2009 rams toc
TRANSCRIPT
-
7/29/2019 2009 RAMS TOC
1/7
Technical Papers
Reliability Analysis of Dynamic Fiber Bundle Models...............................................01C-1
Suprasad V. Amari and Hoang Pham
PMF Series for Availability and Reliability Probabilistic Assessments......................01C-2Jan B. Smith
System of Systems Reliability for Multi-State Systems..............................................01C-3Jason L. Cook
Reliability and Quality of Service in Weighted Probabilistic Networks using AlgebraicDecision Diagrams.......................................................................................................01C-4
Andrea Bobbio and Roberta Terruggia
Improving the 1-Parameter Weibull: A Bayesian Approach...................................... 01D-1
Alexander Aron, Huairui Guo, Adamantios Mettas and Doug Ogden
Bayesian Reliability Demonstration Test in a Design for Reliability Process ........... 01D-2Mingxiao Jiang and Daniel J. Dummer
Weibayes Testing Risk: What is the Impact if Assumed Beta is Incorrect? .............. 01D-3David B. Nicholls and Paul Lein
Analysis of Field Performance Using Interval-Censored Incident Data .................... 01D-4Ke Zhao and Duane Steffey
Six Challenges in Implementation of Effective Accelerated Life Tests......................02C-1
Amar Thiraviam, Will Mudge and Linda Malone
Bayesian parameter estimation with prior weighting in ALT model ..........................02C-2
Sorin Voiculescu and Fabrice Guerin
Life-prediction of the CSADT Based on BP Algorithm of ANN................................02C-3Wei Zhang, Tongmin Jiang and Xiaoyang Li
Optimal Design for Step-Stress Accelerated Degradation Testing with Competing FailureModes ..........................................................................................................................02C-4
Xiaoyang Li and Tongmin Jiang
Worst-Case Prediction using the Arrhenius Model .................................................... 02D-1
Yangyang (Charlotte) Yu and Felix Chen
Warranty Prediction for Products with Random Stresses and Usages ....................... 02D-2
Huairui Guo, Arai Monteforte, Adamantios Mettas and Doug Ogden
-
7/29/2019 2009 RAMS TOC
2/7
Analysis of Data to Predict Warranty Cost for Various Regions ............................... 02D-3
Siva Vinta
Adapted Reliability Prediction by Integrating Mechanical Load Impacts.................. 02D-4
Gisela Lanza, Patrick Werner and Stephan Niggeschmidt
Product Robust Design via Accelerated Degradation Tests ........................................05C-1
Luis Mejia Sanchez and Rong Pan
Flaw-Detected Coating Sensors Applied in Aircraft R&M.........................................05C-2
Feng Hu, Mabao Liu, Hong Gao and Zhigang Lu
Detecting Failure Precursors in BGA Solder Joints ....................................................05C-3
Rubyca Jaai, Michael G. Pecht and Jason L. Cook
Research on Obtaining Dynamic, Robust Fault Diagnosis Rules................................05C-4
Chang Feng, Tingdi Zhao, Nuo Zhao and Shu-yue Yin
Financial-Oriented Approach for the Allocation of Reliability Budgets.....................06C-1Alexandra Mannhart, Andre Dittrich and Bernd Bertsche
Optimal Maintenance of a Multi-Unit System under Dependencies...........................06C-2Bill Sung and Daniel P. Schrage
Hierarchical Decomposition for Optimal Reliability Allocation.................................06C-3Xiaoling Zhang, Hong-Zhong Huang and Yu Liu
A Method for Parameter Estimation of Mixed Weibull Distribution..........................06C-4
Dan Ling, Hong-Zhong Huang and Yu Liu
Concept for the NASA Risk and Reliability Data Collection and Analysis
Environment................................................................................................................ 06D-1
Frank J. Groen and Curtis Lee Smith
Probabilistic Risk Assessment for Decision Making during Spacecraft Operations.. 06D-2
Leila Meshkat
Reliability Practice at NASA Goddard Space Flight Center ...................................... 06D-3
Ming Li, Paula S. Pruessner and Frank J. Groen
Reliability Analysis of Multi-State Phased-Mission Systems .................................... 06D-4
Akhilesh Shrestha, Liudong Xing and Yuanshun Dai
Impact of Proof Test Effectiveness on Safety Instrumented System Performance .... 06D-5
Julia V. Bukowski and Iwan van Beurden
-
7/29/2019 2009 RAMS TOC
3/7
Reliability Centered Preliminary Hazard Analysis......................................................07C-1
Nuo Zhao, Tingdi Zhao and Jin Tian
Multi-Objective Network Interdiction Using Evolutionary Algorithms .....................07C-2
Claudio M. Rocco S., Daniel E. Salazar Aponte and Jose Emmanuel Ramirez-
Marquez
System Failure Analysis Based on Complex Network Theory ...................................07C-3
Hongquan Jiang, Jianmin Gao and Fumin Chen
Process System Fault Source Tracing Based on Bayesian Networks..........................07C-4
Zhong Han, Jianmin Gao and Fumin Chen
Analysis Classes for Space Exploration Reliability Assessments .............................. 07D-1
Benjamion J. Franzini and Blake F. Putney
A Parametric Reliability Prediction Tool for Space Applications.............................. 07D-2Nkiru Udo Ogamba
Design Optimization Considering Performance And Reliability ............................... 07D-3
Shengkui Zeng, Jiming Ma and Feixia Li
Performance Modeling of a Surveillance Mission...................................................... 07D-4
Xavier Quayzin and Emmanuel Arbaretier
Safety Concept Trees ...................................................................................................08C-1
Dominik J. Domis, Mark Forster, Soren Kemmann and Mario Trapp
Reliability Analysis Techniques: How They Relate To Aircraft Certification............08C-2
Mark Saglimbene
A Novel Accident Model And Its Application To Hazard Analysis ...........................08C-3
Shu-yue Yin, Tingdi Zhao, Xiaolei Li and Mei Rong
Seven Key Principles of Orbital Safety Management .................................................08C-4
Tyrone Jackson, Steven Roycraft and Alejandro Levi
Flight Safety Simulation System Based on Hybrid Dynamic System........................ 08D-1
Jian Jiao, Tingdi Zhao and Wei Wang
Statistical Analysis of the Accelerated Life Testing for Fighter-Bomber Wheel Hubs08D-2
Kai-Xian Yue, Mabao Liu, Guoli Wang and Hong Gao
Achieving Shared Accountability for Operational Availability Attainment .............. 08D-3
Ludwig J. Hollick
-
7/29/2019 2009 RAMS TOC
4/7
Achieving World-Class Reliability in General Aviations Supply Chain.................... 08D-4
Murad Hamada and Glenn Jarrell
Improving state-of-the-art power plant availability using Bayesian Networks ...........09C-1
Joel Luyk and Jan L. Rouvroye
A Corrosion Risk Assessment Model For Underground Piping..................................09C-2
Koushik Datta and Douglas Fraser
A Risk Analysis Method Combining Performance and Reliability.............................09C-3
Meng-Lai Yin
Risk Analysis for Transportation Projects ...................................................................09C-4
Paul H. Franklin
Predicting Reliability Investment to Achieve Given Reliability Improvement.......... 09D-1
James A. Forbes, David A. Lee and E. Andrew Long
Advantages of IEEE P1624 for Assessing Organizational Reliability Capability ..... 09D-2Louis J. Gullo
Reliability Prediction Through Bayesian Inference Based On Product Change ........ 09D-3Maurits J.H.A. Houben, Peter J.M. Sonnemans, Guillaume M. Stollman and
Martin J. Newby
Development of Reliability Program Standard GEIA-STD-0009 .............................. 09D-4
Michael J. Cushing, E. Andrew Long and Margaret Hockenberry
Computational Intelligence in Reliability and Maintainability Engineering...............11C-1
Marcia de Fatima Platilha Salgado, Walmir Matos Carminhas and BenjaminRodrigues de Menezes
Modeling Strategies For Reparable Systems Having Multi-Aging Parameters ..........11C-2
Jagmeet Singh, Sameer Vittal and Tong Zou
Behavior of dynamic preventive maintenance optimization for machine tools ..........11C-3
Gisela Lanza, Stephan Niggeschmidt and Patrick Werner
Optimal Selective Maintenance for Multi-State Systems
under Imperfect Maintenance ......................................................................................11C-4Yu Liu, Hong-Zhong Huang and Ming Jian Zuo
Reliability Tool for Initial Quantified Functional Risk and Hazard Analysis............ 11D-1Blake F. Putney, Edward Tavernetti, Joseph R. Fragola and Eric Gold
FMEA Is Not Enough ................................................................................................. 11D-2
-
7/29/2019 2009 RAMS TOC
5/7
Nematollah Bidokhti
Validation of a Mechanical Component Constant Failure Rate Database.................. 11D-3
Julia V. Bukowski and William M. Goble
Failure Analysis of FMEA.......................................................................................... 11D-4Zigmund M. Bluvband and Pavel Grabov
Availability Analysis of a Solar Power System with Graceful Degradation...............12C-1Duane Huffman and France Antelme
How to Estimate and Use MTTF/MTBF: Would the Real MTBF Please Stand Up?.12C-2Milena Krasich
Step Stress Accelerated Life Testing Data Analysis for Repairable System UsingProportional Intensity Model .......................................................................................12C-3
Min Luo and Tongmin Jiang
Multiobjective Optimization of Preventive Maintenance Schedule on Traction PowerSystem in High-Speed Railway ...................................................................................12C-4
Xiao Min Liu, Jun Yong Wu, Yuan Yang and Xu Wei Yan
Reliability Growth of Mobile Gun System during Production Verification Test....... 12D-1
Dmitry E. Tananko, Sharad Kumar, John Paulson and Jenny Chang
Improvements In Automated Reliability Growth Plotting And Estimation ............... 12D-2
David J. Dwyer, Edward Wolfe and Jonathan Cahill
Bayesian Methods for Evaluating Discrete Reliability Growth ................................. 12D-3
J. Brian Hall and Ali Mosleh
A Reliability Growth Simulation Test Bed................................................................. 12D-4
Martin Wayne
Unavailability evaluation method for communication network management ............13C-1
Tatsuya Matsukawa and Hiroyuki Funakoshi
Assessing Availability Impact Caused by Switchover in Database Failover ..............13C-2
Meng-Lai Yin
An Ontology Approach to Support FMEA Studies.....................................................13C-3
Vahid Ebrahimipour, Kamran Razaie and Samaneh Shokravi
Turning Multiple PFMECA Results into an Optimal Action Plan..............................13C-4
Joseph A. Childs
-
7/29/2019 2009 RAMS TOC
6/7
A New Method for Reliability Analysis of Standby Systems ................................... 13D-1
Suprasad V. Amari and Glenn Dill
Reliability Evaluation of a Bulk Power System for the Traction Power Supply System of
a High-Speed Railway ................................................................................................ 13D-2
Yuan Yang, Jun Yong Wu and Jiang Jian Xie
Truncation Approach with the Decomposition Method for System Reliability
Analysis....................................................................................................................... 13D-3Olexandr Yevkin
System Reliability Analysis Considering Fatal and Non-Fatal Shocks in a Fault TolerantSystem......................................................................................................................... 13D-4
Liudong Xing, Prashanthi Boddu and Yan (Lindsay) Sun
A Model of the Competitive Advantage of Prognostics and Health Management..... 14A-1
Brian Douglas Haan
A Rule Based Expert System for Maintenance as a Competitive Advantage ............ 14A-2Filippo De Carlo, Orlando Borgia, Mario Tucci and Mario Rapaccini
Reliability Analysis Required to Determine CBM Condition Indicators................... 14A-3William R. Wessels and F.Chris Sautter
Health Condition Prognostics of Gears Using a Recurrent Neural Net Approach..... 14A-4Zhigang Tian and Ming Jian Zuo
Diagnostic Systems for Power Balancing Large Laser Fusion Facilities ................... 14A-5
Guangyu Chen, Xiaomin Zhang, Xinwen Zeng and Runchang Zhao
Grid Service Reliability Modeling on Fault Recovery and Optimal Task Scheduling14B-1
Suchang Guo, Bo Yang and Hong-Zhong Huang
Leveraging Total Ownership Cost Analysis to Optimize In-Service R&M Programs14B-2John L. Millhouse
Optimization of Warranty Period, Price, and Allocated Reliability............................14B-3Karen Mohan, Duane Huffman and Jennifer Akers
The Lost Components In Commercial Software - A Business Case Study for theNeed for RM&A ..........................................................................................................14B-4
Sheron Morgan and Phillip Paker
Advanced FTA Technique Addressing Early Un-Balanced Failures of Modern
Commercial Electronic Devices ..................................................................................14C-1
David E. Verbitsky
-
7/29/2019 2009 RAMS TOC
7/7
Effect of Solder Flux Residues on Corrosion of Electronics.......................................14C-2Kirsten Stentoft, Morten Jellesen, Per Moller and Peter Jacob Schwenck
Westerman
Consideration for CDM breakdown and reliability designing in the latest semiconductortechnology....................................................................................................................14C-3
Nobuyuki Wakai and Yuji Kobira
Reliability Modeling of Transistor Gates at the Nanoscale .........................................14C-4
Wilkistar Otieno and O. Geoffrey Okogbaa
Software Reliability Modeling of Fault Detection and Correction Processes ............ 14D-1
Yanjun Shu, Zhibo Wu, Hongwei Liu and Xiaozong Yang
Use and Improvements of SysML in Reliability Study.............................................. 14D-2
Pierre David, Vincent Idasiak and Frederic Kratz
Applying Software Failure Modes and Effects Analysis to Interfaces....................... 14D-3Nathaniel W. Ozarin
Software Complexity and Testing Effectiveness: An Empirical Study...................... 14D-4Kostas Kevrekidis, Stijn Albers, Peter J.M. Sonnemans and Guillaume M.
Stollman