1.7 alraddadi how to build
TRANSCRIPT
-
8/3/2019 1.7 Alraddadi How to Build
1/12
EE--LEARNINGLEARNING
How to build A successful EHow to build A successful E--learninglearningCoursewareCourseware
eLSEeLSE 0909
Dr. Abdulaziz Alraddadi Dean of Technical College At Yanbu
-
8/3/2019 1.7 Alraddadi How to Build
2/12
INTRODUCTIONINTRODUCTION
E-Course became very important to interactive
the learners today. And the learners can learn
the electronics course in many different easy
ways. We will propose in this paper JavaProgramming using FOR LOOP Technique
-
8/3/2019 1.7 Alraddadi How to Build
3/12
PROJECT SCOPEPROJECT SCOPE
After completing this Module, the Learners
should be able to write a FOR LOOPusing the
Java Programmingenvironment. In addition,
the learners expected to earn programming
skills via using the e-learning technology.
-
8/3/2019 1.7 Alraddadi How to Build
4/12
PROJECT PLANPROJECT PLAN
Regarding to this paper, I have proposed theproject in the following phases:
Phase1: I am going to use the internal methodin this project due to the following reasons:
Achievement, Skills, and Quality Control. Phase 2: Organize the elements required to
complete this project in two days timeline asshown in next slide.
-
8/3/2019 1.7 Alraddadi How to Build
5/12
Days Tuesday
26-7-2006
Wednesday
27-7-2006
Thursday
28-7-2006
Friday
28-7-2006
Schedule Preparing Meeting2prototype construction of
storyboarding(2 hours)
Meeting 3ID and SME
conductreview andoff-linetesting.
(45 minutes)
Final Presentation
Meeting 1 :ID & SME meet to study
content andnavigation ofcourseware.
Analysis & Sign-off(30 minutes)
SME reviews storyboardsand graphic
constructions.(15 minutes)
Amendments for allelements.
(2hours)
GD & MMP begin basicconstruction andCoordinate with SMEfor clarifications.
(3 hours)
ID makes final Modificationand prepares forvisualization.
(1 hour)
Final review &testing.
(45 minutes)
ID begins storyboarding.(2 hours) SME reviews and sign-off allstoryboards.(50 minutes)
Meeting 4Modifications for all
elements.(2 hours)
Team members beginconstruction ofcoursewaresnavigation.
(3 hours)
Final replicatingandpackaging toLMS.
(10 minutes)
-
8/3/2019 1.7 Alraddadi How to Build
6/12
Phase 3: The complete budget for our e-courseand the cost elements provides as shown in the table below
Numbers of Learners
registered the e- course
(Java) per year
Total revenue per
year in SAR
(Course Cost
=100 SAR )
The total Budget
calculated in three
years
The 20 % of budget
for e-course (Java)
300 Learners 30000 SAR 90000 SAR 18000 SAR
-
8/3/2019 1.7 Alraddadi How to Build
7/12
-
8/3/2019 1.7 Alraddadi How to Build
8/12
HUMAN RESOURCE PLANHUMAN RESOURCE PLAN
We should create five members tom make assucsfulee-course such as: ID, SME, GD, and MMP. Theexpertises are as follows:
The ID is expert in some modules in instructional deigntechnique.
SME (Instructors)
The GD is expert in drawing using various kinds of soft ware
The MMP is expert in programming such as Flash MX, HTML,and Java Programming.
The role of the Instruction Designer is the mostimportant in work team. Therefore, I need Supportfrom CIDT (Centre Instructional Design andTechnology) as well as the other trainers. I haveconstantly used these experts to help support our e-course.
-
8/3/2019 1.7 Alraddadi How to Build
9/12
PROJECT TASK/MILESTONES AND TIMELINESPROJECT TASK/MILESTONES AND TIMELINES
The key elements in timeline are storyboard and construction.The key elements in timeline are storyboard and construction.
Major milestone will be completion of IMajor milestone will be completion of I--tutorial, Learning Object,tutorial, Learning Object,
graphics, and completion of text componentsgraphics, and completion of text components
-
8/3/2019 1.7 Alraddadi How to Build
10/12
BUDGET PLANBUDGET PLAN
The total budget for eThe total budget for e--course of our project estimation has been donecourse of our project estimation has been done
inin PhasePhase 33.. As shown in the following table by using MS ProjectAs shown in the following table by using MS Project
-
8/3/2019 1.7 Alraddadi How to Build
11/12
PROJECT MANAGEMENT METHODOLOGYPROJECT MANAGEMENT METHODOLOGY
The sequential nature of project completion is betterThe sequential nature of project completion is better
represented by a block diagram like the one shown Figurerepresented by a block diagram like the one shown Figure
Project Idea Initiations Control Closure
Customeracceptance
Project Closure report(s)
Lessons learned Report
Project Plan
Risk & issues
Progress Reports
Authorization
Project Definition report
Contract & Cost
Project Team
QualityPrototype Design
-
8/3/2019 1.7 Alraddadi How to Build
12/12
PAPERPAPER CLOSECLOSE--OUTOUT
a) Quality assurance and uses testing are
the major components of the project
close out. The last step would delivery and
testing by client.
b) documentation includes source for
learning objects design document, I tutor,
storyboard scripts, budget, and MSproject calculations