2012 us epa brownfields cleanup grant ‘ central greens’
DESCRIPTION
2012 US EPA Brownfields Cleanup Grant ‘ Central Greens’. City of Indianapolis Department of Metropolitan Development November 15, 2011. What? Brownfield Cleanup Grant. City is applying for a $200,000 Cleanup Grant (site specific) --------------------- - PowerPoint PPT PresentationTRANSCRIPT
2012 US EPA Brownfields Cleanup Grant
‘Central Greens’
City of Indianapolis Department of Metropolitan Development
November 15, 2011
What? Brownfield Cleanup Grant
City is applying for a $200,000 Cleanup Grant (site specific)
---------------------• Can submit up to three site-specific cleanup proposals. • $200,000 is the maximum amount available per site.• Can be used for cleanup of both petroleum and
hazardous substances.
2
• Grant funds may be used for direct costs associated with the cleanup activities, required performance reporting, construction oversight, and environmental monitoring of cleanup work.
---------------------• Grant funds may not be used for administrative
costs - with the exception of financial or performance reporting - or application preparation costs.
3
What? Brownfield Cleanup Grant
Site Eligibility Requirements:• Applicant must be the sole owner of the site• Applicant must own the site at the time of proposal
submission• Applicant must provide a 20% Cost Share
($200,000 Grant requires additional $40,000)• Applicant must have performed AAI at the time they
acquired the site.• City awaits eligibility determination by Region 5
4
What? Brownfield Cleanup Grant
Why? Brownfield Cleanup Grant
EPA’s Strategic Plan to “Sustain, Clean-up, and Restore Communities and the Ecological Systems that Support them”
---------------------In 2009, EPA partnered with HUD to “to discourage
sprawl and encourage or incentivize location efficient investments, smart growth practices, and green infrastructure development...”
5
6
What? Brownfield Cleanup Grant
Central State History• State owned mental
hospital. • Opened in 1848 and
closed in 1993.• City purchased from State
in 2004.• Mixed-Use
Redevelopment Plan published 2007
Current Site Status -• Indiana State Medical
Museum on-site (leased)• City Horse Patrol Stables
located on-site• Max Bahr Park at NE corner• SE corner sold for
redevelopment in 2011
7
What? Brownfield Cleanup Grant
Environmental Challenges -• Nearly 20 buildings in various
states of disrepair, some have lead paint and asbestos containing materials
• Existing service tunnels, which consist of concrete structures that house utilities and steam pipes with asbestos insulation.
• Ash piles with elevated levels of metals near powerhouse.
8
What? Brownfield Cleanup Grant
When? Brownfield Cleanup Grant
Grant timeline• Notice of Public Meeting published November 9,
2011• Public meeting November 15, 2011• Application due November 28, 2011• Notification of Award Spring 2012• Work Plan for EPA approval mid-2012• Term of the Grant is 3-Years
9