20100215 construction weekprops-n.sdccd.edu/ne/news events... · companies that submitted proposals...

32
The Daily Transcript ® Construction Week News, bids, projects and plans Tuesday, February 16, 2010 | San Diego Source: sddt.com/construction Section B Index BID BOARD . . . . . . . . . . . . . . . . . . . . 10B BIDS RECEIVED . . . . . . . . . . . . . . . . . . 9B CONSTRUCTION CALENDAR . . . . . . . . . 32B NEW LISTINGS . . . . . . . . . . . . . . . . . . 12B UPDATE . . . . . . . . . . . . . . . . . . . . . . 12B 32 Pages The Daily Transcript ® material is available at sddt.com on the San Diego Source. Image courtesy of Scripps Health Scripps Health has plans for more than $1.47 billion in capital improvements, including the $460 million Scripps Cardiovascular Institute at Scripps Memorial Hospital La Jolla. See Page 7B Special Reports Online Special Reports Online Top Influentials | SourceBook 2010 Highlighting the Who’s Who in San Diego business, profiling the top news- makers of 2009. Going Green Take a closer look at how businesses in various sectors throughout the region are incorporating the green lifestyle. Who's Who in Construction & Engineering This special report focuses on the play- ers helping to build San Diego — from general contractors and engineers to prime contractors, subcontractors and suppliers. Construction Online ONLINE PLAN ROOM Access hundreds of plans in San Diego, more than a thousand statewide. NEWS Local construction and building industry coverage. DATABASES Construction Bid Board Mechanic Liens Special Report: Construction Works Camp Pendleton hospital progresses toward construction Second phase of RFP to be released in spring By ERIN BRIDGES The Daily Transcript Efforts to build a new hospital at Marine Corps Base Camp Pendleton are under way. The Naval Facilities and Engineering Command (NAVFAC) Southwest posted a phase one request for proposals (RFP) to Navy Electronic Commerce Online (NECO) in January following a pre- solicitation notice posted at the end of December. NAVFAC also hosted Jan. 14 a pre- proposal meeting. More than 300 peo- ple signed in at the meeting, according to documents available on the NECO Web site. A two-phase RFP process is being used for issuing the contract. Companies that submitted proposals during the first phase now will be evaluat- ed and narrowed down to a smaller group See Camp Pendleton on 6B Construction Roundtable Page 4B

Upload: others

Post on 22-Jul-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 20100215 construction weekprops-n.sdccd.edu/NE/News Events... · Companies that submitted proposals during the first phase now will be evaluat- ... CA 92101 † 619.231.1010 † CA

The Daily Transcript®

Construction WeekNews, bids, projects and plans

Tuesday, February 16, 2010 | SSaann DDiieeggoo SSoouurrccee:: sddt.com/construction Section B

IndexBID BOARD . . . . . . . . . . . . . . . . . . . . 10B

BIDS RECEIVED . . . . . . . . . . . . . . . . . . 9B

CONSTRUCTION CALENDAR . . . . . . . . . 32B

NEW LISTINGS . . . . . . . . . . . . . . . . . . 12B

UPDATE . . . . . . . . . . . . . . . . . . . . . . 12B

32 Pages

The Daily Transcript®

material is available at

sddt.com

on the San Diego Source.

Image courtesy of Scripps Health SSccrriippppss HHeeaalltthh hhaass ppllaannss ffoorr mmoorree tthhaann $$11..4477 bbiilllliioonn iinn ccaappiittaall iimmpprroovveemmeennttss,, iinncclluuddiinngg tthhee $$446600 mmiilllliioonn SSccrriippppss CCaarrddiioovvaassccuullaarr IInnssttiittuutteeaatt SSccrriippppss MMeemmoorriiaall HHoossppiittaall LLaa JJoollllaa.. SSeeee PPaaggee 77BB

Special Reports Online Special Reports Online

Top Influentials | SourceBook 2010

Highlighting the Who’s Who in SanDiego business, profiling the top news-makers of 2009.

Going Green

Take a closer look at how businessesin various sectors throughout theregion are incorporating the greenlifestyle.

Who's Who in Construction & Engineering

This special report focuses on the play-ers helping to build San Diego — fromgeneral contractors and engineers toprime contractors, subcontractors andsuppliers.

Construction Online

ONLINE PLAN ROOMAccess hundreds of plans in San Diego,more than a thousand statewide.

NEWSLocal construction and building industry coverage.

DATABASES➤ Construction Bid Board➤ Mechanic Liens

Special Report: Construction Works Camp Pendletonhospital progressestoward construction

Second phase of RFP to be released in spring

By ERIN BRIDGESThe Daily Transcript

Efforts to build a new hospital atMarine Corps Base Camp Pendleton areunder way.

The Naval Facilities and EngineeringCommand (NAVFAC) Southwest posteda phase one request for proposals (RFP)to Navy Electronic Commerce Online(NECO) in January following a pre-solicitation notice posted at the end ofDecember.

NAVFAC also hosted Jan. 14 a pre-proposal meeting. More than 300 peo-ple signed in at the meeting, accordingto documents available on the NECOWeb site.

A two-phase RFP process is beingused for issuing the contract.

Companies that submitted proposalsduring the first phase now will be evaluat-ed and narrowed down to a smaller group

See Camp Pendleton on 6B

Construction Roundtable Page 4B

Page 2: 20100215 construction weekprops-n.sdccd.edu/NE/News Events... · Companies that submitted proposals during the first phase now will be evaluat- ... CA 92101 † 619.231.1010 † CA

THE DAILY TRANSCRIPT® • TUESDAY, FEBRUARY 16, 20102B

By ERIN BRIDGESThe Daily Transcript

A request for proposal for the firstjob order contract (JOC) exclusivelyfor service-disabled veteran-ownedsmall businesses (SDVOSB) from theNaval Facilities EngineeringCommand (NAVFAC) Southwest, isexpected to be issued this month.

And a pre-proposal conference ten-tatively is set for Feb. 18 at CampPendleton, according to the contractposting on the Federal Business

1st contract exclusively for disabled vet small businesses to be issued this monthOpportunities Web site.

The contract is worth a total valueof up to $15 million if all options areexercised through the 60-month con-tract period.

The contract, as posted toFedBizOpps, seeks one SDVOSB toreceive the indefinite-delivery, indefi-nite-quantity JOC “for minor con-struction, addition, renovation, alter-ation and/or repair of various types ofnonresidential buildings within theMarine Corps Base (MCB), Camp

Pendleton and the Naval OrdnanceCenter (NOC) Fallbrook, California.”

Task orders typically will be issuedfor work valued between $2,000 and$1 million, according to the posting onNavy Electronic Commerce Online(NECO). There is a minimum guaran-tee of $5,000 during the base periodof the contract.

No changes have been made to thesolicitation since Jan. 15. Changes atthat time included opening bidding toqualified companies registered in the

Central Contractor Registration,changing the request for proposalposting date to on or around Feb. 10,and changing the date for the pre-pro-posal conference.

In the current construction market,Navy Capt. Joseph Campbell, officerin charge of Construction for MarineCorps Installations West, said thiscontract offers a good source of busi-ness for contracting companies.

See Contract on 7B

YOUR COMMERCIALINSURANCE SPECIALISTS

• Commercial Insurance

• Bonds/Surety

• Employee Benefits

• Personal Lines

750 B Street • Suite 2400 San Diego, CA 92101 • 619.231.1010 • CA License # 0619252

TEAMWORK. Your Values are Our Values.

For a new contractor client with a growing business, we rolled

up our sleeves and got to work. Our Barney & Barney team of

industry experts closed existing gaps in coverage and

negotiated a solution that saved our client 30% on their

insurance costs. We work as a team to build great results.

”“ A risk management program

built from teamwork

Paul HeidemannPrincipalBarney & Barney LLCConstruction PracticeCommercial Department

Employee BenefitsCommercial Insurance

Executive RiskWorkers’ Compensation ConsultingRetirement & Wealth Management

SAN DIEGO | ORANGE COUNTY | OAKLAND | 800.321.4696 | www.barneyandbarney.com

Page 3: 20100215 construction weekprops-n.sdccd.edu/NE/News Events... · Companies that submitted proposals during the first phase now will be evaluat- ... CA 92101 † 619.231.1010 † CA

THE DAILY TRANSCRIPT® • TUESDAY, FEBRUARY 16, 2010 3B

The DailyTranscript

®

Founded April 3, 1886www.sddt.com

ROBERT L. LOOMIS, Publisher

George Chamberlin,Executive Editor

Joseph Guerin, EditorRichard Spaulding, Real Estate Editor

Jennifer Chung Klam,Special Sections Editor

Tracye Grimes, Web Editor

Ellen C. Revelle, Publisher EmeritaJuly 31, 1910 - May 6, 2009

San Diego Daily Transcript®

P.O. Box 85469San Diego, CA 92186–5469

(619) 232-4381Web site: www.sddt.com

By MONICA UNHOLDThe Daily Transcript

As the new president of the U.S.Green Building Council San DiegoChapter, Zachary Pannier plans to usehis construction expertise to increasepublic awareness about sustainableconstruction practices.

As a nine-year veteran of DDPPRRCCoonnssttrruuccttiioonn, Pannier feels obligatedto take action to curb climate changeand ensure his 8-month-old daughtercan enjoy the same quality of life as theprevious generation, he said.

“We in the construction industry are

Close-up: Zachary Pannier

New USGBC San Diego president working to change minds, valuesthe No. 1 contributor of global green-house emissions,” Pannier said.

Contractors must educate peopleabout simple modifications that cangreatly reduce energy consumption, hesaid.

“We can change people’s outlook onwhat they can do to change their way oflife,” Pannier said. “We can changetheir minds and values.”

With nearly all of the company’swork in the private sector, DPR edu-cates clients that building green makesbusiness sense. Energy-efficient facili-ties are cheaper to operate.

DPR plans to demonstrate its com-mitment to green construction withthe company’s new green office build-ing. The contractor is retrofitting arecently purchased 37,000-square-foot, 1970s-era building.

The project will allow DPR to use itsoffices as yet another educational tool.

“You can get another 30 years of lifeout of a building that was really onlydesigned to have 30 years of life,”Pannier said.

When complete, the facility will bethe first entirely owner-operated netzero office building in San DiegoCounty, Pannier said.

The offices of AArrcchhiitteeccttss HHaannnnaaGGaabbrriieell WWeellllss in Ocean Beach becamethe first net zero office building in theregion last year. Net zero buildings pro-duce as much energy as they require,consuming no additional power fromthe grid.

Located on Shoreham Place less thana quarter mile from DPR’s current loca-tion, the single-story office building willincorporate passive cooling, with aninnovative solar chimney system. Air willenter the building through windows onthe north side, and exit on the south side

through a vent in the 17-foot high ceiling. Every third window will be operable

and doors roll up, allowing increasedairflow, Pannier said.

In addition to fresh air, employees will

See Pannier on 8B

ZZaacchhaarryy PPaannnniieerr

Page 4: 20100215 construction weekprops-n.sdccd.edu/NE/News Events... · Companies that submitted proposals during the first phase now will be evaluat- ... CA 92101 † 619.231.1010 † CA

THE DAILY TRANSCRIPT® • TUESDAY, FEBRUARY 16, 20104B

Construction roundtable

Diversity, green focus help some local companies stay in shrinking marketBy MONICA UNHOLD

The Daily Transcript

Diversified construction firms faredbetter than other companies during therecent economic downturn. Such con-tractors were able to focus on publicprojects while building in the privatemarket all but stopped, experts said Feb.5 during a Daily Transcript executiveroundtable.

“Being recession proof means beingdiverse,” said Pat Caughey, president oflandscaper architecture firm WWiimmmmeerrYYaammaaddaa && CCaauugghheeyy.

However, private sector contractorsthat attempted to diversify after the eco-nomic crisis hit experienced difficulty.Projects that typically receive eight to 10proposals, are receiving 20 to 30 as con-tractors compete for shares of a shrink-ing market, said Jamie Awford, vicepresident and general manager ofTTuurrnneerr CCoonnssttrruuccttiioonn CCoo..

“I think you had to diversify threeyears ago,” Awford said. “I think you hadto be ready for this.”

Some sectors, such as military work,require contractors to have a specified

amount of experience on similar proj-ects. In order to gain entry, many con-tractors are inventing creative partner-ships that they previously would haveshied away from, Caughey said.

For DDyynnaalleeccttrriicc, 2010 has gotten off toa better start than the company expect-ed. At the end of 2009, two projects thecompany was depending on were can-celed — one in the private sector, theother public. In 2010 those projectscame back, said Channey Doud, execu-tive vice president of Dynalectric.

Another electrical contractor, NNeeaallEElleeccttrriicc, currently has the longest back-log the company has ever experienced,said President Clark Thompson.

BBaarrnnhhaarrtt IInncc.. also fared remarkablywell during the recession because of itsinvolvement in two of the healthiest con-struction sectors — military and educa-tion. Barnhart’s backlog extendsthrough 2013 and the company is avoid-ing accepting new contracts becausepricing is currently too low, said EricStenman, Barnhart president.

Stenman expects prices will drop byanother 15 percent in 2010, he said.

As the construction industry suffers,government agencies are looking forways to ensure taxpayer-funded projectsare awarded to local companies. Underthe current system of awarding projectsto the lowest bidder it is difficult toensure projects go to local companies,

said Robert “Dukie” Valderrama, presi-dent of AA--DD && DD DDrryywwaallll IInncc.. andWWeessttCCooaasstt SSccaaffffoolldd IInncc.. and a San DiegoPort Commissioner.

“Before there used to be a loyalty, youused to have a relationship with yourcustomers,” Valderrama said.“Nowadays it’s bottom line number.”

Attempts to ban out-of-town con-struction firms are also controversialbecause they encourage other regionsto ban contractors based out of theregion, which adversely affects SanDiego contractors that work elsewhere,said Andy Berg, executive director ofSan Diego chapter of the NationalElectrical Contractors Association(NECA).

Awford agreed. “That’s a challenge alot of agencies are having right now, ishow do you keep work local? How doyou keep San Diegans busy?” he said.

Another type of agreement that hasgained controversy in recent months areproject labor agreements (PLAs). Thecities of Chula Vista, Oceanside and SanDiego and the county of San Diego havevoted to ask voters whether they wantPLAs to be administered on taxpayer-funded projects.

Proponents say the agreements pre-vent strikes on publicly funded projectsby laying out contract conditions.Opponents say PLAs make it nearlyimpossible for nonunion contractors tocompete on such projects.

Berg believes squabbling about suchissues is detrimental to the entire indus-try. Legislation that requires or prohibitsPLAs both go too far, he said.

“Just like the one side was probablywrong, this side is probably wrong, too,”Berg said.

Berg believes the measures will likelypass but predicts they will be subject tolegal challenges.

“Then you’re going to get into theissue of are they legal?” Berg said. “Canyou tell somebody that they can’t negoti-ate an agreement?”

Most contractors have strong feelingson one side of the issue.

“I don’t think anyone should berestricted from the right to compete,”Stenman said. “If you’re qualified youshould be able to; if you’re not qualifiedyou shouldn’t. We’ve built schools for along time and our best subs are unionand nonunion, side by side.”

The PLA issue is gaining momentumnow as contractors fight “for a slice of theever-shrinking pie,” Berg said.

In the next few years the housing mar-ket should recover and provide contrac-

See Roundtable on 5B

All photos: J. Kat WoronowiczAAnnddyy BBeerrgg iiss eexxeeccuuttiivvee ddiirreeccttoorr ooff NNEECCAA..

EErriicc SStteennmmaann ((rriigghhtt)) iiss pprreessiiddeenntt ooff BBaarrnnhhaarrtt IInncc.. PPiiccttuurreedd wwiitthh AAnnddyy BBeerrgg..

Page 5: 20100215 construction weekprops-n.sdccd.edu/NE/News Events... · Companies that submitted proposals during the first phase now will be evaluat- ... CA 92101 † 619.231.1010 † CA

THE DAILY TRANSCRIPT® • TUESDAY, FEBRUARY 16, 2010 5B

Years ofQuality

www.nealelectric.com

tors with more work, Stenman said.“If we don’t get through this recession,

if we don’t see that residential privatemarket recover, I think we have not evencome anywhere near seeing the worst,”Stenman said.

Some worry a “double-dip” recessioncould prevent a housing market recovery.

“If that second wave of foreclosurescomes in, the game’s off for another fewyears,” said Mark Rael, of SSiittee GGeeooEEnnggiinneeeerriinngg SSeerrvviicceess.

A variety of other factors prevent themarket from recovering; the high cost ofland and procuring entitlement makesbuilding large subdivisions impractical,Rael said. With drought conditions inplace in the region, San Diego CountyWater Authority has raised the price of awater meter to $25,000 per home.

“If the projects don’t pencil out, theyaren’t going to build them,” Rael said.

Because of such costs, the housingmarket is likely to re-emerge changed,Caughey said.

“We’ll see more smart growth andurban infill,” he said.

However, a housing recovery willrequire banks to increase spending,according to Valderrama.

“Without financing, nobody can doanything,” Valderrama said.

While commercial and residentialconstruction projects are few and farbetween, “green energy” projects areanother bright spot, said Berg.

Sustainability is becoming an integralpart of operations for most companies,

RoundtableContinued from Page 4B

ROUNDTABLE PARTICIPANTS

Jamie Awford,, VP/General ManagerTurner Construction

Andy Berg,, Executive DirectorNECA

Dave Carlin,, PresidentSoltek Pacific Construction

Pat Caughey,, PresidentWimmer Yamada Caughey

Channey Doud,, Executive VPDynalectric San Diego

Mark Raell,, PrincipalSite Geo Engineering Services

Eric Stenman,, PresidentBarnhart Inc.

Clark Thompson,, PresidentNeal Electric

Robert Valderrama,, ChairPort of San Diego

said Awford.“Green is not a trend; I think it’s just

the way we do business,” Awford said.The construction industry worldwide

uses a large portion of the world’s energyand materials, and some roundtableparticipants said it is contractors’responsibility to reduce consumption.

“I think we have a responsibility asleaders of our industry to be stewards,”said Dave Carlin, president of SSoolltteekkPPaacciiffiicc CCoonnssttrruuccttiioonn. “Who better thanthose of us who are doing the build-ing?”

Another trend in the constructionindustry is the use of building informa-tion modeling (BIM) technology.Contractors use computer software toview 3-D models of buildings and theirincorporated systems, allowing them toanticipate problems they mayencounter.

“We can finish projects with much lessrisk,” Awford said.

Use of BIM also minimizes construc-tion waste and saves time, he said.

Turner Construction is using the soft-ware on its $471 million airport con-struction project. The Airport Authorityhas asked Turner to use the modelingsoftware to demonstrate what passen-gers at Lindbergh Field will experienceduring each phase of construction,Awford said.

“This is here to stay, this is how we dobusiness,” Awford said.

[email protected] Code: 20100216cra

RRoobbeerrtt VVaallddeerrrraammaa iiss aa ccoommmmiissssiioonneerr aanndd tthhee cchhaaiirr ooff tthhee PPoorrtt ooff SSaann DDiieeggoo..

JJaammiiee AAwwffoorrdd iiss vviiccee pprreessiiddeenntt aanndd ggeenneerraallmmaannaaggeerr ooff TTuurrnneerr CCoonnssttrruuccttiioonn..

CCllaarrkk TThhoommppssoonn iiss pprreessiiddeenntt ooff NNeeaall EElleeccttrriicc..

CChhaannnneeyy DDoouudd iiss eexxeeccuuttiivvee vviiccee pprreessiiddeenntt ooff DDyynnaalleeccttrriicc SSaann DDiieeggoo..

Page 6: 20100215 construction weekprops-n.sdccd.edu/NE/News Events... · Companies that submitted proposals during the first phase now will be evaluat- ... CA 92101 † 619.231.1010 † CA

THE DAILY TRANSCRIPT® • TUESDAY, FEBRUARY 16, 20106B

By CARLOS RICOThe Daily Transcript

Representatives from the majortransportation agencies in San Diegogathered Feb. 9 at the 11th annualtransportation update to provide astatus of the more than $1.2 billion infreeway construction projects, and thevarious upgrades to the San Diegotrolley and bus systems.

In the San Diego region, theCalifornia Department ofTransportation and the San DiegoAssociation of Governments arereporting 20 major construction proj-ects that are either ongoing or willbegin this year.

“Thanks to the partnerships at thefederal, state and regional levels, theyhave helped keep Caltrans’ focus for-ward in delivering its projects on timeand within budget,” said LaurieBerman, Caltrans district director forSan Diego and Imperial counties. “Itwas these partnerships ... that havehelped secure vital federal stimulus

C.W. Driver recently awardedcontracts for community college district

C.W. Driver was recently award-ed two contracts with the San DiegoCommunity College District. Currentlybeing designed by NTD Architects,the Miramar College Student Union isa 70,000-gross-square-foot, three-story facility. It is part of the SDCCD’s$1.555 billion Propositions S and Nconstruction bond program, providingfor new teaching, learning and voca-tional training facilities, major renova-tions, campus infrastructure and pub-lic safety improvements at City, Mesaand Miramar Colleges, as well as itssix Continuing Education campuses.

The new student union will housefood service, the cafeteria, dining hall,bookstore, convenience store, dean ofstudent affairs, evaluation, associatedstudent, career/transfer center, coun-seling, disability support service, vet-eran’s affairs, financial aid, account-ing, admissions and records, multi-purpose room, student cyber cafe andrelated services.

A Wing Renovation & Relocation ofAdministration Building for theSDCCD’s historic Educational CulturalComplex (ECC) was awarded to C.W.Driver in December 2009. This project

is currently being designed by RJCArchitects and consists of the addi-tion of a new wing to the main build-ing on campus to replace all bunga-lows and modular classrooms, labsand support rooms. The wing will pro-vide badly needed classrooms andhelp alleviate the current inability toadd more classes and classroomsonsite. The Phase IIB wing wouldinclude state-of-the-art labs, lectureand support space. Programs accom-modated in the new wing will includework force training and preparation,and will allow for the relocation of theCollege Police Substation. This projectalso is funded by Propositions S andN.

C.W. Driver is a multi-facetedbuilder providing general contracting,construction management,design/build and lease-lease backservices to Southern California.Originally founded in Los Angeles in1919, C.W. Driver is the oldest activelicensed builder headquartered inSouthern California. The company isheadquartered in Pasadena withoffices in Irvine, San Diego andOntario.

Submitted by C.W. Driver

County to see more than $1.2 billion in transportation projects this yeardollars and state bond money.”

One such project that began lastyear — thanks to the AmericanRecovery and Reinvestment Act —involves work on state Route 905 andthe Interstate 805 southbound auxil-iary lanes.

There are six highway projectsscheduled to start this year, includingthe construction of HOV lanes onInterstate 805 at Carroll Canyon Roadto the Interstate 5 merge, and a $181million project to build a four-laneextension on state Route 76.

“In all, Caltrans is going to havemore than $210 million in AmericanRecovery and Reinvestment funds inconstruction this summer,” saidBerman, “and we are keeping our fin-gers crossed that there are more stim-ulus dollars on the way for more vitalprojects in the region.”

This fall, the I-805 auxiliary laneproject from state Route 54 to BonitaRoad will be complete, and the newstate Route 52 extension project will

open shortly thereafter.Berman also said that Caltrans

won’t go through 2010 without somechallenges. Caltrans workers — asmany other California employees —are continuing to take three mandato-ry furlough days a month.

The San Diego Metropolitan TransitSystem released details of its $600million repair and renovation projectfor the blue and orange trolley lines.

“The blue line was built in 1981 andsome of the rails on that track wereclose to 100 years old (when they werelaid down),” said Rob Schupp, directorof marketing and communications forthe MTS.

This makeover project entails reno-vating the old platforms at each sta-tion and installing new tracks so thatnew trolleys — like the ones currentlyrunning on the green line — can bepurchased and used.

Funding for this project will comefrom TransNet II and CaliforniaProposition 1B bonds, which are spe-

cially allocated for capital improve-ments. The project is slated to beginthis summer and be completed inapproximately four years.

The MTS is also working withSANDAG on the implementation of aSouth Bay Bus Rapid Transit (BRT)system.

This project would involve design-ing and building a 21-mile BRT linegoing to and from the Otay Mesa Portof Entry and downtown San Diego viastate Route 125, eastern Chula Vista,Interstate 805 and state Route 94.

The preliminary engineering andenvironmental work is under way, andthe first phase is planned to be inoperation by late 2012, according toSANDAG Executive Director GaryGallegos.

“I think as we look to 2010, it’s (goingto be) another year filled with many,many challenges and hopefully many,many opportunities,” Gallegos said.

[email protected] Code: 20100209cyb

of bidders. That group then will be per-mitted to bid on the second phase RFP.

Selected bidders will receive morespecific details in the second phase RFPthat NAVFAC Southwest SpokesmanLee Saunders said would be released inthe spring.

“Source Selection procedures will beused with the intent to award a firm-fixed price construction contract to theresponsible Offeror whose proposal,conforming to the (RFP), is the mostadvantageous and offers the best valueto the government, price and other fac-tors considered,” the phase one RFPstates.

In general, the project will be a rough-ly 500,000-square-foot, multilevelNaval Hospital on a 70-acre site toreplace the existing hospital at CampPendleton. It will include a central utili-ties plant, a 1,500-space multilevelparking structure, surface parking, sitedevelopment and associated supportingfacilities, according to the phase oneRFP.

Estimated cost is between $250 mil-lion and $500 million, funded by theAmerican Recovery and ReinvestmentAct of 2009.

“It will provide the latest in inpatientand outpatient technology, and improvethe ability to remain fully operationalafter an earthquake,” states a NavyMedicine West press release issuedwhen the project first was announced.

Navy Capt. Joseph Campbell, officer

in charge of construction for MarineCorps Installations West, said inJanuary that one of the reasons forbuilding a new hospital is to complywith seismic codes. Those standardschanged since the original hospital wascompleted in 1974.

An environmental assessment com-pleted last month determined the bestlocation for the new hospital would benear the main gate to base, directly eastof Vendegrift Boulevard and north ofWire Mountain Road.

“The NHCP Replacement willincrease the number of NHCP benefici-aries served by accommodating anincreasing active duty military and fam-ily member population, and by beinglocated near Interstate 5 so as todecrease the commute time for eligiblebeneficiaries in Encinitas, Escondido,Rancho Santa Fe, Del Dios, RanchoBernardo and other communities inaccord with federal standards for pri-mary care and emergency service areacoverage,” the environmental assess-ment states.

Contracts already have been awardedto clear the site and prepare for con-struction.

A fixed-price, design-build contractfor the hospital is expected inSeptember. Construction is scheduled tobegin in October with a completion datein November 2013.

[email protected] Code: 20100216crb

Camp PendletonContinued from Page 1B

Page 7: 20100215 construction weekprops-n.sdccd.edu/NE/News Events... · Companies that submitted proposals during the first phase now will be evaluat- ... CA 92101 † 619.231.1010 † CA

THE DAILY TRANSCRIPT® • TUESDAY, FEBRUARY 16, 2010 7B

By MONICA UNHOLDThe Daily Transcript

The California High-Speed RailAuthority met in San Diego Feb. 4 toallow residents and elected officialsto voice their support and recom-mend changes to state’s inter-city railinitiative.

An estimated 60 people packed theSan Diego Association ofGovernments’ offices where themeeting was held.

Elected officials, such as MayorJerry Sanders, expressed support ofthe project, which will carry passen-gers from San Diego to Los Angelesin one hour and 18 minutes and to

By THOR KAMBAN BIBERMANThe Daily Transcript

Scripps Health has plans for morethan $1.47 billion in capital improve-ments, and upgrades in bond ratingsby a couple of rating agencies willsave millions of dollars along theway.

FFiittcchh RRaattiinnggss and SSttaannddaarrdd &&PPoooorr’’ss RRaattiinngg SSeerrvviicceess have upgrad-ed Scripps Health from an A+ to aAA- rating — and when stretchedout over a period of 26 years, the sav-ings will easily add up into many mil-lions of dollars. Scripps’ A1 ratingwas also recently reaffirmed byMMooooddyy’’ss IInnvveessttoorrss SSeerrvviiccee.

In issuing its upgrade, Fitchreported, “Scripps Health has main-tained a strong financial profilewhich continues to exhibit solidoperational performance, strongcash flow generation and manage-able debt burden.”

Scripps Health will issue the $220million in three series, with $120million issued as fixed rate bondsand the remaining $100 millionissued as variable rate bonds. Thebond offerings are expected to closeFeb. 4.

Standard & Poor’s noted that fiscalyear 2009 marked Scripps’ “eighthconsecutive year of consistent solidprofitability driven by the currentmanagement team.”

“In 2012 we will be going to mar-ket again as we will in 2014,” saidRichard Rothberger, Scripps Healthexecutive vice president and chieffinancial officer. “The bond offeringswill be a couple hundred million dol-lars every couple of years.”

This issuance and those expectedto follow will help fund ScrippsHealth projects large and small, as

High-Speed Rail board hears support and concern over routeSacramento in three hours and 35minutes at speeds of up to 220 mph.

“The city of San Diego is very com-mitted to bringing high-speed rail toour region,” Sanders told the board.

Others urged the High-Speed RailAuthority to abandon its plans tofirst construct the Los Angeles toSacramento segment, and insteadbuild the section between San Diegoand Los Angeles. One of the mosttraveled rail corridors in the nation,the project would serve as a publicexample of high-speed rail’s capacityto be self sustaining in California,said Arizona State Sen. Steve Pierce,who grew up in San Diego.

“The San Diego-Los Angeles corri-dor is the first place you should focusyour time and efforts,” Pierce said.

Other suggestions includedextending the train’s route to theMexican border, implementing newtechnology to make the train quieterand shifting the route to bypass RoseCanyon.

Several residents expressed con-cern about the impact on wildlifeand recreation at Rose Canyon Park.The High Speed Rail Authority’s pro-posed alignment sends the trainthrough Rose Canyon to reachUniversity City from downtown SanDiego.

“This would effectively destroymost of the value of the park,” saidDebby Knight of the Friends of RoseCanyon group.

Voters approved California’s HighSpeed Rail project in November2008. Construction of the spanbetween Los Angeles andSacramento is expected to total $33billion and be completed in 2020.The route will be extended to SanDiego and San Francisco by 2026.

Construction is expected to create600,000 jobs statewide, including45,000 in San Diego County.

[email protected] Code: 20100204cya

Scripps Health starts $1.47B in capital improvements; upgrades bond ratingwell as help to defray operating costs.

Proceeds from the series 2010 rev-enue bonds will fund $120 million incapital projects at Scripps Health’svarious patient care facilities andwill reimburse Scripps Health forapproximately $100 million in priorcapital expenditures.

Scripps expects capital projects forfiscal years 2010-14 to be fundedthrough a combination of incomefrom operations, debt financing andphilanthropy.

The capital improvement planincludes infrastructure upgrades andexpansion projects at the ScrippsCardiovascular Institute at ScrippsMemorial Hospital La Jolla, a newemergency department and criticalcare building at Scripps MemorialHospital Encinitas, and work at theConrad Prebys Emergency andTrauma Center at Scripps MercyHospital. Other projects includeparking structures, seismic upgradeprojects and investment in informa-tion technology upgrades.

The biggest ticket item is theplanned $460 million, 382,000-square-foot Scripps CardiovascularInstitute at Scripps MemorialHospital La Jolla. The expansion willinclude 108 beds on three medicalsurgery levels and another 60 bedson two ICU levels among other func-tions. A 27,000-square-foot centralenergy plant would be added as well.The construction will occur on aparking lot south of the main hospi-tal.

Rothberger noted the project isbeing designed by HHOOKK AArrcchhiitteeccttss.MMccCCaarrtthhyy BBuuiillddiinngg CCooss.. IInncc.. is han-dling pre-construction work andJJaaccoobbss EEnnggiinneeeerriinngg is the construc-tion manager.

Construction of the institute isexpected to start late in the summerof next year with completion by early2015.

“This will be built on the employ-ees parking lot on the parking lotclosest to the street,” saidRothberger.

The employees will be able to parkin an existing 1,300-space parkingstructure adjacent and beneath thehospital.

Nearby, off Campus Point Drive,Scripps is in the process of movingadministrative functions into one ofthe buildings formerly occupied bySSAAIICC (NYSE: SAI), which recentlymoved some functions to Virginia.

The bond offering will also helpreimburse Scripps Health for the$100 million it spent for a 797-spaceparking structure at Scripps GreenHospital in La Jolla as well as someoperating theaters at that facility.

Rothberger said the bond

issuances are expected to help payfor a 78,000-square-foot buildingcontaining an emergency room and acritical care facility at ScrippsMemorial Encinitas hospital. Thatproject is slated for completion in2013.

A groundbreaking has been sched-uled for later this month at ScrippsEncinitas for an 884-space parkingstructure expected to be completedin the spring of 2011.

In 2006 Conrad Prebys made a$10 million gift to help fund the newConrad Prebys Emergency andTrauma Center at Scripps Mercy. Thecenter’s expansion during the nextcouple of years will include build outof a new facility and renovation ofthe existing emergency departmentand trauma center — more than dou-bling the square footage to 27,000square feet.

[email protected] Code: 20100202tbe

“It’s $15 million with four optionyears,” he said during a Jan. 15 out-reach event for SDVOSBs at CampPendleton hosted by NAVFACSouthwest and the San DiegoContracting Opportunities Center. “Ifyou get this contract, you’ll be aroundfor a while.”

John Corella, president of CCoorreellllaaIInndduussttrriieess, spoke about buildingstrategic alliances and the keys to suc-cess during the outreach event.

One key to success, he said, is tim-ing — something SDVOSBs have intheir corner right now.

“There are no contracts in the pri-vate sector,” he said. “You are in the

best place and the best time as SDVs.”Campbell said that while this JOC

is the first contract of its kind forNAVFAC, it is not likely to be the last.The current contract will pave the wayfor more JOCs to be issued toSDVOSB.

“As you all learn how to do businesswith us, there will be more,” he said.

Federal contracting policies havebeen a hot topic within the SDVOSBcommunity. Securing set-asides like thisJOC are a step in the right direction.

“You have been fighting for it, andit’s here,” he said.

[email protected] Code: 20100216crc

ContractContinued from Page 2B

Page 8: 20100215 construction weekprops-n.sdccd.edu/NE/News Events... · Companies that submitted proposals during the first phase now will be evaluat- ... CA 92101 † 619.231.1010 † CA

THE DAILY TRANSCRIPT® • TUESDAY, FEBRUARY 16, 20108B

By MONICA UNHOLDThe Daily Transcript

Lawmakers will ask voters to approvean $11.14 billion state water bond inNovember, in hopes of improving thereliability of California’s water supply.

Titled the Safe, Clean and ReliableWater Supply Act of 2010, the measurewould provide $227 million to the SanDiego region for infrastructure and con-servation projects.

San Diego County Water Authority,the region’s wholesale water supplier,supports the bond measure.

“Our current water shortage is evi-dence that we need to keep makinginvestments in water reliability proj-ects and fix California’s water system –this bond helps us do that,” said WaterAuthority Board Chair Claude “Bud”Lewis. “It will fund critical water sup-ply reliability and water quality proj-ects in San Diego County and aroundthe state.

It will also help pave the way for per-manent solutions in the Bay Delta thatwill restore water deliveries to ourregion that have been lost due to regula-tory restrictions.”

Among the projects to be funded bythe bond measure in San Diego is theSan Vicente Dam Raising project. Themeasure allocates $100 million to the$568 million project, which will add152,000 acre-feet of storage capacity tothe San Vicente Reservoir. The projectis part of the Water Authority’s $1.5 bil-lion Emergency Storage Project, whichaims to secure a reliable water supply inthe event natural disaster or droughtprevents water deliveries.

Water bond measure includes $227M for regional projectsThe bond also provides $87 million

for regional and local water reliabilityprojects, and $40 million for conserva-tion and environmental protection pro-grams, including $20 million for theSan Diego River Conservancy.

San Diego County will also be able tocompete for grants for projects designedto improve water supply reliability,water quality and the environment.

An estimated $2.4 billion in competi-tive grants are available for such proj-ects, including water recycling, seawaterdesalination, conservation, storage andconveyance facilities, and environmen-tal protection and restoration.

The bond measure is part of a com-prehensive water package passed by theLegislature and signed by Gov. ArnoldSchwarzenegger in November.

The foremost objective of the packageis finding a long-term solution to theenvironmental and legislative chal-lenges facing importers of water fromthe Bay Delta. The San Diego regionimports 30 percent of its water supplyfrom the source.

The bond includes $2.25 billion torestore the Bay Delta ecosystem andimprove water supply reliability.

Restoring the Delta is the precursorto building new conveyance facilities toimprove the reliability of water deliver-ies to Southern California.

Water deliveries have been reduced inrecent years by regulations that protectendangered fish species.

The bond does not provide fundingfor additional conveyance infrastruc-ture in the Bay Delta region. If restora-tion of the Delta is deemed successful,

water agencies must pay to design, con-struct and the environmental impacts ofthe facilities.

Future needs aside, the bond measureis the first step Californians must take inorder to fix the Bay Delta, said PaulKelley, president of the Association ofCalifornia Water Agencies.

“With the passage of the legislativepackage last November, we have a

framework for moving ahead with solu-tions,” Kelley said. “Now it is essentialthat we pass this water bond to providefunding for the projects and strategiesthat are central to solving our extremewater supply challenges. We can’t affordnot to make this overdue investment inour water system.”

[email protected] Code: 20100202cyc

enjoy natural light. Solar tubes that col-lect and magnify the sun will supply 100percent of the building’s lighting needs.DPR will install screens reminiscent ofsails under each of the 36 solar tubes todiffuse the light.

The building also incorporates largefans, solar water heating and a 64-kilo-watt photovoltaic energy system on theroof. A traditional heating ventilationand air-conditioning (HVAC) system isalso present to control the temperatureon exceptionally hot days.

The interior incorporates a variety ofrecycled and sustainable materials.Wood palates, commonly used to trans-port construction materials, will be visi-bly incorporated in the base of walls,doorways and exterior rectangular arch-es. Such structures will also includerecycled steel plates used to cover opentrenches during road construction. Inaddition to reducing construction

waste, the materials will help create abeach boardwalk theme.

Flooring will include stained concreteand 100 percent recyclable carpetingwith a “completely random pattern” thatfollows the “biomimicry” principle —emulating the non-repeating patternsfound in nature.

DPR’s use of such materials reflectsgrowing interest in “finding ways torecycle, reuse, repurpose and break thecradle to grave cycle (of materials),”Pannier said.

Eventually the goal is to change theway resources are bought and sold.Materials, such as carpet, should essen-tially be leased so that when they’ve ful-filled their usefulness they are takenback by their owner and recycled,Pannier said.

The idea of “restructuring the waythat we operate in this economy” falls inline with the ultimate goal of the

USGBC, Pannier said.Through implementation of

Leadership in Energy Efficiency Design(LEED) standards, the group aims tochange the way building is done. Thestandards are the means for quantita-tively comparing sustainable practicesin construction and continuing to pushgreen building further.

“LEED is the vehicle,” Pannier said.There are currently 70 LEED-certi-

fied buildings in San Diego County and300 registered projects. The number ofcertified buildings is expected toincrease significantly in the near future,Pannier said.

Approximately 85 percent of DPR’srecent projects achieved LEED certifi-cation, and nearly every request for pro-posal the company responds to includesgreen elements.

Unlike the rest of the hard hit con-struction market, green building has not

been impacted by the recession. Retrofitprojects have been increasing despiteeconomic conditions, Pannier said.

With increasing interest in green con-struction, the USGBC plans to addmore LEED Accredited Professionalsand volunteers to its ranks. Over thenext five years, the group plans to dou-ble its volunteer base from the current600 to 1,200 and grow its staff to incor-porate four to five employees. The chap-ter is currently hiring an executivedirector to be the sole staff member,Pannier said.

The larger group will focus its effortson increasing public awareness in addi-tion to the current focus of improvingthe awareness of the community.

“Green building is here to stay,”Pannier said. “I don’t believe it’s a fadthat will fade away.”

[email protected] Code: 20100216crd

PannierContinued from Page 3B

Airport renovations to promote growthBy KEVIN SUEThe Daily Transcript

The Green Build, a series ofimprovements to San DiegoInternational Airport, is a goodopportunity for San Diego, said theoutgoing chairman of the countyRegional Airport Authority.

Speaking at a recent luncheon host-ed by the Asian Business Association,Bob Watkins said that the “airport isan economic driver for this region …what we are trying to do is facilitatecustomer service, support economicdevelopment and make it as fruitfulas possible for the region to grow.”

According to Watkins, the projectwill increase the amount of yearlypassengers from 20 million to 30 mil-lion by 2030.

The improvements will cost around$1 billion, of which $865 million arein projects costs and the rest infinancing, Watkins said.

The Green Build features 10 new jetgates, dual-level roadways forTerminal 2, taxiway improvements,

an expanded concession area and bet-ter-supported security checkpoints.

One of the goals of The Green Buildis to have a Leadership in Energy andEnvironmental Design silver certifi-cation through decreased waterusage, reduced energy consumptionand the use of alternative energy,Watkins said.

According to the Airport Authority,work has been contracted TTuurrnneerrCCoonnssttrruuccttiioonn CCoo..,, PPCCLL CCoonnssttrruuccttoorrssIInncc..,, FFllaattiirroonn CCoonnssttrruuccttiioonn CCoorrpp..,,KKiieewwiitt CCoorrpp.. and TThhee SSuunnddtt CCooss.. IInncc..,which should finish construction bythe end of 2012.

The project should create about1,000 construction jobs, Watkinssaid.

The airport will expand the currentconcessions area by 60,000 squarefeet, Watkins confirmed.

The current concession programlease will expire in November 2012,and Watkins said the airport authori-ty is actively seeking new partners.

Source code: 20100127czc

Page 9: 20100215 construction weekprops-n.sdccd.edu/NE/News Events... · Companies that submitted proposals during the first phase now will be evaluat- ... CA 92101 † 619.231.1010 † CA

THE DAILY TRANSCRIPT® • TUESDAY, FEBRUARY 16, 2010 9B

ConstructionDirectory

For more information on how you can list your business in the Construction Directoryin print and online, contact us at 619-232-4381 or e-mail [email protected]

(760) 432-4690

Recycled Sites:500 N. Tulip St., Escondido3210 Oceanside Blvd., Oceanside7961 Airway Rd., Otay Mesa5692 East Gate Dr., Mira Mar14080 San Pasqual Valley Rd., Escondido

ESCONDIDOO ASPHALTSan Diego’s NEWEST ASPHALT PLANT

(760) 432-0657

• Escondido Dump Site• Sand and Rock• Recycled Class II Base• Asphalt

Concrete Recycling

Construction InsuranceMetal Works

CONSTRUCTION INDUSTRYINSURANCE SPECIALISTS

• GENERAL LIABILITYINCLUDING WRAPS

• WORKERS’ COMPENSATION

• BUILDERS RISK

• COMMERCIAL AUTO

• BONDS

• EQUIPMENT FLOATERS

PHONE: 619.460.1240WEB SITE: www.aspeninsbrokers.com

500 N. Tulip St., Escondido

Sponsored by

LIC. # 655846 (619) 659-1051

Structural Steel

1167 Sweetwater LaneP.O. Box 2124Spring Valley, CA [email protected]

Phone: 619.462.9087 Fax: 619.698.9435Cell: 619.992.9095

CA License # 586353*CA. CERT. SBE # 11168

Structural SteelFabricationErection &Mobile Welding.

Landscaping

Concrete Polishing

DUSTLESS SHOT BLASTING & TERRAZZO GRINDING

DEMO • HYDROBLASTING • RENTALS AVAILABLE

www.concretepolisher.com

Bids ReceivedCan’t Find A Bid Result? Call The Daily Transcript Planroom For Further Information, 232-4381

(G) Indicates General Contractor Requesting Sub bids (S) Indicates Subcontractor (n/a) Indicates Not Available

PPuueennttee HHiillllss LLaannddffiillll DDrraaiinnaaggee IImmpprroovvee.. 22001100, L.A. County Sanitation District No. 2, BidDate: 02/09/10

(G)YY&&MM CCoonnssttrr.. Gardena, 310-516-9993, submitted a low bid of $323,560 to: LL..AA..CCoouunnttyy SSaanniittaattiioonn DDiissttrriicctt NNoo.. 22 1955 Workman Mill Road, Office of the ChiefEngineering of the District, Whittier (562) 908-4288 ext./ FAX 562-699-4515.

Other bidders include:G KKOORRMMXX,, IInncc.. Walnut, (909) 595-9086 - $372,000G KKIIPP IInncc.. Murrieta, (909)698-7890 - $385,570There were 14 bidders. The project was estimated at $375,000 - $625,000.

GGuuaajjoommee RReeggiioonnaall PPaarrkk FFeenncciinngg && GGaatteess , County of San Diego, Bid Date: 02/11/10(G)EExxqquuiissiittee FFeennccee Murrietta, 714-893-0034, submitted a low bid of $34,800 to:

CCoouunnttyy ooff SSaann DDiieeggoo 10089 Willow Creek Road, San Diego 858-537-2505.

Other bidders include:G LLiigghhttnniinngg FFeennccee Poway, 858-679-6524 - $36,700G AAllpphhaa FFeennccee El Cajon, (619) 444-4329 - $37,076There were 13 bidders. The project was estimated at N/A .

AAlllliissoonn AAvvee.. IImmpprroovveemmeennttss, City of La Mesa, Bid Date: 02/11/10(G)HHaazzaarrdd CCoonnsstt.. ((SSDD)) San Diego, (858)587-3600, submitted a low bid of $1,318,000

to: CCiittyy ooff LLaa MMeessaa 8130 Allison Ave, P.O. Box 937, La Mesa (619) 667-1161/ FAX -1380.

Other bidders include:G LL..BB.. CCiivviill CCoonnssttrruuccttiioonn IInncc San Diego, (858) 578-5222 - $1,359,574.50G MMoouunnttaaiinn MMoovveerrss EEnngg San Marcos, 760-510-9019 - $1,385,079.99There were 13 bidders. The project was estimated at $1,300,000 - $1,500,000.

Page 10: 20100215 construction weekprops-n.sdccd.edu/NE/News Events... · Companies that submitted proposals during the first phase now will be evaluat- ... CA 92101 † 619.231.1010 † CA

THE DAILY TRANSCRIPT® • TUESDAY, FEBRUARY 16, 201010B

Bid Board(000) - Plan Room NumberB - BuildingE - EngineeringDT - Drafting Table

(NOF) - Documents Not on FileSpec - SpecialtiesSub - Subcontracts* - Plans on file

Projects listed bid on date and time noted below. New Listings are added to the Bid Boardas they are received.

TTuueessddaayy,, FFeebbrruuaarryy 116610:30 am *Hemet Citrus In-Lieu No. Align. Reach 1 -Pipe Only, San Jacinto(Available at http://plans.sddt.com) Eastern MWD DT2 pm *Red Hill Park Cobblestone , Rancho Cucamonga (125) City of Rancho Cucamonga-Engineering Spec2 pm *Fontana Phase III Academic Building, Fontana (San Bernardino) (Available at http://plans.sddt.com) Chaffey College Fontana Campus B2:15 pm *07a2742 Establish Existing Planting, Los Angeles (Available at http://plans.sddt.com) Department of Transportation, MS-65(Sacra) Spec3 pm *Views West Neighborhood Park, San Diego(Available at http://plans.sddt.com) City of S.D. Spec3 pm *Santa Maria Court Clerks Building, Santa Maria(Available at http://plans.sddt.com) County of Santa Barbara B

WWeeddnneessddaayy,, FFeebbrruuaarryy 117711 am Seafood City , Chula Vista(NOF) Selected Bidders Sub11:30 am *Pauley Pavilion Reno. & Expansion-PREQUAL BIDDERS, Los Angeles(Available at http://plans.sddt.com) UCLA PREQUALIFIED BIDDERS B11:30 am *REBID CHS So. Parking Struct. Seismic Repair, Los Angeles(Available at http://plans.sddt.com) UCLA B12 pm *Scripps Miramar Pump Station Design-Build, San Diego(Available at http://plans.sddt.com) City of S.D. DT1:30 pm *Multi. Large Diameter Plumb/Infra Piping 2010, Los Angeles(Available at http://plans.sddt.com) UCLA B2 pm *Upper Guadalupe River Reach 6 I-280, San Jose(Available at http://plans.sddt.com) Santa Clara Valley WD E2 pm *Annual Asphaltic Concrete , La Mesa-Spring Valley (Available at http://plans.sddt.com) La Mesa-Spring Valley SD E2 pm *Valley Ctr. Roadside Rec. Heritage Trail & L/S , San Diego(Available at http://plans.sddt.com) County of San Diego E2 pm *T/S Mod. Intersection of Third Ave & Montgomery St, Chula Vista(65) City of Chula Vista-Public Svc. Bldg. (PSB) E3 pm *Train A Rehabilitation Phase 2, Lake Elsinore (251) Elsinore Valley Municipal Water Dist-Prequal. GC’s E3 pm *Const. of the Meadows Highline, Valley Center(109) Valley Ctr. MWD E

TThhuurrssddaayy,, FFeebbrruuaarryy 118812 pm *Grossmont College HPSC Audio-Visual Equipment, El Cajon(134) Grossmont CCCD-PCD Spec1:30 pm *Mission Bay Sewage Interceptor System, San Diego(Available at http://plans.sddt.com) City of S.D. E1:30 pm *Microwave Tower Install, Riverside(Available at http://plans.sddt.com) County of Riverside B2 pm *Marina No. 3 Pump. Plant Force Main No. 1 Replace., Long Beach(44) L.A. County Sanitation District No. 2 E2 pm *Torrey Pines & Crest Reservoir Rehabilitation, Del Mar(Available at http://plans.sddt.com) City of Del Mar E2 pm *Const. Automotive Shop at Clairemont HS, San Diego(258) SDUSD-MPSD B2 pm *REBID Ph. 9U Mod: Electrical at Santana HS, Santee(47) Grossmont UHSD B2 pm *Joint Outfall H Unit 1D Trunk Sewer Rehab., South Gate and Bell Gardens(20) L.A. County Sanitation District No. 2 E2 pm *Shelter Island & Spanish Landing L/S Improve., San Diego(139) Port of San Diego Spec2 pm *Young Research Library Second Floor Remodel, Los Angeles (Available at http://plans.sddt.com) UCLA B2:15 pm *On-Call Electrical Irrigation System Repair , San Diego(Available at http://plans.sddt.com) Department of Transportation, MS-65(Sacra) Spec2:15 pm *07a2740 Establish Existing Planting, Los Angeles (Available at http://plans.sddt.com) Department of Transportation, MS-65(Sacra) Spec2:15 pm *07a2746 Irrigation Upgrade, Los Angeles (Available at http://plans.sddt.com) Department of Transportation, MS-65(Sacra) E3 pm *Santa Barbara Court Complex Seismic Retrofit, Santa Barbara(Available at http://plans.sddt.com) County of Santa Barbara B

FFrriiddaayy,, FFeebbrruuaarryy 119910 am *Reroofing: Bldg.1 - Removal Old Roofing/Flashing, San Diego(121) S.D. Co. Off. of Educ. B11 am Desert View Neighborhood Demolition, Lancaster(NOF) City of Lancaster B5 pm *Landscape Maintenance for Highland Ranch Park, San Diego(Available at http://plans.sddt.com) City of S.D. Spec5 pm *Landscape Maint for San Ysidro MAD, San Ysidro (Available at http://plans.sddt.com) City of S.D. Spec

MMoonnddaayy,, FFeebbrruuaarryy 22221 pm *Engineering/Arch. Svcs. Pt. Loma Parking Facility, San Diego(106) Port of San Diego DT2 pm *John F. Kennedy Park Playground, El Cajon(141) City of El Cajon E2 pm *Hospital Replacement Camp Pendleton, Camp Pendleton(Available at http://plans.sddt.com) NAVFAC Southwest Central IPT Code ROPCA B3 pm RFQ Engineering Svcs. Gotham Rd. Widening , Chula Vista (NOF) Southwestern CCD DT

TTuueessddaayy,, FFeebbrruuaarryy 223311 am *Replace T2E Waterline - Fire Suppression, San Diego(Available at http://plans.sddt.com) San Diego County Regional Airport Authority-PSA B2 pm *Puente Hills Landfill Gas Collect. Sys. 2010, Los Angeles (95) L.A. County Sanitation District No. 2 E2 pm San Dieguito Park ADA Accessible Restroom & Stor, San Diego(NOF) County of San Diego B2 pm *Gateway Rd. & Innovation Way Recycled Water Pipe, Carlsbad(Available at http://plans.sddt.com) City of Carlsbad E2 pm *RFQ Video Conf. Rm. Equip. & Install , San Diego(Available at http://plans.sddt.com) Port of San Diego DT5 pm Prequal. Sub-Bids 15th & Commercial Bid Pkgs 3,4&5, San Diego(NOF) Roel Construction Co. Inc. Sub5 pm *Landscape Maint for Haward Lane & Coral Gate Parks, San Ysidro(Available at http://plans.sddt.com) City of S.D. Spec5 pm *RFP ADA Retrofit of Airport Terminal Bldg., County of Imperial(Available at http://plans.sddt.com) Co. of Imperial DPW B

WWeeddnneessddaayy,, FFeebbrruuaarryy 224411 am *Replace HVAC at Polinsky Center Kitchen, San Diego(Available at http://plans.sddt.com) County of San Diego Spec3 pm RFQ DSA Inpsect. & Material Test. Southwestern CCD, Chula Vista(NOF) Southwestern Community College District DT4 pm *High Valley Pump Station Improvements, Poway(Available at http://plans.sddt.com) City of Poway E

TThhuurrssddaayy,, FFeebbrruuaarryy 225511 am *Fire Dept. Doors Furnish-Install , Brawley(80) City of Brawley - 383 Main St Spec1:30 pm *Install County Owned Miracle Playground Equip, La Quinta(Available at http://plans.sddt.com) County of Riverside E2 pm *Downtown San Diego Quiet Zone, San Diego(Available at http://plans.sddt.com) City of S.D. E2 pm *Community Development Bldg. Remodel, Brawley(151) City of Brawley - 383 Main St B2 pm *PREQUAL GCs-Sverdrup Hall HVAC & Elect Upgrade, San Diego(10) UCSD Prequalified Bidders B3 pm *Landscaping Maint. Svcs. Dept. of Gen. Svcs., San Diego(Available at http://plans.sddt.com) County of San Diego Spec

FFrriiddaayy,, FFeebbrruuaarryy 226610 am Reno. of Preschool Central School, National City(NOF) National SD B11 am *Water Source Heat Pump Replacement, San Diego(Available at http://plans.sddt.com) County of San Diego Spec2 pm *Little Italy Public Improvements, San Diego(Available at http://plans.sddt.com) City of S.D. E3 pm *Maint. Insp.& Repair of Fire Sprinkler Supression , San Diego (Available at http://plans.sddt.com) City of S.D. Spec4 pm *Sewer Flow Monitoring & Event Notification, San Diego(Available at http://plans.sddt.com) City of S.D. Spec

MMoonnddaayy,, MMaarrcchh 112 pm *B St Pier and Broadway Pier Cold Ironing , San Diego(46) Port of San Diego E3 pm *Regional Water Quality Reporting Services, San Diego(Available at http://plans.sddt.com) County of San Diego Spec

Page 11: 20100215 construction weekprops-n.sdccd.edu/NE/News Events... · Companies that submitted proposals during the first phase now will be evaluat- ... CA 92101 † 619.231.1010 † CA

THE DAILY TRANSCRIPT® • TUESDAY, FEBRUARY 16, 2010 11B

(000) - Plan Room NumberB - BuildingE - EngineeringDT - Drafting Table

(NOF) - Documents Not on FileSpec - SpecialtiesSub - Subcontracts* - Plans on file

Projects listed bid on date and time noted below. New Listings are added to the Bid Boardas they are received.

TTuueessddaayy,, MMaarrcchh 221 pm *Grossmont College Student Ctr/Svcs Bldg. Mod., El Cajon(252) Grossmont CCCD-PCD B2 pm *La Pata/Vista Hermosa Sports Park Ph 1B Pool House, San Clemente(Available at http://plans.sddt.com) City of San Clemente, B2 pm *La Pata/Vista Hermosa Sports Park Sports Fields, San Clemente(Available at http://plans.sddt.com) City of San Clemente, B2 pm *TVRWF Effluent Storage Expansion , Temecula(Available at http://plans.sddt.com) Eastern MWD E2 pm *Const. of OMWD Operations Building , Encinitas(Available at http://plans.sddt.com) Olivenhain M B2 pm *Church St. Parkway L/S Rochester Ave to Hyssop Dr., Rancho Cucamonga (51) City of Rancho Cucamonga-Engineering E

WWeeddnneessddaayy,, MMaarrcchh 3310 am *Mast Blvd. Recycled Water Replace., San Diego(42) Padre Dam Municipal Water District E2 pm Hedrick Repairs & Refurbishment, Los Angeles (NOF) UCLA B2 pm *Water Group Job 911, San Diego(Available at http://plans.sddt.com) City of S.D. E2 pm *Palm Ave. at Alameda Blvd. Street Improvements, Coronado(Available at http://plans.sddt.com) City of Coronado E2 pm *Traffic Signal & Light. I/S Walnut Ave. & Sherman , Riverside(9) County of Riverside - Transportation Annex E4 pm *FY09/10 ADA Barrier Removal - Hilleary Park , Poway(Available at http://plans.sddt.com) City of Poway E

TThhuurrssddaayy,, MMaarrcchh 4410 am Pipeline Project 2134, La Mesa(NOF) Helix WD E2 pm Community of Highgrove Center Street Trunk Sewer, Riverside(NOF) Co. of Riverside - Redev. E2 pm *Const. New Multi-Media Ctr. Madison HS, San Diego(253) SDUSD B2:15 pm On-Call Hazard. Waste ID Eval. Clean Up & Disposal, San Diego & Imperial Counties(NOF) Department of Transportation, MS-65(Sacra) Spec

FFrriiddaayy,, MMaarrcchh 5511 am *LACC Main Lodge Food Service Reno., Los Angeles(Available at http://plans.sddt.com) UCLA B4 pm *RFSQ Repair/Install. Security, Access & CCTV Sys., San Diego(Available at http://plans.sddt.com) County of San Diego DT

MMoonnddaayy,, MMaarrcchh 881:30 pm *L Rubidoux Nature Ctr & Restrm Bldg. Roof Replace., Riverside(Available at http://plans.sddt.com) County of Riverside - Purchasing and Fleet Service Spec3 pm *Landscape Maintenance of Stonebridge Park Facility, San Diego(Available at http://plans.sddt.com) City of S.D. Spec

TTuueessddaayy,, MMaarrcchh 992 pm *North Johnson Ave. Demolition, El Cajon(142) City of El Cajon B2 pm *Undergrounding Utilities of Black 2E, Ph. II, San Diego(Available at http://plans.sddt.com) City of S.D. E2 pm *Beech Ave. & Home Plant Lift Station Infl. Sewer, Carlsbad(Available at http://plans.sddt.com) City of Carlsbad E2 pm *2010 Water Meter Purchase & Replacement, Carlsbad(Available at http://plans.sddt.com) City of Carlsbad E2 pm Rieber Dining Renovation , Los Angeles(NOF) UCLA B2:30 pm *Aerial Signaling & Fiber Optic Installation , San Diego(45) SANDAG E

WWeeddnneessddaayy,, MMaarrcchh 11001:30 pm *Campus FM200 Fire Suppression System, Los Angeles(Available at http://plans.sddt.com) UCLA B2 pm *STWTP Incompatible Materials, San Jose(Available at http://plans.sddt.com) Santa Clara Valley WD E2 pm *Dykstra Hall Solar Panel Absorber Replacement, Los Angeles(Available at http://plans.sddt.com) UCLA Spec2 pm G St. Sewer Improve. Fourth Ave. to Second Ave., Chula Vista(NOF) City of Chula Vista-Public Svc. Bldg. (PSB) E

TThhuurrssddaayy,, MMaarrcchh 11112 pm *NW Quadrant Storm Drain Program , Carlsbad(Available at http://plans.sddt.com) City of Carlsbad E4 pm RFP Solar Photovoltaic Systems, San Diego (NOF) Sweetwater Union High School Dist. Purchasing Dept DT5 pm *RFQ 8th St. (J Ave. - Palm Ave.) Safety Enhance., National City(Available at http://plans.sddt.com) City of National City DT

FFrriiddaayy,, MMaarrcchh 112211:30 am Weyburn Terrace Grad. Student Housing PREQUAL, Los Angeles (NOF) UCLA PREQUALIFIED BIDDERS B2 pm *Gateway of Americas Svc. Area Sewer Treat. Plant, County of Imperial(Available at http://plans.sddt.com) County of Imperial E

MMoonnddaayy,, MMaarrcchh 11552:15 pm *11A1799 Upgrade Drainage, San Diego(Available at http://plans.sddt.com) Department of Transportation, MS-65(Sacra) E

TTuueessddaayy,, MMaarrcchh 11669 am Bleacher Shade Covers, Mission Viejo(NOF) City of Mission Viejo-Corporate Yard B2 pm *Joint First Responder Training Facility PREQUAL GC, Carlsbad(Available at http://plans.sddt.com) City of Carlsbad PREQUAL GCs B2 pm *Rosecrans & Midway Dr Turn Pockets, San Diego(Available at http://plans.sddt.com) City of S.D. E

WWeeddnneessddaayy,, MMaarrcchh 11772 pm *Pkg 3 Roller-Compact Dams & Facilities PREQUAL GCs, San Diego(Available at http://plans.sddt.com) San Diego County Water Auth. PREQUAL GCs ONLY E

TThhuurrssddaayy,, MMaarrcchh 11882 pm C1094D MDAB Renovation Project (PCC), Long Beach(NOF) Long Beach City College Liberal Arts Campus B

FFrriiddaayy,, MMaarrcchh 11992 pm *Tenth Ave. Marine Terminal Pave. Maint., San Diego(50) Port of San Diego E2 pm *Reno. Rehab. Therapy, Bldg. 1, VA Med. Ctr., San Diego(Available at http://plans.sddt.com) Dept. of Veterans Affairs Network 22 Logistics B

TThhuurrssddaayy,, MMaarrcchh 22552 pm *San Jacinto Valley Reg. Water Rec. Facility , San Jacinto(Available at http://plans.sddt.com) Eastern MWD Prequalified Only E2 pm *Reed Reservoir Replacement , Escondido(Available at http://plans.sddt.com) City of Escondido E

WWeeddnneessddaayy,, MMaarrcchh 33112 pm *Prequal. Gen/Prime Contractors Various Const. , San Marcos(Available at http://plans.sddt.com) Palomar Comm. CD-CSP DT

IInnddeeff9:37 am *Roof Replace, Veterans Affairs, San Diego Facility, San Diego (210) USACE-Los Angeles District B

IInnddeeff4:07 pm *Mt. Miguel Road St. Asphalt, Capping & Striping, Chula Vista (23) Trimark Pacific Homes, L.P. E

Bid Board

Page 12: 20100215 construction weekprops-n.sdccd.edu/NE/News Events... · Companies that submitted proposals during the first phase now will be evaluat- ... CA 92101 † 619.231.1010 † CA

THE DAILY TRANSCRIPT® • TUESDAY, FEBRUARY 16, 201012B

Contra Costa PlanroomBid Date Project Name Location

Access over 1,000 plans from across the state24 hours a day, 7 days a week atplans.sddt.comCurrent online plans include:

Sacramento PlanroomBid Date Project Name Location

02-18 Food Court SJIA San Jose 02-24 Siena Court Senior Apartments Pittsburg 02-25 Spring 2010 Overlay Project Santa Cruz 02-25 Covell Boulevard Sewer Rehabilitation Davis 03-02 Existing Freight/Passenger Elevators Control Rehabilitation Redwood City 03-02 E. Coolidge Area Wterline Replacement Modesto 03-02 Waste Gas Burner System Rehabilitation Redwood City 03-02 Albany Community Center Tower Repair Albany 03-03 E.J. Phair Brewery and Restaurant Tenant Improvements Pittsburg 03-03 Fell Street Pavement Renovation and Sewer Replacement San Francisco03-03 Springlake Drive Road Rehabilitation San Leandro 03-03 Sanitary Sewer Pump Station #12 Improvements Project Redwood City 03-04 Highway 1 Trail Phases 2,3, and 4 Half Moon Bay 03-05 Murwood Elementary School Fire Hydrant Improvememts Walnut Creek 03-09 Hoover Middle School - Bond Repair San Francisco 03-10 2010 Road and Drain Improvements Lafayette 03-11 Municipal Services Center Expansion Project Dixon 03-11 Creekside Park Phase 2 Oakley03-11 Pacific Elementary Safe Routes to School Project Sacramento 03-30 Highland Hospital Acute Tower Replacement Project Oakland

02-16 SCB Mechanical Room Improvements ON LINE ONLY Martinez 02-16 329 Rheem Blvd. Elevator Installation-ONLINE ONLY Moraga 02-17 Seafood City Market Tenant Improvement-ONLINE ONLY Chula Vista 02-18 Best Buy – 2514-ONLINE ONLY Fullerton 02-18 Food Court SJIA San Jose

International Airport 02-18 Starbucks Marketplace-ONLINE ONLY San Jose

International Airport02-18 Cache Creek Bridge Replacement-County Rd. 57 ON LINE ONLY Guinda, Ca 02-18 Requirements Contract for Asphalt Concrete Fresno, Ca 02-19 Shiloh Arms Apartments ON LINE ONLY Sacramento Ca 02-19 Nursing Lab Porterville 02-19 Oyster Point Reutilization Generator Addition ON LINE ONLY S.San Francisco, Ca 02-22 Donahue Schriber Office-ONLINE ONLY Sacramento, Ca 02-23 Alder Grove Bath Exhaust Fans ON LINE ONLY Sacramento, Ca 02-23 Millberry Union West200 SAA Remodel

& Staff Relocation ON LINE ONLY San Francisco, Ca 02-25 2008-2009 Street Overlay Project Rebid ON LINE ONLY Stockton, Ca 02-25 Spring 2010 Overlay Project Santa Cruz 02-25 Concession and Restroom Building (Increment 4) Elk Grove 02-25 South Bay Advanced Recycled Water

Treatment Facility Project- Early Earthwork San Jose CA.02-25 8-Inch Ductile Iron Pipe Main Installation ON LINE ONLY San Francisco, Ca02-26 Lennar T-3 Water Storage and Treatment Project

Cotractor Prequalification Package Fresno 03-02 Albany Community Center Tower Repair Albany CA 03-02 George Washington High School Exterior

Site Improvements-ONLINE ONLY San Francisco03-02 E. Coolidge Area Waterline Replacement Modesto 03-02 American Recovery And Reinvestment Act of 2009

Funded/Cape & Slurry Seal on Various Streets Modesto

Plans & Specs Available Online

UpdateThe following are changes to the construction listings. Noted plans and addenda are on file in theTranscript Plan Room. Deadline changes and new plans are reflected on the Bid Board.

Addenda Received22//1166 SSaannttaa MMaarriiaa CCoouurrtt CClleerrkkss BBuuiillddiinngg,, County of Santa Barbara Addenda #7, #8 22//1177 UUppppeerr GGuuaaddaalluuppee RRiivveerr RReeaacchh 66 II--228800,, Santa Clara Valley WD Addenda #3 22//1177 TTrraaiinn AA RReehhaabbiilliittaattiioonn,, Elsinore Valley MWD Addenda #222//1188 JJooiinntt OOuuttffaallll HH UUnniitt 11DD TTrruunnkk SSeewweerr RReehhaabb..,, L.A. County Sanitation District No. 2 Addenda#1 22//1188 YYoouunngg RReesseeaarrcchh LLiibbrraarryy SSeeccoonndd FFlloooorr RReemmooddeell,, UCLA Addenda #1, #2 22//1188 SSaannttaa BBaarrbbaarraa CCoouurrtt CCoommpplleexx SSeeiissmmiicc RReettrrooffiitt,, County of Santa Barbara Addenda #3 22//1188 CCoonnsstt.. AAuuttoommoottiivvee SShhoopp aatt CCllaaiirreemmoonntt HHSS,, SDUSD Addenda #233//1177 PPkkgg 33 RRoolllleerr--CCoommppaacctt DDaammss && FFaacciilliittiieess PPRREEQQUUAALL GGCCss,, San Diego County Water Auth.PREQUAL GCs ONLY Addenda #1

Date Changes22//1111 SSaannttaa MMaarriiaa CCoouurrtt CClleerrkkss BBuuiillddiinngg,, County of Santa Barbara now 2/16

New Big JobsUpcoming $1 million-plus projects. The following projects are available

for viewing in the Plan Room. See Bidboard for plan

BBiidd DDaattee PPrroojjeecctt nnaammee PPrroojjeecctt oowwnneerrEEssttiimmaattee

((mmiilllliioonnss))PPrroojjeecctt llooccaattiioonn

3/4/2010

Construct New

Multi-Media

Center Madison HS

San Diego Unified

Sch. District$3M-$4M San Diego

3/18/2010C1094D MDAB

Renovation (PCC)

Long Beach

City College$34.4M Long Beach

3/25/2010Reed Reservoir

ReplacementCity of Escondido $6.5M-$7.5M Escondido

BuildingCampus FM200 Fire Suppression System Bid DeadlineLos Angeles March 10, 1:30 pmSubmit bids to UCLA. 2682800. Richard Y. Lee, 731 Young Drive S. 3rd Flr. Box 951526, Los Angeles,CA 90095 (PH: 310-206-6116; Fax: 310-206-9522). Estimate: $175,000.

PPllaannss AAvvaaiillaabbllee aatt hhttttpp::////ppllaannss..ssddddtt..ccoommWWoorrkk IInnvvoollvveess:: The scope of the Project is to update the existing fire suppression system to FM 200system to provide optimum fire protection coverage for IDF Room and Server Rooms in various cam-pus facilities for the University. Contractor shall provide deferred approval submittal package for theState Fire Marshal’s review and approval prior to start of construction for each phase/area of theProject. License required: B. Mandatory pre-bid conf. & job walk on 2/17, 1:30 pm at Capital ProgramsBldg., 1060 Veteran Ave., Rm. 128-H, UCLA campus. Contact Richard Lee (Tel: 310-206-6116). Docsare avail. at Ford Graphics, 2435 Military Ave., Los Angeles, CA 90064 (Tel: 310-477-6501) or viewonline at http://socal.fordgraphics.com/.

EngineeringPipeline Project 2134 Bid DeadlineLa Mesa March 4, 10 amSubmit bids to Helix Water District. Chris McRae:(619) 667-6278 Fax:(619) 667-6235 Email:

New ListingsPUBLISHED ON FIRST REPORTED DATE, EACH MONDAY AND ONE DAY PRIOR TO ACTUAL BID OPENING DATE

# Indicates contractor requesting subbids. (G) Indicates General Contractor Requesting Sub bids

(S) Indicates Subcontractor (n/a) Indicates Not Available

Continues on 14B

Page 13: 20100215 construction weekprops-n.sdccd.edu/NE/News Events... · Companies that submitted proposals during the first phase now will be evaluat- ... CA 92101 † 619.231.1010 † CA

THE DAILY TRANSCRIPT® • TUESDAY, FEBRUARY 16, 2010 13B

REQUEST FOR PROPOSALSThe San Diego Housing Commission is soliciting proposals from qualified firms for Housingg Impactt Feee NexusStudy. Interested and qualified firms including disadvantaged and women owned small businesses are invited tosubmit a proposal. An electronic copy (in PDF form) of the solicitation packages with complete instructions is avail-able. Interested parties please forward your request via email to the address listed below.

San Diego Housing Commission1122 Broadway, Suite 300

San Diego, CA 92101

Contact: Maurcelll Greshamm (619)) 578-7485Email request to: [email protected]

A pre-proposal conference will be held on Thursday,, Februaryy 18,, 20100 att 10:000 a.m. (PST) at the SDHC officeabove. Sealed proposals marked "Housingg Impactt Feee Nexuss Studyy (NS-10-1)) Bidd Documentss --- Doo Nott Open" willbe received on or before Friday,, Marchh 12,, 20100 att 2:000 p.m.. (PST). Three (3) additional copies of the proposaland a completed electronic file containing the proposal on CD-R must be submitted with the original proposal pack-et to the above location. Late proposals will not be accepted.

The Turner PCL Flatiron Joint Venture seeks bids from smaller general contracting firms for the Terminal GroundFloor Preparatory Works at the SDIA Terminal Development Program, Contract 1, Airside Expansion. Approx.value is $ 75,000 working in an operating and public environment.All interested firms must first register on the SDIA’s web site at san.org under The Green Build tab to receive infor-mation updates and the bid documents. All interested firms shall note that this is a prevailing wage project and issubject to both FAA and FARS requirements.Bid documents are to be available on line Feb.10/10 with a submission due on Feb. 24/10.

INVITATION FOR BIDSThe San Diego Housing Commission (SDHC) is soliciting proposals from San Diego businesses for Fumigatee Buildingss atScatteredd Sites located in the City of San Diego. Interested and qualified firms, including disadvantaged and women-ownedsmall businesses, are invited to submit a proposal. Solicitation packages with complete instructions are available for a$10.00 non-refundable fee at the address listed below:

SDHC1122 Broadway, Suite 300, San Diego, CA 92101

Contact: Jessie Helton at (619) 578-7484

A pre-bid conference will be held on Tuesday,, Februaryy 23,, 20100 att 9:000 a.m.,, (PST), at the above listed office. Sealed bidswith a standard label pasted on the outside that reads, “CI-100-166 Fumigatee Buildingss att Scatteredd Sitess –– DOO NOTT OPEN”will be received on or before Wednesday,, Marchh 10,, 2010,, att 2:000 p.m.,, ((PST), at which time bids will be publicly openedand read aloud.

REQUESTING BIDS – ALLL TRADES – FROM CERTIFIED DVBEE SUBCONTRACTORS & SUPPLIERS FOR:LOSS ALAMITOSS ELEMENTARYY SCHOOLL MODERNIZATIONN PROJECT

OWNER: LOS ALAMITOS UNIFIED SCHOOL DISTRICTBID DATE: FRIDAY, FEBRUARY 26, 2010 @ 2:00 P.M.

PROVIDE BIDS TO WCA PRIOR TO BID TIME*BONDS MAY BE REQUIRED*

WEST COAST AIR CONDITIONING CO., INC.12365 MAPLEVIEW STREET

LAKESIDE, CA 92040CONTACT: JAMES CLOWER, VICE PRESIDENT

(619) 561-8000 PHONE(619) 561-3743 FAX

ALL TRADES WORK AVAILABLE FOR SUB-BID

REQUESTING BIDS – ALLL TRADES – FROM CERTIFIED DVBE SUBCONTRACTORS & SUPPLIERS FOR:MCAULIFFEE MIDDLEE SCHOOLL MODERNIZATIONN PROJECT

OWNER: LOS ALAMITOS UNIFIED SCHOOL DISTRICTBID DATE: FRIDAY, FEBRUARY 26, 2010 @ 2:00 P.M.

PROVIDE BIDS TO WCA PRIOR TO BID TIME*BONDS MAY BE REQUIRED*

WEST COAST AIR CONDITIONING CO., INC.12365 MAPLEVIEW STREET

LAKESIDE, CA 92040CONTACT: JAMES CLOWER, VICE PRESIDENT

(619) 561-8000 PHONE(619) 561-3743 FAX

ALL TRADES WORK AVAILABLE FOR SUB-BID

PCLL Constructionn Services,, Inc. is requesting sub-bids for ALLL TRADES from certifiedSmall Business Small Business Veteran-Owned BusinessHUBZone Small Business Small Disadvantaged BusinessWomen-Owned Small Business Veteran-Owned Small Business

Project Information: Mariposaa Landd Portt off Entryy Phasess 2,, 33 andd 4 in Nogales, ArizonaBid Date: February 22, 2010 at 3:00PM Budget: $120,000,000Please contact Melissa Meneses for more information at (858)657-3400 or fax (858)657-9444

THEE CITYY OFF SANN DIEGOO && TURNERR CONSTRUCTIONN COMPANYNOTICEE TOO CONTRACTORSS CALLINGG FORR BIDS

---NOTICE IS HEREBY GIVEN that Turner Construction of San Diego California, will receive up to, but not later

than 2 o’clock p.m. of the below dates, sealed bids for the award of a contract for:

Sann Diegoo Neww Centrall Libraryy Project

Bidd Phasee #1 due Friday March 19th, 2010 at 2:00PM, includes the following scopes: Site Demolition,Excavation & Fill, Shoring, Reinforcing Steel, Building Concrete, Structural Precast Concrete, A/V Equipment ,Hazardous Material Remediation, Fire Alarm System, Fire Suppression Systems, Elevators, Escalators, Plumbing,HVAC, Electrical, Procurement Manager

Bidd Phasee #2 due Friday March 26th, 2010 at 2:00PM, includes the following scopes: Site Demolition,Site Pavers, Structural Steel , Metal Stairs, Misc. Metals, Doors & Frames, Door Hardware, Glass Entrances,Windows & Walls, Skylights, Plaster, Gypsum Drywall Work, Window Washing Equipment, Dome, PV Panels

Bidd Phasee #33 && 4 TBD

Bids shall be received in the office of the Turner Construction, 9330 Scranton Rd., Suite 300, San Diego, CA92121.

Each bid must conform and be responsive to the contract documents & bid form, copies of which may beobtained on or after February 10, 2010, at Planwell http://www.ocbinc.com. Follow links to the public planroom,or contact OCB directly at 619-232-8440.

Turner Construction is requiring financial pre-qualification of all trade contractors wishing to submit bidson the project. Those pre-qualifications, as well as selection criteria are included in the bid package. Bids maynot be accepted if a trade contractor has not met the pre-qualification requirements. If you have previously pre-qualified with Turner Construction, please note that a pre-qualification renewal is required every two years withupdated yearly financials. All completed forms must be returned to 9330 Scranton Rd., Suite 300, San Diego,CA 92121, attn: Jeremy Coriale, [email protected] prior to or at time of bid.

Pre-Bid meetings will be held at Turner Construction, 9330 Scranton Rd., Suite 300, San Diego, CA92121. Those not in attendance may not be allowed to bid. The Phase #1 pre-bid meeting - March 2nd, 2010 at9:00 AM. The Phase #2 pre-bid meeting - March 3rd, 2010 at 9:00 AMEach bid shall be accompanied by a letter from an admitted Surety, approved to conduct business in the State ofCalifornia, confirming your bonding capacity will not be exceeded if awarded the contract. The successful biddermay be required to supply a payment & performance bond issued by an admitted Surety approved to conductbusiness in the State of California.

Turner Construction & the City of San Diego reserve the right to reject any or all bids or to waive anyirregularities or informalities in any bids or in the bidding. No bid will be considered which makes exceptions,changes, or in any manner makes reservations to the terms of the Contract Documents. Bidders shall be select-ed based on the “best value for price and qualifications as noted in the bid documents”.

The Director of Industrial Relations has determined the general prevailing rate of per diem wages in thelocality in which this work is to be performed for each craft or type of worker needed to execute the contractwhich will be awarded to the successful bidder, visit www.dir.ca.gov/DLSR/PWD for more information.

Each bidder shall be a licensed contractor pursuant to the California Contractors License Law requiredfor the performance of work within its specialty.No bidder may withdraw his bid for a period of NINETY (90) days after the date set for the opening of bids.

Additional information can be obtained by contacting Jeremy Coriale, [email protected]. Additional sup-port may be obtained at Turner Construction’s Office, AGC, ABC, ASA, BCA, LBIA, etc.

Ronn RudolphVP of Regional OperationsTurner Construction CompanySan Diego New Central Library Project

RUDOLPHH ANDD SLETTEN,, INC.Requests bids for all trades from ALL qualified subcontractors for the following two projects:

Laa Pataa Parkk -- Phasee 1B work to be performed will consist of furnishing all labor, materials, and equipmentnecessary for the Sports Fields, Restroom Buildings, Street Improvements, Playground, and associated site

work. The overall project value is estimated at $14,000,000.

Laa Pataa // Vistaa Hermosaa Parkk Aquaticc Center work to be performed will consist of furnishing all labor,materials, and equipment necessary for Aquatic Center Pool House, Pools, and associated site work. The

overall project value is estimated at $10,500,000.

(Both projects bid on the same day and time but are being bid as separate projects)BIDD DATEE FORR BOTHH PROJECTSS:: TUESDAY,, MARCHH 2,, 20099 ATT 2:000 PM

Please Contact:RUDOLPHH ANDD SLETTEN

Attn: Andrew Gaylor10955 Vista Sorrento Parkway, Suite 100, San Diego, CA 92130

Telephone: (858) 259-6262, Fax: (858) 259-8282Email: [email protected]

WEE AREE ANN EQUALL OPPORTUNITYY EMPLOYERLicensee #198069

REQUEST FOR PROPOSALSThe San Diego Housing Commission is soliciting proposals from qualified firms for Affordablee Housingg Bestt Practices&& Fundingg Sources. Interested and qualified firms including disadvantaged and women owned small businesses areinvited to submit a proposal. An electronic copy (in PDF form) of the solicitation packages with complete instruc-tions is available. Interested parties please forward your request via email to the address listed below.

San Diego Housing Commission1122 Broadway, Suite 300

San Diego, CA 92101

Contact: Maurcelll Greshamm (619)) 578-7485Email request to: [email protected]

A pre-proposal conference will be held on Thursday,, Februaryy 18,, 20100 att 11:000 a.m. (PST) at the SDHC office above.Sealed proposals marked "AHH Bestt Practicess && Fundingg Sourcess (BPFS-10-1)) Bidd Doccumentss --- Doo Nott Open" willbe received on or before Friday,, Marchh 12,, 20100 att 2:300 p.m.. (PST). Three (3) additional copies of the proposal anda completed electronic file containing the proposal on CD-R must be submitted with the original proposal packet tothe above location. Late proposals will not be accepted.

Page 14: 20100215 construction weekprops-n.sdccd.edu/NE/News Events... · Companies that submitted proposals during the first phase now will be evaluat- ... CA 92101 † 619.231.1010 † CA

THE DAILY TRANSCRIPT® • TUESDAY, FEBRUARY 16, 201014B

SpecialtiesDykstra Hall Solar Panel Absorber Replacement Bid DeadlineLos Angeles March 10, 2 pmSubmit bids to UCLA. HK-011910. Hank Knapp, Rieber Hall 310 De Neve Dr., #134, Los Angeles, CA90095 (Tel: 310-206-6353; Fax: 310-794-6221). Estimate: NA.

PPllaannss AAvvaaiillaabbllee aatt hhttttpp::////ppllaannss..ssddddtt..ccoommWWoorrkk IInnvvoollvveess:: Furnish and install custom manufactured solar collector absorber assemblies for roofmounted solar water heating panels at Dykstra Hall. Remove old absorber assemblies from within theframe of existing solar panels. Furnish and install new absorbers in existing panel frame, includingvalves and piping. Re-use glass and hardware, replace damaged glass and/or hardware as required.Contractor shall schedule and oversee crane needed to move old absorbers to ground level and stagenew absorbers on roof. License required: C-36 (Plumbing) or C-46 (Solar). Mandatory pre-bid conf. &job walk on 2/17, 10 am at Capital Programs Bldg., 1060 Veteran Ave., Rm. 128-H, UCLA campus.Contact Hank Knapp (Tel: 310-206-6353). Docs are avail. at Ford Graphics, 2435 Military Ave., LosAngeles, CA 90064 (Tel: 310-477-6501) or view online at http://socal.fordgraphics.com/.

[email protected] . Estimate: $1,110,000 .DDooccuummeennttss NNoott OOnn FFiillee

WWoorrkk IInnvvoollvveess:: Pipeline Project 2134. Plans/Specs (NR) $35, available from owner, (619) 466-0585.PPllaannhhoollddeerrss IINNCCLLUUDDEE::G ##SScchheeiiddeell CCoonnttrr.. && EEnngg PO Box 1796, La Mesa . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .619-593-8704/FAX 619-593-9193

G St. Sewer Improve. Fourth Ave. to Second Ave. Bid DeadlineChula Vista March 10, 2 pmSubmit bids to City of Chula Vista-Public Svc. Bldg. (PSB). SW-251. (619) 691-5021. Estimate: N/A .

DDooccuummeennttss NNoott OOnn FFiilleeWWoorrkk IInnvvoollvveess:: G St. Sewer Improve. Fourth Ave. to Second Ave.. Bid Docs. (NR) $6 (remit $12) avail-able from owner, (619) 691-5021.

New ListingsPUBLISHED ON FIRST REPORTED DATE, EACH MONDAY AND ONE DAY PRIOR TO ACTUAL BID OPENING DATE

# Indicates contractor requesting subbids. (G) Indicates General Contractor Requesting Sub bids (S) Indicates Subcontractor (n/a) Indicates Not Available

Continued from Page 12B

Fontana Phase III Academic Building Bid DeadlineFontana (San Bernardino) February 16, 2 pmSubmit bids to Chaffey College Fontana Campus. 09P114. Tina Altis, Chaffey College PurchasingServices, (909) 652-6701. Estimate: $10,200,000.

PPllaannss AAvvaaiillaabbllee aatt hhttttpp::////ppllaannss..ssddddtt..ccoommWWoorrkk IInnvvoollvveess:: Fontana Phase III Academic Building: This is a Multi-Prime project. The Project con-sists of an approximate 30,400 square foot building with four classrooms, two labs with prep rooms,library, bookstore, student lounge, dance studio, and administrative offices. Bid Pkg. #, Description,License Requirement & Estimate are as follows: FABP 01 General Construction B $675,000; FABP 02Earthwork, Grading and Paving A $90,000; FABP 03 Concrete C8 $860,000; FABP 04 Fire ProtectionC16 $280,000; FABP 05 Structural, Misc. Steel and Metal Decking C51 $1,425,000; FABP 06Casework and Millwork C6 $480,000; FABP 07 Roofing and Sheet metal C39 $900,000; FABP 08Aluminum Storefront and Glazing C17 $750,000; FABP 09 Framing, Drywall, Fireproofing, Lath andPlaster C9 or C35 $925,000; FABP 10 Ceramic Tile C54 $50,000; FABP 11 Acoustical Ceilings C2$70,000; FABP 12 Flooring C15 $200,000; FABP 13 Painting C33 $150,000; FABP 14 Plumbing C36$475,000; FABP 15 HVAC C20 $1,200,000; FABP 16 Electrical C10 $1,550,000; FABP 17 Landscapeand Irrigation C27, $175,000 . Mandatory Prebid Job Walks held on Jan. 26 & 28, 9am, ChaffeyCollege Fontana Campus. Plans/Specs (NR) $275, Reliable Graphics, 3546 Concours St, Ste 100,Ontario, CA 91764, (909) 476-7682 www.reliablegraphics.com.PPllaannhhoollddeerrss IINNCCLLUUDDEE::G ##JJaayynneess CCoorrppoorraattiioonn 111 Elm Street, Fourth Floor, San Diego . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .(619)233-4080/FAX -4090n/a ##TToobbyy BB..HHaayywwaarrdd,, IInncc.. 1951 South Myrtle Ave., Monrovia . . . . . . . . . . . . . . . . . . . . . . . . . . . . .626-303-5039/FAX 626-358-5127n/a ##SSiieerrrraa LLaannddssccaappee CCoo.. ((PPDD)) 73-771 Dinah Shore Dr. Suite 200, Palm Desert . . . . . . . . . . . . . . . . . . . .760-328-8900/FAX -8944n/a ##RRoobbeerrtt LL.. RReeeevveess CCoonnsstt.. ., Paramount . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .562-634-9818n/a ##RRCC CCoonnsstt.. ((RRiiaallttoo)) 2223 N. Locust Ave., Rialto . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .909-829-3688/FAX 909-822-3696n/a ##PPrriizziioo CCoonnsstt..,, IInncc.. 151 Kalmus Ste. M-1, Costa Mesa . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .714-543-3366/FAX -3388n/a ##PPrreeffeerrrreedd CCeeiilliinnggss,, IInncc.. 475 Capricorn St., Brea . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .(714) 255-9336/FAX -9165n/a ##OOlliivvaass MMeecchhaanniiccaall 414 W California St, Ontario . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .(909) 984-1466/FAX (909) 988-5437n/a ##NNaattuurree TTeecchh.. LLaannddssccaappee 1760 Marlborough Ave, Riverside . . . . . . . . . . . . . . . . . . . . . . . . . .(909)684-8808/FAX 909-779-1064n/a ##LLaaiirrdd CCoonnsstt.. CCoo..,, IInncc.. 9460 Lucas Ranch Rd., Rancho Cucamonga . . . . . . . . . . . . . . . . . . .(909)989-5595/FAX (909)944-9301n/a ##KKaarr CCoonnssttrruuccttiioonn 1306 w. Brooks Street, Ontario . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .909-988-5054n/a ##IInnllaanndd BBuuiillddiinngg CCoonnsstt.. 323 S. Sierra Way, San Bernardino . . . . . . . . . . . . . . . . . . . . . . . . . . .909-884-6276/FAX 909-889-6936n/a ##GGrreegggg EElleeccttrriicc 608 W. Emporia, Ontario . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .(909)983-1794n/a ##FFrryyee CCoonnssttrruuccttiioonn 10010 Rosedale Hwy, Bakersfield . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .661-588-8870n/a ##FFrreeddrriicckk TToowweerrss IInncc.. 7055 Foothills Blvd., Tujunga . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .818-951-3552/FAX -3872n/a ##EEddggee DDeevv..,, IInncc.. 27368 Via Industria Ste. 101, Temecula . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .(951)296-0776/FAX -0775n/a ##DDMMAA GGrreeeennccaarree CCoonnttrraaccttiinngg 3000 E. Coronado, Anaheim . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .714-630-9470n/a ##DDeellmmaacc CCoonnssttrruuccttiioonn && DDeevveellooppmmeenntt,, IInncc 4050 Verdugo Rd., Los Angeles . . . . . . . . . . . . . . . . . . . . . .818-543-7109/FAX -7285n/a ##CCPPEE CCoonnssttrruuccttiioonn 7371 North Ave, Lemon Grove . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .(619)461-1306/FAX (619)337-7693n/a ##BBoogghh CCoonnssttrruuccttiioonn 401 W. 4th St, Beaumont . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .951-845-4607/FAX 951-845-3106n/a ##**PPllaannHHoollddeerrssLLiisstt OOnn LLiinnee && CCoommpplleettee ppllaannss..ssddddtt..ccoomm will fax or email complete list upon request, 619-232-4381 . . . . . . . . . .

Santa Maria Court Clerks Building Bid DeadlineSanta Maria February 16, 3 pmSubmit bids to County of Santa Barbara. 8526. Project Manager, John Green, General Services, (805)934-6229 or [email protected], Technical Questions: Paul Reinhardt at Ravatt Albrecht

& Associates, Inc., (805) 928-5002, [email protected]. Estimate: $5,836,565.PPllaannss AAvvaaiillaabbllee aatt hhttttpp::////ppllaannss..ssddddtt..ccoomm

WWoorrkk IInnvvoollvveess:: Santa Maria Court Clerk’s Building: Construct a new 18,650 SF two-story, slab ongrade, wood and steel Boccupancy structure. This facility will replace the Santa Maria Superior Court Clerk’s modular officebuilding located on the Santa Maria Court House campus. License Required: B . Mandatory PrebidWalk held on Jan. 7, 1pm, Santa Maria Court Campus, 312 East Cook Street, Santa Maria, CA . Requestplans, specs & forms from Amy Gabaldon, Project Asst., (805) 568-3055 or [email protected]. Also available for download from http://www.countyofsb.org/gs/default.aspx?id=7122.PPllaannhhoollddeerrss IINNCCLLUUDDEE::G ##CCAALL PPAACC ., . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .714-449-9404/FAX -9668n/a ##MMaaiinnoo CCoonnssttrruuccttiioonn PO Box 1347, San Luis Obispo . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .(805)543-0514/FAX 805-543-0514n/a ##WWyyssoonngg CCoonnsstt.. 8720-B El Camino Real, Atascadero . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .805-466-1038/FAX 805-466-5176n/a ##SSttaapplleess CCoonnsstt.. CCoo.. 4478 Market St. #705, Ventura . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .(805)658-8786/FAX -8785n/a ##SSppiieessss CCoonnsstt.. ((SSaannttaa MMaarriiaa)) 1110 E. Clark Ave Ste. 210, Santa Maria . . . . . . . . . . . . . . . .(805)937-5859/FAX (805)934-4432n/a ##LLeewwiiss CC.. NNeellssoonn && SSoonnss 3400 McCall, Suite 100, Selma . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .(559)896-1443/FAX -8609n/a ##DDJJMM CCoonnsstt 727 West Century, Santa Maria . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .805-922-9038/FAX -922-9048n/a ##MMoorrrriisssseeyy CCoonnsstt.. CCoo.. IInncc.. ., . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .760-722-6800/FAX -6818n/a ##DDiiaannii BBuuiillddiinngg CCoorrpp 295 North Blosser, Santa Maria . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .(805) 925-9533/FAX -9983n/a ##SSoolltteekk PPaacciiffiicc ., . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .559-439-2750/FAX -2356n/a ##ZZuummwwaalltt CCoonnsstt.. ., . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .559-252-1000n/a ##AAMMGG AAssssoocciiaatteess,, IInncc.. 26470 Ruether Ave. #108, Santa Clarita . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .661-251-7401/FAX -7405n/a ##RRCC CCoonnsstt.. ((RRiiaallttoo)) 2223 N. Locust Ave., Rialto . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .909-829-3688/FAX 909-822-3696n/a ##SSBBSS CCoorrpp ((WWeessttllaakkee VViillll)) 31416 Agoura Rd. Suite 135, Westlake Village . . . . . . . . . . . . . . .818-597-4363/FAX 818-597-4368n/a ##**PPllaannHHoollddeerrssLLiisstt OOnn LLiinnee && CCoommpplleettee ppllaannss..ssddddtt..ccoomm will fax or email complete list upon request, 619-232-4381 . . . . . . . . . .G ##HHiillbbeerrss,, IInncc.. 1210 Stabler Lane, Yuba . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .(530) 673-2947/FAX (530) 674-9578S ##RRaauull MMeennddoozzaa CCoonnssttrruuccttiioonn,, IInncc..//EEnnvviirroonnmmeennttaall SSvvccss PO Box 1570, Lakeside . . . . . . .(619) 390-5964/FAX (619) 390-5966

Pauley Pavilion Reno. & Expansion-PREQUAL BIDDERS Bid DeadlineLos Angeles February 17, 11:30 amSubmit bids to UCLA PREQUALIFIED BIDDERS. 948272.01. (310) 825-7015. Estimate: $90,000,000- $110,000,000.

PPllaannss AAvvaaiillaabbllee aatt hhttttpp::////ppllaannss..ssddddtt..ccoommWWoorrkk IInnvvoollvveess:: Pauley Pavilion Renovation & Expansion: This Project will renovate and expand thePauley Pavilion, a multi-purpose arena constructed in 1965. The Project consists of new constructionand renovation, and upgrade of the UC seismic rating of the structure from Fair to Good. New con-struction shall consist of a two-story subterranean addition at the north side of the building, and anenclosed entry concourse on the north, east, west and south sides of the building. The subterraneanaddition shall accommodate modern locker rooms and team support facilities on the lower level, anda multi-purpose meeting facility seating 300 people on the upper level. The entry concourse shallaccommodate a new main lobby and ticket office, and provide improved access to public restrooms,concessions and arena seating. The renovation scope of work shall include upgrades and replacementof major equipment and distribution components of Pauley’s mechanical, electrical and plumbing sys-tems; provision of building lighting, equipment and environmental control systems; provision of lifesafety systems including new fire alarm and fire sprinkler systems, a smoke evacuation system, emer-

BuildingWork Involving New Construction, Additions, Alterations and Remodeling of Residential, Commercialand Industrial Structures. Please Check Engineering, Specialties or Subcontractors for AdditionalBidding Projects

(G) Indicates General Contractor Requesting Sub bids(S) Indicates Subcontractor(NA) Indicates Not Available

Continues on 15B

Page 15: 20100215 construction weekprops-n.sdccd.edu/NE/News Events... · Companies that submitted proposals during the first phase now will be evaluat- ... CA 92101 † 619.231.1010 † CA

THE DAILY TRANSCRIPT® • TUESDAY, FEBRUARY 16, 2010 15B

gency generator, and fire command center; code-required structural upgrades for assembly occupan-cies; hazardous materials abatement; landscape and paving improvements; restroom and concessionimprovements; new seating and sports flooring. . Mandatory Pre-Bid Conf. & Job Walk held Dec. 16,8:30am, UCLA Campus. 2nd Conf. held on Jan. 14, 10am, Pauley Pavilion, Chancellor’s Rm. 301,Westwood Plaza, UCLA campus. Plans/Specs available for purchase from Ford Graphics, 2435 MilitaryAve., Los Angeles, CA 90064, (310) 477-6501 http://socal.fordgraphics.com/.PPllaannhhoollddeerrss IINNCCLLUUDDEE::G ##CCllaarrkk CCoonnsstt..((CCMM)) 575 Anton Blvd. Ste. 100, Costa Mesa . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .714-427-2812/FAX 714-429-9978G ##HHuunntt CCoonnssttrruuccttiioonn GGrroouupp,, IInncc.. ((IIrrvviinnee)) 2020 Main Street, Suite 1170, Irvine . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .949-862-1100G ##PPCCLL CCoonnsstt..SSvvcc..((GGlleennddaallee)) 700 N. Central Ave., #700, Glendale . . . . . . . . . . . . . . . . . . . . . . . . .818-246-3481/FAX 818-247-5775G ##PPeerriinnii BBuuiillddiinngg CCoommppaannyy,, IInncc.. 2955 N. Green Valley Parkway, Henderson . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .702-792-9209S ##AACCCCOO EEnnggiinneeeerreedd SSyysstteemmss,, IInncc..--MMeecchhaanniiccaall ((HHVVAACC)) 6265 San Fernando Rd, Glendale . . . . . . . . . . . . . . . . . . . . .818-244-6571S ##CCiirrccuullaattiinngg AAiirr,, IInncc..-- MMeecchhaanniiccaall ((HHVVAACC)) 7337 Varna Ave., North Hollywood . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .818-764-0530S ##PPPPCC AAiirr CCoonnddiittiioonniinngg,, IInncc--MMeecchhaanniiccaall ((HHVVAACC)) 5950 Lakeshore Drive, Cypress . . . . . . . . . . . . . . . . . . . . . . . . . . . .714-821-0490S ##XXCCEELL MMeecchhaanniiccaall SSyysstteemmss--MMeecchhaanniiccaall ((HHVVAACC)) 1710 W. 130th Street, Gardena . . . . . . . . . . . . . . . . . . . . . . . . . . .310-660-0090S ##AAnnddeerrssoonn && HHoowwaarrdd EElleeccttrriicc,, IInncc..--EElleeccttrriiccaall 1791 Reynolds Ave., Irvine . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .949-250-4555S ##BBeerrggeelleeccttiirrcc CCoorrpp..--EElleeccttrriiccaall 5650 W. Centinela Ave., Los Angeles . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .310-337-1377S ##CCoommeett EElleeccttrriicc,, IInncc..--EElleeccttrriiccaall 7760 Deering Ave., Canoga Park . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .818-340-0965S ##CCuuppeerrttiinnoo EElleeccttrriicc,, IInncc..--EElleeccttrriiccaall 11929 Hamden Place, Santa Fe Springs . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .562-641-2400S ##HHeelliixx EElleeccttrriicc,, IInncc..--EElleeccttrriiccaall 8260 Camino Santa Fe, Ste A, San Diego . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .858-535-0505S ##KKDDCC IInncc.. ddbbaa DDyynnaalleeccttrriicc--EElleeccttrriiccaall 4462 Corporate Center Dr., Los Alamitos . . . . . . . . . . . . . . . . . . . . . . . . . . . . .714-828-7000S ##LLaanndd MMaarrkk EElleeccttrriicc,, IInncc..--EElleeccttrriiccaall 7876 Deering Ave., Canoga Park . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .818-883-5110S ##MMoorrrrooww--MMeeaaddoowwss CCoorrppoorraattiioonn--EElleeccttrriiccaall 231 Benton Court, City of Industry . . . . . . . . . . . . . . . . . . . . . . . . . . . . .909-598-7700S ##PPoowweerrccoo EElleeccttrriicc CCoorrppoorraattiioonn--EElleeccttrriiccaall 15870 Olden St., Sylmar . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .818-884-1166S ##RRoosseennddiinn EElleeccttrriicc,, IInncc..--EElleeccttrriiccaall 5572 Fresca Dr, La Palma . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .714-521-8113S ##SSaaggee EElleeccttrriicc CCoommppaannyy--EElleeccttrriiccaall 9660 Topanga Canyon Blvd., Chatsworth . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .818-718-9080n/a ##SSAASSCCOO--EElleeccttrriiccaall 2750 Moore Ave., Fullerton . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .714-870-0217 Ext. 21S ##RRaauull MMeennddoozzaa CCoonnssttrruuccttiioonn,, IInncc..//EEnnvviirroonnmmeennttaall SSvvccss PO Box 1570, Lakeside . . . . . . . . . .619-390-5964/FAX 619-390-5966

REBID CHS So. Parking Struct. Seismic Repair Bid DeadlineLos Angeles February 17, 11:30 amSubmit bids to UCLA. 948786.01. Steven Chang 310-983-3151. Estimate: $175,000.

PPllaannss AAvvaaiillaabbllee aatt hhttttpp::////ppllaannss..ssddddtt..ccoommWWoorrkk IInnvvoollvveess:: REBID CHS South Parking Structure Seismic Repair: Repair approximately thirty-fourhundred linear feet of cracks in concrete and fifteen square feet of spalled concrete in the concretewalls within the portion of the parking structure that is used for parking complete. The parking struc-ture will remain operational throughout construction. Mandatory Pre-Bid Conf. to be held on Feb. 2,11am, Capital Programs Bldg., 1060 Veteran Ave., Rm. 128-H, UCLA Campus. Contract Docs. availablefor purchase from Ford Graphics, 2435 Military Ave., Los Angeles, CA 90064. (310) 477-6501http://socal.fordgraphics.com/ .

Multi. Large Diameter Plumb/Infra Piping 2010 Bid DeadlineLos Angeles February 17, 1:30 pmSubmit bids to UCLA. 2820206. (310) 825-7015. Estimate: $1,000,000.

PPllaannss AAvvaaiillaabbllee aatt hhttttpp::////ppllaannss..ssddddtt..ccoommWWoorrkk IInnvvoollvveess:: Multiple Large Diameter Plumbing/Infrastructure Piping Projects 2010 - FacilitiesManagement: Provide large diameter plumbing/utility infrastructure piping labor, material and equip-ment on an as needed basis for UCLA Facilities Management. The scope of work includes, without lim-itation, piping systems associated with a variety of renovation projects on the main campus andMedical Center complex. Work conducted under this Agreement will vary in size between installationof less than 10 feet to installation of several hundred feet of pipe. The number of projects involvingpipe sizes at or above 14 inches in diameter is currently anticipated to be significantly less than thoseinvolving smaller pipe sizes. License Required: A License (General Engineering) or C-04 License (Boiler,Hot Water Heating & Steam Fitting) or C-36 License(Plumbing) . Mandatory Pre-Bid Conf. to be heldon Jan. 26, 1:30pm, Capital Programs Building, 1060 Veteran Ave, Rm 128-H, UCLA campus. Bid Docs.available from Ford Graphics, 2435 Military Ave., Los Angeles, CA 90064 (310) 477-6501 Website:http://socal.fordgraphics.com/ .

Microwave Tower Install Bid DeadlineRiverside February 18, 1:30 pmSubmit bids to County of Riverside - Purchasing & Materials. FMARC-118. Project Manager, BruceNorris (951) 955-0353. Estimate: $70,000.

PPllaannss AAvvaaiillaabbllee aatt hhttttpp::////ppllaannss..ssddddtt..ccoommWWoorrkk IInnvvoollvveess:: Microwave Tower Install: The Contractor shall furnish all travel, parts, labor, materi-als, rentals, equipment, disposal, transportation and supervision necessary to construct and install asteel microwave tower (per plans and specifications) that will support two 8 foot microwave dishes,and one 4 foot microwave dish in strict accordance with the details listed on Appendix A and thedrawings (reserved as noted under the Quote section below). Tower to be installed on the roof of the911 Communications Building. License Required: B General Building Contractor or C-10 Electrical .Mandatory Bidders Conf. to be held on Feb. 9, 9am, County Communication Ctr, 7195 Alessandro Blvd.,Riverside, CA. 92507. RFQ Boilerplate Pkg. available for download from:

www.purchasing.co.riverside.ca.us. Drawings may be obtained by reserving a set before Feb. 4, 10am.Contact: Bruce Norris (951) 955-0353.PPllaannhhoollddeerrss IINNCCLLUUDDEE::n/a ##PPaattrriioott TToowweerrss 4111 Latham St., Riverside . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .n/a ##JJaacckkssoonn EElleeccttrriicc 8 Calle La Reina, Rancho Mirage . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .760-863-1000/FAX -1033n/a ##WWiirreelleessss IInnffrraassttrruuccttuurree SSeerrvviicceess 1837 California Ave., Corona . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .951-371-4900/FAX -4950n/a ##OOppttiimmaa 4590 Eucalyptus Ave., Unit C, Chino . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .909-597-6006/FAX -7008n/a ##VViisslliinnkk SSeerrvviicceess 526 W. Blueridge Ave., Orange . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .714-998-2121/FAX -7808n/a ##DDiivveerrssiiffiieedd CCoommmmuunniiccaattiioonnss,, SSvvccss..,, IInncc.. 11944 Baker Pl., Santa Fe Springs . . . . . . . . . . . . . . . . . . . . .562-696-9660/FAX -9870n/a ##TTeeaamm CCoommmmuunniiccaattiioonnss,, LLLLCC ((LL..AA..)) [email protected], . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Const. Automotive Shop at Clairemont HS Bid DeadlineSan Diego February 18, 2 pmSubmit bids to San Diego Unified School Dist. Procurement. CS-90-827-57. Linda Hippie (858) 522-5831 FAX: (619) 542-5731. Estimate: $3,500,000 - $4,500,000.

TTrraannssccrriipptt PPllaann NNoo.. 225588WWoorrkk IInnvvoollvveess:: Construct Automotive Shop at Clairemont High School: Project consists of remodelexisting autoshop classroom & a new vocational building for the purpose of teaching automotive serv-ice. License Required: B . Mandatory site visit to be held on Feb. 4, 9am, outside main office ofClairemont HS, 4150 Ute Dr., San Diego, CA 92117. Plans/Specs (RF) $100, from C2 Reprographics,4920 Carroll Canyon Rd., San Diego, CA 92121 (858) 535-0607.PPllaannhhoollddeerrss IINNCCLLUUDDEE::S ##GGoollddeenn TTrriiaannggllee LLaanndd SSuurrvveeyyiinngg,, IInncc.. 1298 Navel Place, Vista . . . . . . . . . . . . . . . . . . . . . . . . .760-758-7725/FAX 760-758-7726G ##SSttrraaiigghhtt LLiinnee GGCC 4747-C Oceanside Blvd, Oceanside . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .(760)630-7112/FAX (760)630-7662n/a ##HHAARR CCoonnsstt.. 1480 Frontage Road, Chula Vista . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .(619) 575-5995/FAX (619) 575-5814S ##WWeesstt CCooaasstt IIrroonn 9302 Jamacha Rd, Spring Valley . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .619-464-8456/FAX 619-464-7973G ##AAllll SSttaarr SSeerrvviicceess CCoorrppoorraattiioonn 12250 El Camino Real, San Diego . . . . . . . . . . . . . . . . . . . . .858-259-0900/FAX 858-259-9350G ##SSoolltteekk PPaacciiffiicc 2424 Congress Street, San Diego . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .(619)296-6247/FAX (619)296-4314G ##RRooeell CCoonnsstt.. CCoo.. 34100 Gateway Dr., Ste. 100, Palm Desert . . . . . . . . . . . . . . . . . . . . . . . . . . .760-275-4050/FAX 760-321-0503S ##SSaann DDiieeggoo CCoonnsstt.. WWeellddiinngg 1167 Sweetwater Lane, Spring Valley . . . . . . . . . . . . . . . . . . . . . .619-462-9087/FAX 619-698-9435n/a ##AA..OO.. RReeeedd && CCoo.. 4777 Ruffner St., San Diego . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .(858) 565-4131/FAX (858) 565-7185n/a ##AAddvvaannccee PPlluummbbiinngg CCoo 161 South Marshall, El Cajon . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .(619) 447-2770/FAX (619) 579-3987n/a ##AAddvvaanncceedd SSyysstteemmss ., . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .858-527-0500/FAX -0055n/a ##AAMMDD CCoonnsstt.. GGrroouupp 1403 N. Batavia #101, Orange . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .(714)771-2924n/a ##CCCCCC ., . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .858-583-8111/FAX 858-277-5889n/a ##CCeemmeenntt ++ MMaassoonn LLooccaall 550000//774444 ., . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .619-726-7915/FAX 619-297-7350n/a ##CCyyrrccoonn BBuuiillddeerrss 28408 Constellation Rd., Valencia . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .661-295-3415n/a ##DDCC 3366 ., . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .619-436-7993/FAX 858-278-1714n/a ##FFoorrddyyccee CCoonnssttrruuccttiioonn 9932 Prospect Ave Suite #138, Santee . . . . . . . . . . . . . . . . . . . . . .(619) 449-4272/FAX (619) 449-1930n/a ##HHMMTT EElleeccttrriicc 9550 Waples St., Ste. 105, San Diego . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .858-458-9771/FAX 858-458-9775n/a ##FFoorrddyyccee CCoonnssttrruuccttiioonn 9932 Prospect Ave Suite #138, Santee . . . . . . . . . . . . . . . . . . . . . .(619) 449-4272/FAX (619) 449-1930n/a ##LLooccaall 8899 ., . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .619-263-6661/FAX -6668n/a ##MMaaiinnlliinnee IInnssuurraannccee ., . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .619-300-3948/FAX 619-489-2605n/a ##MMeerrllii CCoonnccrreettee PPuummppiinngg ., . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .760-801-3679/FAX 760-597-2481n/a ##NNiieellsseenn CCoonnsstt.. 3786 Rosecrans St., San Diego . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .619-795-0041/FAX 619-795-0042n/a ##PPaacciiffiicc LLiifftt && EEqquuiippmmeenntt CCoo.. ., . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .626-255-6867/FAX 626-797-4406n/a ##SSoouutthhllaanndd EElleeccttrriicc 4950 Greencraig Ln, San Diego . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .858-634-5050/FAX 858-634-5040n/a ##TTaayylloorr CCoonnssttrruuccttiioonn ., . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .619-562-5110/FAX -1921n/a ##PPWWCCII 1905 E Route 66 Ste 200, Glendora . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .626-857-1955/619-696/FAX -1946n/a ##SSoouutthhllaanndd EElleeccttrriicc 4950 Greencraig Ln, San Diego . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .858-634-5050/FAX 858-634-5040n/a ##TTrrii--CCiittyy GGllaassss ((LLeemmoonn GGrroovvee)) 3661 Costabella St., Lemon Grove . . . . . . . . . . . . . . . . . . . . . . . .(619) 460-6680/FAX -698-3691

REBID Ph. 9U Mod: Electrical at Santana HS Bid DeadlineSantee February 18, 2 pmSubmit bids to Grossmont Union High-School Dist.-Bond Trailer. GU-10.08R.ELEC . (619)644-8051.Estimate: N/A .

TTrraannssccrriipptt PPllaann NNoo.. 4477WWoorrkk IInnvvoollvveess:: REBID Ph. 9U Modernization: Electrical at SantanaHigh School - License Required: C-10 . Mandatory Pre-Bid Conf. & Site Visit to be held on Feb. 4, 9am, Santana HS, 9915 N. Magnolia,Santee, CA 92071. Meet @ the flagpole . Plans/Specs (RF) $200 available from Mayer Reprographics.To order, go to: www.mayer.com; click on Projects Bidding.PPllaannhhoollddeerrss IINNCCLLUUDDEE::G ##RR..LL.. EElleeccttrriicc,, IInncc.. P.O. Box 1309, Lakeside . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .619-561-4506/FAX 619-561-8011

Young Research Library Second Floor Remodel Bid DeadlineLos Angeles February 18, 2 pmSubmit bids to UCLA. 1010829. (310) 825-7015. Estimate: $600,000.

PPllaannss AAvvaaiillaabbllee aatt hhttttpp::////ppllaannss..ssddddtt..ccoomm

BuildingWork Involving New Construction, Additions, Alterations and Remodeling of Residential, Commercialand Industrial Structures. Please Check Engineering, Specialties or Subcontractors for AdditionalBidding Projects

(G) Indicates General Contractor Requesting Sub bids(S) Indicates Subcontractor(NA) Indicates Not Available

Continues on 16B

Page 16: 20100215 construction weekprops-n.sdccd.edu/NE/News Events... · Companies that submitted proposals during the first phase now will be evaluat- ... CA 92101 † 619.231.1010 † CA

THE DAILY TRANSCRIPT® • TUESDAY, FEBRUARY 16, 201016B

WWoorrkk IInnvvoollvveess:: Young Research Library Second Floor Remodel: The scope of this Project consists ofrenovating a vacant suite located on the north side of the second floor of the Young Research Libraryto accommodate support staff and management for the library. The Project shall provide privateoffices for managers, workstations for staff and student workers, and related office support space.Major trade work includes framing, mechanical, electrical and finishes (ceiling, flooring, painting). TheProject area is approximately 9,100 square feet in size. License Required: B . Mandatory Pre-Bid Conf.& Job Walk held on Feb. 5, 10am, Capital Programs Bldg., 1060 Veteran Ave., L.A., CA, UCLA Campus.Bid Docs. available for purchase from Ford Graphics, 2435 Military Ave., Los Angeles, CA 90064(310)477-6501 http://socal.fordgraphics.com.

Santa Barbara Court Complex Seismic Retrofit Bid DeadlineSanta Barbara February 18, 3 pmSubmit bids to County of Santa Barbara. 8554. Project Manager, Jill Van Wie, (805) 560-1079 [email protected]. Technical Questions: Robert Ooley at (805) 568-3085 [email protected]. CC: Amy Gabaldon, [email protected] on all corre-spondence. Estimate: $750,000.

PPllaannss AAvvaaiillaabbllee aatt hhttttpp::////ppllaannss..ssddddtt..ccoommWWoorrkk IInnvvoollvveess:: Santa Barbara Court Complex Seismic Retrofit: This project involves a non-structuralseismic retrofit of building components that pose a falling hazard, like: interior ceilings, exterior rooftile, roof rafter tails and other decorative features. Interior Work: Interior decorative ceilings will beretrofitted with additional supports and stabilizers to reduce the horizontal or vertical movement ofthese elements during an earthquake. Anchoring of heavy equipment, fuel storage tanks and similarnon-structural elements are included. Please reference the December 8, 2008 drawings for locations.Exterior Work: The majority of exterior work involves the removal and replacement of heavy terracotta roof tiles over or around exits of the building, and includes additional work to anchor select woodraft tails over exits. The installation of two ADA access ramps; one from an upper lawn area to themain entry path; the other, from the main entry path to a lower lawn area will also occur. MandatoryJob Walk held on Jan. 19, 10am, 1100 Anacapa St, Santa Barbara, CA.. Request plans, specs & formsfrom Amy Gabaldon, Project Asst., (805) 568-3055 or [email protected]. Also avail-able for download from http://www.countyofsb.org/gs/default.aspx?id=7122.PPllaannhhoollddeerrss IINNCCLLUUDDEE::n/a ##**PPllaannHHoollddeerrssLLiisstt OOnn LLiinnee && CCoommpplleettee ppllaannss..ssddddtt..ccoomm will fax or email complete list upon request, 619-232-4381 . . . . . . . . . .

Reroofing: Bldg.1 - Removal Old Roofing/Flashing Bid DeadlineSan Diego February 19, 10 amSubmit bids to San Diego County Office of Education. 50023. (858) 292-3768. Estimate: $250,000.

TTrraannssccrriipptt PPllaann NNoo.. 112211WWoorrkk IInnvvoollvveess:: Reroofing: Building 1 - Removal Old Roofing/Flashing - down to the wood deck, installinsulation, installing mechanically attached Densdeck and Sarnafil roofing membrane with flashingsand other components to comprise a roofing system. Building 3 - To adhere Sarnafil roofing membraneover mechanically attached Densdeck with flashing and other components over existing capsheet roofto comprise a roofing system. Remove and replace with new, all the skylights. Review AsbestosAbatement Report. License Required: C-39 with ASB Asbestos Certification (in bidder’s name). Mandatory Pre-Bid Mtg. & Job Walk to be held on Jan. 29, 10am, SDCOE, 6401 Linda Vista Rd, SanDiego, CA 92111, meeting outside Rm 503. Bring & review your bid documents . Bid Docs. can beobtained from owner, (858) 292-3768.PPllaannhhoollddeerrss IINNCCLLUUDDEE::S ##RRaauull MMeennddoozzaa CCoonnssttrruuccttiioonn,, IInncc..//EEnnvviirroonnmmeennttaall SSvvccss PO Box 1570, Lakeside . . . . . . .(619) 390-5964/FAX (619) 390-5966

Desert View Neighborhood Demolition Bid DeadlineLancaster February 19, 11 amSubmit bids to City of Lancaster. 10-HNRD302. Kurt Gunzel, 661-723-6132. Estimate: N/A .

DDooccuummeennttss NNoott OOnn FFiilleeWWoorrkk IInnvvoollvveess:: Desert View Neighborhood Demolition: Proposals submitted for consideration shall befor demolition of both residential apartment structures (four (4) family units per structure), at 4553110th Street West (APN 3120-011-022), having approximately 5,900 square foot of building area andthe other at 45423 10th Street West (APN 3120-012-014) with approximately 4,660 square foot ofbuilding area, located in Lancaster, California 93534. Each property is within the designated DesertView Neighborhood Vision Plan Area. In the event of a change in the bid submittal date, notices willonly be given to holders of bid packages. The contractor shall minimally possess either a State ofCalifornia A or C-21 License with Asbestos Certification which will be required in order to qualify foran award of bid. Plans/Specs (NR) $50, available from owner, For further information contact KurtGunzel at 661-723-6132.

Hospital Replacement Camp Pendleton Bid DeadlineCamp Pendleton February 22, 2 pmSubmit bids to NAVFAC Southwest Central IPT Code ROPCA. N6247310R0001. Georgina Perry 619-556-9569 Lisa Young, 619-279-9199 . Estimate: $250,000,000 - $500,000,000.

PPllaannss AAvvaaiillaabbllee aatt hhttttpp::////ppllaannss..ssddddtt..ccoommWWoorrkk IInnvvoollvveess:: Hospital Replacement Camp Pendleton: This is an American Recovery and

Reinvestment Act project to provide a new Hospital for the Marine Corps Base, Camp Pendleton, CA.This pre-solicitation notice is for information and planning purposes only. This project is being adver-tised on an unrestricted basis inviting full and open competition. This procurement will use the Two-Phase Design-Build selection procedures. The Government plans to issue PhaseOne and Phase Two solicitations in sequence. Phase One will include a synopsized scope of work, PhaseTwowill include the plans and specifications. Federal Acquisition Regulations (FAR) Part 15 and FAR Part36source selection procedures will be utilized with the intent to award a firm-fixed price design buildconstructioncontract. The responsible Offeror whose proposal, conforming to the Request for Proposal (RFP), is themostadvantageous and offers the best value to the Government, price and other factors considered will beselected.Price evaluation preference will be given to HUBZone Small Business concerns, in accordance withFAR 52.219-4. The work to be acquired under this project is for the design and construction of approx-imately a 500,000 sq ft multi-level Medical Hospital with a central utilities plant, a 1,500 space multi-level parking structure, surface parking, site-development and associated supporting facilities. TheNorth American Industry Classification System (NAICS) code is 236220, and the annual size standardis $33.5 million. The estimated price range is between $250,000,000 and $500,000,000. TheGovernment intends to evaluate proposals and award without discussions. Selection for award will bebased on evaluation of the following: Phase One: Factor1 - Specialized Experience and Technical Competence, Factor 2 - Past Performance, and Factor 3 -Management Approach. Phase Two: Factor 4 - Small Business Utilization, Factor 5 - EngineeringSolutions, and Factor 6 - Price. The Phase One evaluation will result in a determination of the mosthighly qualified Offerors, a maximum of five. These Offerors will be allowed to submit a Phase Twoproposal. Pre-Solicitation mtg. held on Jan. 14, Naval Training Center Command Center at LibertyStation. Solicitation Docs., plans & other pertinent info available for download/viewing fromwww.fbo.gov .PPllaannhhoollddeerrss IINNCCLLUUDDEE::G ##WWeebbccoorr BBuuiillddeerrss((SSDD)) 5465 Morehouse Drive, Ste. 150, San Diego . . . . . . . . . . . . . . . . . . . .858-622-5200/FAX 858-622-5201S ##BBuuttcchheerr SSuurrvveeyyoorrss GGrroouupp 1637 Warmlands Ave., Vista . . . . . . . . . . . . . . . . . . . . . . . . . . . . .(760) 732-3027/FAX (760) 427-3341

Replace T2E Waterline - Fire Suppression Bid DeadlineSan Diego February 23, 11 amSubmit bids to San Diego County Regional Airport Authority-PSA. 104056-1 . Kimberly Hayes, Fax:619-400-2596, Email: [email protected]. Estimate: $900,000.

PPllaannss AAvvaaiillaabbllee aatt hhttttpp::////ppllaannss..ssddddtt..ccoommWWoorrkk IInnvvoollvveess:: Replace T2E Waterline - Fire Suppression: The work includes the following elements:relocation of an existing twelve- inch waterline at Terminal 2 East. License Required: B or C-34 . Pre-Bid Conf. to be held on Jan. 21, 9:30am, PSA Conf. Rm., West Wing, 2320 Stillwater Rd., San Diego,CA 92101. The solicitation may be downloaded at:http://www.san.org/airport_authority/splash.asp,select Business Opportunities, select Open Solicitations. Any issues w/downloading, contact:PlanetBids customer support at (818) 992-1771 or [email protected] IINNCCLLUUDDEE::G ##GGoorrddoonn PPrriillll,, IInncc.. 8400 North Magnolia Ave. Ste. F, Santee . . . . . . . . . . . . . . . . . . . . . . . . . . .619-448-1490/FAX 619-448-1071

San Dieguito Park ADA Accessible Restroom & Stor Bid DeadlineSan Diego February 23, 2 pmSubmit bids to County of San Diego. RFB 4281. Rian Risley (858) 537-2522 Email:[email protected]. Estimate: $375,000 - $400,000.

DDooccuummeennttss NNoott OOnn FFiilleeWWoorrkk IInnvvoollvveess:: San Dieguito Park ADA Accessible Restroom and Storage Building - License Required:A or B . Pre-Bid Mtg. to be held on Jan. 28, 10am, San Dieguito County Park, 1628 Lomas Santa DeDr. Bid Docs. (NR) $10/CD, available from owner, 858-537-2505.PPllaannhhoollddeerrss IINNCCLLUUDDEE::G ##HHeeaalleeyy CCoonnssttrruuccttiioonn 1545 Tidelands Ave., National City . . . . . . . . . . . . . . . . . . . . . . . . . . . . .(619)474-4900/FAX (619)474-2301G ##NNeeww CCeennttuurryy CCoonnsstt.. 9119 Emerald Grove Avenue (E-Mail: [email protected]), Lakeside . . .619-390-3300

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ./FAX 619-390-3311G ##RRaannddaallll CCoonnsstt.. 3656 Ruffin Rd. Ste. D, San Diego . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .858-560-5453/FAX 858-430-5456G ##JJoohhnn CCaarreeyy CCoonnsstt.. 9484 Chesapeake Dr. #804, San Diego . . . . . . . . . . . . . . . . . . . . . . . . . .858-268-4848/FAX (858) 268-1918G ##MM..AA.. SStteevveennss CCoonnssttrruuccttiioonn,, IInncc.. 125 E. 17th St., National City . . . . . . . . . . . . . . . . . . . . . . . .(619)477-7893/FAX (619)477-7895G ##GGoorrddoonn PPrriillll,, IInncc.. 8400 North Magnolia Ave. Ste. F, Santee . . . . . . . . . . . . . . . . . . . . . . . . . . .619-448-1490/FAX 619-448-1071S ##GGoollddeenn TTrriiaannggllee LLaanndd SSuurrvveeyyiinngg,, IInncc.. 1298 Navel Place, Vista . . . . . . . . . . . . . . . . . . . . . . . . .760-758-7725/FAX 760-758-7726G ##WWhhiittaakkeerr CCoonnssttrruuccttiioonn ((EEllCCaajjoonn)) PO Box 19349 (92159)/2340 Tampa Ave., Ste. F, El Cajon619-698-5141/FAX 619-698-5076G ##SSttrraaiigghhtt LLiinnee GGCC 4747-C Oceanside Blvd, Oceanside . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .(760)630-7112/FAX (760)630-7662G ##WWiieerr CCoonnssttrruuccttiioonn 2255 Barham Dr., Escondido . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .(760) 743-1477/FAX (760) 746-5224G ##FFoorrddyyccee CCoonnssttrruuccttiioonn 9932 Prospect Ave Suite #138, Santee . . . . . . . . . . . . . . . . . . . . . .(619) 449-4272/FAX (619) 449-1930G ##CCoonnaann CCoonnssttrruuccttiioonn,, IInncc.. 5150 Waring Rd., San Diego . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .619-286-2119/FAX 619-330-4834G ##AAllvvaanndd CCoonnssttrruuccttiioonn,, IInncc.. 12344 Oak Knoll Rd. Ste. G-1, Poway . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .858-668-2830/FAX -2832

Continued from Page 15B

BuildingWork Involving New Construction, Additions, Alterations and Remodeling of Residential, Commercialand Industrial Structures. Please Check Engineering, Specialties or Subcontractors for AdditionalBidding Projects

(G) Indicates General Contractor Requesting Sub bids(S) Indicates Subcontractor(NA) Indicates Not Available

Continues on 17B

Page 17: 20100215 construction weekprops-n.sdccd.edu/NE/News Events... · Companies that submitted proposals during the first phase now will be evaluat- ... CA 92101 † 619.231.1010 † CA

THE DAILY TRANSCRIPT® • TUESDAY, FEBRUARY 16, 2010 17B

RFP ADA Retrofit of Airport Terminal Bldg. Bid DeadlineCounty of Imperial February 23, 5 pmSubmit bids to County of Imperial Department of Public Works. 4956AIR. (760)482-4462. Estimate:$232,482.

PPllaannss AAvvaaiillaabbllee aatt hhttttpp::////ppllaannss..ssddddtt..ccoommWWoorrkk IInnvvoollvveess:: Request for Proposal for the ADA Retrofit of Airport Terminal Building InteriorImprovements to include: Restrooms (1st and 2nd floors), Telephone Bank, Passenger Waiting Area ,Passenger Screening Area, ADA Lift, Replacement of Stairs, Replacement of Partial Flooring Systemsin the 1st and 2nd Floors: Scope of work is to provide Professional Services to prepare constructiondocuments for the Interior Improvements to the Airport Terminal Building consisting of the ADAretrofitting of the public restrooms (1st and 2nd Floor), telephone bank, ADA lift, stairs and the remod-eling of the passenger waiting and screening areas, the partial replacement of existing floor systemsand other as indicated on the attached schematic drawings or as required to complete the work.Mandatory Consultant’s Mtg. to be held on Feb. 8, 10am, Airport Terminal Lobby, 1101 Airport Rd.,Imperial, CA 92251. RFP available for download from:http://www.imperialcounty.net/publicworks/index.htm.

Community Development Bldg. Remodel Bid DeadlineBrawley February 25, 2 pmSubmit bids to City of Brawley - 383 Main St. 2010-07. Mr. Steven Sullivan, Associate Engineer, 760-344-5800 ext. 17 FAX: 760-344-5612. Estimate: $75,000.

TTrraannssccrriipptt PPllaann NNoo.. 115511WWoorrkk IInnvvoollvveess:: Community Development Building Remodel: The work consists of remodeling a singlestory office space at the Community Development Building located at 205 S. Imperial Ave. Items ofwork include remove wood floor and columns at existing building entry porch, replace with accessibleconcrete floor & 6-inchX6-inch wood columns; remove existing carpet & flooring & replace w/vinylcomposition tile, replace wood shake roof & replace w/s-tile roofing. Insulate existing attic w/R-19insulation & paint exterior of building. Pre-Bid Conf. to be held on Feb. 11, 10am, Dept. of Public Works,180 So. Western Ave., Brawley, CA . Bid Docs. (NR) $35, available from the office of the City Clerk,(760) 351-3059.

PREQUAL GCs-Sverdrup Hall HVAC & Elect Upgrade Bid DeadlineSan Diego February 25, 2 pmSubmit bids to UCSD Prequalified Bidders. A4L-313/4204/10652320 . University’s Rep. Fred Jaeger,Principal Mech. Engineer & Proj. Mgr., (858) 534-1984 FAX: (858)534-4363 Email:[email protected]. University’s Administrator: M. Boone Hellman, Assoc. Vice Chancellor, (858) 534-2177 FAX: (858) 534-4363. Estimate: $2,100,000.

TTrraannssccrriipptt PPllaann NNoo.. 1100WWoorrkk IInnvvoollvveess:: Prequalified Bidders Only - Sverdrup Hall HVAC & Electrical Upgrades ScrippsInstitution of Oceanography: Work includes replacement of the central laboratory exhaust systemwith a new stainless steel main exhaust trunk duct, exhaust plenum, and new exhaust fans, related structural additions and replacement of the roofing system. Electrical work includes the installation of a new 3,000 A switch board and distribution of newly installed equipment. The work includes demolition of existing systems and equipment, installation of new equipment, control integration, start up, and commissioning activities. License Required: B . Mandatory Pre-Bid Conf. to be held on Feb. 11, 8:30am, meet @ Facilities Design & Const., 10280 N.Torrey Pines Rd., Ste. 465, La Jolla CA Lg. Conf. Rm. After reviewing docs., mtg. will proceed toSverdrup Hall, SIO, Campus Map: http://maps.ucsd.edu. One set of plans/specs will be issued toprospective bidders at no charge. Planholders list may be found at www.fdc.ucsd.edu/bids. (858)534-3887 .PPllaannhhoollddeerrss IINNCCLLUUDDEE::G ##WWeesstt CCooaasstt AAiirr CCoonnddiittiioonniinngg CCoo..,, IInncc.. 12365 Mapleview St., Lakeside . . . . . . . . . . . . . . . . . . . . . . . . . .619-561-8000/FAX -3743G ##UUnniivveerrssiittyy MMeecchhaanniiccaall 1168 Fesler St., El Cajon . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .(619) 956-2500/FAX -2300G ##TTuurrnneerr CCoonnssttrruuccttiioonn CCoo.. 9330 Scranton, Suite 150, San Diego . . . . . . . . . . . . . . . . . . . . . . . . . .(858)320-4040/FAX -558-4408G ##PPaacciiffiicc RRiimm MMeecchhaanniiccaall 7655 Convoy Ct., San Diego . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .858-974-6600/FAX -6501G ##JJaacckkssoonn && BBllaanncc 7929 Arjons Drive, San Diego . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .858-831-7900/FAX 858-695-9764G ##CCaalliiffoorrnniiaa CCoommffoorrtt SSyysstteemmss 9750 Distribution Ave, San Diego . . . . . . . . . . . . . . . . . . . . . . . .619-520-4413/FAX 858-564-1151G ##AA..OO.. RReeeedd && CCoo.. 4777 Ruffner St., San Diego . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .(858) 565-4131/FAX (858) 565-7185

Reno. of Preschool Central School Bid DeadlineNational City February 26, 10 amSubmit bids to National School District. 09-10/119. (619) 336-7718. Estimate: N/A .

DDooccuummeennttss NNoott OOnn FFiilleeWWoorrkk IInnvvoollvveess:: Renovation of Preschool at Central School - License Required: B . Mandatory Pre-BidConf. & Site Walk to be held on Feb. 16, 10am, Board Rm., 1500 N Ave., National City CA 91950.Plans/Specs available from Mayer Reprographics, order form may be obtained from www.mayer.com,select projects bidding & choose folder for project.PPllaannhhoollddeerrss IINNCCLLUUDDEE::

G ##HHeeaalleeyy CCoonnssttrruuccttiioonn 1545 Tidelands Ave., National City . . . . . . . . . . . . . . . . . . . . . . . . . . . . .(619)474-4900/FAX (619)474-2301G ##MM..AA.. SStteevveennss CCoonnssttrruuccttiioonn,, IInncc.. 125 E. 17th St., National City . . . . . . . . . . . . . . . . . . . . . . . .(619)477-7893/FAX (619)477-7895G ##EECC CCoonnssttrruuccttoorrss 166 West Park Ave, El Cajon . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .(619) 440-7181/FAX (619) 440-7180G ##MMuurrrraayy BBuuiillddeerrss 9715 Carroll Center Road, #102, San Diego . . . . . . . . . . . . . . . . . . . . . .(858) 695-8353/FAX (858) 695-2648G ##RRaannddaallll CCoonnsstt.. 3656 Ruffin Rd. Ste. D, San Diego . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .858-560-5453/FAX 858-430-5456G ##WWhhiittaakkeerr CCoonnssttrruuccttiioonn ((EEllCCaajjoonn)) PO Box 19349 (92159)/2340 Tampa Ave., Ste. F, El Cajon619-698-5141/FAX 619-698-5076

Grossmont College Student Ctr/Svcs Bldg. Mod. Bid DeadlineEl Cajon March 2, 1 pmSubmit bids to Grossmont Cuyamaca Community College District, Purchasing & Contracts Dept..B10.013. Tom Webb Email: [email protected] FAX: 619-644-7990. For procedural questons:Karla Estrada (619) 644-7034. Estimate: $623,600 .

TTrraannssccrriipptt PPllaann NNoo.. 225522WWoorrkk IInnvvoollvveess:: Grossmont College Student Center / Services Building Secondary Effects ModularBuildings & Site Improvements:Scope of Work - Provide various site and/or interior tenant improvements for interim facilities to belocated at Grossmont College in Parking Lot 5 and in the 500 quad. Work includes moving modularsfor Culinary Arts from the soccer field west of Lot 4A to Lot 5 and accompanying tenant and siteimprovements. Also included are tenant and site improvements for Griffin Food Court in Lot 5 and util-ity tie-ins for the Temporary Modular Village in Lot 5, Griffin Food Court and Culinary Arts. As well,scope includes exterior painting of both Griffin Food Court and Culinary Arts facilities. LicenseRequired: B . Mandatory Pre-Bid Conf. & Job Walk to be held on Feb. 16, 1pm, Conf. Rm. Parking Lot4, Grossmont College, 8800 Grossmont College Dr., El Cajon, CA 92020 . Two complete sets of biddocuments will be provided at no cost to each bidder (except delivery). Any additional sets can beordered and purchased directly through OCB Reprographics. For further info, Karla Estrada 619-644-7034.PPllaannhhoollddeerrss IINNCCLLUUDDEE::G ##HHeeaalleeyy CCoonnssttrruuccttiioonn 1545 Tidelands Ave., National City . . . . . . . . . . . . . . . . . . . . . . . . . . . . .(619)474-4900/FAX (619)474-2301G ##JJoohhnn CCaarreeyy CCoonnsstt.. 9484 Chesapeake Dr. #804, San Diego . . . . . . . . . . . . . . . . . . . . . . . . . .858-268-4848/FAX (858) 268-1918G ##MM..AA.. SStteevveennss CCoonnssttrruuccttiioonn,, IInncc.. 125 E. 17th St., National City . . . . . . . . . . . . . . . . . . . . . . . .(619)477-7893/FAX (619)477-7895G ##EECC CCoonnssttrruuccttoorrss 166 West Park Ave, El Cajon . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .(619) 440-7181/FAX (619) 440-7180G ##GGoorrddoonn PPrriillll,, IInncc.. 8400 North Magnolia Ave. Ste. F, Santee . . . . . . . . . . . . . . . . . . . . . . . . . . .619-448-1490/FAX 619-448-1071

La Pata/Vista Hermosa Sports Park Ph 1B Pool House Bid DeadlineSan Clemente March 2, 2 pmSubmit bids to City of San Clemente-Council Chambers, Civic Ctr.. 18142-B. (949) 361-6117 Email:[email protected]. Estimate: $10,500,000.

PPllaannss AAvvaaiillaabbllee aatt hhttttpp::////ppllaannss..ssddddtt..ccoommWWoorrkk IInnvvoollvveess:: La Pata/Vista Hermosa Sports Park Phase 1B (Pool House, & Pools) License Required:B . Mandatory Pre-Bid Mtg. to be held on Jan. 12, 2pm, Conf. Rm. A, Comm. Dev. Dept., 910 CalleNegocio, San Clemente, CA 92673. Plans/Specs (NR) $250, available from Coastal Blue Reprographics,33091 Calle Perfecto, San Juan Capistrano, CA 92675 www.coastalblue.com.PPllaannhhoollddeerrss IINNCCLLUUDDEE::G ##JJaayynneess CCoorrppoorraattiioonn 111 Elm Street, Fourth Floor, San Diego . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .(619)233-4080/FAX -4090G ##EErriicckkssoonn--HHaallll CCoonnssttrruuccttiioonn CCoo.. 500 Corporate Dr., Escondido . . . . . . . . . . . . . . . . . . . . . . .(760) 796-7700/FAX (760) 796-7750G ##SSoolltteekk PPaacciiffiicc 2424 Congress Street, San Diego . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .(619)296-6247/FAX (619)296-4314S ##GGoollddeenn TTrriiaannggllee LLaanndd SSuurrvveeyyiinngg,, IInncc.. 1298 Navel Place, Vista . . . . . . . . . . . . . . . . . . . . . . . . .760-758-7725/FAX 760-758-7726G ##WWiieerr CCoonnssttrruuccttiioonn 2255 Barham Dr., Escondido . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .(760) 743-1477/FAX (760) 746-5224G ##HHAARR CCoonnsstt.. 1480 Frontage Road, Chula Vista . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .(619) 575-5995/FAX (619) 575-5814

La Pata/Vista Hermosa Sports Park Sports Fields Bid DeadlineSan Clemente March 2, 2 pmSubmit bids to City of San Clemente-Council Chambers, Civic Ctr.. 18142-A. (949)361-6117. Estimate:$14,000,000.

PPllaannss AAvvaaiillaabbllee aatt hhttttpp::////ppllaannss..ssddddtt..ccoommWWoorrkk IInnvvoollvveess:: La Pata/Vista Hermosa Sports Park (Sports Fields, Restroom Buildings, StreetImprovements & Playground) - License Required: B . Mandatory Pre-Bid Mtg. to be held on Jan. 12,2pm, Conf. Rm. A, Comm. Dev. Dept., 910 Calle Negocio, San Clemente, CA 92673. Plans/Specs (NR)$250, available from Coastal Blue Reprographics, 33091 Calle Perfecto, San Juan Capistrano, CA92675 www.coastalblue.com.PPllaannhhoollddeerrss IINNCCLLUUDDEE::G ##JJaayynneess CCoorrppoorraattiioonn 111 Elm Street, Fourth Floor, San Diego . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .(619)233-4080/FAX -4090S ##AA..MM.. OOrrtteeggaa 10125 Channel Road, Lakeside . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .(619)390-1988/FAX (619)390-1941

Const. of OMWD Operations Building Bid DeadlineEncinitas March 2, 2 pmSubmit bids to Olivenhain Municipal Water District. (760) 753-6466. Estimate: $3,240,000.

PPllaannss AAvvaaiillaabbllee aatt hhttttpp::////ppllaannss..ssddddtt..ccoomm

Continued from Page 16B

BuildingWork Involving New Construction, Additions, Alterations and Remodeling of Residential, Commercialand Industrial Structures. Please Check Engineering, Specialties or Subcontractors for AdditionalBidding Projects

(G) Indicates General Contractor Requesting Sub bids(S) Indicates Subcontractor(NA) Indicates Not Available

Continues on 18B

Page 18: 20100215 construction weekprops-n.sdccd.edu/NE/News Events... · Companies that submitted proposals during the first phase now will be evaluat- ... CA 92101 † 619.231.1010 † CA

THE DAILY TRANSCRIPT® • TUESDAY, FEBRUARY 16, 201018B

WWoorrkk IInnvvoollvveess:: Construction of Olivenhain Municipal Water District Operations Building - LicenseRequired: A or B . Pre-Bid Conf. to be held on Feb. 16, 10am, at the office of the District, 1966Olivenhain Rd., Encinitas, CA . Plans/Specs can be downloaded from Bids and Openings link on thehome page of the District’s website at www.olivenhain.com.PPllaannhhoollddeerrss IINNCCLLUUDDEE::G ##JJoohhnn CCaarreeyy CCoonnsstt.. 9484 Chesapeake Dr. #804, San Diego . . . . . . . . . . . . . . . . . . . . . . . . . .858-268-4848/FAX (858) 268-1918G ##RRooeell CCoonnsstt.. CCoo.. 34100 Gateway Dr., Ste. 100, Palm Desert . . . . . . . . . . . . . . . . . . . . . . . . . . .760-275-4050/FAX 760-321-0503G ##MM..AA.. SStteevveennss CCoonnssttrruuccttiioonn,, IInncc.. 125 E. 17th St., National City . . . . . . . . . . . . . . . . . . . . . . . .(619)477-7893/FAX (619)477-7895S ##RR..LL.. EElleeccttrriicc,, IInncc.. P.O. Box 1309, Lakeside . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .619-561-4506/FAX 619-561-8011

Hedrick Repairs & Refurbishment Bid DeadlineLos Angeles March 3, 2 pmSubmit bids to UCLA. 946498.01. Wayne Chiu 310-206-0980. Estimate: N/A .

DDooccuummeennttss NNoott OOnn FFiilleeWWoorrkk IInnvvoollvveess:: Hedrick Repairs & Refurbishment: The Project replaces and repairs obsolete electrical,plumbing, fire alarm and elevator systems in Hedrick Hall with new and upgraded systems. The scopeof Work includes: replacement and upgrades of systems serving residential floors two through sevenand portions of the basement, including hot and cold water piping; building power distribution, emer-gency power, lighting, fire sprinkler, fire alarm and elevator systems. The Work also includes: refur-bishment of interior finishes on the residential floors; replacement of the windows and sunscreens onthe exterior of the building; and accessibility upgrades and abatement of hazardous materials trig-gered by the Work.. Mandatory Pre-Bid Conf. to be held on Feb. 3, 10am, meet at Hedrick Hall (FiresideLounge, First Floor), 250 De Neve Drive, Los Angeles, CA 90024, UCLA campus. For further info:Wayne Chiu at 310-206-0980. Contract Docs. available for purchase from Ford Graphics, 2435Military Ave., Los Angeles, CA 90064. (310) 477-6501 http://socal.fordgraphics.com/ .

Const. New Multi-Media Ctr. Madison HS Bid DeadlineSan Diego March 4, 2 pmSubmit bids to San Diego Unified Sch Dist-Physical Plant Oper.Ctr. CS-90-826-29. Linda Hippie (858)

522-5831 FAX: (619) 542-5731. Estimate: $3,000,000 - $4,000,000.TTrraannssccrriipptt PPllaann NNoo.. 225533

WWoorrkk IInnvvoollvveess:: Construct New Multi-Media Center at Madison High School: The Project consists ofconstruction of a new Multimedia Center on the existing campus of Madison High School. LicenseRequired: B . Mandatory Site Visit to be held on Feb. 18, 9am, Madison HS, Main Office, 4833 DolivaDr., San Diego, CA 92117. Plans/Specs (RF) $100, from C2 Reprographics, 4920 Carroll Canyon Rd.,San Diego, CA 92121 (858) 535-0607.PPllaannhhoollddeerrss IINNCCLLUUDDEE::G ##SSoolltteekk PPaacciiffiicc 2424 Congress Street, San Diego . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .(619)296-6247/FAX (619)296-4314

LACC Main Lodge Food Service Reno. Bid DeadlineLos Angeles March 5, 11 amSubmit bids to UCLA. 941016.04. Wayne Chiu 310-206-0980. Estimate: N/A .

PPllaannss AAvvaaiillaabbllee aatt hhttttpp::////ppllaannss..ssddddtt..ccoommWWoorrkk IInnvvoollvveess:: LACC Main Lodge Food Service Renovation: The Project replaces all the food serviceequipment, exhaust hood, and walk-in cooler/freezer at the UCLA Lake Arrowhead Conference Center.A new exhaust fan/make-up air unit will be sized to handle the additional food service equipment load.The grease traps shall be replaced in kind. A new steam boiler shall be provided in the boiler roomabove the mechanical room. The new boiler room shall be updated with the necessary fire assemblyseparation. A new domestic water boiler shall be installed in the existing mechanical room. New par-tition walls shall be built to separate the boiler unit from the existing electrical panels. The Projectshall be completed in two phases. Phase 1 scope of work includes exhaust fan, make-up air unit, steamboiler, domestic hot water boiler, and modifications to the mechanical rooms. Phase 2 scope of workincludes all food service equipment and wall, floor and ceiling finishes of the kitchen. All MEP workrelated to this area shall be included in this Phase 2 scope. The Project shall renovate approximately1,950 ASF of space in the facility. License Required: B . Mandatory Pre-Bid Conf. to be held on Feb. 4,10am, Lake Arrowhead Conf. Ctr., (Main Lodge Living Rm), 850 Willow Creek Rd, Lake Arrowhead,CA 92353. Contract Docs. available for purchase from Ford Graphics, 2435 Military Ave., Los Angeles,CA 90064. (310) 477-6501 http://socal.fordgraphics.com/ .

Continued from Page 17B

BuildingWork Involving New Construction, Additions, Alterations and Remodeling of Residential, Commercialand Industrial Structures. Please Check Engineering, Specialties or Subcontractors for AdditionalBidding Projects

(G) Indicates General Contractor Requesting Sub bids(S) Indicates Subcontractor(NA) Indicates Not Available

Continues on 19B

2131 Third Avenue San Diego, CA 92101619.232.4381 • www.sddt.com

THE DAILY TRANSCRIPT®PRESENTS SDDT.COM/GOINGGREEN

Join The Daily Transcript at SDDT.com throughout the year to take a closer look at “going green.” Learn how businesses are

incorporating the green lifestyle throughout the region. How are we incorporating green building into our communities? Who

are the regional pioneers? What local companies are “going green”? What innovative “green products” are out there?

Special Coverage & Distribution include:

January - December — All real estate and construction related special reports.

March 25 — Going Green

October 7 — Going Green

These exclusive special reports reach 50,000+ business readers throughout the county – both in print and online at

SDDT.com/GoinggGreen. Include your firm’s expertise and support for Going Green in San Diego.

Call us at 619.232.4381 or e-mail [email protected] today!

Page 19: 20100215 construction weekprops-n.sdccd.edu/NE/News Events... · Companies that submitted proposals during the first phase now will be evaluat- ... CA 92101 † 619.231.1010 † CA

THE DAILY TRANSCRIPT® • TUESDAY, FEBRUARY 16, 2010 19B

North Johnson Ave. Demolition Bid DeadlineEl Cajon March 9, 2 pmSubmit bids to City of El Cajon. 019-10 . Dede Porter, 619-441-1715 Email: [email protected]. Estimate: $260,000.

TTrraannssccrriipptt PPllaann NNoo.. 114422WWoorrkk IInnvvoollvveess:: North Johnson Ave. Demolition: Demolition of buildings and surface improvements at440, 480, 542, 572, 576, 584, 588 N. Johnson Avenue. License Required: C-21 . Mandatory Pre-BidMtg. to be held on Feb. 23, 10am, 440 N. Johson Ave., El Cajon, CA 92020 . Bid Docs. (NR) $9 (mail-ing $4.95) available from owner, (619) 441-1715.PPllaannhhoollddeerrss IINNCCLLUUDDEE::S ##OOllssoonn--PPaacciiffiicc AAddvvaannccee SSoolluuttiioonnss 1385 N. Johnson Ave., Ste. 104, El Cajon . . . . . . . . . . . . . .619-590-2700/FAX 619-590-2701G ##NNeeww CCeennttuurryy CCoonnsstt.. 9119 Emerald Grove Avenue (E-Mail: [email protected]), Lakeside . . .619-390-3300

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ./FAX 619-390-3311G ##SScchheeiiddeell CCoonnttrr.. && EEnngg PO Box 1796, La Mesa . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .619-593-8704/FAX 619-593-9193

Rieber Dining Renovation Bid DeadlineLos Angeles March 9, 2 pmSubmit bids to UCLA. 946478.02. (310) 825-7015. Estimate: N/A.

DDooccuummeennttss NNoott OOnn FFiilleeWWoorrkk IInnvvoollvveess:: Rieber Dining Renovation: The Project consists of renovating the Rieber Dining Facilityto increase operational efficiencies and customer service. The Project shall improve access to serviceplatforms and beverage stations while optimizing seating arrangements. The Project shall renovateservice areas and workstations in need of repair, and replace equipment that is at the end of itsdesigned life cycle. The Project shall redesign the main entry to improve customer access and egress;replace entry store front, doors and exterior pavement along front of Dining Facility; redesign existingpizza, exhibition, grille, granary, salad bar, breakfast station, and euro platforms to accommodate morediverse menu options; redesign the existing tray return window and reconfigure the existing tray accu-mulator; provide new walk-in refrigeration and freezer units to replace existing; selective replacementof main kitchen equipment and finishes; provide new lighting program throughout the dining room andcustomer service points; provide new ceiling tiles throughout the dining room; provide new carpet inassigned seating areas throughout the dining room; provide terrazzo floor at the entry leading up tothe customer walkways and paths of travel including entrance and foyer; provide new wall tiles toreplace existing tiles to match the new dining room décor; refurbish all millwork and caseworkthroughout the dining room including sneeze guards; and install new counter tops. License Required:B . Mandatory Pre-Bid Conf. & Job Walk held on Feb. 10, 10am, meet at Rieber Hall (Fireside Lounge)310 De Neve Dr., L.A., CA, 90024, UCLA Campus (Online Campus Map: www.ucla.edu/map) Contact:Pi-Hsuan Kao 310-825-6305. Bid Docs. available for purchase from Ford Graphics, 2435 Military Ave.,Los Angeles, CA 90064 (310)477-6501 http://socal.fordgraphics.com.

Campus FM200 Fire Suppression System Bid DeadlineLos Angeles March 10, 1:30 pmSubmit bids to UCLA. 2682800. Richard Y. Lee, 731 Young Drive S. 3rd Flr. Box 951526, Los Angeles,CA 90095 (PH: 310-206-6116; Fax: 310-206-9522). Estimate: $175,000.

PPllaannss AAvvaaiillaabbllee aatt hhttttpp::////ppllaannss..ssddddtt..ccoommWWoorrkk IInnvvoollvveess:: The scope of the Project is to update the existing fire suppression system to FM 200system to provide optimum fire protection coverage for IDF Room and Server Rooms in various cam-pus facilities for the University. Contractor shall provide deferred approval submittal package for theState Fire Marshal’s review and approval prior to start of construction for each phase/area of theProject. License required: B. Mandatory pre-bid conf. & job walk on 2/17, 1:30 pm at Capital ProgramsBldg., 1060 Veteran Ave., Rm. 128-H, UCLA campus. Contact Richard Lee (Tel: 310-206-6116). Docsare avail. at Ford Graphics, 2435 Military Ave., Los Angeles, CA 90064 (Tel: 310-477-6501) or viewonline at http://socal.fordgraphics.com/.

Weyburn Terrace Grad. Student Housing PREQUAL Bid DeadlineLos Angeles March 12, 11:30 amSubmit bids to UCLA PREQUALIFIED BIDDERS. 948279.02. (310) 825-7015. Estimate: N/A .

DDooccuummeennttss NNoott OOnn FFiilleeWWoorrkk IInnvvoollvveess:: Weyburn Terrace Graduate Student Housing PREQUALIFIED BIDDERS ONLY: TheWeyburn Terrace Graduate Student Housing project will construct approximately 275,000 grosssquare feet of new Type I construction located in the Southwest zone of the campus. The Projectincludes construction of 500 studio apartment units, and a commons building that will house meetingand reception spaces, administrative offices and academic and student support functions. The Projectsite is the existing MR Parking Lot, located at the intersection of Weyburn Avenue and Weyburn Place,a city alley. The site is adjacent to Phase 1 of Weyburn Terrace, which constructed 1,387 beds of grad-uate student housing. The proposed Project will demolish the existing surface parking lot. Constructionshall be on a confined site requiring shoring, and includes mat and spread foundation footings, con-crete structural frame, exterior cladding consisting of a waterproofing system with exterior cementplaster, aluminum windows and window wall system, and related mechanical, electrical, plumbing andfire protection systems. The new buildings shall be constructed to meet the LEED® New Construction

green building requirements and achieve a LEED® Silver rating. The Project is anticipated to be con-structed between April 2010 and June 2012.. Mandatory Pre-Bid Conf. & Job Walk held on Feb. 5,1:30pm, Capital Programs Bldg., 1060 Veteran Ave., UCLA Campus. Bid Docs. available from FordGraphics, 2435 Military Ave., Los Angeles, CA 90064 (310) 477-6501 Website: http://socal.fordgraph-ics.com/ .PPllaannhhoollddeerrss IINNCCLLUUDDEE::G ##HHuunntt CCoonnssttrruuccttiioonn GGrroouupp,, IInncc.. ((IIrrvviinnee)) 2020 Main Street, Suite 1170, Irvine . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .949-862-1100G ##PPCCLL CCoonnsstt..SSvvcc..((GGlleennddaallee)) 700 N. Central Ave., #700, Glendale . . . . . . . . . . . . . . . . . . . . . . . . .818-246-3481/FAX 818-247-5775G ##RRuuddoollpphh && SSlleetttteenn((IIrrvviinnee)) 16851 Hale Avenue, Irvine . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .949-252-1919G ##SSwwiinneerrttoonn BBuuiillddeerrss ((LLAA)) 865 S. Figueroa St., Suite 3000, Los Angeles . . . . . . . . . . . . . . . .213-896-3400/FAX 213-896-0027G ##TThhee WWhhiittiinngg TTuurrnneerr CCoonnttrraaccttiinngg CCoo..((AAHH)) 29229 Canwood Street, Agoura Hills, . . . . . . . . . . . . . . . . . . . . . . . . . . .818-879-8100G ##WWeebbccoorr BBuuiillddeerrss 550 So. Hope St., Los Angeles . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .213-239-2848/FAX -2849S ##TThhee CCoonnccoo CCoommppaanniieess--CCoonnccrreettee 13052 Dahlia Street, Fontana . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .909-350-0474S ##GGuuyy YYooccoomm CCoonnssttrruuccttiioonn --CCoonnccrreettee 3299 Horseless Carriage Ln, Norco . . . . . . . . . . . . . . .909-284-3456/FAX 909-284-3457S ##HHBB PPaarrkkccoo CCoonnsstt..,, IInncc.. --CCoonnccrreettee 3188-H Airway Ave., Costa Mesa . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .714-444-1441S ##JJTT WWiimmssaatttt CCoonnttrraaccttiinngg CCoo..--CCoonnccrreettee 28064 Avenue Stanford Unit B, Valencia . . . . . . . . . . .661-775-8090/FAX -775-8099S ##LLaarrggoo CCoonnccrreettee --CCoonnccrreettee 2741 Walnut Ave, Tustin . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .(714)731-3600/FAX -4800S ##PPCCLL CCoonnsstt.. SSvvccss.. IInncc..((GGlleennddaallee))--CCoonnccrreettee 700 N. Central Avenue, #700, Glendale . . . . . . . . . . . . . . . . . . . . . . . . . .818-246-3481S ##RRuuddoollpphh aanndd SSlleetttteenn((IIrrvviinnee))--CCoonnccrreettee 16951 Hale Avenue, Irvine . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .949-252-1919S ##SSwwiinneerrttoonn BBuuiillddeerrss((IIrrvviinnee))--CCoonnccrreettee 17731 Mitchell North, Suite 200, Irvine . . . . . . . . . . . . . . . . . . . . . . . . . . . . .949-622-7000S ##TT..BB.. PPeenniicckk && SSoonnss --CCoonnccrreettee 9747 Olson Dr., San Diego . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .858-558-1800S ##WWeebbccoorr CCoonnccrreettee --CCoonnccrreettee 1227 S. Claudina St., Anaheim . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .714-758-4300S ##AAnnddeerrssoonn && HHoowwaarrdd EElleeccttrriicc,, IInncc..--EElleeccttrriiccaall 1791 Reynolds Ave., Irvine . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .949-250-4555S ##BBeerrggeelleeccttiirrcc CCoorrpp..--EElleeccttrriiccaall 5650 W. Centinela Ave., Los Angeles . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .310-337-1377S ##CCuuppeerrttiinnoo EElleeccttrriicc,, IInncc..--EElleeccttrriiccaall 11929 Hamden Place, Santa Fe Springs . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .562-641-2400S ##HHeelliixx EElleeccttrriicc --EElleeccttrriiccaall 8620 Camino Santa Fe, Ste. A, San Diego . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .858-535-0505S ##KKDDCC ddbbaa DDyynneelleeccttrriicc --EElleeccttrriiccaall 4462 Corp., Center Drive, Los Alamitos . . . . . . . . . . . . . . . . . .(714)828-7000/FAX -236-2281S ##LLaanndd MMaarrkk EElleeccttrriicc,, IInncc..--EElleeccttrriiccaall 7876 Deering Ave., Canoga Park . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .818-883-5110S ##PPoowweerrccoo EElleeccttrriicc CCoorrppoorraattiioonn--EElleeccttrriiccaall 15870 Olden St., Sylmar . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .818-884-1166S ##SSAASSCCOO--EElleeccttrriiccaall 2750 Moore Ave., Fullerton . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .714-870-0217 Ext. 21

Bleacher Shade Covers Bid DeadlineMission Viejo March 16, 9 amSubmit bids to City of Mission Viejo-Corporate Yard. Jerry Hill:(949) 470-3085 Fax:(949) 455-2589Email: [email protected] . Estimate: $140,000 .

DDooccuummeennttss NNoott OOnn FFiilleeWWoorrkk IInnvvoollvveess:: Bleacher Shade Covers. Bid Docs. available from owner, (949)470-3085.

Joint First Responder Training Facility PREQUAL GC Bid DeadlineCarlsbad March 16, 2 pmSubmit bids to City of Carlsbad PREQUAL GCs. PWS10-31UTIL. Estimate: $15,000,000.

PPllaannss AAvvaaiillaabbllee aatt hhttttpp::////ppllaannss..ssddddtt..ccoommWWoorrkk IInnvvoollvveess:: Joint First Responder Training Facility PREQUALIFIED GCs ONLY: Construct threemasonry buildings consisting of a 36,697 square foot (SF), two story, Shooting Range/ClassroomBuilding containing a police firing range (25 yard handgun & 100 yard rifle), a 6,558 SF, four story,training tower, Commercial Burn Prop, & a 2,246 SF, two story, Residential Burn Prop, plus police &fire training grounds including car extrication area, trench rescue area, an underground confined spacerescue area, artwork site, site lighting, masonry perimeter security wall, landscaping & onsite water,sewer, recycled water, & storm drain pipelines . Pre-Bid Mtg. & tour of the project site to be heldon Feb. 18, 10am, City’s Public Safety & Service Ctr. Bldg. 2560 Orion Way, Carlsbad, CA . Plans/Specs(NR) $90 (ready after Mar. 1), available from City of Carlsbad Faraday Ctr., 760-602-2767 .PPllaannhhoollddeerrss IINNCCLLUUDDEE::G ##JJaayynneess CCoorrppoorraattiioonn 111 Elm Street, Fourth Floor, San Diego . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .(619)233-4080/FAX -4090G ##WWeebbccoorr BBuuiillddeerrss((SSDD)) 5465 Morehouse Drive, Ste. 150, San Diego . . . . . . . . . . . . . . . . . . . .858-622-5200/FAX 858-622-5201G ##EErriicckkssoonn--HHaallll CCoonnssttrruuccttiioonn CCoo.. 500 Corporate Dr., Escondido . . . . . . . . . . . . . . . . . . . . . . .(760) 796-7700/FAX (760) 796-7750G ##BBaarrnnhhaarrtt,, IInncc 10760 Thornmint Road, San Diego . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .858-385-8200/FAX .G ##BBeerrnnaarrddss BBuuiillddeerrss 618 San Fernando Rd., San Fernando . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .818-898-1521G ##CCooxx CCoonnsstt.. CCoo.. ((VViissttaa)) 3170 Scott St., Vista . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .(760)727-9020/FAX (760)727-9229G ##DDJJMM CCoonnsstt 727 West Century, Santa Maria . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .805-922-9038/FAX -922-9048G ##EEddggee DDeevv..,, IInncc.. 27368 Via Industria Ste. 101, Temecula . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .(951)296-0776/FAX -0775G ##HHiigghhllaanndd PPaarrttnneerrsshhiipp,, IInncc.. 285 Bay Blvd., Chula Vista . . . . . . . . . . . . . . . . . . . . . . . . . . . . .(619) 498-2900/FAX (619) 498-2970G ##LLeeddccoorr CCoonnssttrruuccttiioonn ((SSDD)) 6405 Mira Mesa Blvd., Ste. 100, San Diego . . . . . . . . . . . . . . . . .858-527-6429/FAX 858-566-6177G ##LLuussaarrddii CCoonnsstt.. 1570 Linda Vista Dr., San Marcos . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .(760) 744-3133/FAX -9064G ##PPCCLL CCoonnsstt.. SSvvcc..,, IInncc.. --((SSDD)) 4690 Executive Dr., Suite 100, San Diego . . . . . . . . . . . . . . . . .858-657-3400/FAX 858-657-9444G ##PPiinnnneerr CCoonnsstt.. 9320 Chesateake Dr. #122, San Diego . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .277-1555/FAX -1333G ##PPrrooWWeesstt CCoonnssttrruuccttoorrss 22710 Palomar Street, Wildomar . . . . . . . . . . . . . . . . . . . . . . . . . . . .(951)678-1038/FAX (951)678-1083G ##PPWWCCII 1905 E Route 66 Ste 200, Glendora . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .626-857-1955/619-696/FAX -1946G ##RReennoo CCoonnttrraaccttiinngg,, IInncc.. 1450 Frazee Rd., #100, San Diego . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .619-220-0224/FAX -0229G ##RRooeell CCoonnsstt.. CCoo.. 34100 Gateway Dr., Ste. 100, Palm Desert . . . . . . . . . . . . . . . . . . . . . . . . . . .760-275-4050/FAX 760-321-0503G ##SS..JJ.. AAmmoorroossoo CCoonnsstt.. 348 Hatch Drive, Foster City . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .(650)349-6691/FAX -7031G ##SSoolltteekk PPaacciiffiicc 2424 Congress Street, San Diego . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .(619)296-6247/FAX (619)296-4314

Continued from Page 18B

BuildingWork Involving New Construction, Additions, Alterations and Remodeling of Residential, Commercialand Industrial Structures. Please Check Engineering, Specialties or Subcontractors for AdditionalBidding Projects

(G) Indicates General Contractor Requesting Sub bids(S) Indicates Subcontractor(NA) Indicates Not Available

Continues on 20B

Page 20: 20100215 construction weekprops-n.sdccd.edu/NE/News Events... · Companies that submitted proposals during the first phase now will be evaluat- ... CA 92101 † 619.231.1010 † CA

THE DAILY TRANSCRIPT® • TUESDAY, FEBRUARY 16, 201020B

G ##SSuuffffoollkk CCoonnsstt.. CCoo.. 38 Discovery #200, Irvine . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .(949)458-9400/FAX (949)585-3033G ##TTBB PPeenniicckk && SSoonnss,, IInncc 9747 Olson Dr., San Diego . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .858-558-1800/FAX 858-558-1831G ##TThhee WWhhiittiinngg-- TTuurrnneerr CCoonnttrraaccttiinngg CCoommppaannyy 440 Stevens Avenu, Solana Beach . . . . . . . . . . . . . . . . .858-792-0600/FAX 9600S ##RR..LL.. EElleeccttrriicc,, IInncc.. P.O. Box 1309, Lakeside . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .619-561-4506/FAX 619-561-8011

C1094D MDAB Renovation Project (PCC) Bid DeadlineLong Beach March 18, 2 pmSubmit bids to Long Beach City College Liberal Arts Campus. Bid Information - Therese Wheeler (562)938-4837, Fax (562) 938-4640; Project Manager - Luis Cruz (562) 938-5064, Fax (562) 938-5065.Estimate: $34,400,000.

DDooccuummeennttss NNoott OOnn FFiilleeWWoorrkk IInnvvoollvveess:: C1094D MDAB Renovation Project (PCC): The work will be conducted in two phases.Phase One: Renovation ofexisting Building DD. Renovation of existing Building EE. All related site work. Fire hydrant, fire water,firesprinkler connections, and all associated work. Phase Two: Renovation of existing Building AA.Renovation of existing Building BB. Renovation of existing basement located under existing BuildingAA. All related site work, and all associated work. The demolition will include abatement work. ThisProject is a DSA project and will have to meet all DSA standards. Requires Pre-Qualification. A biddermust have completed a current District’s Contractor and Vendor Pre-Qualification Application and bedeemed a Qualified Bidder at least ten days prior to the latest date for submission of Bid Proposals.Applications are available online at http://bondprogram.lbcc.edu or by calling (626) 685-6989 .Mandatory Job Walk held on Feb. 9, 10am, Long Beach City College, Pacific Coast Campus.Plans/Specs available for purchase from Dynamic Imaging, 3923 Long Beach Blvd., Long Beach, CA90807 (562) 595-1661 Office; (562) 595-7745-Fax.PPllaannhhoollddeerrss IINNCCLLUUDDEE::G ##SSoolltteekk PPaacciiffiicc 2424 Congress Street, San Diego . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .(619)296-6247/FAX (619)296-4314

Reno. Rehab. Therapy, Bldg. 1, VA Med. Ctr. Bid DeadlineSan Diego March 19, 2 pmSubmit bids to Dept. of Veterans Affairs Network 22 Logistics. VA-262-10-RP-0133. Samson Fang,Contracting Officer, Email: [email protected] (562) 826-5543. Estimate: $250,000 - $500,000.

PPllaannss AAvvaaiillaabbllee aatt hhttttpp::////ppllaannss..ssddddtt..ccoommWWoorrkk IInnvvoollvveess:: 664-09-932 Renovate Rehabilitation Therapy, Building 1, VA Medical Center:Contractor shall furnish all management, supervision, labor, transportation, material and equipmentto perform the following requirement: Renovation of Rooms 1465, 1478 and 1479 in RehabilitationMedicine Service located on the first floor of Building 1 VA Medical Center San Diego. All work shallbe in accordance with specifications and drawings SD-2300. Work includes removal and replacementof flooring, ceilings, walls, doors, architectural finishes, plumbing, HVAC, fire sprinklers, and electricalsystems. The project includes abatement of asbestos containing materials and control of all infectioncontrol risks. Offerors must be currently: 1. listed in the VetBiz Registry Vendor InformationPage(http://www.vetbiz.gov/vip/vip.htm) 2. registered on Central ContractorRegistration(http://www.ccr.gov) 3. completed Online Representations and Certifications at(https://orca.bpn.gov/)

. Pre-Proposal Conf. to be held on Feb. 10, 10:30am, VA San Diego, 3350 La Jolla Villa Dr., San Diego,CA 92161. Solicitation Docs., plans & other pertinent info available for download/viewing fromwww.fbo.gov .PPllaannhhoollddeerrss IINNCCLLUUDDEE::G ##HHeeaalleeyy CCoonnssttrruuccttiioonn 1545 Tidelands Ave., National City . . . . . . . . . . . . . . . . . . . . . . . . . . . . .(619)474-4900/FAX (619)474-2301G ##GGoorrddoonn PPrriillll,, IInncc.. 8400 North Magnolia Ave. Ste. F, Santee . . . . . . . . . . . . . . . . . . . . . . . . . . .619-448-1490/FAX 619-448-1071

Roof Replace, Veterans Affairs, San Diego Facility Bid DeadlineSan Diego Indef, 9:37 amSubmit bids to USACE-Los Angeles District. W912PL-09-R-0050. Patricia Bonilla, Sr. ContractSpecialist, Email: [email protected]. Estimate: $5,000,000 - $10,000,000.

TTrraannssccrriipptt PPllaann NNoo.. 221100WWoorrkk IInnvvoollvveess:: Roof Replacement, Veterans Affairs, San Diego Facility, San Diego County, CA: Theproject consists of removing and replacing the existing roof for the San Diego Veterans AdministrationHospital, Buildings 1, 2, and 14. Site visit to be held on Aug. 27, 10:30am, at the San Diego VA Hospital. 2nd Site Visit added for Sept.10, 8am, SD VA Hospital, front lobby, 3350 La Jolla Village Drive, San Diego, CA 92161. POC for sitevisit Jim Riley (805) 734-0587. Solicitation Docs. available for download from Federal BusinessOpportunities (Fed Biz Opps). www.fbo.gov.PPllaannhhoollddeerrss IINNCCLLUUDDEE::n/a ##JJoosseepphh MMuurrpphhyy CCoonnsstt..,, IInncc.. 6621 Brisa St., Livermore . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .925-735-3000n/a ##JJaayynneess CCoorrppoorraattiioonn 111 Elm Street, Fourth Floor, San Diego . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .(619)233-4080/FAX -4090n/a ##CCooxx CCoonnsstt.. CCoo.. ((VViissttaa)) 3170 Scott St., Vista . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .(760)727-9020/FAX (760)727-9229n/a ##LLaarrssccoorr GGeenneerraall CCoonnttrraaccttoorrss,, IInncc.. 2242 Congress St., San Diego . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .619-341-1045n/a ##CCoonnssoolliiddaatteedd CCoonnttrraaccttiinngg((SSaann CClleemm)) 181 Avenida La Pata, San Clemente . . . . . . . . . . . . . . . . . . . .(949) 498-7500/FAX -7992n/a ##MMTTGGLL 7313 Carrol Rd. Ste G, San Diego . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .(858)537-3999/FAX (858)537-3990

n/a ##CCeerrttiiffiieedd CCoonnccrreettee IInntteerrssttaattee 120 N. Andreasen Dr., Escondido . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .n/a ##GGoooodd MMeenn RRooooffiinngg --GGCC 3940 Hancock St #203, San Diego . . . . . . . . . . . . . . . . . . . . . . . . .(619) 279-4238/FAX (619) 221-0874n/a ##AApppplliieedd RRooooff EEnnggiinneeeerriinngg 211 Pearl St, Corona . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .(951) 278-9164/FAX (951) 278-0974n/a ##SShhaarrppccoonn CCoonnsstt..,, IInncc.. 490 Corporate Dr., Escondido . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .760-755-1957n/a ##JJMMEE,, IInncc.. 2690 N. State St., San Bernardino . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .970-988-2569n/a ##AAccttiioonn--AA&&DD AA JJooiinntt VVeennttuurree 11487 Woodside Ave., Santee . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .619-843-5587n/a ##BBeesstt CCoonnttrraaccttiinngg SSeerrvviicceess ((GGaarrddeennaa)) 19027 S. Hamilton Ave, Gardena . . . . . . . . . . . . . . . . . . . . . . . . . .310-328-6969/FAX 9176n/a ##EEbbeerrhhaarrdd BBeennttoonn RRooooffiinngg 3691 Hancock St., San Diego . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .(619)291-6340/FAX (619)681-1144n/a ##TTeell TTeecchh PPlluuss ((SSaann MMaarrccooss)) 393 Enterprises Street, San Marcos . . . . . . . . . . . . . . . . . . . . . .760-510-8553/FAX 760-510-8559n/a ##EEsssseellmmaann CCoorrpp.. 5745 Kearny Villa Rd., Ste. 111, San Diego . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .858-514-1230n/a ##HHaarrbboorr CCoonnssttrruuccttiioonn((IIrrvviinnee)) 1550 Rock Field Blvd., #B-100, Irvine . . . . . . . . . . . . . . . . . . .(949)457-1888/FAX 949-457-9888n/a ##SSyyggnnooss,, IInncc.. 3950 Mahalia Ave. P24, San Diego . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .(858) 552-0314/FAX -0316n/a ##PPrreemmiieerr WWeesstt CCoonnttrraaccttoorr IInncc 740 West Grove Ave., Orange . . . . . . . . . . . . . . . . . . . . . . . .1-800-278-0105/FAX 714-279-0856n/a ##TTaarrggeett EEnnggiinneeeerriinngg && CCoonnsstt.. IInncc.. 40101 Monterey Ave. Ste. B-1-311, Rancho Mirage . . . . . . . . . . . . . . . . . . . . . . .410-674-0011n/a ##SSoouuzzaa CCoonnssttrruuccttiioonn P.O. Box 3903, San Luis Obispo . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .559-636-1756/FAX 559-636-1768n/a ##GGSSFF EEnntteerrpprriisseess,, IInncc.. 610 S. Jefferson St., Ste. L, Placentia . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .714-524-9500n/a ##**PPllaannHHoollddeerrssLLiisstt OOnn LLiinnee && CCoommpplleettee ppllaannss..ssddddtt..ccoomm will fax or email complete list upon request, 619-232-4381 . . . . . . . . . .

Continued from Page 19B

BuildingWork Involving New Construction, Additions, Alterations and Remodeling of Residential, Commercialand Industrial Structures. Please Check Engineering, Specialties or Subcontractors for AdditionalBidding Projects

(G) Indicates General Contractor Requesting Sub bids(S) Indicates Subcontractor(NA) Indicates Not Available

EngineeringWork Involving Site Improvements; Streets; Highways; Bridges; Irrigation and Landscaping; Drainage,Sewage and Water Pipelines; Disposal, Purification, Utility and Wastewater Treatment Plants;Harbors, Piers and Marine Terminal Projects; Outdoor Electrification; Well Drilling and UndergroundConstruction Projects. Please Check Building, Specialties, or Subcontracts for Overlapping Bids

(G) Indicates General Contractor Requesting Sub bids(S) Indicates Subcontractor(NA) Indicates Not Available

Upper Guadalupe River Reach 6 I-280 Bid DeadlineSan Jose February 17, 2 pmSubmit bids to Santa Clara Valley Water District. 26154002 / C0556. Stephen Ferranti, Proj. Manager(PH: 408-265-2607 ext. 2677; Email: [email protected]). Estimate: $12,000,000 -$15,000,000.

PPllaannss AAvvaaiillaabbllee aatt hhttttpp::////ppllaannss..ssddddtt..ccoommWWoorrkk IInnvvoollvveess:: Upper Guadalupe River Reach 6 I-280 to Union Pacific Railroad Bridge. Proj. site islocated at the intersection of Grant Street and Palm Street. The project scope includes the ff:*Construct a new West Virginia Street Bridge above the proposed floodplain excavation immediatelyeast of the existing West Virginia Street Bridge; *Construct an island between the existing WestVirginia Street Bridge and proposed West Virginia Street Bridge that protects the abutments for bothbridges; *Install all new West Virginia Street Bridge accompaniments, including asphalt concretepaving, concrete sidewalks, bridge railings, lighting, etc. License required: A. In addition, bidder or sub-contractor must possess International Society of Arboriculture (ISA) Certification, C-27 Specialtylicense, C-57 license, a California Pesticide Applicator license, and Applicator Business license.Mandatory pre-bid mtg. on 1/5/10, 9 am at Room B-108 of the District Admin. Bldg., 5750 AlmadenExpressway, San Jose, CA. Confirm attendance to the District Plan Room via email ([email protected]) or phone (408-265-2607 ext. 3088). Contract docs may be purchased for(NR) price of $60/set + $10/set for packaging & postage if mailed. Pick up docs at SCVWD, 5700Almaden Expressway, San Jose, CA 95118 (PH:408-265-2607 ext. 3088).PPllaannhhoollddeerrss IINNCCLLUUDDEE::G ##TTuucckkeerr EEnnggiinneeeerriinngg ((LLooss GGaattooss)) 761 University Ave., Ste. A, Los Gatos . . . . . . . . . . . . .(408) 395-0802/FAX (408) 395-0808S ##MMiissssiioonn CCiittyy RReebbaarr,, IInncc.. 542 Mc Graw Ave., Livermore . . . . . . . . . . . . . . . . . . . . . . . . . . . .(925) 449-6999/FAX (925) 447-8797S ##CChhrriisspp CCoommppaannyy ((FFrreemmoonntt)) 43650 Osgood Rd., Fremont . . . . . . . . . . . . . . . . . . . . . . . . . . .(510) 656-2840/FAX (510)656-2397n/a ##MMccGGuuiirree && HHeesstteerr 7888 Wren Ave., D140, Gilroy . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .408-846-8000/FAX 408-846-5515

Annual Asphaltic Concrete Bid DeadlineLa Mesa-Spring Valley February 17, 2 pmSubmit bids to La Mesa-Spring Valley SD. FB3-09/10. Jeannine Joergensen, Supervisor, Purchasing,(619) 668-5700 ext.6358 E-mail [email protected]. Estimate: N/A .

PPllaannss AAvvaaiillaabbllee aatt hhttttpp::////ppllaannss..ssddddtt..ccoommWWoorrkk IInnvvoollvveess:: Annual Asphaltic Concrete - License Required: A &/or C12. Mandatory Pre-Bid Mtg. tobe held on Feb. 5, 10am, La Mesa-Spring Valley School District, 4750 Date Ave., La Mesa, CA 91942.Bid Docs. may be obtained via request to Jeannine Joergensen, Supervisor, Purchasing, (619) 668-5700 ext.6358 E-mail [email protected].

Valley Ctr. Roadside Rec. Heritage Trail & L/S Bid Deadline

Continues on 21B

Page 21: 20100215 construction weekprops-n.sdccd.edu/NE/News Events... · Companies that submitted proposals during the first phase now will be evaluat- ... CA 92101 † 619.231.1010 † CA

THE DAILY TRANSCRIPT® • TUESDAY, FEBRUARY 16, 2010 21B

San Diego February 17, 2 pmSubmit bids to County of San Diego. RFB 4338. Tamara Ford (858) 537-2544 Email:[email protected]. Estimate: $1,500,000 - $1,700,000.

PPllaannss AAvvaaiillaabbllee aatt hhttttpp::////ppllaannss..ssddddtt..ccoommWWoorrkk IInnvvoollvveess:: Valley Center Roadside Recreational Heritage Trail & Landscaped Medians: Work to bedone for the County Department of Public Works consists in general of clearing and grubbing, earth-work, placing aggregate base, constructing concrete sidewalk curb, stamped concrete, installing head-er board, fence, placing roadside sign, interpretive signage, monument, constructing picnic table,installing bike rack, planting trees, installing rust barrier, placing mulch, placing filter fabric, cobblerock, preparing soil, placing amended topsoil, installing irrigation system, placing temporary fiber roll,portable concrete washout, providing soil test, providing erosion control type D, providing plant estab-lishment, installing stone clad memorial seating, providing traffic control, preparing water pollutioncontrol program and implementing water pollution control measures. No pre-bid meeting is scheduledfor this project. License Required: A or C-12. Contract Docs. (NR) $10/CD, available from County of SanDiego, mail svc. $10 & only available to those outside a 30-mile radius or County office. For furtherinfo: http://buynet.sdcounty.ca.gov., 858-537-2505.PPllaannhhoollddeerrss IINNCCLLUUDDEE::G ##SScchheeiiddeell CCoonnttrr.. && EEnngg PO Box 1796, La Mesa . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .619-593-8704/FAX 619-593-9193G ##NNeeww CCeennttuurryy CCoonnsstt.. 9119 Emerald Grove Avenue (E-Mail: [email protected]), Lakeside . . .619-390-3300

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ./FAX 619-390-3311S ##DDrraavveess PPiippeelliinnee PO Box 1051, Bonsall . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .(760) 728-7094/FAX -0085G ##TTrrii--GGrroouupp CCoonnsstt.. && DDeevv..,, IInncc.. 13939 Poway Rd. Ste. 10, Poway . . . . . . . . . . . . . . . . . . . . . . .858-679-0843/FAX 858-679-5359G ##PPaallmm EEnnggiinneeeerriinngg 3770 Hancock Street Suite H, San Diego . . . . . . . . . . . . . . . . . . . . . . . . .(619) 291-1495/FAX (619) 291-0482n/a ##SSiieerrrraa LLaannddssccaappee 73-771 Dinah Shore Dr., Suite 200, Palm Desert . . . . . . . . . . . . . . . . . .(760) 328-8900/FAX (760) 969-4742S ##IInntteeggrraatteedd SSiiggnn AAssssoocciiaatteess 1160 Pioneer Way Suite M, El Cajon . . . . . . . . . . . . . . . . . . . . . . .619-579-2229/FAX 619-579-7651G ##SSoouutthhwweesstt GGeenneerraall CCoonnttrraaccttoorrss 1835 A S. Centre Parkway #422, Escondido . . . . . . . . . . . . . . . . .(760) 480-8747/FAX -8782S ##TTSS CCoonnsstt.. 15751 Rim of The Valley, Valley Center . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .(760)749-9791G ##HHTTAA EEnnggiinneeeerriinngg && CCoonnssttrruuccttiioonn,, IInncc 12520 Kirkham Ct. Suite 8, Poway . . . . . . . . . . . . . . . . . . . . .(858) 486-3240/FAX 3285G ##HHaazzaarrdd CCoonnsstt.. ((SSDD)) 6465 Mar Industry Pl, San Diego . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .(858)587-3600/FAX (858)453-6034G ##VVaalllleeyyccrreesstt LLaannddssccaappee DDeevv..,, IInncc.. ((SSDD)) 8450 Miramar Pl., San Diego . . . . . . . . . . . . . . . . . . . . . . . . . .858-458-9900/FAX -9904G ##WWhhiilllloocckk CCoonnttrraaccttiinngg PO Box 2322, La Mesa . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .619-579-0700/FAX -0955G ##BBaaddiiii EEnntteerrpprriisseess 12577 Sorrento Way, San Diego . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .858-538-8623/FAX -6141G ##PPaarrkk WWeesstt LLaannddssccaappee ((EEssccoonnddiiddoo)) 480 So. Quince, Escondido . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .760-739-7790/FAX -7290G ##LL..BB.. CCiivviill CCoonnssttrruuccttiioonn IInncc 10650 Treena St., Ste 212, San Diego . . . . . . . . . . . . . . . . . . . . . . . . . . . .(858) 578-5222/FAX -5226n/a ##AABBCC CCoonnsstt.. 3120 National Ave., San Diego . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .619-239-3428/FAX 619-239-6614G ##WWeesstt--TTeecchh CCoonnttrraaccttiinngg 568 N. Tulip Street, Escondido . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .(760)233-2570/FAX -2580

T/S Mod. Intersection of Third Ave & Montgomery St Bid DeadlineChula Vista February 17, 2 pmSubmit bids to City of Chula Vista-Public Svc. Bldg. (PSB). TF-331. Mari Malong (619) 691-5035 Email:[email protected] . Estimate: $306,000.

TTrraannssccrriipptt PPllaann NNoo.. 6655WWoorrkk IInnvvoollvveess:: Traffic Signal Modification at the Intersection of Third Ave & Montgomery St in theCity of Chula Vista: Project consists of the upgrade of traffic signal system with street improvementsat the intersection of Third Ave and Montgomery St. Includes all labor, material, equipment, trans-portation, protection of existing improvement and traffic control necessary for the project as shownin the contract documents. License Required: Minimum license requirements for this contract (combi-nation of contractor and/or subcontractor): (1) C-10 with Class “A” or (2) C-10 with C-8, C-12, C-31,and C-32. Bid Docs. (NR) $9 (mailing $5) available from owner, (619) 691-5021.PPllaannhhoollddeerrss IINNCCLLUUDDEE::n/a ##DDBBXX,, IInncc.. 42066 Avenida Alvarado, Suite C, Temecula . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .(951) 296-9909/FAX -9978n/a ##HHMMSS CCoonnsstt.. ((VViissttaa)) 1047 La Mirada Court, Vista . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .760-727-9808/FAX 760-727-9806n/a ##HHTTAA EEnnggiinneeeerriinngg && CCoonnssttrruuccttiioonn,, IInncc 12520 Kirkham Ct. Suite 8, Poway . . . . . . . . . . . . . . . . . . . . .(858) 486-3240/FAX 3285n/a ##IInntteerrnnaattiioonnaall IIrroonn BBuuiillddeerrss P.O. Box 3039, Riverside . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .(951) 682-2982/FAX (951) 788-0686n/a ##LLeekkooss EElleeccttrriicc 1370 Pioneer Way, El Cajon . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .(619)447-7661/FAX 619-447-0402n/a ##SSuutthheerrlliinn CCoonnttrraaccttiinngg 2007 Muira Lane, El Cajon . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .(619)588-8895/FAX (619)579-1993n/a ##SSoouutthhwweesstt SSiiggnnaall SSeerrvviiccee 397 Releigh, El Cajon . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .619-442-3343/FAX 619-442-4708n/a ##PPTTMM EEnnggiinneeeerriinngg 5942 Acorn St, Riverside . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .951-710-1000/FAX 951-710-1006n/a ##SStteeiinnyy && CCoo.. ((BBaallddwwiinn PPaarrkk)) 12907 E. Garvey Ave., Baldwin Park . . . . . . . . . . . . . . . . . . . . . . . . . . . . .626-338-9923/FAX -6899n/a ##MMccCCaaiinn TTrraaffffiicc SSuuppppllyy 2365 Oak Ridge Way, Vista . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .760-734-5001/FAX (760)597-7113n/a ##MMJJCC CCoonnssttrruuccttiioonn ((NNCC)) 630 National City Blvd., National City . . . . . . . . . . . . . . . . . . . . . . . . .619-472-5619/FAX 619-996-2116n/a ##PPeerrrryy EElleeccttrriicc 9260 Issac St., Ste. G, Santee . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .(619)449-0045/FAX -0511n/a ##RRaammoonnaa PPaavviinngg && CCoonnsstt.. 1303 Olive St., Ramona . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .760-788-2847/FAX 760-789-9935n/a ##RReeppuubblliicc IITTSS ((NNoovvaattoo)) 371 Bel Marin Keys Boulevard #200, Novato . . . . . . . . . . . . . . . . . .415-884-3000/FAX 415-884-4800

Train A Rehabilitation Phase 2 Bid DeadlineLake Elsinore February 17, 3 pmSubmit bids to Elsinore Valley Municipal Water Dist-Prequal. GC’s. 75765. Kelly Urso (951) 674-3146ext. 8346. Estimate: $1,800,000.

TTrraannssccrriipptt PPllaann NNoo.. 225511WWoorrkk IInnvvoollvveess:: Train A Rehabilitation Phase 2 - License Required: A . Mandatory Pre-bid Conf. to beheld on Jan. 27, 9am, Elsinore Valley Municipal Water District, 31315 Chaney St., Lake Elsinore, CA .

Plan/Specs (NR) $150/Full Size or $75/Half Size, both sets include a copy of a CD (mailing $15, FedExor other overnight shipper $35) for further info contact Kelly Urso (951) 674-3146 ext. 8346.PPllaannhhoollddeerrss IINNCCLLUUDDEE::G ##CCoorraa CCoonnssttrruuccttoorrss -- GGCC 74885 Joni Suite 4, Palm Desert . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .(760)674-3201/FAX -8648G ##GGeenneessiiss CCoonnsstt.. ((HHeemmeett)) 170 E Oakland Avenue, Hemet . . . . . . . . . . . . . . . . . . . . . . . . . .951-652-6977 x754/FAX 951-925-6585G ##PPaacciiffiicc HHyyddrrootteecchh 314 E. 3rd St, Perris . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .951-943-8803/FAX 951-943-1093G ##PPaassccaall && LLuuddwwiigg EEnngg.. 2049 E. Francis St., Ontario . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .(909)947-4631/FAX (909)947-4722G ##PPCCLL CCoonnsstt.. SSvvcc..,, IInncc.. --((SSDD)) 4690 Executive Dr., Suite 100, San Diego . . . . . . . . . . . . . . . . .858-657-3400/FAX 858-657-9444G ##PPppcc CCoonnsstt.. IInncc.. 336 N. Central Ave. Ste 10A, Glendale . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .(818)662-8040/FAX -8060G ##SSCCWW CCoonnttrraaccttiinngg 2525 N. Old Hwy 395, Fallbrook . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .(760)728-1308/FAX -2517G ##SSooccaall PPaacciiffiicc 29885 2nd Street, Suite J, Lake Elsinore . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .951-674-1030/FAX 951-674-1035G ##SSttaanneekk CCoonnsstt.. ((EEssccoonnddiiddoo)) 2434 Vineyard Ave. #102, Escondido . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .(760) 871-0102S ##AA..MM.. OOrrtteeggaa 10125 Channel Road, Lakeside . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .(619)390-1988/FAX (619)390-1941

Const. of the Meadows Highline Bid DeadlineValley Center February 17, 3 pmSubmit bids to Valley Center Municipal Water District. 13-5678.78. Project Manager, FernandoCarrillo, (760) 749-1600. Estimate: N/A .

TTrraannssccrriipptt PPllaann NNoo.. 110099WWoorrkk IInnvvoollvveess:: Construction of the Meadows Highline: The project generally consists of constructionof 160 LF of new 8-inch HDPE wastewater line & concrete encasement. The existing 8-inch PVC liesexposed on an existing rock slope. Contractor shall remove & replace existing line while bypassingwastewater flow through a separate pipeline between the two nearest manholes. Contractor shalldemo existing rock(s) to allow for a straight alignment. No blasting shall be permitted. Contractorshall install concrete encasement or as directed by the District. License Required: A or C-34.Mandatory Pre-Bid Conf. to be held on Feb. 4 & 11th @ 10am, Lower Moosa Canyon WaterReclamation Facility, 8711 Circle R Dr., Escondido, CA . Plans/Specs (NR) $35 (mailing $7) availablefrom the district, (760)749-1600 .PPllaannhhoollddeerrss IINNCCLLUUDDEE::G ##AAllvvaanndd CCoonnssttrruuccttiioonn,, IInncc.. 12344 Oak Knoll Rd. Ste. G-1, Poway . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .858-668-2830/FAX -2832

Mission Bay Sewage Interceptor System Bid DeadlineSan Diego February 18, 1:30 pmSubmit bids to City of San Diego-Purchasing and Contracting Dept.. K102820C . Jeff Soriano:(619)533-5140 Fax:(619) 533-5176 Email: [email protected] . Estimate: $1,448,800 .

PPllaannss AAvvaaiillaabbllee aatt hhttttpp::////ppllaannss..ssddddtt..ccoommWWoorrkk IInnvvoollvveess:: Mission Bay Sewage Interceptor System: The work involves furnishing all labor, mate-rials, equipment, services, and construction for removal of existing tideflex gates, installations of newfiberglass flap gates, replacing existing vault hatch lids with double-leafed access hatches, installationof new cast-in-place concrete vaults, removal and replacement of sluice gates, telemetry systems, andall other work and appurtenances. License Required: A . Pre-Bid Conf. to be held on Jan. 21, 10am,1200 3rd Ave., Ste. 200, San Diego, CA 92101. Available for download from the City of San DiegoWebsite: http://www.sandiego.gov/, select Bids & Contracts, then select City Projects on ebidboard.For further info, contact: 619-236-6000.PPllaannhhoollddeerrss IINNCCLLUUDDEE::G ##BBaallbbooaa CCoonnsstt.. 1635 S. Rancho Santa Fe Rd #207, San Marcos . . . . . . . . . . . . . . . . . . . . . . .(619)531-2055/FAX (760)752-4691G ##AAhhrreennss CCoorrpp.. 5959 Mission Gorge Rd. #205, San Diego . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .(619)584-7123/FAX (619)584-7124G ##CCaassss CCoonnsstt.. --((EEll CCaajjoonn)) PO Box 309 (1100 Wagner Dr.), El Cajon . . . . . . . . . . . . . . . . . . . . . . . . . . . . .(619)590-0929/FAX -1202G ##HHPPSS MMeecchhaanniiccaall IInncc.. 3100 East Belle Terrace, Bakersfield . . . . . . . . . . . . . . . . . . . . . . . . . . .(661)397-2121/FAX (661)396-2589G ##KKTTAA CCoonnsstt..,, IInncc.. 1920 Cordell Ct Suite 105, El Cajon . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .(619) 562-9464G ##NNEEWWeesstt CCoonnssttrruuccttiioonn ((SSDD)) 7847 Dunbrook Rd., Ste. C, San Diego . . . . . . . . . . . . . . . . . .(858) 537-0774/FAX (858) 537-9653G ##OOrriioonn CCoonnsstt.. CCoorrpp.. ((VViissttaa)) 1232 Keystone Way, Vista . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .760-597-9660/FAX -9661G ##PPaallmm EEnnggiinneeeerriinngg 3770 Hancock Street Suite H, San Diego . . . . . . . . . . . . . . . . . . . . . . . . .(619) 291-1495/FAX (619) 291-0482S ##PPrreemmiiuumm CCoonnccrreettee PO Box 15733, San Diego . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .619-301-2399/FAX -2523G ##SScchheeiiddeell CCoonnttrr.. && EEnngg PO Box 1796, La Mesa . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .619-593-8704/FAX 619-593-9193G ##TTCC CCoonnsstt..,, IInncc.. ((SSaanntteeee)) 10540 Prospect Ave., Santee . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .619-448-4560/FAX -3341S ##TTeerrrraa WWeesstt IInncc.. 1061 Tierra del Rey Ste 204, Chula Vista . . . . . . . . . . . . . . . . . . . . . . . . . .(619) 591-1007/FAX (619) 568-3475G ##WWiieerr CCoonnssttrruuccttiioonn 2255 Barham Dr., Escondido . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .(760) 743-1477/FAX (760) 746-5224G ##33--DD EEnntteerrpprriisseess 11300 Sorrento Valley, San Diego . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .858-202-0410/FAX -0432G ##BBRRHH GGaarrvveerr WWeesstt 6910 Mission Gorge Road, San Diego . . . . . . . . . . . . . . . . . . . . . . . . . . . . .(619)265-0537/FAX (619)265-8672S ##CC&&WW DDiivviinngg SSeerrvviicceess 1706 Hoover Ave., National City . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .(619)474-2700/FAX (619)477-2700G ##CCaassss CCoonnsstt.. --((EEll CCaajjoonn)) PO Box 309 (1100 Wagner Dr.), El Cajon . . . . . . . . . . . . . . . . . . . . . . . . . . . . .(619)590-0929/FAX -1202n/a ##GGooddwwiinn PPuummppss ((MMLL)) 11161 Harrel St., Mira Loma . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .951-681-3636/FAX -2623G ##HHPPSS MMeecchhaanniiccaall IInncc.. 3100 East Belle Terrace, Bakersfield . . . . . . . . . . . . . . . . . . . . . . . . . . .(661)397-2121/FAX (661)396-2589n/a ##JJ..CC.. EEnnvviirroonnmmeennttaall CCoo..,, IInncc.. 2504 Transportation Ave., National City . . . . . . . . . . . . . . . . . . . . . . . . . .619-477-4416/FAX -4420G ##PPuullllmmaann EEnnggiinneeeerriinngg 7330 Opportunity Rd., Ste. A, San Diego . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .(858)576-1500/FAX -1115S ##RRoocckk EElleeccttrriicc,, IInncc.. ((SSDD)) 7950 Silverton Ave., Suite 211, San Diego . . . . . . . . . . . . . . . . .(858) 566-4449/FAX (858) 536-8931S ##SSaannccoonn EEnnggiinneeeerriinngg 5881 Engineer Dr., Huntington Beach . . . . . . . . . . . . . . . . . . . . . . . . . . . .(714) 902-0115/FAX 714-902-0121G ##SSCCWW CCoonnttrraaccttiinngg 2525 N. Old Hwy 395, Fallbrook . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .(760)728-1308/FAX -2517

Continued from Page 20B

EngineeringWork Involving Site Improvements; Streets; Highways; Bridges; Irrigation and Landscaping; Drainage,Sewage and Water Pipelines; Disposal, Purification, Utility and Wastewater Treatment Plants;Harbors, Piers and Marine Terminal Projects; Outdoor Electrification; Well Drilling and UndergroundConstruction Projects. Please Check Building, Specialties, or Subcontracts for Overlapping Bids

(G) Indicates General Contractor Requesting Sub bids(S) Indicates Subcontractor(NA) Indicates Not Available

Continues on 22B

Page 22: 20100215 construction weekprops-n.sdccd.edu/NE/News Events... · Companies that submitted proposals during the first phase now will be evaluat- ... CA 92101 † 619.231.1010 † CA

THE DAILY TRANSCRIPT® • TUESDAY, FEBRUARY 16, 201022B

Marina No. 3 Pump. Plant Force Main No. 1 Replace. Bid DeadlineLong Beach February 18, 2 pmSubmit bids to L.A. County Sanitation District No. 2. Mike Tatalovich (562) 908-4288 ext. 1623.Estimate: $700,000 - $1,700,000.

TTrraannssccrriipptt PPllaann NNoo.. 4444WWoorrkk IInnvvoollvveess:: Marina No. 3 Pumping Plant Force Main No. 1 Replacement & Force Main No. 2: Theproject consists of the construction of approximately 2,770 feet 18-inch diameter, high density poly-ethylene force mains & appurtenant structures. The project begins at the Marina No. 3 Pumping Plantin the first alley south of 7th St. approximately 50 feet east of Ximeno Ave., then southwesterly acrossprivate right of way to the intersection of Ximeno Ave. & Theresa St., then north westerly & wester-ly in Theresa St. to Roswell Ave. then northerly in Roswell Ave. to 7th St., then westerly in 7th St. toapproximately 50 feet east of the intersection of Belmont Ave. & 7th St., all within the City of LongBeach. Mandatory Job Site Walk-Through to be held on Jan. 26, 10am, 650 Ximeno Ave., Long Beach,CA 90804. Plans/Specs available by contacting the Public Counter, (562) 908-4288 ext. 1205.PPllaannhhoollddeerrss IINNCCLLUUDDEE::G ##AAMM OOrrtteeggaa GGeenneerraall EEnnggiinneeeerriinngg ((RRssiiddee)) 6261 Pedley Rd., Riverside . . . . . . . . . . . . . . . . . . . .951-360-1352/FAX 951-681-5920G ##BBaallii CCoonnssttrruuccttiioonn 9855 East Joe Vargas, So. El Monte . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .626-442-8003/FAX 626-442-8315G ##BBllooiiss CCoonnssttrruuccttiioonn 3201 Sturgis Road, Oxnard . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .(805) 656-1432/FAX (805) 458-0338G ##CChhaarrlleess KKiinngg CCoo.. 2841 Gardena Ave, Signal Hill . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .(562)426-2974/FAX -9714G ##CCoolliicchh && SSoonnss LL..PP..((GGaarrddeennaa)) 547 West 140th St., Gardena . . . . . . . . . . . . . . . . . . . . . . . . . .(310) 516-6346/FAX (310)329-2846G ##EExxcceell PPaavviinngg CCoo.. ((LLBB)) 2230 Lemon Ave., Long Beach . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .(562) 599-5841/FAX -591-7485G ##GGaarrcciiaa JJuuaarreezz CCoonnsstt..((PPeerrrriiss)) 4517 Wade Ave, Perris . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .(951) 657-3535/FAX (951) 657-3955G ##GGCCII CCoonnsstt.. IInncc.. 245 Fischer St. #B-3, Costa Mesa . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .(714)957-0233/FAX -540-1148G ##JJ.. FFlleettcchheerr CCrreeaammeerr && SSoonn 12874 San Fernando Rd., Sylmar . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .(818)367-9748/FAX -9749G ##KKEECC EEnnggiinneeeerriinngg 200 N. Sherman Ave., Corona . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .(951) 734-3010/FAX 951-735-2041G ##MMGG CCoonnsstt.. && DDeevv..,, IInncc.. 8900 Eton Ave., Unit C, Canoga Park . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .818-773-7350/FAX -7351G ##MMiikkee BBuubbaalloo CCoonnsstt.. 5102 Gayhurst Ave ([email protected]), Baldwin Park . . . . . . . . . . .(626) 960-7787/FAX (626) 960-7897G ##MMiikkee PPrrlliicchh && SSoonnss,, IInncc ((BBPP)) 5103 Elton St, Baldwin Park . . . . . . . . . . . . . . . . . . . . . . . . . . . .626-813-1700/FAX (626)813-1770G ##MMiinnccoo CCoonnssttrr.. ((GGaarrddeennaa)) 522 E. Airline Way, Gardena . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .310-516-8100/FAX -516-7404G ##MMllaaddeenn BBuunnttiicchh ((UUppllaanndd)) PO Box 1012 (1500 W 9th St ), Upland . . . . . . . . . . . . . . . . . . . . . . . . . . . . .909-920-9977/FAX -9905G ##OOrriioonn CCoonnsstt.. CCoorrpp.. ((VViissttaa)) 1232 Keystone Way, Vista . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .760-597-9660/FAX -9661G ##PPaauulluuss EEnnggiinneeeerriinngg 2871 E. Coronado St., Anaheim . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .(714)632-3975/FAX -5077G ##RReemmeeddiiaall CCiivviill CCoonnsstt..,, ddbbaa RRCCCC 3823 Oceanview Blvd, Montrose . . . . . . . . . . . . . . . . . . . . . . . . . . . . .(818) 952-6752/FAX -6740G ##TTaammaanngg EElleeccttrriicc 11529 Yorba Ave., Chino . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .(909) 364-8566/FAX -8416G ##VVaassiilljj CCoonnssttrruuccttiioonn 15531 Arrow Hwy., Irwindale . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .626-480-1442/FAX -1610G ##VVCCII TTeellccoomm IInncc 1921 W 11th Street, Upland . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .909-946-0905/FAX 909-946-0924G ##WWAA RRaassiicc CCoonnssttrruuccttiioonn 7314 Scout Avenue, Bell Garden . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .562-928-6111/FAX 562-928-7339G ##WWiilllliiaammss PPiippeelliinnee CCoonnttrraaccttoorrss,, IInncc.. ((VVeennttuurraa)) 4864 Market St Ste C, Ventura . . . . . . .(805) 644-1277/FAX (805) 477-0136n/a ##YY&&MM CCoonnssttrr.. 17800 S. Main St. Ste. 206, Gardena . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .310-516-9993/FAX 310-516-9994n/a ##**PPllaannHHoollddeerrssLLiisstt OOnn LLiinnee && CCoommpplleettee ppllaannss..ssddddtt..ccoomm will fax or email complete list upon request, 619-232-4381 . . . . . . . . . .

Torrey Pines & Crest Reservoir Rehabilitation Bid DeadlineDel Mar February 18, 2 pmSubmit bids to City of Del Mar. Eric Minicilli, Deputy Public Works Director, Email:[email protected], FAX: (858) 481-0254.. Estimate: $220,000.

PPllaannss AAvvaaiillaabbllee aatt hhttttpp::////ppllaannss..ssddddtt..ccoommWWoorrkk IInnvvoollvveess:: Torrey Pines & Crest Reservoir Rehabilitation: The Work consists of corrosion protec-tion (coating & lining systems) of certain portions of the Torrey Pines & Crest Reservoirs; includingCathodic Protection equipment installation & minor structural parts replacemetn/rehabilitation. Pre-Bid Mtg. to be held on Feb. 3, 1pm, Del Mar Public Works Dept. Office, 1050 Camino del Mar, Del Mar,Ca 92014. Contract Docs. available for the cost of printing from AE Scantech, Inc., 7283-H EngineerRd., San Diego, CA 92111 (858)495-0727.PPllaannhhoollddeerrss IINNCCLLUUDDEE::G ##HHeeaalleeyy CCoonnssttrruuccttiioonn 1545 Tidelands Ave., National City . . . . . . . . . . . . . . . . . . . . . . . . . . . . .(619)474-4900/FAX (619)474-2301G ##AAllvvaanndd CCoonnssttrruuccttiioonn,, IInncc.. 12344 Oak Knoll Rd. Ste. G-1, Poway . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .858-668-2830/FAX -2832

Joint Outfall H Unit 1D Trunk Sewer Rehab. Bid DeadlineSouth Gate and Bell Gardens February 18, 2 pmSubmit bids to L.A. County Sanitation District No. 2. Suren Anketell (562) 699-7411 x1618 Fax:(562)699-4515 . Estimate: $2,700,000-$3,700,000 .

TTrraannssccrriipptt PPllaann NNoo.. 2200WWoorrkk IInnvvoollvveess:: Joint Outfall H Unit 1D Trunk Sewer Rehabilitation: Rehabilitation of approximately 3,900feet of 63-inch and 100 feet of 66-inch diameter reinforced concrete pipe Joint Outfall H Unit 1D TrunkSewer with a cured-in-place pipe liner including rehabilitation of manholes and all appurtenant work. Theproject begins in Southern Avenue west of the Rio Hondo Channel at Manhole H53, then northerly in pri-vate right of way, under Firestone Boulevard, to Manhole H62 in private right of way approximately 800feet north of the Union Pacific right of way, all within the Cities of South Gate and Bell Gardens. LicenseRequired: A, C-34 or C-42. Plans/Specs available from owner, 562-908-4288x1205.

07a2746 Irrigation Upgrade Bid DeadlineLos Angeles February 18, 2:15 pm

Submit bids to Department of Transportation, MS-65(Sacra). 07a2746. Procurement and Contracts:(916) 227-6075 Fax (916) 227-1950 . Estimate: $114,495.

PPllaannss AAvvaaiillaabbllee aatt hhttttpp::////ppllaannss..ssddddtt..ccoommWWoorrkk IInnvvoollvveess:: 07a2746 Irrigation Upgrade: Irrigation upgrade in Los Angeles County. License(s)Required: Class A, C-27 or applicable specialty license will be required at time of bid opening . You candownload this Bid Package from the Internet at: http://caltrans-opac.ca.gov/contrac2.htm. For HardCopy, contact: Procurement and Contracts, (916) 227-6075 .

John F. Kennedy Park Playground Bid DeadlineEl Cajon February 22, 2 pmSubmit bids to City of El Cajon. 022-10 . Dede Porter, 619-441-1715 Email: [email protected]. Estimate: $110,000.

TTrraannssccrriipptt PPllaann NNoo.. 114411WWoorrkk IInnvvoollvveess:: John F. Kennedy Park Playground: Construct an ADA accessible playground at John F.Kennedy Park. License Required: A or C27 . Pre-Bid Mtg. to be held on Feb. 5, 10am, John F. KennedyPark, 1675 E. Madison Ave., El Cajon, CA. Contract Docs. (NR) $19 (mailing $4.95) available fromowner, (619) 441-1715.PPllaannhhoollddeerrss IINNCCLLUUDDEE::G ##HHeeaalleeyy CCoonnssttrruuccttiioonn 1545 Tidelands Ave., National City . . . . . . . . . . . . . . . . . . . . . . . . . . . . .(619)474-4900/FAX (619)474-2301G ##AAllvvaanndd CCoonnssttrruuccttiioonn,, IInncc.. 12344 Oak Knoll Rd. Ste. G-1, Poway . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .858-668-2830/FAX -2832G ##NNeeww CCeennttuurryy CCoonnsstt.. 9119 Emerald Grove Avenue (E-Mail: [email protected]), Lakeside . . .619-390-3300

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ./FAX 619-390-3311G ##SScchheeiiddeell CCoonnttrr.. && EEnngg PO Box 1796, La Mesa . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .619-593-8704/FAX 619-593-9193

Puente Hills Landfill Gas Collect. Sys. 2010 Bid DeadlineLos Angeles February 23, 2 pmSubmit bids to L.A. County Sanitation District No. 2. Joe Smisko (562) 908-4288. Estimate:$1,000,000 - $2,000,000.

TTrraannssccrriipptt PPllaann NNoo.. 9955WWoorrkk IInnvvoollvveess:: Puente Hills Landfill Gas Collection System 2010: The proposed project consists ofconstructing approximately 13,000 linear feet of gas collection trenches, 4,600 linear feet of gas col-lection header, 8 gas trench-to-header connections & 1 main haul road crossing. All landfill gas collec-tion trench installation will be conducted beneath the oder control tent. License Required: A .Mandatory Job Site Walk-Thru to be held on Jan. 14, 10am, Puente Hills Landfill Field Office, 2800 S.Workman Mill Rd.. Plans/Specs available from owner, 562-908-4288x1205.

Gateway Rd. & Innovation Way Recycled Water Pipe Bid DeadlineCarlsbad February 23, 2 pmSubmit bids to City of Carlsbad, Purchasing Officer. PWS10-27ENG. (760) 602-4677. Estimate:$600,000.

PPllaannss AAvvaaiillaabbllee aatt hhttttpp::////ppllaannss..ssddddtt..ccoommWWoorrkk IInnvvoollvveess:: Gateway Rd. & Innovation Way Recycled Water Pipelines: Construction of approxi-mately 2,343 feet of 8-inch PVC Recycled Water Pipe . Plans/Specs (NR) $35, available from owner,(760) 602-4677 .PPllaannhhoollddeerrss IINNCCLLUUDDEE::G ##CCrreesstt EEqquuiippmmeenntt,, IInncc.. 161 Scottford Drive, El Cajon . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .619-444-5061/FAX 619-444-5061G ##HHeeaalleeyy CCoonnssttrruuccttiioonn 1545 Tidelands Ave., National City . . . . . . . . . . . . . . . . . . . . . . . . . . . . .(619)474-4900/FAX (619)474-2301G ##33--DD EEnntteerrpprriisseess 11300 Sorrento Valley, San Diego . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .858-202-0410/FAX -0432S ##AAllggeerrtt EEnnggiinneeeerriinngg,, IInncc.. 728 Broadway, Chula Vista . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .(619) 420-7090/FAX -9139G ##BBaallbbooaa CCoonnsstt.. IInncc.. ((VViissttaa)) 3231C Business Park, Vista . . . . . . . . . . . . . . . . . . . . . . . . . . . . .(760) 598-2162/FAX (760) 579-1628G ##BBuurrtteecchh PPiippeelliinnee IInncc 102 Second St, Encinitas . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .(760) 634-2822/FAX -2415G ##CC..EE.. WWiillssoonn CCoorrppoorraattiioonn 662 Grand Ave., Spring Valley . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .619-464-6721/FAX 619-464-2467G ##DDoonn HHuubbbbaarrdd CCoonnttrraaccttiinngg 1015-A Linda Vista Dr., San Marcos . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .(760)736-3241/FAX -3248G ##DDoottyy BBrrooss.. EEqquuiippmmeenntt CCoo.. 11232 E. Firestone Blvd., Norwalk . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .562-345-1499/FAX -929-4518G ##EEll CCaajjoonn GGrraaddiinngg 13684 Hwy 8 / P.O. Box 967, Lakeside . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .(619)561-9840/FAX -9908G ##EErrrreeccaa’’ss IInncc PO Box 640 (12570 Slaughterhouse Canyon Rd), Lakeside . . . . . . . . . . . . . . .(619)390-6400/FAX 619-443-3002G ##HHTTAA EEnnggiinneeeerriinngg && CCoonnsstt..,, IInncc.. P.O. Box 27090 (12520 Kirkham Court #8 SD, CA 92063), San Diego . . . . . .(858)486-3240

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ./FAX (858)486-3285G ##MMuurrrriieettaa DDeevveellooppmmeenntt 42540 Rio Nedo, Temecula . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .909-719-1680/FAX -1684G ##OOrriioonn CCoonnsstt.. CCoorrpp.. ((VViissttaa)) 1232 Keystone Way, Vista . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .760-597-9660/FAX -9661n/a ##PPaacciiffiicc PPiippeelliinnee SSuuppppllyy 235 S. Pacific St., San Marcos . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .(760)471-7473/FAX -4650G ##RRaammoonnaa PPaavviinngg && CCoonnsstt.. 1303 Olive St., Ramona . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .760-788-2847/FAX 760-789-9935n/a ##SS&&JJ SSuuppppllyy CCoo..,, IInncc.. 13105 Florence Ave., Santa Fe Springs . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .562-944-7433/FAX -7224n/a ##WWeesstteerrnn WWaatteerr WWoorrkkss SSuuppppllyy 5831 Pine Ave, Chino . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .(909)597-7000/FAX (909)597-7050G ##WWiieerr CCoonnssttrruuccttiioonn 2255 Barham Dr., Escondido . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .(760) 743-1477/FAX (760) 746-5224n/a ##TTrreenncchh SShhoorriinngg CCoommppaannyy 9450 Dowdy Dr, San Diego . . . . . . . . . . . . . . . . . . . . . . . . . . . .(858) 530-2500/FAX (858) 530-0321

High Valley Pump Station Improvements Bid Deadline

Continued from Page 21B

EngineeringWork Involving Site Improvements; Streets; Highways; Bridges; Irrigation and Landscaping; Drainage,Sewage and Water Pipelines; Disposal, Purification, Utility and Wastewater Treatment Plants;Harbors, Piers and Marine Terminal Projects; Outdoor Electrification; Well Drilling and UndergroundConstruction Projects. Please Check Building, Specialties, or Subcontracts for Overlapping Bids

(G) Indicates General Contractor Requesting Sub bids(S) Indicates Subcontractor(NA) Indicates Not Available

Continues on 23B

Page 23: 20100215 construction weekprops-n.sdccd.edu/NE/News Events... · Companies that submitted proposals during the first phase now will be evaluat- ... CA 92101 † 619.231.1010 † CA

THE DAILY TRANSCRIPT® • TUESDAY, FEBRUARY 16, 2010 23B

Poway February 24, 4 pmSubmit bids to City of Poway. 10-012 . Leslie Parada:(858) 668-4641 Fax:(858) 668-1212 Email:[email protected] . Estimate: $1,700,000 .

PPllaannss AAvvaaiillaabbllee aatt hhttttpp::////ppllaannss..ssddddtt..ccoommWWoorrkk IInnvvoollvveess:: High Valley Pump Station Improvements: The work involves construction of a boost-er pumping station, related piping, surge tanks, grading, paving, drainage, landscaping, along with thedemolition and removal of an existing pump station at the same location. The existing station willremain fully functional during the pump station construction. License Required: A . Pre-Bid Conf. tobe held on Jan. 20, 9am, Main Conf. Rm., 2060, Poway City Hall, 13325 Civic Center Dr, Poway, CA92064. A site visit will follow . Plans/Specs (NR) $100, available from owner, (858) 668-4530 .PPllaannhhoollddeerrss IINNCCLLUUDDEE::G ##NNeeww CCeennttuurryy CCoonnsstt.. 9119 Emerald Grove Avenue (E-Mail: [email protected]), Lakeside . . .619-390-3300

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ./FAX 619-390-3311G ##SScchheeiiddeell CCoonnttrr.. && EEnngg PO Box 1796, La Mesa . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .619-593-8704/FAX 619-593-9193G ##33--DD EEnntteerrpprriisseess 2180 Garnet Ave., Suite 2C, San Diego . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .(858)272-3191/FAX -6089G ##CCaannyyoonn SSpprriinnggss 3001 E. Tahquitz Canyon Way #205, Palm Springs . . . . . . . . . . . . . . . . . .(760)322-5077/FAX (760) 322-5727n/a ##DDoonn HHuubbbbaarrdd CCoonnttrraaccttiinngg 1015-A Linda Vista Dr., San Marcos . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .(760)736-3241/FAX -3248G ##GGeenneessiiss CCoonnsstt.. ((HHeemmeett)) 170 E Oakland Avenue, Hemet . . . . . . . . . . . . . . . . . . . . . . . . . .951-652-6977 x754/FAX 951-925-6585G ##HHPPSS MMeecchhaanniiccaall IInncc.. 3100 East Belle Terrace, Bakersfield . . . . . . . . . . . . . . . . . . . . . . . . . . .(661)397-2121/FAX (661)396-2589G ##NNEEWWeesstt CCoonnssttrruuccttiioonn 7964 Arjons Dr Ste A, San Diego . . . . . . . . . . . . . . . . . . . . . . . . . . .(858) 537-0774/FAX (858) 537-9653G ##PPaacciiffiicc HHyyddrrootteecchh 314 E. 3rd St, Perris . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .951-943-8803/FAX 951-943-1093n/a ##PPaacciiffiicc PPiippeelliinnee SSuuppppllyy 235 S. Pacific St., San Marcos . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .(760)471-7473/FAX -4650G ##PPaallmm EEnnggiinneeeerriinngg 3770 Hancock Street Suite H, San Diego . . . . . . . . . . . . . . . . . . . . . . . . .(619) 291-1495/FAX (619) 291-0482S ##RR..LL.. EElleeccttrriicc CCoo.. PO Box 1309 (9967 Possum Creek Ln, El Cajon), Lakeside . . . . . . . . . . . . . . . . . . . .(619) 561-4506/FAX -8011G ##SScchhuulleerr EEnnggrr.. CCoorrpp.. 564 W. Bateman Circle, Corona . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .(951)738-9215/FAX -0162G ##SSCCWW CCoonnttrraaccttiinngg 2525 N. Old Hwy 395, Fallbrook . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .(760)728-1308/FAX -2517n/a ##SSiiggmmaa IInndduussttrriieess,, IInncc.. 2186 S Holly #110, Denver . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .(303) 782-6944/FAX -6964G ##SSllaatteerr,, IInncc.. 11045 Rose Ave., Fontana . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .909-822-6800/FAX -7647G ##TTeecchhnniiccaall SSyysstteemmss IInncc ((LLyynnwwoooodd)) 2303 196th St. SW Suite B, Lynwood . . . . . . . . . . . . . . .425-678-4170/FAX 425-648-4171n/a ##TTeessccoo CCoonnttrroollss 3434 52nd Ave (PO Box 239012), Sacramento . . . . . . . . . . . . . . . . . . . . . .(916)395-8800/FAX (916)429-2817G ##WWaattkkiinnss LLaannddmmaarrkk CCoonnsstt.. 2262 Carmel Valley Rd., Ste. F, Del Mar . . . . . . . . . . . . . . . . . . . . . . . . . . . .858-259-1240/FAX -1264G ##WWiieerr CCoonnssttrruuccttiioonn 2255 Barham Dr., Escondido . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .(760) 743-1477/FAX (760) 746-5224G ##RRMMRR CCoonnsstt.. 3447 Steele Canyon Rd., Spring Valley . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .(619)669-6995/FAX -6997S ##CCDDEE EElleeccttrriicc 3093 Rancho Del Sol, Escondido . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .760-505-3123/FAX 760-739-1112

Install County Owned Miracle Playground Equip Bid DeadlineLa Quinta February 25, 1:30 pmSubmit bids to County of Riverside - Purchasing & Materials. PKARC-086. Debra Macias, ProcurementContract Specialist, (951) 955-4814 Email:[email protected] . Estimate: $35,000.

PPllaannss AAvvaaiillaabbllee aatt hhttttpp::////ppllaannss..ssddddtt..ccoommWWoorrkk IInnvvoollvveess:: Install County Owned Miracle Playground Equipment, in addition Contractor shallinstall new Rubberized Surfacing & Engineered Wood Fiber Chips for Lake Cahuilla Recreation Area.The Contractor shall furnish all labor, supervision, materials, parts, tools, equipment, storage, trans-portation and services necessary to remove and dispose of all existing playground equipment, rubber-ized surfacing and top four inches of engineered wood fibar chips.Contractor shall replace with exactsame, playground equipment, rubberized surfacing and engineered wood fibar chips in strict accor-dance with Appendix A pages 15 – 29, the drawing (page 29) rubberized surfacing and engineeredwood fibar chips. All playground equipment shall be purchased by the Park District and delivered byMiracle Playground Equipment. All engineered wood fibar chips and rubberized surfacing materialsshall be provided by the installation Contractor. License Required: A . Mandatory Pre-Bid Conf. to beheld on Feb. 11, 10am, Lake Cahuilla Recreation Area, 58-075 Jefferson Ave, La Quinta, CA 92253.Bring bid packet to conf. Complete package may be obtained from the Riverside County Purchasingand Material Services Department, free of charge. www.purchasing.co.riverside.ca.us .

Downtown San Diego Quiet Zone Bid DeadlineSan Diego February 25, 2 pmSubmit bids to City of San Diego-Purchasing and Contracting Dept.. K103579RDA. ClementinaGiordano:(619) 235-5227 Fax:(619) 236-5904 Email: [email protected]. Estimate:$12,000,000.

PPllaannss AAvvaaiillaabbllee aatt hhttttpp::////ppllaannss..ssddddtt..ccoommWWoorrkk IInnvvoollvveess:: Downtown San Diego Quiet Zone: The Work involves furnishing all labor, materials,equipment,services, and construction for the Construction of Safety Enhancements at various down-town atgrade rail crossings within and adjacent the downtown railway corridor. The work includes theconstruction of railroad signaling, traffic signals and modifications to existing signals, railroad inter-connections, medians, curb ramps, detectable warning, curb and gutter, sidewalk, roadway modifica-tions, fencing, pedestrian gates, signing and striping, storm drain modifications, AC and PCC pavingand tubular steel railing and all other incidental work and appurtenances. License Required: A . Pre-Bid Conf. to be held on Jan. 26, 1:30pm, CCDC’s offices in the Board Rm., 401 B St, Ste 400, San Diego,CA 92101. Available for download from the City of San Diego Website: http://www.sandiego.gov/,select Bids & Contracts, then select City Projects on ebidboard. For further info, contact: 619-236-6000.PPllaannhhoollddeerrss IINNCCLLUUDDEE::

G ##WWiieerr CCoonnssttrruuccttiioonn 2255 Barham Dr., Escondido . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .(760) 743-1477/FAX (760) 746-5224G ##33--DD EEnntteerrpprriisseess 11300 Sorrento Valley, San Diego . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .858-202-0410/FAX -0432G ##DDaalleeyy CCoorrpp.. 5370 Eastgate Mall, San Diego . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .858-642-7500/FAX -9269G ##HHaazzaarrdd CCoonnsstt.. ((SSDD)) 6465 Mar Industry Pl, San Diego . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .(858)587-3600/FAX (858)453-6034G ##HHMMSS CCoonnsstt.. ((VViissttaa)) 1047 La Mirada Court, Vista . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .760-727-9808/FAX 760-727-9806S ##JJ..CC.. EEnnvviirroonnmmeennttaall CCoo..,, IInncc.. 2504 Transportation Ave., National City . . . . . . . . . . . . . . . . . . . . . . . . . .619-477-4416/FAX -4420S ##LLeekkooss EElleeccttrriicc 1370 Pioneer Way, El Cajon . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .(619)447-7661/FAX 619-447-0402G ##MMaassss EElleeccttrriicc CCoonnsstt.. CCoo.. ((LLVV)) 1925 Wright Ave., Ste. C, La Verne . . . . . . . . . . . . . . . . . . . . . . . . . . . . .909-962-6001/FAX -6002S ##PPrreemmiiuumm CCoonnccrreettee PO Box 15733, San Diego . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .619-301-2399/FAX -2523S ##RRaaiill SSiiggnnaall SSyysstteemmss CCoorrppoorraattiioonn 2425 Great Southwest Parkway, Ft. Worth . . . . . . . . .(817) 595-3503/FAX (817) 595-3594S ##TTeerrrraa WWeesstt IInncc.. 1061 Tierra del Rey Ste 204, Chula Vista . . . . . . . . . . . . . . . . . . . . . . . . . .(619) 591-1007/FAX (619) 568-3475G ##WWeesstteerrnn RRiimm CCoonnsstt.. ((EEssccoonn)) 912 S. Andreasen Dr. #108, Escondido . . . . . . . . . . . . . . . . . . . . . . . . . .(760)489-4328/FAX -4304n/a ##XXoorraaiill CCoonnssttrruuccttiioonn SSeerrvviicceess 5011 Gate Parkway Bldg. 100, Ste. 400, Jacksonville . . . . . . . . . . . . . . . . . . . . . .(904) 443-0083S ##KKiirrkk PPaavviinngg,, IInncc.. 8722 Winter Gardens Blvd., Lakeside . . . . . . . . . . . . . . . . . . . . . . . . . . . . .(619)938-9958/FAX (619) 938-0767

Little Italy Public Improvements Bid DeadlineSan Diego February 26, 2 pmSubmit bids to City of San Diego-Purchasing and Contracting Dept.. K105029RDA. ClementinaGiordano:(619) 235-5227 Fax:(619) 236-5904 Email: [email protected] . Estimate: $1,060,632.

PPllaannss AAvvaaiillaabbllee aatt hhttttpp::////ppllaannss..ssddddtt..ccoommWWoorrkk IInnvvoollvveess:: Little Italy Public Improvements: The Work involves furnishing all labor, materials,equipment, services, and construction for the sidewalks, curbs, gutters, driveways, pedestrian ramps,and street trees and all other incidental work and appurtenances. License Required: A . Pre-Bid Conf.to be held on Jan. 21, 9am, Center City Dev. Corp., 401 B St., Ste. 400, San Diego, CA 92101. Availablefor download from the City of San Diego Website: http://www.sandiego.gov/, select Bids & Contracts,then select City Projects on ebidboard. For further info, contact: 619-236-6000.PPllaannhhoollddeerrss IINNCCLLUUDDEE::G ##SScchheeiiddeell CCoonnttrr.. && EEnngg PO Box 1796, La Mesa . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .619-593-8704/FAX 619-593-9193G ##SSiinnggllee EEaaggllee,, IInncc.. 12599 Stotler Ct., Poway . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .858-679-5550/FAX 858-486-9272G ##KKoocchh--AArrmmssttrroonngg GGEE PO Box 1190 (9709 Airport Vista Rd #A,), Santee . . . . . . . . . . . . . . .(619)561-2005/FAX (619)561-0317G ##NNeeww CCeennttuurryy CCoonnsstt.. 9119 Emerald Grove Avenue (E-Mail: [email protected]), Lakeside . . .619-390-3300

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ./FAX 619-390-3311G ##HHAARR CCoonnsstt.. 1480 Frontage Road, Chula Vista . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .(619) 575-5995/FAX (619) 575-5814n/a ##11AA TTrreenncchh SShhoorriinngg CCoommppaannyy 9450 Dowdy Dr, San Diego . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .(760) 250-7799G ##33--DD EEnntteerrpprriisseess 11300 Sorrento Valley, San Diego . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .858-202-0410/FAX -0432n/a ##AAccee EElleeccttrriicc PO Box 601071/6061 Fairmount Ave, San Diego . . . . . . . . . . . . . . . . . . . . . . . .(619)521-9740/FAX (619)571-9742G ##HHeefffflleerr CCoo.. 1800 McKinley Ave. Ste. A, National City . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .619-336-0800/FAX -0806G ##HHTTAA EEnnggiinneeeerriinngg && CCoonnssttrruuccttiioonn,, IInncc 12520 Kirkham Ct. Suite 8, Poway . . . . . . . . . . . . . . . . . . . . .(858) 486-3240/FAX 3285S ##JJ..CC.. EEnnvviirroonnmmeennttaall CCoo..,, IInncc.. 2504 Transportation Ave., National City . . . . . . . . . . . . . . . . . . . . . . . . . .619-477-4416/FAX -4420G ##LL..BB.. CCiivviill CCoonnssttrruuccttiioonn IInncc 10650 Treena St., Ste 212, San Diego . . . . . . . . . . . . . . . . . . . . . . . . . . . .(858) 578-5222/FAX -5226G ##PPaallmm EEnnggiinneeeerriinngg 3770 Hancock Street Suite H, San Diego . . . . . . . . . . . . . . . . . . . . . . . . .(619) 291-1495/FAX (619) 291-0482S ##PPrreecciissiioonn LLaannddssccaappee MMaaiinntteennaannccee 5730 Kearny Villa Rd., San Diego . . . . . . . . . . . . . . . . . . . . . . . . . .858-560-1800/FAX -1622S ##PPrreemmiiuumm CCoonnccrreettee PO Box 15733, San Diego . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .619-301-2399/FAX -2523n/a ##RRiicckk EEnnggiinneeeerriinngg CCoo.. 5620 Friars Rd., San Diego . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .(619) 291-0707/FAX -4165G ##RRoossssii CCoonnccrreettee 31565 Rancho Pueblo Rd., Ste. 200, Temecula . . . . . . . . . . . . . . . . . . . . . . . .909-693-5006/FAX 909-693-5106S ##SSiieerrrraa LLaannddssccaappee 73-771 Dinah Shore Dr., Suite 200, Palm Desert . . . . . . . . . . . . . . . . . .(760) 328-8900/FAX (760) 969-4742n/a ##SSnniippeess--DDyyee AAssssoocciiaatteess,, IInncc.. 8438 Center Dr., Ste. G, La Mesa . . . . . . . . . . . . . . . . . . . . . . . . .619-697-9234/FAX 619-460-2033n/a ##SSoouutthh BBaayy FFoouunnddrryy ((SSDD)) 9444 Abraham Way, San Diego . . . . . . . . . . . . . . . . . . . . . . . . . . . . .619-956-2780/FAX 619-956-2788n/a ##SSoouutthh BBaayy FFoouunnddrryy 9444 Abrham Way, Santee . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .(619) 956-2780/FAX -2788S ##TTeerrrraa WWeesstt IInncc.. 1061 Tierra del Rey Ste 204, Chula Vista . . . . . . . . . . . . . . . . . . . . . . . . . .(619) 591-1007/FAX (619) 568-3475G ##TTrrii--GGrroouupp CCoonnsstt.. && DDeevv..,, IInncc.. 13939 Poway Rd. Ste. 10, Poway . . . . . . . . . . . . . . . . . . . . . . .858-679-0843/FAX 858-679-5359G ##WWiieerr CCoonnssttrruuccttiioonn 2255 Barham Dr., Escondido . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .(760) 743-1477/FAX (760) 746-5224S ##KKiirrkk PPaavviinngg,, IInncc.. 8722 Winter Gardens Blvd., Lakeside . . . . . . . . . . . . . . . . . . . . . . . . . . . . .(619)938-9958/FAX (619) 938-0767

B St Pier and Broadway Pier Cold Ironing Bid DeadlineSan Diego March 1, 2 pmSubmit bids to Port of San Diego. 2009-28. Carlos Santiago:(619) 686-6235 Fax:(619) 725-6014Email: [email protected] . Estimate: $2,650,000.

TTrraannssccrriipptt PPllaann NNoo.. 4466WWoorrkk IInnvvoollvveess:: B Street Pier and Broadway Pier Cold Ironing: Furnishing all labor, materials, power,equipment, tools, transportation and supervision necessary to construct, complete in place proprietaryPort District Provided equipment and required interconnection to provide cold ironing facilities tocruise ships as indicated on the project plans and as specified in the Technical Specifications. . Pre-BidMtg. to be held on Feb. 10, 10am, Port of S.D. Admin. Bldg., 3165 Pacific Hwy, San Diego, CA 92101.Plans/Specs (NR) $80, available from owner, (619) 686-6235.PPllaannhhoollddeerrss IINNCCLLUUDDEE::S ##KKiirrkk PPaavviinngg,, IInncc.. 8722 Winter Gardens Blvd., Lakeside . . . . . . . . . . . . . . . . . . . . . . . . . . . . .(619)938-9958/FAX (619) 938-0767

Continued from Page 22B

EngineeringWork Involving Site Improvements; Streets; Highways; Bridges; Irrigation and Landscaping; Drainage,Sewage and Water Pipelines; Disposal, Purification, Utility and Wastewater Treatment Plants;Harbors, Piers and Marine Terminal Projects; Outdoor Electrification; Well Drilling and UndergroundConstruction Projects. Please Check Building, Specialties, or Subcontracts for Overlapping Bids

(G) Indicates General Contractor Requesting Sub bids(S) Indicates Subcontractor(NA) Indicates Not Available

Continues on 24B

Page 24: 20100215 construction weekprops-n.sdccd.edu/NE/News Events... · Companies that submitted proposals during the first phase now will be evaluat- ... CA 92101 † 619.231.1010 † CA

THE DAILY TRANSCRIPT® • TUESDAY, FEBRUARY 16, 201024B

TVRWF Effluent Storage Expansion Bid DeadlineTemecula March 2, 2 pmSubmit bids to Eastern Municipal Water Dist.. 1148S. Mr. Siva Sivapalan c/o Teresa Appelt/LyndaStanley; FAX:951-928-6111, Email: [email protected] & [email protected] . Estimate:$11,000,000-$15,000,000 .

PPllaannss AAvvaaiillaabbllee aatt hhttttpp::////ppllaannss..ssddddtt..ccoommWWoorrkk IInnvvoollvveess:: TVRWF Effluent Storage Expansion: The work comprises construction of, modificationof, and addition to yard structures, Out of Compliance Storage ponds, Secondary Equalization ponds,Tertiary Effluent Storage ponds, Out of Compliance Bypass Pump Station, all appurtenances relatedto these processes, and all associated electrical, instrumentation, control systems, yard piping, pavingand grading, and other work detailed in the project drawings and specifications. License Required: A. Mandatory Pre-Bid Mtg. to be held on Feb. 4, 9am, 42565 Avenida Alvarado, Temecula, CA 92590.Contract Docs. available from owner by mail service only. (NR) $135.94. To order, contact TeresaApplet/Lynda Stanley (951) 928-3777 ext. 4527 or 4352.PPllaannhhoollddeerrss IINNCCLLUUDDEE::G ##EEddggee DDeevv..,, IInncc.. 27368 Via Industria Ste. 101, Temecula . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .(951)296-0776/FAX -0775

Church St. Parkway L/S Rochester Ave to Hyssop Dr. Bid DeadlineRancho Cucamonga March 2, 2 pmSubmit bids to City of Rancho Cucamonga-Engineering. Romeo David:(909) 477-2740 Fax:(909) 477-2746 Email: [email protected] . Estimate: $153,000 .

TTrraannssccrriipptt PPllaann NNoo.. 5511WWoorrkk IInnvvoollvveess:: Church St. Parkway Landscape from Rochester Ave to Hyssop Dr: The scope of workto be performed in general consists of, but not limited to, planting of trees and shrubs, installation ofirrigation and controllers, water meter and miscellaneous landscaping. License Required: A or C-27 .Mandatory Pre-Bid Conf. to be held on Feb. 18, 2pm, City Hall. Tri-Communities Conference Room .Plans/Specs (NR) $35, available from owner, (909)477-2740.

Mast Blvd. Recycled Water Replace. Bid DeadlineSan Diego March 3, 10 amSubmit bids to Padre Dam Municipal Water District. JN 209003. Robin Bier, P.E., Project Engineer,(619) 258-4646. Estimate: $546,000.

TTrraannssccrriipptt PPllaann NNoo.. 4422WWoorrkk IInnvvoollvveess:: Mast Blvd. Recycled Water Replacement. Pre-Bid Conf. to be held on Feb. 16, 10am,District’s Admin. Office Board Rm., 9300 Fanita Parkway, Santee, CA 92072. Bid Docs. (NR) $40, avail-able from the District, (619) 258-4635.PPllaannhhoollddeerrss IINNCCLLUUDDEE::G ##HHeeaalleeyy CCoonnssttrruuccttiioonn 1545 Tidelands Ave., National City . . . . . . . . . . . . . . . . . . . . . . . . . . . . .(619)474-4900/FAX (619)474-2301G ##CCrreesstt EEqquuiippmmeenntt,, IInncc.. 161 Scottford Drive, El Cajon . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .619-444-5061/FAX 619-444-5061S ##KKiirrkk PPaavviinngg,, IInncc.. 8722 Winter Gardens Blvd., Lakeside . . . . . . . . . . . . . . . . . . . . . . . . . . . . .(619)938-9958/FAX (619) 938-0767G ##AA..MM.. OOrrtteeggaa 10125 Channel Road, Lakeside . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .(619)390-1988/FAX (619)390-1941G ##SScchheeiiddeell CCoonnttrr.. && EEnngg PO Box 1796, La Mesa . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .619-593-8704/FAX 619-593-9193G ##SSttrraaiigghhtt LLiinnee GGCC 4747-C Oceanside Blvd, Oceanside . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .(760)630-7112/FAX (760)630-7662

Water Group Job 911 Bid DeadlineSan Diego March 3, 2 pmSubmit bids to City of San Diego-Purchasing and Contracting Dept.. K104696C. Dwayne Abbey:(619)533-5154 Fax:(619) 533-5176 Email: [email protected] . Estimate: $1,696,214 .

PPllaannss AAvvaaiillaabbllee aatt hhttttpp::////ppllaannss..ssddddtt..ccoommWWoorrkk IInnvvoollvveess:: Water Group Job 911: The work involves furnishing all labor, materials, equipment,services, and construction for the Water Group Job 911 consisting of replacing 1,930 linear-feet of 6-inch CI Water Main, 4,110 linear feet of 8-inch CI Water Main to be replaced with 8-inch PVC pipesand new alignment of 500 linear feet of 8-inch PVC main along Alleghany Street, between CalleSerena and Calle Tourtosa; and all other work and appurtenances. License Required: A or C-31 and C-34. Available for download from the City of San Diego Website: http://www.sandiego.gov/, select Bids &Contracts, then select City Projects on ebidboard. For further info, contact: 619-236-6000.PPllaannhhoollddeerrss IINNCCLLUUDDEE::G ##33--DD EEnntteerrpprriisseess 11300 Sorrento Valley, San Diego . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .858-202-0410/FAX -0432G ##AArrrriieettaa CCoonnsstt.. 1215 N. Marshall Ave., El Cajon . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .(619)448-7683/FAX -1287G ##BBaallbbooaa CCoonnsstt.. IInncc.. ((VViissttaa)) 3231C Business Park, Vista . . . . . . . . . . . . . . . . . . . . . . . . . . . . .(760) 598-2162/FAX (760) 579-1628G ##BBaassiillee CCoonnssttrruuccttiioonn,, IInncc.. 7952 Armour St., San Diego . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .858-586-7800/FAX -7809S ##DDeellttaa SSuurrvveeyyiinngg && MMaappppiinngg 39305 Salinas Dr., Murrieta . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .951-764-0158/FAX 951-816-3235n/a ##HHDD SSuuppppllyy 1560 Linda Vista Dr., San Marcos . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .(760) 744-5600/FAX (760) 471-3621G ##HHPPSS MMeecchhaanniiccaall IInncc.. 3100 East Belle Terrace, Bakersfield . . . . . . . . . . . . . . . . . . . . . . . . . . .(661)397-2121/FAX (661)396-2589G ##OOrriioonn CCoonnsstt.. CCoorrpp.. ((VViissttaa)) 1232 Keystone Way, Vista . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .760-597-9660/FAX -9661G ##OOrrttiizz CCoorrpp.. 788 Energy Way, Chula Vista . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .619-482-2076/FAX 1604G ##PPaallmm EEnnggiinneeeerriinngg 3770 Hancock Street Suite H, San Diego . . . . . . . . . . . . . . . . . . . . . . . . .(619) 291-1495/FAX (619) 291-0482G ##PPuullllmmaann EEnnggiinneeeerriinngg 7330 Opportunity Rd., Ste. A, San Diego . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .(858)576-1500/FAX -1115G ##SScchheeiiddeell CCoonnttrr.. && EEnngg PO Box 1796, La Mesa . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .619-593-8704/FAX 619-593-9193S ##TTeerrrraa WWeesstt IInncc.. 1061 Tierra del Rey Ste 204, Chula Vista . . . . . . . . . . . . . . . . . . . . . . . . . .(619) 591-1007/FAX (619) 568-3475

G ##WWiieerr CCoonnssttrruuccttiioonn 2255 Barham Dr., Escondido . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .(760) 743-1477/FAX (760) 746-5224S ##KKiirrkk PPaavviinngg,, IInncc.. 8722 Winter Gardens Blvd., Lakeside . . . . . . . . . . . . . . . . . . . . . . . . . . . . .(619)938-9958/FAX (619) 938-0767

Palm Ave. at Alameda Blvd. Street Improvements Bid DeadlineCoronado March 3, 2 pmSubmit bids to City of Coronado. 10-CO-ES-440. (619) 522-7383. Estimate: $60,000.

PPllaannss AAvvaaiillaabbllee aatt hhttttpp::////ppllaannss..ssddddtt..ccoommWWoorrkk IInnvvoollvveess:: Palm Ave. at Alameda Blvd. Street Improvements - License Required: A, C-12 or C-32.Pre-Bid Conf. to be held on Feb. 24, 10am, City Hall, 1825 Strand Way, Coronado, CA . Bid Docs. (NR)$20, available from owner. Download available to bidders. Request by contacting Eng. & Project Dev.Dept. & requesting an email link. (619) 522-7383.

Traffic Signal & Light. I/S Walnut Ave. & Sherman Bid DeadlineRiverside March 3, 2 pmSubmit bids to County of Riverside - Transportation Annex. B9-0986. (951) 955-6780. Estimate:$190,000 - $220,000.

TTrraannssccrriipptt PPllaann NNoo.. 99WWoorrkk IInnvvoollvveess:: Traffic Signal & Lighting at the Intersection of Walnut Ave. & Sherman Ave. - LicenseRequired: A or C-10. Bid Docs. (NR) $20, available from owner, (951) 955-6780. For further info:www.tlma.co.riverside.ca.us/trans.

FY09/10 ADA Barrier Removal - Hilleary Park Bid DeadlinePoway March 3, 4 pmSubmit bids to City of Poway. 10-013 . Melody Rocco:(858) 668-4622 Fax:(858) 668-1212 Email:[email protected] . Estimate: $15,000 .

PPllaannss AAvvaaiillaabbllee aatt hhttttpp::////ppllaannss..ssddddtt..ccoommWWoorrkk IInnvvoollvveess:: FY09/10 ADA Barrier Removal - Hilleary Park: This project involves upgrading exist-ing public facilities at Hilleary Park, located at 13500 Community Road, to meet current ADA require-ments. Construction includes relocation of existing handrails to the correct height, installation ofhandrail extensions and detectable warning striping on stairways. License Required: A or C60 . Pre-Bid Mtg. to be held on Feb. 23, 10am, Main Conf Rm 2060, Poway City Hall, 13325 Civic Center Dr,Poway, CA 92064 . Bid Docs. Available for download from: http://www.ci.poway.ca.us/. SelectBusiness, Bids & Contracts, & then Current Construction Projects Out to Bid (ebidboard).PPllaannhhoollddeerrss IINNCCLLUUDDEE::G ##NNeeww CCeennttuurryy CCoonnsstt.. 9119 Emerald Grove Avenue (E-Mail: [email protected]), Lakeside . . .619-390-3300

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ./FAX 619-390-3311G ##HHeeaalleeyy CCoonnssttrruuccttiioonn 1545 Tidelands Ave., National City . . . . . . . . . . . . . . . . . . . . . . . . . . . . .(619)474-4900/FAX (619)474-2301G ##SScchheeiiddeell CCoonnttrr.. && EEnngg PO Box 1796, La Mesa . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .619-593-8704/FAX 619-593-9193

Pipeline Project 2134 Bid DeadlineLa Mesa March 4, 10 amSubmit bids to Helix Water District. Chris McRae:(619) 667-6278 Fax:(619) 667-6235 Email:[email protected] . Estimate: $1,110,000 .

PPllaannss AAvvaaiillaabbllee aatt hhttttpp::////ppllaannss..ssddddtt..ccoommWWoorrkk IInnvvoollvveess:: Pipeline Project 2134 - License Required: A or C-34. Plans/Specs (NR) $35, availablefrom owner, (619) 466-0585.PPllaannhhoollddeerrss IINNCCLLUUDDEE::G ##SScchheeiiddeell CCoonnttrr.. && EEnngg PO Box 1796, La Mesa . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .619-593-8704/FAX 619-593-9193

Community of Highgrove Center Street Trunk Sewer Bid DeadlineRiverside March 4, 2 pmSubmit bids to County of Riverside - Redevelopment Agency. Andy Frost (951) 955-6619. Estimate:$5,200,000.

DDooccuummeennttss NNoott OOnn FFiilleeWWoorrkk IInnvvoollvveess:: Community of Highgrove Center Street Trunk Sewer - License Required: A or C-34.Plans/Specs available after Feb. 9 (NR) $75 (mailing $10) from Krieger & Stewart, Inc., 3602University Ave., Riverside, CA 92501 (951) 684-6900 .

Undergrounding Utilities of Black 2E, Ph. II Bid DeadlineSan Diego March 9, 2 pmSubmit bids to City of San Diego-Purchasing and Contracting Dept.. K104949C. (619) 236-6000.Estimate: $4,235,500.

PPllaannss AAvvaaiillaabbllee aatt hhttttpp::////ppllaannss..ssddddtt..ccoommWWoorrkk IInnvvoollvveess:: Undergrounding Utilities of Black 2E, Phase II: The work involves furnishing all labor,materials, equipment, services, and for the Construction of Undergrounding Utilities of Block 2EUtilities, Phase II in the Mission Hills Area. This Work Includes but is not limited to Traffic Control,

Continued from Page 23B

EngineeringWork Involving Site Improvements; Streets; Highways; Bridges; Irrigation and Landscaping; Drainage,Sewage and Water Pipelines; Disposal, Purification, Utility and Wastewater Treatment Plants;Harbors, Piers and Marine Terminal Projects; Outdoor Electrification; Well Drilling and UndergroundConstruction Projects. Please Check Building, Specialties, or Subcontracts for Overlapping Bids

(G) Indicates General Contractor Requesting Sub bids(S) Indicates Subcontractor(NA) Indicates Not Available

Continues on 25B

Page 25: 20100215 construction weekprops-n.sdccd.edu/NE/News Events... · Companies that submitted proposals during the first phase now will be evaluat- ... CA 92101 † 619.231.1010 † CA

THE DAILY TRANSCRIPT® • TUESDAY, FEBRUARY 16, 2010 25B

Excavation and installation of conduits, pull ropes inside conduits, installation of concrete pads andpanels, Traffic Loops, Trench Slurry Backfill, Concrete Trench Cap, In kind Landscape and HardscapeReplacement, Sidewalk Curb and Gutter Replacement and other Related Work as Indicated on theAttached Drawings Appendix O and all other Work and Appurtenances. License Required: A . Pre-BidMtg. to be held on Feb. 17, 10am, Conf. Rm., 2nd Floor, 1200 3rd Ave, San Diego, CA 92101. Availablefor download from the City of San Diego Website: http://www.sandiego.gov/, select Bids & Contracts,then select City Projects on ebidboard. For further info, contact: 619-236-6000.PPllaannhhoollddeerrss IINNCCLLUUDDEE::G ##SScchheeiiddeell CCoonnttrr.. && EEnngg PO Box 1796, La Mesa . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .619-593-8704/FAX 619-593-9193

Beech Ave. & Home Plant Lift Station Infl. Sewer Bid DeadlineCarlsbad March 9, 2 pmSubmit bids to City of Carlsbad. PWS10-29UTIL . Mark Biskup:(760) 602-2763 Fax:(760) 602-8562Email: [email protected] . Estimate: $2,300,000 .

PPllaannss AAvvaaiillaabbllee aatt hhttttpp::////ppllaannss..ssddddtt..ccoommWWoorrkk IInnvvoollvveess:: Beech Avenue & Home Plant Lift Station Influent Sewer Replacement: The work to bedone shall consist of furnishing all labor, equipment and materials, and performing all operations nec-essary to complete the Project Work as shown on the Project Plans and as specified in theSpecifications. The work generally includes the construction of approximately 1,374 linear feet of new8-inch and 12-inch sewer pipeline with manholes along Beech Avenue, by trenchless and open cut con-struction methods and the construction of approximately 215 linear feet of new 15-inch influent sewerpipeline with manholes for the existing Home Plant Lift Station, by trenchless and open cut construc-tion methods. License Required: A . Plans/Specs (NR) $60, available from owner (760) 602-4677. Alsoavailable for download from: City of Carlsbad website: http://www.carlsbadca.gov/business/contract-ing/Pages/default.aspx Select Bids/Contracts.PPllaannhhoollddeerrss IINNCCLLUUDDEE::G ##BBaallbbooaa CCoonnsstt.. IInncc.. ((VViissttaa)) 3231C Business Park, Vista . . . . . . . . . . . . . . . . . . . . . . . . . . . . .(760) 598-2162/FAX (760) 579-1628G ##BBuurrtteecchh PPiippeelliinnee IInncc 102 Second St, Encinitas . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .(760) 634-2822/FAX -2415G ##CCCCLL CCoonnttrraaccttiinngg 1938 Don Lee Place, Escondido . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .(760) 743-2254/FAX 7251G ##CChhaarrlleess KKiinngg CCoo.. 2841 Gardena Ave, Signal Hill . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .(562)426-2974/FAX -9714n/a ##DDoonn HHuubbbbaarrdd CCoonnttrraaccttiinngg 1015-A Linda Vista Dr., San Marcos . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .(760)736-3241/FAX -3248G ##HHPPSS MMeecchhaanniiccaall IInncc.. 3100 East Belle Terrace, Bakersfield . . . . . . . . . . . . . . . . . . . . . . . . . . .(661)397-2121/FAX (661)396-2589S ##HHyyddrrooqquuiipp DDeewwaatteerriinngg CCoorrpp.. 9355 Stewart & Gray Rd., Downey . . . . . . . . . . . . . . . . . . . . . .562-755-5802/FAX 562-690-9500S ##KK&&SS EEnnggiinneeeerriinngg 7801 Mission Ctr. Ct. #100, San Diego . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .619-296-5565/FAX -5564G ##NNEEWWeesstt CCoonnssttrruuccttiioonn ((SSDD)) 7847 Dunbrook Rd., Ste. C, San Diego . . . . . . . . . . . . . . . . . .(858) 537-0774/FAX (858) 537-9653n/a ##PPaacciiffiicc PPiippeelliinnee SSuuppppllyy 235 S. Pacific St., San Marcos . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .(760)471-7473/FAX -4650n/a ##SS&&JJ SSuuppppllyy CCoo..,, IInncc.. ((MMuurrrriieettaa)) 35246 Antelope Rd., Murrieta . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .951-301-4030/FAX -4061G ##TTCC CCoonnsstt..,, IInncc.. ((SSaanntteeee)) 10540 Prospect Ave., Santee . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .619-448-4560/FAX -3341G ##VVaaddnnaaiiss CCoorrppoorraattiioonn 2130 La Mirada Drive, Vista . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .(858)551-1460/FAX (858)550-1470G ##WWeesstt--TTeecchh CCoonnttrraaccttiinngg 568 N. Tulip Street, Escondido . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .(760)233-2570/FAX -2580n/a ##WWeesstteerrnn WWaatteerrwwoorrkkss SSuuppppllyy CCoo.. 5831 Pine Ave., Chino Hills . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .909-606-7733/FAX -7538G ##WWiieerr CCoonnssttrruuccttiioonn 2255 Barham Dr., Escondido . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .(760) 743-1477/FAX (760) 746-5224

2010 Water Meter Purchase & Replacement Bid DeadlineCarlsbad March 9, 2 pmSubmit bids to City of Carlsbad. PWS10-30UTIL. Mario Remillard:(760) 438-2722 Fax:(760) 431-1601Email: [email protected] . Estimate: $3,934,814.40.

PPllaannss AAvvaaiillaabbllee aatt hhttttpp::////ppllaannss..ssddddtt..ccoommWWoorrkk IInnvvoollvveess:: 2010 Water Meter Purchase & Replacement: Remove old water meters, provide andinstall new water meters per the published specifications and provisions. License(s) Required: A, C-34,C-36. Pre-Bid Mtg. to be held on Feb. 18, 2pm, 5950 El Camino Real, Carlsbad, CA 92008. Plans/Specs(NR) $20, available from owner, (760) 602-4677.PPllaannhhoollddeerrss IINNCCLLUUDDEE::G ##33--DD EEnntteerrpprriisseess 11300 Sorrento Valley, San Diego . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .858-202-0410/FAX -0432G ##AAllll SSttaarr SSeerrvviicceess 12250 El Camino Real Ste. 300, San Diego . . . . . . . . . . . . . . . . . . . . . . .(858)259-0900/FAX (858)259-9350G ##BBuurrtteecchh PPiippeelliinnee IInncc 102 Second St, Encinitas . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .(760) 634-2822/FAX -2415G ##DDoonn HHuubbbbaarrdd CCoonnttrraaccttiinngg 1015-A Linda Vista Dr., San Marcos . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .(760)736-3241/FAX -3248n/a ##FFeerrgguussoonn WWaatteerrwwoorrkkss ((PPoowwaayy)) 11909 Tech Center Ct., Poway . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .(858) 391-3700/FAX -5958G ##MMuueelllleerr SSeerrvviiccee CCoo.. 2004 Wood Ct. Ste. C, Plant City . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .G ##NNEEWWeesstt CCoonnssttrruuccttiioonn ((SSDD)) 7847 Dunbrook Rd., Ste. C, San Diego . . . . . . . . . . . . . . . . . .(858) 537-0774/FAX (858) 537-9653G ##SScchhiilllliinngg CCoorrpp.. 697 Greenfield Dr., El Cajon . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .619-579-6500/FAX -3733G ##TTrrii--GGrroouupp CCoonnsstt.. && DDeevv..,, IInncc.. 13939 Poway Rd. Ste. 10, Poway . . . . . . . . . . . . . . . . . . . . . . .858-679-0843/FAX 858-679-5359n/a ##WWeesstteerrnn WWaatteerr WWoorrkkss 601 Front St., El Cajon . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .909-606-7533/FAX -7538G ##WWiieerr CCoonnssttrruuccttiioonn 2255 Barham Dr., Escondido . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .(760) 743-1477/FAX (760) 746-5224

Aerial Signaling & Fiber Optic Installation Bid DeadlineSan Diego March 9, 2:30 pmSubmit bids to SANDAG. CIP 1210001. Technical Questions: Angel Morales Email: [email protected] Questions: Louise Torio Email: [email protected] . Estimate: $7,290,920.

TTrraannssccrriipptt PPllaann NNoo.. 4455WWoorrkk IInnvvoollvveess:: Aerial Signaling & Fiber Optic Installation: The work consists in general of furnishing

and installing overhead and underground railroad signaling and fiber optic cables. License Required: Aor C-10. Pre-Bid Mtg. to be held on Feb. 3, 2:30pm, the offices of Kimley-Horn, 401 B Street, 6th Floor,Wells Fargo Building (same building as SANDAG) . Contract Docs. (NR) $35, available from owner,(619) 699-1923. Further info can be found at www.sandag.org .

STWTP Incompatible Materials Bid DeadlineSan Jose March 10, 2 pmSubmit bids to Santa Clara Valley Water District. C0559. Project Manager: Ms. Lee Ann, Email: [email protected] (408) 265-2607 ext 2026. Process Questions: District Plan Room (408) 265-2607, ext 3088 Email: [email protected] . Estimate: $2,800,000 - $3,500,000.

PPllaannss AAvvaaiillaabbllee aatt hhttttpp::////ppllaannss..ssddddtt..ccoommWWoorrkk IInnvvoollvveess:: Santa Teresa Water Treatment Plant Incompatible Materials: The work includes, butis not limited to, the following: Perform site survey and prepare piping shop drawings for the existingchemical trenches to meet hazardous permitting requirements. Replace existing steel and concretetrench covers and replace with fiberglass trench covers. Install temporary chemical piping system tomeet plant operational requirements during construction to include but not be limited to doublecon-tained piping, leak detection ports, pedestrian safety bridges and piping support system. Remove tem-porary chemical piping system prior to completion of construction. Install new caustic soda/aquaammonia chemical trench with sump pump. Demolish abandoned, spare, and seldom used chemicalpiping and systems. Demolish single-walled piping and replace with single-walled and/or double-con-tained piping for liquid alum (aluminum sulfate)/ferric chloride, phosphoric acid/monosodiumorthophosphate, caustic soda, aqua ammonia (ammonium hydroxide), sodium hypochlorite, and cation-ic polymer chemical systems. Install leak detection monitoring systems for new double-contained pip-ing and secondary containment areas to include, but not be limited to sensors, control panels, andalarms to SCADA. Relocate existing liquid alum and phosphoric acid/monosodium orthophosphatechemical feed systems to include but not be limited to piping, pumps, control panels, and appurte-nances in the chemical feed room. Remove and replace existing 10,000-gallon horizontal phosphoricacid/monosodium orthophosphate tank. Remove abandoned unused 4,000-gallon underground stor-age tank. Remove and/or install chemical resistant coating for secondary containment areas. Installmotor operated valves at the phosphoric acid/monosodium orthophosphate, caustic soda, and aquaammonia tank outlets. Permanently plug the floor drains, regrade trench floor, and install polydrainsand sump pump systems with local control panels and alarms to SCADA in the storage tank areas toinclude, but not limited to, relocation of existing conduits and piping. Comply with all permittingrequirements by the agencies having jurisdiction for the demolition and installation of all permanentand temporary hazardous materials systems. Install caustic soda heating system to include, but notbe limited to, replacement of existing circulation pump, new circulation heater, insulation on the exist-ing caustic soda storage tank, and heat tape with insulation on the caustic soda piping. ProvideOperation and Maintenance documents. Perform all other work as specified in the Drawings andSpecifications. Mandatory Pre-Bid Conf./Site Visits to be held on Feb. 10 & 16, 9am, in the lobby con-ference room at the District’s Santa Teresa Water Treatment Plant located in San Jose, CA. ContactDist. Plan Rm. no later than 24 hrs in advance to confirm attendance. Bid Docs. (NR) $70 (mailing $10)available from owner. Contact SCVWD Plan Room to order, email: [email protected]: (408) 979-5631 Ph: (408) 265-2607 x3088. Request form & further info: http://www.valleywa-ter.org/Programs/Construction.aspx.PPllaannhhoollddeerrss IINNCCLLUUDDEE::G ##CCoonnccoo WWeesstt,, IInncc.. 322 Wetmore ST, Manteca . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .209-239-2110/FAX 209-239-2384G ##MMccGGuuiirree && HHeesstteerr ((OOaakkllaanndd)) 9009 Railroad Ave., Oakland . . . . . . . . . . . . . . . . . . . . . . . . . .(510) 632-7676/FAX (510) 562-5209S ##MMiissssiioonn CCiittyy RReebbaarr,, IInncc.. 542 Mc Graw Ave., Livermore . . . . . . . . . . . . . . . . . . . . . . . . . . . .(925) 449-6999/FAX (925) 447-8797

G St. Sewer Improve. Fourth Ave. to Second Ave. Bid DeadlineChula Vista March 10, 2 pmSubmit bids to City of Chula Vista-Public Svc. Bldg. (PSB). SW-251. (619) 691-5021. Estimate: N/A .

DDooccuummeennttss NNoott OOnn FFiilleeWWoorrkk IInnvvoollvveess:: G St. Sewer Improve. Fourth Ave. to Second Ave.. Bid Docs. (NR) $6 (remit $12) avail-able from owner, (619) 691-5021.

NW Quadrant Storm Drain Program Bid DeadlineCarlsbad March 11, 2 pmSubmit bids to City of Carlsbad. PWS10-28UTIL . Sherri Howard:(760) 602-2756 Fax:(760) 555-1234Email: [email protected] . Estimate: $940,000.

PPllaannss AAvvaaiillaabbllee aatt hhttttpp::////ppllaannss..ssddddtt..ccoommWWoorrkk IInnvvoollvveess:: Northwest Quadrant Storm Drain Program (Chestnut Ave., Pio Pico Dr., & Crest Dr.):Construction of 18-inch to 30-inch reinforced concrete Pipe (RCP), 18-inch high density polyethylenepipe (HDPE), drainage inlets, storm drain cleanouts, & other work appurtenant thereto . Plans/Specs(NR) $35, available from owner, (760) 602-4677 .PPllaannhhoollddeerrss IINNCCLLUUDDEE::G ##AA..MM.. OOrrtteeggaa 10125 Channel Road, Lakeside . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .(619)390-1988/FAX (619)390-1941G ##TTrrii--GGrroouupp CCoonnsstt.. && DDeevv..,, IInncc.. 13939 Poway Rd. Ste. 10, Poway . . . . . . . . . . . . . . . . . . . . . . .858-679-0843/FAX 858-679-5359S ##SSoolliidd SSttrruuccttuurreess P O Box 3858, La Mesa . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .619-464-5210/FAX 619-464-5212G ##OOrriioonn CCoonnsstt.. CCoorrpp.. ((VViissttaa)) 1232 Keystone Way, Vista . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .760-597-9660/FAX -9661

Continued from Page 24B

EngineeringWork Involving Site Improvements; Streets; Highways; Bridges; Irrigation and Landscaping; Drainage,Sewage and Water Pipelines; Disposal, Purification, Utility and Wastewater Treatment Plants;Harbors, Piers and Marine Terminal Projects; Outdoor Electrification; Well Drilling and UndergroundConstruction Projects. Please Check Building, Specialties, or Subcontracts for Overlapping Bids

(G) Indicates General Contractor Requesting Sub bids(S) Indicates Subcontractor(NA) Indicates Not Available

Continues on 26B

Page 26: 20100215 construction weekprops-n.sdccd.edu/NE/News Events... · Companies that submitted proposals during the first phase now will be evaluat- ... CA 92101 † 619.231.1010 † CA

THE DAILY TRANSCRIPT® • TUESDAY, FEBRUARY 16, 201026B

S ##KK&&SS EEnnggiinneeeerriinngg 7801 Mission Ctr. Ct. #100, San Diego . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .619-296-5565/FAX -5564G ##HHPPSS MMeecchhaanniiccaall IInncc.. 3100 East Belle Terrace, Bakersfield . . . . . . . . . . . . . . . . . . . . . . . . . . .(661)397-2121/FAX (661)396-2589G ##EEll CCaajjoonn GGrraaddiinngg 13684 Hwy 8 / P.O. Box 967, Lakeside . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .(619)561-9840/FAX -9908G ##DDoonn HHuubbbbaarrdd CCoonnttrraaccttiinngg 1015-A Linda Vista Dr., San Marcos . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .(760)736-3241/FAX -3248G ##BBuurrtteecchh PPiippeelliinnee IInncc 102 Second St, Encinitas . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .(760) 634-2822/FAX -2415G ##SScchheeiiddeell CCoonnttrr.. && EEnngg PO Box 1796, La Mesa . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .619-593-8704/FAX 619-593-9193

Gateway of Americas Svc. Area Sewer Treat. Plant Bid DeadlineCounty of Imperial March 12, 2 pmSubmit bids to County of Imperial. 4727GTW. Estimate: N/A .

PPllaannss AAvvaaiillaabbllee aatt hhttttpp::////ppllaannss..ssddddtt..ccoommWWoorrkk IInnvvoollvveess:: Gateway of the Americas County Service Area Sewer Treatment Plant Expansion(Phase II). Prebid Mtg. to be held on-site Feb. 17, 9:30am. For further info, contact: (760)482-4462.Plans/Specs (NR) $100, (mailing $15) available from owner, (760) 482-4462.

11A1799 Upgrade Drainage Bid DeadlineSan Diego March 15, 2:15 pmSubmit bids to Department of Transportation, MS-65(Sacra). 11A1799. Procurement and Contracts:(916) 227-6075 Fax (916) 227-1950 . Estimate: N/A .

PPllaannss AAvvaaiillaabbllee aatt hhttttpp::////ppllaannss..ssddddtt..ccoommWWoorrkk IInnvvoollvveess:: 11A1799 Upgrade Drainage: Contractor shall provide all necessary labor, tools, mate-rials, supplies, and equipment necessary to upgrade drainage in San Diego County near Bonsall at ViaMonserate Drive. Bidder’s bond and insurance are required, and 3% DVBE goals apply. LicenseRequired: A, C34. You can download this Bid Package from the Internet at: http://caltrans-opac.ca.gov/contrac2.htm or contact: Procurement and Contracts:(916) 227-6075 FAX: (916) 227-1950. Refer to contract # 11A1799.PPllaannhhoollddeerrss IINNCCLLUUDDEE::G ##HHeeaalleeyy CCoonnssttrruuccttiioonn 1545 Tidelands Ave., National City . . . . . . . . . . . . . . . . . . . . . . . . . . . . .(619)474-4900/FAX (619)474-2301

Rosecrans & Midway Dr Turn Pockets Bid DeadlineSan Diego March 16, 2 pmSubmit bids to City of San Diego-Purchasing and Contracting Dept.. K104366. Jason Guise:(619) 533-4665 Fax:(619) 533-5176 Email: [email protected] . Estimate: $411,249 .

PPllaannss AAvvaaiillaabbllee aatt hhttttpp::////ppllaannss..ssddddtt..ccoommWWoorrkk IInnvvoollvveess:: Rosecrans & Midway Dr Turn Pockets: The work involves modifying the turn pocket onthe North and South bound lanes of Rosecrans at the intersection of Midway Drive. Work to includeremoving and replacing existing curb and gutter and stamped concrete North and South of MidwayDr. on Rosecrans. Work South of Midway on Rosecrans is to narrow and shift the median to providean additional left turn pocket and relocate the storm drain under the new median. Work to be done onthe North side of Midway on Rosecrans is to extend left turn pockets. The signal at the intersection ofMidway and Rosecrans will be modified to incorporate the changes and all other work and appurte-nances. License Required: A

. Pre-Bid Conf. to be held on Feb. 24, 10am, Purch. & Cont. Dept., 1200 Third Ave., San Diego, CA92101. Available for download from the City of San Diego Website: http://www.sandiego.gov/, selectBids & Contracts, then select City Projects on ebidboard. For further info, contact: 619-236-6000.PPllaannhhoollddeerrss IINNCCLLUUDDEE::G ##CCrreesstt EEqquuiippmmeenntt,, IInncc.. 161 Scottford Drive, El Cajon . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .619-444-5061/FAX 619-444-5061G ##SScchheeiiddeell CCoonnttrr.. && EEnngg PO Box 1796, La Mesa . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .619-593-8704/FAX 619-593-9193

Pkg 3 Roller-Compact Dams & Facilities PREQUAL GCs Bid DeadlineSan Diego March 17, 2 pmSubmit bids to San Diego County Water Auth. PREQUAL GCs ONLY. 592. Melissa Retener, ContractAdministrator, (858) 522-6804 FAX: (858) 268-7802 Email: [email protected]. Estimate:$170,000,000 - $190,000,000 .

PPllaannss AAvvaaiillaabbllee aatt hhttttpp::////ppllaannss..ssddddtt..ccoommWWoorrkk IInnvvoollvveess:: PREQUALIFIED GC’S Package 3 - Roller-Compacted Concrete Dams & AppurtenantFacilities: Prospective Bidders have been pre-qualified to perform the Work described herein as setforth in the Notice Inviting Prequalification Information. Therefore, only the following Bidders will beallowed to submit bids for the Work as a prime Contractor. The work to be completed under theContract consists of San Vicente Dam Raise and Appurtenant Facilities Work, including raising theexisting San Vicente Dam 117 feet, constructing a new saddle dam, constructing access roads, andconstructing an outlet tower, pipelines, and control facility . Pre-Bid Mtgs. to be held on Feb. 4 & Mar.2, 8am, in the Board Rm. of the Water Authority, 4677 Overland Ave, San Diego, CA 92123. Site vis-its will follow . Contract Docs. w/Geotech CDs $40, Full-Size Plans (22x34) $125, Reduced Size (11x17)$40. Mailing additional $10 per document, to order contact: Melissa Retener Email:[email protected] (858) 522-6804 .PPllaannhhoollddeerrss IINNCCLLUUDDEE::G ##AA.. AAmmeess --//GGrraanniittee JJooiinntt VVeennttuurree Paul Arnold Email: [email protected], . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .602-431-2111G ##BBaarrnnaarrdd//AASSII JJooiinntt VVeennttuurree Gerry Arvidson Email: [email protected], . . . . . . . . . . . . . . . . . . . . . .406-586-1995

G ##DDrraaggaaddooss UUSSAA,, IInncc..//CCCC MMyyeerrss,, IInncc.. JJooiinntt VVeennttuurree John E. McGrath Email: [email protected], . . . . .951-719-1105G ##KKiieewwiitt PPaacciiffiicc CCoo.. Nicole Empizo Email: [email protected], . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .858-486-3410G ##SShhiimmmmiicckk CCoonnsstt.. CCoo..//OObbaayyaasshhii CCoorrpp.. JJooiinntt VVeennttuurree Harry Young Email: [email protected], . . . . . . . . . . .949-333-1500

Tenth Ave. Marine Terminal Pave. Maint. Bid DeadlineSan Diego March 19, 2 pmSubmit bids to Port of San Diego. Carlos Santiago, 619-686-6235 Email:[email protected] . Estimate: $468,000.

TTrraannssccrriipptt PPllaann NNoo.. 5500WWoorrkk IInnvvoollvveess:: Tenth Avenue Marine Terminal Pavement Maintenance: Work includes furnishing alllabor, materials and equipments necessary to repair asphalt concrete (AC) pavement, cold mill ACpavement, apply slurry seal coat including 300 linear feet of crack sealing, restore pavement striping,and apply pavement markings, pavement markers, and other related incidental items of work asshown on the drawings and as specified in the specifications. The project covers two locations. Thefirst location is at the Tenth Avenue Marine Terminal (TAMT), San Diego, California. TAMT alternate-ly referred in these specifications as Terminal. The second location is the Port employee parking lotacross from the Port Administration Building on Pacific Highway. License Required: A or C-12. Pre-BidMtg. to be held on Feb. 17, 2pm, Port of SD, 3165 Pacific Hwy., San Diego, CA 92101. Plans/Specs (NR)$40, available from owner, (619) 686-6235 .

San Jacinto Valley Reg. Water Rec. Facility Bid DeadlineSan Jacinto March 25, 2 pmSubmit bids to Eastern MWD Prequalified Only. 1047S. Sylvia Zamora (951) 928-3777 x4291 FAX:Fax:(951) 928-6111 Email: [email protected] . Estimate: $130,000,000-$180,000,000 .

PPllaannss AAvvaaiillaabbllee aatt hhttttpp::////ppllaannss..ssddddtt..ccoommWWoorrkk IInnvvoollvveess:: San Jacinto Valley Regional Water Reclamation Facility Title 22 Tertiary TreatmentUpgrade and Plant 2 Facilities: The San Jacinto Valley Regional Water Reclamation Facility (SJVR-WRF) expansion project is presented in two separate design packages that have been combined intoa single project and described in detail within Schedule A (Title 22 Tertiary Treatment Upgrade) andSchedule B (Plant 2 Facilities). A common set of Specifications governs both Schedule A and ScheduleB project elements. Separate sets of Construction Drawings for Schedule A and Schedule B show thework to be completed under each respective Schedule. The CONTRACTOR shall note that there are dif-ferences in typical details, instrumentation, and programming in the Schedule A and Schedule B draw-ing packages and that information presented in the Specifications that is unique to an individualschedule is identified within the Specifications . Mandatory Pre-Bid Conf. to be held on Dec. 2, SanJacinto Valley RWRF, 770 N. Sanderson Ave., San Jacinto, CA 92582. Plans/Specs $543.75, availablefrom owner, contact for further info: Sylvia Zamora (951) 928-3777 x4291 .PPllaannhhoollddeerrss IINNCCLLUUDDEE::G ##AArrcchheerr WWeesstteerrnn ((SSDD)) 4747 Viewridge Ave., Ste. 210, San Diego . . . . . . . . . . . . . . . . . . . .(858) 715-7200/FAX (858) 715-7201G ##BBaallffoouurr BBeeaattttyy CCoonnsstt.. ((FFfflldd)) 2333 Courage Dr., Sutie C, Fairfield . . . . . . . . . . . . . . . . . . . . .(707)427-8900/FAX (707)427-8901G ##JJ..FF.. SShheeaa CCoonnssttrruuccttiioonn ((WWaallnnuutt)) 667 Brea Canyon Rd #30, Walnut . . . . . . . . . . . . . . . . . . .909-595-4397/FAX 909-444-4268G ##JJ..RR.. FFiillaanncc CCoonnsstt.. ((EEssccoonn)) 740 N Andreasen Dr, Escondido . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .(760) 941-7130/FAX -3969G ##JJ..RR.. FFiillaanncc CCoonnsstt.. CCoo//BBiigg SSkkyy,, JJ..VV.. Joint Venture, 740 N. Andreasen Dr., Escondido . . . . . . . . . . . . . .760-941-7130/FAX -3969G ##KKiieewwiitt//MMaassss,, AA JJooiinntt VVeennttuurree 10704 Shoemaker Ave., Santa Fe Springs . . . . . . . . . . . . . . .562-946-1816/FAX 562-946-3823G ##MMccCCaarrtthhyy BBllddgg CCoo.. 20401 S.W. Birch St., #300, Newport Beach . . . . . . . . . . . . . . . . . . . . .(949)851-8383/FAX (949)756-6841G ##MMMMCC,, IInncc.. ((LLaass VVeeggaass)) 408 E. Gowan Rd, N. Las Vegas . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .702-642-3332/FAX -9936G ##PPaarrssoonnss RRCCII,, IInncc.. 1216 140th Avenue Ct E, Sumner . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .253-863-5200/FAX 253-859-5702G ##PPCCLL CCoonnssttrruuccttoorrss IInncc..((TTeemmppee)) 1729 W. Greentree Dr, Tempe . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .480-829-6333/FAX -8252G ##SShhiimmmmiicckk CCoonnssttrruuccttiioonn CCoo..((IIrrvviinnee)) 16481 Scientific Way, Irvine . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .949-333-1500/FAX 1510G ##SShhiimmmmiicckk//OObbaayyaasshhii JJVV 16481 Scientific Way, Irvine . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .949-333-1500/FAX -1510G ##SSkkaannsskkaa UUSSAA CCiivviill WWeesstt 1995 Agua Mansa Rd., Riverside . . . . . . . . . . . . . . . . . . . . .(951)684-5360 x234/FAX (951)788-2449G ##SSuunnddtt CCoonnssttrruuccttiioonn,, IInncc.. ((AAZZ)) 2620 S. 55th St., Tempe . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .480-293-3268G ##TTuuttoorr--SSaalliibbaa CCoorrpp.. 15901 Olden St., Sylmar . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .818-362-8391/FAX 818-367-5379G ##TThhee WWhhiittiinngg--TTuurrnneerr CCoonnttrraaccttiinngg CCoommppaannyy ((LLVV)) 6720 Via Austi Parkway, Ste. 300, Las Vegas . . . . . . . . . . . . . .702-650-0700

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ./FAX 702-650-2650G ##WW..MM.. LLyylleess CCoo.. ((MMuurrrriieettaa)) 38444 Sky Canyon Drive Suite 150, Murrieta . . . . . . . . . . . . . . . . . . . .951-973-7393/FAX 698-3031S ##AAbbiilleennee EElleeccttrriicc 1429 N. Market Blvd. Ste. 3, Sacramento . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .(916) 285-7342/FAX -7330S ##AA..MM.. OOrrtteeggaa 10125 Channel Road, Lakeside . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .(619)390-1988/FAX (619)390-1941

Reed Reservoir Replacement Bid DeadlineEscondido March 25, 2 pmSubmit bids to City of Escondido. Neil Greenwood:(760) 839-4078 Fax:(760) 740-0948 Email: [email protected] . Estimate: $6,500,000-$7,000,000 .

PPllaannss AAvvaaiillaabbllee aatt hhttttpp::////ppllaannss..ssddddtt..ccoommWWoorrkk IInnvvoollvveess:: Reed Reservoir Replacement: The work consists generally of construction including:Installation of two Type I pre-stressed concrete reservoirs, Valve Structure, interconnecting piping,grading, paving, and site improvements, landscaping, electrical, instrumentation, demolition of theexisting facilities, repair and reconstruction of existing improvements affected by the Work, and inci-dentals for complete and usable facility. The demolition of the existing reservoir is not included as apart of this project. Pre-Bid Site Visit to be held on Mar. 11, 10am, meet at the existing Reed Reservoir,

Continued from Page 25B

EngineeringWork Involving Site Improvements; Streets; Highways; Bridges; Irrigation and Landscaping; Drainage,Sewage and Water Pipelines; Disposal, Purification, Utility and Wastewater Treatment Plants;Harbors, Piers and Marine Terminal Projects; Outdoor Electrification; Well Drilling and UndergroundConstruction Projects. Please Check Building, Specialties, or Subcontracts for Overlapping Bids

(G) Indicates General Contractor Requesting Sub bids(S) Indicates Subcontractor(NA) Indicates Not Available

Continues on 27B

Page 27: 20100215 construction weekprops-n.sdccd.edu/NE/News Events... · Companies that submitted proposals during the first phase now will be evaluat- ... CA 92101 † 619.231.1010 † CA

Submit bids to Grossmont Cuyamaca Community College District, Purchasing & Contracts Dept..B10.012 . Technical Questions & RFI: Brian Browning, Email: [email protected] FAX: 619-644-7990. Procedural questions: Stephanie Rodriguez, Ph: 619-644-7036. Estimate: $549,000.

TTrraannssccrriipptt PPllaann NNoo.. 113344WWoorrkk IInnvvoollvveess:: Grossmont College Health/Physical Science Complex Audio-Visual Equipment:Contractor shall provide all engineering, labor, materials, transportation and equipment to pro-vide a complete functional advanced audio-visual system in eleven classrooms and teaching labsin accordance with the documents provided. All work is to be done in compliance with the designintent. Contractor shall confirm any variance from the design intent with all appropriate partiesto include the Design Consultant, and Client. Variances are not approved until all applicable doc-uments have been updated and all aforementioned parties have approved the variance in writ-ing. Contractor is responsible for all coordination with other trades (including electrical) asapplicable to ensure a functional complete system. Contractor is responsible for resolution ofconflicts with connection of and/or interaction of other systems including conduit, back boxes,floor boxes and pull boxes. Contractor is responsible to ensure that all means of support, suspen-sion, attachment, fastening, bracing and seismic restraints are in accordance with all local, stateand federal building codes. Contractor will pay all costs incurred where engineering services arerequired to conform to this item. The system is not a complete functional system until all equip-ment is online, tested and functioning without defect. All power supplies, accessory cables,portable equipment, equipment manuals and as-built system documentation has been providedto and accepted by the Client. The Contractor shall provide system training to the Client. LicenseRequired: C-7 Low Voltage Systems Contractor. Mandatory Pre-Bid Mtg. & Job Walk to be heldon Feb. 5, 1pm, Dist. Annex South Conf. Rm., Parking Lot 4, Grossmont College, 8800 GrossmontCollege Dr., El Cajon, CA 92020. Plans/Specs from OCB Reprographics Downtown San DiegoLocation, 1200 4th Ave., San Diego, CA 92101, 619-232-8440 www.ocbinc.com.PPllaannhhoollddeerrss IINNCCLLUUDDEE::n/a ##WWIIDDCCOO 10567 Oak Creek Dr., Lakeside . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .619-561-4410n/a ##VVeeccttoorr RReessoouurrcceess((SSDD)) 4995 Mira Mesa, Ste A, San Diego . . . . . . . . . . . . . . . . . . . . .858-546-1014/FAX 858-546-1086n/a ##SSppiinniittaarr ((CCaarrllssbbaadd)) 5939 Darwin Ct#113, Carlsbad . . . . . . . . . . . . . . . . . . . . . . . . .(619) 733-9281/FAX (760) 918-9140n/a ##RRCC CCoommmmuunniiccaattiioonn IInnssttaallllaattiioonnss aanndd SSeerrvviiccee 4265 Altadena Ave. Suite 16, San Diego . .619-342-1398/FAX 866-611-2572n/a ##PPrreecciissiioonn EElleeccttrriicc 8137 Wintergardens Blvd., Lakeside . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .619-390-2991/FAX -7539n/a ##IInntteeggrraatteedd MMeeddiiaa SSyysstteemmss 2805 McGaw Ave, Irvine . . . . . . . . . . . . . . . . . . . . . . . .(714) 366-1571/FAX (714) 579-4101n/a ##GGlloobbaall PPrreesseenntteerr 17911 Sampson Lane, Huntington Beach . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .714-887-1310/FAX -1311n/a ##FFlluuiidd SSoouunndd 5111 Santa Fe St., Ste. H, San Diego . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .619-446-6808n/a ##CCWWSS 8909-F Complex Dr., San Diego . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .858-278-4545/FAX 858-278-7709n/a ##AAVVII--SSPPLL 11095 Knott Ave. Ste. E, Cypress . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .(714) 799-7166n/a ##AAVVDDBB GGrroouupp ((LLVV)) 2470 N. Decatur Blvd. Ste 170, Las Vegas . . . . . . . . . . . . . . . . . . . . . . . . .(702) 586-4400/FAX 4404n/a ##AAuuddiioo AAssssoocciiaatteess 8200 Center Dr., La Mesa . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .(619)461-9445/FAX -9469

Shelter Island & Spanish Landing L/S Improve. Bid DeadlineSan Diego February 18, 2 pmSubmit bids to Port of San Diego. Carlos Santiago:(619) 686-6235 Fax:(619) 725-6014 Email:[email protected] . Estimate: $98,000.

TTrraannssccrriipptt PPllaann NNoo.. 113399WWoorrkk IInnvvoollvveess:: Shelter Island and Spanish Landing Water Conserving Landscape Improvements:Existing turf areas located on the locations listed below and as shown on the drawings shall beremoved and replaced with water conserving plants. The work also includes retrofit existing irri-gation, installation of new Cal-Sense irrigation controllers on Areas 4 and 5, traffic control andother related items of work. Located at Shelter Island and Spanish Landing in San Diego,California. License Required: C-27 . Pre-Bid Mtg. to be held on Feb. 4, 10am, Admin. Conf. Rm.2, Port of SD, 3165 Pacific Hwy., San Diego, CA 92101. Bid Docs. (NR) $20 available from owner,(619) 686-6235.

THE DAILY TRANSCRIPT® • TUESDAY, FEBRUARY 16, 2010 27B

552 South Hidden Trails Dr., Escondido, CA 92027. Plans/Specs (NR) $35, available from owner, 760-839-4651.

Mt. Miguel Road St. Asphalt, Capping & Striping Bid DeadlineChula Vista Indef, 4:07 pmSubmit bids to Trimark Pacific Homes, L.P.. Questions: Dale Catalde, c/o Trimark Pacific Homes, (949)

588-6067. Estimate: N/A .TTrraannssccrriipptt PPllaann NNoo.. 2233

WWoorrkk IInnvvoollvveess:: Mt. Miguel Road St. Asphalt, Capping & Striping . Bid Pkgs. may be obtained fromTrimark Homes 85, Argonaut #205, Aliso Viejo, CA 92656. Contact: Jennifer Washburn, JenniferWashburn, Purch. Mgr., (949) 609-1303, if bid pkg. is to be mailed please provide FedEx account no.PPllaannhhoollddeerrss IINNCCLLUUDDEE::S ##LLCC PPaavviinngg 996 Borden Rd., San Diego . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .760-752-1743/FAX 760-752-1674

Continued from Page 26B

EngineeringWork Involving Site Improvements; Streets; Highways; Bridges; Irrigation and Landscaping; Drainage,Sewage and Water Pipelines; Disposal, Purification, Utility and Wastewater Treatment Plants;Harbors, Piers and Marine Terminal Projects; Outdoor Electrification; Well Drilling and UndergroundConstruction Projects. Please Check Building, Specialties, or Subcontracts for Overlapping Bids

(G) Indicates General Contractor Requesting Sub bids(S) Indicates Subcontractor(NA) Indicates Not Available

Red Hill Park Cobblestone Bid DeadlineRancho Cucamonga February 16, 2 pmSubmit bids to City of Rancho Cucamonga-Engineering. Michael Maston:(909) 477-2730 x4139Fax:(909) 477-2746 Email: [email protected] . Estimate: $50,000 .

TTrraannssccrriipptt PPllaann NNoo.. 112255WWoorrkk IInnvvoollvveess:: Red Hill Park Cobblestone: Installation of cobblestones behind the park’samphitheater. License Required: A and/or C-27 . Mandatory Pre-Bid Conf. to be held on Feb. 8,9am, Red Hill Park, 7484 Vineyard Ave, Rancho Cucamonga, CA . Available for download fromCity’s website: http://www.ci.rancho-cucamonga.ca.us/index_govt.htm select City Departments- Administrative Services – Purchasing - Request for Proposals, then scroll to bottom & click on‘Listing of Advertised Projects’ .PPllaannhhoollddeerrss IINNCCLLUUDDEE::n/a ##AAmmeerriiccaa WWeesstt LLaannddssccaappee,, IInncc.. ((CChhiinnoo)) 15086 La Palma Dr., Chino . . . . . . . . . . . . . . . . . . . . .909-393-6300/FAX -6863n/a ##AArraammeexxxx 13040 Smoketree Place, Chino . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .(818) 428-8657/FAX (909) 591-4569G ##BBeellaaiirree--WWeesstt LLaannddssccaappee 7371 Walnut Ave., Buena Park . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .(714)523-9200/FAX -9201G ##CCLLSS LLaannddssccaappee PO Box 1689/4711 Schaefer Ave., Chino . . . . . . . . . . . . . . . . . . . . .(909)628-3005/FAX 909-464-1021n/a ##HHeerrnnaannddeezz LLaannddssccaappee CCoo..,, IInncc.. 4996 W Phillips Blvd, Ontario . . . . . . . . . . . . . . .(909) 208-0350/FAX (909) 591-0140G ##HHoonnddoo CCoo..,, IInncc.. 2121 S. Lyon St., Santa Ana . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .(714)434-0104/FAX -0215n/a ##JJiimm PPrraatthheerr’’ss LLaannddssccaappiinngg 9869 Hemolock Street, Fontana . . . . . . . . . . . . . . . . . . . . . . . . . .(909) 829-7539/FAX -3476G ##KKaassaa CCoonnssttrruuccttiioonn 6339 Felix Ct, Chino . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .(909) 591-6228/FAX (909) 591-7744G ##KKKKGG CCoonnssrruuccttiioonn 4650 Arrow Hwy, Montclair . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .(909) 624-6222/FAX -0222G ##LL&&MM CCoonnssttrruuccttiioonn 1559 West Mesa Dr., Rialto . . . . . . . . . . . . . . . . . . . . . . . . . . . .(909) 728-0533/FAX (909) 752-3183G ##MMGGPP CCoonnsstt.. 111 No. Grove, Upland . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .909-982-2364/FAX -8663G ##NNeeww LLeeggaaccyy CCoorrpp 14627 Arrow Rte, Fontana . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .(951)992-6803/FAX (909)428-7856n/a ##OOuuttddoooorr CCoonncceeppttss 28241 Crown Valley Prkwy, Laguna Niguel . . . . . . . . . . . . . . .(949) 363-7932/FAX (949) 388-2457G ##SS..JJ.. GGrriiggoollllaa CCoonnssttrruuccttiioonn CCoo..,, IInncc.. 2639 Sierra Way, La Verne . . . . . . . . . . . . . . . . . . . . . . . .909-596-6406/FAX -5031

07a2742 Establish Existing Planting Bid DeadlineLos Angeles February 16, 2:15 pmSubmit bids to Department of Transportation, MS-65(Sacra). 07a2742. Procurement andContracts: (916) 227-6075 Fax (916) 227-1950 . Estimate: $147,000.

PPllaannss AAvvaaiillaabbllee aatt hhttttpp::////ppllaannss..ssddddtt..ccoommWWoorrkk IInnvvoollvveess:: 07a2742 Establish Existing Planting: Establish existing planting in Los AngelesCounty. License(s) Required: A, C-27. You can download this Bid Package from the Internet at:http://caltrans-opac.ca.gov/contrac2.htm or contact: Procurement and Contracts:(916) 227-6075 FAX: (916) 227-1950 .

Views West Neighborhood Park Bid DeadlineSan Diego February 16, 3 pmSubmit bids to City of San Diego-Purchasing and Contracting Dept.. 9945-10-Q. Frank Moreno,(619) 235-5212 Email: [email protected] . Estimate: N/A .

PPllaannss AAvvaaiillaabbllee aatt hhttttpp::////ppllaannss..ssddddtt..ccoommWWoorrkk IInnvvoollvveess:: Views West Neighborhood Park: Furnish the City of San Diego with CompleteLandscape Maintenance for Views West Neighborhood Park & Comfort Station, as may berequired for a period of 2 years from date of award, with options to renew for 3 additional 1 yearperiods. License Required: C-27. Pre-Submittal Mtg. to be held on Jan. 26, 9:30am, Views WestNeighborhood Park, 12958 La Tortola, San Diego, CA 92129. Bidding Documents are availablefor download from the City of San Diego Website: http://www.sandiego.gov/, select Bids &Contracts, then Bids Available for Download, then Facility & Grounds Maintenance.

Grossmont College HPSC Audio-Visual Equipment Bid DeadlineEl Cajon February 18, 12 pm Continues on 28B

SpecialtiesWork Primarily Involves Only One Construction Trade. Please Check Building, Engineering or Subcontracts for Additional Bidding Projects.

(G) Indicates General Contractor Requesting Sub bids(S) Indicates Subcontractor(NA) Indicates Not Available

Page 28: 20100215 construction weekprops-n.sdccd.edu/NE/News Events... · Companies that submitted proposals during the first phase now will be evaluat- ... CA 92101 † 619.231.1010 † CA

THE DAILY TRANSCRIPT® • TUESDAY, FEBRUARY 16, 201028B

PPllaannhhoollddeerrss IINNCCLLUUDDEE::n/a ##CCrryynnss EEnntteerrpprriisseess,, IInncc.. 10638 Prospect Ave., Santee . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .(619) 334-9464/FAX -9465n/a ##33--DD EEnntteerrpprriisseess 11300 Sorrento Valley, San Diego . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .858-202-0410/FAX -0432n/a ##DDAAKK EEnnggiinneeeerriinngg 982 West K St., Benicia . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .707-319-0413n/a ##HHeeaalleeyy CCoonnssttrruuccttiioonn 1545 Tidelands Ave., National City . . . . . . . . . . . . . . . . . . . . . .(619)474-4900/FAX (619)474-2301n/a ##KKeellaarr PPaacciiffiicc LLLLCC 6020 Cornerstone Court W, Ste 105, San Diego . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .800-578-2457n/a ##MMAACCTTEECC 9177 Sky Park Court, San Diego . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .(858) 514-6459/FAX 858-278-5300n/a ##MMaannuueell SSiillvvaa && AAssssoocciiaatteess CCoorrppoorraattiioonn 33900 Summit View Place, Temecula . . . . . . . . . . . .951-240-7302/FAX -7305n/a ##MMeettaall--WWeelldd SSppeecciiaallttiieess,, IInncc.. 8137 N 83rd Ave, Peoria . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .(623) 979-1117n/a ##NNeeggaaWWaatttt CCoonnssuullttiinngg,, IInncc.. 1041 Market Street #104, San Diego . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .619-360-4191n/a ##PPaacciiffiicc BBuuiillddiinngg GGrroouupp,, IInncc.. 9752 Aspen Creek Court, Suite 150, San Diego . . . . . . . . . . . . .858-552-0600/FAX -0604n/a ##PPrreecciissiioonn LLaannddssccaappee MMaaiinntteennaannccee 5730 Kearny Villa Rd., San Diego . . . . . . . . . . . . . . . . . . .858-560-1800/FAX -1622n/a ##PPrriimmee VVeennddoorr,, IInncc.. 4608 Cedar Ave., #106, Wilmington . . . . . . . . . . . . . . . . . . . . . . . . . . . . .(800) 746-9554/FAX -8307n/a ##RR..EE.. SSttaaiittee EEnnggiinneeeerriinngg,, IInncc.. 2145 East Belt Street, San Diego . . . . . . . . . . . . . . . . . . . . .(619) 233-0178/FAX 233-3706n/a ##RRaannaa CCrreeeekk 10 Harris Ct, Suite 5-C, Monterey . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .831-659-3820/FAX -3820n/a ##TTeelllliiaarrdd CCoonnssttrruuccttiioonn 740 Amiford Dr., San Diego . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .(619) 224-4725/FAX -0159n/a ##VVaalllleeyy CCooaasstt CCoonnssttrruuccttiioonn 3388 Channel Way, San Diego . . . . . . . . . . . . . . . . . . . . . . . . . . . .(619) 225-9090/FAX 8808n/a ##TThhee TTuurrff CCoommppaannyy,, IInncc.. 32371 Alipaz Street #123, San Juan Capistrano . . . . . . . . . . . . . . . .949-488-2318/FAX -2308

On-Call Electrical Irrigation System Repair Bid DeadlineSan Diego February 18, 2:15 pmSubmit bids to Department of Transportation, MS-65(Sacra). 11a1787. Procurement andContracts: (916) 227-6075 Fax (916) 227-1950 . Estimate: $100,000 - $499,999 .

PPllaannss AAvvaaiillaabbllee aatt hhttttpp::////ppllaannss..ssddddtt..ccoommWWoorrkk IInnvvoollvveess:: On-Call Electrical Irrigation System Repair . You can download this Bid Packagefrom the Internet at: http://caltrans-opac.ca.gov/contrac2.htm. For Hard Copy, contact:Procurement and Contracts, (916) 227-6075 .

07a2740 Establish Existing Planting Bid DeadlineLos Angeles February 18, 2:15 pmSubmit bids to Department of Transportation, MS-65(Sacra). 07a2740 . Procurement andContracts: (916) 227-6075 Fax (916) 227-1950 . Estimate: $147,000.

PPllaannss AAvvaaiillaabbllee aatt hhttttpp::////ppllaannss..ssddddtt..ccoommWWoorrkk IInnvvoollvveess:: 07a2740 Establish Existing Planting: Establish existing planting in Los AngelesCounty in Claremont on Route 210 from Thompson Creek Bridge to San Bernardino County Line.Class A , C-27 or applicable specialty license will be required at time of bid opening. You candownload this Bid Package from the Internet at: http://caltrans-opac.ca.gov/contrac2.htm orcontact: Procurement and Contracts:(916) 227-6075 FAX: (916) 227-1950 .

Landscape Maintenance for Highland Ranch Park Bid DeadlineSan Diego February 19, 5 pmSubmit bids to City of San Diego-Purchasing and Contracting Dept.. 9941-10-Q. Frank Moreno,CPPB, (619) 235-5212 Email: [email protected] . Estimate: N/A .

PPllaannss AAvvaaiillaabbllee aatt hhttttpp::////ppllaannss..ssddddtt..ccoommWWoorrkk IInnvvoollvveess:: Landscape Maintenance for Highland Ranch Park: Furnish the City of San Diegowith Landscape Maintenance for Highland Ranch Neighborhood Park, as may be required for aperiod of 2 years from date of award, with options to renew for 3 additional 1 year periods.License Required: C-27 . Pre-Submittal Mtg. to be held on Feb. 9, 9:30am, Highland RanchNeighborhood Park located at 12140 Eastbourne Rd, San Diego, CA 92128. Bidding Documentsare available for download from the City of San Diego Website: http://www.sandiego.gov/, selectBids & Contracts, then Bids Available for Download, then Facility & Grounds Maintenance.

Landscape Maint for San Ysidro MAD Bid DeadlineSan Ysidro February 19, 5 pmSubmit bids to City of San Diego-Purchasing and Contracting Dept.. 9942-10-Q. Frank Moreno,(619) 235-5212 Email: [email protected] . Estimate: N/A .

PPllaannss AAvvaaiillaabbllee aatt hhttttpp::////ppllaannss..ssddddtt..ccoommWWoorrkk IInnvvoollvveess:: Landscape Maint for San Ysidro MAD: Furnish the City of San Diego withComplete Landscape Maintenance of Designated Center Medians, Rights-of-Way and Areaswithin the San Ysidro MAD, as may be required for a period of 2 years from date of award, withoptions to renew for 3 additional 1 year periods. Questions are due no later than 5:00 p.m. onFriday, February 12, 2010. Pre-Submittal Conf. to be held on Feb. 8, 9:30am, East San YsidroBlvd. & Border Village Rd. Bidding Documents are available for download from the City of SanDiego Website: http://www.sandiego.gov/, select Bids & Contracts, then Bids Available forDownload, then Facility & Grounds Maintenance.

Landscape Maint for Haward Lane & Coral Gate Parks Bid DeadlineSan Ysidro February 23, 5 pmSubmit bids to City of San Diego-Purchasing and Contracting Dept.. 9943-10-Q. Frank Moreno,

CPPB, (619) 235-5212 Email: [email protected] . Estimate: N/A .PPllaannss AAvvaaiillaabbllee aatt hhttttpp::////ppllaannss..ssddddtt..ccoomm

WWoorrkk IInnvvoollvveess:: Landscape Maint for Haward Lane & Coral Gate Parks: Furnish the City of SanDiego with Complete Landscape Maintenance of Howard Lane & Coral Gate Neighborhood Parks,as may be required for a period of 2 year from date of award, with options to renew for 3 addi-tional 1 year periods. License Required: C-27. Pre-Submittal Conf. to be held on Feb. 12, 9:30am,Howard Lane Park, 3100 Plantel Way, San Ysidro, CA 92173. Bidding Documents are availablefor download from the City of San Diego Website: http://www.sandiego.gov/, select Bids &Contracts, then Bids Available for Download, then Facility & Grounds Maintenance.

Replace HVAC at Polinsky Center Kitchen Bid DeadlineSan Diego February 24, 11 amSubmit bids to County of San Diego. RFB 4341 . Raquel Harris (858) 537-2562 Email: [email protected]. Estimate: N/A .

PPllaannss AAvvaaiillaabbllee aatt hhttttpp::////ppllaannss..ssddddtt..ccoommWWoorrkk IInnvvoollvveess:: Replace HVAC at Polinsky Center Kitchen: The County of San Diego (County),Department of General Services has a requirement replace kitchen swamp cooler with Trane 10ton R 22 rooftop HVAC at Polinsky. The Contractor will furnish all labor, materials and equip-ment as described in this statement of work. Prevailing wage rates apply. Job Walk to be heldon Feb. 3, 10am, 9400 Ruffin Ct, San Diego, CA 92123. Bid Pkg. Available for download fromCounty of San Diego’s Buynet Website: http://buynet.sdcounty.ca.gov/main.asp.

Fire Dept. Doors Furnish-Install Bid DeadlineBrawley February 25, 11 amSubmit bids to City of Brawley - 383 Main St. 2010-03. Mr. Guillermo Sillas, (760) 344-5800ext. 14 FAX: (760) 344-5612. Estimate: N/A .

TTrraannssccrriipptt PPllaann NNoo.. 8800WWoorrkk IInnvvoollvveess:: Fire Department Doors: Contractor shall furnish all labor, material, equipment &incidentals to perform the work which consists of supplying & installing 5 commercial overheadgarage doors at the City of Brawley Fire Station. License Required: B. Mandatory Pre-Bid Mtg.to be held on Feb. 16, 10:30am, Dept. of Public Works, 180 So. Western Ave., Brawley, CA. BidDocs. (NR) $35, available from the office of the City Clerk, (760) 351-3059.

Landscaping Maint. Svcs. Dept. of Gen. Svcs. Bid DeadlineSan Diego February 25, 3 pmSubmit bids to County of San Diego. RFP 4319. Rian Risley (858) 537-2522 Email:[email protected]. Estimate: N/A .

PPllaannss AAvvaaiillaabbllee aatt hhttttpp::////ppllaannss..ssddddtt..ccoommWWoorrkk IInnvvoollvveess:: Landscaping Maintenance Services Department of General Services County ofSan Diego. Pre-Proposal Conf. to be held on Jan. 29, 2pm, County Purch. & Cont., 10089 WillowCreek Rd, Ste 150, San Diego, CA 92131. See RFP for further info regarding Optional Site Walks.Bid Pkg. Available for download from County of San Diego’s Buynet Website:http://buynet.sdcounty.ca.gov/main.asp.

Water Source Heat Pump Replacement Bid DeadlineSan Diego February 26, 11 amSubmit bids to County of San Diego. RFB 4342 . Raquel Harris (858) 537-2562 Email: [email protected]. Estimate: N/A.

PPllaannss AAvvaaiillaabbllee aatt hhttttpp::////ppllaannss..ssddddtt..ccoommWWoorrkk IInnvvoollvveess:: Water Source Heat Pump Replacement: The County of San Diego (County),Department of General Services has a requirement to replace one over head water source heatpump unit located at 3989 Ruffin Road, San Diego, California 92123. The Contractor will fur-nish all labor, materials and equipment as described in this statement of work. Contractor musthave a valid state of Califonia (C-20) contractors license. Job Walk to be held on Feb. 10, 10am,HCD, 3989 Ruffin Rd., San Diego, CA 92123. Bid Pkg. Available for download from County of SanDiego’s Buynet Website: http://buynet.sdcounty.ca.gov/main.asp.

Maint. Insp.& Repair of Fire Sprinkler Supression Bid DeadlineSan Diego February 26, 3 pmSubmit bids to City of San Diego-Purchasing and Contracting Dept.. 9940-10-Q. Frank Moreno,(619) 235-5212 Email: [email protected] . Estimate: N/A .

PPllaannss AAvvaaiillaabbllee aatt hhttttpp::////ppllaannss..ssddddtt..ccoommWWoorrkk IInnvvoollvveess:: Maint. Insp.& Repair of Fire Sprinkler Supression: Furnish the City of San Diegowith Maintenance Inspections and Repair of Fire Sprinkler Suppression Systems at Various CityFacilities, as may be required for a period of 1 year from date of award, with options to renewfor 4 additional 1 year periods. License Required: C-16. Bidding Documents are available fordownload from the City of San Diego Website: http://www.sandiego.gov/, select Bids &

Continued from Page 27B

SpecialtiesWork Primarily Involves Only One Construction Trade. Please Check Building, Engineering or Subcontracts for Additional Bidding Projects.

(G) Indicates General Contractor Requesting Sub bids(S) Indicates Subcontractor(NA) Indicates Not Available

Continues on 29B

Page 29: 20100215 construction weekprops-n.sdccd.edu/NE/News Events... · Companies that submitted proposals during the first phase now will be evaluat- ... CA 92101 † 619.231.1010 † CA

THE DAILY TRANSCRIPT® • TUESDAY, FEBRUARY 16, 2010 29B

Contracts, then Bids Available for Download, then Facility & Grounds Maintenance.

Sewer Flow Monitoring & Event Notification Bid DeadlineSan Diego February 26, 4 pmSubmit bids to City of San Diego-Purchasing and Contracting Dept.. 10004692. Bill Broderick,(619) 236-6653 Email: [email protected] . Estimate: N/A .

PPllaannss AAvvaaiillaabbllee aatt hhttttpp::////ppllaannss..ssddddtt..ccoommWWoorrkk IInnvvoollvveess:: Sewer Flow Monitoring & Event Notification: Furnish the City of San Diego withSewer Flow Monitoring and Event Notification Services, as may be required for a period of 5years from date of fully executed Contract (total contract period cannot exceed 5 years). Pre-Submittal Mtg. to be held on Feb. 9, 10am, Public Utilities Department, MOC II, ConferenceRoom 1D, 9192 Topaz Way, San Diego, CA 92123. Bidding Documents are available for downloadfrom the City of San Diego Website: http://www.sandiego.gov/, select Bids & Contracts, thenBids Available for Download, Miscellaneous.

Regional Water Quality Reporting Services Bid DeadlineSan Diego March 1, 3 pmSubmit bids to County of San Diego. RFP 4325. Jose Sandoval (858) 537-2543 Email: [email protected] . Estimate: $4,650,000.

PPllaannss AAvvaaiillaabbllee aatt hhttttpp::////ppllaannss..ssddddtt..ccoommWWoorrkk IInnvvoollvveess:: Regional Water Quality Reporting Services: The County of San Diego, on behalfof the Department of Public Works (DPW), is requesting proposals from qualified firms for com-pilation of data collected under a different contract, to provide expert consultant services in theanalysis of water quality data and watershed-based report preparation for the regionalstormwater monitoring program to comply with the National Pollution Discharge EliminationSystem Permit No. R9-2007-0001 (Order). The types of data sets to be evaluated include waterquality from mass loading stations, benthic macroinvertebrate and periphyton samples frombioassessment stations, marine sediments from lagoons, water quality data from the municipalseparate storm sewer system (MS4), coastal storm drain monitoring and dry weather monitor-ing stations. A clear and concise annual report integrating the data sets and evaluating waterquality in each of the watersheds is required. Additionally,this contract will include the Reportof Waste Discharge and the Long-Term Effectiveness Assessment. No field work will be request-ed as part of this contract. The contract period will be for three years beginning June 1, 2010with two one-year options in years 4 and 5. The annual contract amount will not exceed$1,000,000. The five-year contract amount will not exceed $ 4,650,000 . Bid Pkg. Available fordownload from County of San Diego’s Buynet Website: http://buynet.sdcounty.ca.gov/main.asp.

On-Call Hazard. Waste ID Eval. Clean Up & Disposal Bid DeadlineSan Diego & Imperial Counties March 4, 2:15 pmSubmit bids to Department of Transportation, MS-65(Sacra). 11a1786. Jennifer Noakes 916-227-3216 Fax: 916-227-6155. Estimate: $999,999.

DDooccuummeennttss NNoott OOnn FFiilleeWWoorrkk IInnvvoollvveess:: 11a1786 On-Call Hazardous Waste Identification, Evaluation, Clean-Up &Disposal Services: Caltrans is soliciting bids from Contractors in order to establish a pool of pre-qualified Contractors to provide On-Call Hazardous material/waste and/or underground tank,container, and drum removal services including health and safety services in San Diego andImperial Counties . You can download this Bid Package from the Internet at: http://caltrans-opac.ca.gov/contrac2.htm or contact: Procurement and Contracts:(916) 227-6075 FAX: (916)227-1950 .

L Rubidoux Nature Ctr & Restrm Bldg. Roof Replace. Bid DeadlineRiverside March 8, 1:30 pmSubmit bids to County of Riverside - Purchasing and Fleet Service. PKARC-087. D. Macias (951)955-4814 Email: [email protected]. Estimate: $30,000.

PPllaannss AAvvaaiillaabbllee aatt hhttttpp::////ppllaannss..ssddddtt..ccoommWWoorrkk IInnvvoollvveess:: Louis Rubidoux Nature Center & Restroom Building Roof Replacement: TheContractor shall furnish all labor, supervision, material, parts, tools, equipment, transportationand services necessary to remove existing roofs down to sheathing and re-roof with 30# basefelt underlayment and 30 year fiberglass shingles on the Louis Rubidoux Nature Center and a 15year single ply membrane on the flat portion of the Louis Rubidoux Nature Center and Restroomin strict accordance with Appendix A pages 15 – 19 and Attachment 1 pages 20 - 33. LicenseRequired: C-39 Roofing License . Mandatory Bidders Conf. to be held on Feb. 17, 10am, LouisRubidoux Nature Ctr, 5370 Riverview Dr, Riverside, CA 92509 . RFQ Boilerplate Pkg. availablefor download from: www.purchasing.co.riverside.ca.us.

Landscape Maintenance of Stonebridge Park Facility Bid DeadlineSan Diego March 8, 3 pmSubmit bids to City of San Diego-Purchasing and Contracting Dept.. 9948-10-Q. Frank Moreno,

CPPB, (619) 235-5212 Email: [email protected] . Estimate: N/A.PPllaannss AAvvaaiillaabbllee aatt hhttttpp::////ppllaannss..ssddddtt..ccoomm

WWoorrkk IInnvvoollvveess:: Landscape Maintenance of Stonebridge Park Facility: Furnish the City of SanDiego with Complete Landscape Maintenance of Stonebridge Neighborhood Park and ComfortStation, as may be required for a period of 2 years from date of award, with options to renewfor 3 additional 1 year periods. Questions are due no later than 5:00 p.m. on Tuesday March 2,2010. License Required: C-27. Pre-Submittal Mtg. to be held on Feb. 23, 9:30am, StonebridgeNeighborhood Park 15030 Sycamore Trail Rd, San Diego, CA 92131 . Bidding Documents areavailable for download from the City of San Diego Website: http://www.sandiego.gov/, selectBids & Contracts, then Bids Available for Download, then Facility & Grounds Maintenance.

Dykstra Hall Solar Panel Absorber Replacement Bid DeadlineLos Angeles March 10, 2 pmSubmit bids to UCLA. HK-011910. Hank Knapp, Rieber Hall 310 De Neve Dr., #134, Los Angeles,CA 90095 (Tel: 310-206-6353; Fax: 310-794-6221). Estimate: NA.

PPllaannss AAvvaaiillaabbllee aatt hhttttpp::////ppllaannss..ssddddtt..ccoommWWoorrkk IInnvvoollvveess:: Furnish and install custom manufactured solar collector absorber assemblies forroof mounted solar water heating panels at Dykstra Hall. Remove old absorber assemblies fromwithin the frame of existing solar panels. Furnish and install new absorbers in existing panelframe, including valves and piping. Re-use glass and hardware, replace damaged glass and/orhardware as required. Contractor shall schedule and oversee crane needed to move old absorbersto ground level and stage new absorbers on roof. License required: C-36 (Plumbing) or C-46(Solar). Mandatory pre-bid conf. & job walk on 2/17, 10 am at Capital Programs Bldg., 1060Veteran Ave., Rm. 128-H, UCLA campus. Contact Hank Knapp (Tel: 310-206-6353). Docs areavail. at Ford Graphics, 2435 Military Ave., Los Angeles, CA 90064 (Tel: 310-477-6501) or viewonline at http://socal.fordgraphics.com/.

Continued from Page 28B

SpecialtiesWork Primarily Involves Only One Construction Trade. Please Check Building, Engineering or Subcontracts for Additional Bidding Projects.

(G) Indicates General Contractor Requesting Sub bids(S) Indicates Subcontractor(NA) Indicates Not Available

Drafting TableRequest for Proposals on Architectural and Engineering Services. Please Check Building, Engineering, Specialties and Subcontracts for Construction Bids

(G) Indicates General Contractor Requesting Sub bids(S) Indicates Subcontractor(NA) Indicates Not Available

Hemet Citrus In-Lieu No. Align. Reach 1 -Pipe Only Proposal DeadlineSan Jacinto February 16, 10:30 amSubmit proposals to Eastern Municipal Water Dist.. 1160P-1. Jill Lloyd:(951) 928-3777 Fax:(951)928-6111 Email: [email protected] . Estimate: $3,000,000-$3,400,000 .

PPllaannss AAvvaaiillaabbllee aatt hhttttpp::////ppllaannss..ssddddtt..ccoommWWoorrkk IInnvvoollvveess:: Hemet Citrus In-Lieu Northern Alignment Reach 1 Pre-Purchase Pipe Only: SUP-PLIER shall furnish all detailed fabrication drawings, all pipe, all fittings, and all appurtenancesto provide a complete pipeline system as detailed in the project Contract Documents(Specifications and Construction Drawings). Pipe shall be manufactured, tested, stored, and sub-sequently delivered to the project site within an easement adjacent to Metropolitan WaterDistrict’s second barrel of the Casa Loma Siphon (between Sanderson Avenue and De AnzaDrive), within Potter Road and Lyon Avenue (between De Anza Drive and Ramona Expressway),within Ramona Expressway (between Lyon Avenue and Idyllwild Drive), within Idyllwild Drive(between Ramona Expressway and Eagle Road), within Eagle Road (between Idyllwild Drive andRamona Expressway), within Ramona Expressway (between Eagle Road and Alessandro Avenue),within Alessandro Avenue (between Ramona Expressway and Bergin Street), and withinOlmstead Street (between Bergin Street and New York Avenue).Pipe deliveries will be scheduled on an as needed basis through the District’s InstallationContractor for the Hemet Citrus In-Lieu Northern Alignment Reach 1. Contract Docs. availablefor download from http://www.emwd.org/do_biz/bids_major-projects.html. Under ConstructionContract Opportunities, select View Currently Advertised Projects... .

Scripps Miramar Pump Station Design-Build Proposal DeadlineSan Diego February 17, 12 pmSubmit proposals to City of San Diego-Purchasing and Contracting Dept.. 5006DB. MilanKaras:(619) 235-1977 Fax:(619) 533-5176 . Estimate: N/A .

PPllaannss AAvvaaiillaabbllee aatt hhttttpp::////ppllaannss..ssddddtt..ccoommWWoorrkk IInnvvoollvveess:: Scripps Miramar Pump Station Design-Build: The Scripps Miramar Pump StationProject will include the construction of a new pump station in a City of San Diego owned parcelof land located just north of the Miramar 2A Valve Vault, near the intersection Scripps RanchBlvd. and Scripps Lake Drive. There will be six total pumps, five duty pumps (three 2.7 MGD

Continues on 30B

Page 30: 20100215 construction weekprops-n.sdccd.edu/NE/News Events... · Companies that submitted proposals during the first phase now will be evaluat- ... CA 92101 † 619.231.1010 † CA

THE DAILY TRANSCRIPT® • TUESDAY, FEBRUARY 16, 201030B

pumps, two 4.55 MGD pumps) and one stand by unit (4.55 MGD). The suction to the pump sta-tion will be connected to existing both the 66-inch Miramar PL and the 84-inch Miramar 2A PLvia a 36-inch manifold. The discharge to the pump station will be connected to the existing 20-inch 1020 Zone pipeline on Scripps Lake Drive just south of the Miramar 2A Valve Vault via a30-inch manifold. No permanent power generator will be part of this facility/project. . Pre-Proposal Conf. to be held on Jan. 27, 10am, 1200 3rd Ave., Ste. 200, Conf. Rm. 1, San Diego, CA92101. RFQ available for download from the City of San Diego Website:http://www.sandiego.gov/, select Bids & Contracts, then select Listing of advertised RFPs andRFQs on E-bidboard. For further info, contact: 619-236-6000.

Engineering/Arch. Svcs. Pt. Loma Parking Facility Proposal DeadlineSan Diego February 22, 1 pmSubmit proposals to Port of San Diego. RFQ 10-04. Carlos Santiago:(619) 686-6235 Fax:(619)725-6014 Email: [email protected] . Estimate: N/A .

TTrraannssccrriipptt PPllaann NNoo.. 110066WWoorrkk IInnvvoollvveess:: Engineering/Architectural Services Pt. Loma Parking Facility: The Port District isseeking a professional engineering/architectural Consultant to prepare design & construction biddocuments & provide consulting services for the design & construction of the Point LomaParking Facility & related improvements & utilities. Information Exchange Mtg. to be held onFeb. 3, 2:30pm, 3165 Pacific Highway, San Diego, CA 92101. RFQ Pkg. available from owner,(619) 686-6235.

RFQ Engineering Svcs. Gotham Rd. Widening Proposal DeadlineChula Vista February 22, 3 pmSubmit proposals to Southwestern CCD. 112. Southwestern Community College District (619)482-6597. Estimate: N/A .

DDooccuummeennttss NNoott OOnn FFiilleeWWoorrkk IInnvvoollvveess:: Request for Qualifications (RFQ) Engineering Services for the Gotham RoadWidening Project at Southwestern College . Mandatory Pre-Proposal Conf. to be held on Feb. 17,3pm, 900 Otay Lakes Rd, Chula Vista, CA 91910, Rm L238. All interested parties may obtain acopy of the RFQ by contacting the Program director for the Southwestern Community CollegeDistrict at (619) 482-6597, Room 1681, or e-mailing your request to: [email protected].

RFQ Video Conf. Rm. Equip. & Install Proposal DeadlineSan Diego February 23, 2 pmSubmit proposals to Port of San Diego. Dave Bohn:(619) 686-6446 Fax:(619) 686-6565 .Estimate: N/A.

PPllaannss AAvvaaiillaabbllee aatt hhttttpp::////ppllaannss..ssddddtt..ccoommWWoorrkk IInnvvoollvveess:: RFQ #P1022486DB Video Conference Room Equipment and Install: The SanDiego Unified Port District has a requirement for the Purchase and Installation of VideoConference room equipment (new and unused goods) per the specifications in the RFQ andInstallation services as described. Bid Docs. Available for download from Port of S.D. website:http://www.portofsandiego.org/, select View Current RFP/RFBs link .

RFQ DSA Inpsect. & Material Test. Southwestern CCD Proposal DeadlineChula Vista February 24, 3 pmSubmit proposals to Southwestern Community College District. RFQ No. 113. Alex Munro,Proposition AA Project Manager, SCCD, (619) 206-0802. Estimate: N/A.

DDooccuummeennttss NNoott OOnn FFiilleeWWoorrkk IInnvvoollvveess:: DSA Inspection, DSA Special Inspection & Material Testing Hazardous Material Abatement Consulting and Geotechnical Services for Remaining Proposition AA Projects for theSouthwestern Community College District. Mandatory Pre-Proposal Mtg. to be held on Feb. 17,2pm, Southwestern College at Chula Vista Campus Rm. L238, Student Svcs. Bldg., 900 OtayLakes Rd., Chula Vista CA 91910. All interested parties may obtain a copy of the RFQ by con-tracting Alex Munro, Proposition AA Project Manager for Southwestern Community CollegeDistrict at (619) 206-0802.

RFSQ Repair/Install. Security, Access & CCTV Sys. Proposal DeadlineSan Diego March 5, 4 pmSubmit proposals to County of San Diego. RFSQ 4350. Jose Sandoval (858) 537-2543 Email:[email protected] . Estimate: N/A.

PPllaannss AAvvaaiillaabbllee aatt hhttttpp::////ppllaannss..ssddddtt..ccoommWWoorrkk IInnvvoollvveess:: Request For Statement of Qualifications (RFSQ) 4350 Repair/Installation ofSecurity, Access & CCTV Systems Departemnt of General Services (DGS) The purpose of thisRFSQ is to establish a list of qualified security contractors and serviceproviders from which prices will be solicited for specific assignments throughout the Countythat

require the installation of new security systems and card readers for the Department of GeneralServices. No individual project or task order exceeding $50,000 is allowed using the prequali-fiedlist. The lists will have an initial term of three (3) years. The lists shall be reviewedannually and may be refreshed as needed.The respondent needs to supply labor to install security, access, CCTV systems and many otherlow voltage circuits. For most task orders associated with this RFSQ the County of San Diegowill supply equipment to be installed on the individual task orders and the Contractor will needto supply anything missing from the material parts list. Particular task orders may require theContractor to provide the material for the task order in compliance with California PublicContract Code 3400(B)(2). A valid California Contractor’s License C-7 (Low Voltage SystemsContractor) or C-10 (Electrical Contractor) is required as well as a valid ACO (Alarm CompanyOperator) license. All work shall be completed in a professional manner. Contractors shall beplaced on one or both of two lists: List 1) C-7 Low Voltage Contractor License List 2) C-10Electrical Contractor License . Pre-RFSQ Conf. to be held on Feb. 19, 10am, Dept. of Purch. &Cont., 10089 Willow Creek Rd., Ste. 150 San Diego, CA . Bid Pkg. Available for download fromCounty of San Diego’s Buynet Website: http://buynet.sdcounty.ca.gov/main.asp.

RFP Solar Photovoltaic Systems Proposal DeadlineSan Diego March 11, 4 pmSubmit proposals to Sweetwater Union High School Dist. Purchasing Dept. RFP 90-2196-GP.Email: [email protected] . Estimate: N/A .

DDooccuummeennttss NNoott OOnn FFiilleeWWoorrkk IInnvvoollvveess:: Request for Proposals (RFP) Solar Photovoltaic Systems: Sweetwater Union HighSchool District (hereinafter District) is seeking qualified firms to finance, design, install, operate,and maintain a solar photovoltaic system on nine sites located within the District and to sell theelectricity output to the SUHSD. Mandatory Pre-Submittal Conf. to be held on Feb. 11, 10am,Sweetwater Union High School District Board Room. RFP may be obtained by sending emailrequest to:[email protected]. For further info: www.buildingpropo.com .

RFQ 8th St. (J Ave. - Palm Ave.) Safety Enhance. Proposal DeadlineNational City March 11, 5 pmSubmit proposals to City of National City. (619) 336-4380. Estimate: N/A .

PPllaannss AAvvaaiillaabbllee aatt hhttttpp::////ppllaannss..ssddddtt..ccoommWWoorrkk IInnvvoollvveess:: Request for Qualifications 8th St. (J Ave. to Palm Ave.) Safety Enhancements:The City of National City seeks Statements of Qualifications from interested consultant firms toprovide Civil Engineering services for final design, preparation of plans, specifications & esti-mates, and public outreach for the City’s 8th Street (from J Avenue to Palm Avenue) SafetyEnhancements Project. The project involves, but is not limited to, the following key design ele-ments: roadway widening, utility undergrounding, medians, curb, gutter and sidewalk, slope sta-bilization via retaining walls, traffic signal design and installation, traffic calming, signing andstriping enhancements, ADA upgrades, and access control . The Request for Qualifications pack-age can be obtained from the Engineering Department, City of National City (619) 336-4380.Also available on the City’s website at http://www.nationalcityca.gov.

Prequal. Gen/Prime Contractors Various Const. Proposal DeadlineSan Marcos March 31, 2 pmSubmit proposals to Palomar Community College Dist.-Prequal Required. Eileen Poole, ContractsSpecialist, 760-744-1150, ext. 2697 E-Mail: [email protected]. Estimate: N/A .

PPllaannss AAvvaaiillaabbllee aatt hhttttpp::////ppllaannss..ssddddtt..ccoommWWoorrkk IInnvvoollvveess:: Request for Pre-Qualification of General/Prime Contractors for VariousConstruction Projects - Fiscal Year 2009-10: Palomar Community College District is seeking toprequalify state of California licensed general/prime contractors who wish to compete for theaward of various construction contracts during the District’s fiscal year (FY) July 1, 2009through June 30, 2010, valued at more than $250,000. The District anticipates that a variety of projects may bid during the time period, including, butnot limited to the following: Palomar Comm. College Dist. Projects (Partial List) Name of Project,Est. Bid Ad. & Est. Project Amount are as follows: New Construction: Late Oct. 2009, 14MIndustrial Technology Center; Addition & Remodel: Theatre Fe., 2010, 10M; Retrofit: EscondidoCtr. North Wing, March, 2010, 3M; New Construction: Multi-Media Lab & Planetarium, Dec.2009, 7M. It is mandatory that all licensed general/prime contractors who intend to submit bidsfully complete the pre-qualification questionnaire, provide all materials requested, and beapproved by the District to be on the final Bidder’s list for projects during FY 2009-10. No bidwill be accepted from a General/Prime Contractor that has failed to comply with these require-ments, although the District reserves the right to prequalify a specific pool of contractors forspecific work that may be required if the pool of prequalified contractors is not deemed suffi-cient by the District. Prequalification is open enrollment and will stay on file until 06/30/2010.No specific due date . Prequal Questionnaire available for download:http://www.palomar.edu/businessservices/Contractor%20PreQual.html; Hard Copy may beobtained from the District, contact Eileen Poole, 760-744-1150, ext. 2697 E-Mail: [email protected] for further info.

Continued from Page 29B

Drafting TableRequest for Proposals on Architectural and Engineering Services. Please Check Building, Engineering, Specialties and Subcontracts for Construction Bids

(G) Indicates General Contractor Requesting Sub bids(S) Indicates Subcontractor(NA) Indicates Not Available

Page 31: 20100215 construction weekprops-n.sdccd.edu/NE/News Events... · Companies that submitted proposals during the first phase now will be evaluat- ... CA 92101 † 619.231.1010 † CA

THE DAILY TRANSCRIPT® • TUESDAY, FEBRUARY 16, 2010 31B

Seafood City Bid DeadlineChula Vista February 17, 11 amSubmit bids to SELECTED BIDDERS ONLY. Estimate: N/A .

DDooccuummeennttss NNoott OOnn FFiilleeWWoorrkk IInnvvoollvveess:: Seafood City: This project consists of remodeling an existing Albersons into a New43,500 SF Grocery Store. Coordinate with Selected General Contractors to view/receive Plans,Specs, Addenda, & other pertinent info related to bid.PPllaannhhoollddeerrss IINNCCLLUUDDEE::G ##EElleevveenn WWeesstteerrnn BBuuiillddeerrss 2862 Executive Place, Escondido . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ./FAX (760)796-6360

Prequal. Sub-Bids 15th & Commercial Bid Pkgs 3,4&5 Bid DeadlineSan Diego February 23, 5 pmSubmit bids to Roel Construction Co. Inc.. Andrew Dacri, [email protected], (619) 906-2922Fax (619) 297-7503. Estimate: N/A .

DDooccuummeennttss NNoott OOnn FFiilleeWWoorrkk IInnvvoollvveess:: Prequalification - Sub-Bids 15th & Commercial Packages No. 3, 4 & 5: RequestingSub-bids from Qualified DBE, DVBE, MBE, WBE & SBE, for the trades included in Bid Packages 3,4 & 5. State and Davis-Bacon prevailing wages required. All Subcontractors are required toadhere to ROEL’s pre-qualification process, which is project specific for 15th & Commercial.Submittal of financial statement, letter from your bonding company, and Special InsuranceAssessment from your insurance agent is required. A Payment & Performance Bond may berequired. ROEL will negotiate with any pre-qualified firms and is an E.O.E. / A.A. Project ismixed-use, consisting of daycare facilities, dorm rooms, and studio apartments. Construction willcommence in March 2010 with completion in September 2011. Pre-qualification for the followingtrades is being requested: Bid Pkg. No. 3 Misc. Shell Items: 7150 – Caulking and Sealants; 7200– Building Thermal Insulation; 7500 – Single Ply Roofing; 7600 – Sheet Metal and Flashing; 8250– Overhead Coiling Doors; 8300 – Folding Fire Doors; 9200 – Scaffolding. Bid Pkg. No. 4 Finishes:6200 – Finish Carpentry; 8800 – Interior Glazing; 9300 – Ceramic Tile; 9510 – AcousticalCeilings; 9600 – Stone Countertops; 9650 – Flooring (Carpet, VCT, Base); 9900 – Painting; 10160– Toilet Partitions and Accessories; 10520 – Fire Extinguishers and Cabinets; 10550 – Mailboxes;10660 – Operable Partitions; 11452 – Residential Appliances; 12510 –Window Coverings; 17000– Final Cleanup. Bid Pkg. No. 5 – Site Work: 2450 – Fencing; 2480 – Landscape and Irrigation;2500 – Asphalt Concrete Paving; 2511 – Traffic Signal and Parking Signs; 2520 – PlaygroundEquipment and Site Furnishings; 2550 – Site Concrete Improvements; 2580 – PavementMarkings

. Prequal forms available from Roel Constrution Co., Inc., (619) 906-2922 .

SubcontractsWork of Interest to Subcontractors of Various Trades, Includes Projects that require Sub

bids to Selected General Contractors or Defined Owners. Please Check Building, Engineering and Specialties for Overlapping Bids

(G) Indicates General Contractor Requesting Sub bids(S) Indicates Subcontractor(NA) Indicates Not Available

New principal architectat Sillman Wright

SSiillllmmaann WWrriigghhtt AArrcchhiitteeccttssannounced that R. Brett Tullis hasjoined the company as a principalarchitect and will play a key role inexpanding the firm’s services and mar-

kets.Architect

Rod Wright,who alongwith LarrySillman, is af o u n d i n gprincipal ofthe firm, saidthat Tullisbrings ani m p r e s s i v e

background of hands-on design andmaster-planning experience that willbe invaluable to his role as principal.

“The depth of Brett’s expertise andhis holistic approach is in keeping withour philosophy of providing our clientswith creative, whole project solutions,”Wright said. “Sustainable design isimportant to us and our clients. As aLEED AP, Brett’s leadership in thisimportant area will be integral to ourfuture success in creating projects thatwill add value to both our clients andthe community for years to come.”

Tullis brings more than 15 years ofaward-winning architectural andurban design experience to his positionat Sillman Wright Architects.

“I am very excited to be a part of sucha respected organization as SillmanWright Architects and to have theopportunity to build upon its alreadyoutstanding reputation,” Tullis said.

SSoouurrccee CCooddee:: 2200110000221111ttuuaa• • •

PPeerrkkiinnss++WWiillll, a global leader in sus-tainable architecture and design, hasannounced the appointment of RachelInmon as business development repre-sentative, a key player in businessdevelopment for the firm’s San Diegooffice.

Inmon will lead new business devel-opment efforts to help expandPerkins+Will’s presence in San Diegoacross all six sectors of the firm’sSouthern California practice.

With more than 15 years of experi-ence in the architecture industry,Inmon joins Perkins+Will with astrong background in project manage-

ment and design, including experiencewith both large and small-scale com-mercial, technology, industrial, resi-dential and hospitality projects.Inmon’s long history with customerslike BBaannkk ooff AAmmeerriiccaa (NYSE: BAC)and HHiillttoonn RReessoorrttss has given her expe-rience from which to draw upon.

Prior to joining Perkins+Will, Rachelled the business development efforts ofa local San Diego company, focusingher efforts on the defense market.

“We’re thrilled to welcome Rachel toPerkins+Will,” said Managing DirectorGabrielle Bullock. “As we continue tobuild upon the office’s strong presencein the San Diego market, we are confi-dent that Rachel’s experience and freshperspective will create opportunitiesand foster new client relationships.”

SSoouurrccee CCooddee:: 2200110000221111ttuubb• • •

On Jan. 30, local homebuilderCCaalliiffoorrnniiaa WWeesstt CCoommmmuunniittiieess hosted afirst phase release for their new neigh-borhoods, Monteluz and Andalusia,located in the acclaimed master-planned community of 4S Ranch.

A total of 21 new homes were sold inless than one hour. More than 100potential homebuyers waited withanticipation for their name to beannounced, and applause rang outwith each new home sold.

“It was wonderful to see so manyqualified homebuyers looking forwardto purchasing a new home from us,”said Robert Thorne, CEO of CaliforniaWest Communities. “4S Ranch is a verypopular, family-oriented village in SanDiego where families enjoy newschools, a Boys & Girls Club, severalparks, a library and miles of hikingtrails — all minutes away from theirhome.”

Exquisitely decorated and furnished,seven new model homes were recentlyunveiled, marking the official grandopening of Andalusia and Monteluz.

The two neighborhoods are amongthe last chance to purchase a newhome in the 4S Ranch master plan.Additionally, both projects offer theonly new single-story floorplans within4S Ranch.

The neighborhoods of Andalusia andMonteluz are also situated in closeproximity to 4S Commons offering 43acres of shopping and dining.

Designed for couples and families,Andalusia’s highlights are efficiencyand style. At build-out, Andalusia will

ConstructionNotebookBy Karen Weil

See Notebook on 32B

National City looks toamend landscape ordinance

SAN DIEGO — The week is ashort one, thanks to President’s Dayon Monday, but there is still plentyof news on the construction front —especially today, as plenty of proj-ects are either being awarded orreceived by city councils.

The week starts off in NationalCity, where the City Council willaccept the work performed by PPTTMMGGeenneerraall EEnnggiinneeeerriinngg SSeerrvviicceess IInncc.for the final contract of $594,536 onthe city’s Safe Routes to School

Project.The council will also introduce an

ordinance that would amend thecity’s charter pertaining to land-scape maintenance.

At the Carlsbad City Council onTuesday, EEmmppiirree PPiippeelliinnee is slatedto receive a contract for theCorrugated Metal PipeReplacement Program for StateStreet and Oak Avenue.

Also Tuesday, the Lemon GroveCity Council will consider a resolu-tion approving a contract with AARRCCRRooooffiinngg IInncc. to install a membraneroof at the city’s Recreation Center.

Tuesday in Poway, the City

Construction AgendaBy Carlos Rico

See Agenda on 32B

RR.. BBrreetttt TTuulllliiss

Page 32: 20100215 construction weekprops-n.sdccd.edu/NE/News Events... · Companies that submitted proposals during the first phase now will be evaluat- ... CA 92101 † 619.231.1010 † CA

THE DAILY TRANSCRIPT® • TUESDAY, FEBRUARY 16, 201032B

CONSTRUCTION CALENDAR

OTHER EVENTSTTUUEESSDDAAYY,, FFEEBB 1166 -- SSEEMMIINNAARRCOLLECTIVE BARGAINING FOR CONSTRUCTION CONTRACTORS

This training seminar is specifically designed for construction contractors and their bar-gaining representatives. Guest speakers will explain construction labor relations throughtheir experience on how to prepare for negotiations, avoid costly legal mistakes, maximizecost-effectiveness, conduct yourself at the bargaining table and more.The Webinar is athree-part series that will take place Feb. 16, 18 and 23. OOrrggaanniizzaattiioonn:: Associated GeneralContractors IInnffoorrmmaattiioonn:: 800.233.1234 www.agc.org CCoosstt:: $79.00- $250.00 WWhheenn:: Hours:11:00 AM - 12:30 PM WWhheerree:: WebCast, Online

WWEEDDNNEESSDDAAYY,, FFEEBB 1177 -- DDIISSCCUUSSSSIIOONNGREEN TAX INCENTIVES

Phil Jelsma of Luce Forward will discuss the tax benefits available to the real estate andconstruction industry for renewable energy sources or so-called “Green Tax Incentives.”

These include solar, wind, weatherproofing, hot water systems, doors and windows.Jelsma will also discuss the changes to the net operating loss rules that were enacted inNovember 2009 that benefit real estate owners and developers, and the prospects of estatetax reform and repeal in 2010 and the impact on the real estate industry. OOrrggaanniizzaattiioonn:: ULISan Diego/Tijuana IInnffoorrmmaattiioonn:: (800) 321-5011 www.ulisd.org CCoosstt:: $20.00- $30.00 WWhheenn::Hours: 11:30 AM - 1:00 PM WWhheerree:: Luce Forward Carmel Valley/Del Mar office, 11988 ElCamino Real, Suite 200, San Diego, 92130, Venue Phone - (858) 597-6767

WWEEDDNNEESSDDAAYY,, FFEEBB 1177 -- MMEEEETTIINNGGWATER MAINS, TRAINS AND AUTOMOBILES-WINNING PUBLIC WORK

While private work may be down, there is plenty of public work in the San Diego pipeline.Come meet SANDAG, CALTRANS and the City of San Diego and hear about upcoming proj-ects and what they look for in successful proposals and project teams. To sponsor this pro-gram, contact Dave Sheldon, [email protected]. OOrrggaanniizzaattiioonn:: SMPS(Society for Marketing Professional Services) IInnffoorrmmaattiioonn:: www.smpssd.org CCoosstt:: $45.00-$70.00 WWhheenn:: Hours: 12:00 PM - 1:30 PM WWhheerree:: DoubleTree Hotel Hazard Center, 7450Hazard Center Drive, San Diego, 92108

FFRRIIDDAAYY,, FFEEBB 1199 -- WWOORRKKSSHHOOPPGOVERNMENT SMALL BUSINESS PROCUREMENT OUTREACH

The workshop and networking event is designed to assist the small business communityin contracting and subcontracting with government agencies, covering such topics as con-tracting/procurement procedures and registrations requirements. Featured speakers includerepresentatives from SPAWAR, San Diego County Water Authority, Caltrans, the GeneralServices Administration and various other government agencies. Also Congressman DuncanD. Hunter has been confirmed to speak. Breakfast and lunch will be provided. OOrrggaanniizzaattiioonn::San Diego Contracting Opportunities Center (SDCOC) IInnffoorrmmaattiioonn:: (619) [email protected] CCoosstt:: $35.00- $45.00 WWhheenn:: Hours: 8:00 AM - 3:00 PM WWhheerree::Santee City Hall Community Rooms, 10601 Magnolia Avenue, Santee

FFRRIIDDAAYY,, FFEEBB 1199 -- TTRRAAIINNIINNGG CCLLAASSSSCONFINED SPACES

The content of the program includes developing a confined-space entry permit program,planning for confined-space entry, identifying hazards and how they occur, and learningemergency rescue procedures, respiratory protection techniques and important definitions.The program will be taught by EGCA member Greg Shreenan of Trench Shoring Company.OOrrggaanniizzaattiioonn:: EGCA IInnffoorrmmaattiioonn:: Mary Radovan (619) 692-0760 CCoosstt:: $235.00- $275.00WWhheenn:: Hours: 8:00 AM - 4:00 PM WWhheerree:: National University, 9388 Lightwave Ave. (acrossNU Spectrum Center), San Diego, 92123

MMOONNDDAAYY,, FFEEBB 2222 -- NNEETTWWOORRKKIINNGGGOING GREEN

John Platt of Solar Energy & Efficiency Solutions will talk about green and sustainable tipsthat will save contractors money. OOrrggaanniizzaattiioonn:: California Professional Association ofSpecialty Contractors IInnffoorrmmaattiioonn:: Emily Gardner (858) 357-9808 [email protected]:: No Cost WWhheenn:: Hours: 5:30 PM - 7:30 PM WWhheerree:: ProSource Wholesale Floorcovering,8485 Production Ave, San Diego, 92121

TTHHUURRSSDDAAYY,, FFEEBB 2255 -- MMOONNTTHHYY MMEEEETTIINNGGGREENFORMAT

This month’s meeting will feature Michael Fuller, practicing architecture for more than 25years. He will discuss GreenFormat, a product that allows manufacturers to “accurately anduniformly” report on the sustainable properties of their products and provide designers, con-tractors and building operators with basic information to help meet green and sustainablerequirements. Dinner is included with admission and will be served after networking andcocktail hour. OOrrggaanniizzaattiioonn:: Construction Specifications Institute, Inc. (CSI) IInnffoorrmmaattiioonn::(619) 401-6733 www.sandiegocsi.org CCoosstt:: $15.00- $40.00 WWhheenn:: Starts: 5:30 PM WWhheerree::Admiral Baker Golf Course Clubhouse, 2400 Admiral Baker Road, San Diego, 92120

SSAATTUURRDDAAYY,, FFEEBB 2277 -- WWOORRKKSSHHOOPPDAY WITH DESIGNERS

A five-hour workshop with sessions by eight prominent local interior designers discussinga variety of relevant design subjects, including green design, color trends, design secrets andaging in place. Attendees will also have the opportunity to have an informal lunch withdesigners and enjoy tabletops displays by suppliers that partner with ASID. OOrrggaanniizzaattiioonn::American Society of Interior Designers (ASID) IInnffoorrmmaattiioonn:: (858) 646-9896 www.asid-sandiego.org CCoosstt:: $35.00- $45.00 WWhheenn:: Hours: 9:00 AM - 2:00 PM WWhheerree:: Art Institute,7650 Mission Valley Road, San Diego, 92108

A complete listing of the Construction Calendar is available atSan Diego Source — sddt.com/realestate. Send notices aboutupcoming events to [email protected] for a free listing.—Compiled by Carlos Rico

be comprised of 94 new homes.Floorplans range from approximately2,222-3,486 square feet, three to sixbedrooms and three to four baths, withlots averaging approximately 6,782square feet. Home prices are priced inthe mid $600,000s.

Monteluz, with expansive interiorspaces, offers floorplans ranging fromapproximately 2,566-3,949 squarefeet, three to six bedrooms and 2 1/2 tofive baths. Lot sizes average approxi-mately 8,281 square feet, making thesehomes appealing to larger and extend-ed families.

Home prices begin in the high$600,000s.

SSoouurrccee CCooddee:: 2200110000221111ttuucc• • •

JJoohhnnssoonn && JJeennnniinnggss GGeenneerraallCCoonnttrraaccttiinngg has hired Mike Stout as a

project super-i n t e n d e n t ,said DonnaVargo, execu-tive vice presi-dent of theSan Diego-based com-mercial con-struction firm.

In his newposition, Stout

will focus on the company’s ground-up, design-build and shell projects.

He is responsible for project-specificonsite operations, including daily pro-duction, subcontractor coordination,safety, cost control and field qualitycontrol.

With 40 years in the constructionindustry, Stout has extensive experi-

ence in ground-up, office, educational,mixed-use and retail facilities.Previous employment includesapproximately seven years at RROOEELLCCoonnssttrruuccttiioonn CCoommppaannyy, as well asmultiple years at RReennoo CCoonnttrraaccttiinngg,,BBSSDD BBuuiillddeerrss IInncc.. and JJaayynneess SSaannDDiieeggoo.

Stout is currently working onJohnson & Jennings’ Harbor Pointproject, located at 5055 N. HarborDrive along the San Diego Bay. Thisnew mixed-use building is designedto achieve LEED Silver Certificationfor core and shell from the U.S. GreenBuilding Council. Slated for comple-tion in August, the project includesthe construction of nine office suitesabove three ground-floor retailsuites.

SSoouurrccee CCooddee:: 2200110000221111ttuudd

NotebookContinued from Page 31B

Council is expected to award twocontracts including an asphalt coldmining and operator service con-tract to PPaavveemmeenntt RReeccyycclliinnggSSyysstteemmss.

Wednesday, the Encinitas CityCouncil is scheduled to award a con-tract to RR..BB.. HHoolltt IInncc. in an amountnot to exceed $181,470 for a demoli-tion project involving the HallHouse and other facilities.

In addition, the San Diego PlanningCommission meeting Thursday hasbeen adjourned to Feb. 25.

Looking forward, the Del MarReview Board has released its Feb.24 agenda. It will have three items,which involve homeowners askingfor permits to demolish and rebuilda home on their property.

Source Code: 20100212cyb

AgendaContinued from Page 31C

MMiikkee SSttoouutt