TEN YEAR FORECAST OF FAULT LEVELS SEPTEMBER 2015

Upload: dophuc

Post on 13-Feb-2018

240 views

Category:

Documents


6 download

TRANSCRIPT

Page 1: 2015 ten year forecast fault level report - Transpower · PDF fileThis publication presents an update to the ten year forecast fault levels ... calculation. Minimum fault level calculations

TEN YEAR FORECAST OF FAULT LEVELS SEPTEMBER 2015

Page 2: 2015 ten year forecast fault level report - Transpower · PDF fileThis publication presents an update to the ten year forecast fault levels ... calculation. Minimum fault level calculations

Introduction This publication presents an update to the ten year forecast fault levels report. The Connection Code contained in Schedule 8 to the Benchmark Agreement requires Transpower to publish a ten year forecast of the expected fault levels at each customer point of service annually.1 Transpower last published the Ten Year Forecast of Fault Levels in November 2014.

1 Connection Code clause 4.2(g): to publish annually a 10 year forecast of the expected minimum and maximum fault level at each customer point of service.

Page 3: 2015 ten year forecast fault level report - Transpower · PDF fileThis publication presents an update to the ten year forecast fault levels ... calculation. Minimum fault level calculations

Index INTRODUCTION ........................................................................................................................ 2

INDEX ........................................................................................................................................ 3

FORECAST FAULT LEVELS CALCULATION ASSUMPTIONS ............................................. 4

TEN YEAR FORECAST OF MAXIMUM THREE-PHASE FAULT LEVELS ............................ 7 NORTHLAND ............................................................................................................................................... 7

AUCKLAND .................................................................................................................................................. 9

WAIKATO ................................................................................................................................................... 16

BAY OF PLENTY ........................................................................................................................................ 23

CENTRAL NORTH ISLAND ........................................................................................................................ 29

TARANAKI .................................................................................................................................................. 37

HAWKE’S BAY ........................................................................................................................................... 42

WELLINGTON ............................................................................................................................................ 44

NELSON-MARLBOROUGH ........................................................................................................................ 51

WEST COAST ............................................................................................................................................ 52

CANTERBURY ........................................................................................................................................... 57

SOUTH CANTERBURY .............................................................................................................................. 61

OTAGO-SOUTHLAND ................................................................................................................................ 67

TEN YEAR FORECAST OF MAXIMUM SINGLE-PHASE TO GROUND FAULT LEVELS .. 75 NORTHLAND ............................................................................................................................................. 75

AUCKLAND ................................................................................................................................................ 77

WAIKATO ................................................................................................................................................... 84

BAY OF PLENTY ........................................................................................................................................ 91

CENTRAL NORTH ISLAND ........................................................................................................................ 97

TARANAKI ................................................................................................................................................ 105

HAWKE’S BAY ......................................................................................................................................... 110

WELLINGTON .......................................................................................................................................... 112

NELSON-MARLBOROUGH ...................................................................................................................... 119

WEST COAST .......................................................................................................................................... 120

CANTERBURY ......................................................................................................................................... 125

SOUTH CANTERBURY ............................................................................................................................ 129

OTAGO-SOUTHLAND .............................................................................................................................. 134

Page 4: 2015 ten year forecast fault level report - Transpower · PDF fileThis publication presents an update to the ten year forecast fault levels ... calculation. Minimum fault level calculations

Ten year forecast fault Levels

Forecast fault levels calculation assumptions Calculated fault levels are very dependent on the assumptions used in, and method of, the calculation.

Minimum fault level calculations depend on generation and grid asset dispatch assumptions, and are generally used for ensuring the coordination of protection relays between asset owners. Protection coordination has very important consequences for power system security and safety of people and assets. Accordingly, we are not going to publish minimum fault levels which may be misunderstood and used in a way that threatens security and safety. We encourage connected parties to talk with us directly on matters concerning protection coordination.

Table 8 and Table 9 list the maximum three-phase fault current and maximum single-phase to ground fault current respectively for all Transpower’s transmission buses. Both tables list the 10 year forecast of fault current for existing grid configuration (BASE) and five generation scenarios (GS 1 to GS 5). The generation scenarios are based on the Ministry of Business, Innovation and Employment’s (MBIE’s) draft Electricity Demand and Generation Scenarios2 (EDGS) and work done by the New Zealand Smart Grid Forum3 on disruptive technologies. See Table 7 for generation scenarios description and the 2015 Transmission Planning Report4 for detailed explanation of each scenario. Table 1: Generation scenarios

Generation scenario Description

BASE Existing grid with committed projects at planned commissioning dates

GS 1 Scenario 1 – Mixed Renewables

GS 2 Scenario 2 – High geothermal access

GS 3 Scenario 3 – Low-cost fossil fuels

GS 4 Scenario 4 – Global low carbon

GS 5 Scenario 5 – Disruptive technologies

In Table 10 and Table 11, the listed value is the initial RMS symmetrical short-circuit current (𝐼𝐼𝑘𝑘′′) as defined by IEC 60909 2001.

The 10 year forecast of maximum fault levels is based on information currently known by Transpower. The values in the tables should be regarded as being indicative only. In BASE scenario, we have modelled committed future transmission upgrades and generation projects using the best information we have at this time. We know that towards the end of the 10 year period, there may be additional transmission upgrades and additional generation required to meet the power and energy requirements of New Zealand. We do not know exactly the nature or location of these future transmission upgrades and new generation. The maximum fault level at a transmission bus5 may also change where the number of supply transformers increase or get replaced as part of a Service Change to meet load growth or provide supply security.

Therefore the maximum short-circuit currents listed should not be relied upon for specifying short-circuit requirements for new substation equipment. The forecast fault levels provide an early warning of when plant capability may be exceeded. Accordingly, while Transpower

2 www.med.govt.nz/sectors-industries/energy/energy-modelling/modelling/electricity-demand-and-generation-scenarios

3 www.med.govt.nz/sectors-industries/energy/electricity/new-zealand-smart-grid-forum 4 See chapter 5 Generation Assumptions: https://www.transpower.co.nz/sites/default/files/publications/resources/TPR2015Chapter5Generation.pdf 5 This report includes the maximum fault level for all Transpower’s transmission buses, which

encompasses customer point of service.

© Transpower New Zealand Limited 2016.All rights reserved. 4

Page 5: 2015 ten year forecast fault level report - Transpower · PDF fileThis publication presents an update to the ten year forecast fault levels ... calculation. Minimum fault level calculations

Ten year forecast fault Levels

endeavours to forecast fault levels accurately, the levels may change for a number of reasons and Transpower does not accept liability for other parties reliance on the fault values contained in the forecast. We encourage asset owners to consult with us for detailed information on maximum fault levels at specific sites relating to new equipment connection.

The Connection Code (5.1(h)) puts an obligation on Transpower and the customer to ensure its equipment does not cause the maximum short-circuit power and current limits in Appendix B Table B2 of the Connection Code to be exceeded on or nearby to the grid. Table 8 shows the short-circuit power and limits in Table B2 of Appendix B of the Connection Code. Note that the fault levels at some buses are already near or exceed these values. Table 2: Maximum short-circuit power and current limits

Nominal voltage (kV)

Maximum short-circuit power and current limits (MVA) (kA)

220 12,000 31.5

110 6,000 31.5

66 1,800 16

50 1,350 16

33 1,400 25

22 950 25

11 475 25

In BASE scenario, we calculated maximum fault levels in Table 10 and 11 using the 2001 IEC 60909 method. The values are the initial RMS symmetrical short-circuit levels.

The fault levels have been calculated on the following basis: • All generating units and all transmission assets are assumed to be in service. • A full representation of the existing transmission grid, directly connected generation and

embedded generation above 1 MW known to us is assumed. The existing wind farms are assumed to provide only full load current into a fault.

• Motor loads are not modelled. • The breaker time is 0.1 seconds and the fault clearing time is 1 second. • The fault impedance is zero ohms. • Future committed changes to the power system including transmission upgrades and new

generation detailed in the 2015 Transmission Planning Report. We represented new transmission lines in the model with electrical parameters estimated from the best matches with existing lines of the same conductor type. We have represented committed generation in our power system model with their electrical parameters scaled from the latest example which their type is known to us. We based the timing of these connections on open discussion with the asset owner, and from the generator’s website. The actual commissioning date may vary.

The generation scenarios GS1 to GS5 do not represent commitment from any generation developer and may change from year to year. The forecast maximum fault current in Table 10 and Table 11 are to provide indication on how the fault levels might change if the generation scenarios eventuate.

For scenarios GS1 to GS5, the maximum fault current calculation uses the same assumptions as per BASE scenario, and extended to include the following. • We represent the future generation in Scenario GS1 to GS5 with estimated from the best

matches latest technology with existing generator which their type is known to us. See Table 9 the assumption of fault current contributions from future generation in the generation scenarios.

• We assess each generator site and the grid injection point based on each generator’s operating capacity to ensure there is adequate transmission capacity to dispatch each generator.

© Transpower New Zealand Limited 2016.All rights reserved. 5

Page 6: 2015 ten year forecast fault level report - Transpower · PDF fileThis publication presents an update to the ten year forecast fault levels ... calculation. Minimum fault level calculations

Ten year forecast fault Levels

• We do not include additional transmission upgrades (new transmission line, interconnecting

transformer or supply transformer) required to transfer the generation to load centres or provide supply security.

Table 3: Fault current contributions from future generation in scenarios GS1 to GS5

Category Technology / application Fault current contribution (per unit of capacity)

Thermal Coal, diesel, combined cycle gas turbine, open cycle gas turbine, gas-fired peaker, cogeneration

2.87

Thermal Geothermal 3.60

Hydro Peak hydro, stored hydro, run of river 3.67

Wind Wind 0.0

Solar Photovoltaic 0.0

Load Interruptible load, demand side response 0.0

© Transpower New Zealand Limited 2016.All rights reserved. 6

Page 7: 2015 ten year forecast fault level report - Transpower · PDF fileThis publication presents an update to the ten year forecast fault levels ... calculation. Minimum fault level calculations

Ten year forecast fault Levels

Ten year forecast of maximum three-phase fault levels Table 4: Ten year forecast of maximum three-phase fault levels (kA)

Grid exit point Transmission bus

Generation Scenarios 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025

NORTHLAND

Bream Bay 33 kV BASE 10.5

10.5

10.5

10.5

10.5

10.5

10.5

10.5

10.5

10.5

10.5

GS1 10.5

10.5

10.5

10.5

10.5

10.4

10.4

10.4

10.4

10.4

10.4

GS2 10.5

10.5

10.5

10.5

10.5

10.4

10.4

10.4

10.4

10.4

10.4

GS3 10.5

10.5

10.5

10.5

10.6

10.6

10.6

10.6

10.6

10.6

10.6

GS4 10.5

10.5

10.4

10.4

10.4

10.4

10.4

10.4

10.4

10.4

10.4

GS5 10.5

10.5

10.5

10.4

10.4

10.4

10.4

10.4

10.4

10.4

10.4

Bream Bay 220 kV BASE 5.3

5.3

5.3

5.3

5.3

5.3

5.3

5.3

5.3

5.3

5.3

GS1 5.3

5.3

5.3

5.3

5.3

5.2

5.2

5.2

5.2

5.3

5.3

GS2 5.3

5.3

5.3

5.3

5.3

5.2

5.2

5.2

5.2

5.3

5.3

GS3 5.3

5.3

5.3

5.3

5.5

5.5

5.5

5.5

5.5

5.5

5.5

GS4 5.3

5.3

5.2

5.2

5.1

5.2

5.2

5.2

5.2

5.2

5.2

GS5 5.3

5.3

5.3

5.2

5.2

5.2

5.2

5.2

5.2

5.2

5.2

Marsden 110 kV BASE 7.4

7.4

7.4

7.4

7.4

7.4

7.4

7.4

7.4

7.4

7.4

GS1 7.4

7.4

7.4

7.4

7.4

7.3

7.3

7.3

7.3

7.4

7.4

GS2 7.4

7.4

7.4

7.4

7.4

7.3

7.3

7.3

7.3

7.4

7.4

GS3 7.4

7.4

7.4

7.4

7.6

7.6

7.6

7.6

7.6

7.6

7.6

GS4 7.4

7.4

7.3

7.3

7.2

7.3

7.3

7.3

7.3

7.3

7.3

GS5 7.4

7.4

7.4

7.3

7.3

7.3

7.3

7.3

7.3

7.3

7.3

Marsden 220 kV BASE 5.4

5.4

5.4

5.4

5.4

5.4

5.4

5.4

5.4

5.4

5.4

GS1 5.4

5.4

5.4

5.3

5.3

5.3

5.3

5.3

5.3

5.3

5.3

GS2 5.4

5.4

5.4

5.3

5.3

5.3

5.3

5.3

5.3

5.3

5.3

GS3 5.4

5.4

5.4

5.4

5.6

5.6

5.6

5.6

5.6

5.6

5.6

GS4 5.4

5.4

5.3

5.3

5.2

5.2

5.2

5.2

5.2

5.2

5.2

GS5 5.4

5.4

5.3

5.3

5.3

5.2

5.2

5.2

5.2

5.2

5.2

Maungatapere 110 kV BASE 6.4

6.4

6.4

6.4

6.4

6.4

6.4

6.4

6.4

6.4

6.4

GS1 6.4

6.4

6.4

6.3

6.3

6.3

6.3

6.3

6.3

6.3

6.3

GS2 6.4

6.4

6.4

6.3

6.3

6.3

6.3

6.3

6.3

6.3

6.3

GS3 6.4

6.4

6.4

6.4

6.5

6.5

6.5

6.5

6.5

6.5

6.5

GS4 6.4

6.4

6.3

6.3

6.2

6.3

6.3

6.2

6.3

6.3

6.3

GS5 6.4

6.4

6.3

6.3

6.3

6.2

6.2

6.3

6.3

6.3

6.3

© Transpower New Zealand Limited 2016.All rights reserved. 7

Page 8: 2015 ten year forecast fault level report - Transpower · PDF fileThis publication presents an update to the ten year forecast fault levels ... calculation. Minimum fault level calculations

Ten year forecast fault Levels

Maungaturoto 33 kV BASE 4.4

4.4

4.4

4.4

4.4

4.4

4.4

4.4

4.4

4.4

4.4

GS1 4.4

4.4

4.4

4.4

4.4

4.4

4.4

4.4

4.4

4.4

4.4

GS2 4.4

4.4

4.4

4.4

4.4

4.4

4.4

4.4

4.4

4.4

4.4

GS3 4.4

4.4

4.4

4.4

4.5

4.5

4.4

4.4

4.4

4.5

4.5

GS4 4.4

4.4

4.4

4.4

4.4

4.4

4.4

4.4

4.4

4.4

4.4

GS5 4.4

4.4

4.4

4.4

4.4

4.4

4.4

4.4

4.4

4.4

4.4

Maungaturoto 110 kV (T1) BASE 3.9

3.9

3.9

3.9

3.9

3.9

3.9

3.9

3.9

3.9

3.9

GS1 3.9

3.9

3.9

3.9

3.9

3.9

3.9

3.9

3.9

3.9

3.9

GS2 3.9

3.9

3.9

3.9

3.9

3.9

3.9

3.9

3.9

3.9

3.9

GS3 3.9

3.9

3.9

3.9

4.0

4.0

4.0

4.0

4.0

4.0

4.0

GS4 3.9

3.9

3.9

3.9

3.9

3.9

3.9

3.9

3.9

3.9

3.9

GS5 3.9

3.9

3.9

3.9

3.9

3.9

3.9

3.9

3.9

3.9

3.9

Maungaturoto 110 kV (T2) BASE 3.9

3.9

3.9

3.9

3.9

3.9

3.9

3.9

3.9

3.9

3.9

GS1 3.9

3.9

3.9

3.9

3.9

3.9

3.9

3.9

3.9

3.9

3.9

GS2 3.9

3.9

3.9

3.9

3.9

3.9

3.9

3.9

3.9

3.9

3.9

GS3 3.9

3.9

3.9

3.9

4.0

4.0

4.0

4.0

4.0

4.0

4.0

GS4 3.9

3.9

3.9

3.9

3.9

3.9

3.9

3.9

3.9

3.9

3.9

GS5 3.9

3.9

3.9

3.9

3.9

3.9

3.9

3.9

3.9

3.9

3.9

Wellsford 33 kV BASE 7.3

7.3

7.3

7.3

7.3

7.3

7.3

7.3

7.3

7.3

7.3

GS1 7.3

7.3

7.3

7.3

7.3

7.3

7.3

7.3

7.3

7.3

7.3

GS2 7.3

7.3

7.3

7.3

7.3

7.3

7.3

7.3

7.3

7.3

7.3

GS3 7.3

7.3

7.3

7.3

7.4

7.4

7.4

7.4

7.4

7.4

7.4

GS4 7.3

7.3

7.3

7.3

7.3

7.3

7.3

7.3

7.3

7.3

7.3

GS5 7.3

7.3

7.3

7.3

7.3

7.3

7.3

7.3

7.3

7.3

7.3

Wellsford 110 kV (T1) BASE 4.0

4.0

4.0

4.0

4.0

4.0

4.0

4.0

4.0

4.0

4.0

GS1 4.0

4.0

4.0

4.0

4.0

3.9

3.9

3.9

3.9

4.0

4.0

GS2 4.0

4.0

4.0

4.0

4.0

3.9

3.9

3.9

3.9

4.0

4.0

GS3 4.0

4.0

4.0

4.0

4.0

4.0

4.0

4.0

4.0

4.0

4.0

GS4 4.0

4.0

3.9

3.9

3.9

3.9

3.9

3.9

3.9

3.9

3.9

GS5 4.0

4.0

4.0

3.9

3.9

3.9

3.9

3.9

3.9

3.9

3.9

Wellsford 110 kV (T2) BASE 4.0

4.0

4.0

4.0

4.0

4.0

4.0

4.0

4.0

4.0

4.0

GS1 4.0

4.0

4.0

4.0

4.0

3.9

3.9

3.9

4.0

4.0

4.0

GS2 4.0

4.0

4.0

4.0

4.0

3.9

3.9

4.0

4.0

4.0

4.0

GS3 4.0

4.0

4.0

4.0

4.0

4.0

4.0

4.0

4.0

4.0

4.0

GS4 4.0

4.0

3.9

3.9

3.9

3.9

3.9

3.9

3.9

3.9

3.9

GS5 4.0

4.0

4.0

3.9

3.9

3.9

3.9

3.9

3.9

3.9

3.9

© Transpower New Zealand Limited 2016.All rights reserved. 8

Page 9: 2015 ten year forecast fault level report - Transpower · PDF fileThis publication presents an update to the ten year forecast fault levels ... calculation. Minimum fault level calculations

Ten year forecast fault Levels

AUCKLAND

Albany 33 kV BASE 21.0

21.0

21.0

21.0

21.0

21.0

21.0

21.0

21.0

21.0

21.0

GS1 21.0

21.0

21.0

20.9

20.9

20.8

20.8

20.8

20.8

20.8

20.8

GS2 21.0

21.0

21.0

20.9

20.9

20.8

20.8

20.8

20.8

20.8

20.8

GS3 21.0

21.0

21.0

21.0

21.5

21.5

21.4

21.4

21.4

21.4

21.4

GS4 21.0

21.0

20.7

20.7

20.5

20.6

20.6

20.6

20.6

20.6

20.6

GS5 21.0

21.0

20.9

20.7

20.7

20.6

20.6

20.6

20.6

20.6

20.6

Albany 110 kV BASE 17.3

17.3

17.4

17.4

17.4

17.4

17.4

17.4

17.4

17.4

17.4

GS1 17.3

17.3

17.4

17.0

17.0

16.8

16.8

16.9

16.9

16.9

16.9

GS2 17.3

17.3

17.4

17.1

17.1

16.9

16.9

16.9

16.9

16.9

16.9

GS3 17.3

17.3

17.4

17.4

18.6

18.6

18.2

18.3

18.3

18.3

18.3

GS4 17.3

17.3

16.6

16.7

16.2

16.4

16.4

16.4

16.4

16.4

16.4

GS5 17.3

17.3

17.0

16.6

16.6

16.4

16.4

16.4

16.5

16.5

16.5

Albany 220 kV BASE 14.2

14.2

14.3

14.3

14.3

14.3

14.3

14.3

14.3

14.3

14.3

GS1 14.2

14.2

14.3

13.8

13.8

13.5

13.5

13.6

13.6

13.6

13.6

GS2 14.2

14.2

14.3

13.9

13.9

13.6

13.6

13.6

13.6

13.6

13.7

GS3 14.2

14.2

14.3

14.3

15.9

15.9

15.5

15.5

15.5

15.6

15.6

GS4 14.2

14.2

13.2

13.4

12.8

13.0

13.0

13.0

13.0

13.0

13.0

GS5 14.2

14.2

13.7

13.3

13.3

13.0

13.0

13.0

13.1

13.1

13.1

Bombay 33 kV BASE 9.0

9.0

9.1

9.1

9.1

9.1

9.1

9.1

9.1

9.1

9.1

GS1 9.0

9.0

9.1

9.1

9.1

9.0

9.0

9.1

9.1

9.1

9.1

GS2 9.0

9.0

9.1

9.1

9.1

9.1

9.1

9.1

9.1

9.1

9.1

GS3 9.0

9.0

9.1

9.1

9.1

9.1

9.1

9.1

9.1

9.1

9.1

GS4 9.0

9.0

9.0

9.0

9.0

9.0

9.0

9.0

9.0

9.0

9.0

GS5 9.0

9.0

9.1

9.0

9.0

9.0

9.0

9.0

9.0

9.0

9.0

Bombay 110 kV BASE 10.7

10.7

11.0

11.0

11.0

11.0

11.0

11.0

11.0

11.0

11.0

GS1 10.7

10.7

11.0

10.9

10.9

10.8

10.8

10.8

10.9

10.9

10.9

GS2 10.7

10.7

11.0

10.9

10.9

10.8

10.8

10.9

10.9

10.9

10.9

GS3 10.7

10.7

11.0

11.0

11.3

11.3

11.2

11.2

11.2

11.2

11.2

GS4 10.7

10.7

10.8

10.8

10.7

10.7

10.7

10.7

10.7

10.7

10.7

GS5 10.7

10.7

10.9

10.8

10.8

10.7

10.7

10.7

10.7

10.7

10.7

Drury 220 kV BASE 13.9

13.9

14.0

14.0

14.0

14.0

14.0

14.0

14.0

14.0

14.0

© Transpower New Zealand Limited 2016.All rights reserved. 9

Page 10: 2015 ten year forecast fault level report - Transpower · PDF fileThis publication presents an update to the ten year forecast fault levels ... calculation. Minimum fault level calculations

Ten year forecast fault Levels

GS1 13.9

13.9

14.0

13.5

13.5

13.4

13.4

13.5

13.5

13.5

13.5

GS2 13.9

13.9

14.0

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.6

GS3 13.9

13.9

14.0

14.0

15.0

15.0

14.4

14.4

14.4

14.5

14.5

GS4 13.9

13.9

13.0

13.1

12.4

13.1

13.1

13.0

13.1

13.1

13.1

GS5 13.9

13.9

13.6

13.1

13.1

13.0

13.0

13.1

13.1

13.1

13.1

Glenbrook 33 kV (T4/T5) BASE 15.9

15.9

15.9

15.9

15.9

15.9

15.9

15.9

15.9

15.9

15.9

GS1 15.9

15.9

15.9

15.8

15.8

21.6

21.6

21.6

21.6

21.6

21.6

GS2 15.9

15.9

15.9

15.8

15.8

21.6

21.6

21.6

21.6

21.6

21.6

GS3 15.9

15.9

15.9

15.9

16.1

16.1

16.0

16.0

16.0

16.0

16.0

GS4 15.9

15.9

15.7

15.7

15.6

21.5

21.5

21.5

21.5

21.5

21.5

GS5 15.9

15.9

15.8

15.7

15.7

21.5

21.5

21.5

21.5

21.5

21.5

Glenbrook 33 kV (T6) BASE 16.9

16.9

16.9

16.9

16.9

16.9

16.9

16.9

16.9

16.9

16.9

GS1 16.9

16.9

16.9

16.8

16.8

16.9

16.9

16.9

16.9

16.9

16.9

GS2 16.9

16.9

16.9

16.8

16.8

16.9

16.9

16.9

16.9

16.9

16.9

GS3 16.9

16.9

16.9

16.9

16.9

16.9

16.9

16.9

16.9

16.9

16.9

GS4 16.9

16.9

16.8

16.8

16.8

16.8

16.8

16.8

16.8

16.8

16.8

GS5 16.9

16.9

16.8

16.8

16.8

16.8

16.8

16.8

16.8

16.8

16.8

Glenbrook 220 kV BASE 10.8

10.8

10.8

10.8

10.8

10.8

10.8

10.8

10.8

10.8

10.8

GS1 10.8

10.8

10.8

10.5

10.5

10.8

10.8

10.8

10.9

10.9

10.9

GS2 10.8

10.8

10.8

10.6

10.6

10.8

10.8

10.9

10.9

10.9

10.9

GS3 10.8

10.8

10.8

10.8

11.4

11.4

11.1

11.1

11.1

11.1

11.1

GS4 10.8

10.8

10.3

10.3

9.9

10.6

10.6

10.6

10.6

10.6

10.6

GS5 10.8

10.8

10.6

10.3

10.3

10.5

10.5

10.6

10.6

10.6

10.6

Henderson 33 kV BASE 19.0

19.0

19.1

19.1

19.1

19.1

19.1

19.1

19.1

19.1

19.1

GS1 19.0

19.0

19.1

19.0

19.0

18.9

18.9

18.9

18.9

18.9

18.9

GS2 19.0

19.0

19.1

19.0

19.0

18.9

18.9

18.9

18.9

18.9

18.9

GS3 19.0

19.0

19.1

19.1

19.5

19.5

19.4

19.4

19.4

19.4

19.4

GS4 19.0

19.0

18.8

18.8

18.6

18.7

18.7

18.7

18.7

18.7

18.7

GS5 19.0

19.0

18.9

18.8

18.8

18.7

18.7

18.7

18.7

18.7

18.7

Henderson 110 kV BASE 21.8

21.8

22.0

22.0

22.0

22.0

22.0

22.0

22.0

22.0

22.0

GS1 21.8

21.8

22.0

21.5

21.5

21.1

21.1

21.1

21.2

21.2

21.2

GS2 21.8

21.8

22.0

21.5

21.5

21.2

21.2

21.2

21.2

21.2

21.2

GS3 21.8

21.8

22.0

22.0

23.9

23.9

23.4

23.5

23.5

23.5

23.5

GS4 21.8

21.8

20.7

20.9

20.1

20.5

20.5

20.4

20.5

20.5

20.5

GS5 21.8

21.8

21.3

20.8

20.8

20.4

20.4

20.5

20.5

20.5

20.5

Henderson 220 kV BASE 14.3

14.3

14.4

14.4

14.4

14.4

14.4

14.4

14.4

14.4

14.4

GS1 14.3

14.3

14.4

14.0

14.0

13.6

13.6

13.7

13.8

13.8

13.8

© Transpower New Zealand Limited 2016.All rights reserved. 10

Page 11: 2015 ten year forecast fault level report - Transpower · PDF fileThis publication presents an update to the ten year forecast fault levels ... calculation. Minimum fault level calculations

Ten year forecast fault Levels

GS2 14.3

14.3

14.4

14.0

14.0

13.7

13.7

13.8

13.8

13.8

13.8

GS3 14.3

14.3

14.4

14.4

16.1

16.1

15.7

15.7

15.7

15.7

15.7

GS4 14.3

14.3

13.4

13.5

12.9

13.2

13.2

13.1

13.2

13.2

13.2

GS5 14.3

14.3

13.9

13.4

13.4

13.1

13.1

13.2

13.2

13.2

13.2

Hepburn Road 33 kV BASE 21.6

21.6

21.6

21.6

21.6

21.6

21.6

21.6

21.6

21.6

21.6

GS1 21.6

21.6

21.6

21.5

21.5

21.3

21.3

21.4

21.4

21.4

21.4

GS2 21.6

21.6

21.6

21.5

21.5

21.4

21.4

21.4

21.4

21.4

21.4

GS3 21.6

21.6

21.6

21.6

22.1

22.1

22.0

22.0

22.0

22.0

22.0

GS4 21.6

21.6

21.2

21.3

21.1

21.2

21.2

21.1

21.2

21.2

21.2

GS5 21.6

21.6

21.4

21.3

21.3

21.1

21.1

21.2

21.2

21.2

21.2

Hepburn Road 110 kV BASE 19.8

19.8

19.9

19.9

19.9

19.9

19.9

19.9

19.9

19.9

19.9

GS1 19.8

19.9

20.0

19.5

19.5

19.2

19.2

19.3

19.3

19.3

19.3

GS2 19.8

19.9

20.0

19.6

19.6

19.3

19.3

19.3

19.3

19.3

19.4

GS3 19.8

19.8

19.9

19.9

21.5

21.5

21.1

21.2

21.2

21.2

21.2

GS4 19.8

19.9

18.9

19.1

18.4

18.7

18.7

18.7

18.7

18.7

18.7

GS5 19.8

19.9

19.4

19.0

19.0

18.6

18.6

18.7

18.7

18.8

18.8

Hobson Street 110 kV BASE 20.6

20.6

20.7

20.7

20.7

20.7

20.7

20.7

20.7

20.7

20.7

GS1 20.6

20.6

20.7

20.3

20.3

19.9

19.9

20.0

20.1

20.1

20.1

GS2 20.6

20.6

20.7

20.4

20.4

20.0

20.0

20.1

20.1

20.1

20.1

GS3 20.6

20.6

20.7

20.7

22.4

22.4

22.0

22.0

22.0

22.0

22.0

GS4 20.6

20.6

19.6

19.8

19.1

19.4

19.4

19.4

19.4

19.4

19.4

GS5 20.6

20.6

20.2

19.7

19.7

19.3

19.3

19.4

19.5

19.5

19.5

Hobson Street 220 kV BASE 16.3

16.3

16.4

16.4

16.4

16.4

16.4

16.4

16.4

16.4

16.4

GS1 16.3

16.3

16.4

15.9

15.9

15.4

15.4

15.5

15.6

15.6

15.6

GS2 16.3

16.3

16.4

16.0

16.0

15.5

15.5

15.6

15.6

15.6

15.6

GS3 16.3

16.3

16.4

16.4

18.7

18.7

18.1

18.1

18.1

18.2

18.2

GS4 16.3

16.3

15.1

15.3

14.5

14.8

14.8

14.8

14.8

14.8

14.8

GS5 16.3

16.3

15.7

15.2

15.2

14.7

14.7

14.8

14.9

14.9

14.9

Huapai 220 kV BASE 12.7

12.7

12.8

12.8

12.8

12.8

12.8

12.8

12.8

12.8

12.8

GS1 12.7

12.7

12.8

12.4

12.4

12.2

12.2

12.2

12.3

12.3

12.3

GS2 12.7

12.7

12.8

12.5

12.5

12.2

12.2

12.3

12.3

12.3

12.3

GS3 12.7

12.7

12.8

12.8

14.1

14.1

13.7

13.8

13.8

13.8

13.8

GS4 12.7

12.7

11.9

12.1

11.6

11.8

11.8

11.8

11.8

11.8

11.8

GS5 12.7

12.7

12.4

12.0

12.0

11.7

11.7

11.8

11.8

11.8

11.8

Mangere 33 kV BASE 14.9

14.9

14.9

14.9

14.9

14.9

14.9

14.9

14.9

14.9

14.9

GS1 14.9

14.9

14.9

14.8

14.8

14.8

14.8

14.8

14.8

14.8

14.8

GS2 14.9

14.9

14.9

14.8

14.8

14.8

14.8

14.8

14.8

14.8

14.8

© Transpower New Zealand Limited 2016.All rights reserved. 11

Page 12: 2015 ten year forecast fault level report - Transpower · PDF fileThis publication presents an update to the ten year forecast fault levels ... calculation. Minimum fault level calculations

Ten year forecast fault Levels

GS3 14.9

14.9

14.9

14.9

15.2

15.2

15.1

15.1

15.1

15.1

15.1

GS4 14.9

14.9

14.7

14.7

14.6

14.7

14.7

14.7

14.7

14.7

14.7

GS5 14.9

14.9

14.8

14.7

14.7

14.7

14.7

14.7

14.7

14.7

14.7

Mangere 110 kV BASE 17.4

17.4

17.4

17.4

17.4

17.4

17.4

17.4

17.4

17.4

17.4

GS1 17.4

17.4

17.5

17.1

17.1

16.9

16.9

16.9

17.0

17.0

17.0

GS2 17.4

17.4

17.5

17.2

17.2

16.9

16.9

17.0

17.0

17.0

17.0

GS3 17.4

17.4

17.4

17.4

18.7

18.7

18.3

18.4

18.4

18.4

18.4

GS4 17.4

17.4

16.6

16.8

16.3

16.5

16.5

16.5

16.5

16.5

16.5

GS5 17.4

17.4

17.1

16.7

16.7

16.4

16.4

16.5

16.5

16.5

16.5

Mount Roskill 22 kV BASE 22.0

22.0

22.1

22.1

22.1

22.1

22.1

22.1

22.1

22.1

22.1

GS1 22.0

22.0

22.1

21.9

21.9

21.9

21.9

21.9

21.9

21.9

21.9

GS2 22.0

22.0

22.1

22.0

22.0

21.9

21.9

21.9

21.9

21.9

21.9

GS3 22.0

22.0

22.1

22.1

22.4

22.4

22.3

22.3

22.3

22.3

22.3

GS4 22.0

22.0

21.8

21.8

21.7

21.7

21.7

21.7

21.7

21.7

21.7

GS5 22.0

22.0

21.9

21.8

21.8

21.7

21.7

21.7

21.7

21.7

21.7

Mount Roskill 110 kV BASE 18.6

18.6

18.7

18.7

18.7

18.7

18.7

18.7

18.7

18.7

18.7

GS1 18.6

18.6

18.7

18.4

18.4

18.1

18.1

18.1

18.2

18.2

18.2

GS2 18.6

18.6

18.7

18.4

18.4

18.1

18.1

18.2

18.2

18.2

18.2

GS3 18.6

18.6

18.7

18.7

20.1

20.1

19.8

19.8

19.8

19.8

19.8

GS4 18.6

18.6

17.8

17.9

17.4

17.6

17.6

17.6

17.6

17.6

17.6

GS5 18.6

18.6

18.3

17.9

17.9

17.6

17.6

17.6

17.7

17.7

17.7

Otahuhu 22 kV BASE 26.7

26.7

26.7

26.7

26.7

26.7

26.7

26.7

26.7

26.7

26.7

GS1 26.7

26.7

26.7

26.6

26.6

26.5

26.5

26.5

26.5

26.5

26.5

GS2 26.7

26.7

26.7

26.6

26.6

26.5

26.5

26.5

26.5

26.5

26.5

GS3 26.7

26.7

26.7

26.7

27.3

27.3

27.1

27.2

27.2

27.2

27.2

GS4 26.7

26.7

26.3

26.4

26.2

26.3

26.3

26.3

26.3

26.3

26.3

GS5 26.7

26.7

26.6

26.4

26.4

26.2

26.2

26.3

26.3

26.3

26.3

Otahuhu 110 kV (T2/T4) BASE 24.0

24.0

24.3

24.3

24.3

24.3

24.3

24.3

24.3

24.3

24.3

GS1 24.0

24.1

24.3

23.7

23.7

23.2

23.2

23.3

23.4

23.4

23.4

GS2 24.0

24.1

24.3

23.8

23.8

23.4

23.4

23.4

23.4

23.4

23.5

GS3 24.0

24.0

24.3

24.3

26.6

26.6

25.9

26.0

26.0

26.0

26.0

GS4 24.0

24.1

22.9

23.1

22.2

22.6

22.6

22.5

22.6

22.6

22.6

GS5 24.0

24.1

23.6

23.0

23.0

22.5

22.5

22.6

22.6

22.6

22.6

Otahuhu 110 kV (T3/T5) BASE 18.3

18.3

18.4

18.4

18.4

18.4

18.4

18.4

18.4

18.4

18.4

GS1 18.3

18.4

18.4

18.1

18.1

17.8

17.8

17.8

17.9

17.9

17.9

GS2 18.3

18.4

18.4

18.1

18.1

17.9

17.9

17.9

17.9

17.9

17.9

GS3 18.3

18.3

18.4

18.4

19.8

19.8

19.4

19.5

19.5

19.5

19.5

© Transpower New Zealand Limited 2016.All rights reserved. 12

Page 13: 2015 ten year forecast fault level report - Transpower · PDF fileThis publication presents an update to the ten year forecast fault levels ... calculation. Minimum fault level calculations

Ten year forecast fault Levels

GS4 18.3

18.4

17.5

17.7

17.1

17.4

17.4

17.3

17.4

17.4

17.4

GS5 18.3

18.4

18.0

17.6

17.6

17.3

17.3

17.4

17.4

17.4

17.4

Otahuhu 220 kV BASE 19.6

19.6

19.7

19.8

19.8

19.8

19.8

19.8

19.8

19.8

19.8

GS1 19.6

19.6

19.8

18.9

18.9

18.3

18.3

18.4

18.5

18.6

18.6

GS2 19.6

19.6

19.8

19.1

19.1

18.5

18.5

18.5

18.5

18.6

18.6

GS3 19.6

19.6

19.7

19.8

23.2

23.2

22.2

22.4

22.4

22.4

22.4

GS4 19.6

19.6

17.8

18.1

17.0

17.5

17.5

17.4

17.5

17.5

17.5

GS5 19.6

19.6

18.8

17.9

17.9

17.3

17.3

17.5

17.5

17.5

17.5

Pakuranga 33 kV BASE 24.6

24.6

24.7

24.7

24.7

24.7

24.7

24.7

24.7

24.7

24.7

GS1 24.6

24.6

24.7

24.5

24.5

24.3

24.3

24.3

24.4

24.4

24.4

GS2 24.6

24.6

24.7

24.5

24.5

24.3

24.3

24.4

24.4

24.4

24.4

GS3 24.6

24.6

24.7

24.7

25.3

25.3

25.2

25.2

25.2

25.2

25.2

GS4 24.6

24.6

24.2

24.2

23.9

24.1

24.1

24.1

24.1

24.1

24.1

GS5 24.6

24.6

24.4

24.2

24.2

24.0

24.0

24.1

24.1

24.1

24.1

Pakuranga 220 kV BASE 18.6

18.6

18.8

18.8

18.8

18.8

18.8

18.8

18.8

18.8

18.8

GS1 18.6

18.7

18.8

18.1

18.1

17.6

17.6

17.7

17.7

17.8

17.8

GS2 18.6

18.7

18.8

18.2

18.2

17.7

17.7

17.7

17.7

17.8

17.8

GS3 18.6

18.6

18.8

18.8

21.8

21.8

21.0

21.1

21.1

21.1

21.1

GS4 18.6

18.7

17.1

17.3

16.3

16.8

16.8

16.7

16.8

16.8

16.8

GS5 18.6

18.7

18.0

17.2

17.2

16.7

16.7

16.8

16.8

16.8

16.8

Penrose 22 kV BASE 19.4

19.4

19.4

19.4

19.4

19.4

19.4

19.4

19.4

19.4

19.4

GS1 19.4

19.4

19.4

19.4

19.4

19.3

19.3

19.3

19.3

19.3

19.3

GS2 19.4

19.4

19.4

19.4

19.4

19.3

19.3

19.3

19.3

19.3

19.3

GS3 19.4

19.4

19.4

19.4

19.7

19.7

19.6

19.7

19.7

19.7

19.7

GS4 19.4

19.4

19.2

19.3

19.1

19.2

19.2

19.2

19.2

19.2

19.2

GS5 19.4

19.4

19.3

19.2

19.2

19.2

19.2

19.2

19.2

19.2

19.2

Penrose 33 kV BASE 26.9

26.9

26.9

26.9

26.9

26.9

26.9

26.9

26.9

26.9

26.9

GS1 26.9

26.9

26.9

26.7

26.7

26.5

26.5

26.6

26.6

26.6

26.6

GS2 26.9

26.9

26.9

26.7

26.7

26.6

26.6

26.6

26.6

26.6

26.6

GS3 26.9

26.9

26.9

26.9

27.8

27.8

27.5

27.6

27.6

27.6

27.6

GS4 26.9

26.9

26.4

26.4

26.1

26.2

26.2

26.2

26.2

26.2

26.2

GS5 26.9

26.9

26.7

26.4

26.4

26.2

26.2

26.2

26.3

26.3

26.3

Penrose 110 kV BASE 23.3

23.3

23.4

23.5

23.5

23.5

23.5

23.5

23.5

23.5

23.5

GS1 23.3

23.3

23.5

22.9

22.9

22.4

22.4

22.5

22.6

22.6

22.6

GS2 23.3

23.3

23.5

23.0

23.0

22.6

22.6

22.6

22.6

22.6

22.7

GS3 23.3

23.3

23.4

23.5

25.6

25.6

25.0

25.1

25.1

25.1

25.1

GS4 23.3

23.3

22.1

22.3

21.4

21.8

21.8

21.7

21.8

21.8

21.8

© Transpower New Zealand Limited 2016.All rights reserved. 13

Page 14: 2015 ten year forecast fault level report - Transpower · PDF fileThis publication presents an update to the ten year forecast fault levels ... calculation. Minimum fault level calculations

Ten year forecast fault Levels

GS5 23.3

23.3

22.8

22.2

22.2

21.7

21.7

21.8

21.8

21.9

21.9

Penrose 220 kV BASE 17.9

17.9

18.1

18.1

18.1

18.1

18.1

18.1

18.1

18.1

18.1

GS1 17.9

17.9

18.1

17.4

17.4

16.9

16.9

17.0

17.1

17.1

17.1

GS2 17.9

17.9

18.1

17.5

17.5

17.0

17.0

17.1

17.1

17.1

17.2

GS3 17.9

17.9

18.1

18.1

20.9

20.9

20.1

20.2

20.2

20.2

20.2

GS4 17.9

17.9

16.5

16.7

15.7

16.2

16.2

16.1

16.2

16.2

16.2

GS5 17.9

17.9

17.3

16.6

16.6

16.1

16.1

16.2

16.2

16.2

16.2

Silverdale 33 kV BASE 18.5

18.5

18.5

18.5

18.5

18.5

18.5

18.5

18.5

18.5

18.5

GS1 18.5

18.5

18.5

18.4

18.4

18.3

18.3

18.3

18.3

18.3

18.3

GS2 18.5

18.5

18.5

18.4

18.4

18.3

18.3

18.3

18.3

18.3

18.3

GS3 18.5

18.5

18.5

18.5

18.9

18.9

18.8

18.8

18.8

18.8

18.8

GS4 18.5

18.5

18.2

18.3

18.1

18.2

18.2

18.1

18.2

18.2

18.2

GS5 18.5

18.5

18.4

18.2

18.2

18.1

18.1

18.2

18.2

18.2

18.2

Silverdale 220 kV (T1) BASE 9.2

9.2

9.3

9.3

9.3

9.3

9.3

9.3

9.3

9.3

9.3

GS1 9.2

9.2

9.3

9.1

9.1

8.9

8.9

9.0

9.0

9.0

9.0

GS2 9.2

9.2

9.3

9.1

9.1

9.0

9.0

9.0

9.0

9.0

9.0

GS3 9.2

9.2

9.3

9.3

9.9

9.9

9.8

9.8

9.8

9.8

9.8

GS4 9.2

9.2

8.8

8.9

8.6

8.7

8.7

8.7

8.7

8.7

8.7

GS5 9.2

9.2

9.0

8.8

8.8

8.7

8.7

8.7

8.7

8.7

8.7

Silverdale 220 kV (T2) BASE 9.2

9.2

9.3

9.3

9.3

9.3

9.3

9.3

9.3

9.3

9.3

GS1 9.2

9.2

9.3

9.1

9.1

8.9

8.9

9.0

9.0

9.0

9.0

GS2 9.2

9.2

9.3

9.1

9.1

9.0

9.0

9.0

9.0

9.0

9.0

GS3 9.2

9.2

9.3

9.3

9.9

9.9

9.8

9.8

9.8

9.8

9.8

GS4 9.2

9.2

8.8

8.9

8.6

8.7

8.7

8.7

8.7

8.7

8.7

GS5 9.2

9.2

9.0

8.8

8.8

8.7

8.7

8.7

8.7

8.7

8.7

Southdown 220 kV BASE 16.2

16.2

16.3

16.3

16.3

16.3

16.3

16.3

16.3

16.3

16.3

GS1 16.2

16.2

16.3

15.7

15.7

15.3

15.3

15.4

15.5

15.5

15.5

GS2 16.2

16.2

16.3

15.8

15.8

15.4

15.4

15.5

15.5

15.5

15.5

GS3 16.2

16.2

16.3

16.3

18.6

18.6

18.0

18.0

18.0

18.1

18.1

GS4 16.2

16.2

15.0

15.2

14.4

14.7

14.7

14.7

14.7

14.7

14.7

GS5 16.2

16.2

15.6

15.1

15.1

14.6

14.6

14.7

14.8

14.8

14.8

Takanini 33 kV BASE 17.4

17.4

17.5

17.5

17.5

17.5

17.5

17.5

17.5

17.5

17.5

GS1 17.4

17.4

17.5

17.3

17.3

17.3

17.3

17.3

17.3

17.3

17.3

GS2 17.4

17.4

17.5

17.4

17.4

17.3

17.3

17.3

17.3

17.3

17.3

GS3 17.4

17.4

17.5

17.5

17.7

17.7

17.6

17.6

17.6

17.7

17.7

GS4 17.4

17.4

17.2

17.3

17.1

17.2

17.2

17.2

17.2

17.2

17.2

GS5 17.4

17.4

17.4

17.2

17.2

17.2

17.2

17.2

17.2

17.2

17.2

© Transpower New Zealand Limited 2016.All rights reserved. 14

Page 15: 2015 ten year forecast fault level report - Transpower · PDF fileThis publication presents an update to the ten year forecast fault levels ... calculation. Minimum fault level calculations

Ten year forecast fault Levels

Takanini 220 kV (T5) BASE 15.3

15.3

15.5

15.5

15.5

15.5

15.5

15.5

15.5

15.5

15.5

GS1 15.3

15.4

15.5

14.9

14.9

14.7

14.7

14.7

14.8

14.8

14.8

GS2 15.3

15.4

15.5

15.0

15.0

14.7

14.7

14.8

14.8

14.8

14.8

GS3 15.3

15.3

15.5

15.5

17.1

17.1

16.4

16.5

16.5

16.5

16.5

GS4 15.3

15.4

14.3

14.4

13.6

14.2

14.2

14.1

14.2

14.2

14.2

GS5 15.3

15.4

14.9

14.3

14.3

14.1

14.1

14.2

14.2

14.2

14.2

Takanini 220 kV (T8) BASE 15.1

15.1

15.2

15.2

15.2

15.2

15.2

15.2

15.2

15.2

15.2

GS1 15.1

15.1

15.2

14.7

14.7

14.2

14.2

14.3

14.3

14.3

14.3

GS2 15.1

15.1

15.2

14.7

14.7

14.3

14.3

14.3

14.3

14.3

14.4

GS3 15.1

15.1

15.2

15.2

16.8

16.8

16.2

16.2

16.2

16.3

16.3

GS4 15.1

15.1

14.0

14.2

13.4

13.7

13.7

13.7

13.7

13.7

13.7

GS5 15.1

15.1

14.7

14.1

14.1

13.6

13.6

13.7

13.8

13.8

13.8

Wairau Road 33 kV BASE 17.6

17.6

17.6

17.6

17.6

17.6

17.6

17.6

17.6

17.6

17.6

GS1 17.6

17.6

17.7

17.5

17.5

17.5

17.5

17.5

17.5

17.5

17.5

GS2 17.6

17.6

17.7

17.6

17.6

17.5

17.5

17.5

17.5

17.5

17.5

GS3 17.6

17.6

17.6

17.6

18.0

18.0

17.9

17.9

17.9

17.9

17.9

GS4 17.6

17.6

17.4

17.4

17.3

17.4

17.4

17.3

17.3

17.3

17.3

GS5 17.6

17.6

17.5

17.4

17.4

17.3

17.3

17.3

17.4

17.4

17.4

Wairau Road 220 kV BASE 14.9

14.9

15.0

15.0

15.0

15.0

15.0

15.0

15.0

15.0

15.0

GS1 14.9

14.9

15.0

14.5

14.5

14.2

14.2

14.2

14.3

14.3

14.3

GS2 14.9

14.9

15.0

14.6

14.6

14.2

14.2

14.3

14.3

14.3

14.3

GS3 14.9

14.9

15.0

15.0

16.8

16.8

16.3

16.4

16.4

16.4

16.4

GS4 14.9

14.9

13.8

14.0

13.3

13.6

13.6

13.6

13.6

13.6

13.6

GS5 14.9

14.9

14.4

13.9

13.9

13.6

13.6

13.6

13.7

13.7

13.7

Wiri 33 kV BASE 19.4

19.4

19.5

19.5

19.5

19.5

19.5

19.5

19.5

19.5

19.5

GS1 19.4

19.4

19.5

19.4

19.4

19.3

19.3

19.3

19.3

19.3

19.3

GS2 19.4

19.4

19.5

19.4

19.4

19.3

19.3

19.3

19.3

19.3

19.3

GS3 19.4

19.4

19.5

19.5

19.9

19.9

19.7

19.8

19.8

19.8

19.8

GS4 19.4

19.4

19.2

19.2

19.1

19.1

19.1

19.1

19.1

19.1

19.1

GS5 19.4

19.4

19.3

19.2

19.2

19.1

19.1

19.1

19.1

19.2

19.2

Wiri 110 kV (T1) BASE 16.0

16.0

16.2

16.2

16.2

16.2

16.2

16.2

16.2

16.2

16.2

GS1 16.0

16.0

16.2

15.9

15.9

15.7

15.7

15.7

15.8

15.8

15.8

GS2 16.0

16.0

16.2

16.0

16.0

15.8

15.8

15.8

15.8

15.8

15.8

GS3 16.0

16.0

16.2

16.2

17.1

17.1

16.8

16.9

16.9

16.9

16.9

GS4 16.0

16.0

15.5

15.6

15.2

15.4

15.4

15.4

15.4

15.4

15.4

GS5 16.0

16.0

15.9

15.6

15.6

15.4

15.4

15.4

15.4

15.4

15.4

© Transpower New Zealand Limited 2016.All rights reserved. 15

Page 16: 2015 ten year forecast fault level report - Transpower · PDF fileThis publication presents an update to the ten year forecast fault levels ... calculation. Minimum fault level calculations

Ten year forecast fault Levels

Wiri 110 kV (T2) BASE 15.9

15.9

16.1

16.1

16.1

16.1

16.1

16.1

16.1

16.1

16.1

GS1 15.9

15.9

16.1

15.8

15.8

15.6

15.6

15.7

15.7

15.7

15.7

GS2 15.9

15.9

16.1

15.9

15.9

15.7

15.7

15.7

15.7

15.7

15.7

GS3 15.9

15.9

16.1

16.1

17.0

17.0

16.7

16.8

16.8

16.8

16.8

GS4 15.9

15.9

15.5

15.6

15.2

15.3

15.3

15.3

15.3

15.3

15.3

GS5 15.9

15.9

15.8

15.5

15.5

15.3

15.3

15.3

15.4

15.4

15.4

WAIKATO

Arapuni 110 kV (North Bus) BASE

7.3 7.3

12.4

12.4

12.4

12.4

12.4

12.4

12.4

12.4

12.4

GS1 7.3

7.3

12.5

12.4

12.4

12.4

12.4

12.4

12.4

12.5

12.5

GS2 7.3

7.3

12.5

12.5

12.5

12.4

12.4

12.4

12.4

12.5

12.5

GS3 7.3

7.3

12.4

12.4

12.4

12.4

12.4

12.4

12.4

12.5

12.5

GS4 7.3

7.3

12.4

12.5

12.4

12.4

12.4

12.4

12.4

12.4

12.4

GS5 7.3

7.3

12.5

12.4

12.4

12.4

12.4

12.4

12.4

12.4

12.4

Arapuni 110 kV (South Bus) BASE

4.7 4.7

12.4

12.4

12.4

12.4

12.4

12.4

12.4

12.4

12.4

GS1 4.7

4.7

12.5

12.4

12.4

12.4

12.4

12.4

12.4

12.5

12.5

GS2 4.7

4.7

12.5

12.5

12.5

12.4

12.4

12.4

12.4

12.5

12.5

GS3 4.7

4.7

12.4

12.4

12.4

12.4

12.4

12.4

12.4

12.5

12.5

GS4 4.7

4.7

12.4

12.5

12.4

12.4

12.4

12.4

12.4

12.4

12.4

GS5 4.7

4.7

12.5

12.4

12.4

12.4

12.4

12.4

12.4

12.4

12.4

Atiamuri 220 kV BASE 18.2

18.2

18.3

18.3

18.3

18.3

18.3

18.3

18.3

18.3

18.3

GS1 18.2

18.4

18.5

18.8

18.8

18.8

18.8

18.8

19.1

19.1

19.1

GS2 18.2

18.4

18.5

18.9

18.9

18.9

18.9

19.1

19.1

19.1

19.2

GS3 18.2

18.2

18.3

18.3

18.4

18.4

18.7

18.8

18.8

18.8

18.8

GS4 18.2

18.4

18.5

19.0

18.9

18.9

18.9

18.9

19.1

19.1

19.1

GS5 18.2

18.4

18.4

18.8

18.8

18.7

18.7

18.7

18.9

19.0

19.0

Cambridge 11 kV BASE 22.0

22.0

22.8

22.8

22.8

22.8

22.8

22.8

22.8

22.8

22.8

GS1 22.0

22.0

22.8

22.8

22.8

22.8

22.8

22.8

22.8

22.8

22.8

GS2 22.0

22.0

22.8

22.8

22.8

22.8

22.8

22.8

22.8

22.8

22.8

GS3 22.0

22.0

22.8

22.8

22.9

22.9

22.8

22.9

22.9

22.9

22.9

GS4 22.0

22.0

22.8

22.8

22.8

22.8

22.8

22.8

22.8

22.8

22.8

GS5 22.0

22.0

22.8

22.8

22.8

22.8

22.8

22.8

22.8

22.8

22.8

Cambridge 110 kV (T3) BASE 7.4

7.4

8.4

8.4

8.4

8.4

8.4

8.4

8.4

8.4

8.4

GS1 7.4

7.4

8.4

8.4

8.4

8.3

8.3

8.4

8.4

8.4

8.4

GS2 7.4

7.4

8.4

8.4

8.4

8.4

8.4

8.4

8.4

8.4

8.4

GS3 7.4

7.4

8.4

8.4

8.4

8.4

8.4

8.4

8.4

8.5

8.5

© Transpower New Zealand Limited 2016.All rights reserved. 16

Page 17: 2015 ten year forecast fault level report - Transpower · PDF fileThis publication presents an update to the ten year forecast fault levels ... calculation. Minimum fault level calculations

Ten year forecast fault Levels

GS4 7.4

7.4

8.4

8.4

8.4

8.4

8.4

8.4

8.4

8.4

8.4

GS5 7.4

7.4

8.4

8.4

8.4

8.3

8.3

8.4

8.4

8.4

8.4

Cambridge 110 kV (T4) BASE 7.4

7.4

8.4

8.4

8.4

8.4

8.4

8.4

8.4

8.4

8.4

GS1 7.4

7.4

8.4

8.4

8.4

8.4

8.4

8.4

8.4

8.4

8.4

GS2 7.4

7.4

8.4

8.4

8.4

8.4

8.4

8.4

8.4

8.4

8.4

GS3 7.4

7.4

8.4

8.4

8.4

8.4

8.4

8.4

8.4

8.5

8.5

GS4 7.4

7.4

8.4

8.4

8.4

8.4

8.4

8.4

8.4

8.4

8.4

GS5 7.4

7.4

8.4

8.4

8.4

8.3

8.3

8.4

8.4

8.4

8.4

Hamilton 11 kV BASE 13.3

13.3

13.4

13.4

13.4

13.4

13.4

13.4

13.4

13.4

13.4

GS1 13.3

13.3

13.4

13.4

13.4

13.4

13.4

13.4

13.4

13.4

13.4

GS2 13.3

13.3

13.4

13.4

13.4

13.4

13.4

13.4

13.4

13.4

13.4

GS3 13.3

13.3

13.4

13.4

13.4

13.4

13.4

13.4

13.4

13.4

13.4

GS4 13.3

13.3

13.4

13.4

13.4

13.4

13.4

13.4

13.4

13.4

13.4

GS5 13.3

13.3

13.4

13.4

13.4

13.4

13.4

13.4

13.4

13.4

13.4

Hamilton 33 kV BASE 21.0

21.0

21.1

21.1

21.1

21.1

21.1

21.1

21.1

21.1

21.1

GS1 21.0

21.0

21.1

21.0

21.0

20.9

20.9

23.8

23.9

23.9

23.9

GS2 21.0

21.0

21.1

24.0

24.0

23.8

23.8

23.9

23.9

23.9

23.9

GS3 21.0

21.0

21.1

21.1

21.2

21.2

21.1

24.0

24.0

24.0

24.0

GS4 21.0

21.0

20.9

23.9

23.7

23.8

23.8

23.8

23.8

23.8

23.8

GS5 21.0

21.0

21.1

21.0

21.0

20.8

20.8

23.8

23.8

23.8

23.8

Hamilton 110 kV BASE 13.7

13.7

15.3

15.3

15.3

15.3

15.3

15.3

15.3

15.3

15.3

GS1 13.7

13.7

15.4

15.2

15.2

15.0

15.0

15.2

15.2

15.2

15.2

GS2 13.7

13.7

15.4

15.4

15.4

15.2

15.2

15.2

15.2

15.2

15.3

GS3 13.7

13.7

15.3

15.3

15.5

15.5

15.3

15.5

15.5

15.5

15.5

GS4 13.7

13.7

15.1

15.3

15.1

15.1

15.1

15.1

15.1

15.1

15.1

GS5 13.7

13.7

15.3

15.1

15.1

14.9

14.9

15.1

15.1

15.1

15.1

Hamilton 220 kV BASE 12.6

12.6

13.1

13.1

13.1

13.1

13.1

13.1

13.1

13.1

13.1

GS1 12.6

12.6

13.1

12.8

12.8

12.4

12.4

12.8

12.9

12.9

12.9

GS2 12.6

12.6

13.1

13.2

13.2

12.8

12.8

12.9

12.9

12.9

12.9

GS3 12.6

12.6

13.1

13.1

13.2

13.2

12.9

13.3

13.3

13.3

13.3

GS4 12.6

12.6

12.6

13.0

12.6

12.7

12.7

12.6

12.7

12.7

12.7

GS5 12.6

12.6

12.9

12.6

12.6

12.3

12.3

12.7

12.7

12.7

12.7

Hangatiki 33 kV BASE 4.6

4.6

5.5

5.5

5.5

5.5

5.5

5.5

5.5

5.5

5.5

GS1 4.6

4.6

5.5

5.5

5.5

5.5

5.5

5.5

5.5

5.5

5.5

GS2 4.6

4.6

5.5

5.5

5.5

5.5

5.5

5.5

5.5

5.5

5.5

GS3 4.6

4.6

5.5

5.5

5.5

5.5

5.5

5.5

5.5

5.5

5.5

GS4 4.6

4.6

5.5

5.5

5.5

5.5

5.5

5.5

5.5

5.5

5.5

© Transpower New Zealand Limited 2016.All rights reserved. 17

Page 18: 2015 ten year forecast fault level report - Transpower · PDF fileThis publication presents an update to the ten year forecast fault levels ... calculation. Minimum fault level calculations

Ten year forecast fault Levels

GS5 4.6

4.6

5.5

5.5

5.5

5.5

5.5

5.5

5.5

5.5

5.5

Hangatiki 110 kV BASE 3.5

3.5

5.8

5.8

5.8

5.8

5.8

5.8

5.8

5.8

5.8

GS1 3.5

3.5

5.9

5.8

5.8

5.8

5.8

5.8

5.9

5.9

5.9

GS2 3.5

3.5

5.9

5.9

5.9

5.8

5.8

5.9

5.9

5.9

5.9

GS3 3.5

3.5

5.8

5.8

5.9

5.9

5.8

5.9

5.9

5.9

5.9

GS4 3.5

3.5

5.8

5.9

5.8

5.8

5.8

5.8

5.8

5.8

5.8

GS5 3.5

3.5

5.9

5.8

5.8

5.8

5.8

5.8

5.8

5.8

5.8

Hinuera 33 kV BASE 6.9

6.9

7.2

7.2

7.2

7.2

7.2

7.2

7.2

7.2

7.2

GS1 6.9

6.9

7.2

7.2

7.2

7.2

7.2

7.2

7.2

7.2

7.2

GS2 6.9

6.9

7.2

7.2

7.2

7.2

7.2

7.2

7.2

7.2

7.2

GS3 6.9

6.9

7.2

7.2

7.2

7.2

7.2

7.2

7.2

7.2

7.2

GS4 6.9

6.9

7.2

7.2

7.2

7.2

7.2

7.2

7.2

7.2

7.2

GS5 6.9

6.9

7.2

7.2

7.2

7.2

7.2

7.2

7.2

7.2

7.2

Hinuera 110 kV BASE 3.7

3.7

4.0

4.0

4.0

4.0

4.0

4.0

4.0

4.0

4.0

GS1 3.7

3.7

4.0

4.0

4.0

4.0

4.0

4.0

4.0

4.0

4.0

GS2 3.7

3.7

4.0

4.0

4.0

4.0

4.0

4.0

4.0

4.0

4.0

GS3 3.7

3.7

4.0

4.0

4.0

4.0

4.0

4.0

4.0

4.0

4.0

GS4 3.7

3.7

4.0

4.0

4.0

4.0

4.0

4.0

4.0

4.0

4.0

GS5 3.7

3.7

4.0

4.0

4.0

4.0

4.0

4.0

4.0

4.0

4.0

Huntly 11 kV BASE 16.3

16.3

16.3

16.3

16.3

16.3

16.3

16.3

16.3

16.3

16.3

GS1 16.3

16.3

16.3

16.2

16.2

16.1

16.1

16.2

16.2

16.2

16.2

GS2 16.3

16.3

16.3

16.2

16.2

16.2

16.2

16.2

16.2

16.2

16.2

GS3 16.3

16.3

16.3

16.3

16.3

16.3

16.2

16.2

16.2

16.2

16.2

GS4 16.3

16.3

16.2

16.2

16.1

16.1

16.1

16.1

16.1

16.1

16.1

GS5 16.3

16.3

16.3

16.2

16.2

16.1

16.1

16.1

16.1

16.1

16.1

Huntly 33 kV BASE 14.7

14.7

14.7

14.7

14.7

14.7

14.7

14.7

14.7

14.7

14.7

GS1 14.7

14.7

14.7

14.5

14.5

14.4

14.4

14.4

14.4

14.4

14.4

GS2 14.7

14.7

14.7

14.6

14.6

14.4

14.4

14.4

14.4

14.4

14.4

GS3 14.7

14.7

14.7

14.7

14.7

14.7

14.5

14.5

14.5

14.5

14.5

GS4 14.7

14.7

14.5

14.5

14.3

14.3

14.3

14.3

14.3

14.3

14.3

GS5 14.7

14.7

14.7

14.5

14.5

14.3

14.3

14.3

14.3

14.3

14.3

Huntly 220 kV BASE 22.5

22.5

22.7

22.8

22.8

22.8

22.8

22.8

22.8

22.8

22.8

GS1 22.5

22.5

22.8

20.4

20.4

18.2

18.2

18.4

18.5

18.5

18.5

GS2 22.5

22.5

22.8

20.5

20.6

18.4

18.4

18.5

18.5

18.5

18.6

GS3 22.5

22.5

22.7

22.8

22.2

22.2

19.7

19.9

19.9

20.0

20.0

GS4 22.5

22.5

19.8

20.1

17.6

17.9

17.9

17.8

17.8

17.8

17.8

GS5 22.5

22.5

22.3

19.9

19.9

17.8

17.8

17.9

18.0

18.0

18.0

© Transpower New Zealand Limited 2016.All rights reserved. 18

Page 19: 2015 ten year forecast fault level report - Transpower · PDF fileThis publication presents an update to the ten year forecast fault levels ... calculation. Minimum fault level calculations

Ten year forecast fault Levels

Karapiro 110 kV BASE 7.5

7.5

8.9

8.9

8.9

8.9

8.9

8.9

8.9

8.9

8.9

GS1 7.5

7.5

8.9

8.9

8.9

8.8

8.8

8.9

8.9

8.9

8.9

GS2 7.5

7.5

8.9

8.9

8.9

8.9

8.9

8.9

8.9

8.9

8.9

GS3 7.5

7.5

8.9

8.9

8.9

8.9

8.9

8.9

8.9

8.9

8.9

GS4 7.5

7.5

8.8

8.9

8.8

8.8

8.8

8.8

8.8

8.8

8.8

GS5 7.5

7.5

8.9

8.8

8.8

8.8

8.8

8.8

8.8

8.8

8.8

Kinleith 11 kV (T1A) BASE 13.1

13.1

14.2

14.2

14.2

14.2

14.2

14.2

14.2

14.2

14.2

GS1 13.1

13.2

14.3

14.3

14.3

14.3

14.3

14.3

14.3

14.3

14.3

GS2 13.1

13.2

14.3

14.3

14.3

14.3

14.3

14.3

14.3

14.3

14.3

GS3 13.1

13.1

14.2

14.2

14.2

14.2

14.2

14.2

14.2

14.2

14.2

GS4 13.1

13.2

14.3

14.3

14.3

14.3

14.3

14.3

14.3

14.3

14.3

GS5 13.1

13.2

14.3

14.3

14.3

14.3

14.3

14.3

14.3

14.3

14.3

Kinleith 11 kV (T2) BASE 13.0

13.0

14.0

14.0

14.0

14.0

14.0

14.0

14.0

14.0

14.0

GS1 13.0

13.0

14.1

14.1

14.1

14.1

14.1

14.1

14.1

14.1

14.1

GS2 13.0

13.0

14.1

14.1

14.1

14.1

14.1

14.1

14.1

14.1

14.1

GS3 13.0

13.0

14.0

14.0

14.0

14.0

14.0

14.0

14.0

14.0

14.0

GS4 13.0

13.0

14.1

14.1

14.1

14.1

14.1

14.1

14.1

14.1

14.1

GS5 13.0

13.0

14.1

14.1

14.1

14.1

14.1

14.1

14.1

14.1

14.1

Kinleith 11 kV (T3A and T3B) BASE

13.6 13.6

14.7

14.7

14.7

14.7

14.7

14.7

14.7

14.7

14.7

GS1 13.6

13.6

14.8

14.8

14.8

14.8

14.8

14.8

14.8

14.8

14.8

GS2 13.6

13.6

14.8

14.8

14.8

14.8

14.8

14.8

14.8

14.8

14.8

GS3 13.6

13.6

14.7

14.7

14.7

14.7

14.7

14.7

14.7

14.7

14.7

GS4 13.6

13.6

14.8

14.8

14.8

14.8

14.8

14.8

14.8

14.8

14.8

GS5 13.6

13.6

14.8

14.8

14.8

14.8

14.8

14.8

14.8

14.8

14.8

Kinleith 11 kV (T5) BASE 32.4

32.4

35.5

35.5

35.5

35.5

35.5

35.5

35.5

35.5

35.5

GS1 32.4

32.6

35.6

35.6

35.6

35.6

35.6

35.6

35.6

35.6

35.6

GS2 32.4

32.6

35.6

35.6

35.6

35.6

35.6

35.6

35.6

35.6

35.6

GS3 32.4

32.4

35.5

35.5

35.5

35.5

35.5

35.5

35.5

35.5

35.5

GS4 32.4

32.6

35.6

35.6

35.6

35.6

35.6

35.6

35.6

35.6

35.6

GS5 32.4

32.6

35.6

35.6

35.6

35.5

35.5

35.6

35.6

35.6

35.6

Kinleith 33 kV BASE 4.6

4.6

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

GS1 4.6

4.6

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

GS2 4.6

4.6

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

GS3 4.6

4.6

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

GS4 4.6

4.6

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

GS5 4.6

4.6

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

© Transpower New Zealand Limited 2016.All rights reserved. 19

Page 20: 2015 ten year forecast fault level report - Transpower · PDF fileThis publication presents an update to the ten year forecast fault levels ... calculation. Minimum fault level calculations

Ten year forecast fault Levels

Kinleith 110 kV BASE 5.8

5.8

8.7

8.7

8.7

8.7

8.7

8.7

8.7

8.7

8.7

GS1 5.8

5.9

8.9

8.9

8.9

8.9

8.9

8.9

8.9

8.9

8.9

GS2 5.8

5.9

8.9

8.9

8.9

8.9

8.9

8.9

8.9

8.9

8.9

GS3 5.8

5.8

8.7

8.7

8.7

8.7

8.7

8.7

8.7

8.7

8.7

GS4 5.8

5.9

8.9

8.9

8.9

8.9

8.9

8.9

8.9

8.9

8.9

GS5 5.8

5.9

8.9

8.9

8.9

8.8

8.8

8.9

8.9

8.9

8.9

Kopu 66 kV BASE 2.7

2.7

2.7

2.7

2.7

2.7

2.7

2.7

2.7

2.7

2.7

GS1 2.7

2.7

2.7

2.7

2.7

2.7

2.7

2.7

2.7

2.7

2.7

GS2 2.7

2.7

2.7

2.7

2.7

2.7

2.7

2.7

2.7

2.7

2.7

GS3 2.7

2.7

2.7

2.7

2.7

2.7

2.7

2.7

2.7

2.7

2.7

GS4 2.7

2.7

2.7

2.7

2.7

2.7

2.7

2.7

2.7

2.7

2.7

GS5 2.7

2.7

2.7

2.7

2.7

2.7

2.7

2.7

2.7

2.7

2.7

Kopu 110 kV (T3) BASE 2.4

2.4

2.5

2.5

2.5

2.5

2.5

2.5

2.5

2.5

2.5

GS1 2.4

2.4

2.5

2.5

2.5

2.5

2.5

2.5

2.5

2.5

2.5

GS2 2.4

2.4

2.5

2.5

2.5

2.5

2.5

2.5

2.5

2.5

2.5

GS3 2.4

2.4

2.5

2.5

2.5

2.5

2.5

2.5

2.5

2.5

2.5

GS4 2.4

2.4

2.5

2.5

2.5

2.5

2.5

2.5

2.5

2.5

2.5

GS5 2.4

2.4

2.5

2.5

2.5

2.5

2.5

2.5

2.5

2.5

2.5

Kopu 110 kV (T4) BASE 2.4

2.4

2.5

2.5

2.5

2.5

2.5

2.5

2.5

2.5

2.5

GS1 2.4

2.4

2.5

2.5

2.5

2.5

2.5

2.5

2.5

2.5

2.5

GS2 2.4

2.4

2.5

2.5

2.5

2.5

2.5

2.5

2.5

2.5

2.5

GS3 2.4

2.4

2.5

2.5

2.5

2.5

2.5

2.5

2.5

2.5

2.5

GS4 2.4

2.4

2.5

2.5

2.5

2.5

2.5

2.5

2.5

2.5

2.5

GS5 2.4

2.4

2.5

2.5

2.5

2.5

2.5

2.5

2.5

2.5

2.5

Lichfield 110 kV (T1) BASE 5.2

5.2

6.4

6.4

6.4

6.4

6.4

6.4

6.4

6.4

6.4

GS1 5.2

5.3

6.5

6.5

6.5

6.5

6.5

6.5

6.5

6.5

6.5

GS2 5.2

5.3

6.5

6.5

6.5

6.5

6.5

6.5

6.5

6.5

6.5

GS3 5.2

5.2

6.4

6.4

6.4

6.4

6.4

6.4

6.4

6.4

6.4

GS4 5.2

5.3

6.6

6.6

6.6

6.6

6.6

6.6

6.6

6.6

6.6

GS5 5.2

5.3

6.5

6.5

6.5

6.5

6.5

6.5

6.5

6.5

6.5

Lichfield 110 kV (T2) BASE 5.0

5.0

6.2

6.2

6.2

6.2

6.2

6.2

6.2

6.2

6.2

GS1 5.0

5.2

6.3

6.3

6.3

6.3

6.3

6.3

6.3

6.3

6.3

GS2 5.0

5.2

6.3

6.3

6.3

6.3

6.3

6.3

6.3

6.3

6.3

GS3 5.0

5.0

6.2

6.2

6.2

6.2

6.2

6.2

6.2

6.2

6.2

GS4 5.0

5.2

6.4

6.4

6.4

6.4

6.4

6.4

6.4

6.4

6.4

GS5 5.0

5.2

6.3

6.3

6.3

6.3

6.3

6.3

6.3

6.3

6.3

© Transpower New Zealand Limited 2016.All rights reserved. 20

Page 21: 2015 ten year forecast fault level report - Transpower · PDF fileThis publication presents an update to the ten year forecast fault levels ... calculation. Minimum fault level calculations

Ten year forecast fault Levels

Maraetai 220 kV BASE 23.2

23.2

23.2

23.2

23.2

23.2

23.2

23.2

23.2

23.2

23.2

GS1 23.2

23.2

23.2

23.5

23.5

23.3

23.3

23.4

23.7

23.7

23.7

GS2 23.2

23.2

23.2

23.6

23.6

23.5

23.5

23.7

23.7

23.7

23.9

GS3 23.2

23.2

23.2

23.2

23.5

23.5

23.8

23.9

23.9

23.9

23.9

GS4 23.2

23.2

22.8

23.5

23.1

23.3

23.3

23.2

23.5

23.5

23.5

GS5 23.2

23.2

23.1

23.4

23.4

23.1

23.1

23.2

23.5

23.5

23.5

Ohakuri 220 kV BASE 17.8

17.8

17.9

17.9

17.9

17.9

17.9

17.9

17.9

17.9

17.9

GS1 17.8

18.0

18.1

18.5

18.5

18.4

18.4

18.4

18.7

18.8

18.8

GS2 17.8

18.0

18.1

18.5

18.5

18.5

18.5

18.7

18.7

18.8

18.9

GS3 17.8

17.8

17.9

17.9

18.0

18.0

18.4

18.4

18.4

18.4

18.4

GS4 17.8

18.0

18.1

18.6

18.5

18.6

18.6

18.5

18.8

18.8

18.8

GS5 17.8

18.0

18.0

18.4

18.4

18.4

18.4

18.4

18.6

18.7

18.7

Ohinewai 220 kV BASE 20.7

20.7

21.0

21.0

21.0

21.0

21.0

21.0

21.0

21.0

21.0

GS1 20.7

20.8

21.0

19.5

19.5

18.0

18.0

18.2

18.3

18.4

18.4

GS2 20.7

20.8

21.0

19.7

19.7

18.3

18.3

18.3

18.3

18.4

18.4

GS3 20.7

20.7

21.0

21.0

21.2

21.2

19.6

19.8

19.8

19.9

19.9

GS4 20.7

20.8

18.9

19.2

17.4

17.8

17.8

17.6

17.7

17.7

17.7

GS5 20.7

20.8

20.6

19.0

19.0

17.5

17.5

17.8

17.8

17.8

17.8

Piako 110 kV BASE 5.3

5.3

5.5

5.5

5.5

5.5

5.5

5.5

5.5

5.5

5.5

GS1 5.3

5.3

5.5

5.5

5.5

5.5

5.5

5.5

5.5

5.5

5.5

GS2 5.3

5.3

5.5

5.5

5.5

5.5

5.5

5.5

5.5

5.5

5.5

GS3 5.3

5.3

5.5

5.5

5.5

5.5

5.5

5.5

5.5

5.5

5.5

GS4 5.3

5.3

5.5

5.5

5.5

5.5

5.5

5.5

5.5

5.5

5.5

GS5 5.3

5.3

5.5

5.5

5.5

5.5

5.5

5.5

5.5

5.5

5.5

Te Awamutu 11 kV BASE 17.3

17.3

20.5

20.5

20.5

20.5

20.5

20.5

20.5

20.5

20.5

GS1 17.3

17.3

20.5

20.5

20.5

20.5

20.5

20.5

20.5

20.5

20.5

GS2 17.3

17.3

20.5

20.5

20.5

20.5

20.5

20.5

20.5

20.5

20.5

GS3 17.3

17.3

20.5

20.5

20.5

20.5

20.5

20.5

20.5

20.5

20.5

GS4 17.3

17.3

20.5

20.5

20.5

20.5

20.5

20.5

20.5

20.5

20.5

GS5 17.3

17.3

20.5

20.5

20.5

20.5

20.5

20.5

20.5

20.5

20.5

Te Awamutu 110 kV BASE 3.7

3.7

5.6

5.6

5.6

5.6

5.6

5.6

5.6

5.6

5.6

GS1 3.7

3.7

5.6

5.6

5.6

5.6

5.6

5.6

5.6

5.6

5.6

GS2 3.7

3.7

5.6

5.6

5.6

5.6

5.6

5.6

5.6

5.6

5.6

GS3 3.7

3.7

5.6

5.6

5.6

5.6

5.6

5.6

5.6

5.6

5.6

GS4 3.7

3.7

5.6

5.6

5.6

5.6

5.6

5.6

5.6

5.6

5.6

GS5 3.7

3.7

5.6

5.6

5.6

5.6

5.6

5.6

5.6

5.6

5.6

© Transpower New Zealand Limited 2016.All rights reserved. 21

Page 22: 2015 ten year forecast fault level report - Transpower · PDF fileThis publication presents an update to the ten year forecast fault levels ... calculation. Minimum fault level calculations

Ten year forecast fault Levels

Te Kowhai 33 kV BASE 20.9

20.9

21.0

21.0

21.0

21.0

21.0

21.0

21.0

21.0

21.0

GS1 20.9

20.9

21.0

20.8

20.8

20.5

20.5

20.6

20.6

20.6

20.6

GS2 20.9

20.9

21.0

20.8

20.8

20.6

20.6

20.6

20.6

20.6

20.6

GS3 20.9

20.9

21.0

21.0

20.9

20.9

20.7

20.7

20.7

20.7

20.7

GS4 20.9

20.9

20.7

20.7

20.5

20.5

20.5

20.4

20.4

20.4

20.4

GS5 20.9

20.9

20.9

20.7

20.7

20.5

20.5

20.5

20.5

20.5

20.5

Te Kowhai 220 kV BASE 9.0

9.0

9.0

9.0

9.0

9.0

9.0

9.0

9.0

9.0

9.0

GS1 9.0

9.0

9.0

8.7

8.7

8.3

8.3

8.4

8.4

8.4

8.4

GS2 9.0

9.0

9.0

8.7

8.7

8.4

8.4

8.4

8.4

8.4

8.4

GS3 9.0

9.0

9.0

9.0

8.9

8.9

8.6

8.6

8.6

8.6

8.6

GS4 9.0

9.0

8.6

8.6

8.2

8.3

8.3

8.2

8.2

8.2

8.2

GS5 9.0

9.0

8.9

8.6

8.6

8.3

8.3

8.3

8.3

8.3

8.3

Waihou 33 kV BASE 6.8

6.8

7.0

7.0

7.0

7.0

7.0

7.0

7.0

7.0

7.0

GS1 6.8

6.8

7.0

7.0

7.0

6.9

6.9

7.0

7.0

7.0

7.0

GS2 6.8

6.8

7.0

7.0

7.0

7.0

7.0

7.0

7.0

7.0

7.0

GS3 6.8

6.8

7.0

7.0

7.0

7.0

7.0

7.0

7.0

7.0

7.0

GS4 6.8

6.8

6.9

7.0

6.9

6.9

6.9

6.9

6.9

6.9

6.9

GS5 6.8

6.8

7.0

6.9

6.9

6.9

6.9

6.9

6.9

6.9

6.9

Waihou 110 kV BASE 5.2

5.2

5.4

5.4

5.4

5.4

5.4

5.4

5.4

5.4

5.4

GS1 5.2

5.2

5.5

5.4

5.4

5.4

5.4

5.4

5.4

5.4

5.4

GS2 5.2

5.2

5.5

5.5

5.5

5.4

5.4

5.4

5.4

5.4

5.4

GS3 5.2

5.2

5.4

5.4

5.5

5.5

5.4

5.5

5.5

5.5

5.5

GS4 5.2

5.2

5.4

5.4

5.4

5.4

5.4

5.4

5.4

5.4

5.4

GS5 5.2

5.2

5.4

5.4

5.4

5.4

5.4

5.4

5.4

5.4

5.4

Waikino 33 kV BASE 6.2

6.2

6.2

6.2

6.2

6.2

6.2

6.2

6.2

6.2

6.2

GS1 6.2

6.2

6.2

6.2

6.2

6.2

6.2

6.2

6.2

6.2

6.2

GS2 6.2

6.2

6.2

6.2

6.2

6.2

6.2

6.2

6.2

6.2

6.2

GS3 6.2

6.2

6.2

6.2

6.2

6.2

6.2

6.2

6.2

6.2

6.2

GS4 6.2

6.2

6.2

6.2

6.2

6.2

6.2

6.2

6.2

6.2

6.2

GS5 6.2

6.2

6.2

6.2

6.2

6.2

6.2

6.2

6.2

6.2

6.2

Waikino 110 kV BASE 4.0

4.0

4.2

4.2

4.2

4.2

4.2

4.2

4.2

4.2

4.2

GS1 4.0

4.0

4.2

4.2

4.2

4.1

4.1

4.2

4.2

4.2

4.2

GS2 4.0

4.0

4.2

4.2

4.2

4.2

4.2

4.2

4.2

4.2

4.2

GS3 4.0

4.0

4.2

4.2

4.2

4.2

4.2

4.2

4.2

4.2

4.2

GS4 4.0

4.0

4.1

4.2

4.1

4.1

4.1

4.1

4.1

4.1

4.1

GS5 4.0

4.0

4.2

4.1

4.1

4.1

4.1

4.1

4.1

4.1

4.1

© Transpower New Zealand Limited 2016.All rights reserved. 22

Page 23: 2015 ten year forecast fault level report - Transpower · PDF fileThis publication presents an update to the ten year forecast fault levels ... calculation. Minimum fault level calculations

Ten year forecast fault Levels

Waipapa 220 kV BASE 14.0

14.0

14.0

14.0

14.0

14.0

14.0

14.0

14.0

14.0

14.0

GS1 14.0

14.0

14.0

14.1

14.1

14.0

14.0

14.1

14.2

14.2

14.2

GS2 14.0

14.0

14.0

14.1

14.1

14.1

14.1

14.2

14.2

14.2

14.2

GS3 14.0

14.0

14.0

14.0

14.1

14.1

14.2

14.2

14.2

14.2

14.2

GS4 14.0

14.0

13.9

14.1

14.0

14.0

14.0

14.0

14.1

14.1

14.1

GS5 14.0

14.0

13.9

14.0

14.0

14.0

14.0

14.0

14.1

14.1

14.1

Whakamaru 220 kV BASE 29.7

29.7

29.8

29.8

29.8

29.8

29.8

29.8

29.8

29.8

29.8

GS1 29.7

29.9

29.9

30.4

30.4

30.0

30.0

30.2

30.8

30.8

30.8

GS2 29.7

29.9

29.9

30.6

30.6

30.3

30.3

30.8

30.8

30.8

31.2

GS3 29.7

29.7

29.8

29.8

30.4

30.4

31.0

31.1

31.1

31.2

31.2

GS4 29.7

29.9

29.2

30.4

29.7

29.9

29.9

29.8

30.3

30.3

30.3

GS5 29.7

29.9

29.6

30.1

30.1

29.6

29.6

29.8

30.3

30.4

30.4

BAY OF PLENTY

Aniwhenua 110 kV BASE 4.6

4.6

4.6

4.6

4.6

4.6

4.6

4.6

4.6

4.6

4.6

GS1 4.6

4.6

4.6

4.6

4.6

4.6

4.6

4.6

4.6

4.6

4.6

GS2 4.6

4.6

4.6

4.6

4.6

4.6

4.6

4.6

4.6

4.6

4.6

GS3 4.6

4.6

4.6

4.6

4.6

4.6

4.6

4.6

4.6

4.6

4.6

GS4 4.6

4.6

4.7

4.7

4.7

4.7

4.7

4.7

4.7

4.7

4.7

GS5 4.6

4.6

4.6

4.6

4.6

4.6

4.6

4.6

4.6

4.6

4.6

Edgecumbe 33 kV BASE 14.6

14.6

14.7

14.7

14.7

14.7

14.7

14.7

14.7

14.7

14.7

GS1 14.6

14.7

14.7

14.7

14.7

14.7

14.7

14.7

14.8

14.8

14.8

GS2 14.6

14.7

14.7

14.7

14.7

14.7

14.7

14.8

14.8

14.8

14.8

GS3 14.6

14.6

14.7

14.7

14.7

14.7

14.7

14.7

14.7

14.7

14.7

GS4 14.6

14.7

14.8

14.8

14.8

14.8

14.8

14.8

14.8

14.8

14.8

GS5 14.6

14.7

14.7

14.7

14.7

14.7

14.7

14.7

14.7

14.7

14.7

Edgecumbe 110 kV BASE 8.5

8.5

8.6

8.6

8.6

8.6

8.6

8.6

8.6

8.6

8.6

GS1 8.5

8.6

8.6

8.7

8.7

8.6

8.6

8.7

8.7

8.7

8.7

GS2 8.5

8.6

8.6

8.7

8.7

8.7

8.7

8.7

8.7

8.7

8.7

GS3 8.5

8.5

8.6

8.6

8.6

8.6

8.6

8.6

8.6

8.6

8.6

GS4 8.5

8.6

8.8

8.8

8.8

8.8

8.8

8.8

8.8

8.8

8.8

GS5 8.5

8.6

8.6

8.6

8.6

8.6

8.6

8.6

8.7

8.7

8.7

Edgecumbe 220 kV BASE 7.7

7.7

7.8

7.8

7.8

7.8

7.8

7.8

7.8

7.8

7.8

GS1 7.7

7.9

7.9

8.0

8.0

8.0

8.0

8.0

8.0

8.0

8.0

GS2 7.7

7.9

7.9

8.0

8.0

8.0

8.0

8.0

8.0

8.0

8.0

GS3 7.7

7.7

7.8

7.8

7.8

7.8

7.9

7.9

7.9

7.9

7.9

© Transpower New Zealand Limited 2016.All rights reserved. 23

Page 24: 2015 ten year forecast fault level report - Transpower · PDF fileThis publication presents an update to the ten year forecast fault levels ... calculation. Minimum fault level calculations

Ten year forecast fault Levels

GS4 7.7

7.9

8.0

8.1

8.1

8.1

8.1

8.1

8.1

8.1

8.1

GS5 7.7

7.9

7.9

8.0

8.0

7.9

7.9

7.9

8.0

8.0

8.0

Kaitimako 33 kV BASE 7.5

7.5

7.5

7.5

7.5

7.5

7.5

7.5

7.5

7.5

7.5

GS1 7.5

7.5

7.5

7.5

7.5

7.5

7.5

7.5

7.5

7.5

7.5

GS2 7.5

7.5

7.5

7.5

7.5

7.5

7.5

7.5

7.5

7.5

7.5

GS3 7.5

7.5

7.5

7.5

7.5

7.5

7.5

7.5

7.5

7.5

7.5

GS4 7.5

7.5

7.6

7.6

7.6

7.6

7.6

7.6

7.6

7.6

7.6

GS5 7.5

7.5

7.5

7.5

7.5

7.5

7.5

7.5

7.5

7.5

7.5

Kaitimako 110 kV BASE 8.7

8.7

8.8

8.8

8.8

8.8

8.8

8.8

8.8

8.8

8.8

GS1 8.7

8.8

8.9

8.9

8.9

8.9

8.9

8.9

8.9

8.9

8.9

GS2 8.7

8.8

8.9

8.9

8.9

8.9

8.9

8.9

8.9

8.9

9.0

GS3 8.7

8.7

8.8

8.8

8.8

8.8

8.8

8.8

8.8

8.8

8.8

GS4 8.7

8.8

9.1

9.2

9.2

9.2

9.2

9.2

9.2

9.2

9.2

GS5 8.7

8.8

8.9

8.9

8.9

8.9

8.9

8.9

8.9

8.9

8.9

Kaitimako 220 kV BASE 7.1

7.1

7.2

7.2

7.2

7.2

7.2

7.2

7.2

7.2

7.2

GS1 7.1

7.3

7.4

7.4

7.4

7.4

7.4

7.4

7.4

7.4

7.4

GS2 7.1

7.3

7.4

7.4

7.4

7.4

7.4

7.4

7.4

7.4

7.5

GS3 7.1

7.1

7.2

7.2

7.3

7.3

7.3

7.3

7.3

7.3

7.3

GS4 7.1

7.3

7.5

7.6

7.6

7.6

7.6

7.6

7.6

7.6

7.6

GS5 7.1

7.3

7.4

7.4

7.4

7.4

7.4

7.4

7.4

7.4

7.4

Kawerau 11 kV (T1/T2) BASE 19.8

19.8

19.8

19.8

19.8

19.8

19.8

19.8

19.8

19.8

19.8

GS1 19.8

19.8

19.8

19.8

19.8

19.8

19.8

19.8

19.8

19.8

19.8

GS2 19.8

19.8

19.8

19.8

19.8

19.8

19.8

19.8

19.8

19.8

19.8

GS3 19.8

19.8

19.8

19.8

19.8

19.8

19.8

19.8

19.8

19.8

19.8

GS4 19.8

19.8

19.9

19.9

19.9

19.9

19.9

19.9

19.9

19.9

19.9

GS5 19.8

19.8

19.8

19.8

19.8

19.8

19.8

19.8

19.8

19.8

19.8

Kawerau 11 kV (T6) BASE 17.2

17.2

17.2

17.2

17.2

17.2

17.2

17.2

17.2

17.2

17.2

GS1 17.2

17.2

17.2

17.2

17.2

17.2

17.2

17.2

17.2

17.2

17.2

GS2 17.2

17.2

17.2

17.2

17.2

17.2

17.2

17.2

17.2

17.2

17.2

GS3 17.2

17.2

17.2

17.2

17.2

17.2

17.2

17.2

17.2

17.2

17.2

GS4 17.2

17.2

17.2

17.2

17.2

17.2

17.2

17.2

17.2

17.2

17.2

GS5 17.2

17.2

17.2

17.2

17.2

17.2

17.2

17.2

17.2

17.2

17.2

Kawerau 11 kV (T7) BASE 17.2

17.2

17.2

17.2

17.2

17.2

17.2

17.2

17.2

17.2

17.2

GS1 17.2

17.2

17.2

17.2

17.2

17.2

17.2

17.2

17.2

17.2

17.2

GS2 17.2

17.2

17.2

17.2

17.2

17.2

17.2

17.2

17.2

17.2

17.2

GS3 17.2

17.2

17.2

17.2

17.2

17.2

17.2

17.2

17.2

17.2

17.2

GS4 17.2

17.2

17.2

17.2

17.2

17.2

17.2

17.2

17.2

17.2

17.2

© Transpower New Zealand Limited 2016.All rights reserved. 24

Page 25: 2015 ten year forecast fault level report - Transpower · PDF fileThis publication presents an update to the ten year forecast fault levels ... calculation. Minimum fault level calculations

Ten year forecast fault Levels

GS5 17.2

17.2

17.2

17.2

17.2

17.2

17.2

17.2

17.2

17.2

17.2

Kawerau 11 kV (T8) BASE 17.5

17.5

17.6

17.6

17.6

17.6

17.6

17.6

17.6

17.6

17.6

GS1 17.5

17.6

17.6

17.6

17.6

17.6

17.6

17.6

17.6

17.6

17.6

GS2 17.5

17.6

17.6

17.6

17.6

17.6

17.6

17.6

17.6

17.6

17.6

GS3 17.5

17.5

17.6

17.6

17.6

17.6

17.6

17.6

17.6

17.6

17.6

GS4 17.5

17.6

17.6

17.6

17.6

17.6

17.6

17.6

17.6

17.6

17.6

GS5 17.5

17.6

17.6

17.6

17.6

17.6

17.6

17.6

17.6

17.6

17.6

Kawerau 11 kV (T9) BASE 17.8

17.8

17.8

17.8

17.8

17.8

17.8

17.8

17.8

17.8

17.8

GS1 17.8

17.8

17.8

17.9

17.9

17.8

17.8

17.8

17.9

17.9

17.9

GS2 17.8

17.8

17.8

17.9

17.9

17.9

17.9

17.9

17.9

17.9

17.9

GS3 17.8

17.8

17.8

17.8

17.8

17.8

17.8

17.8

17.8

17.8

17.8

GS4 17.8

17.8

17.9

17.9

17.9

17.9

17.9

17.9

17.9

17.9

17.9

GS5 17.8

17.8

17.8

17.8

17.8

17.8

17.8

17.8

17.9

17.9

17.9

Kawerau 11 kV (T11/T14) BASE 35.0

35.0

35.1

35.1

35.1

35.1

35.1

35.1

35.1

35.1

35.1

GS1 35.0

35.1

35.2

35.2

35.2

35.2

35.2

35.2

35.3

35.3

35.3

GS2 35.0

35.1

35.2

35.2

35.2

35.2

35.2

35.3

35.3

35.3

35.3

GS3 35.0

35.0

35.1

35.1

35.1

35.1

35.2

35.2

35.2

35.2

35.2

GS4 35.0

35.1

35.3

35.3

35.3

35.3

35.3

35.3

35.3

35.3

35.3

GS5 35.0

35.1

35.2

35.2

35.2

35.2

35.2

35.2

35.2

35.2

35.2

Kawerau 110 kV BASE 12.1

12.1

12.2

12.2

12.2

12.2

12.2

12.2

12.2

12.2

12.2

GS1 12.1

12.2

12.3

12.3

12.3

12.3

12.3

12.3

12.4

12.4

12.4

GS2 12.1

12.2

12.3

12.3

12.3

12.3

12.3

12.4

12.4

12.4

12.4

GS3 12.1

12.1

12.2

12.2

12.2

12.2

12.2

12.2

12.2

12.3

12.3

GS4 12.1

12.2

12.4

12.5

12.5

12.5

12.5

12.5

12.5

12.5

12.5

GS5 12.1

12.2

12.3

12.3

12.3

12.3

12.3

12.3

12.3

12.3

12.3

Kawerau 220 kV BASE 7.8

7.8

7.8

7.8

7.8

7.8

7.8

7.8

7.8

7.8

7.8

GS1 7.8

7.9

7.9

8.0

8.0

8.0

8.0

8.0

8.0

8.0

8.0

GS2 7.8

7.9

7.9

8.0

8.0

8.0

8.0

8.0

8.0

8.0

8.0

GS3 7.8

7.8

7.8

7.8

7.9

7.9

7.9

7.9

7.9

7.9

7.9

GS4 7.8

7.9

8.0

8.1

8.1

8.1

8.1

8.1

8.1

8.1

8.1

GS5 7.8

7.9

7.9

8.0

8.0

8.0

8.0

8.0

8.0

8.0

8.0

Matahina 110 kV BASE 10.1

10.1

10.2

10.2

10.2

10.2

10.2

10.2

10.2

10.2

10.2

GS1 10.1

10.2

10.2

10.2

10.2

10.2

10.2

10.2

10.2

10.2

10.2

GS2 10.1

10.2

10.2

10.2

10.2

10.2

10.2

10.2

10.2

10.2

10.3

GS3 10.1

10.1

10.2

10.2

10.2

10.2

10.2

10.2

10.2

10.2

10.2

GS4 10.1

10.2

10.3

10.3

10.3

10.3

10.3

10.3

10.3

10.3

10.3

GS5 10.1

10.2

10.2

10.2

10.2

10.2

10.2

10.2

10.2

10.2

10.2

© Transpower New Zealand Limited 2016.All rights reserved. 25

Page 26: 2015 ten year forecast fault level report - Transpower · PDF fileThis publication presents an update to the ten year forecast fault levels ... calculation. Minimum fault level calculations

Ten year forecast fault Levels

Mt Maunganui 33 kV BASE 10.8

10.8

10.9

10.9

10.9

10.9

10.9

10.9

10.9

10.9

10.9

GS1 10.8

10.9

10.9

10.9

10.9

10.9

10.9

10.9

11.0

11.0

11.0

GS2 10.8

10.9

10.9

11.0

11.0

10.9

10.9

11.0

11.0

11.0

11.0

GS3 10.8

10.8

10.9

10.9

10.9

10.9

10.9

10.9

10.9

10.9

10.9

GS4 10.8

10.9

11.0

11.1

11.0

11.0

11.0

11.0

11.1

11.1

11.1

GS5 10.8

10.9

10.9

10.9

10.9

10.9

10.9

10.9

11.0

11.0

11.0

Mt Maunganui 110 kV BASE 7.0

7.0

7.0

7.0

7.0

7.0

7.0

7.0

7.0

7.0

7.0

GS1 7.0

7.1

7.1

7.1

7.1

7.1

7.1

7.1

7.1

7.1

7.1

GS2 7.0

7.1

7.1

7.1

7.1

7.1

7.1

7.1

7.1

7.1

7.1

GS3 7.0

7.0

7.0

7.0

7.0

7.0

7.0

7.0

7.0

7.0

7.0

GS4 7.0

7.1

7.2

7.3

7.3

7.3

7.3

7.3

7.3

7.3

7.3

GS5 7.0

7.1

7.1

7.1

7.1

7.1

7.1

7.1

7.1

7.1

7.1

Okere 110 kV BASE 7.2

7.2

7.4

7.4

7.4

7.4

7.4

7.4

7.4

7.4

7.4

GS1 7.2

7.5

7.6

7.7

7.7

7.6

7.6

7.7

7.7

7.7

7.7

GS2 7.2

7.5

7.6

7.7

7.7

7.7

7.7

7.7

7.7

7.7

7.7

GS3 7.2

7.2

7.4

7.4

7.4

7.4

7.4

7.4

7.4

7.4

7.4

GS4 7.2

7.5

8.6

8.6

8.6

8.6

8.6

8.6

8.6

8.6

8.6

GS5 7.2

7.5

7.6

7.7

7.7

7.6

7.6

7.6

7.7

7.7

7.7

Owhata 11 kV BASE 9.9

9.9

9.9

9.9

9.9

9.9

9.9

9.9

9.9

9.9

9.9

GS1 9.9

9.9

9.9

10.0

10.0

10.0

10.0

10.0

10.0

10.0

10.0

GS2 9.9

9.9

9.9

10.0

10.0

10.0

10.0

10.0

10.0

10.0

10.0

GS3 9.9

9.9

9.9

9.9

9.9

9.9

9.9

9.9

9.9

9.9

9.9

GS4 9.9

9.9

10.1

10.1

10.1

10.1

10.1

10.1

10.1

10.1

10.1

GS5 9.9

9.9

9.9

10.0

10.0

10.0

10.0

10.0

10.0

10.0

10.0

Owhata 110 kV BASE 5.7

5.7

5.8

5.8

5.8

5.8

5.8

5.8

5.8

5.8

5.8

GS1 5.7

5.8

5.9

5.9

5.9

5.9

5.9

5.9

5.9

5.9

5.9

GS2 5.7

5.8

5.9

5.9

5.9

5.9

5.9

5.9

5.9

5.9

5.9

GS3 5.7

5.7

5.8

5.8

5.8

5.8

5.8

5.8

5.8

5.8

5.8

GS4 5.7

5.8

6.3

6.3

6.3

6.3

6.3

6.3

6.3

6.3

6.3

GS5 5.7

5.8

5.9

5.9

5.9

5.9

5.9

5.9

5.9

5.9

5.9

Rotorua 11 kV BASE 17.2

15.0

15.1

15.1

15.1

15.1

15.1

15.1

15.1

15.1

15.1

GS1 17.2

15.1

15.3

15.3

15.3

15.3

15.3

15.3

15.3

15.3

15.3

GS2 17.2

15.1

15.3

15.3

15.3

15.3

15.3

15.3

15.3

15.3

15.3

GS3 17.2

15.0

15.1

15.1

15.1

15.1

15.1

15.1

15.1

15.1

15.1

GS4 17.2

15.1

15.3

15.3

15.3

15.3

15.3

15.3

15.3

15.3

15.3

GS5 17.2

15.1

15.3

15.3

15.3

15.3

15.3

15.3

15.3

15.3

15.3

© Transpower New Zealand Limited 2016.All rights reserved. 26

Page 27: 2015 ten year forecast fault level report - Transpower · PDF fileThis publication presents an update to the ten year forecast fault levels ... calculation. Minimum fault level calculations

Ten year forecast fault Levels

Rotorua 33 kV BASE 8.7

8.7

8.8

8.8

8.8

8.8

8.8

8.8

8.8

8.8

8.8

GS1 8.7

8.9

9.0

9.0

9.0

9.0

9.0

9.0

9.0

9.0

9.0

GS2 8.7

8.9

9.0

9.0

9.0

9.0

9.0

9.0

9.0

9.0

9.0

GS3 8.7

8.7

8.8

8.8

8.8

8.8

8.8

8.8

8.8

8.8

8.8

GS4 8.7

8.9

9.1

9.1

9.1

9.1

9.1

9.1

9.1

9.1

9.1

GS5 8.7

8.9

9.0

9.0

9.0

9.0

9.0

9.0

9.0

9.0

9.0

Rotorua 110 kV (Tarukenga 1) BASE

6.2 6.2

6.5

6.5

6.5

6.5

6.5

6.5

6.5

6.5

6.5

GS1 6.2

6.6

6.8

6.8

6.8

6.8

6.8

6.8

6.8

6.8

6.8

GS2 6.2

6.6

6.8

6.8

6.8

6.8

6.8

6.8

6.8

6.8

6.8

GS3 6.2

6.2

6.5

6.5

6.5

6.5

6.5

6.5

6.5

6.5

6.5

GS4 6.2

6.6

6.9

7.0

6.9

6.9

6.9

6.9

7.0

7.0

7.0

GS5 6.2

6.6

6.8

6.8

6.8

6.8

6.8

6.8

6.8

6.8

6.8

Rotorua 110 kV (Tarukenga 2) BASE

6.5 6.5

6.8

6.8

6.8

6.8

6.8

6.8

6.8

6.8

6.8

GS1 6.5

6.9

7.1

7.1

7.1

7.1

7.1

7.1

7.1

7.1

7.1

GS2 6.5

6.9

7.1

7.1

7.1

7.1

7.1

7.1

7.1

7.1

7.2

GS3 6.5

6.5

6.8

6.8

6.8

6.8

6.8

6.8

6.8

6.8

6.8

GS4 6.5

6.9

7.3

7.3

7.3

7.3

7.3

7.3

7.3

7.3

7.3

GS5 6.5

6.9

7.1

7.1

7.1

7.1

7.1

7.1

7.1

7.1

7.1

Tarukenga 11 kV BASE 10.5

10.5

10.5

10.5

10.5

10.5

10.5

10.5

10.5

10.5

10.5

GS1 10.5

10.5

10.6

10.6

10.6

10.6

10.6

10.6

10.6

10.6

10.6

GS2 10.5

10.5

10.6

10.6

10.6

10.6

10.6

10.6

10.6

10.6

10.6

GS3 10.5

10.5

10.5

10.5

10.5

10.5

10.5

10.5

10.5

10.5

10.5

GS4 10.5

10.5

10.6

10.6

10.6

10.6

10.6

10.6

10.6

10.6

10.6

GS5 10.5

10.5

10.6

10.6

10.6

10.6

10.6

10.6

10.6

10.6

10.6

Tarukenga 110 kV BASE 10.5

10.5

11.3

11.3

11.3

11.3

11.3

11.3

11.3

11.3

11.3

GS1 10.5

11.5

12.3

12.3

12.3

12.3

12.3

12.3

12.3

12.3

12.3

GS2 10.5

11.5

12.3

12.3

12.3

12.3

12.3

12.3

12.3

12.3

12.3

GS3 10.5

10.5

11.3

11.3

11.3

11.3

11.3

11.3

11.3

11.3

11.3

GS4 10.5

11.5

12.8

12.8

12.8

12.8

12.8

12.8

12.8

12.8

12.8

GS5 10.5

11.5

12.3

12.3

12.3

12.3

12.3

12.3

12.3

12.3

12.3

Tarukenga 220 kV BASE 10.9

10.9

11.1

11.1

11.1

11.1

11.1

11.1

11.1

11.1

11.1

GS1 10.9

11.3

11.4

11.5

11.5

11.5

11.5

11.5

11.6

11.6

11.6

GS2 10.9

11.3

11.4

11.5

11.5

11.5

11.5

11.6

11.6

11.6

11.6

GS3 10.9

10.9

11.1

11.1

11.2

11.2

11.3

11.3

11.3

11.3

11.3

GS4 10.9

11.3

11.7

11.8

11.8

11.8

11.8

11.8

11.8

11.8

11.8

GS5 10.9

11.3

11.4

11.5

11.5

11.5

11.5

11.5

11.6

11.6

11.6

© Transpower New Zealand Limited 2016.All rights reserved. 27

Page 28: 2015 ten year forecast fault level report - Transpower · PDF fileThis publication presents an update to the ten year forecast fault levels ... calculation. Minimum fault level calculations

Ten year forecast fault Levels

Tauranga 11 kV BASE 14.2

14.2

14.2

14.2

14.2

14.2

14.2

14.2

14.2

14.2

14.2

GS1 14.2

14.2

14.3

14.3

14.3

14.3

14.3

14.3

14.3

14.3

14.3

GS2 14.2

14.2

14.3

14.3

14.3

14.3

14.3

14.3

14.3

14.3

14.3

GS3 14.2

14.2

14.2

14.2

14.2

14.2

14.2

14.2

14.2

14.2

14.2

GS4 14.2

14.2

14.3

14.3

14.3

14.3

14.3

14.3

14.3

14.3

14.3

GS5 14.2

14.2

14.3

14.3

14.3

14.3

14.3

14.3

14.3

14.3

14.3

Tauranga 33 kV BASE 13.0

13.0

13.0

13.0

13.0

13.0

13.0

13.0

13.0

13.0

13.0

GS1 13.0

13.1

13.1

13.1

13.1

13.1

13.1

13.1

13.1

13.1

13.1

GS2 13.0

13.1

13.1

13.1

13.1

13.1

13.1

13.1

13.1

13.1

13.1

GS3 13.0

13.0

13.0

13.0

13.0

13.0

13.1

13.1

13.1

13.1

13.1

GS4 13.0

13.1

13.2

13.2

13.2

13.2

13.2

13.2

13.2

13.2

13.2

GS5 13.0

13.1

13.1

13.1

13.1

13.1

13.1

13.1

13.1

13.1

13.1

Tauranga 110 kV BASE 8.0

8.0

8.1

8.1

8.1

8.1

8.1

8.1

8.1

8.1

8.1

GS1 8.0

8.1

8.2

8.2

8.2

8.2

8.2

8.2

8.2

8.2

8.2

GS2 8.0

8.1

8.2

8.2

8.2

8.2

8.2

8.2

8.2

8.2

8.3

GS3 8.0

8.0

8.1

8.1

8.1

8.1

8.1

8.1

8.1

8.1

8.1

GS4 8.0

8.1

8.4

8.4

8.4

8.4

8.4

8.4

8.4

8.4

8.4

GS5 8.0

8.1

8.2

8.2

8.2

8.2

8.2

8.2

8.2

8.2

8.2

Te Kaha 11 kV BASE 1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

GS1 1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

GS2 1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

GS3 1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

GS4 1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

GS5 1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

Te Kaha 50 kV BASE 0.3

0.3

0.3

0.3

0.3

0.3

0.3

0.3

0.3

0.3

0.3

GS1 0.3

0.3

0.3

0.3

0.3

0.3

0.3

0.3

0.3

0.3

0.3

GS2 0.3

0.3

0.3

0.3

0.3

0.3

0.3

0.3

0.3

0.3

0.3

GS3 0.3

0.3

0.3

0.3

0.3

0.3

0.3

0.3

0.3

0.3

0.3

GS4 0.3

0.3

0.3

0.3

0.3

0.3

0.3

0.3

0.3

0.3

0.3

GS5 0.3

0.3

0.3

0.3

0.3

0.3

0.3

0.3

0.3

0.3

0.3

Te Matai 33 kV BASE 7.5

7.5

7.5

7.5

7.5

7.5

7.5

7.5

7.5

7.5

7.5

GS1 7.5

7.5

7.6

7.6

7.6

7.6

7.6

7.6

7.6

7.6

7.6

GS2 7.5

7.5

7.6

7.6

7.6

7.6

7.6

7.6

7.6

7.6

7.6

GS3 7.5

7.5

7.5

7.5

7.5

7.5

7.5

7.5

7.5

7.5

7.5

GS4 7.5

7.5

7.7

7.7

7.7

7.7

7.7

7.7

7.7

7.7

7.7

GS5 7.5

7.5

7.6

7.6

7.6

7.6

7.6

7.6

7.6

7.6

7.6

© Transpower New Zealand Limited 2016.All rights reserved. 28

Page 29: 2015 ten year forecast fault level report - Transpower · PDF fileThis publication presents an update to the ten year forecast fault levels ... calculation. Minimum fault level calculations

Ten year forecast fault Levels

Te Matai 110 kV BASE 6.3

6.3

6.3

6.3

6.3

6.3

6.3

6.3

6.3

6.3

6.3

GS1 6.3

6.4

6.4

6.4

6.4

6.4

6.4

6.4

6.5

6.5

6.5

GS2 6.3

6.4

6.4

6.4

6.4

6.4

6.4

6.5

6.5

6.5

6.5

GS3 6.3

6.3

6.3

6.3

6.3

6.3

6.3

6.3

6.3

6.3

6.3

GS4 6.3

6.4

6.7

6.7

6.7

6.7

6.7

6.7

6.7

6.7

6.7

GS5 6.3

6.4

6.4

6.4

6.4

6.4

6.4

6.4

6.4

6.5

6.5

Waiotahi 11 kV BASE 8.5

8.5

8.6

8.6

8.6

8.6

8.6

8.6

8.6

8.6

8.6

GS1 8.5

8.6

8.6

8.6

8.6

8.6

8.6

8.6

8.6

8.6

8.6

GS2 8.5

8.6

8.6

8.6

8.6

8.6

8.6

8.6

8.6

8.6

8.6

GS3 8.5

8.5

8.6

8.6

8.6

8.6

8.6

8.6

8.6

8.6

8.6

GS4 8.5

8.6

8.6

8.6

8.6

8.6

8.6

8.6

8.6

8.6

8.6

GS5 8.5

8.6

8.6

8.6

8.6

8.6

8.6

8.6

8.6

8.6

8.6

Waiotahi 50 kV BASE 0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.4

GS1 0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.4

GS2 0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.4

GS3 0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.4

GS4 0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.4

GS5 0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.4

Waiotahi 110 kV BASE 2.7

2.7

2.7

2.7

2.7

2.7

2.7

2.7

2.7

2.7

2.7

GS1 2.7

2.7

2.7

2.7

2.7

2.7

2.7

2.7

2.7

2.7

2.7

GS2 2.7

2.7

2.7

2.7

2.7

2.7

2.7

2.7

2.7

2.7

2.7

GS3 2.7

2.7

2.7

2.7

2.7

2.7

2.7

2.7

2.7

2.7

2.7

GS4 2.7

2.7

2.8

2.8

2.8

2.8

2.8

2.8

2.8

2.8

2.8

GS5 2.7

2.7

2.7

2.7

2.7

2.7

2.7

2.7

2.7

2.7

2.7

CENTRAL NORTH ISLAND

Aratiatia 220 kV BASE 21.0

21.0

21.0

21.0

21.0

21.0

21.0

21.0

21.0

21.0

21.0

GS1 21.0

21.1

21.1

22.5

22.5

22.4

22.4

22.4

23.4

23.4

23.4

GS2 21.0

21.1

21.1

22.5

22.5

22.6

22.6

23.4

23.4

23.4

23.9

GS3 21.0

21.0

21.0

21.0

21.1

21.1

22.5

22.6

22.6

22.6

22.6

GS4 21.0

21.1

20.9

22.5

22.4

22.4

22.4

22.4

23.1

23.1

23.1

GS5 21.0

21.1

21.0

22.4

22.4

22.3

22.3

22.3

23.1

23.3

23.3

Bunnythorpe 33 kV BASE 15.8

15.8

15.8

15.9

15.9

15.9

15.9

15.9

15.9

15.9

15.9

GS1 15.8

15.8

15.8

15.9

15.9

15.9

15.9

15.9

15.9

15.9

15.9

GS2 15.8

15.8

15.8

15.9

15.9

15.9

15.9

15.9

15.9

15.9

15.9

GS3 15.8

15.8

15.8

15.9

15.9

15.9

15.9

15.9

15.9

15.9

15.9

© Transpower New Zealand Limited 2016.All rights reserved. 29

Page 30: 2015 ten year forecast fault level report - Transpower · PDF fileThis publication presents an update to the ten year forecast fault levels ... calculation. Minimum fault level calculations

Ten year forecast fault Levels

GS4 15.8

15.8

15.8

15.9

15.9

15.9

15.9

15.7

15.7

15.7

15.7

GS5 15.8

15.8

15.8

15.9

15.9

15.9

15.9

15.9

15.9

15.9

15.9

Bunnythorpe 110 kV BASE 12.8

12.8

12.9

12.9

12.9

12.9

12.9

12.9

12.9

12.9

12.9

GS1 12.8

12.8

12.9

12.9

12.9

12.9

12.9

12.9

12.9

13.1

13.1

GS2 12.8

12.8

12.9

12.9

12.9

12.9

12.9

12.9

12.9

13.1

13.1

GS3 12.8

12.8

12.9

12.9

12.9

12.9

12.9

12.9

12.9

13.1

13.1

GS4 12.8

12.8

12.8

12.9

12.9

12.9

12.9

12.6

12.6

12.6

12.6

GS5 12.8

12.8

12.9

12.9

12.9

12.9

12.9

12.9

12.9

12.9

12.9

Bunnythorpe 220 kV BASE 12.5

12.5

12.5

12.6

12.6

12.6

12.6

12.6

12.6

12.6

12.6

GS1 12.5

12.5

12.5

12.6

12.6

12.6

12.6

12.6

12.6

12.9

12.9

GS2 12.5

12.5

12.5

12.6

12.6

12.6

12.6

12.6

12.6

12.9

13.0

GS3 12.5

12.5

12.5

12.6

12.6

12.6

12.7

12.7

12.7

13.0

13.0

GS4 12.5

12.5

12.5

12.6

12.6

12.6

12.6

12.0

12.0

12.0

12.0

GS5 12.5

12.5

12.5

12.6

12.6

12.6

12.6

12.6

12.6

12.6

12.6

Dannevirke 11 kV BASE 16.3

16.3

16.3

16.3

16.3

16.3

16.3

16.3

16.3

16.3

16.3

GS1 16.3

16.3

16.3

16.3

16.3

16.3

16.3

16.3

16.3

16.3

16.3

GS2 16.3

16.3

16.3

16.3

16.3

16.3

16.3

16.3

16.3

16.3

16.3

GS3 16.3

16.3

16.3

16.3

16.3

16.3

16.3

16.3

16.3

16.3

16.3

GS4 16.3

16.3

16.3

16.3

16.3

16.3

16.3

16.3

16.3

16.3

16.3

GS5 16.3

16.3

16.3

16.3

16.3

16.3

16.3

16.3

16.3

16.3

16.3

Dannevirke 110 kV (T1) BASE 3.9

3.9

3.9

3.9

3.9

3.9

3.9

3.9

3.9

3.9

3.9

GS1 3.9

3.9

3.9

3.9

3.9

3.9

3.9

3.9

3.9

3.9

3.9

GS2 3.9

3.9

3.9

3.9

3.9

3.9

3.9

3.9

3.9

3.9

3.9

GS3 3.9

3.9

3.9

3.9

3.9

3.9

3.9

3.9

3.9

3.9

3.9

GS4 3.9

3.9

3.9

3.9

3.9

3.9

3.9

3.9

3.9

3.9

3.9

GS5 3.9

3.9

3.9

3.9

3.9

3.9

3.9

3.9

3.9

3.9

3.9

Dannevirke 110 kV (T2) BASE 3.9

3.9

3.9

3.9

3.9

3.9

3.9

3.9

3.9

3.9

3.9

GS1 3.9

3.9

3.9

3.9

3.9

3.9

3.9

3.9

3.9

4.0

4.0

GS2 3.9

3.9

3.9

3.9

3.9

3.9

3.9

3.9

3.9

4.0

4.0

GS3 3.9

3.9

3.9

3.9

3.9

3.9

3.9

3.9

3.9

4.0

4.0

GS4 3.9

3.9

3.9

3.9

3.9

3.9

3.9

3.9

3.9

3.9

3.9

GS5 3.9

3.9

3.9

3.9

3.9

3.9

3.9

3.9

3.9

3.9

3.9

Linton 33 kV BASE 12.8

15.8

15.8

15.8

15.8

15.8

15.8

15.8

15.8

15.8

15.8

GS1 12.8

15.8

15.8

15.8

15.8

15.8

15.8

15.8

15.8

15.9

15.9

GS2 12.8

15.8

15.8

15.8

15.8

15.8

15.8

15.8

15.8

15.9

15.9

GS3 12.8

15.8

15.8

15.8

15.8

15.8

15.8

15.8

15.8

15.9

15.9

GS4 12.8

15.8

15.8

15.8

15.8

15.8

15.8

15.7

15.7

15.7

15.7

© Transpower New Zealand Limited 2016.All rights reserved. 30

Page 31: 2015 ten year forecast fault level report - Transpower · PDF fileThis publication presents an update to the ten year forecast fault levels ... calculation. Minimum fault level calculations

Ten year forecast fault Levels

GS5 12.8

15.8

15.8

15.8

15.8

15.8

15.8

15.8

15.8

15.8

15.8

Linton 220 kV (T2) BASE 8.9

8.9

8.9

9.0

9.0

9.0

9.0

9.0

9.0

9.0

9.0

GS1 8.9

8.9

9.0

9.0

9.0

9.0

9.0

9.0

9.0

9.1

9.1

GS2 8.9

8.9

9.0

9.0

9.0

9.0

9.0

9.0

9.0

9.1

9.2

GS3 8.9

8.9

8.9

9.0

9.0

9.0

9.0

9.0

9.0

9.2

9.2

GS4 8.9

8.9

8.9

9.0

9.0

9.0

9.0

8.7

8.7

8.7

8.7

GS5 8.9

8.9

8.9

9.0

9.0

9.0

9.0

9.0

9.0

9.0

9.0

Linton 220 kV (T3) BASE 9.2

9.2

9.2

9.2

9.2

9.2

9.2

9.2

9.2

9.2

9.2

GS1 9.2

9.2

9.2

9.2

9.2

9.2

9.2

9.2

9.2

9.4

9.4

GS2 9.2

9.2

9.2

9.2

9.2

9.2

9.2

9.2

9.2

9.4

9.4

GS3 9.2

9.2

9.2

9.2

9.2

9.2

9.2

9.2

9.2

9.4

9.4

GS4 9.2

9.2

9.2

9.2

9.2

9.2

9.2

8.9

8.9

8.9

8.9

GS5 9.2

9.2

9.2

9.2

9.2

9.2

9.2

9.2

9.2

9.2

9.2

Mangahao 33 kV BASE 9.3

9.3

9.3

9.3

9.3

9.3

9.3

9.3

9.3

9.3

9.3

GS1 9.3

9.3

9.3

9.3

9.3

9.3

9.3

9.3

9.3

9.3

9.3

GS2 9.3

9.3

9.3

9.3

9.3

9.3

9.3

9.3

9.3

9.3

9.3

GS3 9.3

9.3

9.3

9.3

9.3

9.3

9.3

9.3

9.3

9.3

9.3

GS4 9.3

9.3

9.3

9.3

9.3

9.3

9.3

9.3

9.3

9.3

9.3

GS5 9.3

9.3

9.3

9.3

9.3

9.3

9.3

9.3

9.3

9.3

9.3

Mangahao 110 kV (T3) BASE 3.5

3.5

3.5

3.5

3.5

3.5

3.5

3.5

3.5

3.5

3.5

GS1 3.5

3.5

3.5

3.5

3.5

3.5

3.5

3.5

3.5

3.5

3.5

GS2 3.5

3.5

3.5

3.5

3.5

3.5

3.5

3.5

3.5

3.5

3.5

GS3 3.5

3.5

3.5

3.5

3.5

3.5

3.5

3.5

3.5

3.5

3.5

GS4 3.5

3.5

3.5

3.5

3.5

3.5

3.5

3.4

3.4

3.4

3.4

GS5 3.5

3.5

3.5

3.5

3.5

3.5

3.5

3.5

3.5

3.5

3.5

Mangahao 110 kV (T4) BASE 3.4

3.4

3.4

3.5

3.5

3.5

3.5

3.5

3.5

3.5

3.5

GS1 3.4

3.4

3.4

3.5

3.5

3.5

3.5

3.5

3.5

3.5

3.5

GS2 3.4

3.4

3.4

3.5

3.5

3.5

3.5

3.5

3.5

3.5

3.5

GS3 3.4

3.4

3.4

3.5

3.5

3.5

3.5

3.5

3.5

3.5

3.5

GS4 3.4

3.4

3.4

3.5

3.5

3.5

3.5

3.4

3.4

3.4

3.4

GS5 3.4

3.4

3.4

3.5

3.5

3.5

3.5

3.5

3.5

3.5

3.5

Mangamaire 33 kV BASE 4.6

4.6

4.6

4.6

4.6

4.6

4.6

4.6

4.6

4.6

4.6

GS1 4.6

4.6

4.6

4.6

4.6

4.6

4.6

4.6

4.6

4.6

4.6

GS2 4.6

4.6

4.6

4.6

4.6

4.6

4.6

4.6

4.6

4.6

4.6

GS3 4.6

4.6

4.6

4.6

4.6

4.6

4.6

4.6

4.6

4.6

4.6

GS4 4.6

4.6

4.6

4.6

4.6

4.6

4.6

4.6

4.6

4.6

4.6

GS5 4.6

4.6

4.6

4.6

4.6

4.6

4.6

4.6

4.6

4.6

4.6

© Transpower New Zealand Limited 2016.All rights reserved. 31

Page 32: 2015 ten year forecast fault level report - Transpower · PDF fileThis publication presents an update to the ten year forecast fault levels ... calculation. Minimum fault level calculations

Ten year forecast fault Levels

Mangamaire 110 kV BASE 4.8

4.8

4.8

4.8

4.8

4.8

4.8

4.8

4.8

4.8

4.8

GS1 4.8

4.8

4.8

4.8

4.8

4.8

4.8

4.8

4.8

4.9

4.9

GS2 4.8

4.8

4.8

4.8

4.8

4.8

4.8

4.8

4.8

4.9

4.9

GS3 4.8

4.8

4.8

4.8

4.8

4.8

4.8

4.8

4.8

4.9

4.9

GS4 4.8

4.8

4.8

4.8

4.8

4.8

4.8

4.8

4.8

4.8

4.8

GS5 4.8

4.8

4.8

4.8

4.8

4.8

4.8

4.8

4.8

4.8

4.8

Marton 33 kV BASE 6.6

6.6

6.6

6.6

6.6

6.6

6.6

6.6

6.6

6.6

6.6

GS1 6.6

6.6

6.6

6.6

6.6

6.6

6.6

6.6

6.6

6.6

6.6

GS2 6.6

6.6

6.6

6.6

6.6

6.6

6.6

6.6

6.6

6.6

6.6

GS3 6.6

6.6

6.6

6.6

6.6

6.6

6.6

6.6

6.6

6.6

6.6

GS4 6.6

6.6

6.6

6.6

6.6

6.6

6.6

6.6

6.6

6.6

6.6

GS5 6.6

6.6

6.6

6.6

6.6

6.6

6.6

6.6

6.6

6.6

6.6

Marton 110 kV (T1) BASE 5.3

5.3

5.3

5.3

5.3

5.3

5.3

5.3

5.3

5.3

5.3

GS1 5.3

5.3

5.3

5.3

5.3

5.3

5.3

5.3

5.3

5.3

5.3

GS2 5.3

5.3

5.3

5.3

5.3

5.3

5.3

5.3

5.3

5.3

5.3

GS3 5.3

5.3

5.3

5.3

5.3

5.3

5.3

5.3

5.3

5.3

5.3

GS4 5.3

5.3

5.3

5.3

5.3

5.3

5.3

5.2

5.3

5.3

5.3

GS5 5.3

5.3

5.3

5.3

5.3

5.3

5.3

5.3

5.3

5.3

5.3

Marton 110 kV (T2) BASE 5.3

5.3

5.3

5.3

5.3

5.3

5.3

5.3

5.3

5.3

5.3

GS1 5.3

5.3

5.3

5.3

5.3

5.3

5.3

5.3

5.3

5.3

5.3

GS2 5.3

5.3

5.3

5.3

5.3

5.3

5.3

5.3

5.3

5.3

5.3

GS3 5.3

5.3

5.3

5.3

5.3

5.3

5.3

5.3

5.3

5.3

5.3

GS4 5.3

5.3

5.3

5.3

5.3

5.3

5.3

5.2

5.2

5.2

5.2

GS5 5.3

5.3

5.3

5.3

5.3

5.3

5.3

5.3

5.3

5.3

5.3

Mataroa 33 kV BASE 3.5

3.5

3.6

3.6

3.6

3.6

3.6

3.6

3.6

3.6

3.6

GS1 3.5

3.5

3.6

3.6

3.6

3.6

3.6

3.6

3.6

3.6

3.6

GS2 3.5

3.5

3.6

3.6

3.6

3.6

3.6

3.6

3.6

3.6

3.6

GS3 3.5

3.5

3.6

3.6

3.6

3.6

3.6

3.6

3.6

3.6

3.6

GS4 3.5

3.5

3.6

3.6

3.6

3.6

3.6

3.6

3.6

3.6

3.6

GS5 3.5

3.5

3.6

3.6

3.6

3.6

3.6

3.6

3.6

3.6

3.6

Mataroa 110 kV BASE 2.5

2.5

2.6

2.6

2.6

2.6

2.6

2.6

2.6

2.6

2.6

GS1 2.5

2.5

2.6

2.6

2.6

2.6

2.6

2.6

2.6

2.6

2.6

GS2 2.5

2.5

2.6

2.6

2.6

2.6

2.6

2.6

2.6

2.6

2.6

GS3 2.5

2.5

2.6

2.6

2.6

2.6

2.6

2.6

2.6

2.6

2.6

GS4 2.5

2.5

2.6

2.6

2.6

2.6

2.6

2.5

2.5

2.5

2.5

GS5 2.5

2.5

2.6

2.6

2.6

2.6

2.6

2.6

2.6

2.6

2.6

© Transpower New Zealand Limited 2016.All rights reserved. 32

Page 33: 2015 ten year forecast fault level report - Transpower · PDF fileThis publication presents an update to the ten year forecast fault levels ... calculation. Minimum fault level calculations

Ten year forecast fault Levels

National Park 33 kV BASE 1.6

1.6

1.6

1.6

1.6

1.6

1.6

1.6

1.6

1.6

1.6

GS1 1.6

1.6

1.6

1.6

1.6

1.6

1.6

1.6

1.6

1.6

1.6

GS2 1.6

1.6

1.6

1.6

1.6

1.6

1.6

1.6

1.6

1.6

1.6

GS3 1.6

1.6

1.6

1.6

1.6

1.6

1.6

1.6

1.6

1.6

1.6

GS4 1.6

1.6

1.6

1.6

1.6

1.6

1.6

1.6

1.6

1.6

1.6

GS5 1.6

1.6

1.6

1.6

1.6

1.6

1.6

1.6

1.6

1.6

1.6

National Park 110 kV BASE 1.7

1.7

1.8

1.8

1.8

1.8

1.8

1.8

1.8

1.8

1.8

GS1 1.7

1.7

1.8

1.8

1.8

1.8

1.8

1.8

1.8

1.8

1.8

GS2 1.7

1.7

1.8

1.8

1.8

1.8

1.8

1.8

1.8

1.8

1.8

GS3 1.7

1.7

1.8

1.8

1.8

1.8

1.8

1.8

1.8

1.8

1.8

GS4 1.7

1.7

1.8

1.8

1.8

1.8

1.8

1.8

1.8

1.8

1.8

GS5 1.7

1.7

1.8

1.8

1.8

1.8

1.8

1.8

1.8

1.8

1.8

Nga Awa Purua 220 kV BASE 20.3

20.3

20.3

20.3

20.3

20.3

20.3

20.3

20.3

20.3

20.3

GS1 20.3

20.4

20.4

21.6

21.6

21.5

21.5

21.5

22.3

22.4

22.4

GS2 20.3

20.4

20.4

21.6

21.6

21.7

21.7

22.3

22.3

22.4

23.5

GS3 20.3

20.3

20.3

20.3

20.4

20.4

21.6

21.7

21.7

21.7

21.7

GS4 20.3

20.4

20.3

21.6

21.5

21.5

21.5

21.5

22.1

22.1

22.1

GS5 20.3

20.4

20.3

21.5

21.5

21.5

21.5

21.5

22.1

22.3

22.3

Ngatamariki 220 kV BASE 14.5

14.5

14.5

14.5

14.5

14.5

14.5

14.5

14.5

14.5

14.5

GS1 14.5

14.5

14.5

15.1

15.1

15.0

15.0

15.1

15.4

15.4

15.4

GS2 14.5

14.5

14.5

15.1

15.1

15.1

15.1

15.4

15.4

15.4

15.9

GS3 14.5

14.5

14.5

14.5

14.5

14.5

15.1

15.1

15.1

15.1

15.1

GS4 14.5

14.5

14.5

15.1

15.0

15.0

15.0

15.0

15.3

15.3

15.3

GS5 14.5

14.5

14.5

15.0

15.0

15.0

15.0

15.0

15.3

15.4

15.4

Ohaaki 220 kV BASE 16.2

16.2

16.2

16.2

16.2

16.2

16.2

16.2

16.2

16.2

16.2

GS1 16.2

16.2

16.2

16.9

16.9

16.9

16.9

16.9

17.4

17.4

17.4

GS2 16.2

16.2

16.2

16.9

16.9

17.0

17.0

17.4

17.4

17.4

17.8

GS3 16.2

16.2

16.2

16.2

16.2

16.2

17.0

17.0

17.0

17.0

17.0

GS4 16.2

16.2

16.1

16.9

16.9

16.9

16.9

16.9

17.3

17.3

17.3

GS5 16.2

16.2

16.2

16.9

16.9

16.8

16.8

16.9

17.2

17.3

17.3

Ohakune 11 kV BASE 4.7

4.7

4.7

4.7

4.7

4.7

4.7

4.7

4.7

4.7

4.7

GS1 4.7

4.7

4.7

4.7

4.7

4.7

4.7

4.7

4.7

4.7

4.7

GS2 4.7

4.7

4.7

4.7

4.7

4.7

4.7

4.7

4.7

4.7

4.7

GS3 4.7

4.7

4.7

4.7

4.7

4.7

4.7

4.7

4.7

4.7

4.7

GS4 4.7

4.7

4.7

4.7

4.7

4.7

4.7

4.7

4.7

4.7

4.7

GS5 4.7

4.7

4.7

4.7

4.7

4.7

4.7

4.7

4.7

4.7

4.7

© Transpower New Zealand Limited 2016.All rights reserved. 33

Page 34: 2015 ten year forecast fault level report - Transpower · PDF fileThis publication presents an update to the ten year forecast fault levels ... calculation. Minimum fault level calculations

Ten year forecast fault Levels

Ohakune 110 kV BASE 2.1

2.1

2.2

2.2

2.2

2.2

2.2

2.2

2.2

2.2

2.2

GS1 2.1

2.1

2.2

2.2

2.2

2.2

2.2

2.2

2.2

2.2

2.2

GS2 2.1

2.1

2.2

2.2

2.2

2.2

2.2

2.2

2.2

2.2

2.2

GS3 2.1

2.1

2.2

2.2

2.2

2.2

2.2

2.2

2.2

2.2

2.2

GS4 2.1

2.1

2.2

2.2

2.2

2.2

2.2

2.2

2.2

2.2

2.2

GS5 2.1

2.1

2.2

2.2

2.2

2.2

2.2

2.2

2.2

2.2

2.2

Ongarue 33 kV BASE 2.5

2.5

2.6

2.6

2.6

2.6

2.6

2.6

2.6

2.6

2.6

GS1 2.5

2.5

2.6

2.6

2.6

2.6

2.6

2.6

2.6

2.6

2.6

GS2 2.5

2.5

2.6

2.6

2.6

2.6

2.6

2.6

2.6

2.6

2.6

GS3 2.5

2.5

2.6

2.6

2.6

2.6

2.6

2.6

2.6

2.6

2.6

GS4 2.5

2.5

2.6

2.6

2.6

2.6

2.6

2.6

2.6

2.6

2.6

GS5 2.5

2.5

2.6

2.6

2.6

2.6

2.6

2.6

2.6

2.6

2.6

Ongarue 110 kV BASE 2.3

2.3

2.6

2.6

2.6

2.6

2.6

2.6

2.6

2.6

2.6

GS1 2.3

2.3

2.6

2.6

2.6

2.6

2.6

2.6

2.6

2.6

2.6

GS2 2.3

2.3

2.6

2.6

2.6

2.6

2.6

2.6

2.6

2.6

2.6

GS3 2.3

2.3

2.6

2.6

2.6

2.6

2.6

2.6

2.6

2.6

2.6

GS4 2.3

2.3

2.6

2.6

2.6

2.6

2.6

2.6

2.6

2.6

2.6

GS5 2.3

2.3

2.6

2.6

2.6

2.6

2.6

2.6

2.6

2.6

2.6

Poihipi 220 kV BASE 19.4

19.4

19.4

19.4

19.4

19.4

19.4

19.4

19.4

19.4

19.4

GS1 19.4

19.5

19.5

20.5

20.5

20.4

20.4

20.4

21.1

21.2

21.2

GS2 19.4

19.5

19.5

20.5

20.5

20.6

20.6

21.1

21.1

21.2

21.5

GS3 19.4

19.4

19.4

19.4

19.6

19.6

20.6

20.6

20.6

20.6

20.6

GS4 19.4

19.5

19.4

20.5

20.4

20.4

20.4

20.4

20.9

20.9

20.9

GS5 19.4

19.5

19.4

20.4

20.4

20.4

20.4

20.4

20.9

21.1

21.1

Rangipo 220 kV BASE 7.0

7.0

7.0

7.0

7.0

7.0

7.0

7.0

7.0

7.0

7.0

GS1 7.0

7.0

7.0

7.0

7.0

7.0

7.0

7.0

7.1

7.1

7.1

GS2 7.0

7.0

7.0

7.0

7.0

7.0

7.0

7.1

7.1

7.1

7.1

GS3 7.0

7.0

7.0

7.0

7.0

7.0

7.0

7.0

7.0

7.0

7.0

GS4 7.0

7.0

7.0

7.0

7.0

7.0

7.0

7.0

7.0

7.0

7.0

GS5 7.0

7.0

7.0

7.0

7.0

7.0

7.0

7.0

7.1

7.1

7.1

Tangiwai 11 kV BASE 19.8

19.8

19.8

19.8

19.8

19.8

19.8

19.8

19.8

19.8

19.8

GS1 19.8

19.8

19.8

19.8

19.8

19.8

19.8

19.8

19.8

19.8

19.8

GS2 19.8

19.8

19.8

19.8

19.8

19.8

19.8

19.8

19.8

19.8

19.8

GS3 19.8

19.8

19.8

19.8

19.8

19.8

19.8

19.8

19.8

19.8

19.8

GS4 19.8

19.8

19.8

19.8

19.8

19.8

19.8

19.8

19.8

19.8

19.8

GS5 19.8

19.8

19.8

19.8

19.8

19.8

19.8

19.8

19.8

19.8

19.8

© Transpower New Zealand Limited 2016.All rights reserved. 34

Page 35: 2015 ten year forecast fault level report - Transpower · PDF fileThis publication presents an update to the ten year forecast fault levels ... calculation. Minimum fault level calculations

Ten year forecast fault Levels

Tangiwai 220 kV BASE 5.0

5.0

5.0

5.1

5.1

5.1

5.1

5.1

5.1

5.1

5.1

GS1 5.0

5.0

5.1

5.1

5.1

5.1

5.1

5.1

5.1

5.1

5.1

GS2 5.0

5.0

5.1

5.1

5.1

5.1

5.1

5.1

5.1

5.1

5.1

GS3 5.0

5.0

5.0

5.1

5.1

5.1

5.1

5.1

5.1

5.1

5.1

GS4 5.0

5.0

5.0

5.1

5.1

5.1

5.1

5.0

5.0

5.0

5.0

GS5 5.0

5.0

5.0

5.1

5.1

5.1

5.1

5.1

5.1

5.1

5.1

Tararua Central 220 kV BASE 8.7

8.7

8.7

8.8

8.8

8.8

8.8

8.8

8.8

8.8

8.8

GS1 8.7

8.7

8.7

8.8

8.8

8.8

8.8

8.8

8.8

8.9

8.9

GS2 8.7

8.7

8.7

8.8

8.8

8.8

8.8

8.8

8.8

8.9

8.9

GS3 8.7

8.7

8.7

8.8

8.8

8.8

8.8

8.8

8.8

8.9

8.9

GS4 8.7

8.7

8.7

8.8

8.7

8.8

8.8

8.5

8.5

8.5

8.5

GS5 8.7

8.7

8.7

8.8

8.8

8.7

8.7

8.8

8.8

8.8

8.8

Te Mihi 220 kV BASE 24.6

24.6

24.6

24.6

24.6

24.6

24.6

24.6

24.6

24.6

24.6

GS1 24.6

24.7

24.7

26.3

26.3

26.2

26.2

26.2

27.4

27.4

27.4

GS2 24.6

24.7

24.7

26.4

26.4

26.5

26.5

27.4

27.4

27.4

28.0

GS3 24.6

24.6

24.6

24.6

24.8

24.8

26.5

26.5

26.5

26.5

26.5

GS4 24.6

24.7

24.5

26.3

26.1

26.2

26.2

26.2

27.1

27.1

27.1

GS5 24.6

24.7

24.6

26.2

26.2

26.1

26.1

26.1

27.0

27.3

27.3

Tokaanu 33 kV BASE 3.8

3.8

3.8

3.8

3.8

3.8

3.8

3.8

3.8

3.8

3.8

GS1 3.8

3.8

3.8

3.8

3.8

3.8

3.8

3.8

3.8

3.8

3.8

GS2 3.8

3.8

3.8

3.8

3.8

3.8

3.8

3.8

3.8

3.8

3.8

GS3 3.8

3.8

3.8

3.8

3.8

3.8

3.8

3.8

3.8

3.8

3.8

GS4 3.8

3.8

3.8

3.8

3.8

3.8

3.8

3.8

3.8

3.8

3.8

GS5 3.8

3.8

3.8

3.8

3.8

3.8

3.8

3.8

3.8

3.8

3.8

Tokaanu 220 kV BASE 12.0

12.0

12.0

12.0

12.0

12.0

12.0

12.0

12.0

12.0

12.0

GS1 12.0

12.0

12.0

12.1

12.1

12.1

12.1

12.1

12.1

12.1

12.1

GS2 12.0

12.0

12.0

12.1

12.1

12.1

12.1

12.1

12.1

12.1

12.2

GS3 12.0

12.0

12.0

12.0

12.1

12.1

12.1

12.1

12.1

12.2

12.2

GS4 12.0

12.0

12.0

12.1

12.0

12.0

12.0

12.0

12.0

12.0

12.0

GS5 12.0

12.0

12.0

12.1

12.1

12.0

12.0

12.0

12.1

12.1

12.1

Waipawa 11 kV BASE 4.2

4.2

4.2

4.2

4.2

4.2

4.2

4.2

4.2

4.2

4.2

GS1 4.2

4.2

4.2

4.2

4.2

4.2

4.2

4.2

4.2

4.2

4.2

GS2 4.2

4.2

4.2

4.2

4.2

4.2

4.2

4.2

4.2

4.2

4.2

GS3 4.2

4.2

4.2

4.2

4.2

4.2

4.2

4.2

4.2

4.2

4.2

GS4 4.2

4.2

4.2

4.2

4.2

4.2

4.2

4.2

4.2

4.2

4.2

GS5 4.2

4.2

4.2

4.2

4.2

4.2

4.2

4.2

4.2

4.2

4.2

© Transpower New Zealand Limited 2016.All rights reserved. 35

Page 36: 2015 ten year forecast fault level report - Transpower · PDF fileThis publication presents an update to the ten year forecast fault levels ... calculation. Minimum fault level calculations

Ten year forecast fault Levels

Waipawa 33 kV BASE 4.8

4.8

4.8

4.8

4.8

4.8

4.8

4.8

4.8

4.8

4.8

GS1 4.8

4.8

4.8

4.8

4.8

4.8

4.8

4.8

4.8

4.8

4.8

GS2 4.8

4.8

4.8

4.8

4.8

4.8

4.8

4.8

4.8

4.8

4.8

GS3 4.8

4.8

4.8

4.8

4.8

4.8

4.8

4.8

4.8

4.8

4.8

GS4 4.8

4.8

4.8

4.8

4.8

4.8

4.8

4.8

4.8

4.8

4.8

GS5 4.8

4.8

4.8

4.8

4.8

4.8

4.8

4.8

4.8

4.8

4.8

Waipawa 110 kV (T1) BASE 2.0

2.0

2.0

2.0

2.0

2.0

2.0

2.0

2.0

2.0

2.0

GS1 2.0

2.0

2.0

2.0

2.0

2.0

2.0

2.0

2.0

2.0

2.0

GS2 2.0

2.0

2.0

2.0

2.0

2.0

2.0

2.0

2.0

2.0

2.0

GS3 2.0

2.0

2.0

2.0

2.0

2.0

2.0

2.0

2.0

2.0

2.0

GS4 2.0

2.0

2.0

2.0

2.0

2.0

2.0

2.0

2.0

2.0

2.0

GS5 2.0

2.0

2.0

2.0

2.0

2.0

2.0

2.0

2.0

2.0

2.0

Waipawa 110 kV (T2) BASE 2.0

2.0

2.0

2.0

2.0

2.0

2.0

2.0

2.0

2.0

2.0

GS1 2.0

2.0

2.0

2.0

2.0

2.0

2.0

2.0

2.0

2.0

2.0

GS2 2.0

2.0

2.0

2.0

2.0

2.0

2.0

2.0

2.0

2.0

2.0

GS3 2.0

2.0

2.0

2.0

2.0

2.0

2.0

2.0

2.0

2.0

2.0

GS4 2.0

2.0

2.0

2.0

2.0

2.0

2.0

2.0

2.0

2.0

2.0

GS5 2.0

2.0

2.0

2.0

2.0

2.0

2.0

2.0

2.0

2.0

2.0

Wairakei 33 kV BASE 22.2

22.2

22.2

22.2

22.2

22.2

22.2

22.2

22.2

22.2

22.2

GS1 22.2

22.2

22.2

22.4

22.4

22.3

22.3

22.4

22.5

22.5

22.5

GS2 22.2

22.2

22.2

22.4

22.4

22.4

22.4

22.5

22.5

22.5

22.5

GS3 22.2

22.2

22.2

22.2

22.2

22.2

22.4

22.4

22.4

22.4

22.4

GS4 22.2

22.2

22.2

22.4

22.3

22.3

22.3

22.3

22.4

22.4

22.4

GS5 22.2

22.2

22.2

22.3

22.4

22.3

22.3

22.3

22.4

22.4

22.4

Wairakei 220 kV BASE 27.7

27.7

27.7

27.7

27.7

27.7

27.7

27.7

27.7

27.7

27.7

GS1 27.7

27.8

27.8

30.4

30.4

30.2

30.2

30.3

32.1

32.1

32.1

GS2 27.7

27.8

27.8

30.4

30.4

30.7

30.7

32.1

32.1

32.1

33.1

GS3 27.7

27.7

27.7

27.7

27.9

27.9

30.5

30.6

30.6

30.6

30.6

GS4 27.7

27.8

27.6

30.4

30.2

30.2

30.2

30.2

31.6

31.6

31.6

GS5 27.7

27.8

27.7

30.2

30.3

30.1

30.1

30.1

31.6

32.0

32.0

Woodville 11 kV BASE 10.1

10.1

10.1

10.1

10.1

10.1

10.1

10.1

10.1

10.1

10.1

GS1 10.1

10.1

10.1

10.1

10.1

10.1

10.1

10.1

10.1

10.1

10.1

GS2 10.1

10.1

10.1

10.1

10.1

10.1

10.1

10.1

10.1

10.1

10.1

GS3 10.1

10.1

10.1

10.1

10.1

10.1

10.1

10.1

10.1

10.1

10.1

GS4 10.1

10.1

10.1

10.1

10.1

10.1

10.1

10.1

10.1

10.1

10.1

GS5 10.1

10.1

10.1

10.1

10.1

10.1

10.1

10.1

10.1

10.1

10.1

© Transpower New Zealand Limited 2016.All rights reserved. 36

Page 37: 2015 ten year forecast fault level report - Transpower · PDF fileThis publication presents an update to the ten year forecast fault levels ... calculation. Minimum fault level calculations

Ten year forecast fault Levels

Woodville 110 kV BASE 7.6

7.6

7.6

7.6

7.6

7.6

7.6

7.6

7.6

7.6

7.6

GS1 7.6

7.6

7.6

7.6

7.6

7.6

7.6

7.6

7.6

7.7

7.7

GS2 7.6

7.6

7.6

7.6

7.6

7.6

7.6

7.6

7.6

7.7

7.7

GS3 7.6

7.6

7.6

7.6

7.6

7.6

7.6

7.6

7.6

7.7

7.7

GS4 7.6

7.6

7.6

7.6

7.6

7.6

7.6

7.5

7.6

7.6

7.6

GS5 7.6

7.6

7.6

7.6

7.6

7.6

7.6

7.6

7.6

7.6

7.6

TARANAKI

Brunswick 33 kV BASE 8.9

8.9

8.9

9.0

9.0

9.0

9.0

9.0

9.0

9.0

9.0

GS1 8.9

8.9

8.9

9.0

9.0

9.0

9.0

9.0

9.0

9.0

9.0

GS2 8.9

8.9

8.9

9.0

9.0

9.0

9.0

9.0

9.0

9.0

9.0

GS3 8.9

8.9

8.9

9.0

9.0

9.0

9.0

9.0

9.0

9.0

9.0

GS4 8.9

8.9

8.9

9.0

9.0

9.0

9.0

8.8

8.8

8.8

8.8

GS5 8.9

8.9

8.9

9.0

9.0

9.0

9.0

9.0

9.0

9.0

9.0

Brunswick 220 kV BASE 10.2

10.2

10.3

10.4

10.4

10.4

10.4

10.4

10.4

10.4

10.4

GS1 10.2

10.2

10.3

10.4

10.4

10.4

10.4

10.4

10.4

11.0

11.0

GS2 10.2

10.2

10.3

10.4

10.4

10.4

10.4

10.4

10.4

11.0

11.0

GS3 10.2

10.2

10.3

10.4

10.4

10.4

10.4

10.4

10.4

11.0

11.0

GS4 10.2

10.2

10.2

10.4

10.4

10.4

10.4

9.4

9.4

9.4

9.4

GS5 10.2

10.2

10.2

10.4

10.4

10.4

10.4

10.4

10.4

10.4

10.4

Carrington St 33 kV BASE 13.2

13.2

13.2

13.8

13.8

13.8

13.8

13.8

13.8

13.8

13.8

GS1 13.2

13.2

13.2

13.8

13.8

13.8

13.8

13.8

13.8

14.0

14.0

GS2 13.2

13.2

13.2

13.8

13.8

13.8

13.8

13.8

13.8

14.0

14.0

GS3 13.2

13.2

13.2

13.8

13.8

13.8

13.8

13.8

13.8

14.0

14.0

GS4 13.2

13.2

13.2

13.8

13.8

13.8

13.8

13.4

13.4

13.4

13.4

GS5 13.2

13.2

13.2

13.8

13.8

13.8

13.8

13.8

13.8

13.8

13.8

Carrington St 110 kV BASE 11.4

11.4

11.4

12.9

12.9

12.9

12.9

12.9

12.9

12.9

12.9

GS1 11.4

11.4

11.4

12.9

12.9

12.9

12.9

12.9

12.9

13.5

13.5

GS2 11.4

11.4

11.4

12.9

12.9

12.9

12.9

12.9

12.9

13.5

13.5

GS3 11.4

11.4

11.4

12.9

12.9

12.9

12.9

12.9

12.9

13.5

13.5

GS4 11.4

11.4

11.4

12.9

12.9

12.9

12.9

11.8

11.8

11.8

11.8

GS5 11.4

11.4

11.4

12.9

12.9

12.9

12.9

12.9

12.9

12.9

12.9

Hawera 33 kV (T1/T2) BASE 8.1

8.1

8.1

8.2

8.2

8.2

8.2

8.2

8.2

8.2

8.2

GS1 8.1

8.1

8.1

8.2

8.2

8.2

8.2

8.2

8.2

8.2

8.2

GS2 8.1

8.1

8.1

8.2

8.2

8.2

8.2

8.2

8.2

8.2

8.2

GS3 8.1

8.1

8.1

8.2

8.2

8.2

8.2

8.2

8.2

8.2

8.2

© Transpower New Zealand Limited 2016.All rights reserved. 37

Page 38: 2015 ten year forecast fault level report - Transpower · PDF fileThis publication presents an update to the ten year forecast fault levels ... calculation. Minimum fault level calculations

Ten year forecast fault Levels

GS4 8.1

8.1

8.1

8.2

8.2

8.2

8.2

8.1

8.1

8.1

8.1

GS5 8.1

8.1

8.1

8.2

8.2

8.2

8.2

8.2

8.2

8.2

8.2

Hawera 33 kV (T3) BASE 4.7

4.7

4.7

4.7

4.7

4.7

4.7

4.7

4.7

4.7

4.7

GS1 4.7

4.7

4.7

4.7

4.7

4.7

4.7

4.7

4.7

4.7

4.7

GS2 4.7

4.7

4.7

4.7

4.7

4.7

4.7

4.7

4.7

4.7

4.7

GS3 4.7

4.7

4.7

4.7

4.7

4.7

4.7

4.7

4.7

4.7

4.7

GS4 4.7

4.7

4.7

4.7

4.7

4.7

4.7

4.7

4.7

4.7

4.7

GS5 4.7

4.7

4.7

4.7

4.7

4.7

4.7

4.7

4.7

4.7

4.7

Hawera 110 kV BASE 7.7

7.7

7.7

7.8

7.8

7.8

7.8

7.8

7.8

7.8

7.8

GS1 7.7

7.7

7.7

7.8

7.8

7.8

7.8

7.8

7.8

7.9

7.9

GS2 7.7

7.7

7.7

7.8

7.8

7.8

7.8

7.8

7.8

7.9

7.9

GS3 7.7

7.7

7.7

7.8

7.8

7.8

7.8

7.8

7.8

7.9

7.9

GS4 7.7

7.7

7.7

7.8

7.8

7.8

7.8

7.6

7.6

7.6

7.6

GS5 7.7

7.7

7.7

7.8

7.8

7.8

7.8

7.8

7.8

7.8

7.8

Huirangi 33 kV BASE 11.6

11.6

11.6

12.0

12.0

12.0

12.0

12.0

12.0

12.0

12.0

GS1 11.6

11.6

11.6

12.0

12.0

12.0

12.0

12.0

12.0

12.2

12.2

GS2 11.6

11.6

11.6

12.0

12.0

12.0

12.0

12.0

12.0

12.2

12.2

GS3 11.6

11.6

11.6

12.0

12.0

12.0

12.0

12.0

12.0

12.2

12.2

GS4 11.6

11.6

11.6

12.0

12.0

12.0

12.0

11.7

11.7

11.7

11.7

GS5 11.6

11.6

11.6

12.0

12.0

12.0

12.0

12.0

12.0

12.0

12.0

Huirangi 110 kV BASE 8.9

8.9

9.0

9.7

9.7

9.7

9.7

9.7

9.7

9.7

9.7

GS1 8.9

8.9

9.0

9.7

9.7

9.7

9.7

9.7

9.7

10.0

10.0

GS2 8.9

8.9

9.0

9.7

9.7

9.7

9.7

9.7

9.7

10.0

10.0

GS3 8.9

8.9

9.0

9.7

9.7

9.7

9.7

9.7

9.7

10.0

10.0

GS4 8.9

8.9

8.9

9.7

9.7

9.7

9.7

9.1

9.1

9.1

9.1

GS5 8.9

8.9

8.9

9.7

9.7

9.7

9.7

9.7

9.7

9.7

9.7

Junction Road Tee 110 kV BASE - - -

8.6 8.6

8.6

8.6

8.6

8.6

8.6

8.6

GS1 - - - 8.5

8.5

8.5

8.5

8.5

8.5

8.7

8.7

GS2 - - - 8.5

8.5

8.5

8.5

8.5

8.5

8.7

8.7

GS3 - - - 8.6

8.6

8.6

8.5

8.5

8.5

8.7

8.7

GS4 - - - 8.5

8.5

8.5

8.5

8.2

8.2

8.2

8.2

GS5 - - - 8.5

8.5

8.5

8.5

8.5

8.5

8.5

8.5

Kapuni Tee 110 kV BASE 5.9

5.9

5.9

6.0

6.0

6.0

6.0

6.0

6.0

6.0

6.0

GS1 5.9

5.9

5.9

6.0

6.0

6.0

6.0

6.0

6.0

6.1

6.1

GS2 5.9

5.9

5.9

6.0

6.0

6.0

6.0

6.0

6.0

6.1

6.1

GS3 5.9

5.9

5.9

6.0

6.0

6.0

6.0

6.0

6.0

6.1

6.1

GS4 5.9

5.9

5.9

6.0

6.0

6.0

6.0

5.8

5.8

5.8

5.8

© Transpower New Zealand Limited 2016.All rights reserved. 38

Page 39: 2015 ten year forecast fault level report - Transpower · PDF fileThis publication presents an update to the ten year forecast fault levels ... calculation. Minimum fault level calculations

Ten year forecast fault Levels

GS5 5.9

5.9

5.9

6.0

6.0

6.0

6.0

6.0

6.0

6.0

6.0

McKee Tee 110 kV BASE 8.2

8.2

8.2

8.7

8.7

8.7

8.7

8.7

8.7

8.7

8.7

GS1 8.2

8.2

8.2

8.7

8.7

8.7

8.7

8.7

8.7

8.9

8.9

GS2 8.2

8.2

8.2

8.7

8.7

8.7

8.7

8.7

8.7

8.9

8.9

GS3 8.2

8.2

8.2

8.7

8.7

8.7

8.7

8.7

8.7

8.9

8.9

GS4 8.2

8.2

8.2

8.7

8.7

8.7

8.7

8.3

8.3

8.3

8.3

GS5 8.2

8.2

8.2

8.7

8.7

8.7

8.7

8.7

8.7

8.7

8.7

Motunui 11 kV (T3) BASE 15.9

15.9

15.9

16.1

16.1

16.1

16.1

16.1

16.1

16.1

16.1

GS1 15.9

15.9

15.9

16.1

16.1

16.1

16.1

16.1

16.1

16.1

16.1

GS2 15.9

15.9

15.9

16.1

16.1

16.1

16.1

16.1

16.1

16.1

16.1

GS3 15.9

15.9

15.9

16.1

16.1

16.1

16.1

16.1

16.1

16.1

16.1

GS4 15.9

15.9

15.9

16.1

16.1

16.1

16.1

15.9

15.9

15.9

15.9

GS5 15.9

15.9

15.9

16.1

16.1

16.1

16.1

16.1

16.1

16.1

16.1

Motunui 11 kV (T4) BASE 16.0

16.0

16.0

16.2

16.2

16.2

16.2

16.2

16.2

16.2

16.2

GS1 16.0

16.0

16.0

16.2

16.2

16.2

16.2

16.2

16.2

16.3

16.3

GS2 16.0

16.0

16.0

16.2

16.2

16.2

16.2

16.2

16.2

16.3

16.3

GS3 16.0

16.0

16.0

16.2

16.2

16.2

16.2

16.2

16.2

16.3

16.3

GS4 16.0

16.0

16.0

16.2

16.2

16.2

16.2

16.1

16.1

16.1

16.1

GS5 16.0

16.0

16.0

16.2

16.2

16.2

16.2

16.2

16.2

16.2

16.2

Motunui 110 kV BASE 8.6

8.6

8.6

9.2

9.2

9.2

9.2

9.2

9.2

9.2

9.2

GS1 8.6

8.6

8.6

9.2

9.2

9.2

9.2

9.2

9.2

9.5

9.5

GS2 8.6

8.6

8.6

9.2

9.2

9.2

9.2

9.2

9.2

9.5

9.5

GS3 8.6

8.6

8.6

9.2

9.2

9.2

9.2

9.2

9.2

9.5

9.5

GS4 8.6

8.6

8.6

9.2

9.2

9.2

9.2

8.7

8.7

8.7

8.7

GS5 8.6

8.6

8.6

9.2

9.2

9.2

9.2

9.2

9.2

9.2

9.2

New Plymouth 33 kV BASE 10.4

10.4

10.4

10.6

10.6

10.6

10.6

10.6

10.6

10.6

10.6

GS1 10.4

10.4

10.4

10.6

10.6

10.6

10.6

10.6

10.6

10.8

10.8

GS2 10.4

10.4

10.4

10.6

10.6

10.6

10.6

10.6

10.6

10.8

10.8

GS3 10.4

10.4

10.4

10.6

10.6

10.6

10.6

10.6

10.6

10.8

10.8

GS4 10.4

10.4

10.4

10.6

10.6

10.6

10.6

10.4

10.4

10.4

10.4

GS5 10.4

10.4

10.4

10.6

10.6

10.6

10.6

10.6

10.6

10.6

10.6

New Plymouth 110 kV BASE 12.3

12.3

12.3

13.6

13.6

13.6

13.6

13.6

13.6

13.6

13.6

GS1 12.3

12.3

12.3

13.6

13.6

13.6

13.6

13.6

13.6

14.3

14.3

GS2 12.3

12.3

12.3

13.6

13.6

13.6

13.6

13.6

13.6

14.3

14.3

GS3 12.3

12.3

12.3

13.6

13.6

13.6

13.6

13.6

13.6

14.3

14.3

GS4 12.3

12.3

12.3

13.6

13.6

13.6

13.6

12.2

12.2

12.2

12.2

GS5 12.3

12.3

12.3

13.6

13.6

13.6

13.6

13.6

13.6

13.6

13.6

© Transpower New Zealand Limited 2016.All rights reserved. 39

Page 40: 2015 ten year forecast fault level report - Transpower · PDF fileThis publication presents an update to the ten year forecast fault levels ... calculation. Minimum fault level calculations

Ten year forecast fault Levels

New Plymouth 220 kV BASE 9.0

9.0

9.0

9.6

9.6

9.6

9.6

9.6

9.6

9.6

9.6

GS1 9.0

9.0

9.0

9.6

9.6

9.5

9.5

9.5

9.5

10.5

10.5

GS2 9.0

9.0

9.0

9.6

9.6

9.5

9.5

9.5

9.5

10.5

10.5

GS3 9.0

9.0

9.0

9.6

9.6

9.6

9.6

9.6

9.6

10.5

10.5

GS4 9.0

9.0

9.0

9.6

9.5

9.5

9.5

8.0

8.0

8.0

8.0

GS5 9.0

9.0

9.0

9.6

9.6

9.5

9.5

9.5

9.5

9.5

9.5

Opunake 33 kV BASE 4.4

4.4

4.4

4.4

4.4

4.4

4.4

4.4

4.4

4.4

4.4

GS1 4.4

4.4

4.4

4.4

4.4

4.4

4.4

4.4

4.4

4.4

4.4

GS2 4.4

4.4

4.4

4.4

4.4

4.4

4.4

4.4

4.4

4.4

4.4

GS3 4.4

4.4

4.4

4.4

4.4

4.4

4.4

4.4

4.4

4.4

4.4

GS4 4.4

4.4

4.4

4.4

4.4

4.4

4.4

4.4

4.4

4.4

4.4

GS5 4.4

4.4

4.4

4.4

4.4

4.4

4.4

4.4

4.4

4.4

4.4

Opunake 110 kV (T4) BASE 3.5

3.5

3.5

3.5

3.5

3.5

3.5

3.5

3.5

3.5

3.5

GS1 3.5

3.5

3.5

3.5

3.5

3.5

3.5

3.5

3.5

3.5

3.5

GS2 3.5

3.5

3.5

3.5

3.5

3.5

3.5

3.5

3.5

3.5

3.5

GS3 3.5

3.5

3.5

3.5

3.5

3.5

3.5

3.5

3.5

3.5

3.5

GS4 3.5

3.5

3.5

3.5

3.5

3.5

3.5

3.4

3.4

3.4

3.4

GS5 3.5

3.5

3.5

3.5

3.5

3.5

3.5

3.5

3.5

3.5

3.5

Opunake 110 kV (T5) BASE 3.3

3.3

3.3

3.3

3.3

3.3

3.3

3.3

3.3

3.3

3.3

GS1 3.3

3.3

3.3

3.3

3.3

3.3

3.3

3.3

3.3

3.3

3.3

GS2 3.3

3.3

3.3

3.3

3.3

3.3

3.3

3.3

3.3

3.3

3.3

GS3 3.3

3.3

3.3

3.3

3.3

3.3

3.3

3.3

3.3

3.3

3.3

GS4 3.3

3.3

3.3

3.3

3.3

3.3

3.3

3.2

3.2

3.2

3.2

GS5 3.3

3.3

3.3

3.3

3.3

3.3

3.3

3.3

3.3

3.3

3.3

Stratford 33 kV BASE 11.3

11.3

11.3

11.4

11.4

11.4

11.4

11.4

11.4

11.4

11.4

GS1 11.3

11.3

11.3

11.4

11.4

11.4

11.4

11.4

11.4

11.5

11.5

GS2 11.3

11.3

11.3

11.4

11.4

11.4

11.4

11.4

11.4

11.5

11.5

GS3 11.3

11.3

11.3

11.4

11.4

11.4

11.4

11.4

11.4

11.5

11.5

GS4 11.3

11.3

11.3

11.4

11.4

11.4

11.4

11.2

11.2

11.2

11.2

GS5 11.3

11.3

11.3

11.4

11.4

11.4

11.4

11.4

11.4

11.4

11.4

Stratford 110 kV BASE 12.6

12.6

12.6

13.2

13.2

13.2

13.2

13.2

13.2

13.2

13.2

GS1 12.6

12.6

12.6

13.2

13.2

13.2

13.2

13.2

13.2

13.8

13.8

GS2 12.6

12.6

12.6

13.2

13.2

13.2

13.2

13.2

13.2

13.8

13.8

GS3 12.6

12.6

12.6

13.2

13.2

13.2

13.2

13.2

13.2

13.8

13.8

GS4 12.6

12.6

12.6

13.2

13.2

13.2

13.2

12.1

12.1

12.1

12.1

GS5 12.6

12.6

12.6

13.2

13.2

13.2

13.2

13.2

13.2

13.2

13.2

© Transpower New Zealand Limited 2016.All rights reserved. 40

Page 41: 2015 ten year forecast fault level report - Transpower · PDF fileThis publication presents an update to the ten year forecast fault levels ... calculation. Minimum fault level calculations

Ten year forecast fault Levels

Stratford 220 kV BASE 12.8

12.8

12.8

13.4

13.4

13.4

13.4

13.4

13.4

13.4

13.4

GS1 12.8

12.8

12.8

13.4

13.4

13.4

13.4

13.4

13.4

15.6

15.6

GS2 12.8

12.8

12.8

13.4

13.4

13.4

13.4

13.4

13.4

15.6

15.6

GS3 12.8

12.8

12.8

13.4

13.4

13.4

13.4

13.4

13.4

15.6

15.6

GS4 12.8

12.8

12.8

13.4

13.4

13.4

13.4

10.3

10.3

10.3

10.3

GS5 12.8

12.8

12.8

13.4

13.4

13.4

13.4

13.4

13.4

13.4

13.4

Taumarunui 220 kV BASE 4.2

4.2

4.2

4.2

4.2

4.2

4.2

4.2

4.2

4.2

4.2

GS1 4.2

4.2

4.2

4.2

4.2

4.2

4.2

4.2

4.2

4.3

4.3

GS2 4.2

4.2

4.2

4.2

4.2

4.2

4.2

4.2

4.2

4.3

4.3

GS3 4.2

4.2

4.2

4.2

4.2

4.2

4.2

4.2

4.2

4.3

4.3

GS4 4.2

4.2

4.2

4.2

4.2

4.2

4.2

4.0

4.0

4.0

4.0

GS5 4.2

4.2

4.2

4.2

4.2

4.2

4.2

4.2

4.2

4.2

4.2

Wanganui 33 kV BASE 6.4

6.4

6.4

6.4

6.4

6.4

6.4

6.4

6.4

6.4

6.4

GS1 6.4

6.4

6.4

6.4

6.4

6.4

6.4

6.4

6.4

6.4

6.4

GS2 6.4

6.4

6.4

6.4

6.4

6.4

6.4

6.4

6.4

6.4

6.4

GS3 6.4

6.4

6.4

6.4

6.4

6.4

6.4

6.4

6.4

6.4

6.4

GS4 6.4

6.4

6.4

6.4

6.4

6.4

6.4

6.4

6.4

6.4

6.4

GS5 6.4

6.4

6.4

6.4

6.4

6.4

6.4

6.4

6.4

6.4

6.4

Wanganui 110 kV BASE 5.2

5.2

5.2

5.2

5.2

5.2

5.2

5.2

5.2

5.2

5.2

GS1 5.2

5.2

5.2

5.2

5.2

5.2

5.2

5.2

5.2

5.2

5.2

GS2 5.2

5.2

5.2

5.2

5.2

5.2

5.2

5.2

5.2

5.2

5.2

GS3 5.2

5.2

5.2

5.2

5.2

5.2

5.2

5.2

5.2

5.2

5.2

GS4 5.2

5.2

5.2

5.2

5.2

5.2

5.2

5.1

5.1

5.1

5.1

GS5 5.2

5.2

5.2

5.2

5.2

5.2

5.2

5.2

5.2

5.2

5.2

Waverley 11 kV BASE 5.2

5.2

5.2

5.2

5.2

5.2

5.2

5.2

5.2

5.2

5.2

GS1 5.2

5.2

5.2

5.2

5.2

5.2

5.2

5.2

5.2

5.2

5.2

GS2 5.2

5.2

5.2

5.2

5.2

5.2

5.2

5.2

5.2

5.2

5.2

GS3 5.2

5.2

5.2

5.2

5.2

5.2

5.2

5.2

5.2

5.2

5.2

GS4 5.2

5.2

5.2

5.2

5.2

5.2

5.2

5.1

5.1

5.1

5.1

GS5 5.2

5.2

5.2

5.2

5.2

5.2

5.2

5.2

5.2

5.2

5.2

Waverley 110 kV BASE 4.5

4.5

4.5

4.5

4.5

4.5

4.5

4.5

4.5

4.5

4.5

GS1 4.5

4.5

4.5

4.5

4.5

4.5

4.5

4.5

4.5

4.5

4.5

GS2 4.5

4.5

4.5

4.5

4.5

4.5

4.5

4.5

4.5

4.5

4.5

GS3 4.5

4.5

4.5

4.5

4.5

4.5

4.5

4.5

4.5

4.5

4.5

GS4 4.5

4.5

4.5

4.5

4.5

4.5

4.5

4.4

4.4

4.4

4.4

GS5 4.5

4.5

4.5

4.5

4.5

4.5

4.5

4.5

4.5

4.5

4.5

© Transpower New Zealand Limited 2016.All rights reserved. 41

Page 42: 2015 ten year forecast fault level report - Transpower · PDF fileThis publication presents an update to the ten year forecast fault levels ... calculation. Minimum fault level calculations

Ten year forecast fault Levels

HAWKE’S BAY

Fernhill 33 kV BASE 9.5

9.5

9.5

9.5

9.5

9.5

9.5

9.5

9.5

9.5

9.5

GS1 9.5

9.5

9.5

9.5

9.5

9.5

9.5

9.5

9.6

9.6

9.6

GS2 9.5

9.5

9.5

9.5

9.5

9.6

9.6

9.6

9.6

9.6

9.6

GS3 9.5

9.5

9.5

9.5

9.5

9.5

9.5

9.5

9.5

9.5

9.5

GS4 9.5

9.5

9.5

9.5

9.5

9.5

9.5

9.5

9.5

9.5

9.5

GS5 9.5

9.5

9.5

9.5

9.5

9.5

9.5

9.5

9.5

9.6

9.6

Fernhill 110 kV BASE 7.3

7.3

7.3

7.3

7.3

7.3

7.3

7.3

7.3

7.3

7.3

GS1 7.3

7.3

7.3

7.3

7.3

7.3

7.3

7.3

7.5

7.5

7.5

GS2 7.3

7.3

7.3

7.3

7.3

7.5

7.5

7.5

7.5

7.5

7.5

GS3 7.3

7.3

7.3

7.3

7.3

7.3

7.3

7.3

7.3

7.3

7.3

GS4 7.3

7.3

7.3

7.3

7.3

7.3

7.3

7.3

7.3

7.3

7.3

GS5 7.3

7.3

7.3

7.3

7.3

7.3

7.3

7.3

7.3

7.5

7.5

Redclyffe 33 kV BASE 12.1

12.1

12.1

12.1

12.1

12.1

12.1

12.1

12.1

12.1

12.1

GS1 12.1

12.1

12.1

12.1

12.1

12.1

12.1

12.1

12.3

12.3

12.3

GS2 12.1

12.1

12.1

12.1

12.1

12.3

12.3

12.3

12.3

12.3

12.3

GS3 12.1

12.1

12.1

12.1

12.1

12.1

12.1

12.1

12.1

12.1

12.1

GS4 12.1

12.1

12.1

12.1

12.1

12.1

12.1

12.1

12.1

12.1

12.1

GS5 12.1

12.1

12.1

12.1

12.1

12.1

12.1

12.1

12.1

12.3

12.3

Redclyffe 110 kV BASE 8.4

8.4

8.4

8.4

8.4

8.4

8.4

8.4

8.4

8.4

8.4

GS1 8.4

8.4

8.4

8.4

8.4

8.4

8.4

8.4

8.6

8.6

8.6

GS2 8.4

8.4

8.4

8.4

8.4

8.6

8.6

8.6

8.6

8.6

8.6

GS3 8.4

8.4

8.4

8.4

8.4

8.4

8.4

8.4

8.4

8.4

8.4

GS4 8.4

8.4

8.4

8.4

8.4

8.4

8.4

8.4

8.4

8.4

8.4

GS5 8.4

8.4

8.4

8.4

8.4

8.4

8.4

8.4

8.4

8.6

8.6

Redclyffe 220 kV BASE 7.9

7.9

7.9

7.9

7.9

7.9

7.9

7.9

7.9

7.9

7.9

GS1 7.9

8.0

8.0

8.1

8.1

8.0

8.0

8.0

8.6

8.6

8.6

GS2 7.9

8.0

8.0

8.1

8.1

8.6

8.6

8.6

8.6

8.6

8.7

GS3 7.9

7.9

7.9

7.9

8.0

8.0

8.1

8.1

8.1

8.1

8.1

GS4 7.9

8.0

7.9

8.1

8.0

8.0

8.0

8.0

8.1

8.1

8.1

GS5 7.9

8.0

7.9

8.0

8.0

8.0

8.0

8.0

8.1

8.6

8.6

Tuai 110 kV BASE 6.0

6.0

6.0

6.0

6.0

6.0

6.0

6.0

6.0

6.0

6.0

GS1 6.0

6.0

6.0

6.0

6.0

6.0

6.0

6.0

6.1

6.1

6.1

GS2 6.0

6.0

6.0

6.0

6.0

6.1

6.1

6.1

6.1

6.1

6.1

GS3 6.0

6.0

6.0

6.0

6.0

6.0

6.0

6.0

6.0

6.0

6.0

GS4 6.0

6.0

6.0

6.0

6.0

6.0

6.0

6.0

6.0

6.0

6.0

© Transpower New Zealand Limited 2016.All rights reserved. 42

Page 43: 2015 ten year forecast fault level report - Transpower · PDF fileThis publication presents an update to the ten year forecast fault levels ... calculation. Minimum fault level calculations

Ten year forecast fault Levels

GS5 6.0

6.0

6.0

6.0

6.0

6.0

6.0

6.0

6.0

6.1

6.1

Whakatu 33 kV BASE 13.2

13.2

13.2

13.2

13.2

13.2

13.2

13.2

13.2

13.2

13.2

GS1 13.2

13.2

13.2

13.3

13.3

13.3

13.3

13.3

13.5

13.5

13.5

GS2 13.2

13.2

13.2

13.3

13.3

13.5

13.5

13.5

13.5

13.5

13.5

GS3 13.2

13.2

13.2

13.2

13.2

13.2

13.3

13.3

13.3

13.3

13.3

GS4 13.2

13.2

13.2

13.3

13.3

13.3

13.3

13.3

13.3

13.3

13.3

GS5 13.2

13.2

13.2

13.3

13.3

13.3

13.3

13.3

13.3

13.5

13.5

Whakatu 220 kV (T3) BASE 6.6

6.6

6.6

6.6

6.6

6.6

6.6

6.6

6.6

6.6

6.6

GS1 6.6

6.6

6.6

6.6

6.6

6.6

6.6

6.6

7.0

7.0

7.0

GS2 6.6

6.6

6.6

6.6

6.6

7.0

7.0

7.0

7.0

7.0

7.1

GS3 6.6

6.6

6.6

6.6

6.6

6.6

6.6

6.6

6.6

6.6

6.6

GS4 6.6

6.6

6.6

6.6

6.6

6.6

6.6

6.6

6.7

6.7

6.7

GS5 6.6

6.6

6.6

6.6

6.6

6.6

6.6

6.6

6.7

7.0

7.0

Whakatu 220 kV (T4) BASE 6.6

6.6

6.6

6.6

6.6

6.6

6.6

6.6

6.6

6.6

6.6

GS1 6.6

6.6

6.6

6.6

6.6

6.6

6.6

6.6

7.0

7.0

7.0

GS2 6.6

6.6

6.6

6.6

6.6

7.0

7.0

7.0

7.0

7.0

7.1

GS3 6.6

6.6

6.6

6.6

6.6

6.6

6.6

6.6

6.6

6.6

6.6

GS4 6.6

6.6

6.6

6.6

6.6

6.6

6.6

6.6

6.7

6.7

6.7

GS5 6.6

6.6

6.6

6.6

6.6

6.6

6.6

6.6

6.7

7.0

7.0

Whirinaki 11 kV (T1) BASE 16.8

16.8

16.8

16.8

16.8

16.8

16.8

16.8

16.8

16.8

16.8

GS1 16.8

16.8

16.8

16.8

16.8

16.8

16.8

16.8

16.9

16.9

16.9

GS2 16.8

16.8

16.8

16.8

16.8

16.9

16.9

16.9

16.9

16.9

16.9

GS3 16.8

16.8

16.8

16.8

16.8

16.8

16.8

16.8

16.8

16.8

16.8

GS4 16.8

16.8

16.8

16.8

16.8

16.8

16.8

16.8

16.8

16.8

16.8

GS5 16.8

16.8

16.8

16.8

16.8

16.8

16.8

16.8

16.8

16.9

16.9

Whirinaki 11 kV (T2) BASE 21.1

21.1

21.1

21.1

21.1

21.1

21.1

21.1

21.1

21.1

21.1

GS1 21.1

21.1

21.1

21.2

21.2

21.2

21.2

21.2

21.4

21.4

21.4

GS2 21.1

21.1

21.1

21.2

21.2

21.4

21.4

21.4

21.4

21.4

21.4

GS3 21.1

21.1

21.1

21.1

21.1

21.1

21.2

21.2

21.2

21.2

21.2

GS4 21.1

21.1

21.1

21.2

21.2

21.2

21.2

21.2

21.2

21.2

21.2

GS5 21.1

21.1

21.1

21.2

21.2

21.2

21.2

21.2

21.2

21.4

21.4

Whirinaki 11 kV (T3) BASE 21.6

21.6

21.6

21.6

21.6

21.6

21.6

21.6

21.6

21.6

21.6

GS1 21.6

21.6

21.6

21.7

21.7

21.7

21.7

21.7

21.9

21.9

21.9

GS2 21.6

21.6

21.6

21.7

21.7

21.9

21.9

21.9

21.9

21.9

21.9

GS3 21.6

21.6

21.6

21.6

21.6

21.6

21.7

21.7

21.7

21.7

21.7

GS4 21.6

21.6

21.6

21.7

21.7

21.7

21.7

21.7

21.7

21.7

21.7

GS5 21.6

21.6

21.6

21.7

21.7

21.7

21.7

21.7

21.7

21.9

21.9

© Transpower New Zealand Limited 2016.All rights reserved. 43

Page 44: 2015 ten year forecast fault level report - Transpower · PDF fileThis publication presents an update to the ten year forecast fault levels ... calculation. Minimum fault level calculations

Ten year forecast fault Levels

Whirinaki 220 kV BASE 8.6

8.6

8.6

8.6

8.6

8.6

8.6

8.6

8.6

8.6

8.6

GS1 8.6

8.6

8.6

8.7

8.7

8.7

8.7

8.7

9.6

9.6

9.6

GS2 8.6

8.6

8.6

8.7

8.7

9.6

9.6

9.6

9.6

9.6

9.7

GS3 8.6

8.6

8.6

8.6

8.6

8.6

8.7

8.7

8.7

8.7

8.7

GS4 8.6

8.6

8.6

8.7

8.7

8.7

8.7

8.7

8.8

8.8

8.8

GS5 8.6

8.6

8.6

8.7

8.7

8.7

8.7

8.7

8.8

9.6

9.6

WELLINGTON

Central Park 11 kV (T11) BASE 7.2

7.2

7.2

7.2

7.2

7.2

7.2

7.2

7.2

7.2

7.2

GS1 7.2

7.2

7.2

7.2

7.2

7.2

7.2

7.2

7.2

7.2

7.2

GS2 7.2

7.2

7.2

7.2

7.2

7.2

7.2

7.2

7.2

7.2

7.2

GS3 7.2

7.2

7.2

7.2

7.2

7.2

7.2

7.2

7.2

7.2

7.2

GS4 7.2

7.2

7.2

7.2

7.2

7.2

7.2

7.2

7.2

7.2

7.2

GS5 7.2

7.2

7.2

7.2

7.2

7.2

7.2

7.2

7.2

7.2

7.2

Central Park 11 kV (T12) BASE 7.2

7.2

7.2

7.2

7.2

7.2

7.2

7.2

7.2

7.2

7.2

GS1 7.2

7.2

7.2

7.2

7.2

7.2

7.2

7.2

7.2

7.2

7.2

GS2 7.2

7.2

7.2

7.2

7.2

7.2

7.2

7.2

7.2

7.2

7.2

GS3 7.2

7.2

7.2

7.2

7.2

7.2

7.2

7.2

7.2

7.2

7.2

GS4 7.2

7.2

7.2

7.2

7.2

7.2

7.2

7.2

7.2

7.2

7.2

GS5 7.2

7.2

7.2

7.2

7.2

7.2

7.2

7.2

7.2

7.2

7.2

Central Park 33 kV BASE 18.6

18.6

18.6

18.6

18.6

18.6

18.6

18.6

18.6

18.6

18.6

GS1 18.6

18.6

18.6

18.6

18.6

18.6

18.6

18.6

18.6

18.6

18.6

GS2 18.6

18.6

18.6

18.6

18.6

18.6

18.6

18.6

18.6

18.6

18.6

GS3 18.6

18.6

18.6

18.6

18.6

18.6

18.6

18.6

18.6

18.6

18.6

GS4 18.6

18.6

18.6

18.6

18.6

18.6

18.6

18.5

18.5

18.5

18.5

GS5 18.6

18.6

18.6

18.6

18.6

18.6

18.6

18.6

18.6

18.6

18.6

Central Park 110 kV (T3) BASE 8.0

8.0

8.0

8.0

8.0

8.0

8.0

8.0

8.0

8.0

8.0

GS1 8.0

8.0

8.0

8.0

8.0

8.0

8.0

8.0

8.0

8.0

8.0

GS2 8.0

8.0

8.0

8.0

8.0

8.0

8.0

8.0

8.0

8.0

8.0

GS3 8.0

8.0

8.0

8.0

8.0

8.0

8.0

8.0

8.0

8.0

8.0

GS4 8.0

8.0

8.0

8.0

8.0

8.0

8.0

7.9

7.9

7.9

7.9

GS5 8.0

8.0

8.0

8.0

8.0

8.0

8.0

8.0

8.0

8.0

8.0

Central Park 110 kV (T4) BASE 8.0

8.0

8.0

8.0

8.0

8.0

8.0

8.0

8.0

8.0

8.0

GS1 8.0

8.0

8.0

8.0

8.0

8.0

8.0

8.0

8.0

8.0

8.0

GS2 8.0

8.0

8.0

8.0

8.0

8.0

8.0

8.0

8.0

8.0

8.0

GS3 8.0

8.0

8.0

8.0

8.0

8.0

8.0

8.0

8.0

8.0

8.0

© Transpower New Zealand Limited 2016.All rights reserved. 44

Page 45: 2015 ten year forecast fault level report - Transpower · PDF fileThis publication presents an update to the ten year forecast fault levels ... calculation. Minimum fault level calculations

Ten year forecast fault Levels

GS4 8.0

8.0

8.0

8.0

8.0

8.0

8.0

7.9

7.9

7.9

7.9

GS5 8.0

8.0

8.0

8.0

8.0

8.0

8.0

8.0

8.0

8.0

8.0

Central Park 110 kV (T5) BASE 10.5

10.5

10.5

10.5

10.5

10.5

10.5

10.5

10.5

10.5

10.5

GS1 10.5

10.5

10.5

10.5

10.5

10.5

10.5

10.5

10.5

10.6

10.6

GS2 10.5

10.5

10.5

10.5

10.5

10.5

10.5

10.5

10.5

10.6

10.6

GS3 10.5

10.5

10.5

10.5

10.5

10.5

10.5

10.5

10.5

10.6

10.6

GS4 10.5

10.5

10.5

10.5

10.5

10.5

10.5

10.4

10.4

10.4

10.4

GS5 10.5

10.5

10.5

10.5

10.5

10.5

10.5

10.5

10.5

10.5

10.5

Gracefield 33 kV BASE 13.4

13.4

13.4

13.4

13.4

13.4

13.4

13.4

13.4

13.4

13.4

GS1 13.4

13.4

13.4

13.4

13.4

13.4

13.4

13.4

13.4

13.4

13.4

GS2 13.4

13.4

13.4

13.4

13.4

13.4

13.4

13.4

13.4

13.4

13.4

GS3 13.4

13.4

13.4

13.4

13.4

13.4

13.4

13.4

13.4

13.4

13.4

GS4 13.4

13.4

13.4

13.4

13.4

13.4

13.4

13.3

13.3

13.3

13.3

GS5 13.4

13.4

13.4

13.4

13.4

13.4

13.4

13.4

13.4

13.4

13.4

Gracefield 110 kV (T5) BASE 9.2

9.2

9.3

9.3

9.3

9.3

9.3

9.3

9.3

9.3

9.3

GS1 9.2

9.2

9.3

9.3

9.3

9.3

9.3

9.3

9.3

9.3

9.3

GS2 9.2

9.2

9.3

9.3

9.3

9.3

9.3

9.3

9.3

9.3

9.3

GS3 9.2

9.2

9.3

9.3

9.3

9.3

9.3

9.3

9.3

9.3

9.3

GS4 9.2

9.2

9.2

9.3

9.3

9.3

9.3

9.2

9.2

9.2

9.2

GS5 9.2

9.2

9.2

9.3

9.3

9.3

9.3

9.3

9.3

9.3

9.3

Gracefield 110 kV (T6) BASE 9.3

9.3

9.3

9.3

9.3

9.3

9.3

9.3

9.3

9.3

9.3

GS1 9.3

9.3

9.3

9.3

9.3

9.3

9.3

9.3

9.3

9.3

9.3

GS2 9.3

9.3

9.3

9.3

9.3

9.3

9.3

9.3

9.3

9.3

9.3

GS3 9.3

9.3

9.3

9.3

9.3

9.3

9.3

9.3

9.3

9.3

9.3

GS4 9.3

9.3

9.3

9.3

9.3

9.3

9.3

9.2

9.2

9.2

9.2

GS5 9.3

9.3

9.3

9.3

9.3

9.3

9.3

9.3

9.3

9.3

9.3

Greytown 33 kV BASE 3.8

3.8

3.8

3.8

3.8

3.8

3.8

3.8

3.8

3.8

3.8

GS1 3.8

3.8

3.8

3.8

3.8

3.8

3.8

3.8

3.8

3.8

3.8

GS2 3.8

3.8

3.8

3.8

3.8

3.8

3.8

3.8

3.8

3.8

3.8

GS3 3.8

3.8

3.8

3.8

3.8

3.8

3.8

3.8

3.8

3.8

3.8

GS4 3.8

3.8

3.8

3.8

3.8

3.8

3.8

3.8

3.8

3.8

3.8

GS5 3.8

3.8

3.8

3.8

3.8

3.8

3.8

3.8

3.8

3.8

3.8

Greytown 110 kV (T2) BASE 5.5

5.5

5.5

5.5

5.5

5.5

5.5

5.5

5.5

5.5

5.5

GS1 5.5

5.5

5.5

5.5

5.5

5.5

5.5

5.5

5.5

5.5

5.5

GS2 5.5

5.5

5.5

5.5

5.5

5.5

5.5

5.5

5.5

5.5

5.5

GS3 5.5

5.5

5.5

5.5

5.5

5.5

5.5

5.5

5.5

5.5

5.5

GS4 5.5

5.5

5.5

5.5

5.5

5.5

5.5

5.5

5.5

5.5

5.5

© Transpower New Zealand Limited 2016.All rights reserved. 45

Page 46: 2015 ten year forecast fault level report - Transpower · PDF fileThis publication presents an update to the ten year forecast fault levels ... calculation. Minimum fault level calculations

Ten year forecast fault Levels

GS5 5.5

5.5

5.5

5.5

5.5

5.5

5.5

5.5

5.5

5.5

5.5

Greytown 110 kV (T3) BASE 5.5

5.5

5.5

5.5

5.5

5.5

5.5

5.5

5.5

5.5

5.5

GS1 5.5

5.5

5.5

5.5

5.5

5.5

5.5

5.5

5.5

5.5

5.5

GS2 5.5

5.5

5.5

5.5

5.5

5.5

5.5

5.5

5.5

5.5

5.5

GS3 5.5

5.5

5.5

5.5

5.5

5.5

5.5

5.5

5.5

5.5

5.5

GS4 5.5

5.5

5.5

5.5

5.5

5.5

5.5

5.5

5.5

5.5

5.5

GS5 5.5

5.5

5.5

5.5

5.5

5.5

5.5

5.5

5.5

5.5

5.5

Haywards 11 kV BASE 12.6

12.6

12.6

12.6

12.6

12.6

12.6

12.6

12.6

12.6

12.6

GS1 12.6

12.6

12.6

12.6

12.6

12.6

12.6

12.6

12.6

12.6

12.6

GS2 12.6

12.6

12.6

12.6

12.6

12.6

12.6

12.6

12.6

12.6

12.6

GS3 12.6

12.6

12.6

12.6

12.6

12.6

12.6

12.6

12.6

12.6

12.6

GS4 12.6

12.6

12.6

12.6

12.6

12.6

12.6

12.6

12.6

12.6

12.6

GS5 12.6

12.6

12.6

12.6

12.6

12.6

12.6

12.6

12.6

12.6

12.6

Haywards 33 kV BASE 4.0

4.0

4.0

4.0

4.0

4.0

4.0

4.0

4.0

4.0

4.0

GS1 4.0

4.0

4.0

4.0

4.0

4.0

4.0

4.0

4.0

4.0

4.0

GS2 4.0

4.0

4.0

4.0

4.0

4.0

4.0

4.0

4.0

4.0

4.0

GS3 4.0

4.0

4.0

4.0

4.0

4.0

4.0

4.0

4.0

4.0

4.0

GS4 4.0

4.0

4.0

4.0

4.0

4.0

4.0

4.0

4.0

4.0

4.0

GS5 4.0

4.0

4.0

4.0

4.0

4.0

4.0

4.0

4.0

4.0

4.0

Haywards 110 kV BASE 18.5

18.5

18.5

18.5

18.5

18.5

18.5

18.5

18.5

18.5

18.5

GS1 18.5

18.5

18.5

18.5

18.5

18.5

18.5

18.5

18.5

18.7

18.7

GS2 18.5

18.5

18.5

18.5

18.5

18.5

18.5

18.5

18.5

18.7

18.7

GS3 18.5

18.5

18.5

18.5

18.5

18.5

18.6

18.6

18.6

18.7

18.7

GS4 18.5

18.5

18.5

18.5

18.5

18.5

18.5

18.3

18.3

18.3

18.3

GS5 18.5

18.5

18.5

18.5

18.5

18.5

18.5

18.5

18.5

18.5

18.5

Haywards 220 kV BASE 10.9

10.9

10.9

10.9

10.9

10.9

10.9

10.9

10.9

10.9

10.9

GS1 10.9

10.9

10.9

10.9

10.9

10.9

10.9

10.9

10.9

11.1

11.1

GS2 10.9

10.9

10.9

10.9

10.9

10.9

10.9

10.9

10.9

11.1

11.1

GS3 10.9

10.9

10.9

10.9

10.9

10.9

11.0

11.0

11.0

11.1

11.1

GS4 10.9

10.9

10.9

10.9

10.9

10.9

10.9

10.7

10.7

10.7

10.7

GS5 10.9

10.9

10.9

10.9

10.9

10.9

10.9

10.9

10.9

10.9

10.9

Kaiwharawhara 11 kV (T1) BASE 8.0

8.0

8.0

8.0

8.0

8.0

8.0

8.0

8.0

8.0

8.0

GS1 8.0

8.0

8.0

8.0

8.0

8.0

8.0

8.0

8.0

8.0

8.0

GS2 8.0

8.0

8.0

8.0

8.0

8.0

8.0

8.0

8.0

8.0

8.0

GS3 8.0

8.0

8.0

8.0

8.0

8.0

8.0

8.0

8.0

8.0

8.0

GS4 8.0

8.0

8.0

8.0

8.0

8.0

8.0

8.0

8.0

8.0

8.0

GS5 8.0

8.0

8.0

8.0

8.0

8.0

8.0

8.0

8.0

8.0

8.0

© Transpower New Zealand Limited 2016.All rights reserved. 46

Page 47: 2015 ten year forecast fault level report - Transpower · PDF fileThis publication presents an update to the ten year forecast fault levels ... calculation. Minimum fault level calculations

Ten year forecast fault Levels

Kaiwharawhara 11 kV (T3) BASE 8.0

8.0

8.0

8.0

8.0

8.0

8.0

8.0

8.0

8.0

8.0

GS1 8.0

8.0

8.0

8.0

8.0

8.0

8.0

8.0

8.0

8.0

8.0

GS2 8.0

8.0

8.0

8.0

8.0

8.0

8.0

8.0

8.0

8.0

8.0

GS3 8.0

8.0

8.0

8.0

8.0

8.0

8.0

8.0

8.0

8.0

8.0

GS4 8.0

8.0

8.0

8.0

8.0

8.0

8.0

8.0

8.0

8.0

8.0

GS5 8.0

8.0

8.0

8.0

8.0

8.0

8.0

8.0

8.0

8.0

8.0

Kaiwharawhara 110 kV (T1) BASE 10.5

10.5

10.5

10.5

10.5

10.5

10.5

10.5

10.5

10.5

10.5

GS1 10.5

10.5

10.5

10.5

10.5

10.5

10.5

10.5

10.5

10.5

10.5

GS2 10.5

10.5

10.5

10.5

10.5

10.5

10.5

10.5

10.5

10.5

10.5

GS3 10.5

10.5

10.5

10.5

10.5

10.5

10.5

10.5

10.5

10.5

10.5

GS4 10.5

10.5

10.5

10.5

10.5

10.5

10.5

10.4

10.4

10.4

10.4

GS5 10.5

10.5

10.5

10.5

10.5

10.5

10.5

10.5

10.5

10.5

10.5

Kaiwharawhara 110 kV (T3) BASE 10.5

10.5

10.5

10.5

10.5

10.5

10.5

10.5

10.5

10.5

10.5

GS1 10.5

10.5

10.5

10.5

10.5

10.5

10.5

10.5

10.5

10.5

10.5

GS2 10.5

10.5

10.5

10.5

10.5

10.5

10.5

10.5

10.5

10.5

10.5

GS3 10.5

10.5

10.5

10.5

10.5

10.5

10.5

10.5

10.5

10.5

10.5

GS4 10.5

10.5

10.5

10.5

10.5

10.5

10.5

10.4

10.4

10.4

10.4

GS5 10.5

10.5

10.5

10.5

10.5

10.5

10.5

10.5

10.5

10.5

10.5

Masterton 33 kV BASE 8.7

8.7

8.7

8.7

8.7

8.7

8.7

8.7

8.7

8.7

8.7

GS1 8.7

8.7

8.7

8.7

8.7

8.7

8.7

8.7

8.7

8.7

8.7

GS2 8.7

8.7

8.7

8.7

8.7

8.7

8.7

8.7

8.7

8.7

8.7

GS3 8.7

8.7

8.7

8.7

8.7

8.7

8.7

8.7

8.7

8.7

8.7

GS4 8.7

8.7

8.7

8.7

8.7

8.7

8.7

8.7

8.7

8.7

8.7

GS5 8.7

8.7

8.7

8.7

8.7

8.7

8.7

8.7

8.7

8.7

8.7

Masterton 110 kV BASE 5.5

5.5

5.5

5.5

5.5

5.5

5.5

5.5

5.5

5.5

5.5

GS1 5.5

5.5

5.5

5.5

5.5

5.5

5.5

5.5

5.5

5.5

5.5

GS2 5.5

5.5

5.5

5.5

5.5

5.5

5.5

5.5

5.5

5.5

5.5

GS3 5.5

5.5

5.5

5.5

5.5

5.5

5.5

5.5

5.5

5.5

5.5

GS4 5.5

5.5

5.5

5.5

5.5

5.5

5.5

5.5

5.5

5.5

5.5

GS5 5.5

5.5

5.5

5.5

5.5

5.5

5.5

5.5

5.5

5.5

5.5

Melling 11 kV BASE 13.6

13.6

13.6

13.6

13.6

13.6

13.6

13.6

13.6

13.6

13.6

GS1 13.6

13.6

13.6

13.6

13.6

13.6

13.6

13.6

13.6

13.6

13.6

GS2 13.6

13.6

13.6

13.6

13.6

13.6

13.6

13.6

13.6

13.6

13.6

GS3 13.6

13.6

13.6

13.6

13.6

13.6

13.6

13.6

13.6

13.6

13.6

GS4 13.6

13.6

13.6

13.6

13.6

13.6

13.6

13.6

13.6

13.6

13.6

GS5 13.6

13.6

13.6

13.6

13.6

13.6

13.6

13.6

13.6

13.6

13.6

© Transpower New Zealand Limited 2016.All rights reserved. 47

Page 48: 2015 ten year forecast fault level report - Transpower · PDF fileThis publication presents an update to the ten year forecast fault levels ... calculation. Minimum fault level calculations

Ten year forecast fault Levels

Melling 33 kV BASE 9.4

9.4

9.4

9.4

9.4

9.4

9.4

9.4

9.4

9.4

9.4

GS1 9.4

9.4

9.4

9.4

9.4

9.4

9.4

9.4

9.4

9.4

9.4

GS2 9.4

9.4

9.4

9.4

9.4

9.4

9.4

9.4

9.4

9.4

9.4

GS3 9.4

9.4

9.4

9.4

9.4

9.4

9.4

9.4

9.4

9.4

9.4

GS4 9.4

9.4

9.4

9.4

9.4

9.4

9.4

9.4

9.4

9.4

9.4

GS5 9.4

9.4

9.4

9.4

9.4

9.4

9.4

9.4

9.4

9.4

9.4

Melling 110 kV (T1/T3) BASE 9.6

9.6

9.6

9.6

9.6

9.6

9.6

9.6

9.6

9.6

9.6

GS1 9.6

9.6

9.6

9.6

9.6

9.6

9.6

9.6

9.6

9.7

9.7

GS2 9.6

9.6

9.6

9.6

9.6

9.6

9.6

9.6

9.6

9.7

9.7

GS3 9.6

9.6

9.6

9.6

9.6

9.6

9.6

9.6

9.6

9.7

9.7

GS4 9.6

9.6

9.6

9.6

9.6

9.6

9.6

9.6

9.6

9.6

9.6

GS5 9.6

9.6

9.6

9.6

9.6

9.6

9.6

9.6

9.6

9.6

9.6

Melling 110 kV (T2/T4) BASE 9.5

9.5

9.5

9.5

9.5

9.5

9.5

9.5

9.5

9.5

9.5

GS1 9.5

9.5

9.5

9.5

9.5

9.5

9.5

9.5

9.5

9.5

9.5

GS2 9.5

9.5

9.5

9.5

9.5

9.5

9.5

9.5

9.5

9.5

9.5

GS3 9.5

9.5

9.5

9.5

9.5

9.5

9.5

9.5

9.5

9.5

9.5

GS4 9.5

9.5

9.5

9.5

9.5

9.5

9.5

9.4

9.4

9.4

9.4

GS5 9.5

9.5

9.5

9.5

9.5

9.5

9.5

9.5

9.5

9.5

9.5

Paraparaumu 33 kV BASE 20.4

20.4

20.4

20.5

20.6

20.6

20.6

20.6

20.6

20.6

20.6

GS1 20.4

20.4

20.4

20.5

20.6

20.6

20.6

20.6

20.6

20.7

20.7

GS2 20.4

20.4

20.4

20.5

20.6

20.6

20.6

20.6

20.6

20.7

20.7

GS3 20.4

20.4

20.4

20.5

20.6

20.6

20.6

20.6

20.6

20.7

20.7

GS4 20.4

20.4

20.4

20.5

20.6

20.6

20.6

20.5

20.5

20.5

20.5

GS5 20.4

20.4

20.4

20.5

20.6

20.6

20.6

20.6

20.6

20.6

20.6

Paraparaumu 220 kV (T1) BASE 7.1

7.1

7.1

7.1

7.4

7.4

7.4

7.4

7.4

7.4

7.4

GS1 7.1

7.1

7.1

7.1

7.4

7.4

7.4

7.4

7.4

7.5

7.5

GS2 7.1

7.1

7.1

7.1

7.4

7.4

7.4

7.4

7.4

7.5

7.5

GS3 7.1

7.1

7.1

7.1

7.4

7.4

7.4

7.4

7.4

7.5

7.5

GS4 7.1

7.1

7.1

7.1

7.4

7.4

7.4

7.3

7.3

7.3

7.3

GS5 7.1

7.1

7.1

7.1

7.4

7.4

7.4

7.4

7.4

7.4

7.4

Paraparaumu 220 kV (T2) BASE 7.1

7.1

7.1

7.1

7.4

7.4

7.4

7.4

7.4

7.4

7.4

GS1 7.1

7.1

7.1

7.1

7.4

7.4

7.4

7.4

7.4

7.5

7.5

GS2 7.1

7.1

7.1

7.1

7.4

7.4

7.4

7.4

7.4

7.5

7.5

GS3 7.1

7.1

7.1

7.1

7.4

7.4

7.4

7.4

7.4

7.5

7.5

GS4 7.1

7.1

7.1

7.1

7.4

7.4

7.4

7.3

7.3

7.3

7.3

GS5 7.1

7.1

7.1

7.1

7.4

7.4

7.4

7.4

7.4

7.4

7.4

© Transpower New Zealand Limited 2016.All rights reserved. 48

Page 49: 2015 ten year forecast fault level report - Transpower · PDF fileThis publication presents an update to the ten year forecast fault levels ... calculation. Minimum fault level calculations

Ten year forecast fault Levels

Pauatahanui 33 kV BASE 6.3

6.3

6.3

6.3

6.3

6.3

6.3

6.3

6.3

6.3

6.3

GS1 6.3

6.3

6.3

6.3

6.3

6.3

6.3

6.3

6.3

6.3

6.3

GS2 6.3

6.3

6.3

6.3

6.3

6.3

6.3

6.3

6.3

6.3

6.3

GS3 6.3

6.3

6.3

6.3

6.3

6.3

6.3

6.3

6.3

6.3

6.3

GS4 6.3

6.3

6.3

6.3

6.3

6.3

6.3

6.3

6.3

6.3

6.3

GS5 6.3

6.3

6.3

6.3

6.3

6.3

6.3

6.3

6.3

6.3

6.3

Pauatahanui 110 kV (T1) BASE 9.6

9.6

9.6

9.6

9.6

9.6

9.6

9.6

9.6

9.6

9.6

GS1 9.6

9.6

9.6

9.6

9.6

9.6

9.6

9.6

9.6

9.6

9.6

GS2 9.6

9.6

9.6

9.6

9.6

9.6

9.6

9.6

9.6

9.6

9.6

GS3 9.6

9.6

9.6

9.6

9.6

9.6

9.6

9.6

9.6

9.6

9.6

GS4 9.6

9.6

9.5

9.6

9.6

9.6

9.6

9.5

9.5

9.5

9.5

GS5 9.6

9.6

9.6

9.6

9.6

9.6

9.6

9.6

9.6

9.6

9.6

Pauatahanui 110 kV (T2) BASE 9.5

9.5

9.5

9.6

9.6

9.6

9.6

9.6

9.6

9.6

9.6

GS1 9.5

9.5

9.5

9.6

9.6

9.6

9.6

9.6

9.6

9.6

9.6

GS2 9.5

9.5

9.5

9.6

9.6

9.6

9.6

9.6

9.6

9.6

9.6

GS3 9.5

9.5

9.5

9.6

9.6

9.6

9.6

9.6

9.6

9.6

9.6

GS4 9.5

9.5

9.5

9.6

9.6

9.6

9.6

9.5

9.5

9.5

9.5

GS5 9.5

9.5

9.5

9.6

9.6

9.6

9.6

9.6

9.6

9.6

9.6

Takapu Road 33 kV BASE 14.5

14.5

14.5

14.5

14.5

14.5

14.5

14.5

14.5

14.5

14.5

GS1 14.5

14.5

14.5

14.5

14.5

14.5

14.5

14.5

14.5

14.6

14.6

GS2 14.5

14.5

14.5

14.5

14.5

14.5

14.5

14.5

14.5

14.6

14.6

GS3 14.5

14.5

14.5

14.5

14.5

14.5

14.5

14.5

14.5

14.6

14.6

GS4 14.5

14.5

14.5

14.5

14.5

14.5

14.5

14.5

14.5

14.5

14.5

GS5 14.5

14.5

14.5

14.5

14.5

14.5

14.5

14.5

14.5

14.5

14.5

Takapu Road 110 kV BASE 15.2

15.2

15.2

15.2

15.2

15.2

15.2

15.2

15.2

15.2

15.2

GS1 15.2

15.2

15.2

15.2

15.2

15.2

15.2

15.2

15.2

15.3

15.3

GS2 15.2

15.2

15.2

15.2

15.2

15.2

15.2

15.2

15.2

15.3

15.3

GS3 15.2

15.2

15.2

15.2

15.2

15.2

15.2

15.2

15.2

15.3

15.3

GS4 15.2

15.2

15.2

15.2

15.2

15.2

15.2

15.1

15.1

15.1

15.1

GS5 15.2

15.2

15.2

15.2

15.2

15.2

15.2

15.2

15.2

15.2

15.2

Upper Hutt 33 kV BASE 9.6

9.6

9.6

9.6

9.6

9.6

9.6

9.6

9.6

9.6

9.6

GS1 9.6

9.6

9.6

9.6

9.6

9.6

9.6

9.6

9.6

9.6

9.6

GS2 9.6

9.6

9.6

9.6

9.6

9.6

9.6

9.6

9.6

9.6

9.6

GS3 9.6

9.6

9.6

9.6

9.6

9.6

9.6

9.6

9.6

9.6

9.6

GS4 9.6

9.6

9.6

9.6

9.6

9.6

9.6

9.5

9.5

9.5

9.5

GS5 9.6

9.6

9.6

9.6

9.6

9.6

9.6

9.6

9.6

9.6

9.6

© Transpower New Zealand Limited 2016.All rights reserved. 49

Page 50: 2015 ten year forecast fault level report - Transpower · PDF fileThis publication presents an update to the ten year forecast fault levels ... calculation. Minimum fault level calculations

Ten year forecast fault Levels

Upper Hutt 110 kV BASE 13.6

13.6

13.6

13.6

13.7

13.7

13.7

13.7

13.7

13.7

13.7

GS1 13.6

13.6

13.6

13.6

13.7

13.7

13.7

13.7

13.7

13.7

13.7

GS2 13.6

13.6

13.6

13.6

13.7

13.7

13.7

13.7

13.7

13.7

13.7

GS3 13.6

13.6

13.6

13.6

13.7

13.7

13.7

13.7

13.7

13.7

13.7

GS4 13.6

13.6

13.6

13.6

13.7

13.7

13.7

13.5

13.5

13.5

13.5

GS5 13.6

13.6

13.6

13.6

13.7

13.7

13.7

13.7

13.7

13.7

13.7

West Wind 110 kV (Circuit–2) BASE

8.4 8.4

8.4

8.4

8.4

8.4

8.4

8.4

8.4

8.4

8.4

GS1 8.4

8.4

8.4

8.4

8.4

8.4

8.4

8.4

8.4

8.5

8.5

GS2 8.4

8.4

8.4

8.4

8.4

8.4

8.4

8.4

8.4

8.5

8.5

GS3 8.4

8.4

8.4

8.4

8.4

8.4

8.4

8.4

8.4

8.5

8.5

GS4 8.4

8.4

8.4

8.4

8.4

8.4

8.4

8.4

8.4

8.4

8.4

GS5 8.4

8.4

8.4

8.4

8.4

8.4

8.4

8.4

8.4

8.4

8.4

West Wind 110 kV (Circuit–3) BASE

8.4 8.4

8.4

8.5

8.5

8.5

8.5

8.5

8.5

8.5

8.5

GS1 8.4

8.4

8.4

8.5

8.5

8.5

8.5

8.5

8.5

8.5

8.5

GS2 8.4

8.4

8.4

8.5

8.5

8.5

8.5

8.5

8.5

8.5

8.5

GS3 8.4

8.4

8.4

8.5

8.5

8.5

8.5

8.5

8.5

8.5

8.5

GS4 8.4

8.4

8.4

8.5

8.5

8.5

8.5

8.4

8.4

8.4

8.4

GS5 8.4

8.4

8.4

8.5

8.5

8.5

8.5

8.5

8.5

8.5

8.5

Wilton 33 kV BASE 13.2

13.2

13.2

13.2

13.2

13.2

13.2

13.2

13.2

13.2

13.2

GS1 13.2

13.2

13.2

13.2

13.2

13.2

13.2

13.2

13.2

13.2

13.2

GS2 13.2

13.2

13.2

13.2

13.2

13.2

13.2

13.2

13.2

13.2

13.2

GS3 13.2

13.2

13.2

13.2

13.2

13.2

13.2

13.2

13.2

13.2

13.2

GS4 13.2

13.2

13.2

13.2

13.2

13.2

13.2

13.2

13.2

13.2

13.2

GS5 13.2

13.2

13.2

13.2

13.2

13.2

13.2

13.2

13.2

13.2

13.2

Wilton 110 kV BASE 12.8

12.8

12.8

12.8

12.8

12.8

12.8

12.8

12.8

12.8

12.8

GS1 12.8

12.8

12.8

12.8

12.8

12.8

12.8

12.8

12.8

12.9

12.9

GS2 12.8

12.8

12.8

12.8

12.8

12.8

12.8

12.8

12.8

12.9

12.9

GS3 12.8

12.8

12.8

12.8

12.8

12.8

12.8

12.9

12.9

12.9

12.9

GS4 12.8

12.8

12.8

12.8

12.8

12.8

12.8

12.7

12.7

12.7

12.7

GS5 12.8

12.8

12.8

12.8

12.8

12.8

12.8

12.8

12.8

12.8

12.8

Wilton 220 kV BASE 8.0

8.0

8.0

8.0

8.0

8.0

8.0

8.0

8.0

8.0

8.0

GS1 8.0

8.0

8.0

8.0

8.0

8.0

8.0

8.0

8.0

8.1

8.1

GS2 8.0

8.0

8.0

8.0

8.0

8.0

8.0

8.0

8.0

8.1

8.1

GS3 8.0

8.0

8.0

8.0

8.0

8.0

8.0

8.0

8.0

8.1

8.1

GS4 8.0

8.0

8.0

8.0

8.0

8.0

8.0

7.9

7.9

7.9

7.9

GS5 8.0

8.0

8.0

8.0

8.0

8.0

8.0

8.0

8.0

8.0

8.0

© Transpower New Zealand Limited 2016.All rights reserved. 50

Page 51: 2015 ten year forecast fault level report - Transpower · PDF fileThis publication presents an update to the ten year forecast fault levels ... calculation. Minimum fault level calculations

Ten year forecast fault Levels

NELSON-MARLBOROUGH

Argyle 110 kV BASE 2.6

2.6

2.6

2.6

2.6

2.6

2.6

2.6

2.6

2.6

2.6

GS1 2.6

2.6

2.6

2.6

2.6

2.6

4.1

4.2

4.2

4.2

4.2

GS2 2.6

2.6

2.6

2.6

2.6

2.6

4.1

4.1

4.1

4.1

4.1

GS3 2.6

2.6

2.6

2.6

2.6

2.6

2.6

2.6

2.6

2.6

2.6

GS4 2.6

2.6

4.2

4.2

4.2

4.2

4.2

4.2

4.2

4.2

4.3

GS5 2.6

2.6

2.6

2.6

2.6

4.2

4.2

4.2

4.2

4.2

4.2

Blenheim 33 kV BASE 6.7

6.7

6.7

6.7

6.7

6.7

6.7

6.7

6.7

6.7

6.7

GS1 6.7

6.7

6.7

6.7

6.7

6.7

7.6

7.8

7.8

7.8

7.8

GS2 6.7

6.7

6.7

6.7

6.7

6.7

7.6

7.6

7.6

7.6

7.6

GS3 6.7

6.7

6.7

6.7

6.7

6.7

6.7

6.7

6.7

6.7

6.7

GS4 6.7

6.7

7.8

7.8

7.8

7.8

7.8

7.8

7.8

7.8

7.8

GS5 6.7

6.7

6.7

6.7

6.7

7.8

7.8

7.8

7.8

7.8

7.8

Blenheim 110 kV BASE 2.6

2.6

2.6

2.6

2.6

2.6

2.6

2.6

2.6

2.6

2.6

GS1 2.6

2.6

2.6

2.6

2.6

2.6

3.1

3.2

3.2

3.2

3.2

GS2 2.6

2.6

2.6

2.6

2.6

2.6

3.1

3.1

3.1

3.1

3.1

GS3 2.6

2.6

2.6

2.6

2.6

2.6

2.6

2.6

2.6

2.6

2.6

GS4 2.6

2.6

3.2

3.2

3.2

3.2

3.2

3.2

3.2

3.2

3.2

GS5 2.6

2.6

2.6

2.6

2.6

3.2

3.2

3.2

3.2

3.2

3.2

Stoke 33 kV BASE 11.5

11.5

11.5

11.5

11.5

11.5

11.5

11.5

11.5

11.5

11.5

GS1 11.5

11.5

11.5

11.5

11.5

11.5

12.5

12.8

12.8

12.8

12.8

GS2 11.5

11.5

11.5

11.5

11.5

11.5

12.5

12.5

12.5

12.5

12.5

GS3 11.5

11.5

11.5

11.5

11.5

11.5

11.5

11.5

11.5

11.5

11.5

GS4 11.5

11.5

12.8

12.8

12.8

12.8

12.8

12.8

12.8

12.8

12.9

GS5 11.5

11.5

11.5

11.5

11.5

12.8

12.8

12.8

12.8

12.8

12.8

Stoke 66 kV BASE 4.4

4.4

4.4

4.4

4.4

4.4

4.4

4.4

4.4

4.4

4.4

GS1 4.4

4.4

4.4

4.4

4.4

4.4

4.8

4.9

4.9

4.9

4.9

GS2 4.4

4.4

4.4

4.4

4.4

4.4

4.8

4.8

4.8

4.8

4.8

GS3 4.4

4.4

4.4

4.4

4.4

4.4

4.4

4.4

4.4

4.4

4.4

GS4 4.4

4.4

4.9

4.9

4.9

4.9

4.9

4.9

4.9

4.9

4.9

GS5 4.4

4.4

4.4

4.4

4.4

4.9

4.9

4.9

4.9

4.9

4.9

Stoke 110 kV BASE 4.0

4.0

4.0

4.0

4.0

4.0

4.0

4.0

4.0

4.0

4.0

GS1 4.0

4.0

4.0

4.0

4.0

4.0

4.7

4.8

4.8

4.8

4.8

GS2 4.0

4.0

4.0

4.0

4.0

4.0

4.7

4.7

4.7

4.7

4.7

GS3 4.0

4.0

4.0

4.0

4.0

4.0

4.0

4.0

4.0

4.0

4.0

GS4 4.0

4.0

4.8

4.8

4.8

4.8

4.8

4.8

4.8

4.8

4.9

© Transpower New Zealand Limited 2016.All rights reserved. 51

Page 52: 2015 ten year forecast fault level report - Transpower · PDF fileThis publication presents an update to the ten year forecast fault levels ... calculation. Minimum fault level calculations

Ten year forecast fault Levels

GS5 4.0

4.0

4.0

4.0

4.0

4.8

4.8

4.8

4.8

4.8

4.8

Stoke 220 kV BASE 2.7

2.7

2.7

2.7

2.7

2.7

2.7

2.7

2.7

2.7

2.7

GS1 2.7

2.7

2.7

2.7

2.7

2.7

3.1

3.2

3.2

3.2

3.2

GS2 2.7

2.7

2.7

2.7

2.7

2.7

3.1

3.1

3.1

3.1

3.1

GS3 2.7

2.7

2.7

2.7

2.7

2.7

2.7

2.7

2.7

2.7

2.7

GS4 2.7

2.7

3.2

3.2

3.2

3.2

3.2

3.2

3.2

3.2

3.2

GS5 2.7

2.7

2.7

2.7

2.7

3.2

3.2

3.2

3.2

3.2

3.2

WEST COAST

Arthurs Pass 11 kV BASE 2.2

2.2

2.2

2.2

2.2

2.2

2.2

2.2

2.2

2.2

2.2

GS1 2.2

2.2

2.2

2.2

2.2

2.2

2.2

2.3

2.3

2.3

2.3

GS2 2.2

2.2

2.2

2.2

2.2

2.2

2.2

2.2

2.2

2.2

2.2

GS3 2.2

2.2

2.2

2.2

2.2

2.2

2.2

2.2

2.2

2.2

2.2

GS4 2.2

2.2

2.3

2.3

2.3

2.3

2.3

2.3

2.3

2.3

2.3

GS5 2.2

2.2

2.2

2.2

2.2

2.3

2.3

2.3

2.3

2.3

2.3

Arthurs Pass 66 kV BASE 2.1

2.1

2.1

2.1

2.1

2.1

2.1

2.1

2.1

2.1

2.1

GS1 2.1

2.1

2.1

2.1

2.1

2.1

2.1

2.1

2.1

2.1

2.1

GS2 2.1

2.1

2.1

2.1

2.1

2.1

2.1

2.1

2.1

2.1

2.1

GS3 2.1

2.1

2.1

2.1

2.1

2.1

2.1

2.1

2.1

2.1

2.1

GS4 2.1

2.1

2.1

2.1

2.1

2.1

2.1

2.1

2.1

2.1

2.2

GS5 2.1

2.1

2.1

2.1

2.1

2.1

2.1

2.1

2.1

2.1

2.1

Atarau 110 kV BASE 1.5

1.5

1.5

1.5

1.5

1.5

1.5

1.5

1.5

1.5

1.5

GS1 1.5

1.5

1.5

1.5

1.5

1.5

1.6

1.8

1.8

1.8

1.8

GS2 1.5

1.5

1.5

1.5

1.5

1.5

1.6

1.6

1.6

1.6

1.6

GS3 1.5

1.5

1.5

1.5

1.5

1.5

1.5

1.5

1.5

1.5

1.5

GS4 1.5

1.5

1.8

1.8

1.8

1.8

1.8

1.8

1.8

1.8

2.1

GS5 1.5

1.5

1.5

1.5

1.5

1.8

1.8

1.8

1.8

1.8

1.8

Castle Hill 11 kV BASE 2.7

2.7

2.7

2.7

2.7

2.7

2.7

2.7

2.7

2.7

2.7

GS1 2.7

2.7

2.7

2.7

2.7

2.7

2.7

2.8

2.8

2.8

2.8

GS2 2.7

2.7

2.7

2.7

2.7

2.7

2.7

2.7

2.7

2.7

2.7

GS3 2.7

2.7

2.7

2.7

2.7

2.7

2.7

2.7

2.7

2.7

2.7

GS4 2.7

2.7

2.8

2.8

2.8

2.8

2.8

2.8

2.8

2.8

2.8

GS5 2.7

2.7

2.7

2.7

2.7

2.8

2.8

2.8

2.8

2.8

2.8

Castle Hill 66 kV BASE 2.3

2.3

2.3

2.3

2.3

2.3

2.3

2.3

2.3

2.3

2.3

GS1 2.3

2.3

2.3

2.3

2.3

2.3

2.3

2.3

2.3

2.3

2.3

GS2 2.3

2.3

2.3

2.3

2.3

2.3

2.3

2.3

2.3

2.3

2.3

© Transpower New Zealand Limited 2016.All rights reserved. 52

Page 53: 2015 ten year forecast fault level report - Transpower · PDF fileThis publication presents an update to the ten year forecast fault levels ... calculation. Minimum fault level calculations

Ten year forecast fault Levels

GS3 2.3

2.3

2.3

2.3

2.3

2.3

2.3

2.3

2.3

2.3

2.3

GS4 2.3

2.3

2.3

2.3

2.3

2.3

2.3

2.3

2.3

2.3

2.4

GS5 2.3

2.3

2.3

2.3

2.3

2.3

2.3

2.3

2.3

2.3

2.3

Dobson 33 kV BASE 3.1

3.1

3.1

3.1

3.1

3.1

3.1

3.1

3.1

3.1

3.1

GS1 3.1

3.1

3.1

3.1

3.1

3.1

3.1

3.3

3.3

3.3

3.3

GS2 3.1

3.1

3.1

3.1

3.1

3.1

3.1

3.1

3.1

3.1

3.1

GS3 3.1

3.1

3.1

3.1

3.1

3.1

3.1

3.1

3.1

3.1

3.1

GS4 3.1

3.1

3.3

3.3

3.3

3.3

3.3

3.3

3.3

3.3

6.5

GS5 3.1

3.1

3.1

3.1

3.1

3.3

3.3

3.3

3.3

3.3

3.3

Dobson 66 kV BASE 2.8

2.8

2.8

2.8

2.8

2.8

2.8

2.8

2.8

2.8

2.8

GS1 2.8

2.8

2.8

2.8

2.8

2.8

2.9

3.2

3.2

3.2

3.2

GS2 2.8

2.8

2.8

2.8

2.8

2.8

2.9

2.9

2.9

2.9

2.9

GS3 2.8

2.8

2.8

2.8

2.8

2.8

2.8

2.8

2.8

2.8

2.8

GS4 2.8

2.8

3.2

3.2

3.2

3.2

3.2

3.2

3.2

3.2

4.1

GS5 2.8

2.8

2.8

2.8

2.8

3.2

3.2

3.2

3.2

3.2

3.2

Dobson T11 (110 kV) BASE 1.5

1.5

1.5

1.5

1.5

1.5

1.5

1.5

1.5

1.5

1.5

GS1 1.5

1.5

1.5

1.5

1.5

1.5

1.6

1.8

1.8

1.8

1.8

GS2 1.5

1.5

1.5

1.5

1.5

1.5

1.6

1.6

1.6

1.6

1.6

GS3 1.5

1.5

1.5

1.5

1.5

1.5

1.5

1.5

1.5

1.5

1.5

GS4 1.5

1.5

1.8

1.8

1.8

1.8

1.8

1.8

1.8

1.8

2.1

GS5 1.5

1.5

1.5

1.5

1.5

1.8

1.8

1.8

1.8

1.8

1.8

Dobson T12 (110 kV) BASE 1.5

1.5

1.5

1.5

1.5

1.5

1.5

1.5

1.5

1.5

1.5

GS1 1.5

1.5

1.5

1.5

1.5

1.5

1.6

1.7

1.7

1.7

1.7

GS2 1.5

1.5

1.5

1.5

1.5

1.5

1.6

1.6

1.6

1.6

1.6

GS3 1.5

1.5

1.5

1.5

1.5

1.5

1.5

1.5

1.5

1.5

1.5

GS4 1.5

1.5

1.7

1.7

1.7

1.7

1.7

1.7

1.7

1.7

2.1

GS5 1.5

1.5

1.5

1.5

1.5

1.7

1.7

1.7

1.7

1.7

1.7

Greymouth 66 kV BASE 2.6

2.6

2.6

2.6

2.6

2.6

2.6

2.6

2.6

2.6

2.6

GS1 2.6

2.6

2.6

2.6

2.6

2.6

2.6

2.9

2.9

2.9

2.9

GS2 2.6

2.6

2.6

2.6

2.6

2.6

2.6

2.6

2.6

2.6

2.6

GS3 2.6

2.6

2.6

2.6

2.6

2.6

2.6

2.6

2.6

2.6

2.6

GS4 2.6

2.6

2.9

2.9

2.9

2.9

2.9

2.9

2.9

2.9

3.5

GS5 2.6

2.6

2.6

2.6

2.6

2.9

2.9

2.9

2.9

2.9

2.9

Hokitika 66 kV BASE 1.8

1.8

1.8

1.8

1.8

1.8

1.8

1.8

1.8

1.8

1.8

GS1 1.8

1.8

1.8

1.8

1.8

1.8

1.8

1.9

1.9

1.9

1.9

GS2 1.8

1.8

1.8

1.8

1.8

1.8

1.8

1.8

1.8

1.8

1.8

GS3 1.8

1.8

1.8

1.8

1.8

1.8

1.8

1.8

1.8

1.8

1.8

© Transpower New Zealand Limited 2016.All rights reserved. 53

Page 54: 2015 ten year forecast fault level report - Transpower · PDF fileThis publication presents an update to the ten year forecast fault levels ... calculation. Minimum fault level calculations

Ten year forecast fault Levels

GS4 1.8

1.8

1.9

1.9

1.9

1.9

1.9

1.9

1.9

1.9

2.0

GS5 1.8

1.8

1.8

1.8

1.8

1.9

1.9

1.9

1.9

1.9

1.9

Inangahua 110 kV BASE 2.3

2.3

2.3

2.3

2.3

2.3

2.3

2.3

2.3

2.3

2.3

GS1 2.3

2.3

2.3

2.3

2.3

2.3

2.5

3.2

3.2

3.2

3.2

GS2 2.3

2.3

2.3

2.3

2.3

2.3

2.5

2.5

2.5

2.5

2.5

GS3 2.3

2.3

2.3

2.3

2.3

2.3

2.3

2.3

2.3

2.3

2.3

GS4 2.3

2.3

3.2

3.2

3.2

3.2

3.2

3.2

3.2

3.2

3.5

GS5 2.3

2.3

2.3

2.3

2.3

3.2

3.2

3.2

3.2

3.2

3.2

Kikiwa 11 kV BASE 2.9

2.9

2.9

2.9

2.9

2.9

2.9

2.9

2.9

2.9

2.9

GS1 2.9

2.9

2.9

2.9

2.9

2.9

2.9

2.9

2.9

2.9

2.9

GS2 2.9

2.9

2.9

2.9

2.9

2.9

2.9

2.9

2.9

2.9

2.9

GS3 2.9

2.9

2.9

2.9

2.9

2.9

2.9

2.9

2.9

2.9

2.9

GS4 2.9

2.9

2.9

2.9

2.9

2.9

2.9

2.9

2.9

2.9

3.0

GS5 2.9

2.9

2.9

2.9

2.9

2.9

2.9

2.9

2.9

2.9

2.9

Kikiwa 110 kV BASE 4.2

4.2

4.2

4.2

4.2

4.2

4.2

4.2

4.2

4.2

4.2

GS1 4.2

4.2

4.3

4.3

4.3

4.3

5.2

5.6

5.6

5.6

5.6

GS2 4.2

4.2

4.2

4.2

4.3

4.3

5.2

5.2

5.2

5.2

5.2

GS3 4.2

4.2

4.2

4.2

4.2

4.2

4.2

4.2

4.2

4.2

4.2

GS4 4.2

4.2

5.6

5.6

5.6

5.6

5.6

5.6

5.6

5.6

5.8

GS5 4.2

4.2

4.3

4.3

4.3

5.6

5.6

5.6

5.6

5.6

5.6

Kikiwa 220 kV BASE 3.2

3.2

3.2

3.2

3.2

3.2

3.2

3.2

3.2

3.2

3.2

GS1 3.2

3.2

3.2

3.2

3.2

3.2

3.6

3.8

3.8

3.8

3.8

GS2 3.2

3.2

3.2

3.2

3.2

3.2

3.6

3.6

3.6

3.6

3.6

GS3 3.2

3.2

3.2

3.2

3.2

3.2

3.2

3.2

3.2

3.2

3.2

GS4 3.2

3.2

3.8

3.8

3.8

3.8

3.8

3.8

3.8

3.8

3.9

GS5 3.2

3.2

3.2

3.2

3.2

3.8

3.8

3.8

3.8

3.8

3.8

Kumara 66 kV BASE 2.5

2.5

2.5

2.5

2.5

2.5

2.5

2.5

2.5

2.5

2.5

GS1 2.5

2.5

2.5

2.5

2.5

2.5

2.5

2.6

2.6

2.6

2.6

GS2 2.5

2.5

2.5

2.5

2.5

2.5

2.5

2.5

2.5

2.5

2.5

GS3 2.5

2.5

2.5

2.5

2.5

2.5

2.5

2.5

2.5

2.5

2.5

GS4 2.5

2.5

2.6

2.6

2.6

2.6

2.6

2.6

2.6

2.6

2.9

GS5 2.5

2.5

2.5

2.5

2.5

2.6

2.6

2.6

2.6

2.6

2.6

Murchison 11 kV BASE 2.6

2.6

2.6

2.6

2.6

2.6

2.6

2.6

2.6

2.6

2.6

GS1 2.6

2.6

2.6

2.6

2.6

2.6

2.6

2.7

2.7

2.7

2.7

GS2 2.6

2.6

2.6

2.6

2.6

2.6

2.6

2.6

2.6

2.6

2.6

GS3 2.6

2.6

2.6

2.6

2.6

2.6

2.6

2.6

2.6

2.6

2.6

GS4 2.6

2.6

2.7

2.7

2.7

2.7

2.7

2.7

2.7

2.7

2.7

© Transpower New Zealand Limited 2016.All rights reserved. 54

Page 55: 2015 ten year forecast fault level report - Transpower · PDF fileThis publication presents an update to the ten year forecast fault levels ... calculation. Minimum fault level calculations

Ten year forecast fault Levels

GS5 2.6

2.6

2.6

2.6

2.6

2.7

2.7

2.7

2.7

2.7

2.7

Murchison 110 kV BASE 2.3

2.3

2.3

2.3

2.3

2.3

2.3

2.3

2.3

2.3

2.3

GS1 2.3

2.3

2.3

2.3

2.3

2.3

2.5

2.9

2.9

2.9

2.9

GS2 2.3

2.3

2.3

2.3

2.3

2.3

2.5

2.5

2.5

2.5

2.5

GS3 2.3

2.3

2.3

2.3

2.3

2.3

2.3

2.3

2.3

2.3

2.3

GS4 2.3

2.3

2.9

2.9

2.9

2.9

2.9

2.9

2.9

2.9

3.0

GS5 2.3

2.3

2.3

2.3

2.3

2.9

2.9

2.9

2.9

2.9

2.9

Orowaiti 110 kV (Circuit–1) BASE

1.6 1.6

1.6

1.6

1.6

1.6

1.6

1.6

1.6

1.6

1.6

GS1 1.6

1.6

1.6

1.6

1.6

1.6

1.6

2.1

2.1

2.1

2.1

GS2 1.6

1.6

1.6

1.6

1.6

1.6

1.6

1.6

1.6

1.6

1.6

GS3 1.6

1.6

1.6

1.6

1.6

1.6

1.6

1.6

1.6

1.6

1.6

GS4 1.6

1.6

2.1

2.1

2.1

2.1

2.1

2.1

2.1

2.1

2.2

GS5 1.6

1.6

1.6

1.6

1.6

2.1

2.1

2.1

2.1

2.1

2.1

Orowaiti 110 kV (Circuit–2) BASE

1.5 1.5

1.5

1.5

1.5

1.5

1.5

1.5

1.5

1.5

1.5

GS1 1.5

1.5

1.5

1.5

1.5

1.5

1.6

2.0

2.0

2.0

2.0

GS2 1.5

1.5

1.5

1.5

1.5

1.5

1.6

1.6

1.6

1.6

1.6

GS3 1.5

1.5

1.5

1.5

1.5

1.5

1.5

1.5

1.5

1.5

1.5

GS4 1.5

1.5

2.0

2.0

2.0

2.0

2.0

2.0

2.0

2.0

2.2

GS5 1.5

1.5

1.5

1.5

1.5

2.0

2.0

2.0

2.0

2.0

2.0

Otira 11 kV BASE 1.6

1.6

1.6

1.6

1.6

1.6

1.6

1.6

1.6

1.6

1.6

GS1 1.6

1.6

1.6

1.6

1.6

1.6

1.6

1.6

1.6

1.6

1.6

GS2 1.6

1.6

1.6

1.6

1.6

1.6

1.6

1.6

1.6

1.6

1.6

GS3 1.6

1.6

1.6

1.6

1.6

1.6

1.6

1.6

1.6

1.6

1.6

GS4 1.6

1.6

1.6

1.6

1.6

1.6

1.6

1.6

1.6

1.6

1.6

GS5 1.6

1.6

1.6

1.6

1.6

1.6

1.6

1.6

1.6

1.6

1.6

Otira 66 kV BASE 2.3

2.3

2.3

2.3

2.3

2.3

2.3

2.3

2.3

2.3

2.3

GS1 2.3

2.3

2.3

2.3

2.3

2.3

2.3

2.4

2.4

2.4

2.4

GS2 2.3

2.3

2.3

2.3

2.3

2.3

2.3

2.3

2.3

2.3

2.3

GS3 2.3

2.3

2.3

2.3

2.3

2.3

2.3

2.3

2.3

2.3

2.3

GS4 2.3

2.3

2.4

2.4

2.4

2.4

2.4

2.4

2.4

2.4

2.5

GS5 2.3

2.3

2.3

2.3

2.3

2.4

2.4

2.4

2.4

2.4

2.4

Reefton 110 kV (Circuit–1) BASE

1.8 1.8

1.8

1.8

1.8

1.8

1.8

1.8

1.8

1.8

1.8

GS1 1.8

1.8

1.8

1.8

1.8

1.8

1.9

2.3

2.3

2.3

2.3

GS2 1.8

1.8

1.8

1.8

1.8

1.8

1.9

1.9

1.9

1.9

1.9

GS3 1.8

1.8

1.8

1.8

1.8

1.8

1.8

1.8

1.8

1.8

1.8

GS4 1.8

1.8

2.3

2.3

2.3

2.3

2.3

2.3

2.3

2.3

2.5

GS5 1.8

1.8

1.8

1.8

1.8

2.3

2.3

2.3

2.3

2.3

2.3

© Transpower New Zealand Limited 2016.All rights reserved. 55

Page 56: 2015 ten year forecast fault level report - Transpower · PDF fileThis publication presents an update to the ten year forecast fault levels ... calculation. Minimum fault level calculations

Ten year forecast fault Levels

Reefton 110 kV (Circuit–2) BASE

1.8 1.8

1.8

1.8

1.8

1.8

1.8

1.8

1.8

1.8

1.8

GS1 1.8

1.8

1.8

1.8

1.8

1.8

1.9

2.2

2.2

2.2

2.2

GS2 1.8

1.8

1.8

1.8

1.8

1.8

1.9

1.9

1.9

1.9

1.9

GS3 1.8

1.8

1.8

1.8

1.8

1.8

1.8

1.8

1.8

1.8

1.8

GS4 1.8

1.8

2.2

2.2

2.2

2.2

2.2

2.2

2.2

2.2

2.4

GS5 1.8

1.8

1.8

1.8

1.8

2.2

2.2

2.2

2.2

2.2

2.2

Waimangaroa 110 kV (Circuit–1) BASE

1.7 1.7

1.7

1.7

1.7

1.7

1.7

1.7

1.7

1.7

1.7

GS1 1.7

1.7

1.7

1.7

1.7

1.7

1.8

2.4

2.4

2.4

2.4

GS2 1.7

1.7

1.7

1.7

1.7

1.7

1.8

1.8

1.8

1.8

1.8

GS3 1.7

1.7

1.7

1.7

1.7

1.7

1.7

1.7

1.7

1.7

1.7

GS4 1.7

1.7

2.4

2.4

2.4

2.4

2.4

2.4

2.4

2.4

2.5

GS5 1.7

1.7

1.7

1.7

1.7

2.4

2.4

2.4

2.4

2.4

2.4

Waimangaroa 110 kV (Circuit–2) BASE

1.7 1.7

1.7

1.7

1.7

1.7

1.7

1.7

1.7

1.7

1.7

GS1 1.7

1.7

1.7

1.7

1.7

1.7

1.8

2.4

2.4

2.4

2.4

GS2 1.7

1.7

1.7

1.7

1.7

1.7

1.8

1.8

1.8

1.8

1.8

GS3 1.7

1.7

1.7

1.7

1.7

1.7

1.7

1.7

1.7

1.7

1.7

GS4 1.7

1.7

2.4

2.4

2.4

2.4

2.4

2.4

2.4

2.4

2.6

GS5 1.7

1.7

1.7

1.7

1.7

2.4

2.4

2.4

2.4

2.4

2.4

Westport 11 kV BASE 8.8

8.8

8.8

8.8

8.8

8.8

8.8

8.8

8.8

8.8

8.8

GS1 8.8

8.8

8.8

8.8

8.8

8.8

9.1

10.2

10.2

10.2

10.2

GS2 8.8

8.8

8.8

8.8

8.8

8.8

9.1

9.1

9.1

9.1

9.1

GS3 8.8

8.8

8.8

8.8

8.8

8.8

8.8

8.8

8.8

8.8

8.8

GS4 8.8

8.8

10.2

10.2

10.2

10.2

10.2

10.2

10.2

10.2

10.5

GS5 8.8

8.8

8.8

8.8

8.8

10.2

10.2

10.2

10.2

10.2

10.2

Westport 110 kV (T1) BASE 1.4

1.4

1.4

1.4

1.4

1.4

1.4

1.4

1.4

1.4

1.4

GS1 1.4

1.4

1.4

1.4

1.4

1.4

1.5

1.9

1.9

1.9

1.9

GS2 1.4

1.4

1.4

1.4

1.4

1.4

1.5

1.5

1.5

1.5

1.5

GS3 1.4

1.4

1.4

1.4

1.4

1.4

1.4

1.4

1.4

1.4

1.4

GS4 1.4

1.4

1.9

1.9

1.9

1.9

1.9

1.9

1.9

1.9

1.9

GS5 1.4

1.4

1.4

1.4

1.4

1.9

1.9

1.9

1.9

1.9

1.9

Westport 110 kV (T2) BASE 1.4

1.4

1.4

1.4

1.4

1.4

1.4

1.4

1.4

1.4

1.4

GS1 1.4

1.4

1.4

1.4

1.4

1.4

1.5

1.9

1.9

1.9

1.9

GS2 1.4

1.4

1.4

1.4

1.4

1.4

1.5

1.5

1.5

1.5

1.5

GS3 1.4

1.4

1.4

1.4

1.4

1.4

1.4

1.4

1.4

1.4

1.4

GS4 1.4

1.4

1.9

1.9

1.9

1.9

1.9

1.9

1.9

1.9

2.0

GS5 1.4

1.4

1.4

1.4

1.4

1.9

1.9

1.9

1.9

1.9

1.9

© Transpower New Zealand Limited 2016.All rights reserved. 56

Page 57: 2015 ten year forecast fault level report - Transpower · PDF fileThis publication presents an update to the ten year forecast fault levels ... calculation. Minimum fault level calculations

Ten year forecast fault Levels

CANTERBURY

Ashburton 33 kV BASE 9.8

9.8

9.8

9.8

9.8

9.8

9.8

9.8

9.8

9.8

9.8

GS1 9.8

9.8

9.8

9.8

9.8

9.8

9.9

9.9

9.9

9.9

9.9

GS2 9.8

9.8

9.8

9.8

9.8

9.8

9.9

9.9

9.9

9.9

9.9

GS3 9.8

9.8

9.8

9.8

9.8

9.8

9.8

9.8

9.8

9.8

9.8

GS4 9.8

9.8

9.9

9.9

9.9

9.9

9.9

9.9

9.9

9.9

9.9

GS5 9.8

9.8

9.8

9.8

9.8

9.9

9.9

9.9

9.9

9.9

9.9

Ashburton 66 kV BASE 11.0

11.0

11.0

11.0

11.0

11.0

11.0

11.0

11.0

11.0

11.0

GS1 11.0

11.0

11.0

11.0

11.0

11.0

11.1

11.2

11.2

11.2

11.2

GS2 11.0

11.0

11.0

11.0

11.0

11.0

11.1

11.1

11.1

11.1

11.1

GS3 11.0

11.0

11.0

11.0

11.0

11.0

11.0

11.0

11.0

11.0

11.0

GS4 11.0

11.0

11.2

11.2

11.2

11.2

11.2

11.2

11.2

11.2

11.2

GS5 11.0

11.0

11.0

11.0

11.0

11.2

11.2

11.2

11.2

11.2

11.2

Ashburton 220 kV BASE 7.5

7.5

7.5

7.5

7.5

7.5

7.5

7.5

7.5

7.5

7.5

GS1 7.5

7.5

7.5

7.5

7.5

7.5

7.7

7.8

7.8

7.8

7.8

GS2 7.5

7.5

7.5

7.5

7.5

7.5

7.7

7.7

7.7

7.7

7.7

GS3 7.5

7.5

7.5

7.5

7.5

7.5

7.5

7.5

7.5

7.5

7.5

GS4 7.5

7.5

7.8

7.8

7.8

7.8

7.8

7.8

7.8

7.8

7.8

GS5 7.5

7.5

7.5

7.5

7.5

7.8

7.8

7.8

7.8

7.8

7.8

Ashley 11 kV (T5) BASE 8.6

7.8

7.8

7.8

7.8

7.8

7.8

7.8

7.8

7.8

7.8

GS1 8.6

7.8

7.8

7.8

7.8

7.8

7.8

7.8

7.8

7.8

7.8

GS2 8.6

7.8

7.8

7.8

7.8

7.8

7.8

7.8

7.8

7.8

7.8

GS3 8.6

7.8

7.8

7.8

7.8

7.8

7.8

7.8

7.8

7.8

7.8

GS4 8.6

7.8

7.8

7.8

7.8

7.8

7.8

7.8

7.8

7.8

7.8

GS5 8.6

7.8

7.8

7.8

7.8

7.8

7.8

7.8

7.8

7.8

7.8

Ashley 11 kV (T3) BASE 7.8

7.8

7.8

7.8

7.8

7.8

7.8

7.8

7.8

7.8

7.8

GS1 7.8

7.8

7.8

7.8

7.8

7.8

7.8

7.8

7.8

7.8

7.8

GS2 7.8

7.8

7.8

7.8

7.8

7.8

7.8

7.8

7.8

7.8

7.8

GS3 7.8

7.8

7.8

7.8

7.8

7.8

7.8

7.8

7.8

7.8

7.8

GS4 7.8

7.8

7.8

7.8

7.8

7.8

7.8

7.8

7.8

7.8

7.8

GS5 7.8

7.8

7.8

7.8

7.8

7.8

7.8

7.8

7.8

7.8

7.8

Ashley 66 kV BASE 5.1

5.1

5.1

5.1

5.1

5.1

5.1

5.1

5.1

5.1

5.1

GS1 5.1

5.1

5.1

5.1

5.1

5.1

5.1

5.2

5.2

5.2

5.2

GS2 5.1

5.1

5.1

5.1

5.1

5.1

5.1

5.1

5.1

5.1

5.1

GS3 5.1

5.1

5.1

5.1

5.1

5.1

5.1

5.1

5.1

5.1

5.1

GS4 5.1

5.1

5.2

5.2

5.2

5.2

5.2

5.2

5.2

5.2

5.2

© Transpower New Zealand Limited 2016.All rights reserved. 57

Page 58: 2015 ten year forecast fault level report - Transpower · PDF fileThis publication presents an update to the ten year forecast fault levels ... calculation. Minimum fault level calculations

Ten year forecast fault Levels

GS5 5.1

5.1

5.1

5.1

5.1

5.2

5.2

5.2

5.2

5.2

5.2

Bromley 66 kV BASE 12.2

12.2

12.2

12.2

12.2

12.2

12.2

12.2

12.2

12.2

12.2

GS1 12.2

12.2

12.2

12.2

12.2

12.2

12.5

12.6

12.6

12.6

12.6

GS2 12.2

12.2

12.2

12.2

12.2

12.2

12.5

12.5

12.5

12.5

12.5

GS3 12.2

12.2

12.2

12.2

12.2

12.2

12.2

12.2

12.2

12.2

12.2

GS4 12.2

12.2

12.6

12.6

12.6

12.6

12.6

12.6

12.6

12.6

12.7

GS5 12.2

12.2

12.2

12.2

12.2

12.6

12.6

12.6

12.6

12.6

12.6

Bromley 220 kV BASE 5.7

5.7

5.7

5.7

5.7

5.7

5.7

5.7

5.7

5.7

5.7

GS1 5.7

5.7

5.7

5.7

5.7

5.7

5.9

6.0

6.0

6.0

6.0

GS2 5.7

5.7

5.7

5.7

5.7

5.7

5.9

5.9

5.9

5.9

5.9

GS3 5.7

5.7

5.7

5.7

5.7

5.7

5.7

5.7

5.7

5.7

5.7

GS4 5.7

5.7

6.0

6.0

6.0

6.0

6.0

6.0

6.0

6.0

6.0

GS5 5.7

5.7

5.7

5.7

5.7

6.0

6.0

6.0

6.0

6.0

6.0

Coleridge 11 kV BASE 1.6

1.6

1.6

1.6

1.6

1.6

1.6

1.6

1.6

1.6

1.6

GS1 1.6

1.6

1.6

1.6

1.6

1.6

1.6

1.6

1.6

1.6

1.6

GS2 1.6

1.6

1.6

1.6

1.6

1.6

1.6

1.6

1.6

1.6

1.6

GS3 1.6

1.6

1.6

1.6

1.6

1.6

1.6

1.6

1.6

1.6

1.6

GS4 1.6

1.6

1.6

1.6

1.6

1.6

1.6

1.6

1.6

1.6

1.6

GS5 1.6

1.6

1.6

1.6

1.6

1.6

1.6

1.6

1.6

1.6

1.6

Coleridge 66 kV BASE 4.4

4.4

4.4

4.4

4.4

4.4

4.4

4.4

4.4

4.4

4.4

GS1 4.4

4.4

4.4

4.4

4.4

4.4

4.4

4.4

4.4

4.4

4.4

GS2 4.4

4.4

4.4

4.4

4.4

4.4

4.4

4.4

4.4

4.4

4.4

GS3 4.4

4.4

4.4

4.4

4.4

4.4

4.4

4.4

4.4

4.4

4.4

GS4 4.4

4.4

4.4

4.4

4.4

4.4

4.4

4.4

4.4

4.4

4.5

GS5 4.4

4.4

4.4

4.4

4.4

4.4

4.4

4.4

4.4

4.4

4.4

Culverden 33 kV BASE 7.1

7.1

7.1

7.1

7.1

7.1

7.1

7.1

7.1

7.1

7.1

GS1 7.1

7.1

7.1

7.1

7.1

7.1

7.2

7.3

7.3

7.3

7.3

GS2 7.1

7.1

7.1

7.1

7.1

7.1

7.2

7.2

7.2

7.2

7.2

GS3 7.1

7.1

7.1

7.1

7.1

7.1

7.1

7.1

7.1

7.1

7.1

GS4 7.1

7.1

7.3

7.3

7.3

7.3

7.3

7.3

7.3

7.3

7.3

GS5 7.1

7.1

7.1

7.1

7.1

7.3

7.3

7.3

7.3

7.3

7.3

Culverden 66 kV BASE 1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

GS1 1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

GS2 1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

GS3 1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

GS4 1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

GS5 1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

© Transpower New Zealand Limited 2016.All rights reserved. 58

Page 59: 2015 ten year forecast fault level report - Transpower · PDF fileThis publication presents an update to the ten year forecast fault levels ... calculation. Minimum fault level calculations

Ten year forecast fault Levels

Culverden 220 kV (T22) BASE 3.2

3.2

3.2

3.2

3.2

3.2

3.2

3.2

3.2

3.2

3.2

GS1 3.2

3.2

3.2

3.2

3.2

3.2

3.4

3.4

3.4

3.4

3.4

GS2 3.2

3.2

3.2

3.2

3.2

3.2

3.4

3.4

3.4

3.4

3.4

GS3 3.2

3.2

3.2

3.2

3.2

3.2

3.2

3.2

3.2

3.2

3.2

GS4 3.2

3.2

3.4

3.4

3.4

3.4

3.4

3.4

3.4

3.4

3.4

GS5 3.2

3.2

3.2

3.2

3.2

3.4

3.4

3.4

3.4

3.4

3.4

Culverden 220 kV (T23) BASE 3.2

3.2

3.2

3.2

3.2

3.2

3.2

3.2

3.2

3.2

3.2

GS1 3.2

3.2

3.2

3.2

3.2

3.2

3.4

3.4

3.4

3.4

3.4

GS2 3.2

3.2

3.2

3.2

3.2

3.2

3.4

3.4

3.4

3.4

3.4

GS3 3.2

3.2

3.2

3.2

3.2

3.2

3.2

3.2

3.2

3.2

3.2

GS4 3.2

3.2

3.4

3.4

3.4

3.4

3.4

3.4

3.4

3.4

3.4

GS5 3.2

3.2

3.2

3.2

3.2

3.4

3.4

3.4

3.4

3.4

3.4

Hororata 33 kV BASE 2.8

2.8

2.8

2.8

2.8

2.8

2.8

2.8

2.8

2.8

2.8

GS1 2.8

2.8

2.8

2.8

2.8

2.8

2.8

2.8

2.8

2.8

2.8

GS2 2.8

2.8

2.8

2.8

2.8

2.8

2.8

2.8

2.8

2.8

2.8

GS3 2.8

2.8

2.8

2.8

2.8

2.8

2.8

2.8

2.8

2.8

2.8

GS4 2.8

2.8

2.8

2.8

2.8

2.8

2.8

2.8

2.8

2.8

2.9

GS5 2.8

2.8

2.8

2.8

2.8

2.8

2.8

2.8

2.8

2.8

2.8

Hororata 66 kV BASE 4.6

4.6

4.6

4.6

4.6

4.6

4.6

4.6

4.6

4.6

4.6

GS1 4.6

4.6

4.6

4.6

4.6

4.6

4.6

4.6

4.6

4.6

4.6

GS2 4.6

4.6

4.6

4.6

4.6

4.6

4.6

4.6

4.6

4.6

4.6

GS3 4.6

4.6

4.6

4.6

4.6

4.6

4.6

4.6

4.6

4.6

4.6

GS4 4.6

4.6

4.6

4.6

4.6

4.6

4.6

4.6

4.6

4.6

4.7

GS5 4.6

4.6

4.6

4.6

4.6

4.6

4.6

4.6

4.6

4.6

4.6

Islington 33 kV BASE 14.6

14.7

14.7

14.7

14.7

14.7

14.7

14.7

14.7

14.7

14.7

GS1 14.6

14.7

14.7

14.7

14.7

14.7

14.9

15.0

15.0

15.0

15.0

GS2 14.6

14.7

14.7

14.7

14.7

14.7

14.9

14.9

14.9

14.9

14.9

GS3 14.6

14.7

14.7

14.7

14.7

14.7

14.7

14.7

14.7

14.7

14.7

GS4 14.6

14.7

15.0

15.0

15.0

15.0

15.0

15.0

15.0

15.0

15.0

GS5 14.6

14.7

14.7

14.7

14.7

15.0

15.0

15.0

15.0

15.0

15.0

Islington 66 kV BASE 15.3

15.3

15.3

15.3

15.3

15.3

15.3

15.3

15.3

15.3

15.3

GS1 15.3

15.3

15.4

15.4

15.4

15.4

15.9

16.1

16.1

16.1

16.1

GS2 15.3

15.3

15.3

15.3

15.4

15.4

15.9

15.9

15.9

15.9

15.9

GS3 15.3

15.3

15.3

15.3

15.3

15.3

15.3

15.3

15.3

15.3

15.3

GS4 15.3

15.3

16.1

16.1

16.1

16.1

16.1

16.1

16.1

16.1

16.2

GS5 15.3

15.3

15.4

15.4

15.4

16.1

16.1

16.1

16.1

16.1

16.1

© Transpower New Zealand Limited 2016.All rights reserved. 59

Page 60: 2015 ten year forecast fault level report - Transpower · PDF fileThis publication presents an update to the ten year forecast fault levels ... calculation. Minimum fault level calculations

Ten year forecast fault Levels

Islington 220 kV BASE 6.8

6.8

6.8

6.8

6.8

6.8

6.8

6.8

6.8

6.8

6.8

GS1 6.8

6.8

6.8

6.8

6.8

6.8

7.1

7.3

7.3

7.3

7.3

GS2 6.8

6.8

6.8

6.8

6.8

6.8

7.1

7.1

7.1

7.1

7.1

GS3 6.8

6.8

6.8

6.8

6.8

6.8

6.8

6.8

6.8

6.8

6.8

GS4 6.8

6.8

7.3

7.3

7.3

7.3

7.3

7.3

7.3

7.3

7.3

GS5 6.8

6.8

6.8

6.8

6.8

7.3

7.3

7.3

7.3

7.3

7.3

Kaiapoi 11 kV BASE 12.9

12.9

12.9

12.9

12.9

12.9

12.9

12.9

12.9

12.9

12.9

GS1 12.9

12.9

12.9

12.9

12.9

12.9

13.0

13.0

13.0

13.0

13.0

GS2 12.9

12.9

12.9

12.9

12.9

12.9

13.0

13.0

13.0

13.0

13.0

GS3 12.9

12.9

12.9

12.9

12.9

12.9

12.9

12.9

12.9

12.9

12.9

GS4 12.9

12.9

13.0

13.0

13.0

13.0

13.0

13.0

13.0

13.0

13.1

GS5 12.9

12.9

12.9

12.9

12.9

13.0

13.0

13.0

13.0

13.0

13.0

Kaiapoi 66 kV BASE 5.6

5.6

5.6

5.6

5.6

5.6

5.6

5.6

5.6

5.6

5.6

GS1 5.6

5.6

5.6

5.6

5.6

5.6

5.6

5.7

5.7

5.7

5.7

GS2 5.6

5.6

5.6

5.6

5.6

5.6

5.6

5.6

5.6

5.6

5.6

GS3 5.6

5.6

5.6

5.6

5.6

5.6

5.6

5.6

5.6

5.6

5.6

GS4 5.6

5.6

5.7

5.7

5.7

5.7

5.7

5.7

5.7

5.7

5.7

GS5 5.6

5.6

5.6

5.6

5.6

5.7

5.7

5.7

5.7

5.7

5.7

Kimberley 66 kV (T1) BASE 4.2

4.2

4.2

4.2

4.2

4.2

4.2

4.2

4.2

4.2

4.2

GS1 4.2

4.2

4.2

4.2

4.2

4.2

4.2

4.2

4.2

4.2

4.2

GS2 4.2

4.2

4.2

4.2

4.2

4.2

4.2

4.2

4.2

4.2

4.2

GS3 4.2

4.2

4.2

4.2

4.2

4.2

4.2

4.2

4.2

4.2

4.2

GS4 4.2

4.2

4.2

4.2

4.2

4.2

4.2

4.2

4.2

4.2

4.2

GS5 4.2

4.2

4.2

4.2

4.2

4.2

4.2

4.2

4.2

4.2

4.2

Kimberley 66 kV (T2) BASE 4.2

4.2

4.2

4.2

4.2

4.2

4.2

4.2

4.2

4.2

4.2

GS1 4.2

4.2

4.2

4.2

4.2

4.2

4.2

4.2

4.2

4.2

4.2

GS2 4.2

4.2

4.2

4.2

4.2

4.2

4.2

4.2

4.2

4.2

4.2

GS3 4.2

4.2

4.2

4.2

4.2

4.2

4.2

4.2

4.2

4.2

4.2

GS4 4.2

4.2

4.2

4.2

4.2

4.2

4.2

4.2

4.2

4.2

4.2

GS5 4.2

4.2

4.2

4.2

4.2

4.2

4.2

4.2

4.2

4.2

4.2

Southbrook 33 kV BASE 6.0

6.0

6.0

6.0

6.0

6.0

6.0

6.0

6.0

6.0

6.0

GS1 6.0

6.0

6.0

6.0

6.0

6.0

6.1

6.1

6.1

6.1

6.1

GS2 6.0

6.0

6.0

6.0

6.0

6.0

6.1

6.1

6.1

6.1

6.1

GS3 6.0

6.0

6.0

6.0

6.0

6.0

6.0

6.0

6.0

6.0

6.0

GS4 6.0

6.0

6.1

6.1

6.1

6.1

6.1

6.1

6.1

6.1

6.1

GS5 6.0

6.0

6.0

6.0

6.0

6.1

6.1

6.1

6.1

6.1

6.1

© Transpower New Zealand Limited 2016.All rights reserved. 60

Page 61: 2015 ten year forecast fault level report - Transpower · PDF fileThis publication presents an update to the ten year forecast fault levels ... calculation. Minimum fault level calculations

Ten year forecast fault Levels

Southbrook 66 kV BASE 7.1

7.1

7.1

7.1

7.1

7.1

7.1

7.1

7.1

7.1

7.1

GS1 7.1

7.1

7.1

7.1

7.1

7.1

7.2

7.3

7.3

7.3

7.3

GS2 7.1

7.1

7.1

7.1

7.1

7.1

7.2

7.2

7.2

7.2

7.2

GS3 7.1

7.1

7.1

7.1

7.1

7.1

7.1

7.1

7.1

7.1

7.1

GS4 7.1

7.1

7.3

7.3

7.3

7.3

7.3

7.3

7.3

7.3

7.3

GS5 7.1

7.1

7.1

7.1

7.1

7.3

7.3

7.3

7.3

7.3

7.3

Waipara 33 kV BASE 1.8

1.8

1.8

1.8

1.8

1.8

1.8

1.8

1.8

1.8

1.8

GS1 1.8

1.8

1.8

1.8

1.8

1.8

1.8

1.8

1.8

1.8

1.8

GS2 1.8

1.8

1.8

1.8

1.8

1.8

1.8

1.8

1.8

1.8

1.8

GS3 1.8

1.8

1.8

1.8

1.8

1.8

1.8

1.8

1.8

1.8

1.8

GS4 1.8

1.8

1.8

1.8

1.8

1.8

1.8

1.8

1.8

1.8

1.8

GS5 1.8

1.8

1.8

1.8

1.8

1.8

1.8

1.8

1.8

1.8

1.8

Waipara 66 kV BASE 8.2

8.2

8.2

8.2

8.2

8.2

8.2

8.2

8.2

8.2

8.2

GS1 8.2

8.2

8.2

8.2

8.2

8.2

8.5

8.6

8.6

8.6

8.6

GS2 8.2

8.2

8.2

8.2

8.2

8.2

8.5

8.5

8.5

8.5

8.5

GS3 8.2

8.2

8.2

8.2

8.2

8.2

8.2

8.2

8.2

8.2

8.2

GS4 8.2

8.2

8.6

8.6

8.6

8.6

8.6

8.6

8.6

8.6

8.6

GS5 8.2

8.2

8.2

8.2

8.2

8.6

8.6

8.6

8.6

8.6

8.6

Waipara 220 kV (T12) BASE 3.8

3.8

3.8

3.8

3.8

3.8

3.8

3.8

3.8

3.8

3.8

GS1 3.8

3.8

3.8

3.8

3.8

3.8

4.0

4.1

4.1

4.1

4.1

GS2 3.8

3.8

3.8

3.8

3.8

3.8

4.0

4.0

4.0

4.0

4.0

GS3 3.8

3.8

3.8

3.8

3.8

3.8

3.8

3.8

3.8

3.8

3.8

GS4 3.8

3.8

4.1

4.1

4.1

4.1

4.1

4.1

4.1

4.1

4.1

GS5 3.8

3.8

3.8

3.8

3.8

4.1

4.1

4.1

4.1

4.1

4.1

Waipara 220 kV (T13) BASE 3.8

3.8

3.8

3.8

3.8

3.8

3.8

3.8

3.8

3.8

3.8

GS1 3.8

3.8

3.8

3.8

3.8

3.8

4.0

4.1

4.1

4.1

4.1

GS2 3.8

3.8

3.8

3.8

3.8

3.8

4.0

4.0

4.0

4.0

4.0

GS3 3.8

3.8

3.8

3.8

3.8

3.8

3.8

3.8

3.8

3.8

3.8

GS4 3.8

3.8

4.1

4.1

4.1

4.1

4.1

4.1

4.1

4.1

4.1

GS5 3.8

3.8

3.8

3.8

3.8

4.1

4.1

4.1

4.1

4.1

4.1

SOUTH CANTERBURY

Albury 11 kV BASE 4.5

4.5

4.5

4.5

4.5

4.5

4.5

4.5

4.5

4.5

4.5

GS1 4.5

4.5

4.5

4.5

4.5

4.5

4.5

4.5

4.5

4.5

4.5

GS2 4.5

4.5

4.5

4.5

4.5

4.5

4.5

4.5

4.5

4.5

4.5

GS3 4.5

4.5

4.5

4.5

4.5

4.5

4.5

4.5

4.5

4.5

4.5

© Transpower New Zealand Limited 2016.All rights reserved. 61

Page 62: 2015 ten year forecast fault level report - Transpower · PDF fileThis publication presents an update to the ten year forecast fault levels ... calculation. Minimum fault level calculations

Ten year forecast fault Levels

GS4 4.5

4.5

4.5

4.5

4.5

4.5

4.5

4.5

4.5

4.5

4.5

GS5 4.5

4.5

4.5

4.5

4.5

4.5

4.5

4.5

4.5

4.5

4.5

Albury 110 kV BASE 2.8

2.8

2.8

2.8

2.8

2.8

2.8

2.8

2.8

2.8

2.8

GS1 2.8

2.8

2.8

2.8

2.8

2.8

2.8

2.8

2.8

2.8

2.8

GS2 2.8

2.8

2.8

2.8

2.8

2.8

2.8

2.8

2.8

2.8

2.8

GS3 2.8

2.8

2.8

2.8

2.8

2.8

2.8

2.8

2.8

2.8

2.8

GS4 2.8

2.8

2.8

2.8

2.8

2.8

2.8

2.8

2.8

2.8

2.8

GS5 2.8

2.8

2.8

2.8

2.8

2.8

2.8

2.8

2.8

2.8

2.8

Aviemore 220 kV BASE 15.9

16.0

16.0

16.0

16.0

16.0

16.0

16.0

16.0

16.0

16.0

GS1 15.9

16.0

16.0

16.0

16.0

16.0

16.1

16.1

16.1

16.1

16.1

GS2 15.9

16.0

16.0

16.0

16.0

16.0

16.1

16.1

16.1

16.1

16.1

GS3 15.9

16.0

16.0

16.0

16.0

16.0

16.0

16.0

16.0

16.0

16.0

GS4 15.9

16.0

16.1

16.1

16.1

16.1

16.1

16.1

16.1

16.1

16.2

GS5 15.9

16.0

16.0

16.0

16.0

16.1

16.1

16.1

16.1

16.1

16.1

Bells Pond 110 kV BASE 3.9

3.9

3.9

3.9

3.9

3.9

3.9

3.9

3.9

3.9

3.9

GS1 3.9

3.9

3.9

3.9

3.9

3.9

3.9

3.9

3.9

3.9

3.9

GS2 3.9

3.9

3.9

3.9

3.9

3.9

3.9

3.9

3.9

3.9

3.9

GS3 3.9

3.9

3.9

3.9

3.9

3.9

3.9

3.9

3.9

3.9

3.9

GS4 3.9

3.9

3.9

3.9

3.9

3.9

3.9

3.9

3.9

3.9

3.9

GS5 3.9

3.9

3.9

3.9

3.9

3.9

3.9

3.9

3.9

3.9

3.9

Benmore 220 kV BASE 19.6

19.7

19.7

19.7

19.7

19.7

19.7

19.7

19.7

19.7

19.7

GS1 19.6

19.7

19.8

19.8

19.8

19.8

19.9

20.0

20.0

20.0

20.0

GS2 19.6

19.7

19.7

19.7

19.8

19.8

19.9

19.9

19.9

19.9

19.9

GS3 19.6

19.7

19.7

19.7

19.7

19.7

19.7

19.7

19.7

19.7

19.7

GS4 19.6

19.7

20.0

20.0

20.0

20.0

20.0

20.0

20.0

20.0

20.0

GS5 19.6

19.7

19.8

19.8

19.8

20.0

20.0

20.0

20.0

20.0

20.0

Black Point 110 kV BASE 3.2

3.2

3.2

3.2

3.2

3.2

3.2

3.2

3.2

3.2

3.2

GS1 3.2

3.2

3.2

3.2

3.2

3.2

3.2

3.2

3.2

3.2

3.2

GS2 3.2

3.2

3.2

3.2

3.2

3.2

3.2

3.2

3.2

3.2

3.2

GS3 3.2

3.2

3.2

3.2

3.2

3.2

3.2

3.2

3.2

3.2

3.2

GS4 3.2

3.2

3.2

3.2

3.2

3.2

3.2

3.2

3.2

3.2

3.2

GS5 3.2

3.2

3.2

3.2

3.2

3.2

3.2

3.2

3.2

3.2

3.2

Livingstone 220 kV BASE 8.2

9.0

9.0

9.0

9.0

9.0

9.0

9.0

9.0

9.0

9.0

GS1 8.2

9.0

9.0

9.0

9.0

9.0

9.1

9.1

9.1

9.1

9.1

GS2 8.2

9.0

9.0

9.0

9.0

9.0

9.1

9.1

9.1

9.1

9.1

GS3 8.2

9.0

9.0

9.0

9.0

9.0

9.0

9.0

9.0

9.0

9.0

GS4 8.2

9.0

9.1

9.1

9.1

9.1

9.1

9.1

9.1

9.1

9.1

© Transpower New Zealand Limited 2016.All rights reserved. 62

Page 63: 2015 ten year forecast fault level report - Transpower · PDF fileThis publication presents an update to the ten year forecast fault levels ... calculation. Minimum fault level calculations

Ten year forecast fault Levels

GS5 8.2

9.0

9.0

9.0

9.0

9.1

9.1

9.1

9.1

9.1

9.1

Oamaru 33 kV BASE 6.0

6.0

6.0

6.0

6.0

6.0

6.0

6.0

6.0

6.0

6.0

GS1 6.0

6.0

6.0

6.0

6.0

6.0

6.0

6.0

6.0

6.0

6.0

GS2 6.0

6.0

6.0

6.0

6.0

6.0

6.0

6.0

6.0

6.0

6.0

GS3 6.0

6.0

6.0

6.0

6.0

6.0

6.0

6.0

6.0

6.0

6.0

GS4 6.0

6.0

6.0

6.0

6.0

6.0

6.0

6.0

6.0

6.0

6.0

GS5 6.0

6.0

6.0

6.0

6.0

6.0

6.0

6.0

6.0

6.0

6.0

Oamaru 110 kV (T1) BASE 2.1

2.1

2.1

2.1

2.1

2.1

2.1

2.1

2.1

2.1

2.1

GS1 2.1

2.1

2.1

2.1

2.1

2.1

2.1

2.1

2.1

2.1

2.1

GS2 2.1

2.1

2.1

2.1

2.1

2.1

2.1

2.1

2.1

2.1

2.1

GS3 2.1

2.1

2.1

2.1

2.1

2.1

2.1

2.1

2.1

2.1

2.1

GS4 2.1

2.1

2.1

2.1

2.1

2.1

2.1

2.1

2.1

2.1

2.1

GS5 2.1

2.1

2.1

2.1

2.1

2.1

2.1

2.1

2.1

2.1

2.1

Oamaru 110 kV (T2) BASE 2.6

2.6

2.6

2.6

2.6

2.6

2.6

2.6

2.6

2.6

2.6

GS1 2.6

2.6

2.6

2.6

2.6

2.6

2.6

2.6

2.6

2.6

2.6

GS2 2.6

2.6

2.6

2.6

2.6

2.6

2.6

2.6

2.6

2.6

2.6

GS3 2.6

2.6

2.6

2.6

2.6

2.6

2.6

2.6

2.6

2.6

2.6

GS4 2.6

2.6

2.6

2.6

2.6

2.6

2.6

2.6

2.6

2.6

2.6

GS5 2.6

2.6

2.6

2.6

2.6

2.6

2.6

2.6

2.6

2.6

2.6

Ohau A 220 kV BASE 17.8

17.8

17.8

17.8

17.8

17.8

17.8

17.8

17.8

17.8

17.8

GS1 17.8

17.8

18.0

18.0

18.0

18.0

18.1

18.2

18.2

18.2

18.2

GS2 17.8

17.8

17.8

17.8

18.0

18.0

18.1

18.1

18.1

18.1

18.1

GS3 17.8

17.8

17.8

17.8

17.8

17.8

17.8

17.8

17.8

17.8

17.8

GS4 17.8

17.8

18.2

18.2

18.2

18.2

18.2

18.2

18.2

18.2

18.2

GS5 17.8

17.8

18.0

18.0

18.0

18.2

18.2

18.2

18.2

18.2

18.2

Ohau B 220 kV BASE 19.3

19.3

19.3

19.3

19.3

19.3

19.3

19.3

19.3

19.3

19.3

GS1 19.3

19.3

19.5

19.5

19.5

19.5

19.7

19.7

19.7

19.7

19.7

GS2 19.3

19.3

19.3

19.3

19.5

19.5

19.7

19.7

19.7

19.7

19.7

GS3 19.3

19.3

19.3

19.3

19.3

19.3

19.3

19.3

19.3

19.3

19.3

GS4 19.3

19.3

19.7

19.7

19.7

19.7

19.7

19.7

19.7

19.7

19.8

GS5 19.3

19.3

19.5

19.5

19.5

19.7

19.7

19.7

19.7

19.7

19.7

Ohau C 220 kV BASE 17.2

17.2

17.2

17.2

17.2

17.2

17.2

17.2

17.2

17.2

17.2

GS1 17.2

17.2

17.3

17.3

17.3

17.4

17.5

17.5

17.5

17.5

17.5

GS2 17.2

17.2

17.2

17.2

17.3

17.4

17.5

17.5

17.5

17.5

17.5

GS3 17.2

17.2

17.2

17.2

17.2

17.2

17.2

17.2

17.2

17.2

17.2

GS4 17.2

17.2

17.5

17.5

17.5

17.5

17.5

17.5

17.5

17.5

17.5

GS5 17.2

17.2

17.4

17.4

17.4

17.5

17.5

17.5

17.5

17.5

17.5

© Transpower New Zealand Limited 2016.All rights reserved. 63

Page 64: 2015 ten year forecast fault level report - Transpower · PDF fileThis publication presents an update to the ten year forecast fault levels ... calculation. Minimum fault level calculations

Ten year forecast fault Levels

Studholme 11 kV BASE 9.2

9.2

9.2

9.2

9.2

9.2

9.2

9.2

9.2

9.2

9.2

GS1 9.2

9.2

9.2

9.2

9.2

9.2

9.2

9.2

9.2

9.2

9.2

GS2 9.2

9.2

9.2

9.2

9.2

9.2

9.2

9.2

9.2

9.2

9.2

GS3 9.2

9.2

9.2

9.2

9.2

9.2

9.2

9.2

9.2

9.2

9.2

GS4 9.2

9.2

9.2

9.2

9.2

9.2

9.2

9.2

9.2

9.2

9.2

GS5 9.2

9.2

9.2

9.2

9.2

9.2

9.2

9.2

9.2

9.2

9.2

Studholme 110 kV BASE 3.7

3.7

3.7

3.7

3.7

3.7

3.7

3.7

3.7

3.7

3.7

GS1 3.7

3.7

3.7

3.7

3.7

3.7

3.7

3.7

3.7

3.7

3.7

GS2 3.7

3.7

3.7

3.7

3.7

3.7

3.7

3.7

3.7

3.7

3.7

GS3 3.7

3.7

3.7

3.7

3.7

3.7

3.7

3.7

3.7

3.7

3.7

GS4 3.7

3.7

3.7

3.7

3.7

3.7

3.7

3.7

3.7

3.7

3.7

GS5 3.7

3.7

3.7

3.7

3.7

3.7

3.7

3.7

3.7

3.7

3.7

Tekapo A 11 kV BASE 14.7

14.7

14.7

14.7

14.7

14.7

14.7

14.7

14.7

14.7

14.7

GS1 14.7

14.7

14.7

14.7

14.7

14.7

14.7

14.7

14.7

14.7

14.7

GS2 14.7

14.7

14.7

14.7

14.7

14.7

14.7

14.7

14.7

14.7

14.7

GS3 14.7

14.7

14.7

14.7

14.7

14.7

14.7

14.7

14.7

14.7

14.7

GS4 14.7

14.7

14.7

14.7

14.7

14.7

14.7

14.7

14.7

14.7

14.7

GS5 14.7

14.7

14.7

14.7

14.7

14.7

14.7

14.7

14.7

14.7

14.7

Tekapo A 33 kV BASE 1.6

1.6

1.6

1.6

1.6

1.6

1.6

1.6

1.6

1.6

1.6

GS1 1.6

1.6

1.6

1.6

1.6

1.6

1.6

1.6

1.6

1.6

1.6

GS2 1.6

1.6

1.6

1.6

1.6

1.6

1.6

1.6

1.6

1.6

1.6

GS3 1.6

1.6

1.6

1.6

1.6

1.6

1.6

1.6

1.6

1.6

1.6

GS4 1.6

1.6

1.6

1.6

1.6

1.6

1.6

1.6

1.6

1.6

1.6

GS5 1.6

1.6

1.6

1.6

1.6

1.6

1.6

1.6

1.6

1.6

1.6

Tekapo A 110 kV BASE 1.9

1.9

1.9

1.9

1.9

1.9

1.9

1.9

1.9

1.9

1.9

GS1 1.9

1.9

2.0

2.0

2.0

2.0

2.0

2.0

2.0

2.0

2.0

GS2 1.9

1.9

1.9

1.9

2.0

2.0

2.0

2.0

2.0

2.0

2.0

GS3 1.9

1.9

1.9

1.9

1.9

1.9

1.9

1.9

1.9

1.9

1.9

GS4 1.9

1.9

2.0

2.0

2.0

2.0

2.0

2.0

2.0

2.0

2.0

GS5 1.9

1.9

2.0

2.0

2.0

2.0

2.0

2.0

2.0

2.0

2.0

Tekapo B 220 kV BASE 11.9

11.9

11.9

11.9

11.9

11.9

11.9

11.9

11.9

11.9

11.9

GS1 11.9

11.9

12.0

12.0

12.0

12.0

12.1

12.1

12.1

12.1

12.1

GS2 11.9

11.9

11.9

11.9

12.0

12.0

12.1

12.1

12.1

12.1

12.1

GS3 11.9

11.9

11.9

11.9

11.9

11.9

11.9

11.9

11.9

11.9

11.9

GS4 11.9

11.9

12.1

12.1

12.1

12.1

12.1

12.1

12.1

12.1

12.1

GS5 11.9

11.9

12.0

12.0

12.0

12.1

12.1

12.1

12.1

12.1

12.1

© Transpower New Zealand Limited 2016.All rights reserved. 64

Page 65: 2015 ten year forecast fault level report - Transpower · PDF fileThis publication presents an update to the ten year forecast fault levels ... calculation. Minimum fault level calculations

Ten year forecast fault Levels

Temuka 33 kV BASE 7.0

7.0

7.0

7.0

7.0

7.0

7.0

7.0

7.0

7.0

7.0

GS1 7.0

7.0

7.0

7.0

7.0

7.0

7.0

7.0

7.0

7.0

7.0

GS2 7.0

7.0

7.0

7.0

7.0

7.0

7.0

7.0

7.0

7.0

7.0

GS3 7.0

7.0

7.0

7.0

7.0

7.0

7.0

7.0

7.0

7.0

7.0

GS4 7.0

7.0

7.0

7.0

7.0

7.0

7.0

7.0

7.0

7.0

7.0

GS5 7.0

7.0

7.0

7.0

7.0

7.0

7.0

7.0

7.0

7.0

7.0

Temuka 110 kV (T1) BASE 3.6

3.6

3.6

3.6

3.6

3.6

3.6

3.6

3.6

3.6

3.6

GS1 3.6

3.6

3.6

3.6

3.6

3.6

3.6

3.6

3.6

3.6

3.6

GS2 3.6

3.6

3.6

3.6

3.6

3.6

3.6

3.6

3.6

3.6

3.6

GS3 3.6

3.6

3.6

3.6

3.6

3.6

3.6

3.6

3.6

3.6

3.6

GS4 3.6

3.6

3.6

3.6

3.6

3.6

3.6

3.6

3.6

3.6

3.6

GS5 3.6

3.6

3.6

3.6

3.6

3.6

3.6

3.6

3.6

3.6

3.6

Temuka 110 kV (T2) BASE 3.7

3.7

3.7

3.7

3.7

3.7

3.7

3.7

3.7

3.7

3.7

GS1 3.7

3.7

3.7

3.7

3.7

3.7

3.7

3.7

3.7

3.7

3.7

GS2 3.7

3.7

3.7

3.7

3.7

3.7

3.7

3.7

3.7

3.7

3.7

GS3 3.7

3.7

3.7

3.7

3.7

3.7

3.7

3.7

3.7

3.7

3.7

GS4 3.7

3.7

3.7

3.7

3.7

3.7

3.7

3.7

3.7

3.7

3.7

GS5 3.7

3.7

3.7

3.7

3.7

3.7

3.7

3.7

3.7

3.7

3.7

Timaru 11 kV BASE 15.4

15.4

15.4

15.4

15.4

15.4

15.4

15.4

15.4

15.4

15.4

GS1 15.4

15.4

15.4

15.4

15.4

15.4

15.5

15.5

15.5

15.5

15.5

GS2 15.4

15.4

15.4

15.4

15.4

15.4

15.5

15.5

15.5

15.5

15.5

GS3 15.4

15.4

15.4

15.4

15.4

15.4

15.4

15.4

15.4

15.4

15.4

GS4 15.4

15.4

15.5

15.5

15.5

15.5

15.5

15.5

15.5

15.5

15.5

GS5 15.4

15.4

15.4

15.4

15.4

15.5

15.5

15.5

15.5

15.5

15.5

Timaru 110 kV BASE 5.9

5.9

5.9

5.9

5.9

5.9

5.9

5.9

5.9

5.9

5.9

GS1 5.9

5.9

6.0

6.0

6.0

6.0

6.0

6.0

6.0

6.0

6.0

GS2 5.9

5.9

5.9

5.9

6.0

6.0

6.0

6.0

6.0

6.0

6.0

GS3 5.9

5.9

5.9

5.9

5.9

5.9

5.9

5.9

5.9

5.9

5.9

GS4 5.9

5.9

6.0

6.0

6.0

6.0

6.0

6.0

6.0

6.0

6.0

GS5 5.9

5.9

6.0

6.0

6.0

6.0

6.0

6.0

6.0

6.0

6.0

Timaru 220 kV (T5) BASE 4.8

4.8

4.8

4.8

4.8

4.8

4.8

4.8

4.8

4.8

4.8

GS1 4.8

4.8

4.8

4.8

4.8

4.8

4.8

4.8

4.8

4.8

4.8

GS2 4.8

4.8

4.8

4.8

4.8

4.8

4.8

4.8

4.8

4.8

4.8

GS3 4.8

4.8

4.8

4.8

4.8

4.8

4.8

4.8

4.8

4.8

4.8

GS4 4.8

4.8

4.8

4.8

4.8

4.8

4.8

4.8

4.8

4.8

4.8

GS5 4.8

4.8

4.8

4.8

4.8

4.8

4.8

4.8

4.8

4.8

4.8

© Transpower New Zealand Limited 2016.All rights reserved. 65

Page 66: 2015 ten year forecast fault level report - Transpower · PDF fileThis publication presents an update to the ten year forecast fault levels ... calculation. Minimum fault level calculations

Ten year forecast fault Levels

Timaru 220 kV (T8) BASE 4.8

4.8

4.8

4.8

4.8

4.8

4.8

4.8

4.8

4.8

4.8

GS1 4.8

4.8

4.8

4.8

4.8

4.8

4.8

4.8

4.8

4.8

4.8

GS2 4.8

4.8

4.8

4.8

4.8

4.8

4.8

4.8

4.8

4.8

4.8

GS3 4.8

4.8

4.8

4.8

4.8

4.8

4.8

4.8

4.8

4.8

4.8

GS4 4.8

4.8

4.8

4.8

4.8

4.8

4.8

4.8

4.8

4.8

4.8

GS5 4.8

4.8

4.8

4.8

4.8

4.8

4.8

4.8

4.8

4.8

4.8

Twizel 33 kV (T18) BASE 4.7

4.7

4.7

4.7

4.7

4.7

4.7

4.7

4.7

4.7

4.7

GS1 4.7

4.7

7.2

7.2

7.2

7.2

7.2

7.2

7.2

7.2

7.2

GS2 4.7

4.7

4.7

4.7

7.2

7.2

7.2

7.2

7.2

7.2

7.2

GS3 4.7

4.7

4.7

4.7

4.7

4.7

4.7

4.7

4.7

4.7

4.7

GS4 4.7

4.7

7.2

7.2

7.2

7.2

7.2

7.2

7.2

7.2

7.2

GS5 4.7

4.7

7.2

7.2

7.2

7.2

7.2

7.2

7.2

7.2

7.2

Twizel 33 kV (T19) BASE 4.7

4.7

4.7

4.7

4.7

4.7

4.7

4.7

4.7

4.7

4.7

GS1 4.7

4.7

4.7

4.7

4.7

4.7

4.7

4.7

4.7

4.7

4.7

GS2 4.7

4.7

4.7

4.7

4.7

4.7

4.7

4.7

4.7

4.7

4.7

GS3 4.7

4.7

4.7

4.7

4.7

4.7

4.7

4.7

4.7

4.7

4.7

GS4 4.7

4.7

4.7

4.7

4.7

4.7

4.7

4.7

4.7

4.7

4.7

GS5 4.7

4.7

4.7

4.7

4.7

4.7

4.7

4.7

4.7

4.7

4.7

Twizel 220 kV BASE 20.8

20.8

20.8

20.8

20.8

20.8

20.8

20.8

20.8

20.8

20.8

GS1 20.8

20.8

21.0

21.0

21.0

21.1

21.3

21.3

21.3

21.3

21.3

GS2 20.8

20.8

20.8

20.8

21.0

21.1

21.3

21.3

21.3

21.3

21.3

GS3 20.8

20.8

20.8

20.8

20.8

20.8

20.8

20.8

20.8

20.8

20.8

GS4 20.8

20.8

21.3

21.3

21.3

21.3

21.3

21.3

21.3

21.3

21.4

GS5 20.8

20.8

21.1

21.1

21.1

21.3

21.3

21.3

21.3

21.3

21.3

Waitaki 11 kV (T21) BASE 36.0

36.0

36.0

36.0

36.0

36.0

36.0

36.0

36.0

36.0

36.0

GS1 36.0

36.0

36.0

36.0

36.0

36.0

36.0

36.0

36.0

36.0

36.0

GS2 36.0

36.0

36.0

36.0

36.0

36.0

36.0

36.0

36.0

36.0

36.0

GS3 36.0

36.0

36.0

36.0

36.0

36.0

36.0

36.0

36.0

36.0

36.0

GS4 36.0

36.0

36.0

36.0

36.0

36.0

36.0

36.0

36.0

36.0

36.0

GS5 36.0

36.0

36.0

36.0

36.0

36.0

36.0

36.0

36.0

36.0

36.0

Waitaki 11 kV (T22) BASE 36.3

36.3

36.3

36.3

36.3

36.3

36.3

36.3

36.3

36.3

36.3

GS1 36.3

36.3

36.3

36.3

36.3

36.3

36.3

36.3

36.3

36.3

36.3

GS2 36.3

36.3

36.3

36.3

36.3

36.3

36.3

36.3

36.3

36.3

36.3

GS3 36.3

36.3

36.3

36.3

36.3

36.3

36.3

36.3

36.3

36.3

36.3

GS4 36.3

36.3

36.3

36.3

36.3

36.3

36.3

36.3

36.3

36.3

36.3

GS5 36.3

36.3

36.3

36.3

36.3

36.3

36.3

36.3

36.3

36.3

36.3

© Transpower New Zealand Limited 2016.All rights reserved. 66

Page 67: 2015 ten year forecast fault level report - Transpower · PDF fileThis publication presents an update to the ten year forecast fault levels ... calculation. Minimum fault level calculations

Ten year forecast fault Levels

Waitaki 11 kV (T28) BASE 36.3

36.3

36.3

36.3

36.3

36.3

36.3

36.3

36.3

36.3

36.3

GS1 36.3

36.3

36.3

36.3

36.3

36.3

36.3

36.3

36.3

36.3

36.3

GS2 36.3

36.3

36.3

36.3

36.3

36.3

36.3

36.3

36.3

36.3

36.3

GS3 36.3

36.3

36.3

36.3

36.3

36.3

36.3

36.3

36.3

36.3

36.3

GS4 36.3

36.3

36.3

36.3

36.3

36.3

36.3

36.3

36.3

36.3

36.3

GS5 36.3

36.3

36.3

36.3

36.3

36.3

36.3

36.3

36.3

36.3

36.3

Waitaki 33 kV BASE 0.7

0.7

0.7

0.7

0.7

0.7

0.7

0.7

0.7

0.7

0.7

GS1 0.7

0.7

0.7

0.7

0.7

0.7

0.7

0.7

0.7

0.7

0.7

GS2 0.7

0.7

0.7

0.7

0.7

0.7

0.7

0.7

0.7

0.7

0.7

GS3 0.7

0.7

0.7

0.7

0.7

0.7

0.7

0.7

0.7

0.7

0.7

GS4 0.7

0.7

0.7

0.7

0.7

0.7

0.7

0.7

0.7

0.7

0.7

GS5 0.7

0.7

0.7

0.7

0.7

0.7

0.7

0.7

0.7

0.7

0.7

Waitaki 220 kV BASE 13.4

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

GS1 13.4

13.5

13.6

13.6

13.6

13.6

13.7

13.7

13.7

13.7

13.7

GS2 13.4

13.5

13.5

13.5

13.6

13.6

13.7

13.7

13.7

13.7

13.7

GS3 13.4

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

GS4 13.4

13.5

13.7

13.7

13.7

13.7

13.7

13.7

13.7

13.7

13.7

GS5 13.4

13.5

13.6

13.6

13.6

13.7

13.7

13.7

13.7

13.7

13.7

OTAGO-SOUTHLAND

Balclutha 33 kV BASE 3.8

3.8

3.6

3.6

3.6

3.6

3.6

3.6

3.6

3.6

3.6

GS1 3.8

3.8

3.6

3.6

3.6

3.6

3.6

3.6

3.6

3.6

3.6

GS2 3.8

3.8

3.6

3.6

3.6

3.6

3.6

3.6

3.6

3.6

3.6

GS3 3.8

3.8

3.6

3.6

3.6

3.6

3.6

3.6

3.6

3.6

3.6

GS4 3.8

3.8

3.6

3.6

3.6

3.6

3.6

3.6

3.6

3.6

3.6

GS5 3.8

3.8

3.6

3.6

3.6

3.6

3.6

3.6

3.6

3.6

3.6

Balclutha 110 kV BASE 2.7

2.7

2.4

2.4

2.4

2.4

2.4

2.4

2.4

2.4

2.4

GS1 2.7

2.7

2.4

2.4

2.4

2.4

2.4

2.4

2.4

2.4

2.4

GS2 2.7

2.7

2.4

2.4

2.4

2.4

2.4

2.4

2.4

2.4

2.4

GS3 2.7

2.7

2.4

2.4

2.4

2.4

2.4

2.4

2.4

2.4

2.4

GS4 2.7

2.7

2.4

2.4

2.4

2.4

2.4

2.4

2.4

2.4

2.4

GS5 2.7

2.7

2.4

2.4

2.4

2.4

2.4

2.4

2.4

2.4

2.4

Berwick 110 kV BASE 4.7

4.7

4.5

4.5

4.5

4.5

4.5

4.5

4.5

4.5

4.5

GS1 4.7

4.7

4.5

4.5

4.5

4.5

4.5

4.5

4.5

4.5

4.5

GS2 4.7

4.7

4.5

4.5

4.5

4.5

4.5

4.5

4.5

4.5

4.5

GS3 4.7

4.7

4.5

4.5

4.5

4.5

4.5

4.5

4.5

4.5

4.5

© Transpower New Zealand Limited 2016.All rights reserved. 67

Page 68: 2015 ten year forecast fault level report - Transpower · PDF fileThis publication presents an update to the ten year forecast fault levels ... calculation. Minimum fault level calculations

Ten year forecast fault Levels

GS4 4.7

4.7

4.5

4.5

4.5

4.5

4.5

4.5

4.5

4.5

4.5

GS5 4.7

4.7

4.5

4.5

4.5

4.5

4.5

4.5

4.5

4.5

4.5

Brydone 11 kV BASE 12.4

12.4

13.8

13.8

13.8

13.8

13.8

13.8

13.8

13.8

13.8

GS1 12.4

12.4

13.8

13.8

13.8

13.8

13.8

13.8

13.8

13.8

13.8

GS2 12.4

12.4

13.8

13.8

13.8

13.8

13.8

13.8

13.8

13.8

13.8

GS3 12.4

12.4

13.8

13.8

13.8

13.8

13.8

13.8

13.8

13.8

13.8

GS4 12.4

12.4

13.8

13.8

13.8

13.8

13.8

13.8

13.8

13.8

13.8

GS5 12.4

12.4

13.8

13.8

13.8

13.8

13.8

13.8

13.8

13.8

13.8

Brydone 110 kV BASE 3.5

3.5

4.9

4.9

4.9

4.9

4.9

4.9

4.9

4.9

4.9

GS1 3.5

3.5

4.9

4.9

4.9

4.9

4.9

4.9

4.9

4.9

4.9

GS2 3.5

3.5

4.9

4.9

4.9

4.9

4.9

4.9

4.9

4.9

4.9

GS3 3.5

3.5

4.9

4.9

4.9

4.9

4.9

4.9

4.9

4.9

4.9

GS4 3.5

3.5

4.9

4.9

4.9

4.9

4.9

4.9

4.9

4.9

4.9

GS5 3.5

3.5

4.9

4.9

4.9

4.9

4.9

4.9

4.9

4.9

4.9

Clyde 33 kV BASE 10.4

10.4

10.4

10.4

10.4

10.4

10.4

10.4

10.4

10.4

10.4

GS1 10.4

10.4

10.4

10.4

10.4

10.4

10.4

10.4

10.4

10.4

10.4

GS2 10.4

10.4

10.4

10.4

10.4

10.4

10.4

10.4

10.4

10.4

10.4

GS3 10.4

10.4

10.4

10.4

10.4

10.4

10.4

10.4

10.4

10.4

10.4

GS4 10.4

10.4

10.4

10.4

10.4

10.4

10.4

10.4

10.4

10.4

10.4

GS5 10.4

10.4

10.4

10.4

10.4

10.4

10.4

10.4

10.4

10.4

10.4

Clyde 220 kV BASE 15.3

15.4

15.4

15.4

15.4

15.4

15.4

15.4

15.4

15.4

15.4

GS1 15.3

15.4

15.4

15.4

15.4

15.5

15.5

15.5

15.5

15.5

15.5

GS2 15.3

15.4

15.4

15.4

15.4

15.5

15.5

15.5

15.5

15.5

15.5

GS3 15.3

15.4

15.4

15.4

15.4

15.4

15.4

15.4

15.4

15.4

15.4

GS4 15.3

15.4

15.5

15.5

15.5

15.5

15.5

15.5

15.5

15.5

15.5

GS5 15.3

15.4

15.5

15.5

15.5

15.5

15.5

15.5

15.5

15.5

15.5

Cromwell 33 kV BASE 10.5

10.5

10.5

10.5

10.5

10.5

10.5

10.5

10.5

10.5

10.5

GS1 10.5

10.5

10.5

10.5

10.5

11.7

11.7

11.7

11.7

11.7

11.7

GS2 10.5

10.5

10.5

10.5

10.5

11.7

11.7

11.7

11.7

11.7

11.7

GS3 10.5

10.5

10.5

10.5

10.5

10.5

10.5

10.5

10.5

10.5

10.5

GS4 10.5

10.5

11.7

11.7

11.7

11.7

11.7

11.7

11.7

11.7

11.7

GS5 10.5

10.5

11.7

11.7

11.7

11.7

11.7

11.7

11.7

11.7

11.7

Cromwell 110 kV (T5A/B) BASE 4.9

4.9

4.9

4.9

4.9

4.9

4.9

4.9

4.9

4.9

4.9

GS1 4.9

4.9

4.9

4.9

4.9

5.0

5.0

5.0

5.0

5.0

5.0

GS2 4.9

4.9

4.9

4.9

4.9

5.0

5.0

5.0

5.0

5.0

5.0

GS3 4.9

4.9

4.9

4.9

4.9

4.9

4.9

4.9

4.9

4.9

4.9

GS4 4.9

4.9

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

© Transpower New Zealand Limited 2016.All rights reserved. 68

Page 69: 2015 ten year forecast fault level report - Transpower · PDF fileThis publication presents an update to the ten year forecast fault levels ... calculation. Minimum fault level calculations

Ten year forecast fault Levels

GS5 4.9

4.9

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

Cromwell 110 kV (T8) BASE 5.2

5.2

5.2

5.2

5.2

5.2

5.2

5.2

5.2

5.2

5.2

GS1 5.2

5.2

5.2

5.2

5.2

5.3

5.3

5.3

5.3

5.3

5.3

GS2 5.2

5.2

5.2

5.2

5.2

5.3

5.3

5.3

5.3

5.3

5.3

GS3 5.2

5.2

5.2

5.2

5.2

5.2

5.2

5.2

5.2

5.2

5.2

GS4 5.2

5.2

5.3

5.3

5.3

5.3

5.3

5.3

5.3

5.3

5.3

GS5 5.2

5.2

5.3

5.3

5.3

5.3

5.3

5.3

5.3

5.3

5.3

Cromwell 220 kV (T5A/B) BASE 10.0

10.0

10.0

10.0

10.0

10.0

10.0

10.0

10.0

10.0

10.0

GS1 10.0

10.0

10.0

10.0

10.0

10.1

10.1

10.1

10.1

10.1

10.1

GS2 10.0

10.0

10.0

10.0

10.0

10.1

10.1

10.1

10.1

10.1

10.1

GS3 10.0

10.0

10.0

10.0

10.0

10.0

10.0

10.0

10.0

10.0

10.0

GS4 10.0

10.0

10.1

10.1

10.1

10.1

10.1

10.1

10.1

10.1

10.1

GS5 10.0

10.0

10.1

10.1

10.1

10.1

10.1

10.1

10.1

10.1

10.1

Cromwell 220 kV (T8) BASE 10.0

10.0

10.0

10.0

10.0

10.0

10.0

10.0

10.0

10.0

10.0

GS1 10.0

10.0

10.0

10.0

10.0

10.1

10.1

10.1

10.1

10.1

10.1

GS2 10.0

10.0

10.0

10.0

10.0

10.1

10.1

10.1

10.1

10.1

10.1

GS3 10.0

10.0

10.0

10.0

10.0

10.0

10.0

10.0

10.0

10.0

10.0

GS4 10.0

10.0

10.1

10.1

10.1

10.1

10.1

10.1

10.1

10.1

10.1

GS5 10.0

10.0

10.1

10.1

10.1

10.1

10.1

10.1

10.1

10.1

10.1

Edendale 33 kV BASE 5.9

5.9

6.5

6.5

6.5

6.5

6.5

6.5

6.5

6.5

6.5

GS1 5.9

5.9

6.5

6.5

6.5

6.5

6.5

6.5

6.5

6.5

6.5

GS2 5.9

5.9

6.5

6.5

6.5

6.5

6.5

6.5

6.5

6.5

6.5

GS3 5.9

5.9

6.5

6.5

6.5

6.5

6.5

6.5

6.5

6.5

6.5

GS4 5.9

5.9

6.5

6.5

6.5

6.5

6.5

6.5

6.5

6.5

6.5

GS5 5.9

5.9

6.5

6.5

6.5

6.5

6.5

6.5

6.5

6.5

6.5

Edendale 110 kV BASE 3.5

3.5

4.3

4.3

4.3

4.3

4.3

4.3

4.3

4.3

4.3

GS1 3.5

3.5

4.3

4.3

4.3

4.3

4.3

4.3

4.3

4.3

4.3

GS2 3.5

3.5

4.3

4.3

4.3

4.3

4.3

4.3

4.3

4.3

4.3

GS3 3.5

3.5

4.3

4.3

4.3

4.3

4.3

4.3

4.3

4.3

4.3

GS4 3.5

3.5

4.3

4.3

4.3

4.3

4.3

4.3

4.3

4.3

4.3

GS5 3.5

3.5

4.3

4.3

4.3

4.3

4.3

4.3

4.3

4.3

4.3

Frankton 33 kV BASE 7.6

7.6

7.6

7.6

7.6

7.6

7.6

7.6

7.6

7.6

7.6

GS1 7.6

7.6

7.6

7.6

7.6

7.7

7.7

7.7

7.7

7.7

7.7

GS2 7.6

7.6

7.6

7.6

7.6

7.7

7.7

7.7

7.7

7.7

7.7

GS3 7.6

7.6

7.6

7.6

7.6

7.6

7.6

7.6

7.6

7.6

7.6

GS4 7.6

7.6

7.7

7.7

7.7

7.7

7.7

7.7

7.7

7.7

7.7

GS5 7.6

7.6

7.7

7.7

7.7

7.7

7.7

7.7

7.7

7.7

7.7

© Transpower New Zealand Limited 2016.All rights reserved. 69

Page 70: 2015 ten year forecast fault level report - Transpower · PDF fileThis publication presents an update to the ten year forecast fault levels ... calculation. Minimum fault level calculations

Ten year forecast fault Levels

Frankton 110 kV (T2) BASE 2.8

2.8

2.8

2.8

2.8

2.8

2.8

2.8

2.8

2.8

2.8

GS1 2.8

2.8

2.8

2.8

2.8

2.8

2.8

2.8

2.8

2.8

2.8

GS2 2.8

2.8

2.8

2.8

2.8

2.8

2.8

2.8

2.8

2.8

2.8

GS3 2.8

2.8

2.8

2.8

2.8

2.8

2.8

2.8

2.8

2.8

2.8

GS4 2.8

2.8

2.8

2.8

2.8

2.8

2.8

2.8

2.8

2.8

2.8

GS5 2.8

2.8

2.8

2.8

2.8

2.8

2.8

2.8

2.8

2.8

2.8

Frankton 110 kV (T4) BASE 2.8

2.8

2.8

2.8

2.8

2.8

2.8

2.8

2.8

2.8

2.8

GS1 2.8

2.8

2.8

2.8

2.8

2.9

2.9

2.9

2.9

2.9

2.9

GS2 2.8

2.8

2.8

2.8

2.8

2.9

2.9

2.9

2.9

2.9

2.9

GS3 2.8

2.8

2.8

2.8

2.8

2.8

2.8

2.8

2.8

2.8

2.8

GS4 2.8

2.8

2.9

2.9

2.9

2.9

2.9

2.9

2.9

2.9

2.9

GS5 2.8

2.8

2.9

2.9

2.9

2.9

2.9

2.9

2.9

2.9

2.9

Gore 33 kV BASE 6.1

6.1

7.9

7.9

7.9

7.9

7.9

7.9

7.9

7.9

7.9

GS1 6.1

6.1

7.9

7.9

7.9

7.9

7.9

7.9

7.9

7.9

7.9

GS2 6.1

6.1

7.9

7.9

7.9

7.9

7.9

7.9

7.9

7.9

7.9

GS3 6.1

6.1

7.9

7.9

7.9

7.9

7.9

7.9

7.9

7.9

7.9

GS4 6.1

6.1

7.9

7.9

7.9

7.9

7.9

7.9

7.9

7.9

7.9

GS5 6.1

6.1

7.9

7.9

7.9

7.9

7.9

7.9

7.9

7.9

7.9

Gore 110 kV (T2/T3) BASE 3.7

3.7

7.1

7.1

7.1

7.1

7.1

7.1

7.1

7.1

7.1

GS1 3.7

3.7

7.1

7.1

7.1

7.1

7.1

7.1

7.1

7.1

7.1

GS2 3.7

3.7

7.1

7.1

7.1

7.1

7.1

7.1

7.1

7.1

7.1

GS3 3.7

3.7

7.1

7.1

7.1

7.1

7.1

7.1

7.1

7.1

7.1

GS4 3.7

3.7

7.1

7.1

7.1

7.1

7.1

7.1

7.1

7.1

7.1

GS5 3.7

3.7

7.1

7.1

7.1

7.1

7.1

7.1

7.1

7.1

7.1

Gore 110 kV BASE - - 2.4

2.4

2.4

2.4

2.4

2.4

2.4

2.4

2.4

GS1 - - 2.4

2.4

2.4

2.4

2.4

2.4

2.4

2.4

2.4

GS2 - - 2.4

2.4

2.4

2.4

2.4

2.4

2.4

2.4

2.4

GS3 - - 2.4

2.4

2.4

2.4

2.4

2.4

2.4

2.4

2.4

GS4 - - 2.4

2.4

2.4

2.4

2.4

2.4

2.4

2.4

2.4

GS5 - - 2.4

2.4

2.4

2.4

2.4

2.4

2.4

2.4

2.4

Gore 220 kV (T11) BASE - - 5.4

5.4

5.4

5.4

5.4

5.4

5.4

5.4

5.4

GS1 - - 5.4

5.4

5.4

5.5

5.5

5.5

5.5

5.5

5.5

GS2 - - 5.4

5.4

5.4

5.5

5.5

5.5

5.5

5.5

5.5

GS3 - - 5.4

5.4

5.4

5.4

5.4

5.4

5.4

5.4

5.4

GS4 - - 5.5

5.5

5.5

5.5

5.5

5.5

5.5

5.5

5.5

GS5 - - 5.5

5.5

5.5

5.5

5.5

5.5

5.5

5.5

5.5

© Transpower New Zealand Limited 2016.All rights reserved. 70

Page 71: 2015 ten year forecast fault level report - Transpower · PDF fileThis publication presents an update to the ten year forecast fault levels ... calculation. Minimum fault level calculations

Ten year forecast fault Levels

Gore 220 kV (T12) BASE - - 5.4

5.4

5.4

5.4

5.4

5.4

5.4

5.4

5.4

GS1 - - 5.4

5.4

5.4

5.5

5.5

5.5

5.5

5.5

5.5

GS2 - - 5.4

5.4

5.4

5.5

5.5

5.5

5.5

5.5

5.5

GS3 - - 5.4

5.4

5.4

5.4

5.4

5.4

5.4

5.4

5.4

GS4 - - 5.5

5.5

5.5

5.5

5.5

5.5

5.5

5.5

5.5

GS5 - - 5.5

5.5

5.5

5.5

5.5

5.5

5.5

5.5

5.5

Halfway Bush 33 kV (T1/T2) BASE 14.7

14.7

21.5

21.5

21.5

21.5

21.5

21.5

21.5

21.5

21.5

GS1 14.7

14.7

21.5

21.5

21.5

21.5

21.5

21.5

21.5

21.5

21.5

GS2 14.7

14.7

21.5

21.5

21.5

21.5

21.5

21.5

21.5

21.5

21.5

GS3 14.7

14.7

21.5

21.5

21.5

21.5

21.5

21.5

21.5

21.5

21.5

GS4 14.7

14.7

21.5

21.5

21.5

21.5

21.5

21.5

21.5

21.5

21.5

GS5 14.7

14.7

21.5

21.5

21.5

21.5

21.5

21.5

21.5

21.5

21.5

Halfway Bush 33 kV (T5) BASE 13.9

13.9

21.5

21.5

21.5

21.5

21.5

21.5

21.5

21.5

21.5

GS1 13.9

13.9

21.5

21.5

21.5

21.5

21.5

21.5

21.5

21.5

21.5

GS2 13.9

13.9

21.5

21.5

21.5

21.5

21.5

21.5

21.5

21.5

21.5

GS3 13.9

13.9

21.5

21.5

21.5

21.5

21.5

21.5

21.5

21.5

21.5

GS4 13.9

13.9

21.5

21.5

21.5

21.5

21.5

21.5

21.5

21.5

21.5

GS5 13.9

13.9

21.5

21.5

21.5

21.5

21.5

21.5

21.5

21.5

21.5

Halfway Bush 110 kV BASE 7.8

7.8

7.8

7.8

7.8

7.8

7.8

7.8

7.8

7.8

7.8

GS1 7.8

7.8

7.8

7.8

7.8

7.8

7.8

7.8

7.8

7.8

7.8

GS2 7.8

7.8

7.8

7.8

7.8

7.8

7.8

7.8

7.8

7.8

7.8

GS3 7.8

7.8

7.8

7.8

7.8

7.8

7.8

7.8

7.8

7.8

7.8

GS4 7.8

7.8

7.8

7.8

7.8

7.8

7.8

7.8

7.8

7.8

7.8

GS5 7.8

7.8

7.8

7.8

7.8

7.8

7.8

7.8

7.8

7.8

7.8

Halfway Bush 220 kV BASE 7.8

7.8

7.9

7.9

7.9

7.9

7.9

7.9

7.9

7.9

7.9

GS1 7.8

7.8

7.9

7.9

7.9

7.9

7.9

7.9

7.9

7.9

7.9

GS2 7.8

7.8

7.9

7.9

7.9

7.9

7.9

7.9

7.9

7.9

7.9

GS3 7.8

7.8

7.9

7.9

7.9

7.9

7.9

7.9

7.9

7.9

7.9

GS4 7.8

7.8

7.9

7.9

7.9

7.9

7.9

7.9

7.9

7.9

7.9

GS5 7.8

7.8

7.9

7.9

7.9

7.9

7.9

7.9

7.9

7.9

7.9

Invercargill 33 kV BASE 17.4

17.4

17.3

17.3

17.3

17.3

17.3

17.3

17.3

17.3

17.3

GS1 17.4

17.4

17.3

17.3

17.3

17.3

17.3

17.3

17.3

17.3

17.3

GS2 17.4

17.4

17.3

17.3

17.3

17.3

17.3

17.3

17.3

17.3

17.3

GS3 17.4

17.4

17.3

17.3

17.3

17.3

17.3

17.3

17.3

17.3

17.3

GS4 17.4

17.4

17.3

17.3

17.3

17.3

17.3

17.3

17.3

17.3

17.3

GS5 17.4

17.4

17.3

17.3

17.3

17.3

17.3

17.3

17.3

17.3

17.3

© Transpower New Zealand Limited 2016.All rights reserved. 71

Page 72: 2015 ten year forecast fault level report - Transpower · PDF fileThis publication presents an update to the ten year forecast fault levels ... calculation. Minimum fault level calculations

Ten year forecast fault Levels

Invercargill 110 kV BASE 4.5

4.5

4.7

4.7

4.7

4.7

4.7

4.7

4.7

4.7

4.7

GS1 4.5

4.5

4.7

4.7

4.7

4.7

4.7

4.7

4.7

4.7

4.7

GS2 4.5

4.5

4.7

4.7

4.7

4.7

4.7

4.7

4.7

4.7

4.7

GS3 4.5

4.5

4.7

4.7

4.7

4.7

4.7

4.7

4.7

4.7

4.7

GS4 4.5

4.5

4.7

4.7

4.7

4.7

4.7

4.7

4.7

4.7

4.7

GS5 4.5

4.5

4.7

4.7

4.7

4.7

4.7

4.7

4.7

4.7

4.7

Invercargill 220 kV BASE 9.6

9.6

9.4

9.4

9.4

9.4

9.4

9.4

9.4

9.4

9.4

GS1 9.6

9.6

9.4

9.4

9.4

9.4

9.4

9.4

9.4

9.4

9.4

GS2 9.6

9.6

9.4

9.4

9.4

9.4

9.4

9.4

9.4

9.4

9.4

GS3 9.6

9.6

9.4

9.4

9.4

9.4

9.4

9.4

9.4

9.4

9.4

GS4 9.6

9.6

9.4

9.4

9.4

9.4

9.4

9.4

9.4

9.4

9.4

GS5 9.6

9.6

9.4

9.4

9.4

9.4

9.4

9.4

9.4

9.4

9.4

Manapouri 220 kV BASE 11.6

11.6

11.4

11.4

11.4

11.4

11.4

11.4

11.4

11.4

11.4

GS1 11.6

11.6

11.4

11.4

11.4

11.5

11.5

11.5

11.5

11.5

11.5

GS2 11.6

11.6

11.4

11.4

11.4

11.5

11.5

11.5

11.5

11.5

11.5

GS3 11.6

11.6

11.4

11.4

11.4

11.4

11.4

11.4

11.4

11.4

11.4

GS4 11.6

11.6

11.5

11.5

11.5

11.5

11.5

11.5

11.5

11.5

11.5

GS5 11.6

11.6

11.5

11.5

11.5

11.5

11.5

11.5

11.5

11.5

11.5

North Makarewa 33 kV BASE 10.5

10.5

10.4

10.4

10.4

10.4

10.4

10.4

10.4

10.4

10.4

GS1 10.5

10.5

10.4

10.4

10.4

10.4

10.4

10.4

10.4

10.4

10.4

GS2 10.5

10.5

10.4

10.4

10.4

10.4

10.4

10.4

10.4

10.4

10.4

GS3 10.5

10.5

10.4

10.4

10.4

10.4

10.4

10.4

10.4

10.4

10.4

GS4 10.5

10.5

10.4

10.4

10.4

10.4

10.4

10.4

10.4

10.4

10.4

GS5 10.5

10.5

10.4

10.4

10.4

10.4

10.4

10.4

10.4

10.4

10.4

North Makarewa 220 kV BASE 9.7

9.7

9.5

9.5

9.5

9.5

9.5

9.5

9.5

9.5

9.5

GS1 9.7

9.7

9.5

9.5

9.5

9.5

9.5

9.5

9.5

9.5

9.5

GS2 9.7

9.7

9.5

9.5

9.5

9.5

9.5

9.5

9.5

9.5

9.5

GS3 9.7

9.7

9.5

9.5

9.5

9.5

9.5

9.5

9.5

9.5

9.5

GS4 9.7

9.7

9.5

9.5

9.5

9.5

9.5

9.5

9.5

9.5

9.5

GS5 9.7

9.7

9.5

9.5

9.5

9.5

9.5

9.5

9.5

9.5

9.5

Naseby 33 kV BASE 7.8

7.8

7.8

7.8

7.8

7.8

7.8

7.8

7.8

7.8

7.8

GS1 7.8

7.8

7.8

7.8

7.8

7.8

7.8

7.8

7.8

7.8

7.8

GS2 7.8

7.8

7.8

7.8

7.8

7.8

7.8

7.8

7.8

7.8

7.8

GS3 7.8

7.8

7.8

7.8

7.8

7.8

7.8

7.8

7.8

7.8

7.8

GS4 7.8

7.8

7.8

7.8

7.8

7.8

7.8

7.8

7.8

7.8

7.8

GS5 7.8

7.8

7.8

7.8

7.8

7.8

7.8

7.8

7.8

7.8

7.8

© Transpower New Zealand Limited 2016.All rights reserved. 72

Page 73: 2015 ten year forecast fault level report - Transpower · PDF fileThis publication presents an update to the ten year forecast fault levels ... calculation. Minimum fault level calculations

Ten year forecast fault Levels

Naseby 220 kV BASE 6.0

6.2

6.2

6.2

6.2

6.2

6.2

6.2

6.2

6.2

6.2

GS1 6.0

6.2

6.2

6.2

6.2

6.2

6.3

6.3

6.3

6.3

6.3

GS2 6.0

6.2

6.2

6.2

6.2

6.2

6.3

6.3

6.3

6.3

6.3

GS3 6.0

6.2

6.2

6.2

6.2

6.2

6.2

6.2

6.2

6.2

6.2

GS4 6.0

6.2

6.3

6.3

6.3

6.3

6.3

6.3

6.3

6.3

6.3

GS5 6.0

6.2

6.2

6.2

6.2

6.3

6.3

6.3

6.3

6.3

6.3

Roxburgh 110 kV BASE 10.1

10.1

9.8

9.8

9.8

9.8

9.8

9.8

9.8

9.8

9.8

GS1 10.1

10.1

9.8

9.8

9.8

9.8

9.8

9.8

9.8

9.8

9.8

GS2 10.1

10.1

9.8

9.8

9.8

9.8

9.8

9.8

9.8

9.8

9.8

GS3 10.1

10.1

9.8

9.8

9.8

9.8

9.8

9.8

9.8

9.8

9.8

GS4 10.1

10.1

9.8

9.8

9.8

9.8

9.8

9.8

9.8

9.8

9.8

GS5 10.1

10.1

9.8

9.8

9.8

9.8

9.8

9.8

9.8

9.8

9.8

Roxburgh 220 kV BASE 15.3

15.4

15.4

15.4

15.4

15.4

15.4

15.4

15.4

15.4

15.4

GS1 15.3

15.4

15.4

15.4

15.4

15.5

15.5

15.5

15.5

15.5

15.5

GS2 15.3

15.4

15.4

15.4

15.4

15.5

15.5

15.5

15.5

15.5

15.5

GS3 15.3

15.4

15.4

15.4

15.4

15.4

15.4

15.4

15.4

15.4

15.4

GS4 15.3

15.4

15.5

15.5

15.5

15.5

15.5

15.5

15.5

15.5

15.5

GS5 15.3

15.4

15.5

15.5

15.5

15.5

15.5

15.5

15.5

15.5

15.5

South Dunedin 33 kV BASE 17.2

17.2

17.2

17.2

17.2

17.2

17.2

17.2

17.2

17.2

17.2

GS1 17.2

17.2

17.2

17.2

17.2

17.2

17.2

17.2

17.2

17.2

17.2

GS2 17.2

17.2

17.2

17.2

17.2

17.2

17.2

17.2

17.2

17.2

17.2

GS3 17.2

17.2

17.2

17.2

17.2

17.2

17.2

17.2

17.2

17.2

17.2

GS4 17.2

17.2

17.2

17.2

17.2

17.2

17.2

17.2

17.2

17.2

17.2

GS5 17.2

17.2

17.2

17.2

17.2

17.2

17.2

17.2

17.2

17.2

17.2

South Dunedin 220 kV BASE 7.3

7.3

7.4

7.4

7.4

7.4

7.4

7.4

7.4

7.4

7.4

GS1 7.3

7.3

7.4

7.4

7.4

7.4

7.4

7.4

7.4

7.4

7.4

GS2 7.3

7.3

7.4

7.4

7.4

7.4

7.4

7.4

7.4

7.4

7.4

GS3 7.3

7.3

7.4

7.4

7.4

7.4

7.4

7.4

7.4

7.4

7.4

GS4 7.3

7.3

7.4

7.4

7.4

7.4

7.4

7.4

7.4

7.4

7.4

GS5 7.3

7.3

7.4

7.4

7.4

7.4

7.4

7.4

7.4

7.4

7.4

Three Mile Hill 220 kV BASE 8.2

8.2

8.3

8.3

8.3

8.3

8.3

8.3

8.3

8.3

8.3

GS1 8.2

8.2

8.3

8.3

8.3

8.3

8.3

8.3

8.3

8.3

8.3

GS2 8.2

8.2

8.3

8.3

8.3

8.3

8.3

8.3

8.3

8.3

8.3

GS3 8.2

8.2

8.3

8.3

8.3

8.3

8.3

8.3

8.3

8.3

8.3

GS4 8.2

8.2

8.3

8.3

8.3

8.3

8.3

8.3

8.3

8.3

8.3

GS5 8.2

8.2

8.3

8.3

8.3

8.3

8.3

8.3

8.3

8.3

8.3

© Transpower New Zealand Limited 2016.All rights reserved. 73

Page 74: 2015 ten year forecast fault level report - Transpower · PDF fileThis publication presents an update to the ten year forecast fault levels ... calculation. Minimum fault level calculations

Ten year forecast fault Levels

Tiwai 220 kV BASE 8.7

8.7

8.5

8.5

8.5

8.5

8.5

8.5

8.5

8.5

8.5

GS1 8.7

8.7

8.5

8.5

8.5

8.5

8.5

8.5

8.5

8.5

8.5

GS2 8.7

8.7

8.5

8.5

8.5

8.5

8.5

8.5

8.5

8.5

8.5

GS3 8.7

8.7

8.5

8.5

8.5

8.5

8.5

8.5

8.5

8.5

8.5

GS4 8.7

8.7

8.5

8.5

8.5

8.5

8.5

8.5

8.5

8.5

8.5

GS5 8.7

8.7

8.5

8.5

8.5

8.5

8.5

8.5

8.5

8.5

8.5

© Transpower New Zealand Limited 2016.All rights reserved. 74

Page 75: 2015 ten year forecast fault level report - Transpower · PDF fileThis publication presents an update to the ten year forecast fault levels ... calculation. Minimum fault level calculations

Ten year forecast fault Levels

Ten year forecast of maximum single-phase to ground fault levels

Table 5: Ten year forecast of maximum single-phase to ground fault levels (kA)

Grid exit point Transmission bus

Generation Scenarios 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025

NORTHLAND

Bream Bay 33 kV BASE 2.0

2.0

2.0

2.0

2.0

2.0

2.0

2.0

2.0

2.0

2.0

GS1 2.0

2.0

2.0

2.0

2.0

2.0

2.0

2.0

2.0

2.0

2.0

GS2 2.0

2.0

2.0

2.0

2.0

2.0

2.0

2.0

2.0

2.0

2.0

GS3 2.0

2.0

2.0

2.0

2.0

2.0

2.0

2.0

2.0

2.0

2.0

GS4 2.0

2.0

2.0

2.0

2.0

2.0

2.0

2.0

2.0

2.0

2.0

GS5 2.0

2.0

2.0

2.0

2.0

2.0

2.0

2.0

2.0

2.0

2.0

Bream Bay 220 kV BASE 5.9

5.9

5.9

5.9

5.9

5.9

5.9

5.9

5.9

5.9

5.9

GS1 5.9

5.9

5.9

5.8

5.8

5.8

5.8

5.8

5.8

5.8

5.8

GS2 5.9

5.9

5.9

5.8

5.8

5.8

5.8

5.8

5.8

5.8

5.8

GS3 5.9

5.9

5.9

5.9

6.0

6.0

6.0

6.0

6.0

6.0

6.0

GS4 5.9

5.9

5.7

5.8

5.7

5.7

5.7

5.7

5.7

5.7

5.7

GS5 5.9

5.9

5.8

5.7

5.7

5.7

5.7

5.7

5.7

5.7

5.7

Marsden 110 kV BASE 9.1

9.1

9.1

9.1

9.1

9.1

9.1

9.1

9.1

9.1

9.1

GS1 9.1

9.1

9.1

9.0

9.0

9.0

9.0

9.0

9.0

9.0

9.0

GS2 9.1

9.1

9.1

9.0

9.0

9.0

9.0

9.0

9.0

9.0

9.0

GS3 9.1

9.1

9.1

9.1

9.3

9.3

9.2

9.2

9.2

9.3

9.3

GS4 9.1

9.1

8.9

8.9

8.8

8.9

8.9

8.9

8.9

8.9

8.9

GS5 9.1

9.1

9.0

8.9

8.9

8.9

8.9

8.9

8.9

8.9

8.9

Marsden 220 kV BASE 6.0

6.0

6.0

6.0

6.0

6.0

6.0

6.0

6.0

6.0

6.0

GS1 6.0

6.0

6.0

6.0

6.0

5.9

5.9

5.9

5.9

5.9

5.9

GS2 6.0

6.0

6.0

6.0

6.0

5.9

5.9

5.9

5.9

5.9

5.9

GS3 6.0

6.0

6.0

6.0

6.2

6.2

6.1

6.2

6.2

6.2

6.2

GS4 6.0

6.0

5.9

5.9

5.8

5.8

5.8

5.8

5.8

5.8

5.8

GS5 6.0

6.0

5.9

5.9

5.9

5.8

5.8

5.8

5.9

5.9

5.9

Maungatapere 110 kV BASE 5.1

5.1

5.1

5.1

5.1

5.1

5.1

5.1

5.1

5.1

5.1

GS1 5.1

5.1

5.1

5.1

5.1

5.1

5.1

5.1

5.1

5.1

5.1

GS2 5.1

5.1

5.1

5.1

5.1

5.1

5.1

5.1

5.1

5.1

5.1

GS3 5.1

5.1

5.1

5.1

5.2

5.2

5.2

5.2

5.2

5.2

5.2

GS4 5.1

5.1

5.1

5.1

5.1

5.1

5.1

5.1

5.1

5.1

5.1

GS5 5.1

5.1

5.1

5.1

5.1

5.1

5.1

5.1

5.1

5.1

5.1

© Transpower New Zealand Limited 2016.All rights reserved. 75

Page 76: 2015 ten year forecast fault level report - Transpower · PDF fileThis publication presents an update to the ten year forecast fault levels ... calculation. Minimum fault level calculations

Ten year forecast fault Levels

Maungaturoto 33 kV BASE 4.8

4.8

4.8

4.8

4.8

4.8

4.8

4.8

4.8

4.8

4.8

GS1 4.8

4.8

4.8

4.8

4.8

4.8

4.8

4.8

4.8

4.8

4.8

GS2 4.8

4.8

4.8

4.8

4.8

4.8

4.8

4.8

4.8

4.8

4.8

GS3 4.8

4.8

4.8

4.8

4.8

4.8

4.8

4.8

4.8

4.8

4.8

GS4 4.8

4.8

4.8

4.8

4.8

4.8

4.8

4.8

4.8

4.8

4.8

GS5 4.8

4.8

4.8

4.8

4.8

4.8

4.8

4.8

4.8

4.8

4.8

Maungaturoto 110 kV (T1) BASE 2.5

2.5

2.5

2.5

2.5

2.5

2.5

2.5

2.5

2.5

2.5

GS1 2.5

2.5

2.5

2.5

2.5

2.5

2.5

2.5

2.5

2.5

2.5

GS2 2.5

2.5

2.5

2.5

2.5

2.5

2.5

2.5

2.5

2.5

2.5

GS3 2.5

2.5

2.5

2.5

2.5

2.5

2.5

2.5

2.5

2.5

2.5

GS4 2.5

2.5

2.5

2.5

2.5

2.5

2.5

2.5

2.5

2.5

2.5

GS5 2.5

2.5

2.5

2.5

2.5

2.5

2.5

2.5

2.5

2.5

2.5

Maungaturoto 110 kV (T2) BASE 2.5

2.5

2.5

2.5

2.5

2.5

2.5

2.5

2.5

2.5

2.5

GS1 2.5

2.5

2.5

2.5

2.5

2.5

2.5

2.5

2.5

2.5

2.5

GS2 2.5

2.5

2.5

2.5

2.5

2.5

2.5

2.5

2.5

2.5

2.5

GS3 2.5

2.5

2.5

2.5

2.5

2.5

2.5

2.5

2.5

2.5

2.5

GS4 2.5

2.5

2.5

2.5

2.5

2.5

2.5

2.5

2.5

2.5

2.5

GS5 2.5

2.5

2.5

2.5

2.5

2.5

2.5

2.5

2.5

2.5

2.5

Wellsford 33 kV BASE 8.4

8.4

8.4

8.4

8.4

8.4

8.4

8.4

8.4

8.4

8.4

GS1 8.4

8.4

8.4

8.4

8.4

8.3

8.3

8.3

8.3

8.3

8.3

GS2 8.4

8.4

8.4

8.4

8.4

8.3

8.3

8.3

8.3

8.3

8.3

GS3 8.4

8.4

8.4

8.4

8.4

8.4

8.4

8.4

8.4

8.4

8.4

GS4 8.4

8.4

8.3

8.3

8.3

8.3

8.3

8.3

8.3

8.3

8.3

GS5 8.4

8.4

8.3

8.3

8.3

8.3

8.3

8.3

8.3

8.3

8.3

Wellsford 110 kV (T1) BASE 2.4

2.4

2.4

2.4

2.4

2.4

2.4

2.4

2.4

2.4

2.4

GS1 2.4

2.4

2.4

2.4

2.4

2.4

2.4

2.4

2.4

2.4

2.4

GS2 2.4

2.4

2.4

2.4

2.4

2.4

2.4

2.4

2.4

2.4

2.4

GS3 2.4

2.4

2.4

2.4

2.4

2.4

2.4

2.4

2.4

2.4

2.4

GS4 2.4

2.4

2.4

2.4

2.4

2.4

2.4

2.4

2.4

2.4

2.4

GS5 2.4

2.4

2.4

2.4

2.4

2.4

2.4

2.4

2.4

2.4

2.4

Wellsford 110 kV (T2) BASE 2.4

2.4

2.4

2.4

2.4

2.4

2.4

2.4

2.4

2.4

2.4

GS1 2.4

2.4

2.4

2.4

2.4

2.4

2.4

2.4

2.4

2.4

2.4

GS2 2.4

2.4

2.4

2.4

2.4

2.4

2.4

2.4

2.4

2.4

2.4

GS3 2.4

2.4

2.4

2.4

2.4

2.4

2.4

2.4

2.4

2.4

2.4

GS4 2.4

2.4

2.4

2.4

2.4

2.4

2.4

2.4

2.4

2.4

2.4

GS5 2.4

2.4

2.4

2.4

2.4

2.4

2.4

2.4

2.4

2.4

2.4

© Transpower New Zealand Limited 2016.All rights reserved. 76

Page 77: 2015 ten year forecast fault level report - Transpower · PDF fileThis publication presents an update to the ten year forecast fault levels ... calculation. Minimum fault level calculations

Ten year forecast fault Levels

AUCKLAND

Albany 33 kV BASE 3.2

3.2

3.2

3.2

3.2

3.2

3.2

3.2

3.2

3.2

3.2

GS1 3.2

3.2

3.2

3.2

3.2

3.2

3.2

3.2

3.2

3.2

3.2

GS2 3.2

3.2

3.2

3.2

3.2

3.2

3.2

3.2

3.2

3.2

3.2

GS3 3.2

3.2

3.2

3.2

3.2

3.2

3.2

3.2

3.2

3.2

3.2

GS4 3.2

3.2

3.2

3.2

3.2

3.2

3.2

3.2

3.2

3.2

3.2

GS5 3.2

3.2

3.2

3.2

3.2

3.2

3.2

3.2

3.2

3.2

3.2

Albany 110 kV BASE 20.1

20.1

20.2

20.2

20.2

20.2

20.2

20.2

20.2

20.2

20.2

GS1 20.1

20.1

20.2

19.9

19.9

19.6

19.6

19.7

19.7

19.7

19.7

GS2 20.1

20.1

20.2

19.9

19.9

19.7

19.7

19.7

19.7

19.7

19.7

GS3 20.1

20.1

20.2

20.2

21.3

21.3

21.0

21.0

21.0

21.1

21.1

GS4 20.1

20.1

19.4

19.5

19.0

19.2

19.2

19.2

19.2

19.2

19.2

GS5 20.1

20.1

19.8

19.4

19.4

19.2

19.2

19.2

19.2

19.3

19.3

Albany 220 kV BASE 18.4

18.4

18.5

18.5

18.5

18.5

18.5

18.5

18.5

18.5

18.5

GS1 18.4

18.4

18.5

18.0

18.0

17.6

17.6

17.7

17.8

17.8

17.8

GS2 18.4

18.4

18.5

18.1

18.1

17.7

17.7

17.8

17.8

17.8

17.8

GS3 18.4

18.4

18.5

18.5

20.6

20.6

20.0

20.1

20.1

20.1

20.1

GS4 18.4

18.4

17.3

17.4

16.7

17.0

17.0

17.0

17.0

17.0

17.0

GS5 18.4

18.4

17.9

17.3

17.3

16.9

16.9

17.0

17.1

17.1

17.1

Bombay 33 kV BASE 9.8

9.8

9.9

9.9

9.9

9.9

9.9

9.9

9.9

9.9

9.9

GS1 9.8

9.8

9.9

9.9

9.9

9.9

9.9

9.9

9.9

9.9

9.9

GS2 9.8

9.8

9.9

9.9

9.9

9.9

9.9

9.9

9.9

9.9

9.9

GS3 9.8

9.8

9.9

9.9

9.9

9.9

9.9

9.9

9.9

9.9

9.9

GS4 9.8

9.8

9.8

9.9

9.8

9.8

9.8

9.8

9.8

9.8

9.8

GS5 9.8

9.8

9.9

9.9

9.9

9.8

9.8

9.8

9.8

9.8

9.8

Bombay 110 kV BASE 6.1

6.1

6.2

6.2

6.2

6.2

6.2

6.2

6.2

6.2

6.2

GS1 6.1

6.1

6.2

6.1

6.1

6.1

6.1

6.1

6.1

6.1

6.1

GS2 6.1

6.1

6.2

6.2

6.2

6.1

6.1

6.1

6.1

6.1

6.1

GS3 6.1

6.1

6.2

6.2

6.2

6.2

6.2

6.2

6.2

6.2

6.2

GS4 6.1

6.1

6.1

6.1

6.1

6.1

6.1

6.1

6.1

6.1

6.1

GS5 6.1

6.1

6.1

6.1

6.1

6.1

6.1

6.1

6.1

6.1

6.1

Drury 220 kV BASE 13.7

13.7

13.8

13.8

13.8

13.8

13.8

13.8

13.8

13.8

13.8

GS1 13.7

13.7

13.8

13.4

13.4

13.4

13.4

13.4

13.4

13.5

13.5

GS2 13.7

13.7

13.8

13.5

13.5

13.4

13.4

13.4

13.4

13.5

13.5

GS3 13.7

13.7

13.8

13.8

14.5

14.5

14.1

14.1

14.1

14.2

14.2

GS4 13.7

13.7

13.1

13.2

12.7

13.1

13.1

13.1

13.1

13.1

13.1

© Transpower New Zealand Limited 2016.All rights reserved. 77

Page 78: 2015 ten year forecast fault level report - Transpower · PDF fileThis publication presents an update to the ten year forecast fault levels ... calculation. Minimum fault level calculations

Ten year forecast fault Levels

GS5 13.7

13.7

13.5

13.1

13.1

13.1

13.1

13.1

13.1

13.1

13.1

Glenbrook 33 kV (T4/T5) BASE 1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

GS1 1.2

1.2

1.2

1.2

1.2

20.4

20.4

20.4

20.4

20.4

20.4

GS2 1.2

1.2

1.2

1.2

1.2

20.4

20.4

20.4

20.4

20.4

20.4

GS3 1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

GS4 1.2

1.2

1.2

1.2

1.2

20.3

20.3

20.3

20.3

20.3

20.3

GS5 1.2

1.2

1.2

1.2

1.2

20.3

20.3

20.3

20.3

20.3

20.3

Glenbrook 33 kV (T6) BASE 2.1

2.1

2.1

2.1

2.1

2.1

2.1

2.1

2.1

2.1

2.1

GS1 2.1

2.1

2.1

2.1

2.1

2.1

2.1

2.1

2.1

2.1

2.1

GS2 2.1

2.1

2.1

2.1

2.1

2.1

2.1

2.1

2.1

2.1

2.1

GS3 2.1

2.1

2.1

2.1

2.1

2.1

2.1

2.1

2.1

2.1

2.1

GS4 2.1

2.1

2.1

2.1

2.1

2.1

2.1

2.1

2.1

2.1

2.1

GS5 2.1

2.1

2.1

2.1

2.1

2.1

2.1

2.1

2.1

2.1

2.1

Glenbrook 220 kV BASE 10.4

10.4

10.4

10.4

10.4

10.4

10.4

10.4

10.4

10.4

10.4

GS1 10.4

10.4

10.4

10.2

10.2

10.4

10.4

10.4

10.5

10.5

10.5

GS2 10.4

10.4

10.4

10.3

10.3

10.4

10.4

10.5

10.5

10.5

10.5

GS3 10.4

10.4

10.4

10.4

10.8

10.8

10.6

10.6

10.6

10.6

10.6

GS4 10.4

10.4

10.0

10.1

9.8

10.3

10.3

10.2

10.2

10.2

10.2

GS5 10.4

10.4

10.3

10.1

10.1

10.2

10.2

10.3

10.3

10.3

10.3

Henderson 33 kV BASE 1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

GS1 1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

GS2 1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

GS3 1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

GS4 1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

GS5 1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

Henderson 110 kV BASE 26.1

26.1

26.2

26.2

26.2

26.2

26.2

26.2

26.2

26.2

26.2

GS1 26.1

26.1

26.2

25.7

25.7

25.3

25.3

25.4

25.4

25.5

25.5

GS2 26.1

26.1

26.2

25.8

25.8

25.4

25.4

25.4

25.4

25.5

25.5

GS3 26.1

26.1

26.2

26.2

28.1

28.1

27.6

27.7

27.7

27.7

27.7

GS4 26.1

26.1

24.9

25.1

24.3

24.6

24.6

24.6

24.6

24.6

24.6

GS5 26.1

26.1

25.5

25.0

25.0

24.5

24.5

24.6

24.7

24.7

24.7

Henderson 220 kV BASE 16.4

16.4

16.5

16.5

16.5

16.5

16.5

16.5

16.5

16.5

16.5

GS1 16.4

16.4

16.5

16.1

16.1

15.8

15.8

15.9

15.9

15.9

15.9

GS2 16.4

16.4

16.5

16.2

16.2

15.9

15.9

15.9

15.9

15.9

16.0

GS3 16.4

16.4

16.5

16.5

18.1

18.1

17.7

17.7

17.7

17.7

17.7

GS4 16.4

16.4

15.5

15.6

15.0

15.3

15.3

15.2

15.3

15.3

15.3

GS5 16.4

16.4

16.0

15.5

15.5

15.2

15.2

15.3

15.3

15.3

15.3

© Transpower New Zealand Limited 2016.All rights reserved. 78

Page 79: 2015 ten year forecast fault level report - Transpower · PDF fileThis publication presents an update to the ten year forecast fault levels ... calculation. Minimum fault level calculations

Ten year forecast fault Levels

Hepburn Road 33 kV BASE 24.2

1.6

1.6

1.6

1.6

1.6

1.6

1.6

1.6

1.6

1.6

GS1 24.2

1.6

1.6

1.6

1.6

1.6

1.6

1.6

1.6

1.6

1.6

GS2 24.2

1.6

1.6

1.6

1.6

1.6

1.6

1.6

1.6

1.6

1.6

GS3 24.2

1.6

1.6

1.6

1.6

1.6

1.6

1.6

1.6

1.6

1.6

GS4 24.2

1.6

1.6

1.6

1.6

1.6

1.6

1.6

1.6

1.6

1.6

GS5 24.2

1.6

1.6

1.6

1.6

1.6

1.6

1.6

1.6

1.6

1.6

Hepburn Road 110 kV BASE 18.8

18.8

18.9

18.9

18.9

18.9

18.9

18.9

18.9

18.9

18.9

GS1 18.8

18.8

18.9

18.6

18.6

18.4

18.4

18.4

18.5

18.5

18.5

GS2 18.8

18.8

18.9

18.6

18.6

18.4

18.4

18.5

18.5

18.5

18.5

GS3 18.8

18.8

18.9

18.9

19.8

19.8

19.6

19.6

19.6

19.6

19.6

GS4 18.8

18.8

18.2

18.3

17.8

18.0

18.0

18.0

18.0

18.0

18.0

GS5 18.8

18.8

18.5

18.2

18.2

18.0

18.0

18.0

18.1

18.1

18.1

Hobson Street 110 kV BASE 24.2

24.2

24.4

24.4

24.4

24.4

24.4

24.4

24.4

24.4

24.4

GS1 24.2

24.3

24.4

24.0

24.0

23.6

23.6

23.7

23.7

23.8

23.8

GS2 24.2

24.3

24.4

24.0

24.0

23.7

23.7

23.7

23.7

23.8

23.8

GS3 24.2

24.2

24.4

24.4

26.1

26.1

25.6

25.7

25.7

25.7

25.7

GS4 24.2

24.3

23.3

23.4

22.8

23.1

23.1

23.0

23.1

23.1

23.1

GS5 24.2

24.3

23.8

23.4

23.4

23.0

23.0

23.1

23.1

23.1

23.1

Hobson Street 220 kV BASE 21.3

21.3

21.4

21.4

21.4

21.4

21.4

21.4

21.4

21.4

21.4

GS1 21.3

21.3

21.5

20.8

20.8

20.3

20.3

20.4

20.4

20.5

20.5

GS2 21.3

21.3

21.5

20.9

20.9

20.4

20.4

20.4

20.4

20.5

20.5

GS3 21.3

21.3

21.4

21.4

24.2

24.2

23.5

23.6

23.6

23.6

23.6

GS4 21.3

21.3

19.8

20.0

19.0

19.5

19.5

19.4

19.4

19.4

19.4

GS5 21.3

21.3

20.6

19.9

19.9

19.3

19.3

19.4

19.5

19.5

19.5

Huapai 220 kV BASE 13.9

13.9

14.0

14.0

14.0

14.0

14.0

14.0

14.0

14.0

14.0

GS1 13.9

13.9

14.0

13.7

13.7

13.5

13.5

13.5

13.6

13.6

13.6

GS2 13.9

13.9

14.0

13.8

13.8

13.5

13.5

13.6

13.6

13.6

13.6

GS3 13.9

13.9

14.0

14.0

15.1

15.1

14.8

14.9

14.9

14.9

14.9

GS4 13.9

13.9

13.2

13.4

12.9

13.1

13.1

13.1

13.1

13.1

13.1

GS5 13.9

13.9

13.6

13.3

13.3

13.1

13.1

13.1

13.1

13.1

13.1

Mangere 33 kV BASE 16.3

16.3

16.3

16.3

16.3

16.3

16.3

16.3

16.3

16.3

16.3

GS1 16.3

16.3

16.3

16.2

16.2

16.2

16.2

16.2

16.2

16.2

16.2

GS2 16.3

16.3

16.3

16.2

16.2

16.2

16.2

16.2

16.2

16.2

16.2

GS3 16.3

16.3

16.3

16.3

16.5

16.5

16.4

16.5

16.5

16.5

16.5

GS4 16.3

16.3

16.1

16.2

16.1

16.1

16.1

16.1

16.1

16.1

16.1

GS5 16.3

16.3

16.2

16.1

16.1

16.1

16.1

16.1

16.1

16.1

16.1

© Transpower New Zealand Limited 2016.All rights reserved. 79

Page 80: 2015 ten year forecast fault level report - Transpower · PDF fileThis publication presents an update to the ten year forecast fault levels ... calculation. Minimum fault level calculations

Ten year forecast fault Levels

Mangere 110 kV BASE 16.5

16.5

16.5

16.5

16.5

16.5

16.5

16.5

16.5

16.5

16.5

GS1 16.5

16.5

16.5

16.3

16.3

16.2

16.2

16.2

16.2

16.2

16.2

GS2 16.5

16.5

16.5

16.4

16.4

16.2

16.2

16.2

16.2

16.2

16.3

GS3 16.5

16.5

16.5

16.5

17.4

17.4

17.2

17.2

17.2

17.2

17.2

GS4 16.5

16.5

16.0

16.1

15.8

15.9

15.9

15.9

15.9

15.9

15.9

GS5 16.5

16.5

16.3

16.1

16.1

15.9

15.9

15.9

15.9

15.9

15.9

Mount Roskill 22 kV BASE 23.9

23.9

23.9

23.9

23.9

23.9

23.9

23.9

23.9

23.9

23.9

GS1 23.9

23.9

23.9

23.8

23.8

23.8

23.8

23.8

23.8

23.8

23.8

GS2 23.9

23.9

23.9

23.9

23.9

23.8

23.8

23.8

23.8

23.8

23.8

GS3 23.9

23.9

23.9

23.9

24.2

24.2

24.1

24.2

24.2

24.2

24.2

GS4 23.9

23.9

23.7

23.7

23.6

23.7

23.7

23.6

23.6

23.6

23.6

GS5 23.9

23.9

23.8

23.7

23.7

23.6

23.6

23.7

23.7

23.7

23.7

Mount Roskill 110 kV BASE 16.1

16.1

16.2

16.2

16.2

16.2

16.2

16.2

16.2

16.2

16.2

GS1 16.1

16.2

16.2

16.0

16.0

15.8

15.8

15.9

15.9

15.9

15.9

GS2 16.1

16.2

16.2

16.0

16.0

15.9

15.9

15.9

15.9

15.9

15.9

GS3 16.1

16.1

16.2

16.2

16.9

16.9

16.7

16.8

16.8

16.8

16.8

GS4 16.1

16.2

15.7

15.8

15.4

15.6

15.6

15.6

15.6

15.6

15.6

GS5 16.1

16.2

15.9

15.7

15.7

15.6

15.6

15.6

15.6

15.6

15.6

Otahuhu 22 kV BASE 28.0

28.0

28.0

28.0

28.0

28.0

28.0

28.0

28.0

28.0

28.0

GS1 28.0

28.0

28.0

27.9

27.9

27.8

27.8

27.8

27.8

27.8

27.8

GS2 28.0

28.0

28.0

27.9

27.9

27.8

27.8

27.8

27.8

27.8

27.8

GS3 28.0

28.0

28.0

28.0

28.4

28.4

28.3

28.3

28.3

28.3

28.3

GS4 28.0

28.0

27.7

27.7

27.5

27.6

27.6

27.6

27.6

27.6

27.6

GS5 28.0

28.0

27.8

27.7

27.7

27.6

27.6

27.6

27.6

27.6

27.6

Otahuhu 110 kV (T2/T4) BASE

25.7 25.7

26.0

26.0

26.0

26.0

26.0

26.0

26.0

26.0

26.0

GS1 25.7

25.7

26.0

25.5

25.5

25.1

25.1

25.2

25.2

25.3

25.3

GS2 25.7

25.7

26.0

25.6

25.6

25.2

25.2

25.2

25.2

25.3

25.3

GS3 25.7

25.7

26.0

26.0

28.0

28.0

27.5

27.6

27.6

27.6

27.6

GS4 25.7

25.7

24.8

25.0

24.3

24.6

24.6

24.5

24.6

24.6

24.6

GS5 25.7

25.7

25.4

24.9

24.9

24.5

24.5

24.6

24.6

24.6

24.6

Otahuhu 110 kV (T3/T5) BASE

20.7 20.7

20.8

20.8

20.8

20.8

20.8

20.8

20.8

20.8

20.8

GS1 20.7

20.7

20.8

20.5

20.5

20.2

20.2

20.3

20.3

20.3

20.3

GS2 20.7

20.7

20.8

20.5

20.5

20.3

20.3

20.3

20.3

20.3

20.3

GS3 20.7

20.7

20.8

20.8

22.1

22.1

21.8

21.8

21.8

21.8

21.8

GS4 20.7

20.7

20.0

20.1

19.6

19.8

19.8

19.8

19.8

19.8

19.8

GS5 20.7

20.7

20.4

20.0

20.0

19.8

19.8

19.8

19.9

19.9

19.9

© Transpower New Zealand Limited 2016.All rights reserved. 80

Page 81: 2015 ten year forecast fault level report - Transpower · PDF fileThis publication presents an update to the ten year forecast fault levels ... calculation. Minimum fault level calculations

Ten year forecast fault Levels

Otahuhu 220 kV BASE 25.0

25.0

25.3

25.3

25.3

25.3

25.3

25.3

25.3

25.3

25.3

GS1 25.0

25.0

25.3

24.3

24.3

23.6

23.6

23.8

23.9

23.9

23.9

GS2 25.0

25.0

25.3

24.5

24.5

23.8

23.8

23.9

23.9

23.9

24.0

GS3 25.0

25.0

25.3

25.3

30.1

30.1

28.9

29.1

29.1

29.1

29.1

GS4 25.0

25.0

23.2

23.5

22.2

22.8

22.8

22.7

22.8

22.8

22.8

GS5 25.0

25.0

24.4

23.4

23.4

22.6

22.6

22.8

22.9

22.9

22.9

Pakuranga 33 kV BASE 3.6

3.6

3.6

3.6

3.6

3.6

3.6

3.6

3.6

3.6

3.6

GS1 3.6

3.6

3.6

3.6

3.6

3.6

3.6

3.6

3.6

3.6

3.6

GS2 3.6

3.6

3.6

3.6

3.6

3.6

3.6

3.6

3.6

3.6

3.6

GS3 3.6

3.6

3.6

3.6

3.6

3.6

3.6

3.6

3.6

3.6

3.6

GS4 3.6

3.6

3.6

3.6

3.6

3.6

3.6

3.6

3.6

3.6

3.6

GS5 3.6

3.6

3.6

3.6

3.6

3.6

3.6

3.6

3.6

3.6

3.6

Pakuranga 220 kV BASE 24.3

24.3

24.5

24.5

24.5

24.5

24.5

24.5

24.5

24.5

24.5

GS1 24.3

24.3

24.5

23.7

23.7

23.0

23.0

23.1

23.2

23.3

23.3

GS2 24.3

24.3

24.5

23.8

23.8

23.1

23.1

23.2

23.2

23.3

23.3

GS3 24.3

24.3

24.5

24.5

28.2

28.2

27.3

27.4

27.4

27.4

27.4

GS4 24.3

24.3

22.4

22.7

21.4

22.0

22.0

21.9

22.0

22.0

22.0

GS5 24.3

24.3

23.4

22.5

22.5

21.8

21.8

22.0

22.1

22.1

22.1

Penrose 22 kV BASE 19.3

19.3

19.3

19.3

19.3

19.3

19.3

19.3

19.3

19.3

19.3

GS1 19.3

19.3

19.3

19.3

19.3

19.2

19.2

19.2

19.2

19.2

19.2

GS2 19.3

19.3

19.3

19.3

19.3

19.2

19.2

19.2

19.2

19.2

19.2

GS3 19.3

19.3

19.3

19.3

19.5

19.5

19.5

19.5

19.5

19.5

19.5

GS4 19.3

19.3

19.2

19.2

19.1

19.1

19.1

19.1

19.1

19.1

19.1

GS5 19.3

19.3

19.2

19.2

19.2

19.1

19.1

19.1

19.1

19.1

19.1

Penrose 33 kV BASE 21.4

21.4

21.4

21.4

21.4

21.4

21.4

21.4

21.4

21.4

21.4

GS1 21.4

21.4

21.4

21.3

21.3

21.2

21.2

21.2

21.2

21.2

21.2

GS2 21.4

21.4

21.4

21.3

21.3

21.2

21.2

21.2

21.2

21.2

21.2

GS3 21.4

21.4

21.4

21.4

21.7

21.7

21.6

21.7

21.7

21.7

21.7

GS4 21.4

21.4

21.1

21.1

21.0

21.1

21.1

21.0

21.1

21.1

21.1

GS5 21.4

21.4

21.2

21.1

21.1

21.0

21.0

21.1

21.1

21.1

21.1

Penrose 110 kV BASE 27.6

27.6

27.8

27.8

27.8

27.8

27.8

27.8

27.8

27.8

27.8

GS1 27.6

27.6

27.8

27.2

27.2

26.8

26.8

26.9

26.9

27.0

27.0

GS2 27.6

27.6

27.8

27.3

27.3

26.9

26.9

26.9

26.9

27.0

27.0

GS3 27.6

27.6

27.8

27.8

29.9

29.9

29.4

29.4

29.4

29.5

29.5

GS4 27.6

27.6

26.3

26.5

25.7

26.1

26.1

26.0

26.1

26.1

26.1

GS5 27.6

27.6

27.0

26.4

26.4

26.0

26.0

26.1

26.1

26.1

26.1

© Transpower New Zealand Limited 2016.All rights reserved. 81

Page 82: 2015 ten year forecast fault level report - Transpower · PDF fileThis publication presents an update to the ten year forecast fault levels ... calculation. Minimum fault level calculations

Ten year forecast fault Levels

Penrose 220 kV BASE 23.4

23.4

23.6

23.7

23.7

23.7

23.7

23.7

23.7

23.7

23.7

GS1 23.4

23.4

23.7

22.9

22.9

22.2

22.2

22.4

22.4

22.5

22.5

GS2 23.4

23.4

23.7

23.0

23.0

22.4

22.4

22.4

22.4

22.5

22.5

GS3 23.4

23.4

23.6

23.7

27.1

27.1

26.2

26.3

26.3

26.4

26.4

GS4 23.4

23.4

21.6

21.9

20.7

21.3

21.3

21.2

21.2

21.2

21.2

GS5 23.4

23.4

22.6

21.8

21.8

21.1

21.1

21.3

21.3

21.3

21.3

Silverdale 33 kV BASE 1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

GS1 1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

GS2 1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

GS3 1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

GS4 1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

GS5 1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

Silverdale 220 kV (T1) BASE 9.6

9.6

9.7

9.7

9.7

9.7

9.7

9.7

9.7

9.7

9.7

GS1 9.6

9.6

9.7

9.5

9.5

9.4

9.4

9.5

9.5

9.5

9.5

GS2 9.6

9.6

9.7

9.6

9.6

9.5

9.5

9.5

9.5

9.5

9.5

GS3 9.6

9.6

9.7

9.7

10.2

10.2

10.1

10.1

10.1

10.1

10.1

GS4 9.6

9.6

9.3

9.4

9.1

9.2

9.2

9.2

9.2

9.2

9.2

GS5 9.6

9.6

9.5

9.3

9.3

9.2

9.2

9.2

9.3

9.3

9.3

Silverdale 220 kV (T2) BASE 9.6

9.6

9.7

9.7

9.7

9.7

9.7

9.7

9.7

9.7

9.7

GS1 9.6

9.6

9.7

9.5

9.5

9.4

9.4

9.4

9.4

9.5

9.5

GS2 9.6

9.6

9.7

9.5

9.5

9.4

9.4

9.4

9.4

9.5

9.5

GS3 9.6

9.6

9.7

9.7

10.2

10.2

10.0

10.0

10.0

10.1

10.1

GS4 9.6

9.6

9.3

9.3

9.1

9.2

9.2

9.2

9.2

9.2

9.2

GS5 9.6

9.6

9.5

9.3

9.3

9.2

9.2

9.2

9.2

9.2

9.2

Southdown 220 kV BASE 18.3

18.3

18.4

18.4

18.4

18.4

18.4

18.4

18.4

18.4

18.4

GS1 18.3

18.3

18.4

17.9

17.9

17.5

17.5

17.6

17.6

17.7

17.7

GS2 18.3

18.3

18.4

18.0

18.0

17.6

17.6

17.6

17.6

17.7

17.7

GS3 18.3

18.3

18.4

18.4

20.6

20.6

20.1

20.2

20.2

20.2

20.2

GS4 18.3

18.3

17.2

17.4

16.6

17.0

17.0

16.9

17.0

17.0

17.0

GS5 18.3

18.3

17.8

17.3

17.3

16.9

16.9

17.0

17.0

17.0

17.0

Takanini 33 kV BASE 1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

GS1 1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

GS2 1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

GS3 1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

GS4 1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

GS5 1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

© Transpower New Zealand Limited 2016.All rights reserved. 82

Page 83: 2015 ten year forecast fault level report - Transpower · PDF fileThis publication presents an update to the ten year forecast fault levels ... calculation. Minimum fault level calculations

Ten year forecast fault Levels

Takanini 220 kV (T5) BASE 16.0

16.0

16.1

16.1

16.1

16.1

16.1

16.1

16.1

16.1

16.1

GS1 16.0

16.0

16.1

15.7

15.7

15.5

15.5

15.5

15.6

15.6

15.6

GS2 16.0

16.0

16.1

15.7

15.7

15.6

15.6

15.6

15.6

15.6

15.6

GS3 16.0

16.0

16.1

16.1

17.4

17.4

17.0

17.0

17.0

17.0

17.0

GS4 16.0

16.0

15.2

15.3

14.7

15.1

15.1

15.1

15.1

15.1

15.1

GS5 16.0

16.0

15.7

15.2

15.2

15.0

15.0

15.1

15.1

15.1

15.1

Takanini 220 kV (T8) BASE 15.5

15.5

15.6

15.6

15.6

15.6

15.6

15.6

15.6

15.6

15.6

GS1 15.5

15.5

15.6

15.2

15.2

14.8

14.8

14.9

14.9

14.9

14.9

GS2 15.5

15.5

15.6

15.2

15.2

14.9

14.9

14.9

14.9

14.9

14.9

GS3 15.5

15.5

15.6

15.6

16.8

16.8

16.4

16.4

16.4

16.5

16.5

GS4 15.5

15.5

14.7

14.8

14.2

14.5

14.5

14.4

14.4

14.4

14.4

GS5 15.5

15.5

15.2

14.8

14.8

14.4

14.4

14.4

14.5

14.5

14.5

Wairau Road 33 kV BASE 15.7

15.7

15.7

15.7

15.7

15.7

15.7

15.7

15.7

15.7

15.7

GS1 15.7

15.7

15.7

15.6

15.6

15.6

15.6

15.6

15.6

15.6

15.6

GS2 15.7

15.7

15.7

15.7

15.7

15.6

15.6

15.6

15.6

15.6

15.6

GS3 15.7

15.7

15.7

15.7

15.9

15.9

15.8

15.8

15.8

15.9

15.9

GS4 15.7

15.7

15.6

15.6

15.5

15.5

15.5

15.5

15.5

15.5

15.5

GS5 15.7

15.7

15.6

15.6

15.6

15.5

15.5

15.5

15.5

15.5

15.5

Wairau Road 220 kV BASE 19.4

19.4

19.5

19.5

19.5

19.5

19.5

19.5

19.5

19.5

19.5

GS1 19.4

19.4

19.5

19.0

19.0

18.5

18.5

18.6

18.7

18.7

18.7

GS2 19.4

19.4

19.5

19.1

19.1

18.6

18.6

18.7

18.7

18.7

18.7

GS3 19.4

19.4

19.5

19.5

21.8

21.8

21.2

21.3

21.3

21.3

21.3

GS4 19.4

19.4

18.1

18.3

17.5

17.9

17.9

17.8

17.8

17.8

17.8

GS5 19.4

19.4

18.8

18.2

18.2

17.7

17.7

17.8

17.9

17.9

17.9

Wiri 33 kV BASE 2.3

2.3

2.3

2.3

2.3

2.3

2.3

2.3

2.3

2.3

2.3

GS1 2.3

2.3

2.3

2.3

2.3

2.3

2.3

2.3

2.3

2.3

2.3

GS2 2.3

2.3

2.3

2.3

2.3

2.3

2.3

2.3

2.3

2.3

2.3

GS3 2.3

2.3

2.3

2.3

2.3

2.3

2.3

2.3

2.3

2.3

2.3

GS4 2.3

2.3

2.3

2.3

2.3

2.3

2.3

2.3

2.3

2.3

2.3

GS5 2.3

2.3

2.3

2.3

2.3

2.3

2.3

2.3

2.3

2.3

2.3

Wiri 110 kV (T1) BASE 13.1

13.1

13.2

13.2

13.2

13.2

13.2

13.2

13.2

13.2

13.2

GS1 13.1

13.1

13.2

13.1

13.1

13.0

13.0

13.0

13.0

13.0

13.0

GS2 13.1

13.1

13.2

13.1

13.1

13.0

13.0

13.0

13.0

13.0

13.0

GS3 13.1

13.1

13.2

13.2

13.6

13.6

13.5

13.5

13.5

13.5

13.5

GS4 13.1

13.1

12.9

12.9

12.7

12.8

12.8

12.8

12.8

12.8

12.8

GS5 13.1

13.1

13.0

12.9

12.9

12.8

12.8

12.8

12.8

12.8

12.8

© Transpower New Zealand Limited 2016.All rights reserved. 83

Page 84: 2015 ten year forecast fault level report - Transpower · PDF fileThis publication presents an update to the ten year forecast fault levels ... calculation. Minimum fault level calculations

Ten year forecast fault Levels

Wiri 110 kV (T2) BASE 13.0

13.0

13.1

13.1

13.1

13.1

13.1

13.1

13.1

13.1

13.1

GS1 13.0

13.0

13.1

13.0

13.0

12.9

12.9

12.9

12.9

12.9

12.9

GS2 13.0

13.0

13.1

13.0

13.0

12.9

12.9

12.9

12.9

12.9

12.9

GS3 13.0

13.0

13.1

13.1

13.6

13.6

13.4

13.5

13.5

13.5

13.5

GS4 13.0

13.0

12.8

12.9

12.7

12.7

12.7

12.7

12.7

12.7

12.7

GS5 13.0

13.0

13.0

12.8

12.8

12.7

12.7

12.7

12.8

12.8

12.8

WAIKATO

Arapuni 110 kV (North Bus) BASE

6.3 6.3

13.3

13.3

13.3

13.3

13.3

13.3

13.3

13.3

13.3

GS1 6.3

6.3

13.4

13.4

13.4

13.3

13.3

13.4

13.4

13.4

13.4

GS2 6.3

6.3

13.4

13.4

13.4

13.4

13.4

13.4

13.4

13.4

13.4

GS3 6.3

6.3

13.3

13.3

13.4

13.4

13.3

13.4

13.4

13.4

13.4

GS4 6.3

6.3

13.4

13.4

13.3

13.4

13.4

13.4

13.4

13.4

13.4

GS5 6.3

6.3

13.4

13.3

13.3

13.3

13.3

13.3

13.3

13.3

13.3

Arapuni 110 kV (South Bus) BASE

6.0 6.0

13.3

13.3

13.3

13.3

13.3

13.3

13.3

13.3

13.3

GS1 6.0

6.1

13.4

13.4

13.4

13.3

13.3

13.4

13.4

13.4

13.4

GS2 6.0

6.1

13.4

13.4

13.4

13.4

13.4

13.4

13.4

13.4

13.4

GS3 6.0

6.0

13.3

13.3

13.4

13.4

13.3

13.4

13.4

13.4

13.4

GS4 6.0

6.1

13.4

13.4

13.3

13.4

13.4

13.4

13.4

13.4

13.4

GS5 6.0

6.1

13.4

13.3

13.3

13.3

13.3

13.3

13.3

13.3

13.3

Atiamuri 220 kV BASE 17.5

17.5

17.6

17.6

17.6

17.6

17.6

17.6

17.6

17.6

17.6

GS1 17.5

17.7

17.7

18.0

18.0

17.9

17.9

18.0

18.2

18.2

18.2

GS2 17.5

17.7

17.7

18.0

18.0

18.0

18.0

18.2

18.2

18.2

18.3

GS3 17.5

17.5

17.6

17.6

17.6

17.6

17.9

17.9

17.9

17.9

17.9

GS4 17.5

17.7

17.7

18.1

18.0

18.1

18.1

18.0

18.2

18.2

18.2

GS5 17.5

17.7

17.7

17.9

17.9

17.9

17.9

17.9

18.1

18.1

18.1

Cambridge 11 kV BASE 24.2

24.2

24.8

24.8

24.8

24.8

24.8

24.8

24.8

24.8

24.8

GS1 24.2

24.2

24.8

24.8

24.8

24.8

24.8

24.8

24.8

24.8

24.8

GS2 24.2

24.2

24.8

24.8

24.8

24.8

24.8

24.8

24.8

24.8

24.8

GS3 24.2

24.2

24.8

24.8

24.8

24.8

24.8

24.8

24.8

24.8

24.8

GS4 24.2

24.2

24.8

24.8

24.8

24.8

24.8

24.8

24.8

24.8

24.8

GS5 24.2

24.2

24.8

24.8

24.8

24.8

24.8

24.8

24.8

24.8

24.8

Cambridge 110 kV (T3) BASE 6.9

6.9

7.5

7.5

7.5

7.5

7.5

7.5

7.5

7.5

7.5

GS1 6.9

6.9

7.5

7.5

7.5

7.4

7.4

7.5

7.5

7.5

7.5

GS2 6.9

6.9

7.5

7.5

7.5

7.5

7.5

7.5

7.5

7.5

7.5

GS3 6.9

6.9

7.5

7.5

7.5

7.5

7.5

7.5

7.5

7.5

7.5

© Transpower New Zealand Limited 2016.All rights reserved. 84

Page 85: 2015 ten year forecast fault level report - Transpower · PDF fileThis publication presents an update to the ten year forecast fault levels ... calculation. Minimum fault level calculations

Ten year forecast fault Levels

GS4 6.9

6.9

7.4

7.5

7.4

7.4

7.4

7.4

7.4

7.4

7.4

GS5 6.9

6.9

7.5

7.4

7.4

7.4

7.4

7.4

7.4

7.4

7.4

Cambridge 110 kV (T4) BASE 6.9

6.9

7.5

7.5

7.5

7.5

7.5

7.5

7.5

7.5

7.5

GS1 6.9

6.9

7.5

7.5

7.5

7.4

7.4

7.5

7.5

7.5

7.5

GS2 6.9

6.9

7.5

7.5

7.5

7.5

7.5

7.5

7.5

7.5

7.5

GS3 6.9

6.9

7.5

7.5

7.5

7.5

7.5

7.5

7.5

7.5

7.5

GS4 6.9

6.9

7.4

7.5

7.4

7.4

7.4

7.4

7.4

7.4

7.4

GS5 6.9

6.9

7.5

7.4

7.4

7.4

7.4

7.4

7.4

7.4

7.4

Hamilton 11 kV BASE 13.7

13.7

13.8

13.8

13.8

13.8

13.8

13.8

13.8

13.8

13.8

GS1 13.7

13.7

13.8

13.8

13.8

13.8

13.8

13.8

13.8

13.8

13.8

GS2 13.7

13.7

13.8

13.8

13.8

13.8

13.8

13.8

13.8

13.8

13.8

GS3 13.7

13.7

13.8

13.8

13.8

13.8

13.8

13.8

13.8

13.8

13.8

GS4 13.7

13.7

13.8

13.8

13.8

13.8

13.8

13.8

13.8

13.8

13.8

GS5 13.7

13.7

13.8

13.8

13.8

13.8

13.8

13.8

13.8

13.8

13.8

Hamilton 33 kV BASE 0.6

0.6

0.6

0.6

0.6

0.6

0.6

0.6

0.6

0.6

0.6

GS1 0.6

0.6

0.6

0.6

0.6

0.6

0.6

15.4

15.4

15.4

15.4

GS2 0.6

0.6

0.6

15.4

15.4

15.4

15.4

15.4

15.4

15.4

15.4

GS3 0.6

0.6

0.6

0.6

0.6

0.6

0.6

15.4

15.4

15.4

15.4

GS4 0.6

0.6

0.6

15.4

15.3

15.4

15.4

15.4

15.4

15.4

15.4

GS5 0.6

0.6

0.6

0.6

0.6

0.6

0.6

15.4

15.4

15.4

15.4

Hamilton 110 kV BASE 12.6

12.6

13.8

13.8

13.8

13.8

13.8

13.8

13.8

13.8

13.8

GS1 12.6

12.6

13.8

13.7

13.7

13.6

13.6

13.7

13.7

13.7

13.7

GS2 12.6

12.6

13.8

13.8

13.8

13.7

13.7

13.7

13.7

13.7

13.7

GS3 12.6

12.6

13.8

13.8

13.8

13.8

13.8

13.8

13.8

13.8

13.8

GS4 12.6

12.6

13.6

13.7

13.6

13.6

13.6

13.6

13.6

13.6

13.6

GS5 12.6

12.6

13.7

13.6

13.6

13.5

13.5

13.6

13.6

13.6

13.6

Hamilton 220 kV BASE 11.4

11.4

11.7

11.7

11.7

11.7

11.7

11.7

11.7

11.7

11.7

GS1 11.4

11.4

11.7

11.5

11.5

11.3

11.3

11.6

11.6

11.6

11.6

GS2 11.4

11.4

11.7

11.8

11.8

11.6

11.6

11.6

11.6

11.6

11.6

GS3 11.4

11.4

11.7

11.7

11.8

11.8

11.6

11.8

11.8

11.8

11.8

GS4 11.4

11.4

11.4

11.7

11.4

11.5

11.5

11.4

11.5

11.5

11.5

GS5 11.4

11.4

11.6

11.4

11.4

11.2

11.2

11.5

11.5

11.5

11.5

Hangatiki 33 kV BASE 5.3

5.3

6.1

6.1

6.1

6.1

6.1

6.1

6.1

6.1

6.1

GS1 5.3

5.3

6.1

6.1

6.1

6.1

6.1

6.1

6.1

6.1

6.1

GS2 5.3

5.3

6.1

6.1

6.1

6.1

6.1

6.1

6.1

6.1

6.1

GS3 5.3

5.3

6.1

6.1

6.1

6.1

6.1

6.1

6.1

6.1

6.1

GS4 5.3

5.3

6.1

6.1

6.1

6.1

6.1

6.1

6.1

6.1

6.1

© Transpower New Zealand Limited 2016.All rights reserved. 85

Page 86: 2015 ten year forecast fault level report - Transpower · PDF fileThis publication presents an update to the ten year forecast fault levels ... calculation. Minimum fault level calculations

Ten year forecast fault Levels

GS5 5.3

5.3

6.1

6.1

6.1

6.1

6.1

6.1

6.1

6.1

6.1

Hangatiki 110 kV BASE 2.3

2.3

4.0

4.0

4.0

4.0

4.0

4.0

4.0

4.0

4.0

GS1 2.3

2.3

4.0

4.0

4.0

4.0

4.0

4.0

4.0

4.0

4.0

GS2 2.3

2.3

4.0

4.0

4.0

4.0

4.0

4.0

4.0

4.0

4.0

GS3 2.3

2.3

4.0

4.0

4.0

4.0

4.0

4.0

4.0

4.0

4.0

GS4 2.3

2.3

4.0

4.0

4.0

4.0

4.0

4.0

4.0

4.0

4.0

GS5 2.3

2.3

4.0

4.0

4.0

4.0

4.0

4.0

4.0

4.0

4.0

Hinuera 33 kV BASE 8.5

8.5

8.8

8.8

8.8

8.8

8.8

8.8

8.8

8.8

8.8

GS1 8.5

8.5

8.8

8.8

8.8

8.8

8.8

8.8

8.8

8.8

8.8

GS2 8.5

8.5

8.8

8.8

8.8

8.8

8.8

8.8

8.8

8.8

8.8

GS3 8.5

8.5

8.8

8.8

8.8

8.8

8.8

8.8

8.8

8.8

8.8

GS4 8.5

8.5

8.8

8.8

8.8

8.8

8.8

8.8

8.8

8.8

8.8

GS5 8.5

8.5

8.8

8.8

8.8

8.7

8.7

8.8

8.8

8.8

8.8

Hinuera 110 kV BASE 2.9

2.9

3.0

3.0

3.0

3.0

3.0

3.0

3.0

3.0

3.0

GS1 2.9

2.9

3.0

3.0

3.0

3.0

3.0

3.0

3.0

3.0

3.0

GS2 2.9

2.9

3.0

3.0

3.0

3.0

3.0

3.0

3.0

3.0

3.0

GS3 2.9

2.9

3.0

3.0

3.0

3.0

3.0

3.0

3.0

3.0

3.0

GS4 2.9

2.9

3.0

3.0

3.0

3.0

3.0

3.0

3.0

3.0

3.0

GS5 2.9

2.9

3.0

3.0

3.0

3.0

3.0

3.0

3.0

3.0

3.0

Huntly 11 kV BASE 17.1

17.1

17.1

17.1

17.1

17.1

17.1

17.1

17.1

17.1

17.1

GS1 17.1

17.1

17.1

17.0

17.0

17.0

17.0

17.0

17.0

17.0

17.0

GS2 17.1

17.1

17.1

17.0

17.0

17.0

17.0

17.0

17.0

17.0

17.0

GS3 17.1

17.1

17.1

17.1

17.1

17.1

17.0

17.0

17.0

17.0

17.0

GS4 17.1

17.1

17.0

17.0

16.9

17.0

17.0

17.0

17.0

17.0

17.0

GS5 17.1

17.1

17.1

17.0

17.0

17.0

17.0

17.0

17.0

17.0

17.0

Huntly 33 kV BASE 1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

GS1 1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

GS2 1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

GS3 1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

GS4 1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

GS5 1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

Huntly 220 kV BASE 25.7

25.7

25.9

25.9

25.9

25.9

25.9

25.9

25.9

25.9

25.9

GS1 25.7

25.7

25.9

23.6

23.7

21.5

21.5

21.7

21.7

21.8

21.8

GS2 25.7

25.7

25.9

23.8

23.8

21.7

21.7

21.7

21.7

21.8

21.8

GS3 25.7

25.7

25.9

25.9

25.3

25.3

22.9

23.1

23.1

23.2

23.2

GS4 25.7

25.7

23.0

23.3

20.7

21.1

21.1

21.0

21.0

21.0

21.0

GS5 25.7

25.7

25.4

23.1

23.1

20.9

20.9

21.1

21.2

21.2

21.2

© Transpower New Zealand Limited 2016.All rights reserved. 86

Page 87: 2015 ten year forecast fault level report - Transpower · PDF fileThis publication presents an update to the ten year forecast fault levels ... calculation. Minimum fault level calculations

Ten year forecast fault Levels

Karapiro 110 kV BASE 8.1

8.1

9.3

9.3

9.3

9.3

9.3

9.3

9.3

9.3

9.3

GS1 8.1

8.1

9.3

9.3

9.3

9.3

9.3

9.3

9.3

9.3

9.3

GS2 8.1

8.1

9.3

9.3

9.3

9.3

9.3

9.3

9.3

9.3

9.3

GS3 8.1

8.1

9.3

9.3

9.4

9.4

9.3

9.4

9.4

9.4

9.4

GS4 8.1

8.1

9.3

9.3

9.3

9.3

9.3

9.3

9.3

9.3

9.3

GS5 8.1

8.1

9.3

9.3

9.3

9.3

9.3

9.3

9.3

9.3

9.3

Kinleith 11 kV (T1A) BASE 14.3

14.3

15.0

15.0

15.0

15.0

15.0

15.0

15.0

15.0

15.0

GS1 14.3

14.4

15.1

15.1

15.1

15.1

15.1

15.1

15.1

15.1

15.1

GS2 14.3

14.4

15.1

15.1

15.1

15.1

15.1

15.1

15.1

15.1

15.1

GS3 14.3

14.3

15.0

15.0

15.0

15.0

15.0

15.0

15.0

15.0

15.0

GS4 14.3

14.4

15.1

15.1

15.1

15.1

15.1

15.1

15.1

15.1

15.1

GS5 14.3

14.4

15.1

15.1

15.1

15.1

15.1

15.1

15.1

15.1

15.1

Kinleith 11 kV (T2) BASE 14.1

14.1

14.8

14.8

14.8

14.8

14.8

14.8

14.8

14.8

14.8

GS1 14.1

14.1

14.8

14.8

14.8

14.8

14.8

14.8

14.8

14.8

14.8

GS2 14.1

14.1

14.8

14.8

14.8

14.8

14.8

14.8

14.8

14.8

14.8

GS3 14.1

14.1

14.8

14.8

14.8

14.8

14.8

14.8

14.8

14.8

14.8

GS4 14.1

14.1

14.8

14.8

14.8

14.8

14.8

14.8

14.8

14.8

14.8

GS5 14.1

14.1

14.8

14.8

14.8

14.8

14.8

14.8

14.8

14.8

14.8

Kinleith 11 kV (T3A and T3B) BASE

14.8 14.8

15.6

15.6

15.6

15.6

15.6

15.6

15.6

15.6

15.6

GS1 14.8

14.9

15.6

15.6

15.6

15.6

15.6

15.6

15.6

15.6

15.6

GS2 14.8

14.9

15.6

15.6

15.6

15.6

15.6

15.6

15.6

15.6

15.6

GS3 14.8

14.8

15.6

15.6

15.6

15.6

15.6

15.6

15.6

15.6

15.6

GS4 14.8

14.9

15.6

15.6

15.6

15.6

15.6

15.6

15.6

15.6

15.6

GS5 14.8

14.9

15.6

15.6

15.6

15.6

15.6

15.6

15.6

15.6

15.6

Kinleith 11 kV (T5) BASE 0.03

0.03

0.03

0.03

0.03

0.03

0.03

0.03

0.03

0.03

0.03

GS1 0.03

0.03

0.03

0.03

0.03

0.03

0.03

0.03

0.03

0.03

0.03

GS2 0.03

0.03

0.03

0.03

0.03

0.03

0.03

0.03

0.03

0.03

0.03

GS3 0.03

0.03

0.03

0.03

0.03

0.03

0.03

0.03

0.03

0.03

0.03

GS4 0.03

0.03

0.03

0.03

0.03

0.03

0.03

0.03

0.03

0.03

0.03

GS5 0.03

0.03

0.03

0.03

0.03

0.03

0.03

0.03

0.03

0.03

0.03

Kinleith 33 kV BASE 5.0

5.0

5.3

5.3

5.3

5.3

5.3

5.3

5.3

5.3

5.3

GS1 5.0

5.0

5.3

5.3

5.3

5.3

5.3

5.3

5.3

5.3

5.3

GS2 5.0

5.0

5.3

5.3

5.3

5.3

5.3

5.3

5.3

5.3

5.3

GS3 5.0

5.0

5.3

5.3

5.3

5.3

5.3

5.3

5.3

5.3

5.3

GS4 5.0

5.0

5.3

5.3

5.3

5.3

5.3

5.3

5.3

5.3

5.3

GS5 5.0

5.0

5.3

5.3

5.3

5.3

5.3

5.3

5.3

5.3

5.3

© Transpower New Zealand Limited 2016.All rights reserved. 87

Page 88: 2015 ten year forecast fault level report - Transpower · PDF fileThis publication presents an update to the ten year forecast fault levels ... calculation. Minimum fault level calculations

Ten year forecast fault Levels

Kinleith 110 kV BASE 6.4

6.4

8.3

8.3

8.3

8.3

8.3

8.3

8.3

8.3

8.3

GS1 6.4

6.5

8.4

8.4

8.4

8.4

8.4

8.4

8.4

8.4

8.4

GS2 6.4

6.5

8.4

8.4

8.4

8.4

8.4

8.4

8.4

8.4

8.4

GS3 6.4

6.4

8.3

8.3

8.3

8.3

8.3

8.3

8.3

8.3

8.3

GS4 6.4

6.5

8.4

8.4

8.4

8.4

8.4

8.4

8.4

8.4

8.4

GS5 6.4

6.5

8.4

8.4

8.4

8.4

8.4

8.4

8.4

8.4

8.4

Kopu 66 kV BASE 3.3

3.3

3.3

3.3

3.3

3.3

3.3

3.3

3.3

3.3

3.3

GS1 3.3

3.3

3.3

3.3

3.3

3.3

3.3

3.3

3.3

3.3

3.3

GS2 3.3

3.3

3.3

3.3

3.3

3.3

3.3

3.3

3.3

3.3

3.3

GS3 3.3

3.3

3.3

3.3

3.3

3.3

3.3

3.3

3.3

3.3

3.3

GS4 3.3

3.3

3.3

3.3

3.3

3.3

3.3

3.3

3.3

3.3

3.3

GS5 3.3

3.3

3.3

3.3

3.3

3.3

3.3

3.3

3.3

3.3

3.3

Kopu 110 kV (T3) BASE 1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

GS1 1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

GS2 1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

GS3 1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

GS4 1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

GS5 1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

Kopu 110 kV (T4) BASE 1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

GS1 1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

GS2 1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

GS3 1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

GS4 1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

GS5 1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

Lichfield 110 kV (T1) BASE 5.0

5.0

5.5

5.5

5.5

5.5

5.5

5.5

5.5

5.5

5.5

GS1 5.0

5.1

5.6

5.6

5.6

5.6

5.6

5.6

5.6

5.6

5.6

GS2 5.0

5.1

5.6

5.6

5.6

5.6

5.6

5.6

5.6

5.6

5.6

GS3 5.0

5.0

5.5

5.5

5.6

5.6

5.6

5.6

5.6

5.6

5.6

GS4 5.0

5.1

5.7

5.7

5.7

5.7

5.7

5.7

5.7

5.7

5.7

GS5 5.0

5.1

5.6

5.6

5.6

5.6

5.6

5.6

5.6

5.6

5.6

Lichfield 110 kV (T2) BASE 4.8

4.8

5.3

5.3

5.3

5.3

5.3

5.3

5.3

5.3

5.3

GS1 4.8

4.8

5.4

5.4

5.4

5.4

5.4

5.4

5.4

5.4

5.4

GS2 4.8

4.8

5.4

5.4

5.4

5.4

5.4

5.4

5.4

5.4

5.4

GS3 4.8

4.8

5.3

5.3

5.3

5.3

5.3

5.3

5.3

5.3

5.3

GS4 4.8

4.8

5.4

5.4

5.4

5.4

5.4

5.4

5.4

5.4

5.4

GS5 4.8

4.8

5.4

5.4

5.4

5.4

5.4

5.4

5.4

5.4

5.4

© Transpower New Zealand Limited 2016.All rights reserved. 88

Page 89: 2015 ten year forecast fault level report - Transpower · PDF fileThis publication presents an update to the ten year forecast fault levels ... calculation. Minimum fault level calculations

Ten year forecast fault Levels

Maraetai 220 kV BASE 23.1

23.1

23.1

23.1

23.1

23.1

23.1

23.1

23.1

23.1

23.1

GS1 23.1

23.1

23.2

23.4

23.4

23.2

23.2

23.3

23.5

23.5

23.5

GS2 23.1

23.1

23.2

23.4

23.4

23.3

23.3

23.5

23.5

23.5

23.6

GS3 23.1

23.1

23.1

23.1

23.4

23.4

23.6

23.6

23.6

23.6

23.6

GS4 23.1

23.1

22.9

23.3

23.1

23.2

23.2

23.1

23.3

23.3

23.3

GS5 23.1

23.1

23.0

23.2

23.2

23.1

23.1

23.1

23.3

23.4

23.4

Ohakuri 220 kV BASE 17.3

17.3

17.4

17.4

17.4

17.4

17.4

17.4

17.4

17.4

17.4

GS1 17.3

17.5

17.5

17.8

17.8

17.8

17.8

17.8

18.0

18.0

18.0

GS2 17.3

17.5

17.5

17.9

17.9

17.9

17.9

18.0

18.0

18.0

18.1

GS3 17.3

17.3

17.4

17.4

17.4

17.4

17.8

17.8

17.8

17.8

17.8

GS4 17.3

17.5

17.5

17.9

17.9

17.9

17.9

17.9

18.0

18.0

18.0

GS5 17.3

17.5

17.5

17.8

17.8

17.7

17.7

17.8

17.9

18.0

18.0

Ohinewai 220 kV BASE 17.6

17.6

17.7

17.7

17.7

17.7

17.7

17.7

17.7

17.7

17.7

GS1 17.6

17.6

17.7

16.9

16.9

16.1

16.1

16.2

16.3

16.3

16.3

GS2 17.6

17.6

17.7

17.0

17.0

16.2

16.2

16.3

16.3

16.3

16.3

GS3 17.6

17.6

17.7

17.7

17.8

17.8

17.0

17.1

17.1

17.1

17.1

GS4 17.6

17.6

16.6

16.8

15.7

15.9

15.9

15.9

15.9

15.9

15.9

GS5 17.6

17.6

17.5

16.6

16.6

15.8

15.8

15.9

15.9

16.0

16.0

Piako 110 kV BASE 3.0

3.0

3.1

3.1

3.1

3.1

3.1

3.1

3.1

3.1

3.1

GS1 3.0

3.0

3.1

3.1

3.1

3.1

3.1

3.1

3.1

3.1

3.1

GS2 3.0

3.0

3.1

3.1

3.1

3.1

3.1

3.1

3.1

3.1

3.1

GS3 3.0

3.0

3.1

3.1

3.1

3.1

3.1

3.1

3.1

3.1

3.1

GS4 3.0

3.0

3.1

3.1

3.1

3.1

3.1

3.1

3.1

3.1

3.1

GS5 3.0

3.0

3.1

3.1

3.1

3.1

3.1

3.1

3.1

3.1

3.1

Te Awamutu 11 kV BASE 20.5

20.5

23.4

23.4

23.4

23.4

23.4

23.4

23.4

23.4

23.4

GS1 20.5

20.5

23.4

23.4

23.4

23.4

23.4

23.4

23.4

23.4

23.4

GS2 20.5

20.5

23.4

23.4

23.4

23.4

23.4

23.4

23.4

23.4

23.4

GS3 20.5

20.5

23.4

23.4

23.4

23.4

23.4

23.4

23.4

23.4

23.4

GS4 20.5

20.5

23.4

23.4

23.4

23.4

23.4

23.4

23.4

23.4

23.4

GS5 20.5

20.5

23.4

23.4

23.4

23.4

23.4

23.4

23.4

23.4

23.4

Te Awamutu 110 kV BASE 2.8

2.8

4.1

4.1

4.1

4.1

4.1

4.1

4.1

4.1

4.1

GS1 2.8

2.8

4.1

4.1

4.1

4.1

4.1

4.1

4.1

4.1

4.1

GS2 2.8

2.8

4.1

4.1

4.1

4.1

4.1

4.1

4.1

4.1

4.1

GS3 2.8

2.8

4.1

4.1

4.2

4.2

4.1

4.2

4.2

4.2

4.2

GS4 2.8

2.8

4.1

4.1

4.1

4.1

4.1

4.1

4.1

4.1

4.1

GS5 2.8

2.8

4.1

4.1

4.1

4.1

4.1

4.1

4.1

4.1

4.1

© Transpower New Zealand Limited 2016.All rights reserved. 89

Page 90: 2015 ten year forecast fault level report - Transpower · PDF fileThis publication presents an update to the ten year forecast fault levels ... calculation. Minimum fault level calculations

Ten year forecast fault Levels

Te Kowhai 33 kV BASE 1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

GS1 1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

GS2 1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

GS3 1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

GS4 1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

GS5 1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

Te Kowhai 220 kV BASE 8.4

8.4

8.5

8.5

8.5

8.5

8.5

8.5

8.5

8.5

8.5

GS1 8.4

8.4

8.5

8.3

8.3

8.1

8.1

8.1

8.1

8.1

8.1

GS2 8.4

8.4

8.5

8.3

8.3

8.1

8.1

8.1

8.1

8.1

8.1

GS3 8.4

8.4

8.5

8.5

8.4

8.4

8.2

8.2

8.2

8.3

8.3

GS4 8.4

8.4

8.2

8.2

8.0

8.0

8.0

8.0

8.0

8.0

8.0

GS5 8.4

8.4

8.4

8.2

8.2

8.0

8.0

8.0

8.0

8.0

8.0

Waihou 33 kV BASE 7.9

7.9

8.0

8.0

8.0

8.0

8.0

8.0

8.0

8.0

8.0

GS1 7.9

7.9

8.0

8.0

8.0

8.0

8.0

8.0

8.0

8.0

8.0

GS2 7.9

7.9

8.0

8.0

8.0

8.0

8.0

8.0

8.0

8.0

8.0

GS3 7.9

7.9

8.0

8.0

8.0

8.0

8.0

8.0

8.0

8.0

8.0

GS4 7.9

7.9

8.0

8.0

8.0

8.0

8.0

8.0

8.0

8.0

8.0

GS5 7.9

7.9

8.0

8.0

8.0

8.0

8.0

8.0

8.0

8.0

8.0

Waihou 110 kV BASE 2.6

2.6

2.7

2.7

2.7

2.7

2.7

2.7

2.7

2.7

2.7

GS1 2.6

2.6

2.7

2.7

2.7

2.7

2.7

2.7

2.7

2.7

2.7

GS2 2.6

2.6

2.7

2.7

2.7

2.7

2.7

2.7

2.7

2.7

2.7

GS3 2.6

2.6

2.7

2.7

2.7

2.7

2.7

2.7

2.7

2.7

2.7

GS4 2.6

2.6

2.7

2.7

2.7

2.7

2.7

2.7

2.7

2.7

2.7

GS5 2.6

2.6

2.7

2.7

2.7

2.7

2.7

2.7

2.7

2.7

2.7

Waikino 33 kV BASE 7.3

7.3

7.3

7.3

7.3

7.3

7.3

7.3

7.3

7.3

7.3

GS1 7.3

7.3

7.3

7.3

7.3

7.3

7.3

7.3

7.3

7.3

7.3

GS2 7.3

7.3

7.3

7.3

7.3

7.3

7.3

7.3

7.3

7.3

7.3

GS3 7.3

7.3

7.3

7.3

7.4

7.4

7.3

7.4

7.4

7.4

7.4

GS4 7.3

7.3

7.3

7.3

7.3

7.3

7.3

7.3

7.3

7.3

7.3

GS5 7.3

7.3

7.3

7.3

7.3

7.3

7.3

7.3

7.3

7.3

7.3

Waikino 110 kV BASE 2.0

2.0

2.0

2.0

2.0

2.0

2.0

2.0

2.0

2.0

2.0

GS1 2.0

2.0

2.0

2.0

2.0

2.0

2.0

2.0

2.0

2.0

2.0

GS2 2.0

2.0

2.0

2.0

2.0

2.0

2.0

2.0

2.0

2.0

2.0

GS3 2.0

2.0

2.0

2.0

2.0

2.0

2.0

2.0

2.0

2.0

2.0

GS4 2.0

2.0

2.0

2.0

2.0

2.0

2.0

2.0

2.0

2.0

2.0

GS5 2.0

2.0

2.0

2.0

2.0

2.0

2.0

2.0

2.0

2.0

2.0

© Transpower New Zealand Limited 2016.All rights reserved. 90

Page 91: 2015 ten year forecast fault level report - Transpower · PDF fileThis publication presents an update to the ten year forecast fault levels ... calculation. Minimum fault level calculations

Ten year forecast fault Levels

Waipapa 220 kV BASE 12.5

12.5

12.5

12.5

12.5

12.5

12.5

12.5

12.5

12.5

12.5

GS1 12.5

12.5

12.5

12.6

12.6

12.5

12.5

12.6

12.6

12.6

12.6

GS2 12.5

12.5

12.5

12.6

12.6

12.6

12.6

12.6

12.6

12.6

12.7

GS3 12.5

12.5

12.5

12.5

12.6

12.6

12.6

12.6

12.6

12.7

12.7

GS4 12.5

12.5

12.4

12.6

12.5

12.5

12.5

12.5

12.6

12.6

12.6

GS5 12.5

12.5

12.5

12.5

12.5

12.5

12.5

12.5

12.6

12.6

12.6

Whakamaru 220 kV BASE 28.5

28.5

28.5

28.5

28.5

28.5

28.5

28.5

28.5

28.5

28.5

GS1 28.5

28.6

28.6

29.0

29.0

28.8

28.8

28.9

29.3

29.3

29.3

GS2 28.5

28.6

28.6

29.1

29.1

28.9

28.9

29.3

29.3

29.3

29.5

GS3 28.5

28.5

28.5

28.5

28.9

28.9

29.4

29.5

29.5

29.5

29.5

GS4 28.5

28.6

28.1

29.0

28.5

28.7

28.7

28.6

28.9

28.9

28.9

GS5 28.5

28.6

28.4

28.8

28.8

28.5

28.5

28.6

28.9

29.0

29.0

BAY OF PLENTY

Aniwhenua 110 kV BASE 4.0

4.0

4.0

4.0

4.0

4.0

4.0

4.0

4.0

4.0

4.0

GS1 4.0

4.0

4.0

4.0

4.0

4.0

4.0

4.0

4.0

4.0

4.0

GS2 4.0

4.0

4.0

4.0

4.0

4.0

4.0

4.0

4.0

4.0

4.0

GS3 4.0

4.0

4.0

4.0

4.0

4.0

4.0

4.0

4.0

4.0

4.0

GS4 4.0

4.0

4.0

4.1

4.1

4.1

4.1

4.1

4.1

4.1

4.1

GS5 4.0

4.0

4.0

4.0

4.0

4.0

4.0

4.0

4.0

4.0

4.0

Edgecumbe 33 kV BASE 16.4

6.2

6.2

6.2

6.2

6.2

6.2

6.2

6.2

6.2

6.2

GS1 16.4

6.2

6.2

6.2

6.2

6.2

6.2

6.2

6.2

6.2

6.2

GS2 16.4

6.2

6.2

6.2

6.2

6.2

6.2

6.2

6.2

6.2

6.3

GS3 16.4

6.2

6.2

6.2

6.2

6.2

6.2

6.2

6.2

6.2

6.2

GS4 16.4

6.2

6.3

6.3

6.3

6.3

6.3

6.3

6.3

6.3

6.3

GS5 16.4

6.2

6.2

6.2

6.2

6.2

6.2

6.2

6.2

6.2

6.2

Edgecumbe 110 kV BASE 7.7

7.7

7.8

7.8

7.8

7.8

7.8

7.8

7.8

7.8

7.8

GS1 7.7

7.8

7.8

7.8

7.8

7.8

7.8

7.8

7.8

7.8

7.8

GS2 7.7

7.8

7.8

7.8

7.8

7.8

7.8

7.8

7.8

7.8

7.8

GS3 7.7

7.7

7.8

7.8

7.8

7.8

7.8

7.8

7.8

7.8

7.8

GS4 7.7

7.8

7.9

7.9

7.9

7.9

7.9

7.9

7.9

7.9

7.9

GS5 7.7

7.8

7.8

7.8

7.8

7.8

7.8

7.8

7.8

7.8

7.8

Edgecumbe 220 kV BASE 8.0

8.0

8.0

8.0

8.0

8.0

8.0

8.0

8.0

8.0

8.0

GS1 8.0

8.1

8.1

8.1

8.1

8.1

8.1

8.1

8.1

8.1

8.1

GS2 8.0

8.1

8.1

8.1

8.1

8.1

8.1

8.1

8.1

8.1

8.2

GS3 8.0

8.0

8.0

8.0

8.0

8.0

8.1

8.1

8.1

8.1

8.1

© Transpower New Zealand Limited 2016.All rights reserved. 91

Page 92: 2015 ten year forecast fault level report - Transpower · PDF fileThis publication presents an update to the ten year forecast fault levels ... calculation. Minimum fault level calculations

Ten year forecast fault Levels

GS4 8.0

8.1

8.2

8.2

8.2

8.2

8.2

8.2

8.2

8.2

8.2

GS5 8.0

8.1

8.1

8.1

8.1

8.1

8.1

8.1

8.1

8.1

8.1

Kaitimako 33 kV BASE 0.6

0.6

0.6

0.6

0.6

0.6

0.6

0.6

0.6

0.6

0.6

GS1 0.6

0.6

0.6

0.6

0.6

0.6

0.6

0.6

0.6

0.6

0.6

GS2 0.6

0.6

0.6

0.6

0.6

0.6

0.6

0.6

0.6

0.6

0.6

GS3 0.6

0.6

0.6

0.6

0.6

0.6

0.6

0.6

0.6

0.6

0.6

GS4 0.6

0.6

0.6

0.6

0.6

0.6

0.6

0.6

0.6

0.6

0.6

GS5 0.6

0.6

0.6

0.6

0.6

0.6

0.6

0.6

0.6

0.6

0.6

Kaitimako 110 kV BASE 10.6

10.6

10.7

10.7

10.7

10.7

10.7

10.7

10.7

10.7

10.7

GS1 10.6

10.8

10.8

10.9

10.9

10.9

10.9

10.9

10.9

10.9

10.9

GS2 10.6

10.8

10.8

10.9

10.9

10.9

10.9

10.9

10.9

10.9

10.9

GS3 10.6

10.6

10.7

10.7

10.7

10.7

10.7

10.7

10.7

10.7

10.7

GS4 10.6

10.8

11.1

11.1

11.1

11.1

11.1

11.1

11.1

11.1

11.1

GS5 10.6

10.8

10.8

10.9

10.9

10.9

10.9

10.9

10.9

10.9

10.9

Kaitimako 220 kV BASE 7.0

7.0

7.1

7.1

7.1

7.1

7.1

7.1

7.1

7.1

7.1

GS1 7.0

7.1

7.2

7.2

7.2

7.2

7.2

7.2

7.2

7.2

7.2

GS2 7.0

7.1

7.2

7.2

7.2

7.2

7.2

7.2

7.2

7.2

7.2

GS3 7.0

7.0

7.1

7.1

7.1

7.1

7.1

7.1

7.1

7.1

7.1

GS4 7.0

7.1

7.3

7.3

7.3

7.3

7.3

7.3

7.3

7.3

7.3

GS5 7.0

7.1

7.2

7.2

7.2

7.2

7.2

7.2

7.2

7.2

7.2

Kawerau 11 kV (T1/T2) BASE 20.9

20.9

20.9

20.9

20.9

20.9

20.9

20.9

20.9

20.9

20.9

GS1 20.9

20.9

20.9

20.9

20.9

20.9

20.9

20.9

20.9

20.9

20.9

GS2 20.9

20.9

20.9

20.9

20.9

20.9

20.9

20.9

20.9

20.9

20.9

GS3 20.9

20.9

20.9

20.9

20.9

20.9

20.9

20.9

20.9

20.9

20.9

GS4 20.9

20.9

20.9

20.9

20.9

20.9

20.9

20.9

20.9

20.9

20.9

GS5 20.9

20.9

20.9

20.9

20.9

20.9

20.9

20.9

20.9

20.9

20.9

Kawerau 11 kV (T6) BASE 2.2

2.2

2.2

2.2

2.2

2.2

2.2

2.2

2.2

2.2

2.2

GS1 2.2

2.2

2.2

2.2

2.2

2.2

2.2

2.2

2.2

2.2

2.2

GS2 2.2

2.2

2.2

2.2

2.2

2.2

2.2

2.2

2.2

2.2

2.2

GS3 2.2

2.2

2.2

2.2

2.2

2.2

2.2

2.2

2.2

2.2

2.2

GS4 2.2

2.2

2.2

2.2

2.2

2.2

2.2

2.2

2.2

2.2

2.2

GS5 2.2

2.2

2.2

2.2

2.2

2.2

2.2

2.2

2.2

2.2

2.2

Kawerau 11 kV (T7) BASE 2.2

2.2

2.2

2.2

2.2

2.2

2.2

2.2

2.2

2.2

2.2

GS1 2.2

2.2

2.2

2.2

2.2

2.2

2.2

2.2

2.2

2.2

2.2

GS2 2.2

2.2

2.2

2.2

2.2

2.2

2.2

2.2

2.2

2.2

2.2

GS3 2.2

2.2

2.2

2.2

2.2

2.2

2.2

2.2

2.2

2.2

2.2

GS4 2.2

2.2

2.2

2.2

2.2

2.2

2.2

2.2

2.2

2.2

2.2

© Transpower New Zealand Limited 2016.All rights reserved. 92

Page 93: 2015 ten year forecast fault level report - Transpower · PDF fileThis publication presents an update to the ten year forecast fault levels ... calculation. Minimum fault level calculations

Ten year forecast fault Levels

GS5 2.2

2.2

2.2

2.2

2.2

2.2

2.2

2.2

2.2

2.2

2.2

Kawerau 11 kV (T8) BASE 2.2

2.2

2.2

2.2

2.2

2.2

2.2

2.2

2.2

2.2

2.2

GS1 2.2

2.2

2.2

2.2

2.2

2.2

2.2

2.2

2.2

2.2

2.2

GS2 2.2

2.2

2.2

2.2

2.2

2.2

2.2

2.2

2.2

2.2

2.2

GS3 2.2

2.2

2.2

2.2

2.2

2.2

2.2

2.2

2.2

2.2

2.2

GS4 2.2

2.2

2.2

2.2

2.2

2.2

2.2

2.2

2.2

2.2

2.2

GS5 2.2

2.2

2.2

2.2

2.2

2.2

2.2

2.2

2.2

2.2

2.2

Kawerau 11 kV (T9) BASE 2.1

2.1

2.1

2.1

2.1

2.1

2.1

2.1

2.1

2.1

2.1

GS1 2.1

2.1

2.1

2.1

2.1

2.1

2.1

2.1

2.1

2.1

2.1

GS2 2.1

2.1

2.1

2.1

2.1

2.1

2.1

2.1

2.1

2.1

2.1

GS3 2.1

2.1

2.1

2.1

2.1

2.1

2.1

2.1

2.1

2.1

2.1

GS4 2.1

2.1

2.1

2.1

2.1

2.1

2.1

2.1

2.1

2.1

2.1

GS5 2.1

2.1

2.1

2.1

2.1

2.1

2.1

2.1

2.1

2.1

2.1

Kawerau 11 kV (T11/T14) BASE

5.7 5.7

5.7

5.7

5.7

5.7

5.7

5.7

5.7

5.7

5.7

GS1 5.7

5.7

5.7

5.7

5.7

5.7

5.7

5.7

5.7

5.7

5.7

GS2 5.7

5.7

5.7

5.7

5.7

5.7

5.7

5.7

5.7

5.7

5.7

GS3 5.7

5.7

5.7

5.7

5.7

5.7

5.7

5.7

5.7

5.7

5.7

GS4 5.7

5.7

5.7

5.7

5.7

5.7

5.7

5.7

5.7

5.7

5.7

GS5 5.7

5.7

5.7

5.7

5.7

5.7

5.7

5.7

5.7

5.7

5.7

Kawerau 110 kV BASE 14.8

14.8

14.8

14.8

14.8

14.8

14.8

14.8

14.8

14.8

14.8

GS1 14.8

14.9

15.0

15.0

15.0

15.0

15.0

15.0

15.0

15.0

15.0

GS2 14.8

14.9

15.0

15.0

15.0

15.0

15.0

15.0

15.0

15.0

15.0

GS3 14.8

14.8

14.8

14.8

14.9

14.9

14.9

14.9

14.9

14.9

14.9

GS4 14.8

14.9

15.1

15.2

15.1

15.2

15.2

15.2

15.2

15.2

15.2

GS5 14.8

14.9

14.9

15.0

15.0

15.0

15.0

15.0

15.0

15.0

15.0

Kawerau 220 kV BASE 8.8

8.8

8.8

8.8

8.8

8.8

8.8

8.8

8.8

8.8

8.8

GS1 8.8

8.8

8.9

8.9

8.9

8.9

8.9

8.9

8.9

8.9

8.9

GS2 8.8

8.8

8.9

8.9

8.9

8.9

8.9

8.9

8.9

8.9

8.9

GS3 8.8

8.8

8.8

8.8

8.8

8.8

8.8

8.8

8.8

8.8

8.8

GS4 8.8

8.8

8.9

9.0

9.0

9.0

9.0

9.0

9.0

9.0

9.0

GS5 8.8

8.8

8.9

8.9

8.9

8.9

8.9

8.9

8.9

8.9

8.9

Matahina 110 kV BASE 10.3

10.3

10.4

10.4

10.4

10.4

10.4

10.4

10.4

10.4

10.4

GS1 10.3

10.4

10.4

10.4

10.4

10.4

10.4

10.4

10.4

10.4

10.4

GS2 10.3

10.4

10.4

10.4

10.4

10.4

10.4

10.4

10.4

10.4

10.4

GS3 10.3

10.3

10.4

10.4

10.4

10.4

10.4

10.4

10.4

10.4

10.4

GS4 10.3

10.4

10.5

10.5

10.5

10.5

10.5

10.5

10.5

10.5

10.5

GS5 10.3

10.4

10.4

10.4

10.4

10.4

10.4

10.4

10.4

10.4

10.4

© Transpower New Zealand Limited 2016.All rights reserved. 93

Page 94: 2015 ten year forecast fault level report - Transpower · PDF fileThis publication presents an update to the ten year forecast fault levels ... calculation. Minimum fault level calculations

Ten year forecast fault Levels

Mt Maunganui 33 kV BASE 1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

GS1 1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

GS2 1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

GS3 1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

GS4 1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

GS5 1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

Mt Maunganui 110 kV BASE 7.1

7.1

7.1

7.1

7.1

7.1

7.1

7.1

7.1

7.1

7.1

GS1 7.1

7.1

7.1

7.2

7.2

7.2

7.2

7.2

7.2

7.2

7.2

GS2 7.1

7.1

7.1

7.2

7.2

7.2

7.2

7.2

7.2

7.2

7.2

GS3 7.1

7.1

7.1

7.1

7.1

7.1

7.1

7.1

7.1

7.1

7.1

GS4 7.1

7.1

7.3

7.3

7.3

7.3

7.3

7.3

7.3

7.3

7.3

GS5 7.1

7.1

7.1

7.2

7.2

7.2

7.2

7.2

7.2

7.2

7.2

Okere 110 kV BASE 5.8

5.8

5.8

5.8

5.8

5.8

5.8

5.8

5.8

5.8

5.8

GS1 5.8

5.9

6.0

6.0

6.0

6.0

6.0

6.0

6.0

6.0

6.0

GS2 5.8

5.9

6.0

6.0

6.0

6.0

6.0

6.0

6.0

6.0

6.0

GS3 5.8

5.8

5.8

5.8

5.8

5.8

5.9

5.9

5.9

5.9

5.9

GS4 5.8

5.9

8.1

8.1

8.1

8.1

8.1

8.1

8.1

8.1

8.1

GS5 5.8

5.9

6.0

6.0

6.0

6.0

6.0

6.0

6.0

6.0

6.0

Owhata 11 kV BASE 10.5

10.5

10.5

10.5

10.5

10.5

10.5

10.5

10.5

10.5

10.5

GS1 10.5

10.5

10.5

10.5

10.5

10.5

10.5

10.5

10.5

10.5

10.5

GS2 10.5

10.5

10.5

10.5

10.5

10.5

10.5

10.5

10.5

10.5

10.5

GS3 10.5

10.5

10.5

10.5

10.5

10.5

10.5

10.5

10.5

10.5

10.5

GS4 10.5

10.5

10.6

10.6

10.6

10.6

10.6

10.6

10.6

10.6

10.6

GS5 10.5

10.5

10.5

10.5

10.5

10.5

10.5

10.5

10.5

10.5

10.5

Owhata 110 kV BASE 4.0

4.0

4.0

4.0

4.0

4.0

4.0

4.0

4.0

4.0

4.0

GS1 4.0

4.1

4.1

4.1

4.1

4.1

4.1

4.1

4.1

4.1

4.1

GS2 4.0

4.1

4.1

4.1

4.1

4.1

4.1

4.1

4.1

4.1

4.1

GS3 4.0

4.0

4.0

4.0

4.0

4.0

4.0

4.0

4.0

4.0

4.0

GS4 4.0

4.1

4.8

4.8

4.8

4.8

4.8

4.8

4.8

4.8

4.8

GS5 4.0

4.1

4.1

4.1

4.1

4.1

4.1

4.1

4.1

4.1

4.1

Rotorua 11 kV BASE 19.0

2.2

2.2

2.2

2.2

2.2

2.2

2.2

2.2

2.2

2.2

GS1 19.0

2.2

2.2

2.2

2.2

2.2

2.2

2.2

2.2

2.2

2.2

GS2 19.0

2.2

2.2

2.2

2.2

2.2

2.2

2.2

2.2

2.2

2.2

GS3 19.0

2.2

2.2

2.2

2.2

2.2

2.2

2.2

2.2

2.2

2.2

GS4 19.0

2.2

2.2

2.2

2.2

2.2

2.2

2.2

2.2

2.2

2.2

GS5 19.0

2.2

2.2

2.2

2.2

2.2

2.2

2.2

2.2

2.2

2.2

© Transpower New Zealand Limited 2016.All rights reserved. 94

Page 95: 2015 ten year forecast fault level report - Transpower · PDF fileThis publication presents an update to the ten year forecast fault levels ... calculation. Minimum fault level calculations

Ten year forecast fault Levels

Rotorua 33 kV BASE 2.0

2.0

2.0

2.0

2.0

2.0

2.0

2.0

2.0

2.0

2.0

GS1 2.0

2.0

2.0

2.0

2.0

2.0

2.0

2.0

2.0

2.0

2.0

GS2 2.0

2.0

2.0

2.0

2.0

2.0

2.0

2.0

2.0

2.0

2.0

GS3 2.0

2.0

2.0

2.0

2.0

2.0

2.0

2.0

2.0

2.0

2.0

GS4 2.0

2.0

2.0

2.0

2.0

2.0

2.0

2.0

2.0

2.0

2.0

GS5 2.0

2.0

2.0

2.0

2.0

2.0

2.0

2.0

2.0

2.0

2.0

Rotorua 110 kV (Tarukenga 1)

BASE 5.2

5.2

5.3

5.3

5.3

5.3

5.3

5.3

5.3

5.3

5.3

GS1 5.2

5.4

5.5

5.5

5.5

5.5

5.5

5.5

5.5

5.5

5.5

GS2 5.2

5.4

5.5

5.5

5.5

5.5

5.5

5.5

5.5

5.5

5.5

GS3 5.2

5.2

5.3

5.3

5.3

5.3

5.3

5.3

5.3

5.3

5.3

GS4 5.2

5.4

5.6

5.6

5.6

5.6

5.6

5.6

5.6

5.6

5.6

GS5 5.2

5.4

5.5

5.5

5.5

5.5

5.5

5.5

5.5

5.5

5.5

Rotorua 110 kV (Tarukenga 2)

BASE 5.6

5.6

5.7

5.7

5.7

5.7

5.7

5.7

5.7

5.7

5.7

GS1 5.6

5.8

5.9

5.9

5.9

5.9

5.9

5.9

5.9

5.9

5.9

GS2 5.6

5.8

5.9

5.9

5.9

5.9

5.9

5.9

5.9

5.9

5.9

GS3 5.6

5.6

5.7

5.7

5.7

5.7

5.7

5.7

5.7

5.7

5.7

GS4 5.6

5.8

6.0

6.0

6.0

6.0

6.0

6.0

6.0

6.0

6.0

GS5 5.6

5.8

5.9

5.9

5.9

5.9

5.9

5.9

5.9

5.9

5.9

Tarukenga 11 kV BASE 10.8

10.8

10.9

10.9

10.9

10.9

10.9

10.9

10.9

10.9

10.9

GS1 10.8

10.9

10.9

10.9

10.9

10.9

10.9

10.9

10.9

10.9

10.9

GS2 10.8

10.9

10.9

10.9

10.9

10.9

10.9

10.9

10.9

10.9

10.9

GS3 10.8

10.8

10.9

10.9

10.9

10.9

10.9

10.9

10.9

10.9

10.9

GS4 10.8

10.9

10.9

10.9

10.9

10.9

10.9

10.9

10.9

10.9

10.9

GS5 10.8

10.9

10.9

10.9

10.9

10.9

10.9

10.9

10.9

10.9

10.9

Tarukenga 110 kV BASE 12.5

12.5

13.2

13.2

13.2

13.2

13.2

13.2

13.2

13.2

13.2

GS1 12.5

13.9

14.5

14.6

14.6

14.6

14.6

14.6

14.6

14.6

14.6

GS2 12.5

13.9

14.5

14.6

14.6

14.6

14.6

14.6

14.6

14.6

14.6

GS3 12.5

12.5

13.2

13.2

13.2

13.2

13.2

13.2

13.2

13.2

13.2

GS4 12.5

13.9

15.1

15.2

15.1

15.1

15.1

15.1

15.2

15.2

15.2

GS5 12.5

13.9

14.5

14.6

14.6

14.5

14.5

14.6

14.6

14.6

14.6

Tarukenga 220 kV BASE 10.2

10.2

10.3

10.3

10.3

10.3

10.3

10.3

10.3

10.3

10.3

GS1 10.2

10.6

10.7

10.7

10.7

10.7

10.7

10.7

10.8

10.8

10.8

GS2 10.2

10.6

10.7

10.7

10.7

10.7

10.7

10.8

10.8

10.8

10.8

GS3 10.2

10.2

10.3

10.3

10.4

10.4

10.4

10.4

10.4

10.4

10.4

GS4 10.2

10.6

10.8

10.9

10.9

10.9

10.9

10.9

10.9

10.9

10.9

GS5 10.2

10.6

10.7

10.7

10.7

10.7

10.7

10.7

10.7

10.8

10.8

© Transpower New Zealand Limited 2016.All rights reserved. 95

Page 96: 2015 ten year forecast fault level report - Transpower · PDF fileThis publication presents an update to the ten year forecast fault levels ... calculation. Minimum fault level calculations

Ten year forecast fault Levels

Tauranga 11 kV BASE 15.1

15.1

15.1

15.1

15.1

15.1

15.1

15.1

15.1

15.1

15.1

GS1 15.1

15.1

15.1

15.1

15.1

15.1

15.1

15.1

15.1

15.1

15.1

GS2 15.1

15.1

15.1

15.1

15.1

15.1

15.1

15.1

15.1

15.1

15.1

GS3 15.1

15.1

15.1

15.1

15.1

15.1

15.1

15.1

15.1

15.1

15.1

GS4 15.1

15.1

15.2

15.2

15.2

15.2

15.2

15.2

15.2

15.2

15.2

GS5 15.1

15.1

15.1

15.1

15.1

15.1

15.1

15.1

15.1

15.1

15.1

Tauranga 33 kV BASE 1.5

1.5

1.5

1.5

1.5

1.5

1.5

1.5

1.5

1.5

1.5

GS1 1.5

1.5

1.5

1.5

1.5

1.5

1.5

1.5

1.5

1.5

1.5

GS2 1.5

1.5

1.5

1.5

1.5

1.5

1.5

1.5

1.5

1.5

1.5

GS3 1.5

1.5

1.5

1.5

1.5

1.5

1.5

1.5

1.5

1.5

1.5

GS4 1.5

1.5

1.5

1.5

1.5

1.5

1.5

1.5

1.5

1.5

1.5

GS5 1.5

1.5

1.5

1.5

1.5

1.5

1.5

1.5

1.5

1.5

1.5

Tauranga 110 kV BASE 9.4

9.4

9.5

9.5

9.5

9.5

9.5

9.5

9.5

9.5

9.5

GS1 9.4

9.5

9.6

9.6

9.6

9.6

9.6

9.6

9.6

9.6

9.6

GS2 9.4

9.5

9.6

9.6

9.6

9.6

9.6

9.6

9.6

9.6

9.6

GS3 9.4

9.4

9.5

9.5

9.5

9.5

9.5

9.5

9.5

9.5

9.5

GS4 9.4

9.5

9.8

9.8

9.8

9.8

9.8

9.8

9.8

9.8

9.8

GS5 9.4

9.5

9.6

9.6

9.6

9.6

9.6

9.6

9.6

9.6

9.6

Te Kaha 11 kV BASE 1.3

1.3

1.3

1.3

1.3

1.3

1.3

1.3

1.3

1.3

1.3

GS1 1.3

1.3

1.3

1.3

1.3

1.3

1.3

1.3

1.3

1.3

1.3

GS2 1.3

1.3

1.3

1.3

1.3

1.3

1.3

1.3

1.3

1.3

1.3

GS3 1.3

1.3

1.3

1.3

1.3

1.3

1.3

1.3

1.3

1.3

1.3

GS4 1.3

1.3

1.3

1.3

1.3

1.3

1.3

1.3

1.3

1.3

1.3

GS5 1.3

1.3

1.3

1.3

1.3

1.3

1.3

1.3

1.3

1.3

1.3

Te Kaha 50 kV BASE 0.3

0.3

0.3

0.3

0.3

0.3

0.3

0.3

0.3

0.3

0.3

GS1 0.3

0.3

0.3

0.3

0.3

0.3

0.3

0.3

0.3

0.3

0.3

GS2 0.3

0.3

0.3

0.3

0.3

0.3

0.3

0.3

0.3

0.3

0.3

GS3 0.3

0.3

0.3

0.3

0.3

0.3

0.3

0.3

0.3

0.3

0.3

GS4 0.3

0.3

0.3

0.3

0.3

0.3

0.3

0.3

0.3

0.3

0.3

GS5 0.3

0.3

0.3

0.3

0.3

0.3

0.3

0.3

0.3

0.3

0.3

Te Matai 33 kV BASE 1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

GS1 1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

GS2 1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

GS3 1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

GS4 1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

GS5 1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

© Transpower New Zealand Limited 2016.All rights reserved. 96

Page 97: 2015 ten year forecast fault level report - Transpower · PDF fileThis publication presents an update to the ten year forecast fault levels ... calculation. Minimum fault level calculations

Ten year forecast fault Levels

Te Matai 110 kV BASE 5.1

5.1

5.1

5.1

5.1

5.1

5.1

5.1

5.1

5.1

5.1

GS1 5.1

5.1

5.2

5.2

5.2

5.2

5.2

5.2

5.2

5.2

5.2

GS2 5.1

5.1

5.2

5.2

5.2

5.2

5.2

5.2

5.2

5.2

5.2

GS3 5.1

5.1

5.1

5.1

5.1

5.1

5.1

5.1

5.1

5.1

5.1

GS4 5.1

5.1

5.5

5.5

5.5

5.5

5.5

5.5

5.5

5.5

5.5

GS5 5.1

5.1

5.2

5.2

5.2

5.2

5.2

5.2

5.2

5.2

5.2

Waiotahi 11 kV BASE 9.5

9.5

9.5

9.5

9.5

9.5

9.5

9.5

9.5

9.5

9.5

GS1 9.5

9.5

9.5

9.5

9.5

9.5

9.5

9.5

9.5

9.5

9.5

GS2 9.5

9.5

9.5

9.5

9.5

9.5

9.5

9.5

9.5

9.5

9.5

GS3 9.5

9.5

9.5

9.5

9.5

9.5

9.5

9.5

9.5

9.5

9.5

GS4 9.5

9.5

9.5

9.5

9.5

9.5

9.5

9.5

9.5

9.5

9.5

GS5 9.5

9.5

9.5

9.5

9.5

9.5

9.5

9.5

9.5

9.5

9.5

Waiotahi 50 kV BASE 0.5

0.5

0.5

0.5

0.5

0.5

0.5

0.5

0.5

0.5

0.5

GS1 0.5

0.5

0.5

0.5

0.5

0.5

0.5

0.5

0.5

0.5

0.5

GS2 0.5

0.5

0.5

0.5

0.5

0.5

0.5

0.5

0.5

0.5

0.5

GS3 0.5

0.5

0.5

0.5

0.5

0.5

0.5

0.5

0.5

0.5

0.5

GS4 0.5

0.5

0.5

0.5

0.5

0.5

0.5

0.5

0.5

0.5

0.5

GS5 0.5

0.5

0.5

0.5

0.5

0.5

0.5

0.5

0.5

0.5

0.5

Waiotahi 110 kV BASE 1.9

1.9

1.9

1.9

1.9

1.9

1.9

1.9

1.9

1.9

1.9

GS1 1.9

1.9

1.9

1.9

1.9

1.9

1.9

1.9

1.9

1.9

1.9

GS2 1.9

1.9

1.9

1.9

1.9

1.9

1.9

1.9

1.9

1.9

1.9

GS3 1.9

1.9

1.9

1.9

1.9

1.9

1.9

1.9

1.9

1.9

1.9

GS4 1.9

1.9

1.9

1.9

1.9

1.9

1.9

1.9

1.9

1.9

1.9

GS5 1.9

1.9

1.9

1.9

1.9

1.9

1.9

1.9

1.9

1.9

1.9

CENTRAL NORTH ISLAND

Aratiatia 220 kV BASE 20.1

20.1

20.1

20.1

20.1

20.1

20.1

20.1

20.1

20.1

20.1

GS1 20.1

20.1

20.1

21.8

21.8

21.8

21.8

21.8

22.7

22.7

22.7

GS2 20.1

20.1

20.1

21.8

21.8

21.9

21.9

22.7

22.7

22.7

23.2

GS3 20.1

20.1

20.1

20.1

20.2

20.2

21.9

21.9

21.9

21.9

21.9

GS4 20.1

20.1

20.1

21.8

21.7

21.8

21.8

21.7

22.5

22.5

22.5

GS5 20.1

20.1

20.1

21.8

21.8

21.7

21.7

21.7

22.5

22.7

22.7

Bunnythorpe 33 kV BASE 2.0

2.0

2.0

2.0

2.0

2.0

2.0

2.0

2.0

2.0

2.0

GS1 2.0

2.0

2.0

2.0

2.0

2.0

2.0

2.0

2.0

2.0

2.0

GS2 2.0

2.0

2.0

2.0

2.0

2.0

2.0

2.0

2.0

2.0

2.0

GS3 2.0

2.0

2.0

2.0

2.0

2.0

2.0

2.0

2.0

2.0

2.0

© Transpower New Zealand Limited 2016.All rights reserved. 97

Page 98: 2015 ten year forecast fault level report - Transpower · PDF fileThis publication presents an update to the ten year forecast fault levels ... calculation. Minimum fault level calculations

Ten year forecast fault Levels

GS4 2.0

2.0

2.0

2.0

2.0

2.0

2.0

2.0

2.0

2.0

2.0

GS5 2.0

2.0

2.0

2.0

2.0

2.0

2.0

2.0

2.0

2.0

2.0

Bunnythorpe 110 kV BASE 13.2

13.2

13.2

13.2

13.2

13.2

13.2

13.2

13.2

13.2

13.2

GS1 13.2

13.2

13.2

13.2

13.2

13.2

13.2

13.2

13.2

13.3

13.3

GS2 13.2

13.2

13.2

13.2

13.2

13.2

13.2

13.2

13.2

13.3

13.3

GS3 13.2

13.2

13.2

13.2

13.2

13.2

13.2

13.2

13.2

13.3

13.3

GS4 13.2

13.2

13.2

13.2

13.2

13.2

13.2

13.0

13.0

13.0

13.0

GS5 13.2

13.2

13.2

13.2

13.2

13.2

13.2

13.2

13.2

13.2

13.2

Bunnythorpe 220 kV BASE 12.8

12.6

12.6

12.7

12.7

12.7

12.7

12.7

12.7

12.7

12.7

GS1 12.8

12.6

12.6

12.7

12.7

12.7

12.7

12.7

12.7

13.0

13.0

GS2 12.8

12.6

12.6

12.7

12.7

12.7

12.7

12.7

12.7

13.0

13.0

GS3 12.8

12.6

12.6

12.7

12.7

12.7

12.7

12.7

12.7

13.0

13.0

GS4 12.8

12.6

12.6

12.7

12.7

12.7

12.7

12.3

12.3

12.3

12.3

GS5 12.8

12.6

12.6

12.7

12.7

12.7

12.7

12.7

12.7

12.7

12.7

Dannevirke 11 kV BASE 18.2

18.2

18.2

18.2

18.2

18.2

18.2

18.2

18.2

18.2

18.2

GS1 18.2

18.2

18.2

18.2

18.2

18.2

18.2

18.2

18.2

18.2

18.2

GS2 18.2

18.2

18.2

18.2

18.2

18.2

18.2

18.2

18.2

18.2

18.2

GS3 18.2

18.2

18.2

18.2

18.2

18.2

18.2

18.2

18.2

18.2

18.2

GS4 18.2

18.2

18.2

18.2

18.2

18.2

18.2

18.2

18.2

18.2

18.2

GS5 18.2

18.2

18.2

18.2

18.2

18.2

18.2

18.2

18.2

18.2

18.2

Dannevirke 110 kV (T1) BASE 2.3

2.3

2.3

2.3

2.3

2.3

2.3

2.3

2.3

2.3

2.3

GS1 2.3

2.3

2.3

2.3

2.3

2.3

2.3

2.3

2.3

2.3

2.3

GS2 2.3

2.3

2.3

2.3

2.3

2.3

2.3

2.3

2.3

2.3

2.3

GS3 2.3

2.3

2.3

2.3

2.3

2.3

2.3

2.3

2.3

2.3

2.3

GS4 2.3

2.3

2.3

2.3

2.3

2.3

2.3

2.3

2.3

2.3

2.3

GS5 2.3

2.3

2.3

2.3

2.3

2.3

2.3

2.3

2.3

2.3

2.3

Dannevirke 110 kV (T2) BASE 2.3

2.3

2.3

2.3

2.3

2.3

2.3

2.3

2.3

2.3

2.3

GS1 2.3

2.3

2.3

2.3

2.3

2.3

2.3

2.3

2.3

2.3

2.3

GS2 2.3

2.3

2.3

2.3

2.3

2.3

2.3

2.3

2.3

2.3

2.3

GS3 2.3

2.3

2.3

2.3

2.3

2.3

2.3

2.3

2.3

2.3

2.3

GS4 2.3

2.3

2.3

2.3

2.3

2.3

2.3

2.3

2.3

2.3

2.3

GS5 2.3

2.3

2.3

2.3

2.3

2.3

2.3

2.3

2.3

2.3

2.3

Linton 33 kV BASE 1.2

1.3

1.3

1.3

1.3

1.3

1.3

1.3

1.3

1.3

1.3

GS1 1.2

1.3

1.3

1.3

1.3

1.3

1.3

1.3

1.3

1.3

1.3

GS2 1.2

1.3

1.3

1.3

1.3

1.3

1.3

1.3

1.3

1.3

1.3

GS3 1.2

1.3

1.3

1.3

1.3

1.3

1.3

1.3

1.3

1.3

1.3

GS4 1.2

1.3

1.3

1.3

1.3

1.3

1.3

1.3

1.3

1.3

1.3

© Transpower New Zealand Limited 2016.All rights reserved. 98

Page 99: 2015 ten year forecast fault level report - Transpower · PDF fileThis publication presents an update to the ten year forecast fault levels ... calculation. Minimum fault level calculations

Ten year forecast fault Levels

GS5 1.2

1.3

1.3

1.3

1.3

1.3

1.3

1.3

1.3

1.3

1.3

Linton 220 kV (T2) BASE 8.0

7.5

7.5

7.5

7.5

7.5

7.5

7.5

7.5

7.5

7.5

GS1 8.0

7.5

7.5

7.5

7.5

7.5

7.5

7.5

7.5

7.6

7.6

GS2 8.0

7.5

7.5

7.5

7.5

7.5

7.5

7.5

7.5

7.6

7.6

GS3 8.0

7.5

7.5

7.5

7.5

7.5

7.5

7.5

7.5

7.6

7.6

GS4 8.0

7.5

7.5

7.5

7.5

7.5

7.5

7.4

7.4

7.4

7.4

GS5 8.0

7.5

7.5

7.5

7.5

7.5

7.5

7.5

7.5

7.5

7.5

Linton 220 kV (T3) BASE 6.5

6.4

6.4

6.4

6.4

6.4

6.4

6.4

6.4

6.4

6.4

GS1 6.5

6.4

6.4

6.4

6.4

6.4

6.4

6.4

6.4

6.4

6.4

GS2 6.5

6.4

6.4

6.4

6.4

6.4

6.4

6.4

6.4

6.4

6.4

GS3 6.5

6.4

6.4

6.4

6.4

6.4

6.4

6.4

6.4

6.4

6.4

GS4 6.5

6.4

6.4

6.4

6.4

6.4

6.4

6.3

6.3

6.3

6.3

GS5 6.5

6.4

6.4

6.4

6.4

6.4

6.4

6.4

6.4

6.4

6.4

Mangahao 33 kV BASE 11.3

11.3

11.4

11.4

11.4

11.4

11.4

11.4

11.4

11.4

11.4

GS1 11.3

11.3

11.4

11.4

11.4

11.4

11.4

11.4

11.4

11.4

11.4

GS2 11.3

11.3

11.4

11.4

11.4

11.4

11.4

11.4

11.4

11.4

11.4

GS3 11.3

11.3

11.4

11.4

11.4

11.4

11.4

11.4

11.4

11.4

11.4

GS4 11.3

11.3

11.3

11.4

11.4

11.4

11.4

11.3

11.3

11.3

11.3

GS5 11.3

11.3

11.3

11.4

11.4

11.4

11.4

11.4

11.4

11.4

11.4

Mangahao 110 kV (T3) BASE 2.0

2.0

2.0

2.0

2.0

2.0

2.0

2.0

2.0

2.0

2.0

GS1 2.0

2.0

2.0

2.0

2.0

2.0

2.0

2.0

2.0

2.0

2.0

GS2 2.0

2.0

2.0

2.0

2.0

2.0

2.0

2.0

2.0

2.0

2.0

GS3 2.0

2.0

2.0

2.0

2.0

2.0

2.0

2.0

2.0

2.0

2.0

GS4 2.0

2.0

2.0

2.0

2.0

2.0

2.0

2.0

2.0

2.0

2.0

GS5 2.0

2.0

2.0

2.0

2.0

2.0

2.0

2.0

2.0

2.0

2.0

Mangahao 110 kV (T4) BASE 2.0

2.0

2.0

2.0

2.0

2.0

2.0

2.0

2.0

2.0

2.0

GS1 2.0

2.0

2.0

2.0

2.0

2.0

2.0

2.0

2.0

2.0

2.0

GS2 2.0

2.0

2.0

2.0

2.0

2.0

2.0

2.0

2.0

2.0

2.0

GS3 2.0

2.0

2.0

2.0

2.0

2.0

2.0

2.0

2.0

2.0

2.0

GS4 2.0

2.0

2.0

2.0

2.0

2.0

2.0

2.0

2.0

2.0

2.0

GS5 2.0

2.0

2.0

2.0

2.0

2.0

2.0

2.0

2.0

2.0

2.0

Mangamaire 33 kV BASE 5.1

5.1

5.1

5.1

5.1

5.1

5.1

5.1

5.1

5.1

5.1

GS1 5.1

5.1

5.1

5.1

5.1

5.1

5.1

5.1

5.1

5.1

5.1

GS2 5.1

5.1

5.1

5.1

5.1

5.1

5.1

5.1

5.1

5.1

5.1

GS3 5.1

5.1

5.1

5.1

5.1

5.1

5.1

5.1

5.1

5.1

5.1

GS4 5.1

5.1

5.1

5.1

5.1

5.1

5.1

5.1

5.1

5.1

5.1

GS5 5.1

5.1

5.1

5.1

5.1

5.1

5.1

5.1

5.1

5.1

5.1

© Transpower New Zealand Limited 2016.All rights reserved. 99

Page 100: 2015 ten year forecast fault level report - Transpower · PDF fileThis publication presents an update to the ten year forecast fault levels ... calculation. Minimum fault level calculations

Ten year forecast fault Levels

Mangamaire 110 kV BASE 2.9

2.9

2.9

2.9

2.9

2.9

2.9

2.9

2.9

2.9

2.9

GS1 2.9

2.9

2.9

2.9

2.9

2.9

2.9

2.9

2.9

2.9

2.9

GS2 2.9

2.9

2.9

2.9

2.9

2.9

2.9

2.9

2.9

2.9

2.9

GS3 2.9

2.9

2.9

2.9

2.9

2.9

2.9

2.9

2.9

2.9

2.9

GS4 2.9

2.9

2.9

2.9

2.9

2.9

2.9

2.8

2.8

2.8

2.8

GS5 2.9

2.9

2.9

2.9

2.9

2.9

2.9

2.9

2.9

2.9

2.9

Marton 33 kV BASE 7.3

7.3

7.3

7.3

7.3

7.3

7.3

7.3

7.3

7.3

7.3

GS1 7.3

7.3

7.3

7.3

7.3

7.3

7.3

7.3

7.3

7.3

7.3

GS2 7.3

7.3

7.3

7.3

7.3

7.3

7.3

7.3

7.3

7.3

7.3

GS3 7.3

7.3

7.3

7.3

7.3

7.3

7.3

7.3

7.3

7.3

7.3

GS4 7.3

7.3

7.3

7.3

7.3

7.3

7.3

7.3

7.3

7.3

7.3

GS5 7.3

7.3

7.3

7.3

7.3

7.3

7.3

7.3

7.3

7.3

7.3

Marton 110 kV (T1) BASE 3.4

3.4

3.4

3.4

3.4

3.4

3.4

3.4

3.4

3.4

3.4

GS1 3.4

3.4

3.4

3.4

3.4

3.4

3.4

3.4

3.4

3.4

3.4

GS2 3.4

3.4

3.4

3.4

3.4

3.4

3.4

3.4

3.4

3.4

3.4

GS3 3.4

3.4

3.4

3.4

3.4

3.4

3.4

3.4

3.4

3.4

3.4

GS4 3.4

3.4

3.4

3.4

3.4

3.4

3.4

3.4

3.4

3.4

3.4

GS5 3.4

3.4

3.4

3.4

3.4

3.4

3.4

3.4

3.4

3.4

3.4

Marton 110 kV (T2) BASE 3.4

3.4

3.4

3.4

3.4

3.4

3.4

3.4

3.4

3.4

3.4

GS1 3.4

3.4

3.4

3.4

3.4

3.4

3.4

3.4

3.4

3.4

3.4

GS2 3.4

3.4

3.4

3.4

3.4

3.4

3.4

3.4

3.4

3.4

3.4

GS3 3.4

3.4

3.4

3.4

3.4

3.4

3.4

3.4

3.4

3.4

3.4

GS4 3.4

3.4

3.4

3.4

3.4

3.4

3.4

3.4

3.4

3.4

3.4

GS5 3.4

3.4

3.4

3.4

3.4

3.4

3.4

3.4

3.4

3.4

3.4

Mataroa 33 kV BASE 4.1

4.1

4.2

4.2

4.2

4.2

4.2

4.2

4.2

4.2

4.2

GS1 4.1

4.1

4.2

4.2

4.2

4.2

4.2

4.2

4.2

4.2

4.2

GS2 4.1

4.1

4.2

4.2

4.2

4.2

4.2

4.2

4.2

4.2

4.2

GS3 4.1

4.1

4.2

4.2

4.2

4.2

4.2

4.2

4.2

4.2

4.2

GS4 4.1

4.1

4.2

4.2

4.2

4.2

4.2

4.1

4.1

4.1

4.1

GS5 4.1

4.1

4.2

4.2

4.2

4.2

4.2

4.2

4.2

4.2

4.2

Mataroa 110 kV BASE 1.7

1.7

1.8

1.8

1.8

1.8

1.8

1.8

1.8

1.8

1.8

GS1 1.7

1.7

1.8

1.8

1.8

1.8

1.8

1.8

1.8

1.8

1.8

GS2 1.7

1.7

1.8

1.8

1.8

1.8

1.8

1.8

1.8

1.8

1.8

GS3 1.7

1.7

1.8

1.8

1.8

1.8

1.8

1.8

1.8

1.8

1.8

GS4 1.7

1.7

1.8

1.8

1.8

1.8

1.8

1.8

1.8

1.8

1.8

GS5 1.7

1.7

1.8

1.8

1.8

1.8

1.8

1.8

1.8

1.8

1.8

© Transpower New Zealand Limited 2016.All rights reserved. 100

Page 101: 2015 ten year forecast fault level report - Transpower · PDF fileThis publication presents an update to the ten year forecast fault levels ... calculation. Minimum fault level calculations

Ten year forecast fault Levels

National Park 33 kV BASE 0.04

0.04

0.04

0.04

0.04

0.04

0.04

0.04

0.04

0.04

0.04

GS1 0.04

0.04

0.04

0.04

0.04

0.04

0.04

0.04

0.04

0.04

0.04

GS2 0.04

0.04

0.04

0.04

0.04

0.04

0.04

0.04

0.04

0.04

0.04

GS3 0.04

0.04

0.04

0.04

0.04

0.04

0.04

0.04

0.04

0.04

0.04

GS4 0.04

0.04

0.04

0.04

0.04

0.04

0.04

0.04

0.04

0.04

0.04

GS5 0.04

0.04

0.04

0.04

0.04

0.04

0.04

0.04

0.04

0.04

0.04

National Park 110 kV BASE 1.6

1.6

1.6

1.6

1.6

1.6

1.6

1.6

1.6

1.6

1.6

GS1 1.6

1.6

1.6

1.6

1.6

1.6

1.6

1.6

1.6

1.6

1.6

GS2 1.6

1.6

1.6

1.6

1.6

1.6

1.6

1.6

1.6

1.6

1.6

GS3 1.6

1.6

1.6

1.6

1.6

1.6

1.6

1.6

1.6

1.6

1.6

GS4 1.6

1.6

1.6

1.6

1.6

1.6

1.6

1.6

1.6

1.6

1.6

GS5 1.6

1.6

1.6

1.6

1.6

1.6

1.6

1.6

1.6

1.6

1.6

Nga Awa Purua 220 kV BASE 19.9

19.9

19.9

19.9

19.9

19.9

19.9

19.9

19.9

19.9

19.9

GS1 19.9

19.9

19.9

21.1

21.1

21.1

21.1

21.1

21.8

21.8

21.8

GS2 19.9

19.9

19.9

21.1

21.1

21.2

21.2

21.8

21.8

21.8

23.7

GS3 19.9

19.9

19.9

19.9

20.0

20.0

21.2

21.2

21.2

21.2

21.2

GS4 19.9

19.9

19.9

21.1

21.0

21.1

21.1

21.1

21.6

21.6

21.6

GS5 19.9

19.9

19.9

21.1

21.1

21.0

21.0

21.0

21.6

21.7

21.7

Ngatamariki 220 kV BASE 13.4

13.4

13.4

13.4

13.4

13.4

13.4

13.4

13.4

13.4

13.4

GS1 13.4

13.4

13.4

13.8

13.8

13.8

13.8

13.8

14.1

14.1

14.1

GS2 13.4

13.4

13.4

13.8

13.8

13.9

13.9

14.1

14.1

14.1

14.7

GS3 13.4

13.4

13.4

13.4

13.4

13.4

13.8

13.9

13.9

13.9

13.9

GS4 13.4

13.4

13.3

13.8

13.8

13.8

13.8

13.8

14.0

14.0

14.0

GS5 13.4

13.4

13.4

13.8

13.8

13.8

13.8

13.8

14.0

14.1

14.1

Ohaaki 220 kV BASE 13.3

13.3

13.3

13.3

13.3

13.3

13.3

13.3

13.3

13.3

13.3

GS1 13.3

13.3

13.3

13.7

13.7

13.7

13.7

13.7

14.0

14.0

14.0

GS2 13.3

13.3

13.3

13.7

13.7

13.8

13.8

14.0

14.0

14.0

14.4

GS3 13.3

13.3

13.3

13.3

13.3

13.3

13.7

13.7

13.7

13.8

13.8

GS4 13.3

13.3

13.2

13.7

13.7

13.7

13.7

13.7

13.9

13.9

13.9

GS5 13.3

13.3

13.3

13.7

13.7

13.7

13.7

13.7

13.9

14.0

14.0

Ohakune 11 kV BASE 5.1

5.1

5.1

5.1

5.1

5.1

5.1

5.1

5.1

5.1

5.1

GS1 5.1

5.1

5.1

5.1

5.1

5.1

5.1

5.1

5.1

5.1

5.1

GS2 5.1

5.1

5.1

5.1

5.1

5.1

5.1

5.1

5.1

5.1

5.1

GS3 5.1

5.1

5.1

5.1

5.1

5.1

5.1

5.1

5.1

5.1

5.1

GS4 5.1

5.1

5.1

5.1

5.1

5.1

5.1

5.1

5.1

5.1

5.1

GS5 5.1

5.1

5.1

5.1

5.1

5.1

5.1

5.1

5.1

5.1

5.1

© Transpower New Zealand Limited 2016.All rights reserved. 101

Page 102: 2015 ten year forecast fault level report - Transpower · PDF fileThis publication presents an update to the ten year forecast fault levels ... calculation. Minimum fault level calculations

Ten year forecast fault Levels

Ohakune 110 kV BASE 1.6

1.6

1.6

1.6

1.6

1.6

1.6

1.6

1.6

1.6

1.6

GS1 1.6

1.6

1.6

1.6

1.6

1.6

1.6

1.6

1.6

1.6

1.6

GS2 1.6

1.6

1.6

1.6

1.6

1.6

1.6

1.6

1.6

1.6

1.6

GS3 1.6

1.6

1.6

1.6

1.6

1.6

1.6

1.6

1.6

1.6

1.6

GS4 1.6

1.6

1.6

1.6

1.6

1.6

1.6

1.6

1.6

1.6

1.6

GS5 1.6

1.6

1.6

1.6

1.6

1.6

1.6

1.6

1.6

1.6

1.6

Ongarue 33 kV BASE 2.8

2.8

2.9

2.9

2.9

2.9

2.9

2.9

2.9

2.9

2.9

GS1 2.8

2.8

2.9

2.9

2.9

2.9

2.9

2.9

2.9

2.9

2.9

GS2 2.8

2.8

2.9

2.9

2.9

2.9

2.9

2.9

2.9

2.9

2.9

GS3 2.8

2.8

2.9

2.9

2.9

2.9

2.9

2.9

2.9

2.9

2.9

GS4 2.8

2.8

2.9

2.9

2.9

2.9

2.9

2.9

2.9

2.9

2.9

GS5 2.8

2.8

2.9

2.9

2.9

2.9

2.9

2.9

2.9

2.9

2.9

Ongarue 110 kV BASE 1.7

1.7

1.9

1.9

1.9

1.9

1.9

1.9

1.9

1.9

1.9

GS1 1.7

1.7

1.9

1.9

1.9

1.9

1.9

1.9

1.9

1.9

1.9

GS2 1.7

1.7

1.9

1.9

1.9

1.9

1.9

1.9

1.9

1.9

1.9

GS3 1.7

1.7

1.9

1.9

1.9

1.9

1.9

1.9

1.9

1.9

1.9

GS4 1.7

1.7

1.9

1.9

1.9

1.9

1.9

1.9

1.9

1.9

1.9

GS5 1.7

1.7

1.9

1.9

1.9

1.9

1.9

1.9

1.9

1.9

1.9

Poihipi 220 kV BASE 18.0

18.0

18.0

18.0

18.0

18.0

18.0

18.0

18.0

18.0

18.0

GS1 18.0

18.0

18.0

19.0

19.0

18.9

18.9

18.9

19.5

19.5

19.5

GS2 18.0

18.0

18.0

19.0

19.0

19.0

19.0

19.5

19.5

19.5

19.7

GS3 18.0

18.0

18.0

18.0

18.0

18.0

19.0

19.0

19.0

19.0

19.0

GS4 18.0

18.0

17.9

19.0

18.9

18.9

18.9

18.9

19.4

19.4

19.4

GS5 18.0

18.0

18.0

18.9

18.9

18.9

18.9

18.9

19.3

19.4

19.4

Rangipo 220 kV BASE 6.7

6.7

6.7

6.7

6.7

6.7

6.7

6.7

6.7

6.7

6.7

GS1 6.7

6.7

6.7

6.8

6.8

6.8

6.8

6.8

6.8

6.8

6.8

GS2 6.7

6.7

6.7

6.8

6.8

6.8

6.8

6.8

6.8

6.8

6.8

GS3 6.7

6.7

6.7

6.7

6.7

6.7

6.8

6.8

6.8

6.8

6.8

GS4 6.7

6.7

6.7

6.8

6.8

6.8

6.8

6.8

6.8

6.8

6.8

GS5 6.7

6.7

6.7

6.8

6.8

6.8

6.8

6.8

6.8

6.8

6.8

Tangiwai 11 kV BASE 21.2

21.2

21.2

21.2

21.2

21.2

21.2

21.2

21.2

21.2

21.2

GS1 21.2

21.2

21.2

21.2

21.2

21.2

21.2

21.2

21.2

21.2

21.2

GS2 21.2

21.2

21.2

21.2

21.2

21.2

21.2

21.2

21.2

21.2

21.2

GS3 21.2

21.2

21.2

21.2

21.2

21.2

21.2

21.2

21.2

21.2

21.2

GS4 21.2

21.2

21.2

21.2

21.2

21.2

21.2

21.2

21.2

21.2

21.2

GS5 21.2

21.2

21.2

21.2

21.2

21.2

21.2

21.2

21.2

21.2

21.2

© Transpower New Zealand Limited 2016.All rights reserved. 102

Page 103: 2015 ten year forecast fault level report - Transpower · PDF fileThis publication presents an update to the ten year forecast fault levels ... calculation. Minimum fault level calculations

Ten year forecast fault Levels

Tangiwai 220 kV BASE 3.7

3.7

3.7

3.7

3.7

3.7

3.7

3.7

3.7

3.7

3.7

GS1 3.7

3.7

3.7

3.7

3.7

3.7

3.7

3.7

3.7

3.7

3.7

GS2 3.7

3.7

3.7

3.7

3.7

3.7

3.7

3.7

3.7

3.7

3.7

GS3 3.7

3.7

3.7

3.7

3.7

3.7

3.7

3.7

3.7

3.7

3.7

GS4 3.7

3.7

3.6

3.7

3.7

3.7

3.7

3.6

3.7

3.7

3.7

GS5 3.7

3.7

3.7

3.7

3.7

3.7

3.7

3.7

3.7

3.7

3.7

Tararua Central 220 kV BASE 8.0

7.9

7.9

7.9

7.9

7.9

7.9

7.9

7.9

7.9

7.9

GS1 8.0

7.9

7.9

7.9

7.9

7.9

7.9

7.9

7.9

8.0

8.0

GS2 8.0

7.9

7.9

7.9

7.9

7.9

7.9

7.9

7.9

8.0

8.0

GS3 8.0

7.9

7.9

7.9

7.9

7.9

7.9

7.9

7.9

8.0

8.0

GS4 8.0

7.9

7.9

7.9

7.9

7.9

7.9

7.8

7.8

7.8

7.8

GS5 8.0

7.9

7.9

7.9

7.9

7.9

7.9

7.9

7.9

7.9

7.9

Te Mihi 220 kV BASE 24.6

24.6

24.6

24.6

24.6

24.6

24.6

24.6

24.6

24.6

24.6

GS1 24.6

24.6

24.6

26.5

26.5

26.4

26.4

26.5

27.6

27.6

27.6

GS2 24.6

24.6

24.6

26.6

26.6

26.6

26.6

27.6

27.6

27.6

28.1

GS3 24.6

24.6

24.6

24.6

24.7

24.7

26.6

26.6

26.6

26.6

26.6

GS4 24.6

24.6

24.5

26.5

26.4

26.4

26.4

26.4

27.3

27.3

27.3

GS5 24.6

24.6

24.5

26.4

26.4

26.3

26.3

26.4

27.3

27.5

27.5

Tokaanu 33 kV BASE 3.9

3.9

3.9

3.9

3.9

3.9

3.9

3.9

3.9

3.9

3.9

GS1 3.9

3.9

3.9

3.9

3.9

3.9

3.9

3.9

3.9

3.9

3.9

GS2 3.9

3.9

3.9

3.9

3.9

3.9

3.9

3.9

3.9

3.9

3.9

GS3 3.9

3.9

3.9

3.9

3.9

3.9

3.9

3.9

3.9

3.9

3.9

GS4 3.9

3.9

3.9

3.9

3.9

3.9

3.9

3.9

3.9

3.9

3.9

GS5 3.9

3.9

3.9

3.9

3.9

3.9

3.9

3.9

3.9

3.9

3.9

Tokaanu 220 kV BASE 11.3

11.3

11.3

11.4

11.4

11.4

11.4

11.4

11.4

11.4

11.4

GS1 11.3

11.3

11.3

11.4

11.4

11.4

11.4

11.4

11.4

11.4

11.4

GS2 11.3

11.3

11.3

11.4

11.4

11.4

11.4

11.4

11.4

11.4

11.4

GS3 11.3

11.3

11.3

11.4

11.4

11.4

11.4

11.4

11.4

11.4

11.4

GS4 11.3

11.3

11.3

11.4

11.3

11.4

11.4

11.3

11.3

11.3

11.3

GS5 11.3

11.3

11.3

11.4

11.4

11.3

11.3

11.3

11.4

11.4

11.4

Waipawa 11 kV BASE 4.7

4.7

4.7

4.7

4.7

4.7

4.7

4.7

4.7

4.7

4.7

GS1 4.7

4.7

4.7

4.7

4.7

4.7

4.7

4.7

4.7

4.7

4.7

GS2 4.7

4.7

4.7

4.7

4.7

4.7

4.7

4.7

4.7

4.7

4.7

GS3 4.7

4.7

4.7

4.7

4.7

4.7

4.7

4.7

4.7

4.7

4.7

GS4 4.7

4.7

4.7

4.7

4.7

4.7

4.7

4.7

4.7

4.7

4.7

GS5 4.7

4.7

4.7

4.7

4.7

4.7

4.7

4.7

4.7

4.7

4.7

© Transpower New Zealand Limited 2016.All rights reserved. 103

Page 104: 2015 ten year forecast fault level report - Transpower · PDF fileThis publication presents an update to the ten year forecast fault levels ... calculation. Minimum fault level calculations

Ten year forecast fault Levels

Waipawa 33 kV BASE 5.9

5.9

5.9

5.9

5.9

5.9

5.9

5.9

5.9

5.9

5.9

GS1 5.9

5.9

5.9

5.9

5.9

5.9

5.9

5.9

5.9

5.9

5.9

GS2 5.9

5.9

5.9

5.9

5.9

5.9

5.9

5.9

5.9

5.9

5.9

GS3 5.9

5.9

5.9

5.9

5.9

5.9

5.9

5.9

5.9

5.9

5.9

GS4 5.9

5.9

5.9

5.9

5.9

5.9

5.9

5.8

5.8

5.8

5.8

GS5 5.9

5.9

5.9

5.9

5.9

5.9

5.9

5.9

5.9

5.9

5.9

Waipawa 110 kV (T1) BASE 1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

GS1 1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

GS2 1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

GS3 1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

GS4 1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

GS5 1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

Waipawa 110 kV (T2) BASE 1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

GS1 1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

GS2 1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

GS3 1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

GS4 1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

GS5 1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

Wairakei 33 kV BASE 23.0

23.0

23.0

23.0

23.0

23.0

23.0

23.0

23.0

23.0

23.0

GS1 23.0

23.0

23.0

23.1

23.1

23.1

23.1

23.1

23.2

23.2

23.2

GS2 23.0

23.0

23.0

23.1

23.1

23.1

23.1

23.2

23.2

23.2

23.2

GS3 23.0

23.0

23.0

23.0

23.0

23.0

23.1

23.1

23.1

23.1

23.1

GS4 23.0

23.0

23.0

23.1

23.1

23.1

23.1

23.1

23.1

23.1

23.1

GS5 23.0

23.0

23.0

23.1

23.1

23.1

23.1

23.1

23.1

23.1

23.1

Wairakei 220 kV BASE 29.1

29.1

29.1

29.1

29.1

29.1

29.1

29.1

29.1

29.1

29.1

GS1 29.1

29.1

29.1

33.2

33.2

33.1

33.1

33.1

35.6

35.6

35.6

GS2 29.1

29.1

29.1

33.3

33.3

33.5

33.5

35.6

35.6

35.6

36.7

GS3 29.1

29.1

29.1

29.1

29.2

29.2

33.3

33.4

33.4

33.4

33.4

GS4 29.1

29.1

29.0

33.2

33.0

33.1

33.1

33.0

35.2

35.2

35.2

GS5 29.1

29.1

29.1

33.1

33.1

32.9

32.9

33.0

35.1

35.5

35.5

Woodville 11 kV BASE 1.3

1.3

1.3

1.3

1.3

1.3

1.3

1.3

1.3

1.3

1.3

GS1 1.3

1.3

1.3

1.3

1.3

1.3

1.3

1.3

1.3

1.3

1.3

GS2 1.3

1.3

1.3

1.3

1.3

1.3

1.3

1.3

1.3

1.3

1.3

GS3 1.3

1.3

1.3

1.3

1.3

1.3

1.3

1.3

1.3

1.3

1.3

GS4 1.3

1.3

1.3

1.3

1.3

1.3

1.3

1.3

1.3

1.3

1.3

GS5 1.3

1.3

1.3

1.3

1.3

1.3

1.3

1.3

1.3

1.3

1.3

© Transpower New Zealand Limited 2016.All rights reserved. 104

Page 105: 2015 ten year forecast fault level report - Transpower · PDF fileThis publication presents an update to the ten year forecast fault levels ... calculation. Minimum fault level calculations

Ten year forecast fault Levels

Woodville 110 kV BASE 4.8

4.8

4.8

4.8

4.8

4.8

4.8

4.8

4.8

4.8

4.8

GS1 4.8

4.8

4.8

4.8

4.8

4.8

4.8

4.8

4.8

4.8

4.8

GS2 4.8

4.8

4.8

4.8

4.8

4.8

4.8

4.8

4.8

4.8

4.8

GS3 4.8

4.8

4.8

4.8

4.8

4.8

4.8

4.8

4.8

4.8

4.8

GS4 4.8

4.8

4.8

4.8

4.8

4.8

4.8

4.8

4.8

4.8

4.8

GS5 4.8

4.8

4.8

4.8

4.8

4.8

4.8

4.8

4.8

4.8

4.8

TARANAKI

Brunswick 33 kV BASE 9.3

9.3

9.3

9.4

9.4

9.4

9.4

9.4

9.4

9.4

9.4

GS1 9.3

9.3

9.3

9.4

9.4

9.4

9.4

9.4

9.4

9.4

9.4

GS2 9.3

9.3

9.3

9.4

9.4

9.4

9.4

9.4

9.4

9.4

9.4

GS3 9.3

9.3

9.3

9.4

9.4

9.4

9.4

9.4

9.4

9.4

9.4

GS4 9.3

9.3

9.3

9.4

9.4

9.4

9.4

9.3

9.3

9.3

9.3

GS5 9.3

9.3

9.3

9.4

9.4

9.4

9.4

9.4

9.4

9.4

9.4

Brunswick 220 kV BASE 6.9

6.9

6.9

7.0

7.0

7.0

7.0

7.0

7.0

7.0

7.0

GS1 6.9

6.9

6.9

7.0

7.0

7.0

7.0

7.0

7.0

7.3

7.3

GS2 6.9

6.9

6.9

7.0

7.0

7.0

7.0

7.0

7.0

7.3

7.3

GS3 6.9

6.9

6.9

7.0

7.0

7.0

7.0

7.0

7.0

7.3

7.3

GS4 6.9

6.9

6.9

7.0

7.0

7.0

7.0

6.7

6.7

6.7

6.7

GS5 6.9

6.9

6.9

7.0

7.0

7.0

7.0

7.0

7.0

7.0

7.0

Carrington St 33 kV BASE 1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

GS1 1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

GS2 1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

GS3 1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

GS4 1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

GS5 1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

Carrington St 110 kV BASE 11.0

11.0

11.0

13.0

13.0

13.0

13.0

13.0

13.0

13.0

13.0

GS1 11.0

11.0

11.0

13.0

13.0

12.9

12.9

12.9

12.9

13.4

13.4

GS2 11.0

11.0

11.0

13.0

13.0

12.9

12.9

12.9

12.9

13.4

13.4

GS3 11.0

11.0

11.0

13.0

13.0

13.0

13.0

13.0

13.0

13.4

13.4

GS4 11.0

11.0

11.0

12.9

12.9

12.9

12.9

12.2

12.2

12.2

12.2

GS5 11.0

11.0

11.0

12.9

12.9

12.9

12.9

12.9

12.9

12.9

12.9

Hawera 33 kV (T1/T2) BASE 9.1

9.1

9.1

9.1

9.1

9.1

9.1

9.1

9.1

9.1

9.1

GS1 9.1

9.1

9.1

9.1

9.1

9.1

9.1

9.1

9.1

9.1

9.1

GS2 9.1

9.1

9.1

9.1

9.1

9.1

9.1

9.1

9.1

9.1

9.1

GS3 9.1

9.1

9.1

9.1

9.1

9.1

9.1

9.1

9.1

9.1

9.1

© Transpower New Zealand Limited 2016.All rights reserved. 105

Page 106: 2015 ten year forecast fault level report - Transpower · PDF fileThis publication presents an update to the ten year forecast fault levels ... calculation. Minimum fault level calculations

Ten year forecast fault Levels

GS4 9.1

9.1

9.0

9.1

9.1

9.1

9.1

9.0

9.0

9.0

9.0

GS5 9.1

9.1

9.1

9.1

9.1

9.1

9.1

9.1

9.1

9.1

9.1

Hawera 33 kV (T3) BASE 5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

GS1 5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

GS2 5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

GS3 5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

GS4 5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

GS5 5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

Hawera 110 kV BASE 7.8

7.8

7.8

7.9

7.9

7.9

7.9

7.9

7.9

7.9

7.9

GS1 7.8

7.8

7.8

7.9

7.9

7.9

7.9

7.9

7.9

8.0

8.0

GS2 7.8

7.8

7.8

7.9

7.9

7.9

7.9

7.9

7.9

8.0

8.0

GS3 7.8

7.8

7.8

7.9

7.9

7.9

7.9

7.9

7.9

8.0

8.0

GS4 7.8

7.8

7.8

7.9

7.9

7.9

7.9

7.8

7.8

7.8

7.8

GS5 7.8

7.8

7.8

7.9

7.9

7.9

7.9

7.9

7.9

7.9

7.9

Huirangi 33 kV BASE 0.5

0.5

0.5

0.5

0.5

0.5

0.5

0.5

0.5

0.5

0.5

GS1 0.5

0.5

0.5

0.5

0.5

0.5

0.5

0.5

0.5

0.5

0.5

GS2 0.5

0.5

0.5

0.5

0.5

0.5

0.5

0.5

0.5

0.5

0.5

GS3 0.5

0.5

0.5

0.5

0.5

0.5

0.5

0.5

0.5

0.5

0.5

GS4 0.5

0.5

0.5

0.5

0.5

0.5

0.5

0.5

0.5

0.5

0.5

GS5 0.5

0.5

0.5

0.5

0.5

0.5

0.5

0.5

0.5

0.5

0.5

Huirangi 110 kV BASE 8.1

8.1

8.1

8.7

8.7

8.7

8.7

8.7

8.7

8.7

8.7

GS1 8.1

8.1

8.1

8.7

8.7

8.7

8.7

8.7

8.7

8.9

8.9

GS2 8.1

8.1

8.1

8.7

8.7

8.7

8.7

8.7

8.7

8.9

8.9

GS3 8.1

8.1

8.1

8.7

8.7

8.7

8.7

8.7

8.7

8.9

8.9

GS4 8.1

8.1

8.1

8.7

8.7

8.7

8.7

8.4

8.4

8.4

8.4

GS5 8.1

8.1

8.1

8.7

8.7

8.7

8.7

8.7

8.7

8.7

8.7

Junction Road Tee 110 kV BASE - - -

9.5 9.5

9.5

9.5

9.5

9.5

9.5

9.5

GS1 - - - 9.5

9.5

9.5

9.5

9.5

9.5

9.6

9.6

GS2 - - - 9.5

9.5

9.5

9.5

9.5

9.5

9.6

9.6

GS3 - - - 9.5

9.5

9.5

9.5

9.5

9.5

9.6

9.6

GS4 - - - 9.5

9.5

9.5

9.5

9.2

9.2

9.2

9.2

GS5 - - - 9.5

9.5

9.5

9.5

9.5

9.5

9.5

9.5

Kapuni Tee 110 kV BASE 5.1

5.1

5.1

5.2

5.2

5.2

5.2

5.2

5.2

5.2

5.2

GS1 5.1

5.1

5.1

5.2

5.2

5.2

5.2

5.2

5.2

5.2

5.2

GS2 5.1

5.1

5.1

5.2

5.2

5.2

5.2

5.2

5.2

5.2

5.2

GS3 5.1

5.1

5.1

5.2

5.2

5.2

5.2

5.2

5.2

5.2

5.2

GS4 5.1

5.1

5.1

5.2

5.2

5.2

5.2

5.1

5.1

5.1

5.1

© Transpower New Zealand Limited 2016.All rights reserved. 106

Page 107: 2015 ten year forecast fault level report - Transpower · PDF fileThis publication presents an update to the ten year forecast fault levels ... calculation. Minimum fault level calculations

Ten year forecast fault Levels

GS5 5.1

5.1

5.1

5.2

5.2

5.2

5.2

5.2

5.2

5.2

5.2

McKee Tee 110 kV BASE 8.6

8.6

8.6

9.0

9.0

9.0

9.0

9.0

9.0

9.0

9.0

GS1 8.6

8.6

8.6

9.0

9.0

9.0

9.0

9.0

9.0

9.1

9.1

GS2 8.6

8.6

8.6

9.0

9.0

9.0

9.0

9.0

9.0

9.1

9.1

GS3 8.6

8.6

8.6

9.0

9.0

9.0

9.0

9.0

9.0

9.1

9.1

GS4 8.6

8.6

8.6

9.0

9.0

9.0

9.0

8.7

8.7

8.7

8.7

GS5 8.6

8.6

8.6

9.0

9.0

9.0

9.0

9.0

9.0

9.0

9.0

Motunui 11 kV (T3) BASE 0.5

0.5

0.5

0.5

0.5

0.5

0.5

0.5

0.5

0.5

0.5

GS1 0.5

0.5

0.5

0.5

0.5

0.5

0.5

0.5

0.5

0.5

0.5

GS2 0.5

0.5

0.5

0.5

0.5

0.5

0.5

0.5

0.5

0.5

0.5

GS3 0.5

0.5

0.5

0.5

0.5

0.5

0.5

0.5

0.5

0.5

0.5

GS4 0.5

0.5

0.5

0.5

0.5

0.5

0.5

0.5

0.5

0.5

0.5

GS5 0.5

0.5

0.5

0.5

0.5

0.5

0.5

0.5

0.5

0.5

0.5

Motunui 11 kV (T4) BASE 0.5

0.5

0.5

0.5

0.5

0.5

0.5

0.5

0.5

0.5

0.5

GS1 0.5

0.5

0.5

0.5

0.5

0.5

0.5

0.5

0.5

0.5

0.5

GS2 0.5

0.5

0.5

0.5

0.5

0.5

0.5

0.5

0.5

0.5

0.5

GS3 0.5

0.5

0.5

0.5

0.5

0.5

0.5

0.5

0.5

0.5

0.5

GS4 0.5

0.5

0.5

0.5

0.5

0.5

0.5

0.5

0.5

0.5

0.5

GS5 0.5

0.5

0.5

0.5

0.5

0.5

0.5

0.5

0.5

0.5

0.5

Motunui 110 kV BASE 9.0

9.0

9.0

9.6

9.6

9.6

9.6

9.6

9.6

9.6

9.6

GS1 9.0

9.0

9.0

9.6

9.6

9.6

9.6

9.6

9.6

9.8

9.8

GS2 9.0

9.0

9.0

9.6

9.6

9.6

9.6

9.6

9.6

9.8

9.8

GS3 9.0

9.0

9.0

9.6

9.6

9.6

9.6

9.6

9.6

9.8

9.8

GS4 9.0

9.0

9.0

9.6

9.6

9.6

9.6

9.2

9.2

9.2

9.2

GS5 9.0

9.0

9.0

9.6

9.6

9.6

9.6

9.6

9.6

9.6

9.6

New Plymouth 33 kV BASE 11.3

11.3

11.3

11.5

11.5

11.5

11.5

11.5

11.5

11.5

11.5

GS1 11.3

11.3

11.3

11.5

11.5

11.5

11.5

11.5

11.5

11.7

11.7

GS2 11.3

11.3

11.3

11.5

11.5

11.5

11.5

11.5

11.5

11.7

11.7

GS3 11.3

11.3

11.3

11.5

11.5

11.5

11.5

11.5

11.5

11.7

11.7

GS4 11.3

11.3

11.3

11.5

11.5

11.5

11.5

11.3

11.3

11.3

11.3

GS5 11.3

11.3

11.3

11.5

11.5

11.5

11.5

11.5

11.5

11.5

11.5

New Plymouth 110 kV BASE 13.7

13.7

13.7

15.1

15.1

15.1

15.1

15.1

15.1

15.1

15.1

GS1 13.7

13.7

13.7

15.1

15.1

15.1

15.1

15.1

15.1

15.8

15.8

GS2 13.7

13.7

13.7

15.1

15.1

15.1

15.1

15.1

15.1

15.8

15.8

GS3 13.7

13.7

13.7

15.1

15.1

15.1

15.1

15.1

15.1

15.8

15.8

GS4 13.7

13.7

13.7

15.1

15.1

15.1

15.1

14.0

14.0

14.0

14.0

GS5 13.7

13.7

13.7

15.1

15.1

15.1

15.1

15.1

15.1

15.1

15.1

© Transpower New Zealand Limited 2016.All rights reserved. 107

Page 108: 2015 ten year forecast fault level report - Transpower · PDF fileThis publication presents an update to the ten year forecast fault levels ... calculation. Minimum fault level calculations

Ten year forecast fault Levels

New Plymouth 220 kV BASE 8.1

8.1

8.1

8.6

8.6

8.6

8.6

8.6

8.6

8.6

8.6

GS1 8.1

8.1

8.1

8.6

8.6

8.5

8.5

8.5

8.5

9.3

9.3

GS2 8.1

8.1

8.1

8.6

8.6

8.5

8.5

8.5

8.5

9.3

9.3

GS3 8.1

8.1

8.1

8.6

8.6

8.6

8.6

8.6

8.6

9.3

9.3

GS4 8.1

8.1

8.1

8.6

8.5

8.5

8.5

7.7

7.7

7.7

7.7

GS5 8.1

8.1

8.1

8.5

8.5

8.5

8.5

8.5

8.5

8.5

8.5

Opunake 33 kV BASE 4.8

4.8

4.8

4.8

4.8

4.8

4.8

4.8

4.8

4.8

4.8

GS1 4.8

4.8

4.8

4.8

4.8

4.8

4.8

4.8

4.8

4.8

4.8

GS2 4.8

4.8

4.8

4.8

4.8

4.8

4.8

4.8

4.8

4.8

4.8

GS3 4.8

4.8

4.8

4.8

4.8

4.8

4.8

4.8

4.8

4.8

4.8

GS4 4.8

4.8

4.8

4.8

4.8

4.8

4.8

4.8

4.8

4.8

4.8

GS5 4.8

4.8

4.8

4.8

4.8

4.8

4.8

4.8

4.8

4.8

4.8

Opunake 110 kV (T4) BASE 2.4

2.4

2.4

2.4

2.4

2.4

2.4

2.4

2.4

2.4

2.4

GS1 2.4

2.4

2.4

2.4

2.4

2.4

2.4

2.4

2.4

2.5

2.5

GS2 2.4

2.4

2.4

2.4

2.4

2.4

2.4

2.4

2.4

2.5

2.5

GS3 2.4

2.4

2.4

2.4

2.4

2.4

2.4

2.4

2.4

2.5

2.5

GS4 2.4

2.4

2.4

2.4

2.4

2.4

2.4

2.4

2.4

2.4

2.4

GS5 2.4

2.4

2.4

2.4

2.4

2.4

2.4

2.4

2.4

2.4

2.4

Opunake 110 kV (T5) BASE 2.1

2.1

2.1

2.1

2.1

2.1

2.1

2.1

2.1

2.1

2.1

GS1 2.1

2.1

2.1

2.1

2.1

2.1

2.1

2.1

2.1

2.2

2.2

GS2 2.1

2.1

2.1

2.1

2.1

2.1

2.1

2.1

2.1

2.2

2.2

GS3 2.1

2.1

2.1

2.1

2.1

2.1

2.1

2.1

2.1

2.2

2.2

GS4 2.1

2.1

2.1

2.1

2.1

2.1

2.1

2.1

2.1

2.1

2.1

GS5 2.1

2.1

2.1

2.1

2.1

2.1

2.1

2.1

2.1

2.1

2.1

Stratford 33 kV BASE 1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

GS1 1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

GS2 1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

GS3 1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

GS4 1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

GS5 1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

Stratford 110 kV BASE 13.1

13.1

13.1

13.6

13.6

13.6

13.6

13.6

13.6

13.6

13.6

GS1 13.1

13.1

13.1

13.6

13.6

13.6

13.6

13.6

13.6

14.4

14.4

GS2 13.1

13.1

13.1

13.6

13.6

13.6

13.6

13.6

13.6

14.4

14.4

GS3 13.1

13.1

13.1

13.6

13.6

13.6

13.6

13.6

13.6

14.4

14.4

GS4 13.1

13.1

13.1

13.6

13.6

13.6

13.6

12.9

12.9

12.9

12.9

GS5 13.1

13.1

13.1

13.6

13.6

13.6

13.6

13.6

13.6

13.6

13.6

© Transpower New Zealand Limited 2016.All rights reserved. 108

Page 109: 2015 ten year forecast fault level report - Transpower · PDF fileThis publication presents an update to the ten year forecast fault levels ... calculation. Minimum fault level calculations

Ten year forecast fault Levels

Stratford 220 kV BASE 14.2

14.2

14.2

14.8

14.8

14.8

14.8

14.8

14.8

14.8

14.8

GS1 14.2

14.2

14.2

14.7

14.7

14.7

14.7

14.7

14.7

19.3

19.3

GS2 14.2

14.2

14.2

14.7

14.7

14.7

14.7

14.7

14.7

19.3

19.3

GS3 14.2

14.2

14.2

14.8

14.8

14.8

14.7

14.7

14.7

19.3

19.3

GS4 14.2

14.2

14.2

14.7

14.7

14.7

14.7

12.1

12.2

12.2

12.2

GS5 14.2

14.2

14.2

14.7

14.7

14.7

14.7

14.7

14.7

14.7

14.7

Taumarunui 220 kV BASE 2.8

2.8

2.8

2.8

2.8

2.8

2.8

2.8

2.8

2.8

2.8

GS1 2.8

2.8

2.8

2.8

2.8

2.8

2.8

2.8

2.8

2.8

2.8

GS2 2.8

2.8

2.8

2.8

2.8

2.8

2.8

2.8

2.8

2.8

2.8

GS3 2.8

2.8

2.8

2.8

2.8

2.8

2.8

2.8

2.8

2.8

2.8

GS4 2.8

2.8

2.8

2.8

2.8

2.8

2.8

2.7

2.7

2.7

2.7

GS5 2.8

2.8

2.8

2.8

2.8

2.8

2.8

2.8

2.8

2.8

2.8

Wanganui 33 kV BASE 1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

GS1 1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

GS2 1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

GS3 1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

GS4 1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

GS5 1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

Wanganui 110 kV BASE 3.0

3.0

3.0

3.0

3.0

3.0

3.0

3.0

3.0

3.0

3.0

GS1 3.0

3.0

3.0

3.0

3.0

3.0

3.0

3.0

3.0

3.0

3.0

GS2 3.0

3.0

3.0

3.0

3.0

3.0

3.0

3.0

3.0

3.0

3.0

GS3 3.0

3.0

3.0

3.0

3.0

3.0

3.0

3.0

3.0

3.0

3.0

GS4 3.0

3.0

3.0

3.0

3.0

3.0

3.0

3.0

3.0

3.0

3.0

GS5 3.0

3.0

3.0

3.0

3.0

3.0

3.0

3.0

3.0

3.0

3.0

Waverley 11 kV BASE 5.3

5.3

5.3

5.3

5.3

5.3

5.3

5.3

5.3

5.3

5.3

GS1 5.3

5.3

5.3

5.3

5.3

5.3

5.3

5.3

5.3

5.3

5.3

GS2 5.3

5.3

5.3

5.3

5.3

5.3

5.3

5.3

5.3

5.3

5.3

GS3 5.3

5.3

5.3

5.3

5.3

5.3

5.3

5.3

5.3

5.3

5.3

GS4 5.3

5.3

5.3

5.3

5.3

5.3

5.3

5.3

5.3

5.3

5.3

GS5 5.3

5.3

5.3

5.3

5.3

5.3

5.3

5.3

5.3

5.3

5.3

Waverley 110 kV BASE 3.0

3.0

3.0

3.0

3.0

3.0

3.0

3.0

3.0

3.0

3.0

GS1 3.0

3.0

3.0

3.0

3.0

3.0

3.0

3.0

3.0

3.0

3.0

GS2 3.0

3.0

3.0

3.0

3.0

3.0

3.0

3.0

3.0

3.0

3.0

GS3 3.0

3.0

3.0

3.0

3.0

3.0

3.0

3.0

3.0

3.0

3.0

GS4 3.0

3.0

3.0

3.0

3.0

3.0

3.0

3.0

3.0

3.0

3.0

GS5 3.0

3.0

3.0

3.0

3.0

3.0

3.0

3.0

3.0

3.0

3.0

© Transpower New Zealand Limited 2016.All rights reserved. 109

Page 110: 2015 ten year forecast fault level report - Transpower · PDF fileThis publication presents an update to the ten year forecast fault levels ... calculation. Minimum fault level calculations

Ten year forecast fault Levels

HAWKE’S BAY

Fernhill 33 kV BASE 11.0

11.0

11.0

11.0

11.0

11.0

11.0

11.0

11.0

11.0

11.0

GS1 11.0

11.0

11.0

11.0

11.0

11.0

11.0

11.0

11.0

11.0

11.0

GS2 11.0

11.0

11.0

11.0

11.0

11.0

11.0

11.0

11.0

11.0

11.1

GS3 11.0

11.0

11.0

11.0

11.0

11.0

11.0

11.0

11.0

11.0

11.0

GS4 11.0

11.0

11.0

11.0

11.0

11.0

11.0

11.0

11.0

11.0

11.0

GS5 11.0

11.0

11.0

11.0

11.0

11.0

11.0

11.0

11.0

11.0

11.0

Fernhill 110 kV BASE 7.1

7.1

7.1

7.1

7.1

7.1

7.1

7.1

7.1

7.1

7.1

GS1 7.1

7.1

7.1

7.1

7.1

7.1

7.1

7.1

7.2

7.2

7.2

GS2 7.1

7.1

7.1

7.1

7.1

7.2

7.2

7.2

7.2

7.2

7.2

GS3 7.1

7.1

7.1

7.1

7.1

7.1

7.1

7.1

7.1

7.1

7.1

GS4 7.1

7.1

7.1

7.1

7.1

7.1

7.1

7.1

7.1

7.1

7.1

GS5 7.1

7.1

7.1

7.1

7.1

7.1

7.1

7.1

7.1

7.2

7.2

Redclyffe 33 kV BASE 1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

GS1 1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

GS2 1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

GS3 1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

GS4 1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

GS5 1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

Redclyffe 110 kV BASE 9.4

9.4

9.4

9.4

9.4

9.4

9.4

9.4

9.4

9.4

9.4

GS1 9.4

9.4

9.4

9.4

9.4

9.4

9.4

9.4

9.6

9.6

9.6

GS2 9.4

9.4

9.4

9.4

9.4

9.6

9.6

9.6

9.6

9.6

9.6

GS3 9.4

9.4

9.4

9.4

9.4

9.4

9.4

9.4

9.4

9.4

9.4

GS4 9.4

9.4

9.4

9.4

9.4

9.4

9.4

9.4

9.4

9.4

9.4

GS5 9.4

9.4

9.4

9.4

9.4

9.4

9.4

9.4

9.4

9.6

9.6

Redclyffe 220 kV BASE 7.1

7.1

7.1

7.1

7.1

7.1

7.1

7.1

7.1

7.1

7.1

GS1 7.1

7.1

7.1

7.2

7.2

7.2

7.2

7.2

7.7

7.7

7.7

GS2 7.1

7.1

7.1

7.2

7.2

7.6

7.6

7.7

7.7

7.7

7.7

GS3 7.1

7.1

7.1

7.1

7.1

7.1

7.2

7.2

7.2

7.2

7.2

GS4 7.1

7.1

7.1

7.2

7.2

7.2

7.2

7.2

7.2

7.2

7.2

GS5 7.1

7.1

7.1

7.2

7.2

7.2

7.2

7.2

7.2

7.7

7.7

Tuai 110 kV BASE 7.2

7.2

7.2

7.2

7.2

7.2

7.2

7.2

7.2

7.2

7.2

GS1 7.2

7.2

7.2

7.2

7.2

7.2

7.2

7.2

7.3

7.3

7.3

GS2 7.2

7.2

7.2

7.2

7.2

7.3

7.3

7.3

7.3

7.3

7.3

GS3 7.2

7.2

7.2

7.2

7.2

7.2

7.2

7.2

7.2

7.2

7.2

GS4 7.2

7.2

7.2

7.2

7.2

7.2

7.2

7.2

7.2

7.2

7.2

© Transpower New Zealand Limited 2016.All rights reserved. 110

Page 111: 2015 ten year forecast fault level report - Transpower · PDF fileThis publication presents an update to the ten year forecast fault levels ... calculation. Minimum fault level calculations

Ten year forecast fault Levels

GS5 7.2

7.2

7.2

7.2

7.2

7.2

7.2

7.2

7.2

7.3

7.3

Whakatu 33 kV BASE 1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

GS1 1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

GS2 1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

GS3 1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

GS4 1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

GS5 1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

Whakatu 220 kV (T3) BASE 5.6

5.6

5.6

5.6

5.6

5.6

5.6

5.6

5.6

5.6

5.6

GS1 5.6

5.6

5.6

5.6

5.6

5.6

5.6

5.6

5.9

5.9

5.9

GS2 5.6

5.6

5.6

5.6

5.6

5.9

5.9

5.9

5.9

5.9

5.9

GS3 5.6

5.6

5.6

5.6

5.6

5.6

5.6

5.6

5.6

5.6

5.6

GS4 5.6

5.6

5.6

5.6

5.6

5.6

5.6

5.6

5.6

5.6

5.6

GS5 5.6

5.6

5.6

5.6

5.6

5.6

5.6

5.6

5.6

5.9

5.9

Whakatu 220 kV (T4) BASE 5.6

5.6

5.6

5.6

5.6

5.6

5.6

5.6

5.6

5.6

5.6

GS1 5.6

5.6

5.6

5.6

5.6

5.6

5.6

5.6

5.9

5.9

5.9

GS2 5.6

5.6

5.6

5.6

5.6

5.9

5.9

5.9

5.9

5.9

5.9

GS3 5.6

5.6

5.6

5.6

5.6

5.6

5.6

5.6

5.6

5.6

5.6

GS4 5.6

5.6

5.6

5.6

5.6

5.6

5.6

5.6

5.6

5.6

5.6

GS5 5.6

5.6

5.6

5.6

5.6

5.6

5.6

5.6

5.6

5.9

5.9

Whirinaki 11 kV (T1) BASE 1.5

1.5

1.5

1.5

1.5

1.5

1.5

1.5

1.5

1.5

1.5

GS1 1.5

1.5

1.5

1.5

1.5

1.5

1.5

1.5

1.5

1.5

1.5

GS2 1.5

1.5

1.5

1.5

1.5

1.5

1.5

1.5

1.5

1.5

1.5

GS3 1.5

1.5

1.5

1.5

1.5

1.5

1.5

1.5

1.5

1.5

1.5

GS4 1.5

1.5

1.5

1.5

1.5

1.5

1.5

1.5

1.5

1.5

1.5

GS5 1.5

1.5

1.5

1.5

1.5

1.5

1.5

1.5

1.5

1.5

1.5

Whirinaki 11 kV (T2) BASE 2.9

2.9

2.9

2.9

2.9

2.9

2.9

2.9

2.9

2.9

2.9

GS1 2.9

2.9

2.9

2.9

2.9

2.9

2.9

2.9

2.9

2.9

2.9

GS2 2.9

2.9

2.9

2.9

2.9

2.9

2.9

2.9

2.9

2.9

2.9

GS3 2.9

2.9

2.9

2.9

2.9

2.9

2.9

2.9

2.9

2.9

2.9

GS4 2.9

2.9

2.9

2.9

2.9

2.9

2.9

2.9

2.9

2.9

2.9

GS5 2.9

2.9

2.9

2.9

2.9

2.9

2.9

2.9

2.9

2.9

2.9

Whirinaki 11 kV (T3) BASE 2.9

2.9

2.9

2.9

2.9

2.9

2.9

2.9

2.9

2.9

2.9

GS1 2.9

2.9

2.9

2.9

2.9

2.9

2.9

2.9

2.9

2.9

2.9

GS2 2.9

2.9

2.9

2.9

2.9

2.9

2.9

2.9

2.9

2.9

2.9

GS3 2.9

2.9

2.9

2.9

2.9

2.9

2.9

2.9

2.9

2.9

2.9

GS4 2.9

2.9

2.9

2.9

2.9

2.9

2.9

2.9

2.9

2.9

2.9

GS5 2.9

2.9

2.9

2.9

2.9

2.9

2.9

2.9

2.9

2.9

2.9

© Transpower New Zealand Limited 2016.All rights reserved. 111

Page 112: 2015 ten year forecast fault level report - Transpower · PDF fileThis publication presents an update to the ten year forecast fault levels ... calculation. Minimum fault level calculations

Ten year forecast fault Levels

Whirinaki 220 kV BASE 9.2

9.2

9.2

9.2

9.2

9.2

9.2

9.2

9.2

9.2

9.2

GS1 9.2

9.2

9.2

9.3

9.3

9.3

9.3

9.3

10.7

10.7

10.7

GS2 9.2

9.2

9.2

9.3

9.3

10.6

10.6

10.7

10.7

10.7

10.7

GS3 9.2

9.2

9.2

9.2

9.2

9.2

9.3

9.3

9.3

9.3

9.3

GS4 9.2

9.2

9.2

9.3

9.3

9.3

9.3

9.3

9.4

9.4

9.4

GS5 9.2

9.2

9.2

9.3

9.3

9.3

9.3

9.3

9.4

10.7

10.7

WELLINGTON

Central Park 11 kV (T11) BASE 0.2

0.2

0.2

0.2

0.2

0.2

0.2

0.2

0.2

0.2

0.2

GS1 0.2

0.2

0.2

0.2

0.2

0.2

0.2

0.2

0.2

0.2

0.2

GS2 0.2

0.2

0.2

0.2

0.2

0.2

0.2

0.2

0.2

0.2

0.2

GS3 0.2

0.2

0.2

0.2

0.2

0.2

0.2

0.2

0.2

0.2

0.2

GS4 0.2

0.2

0.2

0.2

0.2

0.2

0.2

0.2

0.2

0.2

0.2

GS5 0.2

0.2

0.2

0.2

0.2

0.2

0.2

0.2

0.2

0.2

0.2

Central Park 11 kV (T12) BASE 0.2

0.2

0.2

0.2

0.2

0.2

0.2

0.2

0.2

0.2

0.2

GS1 0.2

0.2

0.2

0.2

0.2

0.2

0.2

0.2

0.2

0.2

0.2

GS2 0.2

0.2

0.2

0.2

0.2

0.2

0.2

0.2

0.2

0.2

0.2

GS3 0.2

0.2

0.2

0.2

0.2

0.2

0.2

0.2

0.2

0.2

0.2

GS4 0.2

0.2

0.2

0.2

0.2

0.2

0.2

0.2

0.2

0.2

0.2

GS5 0.2

0.2

0.2

0.2

0.2

0.2

0.2

0.2

0.2

0.2

0.2

Central Park 33 kV BASE 10.6

10.6

10.6

10.6

10.6

10.6

10.6

10.6

10.6

10.6

10.6

GS1 10.6

10.6

10.6

10.6

10.6

10.6

10.6

10.6

10.6

10.6

10.6

GS2 10.6

10.6

10.6

10.6

10.6

10.6

10.6

10.6

10.6

10.6

10.6

GS3 10.6

10.6

10.6

10.6

10.6

10.6

10.6

10.6

10.6

10.6

10.6

GS4 10.6

10.6

10.6

10.6

10.6

10.6

10.6

10.6

10.6

10.6

10.6

GS5 10.6

10.6

10.6

10.6

10.6

10.6

10.6

10.6

10.6

10.6

10.6

Central Park 110 kV (T3) BASE 6.0

6.0

6.0

6.0

6.0

6.0

6.0

6.0

6.0

6.0

6.0

GS1 6.0

6.0

6.0

6.0

6.0

6.0

6.0

6.0

6.0

6.0

6.0

GS2 6.0

6.0

6.0

6.0

6.0

6.0

6.0

6.0

6.0

6.0

6.0

GS3 6.0

6.0

6.0

6.0

6.0

6.0

6.0

6.0

6.0

6.0

6.0

GS4 6.0

6.0

6.0

6.0

6.0

6.0

6.0

5.9

5.9

5.9

5.9

GS5 6.0

6.0

6.0

6.0

6.0

6.0

6.0

6.0

6.0

6.0

6.0

Central Park 110 kV (T4) BASE 6.0

6.0

6.0

6.0

6.0

6.0

6.0

6.0

6.0

6.0

6.0

GS1 6.0

6.0

6.0

6.0

6.0

6.0

6.0

6.0

6.0

6.0

6.0

GS2 6.0

6.0

6.0

6.0

6.0

6.0

6.0

6.0

6.0

6.0

6.0

GS3 6.0

6.0

6.0

6.0

6.0

6.0

6.0

6.0

6.0

6.0

6.0

© Transpower New Zealand Limited 2016.All rights reserved. 112

Page 113: 2015 ten year forecast fault level report - Transpower · PDF fileThis publication presents an update to the ten year forecast fault levels ... calculation. Minimum fault level calculations

Ten year forecast fault Levels

GS4 6.0

6.0

6.0

6.0

6.0

6.0

6.0

5.9

5.9

5.9

5.9

GS5 6.0

6.0

6.0

6.0

6.0

6.0

6.0

6.0

6.0

6.0

6.0

Central Park 110 kV (T5) BASE 9.4

9.4

9.4

9.4

9.4

9.4

9.4

9.4

9.4

9.4

9.4

GS1 9.4

9.4

9.4

9.4

9.4

9.4

9.4

9.4

9.4

9.4

9.4

GS2 9.4

9.4

9.4

9.4

9.4

9.4

9.4

9.4

9.4

9.4

9.4

GS3 9.4

9.4

9.4

9.4

9.4

9.4

9.4

9.4

9.4

9.4

9.4

GS4 9.4

9.4

9.4

9.4

9.4

9.4

9.4

9.3

9.3

9.3

9.3

GS5 9.4

9.4

9.4

9.4

9.4

9.4

9.4

9.4

9.4

9.4

9.4

Gracefield 33 kV BASE 14.8

14.8

14.8

14.8

14.9

14.9

14.9

14.9

14.9

14.9

14.9

GS1 14.8

14.8

14.8

14.8

14.9

14.8

14.8

14.8

14.9

14.9

14.9

GS2 14.8

14.8

14.8

14.8

14.9

14.8

14.8

14.9

14.9

14.9

14.9

GS3 14.8

14.8

14.8

14.8

14.9

14.9

14.9

14.9

14.9

14.9

14.9

GS4 14.8

14.8

14.8

14.8

14.8

14.8

14.8

14.8

14.8

14.8

14.8

GS5 14.8

14.8

14.8

14.8

14.8

14.8

14.8

14.8

14.8

14.8

14.8

Gracefield 110 kV (T5) BASE 6.0

6.0

6.0

6.0

6.0

6.0

6.0

6.0

6.0

6.0

6.0

GS1 6.0

6.0

6.0

6.0

6.0

6.0

6.0

6.0

6.0

6.0

6.0

GS2 6.0

6.0

6.0

6.0

6.0

6.0

6.0

6.0

6.0

6.0

6.0

GS3 6.0

6.0

6.0

6.0

6.0

6.0

6.0

6.0

6.0

6.0

6.0

GS4 6.0

6.0

6.0

6.0

6.0

6.0

6.0

6.0

6.0

6.0

6.0

GS5 6.0

6.0

6.0

6.0

6.0

6.0

6.0

6.0

6.0

6.0

6.0

Gracefield 110 kV (T6) BASE 6.0

6.0

6.0

6.0

6.0

6.0

6.0

6.0

6.0

6.0

6.0

GS1 6.0

6.0

6.0

6.0

6.0

6.0

6.0

6.0

6.0

6.0

6.0

GS2 6.0

6.0

6.0

6.0

6.0

6.0

6.0

6.0

6.0

6.0

6.0

GS3 6.0

6.0

6.0

6.0

6.0

6.0

6.0

6.0

6.0

6.0

6.0

GS4 6.0

6.0

6.0

6.0

6.0

6.0

6.0

6.0

6.0

6.0

6.0

GS5 6.0

6.0

6.0

6.0

6.0

6.0

6.0

6.0

6.0

6.0

6.0

Greytown 33 kV BASE 4.0

4.0

4.0

4.0

4.0

4.0

4.0

4.0

4.0

4.0

4.0

GS1 4.0

4.0

4.0

4.0

4.0

4.0

4.0

4.0

4.0

4.0

4.0

GS2 4.0

4.0

4.0

4.0

4.0

4.0

4.0

4.0

4.0

4.0

4.0

GS3 4.0

4.0

4.0

4.0

4.0

4.0

4.0

4.0

4.0

4.0

4.0

GS4 4.0

4.0

4.0

4.0

4.0

4.0

4.0

4.0

4.0

4.0

4.0

GS5 4.0

4.0

4.0

4.0

4.0

4.0

4.0

4.0

4.0

4.0

4.0

Greytown 110 kV (T2) BASE 3.3

3.3

3.3

3.3

3.3

3.3

3.3

3.3

3.3

3.3

3.3

GS1 3.3

3.3

3.3

3.3

3.3

3.3

3.3

3.3

3.3

3.3

3.3

GS2 3.3

3.3

3.3

3.3

3.3

3.3

3.3

3.3

3.3

3.3

3.3

GS3 3.3

3.3

3.3

3.3

3.3

3.3

3.3

3.3

3.3

3.3

3.3

GS4 3.3

3.3

3.3

3.3

3.3

3.3

3.3

3.3

3.3

3.3

3.3

© Transpower New Zealand Limited 2016.All rights reserved. 113

Page 114: 2015 ten year forecast fault level report - Transpower · PDF fileThis publication presents an update to the ten year forecast fault levels ... calculation. Minimum fault level calculations

Ten year forecast fault Levels

GS5 3.3

3.3

3.3

3.3

3.3

3.3

3.3

3.3

3.3

3.3

3.3

Greytown 110 kV (T3) BASE 3.3

3.3

3.3

3.3

3.3

3.3

3.3

3.3

3.3

3.3

3.3

GS1 3.3

3.3

3.3

3.3

3.3

3.3

3.3

3.3

3.3

3.3

3.3

GS2 3.3

3.3

3.3

3.3

3.3

3.3

3.3

3.3

3.3

3.3

3.3

GS3 3.3

3.3

3.3

3.3

3.3

3.3

3.3

3.3

3.3

3.3

3.3

GS4 3.3

3.3

3.3

3.3

3.3

3.3

3.3

3.3

3.3

3.3

3.3

GS5 3.3

3.3

3.3

3.3

3.3

3.3

3.3

3.3

3.3

3.3

3.3

Haywards 11 kV BASE 13.0

13.0

13.0

13.0

13.0

13.0

13.0

13.0

13.0

13.0

13.0

GS1 13.0

13.0

13.0

13.0

13.0

13.0

13.0

13.0

13.0

13.0

13.0

GS2 13.0

13.0

13.0

13.0

13.0

13.0

13.0

13.0

13.0

13.0

13.0

GS3 13.0

13.0

13.0

13.0

13.0

13.0

13.0

13.0

13.0

13.0

13.0

GS4 13.0

13.0

13.0

13.0

13.0

13.0

13.0

12.9

12.9

12.9

12.9

GS5 13.0

13.0

13.0

13.0

13.0

13.0

13.0

13.0

13.0

13.0

13.0

Haywards 33 kV BASE 3.9

3.9

3.9

3.9

3.9

3.9

3.9

3.9

3.9

3.9

3.9

GS1 3.9

3.9

3.9

3.9

3.9

3.9

3.9

3.9

3.9

3.9

3.9

GS2 3.9

3.9

3.9

3.9

3.9

3.9

3.9

3.9

3.9

3.9

3.9

GS3 3.9

3.9

3.9

3.9

3.9

3.9

3.9

3.9

3.9

3.9

3.9

GS4 3.9

3.9

3.9

3.9

3.9

3.9

3.9

3.9

3.9

3.9

3.9

GS5 3.9

3.9

3.9

3.9

3.9

3.9

3.9

3.9

3.9

3.9

3.9

Haywards 110 kV BASE 20.7

20.7

20.7

20.7

20.8

20.8

20.8

20.8

20.8

20.8

20.8

GS1 20.7

20.7

20.7

20.7

20.8

20.7

20.7

20.7

20.8

20.9

20.9

GS2 20.7

20.7

20.7

20.7

20.8

20.7

20.7

20.8

20.8

20.9

20.9

GS3 20.7

20.7

20.7

20.7

20.8

20.8

20.8

20.8

20.8

20.9

20.9

GS4 20.7

20.7

20.7

20.7

20.7

20.7

20.7

20.5

20.5

20.5

20.5

GS5 20.7

20.7

20.7

20.7

20.7

20.7

20.7

20.7

20.7

20.7

20.7

Haywards 220 kV BASE 13.0

13.0

13.0

13.0

13.1

13.1

13.1

13.1

13.1

13.1

13.1

GS1 13.0

13.0

13.0

13.0

13.1

13.1

13.1

13.1

13.1

13.2

13.2

GS2 13.0

13.0

13.0

13.0

13.1

13.1

13.1

13.1

13.1

13.2

13.2

GS3 13.0

13.0

13.0

13.0

13.1

13.1

13.1

13.1

13.1

13.2

13.2

GS4 13.0

13.0

13.0

13.0

13.1

13.1

13.1

12.8

12.8

12.8

12.8

GS5 13.0

13.0

13.0

13.0

13.1

13.1

13.1

13.1

13.1

13.1

13.1

Kaiwharawhara 11 kV (T1) BASE 1.3

1.3

1.3

1.3

1.3

1.3

1.3

1.3

1.3

1.3

1.3

GS1 1.3

1.3

1.3

1.3

1.3

1.3

1.3

1.3

1.3

1.3

1.3

GS2 1.3

1.3

1.3

1.3

1.3

1.3

1.3

1.3

1.3

1.3

1.3

GS3 1.3

1.3

1.3

1.3

1.3

1.3

1.3

1.3

1.3

1.3

1.3

GS4 1.3

1.3

1.3

1.3

1.3

1.3

1.3

1.3

1.3

1.3

1.3

GS5 1.3

1.3

1.3

1.3

1.3

1.3

1.3

1.3

1.3

1.3

1.3

© Transpower New Zealand Limited 2016.All rights reserved. 114

Page 115: 2015 ten year forecast fault level report - Transpower · PDF fileThis publication presents an update to the ten year forecast fault levels ... calculation. Minimum fault level calculations

Ten year forecast fault Levels

Kaiwharawhara 11 kV (T3) BASE 1.3

1.3

1.3

1.3

1.3

1.3

1.3

1.3

1.3

1.3

1.3

GS1 1.3

1.3

1.3

1.3

1.3

1.3

1.3

1.3

1.3

1.3

1.3

GS2 1.3

1.3

1.3

1.3

1.3

1.3

1.3

1.3

1.3

1.3

1.3

GS3 1.3

1.3

1.3

1.3

1.3

1.3

1.3

1.3

1.3

1.3

1.3

GS4 1.3

1.3

1.3

1.3

1.3

1.3

1.3

1.3

1.3

1.3

1.3

GS5 1.3

1.3

1.3

1.3

1.3

1.3

1.3

1.3

1.3

1.3

1.3

Kaiwharawhara 110 kV (T1) BASE 10.3

10.3

10.3

10.3

10.3

10.3

10.3

10.3

10.3

10.3

10.3

GS1 10.3

10.3

10.3

10.3

10.3

10.3

10.3

10.3

10.3

10.3

10.3

GS2 10.3

10.3

10.3

10.3

10.3

10.3

10.3

10.3

10.3

10.3

10.3

GS3 10.3

10.3

10.3

10.3

10.3

10.3

10.3

10.3

10.3

10.3

10.3

GS4 10.3

10.3

10.3

10.3

10.3

10.3

10.3

10.2

10.2

10.2

10.2

GS5 10.3

10.3

10.3

10.3

10.3

10.3

10.3

10.3

10.3

10.3

10.3

Kaiwharawhara 110 kV (T3) BASE 10.3

10.3

10.3

10.3

10.3

10.3

10.3

10.3

10.3

10.3

10.3

GS1 10.3

10.3

10.3

10.3

10.3

10.3

10.3

10.3

10.3

10.3

10.3

GS2 10.3

10.3

10.3

10.3

10.3

10.3

10.3

10.3

10.3

10.3

10.3

GS3 10.3

10.3

10.3

10.3

10.3

10.3

10.3

10.3

10.3

10.3

10.3

GS4 10.3

10.3

10.3

10.3

10.3

10.3

10.3

10.2

10.2

10.2

10.2

GS5 10.3

10.3

10.3

10.3

10.3

10.3

10.3

10.3

10.3

10.3

10.3

Masterton 33 kV BASE 1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

GS1 1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

GS2 1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

GS3 1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

GS4 1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

GS5 1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

Masterton 110 kV BASE 3.0

3.0

3.0

3.0

3.0

3.0

3.0

3.0

3.0

3.0

3.0

GS1 3.0

3.0

3.0

3.0

3.0

3.0

3.0

3.0

3.0

3.0

3.0

GS2 3.0

3.0

3.0

3.0

3.0

3.0

3.0

3.0

3.0

3.0

3.0

GS3 3.0

3.0

3.0

3.0

3.0

3.0

3.0

3.0

3.0

3.0

3.0

GS4 3.0

3.0

3.0

3.0

3.0

3.0

3.0

3.0

3.0

3.0

3.0

GS5 3.0

3.0

3.0

3.0

3.0

3.0

3.0

3.0

3.0

3.0

3.0

Melling 11 kV BASE 14.1

14.1

14.1

14.1

14.1

14.1

14.1

14.1

14.1

14.1

14.1

GS1 14.1

14.1

14.1

14.1

14.1

14.1

14.1

14.1

14.1

14.1

14.1

GS2 14.1

14.1

14.1

14.1

14.1

14.1

14.1

14.1

14.1

14.1

14.1

GS3 14.1

14.1

14.1

14.1

14.1

14.1

14.1

14.1

14.1

14.1

14.1

GS4 14.1

14.1

14.1

14.1

14.1

14.1

14.1

14.1

14.1

14.1

14.1

GS5 14.1

14.1

14.1

14.1

14.1

14.1

14.1

14.1

14.1

14.1

14.1

© Transpower New Zealand Limited 2016.All rights reserved. 115

Page 116: 2015 ten year forecast fault level report - Transpower · PDF fileThis publication presents an update to the ten year forecast fault levels ... calculation. Minimum fault level calculations

Ten year forecast fault Levels

Melling 33 kV BASE 10.1

10.1

10.1

10.1

10.1

10.1

10.1

10.1

10.1

10.1

10.1

GS1 10.1

10.1

10.1

10.1

10.1

10.1

10.1

10.1

10.1

10.1

10.1

GS2 10.1

10.1

10.1

10.1

10.1

10.1

10.1

10.1

10.1

10.1

10.1

GS3 10.1

10.1

10.1

10.1

10.1

10.1

10.1

10.1

10.1

10.1

10.1

GS4 10.1

10.1

10.1

10.1

10.1

10.1

10.1

10.1

10.1

10.1

10.1

GS5 10.1

10.1

10.1

10.1

10.1

10.1

10.1

10.1

10.1

10.1

10.1

Melling 110 kV (T1/T3) BASE

7.2 7.2

7.2

7.2

7.2

7.2

7.2

7.2

7.2

7.2

7.2

GS1 7.2

7.2

7.2

7.2

7.2

7.2

7.2

7.2

7.2

7.2

7.2

GS2 7.2

7.2

7.2

7.2

7.2

7.2

7.2

7.2

7.2

7.2

7.2

GS3 7.2

7.2

7.2

7.2

7.2

7.2

7.2

7.2

7.2

7.2

7.2

GS4 7.2

7.2

7.2

7.2

7.2

7.2

7.2

7.1

7.1

7.1

7.1

GS5 7.2

7.2

7.2

7.2

7.2

7.2

7.2

7.2

7.2

7.2

7.2

Melling 110 kV (T2/T4) BASE

6.9 6.9

6.9

6.9

6.9

6.9

6.9

6.9

6.9

6.9

6.9

GS1 6.9

6.9

6.9

6.9

6.9

6.9

6.9

6.9

6.9

7.0

7.0

GS2 6.9

6.9

6.9

6.9

6.9

6.9

6.9

6.9

6.9

7.0

7.0

GS3 6.9

6.9

6.9

6.9

6.9

6.9

6.9

6.9

6.9

7.0

7.0

GS4 6.9

6.9

6.9

6.9

6.9

6.9

6.9

6.9

6.9

6.9

6.9

GS5 6.9

6.9

6.9

6.9

6.9

6.9

6.9

6.9

6.9

6.9

6.9

Paraparaumu 33 kV BASE 1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

GS1 1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

GS2 1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

GS3 1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

GS4 1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

GS5 1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

Paraparaumu 220 kV (T1) BASE 5.9

5.9

5.9

6.0

6.1

6.1

6.1

6.1

6.1

6.1

6.1

GS1 5.9

5.9

5.9

6.0

6.1

6.1

6.1

6.1

6.1

6.2

6.2

GS2 5.9

5.9

5.9

6.0

6.1

6.1

6.1

6.1

6.1

6.2

6.2

GS3 5.9

5.9

5.9

6.0

6.1

6.1

6.1

6.1

6.1

6.2

6.2

GS4 5.9

5.9

5.9

6.0

6.1

6.1

6.1

6.1

6.1

6.1

6.1

GS5 5.9

5.9

5.9

6.0

6.1

6.1

6.1

6.1

6.1

6.1

6.1

Paraparaumu 220 kV (T2) BASE 5.9

5.9

5.9

6.0

6.1

6.1

6.1

6.1

6.1

6.1

6.1

GS1 5.9

5.9

5.9

6.0

6.1

6.1

6.1

6.1

6.1

6.2

6.2

GS2 5.9

5.9

5.9

6.0

6.1

6.1

6.1

6.1

6.1

6.2

6.2

GS3 5.9

5.9

5.9

6.0

6.1

6.1

6.1

6.1

6.1

6.2

6.2

GS4 5.9

5.9

5.9

6.0

6.1

6.1

6.1

6.1

6.1

6.1

6.1

GS5 5.9

5.9

5.9

6.0

6.1

6.1

6.1

6.1

6.1

6.1

6.1

© Transpower New Zealand Limited 2016.All rights reserved. 116

Page 117: 2015 ten year forecast fault level report - Transpower · PDF fileThis publication presents an update to the ten year forecast fault levels ... calculation. Minimum fault level calculations

Ten year forecast fault Levels

Pauatahanui 33 kV BASE 6.6

6.6

6.6

6.6

6.6

6.6

6.6

6.6

6.6

6.6

6.6

GS1 6.6

6.6

6.6

6.6

6.6

6.6

6.6

6.6

6.6

6.6

6.6

GS2 6.6

6.6

6.6

6.6

6.6

6.6

6.6

6.6

6.6

6.6

6.6

GS3 6.6

6.6

6.6

6.6

6.6

6.6

6.6

6.6

6.6

6.6

6.6

GS4 6.6

6.6

6.6

6.6

6.6

6.6

6.6

6.6

6.6

6.6

6.6

GS5 6.6

6.6

6.6

6.6

6.6

6.6

6.6

6.6

6.6

6.6

6.6

Pauatahanui 110 kV (T1) BASE 6.8

6.8

6.8

6.8

6.8

6.8

6.8

6.8

6.8

6.8

6.8

GS1 6.8

6.8

6.8

6.8

6.8

6.8

6.8

6.8

6.8

6.8

6.8

GS2 6.8

6.8

6.8

6.8

6.8

6.8

6.8

6.8

6.8

6.8

6.8

GS3 6.8

6.8

6.8

6.8

6.8

6.8

6.8

6.8

6.8

6.8

6.8

GS4 6.8

6.8

6.8

6.8

6.8

6.8

6.8

6.8

6.8

6.8

6.8

GS5 6.8

6.8

6.8

6.8

6.8

6.8

6.8

6.8

6.8

6.8

6.8

Pauatahanui 110 kV (T2) BASE 6.8

6.8

6.8

6.8

6.8

6.8

6.8

6.8

6.8

6.8

6.8

GS1 6.8

6.8

6.8

6.8

6.8

6.8

6.8

6.8

6.8

6.8

6.8

GS2 6.8

6.8

6.8

6.8

6.8

6.8

6.8

6.8

6.8

6.8

6.8

GS3 6.8

6.8

6.8

6.8

6.8

6.8

6.8

6.8

6.8

6.8

6.8

GS4 6.8

6.8

6.8

6.8

6.8

6.8

6.8

6.8

6.8

6.8

6.8

GS5 6.8

6.8

6.8

6.8

6.8

6.8

6.8

6.8

6.8

6.8

6.8

Takapu Road 33 kV BASE 15.8

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

GS1 15.8

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

GS2 15.8

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

GS3 15.8

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

GS4 15.8

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

GS5 15.8

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

Takapu Road 110 kV BASE 13.0

13.0

13.0

13.0

13.0

13.0

13.0

13.0

13.0

13.0

13.0

GS1 13.0

13.0

13.0

13.0

13.0

13.0

13.0

13.0

13.0

13.1

13.1

GS2 13.0

13.0

13.0

13.0

13.0

13.0

13.0

13.0

13.0

13.1

13.1

GS3 13.0

13.0

13.0

13.0

13.0

13.0

13.0

13.1

13.1

13.1

13.1

GS4 13.0

13.0

13.0

13.0

13.0

13.0

13.0

12.9

12.9

12.9

12.9

GS5 13.0

13.0

13.0

13.0

13.0

13.0

13.0

13.0

13.0

13.0

13.0

Upper Hutt 33 kV BASE 10.2

10.2

10.2

10.2

10.2

10.2

10.2

10.2

10.2

10.2

10.2

GS1 10.2

10.2

10.2

10.2

10.2

10.2

10.2

10.2

10.2

10.2

10.2

GS2 10.2

10.2

10.2

10.2

10.2

10.2

10.2

10.2

10.2

10.2

10.2

GS3 10.2

10.2

10.2

10.2

10.2

10.2

10.2

10.2

10.2

10.2

10.2

GS4 10.2

10.2

10.2

10.2

10.2

10.2

10.2

10.2

10.2

10.2

10.2

GS5 10.2

10.2

10.2

10.2

10.2

10.2

10.2

10.2

10.2

10.2

10.2

© Transpower New Zealand Limited 2016.All rights reserved. 117

Page 118: 2015 ten year forecast fault level report - Transpower · PDF fileThis publication presents an update to the ten year forecast fault levels ... calculation. Minimum fault level calculations

Ten year forecast fault Levels

Upper Hutt 110 kV BASE 10.8

10.8

10.8

10.8

10.8

10.8

10.8

10.8

10.8

10.8

10.8

GS1 10.8

10.8

10.8

10.8

10.8

10.8

10.8

10.8

10.8

10.9

10.9

GS2 10.8

10.8

10.8

10.8

10.8

10.8

10.8

10.8

10.8

10.9

10.9

GS3 10.8

10.8

10.8

10.8

10.8

10.8

10.8

10.8

10.8

10.9

10.9

GS4 10.8

10.8

10.8

10.8

10.8

10.8

10.8

10.8

10.8

10.8

10.8

GS5 10.8

10.8

10.8

10.8

10.8

10.8

10.8

10.8

10.8

10.8

10.8

West Wind 110 kV (Circuit–2) BASE

6.9 6.9

6.9

6.9

6.9

6.9

6.9

6.9

6.9

6.9

6.9

GS1 6.9

6.9

6.9

6.9

6.9

6.9

6.9

6.9

6.9

6.9

6.9

GS2 6.9

6.9

6.9

6.9

6.9

6.9

6.9

6.9

6.9

6.9

6.9

GS3 6.9

6.9

6.9

6.9

6.9

6.9

6.9

6.9

6.9

6.9

6.9

GS4 6.9

6.9

6.9

6.9

6.9

6.9

6.9

6.9

6.9

6.9

6.9

GS5 6.9

6.9

6.9

6.9

6.9

6.9

6.9

6.9

6.9

6.9

6.9

West Wind 110 kV (Circuit–3) BASE

6.9 6.9

6.9

6.9

6.9

6.9

6.9

6.9

6.9

6.9

6.9

GS1 6.9

6.9

6.9

6.9

6.9

6.9

6.9

6.9

6.9

6.9

6.9

GS2 6.9

6.9

6.9

6.9

6.9

6.9

6.9

6.9

6.9

6.9

6.9

GS3 6.9

6.9

6.9

6.9

6.9

6.9

6.9

6.9

6.9

6.9

6.9

GS4 6.9

6.9

6.9

6.9

6.9

6.9

6.9

6.9

6.9

6.9

6.9

GS5 6.9

6.9

6.9

6.9

6.9

6.9

6.9

6.9

6.9

6.9

6.9

Wilton 33 kV BASE 1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

GS1 1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

GS2 1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

GS3 1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

GS4 1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

GS5 1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

Wilton 110 kV BASE 13.7

13.7

13.7

13.7

13.7

13.7

13.7

13.7

13.7

13.7

13.7

GS1 13.7

13.7

13.7

13.7

13.7

13.7

13.7

13.7

13.7

13.8

13.8

GS2 13.7

13.7

13.7

13.7

13.7

13.7

13.7

13.7

13.7

13.8

13.8

GS3 13.7

13.7

13.7

13.7

13.7

13.7

13.7

13.7

13.7

13.8

13.8

GS4 13.7

13.7

13.7

13.7

13.7

13.7

13.7

13.6

13.6

13.6

13.6

GS5 13.7

13.7

13.7

13.7

13.7

13.7

13.7

13.7

13.7

13.7

13.7

Wilton 220 kV BASE 7.5

7.5

7.5

7.5

7.5

7.5

7.5

7.5

7.5

7.5

7.5

GS1 7.5

7.5

7.5

7.5

7.5

7.5

7.5

7.5

7.5

7.6

7.6

GS2 7.5

7.5

7.5

7.5

7.5

7.5

7.5

7.5

7.5

7.6

7.6

GS3 7.5

7.5

7.5

7.5

7.5

7.5

7.5

7.5

7.5

7.6

7.6

GS4 7.5

7.5

7.5

7.5

7.5

7.5

7.5

7.4

7.4

7.4

7.4

GS5 7.5

7.5

7.5

7.5

7.5

7.5

7.5

7.5

7.5

7.5

7.5

© Transpower New Zealand Limited 2016.All rights reserved. 118

Page 119: 2015 ten year forecast fault level report - Transpower · PDF fileThis publication presents an update to the ten year forecast fault levels ... calculation. Minimum fault level calculations

Ten year forecast fault Levels

NELSON-MARLBOROUGH

Argyle 110 kV BASE 2.6

2.6

2.6

2.6

2.6

2.6

2.6

2.6

2.6

2.6

2.6

GS1 2.6

2.6

2.6

2.6

2.6

2.6

4.8

4.9

4.9

4.9

4.9

GS2 2.6

2.6

2.6

2.6

2.6

2.6

4.8

4.8

4.8

4.8

4.8

GS3 2.6

2.6

2.6

2.6

2.6

2.6

2.6

2.6

2.6

2.6

2.6

GS4 2.6

2.6

4.9

4.9

4.9

4.9

4.9

4.9

4.9

4.9

4.9

GS5 2.6

2.6

2.6

2.6

2.6

4.9

4.9

4.9

4.9

4.9

4.9

Blenheim 33 kV BASE 1.7

1.7

1.7

1.7

1.7

1.7

1.7

1.7

1.7

1.7

1.7

GS1 1.7

1.7

1.7

1.7

1.7

1.7

1.7

1.7

1.7

1.7

1.7

GS2 1.7

1.7

1.7

1.7

1.7

1.7

1.7

1.7

1.7

1.7

1.7

GS3 1.7

1.7

1.7

1.7

1.7

1.7

1.7

1.7

1.7

1.7

1.7

GS4 1.7

1.7

1.7

1.7

1.7

1.7

1.7

1.7

1.7

1.7

1.7

GS5 1.7

1.7

1.7

1.7

1.7

1.7

1.7

1.7

1.7

1.7

1.7

Blenheim 110 kV BASE 2.4

2.4

2.4

2.4

2.4

2.4

2.4

2.4

2.4

2.4

2.4

GS1 2.4

2.4

2.4

2.4

2.4

2.4

2.7

2.8

2.8

2.8

2.8

GS2 2.4

2.4

2.4

2.4

2.4

2.4

2.7

2.7

2.7

2.7

2.7

GS3 2.4

2.4

2.4

2.4

2.4

2.4

2.4

2.4

2.4

2.4

2.4

GS4 2.4

2.4

2.8

2.8

2.8

2.8

2.8

2.8

2.8

2.8

2.8

GS5 2.4

2.4

2.4

2.4

2.4

2.8

2.8

2.8

2.8

2.8

2.8

Stoke 33 kV BASE 1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

GS1 1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

GS2 1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

GS3 1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

GS4 1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

GS5 1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

Stoke 66 kV BASE 5.3

5.3

5.3

5.3

5.3

5.3

5.3

5.3

5.3

5.3

5.3

GS1 5.3

5.3

5.3

5.3

5.3

5.3

5.6

5.7

5.7

5.7

5.7

GS2 5.3

5.3

5.3

5.3

5.3

5.3

5.6

5.6

5.6

5.6

5.6

GS3 5.3

5.3

5.3

5.3

5.3

5.3

5.3

5.3

5.3

5.3

5.3

GS4 5.3

5.3

5.7

5.7

5.7

5.7

5.7

5.7

5.7

5.7

5.8

GS5 5.3

5.3

5.3

5.3

5.3

5.7

5.7

5.7

5.7

5.7

5.7

Stoke 110 kV BASE 5.1

5.1

5.1

5.1

5.1

5.1

5.1

5.1

5.1

5.1

5.1

GS1 5.1

5.1

5.1

5.1

5.1

5.1

5.9

6.1

6.1

6.1

6.1

GS2 5.1

5.1

5.1

5.1

5.1

5.1

5.9

5.9

5.9

5.9

5.9

GS3 5.1

5.1

5.1

5.1

5.1

5.1

5.1

5.1

5.1

5.1

5.1

GS4 5.1

5.1

6.1

6.1

6.1

6.1

6.1

6.1

6.1

6.1

6.1

© Transpower New Zealand Limited 2016.All rights reserved. 119

Page 120: 2015 ten year forecast fault level report - Transpower · PDF fileThis publication presents an update to the ten year forecast fault levels ... calculation. Minimum fault level calculations

Ten year forecast fault Levels

GS5 5.1

5.1

5.1

5.1

5.1

6.1

6.1

6.1

6.1

6.1

6.1

Stoke 220 kV BASE 3.4

3.4

3.4

3.4

3.4

3.4

3.4

3.4

3.4

3.4

3.4

GS1 3.4

3.4

3.4

3.4

3.4

3.4

3.9

4.0

4.0

4.0

4.0

GS2 3.4

3.4

3.4

3.4

3.4

3.4

3.9

3.9

3.9

3.9

3.9

GS3 3.4

3.4

3.4

3.4

3.4

3.4

3.4

3.4

3.4

3.4

3.4

GS4 3.4

3.4

4.0

4.0

4.0

4.0

4.0

4.0

4.0

4.0

4.1

GS5 3.4

3.4

3.4

3.4

3.4

4.0

4.0

4.0

4.0

4.0

4.0

WEST COAST

Arthurs Pass 11 kV BASE 2.4

2.4

2.4

2.4

2.4

2.4

2.4

2.4

2.4

2.4

2.4

GS1 2.4

2.4

2.4

2.4

2.4

2.4

2.4

2.4

2.4

2.4

2.4

GS2 2.4

2.4

2.4

2.4

2.4

2.4

2.4

2.4

2.4

2.4

2.4

GS3 2.4

2.4

2.4

2.4

2.4

2.4

2.4

2.4

2.4

2.4

2.4

GS4 2.4

2.4

2.4

2.4

2.4

2.4

2.4

2.4

2.4

2.4

2.4

GS5 2.4

2.4

2.4

2.4

2.4

2.4

2.4

2.4

2.4

2.4

2.4

Arthurs Pass 66 kV BASE 1.3

1.3

1.3

1.3

1.3

1.3

1.3

1.3

1.3

1.3

1.3

GS1 1.3

1.3

1.3

1.3

1.3

1.3

1.4

1.4

1.4

1.4

1.4

GS2 1.3

1.3

1.3

1.3

1.3

1.3

1.4

1.4

1.4

1.4

1.4

GS3 1.3

1.3

1.3

1.3

1.3

1.3

1.3

1.3

1.3

1.3

1.3

GS4 1.3

1.3

1.4

1.4

1.4

1.4

1.4

1.4

1.4

1.4

1.4

GS5 1.3

1.3

1.3

1.3

1.3

1.4

1.4

1.4

1.4

1.4

1.4

Atarau 110 kV BASE 1.5

1.5

1.5

1.5

1.5

1.5

1.5

1.5

1.5

1.5

1.5

GS1 1.5

1.5

1.5

1.5

1.5

1.5

1.5

1.7

1.7

1.7

1.7

GS2 1.5

1.5

1.5

1.5

1.5

1.5

1.5

1.5

1.5

1.5

1.5

GS3 1.5

1.5

1.5

1.5

1.5

1.5

1.5

1.5

1.5

1.5

1.5

GS4 1.5

1.5

1.7

1.7

1.7

1.7

1.7

1.7

1.7

1.7

1.9

GS5 1.5

1.5

1.5

1.5

1.5

1.7

1.7

1.7

1.7

1.7

1.7

Castle Hill 11 kV BASE 2.9

2.9

2.9

2.9

2.9

2.9

2.9

2.9

2.9

2.9

2.9

GS1 2.9

2.9

2.9

2.9

2.9

2.9

2.9

2.9

2.9

2.9

2.9

GS2 2.9

2.9

2.9

2.9

2.9

2.9

2.9

2.9

2.9

2.9

2.9

GS3 2.9

2.9

2.9

2.9

2.9

2.9

2.9

2.9

2.9

2.9

2.9

GS4 2.9

2.9

2.9

2.9

2.9

2.9

2.9

2.9

2.9

2.9

2.9

GS5 2.9

2.9

2.9

2.9

2.9

2.9

2.9

2.9

2.9

2.9

2.9

Castle Hill 66 kV BASE 1.7

1.7

1.7

1.7

1.7

1.7

1.7

1.7

1.7

1.7

1.7

GS1 1.7

1.7

1.7

1.7

1.7

1.7

1.7

1.7

1.7

1.7

1.7

GS2 1.7

1.7

1.7

1.7

1.7

1.7

1.7

1.7

1.7

1.7

1.7

© Transpower New Zealand Limited 2016.All rights reserved. 120

Page 121: 2015 ten year forecast fault level report - Transpower · PDF fileThis publication presents an update to the ten year forecast fault levels ... calculation. Minimum fault level calculations

Ten year forecast fault Levels

GS3 1.7

1.7

1.7

1.7

1.7

1.7

1.7

1.7

1.7

1.7

1.7

GS4 1.7

1.7

1.7

1.7

1.7

1.7

1.7

1.7

1.7

1.7

1.7

GS5 1.7

1.7

1.7

1.7

1.7

1.7

1.7

1.7

1.7

1.7

1.7

Dobson 33 kV BASE 3.6

3.6

3.6

3.6

3.6

3.6

3.6

3.6

3.6

3.6

3.6

GS1 3.6

3.6

3.6

3.6

3.6

3.6

3.7

3.8

3.8

3.8

3.8

GS2 3.6

3.6

3.6

3.6

3.6

3.6

3.7

3.7

3.7

3.7

3.7

GS3 3.6

3.6

3.6

3.6

3.6

3.6

3.6

3.6

3.6

3.6

3.6

GS4 3.6

3.6

3.8

3.8

3.8

3.8

3.8

3.8

3.8

3.8

8.1

GS5 3.6

3.6

3.6

3.6

3.6

3.8

3.8

3.8

3.8

3.8

3.8

Dobson 66 kV BASE 3.6

3.6

3.6

3.6

3.6

3.6

3.6

3.6

3.6

3.6

3.6

GS1 3.6

3.6

3.6

3.6

3.6

3.6

3.7

4.1

4.1

4.1

4.1

GS2 3.6

3.6

3.6

3.6

3.6

3.6

3.7

3.7

3.7

3.7

3.7

GS3 3.6

3.6

3.6

3.6

3.6

3.6

3.6

3.6

3.6

3.6

3.6

GS4 3.6

3.6

4.1

4.1

4.1

4.1

4.1

4.1

4.1

4.1

5.1

GS5 3.6

3.6

3.6

3.6

3.6

4.1

4.1

4.1

4.1

4.1

4.1

Dobson T11 (110 kV) BASE 1.6

1.6

1.6

1.6

1.6

1.6

1.6

1.6

1.6

1.6

1.6

GS1 1.6

1.6

1.6

1.6

1.6

1.6

1.7

1.8

1.8

1.8

1.8

GS2 1.6

1.6

1.6

1.6

1.6

1.6

1.7

1.7

1.7

1.7

1.7

GS3 1.6

1.6

1.6

1.6

1.6

1.6

1.6

1.6

1.6

1.6

1.6

GS4 1.6

1.6

1.8

1.8

1.8

1.8

1.8

1.8

1.8

1.8

2.1

GS5 1.6

1.6

1.6

1.6

1.6

1.8

1.8

1.8

1.8

1.8

1.8

Dobson T12 (110 kV) BASE 1.8

1.8

1.8

1.8

1.8

1.8

1.8

1.8

1.8

1.8

1.8

GS1 1.8

1.8

1.8

1.8

1.8

1.8

1.8

2.0

2.0

2.0

2.0

GS2 1.8

1.8

1.8

1.8

1.8

1.8

1.8

1.8

1.8

1.8

1.8

GS3 1.8

1.8

1.8

1.8

1.8

1.8

1.8

1.8

1.8

1.8

1.8

GS4 1.8

1.8

2.0

2.0

2.0

2.0

2.0

2.0

2.0

2.0

2.3

GS5 1.8

1.8

1.8

1.8

1.8

2.0

2.0

2.0

2.0

2.0

2.0

Greymouth 66 kV BASE 2.7

2.7

2.7

2.7

2.7

2.7

2.7

2.7

2.7

2.7

2.7

GS1 2.7

2.7

2.7

2.7

2.7

2.7

2.8

2.9

2.9

2.9

2.9

GS2 2.7

2.7

2.7

2.7

2.7

2.7

2.8

2.8

2.8

2.8

2.8

GS3 2.7

2.7

2.7

2.7

2.7

2.7

2.7

2.7

2.7

2.7

2.7

GS4 2.7

2.7

2.9

2.9

2.9

2.9

2.9

2.9

2.9

2.9

3.3

GS5 2.7

2.7

2.7

2.7

2.7

2.9

2.9

2.9

2.9

2.9

2.9

Hokitika 66 kV BASE 1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

GS1 1.2

1.2

1.2

1.2

1.2

1.2

1.3

1.3

1.3

1.3

1.3

GS2 1.2

1.2

1.2

1.2

1.2

1.2

1.3

1.3

1.3

1.3

1.3

GS3 1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

© Transpower New Zealand Limited 2016.All rights reserved. 121

Page 122: 2015 ten year forecast fault level report - Transpower · PDF fileThis publication presents an update to the ten year forecast fault levels ... calculation. Minimum fault level calculations

Ten year forecast fault Levels

GS4 1.2

1.2

1.3

1.3

1.3

1.3

1.3

1.3

1.3

1.3

1.3

GS5 1.2

1.2

1.2

1.2

1.2

1.3

1.3

1.3

1.3

1.3

1.3

Inangahua 110 kV BASE 2.1

2.1

2.1

2.1

2.1

2.1

2.1

2.1

2.1

2.1

2.1

GS1 2.1

2.1

2.1

2.1

2.1

2.1

2.2

3.2

3.2

3.2

3.2

GS2 2.1

2.1

2.1

2.1

2.1

2.1

2.2

2.2

2.2

2.2

2.2

GS3 2.1

2.1

2.1

2.1

2.1

2.1

2.1

2.1

2.1

2.1

2.1

GS4 2.1

2.1

3.2

3.2

3.2

3.2

3.2

3.2

3.2

3.2

3.4

GS5 2.1

2.1

2.1

2.1

2.1

3.2

3.2

3.2

3.2

3.2

3.2

Kikiwa 11 kV BASE 0.1

0.1

0.1

0.1

0.1

0.1

0.1

0.1

0.1

0.1

0.1

GS1 0.1

0.1

0.1

0.1

0.1

0.1

0.1

0.1

0.1

0.1

0.1

GS2 0.1

0.1

0.1

0.1

0.1

0.1

0.1

0.1

0.1

0.1

0.1

GS3 0.1

0.1

0.1

0.1

0.1

0.1

0.1

0.1

0.1

0.1

0.1

GS4 0.1

0.1

0.1

0.1

0.1

0.1

0.1

0.1

0.1

0.1

0.1

GS5 0.1

0.1

0.1

0.1

0.1

0.1

0.1

0.1

0.1

0.1

0.1

Kikiwa 110 kV BASE 5.3

5.3

5.3

5.3

5.3

5.3

5.3

5.3

5.3

5.3

5.3

GS1 5.3

5.3

5.3

5.3

5.3

5.3

6.3

6.8

6.8

6.8

6.8

GS2 5.3

5.3

5.3

5.3

5.3

5.3

6.3

6.3

6.3

6.3

6.3

GS3 5.3

5.3

5.3

5.3

5.3

5.3

5.3

5.3

5.3

5.3

5.3

GS4 5.3

5.3

6.8

6.8

6.8

6.8

6.8

6.8

6.8

6.8

7.0

GS5 5.3

5.3

5.3

5.3

5.3

6.8

6.8

6.8

6.8

6.8

6.8

Kikiwa 220 kV BASE 3.8

3.8

3.8

3.8

3.8

3.8

3.8

3.8

3.8

3.8

3.8

GS1 3.8

3.8

3.8

3.8

3.8

3.8

4.2

4.4

4.4

4.4

4.4

GS2 3.8

3.8

3.8

3.8

3.8

3.8

4.2

4.2

4.2

4.2

4.2

GS3 3.8

3.8

3.8

3.8

3.8

3.8

3.8

3.8

3.8

3.8

3.8

GS4 3.8

3.8

4.4

4.4

4.4

4.4

4.4

4.4

4.4

4.4

4.5

GS5 3.8

3.8

3.8

3.8

3.8

4.4

4.4

4.4

4.4

4.4

4.4

Kumara 66 kV BASE 2.4

2.4

2.4

2.4

2.4

2.4

2.4

2.4

2.4

2.4

2.4

GS1 2.4

2.4

2.4

2.4

2.4

2.4

2.4

2.5

2.5

2.5

2.5

GS2 2.4

2.4

2.4

2.4

2.4

2.4

2.4

2.4

2.4

2.4

2.4

GS3 2.4

2.4

2.4

2.4

2.4

2.4

2.4

2.4

2.4

2.4

2.4

GS4 2.4

2.4

2.5

2.5

2.5

2.5

2.5

2.5

2.5

2.5

2.6

GS5 2.4

2.4

2.4

2.4

2.4

2.5

2.5

2.5

2.5

2.5

2.5

Murchison 11 kV BASE 2.7

2.7

2.7

2.7

2.7

2.7

2.7

2.7

2.7

2.7

2.7

GS1 2.7

2.7

2.7

2.7

2.7

2.7

2.7

2.8

2.8

2.8

2.8

GS2 2.7

2.7

2.7

2.7

2.7

2.7

2.7

2.7

2.7

2.7

2.7

GS3 2.7

2.7

2.7

2.7

2.7

2.7

2.7

2.7

2.7

2.7

2.7

GS4 2.7

2.7

2.8

2.8

2.8

2.8

2.8

2.8

2.8

2.8

2.8

© Transpower New Zealand Limited 2016.All rights reserved. 122

Page 123: 2015 ten year forecast fault level report - Transpower · PDF fileThis publication presents an update to the ten year forecast fault levels ... calculation. Minimum fault level calculations

Ten year forecast fault Levels

GS5 2.7

2.7

2.7

2.7

2.7

2.8

2.8

2.8

2.8

2.8

2.8

Murchison 110 kV BASE 2.0

2.0

2.0

2.0

2.0

2.0

2.0

2.0

2.0

2.0

2.0

GS1 2.0

2.0

2.0

2.0

2.0

2.0

2.1

2.4

2.4

2.4

2.4

GS2 2.0

2.0

2.0

2.0

2.0

2.0

2.1

2.1

2.1

2.1

2.1

GS3 2.0

2.0

2.0

2.0

2.0

2.0

2.0

2.0

2.0

2.0

2.0

GS4 2.0

2.0

2.4

2.4

2.4

2.4

2.4

2.4

2.4

2.4

2.5

GS5 2.0

2.0

2.0

2.0

2.0

2.4

2.4

2.4

2.4

2.4

2.4

Orowaiti 110 kV (Circuit–1) BASE

1.2 1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

GS1 1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.8

1.8

1.8

1.8

GS2 1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

GS3 1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

GS4 1.2

1.2

1.8

1.8

1.8

1.8

1.8

1.8

1.8

1.8

1.9

GS5 1.2

1.2

1.2

1.2

1.2

1.8

1.8

1.8

1.8

1.8

1.8

Orowaiti 110 kV (Circuit–2) BASE

1.2 1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

GS1 1.2

1.2

1.2

1.2

1.2

1.2

1.3

1.9

1.9

1.9

1.9

GS2 1.2

1.2

1.2

1.2

1.2

1.2

1.3

1.3

1.3

1.3

1.3

GS3 1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

GS4 1.2

1.2

1.9

1.9

1.9

1.9

1.9

1.9

1.9

1.9

1.9

GS5 1.2

1.2

1.2

1.2

1.2

1.9

1.9

1.9

1.9

1.9

1.9

Otira 11 kV BASE 1.7

1.7

1.7

1.7

1.7

1.7

1.7

1.7

1.7

1.7

1.7

GS1 1.7

1.7

1.7

1.7

1.7

1.7

1.7

1.7

1.7

1.7

1.7

GS2 1.7

1.7

1.7

1.7

1.7

1.7

1.7

1.7

1.7

1.7

1.7

GS3 1.7

1.7

1.7

1.7

1.7

1.7

1.7

1.7

1.7

1.7

1.7

GS4 1.7

1.7

1.7

1.7

1.7

1.7

1.7

1.7

1.7

1.7

1.7

GS5 1.7

1.7

1.7

1.7

1.7

1.7

1.7

1.7

1.7

1.7

1.7

Otira 66 kV BASE 1.4

1.4

1.4

1.4

1.4

1.4

1.4

1.4

1.4

1.4

1.4

GS1 1.4

1.4

1.4

1.4

1.4

1.4

1.4

1.5

1.5

1.5

1.5

GS2 1.4

1.4

1.4

1.4

1.4

1.4

1.4

1.4

1.4

1.4

1.4

GS3 1.4

1.4

1.4

1.4

1.4

1.4

1.4

1.4

1.4

1.4

1.4

GS4 1.4

1.4

1.5

1.5

1.5

1.5

1.5

1.5

1.5

1.5

1.5

GS5 1.4

1.4

1.4

1.4

1.4

1.5

1.5

1.5

1.5

1.5

1.5

Reefton 110 kV (Circuit–1) BASE

1.6 1.6

1.6

1.6

1.6

1.6

1.6

1.6

1.6

1.6

1.6

GS1 1.6

1.6

1.6

1.6

1.6

1.6

1.6

2.0

2.0

2.0

2.0

GS2 1.6

1.6

1.6

1.6

1.6

1.6

1.6

1.6

1.6

1.6

1.6

GS3 1.6

1.6

1.6

1.6

1.6

1.6

1.6

1.6

1.6

1.6

1.6

GS4 1.6

1.6

2.0

2.0

2.0

2.0

2.0

2.0

2.0

2.0

2.1

GS5 1.6

1.6

1.6

1.6

1.6

2.0

2.0

2.0

2.0

2.0

2.0

© Transpower New Zealand Limited 2016.All rights reserved. 123

Page 124: 2015 ten year forecast fault level report - Transpower · PDF fileThis publication presents an update to the ten year forecast fault levels ... calculation. Minimum fault level calculations

Ten year forecast fault Levels

Reefton 110 kV (Circuit–2) BASE

1.5 1.5

1.5

1.5

1.5

1.5

1.5

1.5

1.5

1.5

1.5

GS1 1.5

1.5

1.5

1.5

1.5

1.5

1.5

1.8

1.8

1.8

1.8

GS2 1.5

1.5

1.5

1.5

1.5

1.5

1.5

1.5

1.5

1.5

1.5

GS3 1.5

1.5

1.5

1.5

1.5

1.5

1.5

1.5

1.5

1.5

1.5

GS4 1.5

1.5

1.8

1.8

1.8

1.8

1.8

1.8

1.8

1.8

1.9

GS5 1.5

1.5

1.5

1.5

1.5

1.8

1.8

1.8

1.8

1.8

1.8

Waimangaroa 110 kV (Circuit–1) BASE

1.5 1.5

1.5

1.5

1.5

1.5

1.5

1.5

1.5

1.5

1.5

GS1 1.5

1.5

1.5

1.5

1.5

1.5

1.5

2.4

2.4

2.4

2.4

GS2 1.5

1.5

1.5

1.5

1.5

1.5

1.5

1.5

1.5

1.5

1.5

GS3 1.5

1.5

1.5

1.5

1.5

1.5

1.5

1.5

1.5

1.5

1.5

GS4 1.5

1.5

2.4

2.4

2.4

2.4

2.4

2.4

2.4

2.4

2.5

GS5 1.5

1.5

1.5

1.5

1.5

2.4

2.4

2.4

2.4

2.4

2.4

Waimangaroa 110 kV (Circuit–2) BASE

1.4 1.4

1.4

1.4

1.4

1.4

1.4

1.4

1.4

1.4

1.4

GS1 1.4

1.4

1.4

1.4

1.4

1.4

1.5

2.4

2.4

2.4

2.4

GS2 1.4

1.4

1.4

1.4

1.4

1.4

1.5

1.5

1.5

1.5

1.5

GS3 1.4

1.4

1.4

1.4

1.4

1.4

1.4

1.4

1.4

1.4

1.4

GS4 1.4

1.4

2.4

2.4

2.4

2.4

2.4

2.4

2.4

2.4

2.5

GS5 1.4

1.4

1.4

1.4

1.4

2.4

2.4

2.4

2.4

2.4

2.4

Westport 11 kV BASE 10.6

10.6

10.6

10.6

10.6

10.6

10.6

10.6

10.6

10.6

10.6

GS1 10.6

10.6

10.6

10.6

10.6

10.6

10.9

12.0

12.0

12.0

12.0

GS2 10.6

10.6

10.6

10.6

10.6

10.6

10.9

10.9

10.9

10.9

10.9

GS3 10.6

10.6

10.6

10.6

10.6

10.6

10.6

10.6

10.6

10.6

10.6

GS4 10.6

10.6

12.0

12.0

12.0

12.0

12.0

12.0

12.0

12.0

12.2

GS5 10.6

10.6

10.6

10.6

10.6

12.0

12.0

12.0

12.0

12.0

12.0

Westport 110 kV (T1) BASE 1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

GS1 1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.6

1.6

1.6

1.6

GS2 1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

GS3 1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

GS4 1.1

1.1

1.6

1.6

1.6

1.6

1.6

1.6

1.6

1.6

1.6

GS5 1.1

1.1

1.1

1.1

1.1

1.6

1.6

1.6

1.6

1.6

1.6

Westport 110 kV (T2) BASE 1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

GS1 1.1

1.1

1.1

1.1

1.1

1.1

1.2

1.6

1.6

1.6

1.6

GS2 1.1

1.1

1.1

1.1

1.1

1.1

1.2

1.2

1.2

1.2

1.2

GS3 1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

GS4 1.1

1.1

1.6

1.6

1.6

1.6

1.6

1.6

1.6

1.6

1.7

GS5 1.1

1.1

1.1

1.1

1.1

1.6

1.6

1.6

1.6

1.6

1.6

© Transpower New Zealand Limited 2016.All rights reserved. 124

Page 125: 2015 ten year forecast fault level report - Transpower · PDF fileThis publication presents an update to the ten year forecast fault levels ... calculation. Minimum fault level calculations

Ten year forecast fault Levels

CANTERBURY

Ashburton 33 kV BASE 1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

GS1 1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

GS2 1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

GS3 1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

GS4 1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

GS5 1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

Ashburton 66 kV BASE 0.9

0.9

0.9

0.9

0.9

0.9

0.9

0.9

0.9

0.9

0.9

GS1 0.9

0.9

0.9

0.9

0.9

0.9

0.9

0.9

0.9

0.9

0.9

GS2 0.9

0.9

0.9

0.9

0.9

0.9

0.9

0.9

0.9

0.9

0.9

GS3 0.9

0.9

0.9

0.9

0.9

0.9

0.9

0.9

0.9

0.9

0.9

GS4 0.9

0.9

0.9

0.9

0.9

0.9

0.9

0.9

0.9

0.9

0.9

GS5 0.9

0.9

0.9

0.9

0.9

0.9

0.9

0.9

0.9

0.9

0.9

Ashburton 220 kV BASE 8.3

8.3

8.3

8.3

8.3

8.3

8.3

8.3

8.3

8.3

8.3

GS1 8.3

8.3

8.3

8.3

8.3

8.3

8.5

8.5

8.5

8.5

8.5

GS2 8.3

8.3

8.3

8.3

8.3

8.3

8.5

8.5

8.5

8.5

8.5

GS3 8.3

8.3

8.3

8.3

8.3

8.3

8.3

8.3

8.3

8.3

8.3

GS4 8.3

8.3

8.5

8.5

8.5

8.5

8.5

8.5

8.5

8.5

8.5

GS5 8.3

8.3

8.3

8.3

8.3

8.5

8.5

8.5

8.5

8.5

8.5

Ashley 11 kV (T5) BASE 9.5

8.4

8.4

8.4

8.4

8.4

8.4

8.4

8.4

8.4

8.4

GS1 9.5

8.4

8.4

8.4

8.4

8.4

8.4

8.4

8.4

8.4

8.4

GS2 9.5

8.4

8.4

8.4

8.4

8.4

8.4

8.4

8.4

8.4

8.4

GS3 9.5

8.4

8.4

8.4

8.4

8.4

8.4

8.4

8.4

8.4

8.4

GS4 9.5

8.4

8.4

8.4

8.4

8.4

8.4

8.4

8.4

8.4

8.4

GS5 9.5

8.4

8.4

8.4

8.4

8.4

8.4

8.4

8.4

8.4

8.4

Ashley 11 kV (T3) BASE 0.5

0.5

0.5

0.5

0.5

0.5

0.5

0.5

0.5

0.5

0.5

GS1 0.5

0.5

0.5

0.5

0.5

0.5

0.5

0.5

0.5

0.5

0.5

GS2 0.5

0.5

0.5

0.5

0.5

0.5

0.5

0.5

0.5

0.5

0.5

GS3 0.5

0.5

0.5

0.5

0.5

0.5

0.5

0.5

0.5

0.5

0.5

GS4 0.5

0.5

0.5

0.5

0.5

0.5

0.5

0.5

0.5

0.5

0.5

GS5 0.5

0.5

0.5

0.5

0.5

0.5

0.5

0.5

0.5

0.5

0.5

Ashley 66 kV BASE 3.1

3.1

3.1

3.1

3.1

3.1

3.1

3.1

3.1

3.1

3.1

GS1 3.1

3.1

3.1

3.1

3.1

3.1

3.1

3.1

3.1

3.1

3.1

GS2 3.1

3.1

3.1

3.1

3.1

3.1

3.1

3.1

3.1

3.1

3.1

GS3 3.1

3.1

3.1

3.1

3.1

3.1

3.1

3.1

3.1

3.1

3.1

GS4 3.1

3.1

3.1

3.1

3.1

3.1

3.1

3.1

3.1

3.1

3.1

© Transpower New Zealand Limited 2016.All rights reserved. 125

Page 126: 2015 ten year forecast fault level report - Transpower · PDF fileThis publication presents an update to the ten year forecast fault levels ... calculation. Minimum fault level calculations

Ten year forecast fault Levels

GS5 3.1

3.1

3.1

3.1

3.1

3.1

3.1

3.1

3.1

3.1

3.1

Bromley 66 kV BASE 15.5

15.5

15.5

15.5

15.5

15.5

15.5

15.5

15.5

15.5

15.5

GS1 15.5

15.5

15.6

15.6

15.6

15.6

15.9

16.0

16.0

16.0

16.0

GS2 15.5

15.5

15.5

15.5

15.6

15.6

15.9

15.9

15.9

15.9

15.9

GS3 15.5

15.5

15.5

15.5

15.5

15.5

15.5

15.5

15.5

15.5

15.5

GS4 15.5

15.5

16.0

16.0

16.0

16.0

16.0

16.0

16.0

16.0

16.0

GS5 15.5

15.5

15.6

15.6

15.6

16.0

16.0

16.0

16.0

16.0

16.0

Bromley 220 kV BASE 7.1

7.1

7.1

7.1

7.1

7.1

7.1

7.1

7.1

7.1

7.1

GS1 7.1

7.1

7.1

7.1

7.1

7.1

7.3

7.4

7.4

7.4

7.4

GS2 7.1

7.1

7.1

7.1

7.1

7.1

7.3

7.3

7.3

7.3

7.3

GS3 7.1

7.1

7.1

7.1

7.1

7.1

7.1

7.1

7.1

7.1

7.1

GS4 7.1

7.1

7.4

7.4

7.4

7.4

7.4

7.4

7.4

7.4

7.4

GS5 7.1

7.1

7.1

7.1

7.1

7.4

7.4

7.4

7.4

7.4

7.4

Coleridge 11 kV BASE 1.7

1.7

1.7

1.7

1.7

1.7

1.7

1.7

1.7

1.7

1.7

GS1 1.7

1.7

1.7

1.7

1.7

1.7

1.7

1.7

1.7

1.7

1.7

GS2 1.7

1.7

1.7

1.7

1.7

1.7

1.7

1.7

1.7

1.7

1.7

GS3 1.7

1.7

1.7

1.7

1.7

1.7

1.7

1.7

1.7

1.7

1.7

GS4 1.7

1.7

1.7

1.7

1.7

1.7

1.7

1.7

1.7

1.7

1.7

GS5 1.7

1.7

1.7

1.7

1.7

1.7

1.7

1.7

1.7

1.7

1.7

Coleridge 66 kV BASE 5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

GS1 5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

GS2 5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

GS3 5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

GS4 5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.1

GS5 5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

Culverden 33 kV BASE 1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

GS1 1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

GS2 1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

GS3 1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

GS4 1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

GS5 1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

Culverden 66 kV BASE 0.5

0.5

0.5

0.5

0.5

0.5

0.5

0.5

0.5

0.5

0.5

GS1 0.5

0.5

0.5

0.5

0.5

0.5

0.5

0.5

0.5

0.5

0.5

GS2 0.5

0.5

0.5

0.5

0.5

0.5

0.5

0.5

0.5

0.5

0.5

GS3 0.5

0.5

0.5

0.5

0.5

0.5

0.5

0.5

0.5

0.5

0.5

GS4 0.5

0.5

0.5

0.5

0.5

0.5

0.5

0.5

0.5

0.5

0.5

GS5 0.5

0.5

0.5

0.5

0.5

0.5

0.5

0.5

0.5

0.5

0.5

© Transpower New Zealand Limited 2016.All rights reserved. 126

Page 127: 2015 ten year forecast fault level report - Transpower · PDF fileThis publication presents an update to the ten year forecast fault levels ... calculation. Minimum fault level calculations

Ten year forecast fault Levels

Culverden 220 kV (T22) BASE 2.7

2.7

2.7

2.7

2.7

2.7

2.7

2.7

2.7

2.7

2.7

GS1 2.7

2.7

2.7

2.7

2.7

2.7

2.8

2.8

2.8

2.8

2.8

GS2 2.7

2.7

2.7

2.7

2.7

2.7

2.8

2.8

2.8

2.8

2.8

GS3 2.7

2.7

2.7

2.7

2.7

2.7

2.7

2.7

2.7

2.7

2.7

GS4 2.7

2.7

2.8

2.8

2.8

2.8

2.8

2.8

2.8

2.8

2.8

GS5 2.7

2.7

2.7

2.7

2.7

2.8

2.8

2.8

2.8

2.8

2.8

Culverden 220 kV (T23) BASE 2.7

2.7

2.7

2.7

2.7

2.7

2.7

2.7

2.7

2.7

2.7

GS1 2.7

2.7

2.7

2.7

2.7

2.7

2.8

2.8

2.8

2.8

2.8

GS2 2.7

2.7

2.7

2.7

2.7

2.7

2.8

2.8

2.8

2.8

2.8

GS3 2.7

2.7

2.7

2.7

2.7

2.7

2.7

2.7

2.7

2.7

2.7

GS4 2.7

2.7

2.8

2.8

2.8

2.8

2.8

2.8

2.8

2.8

2.8

GS5 2.7

2.7

2.7

2.7

2.7

2.8

2.8

2.8

2.8

2.8

2.8

Hororata 33 kV BASE 3.1

3.1

3.1

3.1

3.1

3.1

3.1

3.1

3.1

3.1

3.1

GS1 3.1

3.1

3.1

3.1

3.1

3.1

3.1

3.2

3.2

3.2

3.2

GS2 3.1

3.1

3.1

3.1

3.1

3.1

3.1

3.1

3.1

3.1

3.1

GS3 3.1

3.1

3.1

3.1

3.1

3.1

3.1

3.1

3.1

3.1

3.1

GS4 3.1

3.1

3.2

3.2

3.2

3.2

3.2

3.2

3.2

3.2

3.2

GS5 3.1

3.1

3.1

3.1

3.1

3.2

3.2

3.2

3.2

3.2

3.2

Hororata 66 kV BASE 2.6

2.6

2.6

2.6

2.6

2.6

2.6

2.6

2.6

2.6

2.6

GS1 2.6

2.6

2.6

2.6

2.6

2.6

2.6

2.6

2.6

2.6

2.6

GS2 2.6

2.6

2.6

2.6

2.6

2.6

2.6

2.6

2.6

2.6

2.6

GS3 2.6

2.6

2.6

2.6

2.6

2.6

2.6

2.6

2.6

2.6

2.6

GS4 2.6

2.6

2.6

2.6

2.6

2.6

2.6

2.6

2.6

2.6

2.6

GS5 2.6

2.6

2.6

2.6

2.6

2.6

2.6

2.6

2.6

2.6

2.6

Islington 33 kV BASE 0.6

0.6

0.6

0.6

0.6

0.6

0.6

0.6

0.6

0.6

0.6

GS1 0.6

0.6

0.6

0.6

0.6

0.6

0.6

0.6

0.6

0.6

0.6

GS2 0.6

0.6

0.6

0.6

0.6

0.6

0.6

0.6

0.6

0.6

0.6

GS3 0.6

0.6

0.6

0.6

0.6

0.6

0.6

0.6

0.6

0.6

0.6

GS4 0.6

0.6

0.6

0.6

0.6

0.6

0.6

0.6

0.6

0.6

0.6

GS5 0.6

0.6

0.6

0.6

0.6

0.6

0.6

0.6

0.6

0.6

0.6

Islington 66 kV BASE 20.9

20.9

20.9

20.9

20.9

20.9

20.9

20.9

20.9

20.9

20.9

GS1 20.9

20.9

20.9

20.9

20.9

20.9

21.6

21.9

21.9

21.9

21.9

GS2 20.9

20.9

20.9

20.9

20.9

20.9

21.6

21.6

21.6

21.6

21.6

GS3 20.9

20.9

20.9

20.9

20.9

20.9

20.9

20.9

20.9

20.9

20.9

GS4 20.9

20.9

21.9

21.9

21.9

21.9

21.9

21.9

21.9

21.9

22.0

GS5 20.9

20.9

20.9

20.9

20.9

21.9

21.9

21.9

21.9

21.9

21.9

© Transpower New Zealand Limited 2016.All rights reserved. 127

Page 128: 2015 ten year forecast fault level report - Transpower · PDF fileThis publication presents an update to the ten year forecast fault levels ... calculation. Minimum fault level calculations

Ten year forecast fault Levels

Islington 220 kV BASE 8.3

8.4

8.4

8.4

8.4

8.4

8.4

8.4

8.4

8.4

8.4

GS1 8.3

8.4

8.4

8.4

8.4

8.4

8.8

8.9

8.9

8.9

8.9

GS2 8.3

8.4

8.4

8.4

8.4

8.4

8.8

8.8

8.8

8.8

8.8

GS3 8.3

8.4

8.4

8.4

8.4

8.4

8.4

8.4

8.4

8.4

8.4

GS4 8.3

8.4

8.9

8.9

8.9

8.9

8.9

8.9

8.9

8.9

8.9

GS5 8.3

8.4

8.4

8.4

8.4

8.9

8.9

8.9

8.9

8.9

8.9

Kaiapoi 11 kV BASE 1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

GS1 1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

GS2 1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

GS3 1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

GS4 1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

GS5 1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

Kaiapoi 66 kV BASE 3.1

3.1

3.1

3.1

3.1

3.1

3.1

3.1

3.1

3.1

3.1

GS1 3.1

3.1

3.1

3.1

3.1

3.1

3.1

3.1

3.1

3.1

3.1

GS2 3.1

3.1

3.1

3.1

3.1

3.1

3.1

3.1

3.1

3.1

3.1

GS3 3.1

3.1

3.1

3.1

3.1

3.1

3.1

3.1

3.1

3.1

3.1

GS4 3.1

3.1

3.1

3.1

3.1

3.1

3.1

3.1

3.1

3.1

3.1

GS5 3.1

3.1

3.1

3.1

3.1

3.1

3.1

3.1

3.1

3.1

3.1

Kimberley 66 kV (T1) BASE 2.5

2.5

2.5

2.5

2.5

2.5

2.5

2.5

2.5

2.5

2.5

GS1 2.5

2.5

2.5

2.5

2.5

2.5

2.5

2.5

2.5

2.5

2.5

GS2 2.5

2.5

2.5

2.5

2.5

2.5

2.5

2.5

2.5

2.5

2.5

GS3 2.5

2.5

2.5

2.5

2.5

2.5

2.5

2.5

2.5

2.5

2.5

GS4 2.5

2.5

2.5

2.5

2.5

2.5

2.5

2.5

2.5

2.5

2.5

GS5 2.5

2.5

2.5

2.5

2.5

2.5

2.5

2.5

2.5

2.5

2.5

Kimberley 66 kV (T2) BASE 2.5

2.5

2.5

2.5

2.5

2.5

2.5

2.5

2.5

2.5

2.5

GS1 2.5

2.5

2.5

2.5

2.5

2.5

2.5

2.5

2.5

2.5

2.5

GS2 2.5

2.5

2.5

2.5

2.5

2.5

2.5

2.5

2.5

2.5

2.5

GS3 2.5

2.5

2.5

2.5

2.5

2.5

2.5

2.5

2.5

2.5

2.5

GS4 2.5

2.5

2.5

2.5

2.5

2.5

2.5

2.5

2.5

2.5

2.5

GS5 2.5

2.5

2.5

2.5

2.5

2.5

2.5

2.5

2.5

2.5

2.5

Southbrook 33 kV BASE 0.5

0.5

0.5

0.5

0.5

0.5

0.5

0.5

0.5

0.5

0.5

GS1 0.5

0.5

0.5

0.5

0.5

0.5

0.5

0.5

0.5

0.5

0.5

GS2 0.5

0.5

0.5

0.5

0.5

0.5

0.5

0.5

0.5

0.5

0.5

GS3 0.5

0.5

0.5

0.5

0.5

0.5

0.5

0.5

0.5

0.5

0.5

GS4 0.5

0.5

0.5

0.5

0.5

0.5

0.5

0.5

0.5

0.5

0.5

GS5 0.5

0.5

0.5

0.5

0.5

0.5

0.5

0.5

0.5

0.5

0.5

© Transpower New Zealand Limited 2016.All rights reserved. 128

Page 129: 2015 ten year forecast fault level report - Transpower · PDF fileThis publication presents an update to the ten year forecast fault levels ... calculation. Minimum fault level calculations

Ten year forecast fault Levels

Southbrook 66 kV BASE 4.2

4.2

4.2

4.2

4.2

4.2

4.2

4.2

4.2

4.2

4.2

GS1 4.2

4.2

4.2

4.2

4.2

4.2

4.3

4.3

4.3

4.3

4.3

GS2 4.2

4.2

4.2

4.2

4.2

4.2

4.3

4.3

4.3

4.3

4.3

GS3 4.2

4.2

4.2

4.2

4.2

4.2

4.2

4.2

4.2

4.2

4.2

GS4 4.2

4.2

4.3

4.3

4.3

4.3

4.3

4.3

4.3

4.3

4.3

GS5 4.2

4.2

4.2

4.2

4.2

4.3

4.3

4.3

4.3

4.3

4.3

Waipara 33 kV BASE 1.9

1.9

1.9

1.9

1.9

1.9

1.9

1.9

1.9

1.9

1.9

GS1 1.9

1.9

1.9

1.9

1.9

1.9

1.9

1.9

1.9

1.9

1.9

GS2 1.9

1.9

1.9

1.9

1.9

1.9

1.9

1.9

1.9

1.9

1.9

GS3 1.9

1.9

1.9

1.9

1.9

1.9

1.9

1.9

1.9

1.9

1.9

GS4 1.9

1.9

1.9

1.9

1.9

1.9

1.9

1.9

1.9

1.9

1.9

GS5 1.9

1.9

1.9

1.9

1.9

1.9

1.9

1.9

1.9

1.9

1.9

Waipara 66 kV BASE 7.5

7.5

7.5

7.5

7.5

7.5

7.5

7.5

7.5

7.5

7.5

GS1 7.5

7.5

7.5

7.5

7.5

7.5

7.7

7.7

7.7

7.7

7.7

GS2 7.5

7.5

7.5

7.5

7.5

7.5

7.7

7.7

7.7

7.7

7.7

GS3 7.5

7.5

7.5

7.5

7.5

7.5

7.5

7.5

7.5

7.5

7.5

GS4 7.5

7.5

7.7

7.7

7.7

7.7

7.7

7.7

7.7

7.7

7.7

GS5 7.5

7.5

7.5

7.5

7.5

7.7

7.7

7.7

7.7

7.7

7.7

Waipara 220 kV (T12) BASE 3.4

3.4

3.4

3.4

3.4

3.4

3.4

3.4

3.4

3.4

3.4

GS1 3.4

3.4

3.4

3.4

3.4

3.4

3.5

3.5

3.5

3.5

3.5

GS2 3.4

3.4

3.4

3.4

3.4

3.4

3.5

3.5

3.5

3.5

3.5

GS3 3.4

3.4

3.4

3.4

3.4

3.4

3.4

3.4

3.4

3.4

3.4

GS4 3.4

3.4

3.5

3.5

3.5

3.5

3.5

3.5

3.5

3.5

3.5

GS5 3.4

3.4

3.4

3.4

3.4

3.5

3.5

3.5

3.5

3.5

3.5

Waipara 220 kV (T13) BASE 3.4

3.4

3.4

3.4

3.4

3.4

3.4

3.4

3.4

3.4

3.4

GS1 3.4

3.4

3.4

3.4

3.4

3.4

3.5

3.5

3.5

3.5

3.5

GS2 3.4

3.4

3.4

3.4

3.4

3.4

3.5

3.5

3.5

3.5

3.5

GS3 3.4

3.4

3.4

3.4

3.4

3.4

3.4

3.4

3.4

3.4

3.4

GS4 3.4

3.4

3.5

3.5

3.5

3.5

3.5

3.5

3.5

3.5

3.5

GS5 3.4

3.4

3.4

3.4

3.4

3.5

3.5

3.5

3.5

3.5

3.5

SOUTH CANTERBURY

Albury 11 kV BASE 5.2

5.2

5.2

5.2

5.2

5.2

5.2

5.2

5.2

5.2

5.2

GS1 5.2

5.2

5.2

5.2

5.2

5.2

5.2

5.2

5.2

5.2

5.2

GS2 5.2

5.2

5.2

5.2

5.2

5.2

5.2

5.2

5.2

5.2

5.2

GS3 5.2

5.2

5.2

5.2

5.2

5.2

5.2

5.2

5.2

5.2

5.2

© Transpower New Zealand Limited 2016.All rights reserved. 129

Page 130: 2015 ten year forecast fault level report - Transpower · PDF fileThis publication presents an update to the ten year forecast fault levels ... calculation. Minimum fault level calculations

Ten year forecast fault Levels

GS4 5.2

5.2

5.2

5.2

5.2

5.2

5.2

5.2

5.2

5.2

5.2

GS5 5.2

5.2

5.2

5.2

5.2

5.2

5.2

5.2

5.2

5.2

5.2

Albury 110 kV BASE 2.5

2.5

2.5

2.5

2.5

2.5

2.5

2.5

2.5

2.5

2.5

GS1 2.5

2.5

2.5

2.5

2.5

2.5

2.5

2.5

2.5

2.5

2.5

GS2 2.5

2.5

2.5

2.5

2.5

2.5

2.5

2.5

2.5

2.5

2.5

GS3 2.5

2.5

2.5

2.5

2.5

2.5

2.5

2.5

2.5

2.5

2.5

GS4 2.5

2.5

2.5

2.5

2.5

2.5

2.5

2.5

2.5

2.5

2.5

GS5 2.5

2.5

2.5

2.5

2.5

2.5

2.5

2.5

2.5

2.5

2.5

Aviemore 220 kV BASE 16.8

16.8

16.8

16.8

16.8

16.8

16.8

16.8

16.8

16.8

16.8

GS1 16.8

16.8

16.9

16.9

16.9

16.9

17.0

17.0

17.0

17.0

17.0

GS2 16.8

16.8

16.8

16.8

16.9

16.9

17.0

17.0

17.0

17.0

17.0

GS3 16.8

16.8

16.8

16.8

16.8

16.8

16.8

16.8

16.8

16.8

16.8

GS4 16.8

16.8

17.0

17.0

17.0

17.0

17.0

17.0

17.0

17.0

17.0

GS5 16.8

16.8

16.9

16.9

16.9

17.0

17.0

17.0

17.0

17.0

17.0

Bells Pond 110 kV BASE 2.6

2.6

2.6

2.6

2.6

2.6

2.6

2.6

2.6

2.6

2.6

GS1 2.6

2.6

2.6

2.6

2.6

2.6

2.6

2.6

2.6

2.6

2.6

GS2 2.6

2.6

2.6

2.6

2.6

2.6

2.6

2.6

2.6

2.6

2.6

GS3 2.6

2.6

2.6

2.6

2.6

2.6

2.6

2.6

2.6

2.6

2.6

GS4 2.6

2.6

2.6

2.6

2.6

2.6

2.6

2.6

2.6

2.6

2.6

GS5 2.6

2.6

2.6

2.6

2.6

2.6

2.6

2.6

2.6

2.6

2.6

Benmore 220 kV BASE 21.5

21.5

21.5

21.5

21.5

21.5

21.5

21.5

21.5

21.5

21.5

GS1 21.5

21.5

21.6

21.6

21.6

21.6

21.7

21.7

21.7

21.7

21.7

GS2 21.5

21.5

21.5

21.5

21.6

21.6

21.7

21.7

21.7

21.7

21.7

GS3 21.5

21.5

21.5

21.5

21.5

21.5

21.5

21.5

21.5

21.5

21.5

GS4 21.5

21.5

21.7

21.7

21.7

21.7

21.7

21.7

21.7

21.7

21.7

GS5 21.5

21.5

21.6

21.6

21.6

21.7

21.7

21.7

21.7

21.7

21.7

Black Point 110 kV BASE 2.2

2.2

2.2

2.2

2.2

2.2

2.2

2.2

2.2

2.2

2.2

GS1 2.2

2.2

2.2

2.2

2.2

2.2

2.2

2.2

2.2

2.2

2.2

GS2 2.2

2.2

2.2

2.2

2.2

2.2

2.2

2.2

2.2

2.2

2.2

GS3 2.2

2.2

2.2

2.2

2.2

2.2

2.2

2.2

2.2

2.2

2.2

GS4 2.2

2.2

2.2

2.2

2.2

2.2

2.2

2.2

2.2

2.2

2.2

GS5 2.2

2.2

2.2

2.2

2.2

2.2

2.2

2.2

2.2

2.2

2.2

Livingstone 220 kV BASE 6.1

6.4

6.4

6.4

6.4

6.4

6.4

6.4

6.4

6.4

6.4

GS1 6.1

6.4

6.4

6.4

6.4

6.4

6.4

6.4

6.4

6.4

6.4

GS2 6.1

6.4

6.4

6.4

6.4

6.4

6.4

6.4

6.4

6.4

6.4

GS3 6.1

6.4

6.4

6.4

6.4

6.4

6.4

6.4

6.4

6.4

6.4

GS4 6.1

6.4

6.4

6.4

6.4

6.4

6.4

6.4

6.4

6.4

6.5

© Transpower New Zealand Limited 2016.All rights reserved. 130

Page 131: 2015 ten year forecast fault level report - Transpower · PDF fileThis publication presents an update to the ten year forecast fault levels ... calculation. Minimum fault level calculations

Ten year forecast fault Levels

GS5 6.1

6.4

6.4

6.4

6.4

6.4

6.4

6.4

6.4

6.4

6.4

Oamaru 33 kV BASE 7.3

7.3

7.3

7.3

7.3

7.3

7.3

7.3

7.3

7.3

7.3

GS1 7.3

7.3

7.3

7.3

7.3

7.3

7.3

7.3

7.3

7.3

7.3

GS2 7.3

7.3

7.3

7.3

7.3

7.3

7.3

7.3

7.3

7.3

7.3

GS3 7.3

7.3

7.3

7.3

7.3

7.3

7.3

7.3

7.3

7.3

7.3

GS4 7.3

7.3

7.3

7.3

7.3

7.3

7.3

7.3

7.3

7.3

7.3

GS5 7.3

7.3

7.3

7.3

7.3

7.3

7.3

7.3

7.3

7.3

7.3

Oamaru 110 kV (T1) BASE 1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

GS1 1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

GS2 1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

GS3 1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

GS4 1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

GS5 1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

Oamaru 110 kV (T2) BASE 1.5

1.5

1.5

1.5

1.5

1.5

1.5

1.5

1.5

1.5

1.5

GS1 1.5

1.5

1.5

1.5

1.5

1.5

1.5

1.5

1.5

1.5

1.5

GS2 1.5

1.5

1.5

1.5

1.5

1.5

1.5

1.5

1.5

1.5

1.5

GS3 1.5

1.5

1.5

1.5

1.5

1.5

1.5

1.5

1.5

1.5

1.5

GS4 1.5

1.5

1.5

1.5

1.5

1.5

1.5

1.5

1.5

1.5

1.5

GS5 1.5

1.5

1.5

1.5

1.5

1.5

1.5

1.5

1.5

1.5

1.5

Ohau A 220 kV BASE 18.1

18.1

18.1

18.1

18.1

18.1

18.1

18.1

18.1

18.1

18.1

GS1 18.1

18.1

18.2

18.2

18.2

18.2

18.3

18.4

18.4

18.4

18.4

GS2 18.1

18.1

18.1

18.1

18.2

18.2

18.3

18.3

18.3

18.3

18.3

GS3 18.1

18.1

18.1

18.1

18.1

18.1

18.1

18.1

18.1

18.1

18.1

GS4 18.1

18.1

18.4

18.4

18.4

18.4

18.4

18.4

18.4

18.4

18.4

GS5 18.1

18.1

18.2

18.2

18.2

18.4

18.4

18.4

18.4

18.4

18.4

Ohau B 220 kV BASE 20.6

20.6

20.6

20.6

20.6

20.6

20.6

20.6

20.6

20.6

20.6

GS1 20.6

20.6

20.8

20.8

20.8

20.8

20.9

21.0

21.0

21.0

21.0

GS2 20.6

20.6

20.6

20.6

20.8

20.8

20.9

20.9

20.9

20.9

20.9

GS3 20.6

20.6

20.6

20.6

20.6

20.6

20.6

20.6

20.6

20.6

20.6

GS4 20.6

20.6

21.0

21.0

21.0

21.0

21.0

21.0

21.0

21.0

21.0

GS5 20.6

20.6

20.8

20.8

20.8

21.0

21.0

21.0

21.0

21.0

21.0

Ohau C 220 kV BASE 18.0

18.0

18.0

18.0

18.0

18.0

18.0

18.0

18.0

18.0

18.0

GS1 18.0

18.0

18.1

18.1

18.1

18.1

18.2

18.2

18.2

18.2

18.2

GS2 18.0

18.0

18.0

18.0

18.1

18.1

18.2

18.2

18.2

18.2

18.2

GS3 18.0

18.0

18.0

18.0

18.0

18.0

18.0

18.0

18.0

18.0

18.0

GS4 18.0

18.0

18.2

18.2

18.2

18.2

18.2

18.2

18.2

18.2

18.2

GS5 18.0

18.0

18.1

18.1

18.1

18.2

18.2

18.2

18.2

18.2

18.2

© Transpower New Zealand Limited 2016.All rights reserved. 131

Page 132: 2015 ten year forecast fault level report - Transpower · PDF fileThis publication presents an update to the ten year forecast fault levels ... calculation. Minimum fault level calculations

Ten year forecast fault Levels

Studholme 11 kV BASE 10.1

10.1

10.1

10.1

10.1

10.1

10.1

10.1

10.1

10.1

10.1

GS1 10.1

10.1

10.1

10.1

10.1

10.1

10.1

10.1

10.1

10.1

10.1

GS2 10.1

10.1

10.1

10.1

10.1

10.1

10.1

10.1

10.1

10.1

10.1

GS3 10.1

10.1

10.1

10.1

10.1

10.1

10.1

10.1

10.1

10.1

10.1

GS4 10.1

10.1

10.1

10.1

10.1

10.1

10.1

10.1

10.1

10.1

10.1

GS5 10.1

10.1

10.1

10.1

10.1

10.1

10.1

10.1

10.1

10.1

10.1

Studholme 110 kV BASE 2.5

2.5

2.5

2.5

2.5

2.5

2.5

2.5

2.5

2.5

2.5

GS1 2.5

2.5

2.5

2.5

2.5

2.5

2.5

2.5

2.5

2.5

2.5

GS2 2.5

2.5

2.5

2.5

2.5

2.5

2.5

2.5

2.5

2.5

2.5

GS3 2.5

2.5

2.5

2.5

2.5

2.5

2.5

2.5

2.5

2.5

2.5

GS4 2.5

2.5

2.5

2.5

2.5

2.5

2.5

2.5

2.5

2.5

2.5

GS5 2.5

2.5

2.5

2.5

2.5

2.5

2.5

2.5

2.5

2.5

2.5

Tekapo A 33 kV BASE 1.8

1.8

1.8

1.8

1.8

1.8

1.8

1.8

1.8

1.8

1.8

GS1 1.8

1.8

1.8

1.8

1.8

1.8

1.8

1.8

1.8

1.8

1.8

GS2 1.8

1.8

1.8

1.8

1.8

1.8

1.8

1.8

1.8

1.8

1.8

GS3 1.8

1.8

1.8

1.8

1.8

1.8

1.8

1.8

1.8

1.8

1.8

GS4 1.8

1.8

1.8

1.8

1.8

1.8

1.8

1.8

1.8

1.8

1.8

GS5 1.8

1.8

1.8

1.8

1.8

1.8

1.8

1.8

1.8

1.8

1.8

Tekapo A 110 kV BASE 2.2

2.2

2.2

2.2

2.2

2.2

2.2

2.2

2.2

2.2

2.2

GS1 2.2

2.2

2.2

2.2

2.2

2.2

2.2

2.2

2.2

2.2

2.2

GS2 2.2

2.2

2.2

2.2

2.2

2.2

2.2

2.2

2.2

2.2

2.2

GS3 2.2

2.2

2.2

2.2

2.2

2.2

2.2

2.2

2.2

2.2

2.2

GS4 2.2

2.2

2.2

2.2

2.2

2.2

2.2

2.2

2.2

2.2

2.2

GS5 2.2

2.2

2.2

2.2

2.2

2.2

2.2

2.2

2.2

2.2

2.2

Tekapo B 220 kV BASE 11.7

11.7

11.7

11.7

11.7

11.7

11.7

11.7

11.7

11.7

11.7

GS1 11.7

11.7

11.7

11.7

11.7

11.7

11.8

11.8

11.8

11.8

11.8

GS2 11.7

11.7

11.7

11.7

11.7

11.7

11.8

11.8

11.8

11.8

11.8

GS3 11.7

11.7

11.7

11.7

11.7

11.7

11.7

11.7

11.7

11.7

11.7

GS4 11.7

11.7

11.8

11.8

11.8

11.8

11.8

11.8

11.8

11.8

11.8

GS5 11.7

11.7

11.7

11.7

11.7

11.8

11.8

11.8

11.8

11.8

11.8

Temuka 33 kV BASE 0.8

0.8

0.8

0.8

0.8

0.8

0.8

0.8

0.8

0.8

0.8

GS1 0.8

0.8

0.8

0.8

0.8

0.8

0.8

0.8

0.8

0.8

0.8

GS2 0.8

0.8

0.8

0.8

0.8

0.8

0.8

0.8

0.8

0.8

0.8

GS3 0.8

0.8

0.8

0.8

0.8

0.8

0.8

0.8

0.8

0.8

0.8

GS4 0.8

0.8

0.8

0.8

0.8

0.8

0.8

0.8

0.8

0.8

0.8

GS5 0.8

0.8

0.8

0.8

0.8

0.8

0.8

0.8

0.8

0.8

0.8

© Transpower New Zealand Limited 2016.All rights reserved. 132

Page 133: 2015 ten year forecast fault level report - Transpower · PDF fileThis publication presents an update to the ten year forecast fault levels ... calculation. Minimum fault level calculations

Ten year forecast fault Levels

Temuka 110 kV (T1) BASE 3.0

3.0

3.0

3.0

3.0

3.0

3.0

3.0

3.0

3.0

3.0

GS1 3.0

3.0

3.0

3.0

3.0

3.0

3.0

3.0

3.0

3.0

3.0

GS2 3.0

3.0

3.0

3.0

3.0

3.0

3.0

3.0

3.0

3.0

3.0

GS3 3.0

3.0

3.0

3.0

3.0

3.0

3.0

3.0

3.0

3.0

3.0

GS4 3.0

3.0

3.0

3.0

3.0

3.0

3.0

3.0

3.0

3.0

3.0

GS5 3.0

3.0

3.0

3.0

3.0

3.0

3.0

3.0

3.0

3.0

3.0

Temuka 110 kV (T2) BASE 3.0

3.0

3.0

3.0

3.0

3.0

3.0

3.0

3.0

3.0

3.0

GS1 3.0

3.0

3.0

3.0

3.0

3.0

3.0

3.0

3.0

3.0

3.0

GS2 3.0

3.0

3.0

3.0

3.0

3.0

3.0

3.0

3.0

3.0

3.0

GS3 3.0

3.0

3.0

3.0

3.0

3.0

3.0

3.0

3.0

3.0

3.0

GS4 3.0

3.0

3.0

3.0

3.0

3.0

3.0

3.0

3.0

3.0

3.0

GS5 3.0

3.0

3.0

3.0

3.0

3.0

3.0

3.0

3.0

3.0

3.0

Timaru 11 kV BASE 1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

GS1 1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

GS2 1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

GS3 1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

GS4 1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

GS5 1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

Timaru 110 kV BASE 7.0

7.0

7.0

7.0

7.0

7.0

7.0

7.0

7.0

7.0

7.0

GS1 7.0

7.0

7.0

7.0

7.0

7.0

7.0

7.0

7.0

7.0

7.0

GS2 7.0

7.0

7.0

7.0

7.0

7.0

7.0

7.0

7.0

7.0

7.0

GS3 7.0

7.0

7.0

7.0

7.0

7.0

7.0

7.0

7.0

7.0

7.0

GS4 7.0

7.0

7.0

7.0

7.0

7.0

7.0

7.0

7.0

7.0

7.0

GS5 7.0

7.0

7.0

7.0

7.0

7.0

7.0

7.0

7.0

7.0

7.0

Timaru 220 kV (T5) BASE 4.0

4.0

4.0

4.0

4.0

4.0

4.0

4.0

4.0

4.0

4.0

GS1 4.0

4.0

4.0

4.0

4.0

4.0

4.0

4.0

4.0

4.0

4.0

GS2 4.0

4.0

4.0

4.0

4.0

4.0

4.0

4.0

4.0

4.0

4.0

GS3 4.0

4.0

4.0

4.0

4.0

4.0

4.0

4.0

4.0

4.0

4.0

GS4 4.0

4.0

4.0

4.0

4.0

4.0

4.0

4.0

4.0

4.0

4.0

GS5 4.0

4.0

4.0

4.0

4.0

4.0

4.0

4.0

4.0

4.0

4.0

Timaru 220 kV (T8) BASE 4.0

4.0

4.0

4.0

4.0

4.0

4.0

4.0

4.0

4.0

4.0

GS1 4.0

4.0

4.0

4.0

4.0

4.0

4.0

4.0

4.0

4.0

4.0

GS2 4.0

4.0

4.0

4.0

4.0

4.0

4.0

4.0

4.0

4.0

4.0

GS3 4.0

4.0

4.0

4.0

4.0

4.0

4.0

4.0

4.0

4.0

4.0

GS4 4.0

4.0

4.0

4.0

4.0

4.0

4.0

4.0

4.0

4.0

4.0

GS5 4.0

4.0

4.0

4.0

4.0

4.0

4.0

4.0

4.0

4.0

4.0

© Transpower New Zealand Limited 2016.All rights reserved. 133

Page 134: 2015 ten year forecast fault level report - Transpower · PDF fileThis publication presents an update to the ten year forecast fault levels ... calculation. Minimum fault level calculations

Ten year forecast fault Levels

Twizel 33 kV (T18) BASE 4.7

4.7

4.7

4.7

4.7

4.7

4.7

4.7

4.7

4.7

4.7

GS1 4.7

4.7

8.3

8.3

8.3

8.3

8.3

8.3

8.3

8.3

8.3

GS2 4.7

4.7

4.7

4.7

8.3

8.3

8.3

8.3

8.3

8.3

8.3

GS3 4.7

4.7

4.7

4.7

4.7

4.7

4.7

4.7

4.7

4.7

4.7

GS4 4.7

4.7

8.3

8.3

8.3

8.3

8.3

8.3

8.3

8.3

8.3

GS5 4.7

4.7

8.3

8.3

8.3

8.3

8.3

8.3

8.3

8.3

8.3

Twizel 33 kV (T19) BASE 4.7

4.7

4.7

4.7

4.7

4.7

4.7

4.7

4.7

4.7

4.7

GS1 4.7

4.7

4.7

4.7

4.7

4.7

4.7

4.7

4.7

4.7

4.7

GS2 4.7

4.7

4.7

4.7

4.7

4.7

4.7

4.7

4.7

4.7

4.7

GS3 4.7

4.7

4.7

4.7

4.7

4.7

4.7

4.7

4.7

4.7

4.7

GS4 4.7

4.7

4.7

4.7

4.7

4.7

4.7

4.7

4.7

4.7

4.7

GS5 4.7

4.7

4.7

4.7

4.7

4.7

4.7

4.7

4.7

4.7

4.7

Twizel 220 kV BASE 22.2

22.2

22.2

22.2

22.2

22.2

22.2

22.2

22.2

22.2

22.2

GS1 22.2

22.2

22.4

22.4

22.4

22.4

22.6

22.7

22.7

22.7

22.7

GS2 22.2

22.2

22.2

22.2

22.4

22.4

22.6

22.6

22.6

22.6

22.6

GS3 22.2

22.2

22.2

22.2

22.2

22.2

22.2

22.2

22.2

22.2

22.2

GS4 22.2

22.2

22.7

22.7

22.7

22.7

22.7

22.7

22.7

22.7

22.7

GS5 22.2

22.2

22.4

22.4

22.4

22.7

22.7

22.7

22.7

22.7

22.7

Waitaki 33 kV BASE 0.8

0.8

0.8

0.8

0.8

0.8

0.8

0.8

0.8

0.8

0.8

GS1 0.8

0.8

0.8

0.8

0.8

0.8

0.8

0.8

0.8

0.8

0.8

GS2 0.8

0.8

0.8

0.8

0.8

0.8

0.8

0.8

0.8

0.8

0.8

GS3 0.8

0.8

0.8

0.8

0.8

0.8

0.8

0.8

0.8

0.8

0.8

GS4 0.8

0.8

0.8

0.8

0.8

0.8

0.8

0.8

0.8

0.8

0.8

GS5 0.8

0.8

0.8

0.8

0.8

0.8

0.8

0.8

0.8

0.8

0.8

Waitaki 220 kV BASE 14.0

14.1

14.1

14.1

14.1

14.1

14.1

14.1

14.1

14.1

14.1

GS1 14.0

14.1

14.1

14.1

14.1

14.1

14.2

14.2

14.2

14.2

14.2

GS2 14.0

14.1

14.1

14.1

14.1

14.1

14.2

14.2

14.2

14.2

14.2

GS3 14.0

14.1

14.1

14.1

14.1

14.1

14.1

14.1

14.1

14.1

14.1

GS4 14.0

14.1

14.2

14.2

14.2

14.2

14.2

14.2

14.2

14.2

14.2

GS5 14.0

14.1

14.1

14.1

14.1

14.2

14.2

14.2

14.2

14.2

14.2

OTAGO-SOUTHLAND

Balclutha 33 kV BASE 1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

GS1 1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

GS2 1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

GS3 1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

© Transpower New Zealand Limited 2016.All rights reserved. 134

Page 135: 2015 ten year forecast fault level report - Transpower · PDF fileThis publication presents an update to the ten year forecast fault levels ... calculation. Minimum fault level calculations

Ten year forecast fault Levels

GS4 1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

GS5 1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

Balclutha 110 kV BASE 1.6

1.6

1.4

1.4

1.4

1.4

1.4

1.4

1.4

1.4

1.4

GS1 1.6

1.6

1.4

1.4

1.4

1.4

1.4

1.4

1.4

1.4

1.4

GS2 1.6

1.6

1.4

1.4

1.4

1.4

1.4

1.4

1.4

1.4

1.4

GS3 1.6

1.6

1.4

1.4

1.4

1.4

1.4

1.4

1.4

1.4

1.4

GS4 1.6

1.6

1.4

1.4

1.4

1.4

1.4

1.4

1.4

1.4

1.4

GS5 1.6

1.6

1.4

1.4

1.4

1.4

1.4

1.4

1.4

1.4

1.4

Berwick 110 kV BASE 2.7

2.7

2.7

2.7

2.7

2.7

2.7

2.7

2.7

2.7

2.7

GS1 2.7

2.7

2.7

2.7

2.7

2.7

2.7

2.7

2.7

2.7

2.7

GS2 2.7

2.7

2.7

2.7

2.7

2.7

2.7

2.7

2.7

2.7

2.7

GS3 2.7

2.7

2.7

2.7

2.7

2.7

2.7

2.7

2.7

2.7

2.7

GS4 2.7

2.7

2.7

2.7

2.7

2.7

2.7

2.7

2.7

2.7

2.7

GS5 2.7

2.7

2.7

2.7

2.7

2.7

2.7

2.7

2.7

2.7

2.7

Brydone 11 kV BASE 13.8

13.8

15.0

15.0

15.0

15.0

15.0

15.0

15.0

15.0

15.0

GS1 13.8

13.8

15.0

15.0

15.0

15.0

15.0

15.0

15.0

15.0

15.0

GS2 13.8

13.8

15.0

15.0

15.0

15.0

15.0

15.0

15.0

15.0

15.0

GS3 13.8

13.8

15.0

15.0

15.0

15.0

15.0

15.0

15.0

15.0

15.0

GS4 13.8

13.8

15.0

15.0

15.0

15.0

15.0

15.0

15.0

15.0

15.0

GS5 13.8

13.8

15.0

15.0

15.0

15.0

15.0

15.0

15.0

15.0

15.0

Brydone 110 kV BASE 2.5

2.5

3.9

3.9

3.9

3.9

3.9

3.9

3.9

3.9

3.9

GS1 2.5

2.5

3.9

3.9

3.9

3.9

3.9

3.9

3.9

3.9

3.9

GS2 2.5

2.5

3.9

3.9

3.9

3.9

3.9

3.9

3.9

3.9

3.9

GS3 2.5

2.5

3.9

3.9

3.9

3.9

3.9

3.9

3.9

3.9

3.9

GS4 2.5

2.5

3.9

3.9

3.9

3.9

3.9

3.9

3.9

3.9

3.9

GS5 2.5

2.5

3.9

3.9

3.9

3.9

3.9

3.9

3.9

3.9

3.9

Clyde 33 kV BASE 1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

GS1 1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

GS2 1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

GS3 1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

GS4 1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

GS5 1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

1.1

Clyde 220 kV BASE 16.7

16.7

16.7

16.7

16.7

16.7

16.7

16.7

16.7

16.7

16.7

GS1 16.7

16.7

16.7

16.7

16.7

16.8

16.8

16.8

16.8

16.8

16.8

GS2 16.7

16.7

16.7

16.7

16.7

16.8

16.8

16.8

16.8

16.8

16.8

GS3 16.7

16.7

16.7

16.7

16.7

16.7

16.7

16.7

16.7

16.7

16.7

GS4 16.7

16.7

16.8

16.8

16.8

16.8

16.8

16.8

16.8

16.8

16.8

© Transpower New Zealand Limited 2016.All rights reserved. 135

Page 136: 2015 ten year forecast fault level report - Transpower · PDF fileThis publication presents an update to the ten year forecast fault levels ... calculation. Minimum fault level calculations

Ten year forecast fault Levels

GS5 16.7

16.7

16.8

16.8

16.8

16.8

16.8

16.8

16.8

16.8

16.8

Cromwell 33 kV BASE 1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

GS1 1.0

1.0

1.0

1.0

1.0

6.9

6.9

6.9

6.9

6.9

6.9

GS2 1.0

1.0

1.0

1.0

1.0

6.9

6.9

6.9

6.9

6.9

6.9

GS3 1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

GS4 1.0

1.0

6.9

6.9

6.9

6.9

6.9

6.9

6.9

6.9

6.9

GS5 1.0

1.0

6.9

6.9

6.9

6.9

6.9

6.9

6.9

6.9

6.9

Cromwell 110 kV (T5A/B) BASE

5.1 5.1

5.1

5.1

5.1

5.1

5.1

5.1

5.1

5.1

5.1

GS1 5.1

5.1

5.1

5.1

5.1

5.3

5.3

5.3

5.3

5.3

5.3

GS2 5.1

5.1

5.1

5.1

5.1

5.3

5.3

5.3

5.3

5.3

5.3

GS3 5.1

5.1

5.1

5.1

5.1

5.1

5.1

5.1

5.1

5.1

5.1

GS4 5.1

5.1

5.3

5.3

5.3

5.3

5.3

5.3

5.3

5.3

5.3

GS5 5.1

5.1

5.3

5.3

5.3

5.3

5.3

5.3

5.3

5.3

5.3

Cromwell 110 kV (T8) BASE 5.5

5.5

5.5

5.5

5.5

5.5

5.5

5.5

5.5

5.5

5.5

GS1 5.5

5.5

5.5

5.5

5.5

5.7

5.7

5.7

5.7

5.7

5.7

GS2 5.5

5.5

5.5

5.5

5.5

5.7

5.7

5.7

5.7

5.7

5.7

GS3 5.5

5.5

5.5

5.5

5.5

5.5

5.5

5.5

5.5

5.5

5.5

GS4 5.5

5.5

5.7

5.7

5.7

5.7

5.7

5.7

5.7

5.7

5.7

GS5 5.5

5.5

5.7

5.7

5.7

5.7

5.7

5.7

5.7

5.7

5.7

Cromwell 220 kV (T5A/B) BASE

8.4 8.4

8.4

8.4

8.4

8.4

8.4

8.4

8.4

8.4

8.4

GS1 8.4

8.4

8.4

8.4

8.4

8.5

8.5

8.5

8.5

8.5

8.5

GS2 8.4

8.4

8.4

8.4

8.4

8.5

8.5

8.5

8.5

8.5

8.5

GS3 8.4

8.4

8.4

8.4

8.4

8.4

8.4

8.4

8.4

8.4

8.4

GS4 8.4

8.4

8.5

8.5

8.5

8.5

8.5

8.5

8.5

8.5

8.5

GS5 8.4

8.4

8.5

8.5

8.5

8.5

8.5

8.5

8.5

8.5

8.5

Cromwell 220 kV (T8) BASE 8.4

8.4

8.4

8.4

8.4

8.4

8.4

8.4

8.4

8.4

8.4

GS1 8.4

8.4

8.4

8.4

8.4

8.5

8.5

8.5

8.5

8.5

8.5

GS2 8.4

8.4

8.4

8.4

8.4

8.5

8.5

8.5

8.5

8.5

8.5

GS3 8.4

8.4

8.4

8.4

8.4

8.4

8.4

8.4

8.4

8.4

8.4

GS4 8.4

8.4

8.5

8.5

8.5

8.5

8.5

8.5

8.5

8.5

8.5

GS5 8.4

8.4

8.5

8.5

8.5

8.5

8.5

8.5

8.5

8.5

8.5

Edendale 33 kV BASE 7.0

7.1

7.6

7.6

7.6

7.6

7.6

7.6

7.6

7.6

7.6

GS1 7.0

7.1

7.6

7.6

7.6

7.6

7.6

7.6

7.6

7.6

7.6

GS2 7.0

7.1

7.6

7.6

7.6

7.6

7.6

7.6

7.6

7.6

7.6

GS3 7.0

7.1

7.6

7.6

7.6

7.6

7.6

7.6

7.6

7.6

7.6

GS4 7.0

7.1

7.6

7.6

7.6

7.6

7.6

7.6

7.6

7.6

7.6

GS5 7.0

7.1

7.6

7.6

7.6

7.6

7.6

7.6

7.6

7.6

7.6

© Transpower New Zealand Limited 2016.All rights reserved. 136

Page 137: 2015 ten year forecast fault level report - Transpower · PDF fileThis publication presents an update to the ten year forecast fault levels ... calculation. Minimum fault level calculations

Ten year forecast fault Levels

Edendale 110 kV BASE 2.7

2.7

3.5

3.5

3.5

3.5

3.5

3.5

3.5

3.5

3.5

GS1 2.7

2.7

3.5

3.5

3.5

3.5

3.5

3.5

3.5

3.5

3.5

GS2 2.7

2.7

3.5

3.5

3.5

3.5

3.5

3.5

3.5

3.5

3.5

GS3 2.7

2.7

3.5

3.5

3.5

3.5

3.5

3.5

3.5

3.5

3.5

GS4 2.7

2.7

3.5

3.5

3.5

3.5

3.5

3.5

3.5

3.5

3.5

GS5 2.7

2.7

3.5

3.5

3.5

3.5

3.5

3.5

3.5

3.5

3.5

Frankton 33 kV BASE 1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

GS1 1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

GS2 1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

GS3 1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

GS4 1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

GS5 1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

1.2

Frankton 110 kV (T2) BASE 1.8

1.8

1.8

1.8

1.8

1.8

1.8

1.8

1.8

1.8

1.8

GS1 1.8

1.8

1.8

1.8

1.8

1.8

1.8

1.8

1.8

1.8

1.8

GS2 1.8

1.8

1.8

1.8

1.8

1.8

1.8

1.8

1.8

1.8

1.8

GS3 1.8

1.8

1.8

1.8

1.8

1.8

1.8

1.8

1.8

1.8

1.8

GS4 1.8

1.8

1.8

1.8

1.8

1.8

1.8

1.8

1.8

1.8

1.8

GS5 1.8

1.8

1.8

1.8

1.8

1.8

1.8

1.8

1.8

1.8

1.8

Frankton 110 kV (T4) BASE 1.8

1.8

1.8

1.8

1.8

1.8

1.8

1.8

1.8

1.8

1.8

GS1 1.8

1.8

1.8

1.8

1.8

1.8

1.8

1.8

1.8

1.8

1.8

GS2 1.8

1.8

1.8

1.8

1.8

1.8

1.8

1.8

1.8

1.8

1.8

GS3 1.8

1.8

1.8

1.8

1.8

1.8

1.8

1.8

1.8

1.8

1.8

GS4 1.8

1.8

1.8

1.8

1.8

1.8

1.8

1.8

1.8

1.8

1.8

GS5 1.8

1.8

1.8

1.8

1.8

1.8

1.8

1.8

1.8

1.8

1.8

Gore 33 kV BASE 7.2

7.2

8.9

8.9

8.9

8.9

8.9

8.9

8.9

8.9

8.9

GS1 7.2

7.2

8.9

8.9

8.9

8.9

8.9

8.9

8.9

8.9

8.9

GS2 7.2

7.2

8.9

8.9

8.9

8.9

8.9

8.9

8.9

8.9

8.9

GS3 7.2

7.2

8.9

8.9

8.9

8.9

8.9

8.9

8.9

8.9

8.9

GS4 7.2

7.2

8.9

8.9

8.9

8.9

8.9

8.9

8.9

8.9

8.9

GS5 7.2

7.2

8.9

8.9

8.9

8.9

8.9

8.9

8.9

8.9

8.9

Gore 110 kV (T2/T3) BASE

2.6 2.6

6.5

6.5

6.5

6.5

6.5

6.5

6.5

6.5

6.5

GS1 2.6

2.6

6.5

6.5

6.5

6.5

6.5

6.5

6.5

6.5

6.5

GS2 2.6

2.6

6.5

6.5

6.5

6.5

6.5

6.5

6.5

6.5

6.5

GS3 2.6

2.6

6.5

6.5

6.5

6.5

6.5

6.5

6.5

6.5

6.5

GS4 2.6

2.6

6.5

6.5

6.5

6.5

6.5

6.5

6.5

6.5

6.5

GS5 2.6

2.6

6.5

6.5

6.5

6.5

6.5

6.5

6.5

6.5

6.5

© Transpower New Zealand Limited 2016.All rights reserved. 137

Page 138: 2015 ten year forecast fault level report - Transpower · PDF fileThis publication presents an update to the ten year forecast fault levels ... calculation. Minimum fault level calculations

Ten year forecast fault Levels

Gore 110 kV BASE - - 1.5

1.5

1.5

1.5

1.5

1.5

1.5

1.5

1.5

GS1 - - 1.5

1.5

1.5

1.5

1.5

1.5

1.5

1.5

1.5

GS2 - - 1.5

1.5

1.5

1.5

1.5

1.5

1.5

1.5

1.5

GS3 - - 1.5

1.5

1.5

1.5

1.5

1.5

1.5

1.5

1.5

GS4 - - 1.5

1.5

1.5

1.5

1.5

1.5

1.5

1.5

1.5

GS5 - - 1.5

1.5

1.5

1.5

1.5

1.5

1.5

1.5

1.5

Gore 220 kV (T11) BASE - - 4.6

4.6

4.6

4.6

4.6

4.6

4.6

4.6

4.6

GS1 - - 4.6

4.6

4.6

4.6

4.6

4.6

4.6

4.6

4.6

GS2 - - 4.6

4.6

4.6

4.6

4.6

4.6

4.6

4.6

4.6

GS3 - - 4.6

4.6

4.6

4.6

4.6

4.6

4.6

4.6

4.6

GS4 - - 4.6

4.6

4.6

4.6

4.6

4.6

4.6

4.6

4.6

GS5 - - 4.6

4.6

4.6

4.6

4.6

4.6

4.6

4.6

4.6

Gore 220 kV (T12) BASE - - 4.6

4.6

4.6

4.6

4.6

4.6

4.6

4.6

4.6

GS1 - - 4.6

4.6

4.6

4.6

4.6

4.6

4.6

4.6

4.6

GS2 - - 4.6

4.6

4.6

4.6

4.6

4.6

4.6

4.6

4.6

GS3 - - 4.6

4.6

4.6

4.6

4.6

4.6

4.6

4.6

4.6

GS4 - - 4.6

4.6

4.6

4.6

4.6

4.6

4.6

4.6

4.6

GS5 - - 4.6

4.6

4.6

4.6

4.6

4.6

4.6

4.6

4.6

Halfway Bush 33 kV (T1/T2) BASE 17.9

17.9

2.6

2.6

2.6

2.6

2.6

2.6

2.6

2.6

2.6

GS1 17.9

17.9

2.6

2.6

2.6

2.6

2.6

2.6

2.6

2.6

2.6

GS2 17.9

17.9

2.6

2.6

2.6

2.6

2.6

2.6

2.6

2.6

2.6

GS3 17.9

17.9

2.6

2.6

2.6

2.6

2.6

2.6

2.6

2.6

2.6

GS4 17.9

17.9

2.6

2.6

2.6

2.6

2.6

2.6

2.6

2.6

2.6

GS5 17.9

17.9

2.6

2.6

2.6

2.6

2.6

2.6

2.6

2.6

2.6

Halfway Bush 33 kV (T5) BASE 14.4

14.4

2.6

2.6

2.6

2.6

2.6

2.6

2.6

2.6

2.6

GS1 14.4

14.4

2.6

2.6

2.6

2.6

2.6

2.6

2.6

2.6

2.6

GS2 14.4

14.4

2.6

2.6

2.6

2.6

2.6

2.6

2.6

2.6

2.6

GS3 14.4

14.4

2.6

2.6

2.6

2.6

2.6

2.6

2.6

2.6

2.6

GS4 14.4

14.4

2.6

2.6

2.6

2.6

2.6

2.6

2.6

2.6

2.6

GS5 14.4

14.4

2.6

2.6

2.6

2.6

2.6

2.6

2.6

2.6

2.6

Halfway Bush 110 kV BASE 7.8

7.8

8.4

8.4

8.4

8.4

8.4

8.4

8.4

8.4

8.4

GS1 7.8

7.8

8.4

8.4

8.4

8.4

8.4

8.4

8.4

8.4

8.4

GS2 7.8

7.8

8.4

8.4

8.4

8.4

8.4

8.4

8.4

8.4

8.4

GS3 7.8

7.8

8.4

8.4

8.4

8.4

8.4

8.4

8.4

8.4

8.4

GS4 7.8

7.8

8.4

8.4

8.4

8.4

8.4

8.4

8.4

8.4

8.4

GS5 7.8

7.8

8.4

8.4

8.4

8.4

8.4

8.4

8.4

8.4

8.4

© Transpower New Zealand Limited 2016.All rights reserved. 138

Page 139: 2015 ten year forecast fault level report - Transpower · PDF fileThis publication presents an update to the ten year forecast fault levels ... calculation. Minimum fault level calculations

Ten year forecast fault Levels

Halfway Bush 220 kV BASE 5.9

5.9

7.4

7.4

7.4

7.4

7.4

7.4

7.4

7.4

7.4

GS1 5.9

5.9

7.4

7.4

7.4

7.4

7.4

7.4

7.4

7.4

7.4

GS2 5.9

5.9

7.4

7.4

7.4

7.4

7.4

7.4

7.4

7.4

7.4

GS3 5.9

5.9

7.4

7.4

7.4

7.4

7.4

7.4

7.4

7.4

7.4

GS4 5.9

5.9

7.4

7.4

7.4

7.4

7.4

7.4

7.4

7.4

7.4

GS5 5.9

5.9

7.4

7.4

7.4

7.4

7.4

7.4

7.4

7.4

7.4

Invercargill 33 kV BASE 1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

GS1 1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

GS2 1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

GS3 1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

GS4 1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

GS5 1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

Invercargill 110 kV BASE 5.1

5.1

5.3

5.3

5.3

5.3

5.3

5.3

5.3

5.3

5.3

GS1 5.1

5.1

5.3

5.3

5.3

5.3

5.3

5.3

5.3

5.3

5.3

GS2 5.1

5.1

5.3

5.3

5.3

5.3

5.3

5.3

5.3

5.3

5.3

GS3 5.1

5.1

5.3

5.3

5.3

5.3

5.3

5.3

5.3

5.3

5.3

GS4 5.1

5.1

5.3

5.3

5.3

5.3

5.3

5.3

5.3

5.3

5.3

GS5 5.1

5.1

5.3

5.3

5.3

5.3

5.3

5.3

5.3

5.3

5.3

Invercargill 220 kV BASE 9.9

9.9

9.7

9.7

9.7

9.7

9.7

9.7

9.7

9.7

9.7

GS1 9.9

9.9

9.8

9.8

9.8

9.8

9.8

9.8

9.8

9.8

9.8

GS2 9.9

9.9

9.7

9.7

9.8

9.8

9.8

9.8

9.8

9.8

9.8

GS3 9.9

9.9

9.7

9.7

9.7

9.7

9.7

9.7

9.7

9.7

9.7

GS4 9.9

9.9

9.8

9.8

9.8

9.8

9.8

9.8

9.8

9.8

9.8

GS5 9.9

9.9

9.8

9.8

9.8

9.8

9.8

9.8

9.8

9.8

9.8

Manapouri 220 kV BASE 14.1

14.1

14.0

14.0

14.0

14.0

14.0

14.0

14.0

14.0

14.0

GS1 14.1

14.1

14.0

14.0

14.0

14.0

14.0

14.0

14.0

14.0

14.0

GS2 14.1

14.1

14.0

14.0

14.0

14.0

14.0

14.0

14.0

14.0

14.0

GS3 14.1

14.1

14.0

14.0

14.0

14.0

14.0

14.0

14.0

14.0

14.0

GS4 14.1

14.1

14.0

14.0

14.0

14.0

14.0

14.0

14.0

14.0

14.0

GS5 14.1

14.1

14.0

14.0

14.0

14.0

14.0

14.0

14.0

14.0

14.0

North Makarewa 33 kV BASE 1.3

1.3

1.3

1.3

1.3

1.3

1.3

1.3

1.3

1.3

1.3

GS1 1.3

1.3

1.3

1.3

1.3

1.3

1.3

1.3

1.3

1.3

1.3

GS2 1.3

1.3

1.3

1.3

1.3

1.3

1.3

1.3

1.3

1.3

1.3

GS3 1.3

1.3

1.3

1.3

1.3

1.3

1.3

1.3

1.3

1.3

1.3

GS4 1.3

1.3

1.3

1.3

1.3

1.3

1.3

1.3

1.3

1.3

1.3

GS5 1.3

1.3

1.3

1.3

1.3

1.3

1.3

1.3

1.3

1.3

1.3

© Transpower New Zealand Limited 2016.All rights reserved. 139

Page 140: 2015 ten year forecast fault level report - Transpower · PDF fileThis publication presents an update to the ten year forecast fault levels ... calculation. Minimum fault level calculations

Ten year forecast fault Levels

North Makarewa 220 kV BASE 9.6

9.6

9.5

9.5

9.5

9.5

9.5

9.5

9.5

9.5

9.5

GS1 9.6

9.6

9.5

9.5

9.5

9.6

9.6

9.6

9.6

9.6

9.6

GS2 9.6

9.6

9.5

9.5

9.5

9.6

9.6

9.6

9.6

9.6

9.6

GS3 9.6

9.6

9.5

9.5

9.5

9.5

9.5

9.5

9.5

9.5

9.5

GS4 9.6

9.6

9.6

9.6

9.6

9.6

9.6

9.6

9.6

9.6

9.6

GS5 9.6

9.6

9.6

9.6

9.6

9.6

9.6

9.6

9.6

9.6

9.6

Naseby 33 kV BASE 8.1

8.1

8.1

8.1

8.1

8.1

8.1

8.1

8.1

8.1

8.1

GS1 8.1

8.1

8.1

8.1

8.1

8.1

8.1

8.1

8.1

8.1

8.1

GS2 8.1

8.1

8.1

8.1

8.1

8.1

8.1

8.1

8.1

8.1

8.1

GS3 8.1

8.1

8.1

8.1

8.1

8.1

8.1

8.1

8.1

8.1

8.1

GS4 8.1

8.1

8.1

8.1

8.1

8.1

8.1

8.1

8.1

8.1

8.1

GS5 8.1

8.1

8.1

8.1

8.1

8.1

8.1

8.1

8.1

8.1

8.1

Naseby 220 kV BASE 4.1

4.2

4.2

4.2

4.2

4.2

4.2

4.2

4.2

4.2

4.2

GS1 4.1

4.2

4.2

4.2

4.2

4.2

4.2

4.2

4.2

4.2

4.2

GS2 4.1

4.2

4.2

4.2

4.2

4.2

4.2

4.2

4.2

4.2

4.2

GS3 4.1

4.2

4.2

4.2

4.2

4.2

4.2

4.2

4.2

4.2

4.2

GS4 4.1

4.2

4.2

4.2

4.2

4.2

4.2

4.2

4.2

4.2

4.2

GS5 4.1

4.2

4.2

4.2

4.2

4.2

4.2

4.2

4.2

4.2

4.2

Roxburgh 110 kV BASE 11.6

11.6

11.3

11.3

11.3

11.3

11.3

11.3

11.3

11.3

11.3

GS1 11.6

11.6

11.3

11.3

11.3

11.3

11.3

11.3

11.3

11.3

11.3

GS2 11.6

11.6

11.3

11.3

11.3

11.3

11.3

11.3

11.3

11.3

11.3

GS3 11.6

11.6

11.3

11.3

11.3

11.3

11.3

11.3

11.3

11.3

11.3

GS4 11.6

11.6

11.3

11.3

11.3

11.3

11.3

11.3

11.3

11.3

11.3

GS5 11.6

11.6

11.3

11.3

11.3

11.3

11.3

11.3

11.3

11.3

11.3

Roxburgh 220 kV BASE 15.0

15.0

15.1

15.1

15.1

15.1

15.1

15.1

15.1

15.1

15.1

GS1 15.0

15.0

15.1

15.1

15.1

15.2

15.2

15.2

15.2

15.2

15.2

GS2 15.0

15.0

15.1

15.1

15.1

15.2

15.2

15.2

15.2

15.2

15.2

GS3 15.0

15.0

15.1

15.1

15.1

15.1

15.1

15.1

15.1

15.1

15.1

GS4 15.0

15.0

15.2

15.2

15.2

15.2

15.2

15.2

15.2

15.2

15.2

GS5 15.0

15.0

15.2

15.2

15.2

15.2

15.2

15.2

15.2

15.2

15.2

South Dunedin 33 kV BASE 3.1

3.1

3.1

3.1

3.1

3.1

3.1

3.1

3.1

3.1

3.1

GS1 3.1

3.1

3.1

3.1

3.1

3.1

3.1

3.1

3.1

3.1

3.1

GS2 3.1

3.1

3.1

3.1

3.1

3.1

3.1

3.1

3.1

3.1

3.1

GS3 3.1

3.1

3.1

3.1

3.1

3.1

3.1

3.1

3.1

3.1

3.1

GS4 3.1

3.1

3.1

3.1

3.1

3.1

3.1

3.1

3.1

3.1

3.1

GS5 3.1

3.1

3.1

3.1

3.1

3.1

3.1

3.1

3.1

3.1

3.1

© Transpower New Zealand Limited 2016.All rights reserved. 140

Page 141: 2015 ten year forecast fault level report - Transpower · PDF fileThis publication presents an update to the ten year forecast fault levels ... calculation. Minimum fault level calculations

Ten year forecast fault Levels

South Dunedin 220 kV BASE 5.7

5.7

6.6

6.6

6.6

6.6

6.6

6.6

6.6

6.6

6.6

GS1 5.7

5.7

6.6

6.6

6.6

6.7

6.7

6.7

6.7

6.7

6.7

GS2 5.7

5.7

6.6

6.6

6.6

6.7

6.7

6.7

6.7

6.7

6.7

GS3 5.7

5.7

6.6

6.6

6.6

6.6

6.6

6.6

6.6

6.6

6.6

GS4 5.7

5.7

6.7

6.7

6.7

6.7

6.7

6.7

6.7

6.7

6.7

GS5 5.7

5.7

6.7

6.7

6.7

6.7

6.7

6.7

6.7

6.7

6.7

Three Mile Hill 220 kV BASE 6.2

6.2

7.6

7.6

7.6

7.6

7.6

7.6

7.6

7.6

7.6

GS1 6.2

6.2

7.6

7.6

7.6

7.6

7.6

7.6

7.6

7.6

7.6

GS2 6.2

6.2

7.6

7.6

7.6

7.6

7.6

7.6

7.6

7.6

7.6

GS3 6.2

6.2

7.6

7.6

7.6

7.6

7.6

7.6

7.6

7.6

7.6

GS4 6.2

6.2

7.6

7.6

7.6

7.6

7.6

7.6

7.6

7.6

7.6

GS5 6.2

6.2

7.6

7.6

7.6

7.6

7.6

7.6

7.6

7.6

7.6

Tiwai 220 kV BASE 7.4

7.4

7.3

7.3

7.3

7.3

7.3

7.3

7.3

7.3

7.3

GS1 7.4

7.4

7.3

7.3

7.3

7.3

7.3

7.3

7.3

7.3

7.3

GS2 7.4

7.4

7.3

7.3

7.3

7.3

7.3

7.3

7.3

7.3

7.3

GS3 7.4

7.4

7.3

7.3

7.3

7.3

7.3

7.3

7.3

7.3

7.3

GS4 7.4

7.4

7.3

7.3

7.3

7.3

7.3

7.3

7.3

7.3

7.3

GS5 7.4

7.4

7.3

7.3

7.3

7.3

7.3

7.3

7.3

7.3

7.3

© Transpower New Zealand Limited 2016.All rights reserved. 141