2-year pavement performance and target adjustments

7
Footer Text October 15, 2020 2-Year Pavement Performance and Target Adjustments TxDOT – Maintenance Division October 15, 2020

Upload: others

Post on 27-Nov-2021

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 2-Year Pavement Performance and Target Adjustments

Footer Text October 15, 2020

2-Year Pavement Performance and Target AdjustmentsTxDOT – Maintenance Division

October 15, 2020

Page 2: 2-Year Pavement Performance and Target Adjustments

Footer Text October 15, 2020

TxDOT Submit TAMP Target: NHS System

2

Performance measure Baseline 2020Target 2022Target

IH %Good N/A 66.4%

%Poor N/A 0.3%

NonIH NHS %Good 54.4% 52.0% 52.3%

%Poor 13.8% 14.3% 14.3%

• IH used IRI and full distresses as performance measure• NonIH NHS used only IRI as performance measure• A 5-year moving-average approach is used to set the target

Page 3: 2-Year Pavement Performance and Target Adjustments

Footer Text October 15, 2020

Pavement Data Collection History

1982

1993

2001

2017

• State maintained on-system roadways (89,986 roadbed miles)• Off-system National Highway System (NHS) (2,085 roadbed

miles)• HPMS samples (2,943 roadbed miles)• Toll roads (1,183 lane miles)

Page 4: 2-Year Pavement Performance and Target Adjustments

Footer Text October 15, 2020

PMIS vs. HPMS

Pavement Management Information System (PMIS) is an automated system for storing, retrieving, analyzing, and reporting pavement condition information. TxDOT PMIS contains pavement data for all roadbeds (one lane per direction)

Highway Performance Monitoring System (HPMS) is a national level highway information system that includes data on the extent, condition, performance, use and operating characteristics of the nation’s highways. FHWA requires distresses and ride to be reported only on the center lane with all bridge locations removed. (one lane per roadway)

4

Page 5: 2-Year Pavement Performance and Target Adjustments

Footer Text October 15, 2020

TxDOT Pavement Management Strategies

Each District put together a project specific and financially constrained 4-year pavement management plan each year.

Conduct a serious of peer review to share the best maintenance practice.

Preservation – 83% Light Rehab – 5% Medium Rehab – 5% Heavy Rehab – 7%

5

Page 6: 2-Year Pavement Performance and Target Adjustments

Footer Text October 15, 2020

Summary of Performance Measures and Targets

6

• IH used IRI and full distresses as performance measure• NonIH NHS used only IRI as performance measure• A 3-year moving-average approach is used to adjust the target using only HPMS