
41/2
3/201
4Ju
ly 20
16Ju
l-15
20,00
0$
2,200
,002
$
CED#
7Lo
an fr
om C
ED#7
12,00
0$
Dec-1
512
,000
$
2,2
00,00
2$
40Cr
eek
2W
86th
St. S
outh
Road
ETRC
R1-1
9-2(
01)1
5N/
AN/
A45
0,000
$
45
0,000
$
CBRI
8/28/2
014
8/28/2
014
July
2016
8/15/2
015
12/15
450,0
00$
2,200
,002
$
49CE
D#5
Loan
from
CED
#5N/
AN/
A-
$
20
0,000
$
CED5
9/24/2
015
9/29/2
015
Dec 2
015
12/20
1520
0,000
$
2,2
00,00
2$
48Ro
gers
3Ca
toosa
/Ver
digris
Mi
crosu
rface
Road
ETRC
R1-6
6-3(
05)1
6 N/
AN/
A20
0,000
$
20
0,000
$
Loca
l9/2
4/201
59/2
9/201
5De
c 201
5Ja
n-16
200,0
00$
2,200
,002
$
42De
lawar
e2
CR52
4 Box
Culv
ert
Bridg
eET
RCR1
-21-
2(08
)15
N/A
N/A
75,00
0$
75
,000
$
CB
RI/ E
R6/2
5/201
56/2
5/201
5Ju
ly 20
16Fe
b-16
75,00
0$
2,200
,002
$
46De
lawar
e2
S 66
0 & E
450
Road
ETRC
R1-2
1-2(
10)1
6N/
AN/
A15
0,000
$
12
5,000
$
Triba
l8/2
7/201
58/2
7/201
5De
c 201
5Ju
n-16
125,0
00$
2,200
,002
$
47De
lawar
e2
S 59
5 & E
290
Road
ETRC
R1-2
1-2(
09)1
6N/
AN/
A60
,000
$
50,00
0$
CED1
MR
8/27/2
015
8/27/2
015
Jan 2
016
Jul-1
650
,000
$
2,2
00,00
2$
45Ma
yes
1N4
380 C
ulver
ts &
RdRo
adET
RCB1
-49-
1(01
)16
N/A
80,00
0$
80
,000
$
FH
WA
7/30/2
015
7/30/2
015
June
2016
Jul-1
680
,000
$
2,2
00,00
2$
51De
lawar
e2
S 70
0 Rd
Road
way
ETRC
R1-2
1-2-
(11)
16N/
AN/
A8,8
14$
8,8
14$
FHW
A/FE
MA2/2
5/201
62/2
6/201
5Ju
ne 20
17No
v-16
8,814
$
2,200
,002
$
53De
lawar
e2
Old H
wy 20
Road
way
ETRC
R1-2
1-2(
13)1
7N/
AN/
A59
,266
$
16,18
6$
Triba
l/CBR
I7/2
8/201
68/1
2/201
6Oc
tober
2016
Nov-1
616
,186
$
2,2
00,00
2$
54De
lawar
e2
Tincu
p Rd
Road
way
ETRC
R1-2
1-2(
14)1
7N/
AN/
A13
4,000
$
12
5,000
$
Triba
l/CBR
I7/2
8/201
68/1
2/201
6Oc
tober
2016
Nov-1
612
5,000
$
2,2
00,00
2$
57CE
D#6
Loan
from
CED
#6N/
AN/
A79
,000
$
CB
RI/C
IRB
9/29/2
016
10/6/
2016
Augu
st 20
1716
-Nov
79,00
0$
2,200
,002
$
44Tu
lsa3
Pose
y Cre
ekBr
idge
ETRC
B1-7
2-3(
01)1
628
763
N/A
445,0
00$
85,00
0$
CIRB
7/30/2
015
7/30/2
015
June
2017
16-N
ov85
,000
$
2,2
00,00
2$
8,762
,758
$
PROJ
ECTS
COM
PLET
ED A
ND P
AID
BACK
=
NEW
BAL
ANCE
DUE
TO
LEGI
SLAT
IVE
ACTI
ON F
OR F
Y 20
15 S
TATE
BUD
GETI
NG, C
ED#1
LOSI
NG $1
,371,4
26
G:\0
6-38
8 C
ircui
t Eng
inee
ring
Dis
tric
t 1\E
TR
\CE
D#1
ET
R T
rack
ing
Spr
eads
heet
12/1
3/20
16
CIR
CU
IT E
NG
INE
ER
ING
DIS
TR
ICT
#1
EM
ER
GE
NC
Y A
ND
TR
AN
SP
OR
TA
TIO
N (
ET
R)
RE
VO
LV
ING
FU
ND
PR
OG
RA
M
Proj
.ID
Coun
tyDi
st.
Proj
ect
Nam
e
Brid
geor
Road
way
ETR
#JP
#Fo
rce
Acco
unt
Agre
emen
t
Est
imat
edCo
st
Fun
dsRe
ques
ted
Reim
burs
- em
ent
Sour
ce
Appr
oved
by C
EDXm
td to
OCCE
DB
Antic
ipat
edRe
imbu
rsem
ent
Date
Cum
ulat
iveBa
lance
Fund
sRe
paid
Proj
.ID
Coun
tyDi
st.
Proj
ect
Nam
e
Brid
geor
Road
way
ETR
#JP
#Fo
rce
Acco
unt
Agre
emen
t
Est
im-
ated
Cost
Fun
dsRe
ques
ted
Reim
burs
- em
ent
Sour
ce
Appr
oved
by C
EDXm
td to
OCCE
DB
Antic
ipat
edRe
imbu
rsem
ent
Date
Cum
ulat
iveBa
lance
36Ot
tawa
2Ov
erlay
sRo
adwa
y
ETRC
R1-5
8-2(
02)1
4ET
RCR1
-58-
2(03
)14
ETRC
R1-5
8-2(
04)1
4ET
RCR1
-58-
2(05
)14
ETRC
R1-5
8-2(
06)1
4
N/A
N/A
420,0
00$
308,2
15$
CB
RI6/1
9/201
46/2
5/201
4Ju
ly 20
171,8
91,78
7$
37Ot
tawa
3Ov
erlay
sRo
adwa
yET
RCR1
-58-
3(07
)14
ETRC
R1-5
8-3(
08)1
4ET
RCR1
-58-
3(09
)14
N/A
N/A
360,0
00$
308,2
15$
CB
RI6/1
9/201
46/2
5/201
4Ju
ly 20
17Ju
l-15
15,00
0$
1,598
,572
$
38De
lawar
e3
New
Life R
anch
Roa
dRo
adwa
yET
RCR1
-21-
3(07
)14
2934
4N/
A28
5,500
$
28
5,500
$
Triba
l6/1
9/201
46/2
5/201
4Ju
ly 20
171,3
13,07
2$
41Os
age
1NB
I 289
21Br
idge
ETRC
B1-5
7-1(
11)1
5 24
030
N/A
1,048
,267
$
209,6
53.47
$
CI
RB6/2
5/201
56/2
5/201
5Ju
ne 20
171,1
03,41
9$
43Cr
aig1&
3W
hite O
ak R
dRo
adwa
yET
RCR1
-18-
13(0
1)15
3019
5N/
A30
0,000
$
30
0,000
$
CIRB
6/25/2
015
6/25/2
015
April
2017
803,4
19$
48Os
age
2W
. 103
rd S
t. N.
Road
way
ETRC
R1-5
7-2(
12)1
6N/
AN/
A10
0,000
$
10
0,000
$
CBRI
2/25/2
016
2/26/2
016
June
2018
703,4
19$
49Os
age
2W
. 133
rd S
t. N.
Road
way
ETRC
R1-5
7-2(
13)1
6N/
AN/
A10
0,000
$
10
0,000
$
CBRI
2/25/2
016
2/26/2
015
June
2018
603,4
19$
50De
lawar
e1
NBI 2
0247
Bridg
eET
RCR1
-21-
1(12
)16
N/A
N/A
110,0
00$
110,0
00$
CI
RB/E
R2/2
5/201
62/2
6/201
5Fe
brua
ry 20
1749
3,419
$
52Ot
tawa
3CN
G Tr
uck
Road
way
ETRC
R1-2
8-3-
(10)
16N/
AN/
A27
,000
$
27,00
0$
CBRI
3/24/2
016
3/28/2
016
June
2017
466,4
19$
55De
lawar
e1
NBI 3
0806
Bridg
eET
RCB1
-21-
1(15
)17
2853
2N/
A90
0,000
$
11
0,000
$
CIRB
8/25/2
016
8/25/2
016
June
2017
356,4
19$
56Ro
gers
3Mi
crosu
rfacin
g Rds
Road
way
ETRC
R1-6
6-3(
06)1
7N/
AN/
A20
0,000
$
20
0,000
$
CBRI
9/29/2
016
10/6/
2016
Augu
st 20
1715
6,419
$
57De
lawar
e3
Cope
land-
R/W
Road
way
ETRC
R1-2
1-3(
16)1
729
896
N/A
700,0
00$
75,00
0$
CIRB
11/17
/2016
11/22
/2016
June
2017
81,41
9$
58De
lawar
e3
Shac
kelfo
rd- R
/WRo
adwa
yET
RCR1
-21-
3(17
)17
2989
7N/
A90
0,000
$
75
,000
$
CI
RB11
/17/20
1611
/22/20
16Ju
ne 20
176,4
19$
Page
3 of
32,2
08,58
3.47
$
CURR
ENT
PROJ
ECTS
=
Fund
sRe
paid
Emer
genc
y Tra
nspo
rtatio
n Re
volvi
ng F
und
- CUR
RENT
PRO
JECT
S
G:\0
6-38
8 C
ircui
t Eng
inee
ring
Dis
tric
t 1\E
TR
\CE
D#1
ET
R T
rack
ing
Spr
eads
heet
12/1
3/20
16
STP FUNDS
County Project Project Number Job Piece Estimate STP Funds Difference Status TOTAL STP
10,851,935.00$
2009
Pawnee D2 Skedee Road STP-159C(080)CO 24374(04) 1,058,731$ 846,495$ 212,236$ Construction Completed 846,495.00$
2010
Creek D1 W. 81st Street (Phase 1) STP-119C(124)CO 22350(04) 1,738,114$ 969,317$ 768,797$ Construction Completed 2,025,317$
Rogers D2 BR#98 Elm Creek STP-166C(210)CO 25427(04) 1,337,218$ 1,056,000$ 281,218$ Construction Completed
2011
Mayes D3 Chimney Rock Reservoir Rd STP-149C(124)CO 25417(04) 3,054,779$ 1,030,000$ 2,024,779$ Construction Completed 1,030,000$
2012
Delaware D3 Old Hwy 33 STP-121C(152)CO 28320(04) 585,903$ $ 422,069 163,834$ Construction Completed 1,307,273$
Ottawa D1 Quapaw to Peoria Overlay STP-158D(193)CO 28476(04) 1,191,185$ $ 885,204 305,981$ Construction Completed
2013
Washington D1 Bison Road STP-174A(072)CO 26486(04) 1,200,000$ 960,000$ 240,000$ Construction Completed 2,000,000$
Pawnee D1 & D3 Airport Road STP-259C(002)CI 29222(04) 1,250,000$ 1,040,000$ 210,000$ Construction Completed
2014
None
2015
Mayes D1 True Road (SH20 to SH28) STP-249C(023)CI 29346(04) 1,900,000$ 1,142,850$ 757,150$ Let June 2015 for $2,230,907.45Construction Underway
1,142,850$
2016
Rogers D2 N. 193rd E. Ave. STP-166C(244)CO 26988(04) 2,050,650$ 1,000,000$ 1,050,650$ Let April 2016 for $3,970,132.62 1,000,000$
2017
None
2018
Delaware D3 Colcord Keithly 2Mi Overlay 500,000$ 500,000$ -$ Rose & McCraryMust be cleared for letting by 11/1/17
500,000$
2019
Tulsa 86th St N & Sheridan 1,370,550$ 1,000,000$ 370,550$ SchemmerMust be cleared for letting by 11/1/18
1,000,000$
2020
None
Circuit Engineering District #1 Surface Transportation Program (STP)
G:\06-388 Circuit Engineering District 1\.STP (ACCO)\CED#1 STP PROJECT SUMMARY 12/13/2016
CIR
CU
IT E
NG
INE
ER
ING
DIS
TR
ICT
#1
Mat
eria
ls R
equ
est
Gra
nt
Pro
gra
m (
Fu
nd
ed t
hru
CE
D E
xpen
se B
ud
get
)
No.
Span
Length
Width
Type
Num
ber
Length
Width
Overla
yThickness
11
11
Mayes
3Re
place LW
C w/ R
CBN/A
30'
26'
3 ‐ 1
0'x4' RCB
EW 506
20'
$50,00
08/20
/200
8N/A
1001
38/20
/08
22
21
Craig
1Re
place LW
C w/ R
CBN/A
43.5'
26'
Triple RCB
$66,00
0$5
0,00
08/20
/200
8N/A
1001
48/20
/08
33
31
Delaware
1&3
Replace culverts w/ B
RN/A
$150
,000
$50,00
08/20
/200
8N/A
1001
58/20
/08
46
41
Now
ata
3Re
place BR
w/ R
CBNBI 035
96;
Local 51
33/1'
15'
CONC
E16 at N42
26 miles
22'
3"$4
9,32
5$4
9,32
58/20
/200
8N/A
1001
68/20
/08
59
51
Creek
1Re
place BR
w/ R
CBNS389
.75
$50,000
8/20
/2008
N/A
1001
78/20
/08
64
61
Ottaw
a3
Replace LW
C w/ R
CB15
980
'18
'Bo
xNS 58
01 mile
26'
NA
$125
,000
$50,00
01/29
/200
9N/A
1003
21/29
/09
73
72
Delaware
2Overla
yE340
& E 350
1 mile
20'
2"$6
1,85
5$5
0,00
03/24
/200
9N/A
1003
73/24
/09
84
82
Ottaw
a1
Replace pipe
w/RCB
new
33'
24'
RCB
MC 58
50C
‐‐24
'‐‐
$70,00
0$5
0,00
03/13
/09
3/24
/200
9N/A
1004
37/1/09
121
‐2
Mayes.
1Oil and Ch
ip Seal
N42
8 btw
W36
0‐W370
2 miles
24'
1"$7
0,00
0$0
4/27
/09
XX
XX
103
103
Delaware
3Overla
yN/A
CR66
00.6
20'
2"$5
0,00
0$5
0,00
04/20
/09
8/19
/200
910
048
9/29
/09
95
111
Pawne
e2
Repl woo
d br w/RCB
sne
w(2 ea)
20'
24'
RCB
$60,00
0$5
0,00
03/31
/09
10/21/20
091/20
/201
010
055
1/20
/10
171
122
Mayes
1Gabion Ba
skets o
r RIpRa
p65
90.9
23.5
strin
ger/
girder
$100
,000
$50,00
08/31
/09
9/29
/200
99/29
/200
910
081
9/2/10
112
132
Craig
3Oil and Ch
ip Seal
MC 18
66C
4 miles
24'
oil/c
hip seal
$150
,000
$50,00
04/6/09
10/21/20
0910
/21/20
0910
082
9/2/10
131
143
Mayes
2Triple Seal and
Chip
S 43
0 W 530
‐540
1 mile
24'
NA
$50,00
0$5
0,00
05/4/09
10/21/20
0910
/21/20
0910
085
10/29/10
146
152
Now
ata
32 retain walls & culvert
E13, N41
450
'30
'N/A
$50,00
0$5
0,00
05/11
/09
10/21/20
0910
/21/20
0910
086
10/29/10
154
163
Ottaw
a2
Replace bridge
125
$80,00
0$5
0,00
010
/5/09
8/19
/200
98/19
/200
910
089
12/1/10
162
173
Craig
2Overla
yEW
240 &
NS440
03 miles
20'
2"$2
36,544
$50,00
0no
date
9/29
/200
99/29
/200
910
090
12/15/10
175
182
Pawne
e2
Rebu
ild Roadw
ay and
Ch
ip Seal
S359
00 E44
50‐
5030
and
S360
00 E44
50‐
5000
9 miles
22'
3/8"
$114
,320
$50,00
012
/6/10
12/14/20
1012
/14/20
1010
095
2/24
/11
189
192
Creek
1Re
pl (2
) I‐beam sp
an w/ tim
ber d
eck &
mason
ry w/ R
CBne
w18
'20
'RC
B$8
0,00
0$5
0,00
01/11
/11
1/27
/201
11/27
/201
110
101
3/24
/11
205
203
Pawne
e1
Rework road
surface &
chip and
seal
EW 540
03 miles
24'
$100
,000
$50,00
02/28
/11
4/28
/201
14/28
/201
110
103
4/28
/11
226
213
Now
ata
1Re
place short span bridge
new
20'
24'
Box
EW 225
060
0'24
'$5
0,00
0$5
0,00
05/2/11
4/28
/201
14/28
/201
110
104
4/28
/11
2111
221
Tulsa
2Traffic Signal at W
. 41st S
t. & 65th West A
ve.
$125
,000
$50,00
04/4/11
4/28
/201
14/28
/201
110
112
7/28
/11
238
231
Osage
3Overla
yCR
150
10.8
24'
4"$1
00,000
$50,00
05/31
/11
5/26
/201
15/26
/201
110
116
8/25
/11
289
243
Creek
2Re
pl existing I‐b
eam sp
an and
failing
mason
ry
with
RCB
156
30.8
14.8 (1
lane
)I‐b
eam
$65,00
0$5
0,00
02/6/12
2/23
/201
22/23
/201
210
129
2/23
/12
293
254
Delaware
2Asph
alt O
verla
y E‐34
6EW
346
3/4 mile
20'
2"$5
3,00
0$5
0,00
02/21
/12
2/23
/201
22/23
/201
210
128
2/23
/12
2610
261
Washington
3Ke
eler Creek
9512
327
PC Beam
$610
,000
$50,00
012
/19/11
1/26
/201
21/26
/201
210
134
3/21
/12
307
302
Rogers
1Re
place Bridge deck
872‐14
' &
1‐29
'24
'Precast
NS 41
8057
24$1
85,000
$50,00
03/5/12
3/21
/201
23/21
/201
210
133
3/21
/12
2510
282
Washington
2Re
place Bridge
57TB
DTB
DTB
D$3
50,00 0
$50,000
5/31
/11
6/23
/2011
6/23
/2011
1013
84/26
/12
277
291
Rogers
2Cu
lverts
Vario
us$2
20,000
$50,000
7/25
/11
2/23
/2012
2/23
/2012
1013
94/26
/12
311
314
Mayes
1Re
place Bridge
4324
'30
'Steel Stringer
N43
324
ft30
ft$7
0,00
0$5
0,00
04/2/12
4/26
/201
24/26
/201
210
137
4/26
/12
2410
273
Washington
1Overla
yCo
pan Area
0.5
20'
2.5"
$50,000
$50,000
5/31
/11
6/23
/2011
6/23
/2011
10144
5/24
/12
321
325
Mayes
2Ro
adway Oil & Chip
W 540
2mi.
20'
$50,000
$50,000
4/16
/12
4/26
/2012
4/26
/2012
1014
35/24
/12
334
334
Ottaw
a3
Overla
y E. 230
rdE230
Rd
0.25
mi
22'
3"$9
7,000
$50,000
5/7/12
5/24
/2012
5/24
/2012
1015
07/26
/12
345
344
Pawne
e3
Chip/Seal Rd 37
000
3700
02.5m
i24
'$6
8,55
0$5
0,00
07/9/12
7/26
/201
27/26
/201
210
151
7/26
/12
357
353
Rogers
1BR
#71 Sw
eetw
ater Creek
7190
26ft
Used Be
amN41
5010
0026
6"$1
00,000
$50,00
09/24
/12
9/27
/201
29/27
/201
210
162
9/27
/12
364
365
Ottaw
a 1
Drainage Im
provem
ents
$77,50
0$5
0,00
09/24
/12
9/27
/201
29/27
/201
210
166
11/29/12
379
374
Creek
3Re
place Br #18
518
560
28I‐B
eam
$125
,000
$50,00
010
/15/12
10/25/20
1210
/25/20
1210
168
12/13/12
382
384
Craig
2Asph
alt O
verla
y CR
E15
0 Rd
EW 150
4 mi
22'
2"$3
89,973
$50,00
011
/13/12
11/29/20
1211
/29/20
1210
172
1/31
/13
FUNDE
D PR
OJECT
S
CED
PRI
# of
Proj
Date
Approved
by CED
Date
Requ
ested
(executed by
commission)
Check
Date
VOIDED
AT 9‐29
‐09 MTG
‐ RE
PLAC
ED W
ITH #17
IDAm
ount
Requ
ested
from
CED
Coun
tyCo
stEstim
ate
Bridge
Roadway
Descrip
tion of Project
Dist.
Cnty
Rank
Signed
& Dated
by CED
Check #
G:\0
6-38
8 C
ircui
t Eng
inee
ring
Dis
tric
t 1\M
ater
ials
Req
uest
Pro
ject
s\C
ED
#1 M
ater
ials
Req
uest
Log
- 20
10 v
er P
age
1 of
312
/13/
2016
CIR
CU
IT E
NG
INE
ER
ING
DIS
TR
ICT
#1
Mat
eria
ls R
equ
est
Gra
nt
Pro
gra
m (
Fu
nd
ed t
hru
CE
D E
xpen
se B
ud
get
)
No.
Span
Length
Width
Type
Num
ber
Length
Width
Overla
yThickness
CED
PRI
# of
Proj
Date
Approved
by CED
Date
Requ
ested
(executed by
commission)
Check
Date
IDAm
ount
Requ
ested
from
CED
Coun
tyCo
stEstim
ate
Bridge
Roadway
Descrip
tion of Project
Dist.
Cnty
Rank
Signed
& Dated
by CED
Check #
398
392
Osage
2Re
place cross d
rains &
asph
alt o
verla
y 1.2 miles
36th St. N.
1.2
24$1
50,000
$50,00
02/19
/13
2/28
/201
32/28
/201
310
174
2/28
/13
404
406
Ottaw
a3
Replace Br 116
116
2630
RCB
$100
,000
$50,000
3/4/13
2/28
/201
33/21
/201
310
176
3/21
/13
413
415
Delaware
3Re
pairs to
Br #
112
112
7324
'3"
Steel I‐Beam
$10,00
0$5
,511
4/9/13
4/25
/201
34/25
/201
310
179
4/25
/13
421
426
Mayes
3Br#101
101
9430
Slab
Span
$170
,000
$50,00
04/22
/13
4/25
/201
34/25
/201
310
180
4/25
/13
433
436
Delaware
3Flint R
d & S 670
Road Im
provem
ents
CR 660
& S67
03.8
22'/2
4'2 layers
$50,00
0$5
0,00
04/23
/13
4/25
/201
34/25
/201
310
181
4/25
/13
492
495
Craig
1Re
place 1 land
brid
ge with
an
RCB
brid
ge12
'28
'‐30'
RCB
1846
C28
'$5
0,00
0$5
0,00
05/20
/13
5/23
/201
36/20
/201
310
187
6/20
/13
536
537
Ottaw
a2
Replace Br 37 Mud
Creek
3735
.119
.6Temp Struc.
$45,00
0$2
5,00
07/29
/13
7/25
/201
37/25
/201
310
189
7/25
/13
459
455
Creek
3Re
place Br #18
118
195
'26
'Used I‐B
eam
$100
,000
$50,00
05/6/13
5/23
/201
38/29
/201
310
191
8/29
/13
471
467
Mayes
2W 630
Rd
630
1.5 mi
20'
$122
,000
$50,00
05/20
/13
6/20
/201
38/29
/201
310
192
8/29
/13
521
524
Now
ata
3Upgrade
of low
water crossings
$65,25
0$5
0,00
07/22
/13
7/25
/201
39/26
/201
310
195
9/26
/201
3
462
478
Mayes
1Br #14
1420
'15
'6"
RCB
4301
21'
15'6"
$70,00
0$5
0,00
05/20
/13
6/20
/201
31/23
/201
410
203
1/24
/201
448
348
9Mayes.
3Br #83
Saline Creek ‐ P
rotection
8426
326
'PC
Beam
$80,000
$05/20
/13
502
506
Craig
331
0 RD
310
6 mi
21'
$150
,000
$50,00
05/20
/13
5/23
/201
32/27
/201
410
206
2/27
/201
4
513
517
Delaware
22.8 Miles o
f Chipseal on S575
S575
2.8 mi
20'
$65,00
0$5
0,00
06/11
/13
6/20
/201
32/27
/201
410
207
2/28
/201
4
5611
562
Tulsa
1Traffic Signal E 91st &
Garne
ttE068
0$1
25,000
$50,00
03/3/14
3/20
/201
43/20
/201
410
211
3/20
/201
4
543
548
Delaware
3Mill & Chip & Seal 1.65 Miles o
f S71
0 S710
1.65
221 lift
$50,00
0$5
0,00
02/10
/14
2/27
/201
46/19
/201
410
219
6/19
/201
4
448
443
Osage
2Bridge and
Culverts o
n Oak St.
245
2119
.7RC
BOak St
$50,00
0$5
0,00
05/20
/13
5/23
/201
38/28
/201
410
227
8/28
/201
4
553
559
Delaware
3Mill & Chip & Seal 1.55 Miles o
f E51
1E511
1.55
221 lift
$30,00
0$3
0,00
02/10
/14
2/27
/201
48/28
/201
410
228
8/28
/201
4
5810
584
Washington
150
Biso
n Rd
1 m
ile overla
y50
Biso
n Rd
121
'2"
$105
,000
$50,00
08/18
/14
8/28
/201
48/28
/201
410
229
8/28
/201
4
573
5710
Delaware
2Lake Rd 3 & S63
0 Rd
overla
yLake Rd & S63
0 Rd
1.2
20'
2"$6
8,00
0$5
0,00
05/19
/14
6/19
/201
410
/23/20
1410
232
10/23/20
14
599
596
Creek
2Re
place Br 64
6444
16Used Be
am$6
5,00
0$5
0,00
012
/8/14
12/11/20
1412
/11/20
1410
238
12/11/20
14
6011
603
Tulsa
1Signals @
76th and Sheridan
$130
,000
$50,00
012
/15/14
1/29
/201
51/29
/201
520
140
2/26
/201
5
631
615
Now
ata
2Multip
le$9
5,00
0$5
0,00
01/22
/15
1/29
/201
51/29
/201
520
141
2/26
/201
5
613
629
Mayes.
1Re
construct B
r 26 or 38
2620
20Co
nc. Slab
$120
,000
$01/12
/15
1/29
/201
564
764
4R
oger
s3
Rep
lace
RC
B o
n P
ecan
St.
30'
62'
RC
B$1
20,000
$50,000
2/23
/15
2/26
/201
55/
28/2
015
1024
65/
28/2
015
708
709
May
es1&
2R
epla
ce B
r#38
& 1
0538
& 1
0520
', 22
'19
',16'
RC
B, C
ulve
rt$1
50,000
$50,00
05/
11/1
55/
28/2
015
5/28
/201
510
247
1024
85/
28/2
015
668
664
Osa
ge3
Pon
d D
r. a
nd T
imbe
rlake
Rid
geO
verla
yP
ond/
Tim
berla
ke13
37 ft
/35
40 ft
26'
2 in
$67,28
0$5
0,00
03/
23/1
53/
26/2
015
6/25
/201
510
251
6/25
/201
5
625
635
Pawne
e2
Resurfacing E390
0 Rd
E390
0 Rd
4 mi.
26'
Chip Seal
$83,60
0$5
0,00
01/
20/2
015
1/29
/201
59/
24/2
015
1025
99/
24/2
015
748
705
Osa
ge3
Pon
d C
reek
Circ
le R
ebui
ldP
ond
Cre
ek
Circ
le50
0 ft
24'
3 in
$33,55
0$2
5,00
05/
18/1
55/
28/2
015
10/2
9/20
1510
261
10/2
9/20
15
692
697
Cra
ig2
Pur
chas
e of
a n
ew lo
ader
$280
,000
$50,00
03/
30/1
54/
16/2
015
1/28
/201
610
268
1/28
/201
6
659
657
Cre
ek2
Rep
lace
NB
I 044
1730
19'7
"I-
Bea
m S
pan
$75,000
$50,000
2/23
/15
2/26
/201
55/
26/2
016
1027
65/
27/2
016
753
7411
Del
awar
e2
S 5
95 &
E 2
93 O
verla
y/F
og S
eal/P
atch
S 5
95 &
E 2
931+
mi
21'
2in
$60,000
$50,000
5/18
/15
5/28
/201
59/
29/2
016
1028
59/
29/2
016
7710
765
Was
hing
ton
2C
hip
& S
eal R
d 21
0021
002.
5 m
i.21
'$6
2,500
$50,000
9/8/
1510
/29/
2015
9/29
/201
610
286
9/29
/201
6
Projects fu
nded
:$3
,284
,836
G:\0
6-38
8 C
ircui
t Eng
inee
ring
Dis
tric
t 1\M
ater
ials
Req
uest
Pro
ject
s\C
ED
#1 M
ater
ials
Req
uest
Log
- 20
10 v
er P
age
2 of
312
/13/
2016
CIR
CU
IT E
NG
INE
ER
ING
DIS
TR
ICT
#1
Mat
eria
ls R
equ
est
Gra
nt
Pro
gra
m (
Fu
nd
ed t
hru
CE
D E
xpen
se B
ud
get
)
No.
Span
Length
Width
Type
Num
ber
Length
Width
Overla
yThickness
CED
PRI
# of
Proj
Date
Approved
by CED
Date
Requ
ested
(executed by
commission)
Check
Date
IDAm
ount
Requ
ested
from
CED
Coun
tyCo
stEstim
ate
Bridge
Roadway
Descrip
tion of Project
Dist.
Cnty
Rank
Signed
& Dated
by CED
Check #
678
676
Osa
ge1
CR
268
0 R
ecyc
le a
nd C
hip
CR
268
01.
6 m
iles
24'
1.25
in$8
3,62
5$5
0,00
03/
23/1
53/
26/2
015
688
687
Osa
ge3
Rep
air
and
Ove
rlay
Dia
mon
d/W
est W
ind
1522
ft/
1435
ft26
'2
in$6
2,38
0$5
0,00
03/
23/1
53/
26/2
015
714
718
Otta
wa
2O
verla
y 16
0 R
d16
01
mi.
24'
2 in
$100
,00 0
$50,000
6/3/
155/
28/2
015
724
729
Otta
wa
2O
verla
y 64
2 R
d64
21
mi.
24'
2 in
$100
,000
$50,000
6/3/
155/
28/2
015
734
7310
Otta
wa
3O
verla
y 23
0Rd.
230
.5 m
i.24
'2
in$7
0,000
$50,000
6/3/
155/
28/2
015
764
7511
Otta
wa
1 O
verla
y E
60
Rd
E60
1 m
i.23
'2.
5in-
3in
$300
,000
$50,000
7/13
/15
7/30
/201
578
977
8C
reek
2C
hip
& S
eal 1
61st
St.
S16
1st S
t1
mi.
20'
1 in
$125
,000
$50,000
1/19
/16
1/28
/201
6
Projects re
ady for fun
ding:
$350
,000
COUNTY
# of fu
nded
Re
quests
FUNDED
TO DAT
E# of Pen
ding
Requ
ests
TULSA
3$1
50,000
OSA
GE
5$2
25,000
2PA
WNEE
5$2
50,000
ROGER
S4
$200
,000
Sel
ecti
on
po
licy
ado
pte
d M
arch
201
6:WAS
HINGTO
N5
$250
,000
1. C
ou
nty
Cla
ssif
icat
ion
Des
ign
atio
n O
rder
.NOWAT
A5
$249
,325
2. N
um
ber
of
Gra
nts
eac
h c
ou
nty
has
rec
eive
d.
CRAIG
7$3
50,000
3. Im
med
iate
nee
d o
f th
e p
roje
ct.
OTTAW
A7
$325
,000
4CR
EEK
7$3
50,000
1MAY
ES9
$450
,000
DELAWAR
E11
$485
,511
TOTA
L68
$3,284
,836
7
CURR
ENT PR
OJECT
S AW
AITING FUNDING
350,00
0$ 20
0,000
$ 50
,000
$ 100,000
$
Pend
ing
Amou
nt
Requ
ested
2017
Co.
Class.
Order
11 8 7 103 52 1 6 9 4
G:\0
6-38
8 C
ircui
t Eng
inee
ring
Dis
tric
t 1\M
ater
ials
Req
uest
Pro
ject
s\C
ED
#1 M
ater
ials
Req
uest
Log
- 20
10 v
er P
age
3 of
312
/13/
2016
CE
D#1
US
ED
BE
AM
RE
QU
ES
T P
RO
GR
AM
Number of Beams
Beam Lengths
Number of Beams
Beam Lengths
34
1Ottaw
a3
Br 159
Hud
son Creek
X‐To
wn
FA20
1226
'12
45'
80'
12/14/20
106/21
/201
212
47'+
12/14/20
10Bridge is ope
n to traffic
325
1Pawne
e1
Br 92 Lagoon
Creek
X‐To
wn
FA20
1221
'5
50'
43'
6/12
/201
26/21
/201
25
62'+
6/21
/201
2Bridge is ope
n to traffic
344
Ottaw
a1
Br 23 ‐ R
eplace
X‐To
wn
FA20
1224
'6
5550
'10
/1/201
210
/25/20
126
54'+
10/31/20
12Bridge is ope
n to traffic
359
2Creek
3Br 185
‐ Re
place
X‐To
wn
FA20
1226
'6
60'
65'
10/15/20
1210
/25/20
126
64'+
10/26/20
12Bridge is ope
n to traffic
319
1Creek
3
X‐To
wn
FA20
1226
'12
60'
130
5/11
/201
212
/13/20
1212
61'+
10/26/20
12Bridge is ope
n to traffic
369
1Creek
3BR
181
X‐To
wn
FA20
1326
'12
30 & 65
130
5/16
/201
35/23
/201
312
60' &
40'
8/16
/201
3Bridge is ope
n to traffic
429
1Creek
308
652
Br 190
over U
nnam
ed Creek
Other
FA20
1524
'6
40'
40'
6/19
/201
46/19
/201
46
40'
12/2/201
4Bridge is com
plete
4110
1Washington
305
742
Br 156
over S
aund
ers C
reek
X‐To
wn
FA20
1526
'5
40'
40'
11/19/20
1311
/21/20
135
4012
/18/20
13Bridge is com
plete
384
5Ottaw
a3
‐‐New
Br o
ver B
ee Creek on 20
0Rd
X‐To
wn
FA20
1526
'6
50'
50'
8/26
/201
38/29
/201
36
509/9/20
13Bridge is com
plete
126
2Now
ata
202
666
Br 37 Ce
dar C
rk on Rd
405
X‐To
wn
CIRB
2015
26'
550
'50
4100
941
256
464
' 10"
4215
6Bridge is com
plete
165
3Pawne
e2
Br 44 Re
place temp. structure
Removed
from
PONTIS
X‐To
wn
FA20
1524
'5
50'
40'
4/25
/201
212
/13/20
12
173
1De
laware
307
097
Br 86 Floyd Mott B
ridge
X‐To
wn
CIRB
2014
24'
445
'60
'5/1/20
1212
/13/20
124
60 +
10/1/201
2Be
ams A
llocated
183
14De
laware
3Rd
. CR 49
6 Cu
rtis Trim
ble Rd
X‐To
wn
CIRB
2017
24'
460
'60
'5/1/20
1212
/13/20
12
193
5De
laware
3Rd
. E 530
East o
f Barn
X‐To
wn
CIRB
2015
24'
440
'12
0'5/1/20
1212
/13/20
124
45'+
10/1/201
2Be
ams A
llocated
203
8De
laware
3Rd
. (Site 2) C
R 55
0 W. of B
ill Dun
can
X‐To
wn
CIRB
2016
24'
440
'40
'5/1/20
1212
/13/20
12
213
6De
laware
3Rd
. E 577
W. of O
ak's Fire Statio
nX‐To
wn
CIRB
2016
24'
460
'60
'5/1/20
1212
/13/20
12
223
10De
laware
3Rd
. CR 50
5 Joe Starr H
illX‐To
wn
CIRB
2017
24'
460
'60
'5/1/20
1212
/13/20
12
233
2De
laware
307
098
Br 85 Jack Cop
eland
X‐To
wn
CIRB
2014
244
50'
150'
1/22
/201
35/23
/201
34
55'
10/1/201
2Be
ams A
llocated
233
4De
laware
303
224
Br 95 Flint C
reek Brid
ge ‐ 80ft b
eams
X‐To
wn
CIRB
2015
2412
80'
180
8/9/20
129/27
/201
2
243
13De
laware
3Rd
. CR 55
0 Ho
g Ho
llow
X‐To
wn
CIRB
2017
24'
440
'40
'5/1/20
1212
/13/20
12
253
7De
laware
3Rd
. E 583
Bill Dun
can's R
oad
X‐To
wn
CIRB
2016
24'
460
'60
'5/1/20
1212
/13/20
12
263
9De
laware
3Rd
. CR 49
4 S. of O
ld Cloud
Crk Chu
rch
X‐To
wn
CIRB
2017
2416
40'
160'
5/1/20
1212
/13/20
12
273
3De
laware
3Rd
. S 706
Crazy Hollow
X‐To
wn
CIRB
2014
24'
860
'16
0'5/1/20
1212
/13/20
128
61'+
10/1/201
2Be
ams A
llocated
283
12De
laware
3Rd
. E. 540
Joe Martin
X‐To
wn
CIRB
2017
24'
460
'60
'5/1/20
1212
/13/20
12
293
11De
laware
3Rd
. 553
0 Martin
's Salvage
X‐To
wn
CIRB
2017
21'
840
80'
5/1/20
1212
/13/20
12
337
1Ro
gers
1Br 71 Sw
eetw
ater Creek
X‐To
wn
FA20
1524
'15
50'
150'
9/25
/201
29/27
/201
25
64'+
12/2/201
2Be
ams A
llocated
3711
1Tulsa
‐‐‐‐‐for brid
ge re
pairs‐‐‐‐‐
Other
FA20
151
70'
US 16
9 Pine
St. Be
ams
408
2Osage
308
614
BR 96 over Charle
y Creek
X‐To
wn
FA20
1526
'5
55'
55'
10/21/20
1310
/25/20
135
56' +
10/24/20
13Be
ams A
llocated
439
1Creek
204
417
Br 11 over Sand Creek
X‐To
wn
FA20
1526
'6
30'
30'
2/23
/201
52/26
/201
58
29' +
4/15
/201
5Be
ams A
llocated
449
Creek
302
700
Br 246
over U
nnam
ed Creek
X‐To
wn
FA20
1526
'6
50'
50'
2/23
/201
52/26
/201
56
50' +
4/14
/201
5Be
ams A
llocated
459
Creek
302
411
Br 224
over Unn
amed
Creek
X‐To
wn
FA20
1526
'6
50'
50'
2/23
/201
52/26
/201
56
50' +
4/14
/201
5Be
ams A
llocated
469
2Creek
206
383
Br 64 over Unn
amed
Creek
X‐To
wn
FA20
1527
'6
50'
49'
4/16
/201
54/16
/201
56
50'+
4/16
/201
5Be
ams A
llocated
4710
2Washington
303
047
Br 151
over T
yner Creek
X‐To
wn
FA20
1526
'5
60'
60'
4/27
/201
55/28
/201
55
60' +
6/2/20
15Be
ams A
llocated
489
3Creek
208
985
BR 87 over Tiger Creek
X‐To
wn
FA20
1626
740
'40
'1/5/20
167
50' +
1/27
/201
6Be
ams A
llocated
499
4Creek
204
470
BR 155
over U
nnam
ed Creek
X‐To
wn
FA20
1626
740
'40
'1/5/20
167
40' +
1/27
/201
6Be
ams A
llocated
Completed
Used Be
am Projects
940
215
8
244
REQUEST #
Date
Requ
est
Received
Signed
& Dated
by CED
Allocated
Date
Beam
s Allocated
by CED
Notes
CR Rank
COUNTY PRIORITY
COUNTY
District
NBI #
Descriptio
n of Project
Total Bridge Length
Num
ber o
f Beams R
eque
sted
Beam
s Re
maining
in Inventory
Beam
s Available
Requ
ested
Crosstown or Other
CIRB or Force Account
Anticipated Constuction
Year
Clear Rdwy Width
G:\0
6-38
8 C
ircui
t Eng
inee
ring
Dis
tric
t 1\U
sed
Bea
m P
olic
y\C
ED
#1 U
sed
Bea
m T
rack
ing
12/1
3/20
16
CIR
CU
IT E
NG
INE
ER
ING
DIS
TR
ICT
#1
CO
MB
INE
D C
IRB
BR
- 8
YR
PL
AN
12/1
4/20
16
Stat
e FY2
007-
FY20
16(1
st Y
ear-9
th Y
ear)
Stat
e FY2
017
(10t
h Ye
ar)
Stat
e FY2
018
(11t
h Ye
ar)
Stat
e FY2
019
(12t
h Ye
ar)
Stat
e FY2
020
(13t
h Ye
ar)
Stat
e FY2
021
(14t
h Ye
ar)
Stat
e FY2
022
(15t
h Ye
ar)
Stat
e FY2
023
(16t
h Ye
ar)
Stat
e FY2
024
(17t
h Ye
ar)
CIRB
INCO
ME:
104,6
45,55
9$
15,00
0,000
$
15
,000,0
00$
15,00
0,000
$
15
,000,0
00$
15,00
0,000
$
15
,000,0
00$
15,00
0,000
$
15,00
0,000
$
FE
DERA
L IN
COME
:37
,867,4
22$
2,467
,000
$
2,810
,000
$
2,467
,000
$
2,810
,000
$
2,467
,000
$
2,810
,000
$
2,467
,000
$
2,810
,000
$
CARR
YOVE
R:20
,950,5
27$
11,82
3,508
$
2,9
94,08
8$
(8
06,39
4)$
22
8,264
$
64
,771
$
(2
0,590
,990)
$
(2
9,583
,990)
$
AR
RA / S
TP / F
EMA
/ TRI
BAL:
22,90
3,163
$
1,0
57,06
1$
9,2
32,25
0$
5,3
00,00
0$
12
,199,5
00$
8,356
,526
$
7,800
,000
$
10,10
0,000
$
12,80
0,000
$
AB
B / 4
-4-4
PRO
GRAM
(ADJ
UST)
(706
,860)
$
BEGI
NNIN
G BA
LANC
E:16
4,709
,284
$
39
,474,5
88$
38,86
5,758
$
25
,761,0
88$
29,20
3,106
$
26
,051,7
90$
25,67
4,771
$
6,9
76,01
0$
1,0
26,01
0$
COUN
TY20
07 -
2016
2017
2018
2019
2020
2021
2022
2023
2024
CRA
IG
12,16
4,682
$
2,1
00,00
0$
3,1
23,00
0$
2,0
00,00
0$
29
5,000
$
2,0
30,00
0$
3,4
51,00
0$
3,2
05,00
0$
4,5
90,00
0$
CRE
EK
10,94
0,088
$
6,3
05,00
0$
2,2
35,00
0$
2,1
79,00
0$
3,7
16,91
1$
67
2,000
$
4,9
77,00
0$
4,8
80,00
0$
1,6
00,00
0$
DEL
AWAR
E 9,1
56,40
8$
2,7
19,42
7$
4,1
65,00
0$
-
$
2,990
,000
$
2,025
,000
$
2,266
,500
$
4,433
,000
$
4,960
,000
$
MAY
ES
22,87
8,396
$
1,6
04,81
4$
1,9
79,87
0$
1,7
60,00
0$
61
5,000
$
2,0
78,94
3$
5,0
65,00
0$
5,0
05,00
0$
5,2
30,00
0$
NOW
ATA
11,80
5,274
$
1,5
90,00
0$
96
7,000
$
1,3
10,00
0$
2,2
84,00
0$
2,3
17,46
5$
2,2
07,26
1$
1,0
00,00
0$
1,9
60,00
0$
OSA
GE
14,38
5,529
$
1,2
81,65
4$
6,2
07,58
6$
2,7
64,00
0$
7,2
55,75
1$
5,6
32,61
1$
8,7
09,00
0$
6,9
20,00
0$
9,3
50,00
0$
OTT
AWA
17,83
4,727
$
6,1
98,41
9$
78
5,000
$
65
6,762
$
74
0,000
$
67
1,000
$
4,4
09,00
0$
3,9
95,00
0$
2,4
00,00
0$
PAW
NEE
7,859
,541
$
991,0
00$
1,722
,334
$
2,515
,720
$
2,070
,000
$
8,338
,000
$
2,255
,000
$
3,700
,000
$
1,200
,000
$
ROG
ERS
19,15
6,475
$
1,1
91,00
0$
60
,000
$
2,5
57,00
0$
35
0,000
$
15
0,000
$
10
,335,0
00$
1,942
,000
$
5,455
,500
$
TUL
SA
6,955
,517
$
1,505
,766
$
6,170
,480
$
9,490
,000
$
6,230
,000
$
-$
2,3
40,00
0$
1,0
20,00
0$
3,5
10,00
0$
WAS
HING
TON
10,62
2,121
$
2,1
64,00
0$
8,4
56,40
0$
1,3
35,00
0$
2,4
28,18
0$
2,0
72,00
0$
25
1,000
$
46
0,000
$
-
$
TOTA
L EX
PEND
ITUR
ES =
143,7
58,75
7$
27,65
1,080
$
35
,871,6
70$
26,56
7,482
$
28
,974,8
42$
25,98
7,019
$
46
,265,7
61$
36,56
0,000
$
40,25
5,500
$
REMA
ININ
G BA
LANC
E=20
,950,5
27$
11,82
3,508
$
2,9
94,08
8$
(8
06,39
4)$
22
8,264
$
64
,771
$
(2
0,590
,990)
$
(2
9,583
,990)
$
(3
9,229
,490)
$
CED#1 (DIV 8) COMBINEDCIRB AND BR 8YR PLAN OVERVIEW G
:\06-
388
Circ
uit E
ngin
eerin
g D
istr
ict 1
\.CE
D 8
-yea
r P
lans
\CE
D#1
CU
MU
LAT
IVE
BR
& C
IRB
8-Y
R P
LAN
- 2
017-
2024
- H
B11
76&
2242
CE
D#1
Ove
rvie
wP
age
1 of
1
2,903,230 (Estimate)JP PROJECTS PLANNED FUNDING ENGINEER TTF SUFF STATUS
Craig County30441 BR #61 Lightning 535,181 CIRB 610,000 Guy Engineering NO 30 Bridge closed and would like to let ASAP.
D1 0 BR Let October 2016‐ $474,87730443 BR #94 Locust 875,000 CIRB 875,000 Guy Engineering NO 37.7 NEPA completed Apr 2015 ‐ ROW acquisition underway by Commr
D3 BR One parcel remaining. Let in 2017
Creek County29407 BR# 181A Little Deep Fork Creek 500,000 CIRB 500,000 Guy Engineering YES 20.8 Smith Roberts acquiring R/W
D3 BR Let in 2017 ‐ TO SUBMIT FOR TRIBAL FUNDING THRU CREEK NATION29408 Br 26 & 27 Trib to Buckeye Creek 1,803,000 CIRB 1,803,000 Guy Engineering YES 26.8 NEPA complete 12/2015
D2 BR 36.9 Let in 2017 ‐ TO SUBMIT FOR TRIBAL FUNDING THRU CREEK NATION
Delaware County32598 BR#27 Whitewater Creek 201,766 CIRB 1,008,827 Rose & McCrary Emergency Project ‐ CNDOT Funding
D1 807,061 ER Let in September 2016 ‐ $794,425.57, B&B Bridge Co.
Mayes County28555 BR 56 & 57 Trib to Wickliffe Crk 1,668,870 CIRB 1,668,870 Guy Engineering YES 35.3 NEPA completed Dec 2015 ‐ Meshek acquiring R/W
D3 BR 28.4Let in 2017 ‐ NEED TO SUBMIT FOR TRIBAL FUNDS THROUGH CHEROKEE NATION
30485 BR 75 Pleasant View 322,097 CIRB 685,000 Kellogg Ready to letD2 362,903 BR January 2017 letting
Nowata County27816 NS406 LWC 362,097 CIRB 725,000 Guy Engineering NO n/a NEPA complete. R/W complete. Cleared for letting.
D2 362,903 BR February 2017 letting
Osage County29416 Br #220 Claremore Creek 932,586 CIRB 150,000 Guy Engineering YES 21.2 NEPA completed Jun 2015 ‐ ROW acquisition underway by Commr
D3 BR Need Osage Mineral Lease26857 BR# 132 Marchesoni Bridge 828,000 CIRB 850,000 Guy Engineering YES 26.6 NEPA May 2015 ‐ Awaiting Osage Mineral Lease resolution
D3 BR R/W complete ‐ Utils complete ‐ NEED TO SUBMIT FOR TRIBAL FUNDING30499 BR# 5 Caney River 520,000 CIRB 520,000 Guy Engineering YES 15.8 NEPA complete ‐ Commr needs to pick ROW agent
D1 BR R/W by County ‐ Corps Parcel25528 BR# 133 Little Drum 1,727,000 CIRB 1,727,000 Guy Engineering YES 43.1 NEPA May 2010 ‐ Awaiting Osage Mineral Lease resolution
D3 BR R/W complete ‐ Utils complete ‐ NEED TO SUBMIT FOR TRIBAL FUNDING29415 BR# 280 Trib to Delaware 1,200,000 CIRB 1,200,000 Guy Engineering YES 66.3 NEPA Oct 2015 ‐ R/W by County
D2 BR Need Osage Mineral Lease30704 BR# 176 Dog Thresher Crk 830,000 CIRB 830,000 Guy Engineering YES 30.9 NEPA Sep 2015 ‐ R/W complete
D1 BR Need Osage Mineral Lease ‐ NEED TO SUBMIT FOR TRIBAL FUNDING
Ottawa County28597 BR# 19 Elm Creek 637,097 CIRB 1,000,000 Guy Engineering YES 37.9 R/W by Spinks
D1 362,903 BR Let November 2016‐ $865,290.3728596 BR# 52 Warren Branch 637,097 CIRB 1,000,000 Guy Engineering NO 39.9 R/W by Spinks
D2 362,903 BR Let November 2016‐ $670,679.47
Pawnee County29924 BR# 15 Mud Creek 270,097 CIRB 633,000 Guy Engineering ?? 40.9 Cleared for letting. May slip due to 404 issues.
D2 362,903 BR Let November 2016‐ $893,634.2524657 BR# 39 Unnamed Creek 336,334 CIRB 336,334 Mehlberger Brawley ?? 37.1 NEPA Sep 2009 ‐ R/W by Coates
D2 BR Utilities moving ‐ October Letting (?)
Rogers County30711 BR# 85 Trib to Seminole Creek 139,097 CIRB 502,000 HUB NO 40.9 NEPA in Jan 2016
D1 362,903 BR January 2017 letting
Tulsa County25487 Dip Creek Road 1,734,480 CIRB 1,734,480 Tulsa County NO NEPA Mar 2015
BR
Washington County23775 BR# 8 Unnamed Creek 575,000 CIRB 575,000 Guy Engineering NO 47.3 NEPA Apr 2009 ‐ ROW is complete as of 11/16
D1 BR23549 BR# 59 Limestone Draw 258,097 CIRB 621,000 Guy Engineering NO 36.6 Cleared for letting. May slip due to 404 issues.
D2 362,903 BR Let November 2016‐ $536,789.4130615 BR# 84 Trib to Caney River 600,000 CIRB 600,000 Kellogg Engineering YES 37 NEPA Oct 2015 ‐ ROW by Smith‐Roberts
D2 (MATOAKA) 0 BR Let November 2016‐ $705,462.91‐ CNDOT Funding
CED BR INCOME FY 2017 =
CED1 FY 2017 BR Funding
Page 1 of 1
DATE ITEM OF INTERESTDec. 26- Dec. 27, 2016 Christmas Holiday
January 2, 2017 New Year's Day HolidayJanuary 16, 2017 Martin Luther King Jr. DayJanuary 19, 2017 ODOT Bid OpeningJanuary 25, 2017 ACCO Board Meeting, OCCEDB Board Meeting, SIG/ SIF Board Meeting January 26, 2017 CED#1 and Energy District Meeting, Collins Building, Sapulpa, OK
February 7-9, 2017 CODA ConferenceFebruary 16, 2017 ODOT Bid OpeningFebruary 20, 2017 President's Day HolidayFebruary 22, 2017 ACCO Board Meeting, OCCEDB Board Meeting, SIG/ SIF Board MeetingFebruary 23, 2017 CED#1 Meeting, Tri County Tech Center, Bartlesville, OK
February 25-March 1, 2017 NACO Legislative ConferenceMarch 16, 2017 ODOT Bid OpeningMarch 22, 2017 ACCO Board Meeting, OCCEDB Board Meeting, SIG/ SIF Board Meeting March 23, 2017 CED#1 Meeting, Osage County Fairgrounds, Pawhuska, OK
March 29-30, 2017 ACCO Spring ConferenceApril 6-7, 2017 ACCO Safety Meeting
April 9-13, 2017 NACE ConferenceApril 20, 2017 ODOT Bid OpeningApril 26, 2017 ACCO Board Meeting, OCCEDB Board Meeting, SIG/ SIF Board Meeting April 27, 2017 CED#1 and Energy District Meeting, Mayes County Fairgrounds, Pryor, OKMay 18, 2017 ODOT Bid Opening May 25, 2017 CED#1 Meeting, Cherokee Nation, Siloam Springs, OKMay 29, 2017 Memorial DayMay 31, 2017 ACCO Board Meeting, OCCEDB Board Meeting, SIG/ SIF Board Meeting
June 15, 2017 ODOT Bid OpeningJune 28, 2017 ACCO Board Meeting, OCCEDB Board Meeting, SIG/ SIF Board MeetingJune 29, 2017 CED#1 Meeting, Warren CAT, Tulsa, OK
July 4, 2017 Independence DayJuly 20, 2017 ODOT Bid Opening
July 21-24, 2017 NACO Annual ConferenceJuly 26, 2017 ACCO Board Meeting, OCCEDB Board Meeting, SIG/ SIF Board MeetingJuly 27, 2017 CED#1 and Energy District Meeting, Nowata County Fairgrounds, Nowata, OK
August 2-3, 2017 ACCO Summer ConferenceAugust 17, 2017 ODOT Bid OpeningAugust 30, 3017 ACCO Board Meeting, OCCEDB Board Meeting, SIG/ SIF Board Meeting August 31, 2017 CED#1 Meeting, Grove Community Center, Grove, OK
September 4, 2017 Labor DaySeptember 6-8, 2017 CODA ConferenceSeptember 21, 2017 ODOT Bid OpeningSeptember 27, 2017 ACCO Board Meeting, OCCEDB Board Meeting, SIG/ SIF Board Meeting September 28, 2017 CED#1 Meeting, Rogers County Building, 416 S. Brady, Claremore, OKOctober 12-13, 2017 ACCO Safety Meeting
October 18, 2017 ACCO Board Meeting, OCCEDB Board Meeting, SIG/ SIF Board MeetingOctober 19, 2017 ODOT Bid OpeningOctober 19, 2017 CED#1 Meeting ,Pawnee Nation's Roam Chief Complex, Pawnee, OK
October 25-26, 2017 ACCO Fall ConferenceNovember 10, 2017 Veteran's Day HolidayNovember 16, 2017 ODOT Bid Opening November 16, 2017 CED#1 and Energy District Meeting, Craig County Fairgrounds, Vinita, OK
November 23-24, 2017 Thanksgiving HolidayNovember 29, 2017 ACCO Board Meeting, OCCEDB Board Meeting, SIG/ SIF Board Meeting
December 7-8, 2017 ACCO Safety MeetingDecember 13, 2017 ACCO Board Meeting, OCCEDB Board Meeting, SIG/ SIF Board MeetingDecember 14, 2017 CED#1 Meeting, Ottawa County Annex Building, Miami, OK
December 25-26, 2017 Christmas Holiday
CED#1 CALENDAR OF EVENTS
8 Circuit Engineering District 1\Agendas & Meetings\CED1 Calendar of Events 12/13/2016