Vision for Power Sector:
To provide quality & reliable electricity
to all by 2021at an affordable priceVision for Power Sector:
To provide quality & reliable electricity
to all by 2021at an affordable price
Vision 2021-
To be a Middle-Income CountryVision 2021-
To be a Middle-Income Country
VISION-2021
2
Renewable Energy DevelopmentRenewable Energy Development
10% (2000 MW) of total energy generation from RE by 2020
3
10% (4000 MW) of total 10% (4000 MW) of total energy generation from RE energy generation from RE
by 2030by 2030
10% (4000 MW) of total 10% (4000 MW) of total energy generation from RE energy generation from RE
by 2030by 2030
Policy Policy TargetsTargetsPolicy Policy
TargetsTargets
4
RULE OF RE IN THE ENERGY SYSTEMRULE OF RE IN THE ENERGY SYSTEMRULE OF RE IN THE ENERGY SYSTEMRULE OF RE IN THE ENERGY SYSTEM
Off-grid electrification Off-grid electrification Fuel diversification for grid power Fuel diversification for grid power generationgeneration Energy SecurityEnergy Security Environment friendlyEnvironment friendly Green energy: Climate Change Green energy: Climate Change Mitigation Mitigation Green job creationGreen job creation
5
Potential Sources of Renewable Potential Sources of Renewable EnergyEnergy
Solar Energy
6
Solar Photovoltaic System
Solar Radiation
PV Module
Electrical Energy
Component of Solar System
SunPV ModuleSolar Charge ControllerBattery InverterLoad
Light Fan TV Radio Refrigerator Computer
Battery/Inverter
Stand Alone Solar System
PV Module
Sun
BatteryLoad
Stand-alone PV Power System (off-grid)
Grid connected PV systemSUN TRACKING
+ -
DC
ACSMALL LOAD Load
+ + + + +- - - - -
AC
Initializing…Connected
LoadLoad
+ +
- -
GRID FAILURE
INCREASED LOAD
+ +
- -
DC
GRID ConnectedINVERTER
+ -
Rooftop PV ArrayExtended PV Array
GRID
+ + - -
Disconnected
Emergency Load
+ + + + + - - - - -
INVERTER
LOAD IS TAKING POWER FROM SOLAR PANEL
+ +- -
THE BASIC SYSTEM BLOCKLOAD IS TAKING POWER FROM THE GRIDINCREASED LOAD IS TAKING POWER FROM PV AND GRID
LOAD SHEDDING MODEL
12
Wind Energy
13
Wind Turbine
Wind Power Projects
Tender Processing
Project Under Planning
Tender Processing
Project Under Planning
Project Implemented
0.9 MW Grid Connected Wind Power Plant
Feni
1 MW Wind Battery Hybrid Power Plant
Kutubdia Island
60 MW Wind Power Plant
Cox’s Bazar
15 MW Wind Power Plant
Wind Resource Mapping
Project Under Implementation
Tender Processing
Project Under Planning
Project Under Implementation
Tender Processing
Project Under Planning
Project ImplementedFeni
Wind Resource Assessment
Rajshahi
Rangpur
Mymensingh
Mongla
Mirzapur
Sitakunda
Rajapalong
Parky Beach
Mognamaghat
Inani Beach
Chadpur
16
82 m Tower at Parkey Beach
17
Contribution of Renewable EnergyContribution of Renewable EnergyType TotalTotal
Solar Home System 160 MW160 MW
Solar PV (Office Buildings) 12 MW12 MW
Solar Irrigation 2 MW2 MW
Solar Mini-Grid/Micro-grid 1 MW1 MW
Wind 2 MW2 MW
Biomass/Biogas 6 MW6 MW
Hydro 230 MW230 MW
Total 415 MW415 MW• 80,000 bio gas system are in place for cooking• 5 million ICS sold to customers
• 80,000 bio gas system are in place for cooking• 5 million ICS sold to customers
Private Sector Projects:Solar Sarishabari: 3 MW; Kaptai: 7.4 MW Thakurgaon: 5 MW Rangunia: 60 MW Gangachora: 55 MW Dharla: 30 MW Sonagazi: 100 MW Cox’s Bazar: 200 MW Mymensingh: 50 MW Sunamgonj: 32 MW Panchagarh: 200 MW
Private Sector Projects:Solar Sarishabari: 3 MW; Kaptai: 7.4 MW Thakurgaon: 5 MW Rangunia: 60 MW Gangachora: 55 MW Dharla: 30 MW Sonagazi: 100 MW Cox’s Bazar: 200 MW Mymensingh: 50 MW Sunamgonj: 32 MW Panchagarh: 200 MW
18
Ongoing Large Scale ProjectsOngoing Large Scale ProjectsOngoing Large Scale ProjectsOngoing Large Scale Projects
18
Wind Cox’s Bazar: 60MW Rajpalong: 15MW Patuakhali : 100MW
Wind Cox’s Bazar: 60MW Rajpalong: 15MW Patuakhali : 100MW
19
Ongoing Large Scale ProjectsOngoing Large Scale ProjectsOngoing Large Scale ProjectsOngoing Large Scale Projects
19
BPDBAPSC
LEGCB
NWPGCL
RPCLCPGC
LTotal
Solar (MW) 100 100 100 55 50 50 455
Wind (MW) 100 100 100 100 100 100 600
Total 200 200 200 155 150 150 1055
Public Sector Projects:
Renewable Energy Development Plan-2021
Year wise generation plan to reach the targets
Year 2015 2016 2017 2018 2019 2020 2021 Total
(MW) 77 375 680 594 552 410 415 3103
20
21
Renewable Energy Target (MW)
Technology 2015 2016 2017 2018 2019 2020 2021 Total
Solar 75 336 421.75 267 229 203 208 1739.75
Wind 0 20 250 350 350 200 200 1370
Biomass 1 16 6 6 6 6 6 47
Biogas (Biogas to electricity)
1 1 1 1 1 1 1 7
Hydro (mini/micro)
2 2 - - - - 4
Total 77 375 680.75 624 585 410 415 3167.7
22
High upfront cost for RE project Scarcity of land for grid connected RE projects Moderate potentials Inadequate incentives for RE development
Low tariff mechanism Low tariff mechanism Lack of awareness among the peopleLack of awareness among the people Lack of R & DLack of R & D Lack of Confidence of the investorLack of Confidence of the investor Lack of expertise Lack of expertise
High upfront cost for RE project Scarcity of land for grid connected RE projects Moderate potentials Inadequate incentives for RE development
Low tariff mechanism Low tariff mechanism Lack of awareness among the peopleLack of awareness among the people Lack of R & DLack of R & D Lack of Confidence of the investorLack of Confidence of the investor Lack of expertise Lack of expertise
CHALLENGES IN PROMOTION RECHALLENGES IN PROMOTION RE