2 nd workshop on superb 17.03,2006 lnf marcello a giorgi1 marcello a. giorgi universit di pisa and...
DESCRIPTION
2 nd workshop on SuperB 17.03,2006 LNF Marcello A Giorgi3 From Physics presentation M.CiuchiniTRANSCRIPT
2nd workshop on SuperB17 .03,2006 LNF
Marcello A Giorgi 1
Marcello A. GiorgiUniversità di Pisa and INFN Pisa
Closeout Remarks
2nd Workshop on SuperBFRASCATI 16- 18 March 2006
2nd workshop on SuperB17 .03,2006 LNF
Marcello A Giorgi 2
OUTLINE
• More on physics case at Super Flavour Factory
• Status of the art• Goals of the workshop
From my opening talk
2nd workshop on SuperB17 .03,2006 LNF
Marcello A Giorgi 3
From Physics presentationM.Ciuchini
2nd workshop on SuperB17 .03,2006 LNF
Marcello A Giorgi 4
Olympic medals
Beam Polarization
Run at 4.0 GeV
M.Ciuchini
2nd workshop on SuperB17 .03,2006 LNF
Marcello A Giorgi 5
ON THE MACHINE
Pantaleo has presented the results of simulations on various possible designs.
John has presented a solution possibly making use of he present PEPII setup and components (including the tunnel)
2nd workshop on SuperB17 .03,2006 LNF
Marcello A Giorgi 6
Machine design under discussion• USE of ILC DR + ILC FF Requires virtually no R&D- Uses all the work done for ILC- Ring and ff layouts virtually done, 3km circunference rings- 100% Synergy with ILC - IR extremely simplified 80-100 m straight line- Beam stay clear about 30sigmas with 1cm radius beam pipe- Currents around 1.5Amps- Background better than PEP and KEKB- Possibly to operate at the tau with L=10^35- Polarization of one beam considered- UNDER STUDY the possibility to run down to the phi with lumi<10^34- Total cost about half of the ILC e+ DRs (2 e+ 6km rings in ILC) - Power around 40MW, still to be further optimized (goal 25MW)- Possible to reuse PEP RF system, power supplies, Vacuum pumps, etc.,
further reducing the overall cost- Needs the standard injector system, probably a C-band 7GeV linac like in
KEKB upgrade (already designed)
2nd workshop on SuperB17 .03,2006 LNF
Marcello A Giorgi 7
Round Flat (1) Flat (2) Flat (3)Sigx* m 0.9 30 (1 betatron) 30 (1 betatron) 2.67Etax mm 0.0 +-1.5 +-1.5 0.0Sigy nm 900 12.6 12.6 12.6Betx mm 0.55 2.5 2.5 17.8Bety mm 0.55 0.080 0.080 0.080Sigz_IP mm 0.8 0.100 0.100 4.0Sige_IP 1.0e-3 2.0e-2 2.0e-2 1.0e-3Sige_Lum 0.7e-3 1.0e-3 1.0e-3 0.7e-3Emix nm 1.5 0.4 0.4 0.4Emiy nm 1.5 0.002 0.002 0.002Emiz m 0.8 2.0 2.0 4.0Cross_angle mrad Optional Optional 2*25 2*25Sigz_DR mm 0.8 4.0 4.0 4.0Sige_DR 1.0e-3 0.5e-3 0.5e-3 1.0e-3Np 10e10 7.0 7.0 1.0 2.0Nbunches 10000 10000 5000 5000DR_length km 6.0 6.0 3.0 3.0Damping_time msec 10 10 10 10Nturns_betwe_coll 50 50 1 1Collision freq MHz 10.0 10.0 500 500Lsingleturn 1e36 1.3 1.3 1.2 0.8Lmultiturn 1e36 0.9 0.9 1.0 1.2
2nd workshop on SuperB17 .03,2006 LNF
Marcello A Giorgi 8IPFF FF
ILC ring & ILC FF
Simplified layout in the Small Disruption Regime Collisions every TurnUncompressed bunchesCrossing angle = 2*25 mradCrabbed Y-Waist
2nd workshop on SuperB17 .03,2006 LNF
Marcello A Giorgi 9
John Seeman idea:4400m collider (2 rings in the 2200m tunnel
of PEPII)
2nd workshop on SuperB17 .03,2006 LNF
Marcello A Giorgi 10Compressor Compressor
Decompressor Decompressor
IPFF FF
ILC ring with ILC FFILC CompressorColliding every turncrossing angle optional
RaimondiFeb 2006
C = 6000 m
2nd workshop on SuperB17 .03,2006 LNF
Marcello A Giorgi 11
Layout of One Ring: Other Ring is the Reverse!
•
IP AndDetector
Final Focus
ReverseFinal Focus
Damping ring = 2200 m
Bunch expander
Bunch compressor
Linac injector
2nd workshop on SuperB17 .03,2006 LNF
Marcello A Giorgi 12
Super-B-Factory in a 4400 m Tunnel 0.4 mm
•
2nd workshop on SuperB17 .03,2006 LNF
Marcello A Giorgi 13
2 most popular solutions
John and Pantaleo designs seems so far the closest to a possible baseline choice.
We need from now and next workshop a lot and well coordinated work to arrive to a satisfactory decision before the summer.
2nd workshop on SuperB17 .03,2006 LNF
Marcello A Giorgi 14
First meeting of the steering Committee Yesterday, we will meet again tomorrow morning at 9.0
Next workshop on june 14,15,16 (To be confirmed) at SLAC.
Decision on the baseline design for the machine.
Start writing the first conceptual document.
2nd workshop on SuperB17 .03,2006 LNF
Marcello A Giorgi 15
Toward the CDR
A final workshop is needed in October (beginning of) to be able to write a reasonable CDR before the end of the current year.
A theory workshop will be held contiguous to ours and devoted to the preparation of the physics chapter of the CDR