2015 architectural portfolio - nicolette havrish
DESCRIPTION
ÂTRANSCRIPT
ARCHITECTURE - LEADERSHIP - MENTORSHIP - SUSTAINABILITYNICOLETTE HAVRISHMY
WORK
FEATURED PROJECTS LIVERPOOL CSD LEMOYNE COLLEGE HARPURSVILLE CSD WHITNEY POINT CSD BETHLEHEM CSD
STUDENT WORK CITY OF SYRACUSE: DISABILITY CULTURAL CENTER OTHER SELECT WORK
$34M – $9.6M Elementary School Budget Net-zero Design
LEED for Schools 2009 AdditionsNYSERDA
MIDDLE SCHOOL AND ELEMENTARY SCHOOL ADDITIONS & RENOVATIONS
BEFORE
AFTER
Designer of complete gut & renovation of 1950’s era Elementary School
Gymnasium Addition Coordination during programming
through to design & construction REVIT Version 9
DESIGNER I SD – DD – CD – BID – CA LIVERPOOL CENTRAL SCHOOL DISTRICT
Climatic Design Passive Solar Split-Trombe Walls Preheat Walls Exterior wood shiplap cladding Porcelain Tile rain screen Expression & Celebration of Structure Drawings Used to Create Office Standards Color & Scale in Architecture
DESIGN ELEMENTS & CONSIDERATIONS
AFTER
BEFORE
$10M Renovation BudgetLaboratory, Office & Classroom Renovations
COYNE SCIENCE CENTER RENOVATIONS Demolition & renovation of science
laboratory building interiors Responsible for roof drawings, trade
coordination & design of multiple spaces LEED Gold Submission of $20M Addition REVIT Team Leader: Version 9
DESIGNER I SD – DD – CD – BID – CA LEMOYNE COLLEGE
Laboratory HVAC coordination through a four-story, two-way slab building
Public Collaboration vs. Private Teaching, Preparatory and Laboratory Spaces
Integration of High Tech & Security Features Designing Flexibility for the Future High Complexity of Program Elements and
remote coordination of team
DESIGN ELEMENTS & CONSIDERATIONS
IMAGES COURTESY OF ASHLEY MCGRAW ARCHITECTS, DPC ; PHOTOGRAPHY BY JOHN GRIEBSCH
$8.5M Reconstruction Budget$36M Renovations & Additions Budget
Elementary, Middle, and High School BuildingsSHPO Historic Building Reconstruction at Tioughnioga Riverside Academy
DISTRICTWIDE ADDITIONS & RENOVATIONS Designed spaces at all three buildings Responsible for historic window
reconstruction, entrance canopy, HS Main Office entry
<1% of Change Orders resulted from design discrepancies
REVIT Version 9
DESIGNER I SD – DD – CD – BID – CA WHITNEY POINT CENTRAL SCHOOL DISTRICT
Custom window profiles & detailing for energy efficiency & historic requirements
Library, Office, Music Suite, and Home & Careers design & detailing at multiple buildings
Displacement ventilation at offices Gymnasium & auditoria detailing Corridor finish renovations and upgrades
DESIGN ELEMENTS & CONSIDERATIONS
IMAGES COURTESY OF ASHLEY MCGRAW ARCHITECTS, DPC ; PHOTOGRAPHY BY JOHN GRIEBSCH
$17.2M Elementary & High School BudgetCentralized Districtwide Food Service & Kitchen Renovations
DISTRICTWIDE ADDITIONS & RENOVATIONS Demolition & Renovation drawings of
Family & Consumer Science, HS Kitchen, roof & window replacement, Music Room, Technology & Art, etc.
Trade coordination REVIT 2011
DESIGNER II SD – DD – CD – BID – CA HARPURSVILLE CENTRAL SCHOOL DISTRICT
BEFORE
AFTER
Design “Chopped” style High End Family & Consumer Science Classroom
Intensive trade coordination Extensive Abatement and demolition work Custom detailing & casework design SIPS Exterior Wall Construction at Kitchen
Addition
DESIGN ELEMENTS & CONSIDERATIONS
IMAGES COURTESY OF ASHLEY MCGRAW ARCHITECTS, DPC ; PHOTOGRAPHY BY JOHN GRIEBSCH
$20M Renovations & Additions at 10 Buildings $300K Pool Renovations & Replacements
$63K STEM Classroom RenovationMiddle School Basement Egress & Ramp Reconstruction
DISTRICTWIDE ADDITIONS & RENOVATIONS – CURRENTLY UNDER CONSTRUCTION
BEFORE
Lead designer of multiples spaces and scope items at 10 District Buildings
Led development and compilation of 2015 Building Condition Survey & Five Year Districtwide Facilities Plan
REVIT Team Leader: REVIT 2013-2015
DESIGNER II & PA SD – DD – CD – BID – CA
AFTER
BETHLEHEM CENTRAL SCHOOL DISTRICT
Create REVIT base models Upgrade finishes, equipment & structure
in 1950’s era competition swimming and diving pool
Window Replacement, toilet and kitchen renovations, etc.
Construction coordination & conflict resolution
PROJECT RESPONSIBILITIES
IMAGES COURTESY OF ASHLEY MCGRAW ARCHITECTS, DPC ; PHOTOGRAPHY BY JOHN GRIEBSCH
Thesis Advisors: Terrance Goode Katrina Stoll
“DIS”ABILITY AND CONNECTIONS IN SPACE
Connecting people with & without physical impairments
Geography & Language of Disability Movement of the body in space Programming for inclusion and
interaction
2008 THESIS AWARD STUDENT WORK
CITY OF SYRACUSE: DISABILITY CULTURAL CENTER
Climatic Design Materiality Contextual Design Architecture at Multiple Scales Impact of Bodily Movement on Space Movement in architectural form
DESIGN CONSIDERATIONS
FLORENCE STUDY ABROAD & SOCIAL SCULPTURELeft to Right: Museum for the Flood: Sequences &
Views in Space, Via dei Castellani (Graphite & Ink)
Villa Giulia, Pantheon, Jubilee Church, Villa Gamberaia (Graphite Field Sketches)
FLORENCE, ITALY STUDY ABROAD PROGRAMOTHER SELECT WORK
BEFORE AFTER
• Project of Syracuse University Chancellor’s Scholarship in Action Initiative • Artist-run, renovated 1984 RV – Team completed demolition, design and construction• Flexible space for alternative educational & cultural programming• Mobile classroom, digital photo lab, gallery space, and community center• Collaborative effort of 2007-2008 Social Sculpture class• 10 art and architecture students led by artist and SU Director of Community Initiatives
in the Visual Arts Marion Wilson• Used by Syracuse City School District and the greater Syracuse Community
MLAB: MOBILE LITERACTY ARTS BUS – mobileliteracyartsbus.blogspot.com
OTHER K-12 PROJECTS SOUTH JEFFERSON CSD $9.1M – CLARKE HS
BINGHAMTON CSD $577K – UNBUILT FIELD HOUSE WINDSOR CSD $16M – CONCESSION BUILDING
(UNDER CONSTRUCTION) SYRACUSE CSD – CLARY MIDDLE SCHOOL LAFAYETTE CSD – ONONDAGA NATION SCHOOL ALTMAR-PARISH-WILLIAMSTOWN CSD CLYDE-SAVANNAH CSD WESTHILL CSD WATERVILLE CSD EAST SYRACUSE-MINOA CSD LIBERTY CSD
OTHER PROFESSIONAL PROJECTS SYRACUSE CENTER OF EXCELLENCE MCGRAW RESIDENCE