1611 msaad cv - controls
TRANSCRIPT
![Page 1: 1611 MSaad CV - Controls](https://reader030.vdocuments.site/reader030/viewer/2022020213/5871de6f1a28ab6a7b8b52cf/html5/thumbnails/1.jpg)
Mohammad Mustafa Saad B. Sc. Structural Civil Engineer, Jordan University of Science & Technology, 2001 Contacts: ABU DHABI, UAE +971 56 7634 173 E-mail: [email protected]
Mohammad Saad, BSc Civil Engineer, [email protected], Mob. +971 567 634 173, Abu Dhabi – UAE 1 / 5
Objective: Aspiring for challenging positions in consultancy or Construction field
Key Skills: Project Controls, EPC Planning, Earned Value Technique, Value Engineering, Technical coordination, scope Interfaces coordination
Personal Information
Nationality : Jordanian
Marital Status : Married / 3 Children
Current Address : Abu Dhabi, UAE +971 56 76 34 173
Home Address : AMMAN, JORDAN
Valid Residence : ‐ UAE – Current Residence ‐ Saudi Arabia (Valid Residency)
CORE COMPETENCY Comprehensive knowledge and experience in developing project planning package; baselines, progress monitoring
systems, programs development & elaborations, mitigation plans, with good understanding of cost management and risk analysis.
High competency level and experience in coordination among various disciplines; MEP, Civil, Architectural interfaces, and managing scopes successfully.
Competency level of project controls, Cost management, time management, materials procurement and good knowledge contract aspects.
Experience in mega projects with international firms such as ADCO, ADAC, AECOM Bechtel, ARAMCO, Technip, and NPCC.
SUMMARY Civil Engineer with 15+ years’ experience in Site execution, planning / Control & project coordination roles for Civil/Mech. projects
Expertise as Project Coordinator (Midfield terminal project, Abu Dhabi Airport) – Coordinate and lead construction prerequisites to facilitate construction activities, Facilitate/Monitor shop drawings, Method statements reviews, site wide logistics management, temporary works/arrangements to support construction, Work Packages progress highlights and assessment, schedule and visual detailed work plans for combined critical activities and interfaces, presenting the Contractor in client coordination meetings.
Point of contact for Interfaces and Logistics, ensuring the appropriate project strategies / benefits are in place & acted upon priorities
Expertise as Planning Manager: (Various projects) developing EPC baseline schedule, resource loading, updating / revising schedule, and progress monitoring, reporting, and close out documents.
Effective communicator & negotiator with strong analytical, problem solving & organizational abilities.
International expertise working in Gulf countries; Saudi Arabia and UA, and Spain for mega projects with high profile companies and clients like ADCO, ADAC, AECOM Bechtel, ARAMCO, Technip, and NPCC.
Living the culture and leading by example EXPERIENCE BRIEFS
Development Courses
- Project Management Professional‐ PMI (PMP) (Trained) - Risk Management Professional – PMI (RMP) (Trained) - EOT and Related Cost in Construction – onsite training
Sep 2012 till Present
Project Coordinator: Coordinating project activities prerequisites, Logistics, interfaces, critical activities
construction sequence and managing some subcontractors activities – Abu Dhabi Airport Midfield Terminal
Jul 2010 to Aug 2012
Planning Manager Development of level 3 Baseline program, detailed construction programs, and set
progress monitoring system with oriented reporting systems – Bab Thamama “G” & HABSHAN 2 DEVLOP.
1.8 MMBOPD Project – Abu Dhabi, Western Area.
Dec 2009 to Jun 2010
Construction Planning Leader: Leading the development of construction baseline planning for refinery Oil
& Gas Project) – Madrid, Spain
Dec 2005 to Dec 2009
Planning Leader (Department Head) for Khursaniyah Gas Plant project–Jubail, Saudi Arabia.
May 2003 to Dec 2005
Project Engineer ‐ Early works timely execution, and coordination – Al Jaber Residential Project, Dammam
Saudi Arabia
Mar 2002 to May 2003
Site Engineer for Arab Paper Manufacturing Project, Dammam, Saudi Arabia
Oct 2001 to Mar 2002
Site Engineer for SANABEL Commercial Center Project, Tabuk, Saudi Arabia
![Page 2: 1611 MSaad CV - Controls](https://reader030.vdocuments.site/reader030/viewer/2022020213/5871de6f1a28ab6a7b8b52cf/html5/thumbnails/2.jpg)
Mohammad Saad, BSc Civil Engineer, [email protected], Mob. +971 567 634 173, Abu Dhabi – UAE 2 / 5
EXPERIENCE DETAILS
Consolidated Contractors Company WLL, Athens, Greece Abu Dhabi International Airport, MIDFIELD TERMINAL BUILDING – ABU DHABI, UAE
MTB project designed to provide a full terminal building, passenger and cargo facilities, and duty‐free shops and restaurants for a total capacity of 40 million people a year. The terminal Area is designed to have around 680,000 sqm which include 49 gate houses.
Duration : September 2012 till Present Value : ($ 2.9 Billions) Responsibilities : Project Coordinator
The following can conclude the main roles I played in the project: 1. Effectively and accurately communicate critical project activities to the client and project management team / project
team. 2. Participate in various project control activities, elaborated construction sequence planning, and constructability
studies, and critical tasks tracking and monitoring. 3. Coordinate with clients and other contractors’ representatives regarding interfacing issues to meet project goals. 4. Create, maintain, and update project plans documentations and logs related to assigned packages 5. Manage some subcontractors works – package leader – communicate, review and facilitate startup, submission of
subcontractor construction documents; Method statements, ITP’s, Materials submittal, track the execution on site accordingly, and report critical concerns to various departments.
6. Technical support to site teams; RFI’s, RFEI’s, NCRs closure, construction of benchmarks & mock‐ups with coordination with the relevant project disciplines
7. Preparing / presenting construction sequence presentations and highlighting/resolving interfaces with other contractors and subcontractor’s scopes and sequence.
8. Reviewing and commenting internally the time schedules related to logistics & Interfaces 9. Review the contract documents & responsibility matrices for the main contract and Subcontracts involved in the
interface. 10. Developing an Internal Logistics Coordination between different disciplines subcontractors 11. Developing an External Logistics Coordination with client, Airside & Landside contractors. 12. Preparing & updating the logistics plan, layouts and procedures. 13. Mobilization and Temporary works Coordination. 14. Tower Cranes Erection, Dismantling and periodical utilization coordination.
Consolidated Contractors Company WLL, Athens, Greece
BAB THMAMA “G” & HABSHAN 2 DEVLOP. 1.8 MMBOPD Project – ABU DHABI, UAE
The project is to support the production of 80 MBOPD by development of existing utilities of HABSHAN & BAB area, the development is achieved by constructing 4 new Remote Degassing Stations, 8 Water Injection Clusters, 146 Wells (Production, Water Injection, Supply & Disposal), and Upgrading of existing Central Degassing Station. The construction includes 750 Km of pipe line works related to area development. The project is owned By ADCO, the JV partner is NPCC and CCC
Duration : July, 2010 to August 2012 Value : ($217 Millions) Responsibilities : Planning Manager
Responsible and accountable of planning activities as following 1. Development of Baseline Schedule with resource loading and obtaining the client approvals. 2. Development of Detailed and elaborated construction programs, ad‐hoc plans once required within the project. 3. Development of progress measurement / monitoring procedure. 4. Development of trends, recovery plans and analyzes the performance and productivity rates. 5. Participate in construction scenario’s “what‐if” plans and constructability studies in coordination with construction
managers, with the anticipate resources. 6. Develop and manage project and schedule risk register 7. Produce & submit schedule delay analysis reports to construction managers for review & actions. 8. Manage project schedule change 9. Preparing various informative reports such as bar charts, diagrams, S‐curves, KPI’s, executive summaries and client
presentations. 10. Earned Value Analysis and front orientating the construction teams 11. Monitoring the work flow of engineering and analyze the Engineering / procurement deliveries to support
construction requirements. 12. Attending the control/construction meetings and being the focal point with partner and client related to planning.
![Page 3: 1611 MSaad CV - Controls](https://reader030.vdocuments.site/reader030/viewer/2022020213/5871de6f1a28ab6a7b8b52cf/html5/thumbnails/3.jpg)
Mohammad Saad, BSc Civil Engineer, [email protected], Mob. +971 567 634 173, Abu Dhabi – UAE 3 / 5
13. Other common responsibilities of planning department i.e. daily, weekly, monthly reports and schedule reviews & updates.
TECNICAS REUNIDAS S.A, Madrid, Spain
JUBAIL REFINERY EPC PROJECT PACKAGE I – Madrid, SPAIN
The EPC project Objective is to construct the package I of Jubail Refinery project, The client was a consortium of Saudi Armco and TOTAL called SATORP the project was in engineering stage managed in Madrid head offices of TR. The construction field is Saudi Arabia eastern province at AL JUBAIL City. The process is two typical trains of Distillation & Hydro‐treating.
Duration : December, 2009 to July, 2010 Responsibilities : Planning Leader / Construction Phase
Working in Head office of Madrid with group of Engineers to develop the followings: 1. Studding the project contract, scope, specs to be considered in baseline and constructability reviews, heavy
equipment, and activities sequence and logic. 2. Develop Construction baseline schedule in conjunction with E&P schedules. 3. Develop / discuss construction scenarios schedule with resource loading. 4. Compile and consolidate all scenarios review comments from workshops / meetings and conduct an independent
review to determine the most reliable ones with construction manager. 5. Develop the priorities of engineering to create a construction driven schedule. 6. Analyze the interfaces between the other package’s contractors with Interface coordinator, study the construction
impact and timing. 7. Communicate the program with subcontractors and review their detailed programs 8. Resource leveling of the program and risk analysis. 9. Frequent site visits to site, and arranging site meeting to discuss the 3 months targets.
Consolidated Contractors Company WLL, Athens, Greece
Khursaniyah Gas Plant (KGPP), Khursaniyah – Jubail, KSA The fast track gas plant ARAMCO SA owned project was constructed of two trains for gas conditioning, Ethane, and Natural Gas Liquids (NGL) recovery with total capacity of 1000 MMSCFD. KGP were built to produce 190 MBD NGL, 550 MMSCFD Sales Gas and 1800 MTD of Molten Sulfur.
Duration : December, 2005 to December, 2009 Value : ($ 1,106 Millions) Responsibilities : Sr. Planning Engineer – Section Head
Working as Planning Engineer and then promoted to Department Section Head, supervising a group of planners under planning department. As Sr. Planning Engineer carrying the following responsibilities:
1. Review contract documentation to ensure a thorough understanding of the contract requirements. 2. Develops a fully detailed Project Schedule, “what‐if‐scenarios” and required targets 3. Provides project planning and monitoring reports, S‐curves, histograms, and resource requirements 4. Provides the schedule key performance indicators (KPI) for various disciplines. 5. Analyze and update project schedule and prepare delay analysis reports. 6. Provide detailed schedules once needed. 7. Communicate the program with project team, and update the progress 8. Set up recovery schedules and update the construction events log 9. Preparing and updating labor resource schedule showing the work force required for each direct trade 10. Attending meetings with project team, client to improve the weakness and concentrate on critical issues. 11. Train and guide new planers. Identify, in conjunction with manager, the need and areas where training is required.
Duration : December 2005 to November 2007 Responsibilities : Planning Engineer
Working as planning Engineer under planning Department Family performing the following, 12. Prepare the overall weekly & monthly detailed progress reports, the remaining works report for critical activities by
unit, system, and by disciplines. 13. Monitoring site activities daily wise by visiting frequently the site and supervise daily progress. 14. Working at site level to ensure the actual site sequence is complying with project plan and suggesting correction plan. 15. Prepare detailed schedule for site level use & communicating with area supervisors.
Al Swayeh Contracting Co, Khobar - Saudi Arabia
Al Jaber Residential Project, Dammam – KSA It’s a residential complex allocated in Dammam. The complex consists from five buildings. The Project is a turnkey type.
![Page 4: 1611 MSaad CV - Controls](https://reader030.vdocuments.site/reader030/viewer/2022020213/5871de6f1a28ab6a7b8b52cf/html5/thumbnails/4.jpg)
Mohammad Saad, BSc Civil Engineer, [email protected], Mob. +971 567 634 173, Abu Dhabi – UAE 4 / 5
Duration : May, 2003 – December, 2005 Responsibilities : Project Engineer
Working on site with the following responsibilities: 1. Supervise & perform site activities according to project schedule, quality and safety procedures. 2. Distribute the works loads among construction teams and monitoring daily targets. 3. Address construction issue, concerns to construction manager 4. Overseeing the shop drawings, specification and plan daily site activities. 5. Ordering materials, equipment and construction tools and optimize resources utilization 6. Assure execution is based on Method statements and facilitate QC inspection as per ITP 7. Coordinate with other team disciplines like MEP 8. Preparing daily site reports as per project procedures. 9. Review & approve subcontractor’s monthly billed quantities. 10. Facilitate As‐built surveys and red‐marked drawings. 11. Communicate changes with control teams and keep record of them 12. Supervise punch lists and participating in project close out “final Handover”
SWT – Saudi Wiemer & Trachte Co, Jeddah, Saudi Arabia Working in below Projects:
ARAB PAPER MANUFACTURING PROJECT, 2nd Indust City of Dammam – KSA
SANABEL Commercial Center, Tabuk, kingdom of Saudi Arabia.
Duration : October, 2001 – May, 2003 Responsibilities : Site Engineer
Working as civil site engineer to monitor the construction of civil activities as following:
1. Monitoring the construction activities by leading a group of foremen & charge hands 2. Insuring all site drawings are issued for construction (IFC). 3. Preparing quantity surveying for works assigned. 4. Following the Sub‐contractors scope and activities. 5. Preparing site reports in daily basis and reporting to project engineer. 6. Technical assistance for daily construction conflicts and preparing shop drawings. 7. Preparing short term schedules, Look Ahead, & inspection requests.
PROVISIONAL / EDUCATIONAL QUALIFICATION
1997 – 2001 B. SC. CIVIL ENGINEERING, STRUCTURAL ENGINEER. Jordan University of Science & Technology, Irbid – Jordan
1996 – 1997 GENERAL SECONDARY CERTIFICATE SCIENTIFIC STREAM, AMMAN – JORDAN
SKILLS
Professional in usage the windows application and Microsoft Programs such as Office, MS Word, MS Excel, MS PowerPoint etc. in addition to very good knowledge in Civil Engineering Programs packages such as STAAD III, PROKON, AutoCAD 2000 and PRIMAVERA 3.1 and 6.7
Commutation skilled, Team Work Spirit and Self‐motivated.
Saudi, UAE, and Jordanian Valid Driving License. LANGUAGE
Arabic, native speaker & excellent in both reading & writing.
English, good in speaking, reading, and writing.
REFERENCE
![Page 5: 1611 MSaad CV - Controls](https://reader030.vdocuments.site/reader030/viewer/2022020213/5871de6f1a28ab6a7b8b52cf/html5/thumbnails/5.jpg)
Mohammad Saad, BSc Civil Engineer, [email protected], Mob. +971 567 634 173, Abu Dhabi – UAE 5 / 5
Available upon request