2014 construction program...8 77628 i-71 at martin luther king new interchange june 2014 to june...

17
John R. Kasich, Ohio Governor | Jerry Wray, ODOT Director | Steve Mary, P.E., District Deputy Director Serving Butler, Clermont, Clinton, Greene, Hamilton, Preble and Warren Counties. 2014 Construction Program District 8 Hamilton Clinton Butler Warren Preble Greene Lebanon Lebanon Hamilton Clinton Butler Warren Preble Greene Clermont Clermont

Upload: others

Post on 27-Jun-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 2014 Construction Program...8 77628 I-71 at Martin Luther King New Interchange June 2014 to June 2017 $80,808,083 1 87098 SR 126 Bridge rehabilitation April to Oct. 2014 $3,147,600

John R. Kasich, Ohio Governor | Jerry Wray, ODOT Director | Steve Mary, P.E., District Deputy Director

Serving Butler, Clermont, Clinton, Greene, Hamilton, Preble and Warren Counties.

2014 Construction Program

District 8

Hamilton

ClintonButler Warren

PrebleGreene

LebanonLebanon

Hamilton

ClintonButler Warren

PrebleGreene

ClermontClermont

Page 2: 2014 Construction Program...8 77628 I-71 at Martin Luther King New Interchange June 2014 to June 2017 $80,808,083 1 87098 SR 126 Bridge rehabilitation April to Oct. 2014 $3,147,600

The cover: This year’s cover features construction at the U.S. 50/Sixth Street Expressway Improvement project.

Project Hamilton County I-75/Hopple Street Interchange Improvement

Description Reconstruction and improvement of the I-75/Hopple Street Interchange. Four lanes of traffic to be maintained in each direction. More info on project at http://www.dot.state.oh.us/districts/D08/MillCreekEx press/ Construction Cost $90.8 millionCounty HamiltonPID 76257Start March 2013Est. End June 2016

Inside:The construction program for each county is represented by a map as well as a page listing of projects, each of which has a map locator number. Projects in red represent bridge/culvert work; those in green show road resurfacing projects; those in blue represent section improvement, safety and enhancement projects, and those in purple show major construction projects.

2014 Ohio Construction Fast Facts

• ODOT’s 2014 construction program includes 936 dif-ferent projects throughout the state, totaling $2.5 billion.

• $1.5 billion in roadway resurfacing projects. • 84 interstate safety upgrades • 30 bridges repaired or replaced as part of the new

County Bridge Program worth $14 million.• By unlocking the revenue potential of our Ohio Turn-

pike asset, the Ohio Jobs and Transportation Plan isfundingmultiplephasesoffiveprojectsthatwillbegin or continue this year, including:

◦ ConstructionofCleveland’seastbound George V. Voinovich Bridge◦ Interstate75highwayreconstructionthrough Wood and Hancock counties◦ ReconstructionofStateRoute57inLorainCounty◦ WideningofInterstate271inSummitCounty◦ ConstructionofCleveland’sOpportunityCorridor

2014 Construction Season Highlights for District 8

Other large projects beginning or continuing this year include:• ConstructionofanewinterchangeatInterstate71

andMartinLutherKingBlvd.inCincinnati’s“Up-town” area

• ModernizationofInterstate75throughDayton• ReconstructionoftheinterchangeatU.S.Route23

andInterstate270innorthernFranklinCounty

Project Clermont County I-275/SR 32 Interchange Improvement

Description Reconstruction of I-275/SR 32 interchange to add capacity and eliminate access point conflicts to improve safety and traffic flow on SR 32 and the I-275/SR 32 and Eastgate Blvd. interchanges. More info on project at http://easterncorridor.org/projects/sr-32-eastgate/sr-32- eastgate-project-overview Construction Cost $31.9 million County ClermontPID 76289Start July 2013Est. End Oct. 2015

Page 3: 2014 Construction Program...8 77628 I-71 at Martin Luther King New Interchange June 2014 to June 2017 $80,808,083 1 87098 SR 126 Bridge rehabilitation April to Oct. 2014 $3,147,600

Project I-71 Jeremiah Morrow Bridge Replacement

Description Replacement of the two Jeremiah Morrow spans over the Little Miami River. First span opened to northbound I-71 traffic November 2013. Work is proceeding on construction of second span. Additional information on http://www.omniproservices.com/jeremiah-morrow-bridge-replacement-project.html Construction Cost $88.1 million County WarrenPID 22950Start August 2010Est. End May 2016

Project Hamilton County I-71 at Martin Luther King Drive

Description Provide a full movement interchange at I-71 and Martin Luther King Drive while maintaining existing connections to William Howard Taft and McMillan roads. Provide north and southbound auxiliary lanes and capacity improve- ments. Traffic will be maintained. Construction Cost $80.8 millionCounty HamiltonPID 77628Start July 2014Est. End June 2017

Project Waldvogel Viaduct and Sixth Street Expressway Improvement

Description Removal of Waldvogel Memorial Viaduct, including four ramps to Elberon and Warsaw avenues. Replacement of structures for the four ramps to Elberon and Warsaw and replacement of structures for the connection to the Sixth Street Expressway. Removal and replacement of roadways for the required portions of River Road, Elberon Avenue, Warsaw Avenue, State Avenue, Evans Street and Maryland Avenue. One lane of U.S. 50 traffic maintained in each direction. Construction Cost $54.9 millionCounty HamiltonPID 20082Start July 2011Est. End May 2015

Page 4: 2014 Construction Program...8 77628 I-71 at Martin Luther King New Interchange June 2014 to June 2017 $80,808,083 1 87098 SR 126 Bridge rehabilitation April to Oct. 2014 $3,147,600

2014 District 8 Construction Program

4 BUTLER COUNTY

Page 5: 2014 Construction Program...8 77628 I-71 at Martin Luther King New Interchange June 2014 to June 2017 $80,808,083 1 87098 SR 126 Bridge rehabilitation April to Oct. 2014 $3,147,600

BUTLER COUNTY

2014 District 8 Construction Program

5

Map No. PID No. Location Work Type Construction Dates Cost 1 81769 U.S.27,cityofOxford Widening March 2014 to June 2016 $7,566,360

2 88722 SR63 Trafficmanagementsystem-signalization Sept.2013toJuly2014 $947,875

3 88780 WayneMadisonRoad Minor widening May to Nov. 2014 $612,346

4 87098 SR747atUnionCentre Turn lane addition; pavement repair May to Nov. 2014 $2,942,000

1 75686 SR177 Drainage improvement April to Nov. 2014 $2,710,8312 97207 SR129 Culvert March to May 2014 $109,2443 89731 Hueston Woods BridgeRepair April to Nov. 2014 $676,9694 84615 SR126,SR4,U.S.127,I-75 Culvert replacement/repair ApriltoSept.2014 $1,472,346

5 90943 SR73atSR4 Drainage improvement Nov. 2013 to April 2014 $93,699

6 88206 U.S.27 StabilizeIndianCreek Aug. 2014 to June 2015 $1,045,000

1 79390 SR4/122 Urbanpaving-cityofMiddletown July to Nov. 2014 $544,960

Local let projectsYankee Road Bridge deck replacementApril 2014 to April 2015

Roachester-Osceola Road Bridge deck replacementMarch to May 2014

Cincinnati Dayton Road WideningMarch to Aug. 2014

Lakota SchoolsSafe Routes to SchoolMay to July 2014

Hamilton Safe Routes to SchoolJune to Oct. 2014

Hamilton SchoolsNatural gas stationJune 2014 to Feb. 2015

Liberty Fairfield Road WideningJune to Oct 2014

Mauds Hughes Bridge replacementJuly to Nov. 2014

Page 6: 2014 Construction Program...8 77628 I-71 at Martin Luther King New Interchange June 2014 to June 2017 $80,808,083 1 87098 SR 126 Bridge rehabilitation April to Oct. 2014 $3,147,600

2014 District 8 Construction Program

CLERMONT COUNTY 6

Page 7: 2014 Construction Program...8 77628 I-71 at Martin Luther King New Interchange June 2014 to June 2017 $80,808,083 1 87098 SR 126 Bridge rehabilitation April to Oct. 2014 $3,147,600

Map No. PID No. Location Work Type Construction Dates Cost

1 76289 I-275atSR32 Interchangereconstruction Oct. 2013 to Oct. 2015 $31,990,699

2 92502 Eastgate Blvd Bridge InterchangereconstructiontoSR32

March 2013 to Oct. 2014 $9,039,295

1 92917 U.S.50eastofDryRunRd. Widen shoulder JunetoSept.2014 $98,000

2 87761 SR28eastofBranchHillGuinea Pike

Turn lane addition Aug.2014toSept.2015 $3,577,000

3 81425 SR125atMt.Carmel Intersectionimprovement June 2013 to Aug. 2014 $3,465,003

4 89910 SR125atBachBuxton Intersectionimprovement March to Oct. 2014 $387,965

5 85233 SR125atSR132 Intersectionimprovement JunetoSept.2014 $1,067,000

6 92578 SR133 Sliderepair April to Aug. 2014 $419,810

1 85135 U.S.50 Bridge repair resurfacing April to Oct. 2014 $4,680,608

2014 District 8 Construction Program

7 CLERMONT COUNTY

Local let projects

CR 116 Covered bridge repair Nov. 2013 to Nov. 2014

Clough Pike Widening June 2013 to Aug. 2014

Jackson PikeBridge deck replacementJune to Dec. 2014

Various routesPavement markingsJune to July 2104

Various routesGuardrail replacementJune to Sept. 2014

Page 8: 2014 Construction Program...8 77628 I-71 at Martin Luther King New Interchange June 2014 to June 2017 $80,808,083 1 87098 SR 126 Bridge rehabilitation April to Oct. 2014 $3,147,600

2014 District 8 Construction Program

CLINTON COUNTY 8

Map No. PID No. Location Work Type Construction Dates Cost

1 87156 U.S.68 Culvert reconstruction May to July 2014 $506,958

1 87061 I-71/SR380 Four-laneresurfacing/bridgerehab March 2013 to July 2014 $8,887,743

2 87093 SR28 Resurfacing Sept.2013toMay2014 $3,675,000

3 96651 U.S.22 Resurfacing Aug. to Nov. 2014 $1,707,000

Page 9: 2014 Construction Program...8 77628 I-71 at Martin Luther King New Interchange June 2014 to June 2017 $80,808,083 1 87098 SR 126 Bridge rehabilitation April to Oct. 2014 $3,147,600

Map No PID No. Location Work Type Construction Dates Cost1 95272 SR444/DaytonYellowSprings Intersectionimprovement May 2014 to Oct. 2015 $356,000

2 88770 U.S.68/KinseyRoad Intersectionimprovement JunetoSept.2014 $258,000

1 84238 I-675 Pedestrian/cyclist bridge June 2014 to May 2015 $2,850,000

2 89731 JohnBryanStatePark BridgeRepair June to Nov. 2014 $676,9691 77920 I-675 Resurfacing March 2014 to Oct. 2015 $16,267,610

2 88792 U.S.42/68 Urbanpaving-Xenia April to Nov. 2014 $1,302,1713 95678 SR444 Urbanpaving-Fairborn June to Oct. 2014 $133,000

2014 District 8 Construction Program

9 GREENE COUNTY

Local let projects

Fairborn Signals update June to Dec. 2014

Xenia Streetscape April to July 2014

Hanes RoadBridge replacementApril to July 2014

Grange Hall RoadLandscaping April to July 2014

Page 10: 2014 Construction Program...8 77628 I-71 at Martin Luther King New Interchange June 2014 to June 2017 $80,808,083 1 87098 SR 126 Bridge rehabilitation April to Oct. 2014 $3,147,600

2014 District 8 Construction Program

11 HAMILTON COUNTY

10 HAMILTON COUNTY

Page 11: 2014 Construction Program...8 77628 I-71 at Martin Luther King New Interchange June 2014 to June 2017 $80,808,083 1 87098 SR 126 Bridge rehabilitation April to Oct. 2014 $3,147,600

Map No. PID No. Location Work Type Construction Dates Cost1 82278 I-75atMitchellAvenue Reconstruction June2011toSept.2014 $54,649,065

2 82284 I-74atBeekmanStreet Interchangereconstruction Jan.2012toSept.2014 $13,069,483

3 76257 I-75/HoppleStreet Interchangereconstruction March 2013 to June 2016 $90,790,431

4 82283 I-75/RailAmerica Railbridgereplacement July2013toSept.2015 $18,055,153

5 82286 I-75betweenMitchelltoSR562 Reconstruction/widening July2014toJune2017 $3,400,000

6 20082 U.S.50 Bridge replacement/widening July 2011 to Oct. 2014 $54,923,975

7 82976 I-275atI-74 MajorRehabilitation Jan. 2014 to Nov. 2015 $27,993,562

8 77628 I-71atMartinLutherKing NewInterchange June2014toJune2017 $80,808,083

1 87098 SR126 Bridge rehabilitation April to Oct. 2014 $3,147,600

2 94476 I-275 Culvert repair June to Aug. 2014 $201,000

1 92785 MiamiWhitewaterForest Parking lot resurfacing June to Nov. 2014 $289,671

2 84495 I-75,EvendaletoI-275 Resurfacing Aug. to Nov. 2014 $4,400,000

2014 District 8 Construction Program

11 HAMILTON COUNTY

Page 12: 2014 Construction Program...8 77628 I-71 at Martin Luther King New Interchange June 2014 to June 2017 $80,808,083 1 87098 SR 126 Bridge rehabilitation April to Oct. 2014 $3,147,600

2014 District 8 Construction Program

13

Map No. PIDNo. Location Work Type Construction Dates Cost

1 83077 I-71atPfeiffer IntersectionImprovement Jan. 2013 to June 2014 $3,139,393

2 85874 Clough Pike Turn lane addition, signals, sidewalks

March to Aug. 2014 $2,484,042

3 94628 I-71atSR126 IntersectionImprovement MarchtoSept.2014 $3,049,130

4 86797 U.S.127,CresttoCranbrook

Intersectionimprovement ApriltoSept.2014 $980,000

5 83078 U.S.27atEastMiamiRiverRoad

Intersectionimprovement June 2014 to June 2015 $2,120,000

6 92555 U.S.27atI-275 Widening June to Oct. 2014 $2,336,000

7 94293 SR747,Glendale Signals June to Aug. 2014 $59,000

8 96973 U.S.127,SundaletoSR126 Pedestrian signal upgrade July to Nov. 2014 $63,000

9 86895 ReadingRoad,Kemperto Crescentville

turn lane addition/ signals, intersection improvement

July 2014 to July 2015 $2,900,000

10 91466 I-275/U.S.22 Turn lane addition at ramp Aug. to Nov. 2014 $114,000

11 86764 Euclid and Thomas roads, Madeira

SafeRoutestoSchools Aug. 2014 to Oct. 2015 $322,000

12 89182 U.S.22/SR3 Turn lane addition/signals Aug to Nov. 2014 $516,000

13 97537 Cincinnati area interstate Freewayservicepatrol/511sign installation

April to July 2014 $82,175

12 HAMILTON COUNTY

Local letprojects

Westwood Northern Blvd.ResurfacingApril to Nov. 2014

U.S. 50, CincinnatiUrban pavingMay to Nov. 2014

Central ParkwayBikewayJune to Sept. 2014

U.S. 50 Section improvementJune 2014 to March 2015

Page 13: 2014 Construction Program...8 77628 I-71 at Martin Luther King New Interchange June 2014 to June 2017 $80,808,083 1 87098 SR 126 Bridge rehabilitation April to Oct. 2014 $3,147,600

2014 District 8 Construction Program

Map No. PID No. Location Work Type Construction Dates Cost

1 86136 SR121,SR732 CulvertReplacements MaytoSept.2014 $829,073

1 97724 I-70 Pavement repairs Aug. to Oct. 2014 $300,000

PREBLE COUNTY 13

Local let projectSeven Mile RoadBridge repair Jan. to Aug. 2014

Page 14: 2014 Construction Program...8 77628 I-71 at Martin Luther King New Interchange June 2014 to June 2017 $80,808,083 1 87098 SR 126 Bridge rehabilitation April to Oct. 2014 $3,147,600

2014 District 8 Construction Program

WARREN COUNTY 14

Page 15: 2014 Construction Program...8 77628 I-71 at Martin Luther King New Interchange June 2014 to June 2017 $80,808,083 1 87098 SR 126 Bridge rehabilitation April to Oct. 2014 $3,147,600

Map No. PID No. Location Work Type Construction Dates Cost

1 22950 I-71/JeremiahMorrow Bridge replacement June 2010 to May 2016 $88,133,160

2 87401 I-71/MasonMontgomery Northbound loop ramp March 2014 to Oct. 2015 $7,402,950

1 93938 I-71/Mason-Montgomery Intersectionimprovement Aug.2013toSept.2014 $1,138,711

2 87399 I-71/Mason-Montgomery Interchangereconstruction Sept.2013toNov.2014 $1,595,755

3 92040 I-71/SR73 New ramp ApriltoSept.2014 $2,456,114

4 92926 I-75/SR122 Interchangelandscaping July to Oct. 2014 $1,007,000

1 88798 I-71 Bridge repair Oct. 2013 to July 2014 $535,306

2 87128 SR48 Bridge repair March to Aug. 2014 $1,039,785

1 92105 U.S.42 Pavement reconstruction Oct. 2013 to Nov. 2014 $13,851,867

2 82962 I-71,HamiltonCountylinetoSR741 Preventative maintenance May to Nov. 2014 $879,000

3 95749 LytleFivePointsRoad Resurfacing June to Aug. 2014 $420,000

2014 District 8 Construction Program

15 WARREN COUNTY

Local let projects

Mason-Montgomery/Bethany Road Roundabout June 2013 to June 2014

SR 123 Lebanon Connector new alignment June 2013 to Oct. 2014

LM&M railroad Improvements/rehabMay to Aug. 2014

Roachester-OsceolaRoadBridge deck replacement March to May 2014

Towne Blvd.Widening/resurfacing/enhancementsApril to Nov. 2014

Page 16: 2014 Construction Program...8 77628 I-71 at Martin Luther King New Interchange June 2014 to June 2017 $80,808,083 1 87098 SR 126 Bridge rehabilitation April to Oct. 2014 $3,147,600

11

PID No. Location Work Type Construction Dates Cost87019 District Highway lighting June 2012 to June 2014 $2,107,077

87024 District Signals June 2013 to June 2015 $1,617,61794602 District Guardrail repair/upgrade Nov. 2013 to Nov. 2015 $2,044,65596444 District Micro-surface friction treatment May to Aug. 2014 $1,819,38087028 District Highway lighting Sept.2014toAug.2015 $1,600,00087029 District SignUpgrade Sept.2014toSept.2015 $3,000,00084517 District Bridge sealing Oct.2014toFeb.2015 $771,00084530 District Bridge maintenance May to Nov. 2014 $2,300,00087026 District Pavement Marking April 2014 to April 2015 $2,248,382

87304 District Pavement resurfacing Aug. to Nov. 2014 $988,000

84475 District Crack sealing May to Nov. 2014 $284,29582963 District Crack sealing May to Nov. 2014 $279,60284478 District Preventative maintenance March to May 2014 $961,220

16DISTRICT

2014 District 8 Construction Program

Page 17: 2014 Construction Program...8 77628 I-71 at Martin Luther King New Interchange June 2014 to June 2017 $80,808,083 1 87098 SR 126 Bridge rehabilitation April to Oct. 2014 $3,147,600

11www.Ohgo.com