BRIDGING THE GAP:
APRIL 17, 2015
INSTITUTE FOR TRANSPORTATION RESEARCH AND EDUCATION
Economic, Health, and Transportation Impacts from Completing a Critical Link in a 22‐mile Rail Trail
![Page 2: 2015.04.16-ATT_Bridge - Triangle BikePed Workshop](https://reader030.vdocuments.site/reader030/viewer/2022032505/55c5626dbb61ebb91b8b4842/html5/thumbnails/2.jpg)
2
![Page 3: 2015.04.16-ATT_Bridge - Triangle BikePed Workshop](https://reader030.vdocuments.site/reader030/viewer/2022032505/55c5626dbb61ebb91b8b4842/html5/thumbnails/3.jpg)
3
STUDY AREA
![Page 4: 2015.04.16-ATT_Bridge - Triangle BikePed Workshop](https://reader030.vdocuments.site/reader030/viewer/2022032505/55c5626dbb61ebb91b8b4842/html5/thumbnails/4.jpg)
4
Research MethodsMinimize outside factors and influences “Before” and “After” approach
Constrained timeline
Limited Study Area
Data collection at same sites* and same time of year
Short time elapse between bridge opening and YR 2 data collection (3 months)
*with exception of new bridge site in 2014 to capture localized change
![Page 5: 2015.04.16-ATT_Bridge - Triangle BikePed Workshop](https://reader030.vdocuments.site/reader030/viewer/2022032505/55c5626dbb61ebb91b8b4842/html5/thumbnails/5.jpg)
5
Study Timeline
• ‘Before’ Data CollectionMay/June 2013
• ATT Bridge OpensFebruary 2014
• ‘After’ Data CollectionMay/June 2014
• Final ReportDecember 2014
![Page 6: 2015.04.16-ATT_Bridge - Triangle BikePed Workshop](https://reader030.vdocuments.site/reader030/viewer/2022032505/55c5626dbb61ebb91b8b4842/html5/thumbnails/6.jpg)
Impacts
Health
Transportation
Economy
6
Data Collection
![Page 7: 2015.04.16-ATT_Bridge - Triangle BikePed Workshop](https://reader030.vdocuments.site/reader030/viewer/2022032505/55c5626dbb61ebb91b8b4842/html5/thumbnails/7.jpg)
7
Data Collection
Intercept Survey Trip Origins and Destinations Access Points and Turn Around
Point on Trail Trip Purpose Frequency of Trail Use Duration of Active Part of Trip Economic Data Mode Demographic Information
Count Data Mode Demographic Information
![Page 8: 2015.04.16-ATT_Bridge - Triangle BikePed Workshop](https://reader030.vdocuments.site/reader030/viewer/2022032505/55c5626dbb61ebb91b8b4842/html5/thumbnails/8.jpg)
8
Data Collection
![Page 9: 2015.04.16-ATT_Bridge - Triangle BikePed Workshop](https://reader030.vdocuments.site/reader030/viewer/2022032505/55c5626dbb61ebb91b8b4842/html5/thumbnails/9.jpg)
9
Raw Data Collected
2013 2014 % ChangeCountsWeekday 3,946 6,813Weekend 5,320 14,552Total Counts 9,266 21,365 + 131%SurveysWeekday 546 839Weekend 755 1,406Total Surveys 1,301 2,245 + 73%
![Page 10: 2015.04.16-ATT_Bridge - Triangle BikePed Workshop](https://reader030.vdocuments.site/reader030/viewer/2022032505/55c5626dbb61ebb91b8b4842/html5/thumbnails/10.jpg)
10
![Page 11: 2015.04.16-ATT_Bridge - Triangle BikePed Workshop](https://reader030.vdocuments.site/reader030/viewer/2022032505/55c5626dbb61ebb91b8b4842/html5/thumbnails/11.jpg)
11
Estimating Annual Trips
![Page 12: 2015.04.16-ATT_Bridge - Triangle BikePed Workshop](https://reader030.vdocuments.site/reader030/viewer/2022032505/55c5626dbb61ebb91b8b4842/html5/thumbnails/12.jpg)
12
Impact of the Bridge on the Economy
An increase of $3.7 Million in direct expenditures
$‐
$500
$1,000
$1,500
$2,000
$2,500
$3,000
Grocery Retail Restaurant
2013 2014D
irec
t Exp
endi
ture
s (T
hous
ands
)
Economic Impact on Businesses
![Page 13: 2015.04.16-ATT_Bridge - Triangle BikePed Workshop](https://reader030.vdocuments.site/reader030/viewer/2022032505/55c5626dbb61ebb91b8b4842/html5/thumbnails/13.jpg)
13
Impact of the Bridge on the EconomyTrail users’ expenditures supported An additional:
43 jobs
$1.3 million in employee compensation
$4.9 million in gross business revenues
$‐ $1,000 $2,000 $3,000 $4,000 $5,000 $6,000 $7,000 $8,000 $9,000
GrossRevenue
EmployeeCompensation
2013 2014
(Tho
usan
ds)
0
10
20
30
40
50
60
70
80
Jobs
Total Impacts: Direct, Indirect, and Induced
![Page 14: 2015.04.16-ATT_Bridge - Triangle BikePed Workshop](https://reader030.vdocuments.site/reader030/viewer/2022032505/55c5626dbb61ebb91b8b4842/html5/thumbnails/14.jpg)
14
Impact of the Bridge on Transportation
2013 By Bicycle
22%
2013 By Foot28%
2014 Increase in Active Travel to ATT 4%
2014 By Car46%
Round Trip90%
2013 Through Trip8%
2014Through Trip
Increase 2%
Change in Trip Type on Trail
Change in Mode Used to Access Trail
Shift in Non-Recreational Trips
More opportunities for active transportation
![Page 15: 2015.04.16-ATT_Bridge - Triangle BikePed Workshop](https://reader030.vdocuments.site/reader030/viewer/2022032505/55c5626dbb61ebb91b8b4842/html5/thumbnails/15.jpg)
0
2
4
6
8
10
12
14
Bike Walk Jog/Run All Modes
Avg. Distance Traveled
In M
iles
2013 2014
15
Impact of the Bridge on Transportation
Distance Traveled by Activity on Trail
average trip distancesincreased by 27%
![Page 16: 2015.04.16-ATT_Bridge - Triangle BikePed Workshop](https://reader030.vdocuments.site/reader030/viewer/2022032505/55c5626dbb61ebb91b8b4842/html5/thumbnails/16.jpg)
16
Impact of the Bridge on Health
48
53
58
63
68
All Modes All Modes
Male Female
Average Trip Duration (M
in.)
2013 2014
Average Trip DurationAverage travel duration increased to 162 minutes per week.
![Page 17: 2015.04.16-ATT_Bridge - Triangle BikePed Workshop](https://reader030.vdocuments.site/reader030/viewer/2022032505/55c5626dbb61ebb91b8b4842/html5/thumbnails/17.jpg)
17
Impact of the Bridge on Health
0 50 100 150
All Bicycle, Male
All Bicycle, Female
All Walker, Male
All Walker, Female
All Jogger/Runner, Male
All Jogger/Runner,…
Thousands of Calories
2013 2014
Calories Burned By Users of TrailTrail users are estimated to burn 175 million more calories annually.
(or 19,000 more cheese burgers per week)
![Page 18: 2015.04.16-ATT_Bridge - Triangle BikePed Workshop](https://reader030.vdocuments.site/reader030/viewer/2022032505/55c5626dbb61ebb91b8b4842/html5/thumbnails/18.jpg)
18
TO ACCESS FULL REPORT:
WWW.ITRE.NCSU.EDU/PUBLIC/BIKEPED.HTML
![Page 19: 2015.04.16-ATT_Bridge - Triangle BikePed Workshop](https://reader030.vdocuments.site/reader030/viewer/2022032505/55c5626dbb61ebb91b8b4842/html5/thumbnails/19.jpg)
19
PROJECT SPONSORS AND PARTNERS
![Page 20: 2015.04.16-ATT_Bridge - Triangle BikePed Workshop](https://reader030.vdocuments.site/reader030/viewer/2022032505/55c5626dbb61ebb91b8b4842/html5/thumbnails/20.jpg)
Thank You!
KRISTY JACKSONBicycle and Pedestrian [email protected] / 919.515.8771
INSTITUTE FOR TRANSPORTATION RESEARCH & EDUCATION