Page 1: 2013 02 01 - Altura LSM Presentation Final · 2013. 1. 31. · Altura Lithium - Resources JORC Mineral Resource estimate of 25.2 million tonnes @ 1.23% Li2O* (October 2012) 70% Indicated

5th Lithium Supply and Markets

Conference

31 January 2013Las Vegas, Nevada

James Brown

Managing Director

www.alturamining.com

ASX: AJM

Las Vegas, Nevada

1

For

per

sona

l use

onl

y

Page 2: 2013 02 01 - Altura LSM Presentation Final · 2013. 1. 31. · Altura Lithium - Resources JORC Mineral Resource estimate of 25.2 million tonnes @ 1.23% Li2O* (October 2012) 70% Indicated

Disclaimer

This presentation has been prepared by Altura Mining Limited (“Altura” or the “Company”). It should not be considered as an

invitation or offer to subscribe for or purchase any securities in the Company or as an inducement to make an invitation or offer

with respect to those securities. No agreement to subscribe for securities in the Company will be entered into on the basis of this

presentation.

This presentation is provided on the basis that none of Altura nor its respective officers, shareholders, related bodies corporate,

partners, affiliates, employees, representatives and advisers make any representation or warranty (express or implied) as to the

accuracy, reliability, relevance or completeness of the material contained in the presentation and nothing contained in the

presentation is, or may be relied upon as, a promise, representation or warranty, whether as to the past or the future. The

Company hereby excludes all warranties that can be excluded by law.

The presentation contains forward looking information and prospective financial material which is predictive in nature and may be

affected by inaccurate assumptions or by known or unknown risks and uncertainties, and may differ materially from results

ultimately achieved. All references to future production, production targets and resource targets and infrastructure access re

subject to the completion of all necessary feasibility studies, permitting, construction, financing arrangements and infrastructure-

related agreements. Where such a reference is made, it should be read subject to this paragraph and in conjunction with further

information about the Mineral Resources and Exploration Results, as well as the Competent Persons' Statements.

All persons should consider seeking appropriate professional advice in reviewing the presentation and all other information with

respect to the Company and evaluating the business, financial performance and operations of the Company. Neither the

provision of the presentation nor any information contained in the presentation or subsequently communicated to any person in

connection with the presentation is, or should be taken as, constituting the giving of investment advice to any person.

2

For

per

sona

l use

onl

y

Page 3: 2013 02 01 - Altura LSM Presentation Final · 2013. 1. 31. · Altura Lithium - Resources JORC Mineral Resource estimate of 25.2 million tonnes @ 1.23% Li2O* (October 2012) 70% Indicated

Presentation Summary

�Altura Mining – Overview

�Discovery

�Deposit strengths

�Resources�Resources

�Scoping Study

�LTUM Alliance

�Goals for 2013

3

For

per

sona

l use

onl

y

Page 4: 2013 02 01 - Altura LSM Presentation Final · 2013. 1. 31. · Altura Lithium - Resources JORC Mineral Resource estimate of 25.2 million tonnes @ 1.23% Li2O* (October 2012) 70% Indicated

Altura Mining – Overview

Capital Structure (31 December 2012)

ASX Listed Code AJM

Shares on Issue 454,272,181

4

Shares on Issue 454,272,181

Cash A$18 million

Debt Zero

Market Capital A$82 million

For

per

sona

l use

onl

y

Page 5: 2013 02 01 - Altura LSM Presentation Final · 2013. 1. 31. · Altura Lithium - Resources JORC Mineral Resource estimate of 25.2 million tonnes @ 1.23% Li2O* (October 2012) 70% Indicated

Altura Mining – Overview

Multi Faceted Exploration and Mining Services Company

� COAL

Emerging south-east Asian coal producer commencing with Tabalong in

South Kalimantan, Indonesia

� LITHIUM

Significant new discovery – Pilgangoora in the Pilbara region of Western

5

Significant new discovery – Pilgangoora in the Pilbara region of Western

Australia

� IRON ORE

Joint venture with Atlas Iron in the Mt Webber DSO project in the Pilbara

region of Western Australia

� MINING AND EXPLORATION SERVICES

US$10 million in revenue in the 2011/12 year For

per

sona

l use

onl

y

Page 6: 2013 02 01 - Altura LSM Presentation Final · 2013. 1. 31. · Altura Lithium - Resources JORC Mineral Resource estimate of 25.2 million tonnes @ 1.23% Li2O* (October 2012) 70% Indicated

Altura Lithium - Discovery

� Pilgangoora deposit

� Located in Pilbara region of Western Australia

� Adjacent Global Advanced Metals -Wodgina tantalum operations

� Area renowned for iron ore

6

� Area renowned for iron ore production (BHP, Rio Tinto, Fortescue etc.)

� Rapid progression from discovery

- rock chip sampling in Q4 2009

- drilling commenced in Q3 2010

- Maiden resource in Q3 2011

- Scoping Study completed Q4 2012For

per

sona

l use

onl

y

Page 7: 2013 02 01 - Altura LSM Presentation Final · 2013. 1. 31. · Altura Lithium - Resources JORC Mineral Resource estimate of 25.2 million tonnes @ 1.23% Li2O* (October 2012) 70% Indicated

Altura Lithium – Deposit strengths

� Shallow (outcropping) dykes

� Thick intercepts – up to 70 m

� Consistent mineralisation

� Located 90 km from major

7

� Located 90 km from major

regional centre – Port

Hedland – highway access

� Capacity at the port of

Dampier

� Significant iron ore and

metals operations nearby

For

per

sona

l use

onl

y

Page 8: 2013 02 01 - Altura LSM Presentation Final · 2013. 1. 31. · Altura Lithium - Resources JORC Mineral Resource estimate of 25.2 million tonnes @ 1.23% Li2O* (October 2012) 70% Indicated

Altura Lithium - Resources

� JORC Mineral Resource estimate of

25.2 million tonnes @ 1.23% Li2O*

(October 2012)

� 70% Indicated category, 30% Inferred

� 159 drill holes for 14,429 metres of

8

� 159 drill holes for 14,429 metres of

drilling

� Drill spacing 40m X 40m (Indicated)

� 12 spodumene-rich pegmatite dykes

� Exploration completed by Altura in-

house drilling team – offers greater

control and flexibility

� Discovery cost of $0.17 per tonne

Altura Drilling at Pilgangoora

• Refer to Appendix for Resource Table and Competent Persons Statement

For

per

sona

l use

onl

y

Page 9: 2013 02 01 - Altura LSM Presentation Final · 2013. 1. 31. · Altura Lithium - Resources JORC Mineral Resource estimate of 25.2 million tonnes @ 1.23% Li2O* (October 2012) 70% Indicated

Altura Lithium - Resources

C1, E1 and N1 Area

- 15.0 Mt Indicated

Mineral Resource Estimate

distribution

9

- 15.0 Mt Indicated

- 7.2 Mt Inferred

S1 Area

- 2.3 Mt Indicated

- 0.6 Mt Inferred For

per

sona

l use

onl

y

Page 10: 2013 02 01 - Altura LSM Presentation Final · 2013. 1. 31. · Altura Lithium - Resources JORC Mineral Resource estimate of 25.2 million tonnes @ 1.23% Li2O* (October 2012) 70% Indicated

Altura Lithium - Resources

10

For

per

sona

l use

onl

y

Page 11: 2013 02 01 - Altura LSM Presentation Final · 2013. 1. 31. · Altura Lithium - Resources JORC Mineral Resource estimate of 25.2 million tonnes @ 1.23% Li2O* (October 2012) 70% Indicated

Altura Lithium – Scoping Study

� Conducted by Mineral Engineering Technical Services Pty Ltd (METS) in

Perth, Western Australia

� METS considered the project positive for a number of reasons

� Majority of the spodumene is present in the coarse (+0.5 mm)

fraction

11

fraction

� Metallurgical test work results produced a coarse spodumene

concentrate with a grade of +6.0% Li2O

� Potential to produce a fines product by flotation

� Process selected is a simple flowsheet which is well proven for

hard rock lithium deposits

� NPV favourable in current marketFor

per

sona

l use

onl

y

Page 12: 2013 02 01 - Altura LSM Presentation Final · 2013. 1. 31. · Altura Lithium - Resources JORC Mineral Resource estimate of 25.2 million tonnes @ 1.23% Li2O* (October 2012) 70% Indicated

Altura Lithium – Scoping Study

Scoping Study (SS) parameters and outcomes

� Open pit mine and on site processing

� 830,000 tonnes per annum (tpa) of ore mined and fed to plant

12

� 830,000 tonnes per annum (tpa) of ore mined and fed to plant

� Up to 150,000 tpa of spodumene concentrate at +6.0% Li2O

� Capital cost estimate of A$96.3 million (at a SS level of accuracy ±35%)

� Net Present Value (NPV) of A$93.2 million (12% discount rate)For

per

sona

l use

onl

y

Page 13: 2013 02 01 - Altura LSM Presentation Final · 2013. 1. 31. · Altura Lithium - Resources JORC Mineral Resource estimate of 25.2 million tonnes @ 1.23% Li2O* (October 2012) 70% Indicated

Altura Lithium – LTUM Alliance

Strategic Alliance – Lithium

Corporation (OTCBB: LTUM)

� US Based lithium, potash and boron explorer

� Targeting salt playa brine deposits

13

Targeting salt playa brine deposits

� 2 main projects in Nevada – Fish Lake Valley and San Emidio

� Recently completed drilling indicatesanomalous levels of lithium and potash

� Synergy and complimentary skill sets with an agreed focus on exploration and development of properties

� Altura holds 15% stake and director position with LTUM

Drilling at Fish Lake Valley

For

per

sona

l use

onl

y

Page 14: 2013 02 01 - Altura LSM Presentation Final · 2013. 1. 31. · Altura Lithium - Resources JORC Mineral Resource estimate of 25.2 million tonnes @ 1.23% Li2O* (October 2012) 70% Indicated

Goals for 2013 – Altura Lithium

� Complete diamond core drilling for extended process testing – more flotation work

� Progress mining approvals with Western Australian Department of Mining and Petroleum

� Stakeholder agreements (land and traditional owner)� Stakeholder agreements (land and traditional owner)

� Definition of Ore Reserves

� Feasibility Study phase

� Refine process and logistics

� Raise profile of Altura Lithium with a view to forming a strategic alliance with an end user

14

For

per

sona

l use

onl

y

Page 15: 2013 02 01 - Altura LSM Presentation Final · 2013. 1. 31. · Altura Lithium - Resources JORC Mineral Resource estimate of 25.2 million tonnes @ 1.23% Li2O* (October 2012) 70% Indicated

Thank you

Questions?

15

James Brown

Managing Director

For

per

sona

l use

onl

y

Page 16: 2013 02 01 - Altura LSM Presentation Final · 2013. 1. 31. · Altura Lithium - Resources JORC Mineral Resource estimate of 25.2 million tonnes @ 1.23% Li2O* (October 2012) 70% Indicated

Appendices

16

For

per

sona

l use

onl

y

Page 17: 2013 02 01 - Altura LSM Presentation Final · 2013. 1. 31. · Altura Lithium - Resources JORC Mineral Resource estimate of 25.2 million tonnes @ 1.23% Li2O* (October 2012) 70% Indicated

Pilgangoora Mineral Resource Estimates

Pilgangoora Li2O Resource – October 2012

Zone Resource Tonnes Li2O % Li2O tonnes

C1, E1, N1Indicated 14,992,600 1.27 190,783

Inferred 7,239,155 1.22 88,173

S1Indicated 2,295,335 1.11 25,374

Inferred 630,175 0.95 6,012

17

# based on 0.7% Li2O cut-off grade

Inferred 630,175 0.95 6,012

SubtotalIndicated 17,287,935 1.25 216,157

Inferred 7,869,330 1.20 94,185

Total All Resources 25,157,265 1.23 310,342

For

per

sona

l use

onl

y

Page 18: 2013 02 01 - Altura LSM Presentation Final · 2013. 1. 31. · Altura Lithium - Resources JORC Mineral Resource estimate of 25.2 million tonnes @ 1.23% Li2O* (October 2012) 70% Indicated

Competent Persons Statements

Pilgangoora – Western Australia

The information in this report that relates to Exploration Results or Mineral Resources is based on information compiled by Bryan

Bourke, who is a member of the Australian Institute of Geoscientists and a full-time employee of Altura Mining Limited. Bryan

Bourke has sufficient experience, which is relevant to the style of mineralisation and type of deposit under consideration and to

the activity he is undertaking, to qualify as a Competent Person in terms of the ‘Australasian Code for Reporting of Exploration

Results, Mineral Resources and Ore Reserves’ (JORC Code 2004 Edition). Bryan Bourke consents to the inclusion of such

information in this Report in the form and context in which it appears.

Mr Damian Connelly, Fellow AusIMM, Chartered Professional (MET), Fellow Engineers Australia, MMICA, MSME was responsible

for the preparation of the metallurgical test work results reported herein. Mr Connelly has sufficient experience to the activityfor the preparation of the metallurgical test work results reported herein. Mr Connelly has sufficient experience to the activity

which he is undertaking to qualify as a Competent Person as defined in the 2004 Edition of the “Australasian Code for Reporting of

the Exploration Results, Mineral Resources and Ore Reserves. Mr Connelly consents to the inclusion in the report of the matters

based on his information in the form and context in which is appears.

18

For

per

sona

l use

onl

y