1926 Subpart R• Part I History of SENRAC
• Part II Highlights of proposed standard
• Part III If time permits overview of Directive
OSHA’sSSteel
EErectionNNegotiated
RRulemakingAAdvisory
CCommittee
What is SENRAC?The Steel Erection Negotiated Rulemaking Advisory Committee (SENRAC) consists of representatives of employers and employees that will be significantly affected by the proposed rule covering steel erection in construction.
The Committee began negotiations in June of 1994.
Purpose of SENRACPurpose of SENRAC
The committee's purpose is to;- resolve issues
- arrive at a consensus, and - develop a proposed rule
governing steel erection.
ParticipationParticipationAppointees to the Committee include representatives from labor, industry, public interests and government agencies.
Many interested parties have attended the public meetings and have participated in the workgroups established by SENRAC.
Members of the committeeMembers of the committee• Army Corps of Engineers• Ben Hur Construction Company• Regional Administrator• International Association of Bridge,
Structural & Ornamental Iron Workers;
• International Association of Bridge, Structural & Ornamental Iron workers;
• El Paso Crane & Rigging, Inc.;• International Brotherhood of
Boilermakers, Iron Ship Builders, Blacksmiths, Forgers & Helpers;
• Network, Inc.;• Building and Construction Trades
Department (AFL-CIO)• Black & Veatch;
• United Steelworkers of America;
• Gilbane Building Company;
• Williams Enterprises of Georgia, Inc.;
• Holton & Associates, Ltd.;
• CAL/OSHA;
• International Association of Bridge, Structural & Ornamental Iron Workers;
• International Union of Operating Engineers;
• National Institute for Occupational Safety and Health (NIOSH)
• C. Rockwell Turner-L.P.R. Construction Co.;
• National Erectors Association.
Highlights of OSHA’s New Highlights of OSHA’s New ProposedProposed Steel Erection Standard Steel Erection Standard
1926 Subpart R - 1926 Subpart R - Steel ErectionSteel Erection
1926.750 1926.750 Scope and ApplicationScope and Application
• (a) Scope– Hazards associated with steel erection
activities:• Single & multi-story buildings• Bridges• Other structures where steel erection occurs
1926.750 Scope and Application
• (b) Application– Hoisting
– Connecting
– Welding
– Connecting
– Bolting
– Rigging structural steel
– Steel joists and metal buildings
– Installing metal deck, siding systems
– Miscellaneous metals
– Ornamental iron
– Similar metals
– Moving point to point
1926.750 Scope and Application
1926.751 1926.751 DefinitionsDefinitions
Controlling EmployerControlling Employer
1926.752 Site layout, 1926.752 Site layout, site-specific erection plan site-specific erection plan and construction sequenceand construction sequence
• (a) Approval to begin steel erection• Controlling employer• Concrete curing
• (b) Site layout• Access roads• Work area properly maintained
• (c) Overhead protection• Preplanned hoisting operation
• (d) Site-specific erection plan• Employer elects to develop alternate means of protection
1926.752 Site layout, site-specific erection plan
and construction sequence.
1926.753 Hoisting 1926.753 Hoisting and Riggingand Rigging
1926.753 Hoisting and rigging.
• (a) General• Pre-shift visual inspection of cranes
• (b) Working under loads.
• Preplanned routes for suspended loads– Exceptions
• EE’s making initial connection
• Rigged to prevent material displacement
• (c) Multiple lift rigging procedure.
Pre Shift VisualPre Shift VisualInspectionsInspections
Working under the loadWorking under the load
Pre planned routes for suspended loads
Promotes crane safety by including elements of current ANSI
B30.5 - 1994.
Exception to working under loads: riggers making initial attachmentssecuring load
Two connectors were erecting lightweight steel "I" beams on the third floor of a 12-story building, 54 feet above the ground. One employee removed a choker sling from a beam and then attempted to place the sling onto a lower empty hook on a series of stringers. While the crawler tower crane was booming away from the steel, the wind moved the load line and stringer into the beam the employee was standing on. The beam moved while the employee was trying to disengage the hook, and fell to his death.
Multiple lift
"Multiple lift rigging."
Rigging
1926.754 Structuralsteel assembly
1926.754 Structural steel assembly.
• (a) Structural stability shall be maintained at all times during the erection process– (1) The permanent floors shall be installed as the erection of structural
members progresses, and there shall be not more than eight stories between the erection floor and the upper-most permanent floor, except where the structural integrity is maintained as a result of the design.
– (2) At no time shall there be more than four floors or 48 feet (14.6 m), whichever is less, of unfinished bolting or welding above the foundation or uppermost permanently secured floor, except where the structural integrity is maintained as a result of the design.
– (3) A fully planked or decked floor or nets shall be maintained within 2 stories or 30 feet (9.1 m), whichever is less, directly under any erection work being performed.
• (c)
Walking/working surfaces.– Tripping hazards– Skeletal
structural steel• Coated steel
1926.754 Structural steel assembly.
(d) Plumbing-up• Connections used properly secured• Removed only with approval of competent person
1926.754 Structural steel assembly(continued)
• (e) Decking.• Hoisting, landing &
placing of deck bundles
– Strapping
– Roof and floor openings.
– Space around columns.
– Floor decking.
– Derrick floors.
Hoisting, landing & placing of deck bundles
1926.755 1926.755 Anchor boltsAnchor bolts
1926.755 Anchor bolts.
• (a) General requirements for erection stability.
• (b) Repair, replacement or field modification.
1926.756 1926.756 Beams and columnsBeams and columns
1926.756 Beams and columns.
• (a) General• Load shall not be released until final members
secured by at least two bolts per connection, drawn wrench tight per project structural engineer of record
• (b) Diagonal bracing• Secured by at least one bolt per connection
• (c) Double connections at columns and/or at beam webs over a column
• Common connection holes
1926.756 Beams and columns. (continued)
1926.756 Beams and columns. (continued)
(e) Perimeter columns.(f) Perimeter safety cables.
1926.757 1926.757 Open web steel joistsOpen web steel joists
An employee was assigned to connect the X-braces at the end of 40-foot long bar joists. Only one end of the bar joist he was working on had been welded. The employee was sitting on the unwelded end of the bar joist trying to connect the X-braces. He lost his balance, dislodging the bar joist from its end support, and fell approximately 24 feet to his death.
Steel Erection Operation
Five iron workers were distributing 90-foot-long open web bar joists on a building under construction. The bar joists were supported by vertical columns spaced 30 feet apart. The steel columns were not framed in at least two directions and the bar joists were not field bolted to the vertical columns to prevent collapse. The bar joists shifted, causing the vertical columns to lean. This caused entire section of columns and pen web bar joists to collapse. Two employees rode the iron down. One was fatally injured and one received serious injuries.
Steel Erection Operation
1926.757 Open web steel joists
• (a) General.
• (b) Attachment of steel joists and steel joist girders.
• (c) Erection of steel joists.
• (d) Erection bridging.
Open web steel joists
Open web steel joists
1926.7581926.758Pre-engineered Pre-engineered metal buildingsmetal buildings
• Erection shall not begin until site has been completed
• Anchored by minimum of 4 anchor bolts
• Rigid framed - 50 percent bolts installed
1926.758Pre-engineered metal buildings
1926.759 1926.759 Falling object protection.Falling object protection.
1926.759 Falling object protection
• (a) Securing loose items aloft.
• (b) Overhead protection.
Falling objects
1926.760 1926.760 Fall protectionFall protection
No can do??
1926.760 Fall protection
• (a) General requirements.
• (b) Connectors.
• (c) Controlled decking zone (CDZ).
• (d) Covering roof and floor openings.
• (e) Custody of fall protection.
Fall protection
Connectors
Fall protection
Fall protection
Controlled Decking Zone (CDZ)
None
1926.761 1926.761 TrainingTraining
1926.761 Training
• (a) Training personnel.
• (b) Fall hazard training.
• (c) Special training programs.