Page 1: 17, Euphrates Street, Maitama, Abuja – Nigeria info@nigeriamems.com  Key Project Achievements in FY 2013 Work Plan Deliverables and

17, Euphrates Street, Maitama, Abuja – [email protected]

Key Project Achievements in FY 2013

Work Plan Deliverables and Innovations in FY 2014 1

Page 2: 17, Euphrates Street, Maitama, Abuja – Nigeria info@nigeriamems.com  Key Project Achievements in FY 2013 Work Plan Deliverables and

MEMS II Core Services

• IR 1: Performance Monitoring Support

– PMP Reviews, DQAs,

– Performance Reporting System(PRS) and District Health Information System (DHIS)

– Indicators Inventory, Collection and Dissemination

• IR 2: Evaluation Planning and Implementation

– Development and review of SOWs

– Conduct of Evaluations and Assessments

• IR 3: Information Dissemination and Capacity Building

– Training

– Brown Bags

– M&E Resources on MEMS II web portal

– Dissemination of Evaluation Findings

The Mitchel Group (TMG), Inc. Jenkins Cooper, Vice President Lans Kumalah, Director of Operations Abi Fasosin, Financial Controller

MEMS II Field Office

• Dr. Evan Scott Thomas, Acting Chief of Party

• Zakari Zakariya, Deputy Chief of Party and Senior M&E Specialist (PDG)

• Omotayo Olugbemi, Senior M&E Specialist (HPN and HIV/AIDS & TB)

• Nura Nasir Isa, Senior M&E Specialist (Education)

• Maiwada Zubairu Senior M&E Specialist (EGE)

• Dr. Richard Ugbena PEPFAR Advisor (HIV/AIDS &TB)

• Bayo Onimode, Database Specialist

• Joy Nwoji M&E Associate

Local Partners

• MiraMonitor, Dr. Muyiwa Oladosun, PhD

• MSA, Ibidun Adeniyi

2

Page 3: 17, Euphrates Street, Maitama, Abuja – Nigeria info@nigeriamems.com  Key Project Achievements in FY 2013 Work Plan Deliverables and

Key Project Achievements Key Project Achievements in FY 2013in FY 2013

3

Page 4: 17, Euphrates Street, Maitama, Abuja – Nigeria info@nigeriamems.com  Key Project Achievements in FY 2013 Work Plan Deliverables and

S/S/No.No. Key IndicatorsKey Indicators

Annual Annual TargetTarget

AchievAchieveded

1 # of IP Monitoring Plans Reviewed 15 20

2# of Indicators for which DQAs Conducted 40 49

3# of Evaluations / Assessments Conducted 4 4

4 # Of People Trained in M & E 105 125

5 # of GON Officials Trained in M & E 40 27

6# of M & E Fora (Brownbags) Convened 4 6

7# of Evaluation Reports Disseminated 5 5

4

Page 5: 17, Euphrates Street, Maitama, Abuja – Nigeria info@nigeriamems.com  Key Project Achievements in FY 2013 Work Plan Deliverables and

IR 1: Performance Monitoring Support

5

Performance Management Plans (PMPs) Reviewed:

Team IPs Total

P/DG CEPPS, TOLERANCE, STRIDE 3

EGE EASE, NEXTT and ICEED, MARKETS II 4

HIV/AIDS & TB

REACH, CUBS, TNTP, SHiPs (MARPS), LIFT, SPRING, ASSIST

7

HPN MAPS, SHOPS, AIRS, DELIVER Malaria, DELIVER FP and ESMPIN

6

TOTAL 20•By aligning IP PMPs with the Mission’s Intermediate Results, we helped them think through their development hypothesis and the critical assumptions they have made

• By aligning the PMPs with standardized templates (PMP Summary table, Performace Data Table (PDT), Performance Indicator Reference Sheets (PIRS), we helped improve their reporting

Page 6: 17, Euphrates Street, Maitama, Abuja – Nigeria info@nigeriamems.com  Key Project Achievements in FY 2013 Work Plan Deliverables and

IR 1: Performance Monitoring Support (cont.)

6

• Some IPs actually were underreporting their results due to lack of clarity on definitions and expectations of USAID • We helped them clarify indicator definitions and data collection methods• With technical team oversight, we also helped them standardize tooIs and definitions among Implementing Partners

Team IP # Indicators for which DQA conducted

P/DG Tolerance, LEAD, NDI & IRI 19

EGE Markets II & EASE 11

HIV/AIDS & TB

SIDHAS & MSH-ProACT 9

HPN Fistula Care, ESMPIN, AIRS, SHOPS

7

Education SSN & NEI 3

TOTAL 49

Data Quality Assessments (DQAs) conducted:

Page 7: 17, Euphrates Street, Maitama, Abuja – Nigeria info@nigeriamems.com  Key Project Achievements in FY 2013 Work Plan Deliverables and

IR 2: Evaluation Planning and Implementation

7

SOWs Reviewed and Evaluations and Assessments Conducted:

Title Key FIndings Key Recommendations

Mid-Term Evaluation – TSHIP Project

•Achieved many success on which to build•Quality of care & coverage have not been significantly improved

• To be a change model & demonstrate action•Focus on governance & partnership with GON & IPs in states where they work

Focus States Strategy Assessment

•Implementation is better in cluster areas where there is field collaboration•Security is affecting project implementation

•Develop communications strategy to address cross cutting issues (e.g., gender & conflict)•Clearly define FSS goals and roles of partners in the achievement of objectives

Mid-term Performance Evaluation - NEI project

•Project activities benefiting OVCs have produced relevant and effective results•NFLCs offer a promising alternative to formal schools

• School Report Cards, based on readily available data, should be promulgated as originally planned•NEI needs to develop an institutional sustainability plan

Mid-term Performance Evaluation -LEAD Project

Still in Process

Page 8: 17, Euphrates Street, Maitama, Abuja – Nigeria info@nigeriamems.com  Key Project Achievements in FY 2013 Work Plan Deliverables and

IR 3: Information Dissemination and Capacity Building

Training Activities Conducted:

Team Target setting

PRS training

DHIS training

Basic M&E

training

MFR TOT

Overall Total

IPs 30 11 6 - - 47

Mission

- 35 31 - 5 71

MEMSII - - - - 7 7

G0N - - - 27 - 27

TOTAL 30 46 37 27 12 152

8

•Initiated innovative program to develop M&E Champions in GON•Developed TOT suite of performance management and evaluation courses•Enabled IP staff to upload their data correctly on DHIS and PRS•Enabled USAID staff to verify and certify the data in those databases

Page 9: 17, Euphrates Street, Maitama, Abuja – Nigeria info@nigeriamems.com  Key Project Achievements in FY 2013 Work Plan Deliverables and

IR 3: Information Dissemination and Capacity Building (cont.)

Conducted 6 “Brown Bag” sessions:

9

Title of Brown Bag Presented by representativ

e of

Date No of participants

Utilization & Benefits of New RDQA

MEASURE Evaluation

7th Dec. 2012

18

M&E Framework and Challenges MARKETS II April 30th, 2013

23

Blueprint for Evolving a Single National Routine Health Information System (HIS)

SIDHAS May 15th, 2013

20

Role of Voluntary Organizations for Professional Evaluation (VOPEs)

UNICEF 28th Aug. 2013

17

Measurement plan for Vulnerable Children Program

ASSIST 18th Sept. 2013

11

“Do No Harm” (DNH) Tool USAID P/DG Team

26th Sept. 2013

13

Page 10: 17, Euphrates Street, Maitama, Abuja – Nigeria info@nigeriamems.com  Key Project Achievements in FY 2013 Work Plan Deliverables and

Work Plan Deliverables and Innovations for 2014

10

Page 11: 17, Euphrates Street, Maitama, Abuja – Nigeria info@nigeriamems.com  Key Project Achievements in FY 2013 Work Plan Deliverables and

IR 1:IR 1: Performance Monitoring SupportPerformance Monitoring Support

Deliverable:

Review 20 PMPs for existing projects and 5 for new projects

Innovations:

Integrate IP PMP reviews with IP Work plan reviews

Follow up mid year with IPs on Work Plan implementation

Encourage Adaptive Management (e.g., CLA)

11

Page 12: 17, Euphrates Street, Maitama, Abuja – Nigeria info@nigeriamems.com  Key Project Achievements in FY 2013 Work Plan Deliverables and

Deliverable:

Support the conduct of DQAs for 40 IP indicators

Innovations:

Encourage Technical Teams to take the leadUse standardized templates and forms to help draft DQA reportsFill in when there are security concerns

12

IR 1:IR 1: Performance Monitoring SupportPerformance Monitoring Support (cont.) (cont.)

Page 13: 17, Euphrates Street, Maitama, Abuja – Nigeria info@nigeriamems.com  Key Project Achievements in FY 2013 Work Plan Deliverables and

IR 1: Performance Monitoring Support (cont.)

13

Deliverable FY 2014 Planning

Develop an inventory of indicators, composite indicators and indices used by Development partners in Nigeria

Produce a report with inventory on composite and indices and make recommendations for collection and dissemination

Collect and make available on request updated data on these indicators

Collect and make available to development partners selected data on request

Widely disseminate data on composite indicators and indices used by development partners in Nigeria

Provide data on MEMS II database with links to partners' databases where available.

Collect and make available on request, PEPFAR health systems strengthening and capacity building indicators that are supplemental to OGAC indicators

Deliver data subset based on readily available data and follow up with SI Group on any other indicators they propose to collect

Indicators Inventory, Collection and Dissemination:

Page 14: 17, Euphrates Street, Maitama, Abuja – Nigeria info@nigeriamems.com  Key Project Achievements in FY 2013 Work Plan Deliverables and

Deliverable:

Review SOWs for and conduct 4 evaluations and/or assessments

◦ dRPC Performance Evaluation

◦ 3 others

Innovations:

Engaging with Implementing Partners whose projects are being evaluated

Initial briefings Field work Feedback on findings and conclusions

14

IR 2: Evaluation Planning and Implementation

Page 15: 17, Euphrates Street, Maitama, Abuja – Nigeria info@nigeriamems.com  Key Project Achievements in FY 2013 Work Plan Deliverables and

IR 3: IR 3: Information Dissemination and Capacity BuildingInformation Dissemination and Capacity Building

Deliverables:

Training of Trainers – USAID & MEMS II (15 M&E trainers)

Step-down of training to IPs and USAID (60 trainees) Continued DHIS and PRS database training and support

Innovations:

Suite of TOT courses to progressively build capacity (MFR, PMP, DQA, PMP, DARU and EPM)

Developing M&E champions within USAID and IPs

15

Page 16: 17, Euphrates Street, Maitama, Abuja – Nigeria info@nigeriamems.com  Key Project Achievements in FY 2013 Work Plan Deliverables and

IR 3: IR 3: Information Dissemination and Capacity BuildingInformation Dissemination and Capacity Building (cont.)(cont.)

Deliverables:

Training of Trainers – NPC (15 M&E experts)

Innovations:

Key courses (MFR, PMP ) Hands-on DQA training with at least one MDA Develop M&E champions within GON

16

Page 17: 17, Euphrates Street, Maitama, Abuja – Nigeria info@nigeriamems.com  Key Project Achievements in FY 2013 Work Plan Deliverables and

IR 3: IR 3: Information Dissemination and Capacity BuildingInformation Dissemination and Capacity Building (cont.)(cont.)

Deliverables:

Conduct 4 brown bag sessions on topics of interest to M&E practitioners

Implement on-line sharing of evaluation reports as recommended by DO Teams

Upload all evaluation and assessment reports on DEC

17

Page 18: 17, Euphrates Street, Maitama, Abuja – Nigeria info@nigeriamems.com  Key Project Achievements in FY 2013 Work Plan Deliverables and

Thank You!

Questions/Comments

18