2015 november 2015 md. abdur rouf director, power cell use of renewable energy

23
November 2015 2015 Md. Abdur Rouf Md. Abdur Rouf Director, Power Cell Director, Power Cell Use of Renewable Energy Use of Renewable Energy

Upload: antonia-abigail-banks

Post on 29-Jan-2016

222 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: 2015 November 2015 Md. Abdur Rouf Director, Power Cell Use of Renewable Energy

November 2015 2015

Md. Abdur RoufMd. Abdur RoufDirector, Power CellDirector, Power Cell

Use of Renewable EnergyUse of Renewable EnergyUse of Renewable EnergyUse of Renewable Energy

Page 2: 2015 November 2015 Md. Abdur Rouf Director, Power Cell Use of Renewable Energy

Vision for Power Sector:

To provide quality & reliable electricity

to all by 2021at an affordable priceVision for Power Sector:

To provide quality & reliable electricity

to all by 2021at an affordable price

Vision 2021-

To be a Middle-Income CountryVision 2021-

To be a Middle-Income Country

VISION-2021

2

Page 3: 2015 November 2015 Md. Abdur Rouf Director, Power Cell Use of Renewable Energy

Renewable Energy DevelopmentRenewable Energy Development

10% (2000 MW) of total energy generation from RE by 2020

3

10% (4000 MW) of total 10% (4000 MW) of total energy generation from RE energy generation from RE

by 2030by 2030

10% (4000 MW) of total 10% (4000 MW) of total energy generation from RE energy generation from RE

by 2030by 2030

Policy Policy TargetsTargetsPolicy Policy

TargetsTargets

Page 4: 2015 November 2015 Md. Abdur Rouf Director, Power Cell Use of Renewable Energy

4

RULE OF RE IN THE ENERGY SYSTEMRULE OF RE IN THE ENERGY SYSTEMRULE OF RE IN THE ENERGY SYSTEMRULE OF RE IN THE ENERGY SYSTEM

Off-grid electrification Off-grid electrification Fuel diversification for grid power Fuel diversification for grid power generationgeneration Energy SecurityEnergy Security Environment friendlyEnvironment friendly Green energy: Climate Change Green energy: Climate Change Mitigation Mitigation Green job creationGreen job creation

Page 5: 2015 November 2015 Md. Abdur Rouf Director, Power Cell Use of Renewable Energy

5

Potential Sources of Renewable Potential Sources of Renewable EnergyEnergy

Page 6: 2015 November 2015 Md. Abdur Rouf Director, Power Cell Use of Renewable Energy

Solar Energy

6

Page 7: 2015 November 2015 Md. Abdur Rouf Director, Power Cell Use of Renewable Energy

Solar Photovoltaic System

Solar Radiation

PV Module

Electrical Energy

Page 8: 2015 November 2015 Md. Abdur Rouf Director, Power Cell Use of Renewable Energy

Component of Solar System

SunPV ModuleSolar Charge ControllerBattery InverterLoad

Light Fan TV Radio Refrigerator Computer

Battery/Inverter

Page 9: 2015 November 2015 Md. Abdur Rouf Director, Power Cell Use of Renewable Energy

Stand Alone Solar System

PV Module

Sun

BatteryLoad

Page 10: 2015 November 2015 Md. Abdur Rouf Director, Power Cell Use of Renewable Energy

Stand-alone PV Power System (off-grid)

Page 11: 2015 November 2015 Md. Abdur Rouf Director, Power Cell Use of Renewable Energy

Grid connected PV systemSUN TRACKING

+ -

DC

ACSMALL LOAD Load

+ + + + +- - - - -

AC

Initializing…Connected

LoadLoad

+ +

- -

GRID FAILURE

INCREASED LOAD

+ +

- -

DC

GRID ConnectedINVERTER

+ -

Rooftop PV ArrayExtended PV Array

GRID

+ + - -

Disconnected

Emergency Load

+ + + + + - - - - -

INVERTER

LOAD IS TAKING POWER FROM SOLAR PANEL

+ +- -

THE BASIC SYSTEM BLOCKLOAD IS TAKING POWER FROM THE GRIDINCREASED LOAD IS TAKING POWER FROM PV AND GRID

LOAD SHEDDING MODEL

Page 12: 2015 November 2015 Md. Abdur Rouf Director, Power Cell Use of Renewable Energy

12

Wind Energy

Page 13: 2015 November 2015 Md. Abdur Rouf Director, Power Cell Use of Renewable Energy

13

Wind Turbine

Page 14: 2015 November 2015 Md. Abdur Rouf Director, Power Cell Use of Renewable Energy

Wind Power Projects

Tender Processing

Project Under Planning

Tender Processing

Project Under Planning

Project Implemented

0.9 MW Grid Connected Wind Power Plant

Feni

1 MW Wind Battery Hybrid Power Plant

Kutubdia Island

60 MW Wind Power Plant

Cox’s Bazar

15 MW Wind Power Plant

Page 15: 2015 November 2015 Md. Abdur Rouf Director, Power Cell Use of Renewable Energy

Wind Resource Mapping

Project Under Implementation

Tender Processing

Project Under Planning

Project Under Implementation

Tender Processing

Project Under Planning

Project ImplementedFeni

Wind Resource Assessment

Rajshahi

Rangpur

Mymensingh

Mongla

Mirzapur

Sitakunda

Rajapalong

Parky Beach

Mognamaghat

Inani Beach

Chadpur

Page 16: 2015 November 2015 Md. Abdur Rouf Director, Power Cell Use of Renewable Energy

16

82 m Tower at Parkey Beach

Page 17: 2015 November 2015 Md. Abdur Rouf Director, Power Cell Use of Renewable Energy

17

Contribution of Renewable EnergyContribution of Renewable EnergyType TotalTotal

Solar Home System 160 MW160 MW

Solar PV (Office Buildings) 12 MW12 MW

Solar Irrigation 2 MW2 MW

Solar Mini-Grid/Micro-grid 1 MW1 MW

Wind 2 MW2 MW

Biomass/Biogas 6 MW6 MW

Hydro 230 MW230 MW

Total 415 MW415 MW• 80,000 bio gas system are in place for cooking• 5 million ICS sold to customers

• 80,000 bio gas system are in place for cooking• 5 million ICS sold to customers

Page 18: 2015 November 2015 Md. Abdur Rouf Director, Power Cell Use of Renewable Energy

Private Sector Projects:Solar Sarishabari: 3 MW; Kaptai: 7.4 MW Thakurgaon: 5 MW Rangunia: 60 MW Gangachora: 55 MW Dharla: 30 MW Sonagazi: 100 MW Cox’s Bazar: 200 MW Mymensingh: 50 MW Sunamgonj: 32 MW Panchagarh: 200 MW

Private Sector Projects:Solar Sarishabari: 3 MW; Kaptai: 7.4 MW Thakurgaon: 5 MW Rangunia: 60 MW Gangachora: 55 MW Dharla: 30 MW Sonagazi: 100 MW Cox’s Bazar: 200 MW Mymensingh: 50 MW Sunamgonj: 32 MW Panchagarh: 200 MW

18

Ongoing Large Scale ProjectsOngoing Large Scale ProjectsOngoing Large Scale ProjectsOngoing Large Scale Projects

18

Wind Cox’s Bazar: 60MW Rajpalong: 15MW Patuakhali : 100MW

Wind Cox’s Bazar: 60MW Rajpalong: 15MW Patuakhali : 100MW

Page 19: 2015 November 2015 Md. Abdur Rouf Director, Power Cell Use of Renewable Energy

19

Ongoing Large Scale ProjectsOngoing Large Scale ProjectsOngoing Large Scale ProjectsOngoing Large Scale Projects

19

BPDBAPSC

LEGCB

NWPGCL

RPCLCPGC

LTotal

Solar (MW) 100 100 100 55 50 50 455

Wind (MW) 100 100 100 100 100 100 600

Total 200 200 200 155 150 150 1055

Public Sector Projects:

Page 20: 2015 November 2015 Md. Abdur Rouf Director, Power Cell Use of Renewable Energy

Renewable Energy Development Plan-2021

Year wise generation plan to reach the targets

Year 2015 2016 2017 2018 2019 2020 2021 Total

(MW) 77 375 680 594 552 410 415 3103

20

Page 21: 2015 November 2015 Md. Abdur Rouf Director, Power Cell Use of Renewable Energy

21

Renewable Energy Target (MW)

Technology 2015 2016 2017 2018 2019 2020 2021 Total

Solar 75 336 421.75 267 229 203 208 1739.75

Wind 0 20 250 350 350 200 200 1370

Biomass 1 16 6 6 6 6 6 47

Biogas (Biogas to electricity)

1 1 1 1 1 1 1 7

Hydro (mini/micro)

2 2 - - - - 4

Total 77 375 680.75 624 585 410 415 3167.7

Page 22: 2015 November 2015 Md. Abdur Rouf Director, Power Cell Use of Renewable Energy

22

High upfront cost for RE project Scarcity of land for grid connected RE projects Moderate potentials Inadequate incentives for RE development

Low tariff mechanism Low tariff mechanism Lack of awareness among the peopleLack of awareness among the people Lack of R & DLack of R & D Lack of Confidence of the investorLack of Confidence of the investor Lack of expertise Lack of expertise

High upfront cost for RE project Scarcity of land for grid connected RE projects Moderate potentials Inadequate incentives for RE development

Low tariff mechanism Low tariff mechanism Lack of awareness among the peopleLack of awareness among the people Lack of R & DLack of R & D Lack of Confidence of the investorLack of Confidence of the investor Lack of expertise Lack of expertise

CHALLENGES IN PROMOTION RECHALLENGES IN PROMOTION RE

Page 23: 2015 November 2015 Md. Abdur Rouf Director, Power Cell Use of Renewable Energy

23

Thanks