  • 8/3/2019 1.7 Alraddadi How to Build

    1/12

    EE--LEARNINGLEARNING

    How to build A successful EHow to build A successful E--learninglearningCoursewareCourseware

    eLSEeLSE 0909

    Dr. Abdulaziz Alraddadi Dean of Technical College At Yanbu

  • 8/3/2019 1.7 Alraddadi How to Build

    2/12

    INTRODUCTIONINTRODUCTION

    E-Course became very important to interactive

    the learners today. And the learners can learn

    the electronics course in many different easy

    ways. We will propose in this paper JavaProgramming using FOR LOOP Technique

  • 8/3/2019 1.7 Alraddadi How to Build

    3/12

    PROJECT SCOPEPROJECT SCOPE

    After completing this Module, the Learners

    should be able to write a FOR LOOPusing the

    Java Programmingenvironment. In addition,

    the learners expected to earn programming

    skills via using the e-learning technology.

  • 8/3/2019 1.7 Alraddadi How to Build

    4/12

    PROJECT PLANPROJECT PLAN

    Regarding to this paper, I have proposed theproject in the following phases:

    Phase1: I am going to use the internal methodin this project due to the following reasons:

    Achievement, Skills, and Quality Control. Phase 2: Organize the elements required to

    complete this project in two days timeline asshown in next slide.

  • 8/3/2019 1.7 Alraddadi How to Build

    5/12

    Days Tuesday

    26-7-2006

    Wednesday

    27-7-2006

    Thursday

    28-7-2006

    Friday

    28-7-2006

    Schedule Preparing Meeting2prototype construction of

    storyboarding(2 hours)

    Meeting 3ID and SME

    conductreview andoff-linetesting.

    (45 minutes)

    Final Presentation

    Meeting 1 :ID & SME meet to study

    content andnavigation ofcourseware.

    Analysis & Sign-off(30 minutes)

    SME reviews storyboardsand graphic

    constructions.(15 minutes)

    Amendments for allelements.

    (2hours)

    GD & MMP begin basicconstruction andCoordinate with SMEfor clarifications.

    (3 hours)

    ID makes final Modificationand prepares forvisualization.

    (1 hour)

    Final review &testing.

    (45 minutes)

    ID begins storyboarding.(2 hours) SME reviews and sign-off allstoryboards.(50 minutes)

    Meeting 4Modifications for all

    elements.(2 hours)

    Team members beginconstruction ofcoursewaresnavigation.

    (3 hours)

    Final replicatingandpackaging toLMS.

    (10 minutes)

  • 8/3/2019 1.7 Alraddadi How to Build

    6/12

    Phase 3: The complete budget for our e-courseand the cost elements provides as shown in the table below

    Numbers of Learners

    registered the e- course

    (Java) per year

    Total revenue per

    year in SAR

    (Course Cost

    =100 SAR )

    The total Budget

    calculated in three

    years

    The 20 % of budget

    for e-course (Java)

    300 Learners 30000 SAR 90000 SAR 18000 SAR

  • 8/3/2019 1.7 Alraddadi How to Build

    7/12

  • 8/3/2019 1.7 Alraddadi How to Build

    8/12

    HUMAN RESOURCE PLANHUMAN RESOURCE PLAN

    We should create five members tom make assucsfulee-course such as: ID, SME, GD, and MMP. Theexpertises are as follows:

    The ID is expert in some modules in instructional deigntechnique.

    SME (Instructors)

    The GD is expert in drawing using various kinds of soft ware

    The MMP is expert in programming such as Flash MX, HTML,and Java Programming.

    The role of the Instruction Designer is the mostimportant in work team. Therefore, I need Supportfrom CIDT (Centre Instructional Design andTechnology) as well as the other trainers. I haveconstantly used these experts to help support our e-course.

  • 8/3/2019 1.7 Alraddadi How to Build

    9/12

    PROJECT TASK/MILESTONES AND TIMELINESPROJECT TASK/MILESTONES AND TIMELINES

    The key elements in timeline are storyboard and construction.The key elements in timeline are storyboard and construction.

    Major milestone will be completion of IMajor milestone will be completion of I--tutorial, Learning Object,tutorial, Learning Object,

    graphics, and completion of text componentsgraphics, and completion of text components

  • 8/3/2019 1.7 Alraddadi How to Build

    10/12

    BUDGET PLANBUDGET PLAN

    The total budget for eThe total budget for e--course of our project estimation has been donecourse of our project estimation has been done

    inin PhasePhase 33.. As shown in the following table by using MS ProjectAs shown in the following table by using MS Project

  • 8/3/2019 1.7 Alraddadi How to Build

    11/12

    PROJECT MANAGEMENT METHODOLOGYPROJECT MANAGEMENT METHODOLOGY

    The sequential nature of project completion is betterThe sequential nature of project completion is better

    represented by a block diagram like the one shown Figurerepresented by a block diagram like the one shown Figure

    Project Idea Initiations Control Closure

    Customeracceptance

    Project Closure report(s)

    Lessons learned Report

    Project Plan

    Risk & issues

    Progress Reports

    Authorization

    Project Definition report

    Contract & Cost

    Project Team

    QualityPrototype Design

  • 8/3/2019 1.7 Alraddadi How to Build

    12/12

    PAPERPAPER CLOSECLOSE--OUTOUT

    a) Quality assurance and uses testing are

    the major components of the project

    close out. The last step would delivery and

    testing by client.

    b) documentation includes source for

    learning objects design document, I tutor,

    storyboard scripts, budget, and MSproject calculations