Bridge Design to Eurocodes – 4-6 Oct. 2010 – Vienna 1 E d Workshop – Bridge Design to Eurocodes, Vienna, October 4-6, 2010 Eurocodes: Implementation and Further Development Artur Pinto , Credits: M.Geradin, A. Athanasopoulou, M. Poljansek, H. Varum, B. Acun, D. Strezova Joint Research Centre Institute for Protection and Security of the Citizen European Laboratory for Structural Assessment http://eurocodes.jrc.ec.europa.eu/

Upload: superconc

Post on 22-Dec-2015

5 views

Category:

Documents


1 download

DESCRIPTION

.

TRANSCRIPT

Bridge Design to Eurocodes – 4-6 Oct. 2010 – Vienna 1

E d

Workshop – Bridge Design to Eurocodes, Vienna, October 4-6, 2010

Eurocodes: Implementation and Further Development

Artur Pinto, Credits: M.Geradin, A. Athanasopoulou, M. Poljansek, H. Varum, B. Acun, D. Strezova

Joint Research CentreInstitute for Protection and Security of the Citizen

European Laboratory for Structural Assessment

http://eurocodes.jrc.ec.europa.eu/

Bridge Design to Eurocodes – 4-6 Oct. 2010 – Vienna 2

Outline• Eurocodes Implementation

Role of JRC

Implementation Progress

• Eurocodes: Training and Promotion

• Further Development of the Eurocodes

Bridge Design to Eurocodes – 4-6 Oct. 2010 – Vienna 3

Eurocodes: Implementation, and further development

The contribution of the JRC in the framework of the MoU with DG ENTRframework of the MoU with DG ENTR (2005 -…)

• IT toolstoo s

• Promotion and training strategies, training and promotion activities

• Further Development: Set-up and coordination of scientificnetworks for new materials, New programming Mandate

Cooperation:(EC, CEN, MS and NSBs, industry)

New programming Mandate, …

• Extension of European Standards to other Basic Requirements for Construction Works (BWRs)

Bridge Design to Eurocodes – 4-6 Oct. 2010 – Vienna 4

Development of specific informatics tools (IT tools):1. Database for the NDPs (NDPs database) (31/03/06)( ) ( )2. Eurocodes Website (30/11/06) 3. Database for Backgroud Documents4. Centralized help-desk for maintenance

http://eurocodes.jrc.ec.europa.eup j p

Bridge Design to Eurocodes – 4-6 Oct. 2010 – Vienna 5

The Eurocodes …Implementation Progress

Bridge Design to Eurocodes – 4-6 Oct. 2010 – Vienna 6

Country Standard Transposing a European Standard

National Part (Differing from country to country)

Harmonized Part (the same for all EU countries)(the same for all EU countries)

Bridge Design to Eurocodes – 4-6 Oct. 2010 – Vienna 7

Implementation Steps

National Authorities and National Standards Bodies, when an EN Eurocode Part is made available, should:

European Standard Available

CEN

Step 1: Translation

National Standardization Bodies (NSBs)

• ……..

• Step 3: Publish the National Standard transposing the EN Eurocode and the National Annex (with NDPs)

Step 2: Set NDPs National Annex

National Authorities / NSBs

( )

• Step 4: Adapt, as far as necessary, their National Legislation so that the EN Eurocode Part can b d th i t it (2010)

Step 3: Publish Stand. and Nat. Annex

NSBs

be used on their territory (2010)Step 4: Adapt National Legislation

National Authorities

Bridge Design to Eurocodes – 4-6 Oct. 2010 – Vienna 8

Implementation Progress

Publication of National Annexes (NDPs + )

til 2010 (58 t )until 2010 (58 parts)

>67%33%<...<67%< 33%

Malta Cyprus

< 33%no information

(September, 2010)

Bridge Design to Eurocodes – 4-6 Oct. 2010 – Vienna 9

Training and Promotion

Bridge Design to Eurocodes – 4-6 Oct. 2010 – Vienna 10

In this series:Booklets

B1 Th E d I l i • B1: The Eurocodes: Implementation and use

• B2: The role of EN 1990: the key head Eurocode

• B3: The Eurocodes and construction productsp

• B4: The Eurocodes: Supporting EU policies and increasing competitiveness

• B5: The Eurocodes: Use outside EU• B6: The Eurocodes and cooperation in

the Euro-Mediterranean areathe Euro-Mediterranean areaLeaflets• L1: The Eurocodes: What are they?• L2: The Eurocodes: Getting prepared• L3: The Eurocodes: Increasing

competitiveness• L4: The Eurocodes: Opportunit to • L4: The Eurocodes: Opportunity to

innovate

Bridge Design to Eurocodes – 4-6 Oct. 2010 – Vienna 11

Three (3) levels of training:

• Level 1 which will deal with policy of Eurocodes implementation, National Annexes, co-existence with National Codes, the Eurocodes system, etc. and these courses will be aimed at National Authorities, National Standards Bodies (NSBs) and senior personnel in the companies;

L l 2 hi h ill b i t d t t h i di id l E d• Level 2 which will be introductory courses to each individual Eurocode(average duration 1 day);

• Level 3 which comprehensively describes design examples of a number• Level 3 which comprehensively describes design examples of a number of typical structures using a particular package of Eurocodes.

Bridge Design to Eurocodes – 4-6 Oct. 2010 – Vienna 12

Eurocodes: Background and ApplicationsBrussels, 18-20 February 2008usse s, 8 0 eb ua y 008

Bridge Design to Eurocodes – 4-6 Oct. 2010 – Vienna 13

Eurocodes: Background and applications (cont’d)

• 320 participants, 60 lecturers

• all Eurocodes covered (-EC6)( )

• Message from minister Turk (SI)and vice-minister Mihalevski (BG)

8

10

pant

s

2

4

6

Nb

of p

artic

ip

0

Aus

tria

Bel

gium

Bul

garia

Cro

atia

Cyp

rus

Cze

ch R

ep.

Den

mar

kEs

toni

aFi

nlan

dFr

ance

Ger

man

yG

reec

eH

unga

ryIre

land Italy

Latv

iaLi

thua

nia

Luxe

mbo

urg

FYR

OM

Mal

taM

onte

negr

oN

ethe

rland

sN

orw

ayPo

land

Portu

gal

Rom

ania

Slov

akia

Slov

enia

Spai

nSw

eden

Switz

erla

ndTu

rkey U

K

Bridge Design to Eurocodes – 4-6 Oct. 2010 – Vienna 14

Training and promotion: future actions(Level 2/3 training workshops)( g p )The following workshops on Eurocodes are scheduled:

• Design of Bridges with the EurocodesProgramme coordination: Steve Denton (HG Bridges)3 days, 4-6 Oct 2010, Vienna

• Eurocode 8: Seismic Design of Buildings (RC and Steel) Programme coordination: Eduardo Carvalho (SC8)2 days, 10-11 Feb 2011, Lisbon

• Eurocode 2: Design of Reinforced Concrete BuildingsProgramme coordination: Giuseppe Mancini (SC2)2 days, 2011, Brussels (tbc)

Bridge Design to Eurocodes – 4-6 Oct. 2010 – Vienna 15

Seismic Design of BuildingsBuildings

10-11 Feb 2011

Lisbon

R i i d dli D b 15Registration deadline December 15

https://jrc-meeting-registration.jrc.ec.europa.eu

Bridge Design to Eurocodes – 4-6 Oct. 2010 – Vienna 16

Moscow workshop (2008, …, 2010)• Aim: gather and make available

information on EU and Russiastandardisation systems.

• Support from TAIEX, CMC, CEN/TC250

• Russian Federal Agency onRussian Federal Agency onTechnical Regulation andMetrology, World Academy ofSciences for Complex Security

Bridge Design to Eurocodes – 4-6 Oct. 2010 – Vienna 17

FURTHER DEVELOPMENT

• New materials: FRP, glass, …

• New fields of design: robustness,existing structures, membraneg ,structures, …

S ( )• Sustainability (environmental): recyclability, durability, use of environmentallyycompatible materials, energy issues, ...

Bridge Design to Eurocodes – 4-6 Oct. 2010 – Vienna 18

Thank you for your attention

Bridge Designto Eurocodesto Eurocodes

4-6 Oct 2010Austrian Federal Ministry for

Transport, Innovation and TechnologyTechnology

Vienna

http://eurocodes.jrc.ec.europa.eu/