2014 h&s town hall presentation - lcsc · 2014-06-24 · 3. h&s timelines •submit...
TRANSCRIPT
![Page 1: 2014 H&S Town Hall Presentation - LCSC · 2014-06-24 · 3. H&S Timelines •Submit projects for FY 14, 15, and 16 & H&S Revenue Application thby July 25 •FY 2016 projects entered](https://reader034.vdocuments.site/reader034/viewer/2022042101/5e7deef5b036a960595f70a9/html5/thumbnails/1.jpg)
2014 H&S Town Hall Presentation
Dale Sundstrom, School Finance
(651)-582-8605
![Page 2: 2014 H&S Town Hall Presentation - LCSC · 2014-06-24 · 3. H&S Timelines •Submit projects for FY 14, 15, and 16 & H&S Revenue Application thby July 25 •FY 2016 projects entered](https://reader034.vdocuments.site/reader034/viewer/2022042101/5e7deef5b036a960595f70a9/html5/thumbnails/2.jpg)
1. H&S Revenue Application
2. Legislative Update
3. H&S Timelines
4. H&S Data Submissions
5. FY 14 Closeout Activities
6. Regulatory Update
Today’s Agenda
education.state.mn.us 2
![Page 3: 2014 H&S Town Hall Presentation - LCSC · 2014-06-24 · 3. H&S Timelines •Submit projects for FY 14, 15, and 16 & H&S Revenue Application thby July 25 •FY 2016 projects entered](https://reader034.vdocuments.site/reader034/viewer/2022042101/5e7deef5b036a960595f70a9/html5/thumbnails/3.jpg)
H&S Revenue Applicaiton
• Similar to last year’s revenue application
• For 2014 Payable 2015 districts apply for
H&S revenue by providing confirmation of:
1. A school board adopted “budget”
by finance code for 2014, 2015 & 2016
2. A school board adopted H&S policy
education.state.mn.us 3
![Page 4: 2014 H&S Town Hall Presentation - LCSC · 2014-06-24 · 3. H&S Timelines •Submit projects for FY 14, 15, and 16 & H&S Revenue Application thby July 25 •FY 2016 projects entered](https://reader034.vdocuments.site/reader034/viewer/2022042101/5e7deef5b036a960595f70a9/html5/thumbnails/4.jpg)
H&S Application Submittal
• Submit electronic or hard copy of school
board minutes identifying an adopted FY
14-16 “budget” and adopted H&S policy to
regional management assistant
professionals by Friday, July 25th.
• Districts that aren’t members of a service
cooperative may submit their application
electronically to MDE at
education.state.mn.us 4
![Page 5: 2014 H&S Town Hall Presentation - LCSC · 2014-06-24 · 3. H&S Timelines •Submit projects for FY 14, 15, and 16 & H&S Revenue Application thby July 25 •FY 2016 projects entered](https://reader034.vdocuments.site/reader034/viewer/2022042101/5e7deef5b036a960595f70a9/html5/thumbnails/5.jpg)
• 123B.57 Capital Expenditure; Health and Safety
Allows funding for:
Compliance with the National Emission Standards
for Hazardous Air Pollutants for school generators
established by the United States Environmental
Protection Agency
For fiscal 2014 – 2018 must reduce other approved
H&S funding to include emission compliance.
Effective the day after enactment.
2. Legislative Update
education.state.mn.us 5
![Page 6: 2014 H&S Town Hall Presentation - LCSC · 2014-06-24 · 3. H&S Timelines •Submit projects for FY 14, 15, and 16 & H&S Revenue Application thby July 25 •FY 2016 projects entered](https://reader034.vdocuments.site/reader034/viewer/2022042101/5e7deef5b036a960595f70a9/html5/thumbnails/6.jpg)
• 123B.71 Review and Comment
Threshold $2,000,000 ($500,000 cap. loan district)
Exempts many state funded revenues including
H&S and Alt. Facilities from R&C at any amount.
Removes many description items from the R&C
submission and names documentation to be
submitted to verify compliance.
Adds requirement to identify the process used to
determine the need for a new or renovated facility
and list the deficiencies that will and will not be
addressed.
education.state.mn.us 6
![Page 7: 2014 H&S Town Hall Presentation - LCSC · 2014-06-24 · 3. H&S Timelines •Submit projects for FY 14, 15, and 16 & H&S Revenue Application thby July 25 •FY 2016 projects entered](https://reader034.vdocuments.site/reader034/viewer/2022042101/5e7deef5b036a960595f70a9/html5/thumbnails/7.jpg)
• 123B.72 School Facility Commissioning
Retains $1,400,000 as the dollar amount where
school facility commissioning is required.
Previously required for projects subject to review
and comment but now specifies $1.4M.
education.state.mn.us 7
![Page 8: 2014 H&S Town Hall Presentation - LCSC · 2014-06-24 · 3. H&S Timelines •Submit projects for FY 14, 15, and 16 & H&S Revenue Application thby July 25 •FY 2016 projects entered](https://reader034.vdocuments.site/reader034/viewer/2022042101/5e7deef5b036a960595f70a9/html5/thumbnails/8.jpg)
3. H&S Timelines
• Submit projects for FY 14, 15, and 16 & H&S Revenue Application by July 25th
• FY 2016 projects entered Summer 2014
– The Pay 15 levy is for 2015-16 school year and funds the FY16 costs.
–RMA’s and MDE will provide a list of common allowable expenditures (and not allowed) and work to develop project descriptions that streamline the approval process.
education.state.mn.us 8
![Page 9: 2014 H&S Town Hall Presentation - LCSC · 2014-06-24 · 3. H&S Timelines •Submit projects for FY 14, 15, and 16 & H&S Revenue Application thby July 25 •FY 2016 projects entered](https://reader034.vdocuments.site/reader034/viewer/2022042101/5e7deef5b036a960595f70a9/html5/thumbnails/9.jpg)
• Projects can be entered January to July
• The H&S website is disabled at the end of
the day on July 25th for processing
• By August 30th the H&S website will be
restored to show project approvals &
assigned 5-digit project numbers:
–Yes, No, NMI (needs more information),
or PPA (provisional project approval)
H&S Timelines
education.state.mn.us 9
![Page 10: 2014 H&S Town Hall Presentation - LCSC · 2014-06-24 · 3. H&S Timelines •Submit projects for FY 14, 15, and 16 & H&S Revenue Application thby July 25 •FY 2016 projects entered](https://reader034.vdocuments.site/reader034/viewer/2022042101/5e7deef5b036a960595f70a9/html5/thumbnails/10.jpg)
• Districts can make changes to the website
until September 5th
• From September 5th – 19th, MDE reviews
district provided information to finalize
approvals
• September 19th is the last day the capital
dataset is updated for levy limit
calculations
H&S Timelines
education.state.mn.us 10
![Page 11: 2014 H&S Town Hall Presentation - LCSC · 2014-06-24 · 3. H&S Timelines •Submit projects for FY 14, 15, and 16 & H&S Revenue Application thby July 25 •FY 2016 projects entered](https://reader034.vdocuments.site/reader034/viewer/2022042101/5e7deef5b036a960595f70a9/html5/thumbnails/11.jpg)
• September 30th is the last day school
districts can certify their proposed levy to
the county auditor
• November 1st is the last day to submit
closeout documentation in support of
PPAs
H&S Timelines
education.state.mn.us 11
![Page 12: 2014 H&S Town Hall Presentation - LCSC · 2014-06-24 · 3. H&S Timelines •Submit projects for FY 14, 15, and 16 & H&S Revenue Application thby July 25 •FY 2016 projects entered](https://reader034.vdocuments.site/reader034/viewer/2022042101/5e7deef5b036a960595f70a9/html5/thumbnails/12.jpg)
• FY 13-14 project closeout starts in June
and ends December 31
• Reconcile UFARS expenditures to FY14
project approvals
• MDE and RMA’s will be providing more
assistance this fall – many districts
lose revenue by not reconciling
H&S Timelines
education.state.mn.us 12
![Page 13: 2014 H&S Town Hall Presentation - LCSC · 2014-06-24 · 3. H&S Timelines •Submit projects for FY 14, 15, and 16 & H&S Revenue Application thby July 25 •FY 2016 projects entered](https://reader034.vdocuments.site/reader034/viewer/2022042101/5e7deef5b036a960595f70a9/html5/thumbnails/13.jpg)
Data From An Actual School District
education.state.mn.us 13
![Page 14: 2014 H&S Town Hall Presentation - LCSC · 2014-06-24 · 3. H&S Timelines •Submit projects for FY 14, 15, and 16 & H&S Revenue Application thby July 25 •FY 2016 projects entered](https://reader034.vdocuments.site/reader034/viewer/2022042101/5e7deef5b036a960595f70a9/html5/thumbnails/14.jpg)
• Projects are approved and pre-funded
• FY of actual expense is recorded the same year
as the estimated revenue
• The FY project amount and fiscal year UFARS
expense by finance code for the year ended
June 30 are intended to be exactly the same by
November 1 – drives revenue adjustments
• Actual revenue is almost always a different
amount than was estimated on the original levy
so a levy adjustment comes on a future levy
The H&S System Is Approval Based
education.state.mn.us 14
![Page 15: 2014 H&S Town Hall Presentation - LCSC · 2014-06-24 · 3. H&S Timelines •Submit projects for FY 14, 15, and 16 & H&S Revenue Application thby July 25 •FY 2016 projects entered](https://reader034.vdocuments.site/reader034/viewer/2022042101/5e7deef5b036a960595f70a9/html5/thumbnails/15.jpg)
• Adjustments to revenue come from actual
results of projects
• Errors in revenue come from not reconciling
• Invoice is late, missing, miscoded – project
came in over estimate, entered in wrong Fin
code – approval is in wrong year – other reasons
• MDE will offer more assistance with reconciling
this fall. It is a team effort for district staff.
H&S System Is Approval Based
education.state.mn.us 15
![Page 16: 2014 H&S Town Hall Presentation - LCSC · 2014-06-24 · 3. H&S Timelines •Submit projects for FY 14, 15, and 16 & H&S Revenue Application thby July 25 •FY 2016 projects entered](https://reader034.vdocuments.site/reader034/viewer/2022042101/5e7deef5b036a960595f70a9/html5/thumbnails/16.jpg)
• District receives lesser of project approval or
UFARS expenditure by finance code on
December 31. This is the actual revenue that will
be compared to the original levy revenue.
• District gets the correct amount of revenue in
the end when projects have been reconciled.
• Approval based means MDE funds the approved
amount and UFARS can decrease, equal, or
indicate a project approval increase is needed.
• WORK WITH BUSINESS MANAGERS TO MATCH
THE PROJECTS WITH THE UFARS
H&S Timelines
education.state.mn.us 16
![Page 17: 2014 H&S Town Hall Presentation - LCSC · 2014-06-24 · 3. H&S Timelines •Submit projects for FY 14, 15, and 16 & H&S Revenue Application thby July 25 •FY 2016 projects entered](https://reader034.vdocuments.site/reader034/viewer/2022042101/5e7deef5b036a960595f70a9/html5/thumbnails/17.jpg)
4. H&S Data Submissions
• Moving a project that has not started to a
different fiscal year?
–E-MAIL MDE WITH THE 5-DIGIT
PROJECT NUMBER AND DESIRED
FISCAL YEAR
–District’s must verify data after MDE
edits project entry
education.state.mn.us 17
![Page 18: 2014 H&S Town Hall Presentation - LCSC · 2014-06-24 · 3. H&S Timelines •Submit projects for FY 14, 15, and 16 & H&S Revenue Application thby July 25 •FY 2016 projects entered](https://reader034.vdocuments.site/reader034/viewer/2022042101/5e7deef5b036a960595f70a9/html5/thumbnails/18.jpg)
Project Continuations
• A project continues into one or more fiscal
year;
(H&S website approvals and reported
UFARS need to match per fiscal year)
• Reconcile the existing project to what was
spent, then create a new project to move
forward the balance with reference to the
previous project number.
education.state.mn.us 18
![Page 19: 2014 H&S Town Hall Presentation - LCSC · 2014-06-24 · 3. H&S Timelines •Submit projects for FY 14, 15, and 16 & H&S Revenue Application thby July 25 •FY 2016 projects entered](https://reader034.vdocuments.site/reader034/viewer/2022042101/5e7deef5b036a960595f70a9/html5/thumbnails/19.jpg)
education.state.mn.us 19
14 363 Oak High School … 20000.00
Update GEN. Continuation of project #19561, fire
panel replacement 0.00
13 363 Oak High School yes 50000.00
Update 19561 Replace fire panel, SFM inspection
#18420, item #6 (SFM PLAN REVIEWED) 0.00
Project Continuation
13 363 Oak High School yes 30000.00
Update 19561 Replace fire panel, SFM inspection
#18420, item #6 (SFM PLAN REVIEWED) 0.00
![Page 20: 2014 H&S Town Hall Presentation - LCSC · 2014-06-24 · 3. H&S Timelines •Submit projects for FY 14, 15, and 16 & H&S Revenue Application thby July 25 •FY 2016 projects entered](https://reader034.vdocuments.site/reader034/viewer/2022042101/5e7deef5b036a960595f70a9/html5/thumbnails/20.jpg)
Changing Project Cost
• Updated proposed amounts that
substantially increase from previous
approvals?
–E-mail MDE the 5-digit project number
–Provide contact information; including
the district # and phone #
–Explain to substantiate the new
proposed amount (scope of work
change, increased bids, etc.)
– Invoices may be requested
education.state.mn.us 20
![Page 21: 2014 H&S Town Hall Presentation - LCSC · 2014-06-24 · 3. H&S Timelines •Submit projects for FY 14, 15, and 16 & H&S Revenue Application thby July 25 •FY 2016 projects entered](https://reader034.vdocuments.site/reader034/viewer/2022042101/5e7deef5b036a960595f70a9/html5/thumbnails/21.jpg)
Example H&S Project Descriptions
• To reduce administrative time and to
better facilitate the MDE approval
process, RMA’s and MDE are providing a
guide with common approved projects
and those commonly not approved
• Re-occurring H&S projects (FY 16) may be
submitted as district-wide entries!
• Projects not clearly identified will need
more information.
education.state.mn.us 21
![Page 22: 2014 H&S Town Hall Presentation - LCSC · 2014-06-24 · 3. H&S Timelines •Submit projects for FY 14, 15, and 16 & H&S Revenue Application thby July 25 •FY 2016 projects entered](https://reader034.vdocuments.site/reader034/viewer/2022042101/5e7deef5b036a960595f70a9/html5/thumbnails/22.jpg)
Finance Code 347
• PPE, Elevator/Lift Inspections, and
MDH Inspections = District-wide
• Playground re-surfacing – material type
and total sq. ft. of playground area – FY 15 Pine Elem. Wood chips, 225 cubic yards to
cover 5,500 sq ft
• Playground repairs – Scope of work
and CPSI inspector # and date (insp.
rpt. may be requested) – FY 15 Maple Elem. Repair damaged fall
protection barrier per CPSI # 1004-01 3/26/13
inspection report
education.state.mn.us 22
![Page 23: 2014 H&S Town Hall Presentation - LCSC · 2014-06-24 · 3. H&S Timelines •Submit projects for FY 14, 15, and 16 & H&S Revenue Application thby July 25 •FY 2016 projects entered](https://reader034.vdocuments.site/reader034/viewer/2022042101/5e7deef5b036a960595f70a9/html5/thumbnails/23.jpg)
Finance Code 347
• Pool/food code corrections – MN code
violation # and scope of work (scanned
copy of orders may be requested) – FY 14 Oak Elem. Provide No Diving signs per MN
Rule 4717.2450 3/26/13 inspection
– FY 15 Oak Elem. Replace wood shelving per MN
Rule 1304.12 3/26/14 inspection
• Machine guarding – Scope of work, and
location (insp. rpt. may be requested) – FY 14 Hickory HS Mount equipment in wood shop per
MA inspection on 3/26/13
education.state.mn.us 23
![Page 24: 2014 H&S Town Hall Presentation - LCSC · 2014-06-24 · 3. H&S Timelines •Submit projects for FY 14, 15, and 16 & H&S Revenue Application thby July 25 •FY 2016 projects entered](https://reader034.vdocuments.site/reader034/viewer/2022042101/5e7deef5b036a960595f70a9/html5/thumbnails/24.jpg)
Finance Code 349
• Hazardous/Infectious Waste Disposal, Lead
in Water Testing, Radon Testing, RPZ
Backflow Inspections = District-wide
• Local Exhaust Ventilation – scope of work
and location – FY 15 Willow HS Install welding local exhaust system in
the Ind. Tech. metal shop
• Lead in Paint Abatement (must be > 1% by
weight or > 1mg/cm2) – scope of work and
location (lead analysis will be requested) – FY 15 Birch MS Gymnasium lead paint abatement
education.state.mn.us 24
![Page 25: 2014 H&S Town Hall Presentation - LCSC · 2014-06-24 · 3. H&S Timelines •Submit projects for FY 14, 15, and 16 & H&S Revenue Application thby July 25 •FY 2016 projects entered](https://reader034.vdocuments.site/reader034/viewer/2022042101/5e7deef5b036a960595f70a9/html5/thumbnails/25.jpg)
Finance Code 352
• Capped H&S funding source
• Reference the advice entry (towards the
top) on the data submission website
• Capped biennium amount for FY 14 & FY
15; with a new capped biennium amount
for FY 16 & 17
• Possible issues with exceeding the 352
cap in the second year of the biennium
(FY 15 & FY 17)
education.state.mn.us 25
![Page 26: 2014 H&S Town Hall Presentation - LCSC · 2014-06-24 · 3. H&S Timelines •Submit projects for FY 14, 15, and 16 & H&S Revenue Application thby July 25 •FY 2016 projects entered](https://reader034.vdocuments.site/reader034/viewer/2022042101/5e7deef5b036a960595f70a9/html5/thumbnails/26.jpg)
Finance Code 352
• HSEM, Safety Committees, AHERA 3-yr
Inspections, BBP, Emp. Right to Know,
IAQ Tools 4 Schools = District-wide
• HSEM – Contractor / Consultant name
• Identify Emergency Plan Equipment &
Supplies (AED battery/pads, 1st Aid/CPR Training,
Written Plan Development, etc.)
• In-house HSEM - Document FTE hours – FY 16 District-wide In-house HSEM, Bldgs &
Grounds Mngr. 300 hrs, Business Mngr. 100 hours,
Chemical Hygiene Officer, 32 hours
education.state.mn.us 26
![Page 27: 2014 H&S Town Hall Presentation - LCSC · 2014-06-24 · 3. H&S Timelines •Submit projects for FY 14, 15, and 16 & H&S Revenue Application thby July 25 •FY 2016 projects entered](https://reader034.vdocuments.site/reader034/viewer/2022042101/5e7deef5b036a960595f70a9/html5/thumbnails/27.jpg)
FIN CODE 358
AHERA 6-month Periodic Inspections,
Worker Physicals and Asbestos
Training = Only District-wide Entries
• O&M projects must be clearly identified FY 14 patch/repair and glove bag removal in
Mechanical Room
• Asbestos abatement – Type of material,
quantity, and location FY 15 75 sq ft of floor tile in room 115 and
40 lf of pipe insulation in boiler room
education.state.mn.us 27
![Page 28: 2014 H&S Town Hall Presentation - LCSC · 2014-06-24 · 3. H&S Timelines •Submit projects for FY 14, 15, and 16 & H&S Revenue Application thby July 25 •FY 2016 projects entered](https://reader034.vdocuments.site/reader034/viewer/2022042101/5e7deef5b036a960595f70a9/html5/thumbnails/28.jpg)
FIN CODE 363
• 3-yr SFM Fire Inspections, Fire Alarm
Inspections, Fire Extinguisher
Inspections = District-wide
• SFM Corrections – Scope of work,
inspection #, item #
• 363 projects > $20,000 in cost and all
egress projects are subject to SFM Plan
Review (PPA status)
education.state.mn.us 28
![Page 29: 2014 H&S Town Hall Presentation - LCSC · 2014-06-24 · 3. H&S Timelines •Submit projects for FY 14, 15, and 16 & H&S Revenue Application thby July 25 •FY 2016 projects entered](https://reader034.vdocuments.site/reader034/viewer/2022042101/5e7deef5b036a960595f70a9/html5/thumbnails/29.jpg)
SFM Plan Review
• Contractors can send plans of the building
layout showing the scope of work to:
State Fire Marshal Division
Attn: John Swanson
8321 168th Street W
Lakeville, MN 55044
• Contact John if there are any questions:
[email protected] or (651)-334-3217
education.state.mn.us 29
![Page 30: 2014 H&S Town Hall Presentation - LCSC · 2014-06-24 · 3. H&S Timelines •Submit projects for FY 14, 15, and 16 & H&S Revenue Application thby July 25 •FY 2016 projects entered](https://reader034.vdocuments.site/reader034/viewer/2022042101/5e7deef5b036a960595f70a9/html5/thumbnails/30.jpg)
![Page 31: 2014 H&S Town Hall Presentation - LCSC · 2014-06-24 · 3. H&S Timelines •Submit projects for FY 14, 15, and 16 & H&S Revenue Application thby July 25 •FY 2016 projects entered](https://reader034.vdocuments.site/reader034/viewer/2022042101/5e7deef5b036a960595f70a9/html5/thumbnails/31.jpg)
![Page 32: 2014 H&S Town Hall Presentation - LCSC · 2014-06-24 · 3. H&S Timelines •Submit projects for FY 14, 15, and 16 & H&S Revenue Application thby July 25 •FY 2016 projects entered](https://reader034.vdocuments.site/reader034/viewer/2022042101/5e7deef5b036a960595f70a9/html5/thumbnails/32.jpg)
FIN CODE 363
• Costs to maintain/repair an operable fire
alarm system (emergency lighting, exit
signs, smoke/heat detectors,
horns/strobes etc.).
• SFM orders are needed for full
replacement of fire alarm equipment.
education.state.mn.us 32
![Page 33: 2014 H&S Town Hall Presentation - LCSC · 2014-06-24 · 3. H&S Timelines •Submit projects for FY 14, 15, and 16 & H&S Revenue Application thby July 25 •FY 2016 projects entered](https://reader034.vdocuments.site/reader034/viewer/2022042101/5e7deef5b036a960595f70a9/html5/thumbnails/33.jpg)
FIN CODE 366
• No District-wide entries are acceptable
IAQ Project Management & Initial IAQ
Investigation = FIN 352
Must document the presence of mold!
Submittal of Attachment 7 for abatement if project
> $10,000.
Lab analysis or photo documentation for projects
< $10,000. (lab analysis is better)
![Page 34: 2014 H&S Town Hall Presentation - LCSC · 2014-06-24 · 3. H&S Timelines •Submit projects for FY 14, 15, and 16 & H&S Revenue Application thby July 25 •FY 2016 projects entered](https://reader034.vdocuments.site/reader034/viewer/2022042101/5e7deef5b036a960595f70a9/html5/thumbnails/34.jpg)
FIN CODE 366
• Mechanical Ventilation Improvements
• Professional Engineer to complete
Attachment 7 providing detailed scope of
work and itemized project costs
(reference Attachment 8)
• Attachment 8 showing allowable/non-
allowable costs (completed by the district) – Alternative Facilities for projects > $500,000 in cost over
life of project (PPA/PPL/PPB status)
![Page 35: 2014 H&S Town Hall Presentation - LCSC · 2014-06-24 · 3. H&S Timelines •Submit projects for FY 14, 15, and 16 & H&S Revenue Application thby July 25 •FY 2016 projects entered](https://reader034.vdocuments.site/reader034/viewer/2022042101/5e7deef5b036a960595f70a9/html5/thumbnails/35.jpg)
H&S Other Revenue SOURCE 629
--recording other revenue sources for health
and safety projects beyond state aid or levy
--Including, but not limited to:
• Utility rebates for approved lighting
replacement (metal halide) and/or
mechanical ventilation upgrades
• insurance and legal settlements, Petrofund
reimbursements (UST/AST remediation)
![Page 36: 2014 H&S Town Hall Presentation - LCSC · 2014-06-24 · 3. H&S Timelines •Submit projects for FY 14, 15, and 16 & H&S Revenue Application thby July 25 •FY 2016 projects entered](https://reader034.vdocuments.site/reader034/viewer/2022042101/5e7deef5b036a960595f70a9/html5/thumbnails/36.jpg)
Reporting H&S Other Revenue SOU 629
• Must approve the full project amount, then
record additional revenue utilizing the
following UFARS dimension
• Health and Safety
Fund 1 PRO 850 FIN 347, 349, 352, 358, 363,
366 SOU 629
![Page 37: 2014 H&S Town Hall Presentation - LCSC · 2014-06-24 · 3. H&S Timelines •Submit projects for FY 14, 15, and 16 & H&S Revenue Application thby July 25 •FY 2016 projects entered](https://reader034.vdocuments.site/reader034/viewer/2022042101/5e7deef5b036a960595f70a9/html5/thumbnails/37.jpg)
MATCHING THE NUMBERS
Approved H&S Projects
vs.
Reported UFARS Data
(FY 14 close-out)
education.state.mn.us 37
5) FY 14 Closeout Activities
![Page 38: 2014 H&S Town Hall Presentation - LCSC · 2014-06-24 · 3. H&S Timelines •Submit projects for FY 14, 15, and 16 & H&S Revenue Application thby July 25 •FY 2016 projects entered](https://reader034.vdocuments.site/reader034/viewer/2022042101/5e7deef5b036a960595f70a9/html5/thumbnails/38.jpg)
FY 2014 Close-out
• H&S revenue is based on the lesser of
approved costs on the H&S website or
district-reported UFARS data.
• Project amounts on the H&S website
should be updated to equal audited
UFARS expenditures.
• The MFR System updates each time the
district loads UFARS.
• The Capital Expenditure Report will be
updated regularly through January. This
is a change from last year.
education.state.mn.us 38
![Page 39: 2014 H&S Town Hall Presentation - LCSC · 2014-06-24 · 3. H&S Timelines •Submit projects for FY 14, 15, and 16 & H&S Revenue Application thby July 25 •FY 2016 projects entered](https://reader034.vdocuments.site/reader034/viewer/2022042101/5e7deef5b036a960595f70a9/html5/thumbnails/39.jpg)
• Work with accounting office to provide
UFARS reports
• Compare expenses to project approvals
• Accounts Payable has support
documentation for payments
• Projects completed and coded correctly?
• Get all the revenue you deserve!
education.state.mn.us 39
FY 2014 Close-out
![Page 40: 2014 H&S Town Hall Presentation - LCSC · 2014-06-24 · 3. H&S Timelines •Submit projects for FY 14, 15, and 16 & H&S Revenue Application thby July 25 •FY 2016 projects entered](https://reader034.vdocuments.site/reader034/viewer/2022042101/5e7deef5b036a960595f70a9/html5/thumbnails/40.jpg)
3. H&S Administrative Information
• Replace with bullet points or subheading
education.state.mn.us 40
![Page 41: 2014 H&S Town Hall Presentation - LCSC · 2014-06-24 · 3. H&S Timelines •Submit projects for FY 14, 15, and 16 & H&S Revenue Application thby July 25 •FY 2016 projects entered](https://reader034.vdocuments.site/reader034/viewer/2022042101/5e7deef5b036a960595f70a9/html5/thumbnails/41.jpg)
education.state.mn.us 41
![Page 42: 2014 H&S Town Hall Presentation - LCSC · 2014-06-24 · 3. H&S Timelines •Submit projects for FY 14, 15, and 16 & H&S Revenue Application thby July 25 •FY 2016 projects entered](https://reader034.vdocuments.site/reader034/viewer/2022042101/5e7deef5b036a960595f70a9/html5/thumbnails/42.jpg)
education.state.mn.us 42
![Page 43: 2014 H&S Town Hall Presentation - LCSC · 2014-06-24 · 3. H&S Timelines •Submit projects for FY 14, 15, and 16 & H&S Revenue Application thby July 25 •FY 2016 projects entered](https://reader034.vdocuments.site/reader034/viewer/2022042101/5e7deef5b036a960595f70a9/html5/thumbnails/43.jpg)
6) Regulatory Update
• MDH Radon Test Result Reporting
• MDH Indoor Ice Arenas
• Lead in Drinking Water Act
• OSHA Hazard Communication Standard
education.state.mn.us 43
![Page 44: 2014 H&S Town Hall Presentation - LCSC · 2014-06-24 · 3. H&S Timelines •Submit projects for FY 14, 15, and 16 & H&S Revenue Application thby July 25 •FY 2016 projects entered](https://reader034.vdocuments.site/reader034/viewer/2022042101/5e7deef5b036a960595f70a9/html5/thumbnails/44.jpg)
• Minnesota Statutes, section 123B.571
• A school district shall:
1) Report the results radon testing to
the Department of Health; and
2) Report the results of its testing at a
school board meeting
MDH Radon Test Result Reporting
education.state.mn.us 44
![Page 45: 2014 H&S Town Hall Presentation - LCSC · 2014-06-24 · 3. H&S Timelines •Submit projects for FY 14, 15, and 16 & H&S Revenue Application thby July 25 •FY 2016 projects entered](https://reader034.vdocuments.site/reader034/viewer/2022042101/5e7deef5b036a960595f70a9/html5/thumbnails/45.jpg)
Dan Tranter
Indoor Air Unit Supervisor
Minnesota Department of Health
Or
651-201-4618
Radon Testing Plan information at MDH
http://www.health.state.mn.us/divs/eh/indoorair/
schools/radonschool.html
Radon Contact Information
education.state.mn.us 45
![Page 46: 2014 H&S Town Hall Presentation - LCSC · 2014-06-24 · 3. H&S Timelines •Submit projects for FY 14, 15, and 16 & H&S Revenue Application thby July 25 •FY 2016 projects entered](https://reader034.vdocuments.site/reader034/viewer/2022042101/5e7deef5b036a960595f70a9/html5/thumbnails/46.jpg)
• MN Rule 4620.3900-4900
• Previous acceptable air quality standard:
– Carbon Monoxide (CO) = 30 ppm
– Nitrogen Dioxide (NO2) = 0.5 ppm
• Effective 5/20/13 air quality standard:
– Carbon Monoxide (CO) = 20 ppm
– Nitrogen Dioxide (NO2) = 0.3 ppm
• At least one trained responsible person on-site
when open to the public
• More frequent air quality testing requirements
MDH Indoor Ice Arenas
education.state.mn.us 46
![Page 47: 2014 H&S Town Hall Presentation - LCSC · 2014-06-24 · 3. H&S Timelines •Submit projects for FY 14, 15, and 16 & H&S Revenue Application thby July 25 •FY 2016 projects entered](https://reader034.vdocuments.site/reader034/viewer/2022042101/5e7deef5b036a960595f70a9/html5/thumbnails/47.jpg)
John Olson
Indoor Air Unit
Minnesota Department of Health
Or
651-201-4614
Key Changes information at MDH
http://www.health.state.mn.us/divs/eh/indoorair
/arenas/forms/keychangestorule.pdf
Ice Arena Contact Information
education.state.mn.us 47
![Page 48: 2014 H&S Town Hall Presentation - LCSC · 2014-06-24 · 3. H&S Timelines •Submit projects for FY 14, 15, and 16 & H&S Revenue Application thby July 25 •FY 2016 projects entered](https://reader034.vdocuments.site/reader034/viewer/2022042101/5e7deef5b036a960595f70a9/html5/thumbnails/48.jpg)
http://water.epa.gov/drink/info/lead/index.cfm
5/18/14 MDH defined elevated blood level 5 micrograms
lead per deciliter, MN144.9501Sub.(9), was 10 mcg/dcl.
Reduction of Lead in Drinking Water Act
education.state.mn.us 48
20 ppm of lead is still the action level; the new federal
legislation re-defines “lead free” that applies to new
piping, plumbing fittings, fixtures, solder and flux
• Enforced via Minnesota Plumbing Codes / DLI
• Reduction of Lead in Drinking Water Act (S3874-2010) - New “lead-free” definition
- Weighted average of not more than 0.25% lead containing for
piping, plumbing fittings and fixtures
- Not more than 0.2% lead for solder and flux
- Effective date: January 4, 2014 – no longer use old shelf inventory
![Page 49: 2014 H&S Town Hall Presentation - LCSC · 2014-06-24 · 3. H&S Timelines •Submit projects for FY 14, 15, and 16 & H&S Revenue Application thby July 25 •FY 2016 projects entered](https://reader034.vdocuments.site/reader034/viewer/2022042101/5e7deef5b036a960595f70a9/html5/thumbnails/49.jpg)
Leslie Winter
Environmental Health Division
Minnesota Department of Health
651-201-4705
Lead in Drinking Water Contact Information
education.state.mn.us 49
![Page 50: 2014 H&S Town Hall Presentation - LCSC · 2014-06-24 · 3. H&S Timelines •Submit projects for FY 14, 15, and 16 & H&S Revenue Application thby July 25 •FY 2016 projects entered](https://reader034.vdocuments.site/reader034/viewer/2022042101/5e7deef5b036a960595f70a9/html5/thumbnails/50.jpg)
• Globally Harmonized System of
Classification and Labeling of Chemicals
• Train employees by Dec 1, 2013 on the
new labeling system and Safety Data
Sheet (SDS) format
OSHA Hazard Communication (HazCom)
education.state.mn.us 50
![Page 51: 2014 H&S Town Hall Presentation - LCSC · 2014-06-24 · 3. H&S Timelines •Submit projects for FY 14, 15, and 16 & H&S Revenue Application thby July 25 •FY 2016 projects entered](https://reader034.vdocuments.site/reader034/viewer/2022042101/5e7deef5b036a960595f70a9/html5/thumbnails/51.jpg)
• June 1, 2015 comply with all labeling and
SDS (Safety Data Sheet) requirements
(distributors allowed until December 1, 2015,
for labeling)
• June 1, 2016, fully implement HazCom
program
• MN OSHA did retain the annual training
requirement and physical and infectious
agent sections of the Employee Right To
Know rule (MN Rule 5206.0700, Subp. 3 & 4)
OSHA Hazard Communication Standard
education.state.mn.us 51
![Page 52: 2014 H&S Town Hall Presentation - LCSC · 2014-06-24 · 3. H&S Timelines •Submit projects for FY 14, 15, and 16 & H&S Revenue Application thby July 25 •FY 2016 projects entered](https://reader034.vdocuments.site/reader034/viewer/2022042101/5e7deef5b036a960595f70a9/html5/thumbnails/52.jpg)
651-284-5060; ext. 3
MN OSHA Workplace Safety Consultation
Contact Information
education.state.mn.us 52
https://www.osha.gov/dsg/hazcom/index.html