2013 NASA Safety Directors and Occupational Health Managers Meeting ECIC Role and the C of F Process for Safety Keith Britton, Chair Engineering & Construction Innovations Committee March 28, 2013 Construction of Facilities Facilities Engineering and Real Facilities Engineering and Real Property Management Division Property Management Division 1

Upload: levana

Post on 13-Jan-2016

28 views

Category:

Documents


0 download

DESCRIPTION

Facilities Engineering and Real Property Management Division. Construction of Facilities. 2013 NASA Safety Directors and Occupational Health Managers Meeting ECIC Role and the C of F Process for Safety Keith Britton, Chair Engineering & Construction Innovations Committee March 28, 2013. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: 2013 NASA Safety Directors and  Occupational Health Managers Meeting

2013 NASA Safety Directors and Occupational Health Managers Meeting

ECIC Role and the C of F Process for Safety

Keith Britton, ChairEngineering & Construction Innovations Committee

March 28, 2013

Construction of FacilitiesFacilities Engineering and Real Facilities Engineering and Real Property Management DivisionProperty Management Division

1

Page 2: 2013 NASA Safety Directors and  Occupational Health Managers Meeting

2

Introduction:Safety Culture on ConstructionJay-Jay RR Bridge at KSC

Page 3: 2013 NASA Safety Directors and  Occupational Health Managers Meeting

3

Learning from close calls:

Page 4: 2013 NASA Safety Directors and  Occupational Health Managers Meeting

1. In 1998, the Facilities Engineering Division (HQ/JX) and the Facility Board of Directors at Headquarters proposed that a Council be formed to nurture and foster identification and appropriate use of new innovations and practices.

2. The Council will be instrumental in improving NASA’s process of delivering high quality facilities projects to its customers within NASA community.

3. Each Center or component facility with responsibility for construction projects should have one member at the Council.

4. This Council evolves into the Engineering and Construction Innovations Committee, ECIC, as we know it today.

Background History of ECIC:

4

Facilities Engineering and Real Facilities Engineering and Real Property Management DivisionProperty Management Division Construction of Facilities

Page 5: 2013 NASA Safety Directors and  Occupational Health Managers Meeting

Mission: The ECIC is chartered by the Director, Facilities Engineering Division (FED), NASA Headquarters, and exists to advise and support FED in assertively improving the process of delivering safe, efficient, effective, and sustainable facility projects in support of NASA’s mission.

Accomplishes the goal stated by researching, developing, and making recommendations on planning, design, construction, and other facility program issues, guidance, policies, and practices.

5

Facilities Engineering and Real Facilities Engineering and Real Property Management DivisionProperty Management Division Construction of Facilities

Page 6: 2013 NASA Safety Directors and  Occupational Health Managers Meeting

Pillars for ECIC:

1. Serves as a conduit for innovations: From government, industry, and academic research, introducing

new ideas and new ways of doing business to NASA’s facility engineering and construction organizations;

2. Develop or assess potential new best practices : Customize, recommend, and after a decision to implement,

champion them for NASA;

3. Foster effective networking within the agency: Sharing center-level best practices and center-specific approaches

to common issues;

6

Facilities Engineering and Real Facilities Engineering and Real Property Management DivisionProperty Management Division Construction of Facilities

Page 7: 2013 NASA Safety Directors and  Occupational Health Managers Meeting

Pillars for ECIC (continue):

4. Foster networking of NASA personnel outside the agency:

With their counterparts in government, industry, and academia by encouraging participation in research teams and attendance at conferences;

5. Foster professional growth of NASA personnel;

6. Training: Develop, evaluate, advocate, and/or publicize relevant NASA

training courses;

7

Facilities Engineering and Real Facilities Engineering and Real Property Management DivisionProperty Management Division Construction of Facilities

Page 8: 2013 NASA Safety Directors and  Occupational Health Managers Meeting

Pillars for ECIC (continue):

7. Develop and/or recommend process measurements and metrics

8. Act as pioneers for change.

New Pillars:

9. ECIC Management (Logistics/Vision)

10. Tools (improving efficiency)

11. ECIC advocacy and historical record.

8

Facilities Engineering and Real Facilities Engineering and Real Property Management DivisionProperty Management Division Construction of Facilities

Page 9: 2013 NASA Safety Directors and  Occupational Health Managers Meeting

4. Members to implement innovations and new best practices at their home Center.

5. Both members and alternates to be appointed by their Center’s Facility Director.

6. Members to actively participate in ECIC activities, resolve actions, serve on subcommittees, promote and participate in innovation activities both within & outside of NASA.

9

Facilities Engineering and Real Facilities Engineering and Real Property Management DivisionProperty Management Division Construction of Facilities

Membership: 1. One voting member and an alternate member from each of the

ten field Centers and from FED at Headquarters.

2. One non-voting member from each component facility, Headquarters Environmental Management Division, and the Office of Safety and Mission Assurance.

3. ECIC duties to be included in member’s performance plan.

Page 10: 2013 NASA Safety Directors and  Occupational Health Managers Meeting

Membership (continue): 1. Officers: Both Chair and Vice-chair are elected by majority votes once a

year, at the end of the first quarter of each fiscal year.

2. Reporting: members report to their respective management. ECIC reports and make recommendations to the Director of Facilities Engineering Division.

3. Meetings: Monthly video teleconferences, with one or two face-to-face meeting annually.

10

Facilities Engineering and Real Facilities Engineering and Real Property Management DivisionProperty Management Division Construction of Facilities

Page 11: 2013 NASA Safety Directors and  Occupational Health Managers Meeting

Accomplishments: 1. Pre-project Planning.

2. CoF Annual Metrics – include RIR & DART.

3. Project Definition Rating Index (PDRI)

4. BIM Design & Construction Guidelines.

5. Zero Incident Training.

6. LEED and Sustainability Initiatives

7. Lean principles in construction initiative

8. Commissioning Initiative

11

Facilities Engineering and Real Facilities Engineering and Real Property Management DivisionProperty Management Division Construction of Facilities

Page 12: 2013 NASA Safety Directors and  Occupational Health Managers Meeting

Construction of Facilities (CoF) Process

Project Selection: 1. Risk Assessment is consistent with NPR 8000.4A, Agency

Risk Management Procedural Requirements.

2. Performance Measures are: Safety Technical Cost Schedule

12

Facilities Engineering and Real Facilities Engineering and Real Property Management DivisionProperty Management Division Construction of Facilities

Page 13: 2013 NASA Safety Directors and  Occupational Health Managers Meeting

Project Selection (Continue): 1. Risk is operationally defined by: Scenario(s) - Sequential events that lead to injury, fatality,

destruction of assets, etc.) . Likelihood(s) - Possibility that a scenario will occur. Consequence(s) - Performance degradation that would

result if those scenarios were to occur.

13

Facilities Engineering and Real Facilities Engineering and Real Property Management DivisionProperty Management Division Construction of Facilities

Page 14: 2013 NASA Safety Directors and  Occupational Health Managers Meeting

Project Selection (Continue):

14

Facilities Engineering and Real Facilities Engineering and Real Property Management DivisionProperty Management Division Construction of Facilities

Likelihood of Occurrence

Qualitative Very Low Low Moderate High Very HighQuantitative 1 2 3 4 5

Descriptive

Conceivable but extremely unlikely.

Possible but unlikely. Possible at any time.Likely or

intermittent.Certain or

predictable.

         The probability of

this event occurring is no greater than expected under

normal operations

The probability of this event occurring

is higher than normal expectations. No

specific mitigation measures have been

developed but mitigation may be required at some

point.

There is a reasonable expectation that this

event may occur. Specific mitigation measures have been developed and are

occasionally required.

There is a reasonable expectation that this event will occur as there is a history of

frequent occurrences. Specific mitigation measures have been developed and are

intermittently required.

The probability of this event occurring at a critical time is almost certain as

there is a history of regular occurrence. Mitigation measures

or changes to operations are in

place and required for any critical

operation.

Page 15: 2013 NASA Safety Directors and  Occupational Health Managers Meeting

Project Selection (Continue):

15

Facilities Engineering and Real Facilities Engineering and Real Property Management DivisionProperty Management Division Construction of Facilities

Product of Qualitative Probabilities

Very High M M M H VH

High M M M H H

Moderate L L M M M

Low VL L L M M

Very Low VL VL L M M

Very Low Low Moderate High Very High

Page 16: 2013 NASA Safety Directors and  Occupational Health Managers Meeting

Project Selection (Continue):

16

Facilities Engineering and Real Facilities Engineering and Real Property Management DivisionProperty Management Division Construction of Facilities

Consequence of Scenario

Qualitative Very Low Low Moderate High Very HighQuantitative 1 2 3 4 5

Safety

Magnitude of harm or

discomfort to employees,

contractors, or public is not greater than ordinarily

encountered in daily life -Or-

Negligible damage to asset consistent with normal wear

and tear.

Minor first-aid treatment (does not

adversely affect personal safety or health) -Or- Minor

loss/damage to agency capabilities, resources or assets -Or- Administrative

regulatory non-compliance (scoped to safety, health and

environment).

Medical treatment for an injury or

incapacitation -Or- Moderate

loss/damage to agency capabilities, resources or assets -

Or- Moderate regulatory non-

compliance (scoped to safety, health and

environment).

Severe injury or incapacitation -Or-

Major loss/damage to agency capabilities, resources or assets -Or- Major regulatory

non-compliance (scoped to safety,

health and environment).

Death or permanent disability -Or-

Complete loss of critical agency

capabilities, resources or assets.

Technical          

Schedule          

Cost          

Page 17: 2013 NASA Safety Directors and  Occupational Health Managers Meeting

Project Selection (Continue):

17

Facilities Engineering and Real Facilities Engineering and Real Property Management DivisionProperty Management Division Construction of Facilities

Page 18: 2013 NASA Safety Directors and  Occupational Health Managers Meeting

NPR 8820.2G – Facility Project Requirements:

1.2 Facility Program Best Practices

k. “Making Zero Incidents a Reality” – a safety initiative encouraging proactive safe behavior during the construction phase.

2.2.2 Facility Project Manager

The project team shall include all project stakeholders, such as representatives from using organization, safety, health, engineering, fire protection, .....

2.2.4.1 Functional Requirements Document

After the Functional Requirements Document is written, it shall undergo a complete review by the project stakeholders including all …safety, security, energy, legal, planning…

18

Facilities Engineering and Real Facilities Engineering and Real Property Management DivisionProperty Management Division Construction of Facilities

Page 19: 2013 NASA Safety Directors and  Occupational Health Managers Meeting

NPR 8820.2F – Facility Project Requirements (continue):

2.2.2.4.2 Facility Project Management Plan

d. The project team shall include all project stakeholders, such as representatives from using organization, safety, health, engineering, fire protection, .....

2.2.4.5 Occupational Safety and Health

The FPM and the Center Occupational Safety and Health organization(s) shall identify safety and occupational health requirements in compliance with NPR 8715.3 and 8715.1…

a. The FPM shall prepare the Preliminary Hazard Analysis and the Preliminary Hazard List and initiate the Facility Safety Management Plan (FSMP) containing the Hazard Analysis Tracking Index (HATI) in accordance with NASA-STD-8719.7, Facility System Safety Guidebook

19

Facilities Engineering and Real Facilities Engineering and Real Property Management DivisionProperty Management Division Construction of Facilities