1999 learjet 45 s n 20 registration hours … certified with 8.33 spacing and fm immunity mnps...
TRANSCRIPT
1999 LEARJET 45 SERIAL NUMBER: 20 REGISTRATION: C‐GVVZ HOURS: 4734 CYCLES: 3097
Times as of August 2015
Sunwest Aviation is pleased to exclusively offer for immediate sale this commercially maintained corporate aircraft, which is based in Calgary, Alberta Canada. Please call or email for comprehensive sales package including maintenance status reports, and electronic photographs. ENGINES (ON MSP) LEFT RIGHT Hours Since New 4734 4734 Cycles Since New 3097 3097 Time Until CZI 1263 1263 Time Until MPI 682.0 682.0 INTERIOR: June 2012
Double club with eight place belted lavatory
Two pyramid cabinets
Seat storage drawers
Flip down baggage shelf and jump seat
Entertainment includes two plug and play DVD monitors EXTERIOR: June 2012 Matterhorn white with red and white striping. AVIONICS: (HONEYWELL PRIMUS II):
Honeywell Primus 1000 Avionics System with EICAS
Dual Micro Data Computers
4‐tube EFIS Display Including MFD
Cockpit Voice Recorder
Dual Integrated VHF Comms
Dual Honeywell AHZ‐800 AHRS
Dual Integrated VHF Nav’s
Single 2” Standby Altitude Indicator
Single ADF
Single 2” Standby Airspeed Indicator
Dual DMEs
Single 2” Standby Altimeter
Dual Mode S Transponders
TCAS II w/Mode S w/Diversity Transponders
Dual Universal UNS 1CT FMS (802.4)
Primary Bendix/King KHF‐950
ARTEX ELT
Honeywell Signal Enhanced EGPWS w/Windsheer Alert and RAAS
RVSM Certified with 8.33 Spacing and FM Immunity
MNPS Certified
RNP 5 & 10 Certified
OTHER EQUIPMENT:
Gross Weight Increase 21,500 Lbs. Zero Fuel Weight increase 16,500 lbs. Allied Signal RE‐100 APU,
Thrust Reversers
Triple Rosemont Pitot Static System
Pulsating Recognition Light System
Inflatable Crew Oxygen Masks
Dual Angle of Attack Indicators
Ice Detection System
Lighted Chart Holders
Auxiliary Cockpit Foot Warmers
Maintenance Interphone
Externally Serviced Electronic Flushing Toilet
Cockpit Sunvisors
Dual Digital Davtron Clocks
Tailcone Baggage Restraint Net
Third VHF Comm – Clearance Delivery Unit
Belted Lavatory Seat (16G Certified) Digital Variable Position Spoilers
Vanity Sink
40 Amp Ni‐cad Batteries
(4)‐110 Volt A/C Outlets in Cabin
Aircraft Locking Package
Wing Ice Detection Light
Floor Tracking
Dual 28V Flightbag Outlets MAINTENANCE & INSPECTIONS: Phase C1‐6 (Every 1,200 hrs / 48 mo) – Due at 5658 / Oct 2018 Phase D1‐6 (Every 2,400 hrs / 96 mo) – Due at 6858 / Oct 2022 SUNWEST AVIATION LTD. Contact: Ian Darnley ‐ [email protected] 217 Aero Court NE Calgary, Alberta T2E 7C6 Phone: (403) 275‐8121; Fax (403) 730‐4295; Toll Free (888) 291‐4566
Airc
raft
for
Sal
e