2 bim-integration-congress-2015-brochure-download-1

6
DEDICATED TO STREAMLINING MULTI-OFFICE COLLABORATION, INTEGRATE OWNER PERSPECTIVES AND ENSURE PROJECTS ARE DELIVERED ON BUDGET AND SCHEDULE AUGUST 26-27 , 2015 | SAN FRANCISCO | CALIFORNIA FEATURING 20 + CASE STUDIES FOCUSED ON: Follow us on i SAVE $400 Organized By: SAVE $400 Dave McCool Director Of Virtual Design And Construction McCarthy Building Companies Dennis Rodriguez BIM Enterprise Manager AECOM Matt Zwetzig Director Of Virtual Design And Construction VEGA Architecture Mark LaBell Technical Leader SSOE Group Register By Friday June 26, 2015 FEATURING 20+ CASE STUDIES FROM LEADING OWNERS, FACILITY MANAGERS, DESIGNERS AND CONTRACTORS: www.bim-integration-congress.com Incentivizing every department with the measurable benefits of BIM to enhance integration through each project Revealing successful implementation of laser scanning and model-based layout at the job-site BIM IMPLEMENTATION ON-SITE TECHNOLOGY Hearing how remote servers can enable access to large files and enhance collaboration, however your team is distributed across the world CLOUD SOLUTIONS Understanding what deliverables clients need, their expectations for BIM integration and best practice facility management OWNER PERSPECTIVES Forging a single project team across multiple offices to ensure designs have constructability and facility management in-mind INTEGRATION Developing bi-directional collaboration between the field and models to reduce construction errors and keep the project on schedule CONSTRUCTION Eureka moments delivered across content standards, dealing with design changes, clash detection, model-based estimating, energy analysis and training strategies PLUS James Pease Senior Project Manager Facility & Property Services Sutter Health Scott Robinson Preconstruction Gilbane Building Company Dianne Davis BIM Consultant Massachusetts Division Of Capital Asset Management And Maintenance

Upload: aurore-colella

Post on 17-Aug-2015

96 views

Category:

Engineering


0 download

TRANSCRIPT

DEDICATED TO STREAMLINING MULTI-OFFICE COLLABORATION INTEGRATE OWNER PERSPECTIVES AND ENSURE PROJECTS ARE DELIVERED ON BUDGET AND SCHEDULE

AUGUST 26-27 2015 | SAN FRANCISCO | CALIFORNIA

FEATURING 20+ CASE STUDIES FOCUSED ON

Follow us on i

SAVE $400

Organized By

SAVE $400

Dave McCool Director Of Virtual Design And Construction McCarthy Building Companies

Dennis Rodriguez BIM Enterprise Manager AECOM

Matt Zwetzig Director Of Virtual Design And Construction VEGA Architecture

Mark LaBell Technical Leader SSOE Group

Register By FridayJune 26 2015

FEATURING 20+ CASE STUDIES FROM LEADING OWNERS FACILITY MANAGERS DESIGNERS AND CONTRACTORS

wwwbim-integration-congresscom

Incentivizing every department with the measurable benefits of BIM to enhance integration through each project

Revealing successful implementation of laser scanning and model-based layout at the job-site

BIM IMPLEMENTATION

ON-SITE TECHNOLOGY

Hearing how remote servers can enable access to large files and enhance collaboration however your team is distributed across the world

CLOUD SOLUTIONS

Understanding what deliverables clients need their expectations for BIM integration and best practice facility management

OWNER PERSPECTIVES

Forging a single project team across multiple offices to ensure designs have constructability and facility management in-mind

INTEGRATION

Developing bi-directional collaboration between the field and models to reduce construction errors and keep the project on schedule

CONSTRUCTION

Eureka moments delivered across content standards dealing with design changes clash detection model-based estimating energy analysis and training strategies

PLUS

James Pease Senior Project Manager Facility amp Property Services Sutter Health

Scott Robinson Preconstruction Gilbane Building Company

Dianne Davis BIM Consultant Massachusetts Division Of CapitalAsset Management And Maintenance

Venue Information

The Summit Will Be Held At

HILTON San Francisco Airport Bayfront500 Airport BlvdBurlingameSan Francisco CA 94010

Phone 650 340 8500 Fax 650 340 8500Web wwwhiltoncom

wwwbim-integration-congress com (1) 800 721 3915 infoamerican-business-conferencescom

THE FIRST CONFERENCE AGENDA LED BY OWNERS DESIGNERS AND CONTRACTORS TO FOCUS ON INTEGRATION AND COLLABORATIONDuplication of work hesitancy to share content and miscommunication are driving the construction industry crazy and is hindering efforts to deliver projects on time and on budget The only solution is the integration of teams and improved collaboration across owners designers and contractors

In an ideal world each design would factor in every aspect of construction and facility management and changes to the original design would be coordinated in real-time across all stakeholders Yet in reality software and content incompatibility and the distribution of project teams across offices all over the world makes keeping models up to date a nightmare task

Thatrsquos why the inaugural BIM Integration Congress was brought to life - to showcase the solutions implemented by leading owners facility managers architects engineers and construction companies to forge integrated teams ndash as though they were sitting around the same table ndash and improve collaboration to reduce the duplication of work and ensure projects are delivered on time and on schedule

From cloud solutions to laser scanning and model-based layout each technology and innovative process will be assessed from both a technical perspective and in terms of ease of integration into your organization workflow

So join us in San Francisco this August to identify ways to meet your client expectations roll out your BIM implementation strategy and save time and money on every project We look forward to seeing you there

Register By FridayJune 5 2015

SAVE $400

WHY IS THIS EVENT UNIQUE

INTEGRATION INTEGRATION INTEGRATIONEach presentation is focused on forging a single collaborative team for each project to eliminate duplication of work and ensure designs have construction and facility management in mind

OWNER amp FACILITY MANAGER PERSPECTIVESDedicated to providing insights from those writing the cheques Getting the buy- in of clients and identifying the deliverables that facility managers need to reduce lifecycle costs

IMPLEMENTATION STRATEGIESSolutions for achieving the buy-in of corporate decision makers and colleagues stuck in 2D Identifying the measurable benefits of BIM

VENDOR NEUTRALEvery presentation is unbiased and will give honest feedback on software and processes No sales pitches

DESIGNED BY THE INDUSTRY FOR THE INDUSTRYThe insights of over 50 owners facility managers designers and contractors were used to develop this agenda so every minute of the meeting will focus on the very latest critical challenges

FORGING EFFICIENT INTEGRATED TEAMS ACROSS DESIGN AND CONSTRUCTION TO DELIVER PROJECTS WHICH MEET OWNER AND FACILITY MANAGEMENT EXPECTATIONS

Day 1Wednesday August 26 2015

830 Chairrsquos Opening Remarks

OWNERS amp FACILITY MANAGERSUNDERSTANDING CLIENT EXPECTATIONS AND ENSURING

PROJECTS DELIVER THE DIGITAL ASSETS NEEDED BY FACILITY MANAGERS

OWNER PERSPECTIVE BIM EXPECTATIONS

840 Hearing The Expectations Of Owners And Defining Which Deliverables Are Required To Gain Their Buy-In For BIM Implementation

bullReviewinghowmuchvalueownersplaceonBIMdeliverablesandtheirappetitetoincorporateBIMintocurrentprojects

bullExamplesofprojectsclientshaveoptedinoroutofusingBIMandtheirreasonsforthedecision

bullClientperspectivesonthebusinesscaseforBIMHowmuchvaluemustdeliverablesgeneratethroughoutfacilitymanagementtojustifytheupfrontcost

bullUnderstandingwhatdataatthecommissioningpointisrequiredtobegatheredandpassedontotheclient

James Please Senior Project Manager - Facility amp Property Services Sutter Healt

910 Question amp Answer Session

INTEGRATING BIM INTO THE PROJECT LIFECYCLE

PART A OWNER PERSPECTIVE

PART B DELIVERY PERSPECTIVE

920 Learning How To Achieve Flexibility And Certainty Across The BIM Lifecycle To Improve Project Delivery Asset Management Automation And Performance Optimization

bullLinkingBIMmodelstocomputerizedmaintenancemanagementsystemsHowmuchhasbeenachievedandwhataretheremainingchallenges

bullIdentifyingthemeasurablevalueinoperatingandmaintainingthefacilitytoprovethevalueofutilizingBIM

bullAssessingtheemergingBIMusesforownersfromassetmanagementtobuildingautomationtoperformanceoptimization

Dianne Davis BIM Consultant Massachusetts Division Of Capital Asset Management And MaintenanceDennis Rodriquez BIM Enterprise Manager AECOM

1020 Question amp Answer Session

1040 Morning Refreshments In The Exhibition Showcase Area

OWNER PERSPECTIVE FACILITY MANAGEMENT

1100 Integrating BIM Into Facility Management Processes To Improve Accessibility Of Asset Data And Reduce Lifecycle Costs

bullReviewingwhatdatafacilitymanagersareutilizingandhowthisdatawasefficientlypopulatedintothemodelduringdesignandconstruction

bullTransferringdatafromtheBIMmodelatcommissioningtothefacilitymanagementplatformwithoutinformationloss

bullExaminingwhatprocessesstate-of-the-artfacilitymanagersareusingtohaveefficientaccesstoanyinformationtheyrequire

bullLearningwhichapplicationssuchasenergyanalysisandpredictivemaintenancefacilitymanagersareperformingwithBIMdataandestimatingresultinglifecyclecostsavings

Michael Murphy Facility Management Administrator Judicial Council Of California

1130 Question amp Answer Session

TEAM INTEGRATIONDEVELOPING EFFICIENT TEAMS OF OWNERS DESIGNERS

ENGINEERS AND CONTRACTORS TO ELIMINATE DUPLICATION OF EFFORT

INTEGRATION MULTI-OFFICE PROJECTS

1140 Creating Effective Teams Which Seamlessly Collaborate And Share Information Across Multiple Offices To Keep Projects On Schedule

bullOutliningthelatesttoolsandsoftwarepackagessuch

ascloud-basedsystemsforstreamliningmulti-officeintegrationandinformationsharing

bullSettingoutthelevelofBIMimplementationandscopeofeachstakeholderintheinitialprojectphasestoavoidaddingunnecessarymodeldetailswhichwonrsquotbeutilized

bullIncentivisingeachstakeholdertoensuretheyareworkingtooptimizethewholeprojectsratherthanjusttheirownbottomline

bullDeterminingtheoptimalcommunicationmethodsforcollaboratingbetweenofficestoreducethetimetoresolveeachqueryandclash

bullBestpracticesforallowingotherorganisationstoremotelyaccessyourdataBalancingprivacyandsecuritywiththebenefitsofintegration

Joshua Mercado BIM Manager Boldt

1210 Question amp Answer Session

1230 Networking Lunch In The Exhibition Showcase Area

INTEGRATION CLOUD TECHNOLOGY

120 Revealing The Role Of Cloud Technology To Share Data Across Offices And Develop An Integrated Project Delivery Team

bullAssessingtheabilityofcloudtechnologytocommunicateandprocessvastquantitiesofdataandlargefilesCanitcopewithBIMmodels

bullReviewingwhatfunctionalitycloudsoftwareenablesincludingschedulingandqualitycontrol

bullomparingthelevelofteamintegrationachievedbyteamsutilizingcloudtechnologywiththosechoosingalternativecollaborationtechnologies

bullBenchmarkingthecostsandeaseofuseofcloudtechnologywithtraditionalBIMandCADsoftware

Lisa Aguirre Senior BIM Manager Clark Construction Group

150 Question amp Answer Session

COLLABORATION FOR DESIGNEVERAGING STANDARDS AND INTEGRATION TO REDUCE SOFTWARE AND CONTENT INCOMPATIBILITY AND TIME

TAKEN TO MANAGE DESIGN CHANGES

INTEGRATION DESIGNING FOR CONSTRUCTION

PART A CONSTRUCTION PERSPECTIVE

PART B MECHANICAL PERSPECTIVE

200 Allowing Contractors Into The Design Process To Produce One Live BIM Model And Reduce Duplication Of Work

bullResolvingdesignerfearsofcontentbeingmisinterpretedandintellectualpropertyinfringementstoencouragemodelsharing

bullRevealingtheextentofcontractoraccesstothemodelduringdesignandstepsdesignershavetakentocontrolaccess

bullHearingwhatinformationisinputtedbyeachstakeholderateachstageofthedesignprocess

bullIdentifyingatwhatstagethecontractorbeginstocontributetothedesignprocessandoptimizingtheirroleateachstageuntilconstructionbegins

Dave McCool Director Of Virtual Design And Construction McCarthy Building CompaniesBrittany Mendiuk BIM Coordinator Priority Mechanical

300 Question amp Answer Session

320 Afternoon Refreshments In The Exhibition Showcase Area

INTEGRATION DESIGN SOFTWARE

340 Integrating Each Tool Into The Design Process And Developing Software Standards To Minimize Data Loss Between Offices

bullMinimizingthedatalosscausedwhencommunicatingbetweensoftwaretoreducereplicationofworkbetweendepartments

bullLearningwhichdesigntoolsworktogetherharmoniouslyandwhicharemostdifficulttointegrateWhichsoftwarecombinationsshouldbeavoided

bullDevelopingcommonparametersbetweensoftwareto

reducedatalosswhentransferringelementsbullReviewingtheroleofIFCtoreducetheincompatibilityof

softwareandspeedupthecollaborativedesignprocess

Shaun Frazier Design Technology Manager Robert AM Stern Architects

410 Question amp Answer Session

INTEGRATION CONTENT STANDARDS

420 Managing Content Element Standards To Ensure

Consistency Across Models Without Negatively

Impacting Content Developers

bullQuantifyingthetimeandeffortinvestedbyfirmsandunderstandingtheirconcernsofsharingcontentforfreewithprojectpartners

bullHearingsuccessstoriesofcontentelementwarehousesthathavecentrallycuratedandsharedcontentacrossmultipleprojects

bullAvoidingmodelpollutioncausedbyvisuallyincompatibleelementsdownloadedonline

bullReducingthetimetakentocorrectcontentpropertiessuchaslineweightscausedbyincompatibleelements

Keegan Brochu Mechanical Engineer Glumac

Katie MacKenzie Mechanical Engineer Glumac

450 Question amp Answer Session

510 Chairrsquos Closing Remarks

520-620 Networking Drinks In The Exhibition Showcase Area

wwwbim-integration-congress com (1) 800 721 3915 infoamerican-business-conferencescom

Lindsey DuBosarDirector BIM Operations Building amp Facilities STV Group

ldquoBIM Integration is no longer considered the ldquonew thingrdquo It is the present and rapidly becoming a standard in the AEC Industry It is our responsibility as AEC professionals to continue to educate our peers on better and more efficient ways of practice This Congress is a terrific step in that

education goalrdquo

830 Chairrsquos Opening Remarks

BIM IMPLEMENTATION

ROLLING OUT A BIM IMPLEMENTATION PLAN FROM PROVING VALUE TO CORPORATE APPROVAL TO

DEPARTMENTAL INTEGRATION

CHANGE MANAGEMENT PROVING BIM VALUE TO COLLEAGUE

900 Developing A BIM Implementation Plan Which Proves Measurable Benefits To Corporate Decision Makers And Colleagues Unfamiliar With 3D Models

bullUnderstandingresistancetotheBIMlearningcurveandstrategiesforincentivizingstafftoadoptmodern3Dbaseddesign

bullHowtogainsupportfromcorporatedecisionmakerstodevelopandrolloutaBIMimplementationstrategyacrosstheorganisation

bullAssessingwhichBIMbenefitsaremeasurableandhowtoestimatethebenefitsofproblemsbeingprevented

bullCommunicatingqualitativeandquantitativebenefitseffectivelyfromfinancialsavingstoschedulingandreductioninre-work

Lindsey DuBosar Director BIM Operations - Buildings amp Facilities STV Group

930 Question amp Answer Session

COLLABORATION FOR CONSTRUCTIONENHANCING COMMUNICATION BETWEEN THE

CONSTRUCTION SITE AND THE MODEL TO TRACK CONSTRUCTION ERRORS DETECT CLASHES AND

IMPLEMENT DESIGN CHANGES

COLLABORATIVE CONSTRUCTION

940 Developing Effective Bi-Directional Communication Between The Field And Models Such As Utilizing Mobile Apps And Portable Devices

bullHearinghowBIMmodelsarebeingutilizedduringthelayoutandinitialstagesofaconstructionproject

bullAssessingtheroleofmobilesandtabletsinimprovingon-sitevisualisationofmodelstodetectproblemsandstreamlinecommunicationbetweendesignandconstruction

bullUnderstandingtheprocessesusedtodetectmistakesandissuesduringconstructionandutilisingBIMtomorequicklyimplementasolutionormakedesignchanges

bullRevealingtowhatextentdeliveredprojectsresembletheoriginaldesignmodeltodeterminehoweffectiveBIMexecutionwason-site

Wissam Hijazi Virtual Design And Construction Manager EllisDon

1010 Question amp Answer Session

1020 Morning Refreshments In Exhibition Showcase Area

ON-SITE ADOPTION OF BIM

INTEGRATING BIM ON-SITE FROM MODEL BASED LAYOUT AND LASER SCANNING TO PROJECT MANAGEMENT AND

COMMISSIONING

LASER SCANNING

1050 Reviewing The Role Of Laser Scanning To Create Preliminary 3D Digital Representations Of A Structure To Incorporate Into BIM Models

bullIntegratinglaserscanningintotheprojectworkflowWhat

datacanitgatherandwhenshoulditbeusedbullHearingtheeaseofuseandeaseofintegrationoflaser

scanningon-sitebullJustifyingthebusinesscaseforpurchasinglaserscanners

basedonthecostofthemachinewiththeaccuracyandtimesavingsofthetechnology

bullDeterminingwhetherthesamelaserscanningdevicescanbeusedininnovativewaysapartfromjusttheinteriorofabuilding

Mark LaBell Technical Leader SSOE Group

1200 Question amp Answer Session

MODEL BASED LAYOUT

1210 Integrating BIM Models And Robotic Devices To Accurately Layout And Track Coordinates At A Job Site

bullExaminingmethodsforkeepingallon-sitestakeholdersonthesamecoordinatesystemregardlessoftheiruseofBIM

bullReviewingtheroleofroboticdevicestogatherpointsfromamodelandplacetheminthefield

bullComparingtheaccuracyandspeedofmodelbasedlayoutwithtraditionalmethodsandcoordinatesystems

bullHowtousemodelbasedlayoutwithstakeholderson-sitewhoareusingalternativecoordinatesystemstoareunfamiliarwithBIM

1240 Question amp Answer Session

1250 Networking Lunch In Exhibition Showcase Area

KEEPING MODELS UP TO DATESTRATEGIES FOR DEALING WITH DESIGN CHANGES AND DETECTING CLASHES TO ENSURE ALL STAKEHOLDERS

ARE WORKING OFF A CONSISTENT AND UP TO DATE MODEL

DEALING WITH DESIGN CHANGES

150 Seamlessly Updating Models Across Design And Construction Teams Each Time A Design Change Is Made

bullModifyingfabricationmodelswhenchangesaremadetothedesignbyclientsorarchitects

bullReducingthetimetore-designanassetandupdatemodelswhendisconnectsarisebetweenthedesignmodelandtheconstructionsite

bullAdoptingstandardsandguidelinesfortransformingdesignmodelsintoconstructionmodelstoeaseupdating

bullUtilizingBIMtocoordinatedesignswithclientsearlyintheprocesstoreducetheamountofchangesmade

220 Question amp Answer Session

230 Afternoon Refreshments In Exhibition Showcase Area

OFFICE APPLICATIONSSEEING HOW BIM IS BEING UTILIZED TO MODEL ENERGY CONSUMPTION AND ESTIMATING THROUGH DESIGN AND

FACILITY MANAGEMENT

MODEL BASED ESTIMATING

300 Integrating BIM Models Into Workflows And Estimating Software To Automatically Generate New Estimates Every Time The Design Is Updated

bullHearinghowestimatorsareobtainingmodelscomparingthespecificationsfromdesignerswithcustom-builtmodels

bullLinkingmodelswithestimatingsoftwaretogetaccuratenewestimateswhendesignchangesaremade

bullDevelopingtrainingschemestoenableestimatorstouseBIM-ledprocessesandsoftware

bullDeterminingtheoptimalroleofmodelbasedestimatinginaprojectworkflowwhenisitusedandbywho

Matt Zwetzig Director Virtual Design amp Construction VEGA Architecture

330 Question amp Answer Session

TRAINING STRATEGY

SCRUTINIZING INDUSTRY TRENDS ACROSS RETENTION OF STAFF EXPERIENCE TO DETERMINE HOW YOUR

COMPANY NEEDS TO ADAPT TO BIM

TRAINING STRATEGY

340 Creating A Recruitment Training And Staff Retention Strategy Which Enables Teams To Balance Experience With BIM Ability

bullRetainingknowledgeofhowbuildingsareactuallydesignedandconstructedwithinateamasexperiencedstaffretire

bullSuccessfulmethodsforteachingolderstaffhowtoreplaceoldhabitswithprocessesbroughtinthroughBIMandnewtechnology

bullUnderstandingthereal-lifeknowledgegapsinBIMprofessionalswhohavelittleon-siteexperience

bullForeseeinghowstaffrequirementswillchangeinfutureyearsasBIManddeliverymethodsevolve

Lindsey DuBosar Director BIM Operations - Buildings amp Facilities STV Group

Shaun Frazier Design Technology Manager Robert AM Stern Architects420 Chairrsquos Closing Remarks

430 End Of Congress

Day 2Thursday August 27 2015

PROVING AND LEVERAGING THE VALUE OF BIM WITHIN AN ORGANISATION AT THE CONSTRUCTION SITE AND IN FACILITY MANAGEMENT

Scott RobinsonPreconstruction - Gilbane Building Company

ldquoIncreasing efficiency and effectiveness is my passion BIM offers the opportunity for increasing both Getting the right BIM tools into the right peoplersquos hands turns the opportunity into a realityrdquo

wwwbim-integration-congress com (1) 800 721 3915 infoamerican-business-conferencescom

Wissam HijaziVirtual Design And Construction Manager - EllisDon

ldquoBIM is not the future anymore itrsquos the present and the key aspects to unleash its full potential is communication and compatibilityrdquo

BIM MANAGER COORDINATOR - 30

DIRECTOR OF VIRTUAL DESIGN amp CONSTRUCTION - 25

BIM DIRECTOR LEAD - 20

PROJECT MANAGER SUPERINTENDENT - 15 OTHER - 10

DESIGNERS amp ARCHITECTS - 35

CONSTRUCTION COMPANIES - 30

OWNERS amp FACILITY MANAGERS - 20

SOLUTION PROVIDERS - 15

ATTENDEES BY JOB TITLE

ATTENDEES BY COMPANY TYPE

wwwbim-integration-congress com (1) 800 721 3915 infoamerican-business-conferencescom

VISITOR PROFILE

SPONSORSHIP OPPORTUNITIES

The BIM Integration Congress has been designed by owners designers and construction companies to focus on the strategic challenges associated with BIM implementation integration and multi-office collaboration To achieve these aims new generations of software cloud solutions and construction technologies will be demanded of leading and emerging vendors

We welcome the inclusion of leading solution providers looking to reveal their latest case studies Each sponsorship opportunity is designed bespoke to cater for the business objectives of both the vendor and end-user audience ranging from exhibition booths to exclusive networking opportunities and case study presentations

In particular we welcome proposals from those providing cloud-based solutions 3D design software modeling services laser scanning model-based layout content services and solutions for estimating facilities management and energy modeling

To enquire about opportunities to get involved get in touch

Ashley Barnes ashleybarnesamerican-business-conferencescom001 (313) 462 0552

CREATE NEW OPPORTUNITIES FOR YOUR BUSINESS

Address For Invoice Purposes

ZipPostal Code

Country

Payment must be received in full prior to the event

Option 1 CREDIT CARD Please charge my VISA AMERICAN EXPRESS MASTERCARD

Expiry date

Security Code CVV (required)

Signature of card holder

Amount $ USD

Card number

Name on card

I would like to register the delegate(s) below for the 2 day conferenceBIM Integration Congress 2015 | August 26-27 2015 | San Francisco | California

PYesDetails PLEASE USE CAPITALS - PHOTOCOPY FOR MULTIPLE DELEGATES

Delegate Rates GUESTS ARE RESPONSIBLE FOR THEIR OWN TRAVEL AND ACCOMMODATION ARRANGEMENTS

Payment PLEASE TICK APPROPRIATE BOXES AND COMPLETE DETAILS

How To Finalize Your Registration

Option 2 INVOICE An invoice containing payment instructions will be sent electronically upon receipt of the completed registration form

Delegate 1

Mr Dr Miss Ms Mrs Other

Name

Position

Organization

Email

Telephone

Delegate 2

Mr Dr Miss Ms Mrs Other

Name

Position

Organization

Email

Telephone

All prices quoted above are inclusive of GST

Now that your details are completed please send your registration form to

our Customer Service Team using one of the following options

Option 1 Email infoamerican-business-conferencescom

Option 2 Fax (1) 800 714 1359

Enquiries And More Information

Should you have any enquiries or if you would like to request more

information please contact our friendly Customer Service Team on

(1) 800 721 3915 or visit the conference website at

wwwbim-integration-congresscom

Super Early Booking Discount Early Booking Discount Standard Rate

Book And Pay By Friday June 26 2015 Book And Pay By Friday July 24 2015 From July 25 2015

2 Day Conference Pass $1499 USD SAVE $400 $1699 USD SAVE $200 $1899 USD

SAVE UP TO 20WITH GROUP DISCOUNTSCall for rates (1) 800 721 3915

Terms amp Conditions

The conference is being organized by American Business Conferences a division of London Business Conferences Ltd a limited liability company formed under English company law and registered in the UK no 5090859Cancellations received 30 days prior to the start of the event will be eligible for a refund less $150 administration fee after this point no refund will be given Cancellations must be made in writing if you are unable to attend you may nominate a colleague to attend in your place at no additional costReceipt of this registration form inclusive or exclusive of payment constitutes formal agreement to attend and acceptance of the terms and conditions statedAll outstanding fees must be paid within our standard payment period of 7 days Any outstanding invoices will remain valid should cancellation of attendance be received outside of the aforementioned cancellation periodIf you are claiming the early booking discount this may not be used in conjunction with other discounts advertised elsewhere All discount codes and offers must be claimed at

the time of registrationAmerican Business Conferences reserves the right to alter or cancel the speakers or programAmerican Business Conferences reserve the right to refuse admissionWe would like to keep you informed of other American Business Conferences products and services This will be carried out in accordance with the Data Protection Act Please write to the Head of Marketing American Business Conferences at the address below if you specifically do not want to receive this informationAmerican Business Conferences City Center One 800 Town amp Country Blvd Suite 300 Houston Texas 77024American Business Conferences will not accept liability for any individual transport delays and in such circumstances the normal cancellation restrictions applyAmerican Business Conferences is a Division of London Business Conferences Limited Registered in England No 5090859 EIN no 98-0514924

wwwbim-integration-congress com (1) 800 721 3915 infoamerican-business-conferencescom

Venue Information

The Summit Will Be Held At

HILTON San Francisco Airport Bayfront500 Airport BlvdBurlingameSan Francisco CA 94010

Phone 650 340 8500 Fax 650 340 8500Web wwwhiltoncom

wwwbim-integration-congress com (1) 800 721 3915 infoamerican-business-conferencescom

THE FIRST CONFERENCE AGENDA LED BY OWNERS DESIGNERS AND CONTRACTORS TO FOCUS ON INTEGRATION AND COLLABORATIONDuplication of work hesitancy to share content and miscommunication are driving the construction industry crazy and is hindering efforts to deliver projects on time and on budget The only solution is the integration of teams and improved collaboration across owners designers and contractors

In an ideal world each design would factor in every aspect of construction and facility management and changes to the original design would be coordinated in real-time across all stakeholders Yet in reality software and content incompatibility and the distribution of project teams across offices all over the world makes keeping models up to date a nightmare task

Thatrsquos why the inaugural BIM Integration Congress was brought to life - to showcase the solutions implemented by leading owners facility managers architects engineers and construction companies to forge integrated teams ndash as though they were sitting around the same table ndash and improve collaboration to reduce the duplication of work and ensure projects are delivered on time and on schedule

From cloud solutions to laser scanning and model-based layout each technology and innovative process will be assessed from both a technical perspective and in terms of ease of integration into your organization workflow

So join us in San Francisco this August to identify ways to meet your client expectations roll out your BIM implementation strategy and save time and money on every project We look forward to seeing you there

Register By FridayJune 5 2015

SAVE $400

WHY IS THIS EVENT UNIQUE

INTEGRATION INTEGRATION INTEGRATIONEach presentation is focused on forging a single collaborative team for each project to eliminate duplication of work and ensure designs have construction and facility management in mind

OWNER amp FACILITY MANAGER PERSPECTIVESDedicated to providing insights from those writing the cheques Getting the buy- in of clients and identifying the deliverables that facility managers need to reduce lifecycle costs

IMPLEMENTATION STRATEGIESSolutions for achieving the buy-in of corporate decision makers and colleagues stuck in 2D Identifying the measurable benefits of BIM

VENDOR NEUTRALEvery presentation is unbiased and will give honest feedback on software and processes No sales pitches

DESIGNED BY THE INDUSTRY FOR THE INDUSTRYThe insights of over 50 owners facility managers designers and contractors were used to develop this agenda so every minute of the meeting will focus on the very latest critical challenges

FORGING EFFICIENT INTEGRATED TEAMS ACROSS DESIGN AND CONSTRUCTION TO DELIVER PROJECTS WHICH MEET OWNER AND FACILITY MANAGEMENT EXPECTATIONS

Day 1Wednesday August 26 2015

830 Chairrsquos Opening Remarks

OWNERS amp FACILITY MANAGERSUNDERSTANDING CLIENT EXPECTATIONS AND ENSURING

PROJECTS DELIVER THE DIGITAL ASSETS NEEDED BY FACILITY MANAGERS

OWNER PERSPECTIVE BIM EXPECTATIONS

840 Hearing The Expectations Of Owners And Defining Which Deliverables Are Required To Gain Their Buy-In For BIM Implementation

bullReviewinghowmuchvalueownersplaceonBIMdeliverablesandtheirappetitetoincorporateBIMintocurrentprojects

bullExamplesofprojectsclientshaveoptedinoroutofusingBIMandtheirreasonsforthedecision

bullClientperspectivesonthebusinesscaseforBIMHowmuchvaluemustdeliverablesgeneratethroughoutfacilitymanagementtojustifytheupfrontcost

bullUnderstandingwhatdataatthecommissioningpointisrequiredtobegatheredandpassedontotheclient

James Please Senior Project Manager - Facility amp Property Services Sutter Healt

910 Question amp Answer Session

INTEGRATING BIM INTO THE PROJECT LIFECYCLE

PART A OWNER PERSPECTIVE

PART B DELIVERY PERSPECTIVE

920 Learning How To Achieve Flexibility And Certainty Across The BIM Lifecycle To Improve Project Delivery Asset Management Automation And Performance Optimization

bullLinkingBIMmodelstocomputerizedmaintenancemanagementsystemsHowmuchhasbeenachievedandwhataretheremainingchallenges

bullIdentifyingthemeasurablevalueinoperatingandmaintainingthefacilitytoprovethevalueofutilizingBIM

bullAssessingtheemergingBIMusesforownersfromassetmanagementtobuildingautomationtoperformanceoptimization

Dianne Davis BIM Consultant Massachusetts Division Of Capital Asset Management And MaintenanceDennis Rodriquez BIM Enterprise Manager AECOM

1020 Question amp Answer Session

1040 Morning Refreshments In The Exhibition Showcase Area

OWNER PERSPECTIVE FACILITY MANAGEMENT

1100 Integrating BIM Into Facility Management Processes To Improve Accessibility Of Asset Data And Reduce Lifecycle Costs

bullReviewingwhatdatafacilitymanagersareutilizingandhowthisdatawasefficientlypopulatedintothemodelduringdesignandconstruction

bullTransferringdatafromtheBIMmodelatcommissioningtothefacilitymanagementplatformwithoutinformationloss

bullExaminingwhatprocessesstate-of-the-artfacilitymanagersareusingtohaveefficientaccesstoanyinformationtheyrequire

bullLearningwhichapplicationssuchasenergyanalysisandpredictivemaintenancefacilitymanagersareperformingwithBIMdataandestimatingresultinglifecyclecostsavings

Michael Murphy Facility Management Administrator Judicial Council Of California

1130 Question amp Answer Session

TEAM INTEGRATIONDEVELOPING EFFICIENT TEAMS OF OWNERS DESIGNERS

ENGINEERS AND CONTRACTORS TO ELIMINATE DUPLICATION OF EFFORT

INTEGRATION MULTI-OFFICE PROJECTS

1140 Creating Effective Teams Which Seamlessly Collaborate And Share Information Across Multiple Offices To Keep Projects On Schedule

bullOutliningthelatesttoolsandsoftwarepackagessuch

ascloud-basedsystemsforstreamliningmulti-officeintegrationandinformationsharing

bullSettingoutthelevelofBIMimplementationandscopeofeachstakeholderintheinitialprojectphasestoavoidaddingunnecessarymodeldetailswhichwonrsquotbeutilized

bullIncentivisingeachstakeholdertoensuretheyareworkingtooptimizethewholeprojectsratherthanjusttheirownbottomline

bullDeterminingtheoptimalcommunicationmethodsforcollaboratingbetweenofficestoreducethetimetoresolveeachqueryandclash

bullBestpracticesforallowingotherorganisationstoremotelyaccessyourdataBalancingprivacyandsecuritywiththebenefitsofintegration

Joshua Mercado BIM Manager Boldt

1210 Question amp Answer Session

1230 Networking Lunch In The Exhibition Showcase Area

INTEGRATION CLOUD TECHNOLOGY

120 Revealing The Role Of Cloud Technology To Share Data Across Offices And Develop An Integrated Project Delivery Team

bullAssessingtheabilityofcloudtechnologytocommunicateandprocessvastquantitiesofdataandlargefilesCanitcopewithBIMmodels

bullReviewingwhatfunctionalitycloudsoftwareenablesincludingschedulingandqualitycontrol

bullomparingthelevelofteamintegrationachievedbyteamsutilizingcloudtechnologywiththosechoosingalternativecollaborationtechnologies

bullBenchmarkingthecostsandeaseofuseofcloudtechnologywithtraditionalBIMandCADsoftware

Lisa Aguirre Senior BIM Manager Clark Construction Group

150 Question amp Answer Session

COLLABORATION FOR DESIGNEVERAGING STANDARDS AND INTEGRATION TO REDUCE SOFTWARE AND CONTENT INCOMPATIBILITY AND TIME

TAKEN TO MANAGE DESIGN CHANGES

INTEGRATION DESIGNING FOR CONSTRUCTION

PART A CONSTRUCTION PERSPECTIVE

PART B MECHANICAL PERSPECTIVE

200 Allowing Contractors Into The Design Process To Produce One Live BIM Model And Reduce Duplication Of Work

bullResolvingdesignerfearsofcontentbeingmisinterpretedandintellectualpropertyinfringementstoencouragemodelsharing

bullRevealingtheextentofcontractoraccesstothemodelduringdesignandstepsdesignershavetakentocontrolaccess

bullHearingwhatinformationisinputtedbyeachstakeholderateachstageofthedesignprocess

bullIdentifyingatwhatstagethecontractorbeginstocontributetothedesignprocessandoptimizingtheirroleateachstageuntilconstructionbegins

Dave McCool Director Of Virtual Design And Construction McCarthy Building CompaniesBrittany Mendiuk BIM Coordinator Priority Mechanical

300 Question amp Answer Session

320 Afternoon Refreshments In The Exhibition Showcase Area

INTEGRATION DESIGN SOFTWARE

340 Integrating Each Tool Into The Design Process And Developing Software Standards To Minimize Data Loss Between Offices

bullMinimizingthedatalosscausedwhencommunicatingbetweensoftwaretoreducereplicationofworkbetweendepartments

bullLearningwhichdesigntoolsworktogetherharmoniouslyandwhicharemostdifficulttointegrateWhichsoftwarecombinationsshouldbeavoided

bullDevelopingcommonparametersbetweensoftwareto

reducedatalosswhentransferringelementsbullReviewingtheroleofIFCtoreducetheincompatibilityof

softwareandspeedupthecollaborativedesignprocess

Shaun Frazier Design Technology Manager Robert AM Stern Architects

410 Question amp Answer Session

INTEGRATION CONTENT STANDARDS

420 Managing Content Element Standards To Ensure

Consistency Across Models Without Negatively

Impacting Content Developers

bullQuantifyingthetimeandeffortinvestedbyfirmsandunderstandingtheirconcernsofsharingcontentforfreewithprojectpartners

bullHearingsuccessstoriesofcontentelementwarehousesthathavecentrallycuratedandsharedcontentacrossmultipleprojects

bullAvoidingmodelpollutioncausedbyvisuallyincompatibleelementsdownloadedonline

bullReducingthetimetakentocorrectcontentpropertiessuchaslineweightscausedbyincompatibleelements

Keegan Brochu Mechanical Engineer Glumac

Katie MacKenzie Mechanical Engineer Glumac

450 Question amp Answer Session

510 Chairrsquos Closing Remarks

520-620 Networking Drinks In The Exhibition Showcase Area

wwwbim-integration-congress com (1) 800 721 3915 infoamerican-business-conferencescom

Lindsey DuBosarDirector BIM Operations Building amp Facilities STV Group

ldquoBIM Integration is no longer considered the ldquonew thingrdquo It is the present and rapidly becoming a standard in the AEC Industry It is our responsibility as AEC professionals to continue to educate our peers on better and more efficient ways of practice This Congress is a terrific step in that

education goalrdquo

830 Chairrsquos Opening Remarks

BIM IMPLEMENTATION

ROLLING OUT A BIM IMPLEMENTATION PLAN FROM PROVING VALUE TO CORPORATE APPROVAL TO

DEPARTMENTAL INTEGRATION

CHANGE MANAGEMENT PROVING BIM VALUE TO COLLEAGUE

900 Developing A BIM Implementation Plan Which Proves Measurable Benefits To Corporate Decision Makers And Colleagues Unfamiliar With 3D Models

bullUnderstandingresistancetotheBIMlearningcurveandstrategiesforincentivizingstafftoadoptmodern3Dbaseddesign

bullHowtogainsupportfromcorporatedecisionmakerstodevelopandrolloutaBIMimplementationstrategyacrosstheorganisation

bullAssessingwhichBIMbenefitsaremeasurableandhowtoestimatethebenefitsofproblemsbeingprevented

bullCommunicatingqualitativeandquantitativebenefitseffectivelyfromfinancialsavingstoschedulingandreductioninre-work

Lindsey DuBosar Director BIM Operations - Buildings amp Facilities STV Group

930 Question amp Answer Session

COLLABORATION FOR CONSTRUCTIONENHANCING COMMUNICATION BETWEEN THE

CONSTRUCTION SITE AND THE MODEL TO TRACK CONSTRUCTION ERRORS DETECT CLASHES AND

IMPLEMENT DESIGN CHANGES

COLLABORATIVE CONSTRUCTION

940 Developing Effective Bi-Directional Communication Between The Field And Models Such As Utilizing Mobile Apps And Portable Devices

bullHearinghowBIMmodelsarebeingutilizedduringthelayoutandinitialstagesofaconstructionproject

bullAssessingtheroleofmobilesandtabletsinimprovingon-sitevisualisationofmodelstodetectproblemsandstreamlinecommunicationbetweendesignandconstruction

bullUnderstandingtheprocessesusedtodetectmistakesandissuesduringconstructionandutilisingBIMtomorequicklyimplementasolutionormakedesignchanges

bullRevealingtowhatextentdeliveredprojectsresembletheoriginaldesignmodeltodeterminehoweffectiveBIMexecutionwason-site

Wissam Hijazi Virtual Design And Construction Manager EllisDon

1010 Question amp Answer Session

1020 Morning Refreshments In Exhibition Showcase Area

ON-SITE ADOPTION OF BIM

INTEGRATING BIM ON-SITE FROM MODEL BASED LAYOUT AND LASER SCANNING TO PROJECT MANAGEMENT AND

COMMISSIONING

LASER SCANNING

1050 Reviewing The Role Of Laser Scanning To Create Preliminary 3D Digital Representations Of A Structure To Incorporate Into BIM Models

bullIntegratinglaserscanningintotheprojectworkflowWhat

datacanitgatherandwhenshoulditbeusedbullHearingtheeaseofuseandeaseofintegrationoflaser

scanningon-sitebullJustifyingthebusinesscaseforpurchasinglaserscanners

basedonthecostofthemachinewiththeaccuracyandtimesavingsofthetechnology

bullDeterminingwhetherthesamelaserscanningdevicescanbeusedininnovativewaysapartfromjusttheinteriorofabuilding

Mark LaBell Technical Leader SSOE Group

1200 Question amp Answer Session

MODEL BASED LAYOUT

1210 Integrating BIM Models And Robotic Devices To Accurately Layout And Track Coordinates At A Job Site

bullExaminingmethodsforkeepingallon-sitestakeholdersonthesamecoordinatesystemregardlessoftheiruseofBIM

bullReviewingtheroleofroboticdevicestogatherpointsfromamodelandplacetheminthefield

bullComparingtheaccuracyandspeedofmodelbasedlayoutwithtraditionalmethodsandcoordinatesystems

bullHowtousemodelbasedlayoutwithstakeholderson-sitewhoareusingalternativecoordinatesystemstoareunfamiliarwithBIM

1240 Question amp Answer Session

1250 Networking Lunch In Exhibition Showcase Area

KEEPING MODELS UP TO DATESTRATEGIES FOR DEALING WITH DESIGN CHANGES AND DETECTING CLASHES TO ENSURE ALL STAKEHOLDERS

ARE WORKING OFF A CONSISTENT AND UP TO DATE MODEL

DEALING WITH DESIGN CHANGES

150 Seamlessly Updating Models Across Design And Construction Teams Each Time A Design Change Is Made

bullModifyingfabricationmodelswhenchangesaremadetothedesignbyclientsorarchitects

bullReducingthetimetore-designanassetandupdatemodelswhendisconnectsarisebetweenthedesignmodelandtheconstructionsite

bullAdoptingstandardsandguidelinesfortransformingdesignmodelsintoconstructionmodelstoeaseupdating

bullUtilizingBIMtocoordinatedesignswithclientsearlyintheprocesstoreducetheamountofchangesmade

220 Question amp Answer Session

230 Afternoon Refreshments In Exhibition Showcase Area

OFFICE APPLICATIONSSEEING HOW BIM IS BEING UTILIZED TO MODEL ENERGY CONSUMPTION AND ESTIMATING THROUGH DESIGN AND

FACILITY MANAGEMENT

MODEL BASED ESTIMATING

300 Integrating BIM Models Into Workflows And Estimating Software To Automatically Generate New Estimates Every Time The Design Is Updated

bullHearinghowestimatorsareobtainingmodelscomparingthespecificationsfromdesignerswithcustom-builtmodels

bullLinkingmodelswithestimatingsoftwaretogetaccuratenewestimateswhendesignchangesaremade

bullDevelopingtrainingschemestoenableestimatorstouseBIM-ledprocessesandsoftware

bullDeterminingtheoptimalroleofmodelbasedestimatinginaprojectworkflowwhenisitusedandbywho

Matt Zwetzig Director Virtual Design amp Construction VEGA Architecture

330 Question amp Answer Session

TRAINING STRATEGY

SCRUTINIZING INDUSTRY TRENDS ACROSS RETENTION OF STAFF EXPERIENCE TO DETERMINE HOW YOUR

COMPANY NEEDS TO ADAPT TO BIM

TRAINING STRATEGY

340 Creating A Recruitment Training And Staff Retention Strategy Which Enables Teams To Balance Experience With BIM Ability

bullRetainingknowledgeofhowbuildingsareactuallydesignedandconstructedwithinateamasexperiencedstaffretire

bullSuccessfulmethodsforteachingolderstaffhowtoreplaceoldhabitswithprocessesbroughtinthroughBIMandnewtechnology

bullUnderstandingthereal-lifeknowledgegapsinBIMprofessionalswhohavelittleon-siteexperience

bullForeseeinghowstaffrequirementswillchangeinfutureyearsasBIManddeliverymethodsevolve

Lindsey DuBosar Director BIM Operations - Buildings amp Facilities STV Group

Shaun Frazier Design Technology Manager Robert AM Stern Architects420 Chairrsquos Closing Remarks

430 End Of Congress

Day 2Thursday August 27 2015

PROVING AND LEVERAGING THE VALUE OF BIM WITHIN AN ORGANISATION AT THE CONSTRUCTION SITE AND IN FACILITY MANAGEMENT

Scott RobinsonPreconstruction - Gilbane Building Company

ldquoIncreasing efficiency and effectiveness is my passion BIM offers the opportunity for increasing both Getting the right BIM tools into the right peoplersquos hands turns the opportunity into a realityrdquo

wwwbim-integration-congress com (1) 800 721 3915 infoamerican-business-conferencescom

Wissam HijaziVirtual Design And Construction Manager - EllisDon

ldquoBIM is not the future anymore itrsquos the present and the key aspects to unleash its full potential is communication and compatibilityrdquo

BIM MANAGER COORDINATOR - 30

DIRECTOR OF VIRTUAL DESIGN amp CONSTRUCTION - 25

BIM DIRECTOR LEAD - 20

PROJECT MANAGER SUPERINTENDENT - 15 OTHER - 10

DESIGNERS amp ARCHITECTS - 35

CONSTRUCTION COMPANIES - 30

OWNERS amp FACILITY MANAGERS - 20

SOLUTION PROVIDERS - 15

ATTENDEES BY JOB TITLE

ATTENDEES BY COMPANY TYPE

wwwbim-integration-congress com (1) 800 721 3915 infoamerican-business-conferencescom

VISITOR PROFILE

SPONSORSHIP OPPORTUNITIES

The BIM Integration Congress has been designed by owners designers and construction companies to focus on the strategic challenges associated with BIM implementation integration and multi-office collaboration To achieve these aims new generations of software cloud solutions and construction technologies will be demanded of leading and emerging vendors

We welcome the inclusion of leading solution providers looking to reveal their latest case studies Each sponsorship opportunity is designed bespoke to cater for the business objectives of both the vendor and end-user audience ranging from exhibition booths to exclusive networking opportunities and case study presentations

In particular we welcome proposals from those providing cloud-based solutions 3D design software modeling services laser scanning model-based layout content services and solutions for estimating facilities management and energy modeling

To enquire about opportunities to get involved get in touch

Ashley Barnes ashleybarnesamerican-business-conferencescom001 (313) 462 0552

CREATE NEW OPPORTUNITIES FOR YOUR BUSINESS

Address For Invoice Purposes

ZipPostal Code

Country

Payment must be received in full prior to the event

Option 1 CREDIT CARD Please charge my VISA AMERICAN EXPRESS MASTERCARD

Expiry date

Security Code CVV (required)

Signature of card holder

Amount $ USD

Card number

Name on card

I would like to register the delegate(s) below for the 2 day conferenceBIM Integration Congress 2015 | August 26-27 2015 | San Francisco | California

PYesDetails PLEASE USE CAPITALS - PHOTOCOPY FOR MULTIPLE DELEGATES

Delegate Rates GUESTS ARE RESPONSIBLE FOR THEIR OWN TRAVEL AND ACCOMMODATION ARRANGEMENTS

Payment PLEASE TICK APPROPRIATE BOXES AND COMPLETE DETAILS

How To Finalize Your Registration

Option 2 INVOICE An invoice containing payment instructions will be sent electronically upon receipt of the completed registration form

Delegate 1

Mr Dr Miss Ms Mrs Other

Name

Position

Organization

Email

Telephone

Delegate 2

Mr Dr Miss Ms Mrs Other

Name

Position

Organization

Email

Telephone

All prices quoted above are inclusive of GST

Now that your details are completed please send your registration form to

our Customer Service Team using one of the following options

Option 1 Email infoamerican-business-conferencescom

Option 2 Fax (1) 800 714 1359

Enquiries And More Information

Should you have any enquiries or if you would like to request more

information please contact our friendly Customer Service Team on

(1) 800 721 3915 or visit the conference website at

wwwbim-integration-congresscom

Super Early Booking Discount Early Booking Discount Standard Rate

Book And Pay By Friday June 26 2015 Book And Pay By Friday July 24 2015 From July 25 2015

2 Day Conference Pass $1499 USD SAVE $400 $1699 USD SAVE $200 $1899 USD

SAVE UP TO 20WITH GROUP DISCOUNTSCall for rates (1) 800 721 3915

Terms amp Conditions

The conference is being organized by American Business Conferences a division of London Business Conferences Ltd a limited liability company formed under English company law and registered in the UK no 5090859Cancellations received 30 days prior to the start of the event will be eligible for a refund less $150 administration fee after this point no refund will be given Cancellations must be made in writing if you are unable to attend you may nominate a colleague to attend in your place at no additional costReceipt of this registration form inclusive or exclusive of payment constitutes formal agreement to attend and acceptance of the terms and conditions statedAll outstanding fees must be paid within our standard payment period of 7 days Any outstanding invoices will remain valid should cancellation of attendance be received outside of the aforementioned cancellation periodIf you are claiming the early booking discount this may not be used in conjunction with other discounts advertised elsewhere All discount codes and offers must be claimed at

the time of registrationAmerican Business Conferences reserves the right to alter or cancel the speakers or programAmerican Business Conferences reserve the right to refuse admissionWe would like to keep you informed of other American Business Conferences products and services This will be carried out in accordance with the Data Protection Act Please write to the Head of Marketing American Business Conferences at the address below if you specifically do not want to receive this informationAmerican Business Conferences City Center One 800 Town amp Country Blvd Suite 300 Houston Texas 77024American Business Conferences will not accept liability for any individual transport delays and in such circumstances the normal cancellation restrictions applyAmerican Business Conferences is a Division of London Business Conferences Limited Registered in England No 5090859 EIN no 98-0514924

wwwbim-integration-congress com (1) 800 721 3915 infoamerican-business-conferencescom

FORGING EFFICIENT INTEGRATED TEAMS ACROSS DESIGN AND CONSTRUCTION TO DELIVER PROJECTS WHICH MEET OWNER AND FACILITY MANAGEMENT EXPECTATIONS

Day 1Wednesday August 26 2015

830 Chairrsquos Opening Remarks

OWNERS amp FACILITY MANAGERSUNDERSTANDING CLIENT EXPECTATIONS AND ENSURING

PROJECTS DELIVER THE DIGITAL ASSETS NEEDED BY FACILITY MANAGERS

OWNER PERSPECTIVE BIM EXPECTATIONS

840 Hearing The Expectations Of Owners And Defining Which Deliverables Are Required To Gain Their Buy-In For BIM Implementation

bullReviewinghowmuchvalueownersplaceonBIMdeliverablesandtheirappetitetoincorporateBIMintocurrentprojects

bullExamplesofprojectsclientshaveoptedinoroutofusingBIMandtheirreasonsforthedecision

bullClientperspectivesonthebusinesscaseforBIMHowmuchvaluemustdeliverablesgeneratethroughoutfacilitymanagementtojustifytheupfrontcost

bullUnderstandingwhatdataatthecommissioningpointisrequiredtobegatheredandpassedontotheclient

James Please Senior Project Manager - Facility amp Property Services Sutter Healt

910 Question amp Answer Session

INTEGRATING BIM INTO THE PROJECT LIFECYCLE

PART A OWNER PERSPECTIVE

PART B DELIVERY PERSPECTIVE

920 Learning How To Achieve Flexibility And Certainty Across The BIM Lifecycle To Improve Project Delivery Asset Management Automation And Performance Optimization

bullLinkingBIMmodelstocomputerizedmaintenancemanagementsystemsHowmuchhasbeenachievedandwhataretheremainingchallenges

bullIdentifyingthemeasurablevalueinoperatingandmaintainingthefacilitytoprovethevalueofutilizingBIM

bullAssessingtheemergingBIMusesforownersfromassetmanagementtobuildingautomationtoperformanceoptimization

Dianne Davis BIM Consultant Massachusetts Division Of Capital Asset Management And MaintenanceDennis Rodriquez BIM Enterprise Manager AECOM

1020 Question amp Answer Session

1040 Morning Refreshments In The Exhibition Showcase Area

OWNER PERSPECTIVE FACILITY MANAGEMENT

1100 Integrating BIM Into Facility Management Processes To Improve Accessibility Of Asset Data And Reduce Lifecycle Costs

bullReviewingwhatdatafacilitymanagersareutilizingandhowthisdatawasefficientlypopulatedintothemodelduringdesignandconstruction

bullTransferringdatafromtheBIMmodelatcommissioningtothefacilitymanagementplatformwithoutinformationloss

bullExaminingwhatprocessesstate-of-the-artfacilitymanagersareusingtohaveefficientaccesstoanyinformationtheyrequire

bullLearningwhichapplicationssuchasenergyanalysisandpredictivemaintenancefacilitymanagersareperformingwithBIMdataandestimatingresultinglifecyclecostsavings

Michael Murphy Facility Management Administrator Judicial Council Of California

1130 Question amp Answer Session

TEAM INTEGRATIONDEVELOPING EFFICIENT TEAMS OF OWNERS DESIGNERS

ENGINEERS AND CONTRACTORS TO ELIMINATE DUPLICATION OF EFFORT

INTEGRATION MULTI-OFFICE PROJECTS

1140 Creating Effective Teams Which Seamlessly Collaborate And Share Information Across Multiple Offices To Keep Projects On Schedule

bullOutliningthelatesttoolsandsoftwarepackagessuch

ascloud-basedsystemsforstreamliningmulti-officeintegrationandinformationsharing

bullSettingoutthelevelofBIMimplementationandscopeofeachstakeholderintheinitialprojectphasestoavoidaddingunnecessarymodeldetailswhichwonrsquotbeutilized

bullIncentivisingeachstakeholdertoensuretheyareworkingtooptimizethewholeprojectsratherthanjusttheirownbottomline

bullDeterminingtheoptimalcommunicationmethodsforcollaboratingbetweenofficestoreducethetimetoresolveeachqueryandclash

bullBestpracticesforallowingotherorganisationstoremotelyaccessyourdataBalancingprivacyandsecuritywiththebenefitsofintegration

Joshua Mercado BIM Manager Boldt

1210 Question amp Answer Session

1230 Networking Lunch In The Exhibition Showcase Area

INTEGRATION CLOUD TECHNOLOGY

120 Revealing The Role Of Cloud Technology To Share Data Across Offices And Develop An Integrated Project Delivery Team

bullAssessingtheabilityofcloudtechnologytocommunicateandprocessvastquantitiesofdataandlargefilesCanitcopewithBIMmodels

bullReviewingwhatfunctionalitycloudsoftwareenablesincludingschedulingandqualitycontrol

bullomparingthelevelofteamintegrationachievedbyteamsutilizingcloudtechnologywiththosechoosingalternativecollaborationtechnologies

bullBenchmarkingthecostsandeaseofuseofcloudtechnologywithtraditionalBIMandCADsoftware

Lisa Aguirre Senior BIM Manager Clark Construction Group

150 Question amp Answer Session

COLLABORATION FOR DESIGNEVERAGING STANDARDS AND INTEGRATION TO REDUCE SOFTWARE AND CONTENT INCOMPATIBILITY AND TIME

TAKEN TO MANAGE DESIGN CHANGES

INTEGRATION DESIGNING FOR CONSTRUCTION

PART A CONSTRUCTION PERSPECTIVE

PART B MECHANICAL PERSPECTIVE

200 Allowing Contractors Into The Design Process To Produce One Live BIM Model And Reduce Duplication Of Work

bullResolvingdesignerfearsofcontentbeingmisinterpretedandintellectualpropertyinfringementstoencouragemodelsharing

bullRevealingtheextentofcontractoraccesstothemodelduringdesignandstepsdesignershavetakentocontrolaccess

bullHearingwhatinformationisinputtedbyeachstakeholderateachstageofthedesignprocess

bullIdentifyingatwhatstagethecontractorbeginstocontributetothedesignprocessandoptimizingtheirroleateachstageuntilconstructionbegins

Dave McCool Director Of Virtual Design And Construction McCarthy Building CompaniesBrittany Mendiuk BIM Coordinator Priority Mechanical

300 Question amp Answer Session

320 Afternoon Refreshments In The Exhibition Showcase Area

INTEGRATION DESIGN SOFTWARE

340 Integrating Each Tool Into The Design Process And Developing Software Standards To Minimize Data Loss Between Offices

bullMinimizingthedatalosscausedwhencommunicatingbetweensoftwaretoreducereplicationofworkbetweendepartments

bullLearningwhichdesigntoolsworktogetherharmoniouslyandwhicharemostdifficulttointegrateWhichsoftwarecombinationsshouldbeavoided

bullDevelopingcommonparametersbetweensoftwareto

reducedatalosswhentransferringelementsbullReviewingtheroleofIFCtoreducetheincompatibilityof

softwareandspeedupthecollaborativedesignprocess

Shaun Frazier Design Technology Manager Robert AM Stern Architects

410 Question amp Answer Session

INTEGRATION CONTENT STANDARDS

420 Managing Content Element Standards To Ensure

Consistency Across Models Without Negatively

Impacting Content Developers

bullQuantifyingthetimeandeffortinvestedbyfirmsandunderstandingtheirconcernsofsharingcontentforfreewithprojectpartners

bullHearingsuccessstoriesofcontentelementwarehousesthathavecentrallycuratedandsharedcontentacrossmultipleprojects

bullAvoidingmodelpollutioncausedbyvisuallyincompatibleelementsdownloadedonline

bullReducingthetimetakentocorrectcontentpropertiessuchaslineweightscausedbyincompatibleelements

Keegan Brochu Mechanical Engineer Glumac

Katie MacKenzie Mechanical Engineer Glumac

450 Question amp Answer Session

510 Chairrsquos Closing Remarks

520-620 Networking Drinks In The Exhibition Showcase Area

wwwbim-integration-congress com (1) 800 721 3915 infoamerican-business-conferencescom

Lindsey DuBosarDirector BIM Operations Building amp Facilities STV Group

ldquoBIM Integration is no longer considered the ldquonew thingrdquo It is the present and rapidly becoming a standard in the AEC Industry It is our responsibility as AEC professionals to continue to educate our peers on better and more efficient ways of practice This Congress is a terrific step in that

education goalrdquo

830 Chairrsquos Opening Remarks

BIM IMPLEMENTATION

ROLLING OUT A BIM IMPLEMENTATION PLAN FROM PROVING VALUE TO CORPORATE APPROVAL TO

DEPARTMENTAL INTEGRATION

CHANGE MANAGEMENT PROVING BIM VALUE TO COLLEAGUE

900 Developing A BIM Implementation Plan Which Proves Measurable Benefits To Corporate Decision Makers And Colleagues Unfamiliar With 3D Models

bullUnderstandingresistancetotheBIMlearningcurveandstrategiesforincentivizingstafftoadoptmodern3Dbaseddesign

bullHowtogainsupportfromcorporatedecisionmakerstodevelopandrolloutaBIMimplementationstrategyacrosstheorganisation

bullAssessingwhichBIMbenefitsaremeasurableandhowtoestimatethebenefitsofproblemsbeingprevented

bullCommunicatingqualitativeandquantitativebenefitseffectivelyfromfinancialsavingstoschedulingandreductioninre-work

Lindsey DuBosar Director BIM Operations - Buildings amp Facilities STV Group

930 Question amp Answer Session

COLLABORATION FOR CONSTRUCTIONENHANCING COMMUNICATION BETWEEN THE

CONSTRUCTION SITE AND THE MODEL TO TRACK CONSTRUCTION ERRORS DETECT CLASHES AND

IMPLEMENT DESIGN CHANGES

COLLABORATIVE CONSTRUCTION

940 Developing Effective Bi-Directional Communication Between The Field And Models Such As Utilizing Mobile Apps And Portable Devices

bullHearinghowBIMmodelsarebeingutilizedduringthelayoutandinitialstagesofaconstructionproject

bullAssessingtheroleofmobilesandtabletsinimprovingon-sitevisualisationofmodelstodetectproblemsandstreamlinecommunicationbetweendesignandconstruction

bullUnderstandingtheprocessesusedtodetectmistakesandissuesduringconstructionandutilisingBIMtomorequicklyimplementasolutionormakedesignchanges

bullRevealingtowhatextentdeliveredprojectsresembletheoriginaldesignmodeltodeterminehoweffectiveBIMexecutionwason-site

Wissam Hijazi Virtual Design And Construction Manager EllisDon

1010 Question amp Answer Session

1020 Morning Refreshments In Exhibition Showcase Area

ON-SITE ADOPTION OF BIM

INTEGRATING BIM ON-SITE FROM MODEL BASED LAYOUT AND LASER SCANNING TO PROJECT MANAGEMENT AND

COMMISSIONING

LASER SCANNING

1050 Reviewing The Role Of Laser Scanning To Create Preliminary 3D Digital Representations Of A Structure To Incorporate Into BIM Models

bullIntegratinglaserscanningintotheprojectworkflowWhat

datacanitgatherandwhenshoulditbeusedbullHearingtheeaseofuseandeaseofintegrationoflaser

scanningon-sitebullJustifyingthebusinesscaseforpurchasinglaserscanners

basedonthecostofthemachinewiththeaccuracyandtimesavingsofthetechnology

bullDeterminingwhetherthesamelaserscanningdevicescanbeusedininnovativewaysapartfromjusttheinteriorofabuilding

Mark LaBell Technical Leader SSOE Group

1200 Question amp Answer Session

MODEL BASED LAYOUT

1210 Integrating BIM Models And Robotic Devices To Accurately Layout And Track Coordinates At A Job Site

bullExaminingmethodsforkeepingallon-sitestakeholdersonthesamecoordinatesystemregardlessoftheiruseofBIM

bullReviewingtheroleofroboticdevicestogatherpointsfromamodelandplacetheminthefield

bullComparingtheaccuracyandspeedofmodelbasedlayoutwithtraditionalmethodsandcoordinatesystems

bullHowtousemodelbasedlayoutwithstakeholderson-sitewhoareusingalternativecoordinatesystemstoareunfamiliarwithBIM

1240 Question amp Answer Session

1250 Networking Lunch In Exhibition Showcase Area

KEEPING MODELS UP TO DATESTRATEGIES FOR DEALING WITH DESIGN CHANGES AND DETECTING CLASHES TO ENSURE ALL STAKEHOLDERS

ARE WORKING OFF A CONSISTENT AND UP TO DATE MODEL

DEALING WITH DESIGN CHANGES

150 Seamlessly Updating Models Across Design And Construction Teams Each Time A Design Change Is Made

bullModifyingfabricationmodelswhenchangesaremadetothedesignbyclientsorarchitects

bullReducingthetimetore-designanassetandupdatemodelswhendisconnectsarisebetweenthedesignmodelandtheconstructionsite

bullAdoptingstandardsandguidelinesfortransformingdesignmodelsintoconstructionmodelstoeaseupdating

bullUtilizingBIMtocoordinatedesignswithclientsearlyintheprocesstoreducetheamountofchangesmade

220 Question amp Answer Session

230 Afternoon Refreshments In Exhibition Showcase Area

OFFICE APPLICATIONSSEEING HOW BIM IS BEING UTILIZED TO MODEL ENERGY CONSUMPTION AND ESTIMATING THROUGH DESIGN AND

FACILITY MANAGEMENT

MODEL BASED ESTIMATING

300 Integrating BIM Models Into Workflows And Estimating Software To Automatically Generate New Estimates Every Time The Design Is Updated

bullHearinghowestimatorsareobtainingmodelscomparingthespecificationsfromdesignerswithcustom-builtmodels

bullLinkingmodelswithestimatingsoftwaretogetaccuratenewestimateswhendesignchangesaremade

bullDevelopingtrainingschemestoenableestimatorstouseBIM-ledprocessesandsoftware

bullDeterminingtheoptimalroleofmodelbasedestimatinginaprojectworkflowwhenisitusedandbywho

Matt Zwetzig Director Virtual Design amp Construction VEGA Architecture

330 Question amp Answer Session

TRAINING STRATEGY

SCRUTINIZING INDUSTRY TRENDS ACROSS RETENTION OF STAFF EXPERIENCE TO DETERMINE HOW YOUR

COMPANY NEEDS TO ADAPT TO BIM

TRAINING STRATEGY

340 Creating A Recruitment Training And Staff Retention Strategy Which Enables Teams To Balance Experience With BIM Ability

bullRetainingknowledgeofhowbuildingsareactuallydesignedandconstructedwithinateamasexperiencedstaffretire

bullSuccessfulmethodsforteachingolderstaffhowtoreplaceoldhabitswithprocessesbroughtinthroughBIMandnewtechnology

bullUnderstandingthereal-lifeknowledgegapsinBIMprofessionalswhohavelittleon-siteexperience

bullForeseeinghowstaffrequirementswillchangeinfutureyearsasBIManddeliverymethodsevolve

Lindsey DuBosar Director BIM Operations - Buildings amp Facilities STV Group

Shaun Frazier Design Technology Manager Robert AM Stern Architects420 Chairrsquos Closing Remarks

430 End Of Congress

Day 2Thursday August 27 2015

PROVING AND LEVERAGING THE VALUE OF BIM WITHIN AN ORGANISATION AT THE CONSTRUCTION SITE AND IN FACILITY MANAGEMENT

Scott RobinsonPreconstruction - Gilbane Building Company

ldquoIncreasing efficiency and effectiveness is my passion BIM offers the opportunity for increasing both Getting the right BIM tools into the right peoplersquos hands turns the opportunity into a realityrdquo

wwwbim-integration-congress com (1) 800 721 3915 infoamerican-business-conferencescom

Wissam HijaziVirtual Design And Construction Manager - EllisDon

ldquoBIM is not the future anymore itrsquos the present and the key aspects to unleash its full potential is communication and compatibilityrdquo

BIM MANAGER COORDINATOR - 30

DIRECTOR OF VIRTUAL DESIGN amp CONSTRUCTION - 25

BIM DIRECTOR LEAD - 20

PROJECT MANAGER SUPERINTENDENT - 15 OTHER - 10

DESIGNERS amp ARCHITECTS - 35

CONSTRUCTION COMPANIES - 30

OWNERS amp FACILITY MANAGERS - 20

SOLUTION PROVIDERS - 15

ATTENDEES BY JOB TITLE

ATTENDEES BY COMPANY TYPE

wwwbim-integration-congress com (1) 800 721 3915 infoamerican-business-conferencescom

VISITOR PROFILE

SPONSORSHIP OPPORTUNITIES

The BIM Integration Congress has been designed by owners designers and construction companies to focus on the strategic challenges associated with BIM implementation integration and multi-office collaboration To achieve these aims new generations of software cloud solutions and construction technologies will be demanded of leading and emerging vendors

We welcome the inclusion of leading solution providers looking to reveal their latest case studies Each sponsorship opportunity is designed bespoke to cater for the business objectives of both the vendor and end-user audience ranging from exhibition booths to exclusive networking opportunities and case study presentations

In particular we welcome proposals from those providing cloud-based solutions 3D design software modeling services laser scanning model-based layout content services and solutions for estimating facilities management and energy modeling

To enquire about opportunities to get involved get in touch

Ashley Barnes ashleybarnesamerican-business-conferencescom001 (313) 462 0552

CREATE NEW OPPORTUNITIES FOR YOUR BUSINESS

Address For Invoice Purposes

ZipPostal Code

Country

Payment must be received in full prior to the event

Option 1 CREDIT CARD Please charge my VISA AMERICAN EXPRESS MASTERCARD

Expiry date

Security Code CVV (required)

Signature of card holder

Amount $ USD

Card number

Name on card

I would like to register the delegate(s) below for the 2 day conferenceBIM Integration Congress 2015 | August 26-27 2015 | San Francisco | California

PYesDetails PLEASE USE CAPITALS - PHOTOCOPY FOR MULTIPLE DELEGATES

Delegate Rates GUESTS ARE RESPONSIBLE FOR THEIR OWN TRAVEL AND ACCOMMODATION ARRANGEMENTS

Payment PLEASE TICK APPROPRIATE BOXES AND COMPLETE DETAILS

How To Finalize Your Registration

Option 2 INVOICE An invoice containing payment instructions will be sent electronically upon receipt of the completed registration form

Delegate 1

Mr Dr Miss Ms Mrs Other

Name

Position

Organization

Email

Telephone

Delegate 2

Mr Dr Miss Ms Mrs Other

Name

Position

Organization

Email

Telephone

All prices quoted above are inclusive of GST

Now that your details are completed please send your registration form to

our Customer Service Team using one of the following options

Option 1 Email infoamerican-business-conferencescom

Option 2 Fax (1) 800 714 1359

Enquiries And More Information

Should you have any enquiries or if you would like to request more

information please contact our friendly Customer Service Team on

(1) 800 721 3915 or visit the conference website at

wwwbim-integration-congresscom

Super Early Booking Discount Early Booking Discount Standard Rate

Book And Pay By Friday June 26 2015 Book And Pay By Friday July 24 2015 From July 25 2015

2 Day Conference Pass $1499 USD SAVE $400 $1699 USD SAVE $200 $1899 USD

SAVE UP TO 20WITH GROUP DISCOUNTSCall for rates (1) 800 721 3915

Terms amp Conditions

The conference is being organized by American Business Conferences a division of London Business Conferences Ltd a limited liability company formed under English company law and registered in the UK no 5090859Cancellations received 30 days prior to the start of the event will be eligible for a refund less $150 administration fee after this point no refund will be given Cancellations must be made in writing if you are unable to attend you may nominate a colleague to attend in your place at no additional costReceipt of this registration form inclusive or exclusive of payment constitutes formal agreement to attend and acceptance of the terms and conditions statedAll outstanding fees must be paid within our standard payment period of 7 days Any outstanding invoices will remain valid should cancellation of attendance be received outside of the aforementioned cancellation periodIf you are claiming the early booking discount this may not be used in conjunction with other discounts advertised elsewhere All discount codes and offers must be claimed at

the time of registrationAmerican Business Conferences reserves the right to alter or cancel the speakers or programAmerican Business Conferences reserve the right to refuse admissionWe would like to keep you informed of other American Business Conferences products and services This will be carried out in accordance with the Data Protection Act Please write to the Head of Marketing American Business Conferences at the address below if you specifically do not want to receive this informationAmerican Business Conferences City Center One 800 Town amp Country Blvd Suite 300 Houston Texas 77024American Business Conferences will not accept liability for any individual transport delays and in such circumstances the normal cancellation restrictions applyAmerican Business Conferences is a Division of London Business Conferences Limited Registered in England No 5090859 EIN no 98-0514924

wwwbim-integration-congress com (1) 800 721 3915 infoamerican-business-conferencescom

830 Chairrsquos Opening Remarks

BIM IMPLEMENTATION

ROLLING OUT A BIM IMPLEMENTATION PLAN FROM PROVING VALUE TO CORPORATE APPROVAL TO

DEPARTMENTAL INTEGRATION

CHANGE MANAGEMENT PROVING BIM VALUE TO COLLEAGUE

900 Developing A BIM Implementation Plan Which Proves Measurable Benefits To Corporate Decision Makers And Colleagues Unfamiliar With 3D Models

bullUnderstandingresistancetotheBIMlearningcurveandstrategiesforincentivizingstafftoadoptmodern3Dbaseddesign

bullHowtogainsupportfromcorporatedecisionmakerstodevelopandrolloutaBIMimplementationstrategyacrosstheorganisation

bullAssessingwhichBIMbenefitsaremeasurableandhowtoestimatethebenefitsofproblemsbeingprevented

bullCommunicatingqualitativeandquantitativebenefitseffectivelyfromfinancialsavingstoschedulingandreductioninre-work

Lindsey DuBosar Director BIM Operations - Buildings amp Facilities STV Group

930 Question amp Answer Session

COLLABORATION FOR CONSTRUCTIONENHANCING COMMUNICATION BETWEEN THE

CONSTRUCTION SITE AND THE MODEL TO TRACK CONSTRUCTION ERRORS DETECT CLASHES AND

IMPLEMENT DESIGN CHANGES

COLLABORATIVE CONSTRUCTION

940 Developing Effective Bi-Directional Communication Between The Field And Models Such As Utilizing Mobile Apps And Portable Devices

bullHearinghowBIMmodelsarebeingutilizedduringthelayoutandinitialstagesofaconstructionproject

bullAssessingtheroleofmobilesandtabletsinimprovingon-sitevisualisationofmodelstodetectproblemsandstreamlinecommunicationbetweendesignandconstruction

bullUnderstandingtheprocessesusedtodetectmistakesandissuesduringconstructionandutilisingBIMtomorequicklyimplementasolutionormakedesignchanges

bullRevealingtowhatextentdeliveredprojectsresembletheoriginaldesignmodeltodeterminehoweffectiveBIMexecutionwason-site

Wissam Hijazi Virtual Design And Construction Manager EllisDon

1010 Question amp Answer Session

1020 Morning Refreshments In Exhibition Showcase Area

ON-SITE ADOPTION OF BIM

INTEGRATING BIM ON-SITE FROM MODEL BASED LAYOUT AND LASER SCANNING TO PROJECT MANAGEMENT AND

COMMISSIONING

LASER SCANNING

1050 Reviewing The Role Of Laser Scanning To Create Preliminary 3D Digital Representations Of A Structure To Incorporate Into BIM Models

bullIntegratinglaserscanningintotheprojectworkflowWhat

datacanitgatherandwhenshoulditbeusedbullHearingtheeaseofuseandeaseofintegrationoflaser

scanningon-sitebullJustifyingthebusinesscaseforpurchasinglaserscanners

basedonthecostofthemachinewiththeaccuracyandtimesavingsofthetechnology

bullDeterminingwhetherthesamelaserscanningdevicescanbeusedininnovativewaysapartfromjusttheinteriorofabuilding

Mark LaBell Technical Leader SSOE Group

1200 Question amp Answer Session

MODEL BASED LAYOUT

1210 Integrating BIM Models And Robotic Devices To Accurately Layout And Track Coordinates At A Job Site

bullExaminingmethodsforkeepingallon-sitestakeholdersonthesamecoordinatesystemregardlessoftheiruseofBIM

bullReviewingtheroleofroboticdevicestogatherpointsfromamodelandplacetheminthefield

bullComparingtheaccuracyandspeedofmodelbasedlayoutwithtraditionalmethodsandcoordinatesystems

bullHowtousemodelbasedlayoutwithstakeholderson-sitewhoareusingalternativecoordinatesystemstoareunfamiliarwithBIM

1240 Question amp Answer Session

1250 Networking Lunch In Exhibition Showcase Area

KEEPING MODELS UP TO DATESTRATEGIES FOR DEALING WITH DESIGN CHANGES AND DETECTING CLASHES TO ENSURE ALL STAKEHOLDERS

ARE WORKING OFF A CONSISTENT AND UP TO DATE MODEL

DEALING WITH DESIGN CHANGES

150 Seamlessly Updating Models Across Design And Construction Teams Each Time A Design Change Is Made

bullModifyingfabricationmodelswhenchangesaremadetothedesignbyclientsorarchitects

bullReducingthetimetore-designanassetandupdatemodelswhendisconnectsarisebetweenthedesignmodelandtheconstructionsite

bullAdoptingstandardsandguidelinesfortransformingdesignmodelsintoconstructionmodelstoeaseupdating

bullUtilizingBIMtocoordinatedesignswithclientsearlyintheprocesstoreducetheamountofchangesmade

220 Question amp Answer Session

230 Afternoon Refreshments In Exhibition Showcase Area

OFFICE APPLICATIONSSEEING HOW BIM IS BEING UTILIZED TO MODEL ENERGY CONSUMPTION AND ESTIMATING THROUGH DESIGN AND

FACILITY MANAGEMENT

MODEL BASED ESTIMATING

300 Integrating BIM Models Into Workflows And Estimating Software To Automatically Generate New Estimates Every Time The Design Is Updated

bullHearinghowestimatorsareobtainingmodelscomparingthespecificationsfromdesignerswithcustom-builtmodels

bullLinkingmodelswithestimatingsoftwaretogetaccuratenewestimateswhendesignchangesaremade

bullDevelopingtrainingschemestoenableestimatorstouseBIM-ledprocessesandsoftware

bullDeterminingtheoptimalroleofmodelbasedestimatinginaprojectworkflowwhenisitusedandbywho

Matt Zwetzig Director Virtual Design amp Construction VEGA Architecture

330 Question amp Answer Session

TRAINING STRATEGY

SCRUTINIZING INDUSTRY TRENDS ACROSS RETENTION OF STAFF EXPERIENCE TO DETERMINE HOW YOUR

COMPANY NEEDS TO ADAPT TO BIM

TRAINING STRATEGY

340 Creating A Recruitment Training And Staff Retention Strategy Which Enables Teams To Balance Experience With BIM Ability

bullRetainingknowledgeofhowbuildingsareactuallydesignedandconstructedwithinateamasexperiencedstaffretire

bullSuccessfulmethodsforteachingolderstaffhowtoreplaceoldhabitswithprocessesbroughtinthroughBIMandnewtechnology

bullUnderstandingthereal-lifeknowledgegapsinBIMprofessionalswhohavelittleon-siteexperience

bullForeseeinghowstaffrequirementswillchangeinfutureyearsasBIManddeliverymethodsevolve

Lindsey DuBosar Director BIM Operations - Buildings amp Facilities STV Group

Shaun Frazier Design Technology Manager Robert AM Stern Architects420 Chairrsquos Closing Remarks

430 End Of Congress

Day 2Thursday August 27 2015

PROVING AND LEVERAGING THE VALUE OF BIM WITHIN AN ORGANISATION AT THE CONSTRUCTION SITE AND IN FACILITY MANAGEMENT

Scott RobinsonPreconstruction - Gilbane Building Company

ldquoIncreasing efficiency and effectiveness is my passion BIM offers the opportunity for increasing both Getting the right BIM tools into the right peoplersquos hands turns the opportunity into a realityrdquo

wwwbim-integration-congress com (1) 800 721 3915 infoamerican-business-conferencescom

Wissam HijaziVirtual Design And Construction Manager - EllisDon

ldquoBIM is not the future anymore itrsquos the present and the key aspects to unleash its full potential is communication and compatibilityrdquo

BIM MANAGER COORDINATOR - 30

DIRECTOR OF VIRTUAL DESIGN amp CONSTRUCTION - 25

BIM DIRECTOR LEAD - 20

PROJECT MANAGER SUPERINTENDENT - 15 OTHER - 10

DESIGNERS amp ARCHITECTS - 35

CONSTRUCTION COMPANIES - 30

OWNERS amp FACILITY MANAGERS - 20

SOLUTION PROVIDERS - 15

ATTENDEES BY JOB TITLE

ATTENDEES BY COMPANY TYPE

wwwbim-integration-congress com (1) 800 721 3915 infoamerican-business-conferencescom

VISITOR PROFILE

SPONSORSHIP OPPORTUNITIES

The BIM Integration Congress has been designed by owners designers and construction companies to focus on the strategic challenges associated with BIM implementation integration and multi-office collaboration To achieve these aims new generations of software cloud solutions and construction technologies will be demanded of leading and emerging vendors

We welcome the inclusion of leading solution providers looking to reveal their latest case studies Each sponsorship opportunity is designed bespoke to cater for the business objectives of both the vendor and end-user audience ranging from exhibition booths to exclusive networking opportunities and case study presentations

In particular we welcome proposals from those providing cloud-based solutions 3D design software modeling services laser scanning model-based layout content services and solutions for estimating facilities management and energy modeling

To enquire about opportunities to get involved get in touch

Ashley Barnes ashleybarnesamerican-business-conferencescom001 (313) 462 0552

CREATE NEW OPPORTUNITIES FOR YOUR BUSINESS

Address For Invoice Purposes

ZipPostal Code

Country

Payment must be received in full prior to the event

Option 1 CREDIT CARD Please charge my VISA AMERICAN EXPRESS MASTERCARD

Expiry date

Security Code CVV (required)

Signature of card holder

Amount $ USD

Card number

Name on card

I would like to register the delegate(s) below for the 2 day conferenceBIM Integration Congress 2015 | August 26-27 2015 | San Francisco | California

PYesDetails PLEASE USE CAPITALS - PHOTOCOPY FOR MULTIPLE DELEGATES

Delegate Rates GUESTS ARE RESPONSIBLE FOR THEIR OWN TRAVEL AND ACCOMMODATION ARRANGEMENTS

Payment PLEASE TICK APPROPRIATE BOXES AND COMPLETE DETAILS

How To Finalize Your Registration

Option 2 INVOICE An invoice containing payment instructions will be sent electronically upon receipt of the completed registration form

Delegate 1

Mr Dr Miss Ms Mrs Other

Name

Position

Organization

Email

Telephone

Delegate 2

Mr Dr Miss Ms Mrs Other

Name

Position

Organization

Email

Telephone

All prices quoted above are inclusive of GST

Now that your details are completed please send your registration form to

our Customer Service Team using one of the following options

Option 1 Email infoamerican-business-conferencescom

Option 2 Fax (1) 800 714 1359

Enquiries And More Information

Should you have any enquiries or if you would like to request more

information please contact our friendly Customer Service Team on

(1) 800 721 3915 or visit the conference website at

wwwbim-integration-congresscom

Super Early Booking Discount Early Booking Discount Standard Rate

Book And Pay By Friday June 26 2015 Book And Pay By Friday July 24 2015 From July 25 2015

2 Day Conference Pass $1499 USD SAVE $400 $1699 USD SAVE $200 $1899 USD

SAVE UP TO 20WITH GROUP DISCOUNTSCall for rates (1) 800 721 3915

Terms amp Conditions

The conference is being organized by American Business Conferences a division of London Business Conferences Ltd a limited liability company formed under English company law and registered in the UK no 5090859Cancellations received 30 days prior to the start of the event will be eligible for a refund less $150 administration fee after this point no refund will be given Cancellations must be made in writing if you are unable to attend you may nominate a colleague to attend in your place at no additional costReceipt of this registration form inclusive or exclusive of payment constitutes formal agreement to attend and acceptance of the terms and conditions statedAll outstanding fees must be paid within our standard payment period of 7 days Any outstanding invoices will remain valid should cancellation of attendance be received outside of the aforementioned cancellation periodIf you are claiming the early booking discount this may not be used in conjunction with other discounts advertised elsewhere All discount codes and offers must be claimed at

the time of registrationAmerican Business Conferences reserves the right to alter or cancel the speakers or programAmerican Business Conferences reserve the right to refuse admissionWe would like to keep you informed of other American Business Conferences products and services This will be carried out in accordance with the Data Protection Act Please write to the Head of Marketing American Business Conferences at the address below if you specifically do not want to receive this informationAmerican Business Conferences City Center One 800 Town amp Country Blvd Suite 300 Houston Texas 77024American Business Conferences will not accept liability for any individual transport delays and in such circumstances the normal cancellation restrictions applyAmerican Business Conferences is a Division of London Business Conferences Limited Registered in England No 5090859 EIN no 98-0514924

wwwbim-integration-congress com (1) 800 721 3915 infoamerican-business-conferencescom

BIM MANAGER COORDINATOR - 30

DIRECTOR OF VIRTUAL DESIGN amp CONSTRUCTION - 25

BIM DIRECTOR LEAD - 20

PROJECT MANAGER SUPERINTENDENT - 15 OTHER - 10

DESIGNERS amp ARCHITECTS - 35

CONSTRUCTION COMPANIES - 30

OWNERS amp FACILITY MANAGERS - 20

SOLUTION PROVIDERS - 15

ATTENDEES BY JOB TITLE

ATTENDEES BY COMPANY TYPE

wwwbim-integration-congress com (1) 800 721 3915 infoamerican-business-conferencescom

VISITOR PROFILE

SPONSORSHIP OPPORTUNITIES

The BIM Integration Congress has been designed by owners designers and construction companies to focus on the strategic challenges associated with BIM implementation integration and multi-office collaboration To achieve these aims new generations of software cloud solutions and construction technologies will be demanded of leading and emerging vendors

We welcome the inclusion of leading solution providers looking to reveal their latest case studies Each sponsorship opportunity is designed bespoke to cater for the business objectives of both the vendor and end-user audience ranging from exhibition booths to exclusive networking opportunities and case study presentations

In particular we welcome proposals from those providing cloud-based solutions 3D design software modeling services laser scanning model-based layout content services and solutions for estimating facilities management and energy modeling

To enquire about opportunities to get involved get in touch

Ashley Barnes ashleybarnesamerican-business-conferencescom001 (313) 462 0552

CREATE NEW OPPORTUNITIES FOR YOUR BUSINESS

Address For Invoice Purposes

ZipPostal Code

Country

Payment must be received in full prior to the event

Option 1 CREDIT CARD Please charge my VISA AMERICAN EXPRESS MASTERCARD

Expiry date

Security Code CVV (required)

Signature of card holder

Amount $ USD

Card number

Name on card

I would like to register the delegate(s) below for the 2 day conferenceBIM Integration Congress 2015 | August 26-27 2015 | San Francisco | California

PYesDetails PLEASE USE CAPITALS - PHOTOCOPY FOR MULTIPLE DELEGATES

Delegate Rates GUESTS ARE RESPONSIBLE FOR THEIR OWN TRAVEL AND ACCOMMODATION ARRANGEMENTS

Payment PLEASE TICK APPROPRIATE BOXES AND COMPLETE DETAILS

How To Finalize Your Registration

Option 2 INVOICE An invoice containing payment instructions will be sent electronically upon receipt of the completed registration form

Delegate 1

Mr Dr Miss Ms Mrs Other

Name

Position

Organization

Email

Telephone

Delegate 2

Mr Dr Miss Ms Mrs Other

Name

Position

Organization

Email

Telephone

All prices quoted above are inclusive of GST

Now that your details are completed please send your registration form to

our Customer Service Team using one of the following options

Option 1 Email infoamerican-business-conferencescom

Option 2 Fax (1) 800 714 1359

Enquiries And More Information

Should you have any enquiries or if you would like to request more

information please contact our friendly Customer Service Team on

(1) 800 721 3915 or visit the conference website at

wwwbim-integration-congresscom

Super Early Booking Discount Early Booking Discount Standard Rate

Book And Pay By Friday June 26 2015 Book And Pay By Friday July 24 2015 From July 25 2015

2 Day Conference Pass $1499 USD SAVE $400 $1699 USD SAVE $200 $1899 USD

SAVE UP TO 20WITH GROUP DISCOUNTSCall for rates (1) 800 721 3915

Terms amp Conditions

The conference is being organized by American Business Conferences a division of London Business Conferences Ltd a limited liability company formed under English company law and registered in the UK no 5090859Cancellations received 30 days prior to the start of the event will be eligible for a refund less $150 administration fee after this point no refund will be given Cancellations must be made in writing if you are unable to attend you may nominate a colleague to attend in your place at no additional costReceipt of this registration form inclusive or exclusive of payment constitutes formal agreement to attend and acceptance of the terms and conditions statedAll outstanding fees must be paid within our standard payment period of 7 days Any outstanding invoices will remain valid should cancellation of attendance be received outside of the aforementioned cancellation periodIf you are claiming the early booking discount this may not be used in conjunction with other discounts advertised elsewhere All discount codes and offers must be claimed at

the time of registrationAmerican Business Conferences reserves the right to alter or cancel the speakers or programAmerican Business Conferences reserve the right to refuse admissionWe would like to keep you informed of other American Business Conferences products and services This will be carried out in accordance with the Data Protection Act Please write to the Head of Marketing American Business Conferences at the address below if you specifically do not want to receive this informationAmerican Business Conferences City Center One 800 Town amp Country Blvd Suite 300 Houston Texas 77024American Business Conferences will not accept liability for any individual transport delays and in such circumstances the normal cancellation restrictions applyAmerican Business Conferences is a Division of London Business Conferences Limited Registered in England No 5090859 EIN no 98-0514924

wwwbim-integration-congress com (1) 800 721 3915 infoamerican-business-conferencescom

Address For Invoice Purposes

ZipPostal Code

Country

Payment must be received in full prior to the event

Option 1 CREDIT CARD Please charge my VISA AMERICAN EXPRESS MASTERCARD

Expiry date

Security Code CVV (required)

Signature of card holder

Amount $ USD

Card number

Name on card

I would like to register the delegate(s) below for the 2 day conferenceBIM Integration Congress 2015 | August 26-27 2015 | San Francisco | California

PYesDetails PLEASE USE CAPITALS - PHOTOCOPY FOR MULTIPLE DELEGATES

Delegate Rates GUESTS ARE RESPONSIBLE FOR THEIR OWN TRAVEL AND ACCOMMODATION ARRANGEMENTS

Payment PLEASE TICK APPROPRIATE BOXES AND COMPLETE DETAILS

How To Finalize Your Registration

Option 2 INVOICE An invoice containing payment instructions will be sent electronically upon receipt of the completed registration form

Delegate 1

Mr Dr Miss Ms Mrs Other

Name

Position

Organization

Email

Telephone

Delegate 2

Mr Dr Miss Ms Mrs Other

Name

Position

Organization

Email

Telephone

All prices quoted above are inclusive of GST

Now that your details are completed please send your registration form to

our Customer Service Team using one of the following options

Option 1 Email infoamerican-business-conferencescom

Option 2 Fax (1) 800 714 1359

Enquiries And More Information

Should you have any enquiries or if you would like to request more

information please contact our friendly Customer Service Team on

(1) 800 721 3915 or visit the conference website at

wwwbim-integration-congresscom

Super Early Booking Discount Early Booking Discount Standard Rate

Book And Pay By Friday June 26 2015 Book And Pay By Friday July 24 2015 From July 25 2015

2 Day Conference Pass $1499 USD SAVE $400 $1699 USD SAVE $200 $1899 USD

SAVE UP TO 20WITH GROUP DISCOUNTSCall for rates (1) 800 721 3915

Terms amp Conditions

The conference is being organized by American Business Conferences a division of London Business Conferences Ltd a limited liability company formed under English company law and registered in the UK no 5090859Cancellations received 30 days prior to the start of the event will be eligible for a refund less $150 administration fee after this point no refund will be given Cancellations must be made in writing if you are unable to attend you may nominate a colleague to attend in your place at no additional costReceipt of this registration form inclusive or exclusive of payment constitutes formal agreement to attend and acceptance of the terms and conditions statedAll outstanding fees must be paid within our standard payment period of 7 days Any outstanding invoices will remain valid should cancellation of attendance be received outside of the aforementioned cancellation periodIf you are claiming the early booking discount this may not be used in conjunction with other discounts advertised elsewhere All discount codes and offers must be claimed at

the time of registrationAmerican Business Conferences reserves the right to alter or cancel the speakers or programAmerican Business Conferences reserve the right to refuse admissionWe would like to keep you informed of other American Business Conferences products and services This will be carried out in accordance with the Data Protection Act Please write to the Head of Marketing American Business Conferences at the address below if you specifically do not want to receive this informationAmerican Business Conferences City Center One 800 Town amp Country Blvd Suite 300 Houston Texas 77024American Business Conferences will not accept liability for any individual transport delays and in such circumstances the normal cancellation restrictions applyAmerican Business Conferences is a Division of London Business Conferences Limited Registered in England No 5090859 EIN no 98-0514924

wwwbim-integration-congress com (1) 800 721 3915 infoamerican-business-conferencescom