2006-03-17un/cefact tmg closing plenary vancouver, canadaslide 1 un/cefact tmg closing plenary...

22
2006-03-17 UN/CEFACT TMG Closing Plenary Vancouver, Canada Slide 1 UN/CEFACT TMG Closing Plenary Vancouver, Canada 12 – 17 March 2006

Upload: marlene-wood

Post on 18-Jan-2018

221 views

Category:

Documents


0 download

DESCRIPTION

UN/CEFACT TMG Closing Plenary  Vancouver, CanadaSlide 3 TMG BP Projects ProjectResp.StatusPriority Est. Date UMM N090 – IntroductionCHOngoingmediumEnd Q1/06 UMM N091 – UMM Foundation ModuleCHODP 5very highEnd Q1/06 UMM N092 – UMM Base ModuleJDODP 5highEnd Q1/06 UMM N093 – UMM User GuideBMFirst drafthighEnd Q1/06 BCSS – SpecificationSCODP 4very highEnd Q1/06 BPSS V1.1 – Specification – merge with OASISKHCompletehighEnd Q1/06 REA Economic Ontology Module Spec for the UMMBMODP 1mediumEnd 2006

TRANSCRIPT

Page 1: 2006-03-17UN/CEFACT TMG Closing Plenary  Vancouver, CanadaSlide 1 UN/CEFACT TMG Closing Plenary Vancouver, Canada 12 – 17 March 2006

2006-03-17 UN/CEFACT TMG Closing Plenary Vancouver, Canada Slide 1

UN/CEFACT TMGClosing Plenary

Vancouver, Canada12 – 17 March 2006

Page 2: 2006-03-17UN/CEFACT TMG Closing Plenary  Vancouver, CanadaSlide 1 UN/CEFACT TMG Closing Plenary Vancouver, Canada 12 – 17 March 2006

2006-03-17 UN/CEFACT TMG Closing Plenary Vancouver, Canada Slide 2

AgendaWelcomeWorking Group Reports

BPWGCCWGEBAWG

Modeler’s Reference Initiative (MRI)UBLOMG Day

Page 3: 2006-03-17UN/CEFACT TMG Closing Plenary  Vancouver, CanadaSlide 1 UN/CEFACT TMG Closing Plenary Vancouver, Canada 12 – 17 March 2006

2006-03-17 UN/CEFACT TMG Closing Plenary Vancouver, Canada Slide 3

TMG BP Projects

Project Resp. Status Priority Est. Date

UMM N090 – Introduction CH Ongoing medium End Q1/06

UMM N091 – UMM Foundation Module CH ODP 5 very high End Q1/06

UMM N092 – UMM Base Module JD ODP 5 high End Q1/06

UMM N093 – UMM User Guide BM First draft high End Q1/06

BCSS – Specification SC ODP 4 very high End Q1/06

BPSS V1.1 – Specification – merge with OASIS KH Complete high End Q1/06

REA Economic Ontology Module Spec for the UMM BM ODP 1 medium End 2006

Page 4: 2006-03-17UN/CEFACT TMG Closing Plenary  Vancouver, CanadaSlide 1 UN/CEFACT TMG Closing Plenary Vancouver, Canada 12 – 17 March 2006

2006-03-17 UN/CEFACT TMG Closing Plenary Vancouver, Canada Slide 4

TMG CC Projects

Project Resp. Status Priority Est. Date

CCTS Part 1 – Metamodel + Methodology GS ODP 3 high End Q2/06

CCTS Part 2 – Message Assembly (working title) GB ODP 2 high End Q2/06

CCTS Part 3 – User Guide MB Maint. low End Q3/06

Context Methodology Specification JZ ODP 1 High End Q2/06

Page 5: 2006-03-17UN/CEFACT TMG Closing Plenary  Vancouver, CanadaSlide 1 UN/CEFACT TMG Closing Plenary Vancouver, Canada 12 – 17 March 2006

2006-03-17 UN/CEFACT TMG Closing Plenary Vancouver, Canada Slide 5

TMG EBA Projects

Project Resp. Status Priority Est. Date

Electronic Business Architecture Specification AT ODP 2 medium End Q1/06

Glossary JW ongoing low N/A

UBAC – Metamodel and Specification AT ODP 2 medium ?

Page 6: 2006-03-17UN/CEFACT TMG Closing Plenary  Vancouver, CanadaSlide 1 UN/CEFACT TMG Closing Plenary Vancouver, Canada 12 – 17 March 2006

2006-03-17 UN/CEFACT TMG Closing Plenary Vancouver, Canada Slide 6

BPWG: UMM2nd working draft of UMM Base and UMM

Foundation Module ready for ODP Step 5.The review period will start on 2006-03-17 and

will end on 2006-04-30. It will be available at www.untmg.org next week.

Page 7: 2006-03-17UN/CEFACT TMG Closing Plenary  Vancouver, CanadaSlide 1 UN/CEFACT TMG Closing Plenary Vancouver, Canada 12 – 17 March 2006

2006-03-17 UN/CEFACT TMG Closing Plenary Vancouver, Canada Slide 7

BPWG: BCSSBCSS v1.0 draft specification is released to ODP Step 4

and will be available at www.untmg.org next week. Includes UML profile but NOT:

Context (pending Context Methodology Project) XMI profile (leverage OMG interoperability compliance work)

Early planning for BCSS 2.0 UML 2.0 profile CCTS 3.0 compliance

Will carefully consider project/spec scope and name for the next version

Page 8: 2006-03-17UN/CEFACT TMG Closing Plenary  Vancouver, CanadaSlide 1 UN/CEFACT TMG Closing Plenary Vancouver, Canada 12 – 17 March 2006

2006-03-17 UN/CEFACT TMG Closing Plenary Vancouver, Canada Slide 8

BPWG: BPSSThe next version of OASIS’s BPSS standard, v2.0.3, will

be submitted to ISO TC 154 for approval as ISO/DTS 15000-6. The TMG will recommend to the CEFACT Plenary (meeting in May) that this action be supported by CEFACT.

UN/CEFACT and OASIS will announce that BPSS 3.0 will be a joint effort.

TMG and OASIS ebBP TC still need to work out details regarding how/where the work will be done.

The v3.0 project will take in all current TMG comments and work to better align BPSS with the UMM.

Page 9: 2006-03-17UN/CEFACT TMG Closing Plenary  Vancouver, CanadaSlide 1 UN/CEFACT TMG Closing Plenary Vancouver, Canada 12 – 17 March 2006

2006-03-17 UN/CEFACT TMG Closing Plenary Vancouver, Canada Slide 9

BPWG: UBAC

UBAC –Unified Business Agreements and Contract project Joint meeting with LG on Wednesday Joint meeting with LG and TBG2, regarding BRS for clickable

agreementsReached high level agreement on task/project assignments

Worked towards finalization of joint requirements

Page 10: 2006-03-17UN/CEFACT TMG Closing Plenary  Vancouver, CanadaSlide 1 UN/CEFACT TMG Closing Plenary Vancouver, Canada 12 – 17 March 2006

2006-03-17 UN/CEFACT TMG Closing Plenary Vancouver, Canada Slide 10

BPWG: REAREA Economic Ontology Specialization Module

for the UN/CEFACT Modeling Methodology project approved

Bill McCarthy appointed ChairCall for participation will go out shortly

Page 11: 2006-03-17UN/CEFACT TMG Closing Plenary  Vancouver, CanadaSlide 1 UN/CEFACT TMG Closing Plenary Vancouver, Canada 12 – 17 March 2006

2006-03-17 UN/CEFACT TMG Closing Plenary Vancouver, Canada Slide 11

CCWG: CCTSThis Week

Brief overview meetingNext Week – four day meeting

Monday, Tuesday, Thursday, Friday (at Xenos)Goal

Finalize changes to next version/releaseComplete update of comment logSend out for review by TMG

Page 12: 2006-03-17UN/CEFACT TMG Closing Plenary  Vancouver, CanadaSlide 1 UN/CEFACT TMG Closing Plenary Vancouver, Canada 12 – 17 March 2006

2006-03-17 UN/CEFACT TMG Closing Plenary Vancouver, Canada Slide 12

CCWG: CCMAThis Week

Brief meeting to review draft of Technical SpecificationPlans

Update the SpecificationDevelop alternative UMM model of a messageConference calls every other Monday, starting April 3Noon, CET, for two hours

Page 13: 2006-03-17UN/CEFACT TMG Closing Plenary  Vancouver, CanadaSlide 1 UN/CEFACT TMG Closing Plenary Vancouver, Canada 12 – 17 March 2006

2006-03-17 UN/CEFACT TMG Closing Plenary Vancouver, Canada Slide 13

CCWG: Context Methodology IContext Methodology Project approvedJoe Zhou appointed ChairCall for participation will go out shortlyNote: Project deliverables will address CC, BP,

and registry concepts.

Page 14: 2006-03-17UN/CEFACT TMG Closing Plenary  Vancouver, CanadaSlide 1 UN/CEFACT TMG Closing Plenary Vancouver, Canada 12 – 17 March 2006

2006-03-17 UN/CEFACT TMG Closing Plenary Vancouver, Canada Slide 14

CCTS: Context Methodology IIProject Steps

Review and evaluate current UN/CEFACT standards that are related to and potentially impacted by the context methodology;

Develop a context framework meta-model and a context methodology for the implementation of the meta-model;

For each area (category) of the context meta-model, develop a taxonomy that can be used to populate the eventual context driver value instance. Existing taxonomies shall be used.

Collaborate with TBG in developing business process related context model and examples;

Collaborate with ICG in registry meta-model and implementation; Develop first complete draft for review.

Page 15: 2006-03-17UN/CEFACT TMG Closing Plenary  Vancouver, CanadaSlide 1 UN/CEFACT TMG Closing Plenary Vancouver, Canada 12 – 17 March 2006

2006-03-17 UN/CEFACT TMG Closing Plenary Vancouver, Canada Slide 15

Architectural Workgroup

Architectural WG has re-started the Architectural Process A collaborative work with all groups Chair Anders W. Tell

The Architecture will support the UN/CEFACT Electronic Business vision & mission and implement the UN/CEFACT Electronic Business Strategy

Intends to show how all required methodologies and technologies fits together (CCTS, UMM, BCSS, NDR, UN/EDIFACT, UNeDocs, ebXML, Web Services...)

Works with MRI to describe “UN/CEFACT product 1.0”

Meets Tuesday Working on Architectural vision Working on Architectural white papers Discussion session on Business Web Services

Investigating broader collaboration of OMG technologies; Performing GAP-analysis 1st joint meeting in Tampa Bay , Florida, with OMG, in February 2nd joint meeting in Vancouver on Thursday

Page 16: 2006-03-17UN/CEFACT TMG Closing Plenary  Vancouver, CanadaSlide 1 UN/CEFACT TMG Closing Plenary Vancouver, Canada 12 – 17 March 2006

2006-03-17 UN/CEFACT TMG Closing Plenary Vancouver, Canada Slide 16

Classification of technical specifications

Business Libraries / Registry & Repository

Applied Technologies Group

Information Content Management Group

International Trade and Business Processes Group’s

Governmentorganisations Industries

Private Sector

Harmonization (tbg)

”eBusinessFramework”

Business Semantics & Methodology

Business Web Services

ebXML Framework

Traditional EDI

Technological frameworks

(semantic web, SOA, POA,...)

BusinessCollaboration Process

(how,when)

BusinessInformation

(what)

Business Operations View

Functional Service View

ebArchitecture

$

VISIO CORPORATION

eBusiness Requirements

$

VISIO CORPORATION

Translation, Mapping, Compliance, Interoperability(query/view/transform)

ebGlossary

CCTS

NDR

RegRep

UN/EDIFACT XSD

UML2EDIFACT

Business Requirements Specification

Requirements Specification Mapping

Business Standards Workflow

eBusiness Strategy

Families of Technologies

Information and knowledge representation/expressionXMI

Business, Economical, Regulatory "Motivation" (why), Contract (who), Organization (who), Location (where), ... REA

BPSS

Business Collaboration System (how)

UMMCCMA

BCSS

UML

CBPC

Harmonisation

UNLayoutKey

Page 17: 2006-03-17UN/CEFACT TMG Closing Plenary  Vancouver, CanadaSlide 1 UN/CEFACT TMG Closing Plenary Vancouver, Canada 12 – 17 March 2006

2006-03-17 UN/CEFACT TMG Closing Plenary Vancouver, Canada Slide 17

Highlights A productive 2nd MRI-sunday

Founder: Anders W. Tell MRI Purpose:

Stimulate, facilitate and motivate the uptake of the UN/CEFACT modeling approach

Information and experience sharing amongst groups 35+ participants from all groups ebArchitecture Workgroup provided …

an overview of UN/CEFACT work products and their versions; Business Standards, UN Recommendations, Technical Specifications

overview of Business Standards Workflow and Open Development Process (ODP)

Discussions conducted regarding “UN/CEFACT Product v2.0”

Page 18: 2006-03-17UN/CEFACT TMG Closing Plenary  Vancouver, CanadaSlide 1 UN/CEFACT TMG Closing Plenary Vancouver, Canada 12 – 17 March 2006

2006-03-17 UN/CEFACT TMG Closing Plenary Vancouver, Canada Slide 18

Upcoming Meetings19-23 June 2006: UN/CEFACT TMG Meeting at

SWIFT in Brussels, Belgium02-06 October 2006 (tentative): UN/CEFACT

Forum in New Dehli, India

Page 19: 2006-03-17UN/CEFACT TMG Closing Plenary  Vancouver, CanadaSlide 1 UN/CEFACT TMG Closing Plenary Vancouver, Canada 12 – 17 March 2006

2006-03-17 UN/CEFACT TMG Closing Plenary Vancouver, Canada Slide 19

Modeler’s Reference Initiative (MRI)The MRI Chair, Ian Watt, will propose that MRI

get a more prominent position within TBG.The main objective is to assemble the business

knowledge experts in TBG, TMG, ATG, and ICG.

Provide feedback directed to the FMG regarding issues or opportunities

Develop UN/CEFACT UMM/CCTS/NDR/Repository “cookbook”

Will have a websiteDevelop case studies

Page 20: 2006-03-17UN/CEFACT TMG Closing Plenary  Vancouver, CanadaSlide 1 UN/CEFACT TMG Closing Plenary Vancouver, Canada 12 – 17 March 2006

2006-03-17 UN/CEFACT TMG Closing Plenary Vancouver, Canada Slide 20

UBLUBL expectation of TMG

Clear advice from TMG to UBL regarding UBL library conformance with CCTS 2.01 with the goal being that the UBL library submission will be conformant

Initial review with comments to be completed by 30 AprilJoint UBL/TMG expectations

Develop a plan to use UBL 2.0 as a base library for CCTS 3.0 implementation verification

Page 21: 2006-03-17UN/CEFACT TMG Closing Plenary  Vancouver, CanadaSlide 1 UN/CEFACT TMG Closing Plenary Vancouver, Canada 12 – 17 March 2006

2006-03-17 UN/CEFACT TMG Closing Plenary Vancouver, Canada Slide 21

OMG DayProductive day on teleconference with OMG

modeling expertsJens will lead a gap analysis between UMM and

BPDM/BPMNThere are other areas worth analyzing, if leaders

step forward, such as ODM, UML2, etc.

Page 22: 2006-03-17UN/CEFACT TMG Closing Plenary  Vancouver, CanadaSlide 1 UN/CEFACT TMG Closing Plenary Vancouver, Canada 12 – 17 March 2006

2006-03-17 UN/CEFACT TMG Closing Plenary Vancouver, Canada Slide 22

UN/CEFACTSIMPLE, TRANSPARENT AND EFFECTIVE PROCESSES

FOR GLOBAL BUSINESS.