Program Execution Management in Teamcenter
Brian Flynn
© UGS PLM Solutions Inc. 2003. All right reserved.
AgendaAgenda
Teamcenter Program Execution Management
Program Execution Management - Solution Scenarios
Use Case Scenarios
Collaborative Schedule Environment PLM Integration Resource Management Visibility and Decision Support Workplace Creation MS Project Integration
Summary
2004 Roadmap
“Get More Teamcenter Project @ PLM World 2004”
© UGS PLM Solutions Inc. 2003. All right reserved.
2
© UGS PLM Solutions Inc. 2003. All right reserved.
Business Model and Strategy:Teamcenter Backbone Enables...…Enterprise Collaboration, Parts List, Visualization, Reuse, MultiCad.. UGS PLM Solution’s vision
PLM is not a tool It is a set of processes and tools to support
digital decision making Enabling innovation, speed, & agility
Teamcenter is a portfolio of configurable lifecycle domain & industry solutions
Extending the Teamcenter leadership …
Program Execution Management Teamcenter Project
2
© UGS PLM Solutions Inc. 2003. All right reserved.
Teamcenter
Real Time Data Access from Multiple Systems
PDM Platforms – secure, intellectual asset and process management
Visual collaboration
Integrated Program and Project Mgmt
Insuring results match program objectives
Lights-out SourcingVisualization everywhere
Digital manufacturing
UGS PLM Solution’s VisionUGS PLM Solution’s Vision
© UGS PLM Solutions Inc. 2003. All right reserved.
Program Execution ManagementProgram Execution Management
Decision Support Throughout the Product Lifecycle
The ability for stakeholders to:
Leverage program knowledge (engineering and business information) and intellectual assets (team members including partners, allies and suppliers)
In the context of defined business processes (phase-gate and schedule driven workflow, metrics, thresholds and triggers)
To meet business objectives (revenue/growth, investment, cost, quality, timing)
“Doing projects right and doing the right projects” – Dr. Robert Cooper
© UGS PLM Solutions Inc. 2003. All right reserved.
AgendaAgenda
Teamcenter Program Execution Management
Program Execution Management - Solution Scenarios
Use Case Scenarios
Collaborative Schedule Environment PLM Integration Resource Management Visibility and Decision Support Workplace Creation MS Project Integration
Summary
2004 Roadmap
“Get More Teamcenter Project @ PLM World 2004”
© UGS PLM Solutions Inc. 2003. All right reserved.
Vision – Integrating Project & Program Management into the Product LifecycleVision – Integrating Project & Program Management into the Product Lifecycle
Results – Drive Execution
Transformation From “Planning and Statusing” To “Planning and Executing” “With 24x7x365 visibility” Enabling “Informed Decisions”
Business problem
Project and Program Management (planning, statusing & reporting) are traditionally disconnected activities from actual execution
Causes built-in overhead, lost productivity, out-of-sync data, and misguided decisions
Solution – Teamcenter Program Execution Management
Connects project schedules & resources to workflow processes – making it a connected activity that engages everyone across the virtual enterprise
© UGS PLM Solutions Inc. 2003. All right reserved.
Plan Execute Adjust
Plan Execute Adjust
Product Lifecycle Management Product Lifecycle Management
© UGS PLM Solutions Inc. 2003. All right reserved.
Enabling…Program Execution ManagementEnabling…Program Execution Management
Extend project and program management beyond traditional boundaries
Incorporate project schedules as a backbone to the entire product lifecycle process
Provide visibility to how things are progressing within Teamcenter Enterprise and Engineering
Manage resource workloads (people, equipment, groups)
Support costing and budgets Ensure best practice processes are followed
Support supplier and partner coordination
Enhance visibility and decision support with easy access dashboards
© UGS PLM Solutions Inc. 2003. All right reserved.
AgendaAgenda
Teamcenter Program Execution Management
Program Execution Management - Solution Scenarios
Use Case Scenarios
Collaborative Schedule Environment PLM Integration Resource Management Visibility and Decision Support Workplace Creation MS Project Integration
Summary
2004 Roadmap
“Get More Teamcenter Project @ PLM World 2004”
© UGS PLM Solutions Inc. 2003. All right reserved.
Collaborative Schedule EnvironmentCollaborative Schedule Environment
Real time access to changes / everyone on the same page
Collaboratively build schedules / improve efficiency
© UGS PLM Solutions Inc. 2003. All right reserved.
Collaborative Schedule EnvironmentCollaborative Schedule Environment
Step 1 Modifying the Schedule
Login to Teamcenter Project From the Workplaces tab open the Product Development
Projects folder and double click on the Leucadia Project Highlight any task within the schedule Locate the box that states <click here to add tasks>, click
there, type in a task name and press enter Step 2 Collaborating
Select the Collaboration tab Select the Issues Tracking database
Modify cells, add rows Review the other collaborative tools like Notebooks or
Discussion Threads
© UGS PLM Solutions Inc. 2003. All right reserved.
Teamcenter Project Integration Instrumented Lifecycle Display Status in Project Automatic Generation of Task and
Submit to lifecycle Programs / Projects with multiple
independent lifecycles Dashboard View
Lifecycle Enhancements – Schedules and Display Duration / Schedule management Graphical Display
Lifecycle Process Status
Master Resource DrivenProduct Schedule - Teamcenter Project
Product
+ Rev A
- Rev B
+ Part A
- Assy B
Part I
Part II
Feature
A
B
Drives
Supporting WorkflowsTeamcenter Enterprise
Workflow or User-driven events update corresponding tasks
Bi-directionalLinks
PLM IntegrationPLM Integration
© UGS PLM Solutions Inc. 2003. All right reserved.
Resource ManagementResource Management
Visualize and manage resource workloads appropriately
Validate resource demands with group level histograms
© UGS PLM Solutions Inc. 2003. All right reserved.
Resource ManagementResource Management
Step 1 Assigning Resources to Tasks
Double click on any task and select the Resources tab Place a check in the Highlight Overloaded Resources box Assign new team members to the task, if anyone box turns
red that person is currently overloaded Select the Resource Graph icon to view what other tasks
the resource is working on Step 2 Reviewing Resource Histograms
Within the other main window select the People tab and open the Management folder
Highlight Brett Favre, right click and select View Resource Graph
Double clicking on the individual bars will allow you reassign this task from this view
© UGS PLM Solutions Inc. 2003. All right reserved.
Visibility and Decision SupportVisibility and Decision Support
Visual markers
Current task and project level status Life Cycle Tasks Linked Tasks Email Notifications Decision support parameters
Dashboards
Project and Program level statusing and progress Earned Value Resource Allocation Budgets verse Actuals Baseline Reports
© UGS PLM Solutions Inc. 2003. All right reserved.
Visibility and Decision SupportVisibility and Decision Support
© UGS PLM Solutions Inc. 2003. All right reserved.
Workplace CreationWorkplace Creation
Advanced Template Environment
Ensures best practice processes are in place Time needed to launch new projects is measured in minutes
not days
Besides a schedule include:
Life Cycle Tasks
Generic Resource Assignments
Project Cost Parameters
Email Notifications
Task Level Notebooks
Risk and Issue Databases
Documents
© UGS PLM Solutions Inc. 2003. All right reserved.
Workplace CreationWorkplace Creation
Step 1 Creating a Project from a Template
Within the Workplaces tab highlight any folder and select the New Workplace icon
Give your new project a name and then check the Use an existing Workplace template for this Workplace box
Under the Templates folder select the New Product Development Template workplace and click on Select
Click on the Next button three times and then select Finish Once your new project is created double click on it and review
what has been included
© UGS PLM Solutions Inc. 2003. All right reserved.
MS Project IntegrationMS Project Integration
Easily Import, Export and Synchronize schedules with MS Project
© UGS PLM Solutions Inc. 2003. All right reserved.
AgendaAgenda
Teamcenter Program Execution Management
Program Execution Management - Solution Scenarios
Use Case Scenarios
Collaborative Schedule Environment PLM Integration Resource Management Visibility and Decision Support Workplace Creation MS Project Integration
Summary
2004 Roadmap
“Get More Teamcenter Project @ PLM World 2004”
© UGS PLM Solutions Inc. 2003. All right reserved.
Key Value PointsKey Value Points
Corporate AgendaCorporate AgendaCorporate AgendaCorporate Agenda
Business ChallengeBusiness ChallengeBusiness ChallengeBusiness Challenge Improvement Improvement InitiativesInitiatives
Improvement Improvement InitiativesInitiatives
One Overall Solution One Overall Solution TeamcenterTeamcenter
One Overall Solution One Overall Solution TeamcenterTeamcenter Differentiators Differentiators Differentiators Differentiators
• Improve Product Quality
• Improve Process Visibility and Control
• Remove Latency within the PLC process
• Improve Product Quality
• Improve Process Visibility and Control
• Remove Latency within the PLC process
• Program Execution Program Execution ManagementManagement
• Lifecycle Product Lifecycle Product Knowledge Knowledge ManagementManagement
• Enterprise Level Enterprise Level Decision SupportDecision Support
• Program Execution Program Execution ManagementManagement
• Lifecycle Product Lifecycle Product Knowledge Knowledge ManagementManagement
• Enterprise Level Enterprise Level Decision SupportDecision Support
• Issues with schedule and cost expectations
• No clear visibility to costs or progress
• Limited control on suppliers and business partners
• Time to market is critical
• Need to understand resource workloads
• Need to support dispersed teams
• Silos of Information
• Issues with schedule and cost expectations
• No clear visibility to costs or progress
• Limited control on suppliers and business partners
• Time to market is critical
• Need to understand resource workloads
• Need to support dispersed teams
• Silos of Information
• Execution driven Execution driven project management project management
• Control product Control product information from information from concept through concept through end of lifeend of life
• Manage resource Manage resource workloadsworkloads
• Enhance visibility Enhance visibility & decision support& decision support
• Templatize best Templatize best practicespractices
• Single source Single source providerprovider
• Execution driven Execution driven project management project management
• Control product Control product information from information from concept through concept through end of lifeend of life
• Manage resource Manage resource workloadsworkloads
• Enhance visibility Enhance visibility & decision support& decision support
• Templatize best Templatize best practicespractices
• Single source Single source providerprovider
• Gain visibility and controlGain visibility and control• Improve product quality/control costs Improve product quality/control costs
•Correctly manage resource workloadsCorrectly manage resource workloads• Improve productivity and moralImprove productivity and moral
•Control development process/eliminate wasteControl development process/eliminate waste• Improve cost and delivery predictabilityImprove cost and delivery predictability
• Gain visibility and controlGain visibility and control• Improve product quality/control costs Improve product quality/control costs
•Correctly manage resource workloadsCorrectly manage resource workloads• Improve productivity and moralImprove productivity and moral
•Control development process/eliminate wasteControl development process/eliminate waste• Improve cost and delivery predictabilityImprove cost and delivery predictability
UGS AgendaUGS AgendaUGS AgendaUGS Agenda
Solution ValueSolution ValueSolution ValueSolution Value
© UGS PLM Solutions Inc. 2003. All right reserved.
AgendaAgenda
Teamcenter Program Execution Management
Program Execution Management - Solution Scenarios
Use Case Scenarios
Collaborative Schedule Environment PLM Integration Resource Management Visibility and Decision Support Workplace Creation MS Project Integration
Summary
2004 Roadmap
“Get More Teamcenter Project @ PLM World 2004”
© UGS PLM Solutions Inc. 2003. All right reserved.
Jan Jul OctApr
Teamcenter Project V4.1
• GA Target Release Date: End of May, 2004
• Program Management dashboards enhancements
• Teamcenter Community integration
• Project Dashboards as Teamcenter Community web parts
• Microsoft-centric look & feel
• Common infrastructure
• Project application customization
• Project Management
• Task identifier numbers
• Successor / Predecessor Editing by Task IDs
• Customer Enhancement Requests
Teamcenter Project V5.0
• GA Target Release Date: November, 2004
• Phase-Gate with Enterprise
• Delivered with Enterprise v5.0 (9/2004)
• Microsoft Project integration
• Enable Lifecycle-tasks in Microsoft Project
• Supports Microsoft Project Standard, Professional, and Server
• Resource Management
• Skillset membership
• Assignment and skillset mapping improvements
• Customer Enhancement Requests
Q2 2004
Project 4.1
^
Teamcenter Project 2004 RoadmapTeamcenter Project 2004 Roadmap
Q4 2004
Project 5.0
^Dec
© UGS PLM Solutions Inc. 2003. All right reserved.
Teamcenter Project 4.1 - Feature DetailTeamcenter Project 4.1 - Feature Detail
Dashboard Enhancements Additional charts and views to support Project, Program
and Resource Management Improved help in dashboard views
Customer Value: more views of project and resource status improve ability to react in real-time decision time
Integration with Teamcenter Community Program dashboards in native web-parts Compatible look and feel - content and configuration SSO support Note: Project and Community are configurable to use
common Active Directory, SQL*Sever Customer Value: common placement for key success
factor metrics
© UGS PLM Solutions Inc. 2003. All right reserved.
Teamcenter Project 4.1 - Feature DetailTeamcenter Project 4.1 - Feature Detail
Project Management Enhancements Task identifiers - support quick handling of project tasks Successor / predecessor editing by task IDs Tree table view of project with view / hide capability
Customer value: easier manipulation of dependencies and manipulation / viewing of project schedule
© UGS PLM Solutions Inc. 2003. All right reserved.
Teamcenter Project 2005 RoadmapTeamcenter Project 2005 Roadmap
Teamcenter Project V5.1
• GA Target Release Date: Q2, 2005
• Engineering integration
• Workflow / Schedule lifecycle-task integration
• Delivered with Engineering v10 (2/2005)
• Customer Enhancement Requests
Jan Jul OctApr Dec
Q2 2005
TcP 5.1
^
© UGS PLM Solutions Inc. 2003. All right reserved.
Teamcenter Project 5.0 - Feature DetailTeamcenter Project 5.0 - Feature Detail
Phase-Gate Automation Implement initiative management with synchronized project and
resource management capabilities across Enterprise and Project Leverages Lifecycle Tasks available in Teamcenter 4.0 OOTB Dashboard support pulling phase-gate content from all
sources - phase status, criteria metrics, project metrics, resource status, etc.
Customer value: methodology support enables real-time viewing of investment status, enabling faster reaction times
© UGS PLM Solutions Inc. 2003. All right reserved.
Teamcenter Project 5.0 - Feature DetailTeamcenter Project 5.0 - Feature Detail
Microsoft Project Integration Lifecycle task support in Microsoft Project schedule
Customer value: reduced training and time to adopt Teamcenter automation – Schedule initiated workflows which automatically update project / task status
Resource Management Add users to skillsets, allowing easier assignments and
commitment of staff to fulfill skillset assignment View “member of” information in user properties Resource graphing and dashboard utilization by skillset members Advanced assignment support leveraging skillset membership
Customer value: Better management of skillsets and people in the organization. Improved visibility of constraining resources.
© UGS PLM Solutions Inc. 2003. All right reserved.
Fast is … NOW!
Fast was…
Instant Program StatusInstant Program Status
© UGS PLM Solutions Inc. 2003. All right reserved.
AgendaAgenda
Teamcenter Program Execution Management
Program Execution Management - Solution Scenarios
Use Case Scenarios
Collaborative Schedule Environment PLM Integration Resource Management Visibility and Decision Support Workplace Creation MS Project Integration
Summary
2004 Roadmap
“Get More Teamcenter Project @ PLM World 2004”
© UGS PLM Solutions Inc. 2003. All right reserved.
Get More of Teamcenter Project@ PLM World 2004Get More of Teamcenter Project@ PLM World 2004
Project “Hands on Help” sessions – Room 5
Tuesday 9:15 – 10:00AM Wednesday 9:15 – 10:00AM Thursday 9:15 – 10:00AM
“Teamcenter Project – Teamcenter Enterprise Integration, Web-based Program/Project Management, Best Practices, etc.” Two Training Sessions
Wednesday 1:30 – 3:00PM Thursday 3:30 – 5:00PM
© UGS PLM Solutions Inc. 2003. All right reserved.
Thank You
© UGS PLM Solutions Inc. 2003. All right reserved.
Supplemental slides
© UGS PLM Solutions Inc. 2003. All right reserved.
Program Execution Management – Integrated SolutionProgram Execution Management – Integrated Solution
Project template managementMS Project synchronizationProject dashboard reportingProject team collaborationResource managementPhase-Gate managementProcess tasks linked to scheduleRequirements linked to schedule
Process
Phase
Criteria
Gate
Task
Deliverable
Product
+ Rev A
- Rev B
+ Part A
- Assy B
Part I
Part II
Feature
A
B
Drives
Bi-directionalLinks
© UGS PLM Solutions Inc. 2003. All right reserved.
Stage and Gate Management – Process ModelingStage and Gate Management – Process Modeling
Process: A workflow made up of a series of phases and decisions gates.
Phase: A defined stage in the process in which one or more tasks are performed. Phases can have sub-phases.
Gate: A decision point that determines if a project may proceed to the next activity phase. This go/no-go decision is based upon pre-defined deliverables and pre-defined criteria.
Task: An activity that is to be accomplished within a phase.
Deliverable: Required output of a phase or a task
Criteria: The basis upon which gate decisions are made. Criteria may or may not involve the deliverables of a phase.
Process
Phase
Criteria
Gate
Task
Deliverable
ConceptConceptConceptConcept PlanPlan PlanPlan DevelopDevelop DevelopDevelop ValidateValidate ValidateValidate Ramp toRamp to ProductionProduction
Ramp toRamp to ProductionProduction
SupportSupport ThroughThrough End of LifeEnd of Life
SupportSupport ThroughThrough End of LifeEnd of Life
© UGS PLM Solutions Inc. 2003. All right reserved.
Teamcenter Project V4Project & Program ManagementTeamcenter Project V4Project & Program Management
Project Management
Project scheduling Resource management
Program Management
Project & Program management dashboards Linkage to Teamcenter Requirements, Engineering, &
Enterprise Integrated Program Management with Teamcenter
Enterprise Dashboard views in Teamcenter Community
Microsoft Project integration
Web-based client for ease of use & deployment
© UGS PLM Solutions Inc. 2003. All right reserved.
• Team Centric Solution / Global Team Support
• Visibility and Access to All Project-Related Information
What sets the Teamcenter Project solution apart:
• Feature Rich Templates / Best Practice Processes
• TeamNative Environment / Real Time Updates
• Platform Independent / Open Architecture
• Removes Latency within the PLC Process / Automation
Execute on project plans – not just plan them
• Directly connect tasks to the Requirements that drive them
Teamcenter Project V4Project & Program ManagementTeamcenter Project V4Project & Program Management
© UGS PLM Solutions Inc. 2003. All right reserved.
Integrated Project & Program ManagementIntegrated Project & Program Management
Teamcenter Project and Teamcenter Enterprise
“Lifecycle Tasks” (LCT) defined in project plan, with work-ready rule, assignee information and workflow
Triggered into Teamcenter Enterprise for assignment and workflow execution. Task status & actuals automatically updated by Enterprise back in Project
Dashboard panels and gauges show execution status with configurable refresh rates. Broadcasts organization-specific product management metrics / gauges with comprehensive drill-down
Change Module pushes WBS into Project for more accurate pre-approval (cost, resource, duration) info… and for post-approval work execution via LCT [Teamcenter Project 4.1]
© UGS PLM Solutions Inc. 2003. All right reserved.
Challenge
Project Management and execution of tasks are traditionally disconnected activities
Plan, execute… Program managers chase
status & produce reports, all day, everyday – why?
Leads to …
Built-in overhead Lost productivity Out-of-sync data Misguided decisions
Master Resource DrivenProduct Schedule - Teamcenter ProjectProduct
+ Rev A
- Rev B
+ Part A
- Assy B
Part I
Part II
Feature
A
B
DrivesSupporting WorkflowsTeamcenter Enterprise
Workflow or User-driven events update corresponding tasks
Bi-directionalLinks
Lifecycle Business ChallengesProcess Management OptimizationLifecycle Business ChallengesProcess Management Optimization
© UGS PLM Solutions Inc. 2003. All right reserved.
Teamcenter Project Manages program schedules with real-time project information that is directly
linked to PDM business items, such as assembly parts Connects project schedules to Teamcenter Enterprise workflow processes
“Lifecycle Tasks” (LCT) defined in project plan Enterprise triggered for assignment and workflow execution. Task status & actuals automatically updated by Enterprise back in Project Dashboard panels and gauges show execution status with configurable refresh rates. Change Module pushes WBS into Project for more accurate pre-approval (cost,
resource, duration) info and for work execution
Transforming From planning,
executing, and status chasing …
To planning, executing, and 24x7x365 instant status
Teamcenter Project V4Integrated Project & Program ManagementTeamcenter Project V4Integrated Project & Program Management
© UGS PLM Solutions Inc. 2003. All right reserved.
Teamcenter Project V4Project & Program ManagementTeamcenter Project V4Project & Program Management
Project Management
Project scheduling Resource management
Program Management
Project & Program management dashboards Linkage to Teamcenter Requirements, Engineering, &
Enterprise Integrated Program Management with Teamcenter
Enterprise Dashboard views in Teamcenter Community
Microsoft Project integration
Web-based client for ease of use & deployment