![Page 1: 20120730 Board Presentation WAD 230 kV Bus Repair · 1 Your presentation title or header goes here. Waddell 230kV Switchyard: Principles of Performance for Repair Fault Location Transformer](https://reader033.vdocuments.site/reader033/viewer/2022050104/5f4321159ba963461d606927/html5/thumbnails/1.jpg)
1
Your presentation titleor header goes here.
Waddell 230kV Switchyard: Principles of Performance for Repair
Fault Location
Transformer
Bus
230,000 volts
Switches
Agenda Number 6.
![Page 2: 20120730 Board Presentation WAD 230 kV Bus Repair · 1 Your presentation title or header goes here. Waddell 230kV Switchyard: Principles of Performance for Repair Fault Location Transformer](https://reader033.vdocuments.site/reader033/viewer/2022050104/5f4321159ba963461d606927/html5/thumbnails/2.jpg)
2
Electrical Fault
Transformer 7A experienced an electrical fault that caused it to shut down.
The fault was originated with the C-Phase bus.
Electrical Fault
•Extremely dangerous failure •Additional damage may occur
![Page 3: 20120730 Board Presentation WAD 230 kV Bus Repair · 1 Your presentation title or header goes here. Waddell 230kV Switchyard: Principles of Performance for Repair Fault Location Transformer](https://reader033.vdocuments.site/reader033/viewer/2022050104/5f4321159ba963461d606927/html5/thumbnails/3.jpg)
3
Electrical Fault
Normal Operation
Transformer 7B
Transformer 7A
Two pumps on each
transformer
![Page 4: 20120730 Board Presentation WAD 230 kV Bus Repair · 1 Your presentation title or header goes here. Waddell 230kV Switchyard: Principles of Performance for Repair Fault Location Transformer](https://reader033.vdocuments.site/reader033/viewer/2022050104/5f4321159ba963461d606927/html5/thumbnails/4.jpg)
4
After Fault Condition
Transformer 7B
Transformer 7A
Four pumps on one
transformer
Principles of Performance in Project
Manage Assets to ensure system reliability
Build relationships among work groups: Internal Leadership
Involve all departments upfront: Improved Project Development
Achieve environmental excellence
![Page 5: 20120730 Board Presentation WAD 230 kV Bus Repair · 1 Your presentation title or header goes here. Waddell 230kV Switchyard: Principles of Performance for Repair Fault Location Transformer](https://reader033.vdocuments.site/reader033/viewer/2022050104/5f4321159ba963461d606927/html5/thumbnails/5.jpg)
5
Multiple Groups Involved in Repair
Project Management
Waddell
Maintenance Engineering
Mechanical Maintenance
Purchasing
Safety
Environmental
Machine Shop
Engineering Resources
Warehouse
Planning
CAP and Global companies:MEPPI and CGIT
CAP
MEPPI
CGIT
![Page 6: 20120730 Board Presentation WAD 230 kV Bus Repair · 1 Your presentation title or header goes here. Waddell 230kV Switchyard: Principles of Performance for Repair Fault Location Transformer](https://reader033.vdocuments.site/reader033/viewer/2022050104/5f4321159ba963461d606927/html5/thumbnails/6.jpg)
6
Sole Sources: MEPPI and CGIT
CGIT Compressed Gas
Insulated Transmission
MEPPI Mitsubishi Electric
Power Products Inc
Existing Conditions
Transformer
BusSwitches
Surge Arrestors
![Page 7: 20120730 Board Presentation WAD 230 kV Bus Repair · 1 Your presentation title or header goes here. Waddell 230kV Switchyard: Principles of Performance for Repair Fault Location Transformer](https://reader033.vdocuments.site/reader033/viewer/2022050104/5f4321159ba963461d606927/html5/thumbnails/7.jpg)
7
Schedule
Team PlanningJanuary
2011
Award Contracts May 2011
Phase 1 June 2011
Phase 2March 2012
World Events during Planning
Team PlanningJan 2011
Major Earthquake,
Tsunami, and Nuclear Crisis in
Japan March 2011
Award Contracts May 2011
Phase 1 June 2011
![Page 8: 20120730 Board Presentation WAD 230 kV Bus Repair · 1 Your presentation title or header goes here. Waddell 230kV Switchyard: Principles of Performance for Repair Fault Location Transformer](https://reader033.vdocuments.site/reader033/viewer/2022050104/5f4321159ba963461d606927/html5/thumbnails/8.jpg)
8
Phase 1: Repair of Surge Arrestors
Repair
Phase 2:Refurbished Surge Arrestors
![Page 9: 20120730 Board Presentation WAD 230 kV Bus Repair · 1 Your presentation title or header goes here. Waddell 230kV Switchyard: Principles of Performance for Repair Fault Location Transformer](https://reader033.vdocuments.site/reader033/viewer/2022050104/5f4321159ba963461d606927/html5/thumbnails/9.jpg)
9
Phase 2: C Phase Bus
Phase 2: Install
![Page 10: 20120730 Board Presentation WAD 230 kV Bus Repair · 1 Your presentation title or header goes here. Waddell 230kV Switchyard: Principles of Performance for Repair Fault Location Transformer](https://reader033.vdocuments.site/reader033/viewer/2022050104/5f4321159ba963461d606927/html5/thumbnails/10.jpg)
10
Phase 2: Working among the new switches
Phase 2: Flange Cleaning and Desiccant Replacement
![Page 11: 20120730 Board Presentation WAD 230 kV Bus Repair · 1 Your presentation title or header goes here. Waddell 230kV Switchyard: Principles of Performance for Repair Fault Location Transformer](https://reader033.vdocuments.site/reader033/viewer/2022050104/5f4321159ba963461d606927/html5/thumbnails/11.jpg)
11
Phase 2:Preparing the Transformer for Test Conditions
Hi Pot Test Equipment
![Page 12: 20120730 Board Presentation WAD 230 kV Bus Repair · 1 Your presentation title or header goes here. Waddell 230kV Switchyard: Principles of Performance for Repair Fault Location Transformer](https://reader033.vdocuments.site/reader033/viewer/2022050104/5f4321159ba963461d606927/html5/thumbnails/12.jpg)
12
Test Equipment connected to Substation
Teamwork for CAP’s Improved Reliability