2015 architectural portfolio - nicolette havrish

19
ARCHITECTURE - LEADERSHIP - MENTORSHIP - SUSTAINABILITY NICOLETTE HAVRISH MY W O R K

Upload: nicolette-havrish

Post on 24-Jul-2016

227 views

Category:

Documents


5 download

DESCRIPTION

 

TRANSCRIPT

Page 1: 2015 Architectural Portfolio - Nicolette Havrish

ARCHITECTURE - LEADERSHIP - MENTORSHIP - SUSTAINABILITYNICOLETTE HAVRISHMY

WORK

Page 2: 2015 Architectural Portfolio - Nicolette Havrish
Page 3: 2015 Architectural Portfolio - Nicolette Havrish

FEATURED PROJECTS LIVERPOOL CSD LEMOYNE COLLEGE HARPURSVILLE CSD WHITNEY POINT CSD BETHLEHEM CSD

STUDENT WORK CITY OF SYRACUSE: DISABILITY CULTURAL CENTER OTHER SELECT WORK

Page 4: 2015 Architectural Portfolio - Nicolette Havrish

$34M – $9.6M Elementary School Budget Net-zero Design

LEED for Schools 2009 AdditionsNYSERDA

MIDDLE SCHOOL AND ELEMENTARY SCHOOL ADDITIONS & RENOVATIONS

BEFORE

AFTER

Designer of complete gut & renovation of 1950’s era Elementary School

Gymnasium Addition Coordination during programming

through to design & construction REVIT Version 9

DESIGNER I SD – DD – CD – BID – CA LIVERPOOL CENTRAL SCHOOL DISTRICT

Page 5: 2015 Architectural Portfolio - Nicolette Havrish

Climatic Design Passive Solar Split-Trombe Walls Preheat Walls Exterior wood shiplap cladding Porcelain Tile rain screen Expression & Celebration of Structure Drawings Used to Create Office Standards Color & Scale in Architecture

DESIGN ELEMENTS & CONSIDERATIONS

Page 6: 2015 Architectural Portfolio - Nicolette Havrish

AFTER

BEFORE

$10M Renovation BudgetLaboratory, Office & Classroom Renovations

COYNE SCIENCE CENTER RENOVATIONS Demolition & renovation of science

laboratory building interiors Responsible for roof drawings, trade

coordination & design of multiple spaces LEED Gold Submission of $20M Addition REVIT Team Leader: Version 9

DESIGNER I SD – DD – CD – BID – CA LEMOYNE COLLEGE

Page 7: 2015 Architectural Portfolio - Nicolette Havrish

Laboratory HVAC coordination through a four-story, two-way slab building

Public Collaboration vs. Private Teaching, Preparatory and Laboratory Spaces

Integration of High Tech & Security Features Designing Flexibility for the Future High Complexity of Program Elements and

remote coordination of team

DESIGN ELEMENTS & CONSIDERATIONS

IMAGES COURTESY OF ASHLEY MCGRAW ARCHITECTS, DPC ; PHOTOGRAPHY BY JOHN GRIEBSCH

Page 8: 2015 Architectural Portfolio - Nicolette Havrish

$8.5M Reconstruction Budget$36M Renovations & Additions Budget

Elementary, Middle, and High School BuildingsSHPO Historic Building Reconstruction at Tioughnioga Riverside Academy

DISTRICTWIDE ADDITIONS & RENOVATIONS Designed spaces at all three buildings Responsible for historic window

reconstruction, entrance canopy, HS Main Office entry

<1% of Change Orders resulted from design discrepancies

REVIT Version 9

DESIGNER I SD – DD – CD – BID – CA WHITNEY POINT CENTRAL SCHOOL DISTRICT

Page 9: 2015 Architectural Portfolio - Nicolette Havrish

Custom window profiles & detailing for energy efficiency & historic requirements

Library, Office, Music Suite, and Home & Careers design & detailing at multiple buildings

Displacement ventilation at offices Gymnasium & auditoria detailing Corridor finish renovations and upgrades

DESIGN ELEMENTS & CONSIDERATIONS

IMAGES COURTESY OF ASHLEY MCGRAW ARCHITECTS, DPC ; PHOTOGRAPHY BY JOHN GRIEBSCH

Page 10: 2015 Architectural Portfolio - Nicolette Havrish

$17.2M Elementary & High School BudgetCentralized Districtwide Food Service & Kitchen Renovations

DISTRICTWIDE ADDITIONS & RENOVATIONS Demolition & Renovation drawings of

Family & Consumer Science, HS Kitchen, roof & window replacement, Music Room, Technology & Art, etc.

Trade coordination REVIT 2011

DESIGNER II SD – DD – CD – BID – CA HARPURSVILLE CENTRAL SCHOOL DISTRICT

BEFORE

AFTER

Page 11: 2015 Architectural Portfolio - Nicolette Havrish

Design “Chopped” style High End Family & Consumer Science Classroom

Intensive trade coordination Extensive Abatement and demolition work Custom detailing & casework design SIPS Exterior Wall Construction at Kitchen

Addition

DESIGN ELEMENTS & CONSIDERATIONS

IMAGES COURTESY OF ASHLEY MCGRAW ARCHITECTS, DPC ; PHOTOGRAPHY BY JOHN GRIEBSCH

Page 12: 2015 Architectural Portfolio - Nicolette Havrish

$20M Renovations & Additions at 10 Buildings $300K Pool Renovations & Replacements

$63K STEM Classroom RenovationMiddle School Basement Egress & Ramp Reconstruction

DISTRICTWIDE ADDITIONS & RENOVATIONS – CURRENTLY UNDER CONSTRUCTION

BEFORE

Lead designer of multiples spaces and scope items at 10 District Buildings

Led development and compilation of 2015 Building Condition Survey & Five Year Districtwide Facilities Plan

REVIT Team Leader: REVIT 2013-2015

DESIGNER II & PA SD – DD – CD – BID – CA

AFTER

BETHLEHEM CENTRAL SCHOOL DISTRICT

Page 13: 2015 Architectural Portfolio - Nicolette Havrish

Create REVIT base models Upgrade finishes, equipment & structure

in 1950’s era competition swimming and diving pool

Window Replacement, toilet and kitchen renovations, etc.

Construction coordination & conflict resolution

PROJECT RESPONSIBILITIES

IMAGES COURTESY OF ASHLEY MCGRAW ARCHITECTS, DPC ; PHOTOGRAPHY BY JOHN GRIEBSCH

Page 14: 2015 Architectural Portfolio - Nicolette Havrish

Thesis Advisors: Terrance Goode Katrina Stoll

“DIS”ABILITY AND CONNECTIONS IN SPACE

Connecting people with & without physical impairments

Geography & Language of Disability Movement of the body in space Programming for inclusion and

interaction

2008 THESIS AWARD STUDENT WORK

CITY OF SYRACUSE: DISABILITY CULTURAL CENTER

Page 15: 2015 Architectural Portfolio - Nicolette Havrish

Climatic Design Materiality Contextual Design Architecture at Multiple Scales Impact of Bodily Movement on Space Movement in architectural form

DESIGN CONSIDERATIONS

Page 16: 2015 Architectural Portfolio - Nicolette Havrish

FLORENCE STUDY ABROAD & SOCIAL SCULPTURELeft to Right: Museum for the Flood: Sequences &

Views in Space, Via dei Castellani (Graphite & Ink)

Villa Giulia, Pantheon, Jubilee Church, Villa Gamberaia (Graphite Field Sketches)

FLORENCE, ITALY STUDY ABROAD PROGRAMOTHER SELECT WORK

Page 17: 2015 Architectural Portfolio - Nicolette Havrish

BEFORE AFTER

• Project of Syracuse University Chancellor’s Scholarship in Action Initiative • Artist-run, renovated 1984 RV – Team completed demolition, design and construction• Flexible space for alternative educational & cultural programming• Mobile classroom, digital photo lab, gallery space, and community center• Collaborative effort of 2007-2008 Social Sculpture class• 10 art and architecture students led by artist and SU Director of Community Initiatives

in the Visual Arts Marion Wilson• Used by Syracuse City School District and the greater Syracuse Community

MLAB: MOBILE LITERACTY ARTS BUS – mobileliteracyartsbus.blogspot.com

Page 18: 2015 Architectural Portfolio - Nicolette Havrish
Page 19: 2015 Architectural Portfolio - Nicolette Havrish

OTHER K-12 PROJECTS SOUTH JEFFERSON CSD $9.1M – CLARKE HS

BINGHAMTON CSD $577K – UNBUILT FIELD HOUSE WINDSOR CSD $16M – CONCESSION BUILDING

(UNDER CONSTRUCTION) SYRACUSE CSD – CLARY MIDDLE SCHOOL LAFAYETTE CSD – ONONDAGA NATION SCHOOL ALTMAR-PARISH-WILLIAMSTOWN CSD CLYDE-SAVANNAH CSD WESTHILL CSD WATERVILLE CSD EAST SYRACUSE-MINOA CSD LIBERTY CSD

OTHER PROFESSIONAL PROJECTS SYRACUSE CENTER OF EXCELLENCE MCGRAW RESIDENCE