Les Residences |
Client Brief: To demolish the existing Hotel Les Carterets and replace it with a development of 13 high quality apartments with self contained basement parking, terraces and balconies with west and north views of the sea. The building is to respect its setting with careful use of high quality materials.
Les Residences has been carefully designed to complete the ribbon development of domestic properties along Cobo coast road and La Mare playing fields.
The architect and client have worked closely with the Planning Department to ensure that the replacement building has been designed to integrate with its surroundings and to offer a high quality building in this unique, picturesque location.
The design team took inspiration from the many Art Deco buildings of the 1930’s, constructed in coastal locations throughout Southern England and within the Islands. We decided that this approach could be used successfully with this new building, by adopting subtle Art Deco themes within its design. The resultant building provides a high quality development with a high level of attention to detail.
The integration of curved elements, as well as the layering of the different levels ensures that the building sits elegantly within the frontage that is Cobo Village. In addition to this, careful use of quality refined materials such as curved glazing, stucco render as well as granite and stone elements define the finer detailing of this building.
This attention to detail, both internally and externally, has been an extremely important part of the design process and we are proud to have been involved in such a unique and challenging project.
16/23(2016)
CLIENT:
Carterets Ltd.Garenne House Rue de la Cache St Sampson Guernsey
ARCHITECTS:
Tyrrell Dowinton AssociatesThe Barn Rue du Dos d’Ane Castel Guernsey
CONTRACTOR:
RG Falla Ltd.
2016
2016
Category:Residential New Build (over £250k)
Bef
ore
Project no. Drawing no.
Scale
Date Drawn
Copyright:This drawing is the copyright of Tyrrell Dowinton Associates Ltd and may not bereproduced without their permission in writing.Note:It is the contractors responsibility to check all dimensions and levels on site andreport all discrepancies immediately to the architect.The contractor should not scale off the drawings under any circumstance.
Drawing title
Client
Proposed Redevelopment of LesCarterets Hotel,Les Carterets, Cobo, Castel, Guernsey.
Project
Revisionsdrawnrev. description date
Checked
Carterets Developments Ltd.
The Barn, Rue du Dos d'Ane, Castel, Guernsey, Channel Islands GY5 7LAT 01481 259959 F 01481 259899 E [email protected] W www.tda.gg
113 m2
103 m2106 m2
108 m2
102 m2
100 m2
C
C
C
C
form new hoggin pathwayconnecting existing footpaths
form low level earth bankplanted in low lying shrubsand bushes.
low levelgranite wall
form low level earth bank plantedin low lying shrubs and bushes.
form low level earth bank plantedin low lying shrubs and bushes.
existing bank planted in tamariskand gorse to match existing
landscaped areas
beginning of ramp
Nuaire MRXBox95(654w x x431d x 619h)
Nua
ire M
RX
Box
95(6
54w
x x
431d
x 6
19h)
sub-stationelec
terrace
terrace
terrace
terrace
+ ex. 5.17+ pr. 3.40
+ ex. 5.64+ pr. 6.50
+ ex. 7.12+ pr. 7.90
+ ex. 7.13+ pr. 7.90
+ ex. 6.46+ pr. 7.90
+ ex. 5.67+ pr. 6.40
+ pr. 6.85
+ pr. 7.00
+ pr. 6.40
+ pr. 3.90
+ pr. 6.40
+ pr. 6.40+ ex. 6.61+ pr. 6.40
+ ex. 4.88+ pr. 6.70
+ ex. 5.29+ pr. 6.70
+ ex. 6.58+ pr. 6.85
+ ex. 6.59+ pr. 6.85
+ ex. 6.58+ pr. 6.70
Open Courtyard
+ ex. 5.24+ pr. 5.00
Terrace
+ ex. 7.00+ pr. 7.50
+ ex. 6.93+ pr. 7.00
Terrace
Terrace
+ ex. 6.58+ pr. 6.70
+ ex. 6.89+ pr. 6.70
+ ex. 7.07+ pr. 6.50
+ ex. 6.89+ pr. 6.80
+ ex. 6.78+ pr. 6.80
+ ex. 6.76+ pr. 6.50
+ towpr. 7.50
+ towpr. 7.50
+ towpr. 7.50
+ tocpr. 6.50
Pede
stria
n fo
otpa
th
+ towpr. 8.10
+ towpr. 8.10
+ towpr. 8.10
+ towpr. 7.80
+ towpr. 7.80
+ towpr. 7.80
+ ex. 4.77+ pr. 4.77
+ ex. 4.65+ pr. 4.65+ ex. 5.17
+ pr. 5.17+ ex. 6.00+ pr. 6.00+ ex. 6.29
+ pr. 6.29+ ex. 6.42+ pr. 6.60
+ ex. 6.54+ pr. 6.50
+ ex. 6.54+ pr. 6.50
+ ex. 6.16+ pr. 6.75
+ ex. 5.78+ pr. 6.35
+ ex. 5.34+ pr. 6.00
+ ex. 4.65+ pr. 5.50
Access Driveway
public footpath
+ pr. 6.70
+ pr. 6.70
+ pr. 6.70
RefuseStorage
Area
public footpath
publicfootpath
form new low levelgrass verge into
site to matchexisting
form break in existing granitewall and extend footpath with
a hogging finish as drawn
access driveway (shown shaded)laid in exposed aggregateconcrete as per photograph
access driveway (shown shaded)laid in exposed aggregateconcrete as per photographaccess driveway (shown shaded)
laid in exposed aggregateconcrete as per photograph
access driveway (shown shaded)laid in exposed aggregateconcrete as per photograph
layby
existingearth bankretained
existingtamariskretained
+ tocpr. 6.50
+ tocpr. 6.50
+ towpr. 7.00
+ ex. 6.09+ pr. 5.70
+ ex. 5.87+ pr. 5.60
+ ex. 5.58+ pr. 5.35 + ex. 4.93
+ pr. 5.10
+ ex. 4.68+ pr. 5.50
+ ex. 6.41+ pr. 6.41
+ pr. 6.10
+ pr. 5.60
+ pr. 5.10
+ pr. 6.25+ pr. 6.351:12 slope
level
level
1:12 slope
1:12 slope
terraceterrace
+ ex. 5.64+ pr. 6.40
FFL 6.62
FFL 7.00
FFL 7.00
FFL 7.00
+ ex. 5.29+ pr. 6.70
+ ex. 5.87+ pr. 6.85
+ ex. 6.35+ pr. 6.85
+ ex. 6.64+ pr. 6.85
+ ex. 6.47+ pr. 6.85
+ ex. 6.58+ pr. 6.85
Unit 8
Kitchen
Utility
DiningArea
LivingArea
Bedroom 1
DiningArea
LivingArea
Kitchen
Bedroom 1
FFL 6.62
+ pr. 6.70
Bedroom 1
Utility
Bathroom Bedroom 2
cup'd
Kitchen
DiningArea
LivingArea
Bedroom 2
StudyBedroom 1
En-Suite
Utility
WC
LivingArea
DiningArea
StudyArea
Bedroom 2Bedroom 1
dn
Bedroom 2
Unit 9
Unit 10
Unit 11Unit 7/14
Unit 12
FFL 6.62
robe
s
robes
robe
s
FFL 7.00
DiningArea
Living Area
up up
Corridor
En-SuiteSh. Room
En-SuiteSh. Room
Study
Utility
wc
Bedroom 2
Study
cup'd
Bathroom
En-SuiteSh. Room
Kitchen
robes
En-SuiteSh. Room
Bathroom
Utilitycup'd
Landing
En-SuiteSh. Room
Bedroom 1 Bedroom 2
En-SuiteSh. Room
LivingArea
cup'd
cup'd
Kitchen
Kitchen
En-SuiteSh. Room
robe
s
robe
s
cup'd
wc
robe
s
robes
robes
robes
En-SuiteBathroom
WC
cup'
d
robes
robes
robes
DiningArea
StudyArea
cup'
d
Otis Gen2Comfort
(12 person)
telecomselectrical
rwp
supp
lyex
tract
drain
ManifoldManifold
tele
com
s
rwpsupply extract
elec
trica
ldr
ain
supply extract
Man
ifold
Man
ifold
Man
ifold
supplyextract
Manifold
ACPlant
+ ex. 7.00+ pr. 7.00
FFL 7.00
FFL 7.00
Otis Gen2Comfort
(12 person)
Otis Gen2Comfort
(12 person)
4,125
14,4
24
4,800
3,19
7
2,022
1,99
23,
100
3,92
03,
100
2,00
07,
606
6,40
07,
600
400
400 2,015 3,100 3,160 3,100 850
255
14,3
96
5,45
03,
625
6,750 5,450 7,725 1,200
865
3,10
02,
360
3,10
01,
625
1,20
0
7,600 6,400 3,100 4,125 3,100 6,400 3,100 3,225 1,200
3,000 3,250
2,500
1,12
51,
250
375
3.
4.
Proposed Ground Floor Plan (Revised Scheme -August 2012)
Feb 2012
1:100 @ A1
PGD
1011 03.03A
GROUND FLOOR ACCOMMODATION:
Unit 7 - 100m2 (1,075ft2), two bedroom Unit 8 - 102m2 (1,098ft2), two bedroom Unit 9 - 111m2 (1,195ft2), two bedroom Unit 10 - 105m2 (1,130ft2), two bedroom Unit 11 - 105m2 (1,130ft2), two bedroom Unit 12 - 112m2 (1,205ft2), two bedroom
FIRST FLOOR ACCOMMODATION:
Unit 3 - 207m2 (2,230ft2), three bedroom Unit 4 - 201m2 (2,165ft2), three bedroom Unit 5 - 111m2 (1,195ft2), two bedroom Unit 6 - 112m2 (1,205ft2), two bedroom
SECOND FLOOR ACCOMMODATION:
Unit 1 - 324m2 (3,488ft2), three bedroom Unit 2 - 154m2 (1,658ft2), three bedroom
A Revised floor plans PGDAug '12
Project no. Drawing no.
Scale
Date Drawn
Copyright:This drawing is the copyright of Tyrrell Dowinton Associates Ltd and may not bereproduced without their permission in writing.Note:It is the contractors responsibility to check all dimensions and levels on site andreport all discrepancies immediately to the architect.The contractor should not scale off the drawings under any circumstance.
Drawing title
Client
Proposed Redevelopment of LesCarterets Hotel,Les Carterets, Cobo, Castel, Guernsey.
Project
Revisionsdrawnrev. description date
Checked
Carterets Developments Ltd.
The Barn, Rue du Dos d'Ane, Castel, Guernsey, Channel Islands GY5 7LAT 01481 259959 F 01481 259899 E [email protected] W www.tda.gg
Proposed Side (North) Elevation Scale 1:100 Proposed Front (West) and Side (North) Elevations
Feb 2012
1:100 @ A1
PGD
1011 03.07C
A Revised Elevations Jul '12 DL
Scale 1:100Proposed Front (West) Elevation
B Balcony glass reduced on North Elevation Aug '12 DL
C Balcony added on North Elevation Feb '13 PD
Project no. Drawing no.
Scale
Date Drawn
Copyright:This drawing is the copyright of Tyrrell Dowinton Associates Ltd and may not bereproduced without their permission in writing.Note:It is the contractors responsibility to check all dimensions and levels on site andreport all discrepancies immediately to the architect.The contractor should not scale off the drawings under any circumstance.
Drawing title
Client
Proposed Redevelopment of LesCarterets Hotel,Les Carterets, Cobo, Castel, Guernsey.
Project
Revisionsdrawnrev. description date
Checked
Carterets Developments Ltd.
The Barn, Rue du Dos d'Ane, Castel, Guernsey, Channel Islands GY5 7LAT 01481 259959 F 01481 259899 E [email protected] W www.tda.gg
Proposed Side (North) Elevation Scale 1:100 Proposed Front (West) and Side (North) Elevations
Feb 2012
1:100 @ A1
PGD
1011 03.07C
A Revised Elevations Jul '12 DL
Scale 1:100Proposed Front (West) Elevation
B Balcony glass reduced on North Elevation Aug '12 DL
C Balcony added on North Elevation Feb '13 PD