2004 team center training presentation on project

42
© UGS PLM Solutions Inc. 2003. All right reserved. Program Execution Management in Teamcenter Brian Flynn

Upload: sam-ha

Post on 06-May-2015

2.774 views

Category:

Technology


2 download

TRANSCRIPT

Page 1: 2004 Team Center Training Presentation On Project

© UGS PLM Solutions Inc. 2003. All right reserved.

Program Execution Management in Teamcenter

Brian Flynn

Page 2: 2004 Team Center Training Presentation On Project

© UGS PLM Solutions Inc. 2003. All right reserved.

AgendaAgenda

Teamcenter Program Execution Management

Program Execution Management - Solution Scenarios

Use Case Scenarios

Collaborative Schedule Environment PLM Integration Resource Management Visibility and Decision Support Workplace Creation MS Project Integration

Summary

2004 Roadmap

“Get More Teamcenter Project @ PLM World 2004”

Page 3: 2004 Team Center Training Presentation On Project

© UGS PLM Solutions Inc. 2003. All right reserved.

2

© UGS PLM Solutions Inc. 2003. All right reserved.

Business Model and Strategy:Teamcenter Backbone Enables...…Enterprise Collaboration, Parts List, Visualization, Reuse, MultiCad.. UGS PLM Solution’s vision

PLM is not a tool It is a set of processes and tools to support

digital decision making Enabling innovation, speed, & agility

Teamcenter is a portfolio of configurable lifecycle domain & industry solutions

Extending the Teamcenter leadership …

Program Execution Management Teamcenter Project

2

© UGS PLM Solutions Inc. 2003. All right reserved.

Teamcenter

Real Time Data Access from Multiple Systems

PDM Platforms – secure, intellectual asset and process management

Visual collaboration

Integrated Program and Project Mgmt

Insuring results match program objectives

Lights-out SourcingVisualization everywhere

Digital manufacturing

UGS PLM Solution’s VisionUGS PLM Solution’s Vision

Page 4: 2004 Team Center Training Presentation On Project

© UGS PLM Solutions Inc. 2003. All right reserved.

Program Execution ManagementProgram Execution Management

Decision Support Throughout the Product Lifecycle

The ability for stakeholders to:

Leverage program knowledge (engineering and business information) and intellectual assets (team members including partners, allies and suppliers)

In the context of defined business processes (phase-gate and schedule driven workflow, metrics, thresholds and triggers)

To meet business objectives (revenue/growth, investment, cost, quality, timing)

“Doing projects right and doing the right projects” – Dr. Robert Cooper

Page 5: 2004 Team Center Training Presentation On Project

© UGS PLM Solutions Inc. 2003. All right reserved.

AgendaAgenda

Teamcenter Program Execution Management

Program Execution Management - Solution Scenarios

Use Case Scenarios

Collaborative Schedule Environment PLM Integration Resource Management Visibility and Decision Support Workplace Creation MS Project Integration

Summary

2004 Roadmap

“Get More Teamcenter Project @ PLM World 2004”

Page 6: 2004 Team Center Training Presentation On Project

© UGS PLM Solutions Inc. 2003. All right reserved.

Vision – Integrating Project & Program Management into the Product LifecycleVision – Integrating Project & Program Management into the Product Lifecycle

Results – Drive Execution

Transformation From “Planning and Statusing” To “Planning and Executing” “With 24x7x365 visibility” Enabling “Informed Decisions”

Business problem

Project and Program Management (planning, statusing & reporting) are traditionally disconnected activities from actual execution

Causes built-in overhead, lost productivity, out-of-sync data, and misguided decisions

Solution – Teamcenter Program Execution Management

Connects project schedules & resources to workflow processes – making it a connected activity that engages everyone across the virtual enterprise

Page 7: 2004 Team Center Training Presentation On Project

© UGS PLM Solutions Inc. 2003. All right reserved.

Plan Execute Adjust

Plan Execute Adjust

Product Lifecycle Management Product Lifecycle Management

Page 8: 2004 Team Center Training Presentation On Project

© UGS PLM Solutions Inc. 2003. All right reserved.

Enabling…Program Execution ManagementEnabling…Program Execution Management

Extend project and program management beyond traditional boundaries

Incorporate project schedules as a backbone to the entire product lifecycle process

Provide visibility to how things are progressing within Teamcenter Enterprise and Engineering

Manage resource workloads (people, equipment, groups)

Support costing and budgets Ensure best practice processes are followed

Support supplier and partner coordination

Enhance visibility and decision support with easy access dashboards

Page 9: 2004 Team Center Training Presentation On Project

© UGS PLM Solutions Inc. 2003. All right reserved.

AgendaAgenda

Teamcenter Program Execution Management

Program Execution Management - Solution Scenarios

Use Case Scenarios

Collaborative Schedule Environment PLM Integration Resource Management Visibility and Decision Support Workplace Creation MS Project Integration

Summary

2004 Roadmap

“Get More Teamcenter Project @ PLM World 2004”

Page 10: 2004 Team Center Training Presentation On Project

© UGS PLM Solutions Inc. 2003. All right reserved.

Collaborative Schedule EnvironmentCollaborative Schedule Environment

Real time access to changes / everyone on the same page

Collaboratively build schedules / improve efficiency

Page 11: 2004 Team Center Training Presentation On Project

© UGS PLM Solutions Inc. 2003. All right reserved.

Collaborative Schedule EnvironmentCollaborative Schedule Environment

Step 1 Modifying the Schedule

Login to Teamcenter Project From the Workplaces tab open the Product Development

Projects folder and double click on the Leucadia Project Highlight any task within the schedule Locate the box that states <click here to add tasks>, click

there, type in a task name and press enter Step 2 Collaborating

Select the Collaboration tab Select the Issues Tracking database

Modify cells, add rows Review the other collaborative tools like Notebooks or

Discussion Threads

Page 12: 2004 Team Center Training Presentation On Project

© UGS PLM Solutions Inc. 2003. All right reserved.

Teamcenter Project Integration Instrumented Lifecycle Display Status in Project Automatic Generation of Task and

Submit to lifecycle Programs / Projects with multiple

independent lifecycles Dashboard View

Lifecycle Enhancements – Schedules and Display Duration / Schedule management Graphical Display

Lifecycle Process Status

Master Resource DrivenProduct Schedule - Teamcenter Project

Product

+ Rev A

- Rev B

+ Part A

- Assy B

Part I

Part II

Feature

A

B

Drives

Supporting WorkflowsTeamcenter Enterprise

Workflow or User-driven events update corresponding tasks

Bi-directionalLinks

PLM IntegrationPLM Integration

Page 13: 2004 Team Center Training Presentation On Project

© UGS PLM Solutions Inc. 2003. All right reserved.

Resource ManagementResource Management

Visualize and manage resource workloads appropriately

Validate resource demands with group level histograms

Page 14: 2004 Team Center Training Presentation On Project

© UGS PLM Solutions Inc. 2003. All right reserved.

Resource ManagementResource Management

Step 1 Assigning Resources to Tasks

Double click on any task and select the Resources tab Place a check in the Highlight Overloaded Resources box Assign new team members to the task, if anyone box turns

red that person is currently overloaded Select the Resource Graph icon to view what other tasks

the resource is working on Step 2 Reviewing Resource Histograms

Within the other main window select the People tab and open the Management folder

Highlight Brett Favre, right click and select View Resource Graph

Double clicking on the individual bars will allow you reassign this task from this view

Page 15: 2004 Team Center Training Presentation On Project

© UGS PLM Solutions Inc. 2003. All right reserved.

Visibility and Decision SupportVisibility and Decision Support

Visual markers

Current task and project level status Life Cycle Tasks Linked Tasks Email Notifications Decision support parameters

Dashboards

Project and Program level statusing and progress Earned Value Resource Allocation Budgets verse Actuals Baseline Reports

Page 16: 2004 Team Center Training Presentation On Project

© UGS PLM Solutions Inc. 2003. All right reserved.

Visibility and Decision SupportVisibility and Decision Support

Page 17: 2004 Team Center Training Presentation On Project

© UGS PLM Solutions Inc. 2003. All right reserved.

Workplace CreationWorkplace Creation

Advanced Template Environment

Ensures best practice processes are in place Time needed to launch new projects is measured in minutes

not days

Besides a schedule include:

Life Cycle Tasks

Generic Resource Assignments

Project Cost Parameters

Email Notifications

Task Level Notebooks

Risk and Issue Databases

Documents

Page 18: 2004 Team Center Training Presentation On Project

© UGS PLM Solutions Inc. 2003. All right reserved.

Workplace CreationWorkplace Creation

Step 1 Creating a Project from a Template

Within the Workplaces tab highlight any folder and select the New Workplace icon

Give your new project a name and then check the Use an existing Workplace template for this Workplace box

Under the Templates folder select the New Product Development Template workplace and click on Select

Click on the Next button three times and then select Finish Once your new project is created double click on it and review

what has been included

Page 19: 2004 Team Center Training Presentation On Project

© UGS PLM Solutions Inc. 2003. All right reserved.

MS Project IntegrationMS Project Integration

Easily Import, Export and Synchronize schedules with MS Project

Page 20: 2004 Team Center Training Presentation On Project

© UGS PLM Solutions Inc. 2003. All right reserved.

AgendaAgenda

Teamcenter Program Execution Management

Program Execution Management - Solution Scenarios

Use Case Scenarios

Collaborative Schedule Environment PLM Integration Resource Management Visibility and Decision Support Workplace Creation MS Project Integration

Summary

2004 Roadmap

“Get More Teamcenter Project @ PLM World 2004”

Page 21: 2004 Team Center Training Presentation On Project

© UGS PLM Solutions Inc. 2003. All right reserved.

Key Value PointsKey Value Points

Corporate AgendaCorporate AgendaCorporate AgendaCorporate Agenda

Business ChallengeBusiness ChallengeBusiness ChallengeBusiness Challenge Improvement Improvement InitiativesInitiatives

Improvement Improvement InitiativesInitiatives

One Overall Solution One Overall Solution TeamcenterTeamcenter

One Overall Solution One Overall Solution TeamcenterTeamcenter Differentiators Differentiators Differentiators Differentiators

• Improve Product Quality

• Improve Process Visibility and Control

• Remove Latency within the PLC process

• Improve Product Quality

• Improve Process Visibility and Control

• Remove Latency within the PLC process

• Program Execution Program Execution ManagementManagement

• Lifecycle Product Lifecycle Product Knowledge Knowledge ManagementManagement

• Enterprise Level Enterprise Level Decision SupportDecision Support

• Program Execution Program Execution ManagementManagement

• Lifecycle Product Lifecycle Product Knowledge Knowledge ManagementManagement

• Enterprise Level Enterprise Level Decision SupportDecision Support

• Issues with schedule and cost expectations

• No clear visibility to costs or progress

• Limited control on suppliers and business partners

• Time to market is critical

• Need to understand resource workloads

• Need to support dispersed teams

• Silos of Information

• Issues with schedule and cost expectations

• No clear visibility to costs or progress

• Limited control on suppliers and business partners

• Time to market is critical

• Need to understand resource workloads

• Need to support dispersed teams

• Silos of Information

• Execution driven Execution driven project management project management

• Control product Control product information from information from concept through concept through end of lifeend of life

• Manage resource Manage resource workloadsworkloads

• Enhance visibility Enhance visibility & decision support& decision support

• Templatize best Templatize best practicespractices

• Single source Single source providerprovider

• Execution driven Execution driven project management project management

• Control product Control product information from information from concept through concept through end of lifeend of life

• Manage resource Manage resource workloadsworkloads

• Enhance visibility Enhance visibility & decision support& decision support

• Templatize best Templatize best practicespractices

• Single source Single source providerprovider

• Gain visibility and controlGain visibility and control• Improve product quality/control costs Improve product quality/control costs

•Correctly manage resource workloadsCorrectly manage resource workloads• Improve productivity and moralImprove productivity and moral

•Control development process/eliminate wasteControl development process/eliminate waste• Improve cost and delivery predictabilityImprove cost and delivery predictability

• Gain visibility and controlGain visibility and control• Improve product quality/control costs Improve product quality/control costs

•Correctly manage resource workloadsCorrectly manage resource workloads• Improve productivity and moralImprove productivity and moral

•Control development process/eliminate wasteControl development process/eliminate waste• Improve cost and delivery predictabilityImprove cost and delivery predictability

UGS AgendaUGS AgendaUGS AgendaUGS Agenda

Solution ValueSolution ValueSolution ValueSolution Value

Page 22: 2004 Team Center Training Presentation On Project

© UGS PLM Solutions Inc. 2003. All right reserved.

AgendaAgenda

Teamcenter Program Execution Management

Program Execution Management - Solution Scenarios

Use Case Scenarios

Collaborative Schedule Environment PLM Integration Resource Management Visibility and Decision Support Workplace Creation MS Project Integration

Summary

2004 Roadmap

“Get More Teamcenter Project @ PLM World 2004”

Page 23: 2004 Team Center Training Presentation On Project

© UGS PLM Solutions Inc. 2003. All right reserved.

Jan Jul OctApr

Teamcenter Project V4.1

• GA Target Release Date: End of May, 2004

• Program Management dashboards enhancements

• Teamcenter Community integration

• Project Dashboards as Teamcenter Community web parts

• Microsoft-centric look & feel

• Common infrastructure

• Project application customization

• Project Management

• Task identifier numbers

• Successor / Predecessor Editing by Task IDs

• Customer Enhancement Requests

Teamcenter Project V5.0

• GA Target Release Date: November, 2004

• Phase-Gate with Enterprise

• Delivered with Enterprise v5.0 (9/2004)

• Microsoft Project integration

• Enable Lifecycle-tasks in Microsoft Project

• Supports Microsoft Project Standard, Professional, and Server

• Resource Management

• Skillset membership

• Assignment and skillset mapping improvements

• Customer Enhancement Requests

Q2 2004

Project 4.1

^

Teamcenter Project 2004 RoadmapTeamcenter Project 2004 Roadmap

Q4 2004

Project 5.0

^Dec

Page 24: 2004 Team Center Training Presentation On Project

© UGS PLM Solutions Inc. 2003. All right reserved.

Teamcenter Project 4.1 - Feature DetailTeamcenter Project 4.1 - Feature Detail

Dashboard Enhancements Additional charts and views to support Project, Program

and Resource Management Improved help in dashboard views

Customer Value: more views of project and resource status improve ability to react in real-time decision time

Integration with Teamcenter Community Program dashboards in native web-parts Compatible look and feel - content and configuration SSO support Note: Project and Community are configurable to use

common Active Directory, SQL*Sever Customer Value: common placement for key success

factor metrics

Page 25: 2004 Team Center Training Presentation On Project

© UGS PLM Solutions Inc. 2003. All right reserved.

Teamcenter Project 4.1 - Feature DetailTeamcenter Project 4.1 - Feature Detail

Project Management Enhancements Task identifiers - support quick handling of project tasks Successor / predecessor editing by task IDs Tree table view of project with view / hide capability

Customer value: easier manipulation of dependencies and manipulation / viewing of project schedule

Page 26: 2004 Team Center Training Presentation On Project

© UGS PLM Solutions Inc. 2003. All right reserved.

Teamcenter Project 2005 RoadmapTeamcenter Project 2005 Roadmap

Teamcenter Project V5.1

• GA Target Release Date: Q2, 2005

• Engineering integration

• Workflow / Schedule lifecycle-task integration

• Delivered with Engineering v10 (2/2005)

• Customer Enhancement Requests

Jan Jul OctApr Dec

Q2 2005

TcP 5.1

^

Page 27: 2004 Team Center Training Presentation On Project

© UGS PLM Solutions Inc. 2003. All right reserved.

Teamcenter Project 5.0 - Feature DetailTeamcenter Project 5.0 - Feature Detail

Phase-Gate Automation Implement initiative management with synchronized project and

resource management capabilities across Enterprise and Project Leverages Lifecycle Tasks available in Teamcenter 4.0 OOTB Dashboard support pulling phase-gate content from all

sources - phase status, criteria metrics, project metrics, resource status, etc.

Customer value: methodology support enables real-time viewing of investment status, enabling faster reaction times

Page 28: 2004 Team Center Training Presentation On Project

© UGS PLM Solutions Inc. 2003. All right reserved.

Teamcenter Project 5.0 - Feature DetailTeamcenter Project 5.0 - Feature Detail

Microsoft Project Integration Lifecycle task support in Microsoft Project schedule

Customer value: reduced training and time to adopt Teamcenter automation – Schedule initiated workflows which automatically update project / task status

Resource Management Add users to skillsets, allowing easier assignments and

commitment of staff to fulfill skillset assignment View “member of” information in user properties Resource graphing and dashboard utilization by skillset members Advanced assignment support leveraging skillset membership

Customer value: Better management of skillsets and people in the organization. Improved visibility of constraining resources.

Page 29: 2004 Team Center Training Presentation On Project

© UGS PLM Solutions Inc. 2003. All right reserved.

Fast is … NOW!

Fast was…

Instant Program StatusInstant Program Status

Page 30: 2004 Team Center Training Presentation On Project

© UGS PLM Solutions Inc. 2003. All right reserved.

AgendaAgenda

Teamcenter Program Execution Management

Program Execution Management - Solution Scenarios

Use Case Scenarios

Collaborative Schedule Environment PLM Integration Resource Management Visibility and Decision Support Workplace Creation MS Project Integration

Summary

2004 Roadmap

“Get More Teamcenter Project @ PLM World 2004”

Page 31: 2004 Team Center Training Presentation On Project

© UGS PLM Solutions Inc. 2003. All right reserved.

Get More of Teamcenter Project@ PLM World 2004Get More of Teamcenter Project@ PLM World 2004

Project “Hands on Help” sessions – Room 5

Tuesday 9:15 – 10:00AM Wednesday 9:15 – 10:00AM Thursday 9:15 – 10:00AM

“Teamcenter Project – Teamcenter Enterprise Integration, Web-based Program/Project Management, Best Practices, etc.” Two Training Sessions

Wednesday 1:30 – 3:00PM Thursday 3:30 – 5:00PM

Page 32: 2004 Team Center Training Presentation On Project

© UGS PLM Solutions Inc. 2003. All right reserved.

Thank You

Page 33: 2004 Team Center Training Presentation On Project

© UGS PLM Solutions Inc. 2003. All right reserved.

Supplemental slides

Page 34: 2004 Team Center Training Presentation On Project

© UGS PLM Solutions Inc. 2003. All right reserved.

Program Execution Management – Integrated SolutionProgram Execution Management – Integrated Solution

Project template managementMS Project synchronizationProject dashboard reportingProject team collaborationResource managementPhase-Gate managementProcess tasks linked to scheduleRequirements linked to schedule

Process

Phase

Criteria

Gate

Task

Deliverable

Product

+ Rev A

- Rev B

+ Part A

- Assy B

Part I

Part II

Feature

A

B

Drives

Bi-directionalLinks

Page 35: 2004 Team Center Training Presentation On Project

© UGS PLM Solutions Inc. 2003. All right reserved.

Stage and Gate Management – Process ModelingStage and Gate Management – Process Modeling

Process: A workflow made up of a series of phases and decisions gates.

Phase: A defined stage in the process in which one or more tasks are performed. Phases can have sub-phases.

Gate: A decision point that determines if a project may proceed to the next activity phase. This go/no-go decision is based upon pre-defined deliverables and pre-defined criteria. 

Task: An activity that is to be accomplished within a phase.

Deliverable: Required output of a phase or a task

Criteria: The basis upon which gate decisions are made. Criteria may or may not involve the deliverables of a phase.

Process

Phase

Criteria

Gate

Task

Deliverable

ConceptConceptConceptConcept PlanPlan PlanPlan DevelopDevelop DevelopDevelop ValidateValidate ValidateValidate Ramp toRamp to ProductionProduction

Ramp toRamp to ProductionProduction

SupportSupport ThroughThrough End of LifeEnd of Life

SupportSupport ThroughThrough End of LifeEnd of Life

Page 36: 2004 Team Center Training Presentation On Project

© UGS PLM Solutions Inc. 2003. All right reserved.

Teamcenter Project V4Project & Program ManagementTeamcenter Project V4Project & Program Management

Project Management

Project scheduling Resource management

Program Management

Project & Program management dashboards Linkage to Teamcenter Requirements, Engineering, &

Enterprise Integrated Program Management with Teamcenter

Enterprise Dashboard views in Teamcenter Community

Microsoft Project integration

Web-based client for ease of use & deployment

Page 37: 2004 Team Center Training Presentation On Project

© UGS PLM Solutions Inc. 2003. All right reserved.

• Team Centric Solution / Global Team Support

• Visibility and Access to All Project-Related Information

What sets the Teamcenter Project solution apart:

• Feature Rich Templates / Best Practice Processes

• TeamNative Environment / Real Time Updates

• Platform Independent / Open Architecture

• Removes Latency within the PLC Process / Automation

Execute on project plans – not just plan them

• Directly connect tasks to the Requirements that drive them

Teamcenter Project V4Project & Program ManagementTeamcenter Project V4Project & Program Management

Page 38: 2004 Team Center Training Presentation On Project

© UGS PLM Solutions Inc. 2003. All right reserved.

Integrated Project & Program ManagementIntegrated Project & Program Management

Teamcenter Project and Teamcenter Enterprise

“Lifecycle Tasks” (LCT) defined in project plan, with work-ready rule, assignee information and workflow

Triggered into Teamcenter Enterprise for assignment and workflow execution. Task status & actuals automatically updated by Enterprise back in Project

Dashboard panels and gauges show execution status with configurable refresh rates. Broadcasts organization-specific product management metrics / gauges with comprehensive drill-down

Change Module pushes WBS into Project for more accurate pre-approval (cost, resource, duration) info… and for post-approval work execution via LCT [Teamcenter Project 4.1]

Page 39: 2004 Team Center Training Presentation On Project

© UGS PLM Solutions Inc. 2003. All right reserved.

Challenge

Project Management and execution of tasks are traditionally disconnected activities

Plan, execute… Program managers chase

status & produce reports, all day, everyday – why?

Leads to …

Built-in overhead Lost productivity Out-of-sync data Misguided decisions

Master Resource DrivenProduct Schedule - Teamcenter ProjectProduct

+ Rev A

- Rev B

+ Part A

- Assy B

Part I

Part II

Feature

A

B

DrivesSupporting WorkflowsTeamcenter Enterprise

Workflow or User-driven events update corresponding tasks

Bi-directionalLinks

Lifecycle Business ChallengesProcess Management OptimizationLifecycle Business ChallengesProcess Management Optimization

Page 40: 2004 Team Center Training Presentation On Project

© UGS PLM Solutions Inc. 2003. All right reserved.

Teamcenter Project Manages program schedules with real-time project information that is directly

linked to PDM business items, such as assembly parts Connects project schedules to Teamcenter Enterprise workflow processes

“Lifecycle Tasks” (LCT) defined in project plan Enterprise triggered for assignment and workflow execution. Task status & actuals automatically updated by Enterprise back in Project Dashboard panels and gauges show execution status with configurable refresh rates. Change Module pushes WBS into Project for more accurate pre-approval (cost,

resource, duration) info and for work execution

Transforming From planning,

executing, and status chasing …

To planning, executing, and 24x7x365 instant status

Teamcenter Project V4Integrated Project & Program ManagementTeamcenter Project V4Integrated Project & Program Management

Page 41: 2004 Team Center Training Presentation On Project

© UGS PLM Solutions Inc. 2003. All right reserved.

Teamcenter Project V4Project & Program ManagementTeamcenter Project V4Project & Program Management

Project Management

Project scheduling Resource management

Program Management

Project & Program management dashboards Linkage to Teamcenter Requirements, Engineering, &

Enterprise Integrated Program Management with Teamcenter

Enterprise Dashboard views in Teamcenter Community

Microsoft Project integration

Web-based client for ease of use & deployment

Page 42: 2004 Team Center Training Presentation On Project

© UGS PLM Solutions Inc. 2003. All right reserved.

Thank You