Summer 2009 Capital Projects
Elementary Debt Exclusion Work Summer 2009
Presentation for Town Meeting April 2010
![Page 2: 2009 Summer Capital Projects](https://reader033.vdocuments.site/reader033/viewer/2022060200/559936671a28ab0d178b461f/html5/thumbnails/2.jpg)
Capital Projects Summer 2009
Elementary Debt Exclusion • Hardy • Hunnewell• Schofield• Fiske• Upham
![Page 3: 2009 Summer Capital Projects](https://reader033.vdocuments.site/reader033/viewer/2022060200/559936671a28ab0d178b461f/html5/thumbnails/3.jpg)
• Time Frame for summer work– Last day of school for teachers was Thursday, June 24,
2009. Work began immediately after that.– The 42 work days between June 30 and August 27
described the time frame for all the moving and work.
![Page 4: 2009 Summer Capital Projects](https://reader033.vdocuments.site/reader033/viewer/2022060200/559936671a28ab0d178b461f/html5/thumbnails/4.jpg)
Summer 2008 • Roof replacement• Master Clock and Bell System
![Page 5: 2009 Summer Capital Projects](https://reader033.vdocuments.site/reader033/viewer/2022060200/559936671a28ab0d178b461f/html5/thumbnails/5.jpg)
Summer 2008 • Roof replacement• Master Clock and Bell System
Summer 2009 • Flooring abatement and replacement in selected rooms• Gymnasium ceiling abatement / plaster / paint• Boiler replacement (in process)
![Page 6: 2009 Summer Capital Projects](https://reader033.vdocuments.site/reader033/viewer/2022060200/559936671a28ab0d178b461f/html5/thumbnails/6.jpg)
Old flooring was abateddown to a wood subfloor.
![Page 7: 2009 Summer Capital Projects](https://reader033.vdocuments.site/reader033/viewer/2022060200/559936671a28ab0d178b461f/html5/thumbnails/7.jpg)
Old flooring was abateddown to a wood subfloor.
A new wood subfloor was installed in preparation for the new tile.
![Page 8: 2009 Summer Capital Projects](https://reader033.vdocuments.site/reader033/viewer/2022060200/559936671a28ab0d178b461f/html5/thumbnails/8.jpg)
Joints were patched
![Page 9: 2009 Summer Capital Projects](https://reader033.vdocuments.site/reader033/viewer/2022060200/559936671a28ab0d178b461f/html5/thumbnails/9.jpg)
Joints were patched
and new tile installed.
![Page 10: 2009 Summer Capital Projects](https://reader033.vdocuments.site/reader033/viewer/2022060200/559936671a28ab0d178b461f/html5/thumbnails/10.jpg)
Classroom and entry way tile
![Page 11: 2009 Summer Capital Projects](https://reader033.vdocuments.site/reader033/viewer/2022060200/559936671a28ab0d178b461f/html5/thumbnails/11.jpg)
Ceiling tiles were removed. A new ceiling with new lights and new acoustical panels were installed.
![Page 12: 2009 Summer Capital Projects](https://reader033.vdocuments.site/reader033/viewer/2022060200/559936671a28ab0d178b461f/html5/thumbnails/12.jpg)
Ceiling tiles were removed. A new ceiling with new lights and new acoustical panels were installed.
![Page 13: 2009 Summer Capital Projects](https://reader033.vdocuments.site/reader033/viewer/2022060200/559936671a28ab0d178b461f/html5/thumbnails/13.jpg)
New boiler installation
![Page 14: 2009 Summer Capital Projects](https://reader033.vdocuments.site/reader033/viewer/2022060200/559936671a28ab0d178b461f/html5/thumbnails/14.jpg)
The DPW completed work on a redesigned Hardy Road with increased parent drop off and pick up area.
![Page 15: 2009 Summer Capital Projects](https://reader033.vdocuments.site/reader033/viewer/2022060200/559936671a28ab0d178b461f/html5/thumbnails/15.jpg)
Summer 2008 • Master Clock and Bell System• Exterior lights and interior carpet
![Page 16: 2009 Summer Capital Projects](https://reader033.vdocuments.site/reader033/viewer/2022060200/559936671a28ab0d178b461f/html5/thumbnails/16.jpg)
Summer 2008 • Master Clock and Bell System• Exterior lights and interior carpet
Summer 2009 • Flooring abatement and replacement• New air exchange units in gymnasium ceiling• Roof replacement
![Page 17: 2009 Summer Capital Projects](https://reader033.vdocuments.site/reader033/viewer/2022060200/559936671a28ab0d178b461f/html5/thumbnails/17.jpg)
New flooring was installed in 5 elementary schools.
![Page 18: 2009 Summer Capital Projects](https://reader033.vdocuments.site/reader033/viewer/2022060200/559936671a28ab0d178b461f/html5/thumbnails/18.jpg)
New flooring was installed in 5 elementary schools.
![Page 19: 2009 Summer Capital Projects](https://reader033.vdocuments.site/reader033/viewer/2022060200/559936671a28ab0d178b461f/html5/thumbnails/19.jpg)
Point distressed masonry
![Page 20: 2009 Summer Capital Projects](https://reader033.vdocuments.site/reader033/viewer/2022060200/559936671a28ab0d178b461f/html5/thumbnails/20.jpg)
Point distressed masonry
Replace wood gutters
![Page 21: 2009 Summer Capital Projects](https://reader033.vdocuments.site/reader033/viewer/2022060200/559936671a28ab0d178b461f/html5/thumbnails/21.jpg)
Point distressed masonry
Replace wood gutters
New roof on the flat section
![Page 22: 2009 Summer Capital Projects](https://reader033.vdocuments.site/reader033/viewer/2022060200/559936671a28ab0d178b461f/html5/thumbnails/22.jpg)
Summer 2008 • Roof replacement• Master Clock and Bell System
![Page 23: 2009 Summer Capital Projects](https://reader033.vdocuments.site/reader033/viewer/2022060200/559936671a28ab0d178b461f/html5/thumbnails/23.jpg)
Summer 2008 • Roof replacement• Master Clock and Bell System
Summer 2009 - Phase I (required packing and moving of all rooms in the work area)• Ceiling abatement and replacement
• New fire protection• New lighting
• Flooring abatement and replacement• Enlarge two student bathrooms on cafeteria level• Gymnasium ceiling abatement / plaster / paint• Boiler replacement (in process)
![Page 24: 2009 Summer Capital Projects](https://reader033.vdocuments.site/reader033/viewer/2022060200/559936671a28ab0d178b461f/html5/thumbnails/24.jpg)
Summer 2008 • Roof replacement• Master Clock and Bell System
Summer 2009 - Phase I• Ceiling abatement and replacement
• New fire protection• New lighting
• Flooring abatement and replacement• Enlarge two student bathrooms on cafeteria level• Gymnasium ceiling abatement / plaster / paint• Boiler replacement (in process)
Summer 2010 - Phase II• Window replacements for both wings• Continued floor and ceiling abatement and replacement
![Page 25: 2009 Summer Capital Projects](https://reader033.vdocuments.site/reader033/viewer/2022060200/559936671a28ab0d178b461f/html5/thumbnails/25.jpg)
An area of old ceiling previously abated as a result of water damage
The old ceiling was removed in preparation for the installation of fire protection (sprinkler system), new lights and a new suspended ceiling.
![Page 26: 2009 Summer Capital Projects](https://reader033.vdocuments.site/reader033/viewer/2022060200/559936671a28ab0d178b461f/html5/thumbnails/26.jpg)
New smoke and acoustical stops were installed above the new suspended ceiling in walls separating classrooms.
![Page 27: 2009 Summer Capital Projects](https://reader033.vdocuments.site/reader033/viewer/2022060200/559936671a28ab0d178b461f/html5/thumbnails/27.jpg)
New ceiling tile and new lighting
![Page 28: 2009 Summer Capital Projects](https://reader033.vdocuments.site/reader033/viewer/2022060200/559936671a28ab0d178b461f/html5/thumbnails/28.jpg)
New ceiling tile and new lightingbrightened the hallways.
![Page 29: 2009 Summer Capital Projects](https://reader033.vdocuments.site/reader033/viewer/2022060200/559936671a28ab0d178b461f/html5/thumbnails/29.jpg)
Floor preparation and new tile in the cafeteria
![Page 30: 2009 Summer Capital Projects](https://reader033.vdocuments.site/reader033/viewer/2022060200/559936671a28ab0d178b461f/html5/thumbnails/30.jpg)
New tile in the cafeteria
![Page 31: 2009 Summer Capital Projects](https://reader033.vdocuments.site/reader033/viewer/2022060200/559936671a28ab0d178b461f/html5/thumbnails/31.jpg)
New tile in the cafeteria
![Page 32: 2009 Summer Capital Projects](https://reader033.vdocuments.site/reader033/viewer/2022060200/559936671a28ab0d178b461f/html5/thumbnails/32.jpg)
Two student bathrooms on the cafeteria level were renovated and are now ADA compliant.
![Page 33: 2009 Summer Capital Projects](https://reader033.vdocuments.site/reader033/viewer/2022060200/559936671a28ab0d178b461f/html5/thumbnails/33.jpg)
Old carpet flooring
New tile flooring
![Page 34: 2009 Summer Capital Projects](https://reader033.vdocuments.site/reader033/viewer/2022060200/559936671a28ab0d178b461f/html5/thumbnails/34.jpg)
In the process of replacing the gym ceiling the gym floor was damaged.
![Page 35: 2009 Summer Capital Projects](https://reader033.vdocuments.site/reader033/viewer/2022060200/559936671a28ab0d178b461f/html5/thumbnails/35.jpg)
The floor was sanded, lines repainted and new coats of sealant applied.
![Page 36: 2009 Summer Capital Projects](https://reader033.vdocuments.site/reader033/viewer/2022060200/559936671a28ab0d178b461f/html5/thumbnails/36.jpg)
Excavation and extensive new piping was required to add the new sprinkler system.
![Page 37: 2009 Summer Capital Projects](https://reader033.vdocuments.site/reader033/viewer/2022060200/559936671a28ab0d178b461f/html5/thumbnails/37.jpg)
Fiske’s old boilers removed and ready for disposal.
![Page 38: 2009 Summer Capital Projects](https://reader033.vdocuments.site/reader033/viewer/2022060200/559936671a28ab0d178b461f/html5/thumbnails/38.jpg)
New boilers ready for installation.
![Page 39: 2009 Summer Capital Projects](https://reader033.vdocuments.site/reader033/viewer/2022060200/559936671a28ab0d178b461f/html5/thumbnails/39.jpg)
Summer 2008 • Master Clock and Bell System• New roof with improved roof drainage
![Page 40: 2009 Summer Capital Projects](https://reader033.vdocuments.site/reader033/viewer/2022060200/559936671a28ab0d178b461f/html5/thumbnails/40.jpg)
Summer 2008 • Master Clock and Bell System• New roof with improved roof drainage
Summer 2009 • Flooring abatement and replacement in front hallway and entryway• Boiler replacement (in process)
![Page 41: 2009 Summer Capital Projects](https://reader033.vdocuments.site/reader033/viewer/2022060200/559936671a28ab0d178b461f/html5/thumbnails/41.jpg)
Schofield’s entrance hallway rug was replaced with tile.
![Page 42: 2009 Summer Capital Projects](https://reader033.vdocuments.site/reader033/viewer/2022060200/559936671a28ab0d178b461f/html5/thumbnails/42.jpg)
Entrance to the Schofield boiler room
![Page 43: 2009 Summer Capital Projects](https://reader033.vdocuments.site/reader033/viewer/2022060200/559936671a28ab0d178b461f/html5/thumbnails/43.jpg)
Entrance to the Schofield boiler room
![Page 44: 2009 Summer Capital Projects](https://reader033.vdocuments.site/reader033/viewer/2022060200/559936671a28ab0d178b461f/html5/thumbnails/44.jpg)
Entrance to the Schofield boiler room
![Page 45: 2009 Summer Capital Projects](https://reader033.vdocuments.site/reader033/viewer/2022060200/559936671a28ab0d178b461f/html5/thumbnails/45.jpg)
New Boilers
![Page 46: 2009 Summer Capital Projects](https://reader033.vdocuments.site/reader033/viewer/2022060200/559936671a28ab0d178b461f/html5/thumbnails/46.jpg)
Summer 2008 • Master Clock and Bell System
![Page 47: 2009 Summer Capital Projects](https://reader033.vdocuments.site/reader033/viewer/2022060200/559936671a28ab0d178b461f/html5/thumbnails/47.jpg)
Summer 2008 • Master Clock and Bell System
Summer 2009 (required packing and moving of classrooms to complete the work)• New Roof• Flooring abatement and replacement• Gymnasium ceiling abatement / plaster / paint • Boiler replacement (in process)
![Page 48: 2009 Summer Capital Projects](https://reader033.vdocuments.site/reader033/viewer/2022060200/559936671a28ab0d178b461f/html5/thumbnails/48.jpg)
Roofing work was completed more quickly than last summer.
![Page 49: 2009 Summer Capital Projects](https://reader033.vdocuments.site/reader033/viewer/2022060200/559936671a28ab0d178b461f/html5/thumbnails/49.jpg)
Roofing work was completed more quickly than last summer.
![Page 50: 2009 Summer Capital Projects](https://reader033.vdocuments.site/reader033/viewer/2022060200/559936671a28ab0d178b461f/html5/thumbnails/50.jpg)
![Page 51: 2009 Summer Capital Projects](https://reader033.vdocuments.site/reader033/viewer/2022060200/559936671a28ab0d178b461f/html5/thumbnails/51.jpg)
On site demolition of the old boiler was required in preparation for installation of the new heating system.
![Page 52: 2009 Summer Capital Projects](https://reader033.vdocuments.site/reader033/viewer/2022060200/559936671a28ab0d178b461f/html5/thumbnails/52.jpg)
On site demolition of the old boiler was required in preparation for installation of the new heating system.
![Page 53: 2009 Summer Capital Projects](https://reader033.vdocuments.site/reader033/viewer/2022060200/559936671a28ab0d178b461f/html5/thumbnails/53.jpg)
Gym ceilings at
Upham, Hardy and Fiske
were abated and replaced
this summer.
![Page 54: 2009 Summer Capital Projects](https://reader033.vdocuments.site/reader033/viewer/2022060200/559936671a28ab0d178b461f/html5/thumbnails/54.jpg)
Gym ceilings at
Upham, Hardy and Fiske
were abated and replaced
this summer.
![Page 55: 2009 Summer Capital Projects](https://reader033.vdocuments.site/reader033/viewer/2022060200/559936671a28ab0d178b461f/html5/thumbnails/55.jpg)
Gym ceilings at
Upham, Hardy and Fiske
were abated and replaced
this summer.
![Page 56: 2009 Summer Capital Projects](https://reader033.vdocuments.site/reader033/viewer/2022060200/559936671a28ab0d178b461f/html5/thumbnails/56.jpg)
New classroom tile
![Page 57: 2009 Summer Capital Projects](https://reader033.vdocuments.site/reader033/viewer/2022060200/559936671a28ab0d178b461f/html5/thumbnails/57.jpg)
New classroom tile
New stair and landing tread
![Page 58: 2009 Summer Capital Projects](https://reader033.vdocuments.site/reader033/viewer/2022060200/559936671a28ab0d178b461f/html5/thumbnails/58.jpg)
New classroom tile
New stair and landing tread
New hallway tile