2 o 1 6 40 - post-tensioning institute - post-tensioning ... convention/pti... · 2016 pti...

36
April 24-26, 2016 | Renaissance Long Beach | Long Beach, CA, USA PTI CONVENTION 2016 40 years 1 9 7 6 - 2 O 1 6

Upload: voque

Post on 28-Jul-2018

247 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: 2 O 1 6 40 - Post-Tensioning Institute - post-tensioning ... Convention/PTI... · 2016 PTI CONVENTION 3 40 years 1 9 7 6 - 2 O 1 6 ™ Welcome to Long Beach! On behalf of PTI, I would

April 24-26, 2016 | Renaissance Long Beach | Long Beach, CA, USA

PTI CONVENTION2016

40years

19

76 - 2

O1 6

Page 2: 2 O 1 6 40 - Post-Tensioning Institute - post-tensioning ... Convention/PTI... · 2016 PTI CONVENTION 3 40 years 1 9 7 6 - 2 O 1 6 ™ Welcome to Long Beach! On behalf of PTI, I would

2016 PTI CONVENTION

2

40years

19

76 - 2

O1 6

Table of Contents

Welcome Letter 3PTI Officers & Directors 4General Information 5Transportation 6Restaurants 6Exhibition 7Exhibitor Floor Plan 11Sponsors 12Schedule at a Glance 14Special Events 16Technical Sessions 18Committee Meeting Schedule 32Hotel Map & Meeting Rooms 34

Page 3: 2 O 1 6 40 - Post-Tensioning Institute - post-tensioning ... Convention/PTI... · 2016 PTI CONVENTION 3 40 years 1 9 7 6 - 2 O 1 6 ™ Welcome to Long Beach! On behalf of PTI, I would

2016 PTI CONVENTION

3

40years

19

76 - 2

O1 6

Welcome to Long Beach!

On behalf of PTI, I would like to thank you for joining us at the 2016 PTI Convention. Throughout the convention, you will have the opportunity to attend technical sessions, participate in PTI committee meetings, meet with exhibitors, and network at special events.

Technical sessions will cover many aspects of the post-tensioning industry, including repair and strengthening, durability, design, certification, post-tensioning strategies for the future, and more. I encourage you to attend one of these meetings and get involved. Those seeking continuing education credits may earn PDHs/CEUs for attending technical sessions and committee meetings; tracking forms are available at registration.

Join us Sunday evening for the Welcome Reception for a chance to renew connections, build your professional network, and see what products and services the exhibitors have to offer.

On Monday evening, PTI will honor the recipients of the 2016 PTI Awards with a reception and awards presentation. The reception will begin at 6:00 p.m. in the Bixby Ballroom and will be followed with the Awards Dinner and presentation in the Pike Ballroom from 7:00 p.m. to 9:00 p.m. PTI will recognize fellow inductees, TAB Awards, and present two students with the PTI AMSYSCO Scholarships. The evening will conclude with the presentation of the 2016 PTI Legend Awards.

Thank you again for attending the 2016 PTI Convention. If I or one of the PTI staff may be of assistance in making your time here more productive or enjoyable, please do not hesitate to ask.

Sincerely,

Theodore NeffExecutive Director

Page 4: 2 O 1 6 40 - Post-Tensioning Institute - post-tensioning ... Convention/PTI... · 2016 PTI CONVENTION 3 40 years 1 9 7 6 - 2 O 1 6 ™ Welcome to Long Beach! On behalf of PTI, I would

2016 PTI CONVENTION

4

40years

19

76 - 2

O1 6

2016 PTI Officers & Board of DirectionRobert Sward, President VSLDavid Martin, Vice President Dywidag-Systems International USA, Inc.Marc Khoury, Past President CCL USA, Inc.

Rashid Ahmed Walker Parking ConsultantsBrett Alamillo Alamillo Rebar, Inc.Ted Alosi Cumberland Post-Tension, Inc.James Cagley Cagley & AssociatesTommaso Ciccone TENSAJon Cornelius Sumiden Wire Products CorporationWyatt Coupland LMS Reinforcing Steel GroupSergio Dalmau Sr. PTE Systems International, LLCMarc Ducommun Canadian BBR, Inc.Richard Elkins Elkins TriSteelJack Graves Jr. Builders Post-TensionJonathan Hirsch Bentley Systems, Inc.Paul Hohensee Precision-Hayes InternationalEd Hohman Superior Post TensionBruce Jensen Williams Form Engineering Corp.Rattan Khosa AMSYSCO, Inc.Don Kline Kline Engineering & Consulting, LLCAndy Kochis Ready Cable, Inc.Cary Kopczynski Cary Kopczynski & Co. Inc., PSDawn Kori Post Tension Cables, Inc.Larry Krauser General Technologies, Inc.Jim Luke Conco Reinforcing SteelAndy Lynam Phoenix Post-TensionDan MacLean Con-Tech Systems, LTDAndrew Micklus Jr. Freyssinet, LLCTed Mumford Rose City Rebar & Post Tensioning Co.Joe Napoli Insteel Wire ProductsHarley Nethken Tech-Con Systems, Inc.Paul Pattridge PPT, Inc.Russell Price Suncoast Post-Tension Ltd.José Luis Quintana MexpresaDanny Raines Post Tension Technologies, LLCSteve Ross Lubricating Specialties CompanyDouglas Schlegel Consulting EngineerMichael Schwager Schwager Davis, Inc.Pete Scoppa PT USATodd Stevens Gerdau ReinforcingChris Wilkinson Skyline Steel, LLCCoy Williams Consolidated Reinforcement, L.P.Beau Wolfe Continental Concrete Structures, Inc.Curtis Wolfe, Jr. CLW Concrete Construction, Inc.

Page 5: 2 O 1 6 40 - Post-Tensioning Institute - post-tensioning ... Convention/PTI... · 2016 PTI CONVENTION 3 40 years 1 9 7 6 - 2 O 1 6 ™ Welcome to Long Beach! On behalf of PTI, I would

2016 PTI CONVENTION

5

40years

19

76 - 2

O1 6

General InformationAttireBusiness casual is appropriate for all daytime events. Business attire is recommended for receptions and awards.

24-Hour Business CenterFor basic needs, such as surfing the web, checking e-mails, or printing and faxing documents.

Continuing Education Units/Professional Development HoursA session tracking form is available from the PTI registration desk. This may be submitted to state boards that allow self-reporting of Continuing Education activities as evidence of participation. In most cases, one contact hour is equal to .10 Continuing Education Units (CEUs) or 1.0 Professional Development Hour (PDH). Check with your local state board for acceptance criteria.

Conference ProceedingsCopies of the PowerPoint presentations, papers, and abstracts presented during the confer-ence will be published on a CD. The proceedings will be available after the convention and mailed to all conference registrants.

Exhibition Hours The Bixby

Sunday, April 24 6:00 p.m. – 8:00 p.m.Monday, April 25 7:30 a.m. – 5:30 p.m., 6:00 p.m. – 7:00 p.m.Tuesday, April 26 7:30 a.m. – 3:30 p.m.

EmergenciesIn the event of an emergency, please dial “0” from any phone in the hotel and you will be directly connected to hotel security. You may also call “911,” although hotel security should also be notified.

Internet AccessWireless Internet access is complimentary in the hotel lobby. For PTI attendees, complimentary Internet will be available in your sleeping room and meeting space.

Legal Drinking AgeThe legal drinking age in Long Beach, CA, is 21.

Name BadgesPlease wear your name badge at all times during the conference. It is your admission to all sessions and functions for which you are registered.

Page 6: 2 O 1 6 40 - Post-Tensioning Institute - post-tensioning ... Convention/PTI... · 2016 PTI CONVENTION 3 40 years 1 9 7 6 - 2 O 1 6 ™ Welcome to Long Beach! On behalf of PTI, I would

2016 PTI CONVENTION

6

40years

19

76 - 2

O1 6

Package Pick-up and Drop-offTo pick up a package, you should go to the front desk. There is a minimal charge for both incoming and outbound packages. To ship a package out, your package must be labeled properly with the carrier shipping form filled out and then you should take your package to the front desk. If you need assistance with your package or box, hotel staff will be happy to assist you.

PhotographsPTI will take photographs throughout the conference that may be reproduced in news, promotional materials, or on the PTI website. By participating in the 2016 PTI Convention, you grant PTI the right to use your name, photograph, and biography for such purposes.

Refreshments and Meals The BixbyContinental breakfast, coffee breaks, lunch, and the Welcome Reception are included with full registration. Water stations will be available to fill the PTI water bottle you received at registration. Tickets for lunch and the Welcome Reception are included with your name badge.

Schedule ChangesCancellations, additions, and location changes to committee meetings will be posted at the PTI registration desk.

TransportationTaxisTaxi service to or from Long Beach Airport (LGB) is approximately $25 one way.

Taxi service to or from Los Angeles International Airport (LAX) is approximately $70 one way.

Taxi service to or from John Wayne Airport-Orange County (SNA) is approximately $65 one way.

Airport Shuttle Long Beach Airport (LGB) is about 11 miles south of the hotel. Super Shuttle is $18 per person (one way); reservation required.

Los Angeles International Airport (LAX) is about 24 miles southeast of the hotel. Super Shuttle is $17 per person (one way); reservation required.

John Wayne Airport-Orange County (SNA) is about 24 miles northwest of the hotel. Super Shuttle is $37 per person (one way); reservation required.

Restaurants at Renaissance Long Beach Hotel Promenade Café ARA SIP Bar + Lounge StarbucksMon-Fri 6:00 a.m. – 10:30 a.m.; Sat-Sun 7:00 a.m. – 10:30 a.m.

11:30 a.m. – 11:00 p.m. 5:30 a.m. – 8 p.m.

Page 7: 2 O 1 6 40 - Post-Tensioning Institute - post-tensioning ... Convention/PTI... · 2016 PTI CONVENTION 3 40 years 1 9 7 6 - 2 O 1 6 ™ Welcome to Long Beach! On behalf of PTI, I would

2016 PTI CONVENTION

7

40years

19

76 - 2

O1 6

ExhibitionPlease visit the following exhibitors in The Bixby and see what products and services they have to offer.

Hours of Exhibition

Sunday, April 24 6:00 p.m. – 8:00 p.m.Monday, April 25 7:30 a.m. – 5:30 p.m., 6:00 p.m. – 7:00 p.m.Tuesday, April 26 7:30 a.m. – 3:30 p.m.

Exhibit Area Prize DrawingVisit the exhibitors and collect 10 signatures to be entered in a drawing to win one of four $50 Visa gift cards. The drawing will take place during the afternoon break on Tuesday, April 26th.Turn in your signed exhibitor card to the registration table by 12:45 p.m. to be eligible for the drawing.

CCL, Inc.—Booth #16 CCL provides specialized engineering solutions and related construction techniques. The company is world renowned for its post-tensioned solutions for buildings and civil applica-tions. For the repair and maintenance of structures, CCL also offers specialty repair and strengthening services, including external post-tensioning, concrete repair, and carbon fiber-reinforced polymer structural strengthening.

Website: www.cclus.com

Decon—Booth #1 DECON is the original North American manufacturer of STUDRAILS® and has recently become a subsidiary of JORDAHL GmbH, which for more than 100 years has manufactured high-quality connection and reinforcement products for use in the international construction industry. We supply two market leading brands: DECON® punching shear concrete reinforcement products and JORDAHL® anchor channels for structural and architectural concrete connections.

Website: www.deconusa.com

DYWIDAG-Systems International—Booth #23 DYWIDAG-Systems International is part of the international DSI Group. DSI’s business focus is the development and application of post-tensioning and geotechnical systems for the construction industry. For over 40 years, DSI has provided the highest-quality products and systems from a network of regional sales offices and production facilities strategically positioned throughout the United States to meet our customers’ needs and project schedules. Our nationwide business is divided in key areas of: post-tensioning, stay cable and reinforcing systems, geotechnical products and systems, structural evaluation and repair services, and formwork accessories. DYWIDAG-Systems International is a global technology group with a local presence and global competence.

Website: www.dsiamerica.com

Page 8: 2 O 1 6 40 - Post-Tensioning Institute - post-tensioning ... Convention/PTI... · 2016 PTI CONVENTION 3 40 years 1 9 7 6 - 2 O 1 6 ™ Welcome to Long Beach! On behalf of PTI, I would

2016 PTI CONVENTION

8

40years

19

76 - 2

O1 6

Freyssinet, Inc.—Booth #6 Freyssinet offers value-added solutions, products, and services, including:

• Multi-strand and thread bar post-tensioning systems;• Stay and suspension cable systems;• Expansion joints, bearings, seismic devices, and structural dampers;• Structural repair/strengthening and monitoring systems and services; and• Heavy lifting/moving solutions.

Freyssinet performs as a general or specialty subcontractor, and supplier of proprietary products/equipment.

Website: www.freyssinetusa.com

GTI—Booth #9, 10, 11, 12 General Technologies, Inc. (GTI), is a major supplier to the concrete industry in the United States and worldwide, manufacturing over 2000 unique products. GTI designs and manufac-tures unbonded PT systems, bonded PT systems, concrete accessories, and related equip-ment. Examples include zero-void encapsulation systems (unbonded/bonded), post-tension-ing duct (flat, round, tight-radius), composite bar supports (chairs, bolsters, intersectional chairs), precast segmental duct couplers, slab-on-ground products, pocket formers, concrete repair products, bonded tendon accessories (heatshrink, hoses, valves), and equipment (stressing, plasma cutting, sheathing stripper, staplers). In business for over 20 years, GTI is globally recognized for quality, high-performance products.

Website: www.gti-usa.net

Jobsite Stud Welding—Booth #20 Quality Metal Works by Professionals. Jobsite Stud Welding is the industry leader in stud welding installation for a wide variety of applications, including shear rail manufacturing. Trust our highly experienced personnel to be prompt when it comes to field stud welding applications and related stud welding fabrication.

Website: www.jobsitestud.com

Martin Specialty Products—Booth #5 For more than 20 years, Martin Specialty Products has been a leader in the post-tension grease industry. With ISO 9001:2008-certified grease manufacturing plants located in North Kansas City and Houston, Martin can quickly meet customer deadlines throughout the U.S. Additionally, Martin is proud to annually certify its grease to meet PT-1 ratings.

Website: www.martinspecialtyproducts.com

Meadow Burke Products—Booth #7 Meadow Burke is a leading manufacturer of precast, tilt-up, bridge, forming, and reinforcing concrete accessories. Our products are sold and distributed throughout North America to help connect, form, reinforce, and lift concrete. Our leadership position in the industry was established by our U.S. manufacturing and excellence within engineering.

Website: www.meadowburke.com

Page 9: 2 O 1 6 40 - Post-Tensioning Institute - post-tensioning ... Convention/PTI... · 2016 PTI CONVENTION 3 40 years 1 9 7 6 - 2 O 1 6 ™ Welcome to Long Beach! On behalf of PTI, I would

2016 PTI CONVENTION

9

40years

19

76 - 2

O1 6

MEXPRESA—Booth #8 MEXPRESA develops, manufactures, and provides, since 1976, the following products and services for the construction of bridges, buildings, towers, tanks, and excavations: structural design; value and construction engineering; multistrand post-tensioning; stay cables; ground anchors; slab post-tensioning; reinforcing bar splicing (cold swage); high-capacity bearings, joints, and seismic devices; erection systems; and jacking systems.

Website: www.mexpresa.com

Paragon Products—Booth #22 Paragon Products has been manufacturing high-quality post-tension cable and reinforcing bar accessories (along with concrete testing products) for over 22 years. Post-tension cable supports for slab-on-ground or elevated slabs are available from 3/4 to 7 in. Pocket formers, cable end and clearance caps, mesh supports, and many other precast accessories are also available. Our 120,000 ft2 manufacturing and warehouse facility allows us to maintain large inventories for efficient, on-time deliveries.

Website: www.paragonproducts-ia.com

Peikko—Booth #25 Peikko group, founded in 1965, is a family-owned company specializing in composite beams and fastening products for concrete connections. Peikko provides innovative solutions to help customers make their building process faster, easier, and more reliable. Precasters, contrac-tors, developers, flooring contractors, architects, and structural designers can all enjoy and take advantage of the Peikko solutions.

Website: www.peikko.com

Precision-Hayes International—Booth #18,19 Precision-Hayes International provides an unprecedented range of products and services used throughout the world. From wedge anchoring products and tensioning jacks to fabrication equipment and encapsulated systems, we lead the industry in experience and knowledge and are committed to be the first choice provider of prestressed/post-tensioned concrete products.

Website: www.precision-hayes.com

Schwager Davis, Inc.—Booth #24 Schwager Davis, Inc.’s, activities include the design and supply of multistrand post-tensioning systems for large civil engineering projects; structural repair and alteration of post-tensioned concrete structures; the design and supply of erection equipment for segmental bridge construction; and the design, installation, refurbishment, operation, and maintenance of automated people-mover systems for urban transportation.

Website: www.schwagerdavis.com

Page 10: 2 O 1 6 40 - Post-Tensioning Institute - post-tensioning ... Convention/PTI... · 2016 PTI CONVENTION 3 40 years 1 9 7 6 - 2 O 1 6 ™ Welcome to Long Beach! On behalf of PTI, I would

2016 PTI CONVENTION

10

40years

19

76 - 2

O1 6

Skyline Steel—Booth #21 Skyline Steel is a steel foundation supplier serving the United States, Canada, Mexico, the Caribbean, Central America, and Colombia markets. It is a wholly owned subsidiary of Nucor Corporation, the largest producer of steel in the United States.

Website: www.skylinesteel.com

Sumiden Wire—Booth #15 Sumiden Wire Products Corporation, Made in the USA, was established in 1979 with manufacturing plants in California, Tennessee, and soon a new manufacturing plant to be located in the honorable state of Texas. Sumiden Wire produces and distributes PC strand, epoxy coated PC strand, stainless steel PC strand and prestressing hardware and accessories.

Website: www.sumidenwire.com

Suncoast Post-Tension—Booth #3, 4 Suncoast Post-Tension, Ltd., headquartered in Houston, TX, is the largest supplier of post-tensioning materials for the slab-on-ground and high-rise building applications. Suncoast furnishes engineering services and technical field support from eight PTI Certified Plants located throughout the United States., along with Suncoast SRS shear rails, barrier cable systems, and repair and modification services.

Website: www.suncoast-pt.com

TENSA—Booth #14 Supplier and installer of post tensioning, stay cables, bearings, joints, dampers, specialized equipment for bridge construction, and segmental bridge contractor.

Website: www.tensacciai.it

Trompler Fluid Power—Booth #2 Trompler Fluid Power Inc. (TFP) specializes in custom high-pressure hydraulic cylinders and components. They have the unique advantage of tailoring hydraulic solutions to meet your specific application needs. TFP can provide high-pressure hydraulic cylinders ranging from 5 to 1200 tons, as well as 10,000 psi hydraulic pumps.

Website: www.tromplerfluidpower.com

Unigel Inc.—Booth #13 Unigel is a leading manufacturer of advanced corrosion protection compounds to provide solutions for post-tensioning systems. With manufacturing plants in the United States and Europe, we provide our customers with a worldwide service.

Website: unigel.co.uk

VSL—Booth #17 VSL designs, manufactures, and installs post-tensioning and special construction systems. These systems build, repair, and strengthen bridges, high-rise buildings, parking structures, tanks, and special structures in the United States.

Website: www.vsl.net

Page 11: 2 O 1 6 40 - Post-Tensioning Institute - post-tensioning ... Convention/PTI... · 2016 PTI CONVENTION 3 40 years 1 9 7 6 - 2 O 1 6 ™ Welcome to Long Beach! On behalf of PTI, I would

2016 PTI CONVENTION

11

40years

19

76 - 2

O1 6

16 17 18 19 20

6

7

8

9

10

21

22

23

24

25

5

4

3

2

1

Exhibitor Floor Plan

15

14

13

12

11

Food & Beverage Stations

Page 12: 2 O 1 6 40 - Post-Tensioning Institute - post-tensioning ... Convention/PTI... · 2016 PTI CONVENTION 3 40 years 1 9 7 6 - 2 O 1 6 ™ Welcome to Long Beach! On behalf of PTI, I would

2016 PTI CONVENTION

12

40years

19

76 - 2

O1 6

Sponsors

Welcome Reception Sponsored by Martin Specialty ProductsSunday, April 24, 6:00 p.m. – 8:00 p.m.Bixby

Morning Refreshment Break Sponsored by Precision-Hayes InternationalMonday, April 25, 9:45 a.m. – 10:15 a.m.Loft & Jergins

Lunch Sponsored by Sumiden WireMonday, April 25, 12:00 p.m. – 1:30 p.m.Bixby

Afternoon Refreshment Break Sponsored by MeadowBurke LLCMonday, April 25, 3:15 p.m. – 3:45 p.m.Loft & Jergins

Morning Refreshment Break Sponsored by TENSATuesday, April 26, 9:45 a.m. – 10:15 a.m.Loft & Jergins

A/V Sponsored by UnigelSunday, April 24Wilmore Room

A/V Sponsored by StrandTuesday, April 26Nieto Room

Page 13: 2 O 1 6 40 - Post-Tensioning Institute - post-tensioning ... Convention/PTI... · 2016 PTI CONVENTION 3 40 years 1 9 7 6 - 2 O 1 6 ™ Welcome to Long Beach! On behalf of PTI, I would
Page 14: 2 O 1 6 40 - Post-Tensioning Institute - post-tensioning ... Convention/PTI... · 2016 PTI CONVENTION 3 40 years 1 9 7 6 - 2 O 1 6 ™ Welcome to Long Beach! On behalf of PTI, I would

2016 PTI CONVENTION

14

40years

19

76 - 2

O1 6

Schedule at a Glance

Saturday, April 23

8:00 am – 5:00 pm Certification Workshop: Level 1 Unbonded PT-Field Installation Nieto

Sunday, April 24

7:30 am – 5:00 pm Registration Bixby Prefunction

8:00 am – 5:00 pm Certification Workshop: Level 1 Unbonded PT-Field Installation Nieto

8:00 am – 12:00 pm PTI M-50/ASBI Bonded Tendon Joint Task Group Broadlind

8:00 am – 12:00 pm DC-10A Slab-on-Ground—Structural Subcommittee Pike I

8:00 am – 12:00 pm fib Stay Cable Editorial Committee Wilmore

9:45 am – 10:15 am Morning Refreshment Break Loft & Jergins

1:00 pm – 5:00 pm M-55 Grouting Committee Broadlind

1:00 pm – 5:00 pm DC-45 Cable Stayed Bridge CommitteeWilmore

A/V Sponsored by Unigel

1:00 pm – 5:00 pm DC-10B Slab-on-Ground—Geotechnical Subcommittee Pike I

3:00 pm – 3:30 pm Afternoon Refreshment Break Loft & Jergins

6:00 pm – 7:30 pm Registration Reopens Bixby Prefunction

6:00 pm – 8:00 pm Welcome Reception Sponsored by Martin Specialty Products Bixby

7:30 pm – 11:00 pm TAB Technical Advisory Board Broadlind

7:30 pm – 11:00 pm CAB Certification Advisory Board Pike I

Monday, April 25

7:30 am – 4:00 pm Registration Bixby Prefunction

7:30 am – 5:30 pm Exhibits Open Bixby

8:00 am – 9:45 am Opening Session Pike II & III

8:00 am – 12:00 pm DC-10 Slab-on-Ground Committee Broadlind

8:00 am – 12:00 pm CRT-70 Certification—PT Systems Qualification Committee Wilmore

8:00 am – 12:00 pm DC-70 Special Topics Committee / TG Spanish Translation Pike I

8:00 am – 12:00 pm fib Stay Cable Ediitorial Committee Nieto

9:45 am – 10:15 am Morning Refreshment Break Sponsored by Precision Hayes Loft & Jergins

10:15 am – 12:00 pm Session #2: PT Bridges I Pike II & III

12:00 pm – 1:30 pm Committee Chair Lunch (Invitation Only) Delker

12:00 pm – 1:30 pm Lunch (Ticketed Event) Sponsored by Sumiden Wire Bixby

1:30 pm – 3:15 pm Session #3: PT Bridges II Pike II & III

Page 15: 2 O 1 6 40 - Post-Tensioning Institute - post-tensioning ... Convention/PTI... · 2016 PTI CONVENTION 3 40 years 1 9 7 6 - 2 O 1 6 ™ Welcome to Long Beach! On behalf of PTI, I would

2016 PTI CONVENTION

15

40years

19

76 - 2

O1 6

1:30 pm – 3:45 pm DC-40 Bridge Design Committee Wilmore

1:30 pm – 5:30 pm DC-20 Building Design Committee Broadlind

1:30 pm – 5:30 pm TG-M-10A Unbonded Tendon-Barrier Cable Pike I

3:15 pm – 3:45 pm Afternoon Refreshment Break Sponsored by MeadowBurke Loft & Jergins

3:45 pm – 5:30 pm Session #4: PT Buildings I Pike II & III

3:45 pm – 5:30 pm CRT-40 Certification—Bonded PT Field Personnel Committee Wilmore

3:45 pm – 5:30 pm CRT-30 Certification—Unbonded PT Field Personnel Committee Nieto

6:00 pm – 7:00 pm PTI Awards Reception Bixby

7:00 pm – 9:00 pm 2016 PTI Awards Dinner Pike II & III

Tuesday, April 26

7:30 am – 1:30 pm Registration Bixby Prefunction

7:30 am – 3:30 pm Exhibits Open Bixby

8:00 am – 9:45 am Session #5: PT Buildings II Pike II & III

8:00 am – 9:45 am DC-110 Building Information Modeling (BIM) CommitteeNieto

A/V Sponsored by Strand

8:00 am – 12:00 pm DC-80 Repair, Rehabilitation & Strengthening Committee Broadlind

8:00 am – 12:00 pm CRT-20 Certification—Unbonded Tendon Plant Committee Wilmore

9:45 am – 10:15 am Morning Refreshment Break Sponsored by TENSA Loft & Jergins

10:15 am – 12:00 pm Session #6: PT Solutions Pike II & III

10:15 am – 12:00 pm PM-200 Professional Member CommitteeNieto

A/V Sponsored by Strand

12:00 pm – 1:00 pm Lunch (Ticketed Event) Bixby

1:00 pm – 3:00 pm Session #7: Strengthening & Repair Pike II & III

1:00 pm – 5:00 pm M-10 Unbonded Tendon Committee Broadlind

3:00 pm – 3:30 pm Afternoon Refreshment Break Bixby

3:30 pm – 5:00 pm Session #8: Panel Discussion on Repair/Open Paper Pike II & III

3:30 pm – 5:00 pm MKT 150 Marketing CommitteeNieto

A/V Sponsored by Strand

3:30 pm – 5:00 pm CRT-60 Certification—Repair, Rehab. Field Personnel Committee Wilmore

Wednesday, April 27

8:00 am – 12:30 pm Board of Directors Meeting Broadlind Ballroom

12:30 pm – 1:30 pm Board of Directors Lunch Wilmore

Page 16: 2 O 1 6 40 - Post-Tensioning Institute - post-tensioning ... Convention/PTI... · 2016 PTI CONVENTION 3 40 years 1 9 7 6 - 2 O 1 6 ™ Welcome to Long Beach! On behalf of PTI, I would

2016 PTI CONVENTION

16

40years

19

76 - 2

O1 6

Special Events

Welcome Reception – The BixbySunday, April 24, 2016 – 6:00 p.m. – 8:00 p.m.Start the conference off enjoying a beverage and some light hors d’oeuvres while renewing connections, building your professional network, and checking out what the exhibitors are offering. (Two drink tickets are included with your conference registration)

2016 PTI Awards Reception – The Bixby (cash bar)Monday, April 25, 2016 – 6:00 p.m. – 6:45 p.m.

2016 PTI Awards Dinner – Pike BallroomMonday, April 25, 2016 – 7:00 p.m. – 9:00 p.m.

Exhibit Area Prize Drawing – Exhibit Area The BixbyTuesday, April 26, 2016 – 3:15 p.m.Visit the exhibitors and collect 10 signatures to be entered in a drawing to win one of four $50 Visa gift cards. The drawing will take place during the afternoon break on Tuesday, April 26th. Turn completed cards in at the registration desk.

Page 17: 2 O 1 6 40 - Post-Tensioning Institute - post-tensioning ... Convention/PTI... · 2016 PTI CONVENTION 3 40 years 1 9 7 6 - 2 O 1 6 ™ Welcome to Long Beach! On behalf of PTI, I would
Page 18: 2 O 1 6 40 - Post-Tensioning Institute - post-tensioning ... Convention/PTI... · 2016 PTI CONVENTION 3 40 years 1 9 7 6 - 2 O 1 6 ™ Welcome to Long Beach! On behalf of PTI, I would

2016 PTI CONVENTION

18

40years

19

76 - 2

O1 6

Technical SessionsMonday, April 25—Pike II & III

Opening SessionSession Moderator: Theodore L. Neff, Executive Director, Post-Tensioning Institute

8:00 a.m. – 8:05 a.m. Session Introduction

8:05 a.m. – 8:30 a.m. Celebrating 40 years of Advancing the PT Industry Bob Sward, PTI President, VSL

Over the past 40 years, PTI has filled a critical role in the development of new and innovative applications of post-tensioning. From slabs-on-ground to rock and soil anchors, segmental and cable supported bridges, containment structures, and buildings, all have benefited from the leadership provided by the Institute and its members. The Institute has provided guidance and recommendation to Owners, Engineers, Contractors, and Material Suppliers through the development and distribution of technical specifications, guides, and recommendations, and interacting with other Trade and Code writing organizations. To maintain its relevance, the Institute needs to have a clear vision and plan for the future. Over the past year, a select task group has worked to develop a strategic plan to propel the Institute into the coming years. The key elements of the plan will be presented during this session.

8:30 a.m. – 8:55 a.m. The High Cost of (a Lack of) Education Theodore L. Neff, Executive Director, Post-Tensioning Institute

Having a trained and qualified work force is essential to the future success of the post-tensioning industry. However, designers, contractors, suppliers, and even associations are struggling to find competent people. Many experienced personnel have retired or will retire soon; combined with the cutbacks that many organizations had to make as a result of the recession, the result is high demand and low supply that has made it very competitive for the qualified workers that are available. This situation has been aggravated at the university level as well, where relatively few colleges currently teach post-tensioning.

This presentation will examine some of the costs and impacts on the industry’s profitability, efficiency, safety, competitiveness, and image from not having a highly skilled work force, and will highlight PTI’s strategic efforts to counter these trends.

8:55 a.m. – 9:20 a.m. PTI Technical Committees: Reflecting on 40 Years as We Plan for the Future

Don Kline, TAB Chair, Kline Engineering & Consulting, LLC

This presentation will reflect on the achievements and advancements in the PT industry over the past 40 years through the lens of TAB and PTI technical committees. The author presents a case for building on this foundation to propel us forward as the international technical leader for PT.

Page 19: 2 O 1 6 40 - Post-Tensioning Institute - post-tensioning ... Convention/PTI... · 2016 PTI CONVENTION 3 40 years 1 9 7 6 - 2 O 1 6 ™ Welcome to Long Beach! On behalf of PTI, I would

2016 PTI CONVENTION

19

40years

19

76 - 2

O1 6

9:20 a.m. – 9:45 a.m. PTI Certification Programs—A Reflection Larry Krauser, CAB Chair, General Technologies, Inc.

A reflection of the history of the PTI Certification Programs—how they started, how they have transitioned, and where they are going.

Session #2: PT Bridges ISession Moderator: Ken Black, VSL

10:15 a.m. – 10:20 a.m. Session Introduction

10:20 a.m. – 10:45 a.m. 32 Years of PTI’s Development of Recommendations for Cable-Stayed Bridges

David Goodyear, T.Y. Lin International

The East Huntington Bridge was one of the early U.S. projects with detailed stay cable specifications that focused on fatigue and performance testing. The detailed requirements were tailored for Hi-Am cables. The success of strand cables for Brotonne and the general interest of the Post-Tensioning Institute in the stay market were motivation for assembling what was (at the time) an ad-hoc committee to write the industry’s first comprehensive recommendations for stay cable design and supply. Beginning with the first edition, the presentation will chronicle the development of the PTI Recommendations over the years of efforts from the beginning committee meeting in 1984 to the present 6th Edition of the Recommendations.

10:45 a.m. – 11:10 a.m. FHWA DTFH611D00048 - Task 5009; Development of FHWA Guidance for Monitorable Replaceable and Assessable PT Tendons Trey Hamilton, PhD, University of Florida Antonio Ledesma, WSP Parsons Brinckerhoff Ian Hubbard, WSP Parsons Brinckerhoff

Many recent improvements have been made in the design, construction, and inspection practices of post-tensioned (PT) bridges in the United States. However, our industry should continue to develop new means and methods to advance the state of practice for PT bridges to improve quality and durability and to ensure they meet the intended service life. Tasks 2 and 3 of this research project focus on new technologies in the United States, such as EIT monitor-ing and replaceable external PT, and provides recommendations for implementation, standard details, and draft specifications. Task 4 includes an industry-critical assessment of the current construction, inspection, and testing practices and provides recommendations on areas for further improvement.

The research effort is ongoing and the presentation provides an update and current status.

Opening Session, cont.

Page 20: 2 O 1 6 40 - Post-Tensioning Institute - post-tensioning ... Convention/PTI... · 2016 PTI CONVENTION 3 40 years 1 9 7 6 - 2 O 1 6 ™ Welcome to Long Beach! On behalf of PTI, I would

2016 PTI CONVENTION

20

40years

19

76 - 2

O1 6

11:10 a.m. – 11:35 a.m. Experiences and Reflections on EIT Post-Tensioning Tommaso Ciccone, TENSA

Increasing demand for long-lasting and highly protected PT tendons is now leading the way to further developments of electrically isolated tendons (EITs). The presentation goes through experiences and notes taken from a massive project completed with EIT tendons.

11:35 a.m. – 12:00 p.m. Current State of the Art in the Design and Construction of the Complex Interchange Projects Using Spliced Precast Girders

Gregg Reese, Summit Engineering Group, Inc.

The design of spliced precast girder bridges has expanded into complex medium- to long-span urban interchange projects. The development of this technology combines modern precast girder cross sections, post-tensioning, and spliced construction to extend span ranges while accommodating complex and curved alignments. Interchange projects constructed over the last 12 years using this design approach have proven to be an economical and constructible solution that has been successfully implemented on numerous projects in different parts of the United States. This paper will describe the development of the design processes and details and will describe the latest projects where this type of construction has been successfully used.

Session #3: Bridges II Session Moderator: Tommaso Ciccone, TENSA

1:30 p.m. – 1:35 p.m. Session Introduction

1:35 p.m. – 2:00 p.m. Sulfate Limits for Corrosion of Steel Strand in Deficient Grout Krishna Vigneshwaran Konda Krishnamurthy,

Florida International University

Despite all the major advantages of post-tensioning tendons, there have been severe corrosion problems in PT tendons in several Florida bridges. Significant portions of those tendons exhibited segregated grout that was often associated with severe corrosion of the strand that sometimes resulted in tendon failure. Those deficient grouts in the tendons showed low chloride content below commonly assumed threshold limits for corrosion initiation, but they showed higher concentrations of sulfate ions, high pore water pH, and high moisture content. Nationwide, there were cases where significant chloride contamination in similar prepackaged grout product and reported results from research indicated chloride threshold limits as low as 0.2%. However, the adverse role of deficient grout (including combined presence of sulfates) on chloride-induced corrosion had not been elucidated. To address the problems, different laboratory tests (including large-scale casting) were carried out. The casting was carried out with various adverse conditions including expired grout, 15% excess mix water, and with varying level of sulfates and chlorides. The role of pH (12.5 < pH < 13.3 pH) in solution was addressed. The objectives of the research were to verify the role of sulfates but also to quantify sulfate content and introduce possible sulfate limits for corrosion development in various grout conditions.

Session #2: PT Bridges I, cont.

Page 21: 2 O 1 6 40 - Post-Tensioning Institute - post-tensioning ... Convention/PTI... · 2016 PTI CONVENTION 3 40 years 1 9 7 6 - 2 O 1 6 ™ Welcome to Long Beach! On behalf of PTI, I would

2016 PTI CONVENTION

21

40years

19

76 - 2

O1 6

2:00 p.m. – 2:25 p.m. Effect of Exposure to Humidity and Temperature on the Fresh Properties of Cementitious Post-Tensioning Grout

Trey Hamilton, PhD, University of Florida

This paper summarizes ongoing research for the Florida Department of Transportation, which is focused on understanding the effect of environmental exposure on the performance of freshly mixed prepackaged post-tensioning grout and in particular on bleed or segregation, or both. Results will be presented of experimental work using a number of methods that measure the mass change of the portland cement powder after exposure to elevated heat and humid-ity. This testing was focused on understanding the effect of topochemical hydration of the portland cement that can occur under elevated humidity. It is believed that the chemical and physical changes caused by this “pre-hydration” results in adverse effects on the bleed and segrega-tion properties of the freshly mixed grouts, potentially leading to the formation of soft grout.

Session #3: Bridges II, cont.

Page 22: 2 O 1 6 40 - Post-Tensioning Institute - post-tensioning ... Convention/PTI... · 2016 PTI CONVENTION 3 40 years 1 9 7 6 - 2 O 1 6 ™ Welcome to Long Beach! On behalf of PTI, I would

2016 PTI CONVENTION

22

40years

19

76 - 2

O1 6

2:25 p.m. – 2:50 p.m. Project Updates on the St. Croix and Lesner Segmental Bridge Projects

Drew Micklus, Freyssinet, Inc.

Project Updates on the St. Croix and Lesner Segmental Bridge Projects. This presentation will introduce two significant bridges and explain their main features.

2:50 p.m. – 3:15 p.m. Gerald Desmond Replacement Bridge - Long Beach, CA Ken Black, VSL

The Gerald Desmond Bridge is a key link connecting the Port of Long Beach terminals to the surrounding area of Long Beach and the 710 Freeway. It is a busy route with approximately 15% of the nation’s containerized water cargo transported across the bridge. The existing steel arch bridge, which was built in 1968, has become unable to accommodate the much larger container ships underneath its span and the greater traffic across its deck. The clearance is being increased from the existing 155 ft to 205 ft with an elegant cable stay design. The main span will be 410 ft. In addition to the stay cables, the structure also uses post-tensioning. Besides the improved traffic flow, safer access, and accommodating of larger ships, the bridge will also feature a bicycle path with three scenic overlooks. The design-build contact was awarded to the joint venture team of Shimmick Construction Co. Inc., FCC Construction S.A. and Impregilo S.p.A. (SFI) in 2012. Structural Technologies LLC (VSL) is providing the stays. The bridge is currently under construction with completion expected in 2018. The presentation will cover the history of the bridge, current progress and schedule, construction methods and highlighting the post-tensioning and stay cable portions of the project.

Session #4: PT Buildings ISession Moderator: Thomas Kang, PhD, Seoul National University

3:45 p.m. – 3:50 p.m. Session Introduction

3:50 p.m. – 4:15 p.m. Post-Tensioned Concrete in U.S. Buildings Ken Bondy, Consultant

A 50-year overview of the use of post-tensioned concrete in U.S. building construction as seen through the eyes of the author.

Session #3: Bridges II, cont.

Page 23: 2 O 1 6 40 - Post-Tensioning Institute - post-tensioning ... Convention/PTI... · 2016 PTI CONVENTION 3 40 years 1 9 7 6 - 2 O 1 6 ™ Welcome to Long Beach! On behalf of PTI, I would

2016 PTI CONVENTION

23

40years

19

76 - 2

O1 6

4:15 p.m. – 4:40 p.m. Design, Modeling, and Monitoring Considerations for PT Building Structures

Thomas Kang, PhD, Seoul National University

In this presentation, recent advances in design, modeling, and monitoring considerations for PT building structures will be introduced. For architectural reasons, PT buildings often have an irregular and asymmetric plan layout of multiple vertical elements (columns and bearing walls) and two-way slabs. For such cases, modeling the right boundary condition and the right restraint effects is a challenging task and should be carefully considered. Three different modeling schemes are compared in terms of pre-compression, deflection, and applied concrete stress. During the construction of multi-story PT flat plate buildings, shoring and unshoring or reshoring procedures are complicated, and construction loads associated with cumulative shoring could be significant, particularly for the floor below which shoring is removed. Because improper construction procedures could make the service load design invalid and cause substantial cracking and long-term deflection, the construction sequence should be an important part of the design process and are considered in design. Finally, monitoring of long-term tendon stresses at various points along the length is something that has never been done before. Prof. Kang’s research team has been successfully monitoring the unbonded tendon stresses from an actual PT building structure in Korea and will share the research results with PTI Convention participants.

4:40 p.m. – 5:05 p.m. Key Aspects of 2-D and 3-D Finite Element Solutions for Serviceability and Strength Requirements of Post-Tensioned Beams and Slabs

Spencer Lee, ADAPT Corporation

The design of two-way unbonded or bonded post-tensioned two-way flat slab and flat plates, one-way slabs, and beams oftentimes relies on computer models and analysis for checking compliance of code-specific serviceability requirements and strength design. Two common software approaches are the use of a simplified two-dimensional (2-D) frame program employing the Equivalent Frame Method or an advanced three-dimensional (3-D) finite element program for continuum slabs with and without integrated beams.

The use of 3-D finite element software has gained wide acceptance and use, especially for two-way slabs of complex geometry and irregularity like podium or transfer slabs. However, the use of simplified 2-D frame software continues to be a popular and widely used method for more linear, repetitive geometric layouts like parking structures. There are clear advantages to the use of both methods for specific slab and beam configurations.

Key design drivers that are stipulated by design codes are often compared between both methods. These include precompression (P/A), balanced loading, tensile and compressive stresses, long-term deflections, secondary PT effects, flexural reinforcement for minimum and strength requirements, and punching shear. Differences exist in these key results between both methods of analysis as a result of underlying programmatic assumptions and methodol-ogy. While results of both methods may satisfy code requirements, understanding these key differences is critical to design confidence and adoption.

Session #4: PT Buildings I, cont.

Page 24: 2 O 1 6 40 - Post-Tensioning Institute - post-tensioning ... Convention/PTI... · 2016 PTI CONVENTION 3 40 years 1 9 7 6 - 2 O 1 6 ™ Welcome to Long Beach! On behalf of PTI, I would

2016 PTI CONVENTION

24

40years

19

76 - 2

O1 6

5:05 p.m. – 5:30 p.m. Design and Construction Issues in Post-Tensioned Mat Slab Foundations

Bryan Allred, Seneca Structural Engineering, Inc.

The presentation will cover several topics related to the successful design of the post-tensioned mat foundations. Post-tensioned detailing, use of available software, and engineering concepts will be addressed in addition to construction photographs, which will show what elements to “look out” for during structural observations.

Tuesday, April 26—Pike II & III

Session #5: PT Buildings II Session Moderator: Edgar Zuniga, Dywidag-Systems International USA, Inc.

8:00 a.m. – 8:05 a.m. Session Introduction

8:05 a.m. – 8:30 a.m. Recentering Post-Tensioned Concrete Walls for Enhanced Seismic Resilience

Leo Panian, Tipping Structural Engineers

Lateral force-resisting systems using well-designed ductile concrete walls offer inherent advantages for the seismic performance of buildings. The strength and stiffness of concrete walls naturally serve to reduce seismic movements to better protect the structure and building systems. While traditional seismic design’s emphasis on ductile yielding, transient movement, and energy dissipation is effective in protecting building occupants or preventing collapse, there is little regard to the effects of permanent deformations or post-earthquake functionality. A structural system that has the ability to recenter the building provides an added measure of resiliency that can protect and maintain the function of important building components such as cladding, elevators, and interiors.

Post-tensioned concrete walls, which combine unbonded high-strength steel tendons with conventional mild-steel reinforcement, offer the opportunity to meaningfully enhance the seismic resiliency of structural wall systems in a cost-effective and practical way. The defining feature of the post-tensioned cast-in-place wall system is its self-centering ten-dency, which can minimize or virtually eliminate permanent deformations following a major earthquake. In this combination, the tendons remain elastic to provide restoring force, while the reinforcement yields to dissipate seismic energy for controlled inelastic response. The post-tensioning provides increased flexural strength with reduced quantities of mild rein-forcement, resulting in more efficient design and improved constructability. The system has broad application for mid- and high-rise structures and can be adapted for retrofit and new construction.

The presentation will explain the concepts and principles underlying the design of the system and illustrate its application through case studies highlighting a number recent projects in the SF Bay Area.

Session #4: PT Buildings I, cont.

Page 25: 2 O 1 6 40 - Post-Tensioning Institute - post-tensioning ... Convention/PTI... · 2016 PTI CONVENTION 3 40 years 1 9 7 6 - 2 O 1 6 ™ Welcome to Long Beach! On behalf of PTI, I would

2016 PTI CONVENTION

25

40years

19

76 - 2

O1 6

8:30 a.m. – 8:55 a.m. Shear Nonsense: A Critique of the ACI Code Shear Design Procedure for Post-Tensioned Beams

Dirk Bondy, Seneca Structural Engineering, Inc.

This paper criticizes the ACI Code procedure for shear design in post-tensioned concrete beams, a procedure that has remained substantially unchanged for more than 50 years since it first appeared in ACI 318-63. The primary criticism is that the ACI 318 shear equations mismatch demand and capacity, consistently requiring more shear reinforcement away from the supports (like at quarter points) than they do at the supports where the shear is highest. That flies in the face of actual post-tensioned concrete beam behavior, and common sense. The current ACI 318 procedure also, in many typical cases, predicts concrete shear capacities Vc in prestressed beams that are substantially less than those in otherwise identical nonpre-stressed beams. Additional criticisms involve the definitions and use of the d and dp terms, and the procedure for minimum shear reinforcement. A new logical equation for shear design of post-tensioned beams is proposed that will greatly simplify shear design and remedy all the cited anomalies.

Session #5: PT Buildings II, cont.

Page 26: 2 O 1 6 40 - Post-Tensioning Institute - post-tensioning ... Convention/PTI... · 2016 PTI CONVENTION 3 40 years 1 9 7 6 - 2 O 1 6 ™ Welcome to Long Beach! On behalf of PTI, I would

2016 PTI CONVENTION

26

40years

19

76 - 2

O1 6

8:55 a.m. – 9:20 a.m. Advancing Anchorage Performance Technology Thomas Mathews, Precision-Hayes International

Research and development regarding the efficiency of anchorage assemblies has been accelerated in recent years to provide substantive value to the industry. These efforts continue to progress beyond dimensional considerations to other factors that contribute to optimized tendon performance. Decades of manufacturing, design, and testing experience specific to anchorage development have contributed to unique improvements that offer dependable, superior performance. This presentation provides some historical perspective and details significant advances.

9:20 a.m. – 9:45 a.m. Anchorage Zone Reinforcement: How Important and Whose Responsibility Is It?

Edgar Zuniga, DYWIDAG-Systems International USA, Inc.

The reinforcement in both the general and local anchorage zones is critical for the proper performance of a post-tensioning tendon anchorage. However, what these two zones are, how they interact with each other, what the main solicitations in each of them are, and who is responsible for their design is not always well understood. The ACI and AASHTO code requirements for unbonded and bonded post-tensioning anchorage zones are presented along with typical applications. Also, the differences between basic or normal versus special anchorage devices are discussed.

Session #6: PT Solutions Session Moderator: Don Illingworth, Don Illingworth & Associates, Inc.

10:15 a.m. – 10:20 a.m. Session Introduction

10:20 a.m. – 10:45 a.m. Slab-on-Ground Conversion to Suspended Foundation Don Illingworth, Don Illingworth & Associates, Inc.

The presentation will discuss the construction methods and engineering involved in converting a typical ribbed post-tensioned slab-on-ground to a pier-supported foundation.

The method is compliant with IBC and ACI and the appropriate section of the codes will be discussed. Tunneling under the foundation provides access to the interior of the foundation and steel push piles are driven to refusal to raise the foundation. The foundation is no longer in contact with the soil and future soil movement will not affect the foundation. This repair was done in Texas, where excessive deferential soil movement has caused problems and minor adjustments are not appropriate.

Session #5: PT Buildings II, cont.

Page 27: 2 O 1 6 40 - Post-Tensioning Institute - post-tensioning ... Convention/PTI... · 2016 PTI CONVENTION 3 40 years 1 9 7 6 - 2 O 1 6 ™ Welcome to Long Beach! On behalf of PTI, I would

2016 PTI CONVENTION

27

40years

19

76 - 2

O1 6

Session #6: PT Solutions, cont.10:45 a.m. – 11:10 a.m. Innovated Post-Tensioning Solutions for State-of-the-Art

Projects Yosbany Ballate, VSL

1000 Museum Place, Downtown Miami, FL - The new 1000 Museum Place will be a unique and innovative building located in downtown Miami near Museum Park. Designed by the famous architect Zaha Hadid, this 62-story work of art with its spiraling and flowing columns will prove to be one of the most beautiful structures in Miami. A unique post-tensioning layout was used to overcome the challenges presented by the building concrete exoskeleton.

Grove and Grand Bay, Coconut Grove, FL - Grove and Grand Bay Project consist of two unique twisting tower buildings designed by the Danish Architect Bjarke Ingels. To achieve the twists, inclined columns were incorporated into the design. A bonded post-tensioning roof frame was used to overcome the torsion forces generated by the tower’s inclined columns.

Page 28: 2 O 1 6 40 - Post-Tensioning Institute - post-tensioning ... Convention/PTI... · 2016 PTI CONVENTION 3 40 years 1 9 7 6 - 2 O 1 6 ™ Welcome to Long Beach! On behalf of PTI, I would

2016 PTI CONVENTION

28

40years

19

76 - 2

O1 6

11:10 a.m. – 11:35 a.m. Project Update on the Hebron Gravity-Based Structure Drew Micklus, Freyssinet, Inc.

The main features of this significant structure will be addressed in this presentation.

11:35 a.m. – 12:00 p.m. Innovative Use of Bonded, Post-Tensioned Bars and Precast Segmental-Concrete Foundations

Cory Brett, Simpson Gumpertz & Heger, Inc.

As part of a radar facility being constructed for the U.S. Government in the remote Arctic, several logistical challenges confronted the project team. Procurement of construction materials in the United States, delivery to Greenland, limited availability of construction equipment, and a restrictive two-and-a-half-month construction season all contributed to a complex engineering and construction project.

For foundation construction, traditional cast-in-place concrete construction was not possible given the lack of batch plants near the remote site. Precast segmental-concrete ele-ments were the alternative, including a mat foundation for the radar tower and deep footings for an ancillary support structure. To accelerate the erection schedule, the design engineers engaged a domestic concrete precaster to cast elements in Massachusetts and truck them to a port in Norfolk, VA. From there, segments were loaded onto a boat that carries supplies to the project site once a year. The segments had to be small enough to fit into shipping containers, be light enough for site cranes to manipulate, and act as a cohesive foundation system once in-stalled. Using a combination of grouted splice sleeves and bonded post-tensioning techniques, the contractor completed foundation construction within the short construction season. This case study shows how the U.S.-based design engineers worked creatively and successfully with a domestic precaster and foreign contractor to provide a solution that satisfied the project’s many technical and logistical challenges.

Session #7: Strengthening & Repair Session Moderator: Tracy Naso, Wiss, Janney, Elstner Associates, Inc.

1:00 p.m. – 1:05 p.m. Session Introduction

1:05 p.m. – 1:30 p.m. Considerations in Designing Post-Tensioning Repairs Tracy Naso, Wiss, Janney, Elstner Associates, Inc.

Designing repairs for existing post-tensioning systems requires consideration of unique conditions beyond basic repair techniques. Common challenges will be introduced and discussed, such as accommodating the post-tensioning force flow in the structure, avoiding unintentional damage as a result of repairs, repair phasing, shoring requirements, stressing procedures, and repair durability.

Session #6: PT Solutions, cont.

Page 29: 2 O 1 6 40 - Post-Tensioning Institute - post-tensioning ... Convention/PTI... · 2016 PTI CONVENTION 3 40 years 1 9 7 6 - 2 O 1 6 ™ Welcome to Long Beach! On behalf of PTI, I would

2016 PTI CONVENTION

29

40years

19

76 - 2

O1 6

Session #7: Strengthening & Repair, cont.1:30 p.m. – 2:00 p.m. Innovative Evaluation of Paper-Wrapped Post-Tensioning Liao Haixue, Vector Corrosion Technologies

Paper-wrapped post-tensioning was used widely in bridges, buildings, parking garages, and stadiums from late 1950 to the early 1970s. This early post-tensioning system has unique characteristics and can be difficult to evaluate and repair. This presentation discusses various evaluation techniques that can be applied to evaluate paper-wrapped post-tensioning effectively, which include visual inspection, test pit, corrosion potential, continuity, conductivity, and tension tests. Case studies will be presented. Once the conditions of tendons are well-understood, cost-effective solutions can be prescribed to repair and rehabilitate this early post-tensioning system.

Page 30: 2 O 1 6 40 - Post-Tensioning Institute - post-tensioning ... Convention/PTI... · 2016 PTI CONVENTION 3 40 years 1 9 7 6 - 2 O 1 6 ™ Welcome to Long Beach! On behalf of PTI, I would

2016 PTI CONVENTION

30

40years

19

76 - 2

O1 6

2:00 p.m. – 2:30 p.m. Structural Strengthening Using External PT Michelle Haughey, Schwager Davis, Inc.

Many of our nation’s existing structures have outlived their expected design life. With the increased cost of construction, many owners have resorted to structural renovations and strengthening to extend the life of their structures in lieu of replacement. The success of these renovation projects is largely dependent on the systems and details used. This presentation will highlight how post-tensioning can be an effective solution for such projects.

2:30 p.m. – 3:00 p.m. Corrosion Mitigation Using Impregnation on Bonded PT Garth Fallis, Vector Corrosion Technologies

Two new case studies and further research of this promising technique will be presented.

Session #8: Panel Discussion on Repair/Open Paper Session Moderator: Sivakumar Munuswamy, Thornton Tomasseti, Inc.

3:30 p.m. – 3:35 p.m. Session Introduction

3:35 p.m. – 4:00 p.m. Panel Discussion: Repair & Strengthening of Structures Tracy Naso (Moderator), Wiss, Janney, Elstner Associates, Inc. Garth Fallis, Vector Corrosion Technologies Liao Haixue, Vector Corrosion Technologies Michelle Haughey, Schwager Davis, Inc.

4:00 p.m. – 4:25 p.m. Post-Tensioning - Codes vs. Practices; A Need for Trained Engineering Professionals

Sivakumar Munuswamy, Thornton Tomasseti, Inc.

Lately, post-tensioning design is delegated to the specialty engineers due to lack of trained engineers, as only very few universities teach prestressed concrete, and some of the universities do not even have two-way slab design in their reinforced concrete design courses. Some believe that the liability and responsibility can be divested, contrary to many professional engineering boards’ requirements. As an institution, PTI needs to take an initiative to convince the universities through ABET the urgency to include this fundamental design topic as part of the undergraduate structural engineering curriculum. This paper presents how the industry could benefit from having well-trained engineers from the universities.

4:25 p.m. – 4:50 p.m. TENDON - New Educational Free Software for Post-Tensioned Structures

Fábio Albino de Souza, EBPX

The TENDON is an educational free software, aiming to help in the learning of post-tensioned structures such as beams and one-way and two-way slabs. The working platform is the Android and IOS suitable for tablets due to better visualization and manipulation of data

Session #7: Strengthening & Repair, cont.

Page 31: 2 O 1 6 40 - Post-Tensioning Institute - post-tensioning ... Convention/PTI... · 2016 PTI CONVENTION 3 40 years 1 9 7 6 - 2 O 1 6 ™ Welcome to Long Beach! On behalf of PTI, I would

2016 PTI CONVENTION

31

40years

19

76 - 2

O1 6

Session #8: Panel Discussion on Repair/Open Paper, cont.beyond mobility. Because it is a very intuitive software, the teacher can be more dynamic in their teachings, causing the student to visualize faster results, arousing interest and interaction with the class. Designed to be a universal software, it provides basic elements and unknowns that the user fills in and can later edit the code according to their country. The application will be available in April 2016 to download. We hope to contribute to the knowledge of prestressed concrete and that it can be spread worldwide, mainly in Latin America.

4:50 p.m. – 5:15 p.m. Forty Years of PT Construction Bill Klorman, Klorman Construction

This presentation will reflect on the construction aspects of post-tensioning over several decades. The evolution of the PT systems will be discussed, with the changing specification re-quirements. Ease of post-tensioning construction will be illustrated as well. A future outlook will show how PT is integrated into BIM and what advantages it brings.

Page 32: 2 O 1 6 40 - Post-Tensioning Institute - post-tensioning ... Convention/PTI... · 2016 PTI CONVENTION 3 40 years 1 9 7 6 - 2 O 1 6 ™ Welcome to Long Beach! On behalf of PTI, I would

2016 PTI CONVENTION

32

40years

19

76 - 2

O1 6

Committee Meeting ScheduleDay / Date Meeting Time Broadlind Wilmore Pike 1 Nieto

Sunday 4/24/2016

8:00 am - 12:00 pm PTI M-50 / ASBI Joint Task Group

fib Stay Cable Editorial Committee

DC-10A SOG Structural Sub

12:00 pm - 1:00 pm Lunch

1:00 pm - 5:00 pm M-55 Grouting

DC-45 Cable Stayed Bridge

DC-10B SOG-Geotechnical

6:00 pm - 8:00 pm Opening Reception

7:30 pm - 11:00 pm TAB Techn Advisory Board

CAB Cert Advisory Board

Day / Date Meeting Time Broadlind Wilmore Pike 1 Nieto

Monday 4/25/2016

8:00 am - 12:00 pm DC-10 SOG

CRT-70 PT Systems QT

DC-70 Special Topics

TG-Spanish Translation

fib Stay Cable Editorial Committee

12:00 pm - 1:30 pm Chair Luncheon / Lunch in the Exhibit Area for Other Attendees

1:30 pm - 3:15 pmDC-20

Building Design

DC-40 Bridge Design (to 3:45 pm) TG-M-10A

Barrier Cable

TG / Overflow Meeting

3:45 pm - 5:30 pm CRT-40 Cert-BFPC CRT-30 Cert-UFPC

6:00 pm - 8:30 pm Awards Dinner

Day / Date Meeting Time Broadlind Wilmore Nieto Pike 1

Tuesday 4/26/2016

8:00 am - 9:45 amDC-80

Repair, Rehab, StrengthCRT-20

Cert-UTPC

DC-110 BIM TG / Overflow Meeting

10:15 am - 12:00 pm PM-200 Professional Member TG / Overflow Meeting

12:00 pm - 1:00 pm Lunch in the Exhibit Area

1:00 pm - 3:00 pmM-10

Unbonded Tendon

TG / Overflow Meeting TG / Overflow Meeting TG / Overflow Meeting

3:30 pm - 5:00 pm CRT-60 Cert-R&RFPC MKT Marketing TG / Overflow Meeting

6:30 pm - 8:30 pm Board Reception

Day / Date Meeting Time Broadlind Wilmore

Wednesday 4/27/2016

8:00 am-12:30 pm BD Board of Directors

12:30 pm - 1:30 pm Board of Directors Luncheon (Registration Required)

Page 33: 2 O 1 6 40 - Post-Tensioning Institute - post-tensioning ... Convention/PTI... · 2016 PTI CONVENTION 3 40 years 1 9 7 6 - 2 O 1 6 ™ Welcome to Long Beach! On behalf of PTI, I would

2016 PTI CONVENTION

33

40years

19

76 - 2

O1 6

Committee Meeting ScheduleDay / Date Meeting Time Broadlind Wilmore Pike 1 Nieto

Sunday 4/24/2016

8:00 am - 12:00 pm PTI M-50 / ASBI Joint Task Group

fib Stay Cable Editorial Committee

DC-10A SOG Structural Sub

12:00 pm - 1:00 pm Lunch

1:00 pm - 5:00 pm M-55 Grouting

DC-45 Cable Stayed Bridge

DC-10B SOG-Geotechnical

6:00 pm - 8:00 pm Opening Reception

7:30 pm - 11:00 pm TAB Techn Advisory Board

CAB Cert Advisory Board

Day / Date Meeting Time Broadlind Wilmore Pike 1 Nieto

Monday 4/25/2016

8:00 am - 12:00 pm DC-10 SOG

CRT-70 PT Systems QT

DC-70 Special Topics

TG-Spanish Translation

fib Stay Cable Editorial Committee

12:00 pm - 1:30 pm Chair Luncheon / Lunch in the Exhibit Area for Other Attendees

1:30 pm - 3:15 pmDC-20

Building Design

DC-40 Bridge Design (to 3:45 pm) TG-M-10A

Barrier Cable

TG / Overflow Meeting

3:45 pm - 5:30 pm CRT-40 Cert-BFPC CRT-30 Cert-UFPC

6:00 pm - 8:30 pm Awards Dinner

Day / Date Meeting Time Broadlind Wilmore Nieto Pike 1

Tuesday 4/26/2016

8:00 am - 9:45 amDC-80

Repair, Rehab, StrengthCRT-20

Cert-UTPC

DC-110 BIM TG / Overflow Meeting

10:15 am - 12:00 pm PM-200 Professional Member TG / Overflow Meeting

12:00 pm - 1:00 pm Lunch in the Exhibit Area

1:00 pm - 3:00 pmM-10

Unbonded Tendon

TG / Overflow Meeting TG / Overflow Meeting TG / Overflow Meeting

3:30 pm - 5:00 pm CRT-60 Cert-R&RFPC MKT Marketing TG / Overflow Meeting

6:30 pm - 8:30 pm Board Reception

Day / Date Meeting Time Broadlind Wilmore

Wednesday 4/27/2016

8:00 am-12:30 pm BD Board of Directors

12:30 pm - 1:30 pm Board of Directors Luncheon (Registration Required)

Page 34: 2 O 1 6 40 - Post-Tensioning Institute - post-tensioning ... Convention/PTI... · 2016 PTI CONVENTION 3 40 years 1 9 7 6 - 2 O 1 6 ™ Welcome to Long Beach! On behalf of PTI, I would

2016 PTI CONVENTION

34

40years

19

76 - 2

O1 6

Hotel Map & Meeting Rooms1ST FLOOR PIKE 2ND FLOOR BIXBY

3RD FLOOR MEETING ROOMS AND

HOSPITALITY SUITES

Where is that Meeting Room?PTI Events and Rooms on Lobby Level:

Certification Workshops – Nieto

Registration – Bixby Prefunction

Committee Meetings – Nieto, Wilmore, Broadlind I & II, Pike l

Welcome Reception – Bixby

Exhibits – Bixby

Lunches – Bixby

Technical Sessions – Pike II & III

2016 PTI Awards Reception – Bixby

2016 PTI Awards Dinner – Pike Ballroom

Committee Chair Lunch – Delker

Bixby

Page 35: 2 O 1 6 40 - Post-Tensioning Institute - post-tensioning ... Convention/PTI... · 2016 PTI CONVENTION 3 40 years 1 9 7 6 - 2 O 1 6 ™ Welcome to Long Beach! On behalf of PTI, I would
Page 36: 2 O 1 6 40 - Post-Tensioning Institute - post-tensioning ... Convention/PTI... · 2016 PTI CONVENTION 3 40 years 1 9 7 6 - 2 O 1 6 ™ Welcome to Long Beach! On behalf of PTI, I would

PTI Committee Days 2016Hilton El Conquistador ResortOctober 5 – 7, 2016 | Tucson, AZ

PTI Convention 2017Hyatt Regency Atlanta

April 30 – May 3, 2017 | Atlanta, GA

Save theDates!

photo courtesy of Jerry Rosen

©2013, Gene Phillips, Courtesy of ACVB & AtlantaPhotos.com